HomeMy WebLinkAboutBPX - Milne Point Central
'¡\I:'4¡j:;If/<{f~Æ~~'~o/<IIf:;I/I/~W'/'/.mI{rlfY~AP~/I/I/I/I/Æ""./I/#W/""/1/1/1~1/1/1/I~H/'hiW'/.N'/A1ž49YI/D/""..øYI/ÆYIW/I/I,w/8/#'I/N/I/'/4Y1.w/I/Æ'1/8/14V/'/IX~~I/AI";:;ø"/'@;W4V';j¡IP/,;ø?At'l'A!~I/¡f~::;¥.:.';j':~
POiNT CENT¿RL.
.
a'~ .. MII.N~
;as )iS10Si~ior_ ]ileS
-
~l99 5
I r(" r-( r-(
ll~.~ .~.~
'¡ .':;~¡>:.w.:;;Jt;;;:A':'W4f~.íIf~7/Mo/~:fW'/I/~I~/I/'/I/ÆW"/I/N/.Ø"/'~W/.øw..@;w/4?I/ø/AI¡g%UlrÁW"'4V/A~..œ:W..(Ø'/""'/,iWAJlYH/.ø/'/..MVI.480/.67H4IJJ'V#'''''''AØY.4II'7"",,/,'-,4W'.m'.oIt9'N/'''''/Æ'AWI~H/H/I,.W''#/N/N/8/Ø/841W'/''1';1W'/A%4~<'4I~{!~·:~r, ¡~':;
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
FaCility
Milne Point
Disposition
1. Sold
2. Reinjected
e
3. Flared or vented less than I hour
4. Flared or vented greater than 1 hour
(Supplemental report requireddSee 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1-7
e
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
:¡:::::,,':'ð;;;; UU'
Form 10-4':;'/
Rev. 4/95
operator
BP Exploration (Alaska) Inc.
Volume MCF*
Fuel
10,009
293,006
7,370
9,839
2,527
Fuel
168,531
491,282
I Field( s)
Milne Point
and correct to the best of my knowledge.
/,~;:>Pc7/rr04
Title ~4¿YSr Date I~~G
Month/year of Disposition
DECEMBER, 1995
I *Indicate contribution of each pool to total.
Pool Name
KUPARUK
SCH. BLUFF
Code Percent
525100
525140
89.9
10.1
Official Use Only-Flaring Authorization>I hr.
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
1/11/96
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
Decem ber-95
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
e
12/1/95
12/2/95
12/3/95
12/4/95
12/5/95
12/6/95
12/7/95
12/8/95
12/9/95
12/10/95
12/11/95
12/12/95
12/13/95
12/14/95
12/15/95
12/16/95
12/17/95
12/18/95
12/19/95
12/20/95
12/21/95
12/22/95
12/23/95
12/24/95
12/25/95
12/26/95
12/27/95
12/28/95
12/29/95
12/30/95
12/31/95
e
TOTAL
175.0
80.0
278.0
355.0
496.0
367.0
172.0
307.0
229.0
3.7
0.0
0.0
511.4
13.4
0.0
61.1
679.8
149.6
109.9
24.7
131.7
491.1
567.4
529.3
1,026.0
225.0
258.0
0.0
2.5
0.0
126.0
7,369.6
JAN 1 G
1't*(\ (~
j,> ,~¡..)
Page 1
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
1/11/96
IUnplanned Events greater than 1 hour
DATE'"' 'TIME)""" VOLÛME
12/13/95 08:41-10:22, l'
12/25/95 06:00-08:00
TOTAL
477.4
1,026.0
1 ,503.4
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
December-95
DESCRIPTION QlfrJNÇIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
See Attachment
See Attachment
e IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
e
o
Page 2
,-,
ACTION TAKE~:¡Q'ELlMINATECAlJ$E> {iK'
Not required for unplanned events which
are less than or equal to 1 hour
1/11/96
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
December-95
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
See Attachment
See Attachment
See Attachment
See Attachment
12/14/95
12/15/95
12/16/95
12/17/95
e
06:09-24:00
00:01-24:00
00:00-12:46, 1,
00:00-03:48
TOTAL
2,784.0
3,448.0
2,059.5
44.4
8,335.9
TOTAL
Unplanned Events < 1 Hour 7,370
Unplanned Events> 1 Hour 1,503
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events> 1 hour or 8,336
exceeding 5,000 MCF
Pilot Purge 2,527
e TOTAL FLARED VOLUME 19,736 mscf
Page 3
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
December 13, 1995
Time and duration of incident: 0841 to 1022 hrs - 1 hr. 41 min.
Volume flared: 134.2 MSCF
Time and duration of incident: 1027 to 1135 hrs - 1 hr. 8 min.
Volume flared: 159.1 MSCF
Time and duration of incident: 1426 to 1541 hrs - 1 hr. 15 min.
Volume flared: 184.1 MSCF
This unplanned emergency flaring was caused by failure of the #4 cylinder
piston rings on C-5501 A gas compressor. The compressor was brought off line
and safed out for maintenance. Internal valves were inspected and new piston
rings were installed.. Production was curtailed due to the expected long
duration of equipment down time.
I··}\ l' r.:.'
"~ ì~¡~ -
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
December 14, 1995
Time and duration of incident: 0609 to 2400 hrs - 17 hr. 51 min.
Volume flared: 2784 MSCF
This was a planned flaring incident that was caused by new construction work
at E-Pad. All of the gas re-injection was shut in for tie in work. The flaring is
expected to continue for a 48 hour period. Production was curtailed due to the
expected long duration of system down time.
;~J j~,. N: '1 G
!~<>
"
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
December 16, 1995
Time and duration of incident: 0000 hrs to 1246 hrs - 12hr. 46min.
Volume flared: 1918.9 MSCF
Time and duration of incident: 1306 hrs to 1422 hrs - 1 hr. 16min.
Volume flared: 49.8 MSCF
Time and duration of incident: 1848 hrs to 2400 hrs - 5hr. 12min.
Volume flared: 90.8 MSCF
These were planned flaring incidents caused by new construction work at E-
Pad. All of the gas re-injection was shut in for tie in work. Production was
curtailed due to the expected long duration of system down time.
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
December 17, 1995
Time and duration of incident: 0000 to 0348hrs - 3 hr. 48 min.
Volume flared: 44.4 MSCF
This was a planned flaring incident that was caused by new construction work
at E-Pad. All of the gas re-injection was shut in for tie in work. Production was
curtailed due to the expected long duration of system down time.
r:'
·,t
e
e
Ii
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
December 25, 1995
Time and duration of incident: 0600 to 0800 hrs. - 2 hr's
Volume flared: 1026 MSCF
This was an unplanned emergency flaring event which occurred
when a gas detector head in 08 turbine enclosure failed and
shutdown power generation causing a production shutdown. Once
power was returned we experienced PLC communication problems
with the Mod. 56 processor causing the return of gas compression to
be delayed due to no communication with PLC. Once communication
was restored, we returned to normal operations with no further
incident.
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
December 27, 1995
Time and Duration of Incident: 1555 to 1737 hrs - 1 hr 42 mm
Volume Flared: 159 MSCF
This was an unplanned flaring event, which occured when the PLC at
E-pad failed and caused a production shutdown of the injection gas
well, therefore causing a shutdown of the injection gas compressors
in Mod. 55. Once E-pads PLC was returned to normal operation the
injection gas compressor's were returned to service.
~J
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
December 15, 1995
Time and duration of incident: 0001 to 2400 hrs - 23 hr. 1 min.
Volume flared: 3448 MSCF
This was a planned flaring incident that was caused by new construction work
at E-Pad. All of the gas re-injection was shut in for tie in work. Production was
curtailed due to the expected long duration of system down time.
~J
e
e
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facili ty
Milne Point
Oper a tor
BP Exploration (Alaska) Inc.
Disposition
Volume MCF*
1. Sold Fuel 9,136
2. Reinjected 325,046
e 3. Flared or vented less than 1 hour 2,078
4. Flared or vented greater than 1 hour 2,106
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 2,446
6. Used for lease operations Fuel 159,631
7. Other
:!!:
Î-
TOT AL items 1-7 . :::0 500,443
~ ~ Iii
øe ..."
8. NGL gas equivalent produced Ii n (j
e N m
-.a
-.
9. Purchased gas - <
I c.ø
<(">
c:.n ..
10. Transferred from: C
~
11. Transferred to:
Remarks:
I hereby certi/ihat the foregoing is true
Signature ~Û. ~
Form 10-422
Rev. 4/95
Field(s)
Milne Point
Title ~ \.AJC-V~ Date
and correct to the best of my knowledge.
l,-jI8/CZ,J
Month/Year of Disposition
November, 1995
I *Indicate contribution of each pool to total.
Pool Name
KUPARUK
SCH. BLUFF
Code Percent
525100
525140
89.9
10.1
Official Use Only-Flaring Authorization>l hr.
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
12/18/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
November-95
·Unplanned Events less than or equal to 1 hour
PJ\T:Ê TIME (VO~UìïllE'" DESCRlgJlþN OF INCIDENT ~C~SE
Not required for unplanned events which
are less than or equal to 1 hour
e
11/1/95
11/2/95
11/3/95
11/4/95
11/5/95
11/6/95
11/7/95
11/8/95
11/9/95
11/10/95
11/11/95
11/12/95
11/13/95
11/14/95
11/15/95
11/16/95
11/17/95
11/18/95
11/19/95
11/20/95
11/21/95
11/22/95
11/23/95
11/24/95
11/25/95
11/26/95
11/27/95
11/28/95
11/29/95
11/30/95
80.8
0.0
16.2
154.6
4.0
59.7
0.0
458.1
37.3
0.0
0.1
2.8
0.0
83.9
0.2
67.1
38.1
2.9
27.2
61.0
83.0
272.1
42.7
0.4
10.6
0.0
0.0
0.0
347.5
228.0
2,078.3
e
TOTAL
~
i ~
Q d
sa- "T1 (")
~i (")
Ii N m
~ -
ú> <:
~ <.D rr
(.1\
, C
::s
Page 1
J\@TION T AKEN¡[OELlMINA TE CAUSE¿;A1{t'i':
Not required for unplanned events which
are less than or equal to 1 hour
12/18/95
·Unplanned Events greater than 1 hour
DAT~jI~" , 'l(l¡lh'iE;' ';\{~~1JME
11/6/95 03:59-05:00 132.3
11/6/95 08: 16-09:38 234.0
11/6/95 21 :07-22:22 130.0
11/9/95 19: 18-20:23 187.0
e 01/16/95 05:47-08:53 409.0
11/20/95 16:44-21:11 630.0
11/21/95 07:57-12:52 171.0
11/22/95 00:40-01 :46 127.0
11/27/95 17:11-18:36 86.0
TOTAL 2,106.3
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
November-95
Page 2
pE'SCRIPTION OF ItiPIDENT & CAU~É ACTION TAKEN TOE;lI!\IIìì>,IÀTE CAUSE)
Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
L8HH - 2nd stage separator - caused field production shutdown
Gas compressor (C-5511A) shutdown due to leak on valve cover gasket on #4 cylinder
Min flow to PL cooler failed in open position causing extra high level in 3rd stage sep - field shutdown
L8HH - 1 st stage separator - caused field production shutdown
C pad IWAG compressor shutdown for excessive vibration - Wells B-9 & B-22 81 at 09:00 to stop flaring
C pad IWAG shutdown during CFP compressor repairs - B/D GL wells 81 @ 21 :00 hrs
Compressor valve prob. caused interstage P8V to relieve to flare - 81 B-4/9 just after leak was detected
E pad PLC failed - short production shutdown of gas injection wells
L8HH in 3rd stage sep caused field shutdown
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
e
:e:
!-
Q (':2
9" 'M
Ii N
ti -;
\~
?fi
("')
m
'Z
rr
c
o
12/18/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
November-95
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
e
TOTAL
2,078
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
2,106
Planned Events < 1 hour & not
exceeding 5,000 MCF
o
Planned Events> 1 hour or
exceeding 5,000 MCF
o
Pilot Purge
2,446
TOTAL FLARED VOLUME
6,631 mscf
e
~
I- ::0
.
Q 0
ø- rT1 m
!f ("') 0
t~ N m
......
-
- <
f cD
cD IT
<0n-
e
Page 3
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
Flaring Incident Report
(exceeding 1 hour)
RECEIVt:u
DEe 2 1 1995
Alaska Oil & Gas Cons. Commission
Anc:horage
BP Exploration - Milne Point Unit
November 6, 1995
Three separate flare incidents to report:
Time and duration of incident: 0359 to 0500 hrs - 1 hr 1 min
Volume flared: 132.3 MSCF
This was an unplanned flaring event that occurred during a
production shutdown which was a result of a LSHH in the 2nd stage
separator, which caused the gas compressors to shutdown and vent
to the flare. Once the level switch had cleared production was
brought back on line and the flare was eliminated.
Time and duration of incident: 0816 to 0938 - 1 hr 22 mm
V olume flared: 234 MSCF
This was an unplanned event that occurred when C-5511-A gas
compressor was shutdown due to a gas leak on a valve cover gasket
on the #4 cylinder. Valve and gasket were changed and compressor
brought back on line with no further incidents.
Time and duration of incident: 2107 to 2222 hrs - 1 hr 15 mm
Volume flared: 130 MSCF
This was an unplanned flare event which occurred when FCV -5805
(Min Flow to Pipeline Cooler) failed in the open position causing an
Extra High Level in the 3rd stage sep. resulting in a production
shutdown. Once returned to normal operations the field was brought
back on line with no further incidents.
e
e
BP Exploration - Milne Point Unit
November 9, 1995
Flaring Incident Report
(exceeding 1 hour)
Time and duration of incident: 1918102023 hrs -1 hrs 5 min.
Volume flared: 187 MSCF
This was unplanned emergency flaring when a production shut down was
initiated from the first stage separator high high level shut down switch. The
condition was cleared and the field expeditiously returned to production.
RECEIVt:u
eEe 2 1 1995
Alaska Oit & Gas Cons. Commission
Anchorage
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
November 16, 1995
Time and duration of incident: 0547 to 0853 hrs -3 hrs 6 min.
Volume flared: 409 MSCF
This was unplanned flaring when the C-pad gas re-injection compressor shut
down. Due to vibration problems with this compressor, the decision was made
to leave it off line until longer term repairs are made. Production rates in the
field were reduced to cease the flaring.
RECE\Vt:.U
orc 2 1 1995
. ssiOO
...." Oi\ & Gas eons· Com""
A\èAI\a AnChorage
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
November 20, 1995
Time and duration of incident: 1644 to 2111 hrs -4 hrs 27 min.
Volume flared: 630 MSCF
This was unplanned flaring during a period when maintenance was being
performed on gas compressors in the Central Processing Facility. One gas
reinjection machine was shut down for maintenance. With the injection
compressor at C-pad on line, the other machine in the main facility was brought
off line to relieve pressure and safely make piping changes to part of its system.
The C-pad compressor unexpectedly shut down and would not restart. When
going for a start on a main facility compressor, problems were experienced
which meant trouble shooting and delay of start-up. Field production was
curtailed at this time to mitigate the flaring. Compressors in the main facility
were repaired and returned to service and field production ramped back up.
RECE\V\:.U
UtC 2 1 1995
Alaska Oil & Gas Cons. eommiaion
AnchOrage
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
November 21, 1995
Time and duration of incident: 0757 to 1252 hrs - 4 hrs 55 mm
Volume flared: 171 MSCF
This was an unplanned flaring event that occured when C-5531-A
experienced valve problems on the #4 cylinder, causing the
interstage PSV to relive to flare. Compressor was shutdown along
with production wells (B-9 and B-4) in order to mitigate flaring. Once
valves and piston seal rings were replaced the compressor was
brought back on line with no further incidents.
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
November 22, 1995
Time and duration of incident: 0040 to 0146 hrs - 1 hr 6 mIll
Volume Flared: 127 MSCF
This was an unplanned flaring event, which occured when the PLC at
E-pad failed and caused a production shutdown of the injection gas
wells, therefore causing a shutdown of the injection gas compressors
in Mod. 55. Once E-pad's PLC was returned to normal operation the
injection gas compressor's were returned to service with no further
incidents.
RECE,\Vt:U
OtC 21 \995
Oil & Gas Cons. ~
Alaska AnchOrage
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
November 27, 1995
Time and duration of incident: 1711 to 1836 hrs - 1 hr 25 min
Volume flared: 86 MSCF
This was an unplanned flaring event that occurred during a during
production shutdown which was a result of a LSHH in the 3rd stage
seperator. Once the shutdown alarm had cleared in the 3rd stage sep.
production was returned to normal and the flare was eliminated.
e
e
e
e
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
FaCility
Milne Point
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1-7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
:¡:::::,,"'~;;'j'
Form 10-422 -/ "7
Rev. 4/95
operator
BP Exploration (Alaska) Inc.
Field(S)
Milne Point
Volume MCF*
Fuel
8,706
289,851
436
1,538
2,528
Fuel
149,145
452,204
f
";;¡I. t,.,,. 1 "~
~'
true and correct to the best of my knowledge.
pl~OPIJC.í"~
Title .ANp.Ly~r Date 10);/9!1-
I MonthlY ear of Disposition
October, 1995
I *Indicate contribution of each pool to total.
Pool Name
KUPARUK
SCH. BLUFF
Code Percent
525100
525140
87.5
12.5
.:-:;-::;.,.
offiêrålUse Only-Flaring Authorization> Ihr.
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
11/15/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
October
·Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
e
1/2/95
1/3/95
1/4/95
1/5/95
1/6/95
1/7/95
118/95
1/9/95
1/10/95
1/11/95
1/12/95
1/13/95
1/14/95
1/15/95
1/16/95
1/17/95
1/18/95
1/19/95
1/20/95
1/21/95
1/22/95
1/23/95
1/24/95
1/25/95
1/26/95
1/27/95
e
1-23: 1 0/23: 12-~
19:12-19:17/H
4:51-4:53/4:54
4: 14-5:06/5:44
13:01-13:03
12:54-13:16/1~
17.3
11.9
19.4
26.9
0.7
46.1
o
26.3
o
2.5
32.8
0.7
o
0.41
33.8
72.6
38.7
57.4
o
10.8
6
o
o
o
26
5.8
3:29-:31/4:35-:
2:08-: 12/8:27-:
6:23-:25/6:40-:
1 :42-:46
9:29-9:34/9:37
8:31-:36/12:51
8:25-:52/8:57-!
7:32-:45/7:51-:
12: 18-:29/12:3
12:34-:39/12:4
6:34-:45/7: 17-:
18:26-:29/18:3
19:24-:28
,. i...,"
TOTAL
436
Page 1
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
11/15/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
October
Page 2
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
10/2/95
10/7 /95
10/15/95
10/23/95
10/25/95
18:33-22:50
16:50-19:06
4:49-7:38
12:50-16:07
14:34-15:58
609.9 A shutdown was caused by a LSHH in the second stage separator.
356 A surge during pigging operations caused a malfunction of a level transmitter in the first stage separator.
21 .7 Gas reinjection compressor-auto valve malfunction
541 Gas Compressor maintenance (C-5501A)
9 Gas Compressor-leaking isolation valve (C-5531 B)
e
TOTAL
1,538
It
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
o
11/15/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
October
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
e
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour & not
exceeding 5,000 MCF
Planned Events> 1 hour and
exceeding 5,000 MCF
Pilot Purge
TOTAL FLARED VOLUME
e
o
TOTAL
436
1,538
o
o
2,528
4,502
Page 3
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
October 2, 1995
Time and duration of incident: 1833 to 2250 hrs - 4 hrs 17 mm
Volume flared: 609.9 MSCF
This was an unplanned flaring event that occurred during a
production shutdown caused by a LSHH in the 2nd stage sep. Levels
in vessels were returned to normal, and compressor's brought back
on line which eliminated gas to the flare header.
e
e
mi
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
October 7, 1995
Time and duration of incident: 16:50 to 19:06 hrs -2 hrs 16 mm.
Volume flared: 356 MSCF
This was an unplanned flaring event that occurred during
pigging operations on a field to plant production line (B-pad
production). The pigging operations were causing abnormal fluid
consistency and flow with resultant surging action within the first
stage separator vessel. The first stage separator level reached a high
level which was not common but was within normal operating
parameters, however on this occurrence the level tripped a high high
and shut down CFP process facilities. Follow up calibration checks
found the level transmitter had drifted off 10% from the normal
setting. Also, during the process plant start up the gas plant
required more than one re-start as a result of slugging and surging
flow streams.
e
e
m¡
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
October 15, 1995
Time and duration of incident: 0449 to 0738 hrs -2 hrs 49 min.
Volume flared: 21 MSCF
This was unplanned flaring resulting from an automatic valve malfunction on
one of the gas re-injection compressors. The duration versus volume is atypical
due to the necessity for trouble shooting to identify the malfunction. The
compressor was isolated to cease flaring.
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
October 23, 1995
Time and duration of incident: 1250 to 1607 hrs -3 hrs 17 min.
Volume flared: 541 MSCF
This was unplanned flaring from repairs having to be made to C-5501 A gas
compressor. The compressor was brought off line and safed out for
maintenance. Internal valves and gaskets were replaced in two of the four
cylinders. The compressor was immediately returned to service after repairs
were complete. Production was not curtailed due to the expected short duration
of equipment down time.
e
e
r
~
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
October 26, 1995
Date of Incident: 10-25-95
Time and duration of incident: 1434 to 1558 hrs -1 hrs 28 min.
Volume flared: 9.0 MSCF
This was unplanned flaring from a leaking actuated isolation valve on C-5531B
gas compressor. Once the flare source was found, a secondary isolation valve
was closed to stop the flaring. Production was not curtailed due to the expected
short duration and low flaring rate.
~."" .,.... i..,,,, j' ~
; f <{,.
\1 L: 0
e
e
e
e
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Milne Point
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1-7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
Si:::::,,~:;Z;;'7 ¡,
Form 10-422 /- . 1
Rev. 4/95
operator
BP Exploration (Alaska) Inc.
I Field( s)
Milne Point
Volume MCF*
Fuel
8,027
226,456
1,161
287
2,446
Fuel
129,123
367,500
RI..~LtwED
OCT 1 9 1995
Alaska Oil & Gas Cons. Commission
Anchorage
true and correct to the best of my knowledge.
;::RoDf.I<.;f;p;c;
Title -'9.IVA¿y.s,- Date /~~~
),
Month/year of Disposition
September, 1995
I *Indicate contribution of each pool to total.
Pool Name
KUPARUK
SCH. BLUFF
Code Percent
525100
525140
87.5
12.5
Official Use Only-Flaring' ALlthorization> I hr.
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
10/12/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
September-95
Page 1
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
e
9/1/95
9/2/95
9/3/95
9/4/95
9/5/95
9/7/95
9/8/95
9/9/95
9/10/95
9/11/95
9/12/95
9/13/95
9/19/95
9/21/95
9/25/95
9/26/95
9/27/95
9/28/95
9/29/95
e
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
3-09:00/09:02-(
~-14:47/18:37-1
09:31-09:39
7-18:17/19:37-"
16:25-16:31
21 :43-22:00/2~
00:29-01 :43/0"
08:04-08: 19/m
09:51-09:59/1 (
13:11-13:16/1~
22:49-22:54
13:40-13:43/1 t
14:41-14:44
19:08-19:28/H
20:35-20:39/2(
00:53-00:56/0~
20:28-20:30
00:58-00:59/1 ~
16:27-16:35/H
TOTAL
26
1
17
20
1
191
185
126
51
33
1
17
7
10
141
113
1 Production rates and gas volumes were reduced to mitigate flaring.
9
212
1,161
Rt.....L:lw[O
OCT 1 9 1995
Alaska Oil & Gas Cons. Commission
Anchorage
10/12/95
"Unplanned Events greater than 1 hour
DATE TIME VOLUME
9/8/95 00:29-01 :43
9/27/95 07:55-14:42
TOTAL
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
September-95
Page 2
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
231 This was an unplanned emergency flaring event when the Production rates and gas volumes were reduced to
56 pressure safety high on the first stage separator tripped. mitigate flaring.
287
e
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
e
o
R t. '"' L..' 'Í t 0
OCT 'I 9 1995
Alaska Oil & Gas Cons. Commission
Anchorage
10/12/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
September-95
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
e
TOTAL
1,161
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
287
Planned Events < 1 hour & not
exceeding 5,000 MCF
o
Planned Events> 1 hour and
exceeding 5,000 MCF
o
Pilot Purge
2.446
TOTAL FLARED VOLUME
3,894
e
.
Page 3
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
R ' ,..
to-L't/tO
OCT Î 9 1995
AJaskaOil .& Gas Cons Co '.
Anchorag~ mmlSSlon
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
IFacility
Milne Point
Disposition
1. Sold
2. Reinjected
e
3. Flared or vented less than 1 hour
e
4. Flared or vented greater than 1 hour
(Supplemental report requjred--See 20 AAC 25.235)
r:::
,
Q e
6. Used for lea~era~s 8
I"> ~ riG
-- \0 (3£f
J..u ~ 811
,rt;;:) CJ... c:::!
TOT~tem~-7 3 f
8. NGL gas equivalent produÌl
5. Pilot and Purge
7. Other
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
S¡:::::""~~fh~;;)¡'
Form 10-422 /
Rev. 4/95
operator
BP Exploration (Alaska) Inc.
Field(S)
Milne Point
Volume MCF*
Fuel
7,978
228,416
2,238
149
2,528
Fuel
122,580
363,889
true and correct to the best of my knowledge.
Pl2ðOLlcT/~
Title ~4L'/.s-T Date 0 ~/9 S
Month/Year of Disposition
August, 1995
I *Indicate contribution of each pool to total.
Pool Natne
KUPARUK
SCH. BLUFF
Code Percent
525100
525140
88.0'
12.0
Officiál . Use Only-Flaring Autho~ization>l· hi.
;.)...... '. " ::~:.~~~.,
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
·
9/14/95
IUnplanned Events less than or equal to 1 hour
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
August-95
Page 1
e
8/1/95
8/4/95
8/5/95
8/6/95
8/7 /95
8/8/95
8/9/95
8/10/95
8/11/95
8/12/95
8/13/95
8/14/95
8/15/95
8/16/95
8/18/95
8/19/95
8/20/95
8/21/95
8/22/95
8/23/95
8/25/95
8/27/95
8/28/95
8/29/95
e
18-16:50/17:09-17:0!
9:38-9:44/9:44-9:56
7:42-7:47/7:52-7: 55
17:21-17:22
01 :03-01 :06/1 0:31-1
00:03-00:06/00:08-(
14:06-14:09/16:06- '
19:27-19:30/19:32-'
16:02-16:06
00:00-00:04/00:05-(
02:03-02:08/02:09-(
00:00-00:03/00: 11-(
03:57-04: 1 0/04: 18-(
01 :26-01 :52/02:00-(
17:07-17:09/17:37-'
02 :42-02:46/02:47-(
06:32-06:36/06:44-(
08:54-09: 12/09:31-(
o
20: 11-20:27 /20:31-~
02:31-02:44/02:47-(
o
TOTAL
3.8
2.3
45.5
o
52
34.7
76.1
23.8
23
69.8
66.7
216.4
328.1
363.8
72.1
242.6
78.9
96.5
126
0.3
152.5
160
2.7
2,238
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
"
9/14/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
August-95
IUnplanned Events greater than 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
Page 2
events
are less than or equal to 1 hour
e
8/22/95 (1:18-_23:~:~
GoD N...,.. !.IV
149MSCF Unplanned emergency flaring event when the pressure safety high on the first stage separator tripped.
Production rates and gas volumes were reduced to mitigate flaring.
~Lu(<:<- J5 -. <7
TOTAL
158 MSCF
e
Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
TOTAL
o
9/14/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
August-95
Page 3
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
Not required for unplanned events which
are less than or equal to 1 hour
.............,.. :~,~.~
~'rO.;,gqMINÞ,.:m;;ç~gª.~~~1~"'~~". "
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
e
Unplanned Events < 1 Hour 2,238
Unplanned Events> 1 Hour 149 MSCF
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events> 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 2528 MSCF
TOTAL FLARED VOLUME 4915 MSCF
e
e
e
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Milne Point
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1-7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
:¡::::"œrt~~7 ¡.
Form 10-42;1 -
Rev. 4/95
operator
BP Exploration (Alaska) Inc.
Field(S)
Milne Point
Volume MCF*
Fuel
7,893
290,334
1,078
4,337
2,284
Fuel
119,978
425,904
~ ~
...,.
,,'to
AUG 1 7 1995
AlQS~ DU .& Gas ;oos. Cnmm' ,
-- ....1 rA"".. _u.ulijUU)
.. DI.uuQIiQII.y"-----
true and correct to the best of my knowledge.
?£oD';;~ 9'1-
Title ..4/VA1<y.sr Date ~/-05-
1~::th/Year of Disposition
:r~I..'y
, 1995
*Indicate contribution of each pool to total.
Pool Name
KUPARUK
SCH. BLUFF
Code Percent
525100
525140
86.3
13.7
Öfficial Use Only-Flarjng AuthorizatiQn>I hr.
~:. -:. : .. '~A.- .,.
...... /.."
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
...
:
8/15/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
July-1995
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
7/1/95 1423-1424 0.2
7/6/95 0030-0100 58.1
7/7/95 1507-1538,18C 90.7
7/8/95 0738-2118 87.9
e 7/12/95 1038-1723 26.2
7/14/95 0946-1006 42
7/15/95 1800-1944 39.5
7/16/95 1730-2326 60
7/18/95 0522-2000,221 335.8
7/19/95 0000-0012,14C 243.9
7/25/95 1611-1627 26.4
7/26/95 0942-1128 56
7/28/95 0625-0650 7.1
7/29/95 0847-0841 3.7
TOTAL 1,078
e
Page 1
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
8/15/95
IUnplanned Events greater than 1 hour
e
DATE
7/6/95
7/6/95
7/15/95
7/16/95
7/16/95
7/17/95
7/18/95
7/26/95
7/27/95
7/27/95
7/28/95
7/28/95
7/30/95
7/30/95
TIME
0036-0622
1414-2316
1521-1749
0919-1152
1555-1705
1350-2016
2013-2136
0713-0934
1008-1310
1429-1609
0038-0625
0509-0623
0537 -0801
1356-1518
TOTAL
VOLUME
117 MSCF
1343 MSCF
251 MSCF
280 MSCF
89 MSCF
62 MSCF
190 MSCF
278 MSCF
533 MSCF
287 MSCF
622 MSCF
207 MSCF
45 MSCF
33 MSCF
4337 MSCF
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
July-1995
DESCRIPTION OF INCIDENT & CAUSE
Compressor Maint.
Compressor Maint.
Turbine on diesl for pig launch
Turbine on diesl for pig launch
Turbine on diesl for pig launch
Turbine on diesl for pig launch
Compressor Maint.
Turbine on diesl for pig launch
Compressor Maint. SID Big "A", "B"
Compressor Maint. SID Big "A", "B"
F+G system failure (UV controller fault)
Lube oil switch malfunction on compressor
Flare from supplimental gas from a nitrogen safe out
Flare from supplimental gas from a nitrogen safe out
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
e
TOTAL
o
Page 2
ACTION TAKEN TO ELIMINATE CAUSE
.
.
8/15/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
July-1995
Page 3
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
e TOTAL
Unplanned Events < 1 Hour 1,078
Unplanned Events> 1 Hour 4337 MSCF
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events> 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 2284 MSCF
TOTAL FLARED VOLUME 7699 MSCF
e
e
c
0
'(jj
(I)
0 'ë
I.t") s
U-J 0
0"> Q
...,:::> ~ cñ CD
....,.", c:: C)
(j) 0 ~
u 0
L.U (I) i3
< } ct ~
:L c..!)
lU ..J..J cd
æ (f) .5
~.
e Kt
<ë,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
¡Facility
Milne Point
operator
BP Exploraûon (Alaska) Inc.
IField(s)
Milne Point
Djsposition
Vo'ume MCF·
1. Sold Fuel
7,503
2. ReiJlj~t~
260,435
3. Flared o~ veJ1lC4"J less than 1 bour
5,588
4. FI3red or ventC4"J greater th~ß 1 hour
lSupp¡"mcmal "p." .....IIed..s.. 2D AAC 2.5.23S)
2,0.51
5. Pi101 ~ßd Purge
o
6. Used for lease operations Fuel
113,262
7. Other
TOTAL i1ems 1-7
)88,839
8. NGL gas equivalent produced
9. Purchased gas
JO. Transferrro from:
l1. Transferred 10;
Remarks:
I 'oreby ""'Jl ,"" "'~ CM""", ¡, .~ ..., 00'_ 10 "" ". of ..y ....,....
Sigßature {<"G. {L~ Title Wlrb(t VQU.JVYTÆDate 7/p/~0'
Form 10-422
Rev. 4195
MonlhlYear of Disposition
~June, 1995
UJ
(T1
-U
I--"
IJ)
.IndiCAte cOJ1I~ibution of each pool to tolal.
~
IJ)
lJ1
IS)
Q)
Pool Name
KUPARUK
SCH. BLUFf
Code Percent
525100
525140
84.5
15.5
I--"
N
~
tD
-U
(T1
X
-U
r
o
AJ
D
-
H
o
:z
-
D
X
< -
offièi¡¡1 ~sè .Only-~Flà(iñg Au:thoJìu,fiorì>1 - hi
1. S ~fety
MCP
2. Lease
MCP
3. Conserv. PllCposes
MCF
Commju;oner
Date
Note: AU volumes musl be corrected lo
pressure of 14.65 psia and to a ~emperalure
of 60 degrees F. Reporl due by the 20111 of
the month folowing lhe month of
disposition, Autborily 20 AAC 25.235.
-u
N
"-
N
N
"
N
a..
9/25/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
For the Month of: June
IUnplanned Events less than or equal to 1 hour
. DATE - : TiME - - VOLUME . DEScRIPTION OF INCIDENJ-&:CAUSE
Unplanned Events greater than 1 hour
e
x
a:
I-
z:
o
H
I-
a:
œ:
o
~e
a..
In
E
a..
Q"\
N
(Y)
(S)
If)
Q"\
,
If)
N
a..
w
(f)
_: _. DATE
6/1/95
6/1/95
6/1/95
6/1/95
6/1/95
6/1/95
6/1/95
6/1/95
6/1/95
6/2/95
6/2/95
6/2/95
6/3/95
6/3/95
6/4195
6/10/95
6/11195
6/20/95
6/21/95
6/22/95
6/28/95
6/30/95
6130/95
_ - ~-- ~mÆ -...
00:00-01 :17
04:21-06:13
06:13-07:23
07:23-09:59
10:02-11 :51
12:51-14:09
14:10-16:32
17:57-19:49
22:55-24:00
00:53-02:25
02:46-05: 18
07:02-08:39
12:32-14:28
15:16-16:23
10:06-13:50
07:57-09:11
13:23-17: 17
16:14-17:45
14:01-16:03
09:51-11:38
05:09-06:23
05:37-08:01
13:56-15:1 B
TOTAL
'.VOL1.,lMÉ-:_ - 'DE$ÇRIP'I1ÓNOFINCIOEÑT BeCAtJSE·. . _ . -'.-..
49.61' CM5502·31 B Down for repair
37.1 CombineÐ to 1 event
65.7 Combined to 1 event
64.7 ð\ Comblnecl to1 event
49.7 (!-
27.3 Q-
77.6
51.4
33.5
32.6 These three even1S are from 1Itlle B ft 1 cylinder
55.9 125.) piston damage. Equip. off line for repairs. mod &
37 piston shipped out for repairs.
52 .2 <- - Big B SID for valve replacement & leaks into mod.
30.7 \8Z.,e¡ Big B down fOT valves & leaks
142.3
199.6
493.1
241
3.3
21.4
207.3
45 l
33 S 7B
2,051
CSS01-11A Compo back on line @09:01
Compression SID
Gas Comp. SID
Compo back on @ 06:20
Rr- ...."'ED
C.... t I 'w
~tP 26 1995
Alaska UII & Gas Cons. ComtnissiQn
Anchorage
Page 1
AcnON TÀKEN. 'Jö. ELIMINATE èAU~
e
>
fa'"'
(I)
::<;"
p.¡
Q c:.... ^'
Qo C Mï
'" ø :z n
:¡
" ¡u
'" (t) N m
0
<:) --' -
:::J
¡n "....,..&- <
0 u:;;
<:> ('D ïn
:3 (f¡
:3 0
ëñ"
en
õ· e
:::J
J'
II,
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
IFaCility
Milne Point
I Field(s)
Milne Point
operator
BP Exploration (Alaska) Inc.
Disposition
Volume MCF*
1. Sold Fuel 8,268
2. Reinjected 311,866
3. Flared or vented less than 1 hour 4,074
4. Flared or vented greater than 1 hour 5,014
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 2,528
6. Used for lease operations Fuel 122,919
7. Other
TOTAL items 1-7
454,669
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I .herebY cer¡rr; r;tt the fore7fiïf
SIgnature '<' {LA /I/(ì'UJ
is true and correct to the best of my knowledge.
Title m&(t. \fO{ f-ê\/ Date (~t511S'
Form 10-422
Rev. 4/95
Month/Year of Disposition
May, 1995
I *Indicate contribution of each pool to total.
Pool Name
KUPARUK
SCH. BLUFF
Code Percent
525100
525140
87.7
12.3
Ol'ficial l.j~c Only-f'laring Authorization> I hr.
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Nott;: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REI)ORT OF PRODUCED GAS DISPOSITION
FaciJily
CENTRAL FACILITY
Operator
BP EXPLORATION
rield(s)
MILNE POINT
Month/Year of Disposition
April 1995
Disposition
Volume MCF*
*If production comes from multiple pools,
indicate contribution of each pool to total.
I. Sold
0,163
Pool Pool Percent
code
KUPARUK 525100 86.5%
SCH. BLUFF 525140 13.5%
2. Reinjected
e
290,529
3. Flared or vented less than I hour
5,088
4. Flared or vented greater than 1 hOllr
(Supplemental repon required-oSee 20 AAC 2S.23S)
3,450
5. Pilot and Purge
2,446
. .Ai,.,! ',ioi~).':",::,~"! ''':';' ".' '~. :'+.:,d" ~.t:,": i'if: ",\,,: }~]~~l:,~ ":> ~ .+,~-" ¡:i;',:, ;:"; .:,...~,-~.-<, ~\.;,.;'j'. ,:, ,:'.'
o.ffiêiäl kiP se.?:: o.Ì1I>,~ fl ªrirÜ~ .\{ðuUio~ii~tipn>1 ;,hr !(;{,;:.;j~.
tt~.f~~11(1'¡~t!~~~:t¡f~1f't(~¥tRY:i;*~;i!;~¡,'m'~lt¥4;;;~:~~ v :>ì;i'¡:;' .; .:.,;;
6. Used for lease operations
158,678
I. Safety
Mcr
7. Olher
2. Lease
Mcr
TOTAL
470,354
3. Conserv. Purposes
Mcr
e
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month
following the month of disposition. Authority 20 AAC 25.253
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Sign.."« Q.O. fL~~
Title
MI!g, Vol, Royalty & Sev.
Date: -3/rl,(q-:r
Form 10-422
Rev. 11/94
7rr~
r, ¡,;.
',;'
"""~f!!R"lJI!'! ""'f('''
BP EXPLORATION (ALASKA) INC.
MILNE POINT UNIT
GAS FLARING INCIDENT REPORT
APRIL, 1995
(Unplanned Events less than or equal to 1 hour
IU]:..,· DAT~#I;mm.fi1JJ~§!JImJ!IY.º~.uM,~.~t:~~,>j';RJ:§ç'lm:r'PN.ºff.lNÇID.J;{III¡~' çA.y~~t.iî~'~'~'I~fi~~ri\
1-Apr 211 Not required for unplanned events which
2-Apr 255 are less than or equal to 1 hour
3-Apr 253
4-Apr 266
5-Apr 185
6-Apr 190
a 7-Apr 475
., 8-Apr 265
9-Apr 78
10-Apr 131
11-Apr 231
12-Apr 230
13-Apr 214
14-Apr 359
15-Apr 276
16-Apr 209
17-Apr ,0
18-Apr 7
19-Apr 157
20-Apr 29
21-Apr 37
22-Apr 74
e 23-Apr 25
24-Apr 200
25-Apr 44
26-Apr 52
27-Apr 76
28-Apr 117
29-Apr 261
30-Apr 181
TOTAL 5,088
RECE/li
VcD
-4IQ$kq M4 y 7
all & G. 6 1995
q$Co.
I/¡¡c/¡o/: 'l/s. COIll .
CI ~/$S¡O"
Page 1
,!¡¡ñ;';;AG11(>{IIT A~ENTº,J;b!MINAIEÇA""SEt,~'r<\.' (¡5¡Miîi,,~¡
Not required for unplanned events which
are less than or equal to 1 hour
BP EXPLORATION (ALASKA) INC.
MILNE POINT UNIT
GAS FLARING INCIDENT REPORT
APRIL, 1995
Page 2
(Unplanned Events greater than 1 hour I
DAT~M:~~j\T~IM~?mME:.~ijf~ºhllM.¡;,..iºf;§çßleIIQJ:ii9].JN9IJl~~I¿ft.·.çÆY§!;_'_!i~li~~£!,.º~.·;r~~E.Nltº.!=.YMJ!,!~n;.çA!l~,ª"~~liIIi
e
e
1-Apr
1-Apr
1-Apr
2-Apr
5-Apr
6-Apr
6-Apr
6-Apr
8-Apr
16-Apr
19-Apr
23-Apr
1 051 - 1231
1258 - 1436
1454 - 1614
1035 - 1451
1510 . 1615
0704 - 1150
1341 - 1446
1447 - 1726
1307 - 1409
1245 - 1725
1120 - 1428
0804 - 1035
TOTAL
204 Relieving wellbore psi to allow for safe well work
1 88 Relieving wellbore psi to allow for safe well work
1 3 Relieving wellbore psi to allow for safe well work
474 Gas compression SID on computer malfunction
1 67 Field SID resulting from a psi switch malfunction
66 5 Unplanned gas compressor repairs
97 Unplanned gas compressor repaIrs
288 Unplanned gas compressor repairs
1 28 Unplanned gas compo main!. to repair leak into mod.
406 Main power generation equipment failure
4 7 1 Unplanned gas compressor repairs
349 Gas compo SID from lire & gas sys. malfunction
3,450
..,./z.. (Pf/'IY, ~L;-? \J.)fìAï
n'\1U:. ¡)
i) b - Wt\ 4'\1 kf>/\ tV-S
Slowly blow down to minimize flaring
Slowly blow down to minimize flaring
Slowly blow down to minimize flaring
Restored computer, sys. cleared. return equip to SVC.
Sys. cleared to Immediately resume field prod.
Production rates reduced to mitigate flarIng
Production rates reduced to mitigate flaring
Production rates reduced to mitigate flaring
Leak repaired and equipment returned to service
Equipment repaired and power turbine restarted
Repairs made and equipment returned to service
Condition cleared and equipment returned to service
BP EXPLORATION (ALASKA) INC.
MILNE POINT UNIT
GAS FLARING INCIDENT REPORT
APRIL, 1995
Page 3
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf I
:S··";.. D#\T~J:~t~~~;!tI~TIME;~~ºbµME:j;,!i¿iD;å;:Q1;!)çF1leI!ºN:c;O:JN,Çtº,ªNI:~ÇAYª,g%11.~í!¡¡i~,~'¡12:¡Î~~2;::: E;¡'¡;;i;iAÇII.ºNIAt(I:N:rº..gL!MIN~T1;Ç~µSE:2~5;1H:';1'Ì~t!~~>
TOTAL
o
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
_jiïº.ÍÄ.~:~~!
5,088
3,450
Planned Events < 1 hour & not
exceeding 5,000 MCF
Planned Events> 1 hour and
exceeding 5,000 MCF
Pilot Purge
e TOTAL FLARED VOLUME
o
o
~
10,984
BP EXPLORATION (AlASKA), INC. 1995- REPORTING FORMAT
VOlUME ACCOUNTING
KUPAAUK & SCHRADER BlUFF GAS DISPOSITION & RESERVE DEBIT REPORT
(VOLUMES ARE IN MCF AT 14.65 PSIA AND 60 F.)
CAlCUlATIONS SUBJECT TO REVISION WHEN ANAlIZED
Apr-95
BPXO OXY BPXA TOTAL
KUPARUK OWNERSHIP % (Blend due to non-consent wells) 65.21% 8.93% 25.86% 100.00%
SCHRADER BLUFF OWNERSHIP % 64.38% 8.82% 26.80% 100.00%
COMPOSITE TRACT OWNERSHIP% 64.38% 8.81% 26.81% 100.00%
Total Gas Produced
e Gas Production KUP 207,738 28,435 82,360 318.533
Gas Production SB 40.793 5,588 16,982 63,363
Gas Production Tract Operations 56,756 7,768 23,634 88,158
Total 305,287 41,791 122,976 470,054
Gas Was Used As FOllows:
Electric Power Generation (Excluding Sales to MPPL) 76,956 10,535 30,999 118.490
Other Operations Use (Buildings & To Heat Oil) 26,101 3,576 10,511 40,188
Electric Power Generation (Sales to MPPL) 6,627 907 2,629 10,163
Flare 6,939 952 2,793 10,684
Injection 188,664 25,821 76,044 290,529
Tolal 305,287 41,791 122,976 470,054
Allocallon 01 Electric Power (Excl MPPL) and OIher Operallons Use
KUP Share of Fuel Gas Used For Area Operations
For Power Generation·Excludlng Sales to MPPL 52,367 7,170 20,759 80,296
For Other Uses 17,761 2,434 7,038 27.233
Total KUP Fuel Gas Excluding MPPL Sale 70,128 9,604 27,797 107,529
SB Share 01 Fuel Gas Used For Area Operations
e For Power Generation-Excluding Sales to MPPL 10,281 1,408 4,282 15,971
For Other Uses 3,488 478 1,452 5,418
Tolal SB Fuel Gas Excluding MPPL Sale 13,769 1.886 5,734 21.389
Tract Operations Share 01 Fuel Gas Used For Area Operations
For Power Generation-Excluding Sales to MPPL 14,308 1,957 5,958 22,223
For Other Uses 4,852 664 2,021 7,537
Tolal Tract Operations Fuel Gas Excluding MPPL Sale 19,160 2,621 7,979 29,760
Page 1
BP EXPLORATION (AlASKA), INC. 1995· REPORTING FORMAT
VOlUME ACCOUNllNG
KUPARUK & SCHRADER BlUFF GAS DISPOSITION & RESERVE DEBIT REPORT
(VOlUMES ARE IN MCF AT 14.65 PSIA AND 60 F.)
CAlCULATIONS SUBJECT TO REVISION WHEN RNAlIZED
Apr-95
KUPARUK OWNERSHIP % (Blend due to non-consent wells)
SCHRADER BLUFF OWNERSHIP %
COMPOSITE TRACT OWNERSHIP%
BPXO OXY BPXA TOTAL
65.21% 8.93% 25.86% 100.00%
64.38% 8.82% 26.80% 100.00%
64.38% 8.81% 26.81% 100.00%
Allocation of Flare Gas & Flare Authorization to PA and Tracts
.. Authorized Flare-All PAs and Tracts
_ Addlional Flare Authorized
Tract Operations Share Of Flare Gas
Authorized Flere Gas
Additional Authorized Flare Gas
Authorized Flare Gas Subject To Tax
Unauthorized Flare Gas Subject To Tax & Penalty
N/A N/A N/A 10.984
N/A N/A N/A N/A
N/A N/A N/A 7,443
N/A N/A N/A 7,443
N/A N/A N/A N/A
0 0 0 0
0 0 0 0
N/A N/A N/A 1,481
N/A N/A N/A 1,481
N/A N/A N/A N/A
0 0 0 0
0 0 0 0
N/A N/A N/A 2,060
N/A N/A N/A 2,060
N/A N/A N/A N/A
0 0 0 0
0 0 0 0
KUP Share 01 Flare Gas
Authorized Flare Gas
Additional Authorized Flare Gas
Authorized Rare Gas Subject To Tax
Unauthorized Flare Gas Subject To Tax & Penalty
Schrader Bluff Share Of Flare Gas
Authorized Flare Gas
Additional Authorized Flare Gas
Authorized Rare Gas Subject To Tax
Unauthorized Rare Gas Subject To Tax & Penalty
e
Allocation-Electric Power (7.9% of Total Electric Power) Sold To MPPL
From Kuparuk PA
6,627
907
2,629
10,163
GaslnjectJon. Allocation to PAs and Tract Operation.
Kuparuk Injection 126,261 17,279 50,060 193,600
YTD 462,116 63,236 184,547 709,899
ITD 5.947,861 832,711 2,147,329 8,927,901
Schrader Bluff Injection 26,097 3,572 10,865 40,534
Page 2
BP EXPLORATION (AlASKA), INC. 1995- REPORTING FORMAT
VOlUME ACCOUNTING
KUPAALA< & SCHRADER BLUFF GAS DISPOSITION & RESERVE DEBIT REPORT
(VOLUMES ARE IN MCF AT 14.65 PSIA AND 60 F.)
CAlCUlA TlONS SUBJECT TO REVISION MIEN ANALIZED
Apr-95
BPXO OXY BPXA TOTAL
KUPARUK OWNERSHIP % (Blend due to non-con.ent wells) 65.21% 8.93% 25.86% 100.00%
SCHRADER BLUFF OWNERSHIP % 64.38% 8.82% 26.80% 100.00%
COMPOSITE TRACT OWNERSHIP% 64.38% 8.81% 26.81% 100.00%
YTO 85,473 11,697 35,588 132,758
ITD 681,489 68,419 345,390 1,095,298
e Tract Operations Injection 36,306 4,970 15,119 56,395
YTO 107,998 14,782 44,976 167,756
!TO 131,955 18,060 54,954 204,969
Total Gas Reserve Debit 116,623 15,970 46,932 179,525
Tolal KUP Reserve Gas Debit
Month 81,477 11,156 32,300 124,933
YTD 311.217 42,594 124,337 478.148
ITO 7,197.819 1,013,074 2,483,791 10,694,684
Total S6 Reserve Gas Debit
Month 14.696 2,016 6,117 22,829
YTD 50,420 6,900 20,989 78,309
ITO 592,881 54,811 312,146 959,838
Total Tract Operations Reserve Gas Debit
Month 20,450 2,798 8,515 31,763
YTD 63,750 8,722 26,541 99,013
ITD 88.159 12,063 36,706 136,928
Total S6 Reserves Injected Into KUP Reservoir
e Month 26,097 3,572 10,865 40,534
YTD 85,473 11,697 35,588 132.758
ITD 681,489 68,419 345,390 1.095,298
Total Tract Operations Reserves Injected Into KUP Reservoir
Month 36,306 4,970 15,119 56,395
YTD 107,998 14,782 44.976 167,756
ITO 131,955 18,060 54,954 204,969
Total S6 or Tract Reserves Sold from KUP Reservoir
Month n/s nla nla nla
YTD n/s nla nla nla
ITO nla nla nla nla
Page 3
"
BP EXPLORATION (AlASKA), INC. 1995- REPORTING FORMAT
VOlUME ACCOUNTING
KUPARUK & SCHRADER BlUFF GAS DlSPOS/TION & RESERVE DEBIT REPORT
(VOLUMES ARE IN MCF AT 14.65 PSIA AND 60 F.)
CALCUlATlONS SUBJECT TO REVISION WHEN ANAl/ZED
Apr-95
BPXO
KUPARUK OWNERSHIP % (Blend due to norw:onsent wells) 65.21%
SCHRADER BLUFF OWNERSHIP % 64.38%
COMPOSITE TRACT OWNERSHIP% 64.38%
NOTE: CURRENT MONTH KUPARUK PA FIGURES SHOWN ABOVE INCLUDES WElll14 VOLUMES.
PRIOR MONTH'S NEED TO BE RESTATED FOR RETROACTIVE INCLUSION OF l141N PA.
~ TAXED AUTHORIZED FlARING NOT REQUIRED TO BE AlLOCATED TO WIOs FOR SCH B2 REPORTING
~líTHoRIZED FlARING INCLUDES AlL FlARING EXCEPT CATEGORY C SCHEDULE B2 AI< GAS FlARING REPORT
e
Page 4
OXY
8.93%
8.82%
8.81%
BPXA
25.86%
26.80%
26.81%
TOTAL
100.00%
100.00%
100.00%
I spoke to Henry Harrington on August 07, 1995 about the following events that were
reported for April:
04/01/95
relieving wellbore psi to allow safe well work
There were three events on this day. They were trying to bring a new well on and it
wouldn't gas-off. There was way too much gas and they decided that they had
communication with a nearby well. They finally shut the well back in.
04/02/95
Gas compressoin SID on computer malfunction
They had a problem with the PLC (programmable logic control) and had to troubleshoot
it. They whole compression plant was shut down. When this happens they can;t supply
gas for the artificial lift system and the whole field shuts down. The volume flared is
depress-urization volumes in this case. the event lasted 4 hours, but aside from the
depressuri-zation volume, nothing else was flared. The PLC has been very problematic
and they will replace the whole system when they expand their facility in September.
04/05195
Field SID resulting from a psi switch malfunction
The high pressure switch in either module 55 or 58 in the main production facility failed.
They troubleshooted and then reset the switch.
04/06/95
Unplanned gas compressor repairs
During three events, both ofthe gas lift compressors (5511A and 5511B) had to be shut
down to change out valves which had been leaking. The suction and discharge valves
were replaced on both machines. He was unable to tell me which one of the compressors
was shut down at what times.
04/08/95
Unplanned gas compressor maintenance to repair leak into module
The leak was at the compressor. A valve cover gasket had blown out on the B gas lift
compressor.
04/16/95
Main power generation equipment failure
This was a complete failure caused by a failure of the speed sensor on the turbine. They
replaced the magnetic pick-up of the sensor. This took a lot of troubleshooting time, but
e
e
since the whole field was shut in, no gas was being flared. The volumes were, again,
depressurization volumes.
04/19/95
Unplanned gas compressor repairs
Several suction valves were replaced on #3 cylinder. The gas lift wells were shut-in while
these repairs were being made.
04/23/95
Gas compressor SID from fire and gas system malfunction
The PLC initiated the fire and gas logic on B pad, which shut down module 55.
e
e
!;.;;,;;~~~¡.~\~
. }!¡
. ..'-"-.
."
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL FACILITIES
Operator
BP EXPLORATION
Field(s)
MILNE POINT
Month/Year of Disposition
March 1995
Disposition
Volume MCF*
*If production comes from multiple pools,
indicate contribution of each pool to total.
1. Sold
9,575
Pool Pool Percent
code
KUPARUK 525100 86.9%
SCH. BLUFF 525140 13.1%
e 2. Reinjected
248,380
3. Flared or vented less than 1 hour
3,578
4. Flared or vented greater than 1 hour
(SupplemenlaJ report required--See 20 AAC 25.235)
1,448
5. Pilot and Purge
2,527
-''''7'~:~~~''''''':'- ·"77-~~--~:·_-'--:-'------,-,·-:'t T7-~~7~-~-:--~--'~-~,
Official Use( Orily-Flaring' 'Authorization> 1 . hr:';W0
¡,,::':.:, " ",,':~ :f>' --.:~::,¿: <, '::.,: "~i) i'<1:,.';.';:' :~ ,;: :;,,:'," t,:,,'t:},,: '(':,<~,:/ '\ :,ff \:;;;
6. Used for lease operations
151,910
I. Safety MCr
7. Other
2. Lease
Mcr
e
TOTAL
417,418
3. Conserv. Purposes
Mcr
Note: All volumes must be corrected to pressure of 14.65 psia and to a tcmpcratufe of 60 degrees F. ReP9f't/ by the 20th of the month
following the month of disposition. Authority 20 AAC 25.253 C [:/1 ~
Remarks: 4 y,/:,[)
.tJQ$kq PI? 1 ('J
4icf 8 In
4'q,r C .I.9S
I hereby certify that the foregoing is true and correct to the best of illY knowledge. "'ltJcqO/J 01J.s: GJ
Oi il.¡:¡ Ol}¡þ..
í\ I ~ ' ,~ "1102
Signature _ _ ~1. Title___._.__.M!!g,_ygJLBºyalty & Sev. Date: _'i~3(f:/J
Form 10-422
Rev. 11/94
·;.
. 8/16/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
March-1995
lunplanned Events less t~.~n or equal to 1 hour
e
DATE
1-Mar
2-Mar
3-Mar
4-Mar
5-Mar
6-Mar
7-Mar
8-Mar
9-Mar
10-Mar
11-Mar
12-Mar
13-Mar
14-Mar
15-Mar
16-Mar
17-Mar
18-Mar
19-Mar
20-Mar
21-Mar
22-Mar
23·Mar
24-Mar
25·Mar
26-Mar
27-Mar
28-Mar
29-Mar
30-Mar
31-Mar
e
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
57.5 Not required for unplanned events which
50.7 are less than or equal to 1 hour
42
12.3
22.7
33.1
32.7
0.8
70.9
16.4
9
16.8
7.5
16.8
20
51.7
73.2
127.5
236
279
4
39.5
156
395.6
181.6
462.5
326.2
200.2
196.4
264.8
174.7
3,4 70
TOTAL
Page 1
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
R (. t ~ 'w'E D
AUG 1 7 1995
AiaSkaOil.& Gas Cons. Commission
~chorage
e
e
.~
. 8/16/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
March-1995
Page 2
IUnplanned Events greater than 1 hour
DATE
2-Mar
11-Mar
11-Mar
17-Mar
26-Mar
26-Mar
30-Mar
30-Mar
TIME
1220 - 1531
0808 - 0931
1906 - 2017
1549 - 1747
1107 - 1214
1724 - 1830
0803 - 1005
1016 - 1150
TOTAL
VOLUME DESCRIPTION OF INCIDENT & CAUSE
31 7.4 Gas compressor maintenance
1 6.5 Process upsets & gas compressor shut down
129.2 Gas compressor shut down
255.4 Gas lift header shut down valves closing
97.7 Gas compressor pressure relief valve lifting
96.2 Excess gas while bringing shut in producer on line
299 Relieving well bore high pressure for safe work
236.5 Relieving well bore high pressure for safe work
1,448
ACTION TAKEN TO ELIMINATE CAUSE
Repair and restart equipment
Upsets remedied and equip't. returned to service
SID cleared and equip't. returned to service
System restarted and valves to normal position
Unloaded compressor and reseated valve
Well shut back in to eliminate flaring
Well depressurized and shut in
Well depressurized and shut in
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
o
,. 'E'D
R ;~, ... I. ' .
AUG 1 7 1995
AlasKa Oil 8& Gas Cons. Commission
Anchorage
'.
8/16/95
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
GAS FLARING INCIDENT REPORT
March-1995
Page 3
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
e TOTAL
Unplanned Events < 1 Hour 3,470
Unplanned Events> 1 Hour 1,448
Planned Events < 1 hour & not 0
exceeding 5,000 MCF 1< ;. "'ED
",I.
Planned Events> 1 hour and 0
exceeding 5,000 MCF AUG 1 7 1995
Pilot Purge 2284 MSCF Alaska OU .& Gas Cons. Commission
- Anchorage
TOTAL FLARED VOLUME 7699 MSCF
e
e
e
I spoke to Henry Harrington on August 31, 1995 about the following events that were
reported for March:
03/02/95 Gas compressor maintenance
There was an internal valve problem with 5501B, which is the main gas lift compressor.
They reduced rates while the repairs were being made.
03/11/95 Process upsets and gas compressor shutdowns
There was a high cylinder temperature alarm, indicative of a bad valve.
03/11/95 Gas compressor shutdown
There was low lube oil pressure in the traybomb? system, which is the oiling system.
03/17/95 Gas lift header shutdown valves closing
5801A and 5801B shipping pumps had an emergency shutdown alarm on the gas lift
header.
03/26/95 Gas compressor pressure relief valve lifting
A PSV relief valve was relieving prematurely, causing compressor loading
Rates were cut back while repairs were being made.
03/26/95
Excess gas while bringing shut in producer on line
03/30/95 Relieving wellbore high pressure for safe work
They were replacing the internal valves. Milne Point has the only ones of this type on the
North Slope, and they're positive displacement reciprocating. They will have more gas
handling problems as they bring more wells on line.
03/30/95
ala
Relieving wellbore high pressure for safe well work
..
-
-
.
'*
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
"..
1
Facility
CENTRAL FACILITIES
Operator
BP EXPLORATION
Field(s)
MILNE POINT
Month/Year of Disposition
Feb-95
Disposition
Volume MCF*
*1£ production comes from multiple pools,
indicate contribution of each pool to total.
Pool
Percent
1. Sold
8,134
KUPARUK
88.0%
2. Reinjected
224,643
SCHRADER BLUFF
12.0%
3. Flared or vented less than 1 hour
1,500
4. Flared or vented greater than 1 hour
(Supplemental report requiredhSee 20 AAC 25.235)
1,487
5. Pilot and Purge
2,283
Official Use Only-Flaring Authorization> 1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
6. Used for lease operations
131,518
7. Other
TOTAL
369,565
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month
following the month of disposition. Authority 20 AAC 25.253
Remarks:
I hereby certify that the foregoing is true and correct to the best of my kÌ1owled!e.
Signature QQ. ~
Ti tIe
Mug, Vol, Royalty & Sev.
Date: 3/~'{ 1,s
Form 10-422
Rev. 11/94
.
.
(bl)
(b2)
(b3)
(b4)
(b5)
(b6)
(e)
EmerIOø Up <1 No Tax
Pilot/Purge No Tax
Erner >1 NoTøx
Plan. <1&<5000 NoTax
Indispens. Leaae No Tax
Authorized Tax
UnauthlWaste Tax/Penalty
N/A
1500
2283
1487
o
o
--
Includes Flare purgelpilot; Vent purge & TEG regen. akid .tripplnq and bianket gas volume.
Prepar.d Þv G, Alexander - MPU Facllitv PI'9d, SUP\', ext. 8331
e
COR RepoMg
Beg. & End. Times <1hr >1hr
Dot. Duration VoIu.... Duration Volumes D.scrlptlon 01
01 hour Mel > 1 hour Mel Incidents I Ce....
Tot.1 Sch. 82 (b6) 0 0
AOGCC ~ng
Un. 3 dhr I 1,500
Une 4 > 1hr 1.487
AOGCC~
Une & Pilot I PUrge Sch. B2 (b2) 2283
Lln. 7 Contln_ AMiot Sch. 82 (b5) N/A
I ,
1) Pre-euthorizaUon reQuired for flarina and venting when testing a well before reQutar production
~~
(~ <-. .~
C" ~~ ~~
q, «; '\, ~ .#
~ <->" (
~~ '\!,~ ~~Cb
.~ <1.> - ~
~ ~.
>~
~i?
¥
Action T.k... to
Eliminate C.....
P.rt 4 Plenned ...nt. ._Ing 1 hour OR
I I
AOGCC _ fIorng I V_ng Incklont R_rt
.x_lng &000 Mel
Tol.1
Sch. B2 (b4)
o
Dot.
Bog. & End. TIII10II
Duration
hour AND not ox_lng &000 Mel
<1hr
VoIu....
Mel
Description 01
Incldonto
ICe....
T.k... to
Ellmlnato e.u..
lib.
1fEÞ?t:...
Port 3 Plenned ._ not ._Ing
2 UI\PIaßned .vento gruIor lhan , hour
Bog. & End. TIII10II
D.. Dur.tlon
1-Fob 0118 - 0328 1 hr 8 mln
4-Fob 1140 - 1818 4 hra 3' mln
'-Fob 1128 - 1&17 3 hra &1 mln
12-Fob '828 - 2333 & hra & mln
13-F.b 080& - 10&' 2 hra &4 mln
22-Fob 08&7 - 1344 3 hra 47 mln
Totol Sch. B2 (b3)
>1hr
VoIu.... Description 01
Mel Incldonto I Ce....
113 Gu co~..tfon .Idd SID-control IVI. malfunction
378 Centr.1 Focflhln high ,...... molfunetion ESD
25 3 Inadvertent F~IItH SID from Prev.nt. M"nL
8 8 eøeretional upaetl - 3ref Itg uparetor t.,. relief
4.8 Gu compreuion aIdd SID..frtacMrtent from PM'I
1 3 3 PSV, m au co~re'lion reUevedlmalfunctioned
1487
ActIon
Action T."'" to
Ellmlnato e.u..
Repair control IYI. & return .quip\. to ..rvle.
T_ .hoo~ ....oIr & brought Focflllio. on llno
SID _diad & brought Central FoclUtIn on llno
AIt.red procell t8n1n. & prenu,., to ateblllze
Condltionl norrMliZed and return equlp't. to ..rvice
Trouble 1h00l. rn.... repair and return .qulp't. to ,.rvlce
Pori
Tot.1
Sch.
82 (bl)
28-F.b
27·F.b
Dote
1·F.b
2-F.b
I-Fob
4-F.b
7-F.b
'·F.b
11-F.b
12-Fob
13-F.b
14-F.b
1I-F.b
1I-F.b
17-F.b
18-Fob
"-Fob
20-F.b
21-Fob
Beg. & End. TinM
Durllllon
I I I
AOGCC GII, Flaring & Venting Incident Report
I IDORR~ I
Port Unplanned _nto not ._Ing 1 hour
c1hr
VoIuIMo
Mel
,
'3
288
II
33
10
73
38
74
74
184
128
84
41
8'
.2
18
8
11
8'
"
1&00
BPX Milne Point Unit
FEB 1995
."
mi
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
February 1, 1995
Time and duration of incident: 0118 hrs to 0326 hrs - 1..hr 8 min.
Volume flared: 192.7 MSCF
This emergency flaring was a result of a gas compression module SID from a
scrubber level control mechanism malfunction. The system was immediately
repaired, returned to service and the gas compression process equipment
brought back on line.
e
e
Iii
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
February 4, 1995
Time and duration of incident: 1140 hrs to 1619 hrs - 4 hrs 39 min.
Volume flared: 376.4 MSCF
This emergency flaring was a result of a field wide production SID originating in
the Central Facilities. The crude sales stream was flowing at an abnormally
high temperature as a result of a valve test in progress on the pipeline oil
cooler. The downstream high temperature switch malfunctioned and initiated
the production shut down. The long duration of the flaring was a result of
extensive trouble shooting in order to bring the facility back on line.
. .
e
e
e
e
\À~~ ?
Þ.).?J.s'VA O\\&. Gª. '..
._, ",f\\l\\\}ì
\,;q
~~ß{\\I ~\
This emergency flaring was a result of a field wide production SID originating in
the Central Facilities. Preventive maintenance on the sales pipeline high
temperature switch resulted in an inadvertent shut down. The cause was
remedied and the wells and facilities brought back on line. A gas leak to the
flare system from the gas compression facility was located and stopped.
..\\~,:>\QI.\
Time and duration of incident:
Volume flared: 252.8 MSCF
BP Exploration - Milne Point
February 9, 1995
1126 hrs
to
1517 hrs
3 hrs 51
min.
®
Unit
Flaring Incident
(exceeding 1 hour)
Report
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
February 12, 1995
Time and duration of incident: - 1828 to 2333 = 5 hrs 5 min.
Volume flared: 65.9 MSCF
This flaring occurred through the flare relief valve off the third stage separator
from operational upsets. Low heat from the field held gas in solution and the
operating pressure had to be increased. Temperatures were increased within
the Facility for make-up. The flaring ceased once the process stabilized,
allowing the pressure to be returned to normal.
.......
~
e
e
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
February 13, 1995
Time and duration of incident: - 0805 to 1059 = 2 hrs 54 min.
Volume flared: 465.8 MSCF
This emergency flaring occurred when the gas compression facility shut down
from a system malfunction during routine fire and gas protection PM's. The
electronics and automation communication were checked for faults. The gas
compressors were returned to service after all conditions had been normalized.
..
e
e
mi
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
February 22, 1995
Time and duration of incident:
Volume flared: 132.9 MSCF
0957 to 1344 = 3 hrs 47 mIn.
This emergency flaring occured when PSV -5558 on the Fuel Gas
Filter Seperator lifted off seat and went to flare. PSV was reseated
and put back in normal operation. During this period C-5531 .
injection compressor was taken down due to PSV 5541B on the
discharge of compressor leaking gas on the pilot line. Pilot line was
repaired and put back in service.
t.ct.\\!~\)
R \~~'i)
þ,\\ ~ () ~~\
\J\ cot\ß. C~·
..&~3.~ .~.
.~ø 1,)\\ ~f\~\\Qt3.~
;.~"':) 11'\>'
,
.
~
e
e
e
e
AJaska Oil & Gas Cons.
Anchora .e
Commission
FE8 2 2
RECEIVED
This emergency flaring was a result of a field wide production SID originating in
the Central Facilities. The crude sales stream was flowing at an abnormally
high temperature as a result of a valve test in progress on the pipeline oil
cooler. The downstream high temperature switch malfunctioned and initiated
the production shut down. The long duration of the flaring was a result of
extensive trouble shooting in order to bring the facility back on line.
1995
Time and duration of incident:
Volume flared: 376.4 MSCF
BP Exploration - Milne Point
February 1 1995
1140 hrs
to
1619 hrs
4 hrs 39 min
Unit
Flaring Incident
(exceeding 1 hour)
..
®
Report
4'
®
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
February 1, 1995
Time and duration of incident: 0118 hrs to 0326 hrs 1 hr 8 min.
Volume flared: 192.7 MSCF
This emergency flaring was a result of a gas compression module SID from a
scrubber level control mechanism malfunction. The system was immediately
repaired, returned to service and the gas compression process equipment
brought back on line.
e e
I spoke to Greg Alexander on June 29, 1995 about the following events that were
reported for February:
02/01/95
Gas compressions skid SID-control system malfunction
A scrubber level control mechanism failed, causing the compressor to shut down. The
level controls control the liquid level in the dehydration scrubber. The final stage is a
physical switch. This failed, giving the appearance that the liquid level was too high. When
this happens, it sends a sequence to depressure the volumes in the compressor, causing
the compressor sid.
02/04/95
Central Facilities high temp. malfunction ESD
A valve test was being performed on the pipeline oil cooler and the downstream high
temperature switch failed. The switch is normally set for 200 deg. and it failed at 184 deg.,
causing a fieldwide shutdown. The volumes flared during the incident were blowdown and
safety flare volumes. This type of switch failure is very rare.
02/09195
Inadvertent Facilities SID from preventative maintenance
The same high temperature switch failed while preventative maintenance was being done.
I spoke to Jeff Scarbrough on July 07, 1995 about the high temperature switch:
On February 4th, the switch had drifted out of calibration and was 30 deg. off when it
tripped. They repaired it, recalibrated it, and retested it on the 4th and it appeared to be
working properly. On the 9th it failed again. It had drifted out of calibration again and they
replaced the switch this time.
02/12/95
Operational upsets - 3rd stage separator flare relief
Low heat from the field held the gas in solution and the operating pressure had to be
increased. When ththis happens the pumps begin to cavitate and stop moving liquid. As a
result, more gas is "flashing" upstream, causing sporadic flaring. 5 hours is a reasonable
time frame because that's the retention time in the pipeline. A line heater and glycol bath
heat the stream up at the wellsite.
e
e
2/13/95
Gas compression skid sid-inadvertent £fom PM's
There is a fire and gas detection and prevention system in all of the modules. Periodically,
they have to make sure that all are calibrated and functioning properly. The ESD fuses
have to be lifted and at a certain point there's a high chance of sid through the computer
system. This happened in gas compression facility Module 55.
I spoke to Jeff Scarbrough again on July 7th about the flaring and he said during the PM
period each device is tested, bypassed and put in maintenance mode. Wires are pulled,
hooked up to a meter, and signals are sent and recieved. During this operation the
operator hit 2 wires together, causing a spark which blew a fuse. They know immediately
which fuse has blown, but there's a 10 minute blowdown initiated, followed by 220
minute purges for the compressors. Then the pressure is slowly built back up to operating
parameters. This type of failure is largely dependant on the individual performing the PM.
They have become very selective about who they will let work on the system and
procedures are in place to minimize this type of occurrence.
02/22/95
PSV's in gas compression relieved/malfunctioned
I spoke to Jeff Scarbrough on July 7th about this incident. PSV 5541B on the compressor
discharge was leaking gas on the pilot line. The pilot tubing line had blown, so they had to
shut down one of the compressors, since gas was leaking into the module. Shutting the
compressor down caused the injection stage to come up since they only had half of the
compression ability. This caused the PSV 5558 to come off seat. There are 75 to 80
PSV's in the module and if a smaller one comes off seat, it's extremely difficult to hear the
gas escaping, since it is very noisy. They have to take temperature readings upstream and
downstream of the PSV to try to determine which one it is. This can take some time.
e
e
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY RÉPORT OF PRODUCED GAS DISPOSITION
-'", ,:-",'.:-'
Facility
CENTRAL FACILITIES
Ficld(s)
MILNE POINT
Month/Year of Disposition
Jan-95
Operator
DP EXPLORATION
Disposition
*If production comes from multiple pools,
indicate contribution of each pool to total.
Volumc MCF*
Pool -:::tf::.
Percent
1. Sold
9,310
e 2.
KUPARUK
SCHRADER BLUFF
Reinjected
246,861
3. Flared or vented less than I hour
2,441
4. Flared or vented greater than I hour
(Supplemental report required--See 20 AAC 25.235)
793
5. Pilot and Purge
OlTid~l';'Ù~l:'()n'I)'-l'iat'ing An II (II ¡/.alion> I hr.
, ; ",': , . . . I ., ~ " ,
2,176
.--" . .--'-- --. .---
6. Used for lease operations
147,265
I. Safety
7. Other
2. Lease
TOTAL
408,846
3. Conserv. Purposes
e
Note: All volumes must be corrected to pressure of 14.65 psia and to
following the month of disposition. Authority 20 AAC 25.253
Remarks:
88.1%
11.9%
MCF
MCF
MCF
by the 20th of the month
a temperature l? 60 degrees F. Report due
Fetlv.
41i/s'" FEe < 7 t D
'lCt Oil4 Oa. /9.95
I hereby certify that the foregoing is true and correct to the best of my knowledge..JI~ '8 COlla.
"V1C/o. . Co".
't¡¡Ue "1/1]10",
, -ID/1
Title __.___..M.I!g, Vol, Royalty & Sev.
Signature 12~-0 (2 ~~~~
'Lh7/9S-
---~-_.._-~
Date:
Form 10-422
Rev. 1 1/94
I.
',;;l~~~~~:ri'~"'ì~-"""'> .
~,
'It. ',-
\
~,
....
..
-. .
.
~
mi
BP EXPLORATION
"öMMI__
-.. -------1
CÕMM
BP Exploration (Alaska) Inc. iCOMt.A \ --
900 East Benson BOUlevardlRESENGT
P.O. Box 196612 'FENG I ì
Anchorage, Alaska 99519-66' R ENG \ -,
(907) 561-5111 -~ÑG=-ÄS~:3"r \ ¡
-ENG~ST \ ¡
SRGEOLli
GEOL ASST\-
GEOIAssTrl
sf ÄTtEt5HT~~i
-sTAffECH\
t-~ILE."---.-T
February 21, 1995
State of Alaska
Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
To Whom It May Concern:
Attached is the supplemental flaring report required under 20-AAC 25.235 for
the Milne Point Unit for the month of January 1995. In the future this submission
will be part of the overall report package.
HAND DELIVER
Should you have any questions, please contact Mr. Richard Sepersky at (907)
564-4268.
Sincerely,
- A
(¡ ~ r í.~
.' /~~1 ~
Robert A. Reynolds
Manager, Volume, Royalty & Severance
cc: Rick Foppiano
OXY USA Inc.
P. O. Box 50250
Midland, TX 79710
Alaska Department of Revenue
Petroleum Revenue Section
550 West 7th Ave., Ste. 570
Anchorage, AK 99501
Atten: Leslie Stewart
Mark Bendersky- MB3-4
Larry Niles/John Ketchum- Milne Point
RECE'VED
FEB 22 1995
A.íaska Oil & Gas Cons. Commission
AnchoradB
e
e
Jan-951 I I
AOGCC Gas Flaring & Venting Incident Report
I I DOR Raport~ I
Part 1 .. Unplanned 8"nts not e:xcMdlng 1 hour
<1hr
Volumes
Mel
47
18
58
30
32
24
12
104
53
48
81
12
86
410
198
188
83
310
195
58
133
23
39
11
83
6
9
49
Data
I-Jan
3·Jan
6-Jan
8-Jan
7-Jan
I..Jan
I-Jan
10-Jan
11-Jan
12-Jan
13-Jan
14-Jan
15-Jan
17-Jan
18-Jan
19-Jan
20-Jan
21-Jan
22-Jan
23-Jan
24-Jan
25-Jan
26-Jan
27-Jan
28-Jan
29-Jan
30-Jan
31-Jan
Total
Beg. & End. Tomas
Duration
Soh. 82 (bl)
2313
Part 2 Unplanned events great.r than 1 hour
Beg. & End. TtmeS
Oat. Duration
9-Jan 1405 1630
21·Jan 0837· 1201
Total
Part 3 Planned events not exceedinq 1 hour AND not exceeding 5000 Met
I <1hr
! Beg. & End. Times Volumes
Oat. / Duration Met
16·Jan 128
Tota'l Sch. B2 (b4)
Part 4 Planned events exceeding 1 hour OR exceeding 6000 Met
I I
AOGCC Gas Flaring & Venting Incident Report
I
I BeQ. & End. Times
Duration
<=1 hour
Date
i9-Jan
Total
,QGCC Raporting
line 3 <1hr I
line 4 > 1hr
I
,QGCC Raporting
Une 5 Pilot & Purge
Une 7 Contfnuous Assist
I
2 hra 35 mln
3 hra 39 mln
Sch. 82 (b3)
Sch. 82 (b6)
Sch. 82 (b2)
Sch. 82 (b5)
128
<1hr
Volumes
Mcl
Duration
> 1 hour
1 hr 8 mln
>1hr
Volu.....
Mel
378
256
634
>1hr
Volumes
Mcl
159
2176
BPX Milne Point Unit
Deac:rlptlon 01
Incidents. Cau..
Gas reinjection SID due to instrumentation failure
Production Facility safety/emergel'lCY shut down
Description 01
Incidents & Cause
SID gas comps. for annual PSV recertification
Description 01
Incidents & Cause
SID gas compression 10 return X·6901 heat
exchal'lger to service
159
COR Raporting
(1) Pre--authorilation required for flaring and venting when lesting a well before regular production
(b1)
(b2)
(b3)
(b4)
(b5)
(b6)
(c)
EmerlOp Up <1
Pilot/Purge
Erner:>1
Plan. <1&<5000
Indispens. lease
Authorized
UnauthJWaste
No Tax
No Tax
NoTax
NoTax
No Tax
Tax
Tax/Penalty
2313
2176
634
128
o
159
SYIO
e
Action Taken to
Eliminate Cause
Repair/Return instrumentation to service
Productio/'l Facility brought back on line
Action Taken to
Eliminate Cause
Production rates reduced prior to maintenance
Action raken to
Eliminate Cause
Restart gas compressors
Prepared by G. Alexander· MPU Prod. SuPV. eX!. 6331
e
RECEIVED
FEB 2 2 1995
r-
Alaska Oil & Gas Cons. Commission
Anchora"E!
, .
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
January 9, 1995
Time and duration of incident: 1405 hrs to 1630 hrs
Volume flared: 378 MSCF
While performing PLC editing on MPU E-pad facilities, a "processor
fault" occurred which caused a total E-pad shut down. This included
the stopping of two Electric Submersible Pump (ESP) operated oil
producers, E-8 and E-9, and the shutting in of both gas re-injection
wells, E-3 and E-7 (WAG on gas at the time). When the PLC
processor was reset the true logic status was communicated via the
data highway and initiated an atypical gas re-injection compressor
shut down. Prior to the compressor shut down, the rapid discharge
pressure increase operated the flare relief control valves and the
PSV on C-5531A lifted and did not reseat. This was discovered only
after a purge for restart was initiated and did not sequence as per
normal automation. The sister train, C-5531B, was then purged and
restarted and the PSV on the discharge of the A compressor was
replaced and brought on line.
Management discussed reducing production rates to mitigate flaring
and prudently agreed that it would be fruitless considering the time
necessary to change the PSV. The A compressor would have been
ready for operation before any real decrease in gas production would
be achieved.
The facilities were returned to normal operations and flaring ceased
without further complication.
RECEIVED
FEB 2 2 1995
e
aska Oil & Gas Cons. Commission
- Anchorae
·
;*
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point
January 21, 1995
Time and duration of incident:
Volume flared: 255.6 MSCF
0837 hrs to 1201 hrs
Flaring was a result of an emergency shut down of the gas
compression system as a result of process control system failure III
Module 55.
We also received a Level Low Low shut down alarm on the Heating
Medium Expansion Tank, which caused a production shutdown in the
facility. Levels were returned to normal and the facility is back on
line.
e
e
,..., .' ,
. ,
Iii
Flaring Incident Report
(exceeding 1 hour)
BP Exploration - Milne Point Unit
January 19, 1995
Time and duration of incident:
Volumn flared: 159.2 MSCF
1434 hrs to 1542 hrs
Gas compressor's were shut down due to maintenance required on
water jacket cooler X-6901. The exchanger had been down for repair
and needed to be returned to it's normal operation. The compressor's
were brought back on line as soon as the exchanger was put back in
service. All efforts were made to bring the compressor's back up as
soon as possible and to eliminate any additional flaring.
e
e
.
~,
" ...
) '.
EXHIBIT 4
Jan-95
PRODUCTION ALLOCATION FACTORS
e
ALL MILNE POINT UNIT
OIL
1.004023
WATER
0.93123
GAS
1.071375
ADL28231 ADL315848 ADL25515 ADL25906
KUPARUKPA SCHRADER BLUFF E9,E11 J6 J9 J10,J11,J12 TOTAL
OIL (STB) 428,079 87,972 51,401 0 0 99,337 666,789
WATER 305,920 30,366 473 0 0 15,249 352,008
e GAS (MSCF) 315,353 48,661 10,378 0 0 34,454 408,846
OIL GRAVllY 22.6 17.9 22.6 22.6 22.6 22.6
TOTAL METERED VOLUME (OIL & NGL) 666,789
OIL GRAVI1Y OF COMBINED STREAM 22.0
F:'f"c(IV(D
4,JiiSkq> 8 2 1
vii & Gas 199$
41l cO/Js.
. %J/'¿ . COI/JIlJ.'
"Sslo/]
Page 1
I spoke to Henry Harrington on June 09, 1995 about the following events that were
reported for January:
01/09/95
gas reinjection SID due to instrumentation failure
While working on the injection wells at E-pad, There was a processor fault which caused
the compressor to shut down. He said a switch probably failed, causing the shut-down.
PLC means program logic editing. Processor faults can happen from shorts in the system,
people working on equipment, etc. They had problems getting the system back on line
and the PSV on C-5531A lifted and didn't reseat. The PSV was replaced and brought
back on line.
01/21/95
Production facility safety/emergency shutdown
There was a low low level shut down alarm on the heating expansion tank, which caused
the compressor shut down.
e
e