Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutBPX - GC #3S : :',',g 0 ,.~,'<~.:8~"/vW/~%W%~/.19/.®.~/~/.~/.~/s~/.~/wr'~~I/.~W/.~/M/.B/.~"/~:~/~%e®/nC1.~Y/~/.~~~/~W/.Y/.~/.~/.e~/.~/.,®/a~/.~/.~/.~/~/.~/B'~B/.rI///s~s/I~/.IY//.N%NYA/.N/.Y/.M/~/~%R'/.IYJ/~'/.IP/~/.~/./6/~/~/A/.~/..~/B/.M%1P/.~/~~0/.®/6FY~.~rio~' a9 ~°, ~.. AGOCC GAS Disposition Files 1997 $PX -GC3 ALASKA OII. AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Dec-97 i Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 11,269 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 634 5. Pilot and Purge 16,570 6. Used for lease operations 609,131 7.Other 0 TOTAL items 1 - 7 637,604 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 27,393,964 Remarks: I hereby certify that the fo going is true and correct to the best of my knowledge. Signature: ~,~~- ~~~~~/~~ t~~l ~ ~ Title: SUPERVISOR Form 10-422 (Revised 4~5) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Official'Use Onl --Flarin' Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner llate All volumes must be pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. ~ PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT ,j DECEMBER, 1997 Unplanned Events less than or equal to 1 hour -DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/4/97 1455-1505 208 Not required for unplanned events which Not required for unplanned events whit 12/4/97 0932-1006 354 are less than or equal to 1 hour are less than or equal to 1 hour 12/4/97 1408-1434 271 12/4/97 1536-1620 458 12/8/97 1754-1828 5,320 12/9/97 0012-0043 125 12/9/97 2040-2048 150 12/11/97 0733-0751 175 12/17/97 1431-1458 3,094 12/17/97 2324-2345 175 12/18/97 1703-1732 806 12/27/97 0543-0635 133 TOTAL 11,269 Un tanned Events reater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/4/97 1912-2030 634 See Attachments See Attachments TOTAL 634 Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf • DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL Unplanned Events < 1 Hour 11,269 Unplanned Events > 1 Hour 634 Planned Events < 1 hour & not 0 exceeding 5,000 MCF Planned Events > 1 hour and 0 exceeding 5,000 MCF Pilot Purge 16.570 TOTAL FLARED VOLUME 28,473 Page 1 REPORT NO: 97-4113 i B PX FLAR E REPORT PRUDHOE BAY FACILITY: GC-3 DATE: O4 DeC 97 TOTAL VOLUME: 1,925 MSCF Intermittent Black TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 14:55 To: 15:05 0 Hrs. 10 Mins. ^ ® ^ ^ 208 MSCF 2. FROM: 09:32 TO: 10:06 0 Hrs. 34 Mins. ^ ® ^ ^ 354 MSCF 3. FROM: 14:0$ TO: 14:34 O Hrs. 26 Mins. ^ ® ^ ^ 271 MSCF 4. FROM: 15:36 To: 16:20 0 Hrs. 44 Mins. ^ ® ^ ^ 458 MSCF 5. FROM: 19:12 TO: 20:30 1 Hrs. 18 Mins. ^ ® ^ ^ 634 MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: First Defermination of Cause: 1. Sk-18 IP/LPcompressor shut down because of a problem associated with compressors not pumping. 2. Skid 18 IP/LP compressor problems using assist gas to prevent black smoke. 3. Skid 18 IP/LP compressor problems using assist gas to prevent black smoke. 4. Skid 18 IP/LP compressor problems using assist gas to prevent black smoke. 5. Skid 18 IP/LP compressor problems using assist gas to prevent black smoke. Action Taken to Stop Flaring: 1. Equipment was restarted. 2. Assist gas shut off. 3. Assist gas shut off. 4. Assist gas shut off. 5. Compressors loaded and assist gas shut off. aev sizva~ OTHER: • • .,, ALASKA OII, AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION • • Facility Operator Field(s) Month/Year of Disposition GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Nov-97 Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 9,377 4. Flared or vented greater than 1 hour 14,154 (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 15,004 .~ c 7 6. Used for lease operations Q° r'-~ C7 ~ 405,207 D S= n u, .~ I~ 7.Other ~ ~ ~ `~ --- 0 c ~' ^" TOTAL items 1 - 7 = ~ 443,742 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 21,360,509 Remarks: th at the foreg ' g is true and correct to the be st of my knowledge. I hereby certify ~ J / Signature: ~.~~ /L~ f 'Z'/~ /92Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Official Use On --Flarin Authotizafion > i>hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner llate must pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. • u BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- GC-3 ~. GAS FLARING INCIDENT REPORT NOVEMBER, 1997 Un tanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/1/97 1437-1458 131 Not required for unplanned events which Not required for unplanned events whit 11/6/97 1034-1047 90 are less than or equal to 1 hour are less than or equal to 1 hour 11/8/97 1145-1200 521 11/10/97 1428-1505 385 11/10/97 2103-2138 972 11 /11 /97 1016-1038 153 11/12/97 0845-0855 69 11 /12/97 1001-1017 178 11/17/97 2146-2203 6,611 11/24/97 1002-1045 267 TOTAL 9,377 Unplanned Events greater than 1 hour ~ DATE TIME ., VOLUME DESCRIPTION OF, INCIDENT & CAUSE - ACTION TAKEN TO ELIMINATE CAUSE 11/15/97 1833-2359 1,132 See Attachments See Attachments 11/17/97 0433-0724 2,375 See Attachments See Attachments 11/22/97 0916-1055 438 See Attachments See Attachments 11/26/97 1343-1444 10,209 See Attachments See Attachments TOTAL 14,154 Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf DATE ' TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATECAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~ DATE TIME' VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATECAUSE TOTAL 0 TOTAL Unplanned Events < 1 Hour 9,377 Unplanned Events > 1 Hour 14,154 Planned Events < 1 hour & not 0 exceeding 5,000 MCF Planned Events > 1 hour and 0 exceeding 5,000 MCF Pilot Purge 15,004 TOTAL FLARED VOLUME 38,535 Page 1 • • REPORT NO: 9]-4091 i B PX FLARE REPORT ' PRUDHOE BAY ' FACILITY: GC-$ DATE: 15 Nov 97 TOTAL VOLUME: 1 ,132 MSCF Intermittent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 18:33 TO: 23:59 5 Hrs. 26 Mins. ^ ® ^ ^ 1,132 MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. GC-3 was s/d for maintenance and venting occured for safety reasons. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. None as venting was necessary for the safety of personnel 2. 3. 4. 5. I Rev 6/22/97 • ~ REPORT NO: BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 17 NOV 97 TOTAL VOLUME: Intermi ttent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? 1. FROM: 04:33 TO: 07:24 2 Hrs. 51 Mins. ^ ® ^ ^ 2. FROM: 21:46 TO: 22:03 0 Hrs. 17 Mins. ^ ® ^ ^ 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE D ISK: CONTROLLED SLOWDOWN: First Determination of Cause: 1. Following Gathering Center s/d for repairs, gas was needed prior to compressor startup. 2. Partial Gathering Center s/d because of V-337 high level. 3. 4. 5. Action Taken to Stop Flaring: 1. Equipment was restarted at 07:24 hours. 2. None as the s/d was reset and flaring ceased. 3. 4. 5. 97-4094 $986 MSCF VOLUME 2,375 MscF 6,611 MSCF MSCF MSCF MSCF OTHER: Rev 6/22/97 • • REPORT NO: 97-4098 f B PX FLARE REPORT ' PRUDHOE BAY FACILITY: GC-$ DATE: 2Z N OV 97 TOTAL VOLUME: 438 MSCF Intermittent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 09:16 TO: 10:55 1 Hrs. 39 Mins. ® ^ ^ ^ 43$ MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. While bringing production rates up following sulzer s/d, LPS compressors exceeded maximum gas capacity and discharged to flare. ~ ~v,~pS ~- ~uMP $-p~~„K. (n~7o ~n~E,~OR,,.s 3. 4. S u -e..C~t N C-~ ,g~,l >J~ ! N (~ ,~} r~C,l~ li`t' _ 5. Action Taken to Stop Flaring: 1. BPX stopped bringing production rates up until wells unloaded and flaring was ceased. 2. 3. 4. 5. Rev 6/22/97 • • REPORT NO: 97-4104 r BPX FLARE REPORT ' PRUDHOE BAY FACILITY: GC-3 DATE: 26 N ov 97 TOTAL VOLUME: 10209 MSCF Intermittent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 13:43 To: 14:44 1 Hrs. 1 Mins. ^ ® ^ ^ 10,209 MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN: _ OTHER:_ First Determination of Cause: 1. LPS compressor K-7000 shut down because of accidental trip of fuel gas valve. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. Equipment was restarted at 14:44 hrs. LP gas was cut back to allow restart of compressor. 2. 3. 4. 5. Rev 6/22/97 ~, _ 1 GATHERING CENTER 3 Disposiflon 1. Sold t 2. Reinjected • 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour (Supplemental report requved-See 20 AAC 5. Pilot and Purge 6. Used for lease operations 7.Other ALASKA OII. AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition ORATION ALASKA WESTERN OPERATING AREA-PBU Oct-97 ~ ~ n --' t'T7 ~ 'h '~- to ~.n C ~' "~ G GCS ~._ ~~ TOTAL items 1 - 7 8. NGL gas equivalent produced • 9. Purchased gas 10. Transferred from: 11. Transferred to: CCP Remarks: I hereby certify that the tegoing is true and correct to the best of my knowledge. Signature: t~ ' 1/~~2/~~-- Title: 0 0 20,970 20,284 16,207 533,028 0 590,489 0 0 0 24,109,386 SUPERVISOR *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Official lJse Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner llate Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) ` .~ _ ~ BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT OCTOBER, 1997 `Unplanned Events less than or equal to 1 hour ~ -.DATE TIME VOLUME ' DESCRIPTIONAF,.INCIDENT &'CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/4/97 0406-0419 39 Not required for unplanned events which Not required for unplanned events wt 10/5/97 0607-0613 21 are less than or equal to 1 hour are less than or equal to 1 hour 10/9/97 1146-1203 118 10/9/97 1734-1743 150 10/14/97 2315-2400 800 10/15/97 0000-0056 975 ~ 10/19/97 1605-1645 658 ~ .~- 10/19/97 2206-2246 4 861 '~' ~~ ~ ~"' r'1'ti 10/26/97 0953-1029 9,125 o n '~ i`Tl 10/26/97 1113-1143 1,583 ~ ° -`•'` -- 10/26/97 1231-1326 2,215 '~ ~ '~ 10/26/97 1956-2034 317 ~ "~ r"f`>< 10/30/97 0832-0845 108 Q TOTAL 20,970 ~, Unplanned Events greater than 1 hour ~ DATE TIME VOLUME DESCRtPTiON'OF,lNCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE ' , 10/5/97 0058-0159 191 See Attachments See Attachments 10/7/97 1920-2026 9,167 See Attachments See Attachments 10/8/97 0824-0958 555 See Attachments See Attachments 10/14/97 1618-1955 9,850 See Attachments See Attachments 10/30/97 0319-0421 521 See Attachments See Attachments TOTAL 20,284 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~ w. wwiw DATE „ Ti,MI= VOLUME DESCRtPTION,OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE ', TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~ .. DATE '' TIME VOLUME !DESCRIPTION OFINCIDENT & CAUSE ACTION'TAKEN TO ELIMINATE CAUSE Page 1 TOTAL 0 w ~ BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- GC-3 GAS FLARING INCIDENT REPORT OCTOBER, 1997 70TA1_. Unplanned Events < 1 Hour 20,970 Unplanned Events > 1 Hour 20,284 Planned Events < 1 hour & not 0 exceeding 5,000 MCF Planned Events > 1 hour and 0 • exceeding 5,000 MCF Pilot Purge 16.202 TOTAL FLARED VOLUME 57A61 am- ;y Y n N .,ra- ~ A ~ • C ~ Page 2 • • REPORT NO: J7-4041 B PX FLARE REPORT ' PRUDHOE BAY ' FACILITY: GC-3 DATE: O5 OCt 97 TOTAL VOLUME: 212 MSCF Intermittent Black TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 00:58 TO: 01:59 1 Hrs. 1 Mins. ® ^ ^ ^ 191 MSCF 2. FROM: 06:07 To: 06:13 O Hrs. 6 Mins. ^ ® ^ ^ 21 MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. While bringing J Pad up after choke /divert valve work, the Gas Transit Line pressure increased causing a HP flare valve to open. 2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 2°F. 3. 4. 5. Action Taken to Stop Flaring: 1. Arco reduced production rates and shut-in 3 wells equalling 80 mmscfd. Wells were shut-in or choked back starting at 01:00 hours. 2. BPX reduced production rates and shut-in 1 wells equaling 25 mmcfd. ARCO reduced production rates and shut-in 1 wells equaling 25 mmcfd. Wells were shut-in or choked back starting at 0608 hours. 3. 4. 5. Rev 6/22/97 • • REPORT NO: BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-$ DATE: O7 OCt 97 TOTAL VOLUME: Intermi ttent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? 1. FROM: 19:20 TO: 20:26 1 Hrs. 6 Mins. ^ ® ^ ^ 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED SLOWDOWN: First Determination of Cause: 1. Gathering Center lost instrument air pressure resulting in flaring and event ually a total GC S/D. 2. 3. 4. 5. 97-4045 9,167 MSCF VOLUME 9,167 MSCF MSCF MSCF MSCF MSCF OTHER: Action Taken to Stop Flaring: 1. Gathering Center was S/D in an orderly manor, and then re-started after air pressure problems were repaired. 2. 3. 4. 5. Rev 6/22/97 • . REPORT NO: 97-4047 f BPX FLARE REPORT ' PRUDHOE BAY FACILITY: GC-3 DATE: O8 OCt 97 TOTAL VOLUME: 555 MSCF Intermittent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 08:24 TO: 09:58 1 Hrs. 34 Mins. ^ ® ^ ^ 555 MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. GC3 flare assist valve opened. GC unable to close the valve (their indication showed the valve closed), so they have a Controls technician trying to repair the problem and close the valve. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. Controls technician repaired the problem and closed the flare assist valve. 2. 3. 4. 5. Rev 6/22/97 • ~ REPORT NO: 97-4055 B PX FLARE REPORT ' PRUDHOE BAY FACILITY: GC-$ DATE: 14 OCt 97 TOTAL VOLUME: 10,650 MscF Intermittent Black TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 16:18 To: 19:55 3 Hrs. 37 Mins. ^ ® ® ^ 9,850 MSCF 2. FROM: 23:15 TO: 24:00 0 Hrs. 45 Mins. ^ ® ^ ^ $00 MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER: First Determination of Cause: 1. LPS compressors shut down because of control/instrumentation failure associated with a faulty PLC power supply. Sk-18 LP compressor failed to load due to low gas rate. Assist gas was added to mitigate black smoke. 2. LPS compressor s failed to load because of control/instrumentation failure during plant start-up. Sk-18 LP compressor failed to load due to low gas rate. Assist gas was added to mitigate black smoke. 3. 4. 5. Action Taken to Stop Flaring: 1. BPX reduced production rates and shut-in 73 wells equalling 540 mmscfd. Wells were shut-in or choked back starting at 16:35 hours. The total plant was shutdown at 19:34 2. BPX reduced production rates and shut-in all LP wells until compressors could be reloaded. 3. 4. 5. Rev 6/22/97 • • REPORT NO: 97-4U68 B PX FLARE REPORT ' PRUDHOE BAY FACILITY: GC-$ DATE: 3O OCt 97 TOTAL VOLUME: 629 MSCF Intermittent Black TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 03:19 TO: 04:21 1 Hrs. 2 Mins. ® ^ ^ ^ 521 MSCF 2. FROM: 0$:32 TO: 08:45 0 Hrs. 13 Mins. ^ ® ^ ^ 108 MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 2°F. 2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 2°F. 3. 4. 5. Action Taken to Stop Flaring: 1. BPX reduced production rates and shut-in 1 wells equaling 20 mmscfd. ARCO reduced production rates and shut-in 4 wells equaling 50 mmscfd. Wells were shut-in or choked back starting at 03:30 hours. 2. BPX reduced production rates and shut-in 1 well equaling 40 mmscfd. ARCO reduced production rates and shut-in 2 wells equaling 40 mmscfd. Wells were shut-in or choked back starting at 08:37 hours. 3. 4. 5. Rev 6/22/97 t ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PB Se -97 Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 9,028 4. Flared or vented greater than 1 hour (Supplemental report aired--See 20 AAC 25.235) 10,018 5. Pilot and Purge 20,321 6. Used for lease operations 521,955 7.Other 0 TOTAL items 1- 7 561,322 8. NGL gas equivalent produced 0 9. Purchased f¢as 0 10. Transferred from: 0 11. Transferred to: CCP 23,736.537 Remarks: I hereby certify the foreaoins is true and correct to the best of my knowled¢e. Signature: ~~ ' ~„_,( Title: SUPERVISOR *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. 1. s .._. ;.~ .. ~-- -~~.,v ~..~ ~~ ~> ',,,~, ~; Form 10-422 (Revised 4/95) BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT SEPTEMBER, 1997 Unplanned Events less than or equal to 1 hour ~ DATE TIME VOLUME ' 'DESCRiPT10N AFiNCIDENT'&'CAUSE ' ACTION TAKEN TO ELIMINATE CAUSE 9/3/97 1638-1721 5,226 Not required for unplanned events which Not required for unplanned events whip 9/4/97 0826-0848 1,910 are less than or equal to 1 hour are less than or equal to 1 hour 9/13/97 2204-2218 1,264 9/17/97 2216-2235 198 9/17/97 2252-2329 308 9/29/97 2325-2333 122 • TOTAL 9,028 ".DATE TIME VOLUME '' DESCRIPTION OF INCIDENT.&'CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/3/97 2004-2320 2,042 See Attachments See Attachments 9/14/97 0255-0401 6,463 See Attachments See Attachments 9/29/97 1311-1450 1,513 See Attachments See Attachments TOTAL 10,018 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ''DATE TIME VOLUME '''DESCRIPTION OF INCIDENT& CAUSE ' ACTION TAKEN TO'ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf • DATE TIME VOLUME' DESCRIPTION OFiNCIDENT'& CAUSE ACTION TAKEN TO'ELIMINATE CAUSE TOTAL 0 1'OTA L Unplanned Events < 1 Hour 9,028 Unplanned Events > 1 Hour 10,018 Planned Events < 1 hour & not 0 exceeding 5,000 MCF Planned Events > 1 hour and 0 exceeding 5,000 MCF L Pilot Purge 20,321 TOTAL FLARED VOLUME 39,367 Page 1 • • REPORT NO: BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 03 Sep 97 TOTAL VOLUME: Intermittent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? 1. FROM: 16:38 To: 17:21 O Hrs. 43 Mins. ^ ® ^ ^ 2. FROM: 20:04 TO: 23:20 3 Hrs. 16 Mins. ^ ® ^ ^ 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: First Determination of Cause: 1. High gas transit line pressure caused by CGF ESD problems. 2, High gas transit line pressure caused by CGF ESD problems (Flare assist gas to keep LP flares clean.) 3. 4. 5. Action Taken to Stop Flaring: 97-3998 7,26$ MSCF VOLUME 5,226 MSCF 2,042 MSCF MSCF MSCF MSCF OTHER: 1. BPX reduced production rates and shut-in several wells equalling 1800 mmscfd. Wells were shut-in or choked back starting at 16:40 hours. 2. Equipment was restarted at 22:59 hours (Tandem compressors & Booster compressor.) 3. 4. 5. Rev 6/22/97 • • REPORT NO: BPX FLARE REPORT PRUDHOE BAY 97-4019 FACILITY: GC-3 DATE: 14 Sep 97 TOTAL VOLUME: 6,46$ MSCF Intermi ttent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 02:55 TO: 04:01 1 Hrs. 6 Mins. ^ ® ^ ^ 6,463 MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. LPS compressor K-7000/K-70011ost suction because of control/instru mentation failure associated with a faulty Flare value control card on "A" bank slugcatcher. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. BPX removed all production into "A" bank slugcatcher to stop flaring, techs called out to repair associated card with faulty flare valve controller. 2. 3. 4. 5. Rev 6/22/97 • ~ REPORT NO: 97-4034 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 29 Sep 97 TOTAL VOLUME: 1 ,635 MSCF Intermi ttent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 13:11 TO; 14:50 1 Hrs. 39 Mins. ^ ® ^ ^ 1,513 MSCF 2. FROM: 23:25 To: 23:33 0 Hrs. $Mins. ^ ® ^ ^ 122 MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: _ RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. LP Assist gas to stop Black Smoking. 2. Sk-18 LP compressor shut down because of compressor surging due to lo w gas rate. Assist gas was added to prevent black smoke. 3. 4. 5. Action Taken to Stop Flaring: 1. Bring up C LDF and X pads. 2. Equipment was restarted at XXXX hours. 3. 4. 5. Rev 6/22/97 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Au -97 J • Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 6,922 4. Flared or vented greater than 1 hour 0 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 20,021 6. Used for lease operations 553,838 7.OWer 0 TOTAL items 1 - 7 580,781 8. NGL gas equivalent produced 0 9. Purchased gas ~} ~ ~ ~ ~ ~ ~ D 0 10. Transferred from: ~ ~V ~, 4 ~~~ ` 0 a~ cbna~ ~ammi~>~lo 11. Transferred to: CCP ~~~~~~~ ~l . ~ 24,354,898 A~ohor~p~ Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: Title: SUPERVISOR Form 10-422 (Revised 4195) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 _.. __ Official Use Onl :-Flarin Authorization >>l .hr. 1. Safety MCF. 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner llate Note: All volumes must be convected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT AUGUST, 1997 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT 8 CAUSE 8/3/97 1058-1110 83 Not required for unplanned events which 8/3/97 1424-1523 4,917 are less than or equal to 1 hour 8/10/97 0536-0548 167 8/10/97 0756-0803 73 8/10/97 1418-1433 208 8/12/97 0144-0231 153 8/14/97 1014-1027 135 • 8/22/97 i 6i 5-1646 215 8/23/97 0948-1017 181 8/23/97 2121-2145 283 8/24/97 0840-0935 382 8/28/97 1004-1022 125 TOTAL 6,922 DATE TIME VOLUME DESCRIPTION OF INCIDENT 8 CAUSE See Attachments TOTAL 0 DATE TIME VOLUMME DESCRIPTION OF INCIDENT rl< CAUSE TOTAL 0 • Planned Events Exceeding i Hour OR Exceeding 5000 Mct` DATE. TIME Y04UME , DESCRIPTION OF INCIDENT & CAUSE TOTAL 0 TOTAL Unplanned Events < 1 Hour 6,922 Unplanned Events > 1 Hour 0 Planned Events < 1 hour & not 0 exceeding 5,000 MCF Planned Event > 1 hour and 0 exceeding 5,000 MCF Pilot Purge 24,921 TOTAL FLARED VOLUME 26,943 ~.,t~ Page 1 °~. , ~sr ~ ~.., ~. ~ " ' ~" .. ~. ACTION TAKEN TO ELIMINATE CAUSE ~ Not required for unplanned events which '~,,t rre ~' ~ ~ are less than or equal to 1 hour ry,`~_ -„ v~ nl ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE ACTION TAKEN TO EUMtNATE CAUSE • • ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Yeaz of Disposition GATHERING CENTER 3 BP FJCPLORATION ALASKA WESTF,RN OPrRATING AREA-PBI Jul-97 Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less Wan 1 hour 8,874 4. Flared or vented greater than 1 hour (Su lemental re rt aired--See 20 AAC 25.235) 47,204 5. Pilot and Purge 21,449 6. Used for lease operations 484,396 7.Other 0 TOTAL items 1- 7 561,923 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 21,073,060 Remazks: I hereby cCrtifv that the f reaoina is true and correct to the best of my lmowledae. Signature: ~j~ ~,, ~ _,~` __ Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRiJDfiOE 640150 100 Official Use Onl --Flarin Authorization ~ 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the monW following the month of disposition. Authority 20 AAC 25.235. ~~ .-a ~J • BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT JULY, 1997 Unplanned Events less than or eq ual to 1 hour ~ '- DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/3/97 1754-1844 694 Not required for unplanned events which Not required for unplanned events whit 7/6/97 0116-0132 1,389 are less than or equal to 1 hour are less than or equal to 1 hour 7/9/97 2241-2338 713 7/12/97 0356-0428 267 7/12/97 1252-1326 217 7/13/97 0837-0934 435 7/14/97 0848-0918 343 7/16/97 1524-1609 469 7/17/97 2008-2030 229 7/23/97 0948-1017 604 7/24/97 0120-0152 1,089 7/24/97 0517-0543 632 7/25/97 0519-0532 45 7/25/97 1010-1100 1,042 7/27/97 0115-0139 417 7/29/97 1931-2014 289 TOTAL 8,874 -DATE TIME - VOClIME DESCRIPTION OF INCIDENT & CAUSE ACT10 TAKEN T EL MI 7/2/97 1130-2400 2,601 See Attachments See Attachments 7/3/97 0000-2400 6,000 See Attachments See Attachments 7/3/97 1505-1749 3,021 See Attachments See Attachments 7/4/97 0000-2400 7,000 See Attachments See Attachments 7/4/97 0000-0644 6,032 See Attachments See Attachments 7/4/97 0633-0929 14,667 See Attachments See Attachments 7/4/97 1021-2128 5,651 See Attachments See Attachments 7/5/97 0000-0150 252 See Attachments See Attachments 7/6/97 0314-0600 1,787 See Attachments See Attachments 7/26/97 0027-0128 193 See Attachments See Attachments TOTAL 47,204 Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT'& CAUSE ACTION TAKEN`TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL Page 1 _ ~ BP EXPLORATION (ALASKA) INC. k t PRUDHOE BAY UNIT - GG3 GAS FLARING INCIDENT REPORT JULY, 1997 Unplanned Events < 1 Hour 8,874 Unplanned Events > 1 Hour 47,204 Planned Events < 1 hour & not 0 exceeding 5,000 MCF Planned Events > 1 hour and 0 exceeding 5,000 MCF ~ ._ Pilot Purge 21 n44 TOTAL FLARED VOLUME 77,527 • Page 2 • • • REPORT NO: 9]-3899 + BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-$ DATE: 02 Jul 97 TIME OF FLARING: DURATION: 1. FROM: 11:30 TO: 24:00 12 Hrs. 30 Mins. 2. FROM: TO: Hrs. Mins. 3. FROM: TO: Hrs. Mins. 4. FROM: TO: Hrs. Mins. 5. FROM: TO: Hrs. Mins. Intermittent Yes No ^ ^ ^ ^ ^ ^ ^ ^ TOTAL VOLUME: Black Smoke? Planned? ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ 2,601 MSCF VOLUME 2,601 MSCF MSCF MSCF MSCF MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER: First Determination of Cause: 1. Extended flaring event occurred during GC start-up operation as part of shutdown work when bringing up production from B&C pads. Skid 18 I.P & L.P. gas compressors could not handle the low gas rates resulting from low oil rates as production increase problems occurred. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. No response taken as this was deemed to be of short duration. Difficulties increasing plant oil rate lengthened the flaring event duration. 2. 3. 4. 5. Rev 6/22/97 • • REPORT NO: 97-3901 B PX FLARE REPORT ' PRUDHOE BAY FACILITY: Ci. C-3 DATE: O3 JUI 97 TOTAL VOLUME: 9715 MSCF Intermittent Black TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 00:00 TO: 24:00 24 Hrs. 0 Mins. ^ ® ^ ^ 6,000 MSCF 2. FROM: 15:05 TO: 17:49 2 Hrs. 44 Mins. ^ ® ^ ^ 3,021 MSCF 3. FROM: 17:54 To: 18:44 0 Hrs. 50 Mins. ^ ® ^ ^ 694 MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. Extended flaring event occurred during GC3 shutdown/turnaround work .The volume of gas from B&C pads HP production was too low to keep the Skid 18 IP & LP gas compressors on line. 2. While bringing production rates up following shutdown maintenance work on LPS compressor K-7001 had barn door problems (sheared pin). 3. GC3 opened flare assist gas to minimize any potential of black smoke flaring until the LPS compressor was brought back on line. 4. 5. Action Taken to Stop Flaring: 1. Ongoing efforts to increase oil production rate through the plant by attempting to get LPS compressors started. Plant was kept on production near minimum rates to avoid need for full plant shutdown and safeout. 2. BPX stopped bringing production rates up. The GC informed PCC that the compressor would not be shutdown again to troubleshoot problems. BPX shut in all L.P production at 1730 hours to stop flaring. 3. LPS K7001 compressor will be brought on line and flare assist gas will be closed. 4. 5. Rev 6/22/97 • • REPORT NO: 97-3902 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 04 ~U~ 97 TOTAL VOLUME: 33,350 MscF Intermittent Black TIM E OF FLA RING: DURATION: Yes No Smoke? Planned? 1. FROM: 00:00 TO: 24;00 24 Hrs. 0 Mins. ^ ® ^ ^ 2. FROM: 00:00 TO: 06:44 6 Hrs. 44 Mins. ^ ® ^ ^ 3. FROM: 06:33 TO: 09:29 2 Hrs. 56 Mins. ^ ® ^ ^ 4. FROM: 10:21 TO: 21:28 11 Hrs. 7 Mins. ^ ® ^ ^ 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ VOLUME 7,000 MSCF 6,032 MSCF 14,667 MscF 5,651 MscF MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. Extended flaring event occurred during GC3 shutdown/turnaround work .The volume of gas from B&C pads HP production was too low to keep the Skid 18 IP & LP gas compressors on line. 2. GC3 opened flare assist gas to minimize any potential of black smoke flaring until the LPS compressor was brought back on line (replacing motor and clutch on K7001 barn door). 3. While bringing production rates up following shutdown maintenance work, LPS compressor K-7001 continued having start up problems, compressor was started serveral time due to barn door and logic trouble. 4. GC3 opened flare assist gas to minimize any potential of black smoke flaring until there is sufficient gas to start-up Skid 18 IP and LP compressors. 5. Action Taken to Stop Flaring: 1. Reduced gas rates to Skid 18 IP & LP gas compressors to minimimze flaring, and waiting on additional equipment start-up and increased gas rates prior to starting up the Skid 18 compressors. 2. LPS K7001 compressor will be brought on line and flare assist gas will be closed. 3. K-7001 compressor was restarted at 09:15 hours. 4. Winged in all LP wells at 2045 hrs, totalling 550 mmscf, reduced GC3 gas rates to minimum rates, and closed flare assist gas. 5. Rev 6/22/97 • • REPORT NO: 97-3905 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-$ DATE: O5 JUI 97 TOTAL VOLUME: 252 MSCF Intermi ttent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 00:00 TO: 01:50 1 Hrs. 50 Mins. ^ ® ^ ^ 252 MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER: First Determination of Cause: 1. Extended flaring event occurred during GC3 shutdown/turnaround work .The volume of gas from B&C pads HP production was too low to keep the Skid 18 IP & LP gas compressors on line. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. All rate to GC3 shut-in at 0150 hrs to safe-out the GC for blind swinging during shutdown/turnaround work. 2. 3. 4. 5. Rev 6/22/97 • • REPORT NO: 97-3907 B PX FLARE REPORT ' PRUDHOE BAY FACILITY: GC-3 DATE: 06 Jul 97 TOTAL VOLUME: 3,176 MSCF Intermittent Black TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 01:16 To: 01:32 O Hrs. 16 Mins. ^ ® ^ ^ 1,389 MSCF 2. FROM: 03:14 TO: 06:00 2 Hrs. 46 Mins. ^ ® ^ ^ 1,787 MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. During A-pad and C-pad start-up following SD/turnaround work, K7001 LPS compressor as slow in loading, causing the inital LPS gas from the slugcatcher to go to flare. 2. Extended flaring event occurred during GC3 shutdown/turnaround work .The volume of gas from A&C pads production was too low to keep the Skid 18 IP & LP gas compressors on line. 3. 4. 5. Action Taken to Stop Flaring: 1. K-7001 LPS compressor was loaded and the slugcatcher flare valve closed. 2. Skid 18 IP and LP compressors were started at 0532 hrs and flaring ceased. 3. 4. 5. Rev s~aa~s~ • • REPORT NO: BPX FLARE REPORT PRUDHOE BAY 97-3941 FACILITY: GC-3 DATE: 26 Jul 97 TOTAL VOLUME: 193 MscF Intermi ttent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 00:27 TO: 01:28 1 Hrs. 1 Mins. ® ^ ^ ^ 193 MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: _ OTHER: _ First Determination of Cause: 1. High ambient temperature swings resulted in flaring and required cuts in production. Am bient temperatu re increased by 1 °F. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. BPX reduced production rates and shut-in 6 wells equalling 150 mmscfd. Wells were shut-in or choked back starting at 0027 hours. 2. 3. 4. 5. Rev 6/22!97 • • • ~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PB Jun-97 Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 6,605 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 667 5. Picot and Purge 24,225 6. Used for lease operations 569,250 7.Other 0 TOTAL items 1 - 7 600,747 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 24,505,128 Remarks: I hereby certify that th foregoing is true and correct to the best of my knowledge. Signature~~ ~~~~~~~~j~itle: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. =~ ~' , ` ; I. t~-.- m 4' -.. c.a. '. 14.t,~1 ;... ; -..a ~-- ~ ~, ~ ~ ~ ~, ~~ ,~ -..- -_, -' ®. x Q BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT JUNE, 1997 • • Unplanned Events less than or equal to 1 hour ~~ ~~~ ~ ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT'& CAUSE ACTION TAKEN'TO'ELIMINATE CAUSE 6/13/97 0317-0406 953 Not required for unplanned events which Not required for unplanned events whit 6/13/97 0507-0559 614 are less than or equal to 1 hour are less than or equal to 1 hour 6/15/97 1534-1552 188 6/19/97 0947-1007 194 6/19/97 1240-1334 713 6/19/97 1437-1534 752 6/19/97 1609-1659 868 6/20/97 0802-0840 225 6/20/97 1106-1130 417 6/20/97 1612-1656 188 6/21 /97 2117-2138 117 6/24/97 1041-1102 219 6/24/97 1501-1558 990 6/30/97 1102-1126 167 TOTAL 6,605 Unplanned Events greater than 1 hour ~ DATE TIME 'VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/19/97 0102-0222 667 TOTAL 667 Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'ELIMINATE CAUSE TOTAL 0 TOTAL Unplanned Events < 1 Hour 6,605 Unplanned Events > 1 Hour 667 Planned Events < 1 hour & not 0 exceeding 5,000 MCF Planned Events > 1 hour and 0 exceeding 5,000 MCF Pilot Purge 24.225 TOTAL FLARED VOLUME 31,497 Page 1 P~ ~~~~ -~ ~° '~ ~ ~~ A~ask~ ~,` & P~G~aC~~~' • • REPORT NO: 97-3876 ~. B PX FLAR E REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 19 Jun 97 TOTAL VOLUME: 3,194 MSCF Intermittent Black TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 01:02 TO: 02:22 1 Hrs. 20 Mins. ^ ® ^ ^ 667 MSCF 2. FROM: 09:47 TO: 10:07 0 Hrs. 20 Mins. ® ^ ^ ^ 194 MSCF 3. FROM: 12:40 TO: 13:34 0 Hrs. 54 Mins. ^ ® ^ ^ 713 MSCF 4. FROM: 14:37 TO: 15:34 0 Hrs. 57 Mins. ^ ® ^ ^ 752 MSCF 5. FROM: 16:09 To: 16:59 0 Hrs. 50 Mins. ^ ® ^ ^ $6$ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. High gas transit line pressure caused by CCP 1801 low stage compressor shutdown. 2, High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 4°F. 3. High gas transit line pressure caused by CCP 1801 low stage compressor shutdown. 4. High gas transit line pressure caused by CCP 1801 low stage compressor shutdown. 5. High gas transit line pressure caused by CCP 1801 low stage compressor and rising ambient. Action Taken to Stop Flaring: 1. CCP restarted and loaded compressor at 01:24, but the transit pressure remained high. BPX reduced production rates and shut-in 1 well equalling 60 mmscfd. ARCO reduced production rates and shut-in 4 wells equalling 100 mmscfd. Wells were shut-in or choked back starting at 01:40 hours. 2. BPX reduced production rates and shut-in Swells equaling 100 mmcfd. ARCO reduced production rates and shut-in 2 wells equaling 85 mmcfd. Wells were shut-in or choked back starting at 09:15 hours. 3. CCP restarted and loaded compressor at 1308, but the transit pressure remained high. BPX reduced production rates and shut-in 1 well equalling 53 mmscfd. 4. CCP restarted and loaded compressor at 1525, but the transit pressure remained high. BPX reduced production rates and shut-in 1 well equalling 53 mmscfd. Arco s/i 1 well 30 mmscfd in gas. 5. BPX reduced production rates and shut-in 1 wells equaling 53 mmcfd. ARCO reduced production rates and shut-in 4 wells equaling 125 mmcfd. Wells were shut-in or choked back starting at 1600 hours. If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _ AOGCC Representative: Date: BPX Representative: Date: ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PB Ma -97 • i Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 418 4. Flared or vented :¢reater than 1 hour (Su lemental re rt aired--See 20 AAC 25.235) 0 5. Pilot and Purge 23,222 6. Used for lease operations 615,058 7.Other 0 TOTAL items 1- 7 638,698 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 26,693,869 Remarks: I hereby certify~that the foregoing is true and correct to the best of my knowledge. Signature:~C~., ~ ~~9~ Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 ~ff#G]~ SC: C~Iil ; ~r1 ;:::.: n ::AllthiJrJ~~tl~A'?:~ .~11',.. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 ~ GAS FLARING INCIDENT REPORT MAY, 1997 Unplanned Events less than or equal to 1 hour ~ ~ DATE TIME VOLUME `DESCRIPTION OF' INCIDENT`& CAUSE , ACTION TAKEN'TO' ELIMINATE CAUSE 5/15/97 0908-0936 272 Not required for unplanned events which Not required for unplanned events whit 5/27/97 2223-2305 146 are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 418 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTIONOF'INCIDENT & CAUSE 'ACTION TAKEN TO ELIMINATE CAUSE • TOTAL 0 Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf DATE 71ME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN 70 ELIMINATE CAUSE TOTAL 0 Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT &`CAUSE ACTION TAKEN;TO ELIMINATE CAUSE TOTAL 0 TOTAL Unplanned Events < 1 Hour 418 • Unplanned Events > 1 Hour 0 Planned Events < 1 hour & not 0 exceeding 5,000 MCF Planned Events > 1 hour and 0 exceeding 5,000 MCF Pilot Purge 23.222 TOTAL FLARED VOLUME 23,640 Page 1 • i ' ALASKA OIL AND GAS CONSERVATION CI FACILITY REPORT OF PRODUCED GAS DISP Facility GATHERING CENTER 3 Operator BP EXPLORATION ALASKA Field(s) WESTERN Ol Disposition 1. Sold 0 2. Reinjected 0 3. Flazed or vented less than 1 hour 3,887 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,410 5. Pilot and Purge 13,883 6. Used for lease operations 596,505 7.Other 0 TOTAL items 1 - 7 615,685 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 25,643,046 Remarks: I hereby certify that th foregoing is true and correct to the best of my knowledge. Signature: ~ ~,~ /~~~Title: SUPERVISOR Form 10-422 (Revised 4/95) )MMISSION OSITION Month/Yeaz of Disposition 'ERATING AREA-PB Apr-97 *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ,~,.y; f, Y...~, ~.on,_i Y }. ..... ,.... 1 < ~ BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT APRIL, 1997 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION Of INCIDENT & CAUSE ACTION TAKEN' TO ELIMINATE: CAUSE `' 4/5/97 1755-1812 260 Not required for unplanned events which Not required for unplanned events whit 4/7/97 1243-1301 300 are less than or equal to 1 hour are less than or equal to 1 hour 4/7/97 1747-1810 59 4/9/97 1730-1816 747 4/9/97 2108-2118 44 4/13/97 2053-2125 1,111 4/14/97 2306-2327 69 • 4/15/97 2224-2315 521 4/17/97 1211-1304 183 4/18/97 0229-0237 83 4/22/97 1518-1538 111 4/28/97 0332-0347 125 4/29/97 1911-1921 201 4/30/97 0457-0504 73 TOTAL 3,887 Unplanned Events greater than 1 hour ~ DATE TIME ~VOL ~ ' DESCRIPTION'OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/1'5/97 1115-1328 153 See Attachments See Attachments 4/29/97 0538-0720 813 See Attachments See Attachments 4/30/97 1205-1724 194 See Attachments See Attachments 4/30/97 1749-1941 250 See Attachments See Attachments • TOTAL 1,410 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION Of INCIDENT & CAUSE ACTION`TAKEN`TO ELIMINATE CAUSE:. TOTAL Planned Event_ Exceeding 1 Hour OR Exceed'I^ g 5 _; 0 Mcf _ ,~. ,..,, , ~~_~ ~ DATE "TIME VOLUME DSSCR^IPTtON Of INCIDENT & CAUSE ACTION TAKEN TO ELFMINATE`CAUSE "` TOTAL 0 Page 1 ~.' :~ c7 %i r, ..~ ;Y? <.~ • BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 • GAS FLARING INCIDENT REPORT APRIL, 1997 TOTAL Unplanned Events < 1 Hour 3,887 Unplanned Events> 1 Hour 1,410 Planned Events < 1 hour & not 0 exceeding 5,000 MCF Planned Events > 1 hour and 0 exceeding 5,000 MCF Pilot Purge TOTAL FLARED VOLUME 5,297 Page 2 u • PORT NO: 97-3775 BPX FLARE REPORT ' PRUDHOE BAY FACILITY: GC-3 DATE: 15 Apr 97 TOTAL V OLUME: 674 MSCF Intermittent Black TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 11:15 TO: 13:28 2 Hrs. 13 Mins. ® ^ ^ ^ 153 MSCF ;`2. FROM: 22:24 TO: 23:15 ~ Hrs. 51 Mins. ® ^ ^ ^ 521 MSCF '3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 5°F. 2. While bringing production rates up following K7000 LPS compressor water wash, LPS compressors exceeded maximum gas capacity and discharged to flare when K7000 was once again shutdown to troubleshoot a problem. 3. 4. 5. Action Taken to Stop Flaring: I~' 1. BPX reduced production rates and shut-in 1 wells equaling 20 mmcfd. Wells were shut-in or choked back starting at 1115 hours. 2. BPX reduced production rates and shut-in 4 wells equaling 20 mmcfd. Wells were shut-in or choked back starting at 2300 hours. If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: AOGCC Representative: Date: ~ BPX Representative: Date: • BPX FLARE REPORT PRUDHOE BAY • REPORT NO: 97-3797 FACILITY: GC-3 DATE: 29 Apr 97 TOTAL VOLUME: 1 ,014 MSCF Intermi ttent Black TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 05:38 TO: 07:20 1 Hrs. 42 Mins. ^ ® ^ ^ 813 MSCF 2. FROM: 19:11 TO: 19:21 0 Hrs. 10 Mins. ^ ® ^ ^ 201 MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEFVALVE: _ RUPTUREDISK:_ CONTROLLEDBLOWDOWN:_ OTHER:_ First Determination of Cause: 1. Sk-18 306LP/3071P compressors shut down because of a problem. 2, Sk-18 306LP/3071P compressors shut down because of a problem. 3. 5 ~ - l ~ S I,p ~£ Chi. U.~ C.. Ot }-~ i~ N ~ 1 C~J~.~1"?- Q f°J TR-I~ 5. l ~ - ~ ~I ~~.~ ~~ NofZMAi-L`~ 3p Mid ~NE~ ~H®N~, d C.~?P~? i~~~ C.A~'~ ~P~.S ~ Action Taken to Stop Flaring: ~J'~l~Q-"'C '~.~,.~ G'~f tl~ ~" "'~~ '?~ )"` /~ ~- ^'„ 1. No response taken as this was deemed to be of short duration. ,~ . l~ ; ~ ~~,i,~,..g ~ '~~ 2. No response taken as this was deemed to be of short duration. 5. Qt ~~~ --.° ~~ ~~-I~ Sj~ ~~'G~~~S ~~ .~ If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _ AOGCC Representative: Date: BPX Representative: Date: • BPX FLARE REPORT PRUDHOE BAY • REPORT NO: 97_3800 FACILITY: GC-$ DATE: 30 Apr 97 TOTAL VOLUME: 517 MSCF Intermi ttent Black TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 04:57 TO: 05:04 0 Hrs. 7 Mins. ^ ® ^ ^ 73 MSCF 2. FROM: 12:05 TO: 17:24 5 Hrs. 19 Mins. ® ^ ^ ^ 194 MSCF 3. FROM: 17:49 TO: 19:41 1 Hrs. 52 Mins. ® ^ ^ ^ 250 MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN;_ OTHER:_ First Determination of Cause: 1. High gas transit line pressure caused by bring rates up after proration. 2, High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 2°F. 3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 4°F. 4. 5. Action Taken to Stop Flaring: 1. BPX stopped bringing production rates up until wells unloaded and flaring was ceased. Arco reduced production rates 370 mmscfd. Wells were shut-in or choked back starting at 0445 hours. 2. BPX reduced production rates and shut-in 5 wells equaling 63 mmcfd. ARCO reduced production rates and shut-in 5 wells equaling 80 mmcfd. Wells were shut-in or choked back starting at 13:15 hours. 3. BPX reduced production rates and shut-in 2 wells equaling 30 mmcfd. Wells were shut-in or choked back starting at 18:00 hours. 4. 5. If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _ AOGCC Representative: Date: BPX Representative: Date: ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION • Facility Operator Field(s) Month/Year of Disposition GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PB Mar-97 Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 6,303 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,806 5. Pilot and Purge 17,666 6. Used for lease operations 594,228 7.Other 0 TOTAL items 1- 7 620,003 8. NGL aas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 27,399,355 Remarks: I hereby certify that th foregoing is a and correct to the best of my knowledge. Si nature: ~~/g~ Title: SUPERVISOR g ~ o,.~f~ _ Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Uffici~tl Llse Unlv--Flarin~.Auth~i•ization > l hr. 1. Safetv MCF 2. Lease Use MCF 3. Conserv. Pumoses MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. • • BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT MARCH, 1997 Unplanned Events less than or equal to 1 hour ~ DATE TIME VOLUME DESCRIATION OF INCIDENT & CAUSE ` ACTIQN`TAKEN TO `ELIMINATE CAUSE 3/2/97 0210-0216 67 Not required for unplanned events which Not required for unplanned events whic 3/2/97 1538-1609 1,076 are less than or equal to 1 hour are less than or equal to 1 hour 3/7/97 0827-0909 3,612 3/7/97 1707-1740 229 3/11 /97 0656-0721 217 3/12/97 0616-0657 588 3/12/97 1618-1646 97 3/23/97 1132-1225 417 TOTAL 6,303 Unplanned Events greater than 1 hour ~ ~~. DATE TIME VQLUME DESCRIPTION OF INCIDENT & CAUSE ACTIQN TAKEN TO ELIMINATE CAUSE 3/30/97 0156-0301 1,806 See Attachments See Attachments TOTAL 1,806 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE .TIME VOLUME DESCRIPTION OF`INCIDENT & CAUSE ACTION TAKEN TO`ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~ DATE TIME VOLUME DESCRIPTION 4F INCIDENT & CAUSE '' ACt10N TAKEN TO ELIMINATE CAUSE' TOTAL 0 ,.. TOTAL .~" , x° ' Unplanned Events < 1 Hour 6,303 ~ ,~ -Q, ~'" Unplanned Events > 1 Hour 1,806 F~s ~, ~~ Planned Events < 1 hour & not 0 ,~ ~ ~ . ~z~, exceeding 5,000 MCF z `-; ~ ~' Planned Events > 1 hour and 0 G ~ . exceeding 5,000 MCF } Pilot Purge 17,666 ; TOTAL FLARED VOLUME 25,775 Page 1 REPORT NO BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-$ DATE: 30 Mar 97 TIME OF FLARING: 1. FROM: 1:56 TO: 3:01 2. FROM: TO: 3. FROM: TO: 4. FROM: TO: 5. FROM: TO: DURATION: 1 Hrs. 5 Mins. Hrs. Mins. Hrs. Mins. Hrs. Mins. Hrs. Mins. TOTAL VOLUME: Intermi ttent Black Yes No Smoke? Planned? ^ ® ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ 97-3743 1,$06 MSCF VOLUME 1,$06 MSCF MSCF MSCF MSCF MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER: First Determination of Cause: 1. High gas transit line pressure caused by CGF compressor problems due to gas leak in turbine room. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. Arco reduced production rates and shut-in 17 wells equaling 368 mmcfd. Wells were shut-in or choked back starting at 01:50 hours. ARCo informed BP at 02:20 they were trying to restart the compressor. 2. 3. 4. 5. If >11 HRS.y the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: .AOGCC Representative: Date: I BPX Representative: Date: • • ` ~~ ' ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION GATHERING CENTER 3 • ~J Operator BP EXPLORATION ALASKA OPERATING Month/Year of Disposition Feb-97 Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 3,834 4. Flared or vented greater than 1 hour (Sup lemental report required--See 20 AAC 25.235) 6,598 5. Pilot and Purge 13,512 6. Used for lease operations 605,968 7.Other 0 TOTAL items 1- 7 629,912 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 25,424,267 Remarks: I hereby certify that th foregoing is true and correct to the best of my knowledge. Signature: ~~~ ®„ _ ~,,.`___.~!/ ~~ Vie: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 iQr~cial.'~~e!C~n1 `~€~7ari ....... r~ ;;A~utt>~afAi:::l;hr,:.;; 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. c 0 1..t..I Q7 U ` 07 ~~ / N to Q1 o `~° ° W U V ~ _ ~ ~ o `~ a { , . BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 \ GAS FLARING INCIDENT REPORT FEBRUARY, 1997 Page 1 Unplanned Events less than or equal to 1 hour ~ 2/1/97 0000-0015 104 Not required for unplanned events which 2/3/97 0036-0055 198 are less than or equal to 1 hour 2/3/97 0706-0727 248 2/3/97 1519-1538 198 • 2/4/97 0458-0513 156 2/4/97 0745-0756 92 2/4/97 1038-1059 350 2/4/97 1550-1620 417 2/4/97 1743-1838 104 2/5/97 0006-0015 63 2/6/97 0832-0915 806 2/7/97 1547-1608 175 2/24/97 1028-1101 169 2/24/97 2248-2323 139 2/26/97 0127-0148 386 2/28/97 2014-2036 229 TOTAL 3,834 • Unplanned Events areater than 1 hour 2/20/97 1305-1615 467 See Attachments 2/24/97 1807-1917 331 See Attachments 2/26/97 0336-1022 3,928 See Attachments 2/26/97 1112-1247 924 See Attachments 2/26/97 1744-1915 948 See Attachments TOTAL 6,598 Not required for unplanned events whi are less than or equal to 1 hour See Attachments See Attachments See Attachments See Attachments See Attachments Page 2 ........................................... .......................................... ........................................... ..................... Unplanned Events < 1 Hour 3,834 Unplanned Events > 1 Hour 6,598 Planned Events < 1 hour & not 0 exceeding 5,000 MCF Planned Events > 1 hour and 0 exceeding 5,000 MCF • Pilot Purge 13,512 TOTAL FLARED VOLUME 23,944 • C~ REPORT NO: 96-3699 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 20 Feb 97 TIME OF FLARING: 1. FROM: 13:05 To: 16:15 2. FROM: TO: 3. FROM: TO: 4. FROM: TO: 5. FROM: TO: DURATION: 3 Hrs. 10 Mins. Hrs. Mins. Hrs. Mins. Hrs. Mins. Hrs. Mins. TOTAL VOLUME: 467 MSCF Intermittent Black Yes No Smoke? Planned? VOLUME Q ^ ^ ^ 467 MscF ^ ^ ^ ^ MSCF ^ ^ ^ ^ MSCF ^ ^ ^ ^ MSCF ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. LPS compressor K-7001/K7000 had backed down due to a high differantial across the inlets to turbines. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. BPX reduced production rates on3 LP wells equaling60 mmcfd. Wells were shut-in or choked back starting at 1405 hours. High differantial alarms were reset and compressors were loaded back up. 2. 3. 4. 5. If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _ AOGCC Representative:. Date: BPX Representative: Date: • REPORT NO: 96-37U4 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 24 Feb 97 TOTAL VOLUME: 639 MSCF Intermittent Black TIME OF F LARING: DURA TION: Yes No Smoke? Planned? VOLUME 1. FROM: 10:28 TO: 11:01 O Hrs. 33 Mins. Q ^ ^ ^ 169 MSCF 2. FROM: 18:07 TO: 19:17 1 Hrs. 10 Mins. Q ^ ^ ^ 331 MSCF 3. FROM: 22:48 TO: 23:23 O Hrs. 35 Mins. Q ^ ^ ^ 139 MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. High gas transit line pressure caused by EWE gas compressor shutdown 2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 5°F. In addition, EWE compressor shutdown at 1838 hours. 3. High gas transit line pressure caused by ARCO ramping up rates. 4. 5. Action Taken to Stop Flaring: 1. BPX reduced production rates by choking back on 3 wells equaling 45 mmcfd. Wells were choked back starting at 10:29 hours. 2. BPX reduced production rates and shut-in 4 wells equaling 129 mmcfd. ARCO reduced production rates and shut-in 6 wells equaling 150 mmcfd. Wells were shut-in or choked back starting at 1812 hours. 3. Arco reduced production rates and shut-in 3 wells equaling 60 mmcfd. Wells were shut-in or choked back starting at 2324 hours. 4. 5. If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: AOGCC Representative: Date: BPX Representative: Date: • REPORT NO: 96-$]~ BPX FLARE REPORT PRUDHOE BAY C~ FACILITY: GC-3 DATE: 26 Feb 97 TIME OF FLARING: 1. FROM: 01:27 To: 01:48 2. FROM: 03:36 To: 10:22 3. FROM: 11:12 ro: 12:47 4. FROM: 17:44 To: 19:15 5. FROM: TO: DURATION: O Hrs. 21 Mins. 6 Hrs. 46 Mins. 1 Hrs. 35 Mins. 1 Hrs. 31 Mins. Hrs. Mins. Intermittent Yes No ^ 0 ^ 0 ^ ^ TOTAL VOLUME: Black Smoke? Planned? ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN: First Determination of Cause: 1. Sk-18 LP compressor shut down because of a problem associated with high vibration. 2. Sk-18 LP compressor shut down because of a problem associated with the bearings. 3. Sk-18 LP compressor shut down because of a problem associated with the bearings. 4. Sk-18 LP compressor shut down because of a problem associated with the bearings. 5. 6,186 MSCF VOLUME 386 MSCF 3,928 MSCF 924 MSCF 948 MSCF MSCF OTHER: Action Taken to Stop Flaring: 1. Flaring was permitted to continue while GC operations personnel attempted to start the standby compressor. 2 restarts attempted at 0131 hrs and 0144 hrs. 2. Flaring was permitted to continue while maintenance personell worked on LP compressor. The amount of LP gas flared is around 4 mmscfd. The remainder is assist gas that is added to prevent black smoke. The entire plant would have to be shutdown to prevent any LP gas from flaring. 3. Flaring was permitted to continue while maintenance personell worked on LP compressor. The amount of LP gas flared is around 4 mmscfd. The remainder is assist gas that is added to prevent black smoke. The entire plant would have to be shutdown to prevent any LP gas from flaring. 4. Flaring was permitted to continue while maintenance personell worked on LP compressor. The amount of LP gas flared is around 4 mmscfd. The remainder is assist gas that is added to prevent black smoke. The entire plant would have to be shutdown to prevent any LP gas from flaring. 5. If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: AOGCC Representative: Date: BPX Representative: Date: .~ ;,~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PB Jan-97 • • Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 955 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25?35) 4,590 5. Pilot and Purge 15,125 6. Used for lease operations 698,555 7.Other 0 TOTAL items 1 - 7 719,225 8. NGL gas equivalent produced ~ 0 9. Purchased gas ,~ 0 10. Transferred from: t~ ~ Gas ~s ~g411tY9tSS`Qt6 0 A(1 11. Transferred to: CCP 25,860,731 Remarks: I hereby certify that tt fore~oin~ is true and correct to the best of rnv knowled~7e. Signature: ~~ ~'~~~~itle: SUPERVISOR ~ . ___.~ Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Official UseOnl --Flarins Authorization> 1 hr. 1. Safetv MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of 1118 month following the month of disposition. Authority 20 AAC 25.235. • • ~~ i BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT JANUARY, 1997 Unplanned Events less than or equal to 1 hour ~~~I ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/12/97 1739-1759 306 Not required for unplanned events which Not required for unplanned events which 1/13/97 1810-1827 117 are less than or equal to 1 hour are less than or equal to 1 hour 1/13/97 2146-2159 58 1 /14/97 0001-0055 83 1 /18/97 2101-2114 90 1 /19/97 1529-1538 63 1 /21 /97 1709-1717 61 1 /27/97 1753-1810 177 TOTAL 955 Unplanned Events greater than 1 hour ~ DATE TIME VOLUM E DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/13/97 1056-1420 238 See Attachments See Attachments 1/13/97 2248-2356 76 See Attachments See Attachments 1/14/97 0724-1024 264 See Attachments See Attachments 1/15/97 0113-0257 132 See Attachments See Attachments 1/16/97 1556-1838 250 See Attachments See Attachments 1/22/97 1455-1604 533 See Attachments See Attachments 1/22/97 1850-2025 460 See Attachments See Attachments 1/26/97 1436-1708 2,188 See Attachments See Attachments 1/28/97 0916-1037 345 See Attachments See Attachments 1/31/97 1629-1740 104 See Attachments See Attachments TOTAL 4,590 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 ~~~~~ ~~ FFB 21 1997 Page 1 Alaska Oel & Gas Cons. C.~rnmissic~r~ Altchora~3e • • r TOTAL Unplanned Events < 1 Hour 955 Unplanned Events > 1 Hour 4,590 Planned Events < 1 hour & not 0 exceeding 5,000 MCF Planned Events > 1 hour and 0 exceeding 5,000 MCF Pilot Purge 15.125 TOTAL FLARED VOLUME 20, 670 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT JANUARY, 1997 FE3 21 1997 Masks Oi6 & Gas Cons. Commission Anchorage Page 2 REPORT NO: 96-3644 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 13 Jan 97 TOTAL VOLUME: 489 MSCF Intermittent Black TIME OF F LARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 10:56 TO: 14:20 3 Hrs. 24 Mins. Q ^ ^ ^ 238 MSCF 2. FROM: 18:10 TO: 18:27 0 Hrs. 17 Mins. Q ^ ^ ^ 117 MSCF 3. FROM: 21:46 TO: 21:59 0 Hrs. 13 Mins. X^ ^ ^ ^ 58 MSCF 4. FROM: 22:48 TO: 23:56 1 Hrs. 8 Mins. X^ ^ ^ ^ 76 MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 2°F. 2. High gas transit line pressure due to too much gas in transit system given the ambient comditions. 3. While bringing production rates up following Trico well testing, LPS compressors exceeded maximum gas capacity and discharged to flare. 4. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 1 °F. 5. Action Taken to Stop Flaring: 1. BPX and ARCO reduced production rates. 2. Arco reduced production rates and shut-in 2 wells equaling 70 mmcfd. Wells were shut-in or choked back starting at1844 hours. 3. No response taken as this was deemed to be of short duration. 4. BPX reduced production rates and shut-in 2 wells equaling 70 mmcfd. ARCO reduced production rates and shut-in 2 wells equaling 45 mmcfd. Wells were shut-in or choked back starting at 2320 hours. 5. If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: AOGCC Representative: Date: BPX Representative: Date: ~ ~ REPORT NO: 96-3645 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 14 Jan 97 TOTAL VOLUME: 347 MSCF Intermittent Black TIME OF FLARING: DURA TION: Yes No Smoke? Planned? VOLUME 1. FROM: 00:01 TO: 00:55 0 Hrs. 54 Mins. Q ^ ^ ^ 83 MSCF 2. FROM: 07:24 TO: 10:24 3 Hrs. 0 Mins. Q ^ ^ ^ 264 MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 1 °F. 2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 4°F. 3. 4. 5. Action Taken to Stop Flaring: 1. BPX reduced production rates and shut-in 1 wells equaling 50 mmcfd. Wells were shut-in or choked back starting at 00:01 hours. 2. BPX reduced production rates cutting back chokes on3 wells equaling 50 mmcfd. Wells were shut-in or choked back starting at 07:50 hours. 3. 4. 5. If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: AOGCC Representative: Date: BPX Representative: Date: ~ ~ REPORT NO: J6-3646 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 15 Jan 97 TOTAL VOLUME: 182 MSCF Intermittent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 01:13 TO: 02:57 1 Hrs. 44 Mins. Q ^ ^ ^ 132 MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN:_ OTHER:_ First Determination of Cause: 1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 5°F. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. BPX reduced production rates and trimmed 1 well equaling 20 mmcfd. Wells were shut-in or choked back starting at 0200 hours. 2. 3. 4. 5. If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: AOGCC Representative: Date: BPX Representative: Date: ~ ~ REPORT NO: 96-3648 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 16 fan 97 TOTAL VOLUME: 25~ MSCF Intermittent Black TIME OF FLARING: DURA TION: Yes No Smoke? Planned? VOLUME 1. FROM: 15:56 TO: 18:38 2 Hrs. 42 Mins. X^ ^ ^ ^ 250 MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. While bringing production rates up following XXXXXX, LPS compressors exceeded maximum gas capacity and discharged to flare. l.i~'tT,NG ~-Rtcs Lomas L~~7 MA~~^'~ 2. gACac- o N L-I-~E. ~ {~' H,A~-7~i[~a~. ~~a3I9~ 3. 4. 5. Action Taken to Stop Flaring: 1. BPX reduced production rates and shut-in 2 wells equaling 45 mmcfd. Wells were shut-in or choked back starting at 1744 hours. 2. 3. 4. 5. If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _ AOGCC Representative: Date: BPX Representative: Date: ~ ~ REPORT NO: 96-3657 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 22 Jan 97 TOTAL VOLUME: 993 MSCF Intermittent Black TIME OF FLARING: DURA TION: Yes No Smoke? Planned? VOLUME 1. FROM: 14:55 To: 16:04 1 Hrs. 9 Mins. ^ Q ^ ^ 533 MSCF 2. FROM: 18:50 TO: 20:25 1 Hrs. 35 Mins. Q ^ ^ ^ 460 MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER: First Determination of Cause: 1. GLT compressor K-3200 shut down because of control/intrumentation failure associated with fuel valve. 2. GLT compressor K-3200 shut down because of control/intrumentation failure associated with fuel valve. 3. 4. 5. Action Taken to Stop Flaring: 1. BPX reduced production rates and shut-in 3 wells equaling 86 mmcfd. ARCO reduced production rates and shut-in 2 wells equaling 85 mmcfd. Wells were shut-in or choked back starting at 1540 hours. 2. BPX reduced production rates equaling 40 mmcfd. ARCO reduced production rates equaling 50 mmcfd. Wells were .shut-in or choked back starting at 19:00 hours. 3. 4. 5. If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _ AOGCC Representative: Date: BPX Representative: Date: ~ ~ REPORT NO: 96-3662 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 26 Jan 97 TOTAL VOLUME: 2,1$$ MSCF Intermittent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 14:36 TO: 17:0$ 2 Hrs. 32 Mins. X^ ^ ^ ^ 2,188 MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER: First Determination of Cause: 1. High gas transit line pressure caused by CGF compressor problems due toTandem 1886 S/D. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. BPX reduced production rates and shut-in 8 wells equaling 180 mmcfd. Restarted compressor. 2. 3. 4. 5. If>ii HRS., the PCC wilt notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: AOGCC Representative: Date: BPX Representative: Date: ~ ~ REPORT NO: 96-3665 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 28 Jan 97 TOTAL VOLUME: 345 MSCF Intermittent Black TIME OF FLARING: DURA TION: Yes No Smoke? Planned? VOLUME 1. FROM: 09:16 To: 10:37 1 Hrs. 21 Mins. Q ^ ^ ^ 345 MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. While bringing production rates up following GC-2 "B" Bank S/D," D" Bank flared. 2 3 4 5 Action Taken to Stop Raring: 1. Arco reduced production rates and shut-in 5 wells equaling 150 mmcfd. Wells were shut-in or choked back starting at 09:20 hours. 2. 3. 4. 5. !# >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: AOGCC Representative: Date: BPX Representative: Date: ~ ~ REPORT NO: 9G-3671 BPX FLARE REPORT PRUDHOE BAY FACILITY: GC-3 DATE: 31 Jan 97 TOTAL VOLUME: 104 MSCF Intermittent Black TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME 1. FROM: 16:29 TO: 17:40 1 Hrs. 11 Mins. Q ^ ^ ^ 104 MSCF 2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF 4. FROM: TO: Hrs, Mins. ^ ^ ^ ^ MSCF 5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_ First Determination of Cause: 1. While bringing production rates up following 50% nomations GC#3 C Bank Slg Cat flared due to wells coming on. 2. 3. 4. 5. Action Taken to Stop Flaring: 1. BPX reduced production rates by chokeing back on wells. 2. 3. 4. 5. ~~~~ w ~ ~ 2 ~ 1997 Alaska Oil & Gas ~. Ca~mias-o~. p~ar~,e ~If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _ AOGCC Representative: Date: BPX Representative: Date: ~ ~ • • BP EXPLORATION (ALASKA) INC. - - - P.O. Box 196612, Anchorage AK 99519-6612 REPORT OF ACCIDENTAL NATURAL GAS RELEASE DATE: January 24, 1997 TO: Mr. Blair Wond~~; Alaska Oil and Gas Conservation Commission - 3001 Porcupine Drive Anchorage, AK 99501 FAX: 276-7542 DESCRIPTION OF INCIDENT 1. Date and Time: Friday, 01/24/97, 00:59 2. Location: Detailed Location: X Prudhoe Bay Unit GC-3 Wellpad A Module 54 _ Endicott Well A 23 Temperature transmitter thermowell _ Milne Point Niakuk Other 3. Volume of natural gas lost: 150 mscf 4. Cause of loss: Throu h wall enetration of A23 tem .transmitter thermowell bod 5. Actions taken and planned Thermowell was changed out. Study team is looking into cause of to revent further loss: failure and will recommend actions to revent re-occurrence 6. Equipment or procedural Awaits Study Team recommendations changes to prevent loss . from recurrin 7. Contact (name and W. Garry Meek 907-659-4472 tele hone number Signature: ~G'~/ cc: BPX Environmental Compliance Supervisor MB 11-6 (FAX 564-5020) BPX Volume Accounting MB 5-4 Production Coordinator Facility Superintendent ~~,: ( `b Aid S4pT, E~E~~ED R SAN ~~ ~~~~ Gas Cons• Commtssion piaska Oil & Anchorage ,o t~' • • BP EXPLORATION (ALASKA) INC. - -P.O. Box 196612, Anchorage AK 99519-6612 REPORT OF ACCIDENTAL NATURAL GAS RELEASE DATE: January 23, 1997 TO: Mr. Blair Wondzell Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 FAX: 276-7542 DESCRIPTION OF INCIDENT 1. Date and Time: Wednesday, 01/23/97, 05:34 2. Location: Detailed Location: X Prudhoe Bay Unit GC-3 Module 4 Well C-03 choke - _ Endicott _ Milne Point _ Niakuk Other 3. Volume of natural gas lost: 30 mscf 4. Cause of loss: Throu h wall enetration of Well C-03 choke tail iece 5. Actions taken and planned Choke was changed out. Investigation team looking into further to revent further loss: o ortunities for revention of erosion on tail iece. 6. Equipment or procedural Investigation team will review operating procedures. changes to prevent loss from recurrin 7. Contact (name and W. Garry Meek 907-659-4472 tele hone number Signature: i~~/~ cc: BPX Environmental Compliance Supervisor MB 11-6 (FAX 564-5020) BPX Volume Accounting MB 5-4 Production Coordinator Facility Superintendent (i ~•rzswl 'td ~~~ S«pT,