Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutBPX - Sag Delta North
,~'w/¥..0f/.:d'~~rMr/AlrÆ:ß!Y#::tY/N'/AIž'&¥7.1/Ih!VAØVAr'~I/M"'#~W/'/I/#'K/E-:íW/I~AYl~hY'w/4'41P/I/'&øv#-'.4VAJ'P'AfYI'AØ"apZIW/..ofWM'.M'IAØ'YN/I/..;wAfl'7..v/I/..;wI/I/I/I/AV.MY..ofW.MYI/1/1/'/I/I/I/'áW;~V/N'{.7.M~:W::t,!~Ü¡·'~
"~iGOCC
GaS DiS10SitioIl FLes
-
1995
a1JX -$I(; ~''-TA -
NO~TII
-
(;ff;:¡,W.;;(t-~.¡:;4IP4J~~~I,.{dP/I/AW~8/1/1/1/1/1/1/1/1/1/##/I/1/1-W/ßYßr~:~U/H.4Wfi?'w/MW/I/I/,E,.Ø'Y'/IAØ'YI/'/I/.,....,/,/,/g/ØAØ'YM#'#~"'o/Ø/K/A7..49Y.8WD/'/Ø/..øwN7A/.""/I/I/I/H4!IP/Áf..;t¡v,-:;¿¡¡:YÆ"'.~;/4I!:<:¡¡,::;¡f·~
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
operator
BP Exploration (Alaska) Inc.
Field(S)
Sag Delta North
Disposition
Volume MCF*
I. Sold
Fuel
NGL
o
220
2. Reinjected
5,150
-
3. Flared or vented less than I hour
19
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
50
5. Pilot and Purge
1 I
6. Used for lease operations
Assist
Fuel
27
6,790
7. Other
TOTAL items 1-7
12,267
8. NGL gas equivalent produced
220
-
9. Purchased gas
Kl::l#cj vt:D
10. Transferred from:
JAN 1 0 1~96
11. Transferred to:
ßja::';it.,,-j.,i¡~ .~
!\r I~~;'\ß:-~~:..j\',
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature eO. ~lt Title ~(( VÖL. Date t! ~¡í&
Form 10-422
Rev. 4/95
Endicott 10450 Month/Year of Disposition
December, 1995
I *Indicate contribution of each pool to total.
Pool Name Code
220150
Percent
Official (;se On(y-¡';Iaring Authorization> I hr.
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
1/4/96
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
December, 1995
Page 1
IUnplanned Events less than or equal to 1 hour
TOTAL
12,282
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
12/2/95 22:00-23: 10 5,195 MGC-B shutdown due to WHRU louver "valve out of MGC-B restarted.
- position" .
12/3/95 00:00-01: 1 0 6,559 MGC-B shutdown due to WHRU louver "valve out of Louvers placed in manual service and MGC-B
position" . restarted. Instrument techs installed "glitsch
detector" to catch cause of louver failure.
12/7/95 15:30-16:40 142 Ambient temperature increased 3.3°F in 30 minutes Shut-in well 1-21.
12/9/95 02: 1 0-03:40 2,816 While attempting to jumper a known failed exhaust Bad thermocouple jumpered and MGC-B
thermocouple, the MGC-B ESD was inadvertantly restarted
tripped.
12/12/95 15:50-17:20 8,864 MGC-A shutdown on WHRU valve out of position. Switched WHRU to MGC-B; rebuilt louver
position indicator, installed on MGC-A and
restarted unit.
12/12/95 19: 1 0-20:40 455 Lining out production following MGC-A restart.
12/13/95 16:30-17:30 1,960 Gas leaked back through hydraulic equalization and Fluid packed balance and control lines and
control lines from gas injection well 2-06 to the placed well 2-06 back in injection service.
hydraulic return tank in Skid 410. The injection well
e was shut in, resulting in gas flaring.
12/16/95 10:50-12:50 10,856 MGC-A shutdown due to power supply fuse blown Trouble shot for 2 hrs and not able to locate
(short circuit). problem. Cut production to stop flaring during
troubleshooting. Pulled card connectors,
replaced fuse and reconnected cards one at a
time to try to locate problem w/o success.
Further investigation needed.
12/17/95 09:00-11 :00 5,392 Inadvertant total plant shutdown occurred while Error resulted from misinterpretation of the
troubleshooting the UPS system to find the source of troubleshooting procedure. Consulted
a power supply ground fault. manufacturer for clarification and held training
courses for electricians to prevent a future
occurrence. Restarted both MGCs.
TOTAL 42,239
1/4/96
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
December, 1995
·Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
e
DATE TIME VOLUME
12/6/95 10:40-11 :10 240
12/8/95 04:00-04:20 237
12/8/95 17:10-17:50 870
12/9/95 23:00-23:30 134
12/11/95 09:40-10: 10 131
12/11/95 16:50-17:30 144
12/12/95 21 :30-22:00 218
12/13/95 01 :50-02:20 306
12/14/95 08:00-08: 1 0 126
12/17/95 00:20-01 :00 588
12/18/95 14:30-15:10 429
12/20/95 11:30-12:20 397
12/24/95 13:40-14:20 185
12/26/95 14:40-14:40 236
12/26/95 19:30-19:50 955
12/26/95 20:30-20:50 315
12/27/95 19:00-19:50 285
12/28/95 20:40-20:50 109
TOTAL 5,905
-
~~c~t;,i vt:D
JAN 1 0 1~96
.- ,..' " <.~
~p~:;i'~ii .m f~
Page 2
DESCRIPTION OF INCIDENT & CAUSE
POP well 2-38.
MGC-B shutdown for gearbox bearing replacement;
bearing replacement required due to high vibration
(normal wear and tear).
POP well 2-14
POP well 1-03.
POP well 1-25.
POP well 1-21.
Pressure up tubing on well 1-63 with lift gas to
equalize pressure across sssv in order to re-open.
POP well 1-25. Allow to gas off at reduced choke setting.
Return 1-25 to production. Shut-in well 2-52.
MGC-A idled to repair axial compressor bleed valve. Repairs completed and MGC-A re-Ioaded.
Put well 2-26 on production.
Put well 1-25 on production.
Return well 3-09 to production following scale
inhibition treatment.
Shutdown MPI to allow repairs to eroded elbow in
piperack.
Restart MGC-A following MPI shutdown to repair
piperack erosion.
Continuing to bring MPI wells on production to fully
load MGC-A
Well 2-52 corrosion inhibitor treatment
POP well 1-35.
ACTION TAKEN TO ELIMINATE CAUSE
Allow to gas off at reduced choke setting.
Reduced production rates until flare was
eliminated
Shut-in wells 1-27 and 1-29
Allow to gas off.
Allow to gas off.
Reduce choke on well 1-25.
Allow well to gas off.
Allow to gas off at reduced choke setting.
Allow to gas off at reduced choke setting.
Shut-in all MPI production wells.
Complete flowback at reduced choke; s/i 2-52
when done
Allow well to gas off at reduced choke setting.
1/4/96
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
December, 1995
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
Shut-in well 2-28 to safe-out and inspect flowline
check valve for possible erosion damage. Opened
other wells to compensate.
MGC-A shut down to repair ground fault problem.
12/3/95
04:20-05:20
328
12/17/95
16:00-17:00
4,287
e
TOTAL 4,615
. <
Page 3
Kept other wells at reduced choke until
process swings settled out.
Found the MGC-A ground fault source in
conduit leading to bleed valve solenoid;
replaced solenoid, coil, and wiring in conduit
from coil to junction box in turbine enclosure.
MGC-A restarted.
TOTAL SDN ENDICOTT
Volume flared less than 1 hour 18,187 19 18,168
Volume flared greater than 46,854 50 46,804
1 hour
Pilot Purge 10,199 11 10,188
Assist Gas 25.835 27 25.808
e TOTAL FLARED VOLUME 101,075 107 100,968
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Facility
Endicott
loperator
BP Exploration (Alaska) Inc.
Disposi tion
1. Sold
Fuel
NGL
2. Reinjected
e
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
Assist
Fuel
7. Other
TOTAL items 1-7
8. NGL gas equivalent produced
e
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby certif/1hat the, foregoing is true
Signature (.0. (~~
Form 10-422
Rev. 4/95
Volume MCF*
2,903
16
3,451
6,525
Field(S)
Sag Delta North
o
125
1 1
13
6
125
Title m&fl V6L
and correct to the best of my knowledge.
Date ~7..f~/qS'
Endicott 10450 I Month/Year of Disposition
November, 1995
I *Indicate contribution of each pool to total.
Pool Name Code
220150
Percent
Officiäl Use Only-Flaring Authorization> 1 hr.
I. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
12/5/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
November, 1995
IUnplanned Events less than or equal to 1 hour
DATi+k ' ,! "¥iMÊ}l7 VOLUME D~SCRIPTION OF IN~tDENT & CAU'SE
TOTAL 14,539 Not required for unplanned events which
are less than or equal to 1 hour
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
,DAT~/0F"i TIME V9LUME ,if ',DES'1RíIPTION OF INCIDErfi" &'CAUSE>40"
11/6/95 09:50-10:30 348 POP well 1-01 following downhole work
11/18/95 10:10-10:30 578 MGCA shut down to repair solenoid valve on axial
compressor
Loading up compressor after solenoid repairs
POP 2-14 following downhole corrosion treatment
POP well 2-18 following flowline spool replacement
POP well 2-14 following flowline repairs
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
11/1/95 01 :10-04:50 770
e 11/1/95 09:30-10:50 321
11/5/95 04:40-05:40 729
11/11/95 21 :30-22:50 284
11/21/95 09: 1 0-12:00 15,058
11/25/95 01: 1 0-02:20 117
11/25/95 04:20-05:30 90
11/26/95 07:00-08:50 665
11/26/95 19:10-20:10 249
e 11/28/95 21 :40-22:50 297
11/30/95 09:00-10:00 435
TOTAL 19,015
11/18/95
11/22/95
11/27/95
11/30/95
13:30-14:00
17:20-18:00
21 :00-21 :50
20:30-21:10
TOTAL
357
399
1045
622
3,349
ACTION TAKEN TO ELIMINATE CAUSE
Reduced chokes on wells 1-29 and 1-35,
finally SI well 1-35 to eliminate flaring
Automatic load share system failed on compressors Machines put back into manual operation and
gas rate reduced
MGC antisurge problem resulting from a ground fault SI wells 1-21 and 2-40. Called out technician
in a solenoid caused compressors to shed gas and solenoid valve repaired
Ambient temp increased from 3-9F SI well 3-17 and then cut 1-27 to 95b and 1-25
to 55b
Replaced thermocouples and attempted
restart. Start up turbine dissengaged
prematurely. Spin down MGC and started 2nd
attempt. SI well 1-35 to reduce flared volume
Cut wells 1-35 and 1-29
SI well 1-21 to eliminate flaring
SI well 1-35 to eliminate flaring
SI well 1-21 to eliminate flaring
SI wells 1-21, 1-35 and 2-18, reduced choke
on well 1-29 to 70b
SI well 1-35
DESCRIPTION OF INCIDENT & CAUSE
Ambient temp increased from 22 to 24F
MGCB shut down due to turbine exhaust
thermocouple failure
Ambient temp increased from 8-12F
Ambient temp increased from12-14F
Ambient temp increased from 0-4F
Ambient temp increased from 0-4F again
Ambient temp increased from 12-22F
Ambient temperatue increased from 4-6F
Page 1
ACTION;i~WEN TO ELlMINATf;;,;ÇAUSE
Not required for unplanned events which
are less than or equal to 1 hour
~ .':"'f.'
ACTION TAKEN,T:OEL¥lMÎNATE C~,W~$E ;
None, allow well to gas off
SI 8 wells to reduce flaring
None, POP wells to provide gas to compressor
Allow well to gas off.
None, allow to gas off
None, allow to gas off
12/5/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
November, 1995
Page 2
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
11/16/95 13:10-14:40 299 POP wells 2-52 and 2-40 Allow to gas off, when flare was still ongoing
for> 1 hour 81 well 1-25 and cut 1-29 to 75b.
11/17/95 15:50-17:40 884 POP wells 1-25 and 2-52 as ambient temps dropped Allowed to gas off. Then 81 3-03 to stop
flaring.
11/17/95 18:00-19:00 1,881 "A" main compressor backed down to 80% to 81 well 1-25 to eliminate flaring
e remove air keeping the compressor blow off valve
closed.
11/22/95 15:50-16:50 313 POP well 2-52 A8 flare still open 81 well 2-52
TOTAL 3,377
Volume flared less than 1 hour
,)jOT AL . \¿ ,
17,888
.. ~,
SDN
11
ENDICOTT
17,877
Volume flared greater than
1 hour
22,392
13
22,379
Pilot Purge
9,870
6
9,864
e
Assist Gas
27.347
16
27.331
TOTAL FLARED VOLUME
77,497
46
77,451
e
e
't
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
loperator
BP Exploration (Alaska) Inc.
Disposition
I. Sold
Fuel
NGL
2. Reinjected
3. Flared or vented less than 1 hour
4. Flared or vented greater than I hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
Assist
Fuel
7. Other
TOTAL items 1-7
8. NGL gas equivalent produced
9. Purchased gas
r
. ,.~ ... i-",-~ i ,. ~'n
t,t 0 <} I ~....~ i"r'
10. Transferred from:
11. Transferred to:
Alaska DB &. Gas (:C\r:1:;-;¡£:Icn
Anchonga
Remarks:
I hereby certiJ1 t
Signature k'.
Volume MCF*
3,338
20
3,468
6,986
I Field( s)
Sag Delta North
o
129
15
9
7
129
Title f1A<..,fL V'ÖL
and correct to the best of my knowledge.
Date
t¡{?{l1ú
Form 10-422
Rev. 4/95
Endicott 10450 I Month/Year of Disposition
October, 1995
I *Indicate contribution of each pool to total.
Pool Name Code
220150
Percent
Official l:sc Only-rlaring Authorization> I hI'.
I. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
-
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
1. Sold
2. Reinjected
e
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
8. NGL gas equivalent
:1'
~
en
~
~
E.
produced I2G
>w
:::I '"
.. (f>
gC?
~g
m ~
TOTAL items 1-7
e
9. Purchased gas
10. Transferred from:
C? <..D
3 CJ\
ê.
.."
(f>
õ'
:::I
11. Transferred to:
Remarks:
:i:::~:,,"rttlëô ili,t;::jj'
Form 10-422
Rev. 4/95
operator
BP Exploration (Alaska) Inc.
Fuel
NGL
Assist
Fuel
^'
c....'
r;
-I
~
.
"
I
- ..
--'
,("")
......
r-n
o
Volume MCF*
5,172
35
6,225
11,578
Field(S)
Sag Delta North
o
77
34
23
12
77
and correct to the best of my knowledge.
Title ~ VÜ! .UI?AÆ Date /,6 [ 'l(<1)
Endicott 1 0450 I MonthlY ear of Disposition
September, 1995
I *Indicate contribution of each pool to total.
Pool Name Code
220150
Percent
Oftïci¡¡( Use Only-Flaring Authorization> I hr.
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
10/4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
September, 1995
Page 1
Unplanned Events less than or equal to 1 hour
TOTAL
20,506
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
9/8/95
13:10-14:50
-
7,459
9/19/95 07:50-09:10 542
9/19/95 18:20-20:00 448
9/21/95 13:00-14:30 668
9/30/95 01 :50-04:50 577
TOTAL 9,694
MGC-B shutdown due to WHRU exhaust louvers out The failed solenoid valve was replaced, the
of position. The louvers failed to move properly due louvers repositioned & MGC-B was restarted.
to a failed solenoid valve. The louver control logic was modified to
prevent the WHRU & exhaust louvers from
"modulating" such that the wear-and-tear on
these solenoid valves should be reduced.
Reduced rates on wells 1-21,1-27 and 2-36.
Shut-in 1-01 & 2-58.
Shut-in well 1-25.
Ambient temperature climbed 1Q°F, during flaring
period.
Ambient temperature spikes bumping flare (ambient
at z45°F).
Ambient temperature climbed 13 degrees during
flaring period.
Intermittent flaring occurred while trying to maximize Shut-in well 2-18 at 0240.
production rates; wells 2-18 and 1-25 were POP and
allowed to gas off during this period.
Shut-in wells 2-18, 1-21, 1-25 and 1-35.
e .Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
9/1/95 17:40-17:50
9/2/95 15:50-16:40
9/3/95 13:20-13:40
9/15/95 08: 10-08:20
9/26/95 08:20-08:50
9/26/95 14:00-14:10
1174 Trip MGC-A to idle for antisurge control testing None; flaring required to monitor response of
(CCC). antisurge valve.
1239 Antisurge control testing on MGC-A Flaring required to monitor response of
antisurge valve; control logic modified to
prevent future recycle trips.
2185 Compressor Controls Corp. antisurge control testing None; flaring required to monitor response of
of MGC-A. antisurge valve.
152 POP well 2-68. Allow well to gas off (did in 20 minutes).
198 POP well 2-52 Reduce production on well 1-21; allow 2-52 to
gas off.
117 POP 2-18 for State subsurface safety valve test. Shut-in well 1-21.
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/11/95 01 :40-03:50 3,129 Depressure and purge gas plant and flare system for None. Required for safe plant shutdown.
plant shutdown to replace flare tip.
Relight flare following planned plant shutdown for
flare tip replacement; keep flare lit while attempting
to restart an MGC.
Bringing on production in preparation of MGC-A
start-up.
Startup NGL plant; additional backpressure on gas Reduce rates on 4-10 and 1-61.
system reduces effective gas handling capacity.
POP well 2-52 at 50 beans and allow to gas off
(@2115).
POP well 1-25 & allow to gas off.
10/4/95
9/28/95
09:20-10:00
1032
9/28/95
14:00-14:10
TOTAL
142
6,239
-
9/12/95
10:10-13:00
1,554
9/12/95
18:30-19:30
1,574
9/16/95
00:10-01:10
220
9/17/95
21 :30-22:30
134
9/25/95
20:50-21 :50
367
9/28/95 15:10-16:30 608
9/28/95 16:50-18:20 395
It 9/29/95 01:40-03:10 308
9/30/95 08:20-09:40 564
9/30/95 12:00-13:10 125
TOTAL 8,978
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
September, 1995
Page 2
Shut-in gas injection well 2-06 for State subsurface 2-06 passed test and returned to injection
safety valve test. service.
POP 1-29 for State subsurface safety valve test. Shut-in 1-29.
Reduced production rate on 2-46 (one of only
two wells flowing to plant). Restarted MGC-B
and failed attempts at starting MGC-A.
MGC-A startup delayed; Shut-in well 1-35.
Choke 2-52 back at 2225; shut-in at 2235.
Well did not gas off within one hour; ultimately
shut-in.
Reduced production on neighboring well after
40 minutes to minimize flaring.
Well 1-05 passed test and returned to injection
service.
Well did not gas off within one hour; shut-in
well 2-08 at 0200; ultimately shut-in 1-25 at
0310.
POP 1-09 and allow to gas off; also, State witness of Shut-in wells 1-09 and 1-25.
k-valve closure test on well 1-21.
Start gas lift to well 1-31 ; allow to unload and
stabilize.
POP well 2-36 and allow to gas off.
Shut-in gas injection well 1-05 for State subsurface
safety valve test
POP well 1-25 & allow to gas off.
Shut-in well 1-25.
10/4/95 BP EXPLORATION (ALASKA) INC. Page 3
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Septem ber, 1995
TOTAL SDN ENDICOTT
Volume flared less than 1 hour 26,745 34 26,711
Volume flared greater than 18,672 23 18,649
1 hour
Pilot Purge 9,870 12 9,858
e Assist Gas 27.753 35 27.718
TOTAL FLARED VOLUME 83,040 104 82,936
e
-
e
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
operator
BP Exploration (Alaska) Inc.
I Field( s)
Sag Delta North
Disposition
Volume MCF*
I. Sold
Fuel
NGL
o
o
2. Reinjected
6,580
3. Flared or vented less than 1 hour
14
4. Flared or vented greater than I hour
(Supplemental report required--See 20 AAC 25.235)
14
5. Pilot and Purge
14
6. Used for lease operations
Assist
Fuel
41
7,547
7. Other
TOTAL items 1-7
14,210
8. NGL gas equivalent produced
o
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby cert~ th/'¡the f. oregoing i~ true and correct to the best of my knowledge.
Signature /¿. (lv~ Title (V1,0(L V¿)~ Date 1.17 ['1,<..,-
Form 10-422
Rev. 4/95
Endicott 10450 Month/Year of Disposition
August, 1995
I *Indicate contribution of each pool to total.
Pool Name Code
220150
Percent
Official ¡;~C Only-Haring Authorizat.ion> I hr.
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
9/7/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
August, 1995
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL 8,842 Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
- 8/16/95 13:10-14:30 570
8/18/95 2:50-4:40 388
8/18/95 10:30-11 :30 354
8/18/95 19:20-20:20 150
8/22/95 18:30-19:30 5,109
TOTAL 6,571
DESCRIPTION OF INCIDENT & CAUSE
Gas injection well 2-06 shut-in for gas leak repair.
Leak was on valve packing in 2-inch bypass around
flow control valve.
High ambient temp. swings caused intermittent
flaring & forced a reduction in production rates.
Ambient temp up 5°F.
High ambient temp. swings caused intermittent
flaring & forced a reduction in production rates.
Ambient temp up 5°F.
High ambient temp. swings caused intermittent
flaring & forced a reduction in production rates.
Ambient temp up 6°F.
MGC-B shutdown due to a failure of the solenoid
valve that operates the WHRU exhaust damper
(resulted in a 'valve out of position' shutdown).
Page 1
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Reduced production within 30 minutes of
identifying problem. Repacked 2-inch valve
and returned well 2-06 to service.
Reduced choke on wells 1-63 and 1-35
Reduced production from wells 1-29, 3-17 and
2-04.
Reduced production from well 2-04
Maintenance technicians changed out the
failed solenoid valve and MGC-B was
restarted.
e IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/3/95 21 :10-21 :20 965 Weekly flare test. None. Safety requirement.
8/18/95 7:50-8:00 54 POP well 3-17. Allow to gas off.
Shut-in well 1-29 for corrosion inhibitor
8/19/95 13:50-14:30 371 POP well 1-55 following corrosion inhibitor treatment treatment
TOTAL 1,390
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8/6/95 13:30-14:30 287 POP well 1-39 and allow to gas off.
ACTION TAKEN TO ELIMINATE CAUSE
Reduce choke on wells 1-35 and 2-52
(ultimately shut-in 2-52).
9/7/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
August, 1995
Page 2
8/23/95
17:40-19:10
TOTAL
3,156
3,443
Flared to trouble shoot problem with flare tip
(apparent leak at base of tip). Plant shutdown on
high 1 st stage pressure. Brought MPI & SDI well
back on production.
None. Flaring was required to troubleshoot
problem with flare system. Testing of flare tip
was completed.
- TOTAL SDN" . ENDICOTT
Volume flared less than 1 hour 10,232 14 10,218
Volume flared greater than 10,014 14 1 0,000
1 hour
Pilot Purge 1 0,199 14 10,185
Assist Gas 29.810 41 29.769
TOTAL FLARED VOLUME 60,255 83 60,172
e
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
operator
BP Exploration (Alaska) Inc.
Field(S)
Sag Delta North
Disposition
Volume MCF*
1. Sold
Fuel
NGL
o
21
2. Reinjected
6,548
e
3. Flared or vented less than 1 hour
27
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
6
5. Pilot and Purge
14
6. Used for lease operations
Assist
Fuel
46
6,507
7. Other
TOTAL items 1-7
13,169
8. NGL gas equivalent produced
2 I
e
9. Purchased gas
R r " ~ '.,,' F D
AUG 1 0 1995
10. Transferred from:
11. Transferred to:
AiaSka 011 & Gas Cons. Commission
Anchgrage
Remarks:
I hereby certi~hat the 7egOing is true and correct to the best of my knowledge.
Signature fi. Q. Ilh~ ÅTitle (hf:.tZ VI:) L Date Ô h I ~S-
Form 10-422
Rev. 4/95
Endicott 10450 I Month/Year of Disposition
July, 1995
I *Indicate contribution of each pool to total.
Pool Name Code
220150
Percent
Official LSC Only-Flaring Authorization> I hr.
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
8/4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
July, 1995
Page 1
Unplanned Events less than or equal to 1 hour
TOTAL
13,941
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME' VOIjØME
896
DESCRIPTMfIb~~QiNT &~e.USE ' "~;,;:
High ambient temp. swings caused intermittent
flaring & forced a reduction in prod. Ambient temp
up 6°F
,~~jiJØØ"~EN TO ELIMINATE CAUSE
e
7/2/95
9:10-10:20
Bypassed NGL plant to increase plant gas
throughput; reduce choke on well 2-36
7/11/95
14:40-16:40
TOTAL
1,952
2,848
1 st stage anti-surge control problem with MGC-A;
control valve opening abruptly to prevent
compressor surge, but resulting in process
destabilization and flaring
Attempt to duplicate anti-surge control problem
in order to identify cause; unsuccessful, so
production rates were reduced starting at 1550
hours and the controller was changed out
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
7/4/95 4:00-4:30 107 POP well 1-25 Shut-in wells 1-21 and 1-67
7/4/95 17:00-17:10 266 Ramp down MGC-A for MGC-B restart attempt MGC-B restart failed; fully load MGC-A
7/4/95 18:00-18:00 203 Ramp down MGC-A for MGC-B restart attempt Restart MGC-B
7/5/95 4:50-5:30 588 POP wells 2-04 and 2-08 Allow wells to gas off
e 7/5/95 10:00-10:40 189 POP well 1-01 Rf :;\,'ED Reduce chokes on wells 1-35 and 4-38
7/5/95 11 :00-11 :20 136 POP well 3-21 Shut-in well 1-17
7/6/95 13:00-13:40 406 POP 2-40 AUG 1 0 1995 Shut-in well 2-40
7/9/95 7:40-8: 1 0 163 POP well 2-04 Reduce chokes on wells 1-27 and 1-29
7/10/95 7:30-7:40 63 POP well 1-21 ~~iI ~¡~ons C .. Allow well to gas off
7/11/95 2:40-3:00 137 Increasing rates t 0 ß,r ra ~ ommlSSIOn Allow wells to gas off
7/11/95 19:20-19:40 271 Begin loading MGC-A g Bring MGC-A to full speed
7/12/95 11 :20-12:00 231 POP well 1-63 Shut-in well 2-40; allow well 1-63 to gas off
Complete adjustment; return to normal
7/13/95 8:40-9:00 116 Adjust MGC-A A/S control set point operation
7/16/95 21 :40-22:00 330 Attempt to test well 1-21 k-valve Test failed; bleed off remaining pressure
7/17/95 11 :20-11 :30 216 Test k-valve on well 1-21 Complete test; leave well shut-in
7/17/95 20:30-20:50 149 POP 2-04 Allow well to gas off
7/18/95 11 :50-12:10 75 Run Copus start-up compressor to start MGC-A Successfully start and speed up MGC-A
8/4/95
7/18/95 14:30-14:40
7/19/95 4:30-5: 10
7/25/95 16:30-17:20
7/31/95 8:40-8:40
e 7/31/95 9:20-9:40
TOTAL
168
318
1499
84
477
6,192
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
July, 1995
Return MPI wells to production following high-flow
test separator block valve repair
POP well 2-04
Take MGC-A down to work on 1 st stage anti-surge
valve
1 st stage separator pressure control valve function
testing
1 st stage separator pressure control valve function
testing
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
Page 2
Fully load "A" Main Gas Compressor
Too much gas; shut-in well 2-04
Reload MGC-A
Flaring required during function testing
Flaring required during function testing
7/1/95
7/2/95
17:10-18:30
7:50-8:50
7/5/95
8:00-9:20
TOTAL
e
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
483
414
485
1,382
Adjusting choke on well 2-36 during sand monitoring
work to attempt to identify cause of well line erosion Complete sand monitoring
POP well 1-25; ambient temp up 2°F Shut-in well 1-35 and 2-18.
Attempting to return wells to full production after
shutdown yesterday caused flaring and process
upset until those wells were stabilized. Ambient
temp also up 4°F
Reduced chokes on wells 3-15,1-25 and 1-67;
shut-in well 3-03
TOTAL SDN ENDICOTT
20,133 27 20,106
4,230 R r; wED 6 4,224
.....
10,199 AUG 1 0 1995 14 10,185
Alaska Oil & Gas Cons Co .
34.528 Anchorag~ mmlSSfon 46 34.482
69,090 93 68,997
:"
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Operator
BP Exploration (Alaska) Inc.
Field(S) Endicott 10450 Month/Year of Disposition
Sag Delta North June, 1995
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
Fuel
NGL
o
185
Pool Name Code
220150
Percent
2. Reinjected
9,672
e
3. Flared or vented less than 1 hour
33
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
56
5. Pilot and Purge
17
Official l;sc Only-Flaring AUlhori7alion>1 hI'.
6. Used for lease operations
Assist
Fuel
61
7,907
1. Safety
MCF
7. Other
2. Lease
MCF
TOTAL items 1-7
17,931
3. Conserv. Purposes
MCF
8. NGL gas equivalent produced
185
e
9. Purchased gas
Commissioner
Date
10. Transferred from:
11. Transferred to:
Title (hG(l 0Jy!VOL
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
Remarks:
I hereby cer~y that the foregoing is
Signature II.G, ~1k
true and correct to the best of my knowledge.
Date 7 f¡ol'tr
Form 10-422
Rev. 4/95
7/7/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
June, 1995
IUnpla"ned Events less than or equal to 1 hour
DATETIMEf . VOL:UI\iIE"':ii,;;!'DESC~IPTIOfI¡J<dF,INCI[)ENr08lcAUSE .'
TOTAL 15,202 Not required' for unplanned events which
are less than or equal to 1 hour
Iunplanned Events greater than 1 hour
DATE TIME VOLUME·
e
6/3/95
18:00-19:10
140
617/95
7:20-10:20
859
6/9/95 10:10-11 :20 1,145
6/10/95 11 :20-12:20 310
6/10/95 8:10-10:00 510
6/11/95 15:10-16:20 957
6/11/95 18:30-20:00 747
e 6/12/95 9:00-10:50 174
6/19/95 18:20-19:40 555
6/19/95 21 :20-22:20 197
6/21/95 8:40-10:30 735
6/23/95 1 :00-3:30 422
TOTAL 6,751
,DESCRIPTION OF INCIDENT & CAUSE
MGC-B WHRU dampeners would not open, well 4-
10 POP following essential well head maintenance
Increasing ambient temp (4 deg in 3 hours) caused
1 st stage pressure to rise
Increasing ambient temp (10 deg in 4 hours)
combined with unplanned shutdown and repair of Repaired injection pumps shut in several
both water injection pumps caused plant to be producing wells to minimize/eliminate flare
unstable for most of the day (total impacts for the day were 4250 bbls of oil)
Increasing ambient temp (2 deg in hour) caused 1st
stage pressure to rise Shut in well 2-40 to eliminate flare
Increasing ambient temp (3 deg in 2 hours) caused
1 st stage pressure to rise
Flaring caused by control problems with anti-surge.
Flaring caused by control problems with anti-surge.
PW pump SID causing plant upset.
Increasing ambient temperature caused 1 st stage
pressure to rise
Increasing ambient temperature caused 1 st stage
pressure to rise
MGC-A recycle trip occurred at same time as POP
well 1-29
MGC-A 3rd stage Fin fan shut down
:
Page 1
. iACTION':TA!<EN,Tb~E:l;liûlINÄtE!~¡!tAUSE~~:i~;,i
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELlMINATE,cAUSE
Repaired dampeners and cut well chokes to
eliminate flaring.
Wells 1-25 and 2-08 cut to eliminate flare
Wells 1-25 and 2-08 cut to eliminate flare
New control constants installed following
discussions with Turbine manufacturer
New control constants installed following
discussions with Turbine manufacturer
Cut production to eliminate flaring
Well 1-25 cut to eliminate flare
Well 1-25 cut to eliminate flare
Shut in well 1-25
Fan repaired and wells 1-35/1-67 shut in to
eliminate flare
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf '.
DATE .. TIMê,.'.·:iii¡'i" VOLUME ',:öE;§:<:;~1~itI9N qf.INC.IDENT:'& CAU~.E:¡{t'!::.!,;<:: '~.. ····~;ri;·ÄCTIOr'<l,..:rA(EN':TO .E~I~!NÅ1~'Ç'AU§E::,i:¡;~il;:i"~·\~"i
Hi9h 1st stage pressure resulted in MPI well shut Manually tripped MGC-A to idle to maintain
6/6/95 16: 10-16:50 799 down pressure
7/7 /95
6/6/95 17:30-18:00
6/6/95 8:20-9:00
6/7/95 15:00-15:30
6/9/95 7:00-7:50
6/9/95 8:50-9:30
e 6/12/95 11 :50-12:40
6/13/95 19:50-20: 10
6/13/95 22:00-22:50
6/20/95 13:20-14:00
6/24/95 17:10-18:00
TOTAL
423
241
310
436
195
176
269
100
448
106
3,503
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
June, 1995
High 1 st stage pressure resulted in MPI well shut
down
POP well 2-68
Bypassed NGL plant
POP well 2-18
Open well 2-18
Essential well head maintenance necessitated
shutting in and then POP'ing wells 1-21, 1-25, 2-42,
2-60 and 3-27
Well 4-20 put on production and plant started to
receive slugs.
Well 4-20 put on production and plant started to
receive slugs.
POP well 1-01 following well work
POP well 1-01
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME' VOt:tJME\:¡>9t.:¡:F:¡lpES(:RIPTldN"!'OF INC.IDENT & CAUSE
6/1/95
16:40-17:40
e
6/2/95
22:10-23:50
201
392
POP well 2-40
POP well 2-40
Control problems with compressor anti-surge
6/11/95 10:00-14:50 19,598 controllers.
Essential well head maintenance necessitated
shutting in and then POP'ing wells 1-21, 1-25, 2-42,
6/12/95 13:00-14:00 235 2-60 and 3-27
Well 4-20 put on production and plant started to
6/13/95 18:20-19:30 260 receive slugs.
Following well work well 4-20 was POP, resulting
slugs from SOl caused significant swings in 1 st
6/13/95 20:40-21 :40 127 stage levels and pressure
~
Page 2
Manually tripped MGC-A to idle to maintain
pressure
Allow to gas off slowly
Reduced choke on well 1-21 to eliminate
flaring
SI well 1-57 to eliminate flaring
Shut in well 1-25 to eliminate flaring
Minimized flare by reducing adjacent wells and
POP treated wells slowly
Increased Lift gas to SOl to stabilize line
Increased Lift gas to SOl to stabilize line
POP slowly to allow well to gas off
SI well 1-35
,. ACTION TAKENTO'~~U\I!IN~J¡~\~At.:JSE;~· ':~"
Reduced adjacent well chokes to eliminate
flare
Reduced adjacent well chokes to eliminate
flare
New control constants installed following
discussions with Turbine manufacturer. Wells
were reduced to limit flaring while maintaining
some load on the compressor to function
check new controllers/transmitters
Minimized flare by reducing adjacent wells and
POP treated wells slowly
Increased Lift gas to SOl to stabilize line
~.
..~
Increased Lift gas to SOl to stabilize line
.
.
7/7/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
June, 1995
Page 3
6/16/95 9:50-11 :00 438 Well 2-08 POP following well work Shut in wells 1-21 and 1-67 to eliminate flaring
Displacing interisland water line with gas in
6/22/95 18:10-19:30 223 preparation for 'intelligent pig' inspection Well 1-25 gradually reduced then shut in
Displacing interisland water line with gas in
6/22/95 19:50-21 :00 710 preparation for 'intelligent pig' inspection Well 1-25 gradually reduced then shut in
Inter-island water line was inspected using intelligent
PIG displaced with gas routed back to the 1 st stage Well 1-35 was gradually cut, then shut in to
- 6/23/95 11 :00-12:50 472 separator eliminate flare
Reduced chokes on wells 1-29, 1-63 and 2-36.
6/24/95 20:40-22:20 346 POP well 1-25 Then again Shut in well 1-25 to eliminate flare
None, in pre-activity safety review this
Flaring at SOl to depressure inter-island water line operation was deemed as the safest way to
6/24/95 19:00-24:00 234 following 'intelligent pig' inspection reduce line pressure in order to recover pig.
Shut in well 1-29 for State required pressure survey POP well 1-25 to make up for loss and allowed
6/26/95 7:00-8:30 404 logs to gas off slowly
Two wells restQred to production following flowline
6/28/95 19:20-20:40 1,287 repairs Adjacent wells cut back to eliminate flare
TOTAL 24,927
e TOTAL SDN 'ENDICOTT
Volume flared less than 1 hour 18,705 33 18,672
Volume flared greater than 31,678 56 31,622
1 hour
Pilot Purge 9,870 17 9,853
Assist Gas 34.792 61 34.731
TOTAL FLARED VOLUME 95,045 167 94,878
Facility
Endicott
I. Sold
2. Reinjected
e
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
operator
BP Exploration (Alaska) Inc.
Disposition
Volume MCF*
Fuel
NGL
10,721
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
Assist
Fuel
94
10,718
TOTAL items 1-7
t:
0
"w
W VI
"Ë
f."LJ t..o E
en <:>
....... m (;
-- ....... Q,
(.'; C::1
....- r:: (;$
LU ~:; "'.
N wO
U .~ -£
c.c: iB,¿
LW <C eð
rv 2 ë5
~
ro
<U
::¡:
21,900
e
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
II. Transferred to:
Remarks:
I hereby cer1{
Signature ((.
Form 10-422
Rev. 4/95
I Field(s)
Sag Delta North
o
194
45
105
23
194
Title ()1.Grl.. v'òL-
and correct to the best of my knowledge.
Date C(r..e[q$"
Endicott 10450 I MonthlY ear of Disposition
May, 1995
*lndicate contribution of each pool to total.
Pool Name Code
220150
Percent
Official Use Only-Flaring Authorization>l hr.
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
6/7/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
May, 1995
Page 1
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL 15,443 Not required for unplanned events which
are less than or equal to 1 hour
ACTION. TAKEN TO ELIMINATE CAUSE;
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE ~AUSE
5/11/95 22:30-23:50 5,046 Main compressor shut down due to WHRU alarm Switched WHRU to other compressor
e
5/12/95 5:40-8: 10 650 Plant upset due to slugging into separation train Stabilized facility process and operation
5/12/95 13:10-14:10 386 Well treatment flowbacks upset plant stability Stabilized facility process and operation
5/14/95 13:20-14:20 211 Ambient temperature swings affected plant stability Stabilized facility process and operation
5/14/95 16:40-18:10 423 Ambient temperature swings affected plant stability Stabilized facility process and operation
5/15/95 8:50-10:00 1,029 Well 1-67 shut in due to SSSV closure Stabilized facility process and operation
5/16/95 13:50-15:30 400 Well treatments caused plant upset and hence flare Stabilized facility process and operation
to open
5/18/95 18:10-20:10 4,753 Plant shut down due to water handling problems Brought plant back on line
e 5/21/95 13:20-15:10 7,056 MGC 'A' shutdown due to high bearing temperature Replaced bearing thermocouple
alarm
5/21/95 21 :20-23:50 11,062 Attempting to restart MGC 'A' after machine failure Essential maintenance completed
5/22/95 20:50-22:00 643 Booster compressor shut down, plant de-stabilized Switched to back up booster compressor
5/26/95 18:20-20:20 975 Ambient temperature swings affected plant stability Stabilized facility process and operation
5/27/95 14:30-15:50 402 Ambient temperature swings affected plant stability Stabilized facility process and operation
5/28/95 13:50-15:30 676 Ambient temperature swings affected plant stability Stabilized facility process and operation
TOTAL 33,712
6/7/95 BP EXPLORATION (ALASKA) INC. Page 2
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
May, 1995
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME ' "DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5f7 /95 18:00-18:10 44 Weekly Flare test None, safety requirement.
5/9/95 0:50-1 :20 609 Optimizing rate during compressor overhaul Stabilized facility process and operation
5/9/95 2:10-2:40 408 Optimizing rate during compressor overhaul Stabilized facility process and operation
e 5/9/95 3:00-3:50 206 Optimizing rate during compressor overhaul Stabilized facility process and operation
5/9/95 5:00-5:20 338 Optimizing rate during compressor repair Stabilized facility process and operation
5/9/95 16:20-16:50 29 Optimizing rate during compressor overhaul Stabilized facility process and operation
5/16/95 11 :00-11 :20 357 POP well 1-67 and allow to gas off Stabilized facility process and operation
5/19/95 3:40-4:30 561 Start main compressor following overhaul Stabilized facility process and operation
5/22/95 1 :30-2:00 201 Optimizing rate during compressor repair Stabilized facility process and operation
5/23/95 3:00-3:50 638 Gas flared during loading of compressor during Stabilized facility process and operation
5/23/95 8:30-9:20 139 Optimizing rate during compressor overhaul Stabilized facility process and operation
e 5/26/95 14:10-15:00 98 Ambient temperature swings affected plant stability Stabilized facility process and operation
5/29/95 5:40-6:00 39 Optimizing rate to TAPS proration levels Stabilized facility process and operation
5/29/95 12:10-12:10 110 Optimizing rate to TAPS proration levels Stabilized facility process and operation
5/29/95 13:30-13:30 137 Optimizing rate to TAPS proration levels Stabilized facility process and operation
5/29/95 14:20-14:30 263 Optimizing rate to TAPS proration levels Stabilized facility process and operation
5/29/95 17:40-17:50 42 Optimizing rate to TAPS proration levels Stabilized facility process and operation
TOTAL 4,219
6/7 /95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
May, 1995
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME .' DESCRIPTION OF INCII?ENT &.CAUSE
5/3/95 14:20-15:20 213 POP well 2-42 following well work
5/9/95 6:40-7:40 130
5/9/95 8:20-10:50 870
e
5/10/95 17:30-20:30 3,492
5/12/95 1:10-2:20 504
5/13/95 16:30-19:30 739
5/13/95 19:50-21 :20 315
5/14/95 5:10-7:50 1,098
5/15/95 16:50-18:20 951
e 5/15/95 18:40-21 :20 1,059
l'
.If)} ^
5/16/95 . ('4'f.-Q:00-1 :20 197
. .....
4.{.., 4:1'A '" <<(~./~ f
"û't. '''~j) / l ..
·'f~,.. t/'. ¡,r,,_:'\
'<@cf%/95 ¿> 18:104~ 600
""l"v" /.'"1
5/~&~~Z,~ 'r~~0-14:50 934
, (;h?' (~';Z~;i-,.
t--,/.,
5/27/95 2:t''ê-3:10 565
5/29/95 18:20-19:50 772
MGC 'A' shut down for maintenance,optimize rate
on 1 compressor
MGC 'A' shut down for maintenance,optimize rate
on 1 compressor
POP wells 2-04 & 1-27 to prepare for Compressor
restart
Optimizing rate during compressor overhaul
Water wash gas injection wells
Water wash gas injection wells
Turbine wash of main gas compressors
Adjusting temperature control logic on MGC 'B'
Adjusting temperature control logic on MGC 'B'
Optimizing rate following MGC 'B' control logic
change
POP well 1-29 and 2-20 following well work
Page 3
ACTION TAKEN TO EtIMINATE.CAUSE
Stabilized facility process and operation
Stabilized facility process and operation
Essential maintenance completed
Stabilized facility process and operation
Stabilized facility process and operation
Stabilized facility process and operation
Stabilized facility process and operation
Essential maintenance completed
Essential maintenance completed
Essential maintenance completed
Essential maintenance completed
Stabilized facility process and operation
SI well 1-29 for Rig Move, POP well 1-55 and allow Stabilized facility process and operation
to gas off
Optimizing compressor performance
Wells gassing off after TAPS slowdown.
Equipment testing completed
Stabilized facility process and operation
6/7/95
5/30/95
5/30/95
e
11:50-13:20
20:20-21 :30
TOTAL
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
e
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
May, 1995
Page 4
268
Stabilized facility process and operation
Shut in well 1-29, attempted to make up rate with
other wells
374
POP new well 3-37. Gas rate initially contiunued to Stabilized facility process and operation
rise.
13,081
TOTAL SDN· END'ICOTT
19,662 45 19,617
46,793 105 46,688
10,199 23 10,176
41.609 94 41.515
118,263 267 117,996
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Operator
BP Exploration (Alaska) Inc.
Disposition
Field(s) Endicott 10450 Month/Year of Disposition
Sag Delta North April, 1995
Volume MCF*
*If production comes from multiple pools,
indicate contribution of each pool to total.
I. Sold
e 2. Reinjected
3. Flared or vented less than I hour
'L:
o
~¡;)
(,?
'Ë
E
(..)
(...)
I..::)
f.J~!
(.0
<:1'>
c:.."?
.--
4. Flared or vented greater than I hour
(Supplemental report required--See 20 AAC 25.235)
:::~
. , .
f...e;...,,.'
ç,
5. Pilot and Purge
t
("
6. Used for lease operations
7. Other
NGL Gas Equivalent
Assist Gas
e
TOTAL
Pool
Percent
o
220150
6,374
I 3
6
I 3
Use Only-flaring Authorization> J hr.
6,441
I. Safety
MCF
235
38
2. Lease
MCF
13,120
3. Conserv. Purposes
MCF
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month
following the month of disposition. Authority 20 AAC 25.253
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Q.QL~_
Title Ybd~t1._&ç;\Ll~-"!J\ßlli~
Date: _~/'i..r
Form 10-422
Rev. 11194
5/5/95
IUnplanned Events less than or equal to 1 hour
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
April, 1995
Page 1
events
are less than or equal to 1 hour
fUnplanned Events greater than 1 hour
Not events
are less than or equal to 1 hour
0700-0810 228
e 4/6/95 1150-1320 246
4/9/95 2010-2140 348
4/17/95 1210-1350 574
4/20/95 1540-1640 213
4/25/95 1350-1540 409
4/26/95 0640-0830 836
TOTAL 2,854
Ambient temperatures caused flare valve to open
production to
Ambient temperatures caused flare valve to open
Cut production to avoid flaring
Compressor anti-surge control problems led to flare Blocked in GL header valve on MGC'A'
event
Ambient temperatures caused flare valve to open
Cut production to avoid flaring
Attempting to limit production to TAPS proration
levels
Ambient temperatures caused flare valve to open
Cut production to avoid flaring
Ambient temperatures caused flare valve to open
Cut production to avoid flaring
e IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mef
2120-2200 109 Put well 2-52 on production
4/16/95 1320-1400 486 Bypass Chiller to assess compressor performance None, equipment function test.
4/22/95 1910-1920 833 Second stage flare test. None, safety requirement
TOTAL 1,428
"
5/5/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
April, 1995
Page 2
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
151 610
1510-1610
1810-1930
out on own
Cut rate to eliminate flaring
None, Safety requirement
4/14/95
4/16/95
175
264
1,256
Brought wells on, allowed to gas off.
Put well 2-50 on production. Allowed to gas off
Routine Flare Test
TOTAL 1,695
-
SDN ENDICOTT
10,223 13 10,210
4,549 6 4,543
if'
9,870 13 9,857
29.824 38 29.786
54,466 70 54,396
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
-
/'/\
f'~
é"
~ " "'"
(#d"\
ft.... ;
. /'j
:t':..,.......
.é\
."')
C'
"~w
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Operator
BP Exploration (Alaska) Inc.
Disposition
1. Sold
e 2. Reinjected
3. Flared or vented less than I hour
o
f..LJ
4. Flared or vented greater than I hour.......
(Supplemental report required--See 20 AAC 25.235) .-P"
5. Pilot and Purge
U.J
'"..;
L.LJ
CL
6. Used for lease operations
7. Other
e
Note; All
NGL Gas Equivalent
Assist Gas
TOTAL
'.
Field(s) Endicott 10450 MonthlYear of Disposition
Sag Delta North March, 1995
Volume MCF*
l..O
cn
c:!'ì
...--
~
(:)
·r..)
tf)
'f:
E
(,;)
Q
. n,
f'l) I'^~
r: ;j
8~
~i ~g
0<t
ct\
*If production comes from multiple pools,
indicate contribution of each pool to total.
Pool
Percent
N
0:
.<f'
~:
o
~'
~,;¡
o
220150
9,705
1 6
17
-- ..... ,."-----.'.-
Official Use Only-Flaring Authorization> 1 hr,
8,896
1. Safety MCF
330
47
2. Lease
MCF
19,012
3. Conserv. Purposes
MCF
volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month
following the month of disposition. Authority 20 AAC 25.253
Remarks:
: i:~:~:"ce'Q (it ~"::d
Form 10-422
Rev. 11194
i
correct to the best of my knowledge.
Ti tie {Y1G'(L---VOL.l~t::."'4f!.,Qý-/J(1..l1¥-____--
Date: -'1tlLl'1.f'
417195
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
March, 1995
IUnplanned Events less than or equal to 1 hour
"::t:l"TIME.:Y:~l;')',:-:~t ~<,ç~~ ¿)VOLiUME DESCRIPTION,Of,INCIDENT&.CAUSE: 'ii'
TOTAL 6,543 Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE . TIME .,' ';,A\';:<sVOLUME
TOTAL 0
'. DESCRIPTION OF. INCIDENT & CAUSE! ,
e
[Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE· TIME' 'i ?~. .òU~: VOLUME-. DESCRIPTI0t:l OF;lNCIDENT & CAUSE ,!, , ',1./
3/5/95 1640-1650 619 Perform weekly test of the high pressure flare
3f1/95 1320-1400 259 Put well 2-42 on production
3/9/95 1330-141 0 816 Put well 2-52 on production
3/12/95 1740-1750 487 Perform weekly test of the high pressure flare
3/19/95 1200-1300 191 Begin underream & flowback of well 3-39
3/21/95 2100-2120 119 MGC-B startup following exhaust thermocouple
e 3/26/95 1910-1920 539 Perform weekly test of the high pressure flare
3/31/95 2230-2300 180 Put well 2-32 on production
TOTAL 3,210
Page 1
ACTIONTAKENTOiELIMINATE.CAUSE...······ hi" '.'
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE: ' ,; '"
ACTIQN T A(ENTQELlMINATE;~AlJSE!)iF
None; safety requirement
;':,·..'..i'·".···:·.',
è/"Y__::Ù':::'?
Allow well to gas off at reduced choke setting
See above
None; safety requirement
Adjust other wells to minimize flare volume
Small flare volume required by Copus
slu turbine
None; safety requirement
Allow well to gas off at reduced choke setting
4/7 195
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO, 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
March, 1995
Page 2
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
ibATETIME " ~·;;¡;iiVÓ(:(JMEI~11Iitjit:>~§þRìPtlº!iJ;t>f;ilNcl_DgNT;&Ç~(J$I:;¡~t·,;¿
3/10/95 1310-1440 484 I Put well 2-46 on production
TOTAL 484
{::,::~~
/iÚt;:::,'8:t\r
. ACTIÞN;TA.KENTC).ELÎMí!iJA T¡:ÇAUSE§~.;~~j.if· ,.
Allow well to gas off at reduced choke setting
- w>:'*""~
TOTAL SDN ENDICQTT,
Volume flared less than 1 hour 9,753 16 9,737
Volume flared greater than 484 483
1 hour
Pilot Purge 10,199 17 10,182
Assist Gas 29.013 47 28.966
TOTAL FLARED VOLUME 49,449 81 49,368
e
"t~,
\}f ~1?'
#ç:> ¿ 1
'(,.1-.. ~'r.A¡)
-"/.... '.1'
C~-:~'~ ,J >
\';"(': /'
-'(7, ~.,
'~;:;\:;~~~ l':r;-"
.~. ,.? ..
·{i.h·
'i.;>
/\,
~#~~ ..
" <~~,.
.,
<~)
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Operator
BP Exploration <Alaska) Inc.
Field(s) Endicott 10450 Month/Year of Disposition
Sag Delta North February, 1995
Disposition
Volume MCF*
*If production comes from multiple pools,
indicate contribution of each pool to total.
Pool
Percent
I. Sold
o
220150
e 2. Reinjected
3,342
3. Flared or vented less than I hour
I I
4. Flared or vented greater than I hour
(Supplemental report required--See 20 AAC 250f<> E eEl V E D
5. Pilot and Purge
I 2
4
Official Use
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
MA.n 2 1 1996
6. Used for lease operations . . .
Alaska OH & Gas Cens. Ccmm¡SSlon
An¡;hu Ci\J1::
1,269
7. Other
NGL Gas Equivalent
Assist Gas
83
10
e
TOTAL
4,731
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month
following the month of disposition. Authority 20 AAC 25.253
Remarks:
..
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature _QIJ_~
Ti tl e --L!:16t:L-._I&J-I~!:f-Itliz..V
Date: ~/8/'iS-
Form 10-422
Rev. 11/94
e
e
3/7/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
February, 1995
Page 1
[ifu·p!anned Events less than or equal to 1 hour
DATE TIME ,c",,(! VOLUME DESCRIPTION OF INCIDENT & CAUSe?>
TOTAL 14,889 Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE ' TIME)f¡;: t(;b>' 'VOLUME>
2/5/95 0730-0900 348
".' DESCRIPTION OF INCIDENT & CAUSEtM¡ ..>
Rising ambient temp caused flare valve to open
ACTION TAKEN ,TO ELIMiNATE ,CAUSE L'';~,:tÚ'';'"
Reduced prod rates to minimize flared volume
2/5/95 1450-1630 716 See above See above
2/10/95 0000-0520 13,174 Lost "B" main due to thermocouple control Replaced failed exhaust thermocouples
instrument failure
2/11/95 1800-1930 546 Rising ambient tempertures caused flare valve to Reduced prod rates to minimize tlare
2/12/95 1240-1410 512 High ambiernt tempertures forced the flare valve See above
2/12/95 1940-2120 10,617 Lost "B" main gas compressor with a control failure. Repaired bad control card and restart "B" main
2/13/95 1900-2130 1,136 Rising ambient tempertures caused flare valve to Reduced prod rates (phase 3 weather)
2/13/95 2210-2320 292 See above See above
2/15/95 1210-1320 138 See above Reduced prod rates to minimize tlare
TOTAL 27,479
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
, DA TEiTlME(iii;!,ÿ3!ii!;.i,i;!¡!¡ii¡'Šii'ŸVOLUMEii,!U'9¡¡iDEŠCRI~IIÖ~OBINCI[)ENJ'&¡ÇAt.J§g;0.¡;:
2/4/95 1730-1830 1277 Put well 2-14 on production
;f~':1d'::j{:iT1'
"A"':";
i" :;~0:"/ACTION ,TAKEN TOELlMINA TECAUSE ¡;*-~;-¡ í£¡ .j;kL::!;':;!
, r">,·.Sê:·-:~:(,"".."., ':....'.." .:.".' . .... ".':. ......, .,.":.. :...... .".: . ,,::.' . ,.,. :,'.:"... ...,. . ·c', .." .,'., ":..::, .". <':::::.:':.'.;:.:'>.'.:.:;'~::. ...~.,. '". :.:.::.·.·.:···:::,::,·:·,:.:",Æ
Allow well to gas off at reduced choke setting
2/4/95 ·2010-2040 693 Flare test None; safety requirement
2/11/95 1320-1420 337 Put well 1-45 on production Allow well to gas off at reduced choke setting
2/12/95 1540-1610 641 Put well 2-14 on production See above
2/14/95 0500-0540 847 "B"-Main compressor shutdown Repair NGL bypass valve and restart "B"-Main
3/7/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
February, 1995
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE·' TIME·' ""i~ih., '<V.OL.UMEA ~j::~;:DESCRIPT'ION,OF::;:INCI[)ENT;'&'CAUSE
2/14/95 0800-0840 245 Put well 1-27 on production
2/14/95 0900-0910 772 Put well 2-14 on production
2/18/95 1930-1950 639 Flare test
- 2/21/95 2000-2050 4499 Bringing wells on production following TAPS
TOTAL 9,950
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME',:;) DESCRIPTION OF INCIDENT&'CAUSEi'!S)¡;;;!0)/
2/28/95 1120-1240 155 I Put well 2-14 on production following corrosion
TOTAL 155
Page 2
/ACTlONTAKENTO ELlMINATECAUSE),t,.r¡'>:¡;\i!¡¿// .,
Allow well to gas off at reduced choke setting
See above
None; safety requirement
Reduce choke settings to allow wells to gas off
> "ACTION TAKEN TOELlMINATE.CAUSE'¡y··
Reduce choke setting to allow well to gas off
SDN ENDICOTT'
Volume flared less than 1 hour 24,839 11 24,828
Volume flared greater than 27,634 12 27,622
1 hour
e 4 9,208
Pilot Purge 9,212
Assist Gas 23.391 10 23.381
TOTAL FLARED VOLUME 85,076 37 .i 85,039
· .
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Faci I i ty
Endicott
Operator
BP Exploration (Alaska) Inc.
Field(s) Endicott 10450 Month/Year of Disposition
Sag Delta North January, 1995
Disposition
Volume MCF*
*1£ production comes from multiple pools,
indicate contribution of each pool to total.
Pool
Percent
I. Sold
o
220150
e 2. Reinjected
6,003
3. Flared or vented less than I hour
10
4. Flared or vented greater than I hour
(Supplemenlal report required--See 20 AAC 25.235)
30
5. Pilot and Purge
ECE~\ltD
---------,--_._,_.~._,_.._---------~---_._-_.._~_.__.~.....,....-~--------
9
Official Use Only-Flaring Authorization> 1 hr.
6. Used for Icase operations
t,lI
I'"
, ¡¡ ~
') 1 10.(',(:
£.. . ...;..;0
4,436
I. Safety
MCF
7, Other
NGL Gas Equivalent
Assist Gas
Alrrs}ca OiJ e~ G.Js. '_:u::1:;,;. CI~;iTI~11g3::Jn
An ~no:2~c
1 8 I
24
2. Lease
MCF
e
TOTAL
10,693
3. Conserv. Purposes
MCF
Note; All volumes must be corrected to prcssure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month
following thc month of disposition. Authority 20 AAC 25.253
Remarks:
I hcrcby certify that thc forcgoing is true and correct to thc bcst of my knowledge.
Signature _(2'D....L_~____
Ti tl c _¡.'1./M~a.__VÙL I ~-/-ðW-------
Datc:___Z!LQlîS
Form 10-422
Rev. 11/94
2/10/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
January, 1995
IUnplanned Events less than or equal to 1 hour
DATE' '>TIME»" ji VOLUME),! !ii¡'¡">[)~SêFUÞTI()NÖF'NêIDENt,&CAlISE;:"
TOTAL 5,774 Not required for unplanned events which
are Jess than or equal to 1 hour
IUnplanned Events greater than 1 hour
. DATE VOLUME» DESCFUÞTIONOFINCIOENT&iCAÛSE¡r¡js\¡¡S1S.::; ,
1/1/95 1700-1900 40 Ambient temp swing caused flare valve to open
e 1/2/95 1300-1600 1,250
1/15/95 1940-2050 186
1/16/95 0110-0230 136
1/17/95 0940-1230 9,594
1/17/95 1250-1450 9,930
1/17/95 2100-2230 648
1/18/95 0100-0230 1,382
e 1/18/95 0900-1120 1,418
1/26/95 0140-0250 411
TOTAL 24,995
Plant SID & restart (high 1 st stage level)
Running maximum rates, bumping flare.
Rising ambient temp cause flare valve to open
Page 1
!i ACTION TAKEN TOELIMINATECAUSEi::¡i\Hi' i+fè,,'¡.>
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE·" 'WKiii; S};¡jigy<'
Reduced prod rates to minimize flare vol
Adjust well chokes to minimize prod swings
Reduced prod rates to minimize flare vol
See above
MGC A SID on a problem with waste heat recovery Repaired waste heat recovery unit, restarted
MGC-A
MGC A startup then SID due to thermocouple failure Replaced failed thermocouples & resstarted
MGC-A
Rising ambient temp caused flare valve to open
See above
See above
Ambient temp swing caused flare valve to open
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME iVOLlIME'<. DESCRIPTION OF INCIDENT&.CAlISE;;'
1/4/95 1600-1700 350 Put well 2-52 on prod; allow well to gas off
1f7/95
0200-0230
670
1f7/95
0500-0530
120
Put well 1-67 on prod; allow well to gas off
Put well 1-35 on prod; allow well to gas off
Reduced prod rates to minimize flare vol
See above
See above
See above
ACTION TAKEN TO ELlMINATECAlISE.'/' ;'5<;( ;r.i
Shut-in well 2-52
Adjust other wells to minimize flare
See above
2/10/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
January, 1995
Page 2
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
¡J>;. DATE" .' TIME')'''i!4{;fh~wOLUM~ ,,;'~F:/bESCÁIPtION OF.INCIDENt'&>CAUSE ":"':"1;'"
1f7/95 0600-0630 120 ' Well 1·61 nitrogen lift and put on production
e
1f7/95 1610-1710 220
1 f7/95 1900-1930 90
1/8/95 1920-1940 708
1/10/95 1140-1150 24
1/12/95 131 0-1340 36
1/12/95 1630-1650 20
1/13/95 0820-0840 35
1/13/95 1250-1300 66
1/13/95 1830-1850 44
1/14/95 0740-0750 1
1/14/95 1050-1130 247
1/14/95 1230-1250 33
1/14/95 1950-2010 579
1/16/95 1210-1240 139
1/19/95 1510-1520 29
1/20/95 0130-0220 329
1/20/95 0500-0600 215
e
I
i)i~i:: r,·' ACTION .TAKEN TO ELlMINA TE,CAUSE Lf;W,'* i%-,r;rfit;~
See above
Put well 2-52 on prod; allow well to gas off
See above
Well 3-21 WSO squeeze
Reduced prod rates to minimize flare
Beginning well 3-19 WSO squeeze
See above
Well 3-19 inflow test
No response taken due to short event duration
POP well 3-21 following squeeze
Reduced prod rates to minimize flare
POP well 3-19 following squeeze
See above
Corrosion inhibitor treatment flowback
Reduced prod rates to minimize flare
See above
No response taken due to short event duration
See above
Reduced prod rates to minimize flare
See above
No response taken due to short event duration
See above
Reduced prod rates to minimize flare
See above See above
Flare test None. Safety requirement
Corrosion inhibitor treatment flowback Reduced prod rates to minimize flare
Slowed MGCs to minimum speed for maintenance Completed work on main gas compressors
Adjust wells to meet Alyeska proration requirement Reduced prod rates to minimize flare
See above See above
2/10/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
January, 1995
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME «(",mg.!,', VOlUME·(";! '/DESCRIPTI()N()FINCíDÊNT&CAUSE'~;';!> "!
1/21/95 2100-2130 116 MGC anti-surge valve calibration
1/22/95
0210-0250
TOTAL
257
4,448
Well 2-18 squeeze work
e
(Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE ,;,:iJIM E :):";//'Ý;:4; '~::. V.OLUM E'Y ;,:,,; D,E:SCRI,RJlqN::,OF::'INCIDENT,&::'C,~US__E:.~I~f~ 0:;~f'!~:ffr~~Y ':;':::l¡«:;:~'?:,,::*:
1/14/95 1350-1500 288 Shutin high prod well. Tried to bring on more prod
1/16/95 1750-1900 159 Bleed 3-01 inner & outer annulus due to high
pressure
1/17/95 0640-0750 160 Well corrosion & scale jobs caused prod swings
1/17/95 081 0-0920 718 See above
1/17/95 1520-1910 1,080 MGC A startup, prod swings
1/25/95 1450-1610 925 MGC performance testing (pre regulatory change
permit #202.36)
1/26/95 081 0-0930 5,257 See above
e TOTAL 8,587
Page 3
ACTION TAKEN TO ELIMINATE CAUSE
See above
See above
ACTION TAKE,N TO ELIMINATE CAUSE
Reduced prod rates to minimize flare
, ",,;\¡
þ:::::i/":'8
lU-:&fi$J
Minimize bleed rate; adjust well flowrates
Adjust well flowrates to line out prod swings
See abaove
Adjust well flowrates to line out prod swings
Flaring previously approved by AOGCC
permit #202.36
See above
Volume flared less than 1 hour 10,222 10 10,212
Volume flared greater than 33,582 30 33,552
1 hour
Pilot Purge 10,199 9 10,190
Assist Gas 26.099 24 26.075
TOTAL FLARED VOLUME 80,102 73 80,029
.~
_ _c· _
WALTER J. HICKEL, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
JIIOI PORCl:PL'ò[ DRJ\'[
A'liCIIORAGE. ALASJ.:A 99!'OJ -JI9:
""ONE: (907)279-I43J
TEI.[COP\,: (907):76-7!'4:
Novcmber 29. 1994
ADMINISTRA TTVE APPROVAL NO. 202.36
ENVIRONMENTAL
DtC 0 1 1994
Rc:
Additional narc volume. Endicott Oil Pool production facilitics. Duck Island Unit.
Alison D. Cookc
BP Exploration (Alaska) Inc.
P. O. Bex 196612
Anchorage. Alaska 99519-66 I 2
.~ ··EG .;FFAIRS
Dear Ms, Cooke:
Wc have receivcd your IcUcr of Novcmber 28. 1994 requesting additional flare volume for the Endicott oil
pool production facijity in the Duck Island Unit (DIU). The additional flarc "olume is rcquired during
tcsting of the reccntly rcpaircd gas compressors.
The Commission hereby approvcs flaring up to 30 MMcf of gas ovcr and above the dcsignated safety flare
of thc Endicott production facility. Flaring is expccted to commcnce on or about November 29. 1994 and
continue until work is complete.
It is understood that gas flaring will be kcpt to a minimum whenever possible. and all volumes will be
reported monthly on Alaska Oil and Gas ConseryaLÌon Commission form 10-422.
DONE at Anchorage. Alaska and d<1ted Novcmber 29. ]994.
c
\
~
.. ...,.....,.
~e!i:Jf----
Alaska Oil and Gas Conservation Commission
-þc (u:_~/2rrÁ--- .______.
I
Tuckerman B<1bcock. Commissioner
Alaska Oil and G<1S ConseT\'atÎon Commission
e
e