ALASKA OIL AND GAS CONSERVATION CONIl~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Badami Jan-99
Disposition Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 2,855
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 12,466
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel* 0
51 256
7. Other
TOTAL items 1-7 66,577
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
* Includes 1347 MCF from Endicott on 1/31/99
I hereby ce 'fy t t the fore oing is true and correct to the best of
Signature , Title /~,~~ ~x Date 2 d$ I
*Indicate contribution of each pool to t
Pool Name c:oae Percent
60100
Officia L Use Orily-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
25.235.
•
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION CONIl~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Badami Feb-99
Disposition
1. Sold Fuel
NGL
2. Reinjected
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations Assist
Fuel
7. Other
Volume MCF*
0
0
*Indicate contribution of each pool to t
Pool Name Code Percent
60100
0
0
9,368 includes 3,402
from EndicottL
0
0
8,960 all from Endi
TOTAL items 1-7 48,328
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby c t' y that t e foregoing is true and correct to thelf_b~e~s~t of
Signature t Title~~i VOC., Date -~, I
Official Use Only:-Flaring Authorization
ott
1. Safety
MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
25.235.
C ~I
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility (Operator (Field(s)
Badami BP Exploration (Alaska) Badami
Disposition Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel 0
0
7. Other
TOTAL items 1-7 0
8. NGL gas equivalent produced 0
9. Purchased gas 38280 from Endicot
10. Transferred from:
11. Transferred to:
I hereby c tify t at the foregoing is true and correct to the best of
Signature Title /~(o~, 'T1A'~C Date ~{ Q
Mar-99
of Disposi
*Indicate contribution of each pool to t
Pool Name Code Percent
60100
Official Use Only-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
Asia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
25.235.
Form 10-422
Rev. 4/95
~ ~ oaf ~ ~~
C
. ry;. -, . ALASKA OIL AND GAS CONSERVATION CONII~lISSION
.~,~,.. FACILITY REPORT OF PRODUCED GAS DISPOSITION
;`~~+7~aa~~i ~ ~~~Yk+~' ~~~~~• Operator Field(s) Month/Year of Disposition
~1~chara~ Bp Exploration (Alaska) Badami Apr-99
Disposition Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 0
3. Flared or vented less than 1 hour 100
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 860
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel 0
0
7. Other
TOTAL items 1-7 960
8. NGL gas equivalent produced 0
9. Purchased gas 55689 from Endicott
(55537.3 fuel, 151.4 flare)
10. Transferred from:
11. Transferred to:
I hereby certify
Signature
forggoing is true and correct to the best of
Title /VL(~(L ~'14 X Date
*Indicate contribution of each pool to t
Pool Name Code Percent
60100
Official Use Only-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note; All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
25.235.
Form 10-422
Rev. 4/95
~,
~ :.
5/12/99 ,,. ~.
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
April-99
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
0
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION'OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Coil tubing work on B1-14. Well had to be flowed
4/2/99 1906-2000 100 back at times during clean up operations. N/A
TOTAL 100
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Coil tubing work on B1-14, Well had to be flowed
4/2/99 1706-1900 620 back at times during clean up operations. N/A
Coil tubing work on B1-14. Well had to be flowed
4/ 11 /99 1724-2000 240 back at times during clean up operations. N/A
TOTAL 860
TOTAL
Volume flared less than 1 hour 100 Note: This report includes only Badami produced gas
flared at Badami. It does not include 151 mscf gas
Volume flared greater than 860 purchased from Endicott that was flared at Badami.
1 hour
Pilot Purge 0
Assist Gas 0
TOTAL FLARED VOLUME 960
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Badami May-99
Disposition ~ Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 62,844
3. Flared or vented less than 1 hour 3,745
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,725
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel 0
57 032
7. Other
TOTAL items 1-7 125,346
8. NGL gas equivalent produced 0
9. Purchased gas 45,170 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby c fy t at the regoing is true and correct to the best of my
Signature ~~ - Title /~,((~'(11f~( Date lp ~(p
*Indicate contribution of each pool to t
Pool Name Code Percent
60100
Official Use Only-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
Form 10-422
Rev. 4/95
6/16/99
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - BADAMI
May-99
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 3,411 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION 7AKENTO ELIMINATE CAUSE
5/12/99 00;30-02:18 365 "B" Solar turbine generator tripped off line. Started turbine back up, plant back on line.
IG comp, "A" tripped on faulty high temperature
5/21/99 18:00-19:00 646 shut down, Started compressor back up with repaired tern
B1-36 shut in the wells due to high pressure in test
5/31 /99 02:00-03:12 149 separator. This caused the IG to trip. Started compressor back up and put wells bac
TOTAL 1,160
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'ELIMINATE CAUSE
5/1/99 07:00-07:12 4
5/1/99 21;48-22:12 10
5/2/99 06:42-06:54 12
5/2/99 17;36-17:48 5
5/2/99 22:00-23;59 194
5/3/99 02:48-03:00 10
5/3/99 03;12-03;24 10
5/3/99 03:30-03:42 7
5/3/99 09:54-10:06 18
5/3/99 10:12-10;18 4
5/3/99 10:36-10;42 2
5/3/99 10:54-11,12 10
5/3/99 11,24-11:54 15
5/3/99 12:00-12:24 14
5/3/99 12:30-12;36 2
5/3/99 12:54-13:00 4
5/3/99 15:24-15;30 1
5/4/99 16:30-16:42 11
5/4/99 17:30-17:36 3
TOTAL 334
s
s
6/16/99
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
May-99
Page 2
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/1/99 00:00-01:06 86 Badami Start up activities. Having equipment ready for startup,
5/1/99 Ol :12-04;06 112 Badami Start up activities. Having equipment ready for startup.
5/1/99 04:24-06;48 60 Badami Start up activities. Having equipment ready for startup,
5/2/99 11;30-15:42 105 Badami Start up activities. Having equipment ready for start up,
5/3/99 00:00-02:42 202 Badami Start up activities. Having equipment ready for startup.
TOTAL 566
TOTRL
Volume flared less than 1 hour 3,745
Volume flared greater than 1,725
1 hour
Pilot Purge 0
Assist Gas 0
TOTAL FLARED VOLUME 5,470
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Badami Jun-99
Disposition ~ Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 76,333
3. Flared or vented less than 1 hour 373
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel 0
40 442
7. Other
TOTAL items 1-7 117,148
8. NGL gas equivalent produced 0
9. Purchased gas
included 15,723
in above from Endicott
dis ositions
10. Transferred from:
11. Transferred to:
I hereby ce ify t at the foregoing is true and correct to
Signature Title~~~'(~/1x Date the best of my
__~~~
*Indicate contribution of each pool to t
Pool Name Code Percent
60100
Official Use Only-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
Asia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
Form 10-422
Rev. 4/95
7/13/99
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
June-99
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME" DESCRIPTION OF INCIDENT & CAUSE ACT10N TAKEN TO ELIMINATE CAUSE
TOTAL 166 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
Pla
Ined Events Less Than or Equal 1 Hour
DATE TIME VOLUME
6/2/99 2136-2142 2.7
6/2/99 1848-1854 0.3
6/3/99 1824-1830 2.0
6/3/99 0148-0206 13,1
6/6/99 0130-0136 1.6
6/11/99 1512-1536 18,8
6/11/99 1400-1412 6.4
6/11/99 1348-1354 4.8
6/11/99 1312-1330 40.5
6/11/99 1242-1306 69,7
6/14/99 1454-1500 2.0
6/14/99 1430-1442 10.6
6/14/99 1412-1418 2,4
6/14/99 0642-0706 29.0
6/17/99 2042-2048 1.6
6/26/99 0248-0254 1.7
TOTAL 207
ned Events Exceeding 1 Hour OR Exce
DATE TIME VOLUME
None
TOTAL n
0
Not Exceeding 5000 Mcf
DESCRIPTION OF INCIDENT & CAUSE
Bleeding tubing on B1-36
Put B1-11 on Production
Put B1-36 on Production
Bleeding tubing on B1-36
Put B1-36 on Production
Alyeska Prorations
Alyeska Prorations
Alyeska Prorations
Alyeska Prorations
Alyeska Prorations
Alyeska Prorations
Alyeska Prorations
Alyeska Prorations
Alyeska Prorations
Depressured compressor for PSV work
Depressured compressor for PSV work
5
ACTION TAKEN TO'ELIMINATI
N/A
Adjust plant to handle rate.
Adjust plant to handle rate.
N/A
Adjust plant to handle rate,
Adjust plant to handle swings.
Adjust plant to handle swings.
Adjust plant to handle swings.
Adjust plant to handle swings.
Adjust plant to handle swings.
Adjust plant to handle swings.
Adjust plant to handle swings.
Adjust plant to handle swings.
Adjust plant to handle swings.
N/A
N/A
C
DESCRIPTION OF INCIDENT'& CAUSE ACTION TAKEN TO ELIMINATE CAUS
7/13/99 BP EXPLORATION (ALASKA) INC. Page 2
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - BADAMI
June-99
TOTAL
Volume flared less than 1 hour 373
Volume flared greater than 0
1 hour
Pilot Purge 0
Assist Gas 0
TOTAL FLARED VOLUME 373
ALASKA OIL AND GAS CONSERVATION CON~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Badami Jul-99
Disposition
Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 130,789
3. Flared or vented less than 1 hour 2,442
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 29,432
5. Pilot and Purge 403
6. Used for lease operations Assist
Fuel 0
34 329
7. Other
TOTAL items 1-7 197,395
8. NGL gas equivalent produced 0
9. Purchased gas 69,341 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby c ify at the foregoing is true and.,,cMOr/rect to th~e~ b'e~s"t~of my
Signature Title /N.6(L "yam Date ~'+LI yG
*Indicate contribution of each pool to t
Pool Name Code Percent
60100
Official Use Only-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
m
cn
Q
~ ~
~~
a
co G~
a
o~
-.~
~-"
~:
fi
r;,
~~
GS7
Form 10-422
Rev. 4/95
. r . ,,
8/11/1999
BP EXPLORATION (ALASKA) INC,
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - BADAMI
J u 1y-99
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 2,405 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
07/ 19/99 02:00-04:54 683 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems,
07/23/99 02:36-04;42 598 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems.
07/23/99 04:48-23:59 4,168 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems.
07/24/99 00:00-16;30 3,552 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems.
07/24/99 16:48-23:59 1,576 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems.
07/25/99 00:00-23;59 5,899 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems.
07/26/99 00:00-13;30 3,164 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems.
07/26/99 20:30-23;59 790 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems.
07/27/99 00;00-16;24 3,616 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems.
07/27/99 16:30-18:12 339 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems.
07/27/99 18;24-23:59 1,266 Solar Turbines will not run, can not run IG compressor. Working on fuel gas problems.
07/28/99 00;00-15:48 3,555 Solar Turbines will not run, can not run IG compressor, Working on fuel gas problems.
07/29/99 15:30-16;42 226 "B" IG compressor ESD per loose wire. Repaired, compressor back on line.
TOTAL 29,432
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Blowing down fuel gas system for Solar turbine "A" per
07/29/99 13:54-14:12 37 trying to clean out liquids. Expediting the blow down in an efficient manor.
TOTAL 37
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
°`
i~
8/11/1999
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
J u 1y-99
Page 2
TOTAL
Volume flared less than 1 hour 2,442
Volume flared greater than 29,432
1 hour
Pilot Purge 403
Assist Gas 0
TOTAL FLARED VOLUME 32,277
s_
~
!`~O :`yo f~
~,
~~
~ ~
ALASKA OIL AND GAS CONSERVATION CONIl~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badam~;> BP Exploration (Alaska) Badami Aug-99
Disposition ~ Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 272,180
3. Flared or vented less than 1 hour 1,668
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 4,001
5. Pilot and Purge 403
6. Used for lease operations Assist
Fuel 0
41 414
7. Other
TOTAL items 1-7 319,666
8. NGL gas equivalent produced 0
9. Purchased gas 125,765 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of my
Signatury~~/~ Title .Date ~ ~+~
*Indicate contribution of each pool to t
Pool Name Code Percent
60100
Official Use Only-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
Form 10-422
Rev. 4/95
9/13/1999 BP EXPLORATION (ALASKA) INC. Page 1
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - BADAMI
August-99
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN'TO ELIMINATE CAUSE
TOTAL 1,429 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE' CAUSE
IG compressor "A" & "B" shut down due to main breaker
08/08/99 06:30-07:42 357 tripped for M-300 Trouble shooting reason for breaker trip
08/11 /99 16:42-19:00 675 Lost a temp. controller TI-0530 3rd stg. Replace MI cable
Swapped compressors and lost "A" unit on high 2nd stg.
08/13/99 20:12-21:24 387 discharge Restarted IG-A
08/14/99 06:24-09:48 914 IG "A" comp. down on high 3rd stg. temp, Restarted IG-A "
08/15/99 03;18-04;30 394 Compressor S/D due to high 3rd stg. discharge. Bad TI Replace TI
Problems in M-300, suspect bad PLC Continuing with
08/19/99 00:00-02:30 426 investigation Investigating problem, restarted IG compressor
Problems in M-300, suspect bad PLC Continuing with
08/19/99 02:36-11:54 658 investigation Investigating problem, restarted IG compressor
Problems in M-300, suspect bad PLC Continuing with
08/19/99 12:48-14:12 124 investigation Investigating problem, restarted IG compressor
Problems in M-300, suspect bad PLC Continuing with
08/19/99 16:30-18:18 66 investigation Investigating problem, restarted IG compressor
TOTAL 4,001
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
08/12/99 00:54-01:06 6 Bled down IG"A" compressor for maintenance on unit Oil and filter change, starting other IG
08/14/99 16;06-16:42 224 Bled down IG"B" compressor for maintenance on unit Oil and filter change, starting other IG
08/14/99 16:48-16:54 6 Bled down IG"A" compressor Bad TI-0530, replaced MI cable
Brought IG"A" compressor back on line and shut down
08/14/99 20:00-20:06 3 IG"B" Shutdown IG-B for maintance, started IG-A
TOTAL 239
jPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUM~ DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
9/13/1999 BP EXPLORATION (ALASKA) INC. Page 2
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - BADAMI
August-99
TOTAL
Volume flared less than 1 hour 1,668
Volume flared greater than 4,001
1 hour
Pilot Purge 403
Assist Gas
0
TOTAL FLARED VOLUME 6,072
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Badami Sep-99
Disposition ~ Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 292,472
3. Flared or vented less than 1 hour 1,199
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,897
5. Pilot and Purge 390
6. Used for lease operations Assist
Fuel 0
43 262
7. Other
TOTAL items 1-7 339,220
8. NGL gas equivalent produced 0
9. Purchased gas
included 98,162
in above from Endicott
dis ositions
10. Transferred from:
11. Transferred to:
I hereby c tify hat the foregoing is true and correct to the best of my
Signature~Q, Title r-~R. Tl~}( Date ~ ~((~ 44
~~~~~~~~
Form 10-422 O(~'(' "~ 5 1(}(~a
Rev. 4/95 ll~i ll 1JJJ
*Indicate contribution of each pool to t
Pool Name Code Percent
60100
Official Use Only-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
Q~f 8t ~~Wns• ~„~IW
10/13/1999 BP EXPLORATION (ALASKA) INC. Page 1
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
September-99
less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO' ELIMINATE CAUSE
TOTAL 981 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
.DATE TIME VOLUME DESCRIPTION OF INCIDENT..& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
09/01 /99 08:30-09:36 29 Gas compressor loaded up Adjust wells
09/19/99 04:12-05:30 410 IG"B" down due to high level in 1st stage scrubber Restart compressor
09/30/99 18:42-19:48 290 BESD due to smoke in M-004 Bad heater caused smoke, restarted the plant
TOTAL 729
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
09/10/99
09/11/99
09/11/99
09/11/99
09/12/99
09/12/99
09/12/99
09/13/99
09/15/99
09/15/99
09/28/99
09/30/99
TIME'
06:35-06:54
12:54-13:00
13:06-13:12
14:12-14:30
13:06-13:12
15:06-15:18
15:24-15:30
20:54-21:12
13:00-13:30
16:42-16:48
16:00-16:36
16:06-16:12
TOTAL
"VOLUME.
19
2
3
66
1
13
1
13
14
81
DESCRIPTION OF INCIDENT & CAUSE
Depressure IG"A" for maintenance
Alyeska shut down, Plant shut down work
Alyeska shut down, Plant shut down work
Alyeska shut down, Plant shut down work
Restarting plant after Alyeska planned shut down
Restarting plant after Alyeska planned shut down
Restarting plant after Alyeska planned shut down
Brought B1-36 into production
Begin gas lift on B1-36
Begin gas tiff on B1-36
Depressure B1-28 in preparation for well work
POP well B1-11
ACTION TAKEN'TO ELIMINATE C7
N/A
N/A
N/A
N/A
Startup injection gas compressor
Startup injection gas compressor
Adjust rates to limit flaring
Choke back on B1-18
Choke back on B1-18
Choke back on B1-18
N/A
Choke back on B1-18
E
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
09/11/99 15:12-16:42 48 De-pressuring plant for maintenance during shut down N/A
09/12/99 10:36-12:54 1,120 Restarting plant after Alyeska planned shut down Put IG compressor on line
TOTAL 1,168
. ..
10/13/1999
TOTAL
Volume flared less than 1 hour 1,199
Volume flared greater than 1,897
1 hour
Pilot Purge 390
Assist Gas 0
TOTAL FLARED VOLUME 3,486
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
September-99
Page 2
.~ '
ATTACHMENT)
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
September-99
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESGRIPTION OF'INCIDENT & CAUSE" ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 981 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE' TIME VOLUME DE
09/01 /99 08;30-09:36 29
09/19/99 04:12-05:30 410
09/30/99 18:42-19:48 290
TOTAL 729
WENT &r(2ol1SE
Updated 10/27/1999 by A.DubE;
Page 1
!IMINATE:CAUSE
The Vapor Recovery Unit (VRU) Compressor went down
on high high level (HH LVL) due to a large volume of
condensates dropping out of the gas. We choked back the wells to minimize the
amount of gas produced and subsequently sent
to the vapor recovery unit.
We flared due to the "B" gas compressor going down We shut-in B1-18 to minimize flaring and started-
on high high level alarm (HH LVL) in the 1st stage up the gas compressor.
scrubber. While trying to restart the compressor, it
went down on high high pressure alarm (HH PR) on the
2nd sta e dischar e.
The entire plant shut-down due to an electric heater The heater was left off-line until the plant was
malfunction in the electrical skid (M-004) causing brought back on-line. When we went back to
smoke. investigate the cause of smoke, we were not
able to get the heater to smoke again. It is
expected dust caused the smoke and the unit
was dusted,
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
09/10/99 06,35-06:54 19 Depressure IG"A" for maintenance
09/11/99 12:54-13:00 2 Alyeska shut down, Plant shut down work
09/11 /99 13:06-13:12 3 Alyeska shut down, Plant shut down work
09/ 11 /99 14:12-14:30 66 Alyeska shut down, Plant shut down work
09/12/99 13:06-13:12 1 Restarting plant after Alyeska planned shut down
09/12/99 15:06-15:18 13 Restarting plant after Alyeska planned shut down
09/12/99 15:24-15:30 1 Restarting plant after Alyeska planned shut down
09/13/99 20:54-21:12 13 Brought B1-36 into production
09/15/99 13:00-13:30 14 Begin gas lift on 61-36
09/15/99 16:42-16:48 1 Begin gas lift on B1-36
09/28/99 16:00-16:36 81 Depressure B1-28 in preparation for well work
09/30/99 16:06-16:12 4 POP well B1-11
TOTAL 218
.,ACTION TAKEN TO ELIMINATE Ci
N/A
N/A
N/A
N/A
Startup injection gas compressor
Start up injection gas compressor
Adjust rates to limit flaring
Choke back on B1-18
Choke back on B1-18
Choke back on B1-18
N/A
Choke back on B1-18
ATTACHMENT J BP EXPLORATION (ALASKA) INC. Updated 10/27/1999 by A.Dube
ADMINISTRATIVE APPROVAL NO. 202.4 Page 2
GAS FLARING INCIDENT REPORT - BADAMI
September-99
r OR
5000 Mcf
)ESCRIPTION OF INCIDENT &
09/ 11 /99 15:12-16:42 48
09/12/99 10:36-12:54 1,120
TOTAL 1,168
TOTAL
Volume flared less than 1 hour 1,199
Volume flared greater than 1,897
1 hour
Pilot Purge 390
Assist Gas 0
1OTAL FLARED VOLUME 3,486
E AGTION TAKEN TO ELIMINATE CAUSE
As part of the plant shut-down for Alyeska's proration, Required to flare gas during de-pressuring the
the lant was de ressurized. lant as a matter of safet ,
During the plant coming back on-line from the shut- Investigated problems with the gas compressors
down, we experienced problems with the high and choked back B1-18 until we were able to
iem erature on the 2nd sta e of the as com ressor. lace them back on-line.
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Badami Oct-99
Disposition
Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 376,152
3. Flared or vented less than 1 hour 966
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 958
5. Pilot and Purge 403
6. Used for lease operations Assist
Fuel 0
45 279
7. Other
TOTAL items 1-7 423,758
8. NGL gas equivalent produced 0
9. Purchased gas 84,078 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby ce tify hat the foregoing is true and correct to
Signature Title NL(SR,• '1flPf~ Date the best of my
/ L
*Indicate contribution of each pool to t
Pool Name Code Percent
60100
Gfficial Use Only-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
Form 10-422
Rev. 4/95
11/16/1999 BP EXPLORATION (ALASKA) INC. Page 1
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
October-99
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 944 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME bESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/16/99 07:54-08:00 4 Not required for planned events which Not required for planned events which
io/17/ss 16:18-16:30 s are less than or equal to 1 hour are less than or equal to 1 hour
10/17/99 16:42-16:48 3
10/19/99 18:24-18:36 6
TOTAL 22
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/17/99 10:00-14:54 958 Shut down both Injection Gas compressors "A" & "B" to Shut in 61-18 & Bi -15 because they are high gas
replace compressor "A" 4th stage discharge blockvalve. producing wells. Without the ability to send gas
Both compressors had to be shut down due to the fact that through the gas compressors onto injection and gas
both compressors discharge through the blockvalve into a lift, reducing the amount of gas sent to the gas train by
common discharge header. shutting in these wells, flaring is reduced.
TOTAL 958
TOTAL
Volume flared less than 1 hour 966
Volume flared greater than 958
1 hour
Pilot Purge 403
Assist Gas 0
TOTAL FLARED VOLUME 2,327
ALASKA OIL AND GAS CONSERVATION CONIl~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facilil_y Operator Fi.eld(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Badami Nov-99
nlsp~siti~n ~ Volume MCF*
1. Sold Fuel
NGL 0
0
2. keinJectad 292,909
3. Flared. or vented less than 1 hour 3,742
4. Flared or vented greater than 1 hour
~su[,plemenrnl revnrC- ~c<~uS re<f--see zn nnc zs.a:i s~ 43,849
(includes 41 751 mcf vented)
5. Pilot and Purge 390
6. Used for lease operations Assist
Fuel 0
44,324
7. Other
TOTAL items 1-7 385,214
8. NGL gas equivalent produced 0
9. Purchased gas 103,165 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
the foregoing is true and correct to the best of my
Title ~~ ~~ Date
*Tndicate contribution of each pool to t
Cool Name Coce p~rc~nt
60100
Official Use Only-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
Asia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
25.235.
i~
O
~' c'
~~
O
~~
Q
r~ ~•-~
C,T1 ~...
C
rn~J
~i
Form 10-422
Rev. 4/95
12/13/1999 BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
_ GAS FLARING INCIDENT REPORT - BADAMI
__ ___ _ _ November-99
Unplanned Events less than or equal to 1 hour
DATE TIME .VOLUME DESCRIPTION OF INCIDENT & CAUSE... ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 3,410 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events seater than 1 hour
DATE- TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE-CAUSE
11 /07/99 10:24-12:48 851 Problems while running the turbines in parallel caused a Cleared the emergency shut down, restarted turbine,
puwur outUgc~ and Drought down the entire plant and Injection gas compressors, and production heater.
production. After the power outage, the unloading wells Refilled first stage separator and brought plant and
_ _ _ surged gas through the first stage se arator. roduction back on-line.
11/13/99 18:20-24:00 5,290 Calculated volume of gas VENTED during Badami utility Badami utility pipeline was isolated when leak was
pipeline leak incident. identified on 11/15/99. Pipeline has not been in
service since being Isolated. Repair and proactive
measures to revent re-occurrence are in ro ress.
11/14/99 00:00-24:00 30,430 Calculated volume of gas VENTED during Badami utility Badami utility pipeline was isolated when leak was
pipeline leak incident. identified on 11/15/99. Pipeline has not been in
service since being Isolated. Repair and proactive
measures to revent re-occurrence are in ro ress.
__
11/15/99 __
00:00-04:45 6,020 Calculated volume of gas VENTED during Badami utility Badami utility pipeline was isolated when leak was
pipeline leak incident. identified on 11/15/99. Pipeline has not been in
service since being isolated. Repair and proactive
measures to revent re-occurrence are in ro ress.
11/15/99 05:48-08:06 232 While all the problems associated with the utility pipeline Production was choked back to minimize flaring. After
leak were occurring, a temperature indicator (RTD) failed attempts to use emergency generators failed to power
due to a bad MI cable and brought down the injection gas the injection gas compressor, 81-18 was used to back
compressor "B". Injection gas compressor "A" was already pressure the utility pipeline off of the first stage
down due to roblems se arator.
with the 4th stage cylinder. With the utility line leak, turbine The section of utility pipeline between RTU#1 and the
"A" went down. on low fuel gas supply. Without utility gas or plant was back pressured as a fuel source for the
produced gas, we attempted to run the injection gas injection gas compressor. Flaring was eliminated by
compressor with the emergency generators but did not have bringing the injection gas compressor on line and
enou h power. in'ectin as into Bi-21.
1~ /15/99 10:30-12:24 96 Attempts to place the injection gas compressors back on-line Production was choked back to minimize flaring.
occurred while we investigated the root cause of the
temperature indicator failure. Being that the cause was a
faulty MI cable, it continued to reset and fail until it was
re laced.
11/15/99 12:30-15:18 353 Attempts to restart the plant failed each time the MI cable Production was choked back to minimize flaring.
tri ped.
11/16/99 08:18-10:00 288 Attempts to restart the plant failed each time the MI cable Identified the faulty MI cable and replaced it.
tripped.
TOTAL 43,560
Page 1
12/ 13/ 1999 BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - BADAMI
November-99
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE .ACTION TAKEN TO ELIMINATE CAUSE
11/13/1999 18:54-19:00 1 Popped B1-18 to pressure up compressor and to bring plant Shut B1-18 back in.
bock on Ilno. 3rd stg compressor leaking so had to shut In
and flare off as.
11/14/1999 07:18-07:24 2 Depressuring IG "B" for maintenance.
11/14/1999
11/14/1999 13:48-14:00
14:12-14:48 9
143 Popped B1-18 In plant filling 1st stg separator
Brin in Bi-18 on line and startin IG com ressor Pinched back on B1-18.
Pinched back on B1-18.
11/14/1999 15:12-16:06 147 Bringing Bi-18 on line and startin IG com ressor Pinched back on B1-18.
11/28/1999 11:30-11:42 12 1st stg separator was manually opened (PV-1405) for more
as to flare tip while attemptin to re-li ht flare. Llt the flare and closed PV-1405
11 /28/1999 12:24-12:30
_ 1
_ 2nd stg separator was manually opened (PV-1405) for more
gas to flare tip while attem tin to re-li ht flare. Lit the flare and closed PV-1406
_
11/28/1999 16:48-17:06 17 Open a bypass around a fuel gas scrubber to put more gas
to flare to re-li ht flare. Lit flare and closed valve.
TOTAL 332
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/20/1999 18:20-24:00 256 Gas flared in portable flare when depressurizing the Badami Gas flaring was necessary to safely and responsibly
Utility Gas Pipeline in preparation for repair. prepare the Badami Utility Pipeline for repair following
the leak incident.
11/21/1999 00:00-06:35 22 Gas flared in portable flare when depressurizing the Badami
Utility Gas Pipeline in preparation for repair. Gas flaring was necessary to safely and responsibly
prepare the Badami Utility Pipeline for repair following
the leak incident.
11/21/1999 12:00-13:00 11 Gas VENTED when purging the Badami Utility Gas Pipeline
with Nitrogen in preparation for repair. Purging with Nitrogen (and venting contents of
pipeline) was necessary to safely and responsibly
prepare the Badami Utility Pipeline for repair following
the leak incident.
TOTAL 289
TOTAL
Volume flared less than 1 hour 3,742
Volume flared greater than 43,849 includes 41,751 mcf VENTED gas
1 hour
Pilot Purge 390
Assist Gas 0
TOTAL FLARED VOLUME 47,981
Page 2
EXPLORATION ;11-19-99 ; 9~38AM ; SP EXPLOR. ENDICOTT-~
yU0 East BCl1~Un Blvd.
Anchora~*e, AK 9y5()y
l'.O.13c~x 196612
Ancht~ragc, AK 995 19-66 1 2
To: Blair Wondzell Frvm: Scott Mcf~ntyre
Fax: (907) 276-7542 pages: 2 (Including Cover Sheat}
Phones (907) Diste: November 19, 1999
Re: Report of Accidental Natural Gas Release CC: BPX Envrionmental Compliance Supervisor
MB 2-6 (FAX (907)564-5020)
B~'X Volume Accounting IVIB 12-4 (FAX
(907) 564-4094.
Urgent ^ For Review ^ Please Comment ^ Please Reply ^ Please Recycle
• Comments:
Resend of identical original, copied to appropria#e kiF'X areas- (f transmission problems occur, please
contact Scott McEntyre at (907) 659-6544_
~~~~~
«l¢i it,a ~~ 4# ~~~1'
~ EXPl.OR1b"ION
907 5644202
907 564-5200 FAX
907 276 7542;# 1/ 1
FaX
~:~~:~ uR ~ Ca:: Cons. Ccrnrnission
Arcyara~e
Y:BP EXPLORATION ;11-19-99 9~38AM ; BP EXPLOR. ENDICOTT~ 907 276 7542;# 2! 2
ESOP Number: E-Oi
Attachment 1
BP EXPLpRATIQN (ALASKA) INC.
P.O. Box 196612, Anchorage, AK 99519-6612
R!°.PORT OF ACCIDENTAL NATURAL GAS RELEASE
DATE: 1 't!~ $/99
TO: i~rr, Blair WrZndze!!
~~laska Oil and Gas Conservation Commission
x~~f01 Porcupine Drive ~'v~}t~ ~~ ~ ~~j~~
''~r~r,~horage, AK 99501
fAX• ~' ~g'6-7542 A.'asiaa iii ~ teas t;u~i;;. ~o~~nmission
• Anchorage
DESCRIR ~ ~~N pF INCIDENT Accidental Natural Gas Release from the Badami Utility Gas
Pi aline.
1. Date anr! ~~ rrie: The release was confirmed on November 15, 1999, at 4:45 A.M.. !t is
suspected that the release started on November 13, 1999.
2. Location: Detailed Location:
The Accidental Natural Gas Release occurred on the pipellne that
Prudhoe ~~y Unit supplies Endicott natural gas to Badami for utility purposes. The
Endicott location of the release is approximately 9 miles East of the point where
Milne Point the Badami utility gas pipeline departs from the Endicott export pipelire.
Niakuk The release point is located between Vertical Support Members (VSM)
XX ether: Badami Utility Gas 825 and 826.
Pi aline
3. Volume i~f natural gas lost: At this time, the best estimate of the released volume is in the range of
30 to 50 mmscf/d, and the exact volume Continues to be refined.
4. Cause of la~~s: The cause is currently believed to be a circumferential crack in a girth
weld.
5. Actions tak.a~;i and planned The utility gas pipeline is currently isolated at every possible isolation
to prevent farther loss: point and will remain isolated until aA repairs are completed. The
pipeline has been isolated since confirmation of a loss of pressure in
the line- Planning is underway to provant further loss during repair.
f. Equipment ~ ~~ procedural The ongoing investigation will identify further equipment or procedural
changes to f?revent loss changes necessary to prevent recurrence.
from recurring:
7. Contact (name and Scott R. McEntyre
telephone number): (90~'j659~ti544
Signature: ~~ ~ F,A.fDrGvJ!° PQOAc[cTip~ uneQ-N~7'a~ ,
.. ! I
cc: Bf~X Environmental Compliance Supervisor MB 2-ti (FAX 564-502pj
BFX Volume Accounting MB 12-4
FORM 803 (RI:V 9/30/99}
Status: ENO Car~trolied Document
PAPER COPIER ARE UNCONTROLLED. THIS COPY VALID ONLY AT TIME OF PRINTING.
The controlled version at this document can be found on the Endicott Home Page.
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Badami Nov-99
Disposition
Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 292,909
3. Flared or vented less than 1 hour 3,742
4. Flared or vented greater than 1 hour
(supplemental report. required--See 20 AAC 25.235) 43,849
(1nCllldeS 41,751 mcf vented)
5. Pilot and Purge 390
6. Used for lease operations Assist
Fuel 0
44,324
7. Other
TOTAL items 1-7 385,214
8. NGL gas equivalent produced 0
9. Purchased gas 103,165 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby cerxify
Signature
the foregoing is true and correct to the best of my
Title ~ 2 ~ ran Date
*Indicate contribution of each pool to t
Pool Name Code Percent
60100
Official Use Only-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
25.235.
O
~~
~~
0
A~ ~
~~
C;.7
r~n t"f 7
n
.,,.~ ~1
.C
~~
Form 10-422
Rev. 4/95
12/13/1999 BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
November-99
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 3,410 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
DATE
11 /07/99
11 /13/99
nts greater than 1 hour
TIME VOLUME
10:24-12:48 I 851
18:20-24:00
5,290
11 /14/99 100:00-24:00
11 /15/99
11 /15/99
6,020
DESCRIPTION OF INCIDENT & CAUSE
Problems while running the turbines in parallel caused a
power outage and brought down the entire plant and
production. After the power outage, the unloading wells
surged gas through the first stage separator.
Calculated volume of gas VENTED during Badami utility
pipeline leak incident.
Calculated volume of gas VENTED during Badami utility
pipeline leak incident.
Calculated volume of gas VENTED during Badami utility
pipeline leak incident.
232 While all the problems associated with the utility pipeline
leak were occurring, a temperature indicator (RTD) failed
due to a bad MI cable and brought down the injection gas
compressor "B". Injection gas compressor "A" was already
ACTION TAKEN TO ELIMINATE CAUSE
Cleared the emergency shut down, restarted turbine,
injection gas compressors, and production heater.
Refilled first stage separator and brought plant and
production back on-line.
Badami utility pipeline was isolated when leak was
identified on 11/15/99. Pipeline has not been in
service since being isolated. Repair and proactive
measures to prevent re-occurrence are in pro ress.
Badami utility pipeline was isolated when leak was
identified on 11/15/99. Pipeline has not been in
service since being isolated. Repair and proactive
measures to prevent re-occurrence are in pro ress.
Badami utility pipeline was isolated when leak was
identified on 11/15/99. Pipeline has not been in
service since being isolated. Repair and proactive
measures to prevent re-occurrence are in pro ress.
Production was choked back to minimize flaring. After
attempts to use emergency generators failed to power
the injection gas compressor, Bi-18 was used to back
pressure the utility pipeline off of the first stage
down due to problems separator.
with the 4th stage cylinder. With the utility line leak, turbine The section of utility pipeline between RTU#1 and the
"A" went down on low fuel gas supply. Without utility gas or plant was back pressured as a fuel source for the
produced gas, we attempted to run the injection gas injection gas compressor. Flaring was eliminated by
compressor with the emergency generators but did not have bringing the injection gas compressor on line and
enou h power. injectin as into B1-21.
11 /15/99 10:30-12:24
11 /15/99 12:30-15:18
11 /16/99 108:18-10:00
96
353
288
TOTAL
Attempts to place the injection gas compressors back on
occurred while we investigated the root cause of the
temperature indicator failure. Being that the cause was a
faulty MI cable, it continued to reset and fail until it was
-line Production was choked back to minimize flaring.
Attempts to restart the plant failed each time the MI cable ~ Production was choked back to minimize flaring.
Attempts to restart the plant failed each time the MI cable ~ Identified the faulty MI cable and replaced it.
Page 1
12/13/1999 BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
November-99
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/13/1999 18:54-19:00 1 Popped 61-18 to pressure up compressor and to bring plant Shut 61-18 back in.
back on line. 3rd stg compressor leaking so had to shut in
and flare off as.
11/14/1999 07:18-07:24 2 Depressuring IG "B" for maintenance.
11/14/1999 13:48-14:00 9 Pop ed B1-18 in plant fillip 1st st separator. Pinched back on 61-18.
11/14/1999 14:12-14:48 143 Brin in Bi-18 on line and startin IG compressor Pinched back on B1-18.
11/14/1999 15:12-16:06 147 Brin ing Bi-18 on line and startin IG compressor Pinched back on B1-18.
11/28/1999 11:30-11:42 12 1st stg separator was manually opened (PV-1405) for more
gas to flare tip while attemptin to re-li ht flare. Lit the flare and closed PV-1405
11/28/1999 12:24-12:30 1 2nd stg separator was manually opened (PV-1405) for more
as to flare tip while attemptin to re-li ht flare. Lit the flare and closed PV-1406
11/28/1999 16:48-17:06 17 Open a bypass around a fuel gas scrubber to put more gas
to flare to re-li ht flare. Lit flare and closed valve.
TOTAL 332
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/20/1999 18:20-24:00 256 Gas flared in portable flare when depressurizing the Badami Gas flaring was necessary to safely and responsibly
Utility Gas Pipeline in preparation for repair. prepare the Badami Utility Pipeline for repair following
the leak incident.
11/21/1999 00:00-06:35 22 Gas flared in portable flare when depressurizing the Badami
Utility Gas Pipeline in preparation for repair. Gas flaring was necessary to safely and responsibly
prepare the Badami Utility Pipeline for repair following
the leak incident.
11/21/1999 12:00-13:00 11 Gas VENTED when purging the Badami Utility Gas Pipeline
with Nitrogen in preparation for repair. Purging with Nitrogen (and venting contents of
pipeline) was necessary to safely and responsibly
prepare the Badami Utility Pipeline for repair foAowing
the leak incident.
TOTAL 289
TOTAL
Volume flared less than 1 hour 3,742
Volume flared greater than 43,849 includes 41,751 mcf VENTED gas
1 hour
Pilot Purge 390
Assist Gas 0
TOTAL FLARED VOLUME 47,981
Page 2
,~
f ~:
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility - - Operator Field(s) Month/Year of Disposition
~Badaini BP Exploration (Alaska) Badami Dec-99
Disposition I Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 211,781
3. Flared or vented less than 1 hour 1,319
4. Flared or vented greater than 1 hour 2,929
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 403
6. Used for lease operations Assist 0
Fuel 41,916
7. Other
TOTAL items 1-7 258,348
8. NGL gas equivalent produced 0
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby ce > fy th t the for going is true /a1nd~,~c~o~r/rect to the best of my
Signature ~ Title ~/1~{,(L ~t 7\~, Date 1 ~ 'joc7rf
_- ~ 1
*Indicate contribution of each pool to t
Pool Name Code Percent
60100
Official Use Only-Flaring Authorization
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the 20th
of the month folowing the month of
disposition. Authority 20 AAC
25.235.
Form 10-422
Rev. 4/95
1 /14/2000 BP EXPLORATION (ALASKA) INC. Page 1
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
December-99
Jnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 1,112 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Jnplanned Events greater than 1 hour
DATE .TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/03/99 19:30-21:12 196 Continuation of bringing plant and wells back on-line after Well Bi-18, a high gas producer, was choked back to
compressor repairs. Bi-25 was surging and sending slugs make room for Bi-25 gas production.
of production into plant.
12/30/99 14:30-17:12 907 Water entered MCC (motor control center) when snow from Dried out motor control center and process control
storm blew in from vents. Total plant BESD (blowdown system. Restarted the plant and began bringing wells
emergency shut down) due to false signal from M-400 PLC back on-line.
(process logic controller).
12/30/99 17:36-23:42 1,562 In a BESD (blowdown emergency shut down), all control Well choke settings were reduced to stabilize gas and
systems fail to a safe position, even wells. Flaring occurred oil production entering the plant and therefore stabilize
while trying to bring plant and wells back on-line. the plant.
TOTAL 2,665
planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN'TO ELIMINATE CAUSE
12/03/99 07:54-08:00 L Shutting down IG "B" for maintenance Safed out compressor to repair packing on 4th stage
12/03/99 08:12-08:18 3 Same as above Repairing B- compressor
12/03/99 13:42-14:12 56 IG"B" brought on line and back down Wells shut back in.
12/03/99 15:18-15:48 119 Same as above Wells shut back in.
12/03/99 16:30-16:42 16 Compressor repaired and wells were being brought back into adjusting chokes and stabilizing plant
plant.
12/03/99 17:06-17:12 2 Compressor repaired and wells were being brought back into adjusting chokes and stabilizing plant
plant.
12/11/99 19:36-19:48 5 Thermal expansion pressured utility line above alarm set started using utility gas for fuel gas and flared excess
point, had to flare to relieve pressure
12/11/99 20:00-20:06 2 same as above same as above
12/20/99 07:18-07:24 2 Purging IG"A" compressor to ready for service blocked in purge and pressured up on standby
TOTAL 207
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME - DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE'CAUSE
12/03/99 17:30-19:06 264 Seal leaking on glycol cooling pump on injection gas As wells were brought back on-ime, chokes were
compressor "B" requiring repair. With injection gas adjusted to cut back on gas production and minimize
compressor "A" already down due to repair of 4th stage flaring.
piston, all wells were brought down for repairs on injection
gas compressor "B".
Flaring occurred while trying to bring plant and well back on-
line.
TOTAL 264
1/14/2000 BP EXPLORATION (ALASKA) INC. Page 2
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
December-99
TOTAL
Volume flared less than 1 hour 1,319
Volume flared greater than 2,929
1 hour
Pilot Purge 403
Assist Gas 0
TOTAL FLARED VOLUME 4,651