ALASKA OII. AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Dec-97
i
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 11,269
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 634
5. Pilot and Purge 16,570
6. Used for lease operations 609,131
7.Other 0
TOTAL items 1 - 7 637,604
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 27,393,964
Remarks:
I hereby certify that the fo going is true and correct to the best of my knowledge.
Signature: ~,~~- ~~~~~/~~ t~~l ~ ~ Title: SUPERVISOR
Form 10-422 (Revised 4~5)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official'Use Onl --Flarin' Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner llate
All volumes must be
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
~ PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
,j DECEMBER, 1997
Unplanned Events less than or equal to 1 hour
-DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/4/97 1455-1505 208 Not required for unplanned events which Not required for unplanned events whit
12/4/97 0932-1006 354 are less than or equal to 1 hour are less than or equal to 1 hour
12/4/97 1408-1434 271
12/4/97 1536-1620 458
12/8/97 1754-1828 5,320
12/9/97 0012-0043 125
12/9/97 2040-2048 150
12/11/97 0733-0751 175
12/17/97 1431-1458 3,094
12/17/97 2324-2345 175
12/18/97 1703-1732 806
12/27/97 0543-0635 133
TOTAL 11,269
Un tanned Events reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/4/97 1912-2030 634 See Attachments See Attachments
TOTAL 634
Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf
• DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 11,269
Unplanned Events > 1 Hour 634
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 16.570
TOTAL FLARED VOLUME 28,473
Page 1
REPORT NO: 97-4113
i B PX FLAR E REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: O4 DeC 97 TOTAL VOLUME: 1,925 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 14:55 To: 15:05 0 Hrs. 10 Mins. ^ ® ^ ^ 208 MSCF
2. FROM: 09:32 TO: 10:06 0 Hrs. 34 Mins. ^ ® ^ ^ 354 MSCF
3. FROM: 14:0$ TO: 14:34 O Hrs. 26 Mins. ^ ® ^ ^ 271 MSCF
4. FROM: 15:36 To: 16:20 0 Hrs. 44 Mins. ^ ® ^ ^ 458 MSCF
5. FROM: 19:12 TO: 20:30 1 Hrs. 18 Mins. ^ ® ^ ^ 634 MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN:
First Defermination of Cause:
1. Sk-18 IP/LPcompressor shut down because of a problem associated with compressors not pumping.
2. Skid 18 IP/LP compressor problems using assist gas to prevent black smoke.
3. Skid 18 IP/LP compressor problems using assist gas to prevent black smoke.
4. Skid 18 IP/LP compressor problems using assist gas to prevent black smoke.
5. Skid 18 IP/LP compressor problems using assist gas to prevent black smoke.
Action Taken to Stop Flaring:
1. Equipment was restarted.
2. Assist gas shut off.
3. Assist gas shut off.
4. Assist gas shut off.
5. Compressors loaded and assist gas shut off.
aev sizva~
OTHER:
• •
.,,
ALASKA OII, AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
•
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Nov-97
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 9,377
4. Flared or vented greater than 1 hour 14,154
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 15,004
.~ c 7
6. Used for lease operations Q° r'-~
C7 ~ 405,207
D S=
n u, .~ I~
7.Other ~ ~ ~ `~ --- 0
c ~'
^"
TOTAL items 1 - 7 = ~ 443,742
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 21,360,509
Remarks:
th
at the foreg ' g is true and correct to the be
st of my knowledge.
I hereby certify
~ J
/
Signature: ~.~~ /L~ f 'Z'/~ /92Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use On --Flarin Authotizafion > i>hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner llate
must
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
•
u
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- GC-3
~. GAS FLARING INCIDENT REPORT
NOVEMBER, 1997
Un tanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/1/97 1437-1458 131 Not required for unplanned events which Not required for unplanned events whit
11/6/97 1034-1047 90 are less than or equal to 1 hour are less than or equal to 1 hour
11/8/97 1145-1200 521
11/10/97 1428-1505 385
11/10/97 2103-2138 972
11 /11 /97 1016-1038 153
11/12/97 0845-0855 69
11 /12/97 1001-1017 178
11/17/97 2146-2203 6,611
11/24/97 1002-1045 267
TOTAL 9,377
Unplanned Events greater than 1 hour ~
DATE
TIME .,
VOLUME DESCRIPTION OF, INCIDENT & CAUSE -
ACTION TAKEN TO ELIMINATE CAUSE
11/15/97 1833-2359 1,132 See Attachments See Attachments
11/17/97 0433-0724 2,375 See Attachments See Attachments
11/22/97 0916-1055 438 See Attachments See Attachments
11/26/97 1343-1444 10,209 See Attachments See Attachments
TOTAL 14,154
Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf
DATE ' TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATECAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~
DATE TIME' VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATECAUSE
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 9,377
Unplanned Events > 1 Hour 14,154
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 15,004
TOTAL FLARED VOLUME 38,535
Page 1
• • REPORT NO: 9]-4091
i B PX FLARE REPORT
' PRUDHOE BAY '
FACILITY: GC-$ DATE: 15 Nov 97 TOTAL VOLUME: 1 ,132 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 18:33 TO: 23:59 5 Hrs. 26 Mins. ^ ® ^ ^ 1,132 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. GC-3 was s/d for maintenance and venting occured for safety reasons.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. None as venting was necessary for the safety of personnel
2.
3.
4.
5.
I Rev 6/22/97
• ~ REPORT NO:
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 17 NOV 97 TOTAL VOLUME:
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned?
1. FROM: 04:33 TO: 07:24 2 Hrs. 51 Mins. ^ ® ^ ^
2. FROM: 21:46 TO: 22:03 0 Hrs. 17 Mins. ^ ® ^ ^
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE D ISK: CONTROLLED SLOWDOWN:
First Determination of Cause:
1. Following Gathering Center s/d for repairs, gas was needed prior to compressor startup.
2. Partial Gathering Center s/d because of V-337 high level.
3.
4.
5.
Action Taken to Stop Flaring:
1. Equipment was restarted at 07:24 hours.
2. None as the s/d was reset and flaring ceased.
3.
4.
5.
97-4094
$986 MSCF
VOLUME
2,375 MscF
6,611 MSCF
MSCF
MSCF
MSCF
OTHER:
Rev 6/22/97
• • REPORT NO: 97-4098
f B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-$ DATE: 2Z N OV 97 TOTAL VOLUME: 438 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 09:16 TO: 10:55 1 Hrs. 39 Mins. ® ^ ^ ^ 43$ MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following sulzer s/d, LPS compressors exceeded maximum gas capacity and
discharged to flare. ~ ~v,~pS ~- ~uMP $-p~~„K. (n~7o ~n~E,~OR,,.s
3.
4. S u -e..C~t N C-~ ,g~,l >J~ ! N (~ ,~} r~C,l~ li`t' _
5.
Action Taken to Stop Flaring:
1. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
2.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 97-4104
r
BPX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-3 DATE: 26 N ov 97 TOTAL VOLUME: 10209 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 13:43 To: 14:44 1 Hrs. 1 Mins. ^ ® ^ ^ 10,209 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN: _ OTHER:_
First Determination of Cause:
1. LPS compressor K-7000 shut down because of accidental trip of fuel gas valve.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Equipment was restarted at 14:44 hrs. LP gas was cut back to allow restart of compressor.
2.
3.
4.
5.
Rev 6/22/97
~, _ 1
GATHERING CENTER 3
Disposiflon
1. Sold
t
2. Reinjected
• 3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report requved-See 20 AAC
5. Pilot and Purge
6. Used for lease operations
7.Other
ALASKA OII. AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
ORATION ALASKA WESTERN OPERATING AREA-PBU Oct-97
~ ~
n --' t'T7
~ 'h '~-
to ~.n
C ~' "~
G GCS ~._
~~
TOTAL items 1 - 7
8. NGL gas equivalent produced
•
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
Remarks:
I hereby certify that the tegoing is true and correct to the best of my knowledge.
Signature: t~ ' 1/~~2/~~-- Title:
0
0
20,970
20,284
16,207
533,028
0
590,489
0
0
0
24,109,386
SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official lJse Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner llate
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95) `
.~ _ ~
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
OCTOBER, 1997
`Unplanned Events less than or equal to 1 hour ~
-.DATE TIME VOLUME ' DESCRIPTIONAF,.INCIDENT &'CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/4/97 0406-0419 39 Not required for unplanned events which Not required for unplanned events wt
10/5/97 0607-0613 21 are less than or equal to 1 hour are less than or equal to 1 hour
10/9/97 1146-1203 118
10/9/97 1734-1743 150
10/14/97 2315-2400 800
10/15/97 0000-0056 975 ~
10/19/97
1605-1645
658 ~
.~-
10/19/97 2206-2246 4 861 '~'
~~
~ ~"' r'1'ti
10/26/97 0953-1029 9,125 o n '~ i`Tl
10/26/97 1113-1143 1,583 ~ ° -`•'` --
10/26/97 1231-1326 2,215 '~ ~ '~
10/26/97 1956-2034 317 ~ "~ r"f`><
10/30/97 0832-0845 108 Q
TOTAL 20,970 ~,
Unplanned Events greater than 1 hour ~
DATE TIME VOLUME DESCRtPTiON'OF,lNCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE ' ,
10/5/97 0058-0159 191 See Attachments See Attachments
10/7/97 1920-2026 9,167 See Attachments See Attachments
10/8/97 0824-0958 555 See Attachments See Attachments
10/14/97 1618-1955 9,850 See Attachments See Attachments
10/30/97 0319-0421 521 See Attachments See Attachments
TOTAL 20,284
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~
w. wwiw
DATE „ Ti,MI= VOLUME DESCRtPTION,OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE ',
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~
..
DATE '' TIME VOLUME !DESCRIPTION OFINCIDENT & CAUSE ACTION'TAKEN TO ELIMINATE CAUSE
Page 1
TOTAL 0
w ~
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- GC-3
GAS FLARING INCIDENT REPORT
OCTOBER, 1997
70TA1_.
Unplanned Events < 1 Hour 20,970
Unplanned Events > 1 Hour 20,284
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
• exceeding 5,000 MCF
Pilot Purge 16.202
TOTAL FLARED VOLUME 57A61
am-
;y
Y
n N
.,ra-
~
A ~
• C ~
Page 2
• • REPORT NO: J7-4041
B PX FLARE REPORT
' PRUDHOE BAY '
FACILITY: GC-3 DATE: O5 OCt 97 TOTAL VOLUME: 212 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 00:58 TO: 01:59 1 Hrs. 1 Mins. ® ^ ^ ^ 191 MSCF
2. FROM: 06:07 To: 06:13 O Hrs. 6 Mins. ^ ® ^ ^ 21 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing J Pad up after choke /divert valve work, the Gas Transit Line pressure increased causing a HP flare
valve to open.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. Arco reduced production rates and shut-in 3 wells equalling 80 mmscfd. Wells were shut-in or choked back starting at
01:00 hours.
2. BPX reduced production rates and shut-in 1 wells equaling 25 mmcfd. ARCO reduced production rates and shut-in 1
wells equaling 25
mmcfd. Wells were shut-in or choked back starting at 0608 hours.
3.
4.
5.
Rev 6/22/97
• • REPORT NO:
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-$ DATE: O7 OCt 97 TOTAL VOLUME:
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned?
1. FROM: 19:20 TO: 20:26 1 Hrs. 6 Mins. ^ ® ^ ^
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED SLOWDOWN:
First Determination of Cause:
1. Gathering Center lost instrument air pressure resulting in flaring and event ually a total GC S/D.
2.
3.
4.
5.
97-4045
9,167 MSCF
VOLUME
9,167 MSCF
MSCF
MSCF
MSCF
MSCF
OTHER:
Action Taken to Stop Flaring:
1. Gathering Center was S/D in an orderly manor, and then re-started after air pressure problems were repaired.
2.
3.
4.
5.
Rev 6/22/97
• . REPORT NO: 97-4047
f BPX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-3 DATE: O8 OCt 97 TOTAL VOLUME: 555 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 08:24 TO: 09:58 1 Hrs. 34 Mins. ^ ® ^ ^ 555 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. GC3 flare assist valve opened. GC unable to close the valve (their indication showed the valve closed), so they have a
Controls technician trying to repair the problem and close the valve.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Controls technician repaired the problem and closed the flare assist valve.
2.
3.
4.
5.
Rev 6/22/97
• ~ REPORT NO: 97-4055
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-$ DATE: 14 OCt 97 TOTAL VOLUME: 10,650 MscF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 16:18 To: 19:55 3 Hrs. 37 Mins. ^ ® ® ^ 9,850 MSCF
2. FROM: 23:15 TO: 24:00 0 Hrs. 45 Mins. ^ ® ^ ^ $00 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. LPS compressors shut down because of control/instrumentation failure associated with a faulty PLC power supply.
Sk-18 LP compressor failed to load due to low gas rate. Assist gas was added to mitigate black smoke.
2. LPS compressor s failed to load because of control/instrumentation failure during plant start-up. Sk-18 LP compressor
failed to load due to low gas rate. Assist gas was added to mitigate black smoke.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 73 wells equalling 540 mmscfd. Wells were shut-in or choked back starting at
16:35 hours. The total plant was shutdown at 19:34
2. BPX reduced production rates and shut-in all LP wells until compressors could be reloaded.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 97-4U68
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-$ DATE: 3O OCt 97 TOTAL VOLUME: 629 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 03:19 TO: 04:21 1 Hrs. 2 Mins. ® ^ ^ ^ 521 MSCF
2. FROM: 0$:32 TO: 08:45 0 Hrs. 13 Mins. ^ ® ^ ^ 108 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 1 wells equaling 20 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 50 mmscfd. Wells were shut-in or choked back starting at 03:30 hours.
2. BPX reduced production rates and shut-in 1 well equaling 40 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 40 mmscfd. Wells were shut-in or choked back starting at 08:37 hours.
3.
4.
5.
Rev 6/22/97
t
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PB Se -97
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 9,028
4. Flared or vented greater than 1 hour
(Supplemental report aired--See 20 AAC 25.235) 10,018
5. Pilot and Purge 20,321
6. Used for lease operations 521,955
7.Other 0
TOTAL items 1- 7 561,322
8. NGL gas equivalent produced 0
9. Purchased f¢as 0
10. Transferred from: 0
11. Transferred to: CCP 23,736.537
Remarks:
I hereby certify the foreaoins is true and correct to the best of my knowled¢e.
Signature: ~~ ' ~„_,( Title: SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
1. s .._.
;.~ ..
~--
-~~.,v
~..~ ~~
~>
',,,~,
~;
Form 10-422 (Revised 4/95)
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
SEPTEMBER, 1997
Unplanned Events less than or equal to 1 hour ~
DATE TIME VOLUME ' 'DESCRiPT10N AFiNCIDENT'&'CAUSE ' ACTION TAKEN TO ELIMINATE CAUSE
9/3/97 1638-1721 5,226 Not required for unplanned events which Not required for unplanned events whip
9/4/97 0826-0848 1,910 are less than or equal to 1 hour are less than or equal to 1 hour
9/13/97 2204-2218 1,264
9/17/97 2216-2235 198
9/17/97 2252-2329 308
9/29/97 2325-2333 122
• TOTAL 9,028
".DATE TIME VOLUME '' DESCRIPTION OF INCIDENT.&'CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/3/97 2004-2320 2,042 See Attachments See Attachments
9/14/97 0255-0401 6,463 See Attachments See Attachments
9/29/97 1311-1450 1,513 See Attachments See Attachments
TOTAL 10,018
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
''DATE TIME VOLUME '''DESCRIPTION OF INCIDENT& CAUSE ' ACTION TAKEN TO'ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
• DATE TIME VOLUME' DESCRIPTION OFiNCIDENT'& CAUSE ACTION TAKEN TO'ELIMINATE CAUSE
TOTAL 0
1'OTA L
Unplanned Events < 1 Hour 9,028
Unplanned Events > 1 Hour 10,018
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
L Pilot Purge 20,321
TOTAL FLARED VOLUME 39,367
Page 1
• • REPORT NO:
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 03 Sep 97 TOTAL VOLUME:
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned?
1. FROM: 16:38 To: 17:21 O Hrs. 43 Mins. ^ ® ^ ^
2. FROM: 20:04 TO: 23:20 3 Hrs. 16 Mins. ^ ® ^ ^
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN:
First Determination of Cause:
1. High gas transit line pressure caused by CGF ESD problems.
2, High gas transit line pressure caused by CGF ESD problems (Flare assist gas to keep LP flares clean.)
3.
4.
5.
Action Taken to Stop Flaring:
97-3998
7,26$ MSCF
VOLUME
5,226 MSCF
2,042 MSCF
MSCF
MSCF
MSCF
OTHER:
1. BPX reduced production rates and shut-in several wells equalling 1800 mmscfd. Wells were shut-in or choked back
starting at 16:40 hours.
2. Equipment was restarted at 22:59 hours (Tandem compressors & Booster compressor.)
3.
4.
5.
Rev 6/22/97
• • REPORT NO:
BPX FLARE REPORT
PRUDHOE BAY
97-4019
FACILITY: GC-3 DATE: 14 Sep 97 TOTAL VOLUME: 6,46$ MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 02:55 TO: 04:01 1 Hrs. 6 Mins. ^ ® ^ ^ 6,463 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. LPS compressor K-7000/K-70011ost suction because of control/instru mentation failure associated with a faulty Flare
value control card on "A" bank slugcatcher.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX removed all production into "A" bank slugcatcher to stop flaring, techs called out to repair associated card with
faulty flare valve controller.
2.
3.
4.
5.
Rev 6/22/97
• ~ REPORT NO: 97-4034
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 29 Sep 97 TOTAL VOLUME: 1 ,635 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 13:11 TO; 14:50 1 Hrs. 39 Mins. ^ ® ^ ^ 1,513 MSCF
2. FROM: 23:25 To: 23:33 0 Hrs. $Mins. ^ ® ^ ^ 122 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: _ RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. LP Assist gas to stop Black Smoking.
2. Sk-18 LP compressor shut down because of compressor surging due to lo w gas rate. Assist gas was added to prevent
black smoke.
3.
4.
5.
Action Taken to Stop Flaring:
1. Bring up C LDF and X pads.
2. Equipment was restarted at XXXX hours.
3.
4.
5.
Rev 6/22/97
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Au -97
J
•
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 6,922
4. Flared or vented greater than 1 hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 20,021
6. Used for lease operations 553,838
7.OWer 0
TOTAL items 1 - 7 580,781
8. NGL gas equivalent produced 0
9. Purchased gas ~} ~ ~ ~ ~ ~ ~ D 0
10. Transferred from: ~ ~V ~, 4 ~~~ ` 0
a~ cbna~ ~ammi~>~lo
11. Transferred to: CCP ~~~~~~~ ~l . ~ 24,354,898
A~ohor~p~
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: Title: SUPERVISOR
Form 10-422 (Revised 4195)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
_..
__
Official Use Onl :-Flarin Authorization >>l .hr.
1. Safety MCF.
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner llate
Note: All volumes must be convected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
AUGUST, 1997
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8 CAUSE
8/3/97 1058-1110 83 Not required for unplanned events which
8/3/97 1424-1523 4,917 are less than or equal to 1 hour
8/10/97 0536-0548 167
8/10/97 0756-0803 73
8/10/97 1418-1433 208
8/12/97 0144-0231 153
8/14/97 1014-1027 135
•
8/22/97 i 6i 5-1646 215
8/23/97 0948-1017 181
8/23/97 2121-2145 283
8/24/97 0840-0935 382
8/28/97 1004-1022 125
TOTAL 6,922
DATE TIME VOLUME DESCRIPTION OF INCIDENT 8 CAUSE
See Attachments
TOTAL 0
DATE TIME VOLUMME DESCRIPTION OF INCIDENT rl< CAUSE
TOTAL 0
• Planned Events Exceeding i Hour OR Exceeding 5000 Mct`
DATE. TIME Y04UME , DESCRIPTION OF INCIDENT & CAUSE
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 6,922
Unplanned Events > 1 Hour 0
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Event > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 24,921
TOTAL FLARED VOLUME 26,943
~.,t~ Page 1 °~.
,
~sr ~
~.., ~.
~ " ' ~"
.. ~.
ACTION TAKEN TO ELIMINATE CAUSE ~
Not required for unplanned events which '~,,t rre ~'
~ ~
are less than or equal to 1 hour ry,`~_ -„
v~
nl
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
ACTION TAKEN TO EUMtNATE CAUSE
•
•
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
GATHERING CENTER 3 BP FJCPLORATION ALASKA WESTF,RN OPrRATING AREA-PBI Jul-97
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less Wan 1 hour 8,874
4. Flared or vented greater than 1 hour
(Su lemental re rt aired--See 20 AAC 25.235) 47,204
5. Pilot and Purge 21,449
6. Used for lease operations 484,396
7.Other 0
TOTAL items 1- 7 561,923
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 21,073,060
Remazks:
I hereby cCrtifv that the f reaoina is true and correct to the best of my lmowledae.
Signature: ~j~ ~,, ~ _,~` __ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRiJDfiOE 640150 100
Official Use Onl --Flarin Authorization ~ 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
monW following the month of disposition.
Authority 20 AAC 25.235.
~~ .-a
~J
•
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
JULY, 1997
Unplanned Events less than or eq ual to 1 hour ~
'- DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/3/97 1754-1844 694 Not required for unplanned events which Not required for unplanned events whit
7/6/97 0116-0132 1,389 are less than or equal to 1 hour are less than or equal to 1 hour
7/9/97 2241-2338 713
7/12/97 0356-0428 267
7/12/97 1252-1326 217
7/13/97 0837-0934 435
7/14/97 0848-0918 343
7/16/97 1524-1609 469
7/17/97 2008-2030 229
7/23/97 0948-1017 604
7/24/97 0120-0152 1,089
7/24/97 0517-0543 632
7/25/97 0519-0532 45
7/25/97 1010-1100 1,042
7/27/97 0115-0139 417
7/29/97 1931-2014 289
TOTAL 8,874
-DATE
TIME -
VOClIME DESCRIPTION OF INCIDENT & CAUSE
ACT10 TAKEN T EL MI
7/2/97 1130-2400 2,601 See Attachments See Attachments
7/3/97 0000-2400 6,000 See Attachments See Attachments
7/3/97 1505-1749 3,021 See Attachments See Attachments
7/4/97 0000-2400 7,000 See Attachments See Attachments
7/4/97 0000-0644 6,032 See Attachments See Attachments
7/4/97 0633-0929 14,667 See Attachments See Attachments
7/4/97 1021-2128 5,651 See Attachments See Attachments
7/5/97 0000-0150 252 See Attachments See Attachments
7/6/97 0314-0600 1,787 See Attachments See Attachments
7/26/97 0027-0128 193 See Attachments See Attachments
TOTAL 47,204
Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT'& CAUSE ACTION TAKEN`TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL
Page 1
_ ~ BP EXPLORATION (ALASKA) INC.
k t PRUDHOE BAY UNIT - GG3
GAS FLARING INCIDENT REPORT
JULY, 1997
Unplanned Events < 1 Hour 8,874
Unplanned Events > 1 Hour 47,204
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF ~ ._
Pilot Purge 21 n44
TOTAL FLARED VOLUME 77,527
•
Page 2
•
• • REPORT NO: 9]-3899 +
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-$ DATE: 02 Jul 97
TIME OF FLARING: DURATION:
1. FROM: 11:30 TO: 24:00 12 Hrs. 30 Mins.
2. FROM: TO: Hrs. Mins.
3. FROM: TO: Hrs. Mins.
4. FROM: TO: Hrs. Mins.
5. FROM: TO: Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
2,601 MSCF
VOLUME
2,601 MSCF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. Extended flaring event occurred during GC start-up operation as part of shutdown work when bringing up production
from B&C pads. Skid 18 I.P & L.P. gas compressors could not handle the low gas rates resulting from low oil rates as
production increase problems occurred.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. No response taken as this was deemed to be of short duration. Difficulties increasing plant oil rate lengthened the flaring
event duration.
2.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 97-3901
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: Ci. C-3 DATE: O3 JUI 97 TOTAL VOLUME: 9715 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 00:00 TO: 24:00 24 Hrs. 0 Mins. ^ ® ^ ^ 6,000 MSCF
2. FROM: 15:05 TO: 17:49 2 Hrs. 44 Mins. ^ ® ^ ^ 3,021 MSCF
3. FROM: 17:54 To: 18:44 0 Hrs. 50 Mins. ^ ® ^ ^ 694 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. Extended flaring event occurred during GC3 shutdown/turnaround work .The volume of gas from B&C pads HP
production was too low to keep the Skid 18 IP & LP gas compressors on line.
2. While bringing production rates up following shutdown maintenance work on LPS compressor K-7001 had barn door
problems (sheared pin).
3. GC3 opened flare assist gas to minimize any potential of black smoke flaring until the LPS compressor was brought back
on line.
4.
5.
Action Taken to Stop Flaring:
1. Ongoing efforts to increase oil production rate through the plant by attempting to get LPS compressors started. Plant
was kept on production near minimum rates to avoid need for full plant shutdown and safeout.
2. BPX stopped bringing production rates up. The GC informed PCC that the compressor would not be shutdown again to
troubleshoot problems. BPX shut in all L.P production at 1730 hours to stop flaring.
3. LPS K7001 compressor will be brought on line and flare assist gas will be closed.
4.
5.
Rev 6/22/97
• • REPORT NO: 97-3902
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3
DATE: 04 ~U~ 97
TOTAL VOLUME:
33,350 MscF
Intermittent Black
TIM E OF FLA RING: DURATION: Yes No Smoke? Planned?
1. FROM: 00:00 TO: 24;00 24 Hrs. 0 Mins. ^ ® ^ ^
2. FROM: 00:00 TO: 06:44 6 Hrs. 44 Mins. ^ ® ^ ^
3. FROM: 06:33 TO: 09:29 2 Hrs. 56 Mins. ^ ® ^ ^
4. FROM: 10:21 TO: 21:28 11 Hrs. 7 Mins. ^ ® ^ ^
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^
VOLUME
7,000 MSCF
6,032 MSCF
14,667 MscF
5,651 MscF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. Extended flaring event occurred during GC3 shutdown/turnaround work .The volume of gas from B&C pads HP
production was too low to keep the Skid 18 IP & LP gas compressors on line.
2. GC3 opened flare assist gas to minimize any potential of black smoke flaring until the LPS compressor was brought back
on line (replacing motor and clutch on K7001 barn door).
3. While bringing production rates up following shutdown maintenance work, LPS compressor K-7001 continued having
start up problems, compressor was started serveral time due to barn door and logic trouble.
4. GC3 opened flare assist gas to minimize any potential of black smoke flaring until there is sufficient gas to start-up Skid
18 IP and LP compressors.
5.
Action Taken to Stop Flaring:
1. Reduced gas rates to Skid 18 IP & LP gas compressors to minimimze flaring, and waiting on additional equipment
start-up and increased gas rates prior to starting up the Skid 18 compressors.
2. LPS K7001 compressor will be brought on line and flare assist gas will be closed.
3. K-7001 compressor was restarted at 09:15 hours.
4. Winged in all LP wells at 2045 hrs, totalling 550 mmscf, reduced GC3 gas rates to minimum rates, and closed flare assist
gas.
5.
Rev 6/22/97
• • REPORT NO:
97-3905
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-$ DATE: O5 JUI 97 TOTAL VOLUME: 252 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 00:00 TO: 01:50 1 Hrs. 50 Mins. ^ ® ^ ^ 252 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. Extended flaring event occurred during GC3 shutdown/turnaround work .The volume of gas from B&C pads HP
production was too low to keep the Skid 18 IP & LP gas compressors on line.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. All rate to GC3 shut-in at 0150 hrs to safe-out the GC for blind swinging during shutdown/turnaround work.
2.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 97-3907
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-3 DATE: 06 Jul 97 TOTAL VOLUME: 3,176 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 01:16 To: 01:32 O Hrs. 16 Mins. ^ ® ^ ^ 1,389 MSCF
2. FROM: 03:14 TO: 06:00 2 Hrs. 46 Mins. ^ ® ^ ^ 1,787 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. During A-pad and C-pad start-up following SD/turnaround work, K7001 LPS compressor as slow in loading, causing the
inital LPS gas from the slugcatcher to go to flare.
2. Extended flaring event occurred during GC3 shutdown/turnaround work .The volume of gas from A&C pads production
was too low to keep the Skid 18 IP & LP gas compressors on line.
3.
4.
5.
Action Taken to Stop Flaring:
1. K-7001 LPS compressor was loaded and the slugcatcher flare valve closed.
2. Skid 18 IP and LP compressors were started at 0532 hrs and flaring ceased.
3.
4.
5.
Rev s~aa~s~
• • REPORT NO:
BPX FLARE REPORT
PRUDHOE BAY
97-3941
FACILITY: GC-3 DATE: 26 Jul 97 TOTAL VOLUME: 193 MscF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 00:27 TO: 01:28 1 Hrs. 1 Mins. ® ^ ^ ^ 193 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: _ OTHER: _
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Am bient temperatu re increased by
1 °F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 6 wells equalling 150 mmscfd. Wells were shut-in or choked back starting at
0027 hours.
2.
3.
4.
5.
Rev 6/22!97
•
• • ~ ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PB Jun-97
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 6,605
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 667
5. Picot and Purge 24,225
6. Used for lease operations 569,250
7.Other 0
TOTAL items 1 - 7 600,747
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 24,505,128
Remarks:
I hereby certify that th foregoing is true and correct to the best of my knowledge.
Signature~~ ~~~~~~~~j~itle: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
=~
~' ,
`
;
I. t~-.-
m 4' -..
c.a. '.
14.t,~1 ;...
; -..a
~-- ~ ~,
~
~ ~ ~,
~~ ,~
-..-
-_,
-' ®.
x
Q
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
JUNE, 1997
•
•
Unplanned Events less than or equal to 1 hour
~~
~~~ ~ ~
DATE TIME VOLUME DESCRIPTION OF INCIDENT'& CAUSE ACTION TAKEN'TO'ELIMINATE CAUSE
6/13/97 0317-0406 953 Not required for unplanned events which Not required for unplanned events whit
6/13/97 0507-0559 614 are less than or equal to 1 hour are less than or equal to 1 hour
6/15/97 1534-1552 188
6/19/97 0947-1007 194
6/19/97 1240-1334 713
6/19/97 1437-1534 752
6/19/97 1609-1659 868
6/20/97 0802-0840 225
6/20/97 1106-1130 417
6/20/97 1612-1656 188
6/21 /97 2117-2138 117
6/24/97 1041-1102 219
6/24/97 1501-1558 990
6/30/97 1102-1126 167
TOTAL 6,605
Unplanned Events greater than 1 hour ~
DATE TIME 'VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/19/97 0102-0222 667
TOTAL 667
Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'ELIMINATE CAUSE
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 6,605
Unplanned Events > 1 Hour 667
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 24.225
TOTAL FLARED VOLUME 31,497
Page 1
P~
~~~~
-~ ~° '~
~ ~~
A~ask~ ~,` & P~G~aC~~~'
• • REPORT NO: 97-3876
~.
B
PX FLAR
E REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 19 Jun 97 TOTAL VOLUME: 3,194 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 01:02 TO: 02:22 1 Hrs. 20 Mins. ^ ® ^ ^ 667 MSCF
2. FROM: 09:47 TO: 10:07 0 Hrs. 20 Mins. ® ^ ^ ^ 194 MSCF
3. FROM: 12:40 TO: 13:34 0 Hrs. 54 Mins. ^ ® ^ ^ 713 MSCF
4. FROM: 14:37 TO: 15:34 0 Hrs. 57 Mins. ^ ® ^ ^ 752 MSCF
5. FROM: 16:09 To: 16:59 0 Hrs. 50 Mins. ^ ® ^ ^ $6$ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by CCP 1801 low stage compressor shutdown.
2, High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
3. High gas transit line pressure caused by CCP 1801 low stage compressor shutdown.
4. High gas transit line pressure caused by CCP 1801 low stage compressor shutdown.
5. High gas transit line pressure caused by CCP 1801 low stage compressor and rising ambient.
Action Taken to Stop Flaring:
1. CCP restarted and loaded compressor at 01:24, but the transit pressure remained high. BPX reduced production rates
and shut-in 1 well equalling 60 mmscfd. ARCO reduced production rates and shut-in 4 wells equalling 100 mmscfd.
Wells were shut-in or choked back starting at 01:40 hours.
2. BPX reduced production rates and shut-in Swells equaling 100 mmcfd. ARCO reduced production rates and shut-in 2
wells equaling 85 mmcfd. Wells were shut-in or choked back starting at 09:15 hours.
3. CCP restarted and loaded compressor at 1308, but the transit pressure remained high. BPX reduced production rates
and shut-in 1 well equalling 53 mmscfd.
4. CCP restarted and loaded compressor at 1525, but the transit pressure remained high. BPX reduced production rates
and shut-in 1 well equalling 53 mmscfd. Arco s/i 1 well 30 mmscfd in gas.
5. BPX reduced production rates and shut-in 1 wells equaling 53 mmcfd. ARCO reduced production rates and shut-in 4
wells equaling 125 mmcfd. Wells were shut-in or choked back starting at 1600 hours.
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _
AOGCC Representative: Date: BPX Representative: Date:
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PB Ma -97
•
i
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 418
4. Flared or vented :¢reater than 1 hour
(Su lemental re rt aired--See 20 AAC 25.235) 0
5. Pilot and Purge 23,222
6. Used for lease operations 615,058
7.Other 0
TOTAL items 1- 7 638,698
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 26,693,869
Remarks:
I hereby certify~that the foregoing is true and correct to the best of my knowledge.
Signature:~C~., ~ ~~9~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
~ff#G]~ SC: C~Iil ; ~r1 ;:::.:
n ::AllthiJrJ~~tl~A'?:~ .~11',..
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
~ GAS FLARING INCIDENT REPORT
MAY, 1997
Unplanned Events less than or equal to 1 hour ~
~
DATE TIME VOLUME `DESCRIPTION OF' INCIDENT`& CAUSE ,
ACTION TAKEN'TO' ELIMINATE CAUSE
5/15/97 0908-0936 272 Not required for unplanned events which Not required for unplanned events whit
5/27/97 2223-2305 146 are less than or equal to 1 hour are less than or equal to 1 hour
TOTAL 418
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTIONOF'INCIDENT & CAUSE 'ACTION TAKEN TO ELIMINATE CAUSE
• TOTAL 0
Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf
DATE 71ME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN 70 ELIMINATE CAUSE
TOTAL 0
Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT &`CAUSE ACTION TAKEN;TO ELIMINATE CAUSE
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 418
• Unplanned Events > 1 Hour 0
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 23.222
TOTAL FLARED VOLUME 23,640
Page 1
•
i
' ALASKA OIL AND GAS CONSERVATION CI
FACILITY REPORT OF PRODUCED GAS DISP
Facility
GATHERING CENTER 3 Operator
BP EXPLORATION ALASKA Field(s)
WESTERN Ol
Disposition
1. Sold 0
2. Reinjected 0
3. Flazed or vented less than 1 hour 3,887
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,410
5. Pilot and Purge 13,883
6. Used for lease operations 596,505
7.Other 0
TOTAL items 1 - 7 615,685
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 25,643,046
Remarks:
I hereby certify that th foregoing is true and correct to the best of my knowledge.
Signature: ~ ~,~ /~~~Title: SUPERVISOR
Form 10-422 (Revised 4/95)
)MMISSION
OSITION
Month/Yeaz of Disposition
'ERATING AREA-PB Apr-97
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
,~,.y; f,
Y...~,
~.on,_i
Y }. ..... ,....
1 < ~
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
APRIL, 1997
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION Of INCIDENT & CAUSE ACTION TAKEN' TO ELIMINATE: CAUSE `'
4/5/97 1755-1812 260 Not required for unplanned events which Not required for unplanned events whit
4/7/97 1243-1301 300 are less than or equal to 1 hour are less than or equal to 1 hour
4/7/97 1747-1810 59
4/9/97 1730-1816 747
4/9/97 2108-2118 44
4/13/97 2053-2125 1,111
4/14/97 2306-2327 69
•
4/15/97 2224-2315 521
4/17/97 1211-1304 183
4/18/97 0229-0237 83
4/22/97 1518-1538 111
4/28/97 0332-0347 125
4/29/97 1911-1921 201
4/30/97 0457-0504 73
TOTAL 3,887
Unplanned Events greater than 1 hour ~
DATE TIME ~VOL ~ ' DESCRIPTION'OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/1'5/97 1115-1328 153 See Attachments See Attachments
4/29/97 0538-0720 813 See Attachments See Attachments
4/30/97 1205-1724 194 See Attachments See Attachments
4/30/97 1749-1941 250 See Attachments See Attachments
• TOTAL 1,410
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION Of INCIDENT & CAUSE ACTION`TAKEN`TO ELIMINATE CAUSE:.
TOTAL
Planned Event_ Exceeding 1 Hour OR Exceed'I^ g 5 _; 0 Mcf _ ,~. ,..,, , ~~_~ ~
DATE "TIME VOLUME DSSCR^IPTtON Of INCIDENT & CAUSE ACTION TAKEN TO ELFMINATE`CAUSE "`
TOTAL 0
Page 1
~.'
:~
c7
%i
r,
..~
;Y?
<.~
•
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
• GAS FLARING INCIDENT REPORT
APRIL, 1997
TOTAL
Unplanned Events < 1 Hour 3,887
Unplanned Events> 1 Hour 1,410
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge
TOTAL FLARED VOLUME 5,297
Page 2
u
• PORT NO: 97-3775
BPX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-3 DATE: 15 Apr 97 TOTAL V OLUME: 674 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 11:15 TO: 13:28 2 Hrs. 13 Mins. ® ^ ^ ^ 153 MSCF
;`2. FROM: 22:24 TO: 23:15 ~ Hrs. 51 Mins. ® ^ ^ ^ 521 MSCF
'3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
2. While bringing production rates up following K7000 LPS compressor water wash, LPS compressors exceeded maximum
gas capacity and discharged to flare when K7000 was once again shutdown to troubleshoot a problem.
3.
4.
5.
Action Taken to Stop Flaring:
I~' 1. BPX reduced production rates and shut-in 1 wells equaling 20 mmcfd. Wells were shut-in or choked back starting at
1115 hours.
2. BPX reduced production rates and shut-in 4 wells equaling 20 mmcfd. Wells were shut-in or choked back starting at
2300 hours.
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No:
AOGCC Representative: Date: ~ BPX Representative: Date:
•
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 97-3797
FACILITY: GC-3 DATE: 29 Apr 97 TOTAL VOLUME: 1 ,014 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 05:38 TO: 07:20 1 Hrs. 42 Mins. ^ ® ^ ^ 813 MSCF
2. FROM: 19:11 TO: 19:21 0 Hrs. 10 Mins. ^ ® ^ ^ 201 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEFVALVE: _ RUPTUREDISK:_ CONTROLLEDBLOWDOWN:_ OTHER:_
First Determination of Cause:
1. Sk-18 306LP/3071P compressors shut down because of a problem.
2, Sk-18 306LP/3071P compressors shut down because of a problem.
3. 5 ~ - l ~ S I,p ~£ Chi. U.~ C.. Ot }-~ i~ N ~ 1 C~J~.~1"?- Q f°J TR-I~
5. l ~ - ~ ~I ~~.~ ~~
NofZMAi-L`~ 3p Mid ~NE~ ~H®N~, d C.~?P~? i~~~ C.A~'~ ~P~.S ~
Action Taken to Stop Flaring: ~J'~l~Q-"'C '~.~,.~ G'~f tl~ ~" "'~~ '?~ )"` /~ ~-
^'„
1. No response taken as this was deemed to be of short duration. ,~ . l~ ; ~ ~~,i,~,..g ~ '~~
2. No response taken as this was deemed to be of short duration.
5. Qt ~~~ --.°
~~ ~~-I~ Sj~ ~~'G~~~S
~~ .~
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _
AOGCC Representative: Date: BPX Representative: Date:
•
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 97_3800
FACILITY: GC-$ DATE: 30 Apr 97 TOTAL VOLUME: 517 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 04:57 TO: 05:04 0 Hrs. 7 Mins. ^ ® ^ ^ 73 MSCF
2. FROM: 12:05 TO: 17:24 5 Hrs. 19 Mins. ® ^ ^ ^ 194 MSCF
3. FROM: 17:49 TO: 19:41 1 Hrs. 52 Mins. ® ^ ^ ^ 250 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN;_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by bring rates up after proration.
2, High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
4.
5.
Action Taken to Stop Flaring:
1. BPX stopped bringing production rates up until wells unloaded and flaring was ceased. Arco reduced production rates
370 mmscfd. Wells were shut-in or choked back starting at 0445 hours.
2. BPX reduced production rates and shut-in 5 wells equaling 63 mmcfd. ARCO reduced production rates and shut-in 5
wells equaling 80 mmcfd. Wells were shut-in or choked back starting at 13:15 hours.
3. BPX reduced production rates and shut-in 2 wells equaling 30 mmcfd. Wells were shut-in or choked back starting at
18:00 hours.
4.
5.
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _
AOGCC Representative: Date: BPX Representative: Date:
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PB Mar-97
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 6,303
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,806
5. Pilot and Purge 17,666
6. Used for lease operations 594,228
7.Other 0
TOTAL items 1- 7 620,003
8. NGL aas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 27,399,355
Remarks:
I hereby certify that th foregoing is a and correct to the best of my knowledge.
Si nature: ~~/g~ Title: SUPERVISOR
g ~ o,.~f~ _
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Uffici~tl Llse Unlv--Flarin~.Auth~i•ization > l hr.
1. Safetv MCF
2. Lease Use MCF
3. Conserv. Pumoses MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
•
•
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
MARCH, 1997
Unplanned Events less than or equal to 1 hour ~
DATE TIME VOLUME DESCRIATION OF INCIDENT & CAUSE ` ACTIQN`TAKEN TO `ELIMINATE CAUSE
3/2/97 0210-0216 67 Not required for unplanned events which Not required for unplanned events whic
3/2/97 1538-1609 1,076 are less than or equal to 1 hour are less than or equal to 1 hour
3/7/97 0827-0909 3,612
3/7/97 1707-1740 229
3/11 /97 0656-0721 217
3/12/97 0616-0657 588
3/12/97 1618-1646 97
3/23/97 1132-1225 417
TOTAL 6,303
Unplanned Events greater than 1 hour ~
~~.
DATE TIME VQLUME DESCRIPTION OF INCIDENT & CAUSE ACTIQN TAKEN TO ELIMINATE CAUSE
3/30/97 0156-0301 1,806 See Attachments See Attachments
TOTAL 1,806
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE .TIME VOLUME DESCRIPTION OF`INCIDENT & CAUSE ACTION TAKEN TO`ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~
DATE TIME VOLUME DESCRIPTION 4F INCIDENT & CAUSE '' ACt10N TAKEN TO ELIMINATE CAUSE'
TOTAL 0
,..
TOTAL
.~"
,
x°
'
Unplanned Events < 1 Hour 6,303 ~
,~ -Q, ~'"
Unplanned Events > 1 Hour 1,806 F~s ~, ~~
Planned Events < 1 hour & not 0 ,~ ~ ~ . ~z~,
exceeding 5,000 MCF z `-; ~ ~'
Planned Events > 1 hour and 0 G ~ .
exceeding 5,000 MCF
}
Pilot Purge 17,666 ;
TOTAL FLARED VOLUME 25,775
Page 1
REPORT NO
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-$ DATE: 30 Mar 97
TIME OF FLARING:
1. FROM: 1:56 TO: 3:01
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 5 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
TOTAL VOLUME:
Intermi ttent Black
Yes No Smoke? Planned?
^ ® ^ ^
^ ^ ^ ^
^ ^ ^ ^
^ ^ ^ ^
^ ^ ^ ^
97-3743
1,$06 MSCF
VOLUME
1,$06 MSCF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor problems due to gas leak in turbine room.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Arco reduced production rates and shut-in 17 wells equaling 368 mmcfd. Wells were shut-in or choked back starting at
01:50 hours. ARCo informed BP at 02:20 they were trying to restart the compressor.
2.
3.
4.
5.
If >11 HRS.y the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No:
.AOGCC Representative: Date: I BPX Representative: Date:
• •
` ~~ ' ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
GATHERING CENTER 3
•
~J
Operator
BP EXPLORATION ALASKA
OPERATING
Month/Year of Disposition
Feb-97
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 3,834
4. Flared or vented greater than 1 hour
(Sup lemental report required--See 20 AAC 25.235) 6,598
5. Pilot and Purge 13,512
6. Used for lease operations 605,968
7.Other
0
TOTAL items 1- 7 629,912
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 25,424,267
Remarks:
I hereby certify that th foregoing is true and correct to the best of my knowledge.
Signature: ~~~ ®„ _ ~,,.`___.~!/ ~~ Vie: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
iQr~cial.'~~e!C~n1 `~€~7ari .......
r~ ;;A~utt>~afAi:::l;hr,:.;;
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
c
0
1..t..I Q7 U
` 07
~~
/
N to Q1
o `~°
°
W U
V ~
_
~ ~ o
`~
a
{ , . BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
\ GAS FLARING INCIDENT REPORT
FEBRUARY, 1997
Page 1
Unplanned Events less than or equal to 1 hour ~
2/1/97 0000-0015 104 Not required for unplanned events which
2/3/97 0036-0055 198 are less than or equal to 1 hour
2/3/97 0706-0727 248
2/3/97 1519-1538 198
• 2/4/97 0458-0513 156
2/4/97 0745-0756 92
2/4/97 1038-1059 350
2/4/97 1550-1620 417
2/4/97 1743-1838 104
2/5/97 0006-0015 63
2/6/97 0832-0915 806
2/7/97 1547-1608 175
2/24/97 1028-1101 169
2/24/97 2248-2323 139
2/26/97 0127-0148 386
2/28/97 2014-2036 229
TOTAL 3,834
•
Unplanned Events areater than 1 hour
2/20/97 1305-1615 467 See Attachments
2/24/97 1807-1917 331 See Attachments
2/26/97 0336-1022 3,928 See Attachments
2/26/97 1112-1247 924 See Attachments
2/26/97 1744-1915 948 See Attachments
TOTAL 6,598
Not required for unplanned events whi
are less than or equal to 1 hour
See Attachments
See Attachments
See Attachments
See Attachments
See Attachments
Page 2
...........................................
..........................................
...........................................
.....................
Unplanned Events < 1 Hour 3,834
Unplanned Events > 1 Hour 6,598
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
• Pilot Purge 13,512
TOTAL FLARED VOLUME 23,944
•
C~
REPORT NO: 96-3699
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 20 Feb 97
TIME OF FLARING:
1. FROM: 13:05 To: 16:15
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
3 Hrs. 10 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
TOTAL VOLUME: 467 MSCF
Intermittent Black
Yes No Smoke? Planned? VOLUME
Q ^ ^ ^ 467 MscF
^ ^ ^ ^ MSCF
^ ^ ^ ^ MSCF
^ ^ ^ ^ MSCF
^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. LPS compressor K-7001/K7000 had backed down due to a high differantial across the inlets to turbines.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates on3 LP wells equaling60 mmcfd. Wells were shut-in or choked back starting at 1405
hours. High differantial alarms were reset and compressors were loaded back up.
2.
3.
4.
5.
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _
AOGCC Representative:. Date: BPX Representative: Date:
•
REPORT NO: 96-37U4
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 24 Feb 97
TOTAL VOLUME: 639 MSCF
Intermittent Black
TIME OF F LARING: DURA TION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:28 TO: 11:01 O Hrs. 33 Mins. Q ^ ^ ^ 169 MSCF
2. FROM: 18:07 TO: 19:17 1 Hrs. 10 Mins. Q ^ ^ ^ 331 MSCF
3. FROM: 22:48 TO: 23:23 O Hrs. 35 Mins. Q ^ ^ ^ 139 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by EWE gas compressor shutdown
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F. In addition, EWE compressor shutdown at 1838 hours.
3. High gas transit line pressure caused by ARCO ramping up rates.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates by choking back on 3 wells equaling 45 mmcfd. Wells were choked back starting at
10:29 hours.
2. BPX reduced production rates and shut-in 4 wells equaling 129 mmcfd. ARCO reduced production rates and shut-in 6
wells equaling 150 mmcfd. Wells were shut-in or choked back starting at 1812 hours.
3. Arco reduced production rates and shut-in 3 wells equaling 60 mmcfd. Wells were shut-in or choked back starting at
2324 hours.
4.
5.
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No:
AOGCC Representative: Date: BPX Representative: Date:
•
REPORT NO: 96-$]~
BPX FLARE REPORT
PRUDHOE BAY
C~
FACILITY: GC-3 DATE: 26 Feb 97
TIME OF FLARING:
1. FROM: 01:27 To: 01:48
2. FROM: 03:36 To: 10:22
3. FROM: 11:12 ro: 12:47
4. FROM: 17:44 To: 19:15
5. FROM: TO:
DURATION:
O Hrs. 21 Mins.
6 Hrs. 46 Mins.
1 Hrs. 35 Mins.
1 Hrs. 31 Mins.
Hrs. Mins.
Intermittent
Yes No
^ 0
^ 0
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN:
First Determination of Cause:
1. Sk-18 LP compressor shut down because of a problem associated with high vibration.
2. Sk-18 LP compressor shut down because of a problem associated with the bearings.
3. Sk-18 LP compressor shut down because of a problem associated with the bearings.
4. Sk-18 LP compressor shut down because of a problem associated with the bearings.
5.
6,186 MSCF
VOLUME
386 MSCF
3,928 MSCF
924 MSCF
948 MSCF
MSCF
OTHER:
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted to start the standby compressor. 2 restarts
attempted at 0131 hrs and 0144 hrs.
2. Flaring was permitted to continue while maintenance personell worked on LP compressor. The amount of LP gas flared
is around 4 mmscfd. The remainder is assist gas that is added to prevent black smoke. The entire plant would have to
be shutdown to prevent any LP gas from flaring.
3. Flaring was permitted to continue while maintenance personell worked on LP compressor. The amount of LP gas flared
is around 4 mmscfd. The remainder is assist gas that is added to prevent black smoke. The entire plant would have to
be shutdown to prevent any LP gas from flaring.
4. Flaring was permitted to continue while maintenance personell worked on LP compressor. The amount of LP gas flared
is around 4 mmscfd. The remainder is assist gas that is added to prevent black smoke. The entire plant would have to
be shutdown to prevent any LP gas from flaring.
5.
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No:
AOGCC Representative: Date: BPX Representative: Date:
.~ ;,~ ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 3 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PB Jan-97
•
•
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 955
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25?35) 4,590
5. Pilot and Purge 15,125
6. Used for lease operations 698,555
7.Other 0
TOTAL items 1 - 7 719,225
8. NGL gas equivalent produced ~ 0
9. Purchased gas ,~ 0
10. Transferred from:
t~ ~ Gas ~s ~g411tY9tSS`Qt6 0
A(1
11. Transferred to: CCP
25,860,731
Remarks:
I hereby certify that tt fore~oin~ is true and correct to the best of rnv knowled~7e.
Signature: ~~ ~'~~~~itle: SUPERVISOR
~ . ___.~
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official UseOnl --Flarins Authorization> 1 hr.
1. Safetv MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of 1118
month following the month of disposition.
Authority 20 AAC 25.235.
•
•
~~
i
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
JANUARY, 1997
Unplanned Events less than or equal to 1 hour
~~~I ~
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/12/97 1739-1759 306 Not required for unplanned events which Not required for unplanned events which
1/13/97 1810-1827 117 are less than or equal to 1 hour are less than or equal to 1 hour
1/13/97 2146-2159 58
1 /14/97 0001-0055 83
1 /18/97 2101-2114 90
1 /19/97 1529-1538 63
1 /21 /97 1709-1717 61
1 /27/97 1753-1810 177
TOTAL 955
Unplanned Events greater than 1 hour ~
DATE TIME VOLUM E DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/13/97 1056-1420 238 See Attachments See Attachments
1/13/97 2248-2356 76 See Attachments See Attachments
1/14/97 0724-1024 264 See Attachments See Attachments
1/15/97 0113-0257 132 See Attachments See Attachments
1/16/97 1556-1838 250 See Attachments See Attachments
1/22/97 1455-1604 533 See Attachments See Attachments
1/22/97 1850-2025 460 See Attachments See Attachments
1/26/97 1436-1708 2,188 See Attachments See Attachments
1/28/97 0916-1037 345 See Attachments See Attachments
1/31/97 1629-1740 104 See Attachments See Attachments
TOTAL 4,590
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
~~~~~ ~~
FFB 21 1997
Page 1
Alaska Oel & Gas Cons. C.~rnmissic~r~
Altchora~3e
•
•
r
TOTAL
Unplanned Events < 1 Hour 955
Unplanned Events > 1 Hour 4,590
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 15.125
TOTAL FLARED VOLUME 20, 670
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
JANUARY, 1997
FE3 21 1997
Masks Oi6 & Gas Cons. Commission
Anchorage
Page 2
REPORT NO: 96-3644
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 13 Jan 97 TOTAL VOLUME: 489 MSCF
Intermittent Black
TIME OF F LARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:56 TO: 14:20 3 Hrs. 24 Mins. Q ^ ^ ^ 238 MSCF
2. FROM: 18:10 TO: 18:27 0 Hrs. 17 Mins. Q ^ ^ ^ 117 MSCF
3. FROM: 21:46 TO: 21:59 0 Hrs. 13 Mins. X^ ^ ^ ^ 58 MSCF
4. FROM: 22:48 TO: 23:56 1 Hrs. 8 Mins. X^ ^ ^ ^ 76 MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
2. High gas transit line pressure due to too much gas in transit system given the ambient comditions.
3. While bringing production rates up following Trico well testing, LPS compressors exceeded maximum gas capacity and
discharged to flare.
4. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
1 °F.
5.
Action Taken to Stop Flaring:
1. BPX and ARCO reduced production rates.
2. Arco reduced production rates and shut-in 2 wells equaling 70 mmcfd. Wells were shut-in or choked back starting
at1844 hours.
3. No response taken as this was deemed to be of short duration.
4. BPX reduced production rates and shut-in 2 wells equaling 70 mmcfd. ARCO reduced production rates and shut-in 2
wells equaling 45 mmcfd. Wells were shut-in or choked back starting at 2320 hours.
5.
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No:
AOGCC Representative: Date: BPX Representative: Date:
~ ~
REPORT NO: 96-3645
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 14 Jan 97
TOTAL VOLUME: 347 MSCF
Intermittent Black
TIME OF FLARING: DURA TION: Yes No Smoke? Planned? VOLUME
1. FROM: 00:01 TO: 00:55 0 Hrs. 54 Mins. Q ^ ^ ^ 83 MSCF
2. FROM: 07:24 TO: 10:24 3 Hrs. 0 Mins. Q ^ ^ ^ 264 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
1 °F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 1 wells equaling 50 mmcfd. Wells were shut-in or choked back starting at
00:01 hours.
2. BPX reduced production rates cutting back chokes on3 wells equaling 50 mmcfd. Wells were shut-in or choked back
starting at 07:50 hours.
3.
4.
5.
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No:
AOGCC Representative: Date: BPX Representative: Date:
~ ~
REPORT NO: J6-3646
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 15 Jan 97 TOTAL VOLUME: 182 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 01:13 TO: 02:57 1 Hrs. 44 Mins. Q ^ ^ ^ 132 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and trimmed 1 well equaling 20 mmcfd. Wells were shut-in or choked back starting at
0200 hours.
2.
3.
4.
5.
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No:
AOGCC Representative: Date: BPX Representative: Date:
~ ~
REPORT NO: 96-3648
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 16 fan 97
TOTAL VOLUME: 25~ MSCF
Intermittent Black
TIME OF FLARING: DURA TION: Yes No Smoke? Planned? VOLUME
1. FROM: 15:56 TO: 18:38 2 Hrs. 42 Mins. X^ ^ ^ ^ 250 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following XXXXXX, LPS compressors exceeded maximum gas capacity and
discharged to flare. l.i~'tT,NG ~-Rtcs Lomas L~~7 MA~~^'~
2. gACac- o N L-I-~E. ~ {~' H,A~-7~i[~a~. ~~a3I9~
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 45 mmcfd. Wells were shut-in or choked back starting at
1744 hours.
2.
3.
4.
5.
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _
AOGCC Representative: Date: BPX Representative: Date:
~ ~
REPORT NO: 96-3657
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 22 Jan 97
TOTAL VOLUME: 993 MSCF
Intermittent Black
TIME OF FLARING: DURA TION: Yes No Smoke? Planned? VOLUME
1. FROM: 14:55 To: 16:04 1 Hrs. 9 Mins. ^ Q ^ ^ 533 MSCF
2. FROM: 18:50 TO: 20:25 1 Hrs. 35 Mins. Q ^ ^ ^ 460 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. GLT compressor K-3200 shut down because of control/intrumentation failure associated with fuel valve.
2. GLT compressor K-3200 shut down because of control/intrumentation failure associated with fuel valve.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 3 wells equaling 86 mmcfd. ARCO reduced production rates and shut-in 2
wells equaling 85 mmcfd. Wells were shut-in or choked back starting at 1540 hours.
2. BPX reduced production rates equaling 40 mmcfd. ARCO reduced production rates equaling 50 mmcfd. Wells were
.shut-in or choked back starting at 19:00 hours.
3.
4.
5.
If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _
AOGCC Representative: Date: BPX Representative: Date:
~ ~
REPORT NO: 96-3662
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 26 Jan 97 TOTAL VOLUME: 2,1$$ MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 14:36 TO: 17:0$ 2 Hrs. 32 Mins. X^ ^ ^ ^ 2,188 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor problems due toTandem 1886 S/D.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 8 wells equaling 180 mmcfd. Restarted compressor.
2.
3.
4.
5.
If>ii HRS., the PCC wilt notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No:
AOGCC Representative: Date: BPX Representative: Date:
~ ~
REPORT NO: 96-3665
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 28 Jan 97
TOTAL VOLUME: 345 MSCF
Intermittent Black
TIME OF FLARING: DURA TION: Yes No Smoke? Planned? VOLUME
1. FROM: 09:16 To: 10:37 1 Hrs. 21 Mins. Q ^ ^ ^ 345 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following GC-2 "B" Bank S/D," D" Bank flared.
2
3
4
5
Action Taken to Stop Raring:
1. Arco reduced production rates and shut-in 5 wells equaling 150 mmcfd. Wells were shut-in or choked back starting at
09:20 hours.
2.
3.
4.
5.
!# >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No:
AOGCC Representative: Date: BPX Representative: Date:
~ ~
REPORT NO: 9G-3671
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-3 DATE: 31 Jan 97
TOTAL VOLUME: 104 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 16:29 TO: 17:40 1 Hrs. 11 Mins. Q ^ ^ ^ 104 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs, Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following 50% nomations GC#3 C Bank Slg Cat flared due to wells coming on.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates by chokeing back on wells.
2.
3.
4.
5.
~~~~
w ~ ~ 2 ~ 1997
Alaska Oil & Gas ~. Ca~mias-o~.
p~ar~,e
~If >11 HRS., the PCC will notify AOGCC (907) 279-1433. STATE TELEPHONE REPORT? Yes: _ No: _
AOGCC Representative: Date: BPX Representative: Date:
~ ~
• •
BP EXPLORATION (ALASKA) INC.
- - - P.O. Box 196612, Anchorage AK 99519-6612
REPORT OF ACCIDENTAL NATURAL GAS RELEASE
DATE: January 24, 1997
TO: Mr. Blair Wond~~;
Alaska Oil and Gas Conservation Commission
- 3001 Porcupine Drive
Anchorage, AK 99501
FAX: 276-7542
DESCRIPTION OF INCIDENT
1. Date and Time: Friday, 01/24/97, 00:59
2. Location: Detailed Location:
X Prudhoe Bay Unit GC-3 Wellpad A Module 54
_ Endicott Well A 23 Temperature transmitter thermowell
_ Milne Point
Niakuk
Other
3. Volume of natural gas lost: 150 mscf
4. Cause of loss: Throu h wall enetration of A23 tem .transmitter thermowell bod
5. Actions taken and planned Thermowell was changed out. Study team is looking into cause of
to revent further loss: failure and will recommend actions to revent re-occurrence
6. Equipment or procedural Awaits Study Team recommendations
changes to prevent loss
. from recurrin
7. Contact (name and W. Garry Meek 907-659-4472
tele hone number
Signature: ~G'~/
cc: BPX Environmental Compliance Supervisor MB 11-6 (FAX 564-5020)
BPX Volume Accounting MB 5-4
Production Coordinator
Facility Superintendent
~~,: ( `b Aid S4pT,
E~E~~ED
R
SAN ~~ ~~~~
Gas Cons• Commtssion
piaska Oil & Anchorage
,o t~'
• •
BP EXPLORATION (ALASKA) INC.
- -P.O. Box 196612, Anchorage AK 99519-6612
REPORT OF ACCIDENTAL NATURAL GAS RELEASE
DATE: January 23, 1997
TO: Mr. Blair Wondzell
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
FAX: 276-7542
DESCRIPTION OF INCIDENT
1. Date and Time: Wednesday, 01/23/97, 05:34
2. Location: Detailed Location:
X Prudhoe Bay Unit GC-3 Module 4 Well C-03 choke -
_ Endicott
_ Milne Point
_ Niakuk
Other
3. Volume of natural gas lost: 30 mscf
4. Cause of loss: Throu h wall enetration of Well C-03 choke tail iece
5. Actions taken and planned Choke was changed out. Investigation team looking into further
to revent further loss: o ortunities for revention of erosion on tail iece.
6. Equipment or procedural Investigation team will review operating procedures.
changes to prevent loss
from recurrin
7. Contact (name and W. Garry Meek 907-659-4472
tele hone number
Signature: i~~/~
cc: BPX Environmental Compliance Supervisor MB 11-6 (FAX 564-5020)