Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutBPXA - BADAMIState of Alaska Alaska Oil & Gas Conservation Commission 1999 Facility Report Files File Names Gas Disposition ~C A - 1~adum~~ ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Badami Jan-99 Disposition Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 2,855 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 12,466 5. Pilot and Purge 0 6. Used for lease operations Assist Fuel* 0 51 256 7. Other TOTAL items 1-7 66,577 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: * Includes 1347 MCF from Endicott on 1/31/99 I hereby ce 'fy t t the fore oing is true and correct to the best of Signature , Title /~,~~ ~x Date 2 d$ I *Indicate contribution of each pool to t Pool Name c:oae Percent 60100 Officia L Use Orily-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. • Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Badami Feb-99 Disposition 1. Sold Fuel NGL 2. Reinjected 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 6. Used for lease operations Assist Fuel 7. Other Volume MCF* 0 0 *Indicate contribution of each pool to t Pool Name Code Percent 60100 0 0 9,368 includes 3,402 from EndicottL 0 0 8,960 all from Endi TOTAL items 1-7 48,328 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby c t' y that t e foregoing is true and correct to thelf_b~e~s~t of Signature t Title~~i VOC., Date -~, I Official Use Only:-Flaring Authorization ott 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. C ~I Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility (Operator (Field(s) Badami BP Exploration (Alaska) Badami Disposition Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 0 6. Used for lease operations Assist Fuel 0 0 7. Other TOTAL items 1-7 0 8. NGL gas equivalent produced 0 9. Purchased gas 38280 from Endicot 10. Transferred from: 11. Transferred to: I hereby c tify t at the foregoing is true and correct to the best of Signature Title /~(o~, 'T1A'~C Date ~{ Q Mar-99 of Disposi *Indicate contribution of each pool to t Pool Name Code Percent 60100 Official Use Only-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ~ ~ oaf ~ ~~ C . ry;. -, . ALASKA OIL AND GAS CONSERVATION CONII~lISSION .~,~,.. FACILITY REPORT OF PRODUCED GAS DISPOSITION ;`~~+7~aa~~i ~ ~~~Yk+~' ~~~~~• Operator Field(s) Month/Year of Disposition ~1~chara~ Bp Exploration (Alaska) Badami Apr-99 Disposition Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 0 3. Flared or vented less than 1 hour 100 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 860 5. Pilot and Purge 0 6. Used for lease operations Assist Fuel 0 0 7. Other TOTAL items 1-7 960 8. NGL gas equivalent produced 0 9. Purchased gas 55689 from Endicott (55537.3 fuel, 151.4 flare) 10. Transferred from: 11. Transferred to: I hereby certify Signature forggoing is true and correct to the best of Title /VL(~(L ~'14 X Date *Indicate contribution of each pool to t Pool Name Code Percent 60100 Official Use Only-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note; All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ~, ~ :. 5/12/99 ,,. ~. BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI April-99 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 0 TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION'OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Coil tubing work on B1-14. Well had to be flowed 4/2/99 1906-2000 100 back at times during clean up operations. N/A TOTAL 100 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Coil tubing work on B1-14, Well had to be flowed 4/2/99 1706-1900 620 back at times during clean up operations. N/A Coil tubing work on B1-14. Well had to be flowed 4/ 11 /99 1724-2000 240 back at times during clean up operations. N/A TOTAL 860 TOTAL Volume flared less than 1 hour 100 Note: This report includes only Badami produced gas flared at Badami. It does not include 151 mscf gas Volume flared greater than 860 purchased from Endicott that was flared at Badami. 1 hour Pilot Purge 0 Assist Gas 0 TOTAL FLARED VOLUME 960 ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Badami May-99 Disposition ~ Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 62,844 3. Flared or vented less than 1 hour 3,745 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,725 5. Pilot and Purge 0 6. Used for lease operations Assist Fuel 0 57 032 7. Other TOTAL items 1-7 125,346 8. NGL gas equivalent produced 0 9. Purchased gas 45,170 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby c fy t at the regoing is true and correct to the best of my Signature ~~ - Title /~,((~'(11f~( Date lp ~(p *Indicate contribution of each pool to t Pool Name Code Percent 60100 Official Use Only-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC Form 10-422 Rev. 4/95 6/16/99 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - BADAMI May-99 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 3,411 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION 7AKENTO ELIMINATE CAUSE 5/12/99 00;30-02:18 365 "B" Solar turbine generator tripped off line. Started turbine back up, plant back on line. IG comp, "A" tripped on faulty high temperature 5/21/99 18:00-19:00 646 shut down, Started compressor back up with repaired tern B1-36 shut in the wells due to high pressure in test 5/31 /99 02:00-03:12 149 separator. This caused the IG to trip. Started compressor back up and put wells bac TOTAL 1,160 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'ELIMINATE CAUSE 5/1/99 07:00-07:12 4 5/1/99 21;48-22:12 10 5/2/99 06:42-06:54 12 5/2/99 17;36-17:48 5 5/2/99 22:00-23;59 194 5/3/99 02:48-03:00 10 5/3/99 03;12-03;24 10 5/3/99 03:30-03:42 7 5/3/99 09:54-10:06 18 5/3/99 10:12-10;18 4 5/3/99 10:36-10;42 2 5/3/99 10:54-11,12 10 5/3/99 11,24-11:54 15 5/3/99 12:00-12:24 14 5/3/99 12:30-12;36 2 5/3/99 12:54-13:00 4 5/3/99 15:24-15;30 1 5/4/99 16:30-16:42 11 5/4/99 17:30-17:36 3 TOTAL 334 s s 6/16/99 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI May-99 Page 2 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/1/99 00:00-01:06 86 Badami Start up activities. Having equipment ready for startup, 5/1/99 Ol :12-04;06 112 Badami Start up activities. Having equipment ready for startup. 5/1/99 04:24-06;48 60 Badami Start up activities. Having equipment ready for startup, 5/2/99 11;30-15:42 105 Badami Start up activities. Having equipment ready for start up, 5/3/99 00:00-02:42 202 Badami Start up activities. Having equipment ready for startup. TOTAL 566 TOTRL Volume flared less than 1 hour 3,745 Volume flared greater than 1,725 1 hour Pilot Purge 0 Assist Gas 0 TOTAL FLARED VOLUME 5,470 ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Badami Jun-99 Disposition ~ Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 76,333 3. Flared or vented less than 1 hour 373 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 0 6. Used for lease operations Assist Fuel 0 40 442 7. Other TOTAL items 1-7 117,148 8. NGL gas equivalent produced 0 9. Purchased gas included 15,723 in above from Endicott dis ositions 10. Transferred from: 11. Transferred to: I hereby ce ify t at the foregoing is true and correct to Signature Title~~~'(~/1x Date the best of my __~~~ *Indicate contribution of each pool to t Pool Name Code Percent 60100 Official Use Only-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC Form 10-422 Rev. 4/95 7/13/99 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI June-99 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME" DESCRIPTION OF INCIDENT & CAUSE ACT10N TAKEN TO ELIMINATE CAUSE TOTAL 166 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE None TOTAL 0 Pla Ined Events Less Than or Equal 1 Hour DATE TIME VOLUME 6/2/99 2136-2142 2.7 6/2/99 1848-1854 0.3 6/3/99 1824-1830 2.0 6/3/99 0148-0206 13,1 6/6/99 0130-0136 1.6 6/11/99 1512-1536 18,8 6/11/99 1400-1412 6.4 6/11/99 1348-1354 4.8 6/11/99 1312-1330 40.5 6/11/99 1242-1306 69,7 6/14/99 1454-1500 2.0 6/14/99 1430-1442 10.6 6/14/99 1412-1418 2,4 6/14/99 0642-0706 29.0 6/17/99 2042-2048 1.6 6/26/99 0248-0254 1.7 TOTAL 207 ned Events Exceeding 1 Hour OR Exce DATE TIME VOLUME None TOTAL n 0 Not Exceeding 5000 Mcf DESCRIPTION OF INCIDENT & CAUSE Bleeding tubing on B1-36 Put B1-11 on Production Put B1-36 on Production Bleeding tubing on B1-36 Put B1-36 on Production Alyeska Prorations Alyeska Prorations Alyeska Prorations Alyeska Prorations Alyeska Prorations Alyeska Prorations Alyeska Prorations Alyeska Prorations Alyeska Prorations Depressured compressor for PSV work Depressured compressor for PSV work 5 ACTION TAKEN TO'ELIMINATI N/A Adjust plant to handle rate. Adjust plant to handle rate. N/A Adjust plant to handle rate, Adjust plant to handle swings. Adjust plant to handle swings. Adjust plant to handle swings. Adjust plant to handle swings. Adjust plant to handle swings. Adjust plant to handle swings. Adjust plant to handle swings. Adjust plant to handle swings. Adjust plant to handle swings. N/A N/A C DESCRIPTION OF INCIDENT'& CAUSE ACTION TAKEN TO ELIMINATE CAUS 7/13/99 BP EXPLORATION (ALASKA) INC. Page 2 ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - BADAMI June-99 TOTAL Volume flared less than 1 hour 373 Volume flared greater than 0 1 hour Pilot Purge 0 Assist Gas 0 TOTAL FLARED VOLUME 373 ALASKA OIL AND GAS CONSERVATION CON~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Badami Jul-99 Disposition Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 130,789 3. Flared or vented less than 1 hour 2,442 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 29,432 5. Pilot and Purge 403 6. Used for lease operations Assist Fuel 0 34 329 7. Other TOTAL items 1-7 197,395 8. NGL gas equivalent produced 0 9. Purchased gas 69,341 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby c ify at the foregoing is true and.,,cMOr/rect to th~e~ b'e~s"t~of my Signature Title /N.6(L "yam Date ~'+LI yG *Indicate contribution of each pool to t Pool Name Code Percent 60100 Official Use Only-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC m cn Q ~ ~ ~~ a co G~ a o~ -.~ ~-" ~: fi r;, ~~ GS7 Form 10-422 Rev. 4/95 . r . ,, 8/11/1999 BP EXPLORATION (ALASKA) INC, ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - BADAMI J u 1y-99 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 2,405 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 07/ 19/99 02:00-04:54 683 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems, 07/23/99 02:36-04;42 598 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems. 07/23/99 04:48-23:59 4,168 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems. 07/24/99 00:00-16;30 3,552 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems. 07/24/99 16:48-23:59 1,576 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems. 07/25/99 00:00-23;59 5,899 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems. 07/26/99 00:00-13;30 3,164 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems. 07/26/99 20:30-23;59 790 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems. 07/27/99 00;00-16;24 3,616 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems. 07/27/99 16:30-18:12 339 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems. 07/27/99 18;24-23:59 1,266 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems. 07/28/99 00;00-15:48 3,555 Solar Turbines will not run, can not run IG compressor, Working on fuel gas problems. 07/29/99 15:30-16;42 226 "B" IG compressor ESD per loose wire. Repaired, compressor back on line. TOTAL 29,432 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Blowing down fuel gas system for Solar turbine "A" per 07/29/99 13:54-14:12 37 trying to clean out liquids. Expediting the blow down in an efficient manor. TOTAL 37 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE None TOTAL 0 °` i~ 8/11/1999 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI J u 1y-99 Page 2 TOTAL Volume flared less than 1 hour 2,442 Volume flared greater than 29,432 1 hour Pilot Purge 403 Assist Gas 0 TOTAL FLARED VOLUME 32,277 s_ ~ !`~O :`yo f~ ~, ~~ ~ ~ ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badam~;> BP Exploration (Alaska) Badami Aug-99 Disposition ~ Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 272,180 3. Flared or vented less than 1 hour 1,668 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 4,001 5. Pilot and Purge 403 6. Used for lease operations Assist Fuel 0 41 414 7. Other TOTAL items 1-7 319,666 8. NGL gas equivalent produced 0 9. Purchased gas 125,765 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the best of my Signatury~~/~ Title .Date ~ ~+~ *Indicate contribution of each pool to t Pool Name Code Percent 60100 Official Use Only-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC Form 10-422 Rev. 4/95 9/13/1999 BP EXPLORATION (ALASKA) INC. Page 1 ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - BADAMI August-99 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN'TO ELIMINATE CAUSE TOTAL 1,429 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE' CAUSE IG compressor "A" & "B" shut down due to main breaker 08/08/99 06:30-07:42 357 tripped for M-300 Trouble shooting reason for breaker trip 08/11 /99 16:42-19:00 675 Lost a temp. controller TI-0530 3rd stg. Replace MI cable Swapped compressors and lost "A" unit on high 2nd stg. 08/13/99 20:12-21:24 387 discharge Restarted IG-A 08/14/99 06:24-09:48 914 IG "A" comp. down on high 3rd stg. temp, Restarted IG-A " 08/15/99 03;18-04;30 394 Compressor S/D due to high 3rd stg. discharge. Bad TI Replace TI Problems in M-300, suspect bad PLC Continuing with 08/19/99 00:00-02:30 426 investigation Investigating problem, restarted IG compressor Problems in M-300, suspect bad PLC Continuing with 08/19/99 02:36-11:54 658 investigation Investigating problem, restarted IG compressor Problems in M-300, suspect bad PLC Continuing with 08/19/99 12:48-14:12 124 investigation Investigating problem, restarted IG compressor Problems in M-300, suspect bad PLC Continuing with 08/19/99 16:30-18:18 66 investigation Investigating problem, restarted IG compressor TOTAL 4,001 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 08/12/99 00:54-01:06 6 Bled down IG"A" compressor for maintenance on unit Oil and filter change, starting other IG 08/14/99 16;06-16:42 224 Bled down IG"B" compressor for maintenance on unit Oil and filter change, starting other IG 08/14/99 16:48-16:54 6 Bled down IG"A" compressor Bad TI-0530, replaced MI cable Brought IG"A" compressor back on line and shut down 08/14/99 20:00-20:06 3 IG"B" Shutdown IG-B for maintance, started IG-A TOTAL 239 jPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUM~ DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE None TOTAL 0 9/13/1999 BP EXPLORATION (ALASKA) INC. Page 2 ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - BADAMI August-99 TOTAL Volume flared less than 1 hour 1,668 Volume flared greater than 4,001 1 hour Pilot Purge 403 Assist Gas 0 TOTAL FLARED VOLUME 6,072 ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Badami Sep-99 Disposition ~ Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 292,472 3. Flared or vented less than 1 hour 1,199 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,897 5. Pilot and Purge 390 6. Used for lease operations Assist Fuel 0 43 262 7. Other TOTAL items 1-7 339,220 8. NGL gas equivalent produced 0 9. Purchased gas included 98,162 in above from Endicott dis ositions 10. Transferred from: 11. Transferred to: I hereby c tify hat the foregoing is true and correct to the best of my Signature~Q, Title r-~R. Tl~}( Date ~ ~((~ 44 ~~~~~~~~ Form 10-422 O(~'(' "~ 5 1(}(~a Rev. 4/95 ll~i ll 1JJJ *Indicate contribution of each pool to t Pool Name Code Percent 60100 Official Use Only-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC Q~f 8t ~~Wns• ~„~IW 10/13/1999 BP EXPLORATION (ALASKA) INC. Page 1 ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI September-99 less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO' ELIMINATE CAUSE TOTAL 981 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour .DATE TIME VOLUME DESCRIPTION OF INCIDENT..& CAUSE ACTION TAKEN TO ELIMINATE CAUSE 09/01 /99 08:30-09:36 29 Gas compressor loaded up Adjust wells 09/19/99 04:12-05:30 410 IG"B" down due to high level in 1st stage scrubber Restart compressor 09/30/99 18:42-19:48 290 BESD due to smoke in M-004 Bad heater caused smoke, restarted the plant TOTAL 729 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 09/10/99 09/11/99 09/11/99 09/11/99 09/12/99 09/12/99 09/12/99 09/13/99 09/15/99 09/15/99 09/28/99 09/30/99 TIME' 06:35-06:54 12:54-13:00 13:06-13:12 14:12-14:30 13:06-13:12 15:06-15:18 15:24-15:30 20:54-21:12 13:00-13:30 16:42-16:48 16:00-16:36 16:06-16:12 TOTAL "VOLUME. 19 2 3 66 1 13 1 13 14 81 DESCRIPTION OF INCIDENT & CAUSE Depressure IG"A" for maintenance Alyeska shut down, Plant shut down work Alyeska shut down, Plant shut down work Alyeska shut down, Plant shut down work Restarting plant after Alyeska planned shut down Restarting plant after Alyeska planned shut down Restarting plant after Alyeska planned shut down Brought B1-36 into production Begin gas lift on B1-36 Begin gas tiff on B1-36 Depressure B1-28 in preparation for well work POP well B1-11 ACTION TAKEN'TO ELIMINATE C7 N/A N/A N/A N/A Startup injection gas compressor Startup injection gas compressor Adjust rates to limit flaring Choke back on B1-18 Choke back on B1-18 Choke back on B1-18 N/A Choke back on B1-18 E Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 09/11/99 15:12-16:42 48 De-pressuring plant for maintenance during shut down N/A 09/12/99 10:36-12:54 1,120 Restarting plant after Alyeska planned shut down Put IG compressor on line TOTAL 1,168 . .. 10/13/1999 TOTAL Volume flared less than 1 hour 1,199 Volume flared greater than 1,897 1 hour Pilot Purge 390 Assist Gas 0 TOTAL FLARED VOLUME 3,486 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI September-99 Page 2 .~ ' ATTACHMENT) BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI September-99 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESGRIPTION OF'INCIDENT & CAUSE" ACTION TAKEN TO ELIMINATE CAUSE TOTAL 981 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE' TIME VOLUME DE 09/01 /99 08;30-09:36 29 09/19/99 04:12-05:30 410 09/30/99 18:42-19:48 290 TOTAL 729 WENT &r(2ol1SE Updated 10/27/1999 by A.DubE; Page 1 !IMINATE:CAUSE The Vapor Recovery Unit (VRU) Compressor went down on high high level (HH LVL) due to a large volume of condensates dropping out of the gas. We choked back the wells to minimize the amount of gas produced and subsequently sent to the vapor recovery unit. We flared due to the "B" gas compressor going down We shut-in B1-18 to minimize flaring and started- on high high level alarm (HH LVL) in the 1st stage up the gas compressor. scrubber. While trying to restart the compressor, it went down on high high pressure alarm (HH PR) on the 2nd sta e dischar e. The entire plant shut-down due to an electric heater The heater was left off-line until the plant was malfunction in the electrical skid (M-004) causing brought back on-line. When we went back to smoke. investigate the cause of smoke, we were not able to get the heater to smoke again. It is expected dust caused the smoke and the unit was dusted, DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 09/10/99 06,35-06:54 19 Depressure IG"A" for maintenance 09/11/99 12:54-13:00 2 Alyeska shut down, Plant shut down work 09/11 /99 13:06-13:12 3 Alyeska shut down, Plant shut down work 09/ 11 /99 14:12-14:30 66 Alyeska shut down, Plant shut down work 09/12/99 13:06-13:12 1 Restarting plant after Alyeska planned shut down 09/12/99 15:06-15:18 13 Restarting plant after Alyeska planned shut down 09/12/99 15:24-15:30 1 Restarting plant after Alyeska planned shut down 09/13/99 20:54-21:12 13 Brought B1-36 into production 09/15/99 13:00-13:30 14 Begin gas lift on 61-36 09/15/99 16:42-16:48 1 Begin gas lift on B1-36 09/28/99 16:00-16:36 81 Depressure B1-28 in preparation for well work 09/30/99 16:06-16:12 4 POP well B1-11 TOTAL 218 .,ACTION TAKEN TO ELIMINATE Ci N/A N/A N/A N/A Startup injection gas compressor Start up injection gas compressor Adjust rates to limit flaring Choke back on B1-18 Choke back on B1-18 Choke back on B1-18 N/A Choke back on B1-18 ATTACHMENT J BP EXPLORATION (ALASKA) INC. Updated 10/27/1999 by A.Dube ADMINISTRATIVE APPROVAL NO. 202.4 Page 2 GAS FLARING INCIDENT REPORT - BADAMI September-99 r OR 5000 Mcf )ESCRIPTION OF INCIDENT & 09/ 11 /99 15:12-16:42 48 09/12/99 10:36-12:54 1,120 TOTAL 1,168 TOTAL Volume flared less than 1 hour 1,199 Volume flared greater than 1,897 1 hour Pilot Purge 390 Assist Gas 0 1OTAL FLARED VOLUME 3,486 E AGTION TAKEN TO ELIMINATE CAUSE As part of the plant shut-down for Alyeska's proration, Required to flare gas during de-pressuring the the lant was de ressurized. lant as a matter of safet , During the plant coming back on-line from the shut- Investigated problems with the gas compressors down, we experienced problems with the high and choked back B1-18 until we were able to iem erature on the 2nd sta e of the as com ressor. lace them back on-line. ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Badami Oct-99 Disposition Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 376,152 3. Flared or vented less than 1 hour 966 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 958 5. Pilot and Purge 403 6. Used for lease operations Assist Fuel 0 45 279 7. Other TOTAL items 1-7 423,758 8. NGL gas equivalent produced 0 9. Purchased gas 84,078 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby ce tify hat the foregoing is true and correct to Signature Title NL(SR,• '1flPf~ Date the best of my / L *Indicate contribution of each pool to t Pool Name Code Percent 60100 Gfficial Use Only-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC Form 10-422 Rev. 4/95 11/16/1999 BP EXPLORATION (ALASKA) INC. Page 1 ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI October-99 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 944 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME bESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/16/99 07:54-08:00 4 Not required for planned events which Not required for planned events which io/17/ss 16:18-16:30 s are less than or equal to 1 hour are less than or equal to 1 hour 10/17/99 16:42-16:48 3 10/19/99 18:24-18:36 6 TOTAL 22 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/17/99 10:00-14:54 958 Shut down both Injection Gas compressors "A" & "B" to Shut in 61-18 & Bi -15 because they are high gas replace compressor "A" 4th stage discharge blockvalve. producing wells. Without the ability to send gas Both compressors had to be shut down due to the fact that through the gas compressors onto injection and gas both compressors discharge through the blockvalve into a lift, reducing the amount of gas sent to the gas train by common discharge header. shutting in these wells, flaring is reduced. TOTAL 958 TOTAL Volume flared less than 1 hour 966 Volume flared greater than 958 1 hour Pilot Purge 403 Assist Gas 0 TOTAL FLARED VOLUME 2,327 ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facilil_y Operator Fi.eld(s) Month/Year of Disposition Badami BP Exploration (Alaska) Badami Nov-99 nlsp~siti~n ~ Volume MCF* 1. Sold Fuel NGL 0 0 2. keinJectad 292,909 3. Flared. or vented less than 1 hour 3,742 4. Flared or vented greater than 1 hour ~su[,plemenrnl revnrC- ~c<~uS re<f--see zn nnc zs.a:i s~ 43,849 (includes 41 751 mcf vented) 5. Pilot and Purge 390 6. Used for lease operations Assist Fuel 0 44,324 7. Other TOTAL items 1-7 385,214 8. NGL gas equivalent produced 0 9. Purchased gas 103,165 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: the foregoing is true and correct to the best of my Title ~~ ~~ Date *Tndicate contribution of each pool to t Cool Name Coce p~rc~nt 60100 Official Use Only-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. i~ O ~' c' ~~ O ~~ Q r~ ~•-~ C,T1 ~... C rn~J ~i Form 10-422 Rev. 4/95 12/13/1999 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 _ GAS FLARING INCIDENT REPORT - BADAMI __ ___ _ _ November-99 Unplanned Events less than or equal to 1 hour DATE TIME .VOLUME DESCRIPTION OF INCIDENT & CAUSE... ACTION TAKEN TO ELIMINATE CAUSE TOTAL 3,410 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events seater than 1 hour DATE- TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE-CAUSE 11 /07/99 10:24-12:48 851 Problems while running the turbines in parallel caused a Cleared the emergency shut down, restarted turbine, puwur outUgc~ and Drought down the entire plant and Injection gas compressors, and production heater. production. After the power outage, the unloading wells Refilled first stage separator and brought plant and _ _ _ surged gas through the first stage se arator. roduction back on-line. 11/13/99 18:20-24:00 5,290 Calculated volume of gas VENTED during Badami utility Badami utility pipeline was isolated when leak was pipeline leak incident. identified on 11/15/99. Pipeline has not been in service since being Isolated. Repair and proactive measures to revent re-occurrence are in ro ress. 11/14/99 00:00-24:00 30,430 Calculated volume of gas VENTED during Badami utility Badami utility pipeline was isolated when leak was pipeline leak incident. identified on 11/15/99. Pipeline has not been in service since being Isolated. Repair and proactive measures to revent re-occurrence are in ro ress. __ 11/15/99 __ 00:00-04:45 6,020 Calculated volume of gas VENTED during Badami utility Badami utility pipeline was isolated when leak was pipeline leak incident. identified on 11/15/99. Pipeline has not been in service since being isolated. Repair and proactive measures to revent re-occurrence are in ro ress. 11/15/99 05:48-08:06 232 While all the problems associated with the utility pipeline Production was choked back to minimize flaring. After leak were occurring, a temperature indicator (RTD) failed attempts to use emergency generators failed to power due to a bad MI cable and brought down the injection gas the injection gas compressor, 81-18 was used to back compressor "B". Injection gas compressor "A" was already pressure the utility pipeline off of the first stage down due to roblems se arator. with the 4th stage cylinder. With the utility line leak, turbine The section of utility pipeline between RTU#1 and the "A" went down. on low fuel gas supply. Without utility gas or plant was back pressured as a fuel source for the produced gas, we attempted to run the injection gas injection gas compressor. Flaring was eliminated by compressor with the emergency generators but did not have bringing the injection gas compressor on line and enou h power. in'ectin as into Bi-21. 1~ /15/99 10:30-12:24 96 Attempts to place the injection gas compressors back on-line Production was choked back to minimize flaring. occurred while we investigated the root cause of the temperature indicator failure. Being that the cause was a faulty MI cable, it continued to reset and fail until it was re laced. 11/15/99 12:30-15:18 353 Attempts to restart the plant failed each time the MI cable Production was choked back to minimize flaring. tri ped. 11/16/99 08:18-10:00 288 Attempts to restart the plant failed each time the MI cable Identified the faulty MI cable and replaced it. tripped. TOTAL 43,560 Page 1 12/ 13/ 1999 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - BADAMI November-99 Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE .ACTION TAKEN TO ELIMINATE CAUSE 11/13/1999 18:54-19:00 1 Popped B1-18 to pressure up compressor and to bring plant Shut B1-18 back in. bock on Ilno. 3rd stg compressor leaking so had to shut In and flare off as. 11/14/1999 07:18-07:24 2 Depressuring IG "B" for maintenance. 11/14/1999 11/14/1999 13:48-14:00 14:12-14:48 9 143 Popped B1-18 In plant filling 1st stg separator Brin in Bi-18 on line and startin IG com ressor Pinched back on B1-18. Pinched back on B1-18. 11/14/1999 15:12-16:06 147 Bringing Bi-18 on line and startin IG com ressor Pinched back on B1-18. 11/28/1999 11:30-11:42 12 1st stg separator was manually opened (PV-1405) for more as to flare tip while attemptin to re-li ht flare. Llt the flare and closed PV-1405 11 /28/1999 12:24-12:30 _ 1 _ 2nd stg separator was manually opened (PV-1405) for more gas to flare tip while attem tin to re-li ht flare. Lit the flare and closed PV-1406 _ 11/28/1999 16:48-17:06 17 Open a bypass around a fuel gas scrubber to put more gas to flare to re-li ht flare. Lit flare and closed valve. TOTAL 332 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/20/1999 18:20-24:00 256 Gas flared in portable flare when depressurizing the Badami Gas flaring was necessary to safely and responsibly Utility Gas Pipeline in preparation for repair. prepare the Badami Utility Pipeline for repair following the leak incident. 11/21/1999 00:00-06:35 22 Gas flared in portable flare when depressurizing the Badami Utility Gas Pipeline in preparation for repair. Gas flaring was necessary to safely and responsibly prepare the Badami Utility Pipeline for repair following the leak incident. 11/21/1999 12:00-13:00 11 Gas VENTED when purging the Badami Utility Gas Pipeline with Nitrogen in preparation for repair. Purging with Nitrogen (and venting contents of pipeline) was necessary to safely and responsibly prepare the Badami Utility Pipeline for repair following the leak incident. TOTAL 289 TOTAL Volume flared less than 1 hour 3,742 Volume flared greater than 43,849 includes 41,751 mcf VENTED gas 1 hour Pilot Purge 390 Assist Gas 0 TOTAL FLARED VOLUME 47,981 Page 2 EXPLORATION ;11-19-99 ; 9~38AM ; SP EXPLOR. ENDICOTT-~ yU0 East BCl1~Un Blvd. Anchora~*e, AK 9y5()y l'.O.13c~x 196612 Ancht~ragc, AK 995 19-66 1 2 To: Blair Wondzell Frvm: Scott Mcf~ntyre Fax: (907) 276-7542 pages: 2 (Including Cover Sheat} Phones (907) Diste: November 19, 1999 Re: Report of Accidental Natural Gas Release CC: BPX Envrionmental Compliance Supervisor MB 2-6 (FAX (907)564-5020) B~'X Volume Accounting IVIB 12-4 (FAX (907) 564-4094. Urgent ^ For Review ^ Please Comment ^ Please Reply ^ Please Recycle • Comments: Resend of identical original, copied to appropria#e kiF'X areas- (f transmission problems occur, please contact Scott McEntyre at (907) 659-6544_ ~~~~~ «l¢i it,a ~~ 4# ~~~1' ~ EXPl.OR1b"ION 907 5644202 907 564-5200 FAX 907 276 7542;# 1/ 1 FaX ~:~~:~ uR ~ Ca:: Cons. Ccrnrnission Arcyara~e Y:BP EXPLORATION ;11-19-99 9~38AM ; BP EXPLOR. ENDICOTT~ 907 276 7542;# 2! 2 ESOP Number: E-Oi Attachment 1 BP EXPLpRATIQN (ALASKA) INC. P.O. Box 196612, Anchorage, AK 99519-6612 R!°.PORT OF ACCIDENTAL NATURAL GAS RELEASE DATE: 1 't!~ $/99 TO: i~rr, Blair WrZndze!! ~~laska Oil and Gas Conservation Commission x~~f01 Porcupine Drive ~'v~}t~ ~~ ~ ~~j~~ ''~r~r,~horage, AK 99501 fAX• ~' ~g'6-7542 A.'asiaa iii ~ teas t;u~i;;. ~o~~nmission • Anchorage DESCRIR ~ ~~N pF INCIDENT Accidental Natural Gas Release from the Badami Utility Gas Pi aline. 1. Date anr! ~~ rrie: The release was confirmed on November 15, 1999, at 4:45 A.M.. !t is suspected that the release started on November 13, 1999. 2. Location: Detailed Location: The Accidental Natural Gas Release occurred on the pipellne that Prudhoe ~~y Unit supplies Endicott natural gas to Badami for utility purposes. The Endicott location of the release is approximately 9 miles East of the point where Milne Point the Badami utility gas pipeline departs from the Endicott export pipelire. Niakuk The release point is located between Vertical Support Members (VSM) XX ether: Badami Utility Gas 825 and 826. Pi aline 3. Volume i~f natural gas lost: At this time, the best estimate of the released volume is in the range of 30 to 50 mmscf/d, and the exact volume Continues to be refined. 4. Cause of la~~s: The cause is currently believed to be a circumferential crack in a girth weld. 5. Actions tak.a~;i and planned The utility gas pipeline is currently isolated at every possible isolation to prevent farther loss: point and will remain isolated until aA repairs are completed. The pipeline has been isolated since confirmation of a loss of pressure in the line- Planning is underway to provant further loss during repair. f. Equipment ~ ~~ procedural The ongoing investigation will identify further equipment or procedural changes to f?revent loss changes necessary to prevent recurrence. from recurring: 7. Contact (name and Scott R. McEntyre telephone number): (90~'j659~ti544 Signature: ~~ ~ F,A.fDrGvJ!° PQOAc[cTip~ uneQ-N~7'a~ , .. ! I cc: Bf~X Environmental Compliance Supervisor MB 2-ti (FAX 564-502pj BFX Volume Accounting MB 12-4 FORM 803 (RI:V 9/30/99} Status: ENO Car~trolied Document PAPER COPIER ARE UNCONTROLLED. THIS COPY VALID ONLY AT TIME OF PRINTING. The controlled version at this document can be found on the Endicott Home Page. ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Badami Nov-99 Disposition Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 292,909 3. Flared or vented less than 1 hour 3,742 4. Flared or vented greater than 1 hour (supplemental report. required--See 20 AAC 25.235) 43,849 (1nCllldeS 41,751 mcf vented) 5. Pilot and Purge 390 6. Used for lease operations Assist Fuel 0 44,324 7. Other TOTAL items 1-7 385,214 8. NGL gas equivalent produced 0 9. Purchased gas 103,165 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby cerxify Signature the foregoing is true and correct to the best of my Title ~ 2 ~ ran Date *Indicate contribution of each pool to t Pool Name Code Percent 60100 Official Use Only-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. O ~~ ~~ 0 A~ ~ ~~ C;.7 r~n t"f 7 n .,,.~ ~1 .C ~~ Form 10-422 Rev. 4/95 12/13/1999 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI November-99 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 3,410 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour DATE 11 /07/99 11 /13/99 nts greater than 1 hour TIME VOLUME 10:24-12:48 I 851 18:20-24:00 5,290 11 /14/99 100:00-24:00 11 /15/99 11 /15/99 6,020 DESCRIPTION OF INCIDENT & CAUSE Problems while running the turbines in parallel caused a power outage and brought down the entire plant and production. After the power outage, the unloading wells surged gas through the first stage separator. Calculated volume of gas VENTED during Badami utility pipeline leak incident. Calculated volume of gas VENTED during Badami utility pipeline leak incident. Calculated volume of gas VENTED during Badami utility pipeline leak incident. 232 While all the problems associated with the utility pipeline leak were occurring, a temperature indicator (RTD) failed due to a bad MI cable and brought down the injection gas compressor "B". Injection gas compressor "A" was already ACTION TAKEN TO ELIMINATE CAUSE Cleared the emergency shut down, restarted turbine, injection gas compressors, and production heater. Refilled first stage separator and brought plant and production back on-line. Badami utility pipeline was isolated when leak was identified on 11/15/99. Pipeline has not been in service since being isolated. Repair and proactive measures to prevent re-occurrence are in pro ress. Badami utility pipeline was isolated when leak was identified on 11/15/99. Pipeline has not been in service since being isolated. Repair and proactive measures to prevent re-occurrence are in pro ress. Badami utility pipeline was isolated when leak was identified on 11/15/99. Pipeline has not been in service since being isolated. Repair and proactive measures to prevent re-occurrence are in pro ress. Production was choked back to minimize flaring. After attempts to use emergency generators failed to power the injection gas compressor, Bi-18 was used to back pressure the utility pipeline off of the first stage down due to problems separator. with the 4th stage cylinder. With the utility line leak, turbine The section of utility pipeline between RTU#1 and the "A" went down on low fuel gas supply. Without utility gas or plant was back pressured as a fuel source for the produced gas, we attempted to run the injection gas injection gas compressor. Flaring was eliminated by compressor with the emergency generators but did not have bringing the injection gas compressor on line and enou h power. injectin as into B1-21. 11 /15/99 10:30-12:24 11 /15/99 12:30-15:18 11 /16/99 108:18-10:00 96 353 288 TOTAL Attempts to place the injection gas compressors back on occurred while we investigated the root cause of the temperature indicator failure. Being that the cause was a faulty MI cable, it continued to reset and fail until it was -line Production was choked back to minimize flaring. Attempts to restart the plant failed each time the MI cable ~ Production was choked back to minimize flaring. Attempts to restart the plant failed each time the MI cable ~ Identified the faulty MI cable and replaced it. Page 1 12/13/1999 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI November-99 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/13/1999 18:54-19:00 1 Popped 61-18 to pressure up compressor and to bring plant Shut 61-18 back in. back on line. 3rd stg compressor leaking so had to shut in and flare off as. 11/14/1999 07:18-07:24 2 Depressuring IG "B" for maintenance. 11/14/1999 13:48-14:00 9 Pop ed B1-18 in plant fillip 1st st separator. Pinched back on 61-18. 11/14/1999 14:12-14:48 143 Brin in Bi-18 on line and startin IG compressor Pinched back on B1-18. 11/14/1999 15:12-16:06 147 Brin ing Bi-18 on line and startin IG compressor Pinched back on B1-18. 11/28/1999 11:30-11:42 12 1st stg separator was manually opened (PV-1405) for more gas to flare tip while attemptin to re-li ht flare. Lit the flare and closed PV-1405 11/28/1999 12:24-12:30 1 2nd stg separator was manually opened (PV-1405) for more as to flare tip while attemptin to re-li ht flare. Lit the flare and closed PV-1406 11/28/1999 16:48-17:06 17 Open a bypass around a fuel gas scrubber to put more gas to flare to re-li ht flare. Lit flare and closed valve. TOTAL 332 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/20/1999 18:20-24:00 256 Gas flared in portable flare when depressurizing the Badami Gas flaring was necessary to safely and responsibly Utility Gas Pipeline in preparation for repair. prepare the Badami Utility Pipeline for repair following the leak incident. 11/21/1999 00:00-06:35 22 Gas flared in portable flare when depressurizing the Badami Utility Gas Pipeline in preparation for repair. Gas flaring was necessary to safely and responsibly prepare the Badami Utility Pipeline for repair following the leak incident. 11/21/1999 12:00-13:00 11 Gas VENTED when purging the Badami Utility Gas Pipeline with Nitrogen in preparation for repair. Purging with Nitrogen (and venting contents of pipeline) was necessary to safely and responsibly prepare the Badami Utility Pipeline for repair foAowing the leak incident. TOTAL 289 TOTAL Volume flared less than 1 hour 3,742 Volume flared greater than 43,849 includes 41,751 mcf VENTED gas 1 hour Pilot Purge 390 Assist Gas 0 TOTAL FLARED VOLUME 47,981 Page 2 ,~ f ~: ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility - - Operator Field(s) Month/Year of Disposition ~Badaini BP Exploration (Alaska) Badami Dec-99 Disposition I Volume MCF* 1. Sold Fuel 0 NGL 0 2. Reinjected 211,781 3. Flared or vented less than 1 hour 1,319 4. Flared or vented greater than 1 hour 2,929 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 403 6. Used for lease operations Assist 0 Fuel 41,916 7. Other TOTAL items 1-7 258,348 8. NGL gas equivalent produced 0 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby ce > fy th t the for going is true /a1nd~,~c~o~r/rect to the best of my Signature ~ Title ~/1~{,(L ~t 7\~, Date 1 ~ 'joc7rf _- ~ 1 *Indicate contribution of each pool to t Pool Name Code Percent 60100 Official Use Only-Flaring Authorization 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 1 /14/2000 BP EXPLORATION (ALASKA) INC. Page 1 ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI December-99 Jnplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 1,112 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Jnplanned Events greater than 1 hour DATE .TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/03/99 19:30-21:12 196 Continuation of bringing plant and wells back on-line after Well Bi-18, a high gas producer, was choked back to compressor repairs. Bi-25 was surging and sending slugs make room for Bi-25 gas production. of production into plant. 12/30/99 14:30-17:12 907 Water entered MCC (motor control center) when snow from Dried out motor control center and process control storm blew in from vents. Total plant BESD (blowdown system. Restarted the plant and began bringing wells emergency shut down) due to false signal from M-400 PLC back on-line. (process logic controller). 12/30/99 17:36-23:42 1,562 In a BESD (blowdown emergency shut down), all control Well choke settings were reduced to stabilize gas and systems fail to a safe position, even wells. Flaring occurred oil production entering the plant and therefore stabilize while trying to bring plant and wells back on-line. the plant. TOTAL 2,665 planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN'TO ELIMINATE CAUSE 12/03/99 07:54-08:00 L Shutting down IG "B" for maintenance Safed out compressor to repair packing on 4th stage 12/03/99 08:12-08:18 3 Same as above Repairing B- compressor 12/03/99 13:42-14:12 56 IG"B" brought on line and back down Wells shut back in. 12/03/99 15:18-15:48 119 Same as above Wells shut back in. 12/03/99 16:30-16:42 16 Compressor repaired and wells were being brought back into adjusting chokes and stabilizing plant plant. 12/03/99 17:06-17:12 2 Compressor repaired and wells were being brought back into adjusting chokes and stabilizing plant plant. 12/11/99 19:36-19:48 5 Thermal expansion pressured utility line above alarm set started using utility gas for fuel gas and flared excess point, had to flare to relieve pressure 12/11/99 20:00-20:06 2 same as above same as above 12/20/99 07:18-07:24 2 Purging IG"A" compressor to ready for service blocked in purge and pressured up on standby TOTAL 207 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME - DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE'CAUSE 12/03/99 17:30-19:06 264 Seal leaking on glycol cooling pump on injection gas As wells were brought back on-ime, chokes were compressor "B" requiring repair. With injection gas adjusted to cut back on gas production and minimize compressor "A" already down due to repair of 4th stage flaring. piston, all wells were brought down for repairs on injection gas compressor "B". Flaring occurred while trying to bring plant and well back on- line. TOTAL 264 1/14/2000 BP EXPLORATION (ALASKA) INC. Page 2 ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI December-99 TOTAL Volume flared less than 1 hour 1,319 Volume flared greater than 2,929 1 hour Pilot Purge 403 Assist Gas 0 TOTAL FLARED VOLUME 4,651