ALASKA OIL AND GA5 CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 1 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Dec-98
•
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 9,562
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge ta"~ ~ ~ &$~ - 36,987
6. Used forlease operations '~~ ~'~ G ° - ~`' `''' 881,674
7. Other r~~y0r , ~~ 0
TOTAL items 1 - 7 928,223
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 70,602,944
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
l ,
Signature: ''~~` / ~ - ~/ Title:
SUPERVISOR
Form 10-422 (Redised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Ollici.il Use Only--Fl.iring Authoriz~ktion> 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
9812 FORM 10-422.x1s/FORM 10-422
- BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
1/6/99 GAS FLARING INCIDENT REPORT
DECEMBER, 1998
Unplanned Events less than or equal to 1 hour ~
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELI~MINATE:CAUSE ''
12/2/98 0828-0833 104 Not required for unplanned events which Not required for unplanned events whit
12/3/98 0657-0704 292 are less than or equal to 1 hour are less than or equal to 1 hour
12J3/98 1141-1148 292
12/3/98 1745-1756 76
12/4/98 1125-1132 292
12/5/98 0242-0247 175
12/5/98 1324-1329 175
12/5/98 2331-2336 175
12/7/98 0001-0006 175
12/8/98 1954-2001 250
12/10/98 1331-1337 125
12/11 /98 1721-1727 125
12/12/98 0050-0124 972
12/14/98 2247-2252 174
12/18/98 1357-1419 1,750
12/18/98 1453-1546 2,208
12/19/98 1710-1720 194
12/21 /98 1857-1916 198
12/21 /98 2038-2051 35
12/22/98 1917-1923 142
12/24/98 0710-0716 208
12/27/98 0113-0119 118
12/27/98 1824-1829 104
12/27/98 2112-2118 125
12/28/98 1424-1430 208
12/29/98 1340-1345 174
12/31/98 1055-1134 488
12/31/98 1758-1804 208
TOTAL 9,562
Unplanned Events greater than 1 hour
:DATE T1ME VOLUME DESCRIPTION OF INGIDENT & CAUSE ACTION`TAKEN TO ELIMINATE :CAUSE
........
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME vOLUME DESCRIPTION OF JNC9DENT & CAUSE ACTION AKEN'TO ELIMINATE CAUSE
TOTAL 0
Page 1
1/6/99
(Planned Events Exceeding 1 Hour OR E:
DATE TIME VOLUME
TOTAL C
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour & not
exceeding 5,000 MCF
Planned Events > 1 hour and
exceeding 5,000 MCF
Pilot Purge
TOTAL FLARED VOLUME
rora~
9,562
0
0
0
36, 987
46,549
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
DECEMBER, 1998
ing 5000 Mcf
RIPTION OF INCIDENT& CAUSE
Page 2
_._
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
Facility Operator Field(s) ~ Month/Year of Disposition
GATHERING CENTER 1 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Nov-98
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 3,282
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 278
5. Pilot and Purge 36,123
6. Used for lease operations 862,066
7. Other 0
TOTAL items 1 - 7 901,749
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 69,709,067
Remarks:
I hereby certify~tha~t the foregoing is true and correct to the best of my knowledge.
Signature: ~~~1 '~,~-~--~--- ~ ~ ~~; /j"`j Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Offici~il Use Only--Flaring Authorization> 1 lu.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
9811 FORM 10.422.x1s/FORM 10-422
z
12/3/98
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
NOVEMBER, 1998
Unplanned Events less than or equal to 1 hour ~
-DATE .TIME `VOLUME DESCRIPTION OF INCIDENT`& CAUSE ' ACTION TAKEN TO ELIMINATE CAUSE
11/1/98 1018-1104 191 Not required for unplanned events which Not required for unplanned events whit
11/2/98 0233-0328 267 are less than or equal to 1 hour are less than or equal to 1 hour
11 /2/98 1305-1338 111
11/6/98 2337-2351 292
11 /7/98 0428-0447 264
11 /9/98 1621-1626 108
11/12/98 0439-0508 383
11 /21 /98 2239-2246 250
11 /22/98 1415-1420 125
11 /24/98 0439-0445 250
11 /27/98 0310-0315 833
11 /30/98 2244-2250 208
TOTAL 3,282
Unplanned Events greater than 1 hour ~
DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/2/98 1605-1712 278 See attachments See attachments
TOTAL 278
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~
DATE TIME VOLUME -DESCRIPTION OF INCIDENT &;CAUSE ACTION TAKEN 70 ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT &;CAUSE
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 3,282
Unplanned Events > 1 Hour 278
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 36.123
TOTAL FLARED VOLUME 39,683
~'O ELIMMATE,CAUSE
Page 1
• REPORT NO: 9$-4578
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-1 DATE: O2 NOV 98
TOTAL VOLUME: 656 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 02:33 To: 03:28 0 Hrs. 55 Mins. ^ ® ^ ^ 267 MSCF
2. FROM: 13:05 TO: 13:38 0 Hrs. 33 Mins. ® ^ ^ ^ 111 MSCF
3. FROM: 16:05 To: 17:12 1 Hrs. 7 Mins. ® ^ ^ ^ 27$ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED BLOWDOWN: _ OTHER: _
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
3. ARCO was bringing production rates up following State SSSV Testing at Drill Site #15 resulting in high Gas Transit Line
pressure.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 30 mmscfd. ARCO reduced production rates and shut-in 3
wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 02:12 hours.
2. BPX reduced production rates and shut-in 2 wells equaling 40 mmscfd. ARCO reduced production rates and shut-in 3
wells equaling 75 mmscfd. Wells were shut-in or choked back starting at 13:03 hours.
3. BPX reduced production rates and shut-in 4 wells equaling 60 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 60 mmscfd. Wells were shut-in or choked back starting at 16:12 hours.
4.
5.
I ~e~ si2zs~
n
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility GATHERING CENTER 1 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBUMonth/Year of Di0 t 98 n
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 15,280
4. Flared or vented greater than 1 hour
(Supplemental report required--See ZO AAC 25.235) 16,318
5. Pilot and Purge 37,330
6. Used for lease operations 934,902
7.Other 0
TOTAL items 1 - 7 1,003,830
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 66,679>658
Remarks:
I hereby certify that the foregoing is true and correct to®the best of my knowledge.
Signature: 2~'~~" ~ 1 !//~~-// g Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
0lticial Use OnIV--Flaiina Authorization > I hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
9810 FORM 10-422.x1s/FORM 10-422
BP EXPLORATION (ALASKA) INC.
,' ~ PRUDHOE BAY UNIT- GC-1
11 /4/98 GAS FLARING INCIDENT REPORT
OCTOBER, 1998
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
10/1/98 1530-1545 208 Not required for unplanned events which
10/2/98 0510-0515 104 are less than or equal to 1 hour
10/2/98 0937-0948 229
10/2/98 1200-1216 333
10/2/98 1449-1455 542
10/3/98 0311-0316 104
10/3/98 0332-0337 104
10/4/98 0451-0456 104
10/4/98 0458-0504 125
10/5/98 2213-2219 167
10/6/98 1340-1426 4,792
10/7/98 0200-0205 104
10/9/98 1844-1858 150
10/10/98 2041-2113 521
10/11 /98 2327-2342 850
10/13/98 0831-0912 1,281
10/21 /98 1244-1256 350
10/21 /98 1830-1836 208
10/23/98 1241-1255 730
10/24/98 0656-0704 56
•
10/25/98 0117-0144 338
10/25/98 0607-0624 118
10/27/98 0008-0013 278
10/27/98 0408-0500 1,444
10/27/98 0605-0642 642
10/28/98 0549-0554 278
10/28/98 1955-2001 313
10/28/98 2352-2356 122
10/29/98 1658-1727 106
10/30/98 0659-0704 104
10/31/98 0950-1106 475
TOTAL 15,280
ACTION TAKEN TO ELIMINATE,CAUSE
Not required for unplanned events whit
are Tess than or equal to 1 hour
Page 1
'~,r'
11/4/98
•
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
OCTOBER, 1998
Unplanned Events greater than 1 hour
.~_. ~
~~.~
DATE 'TIME' 'VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE'CAUSE'
10/1/98 0120-0650 2,360 See attachments See attachments
10/9/98 0907-1008 12,979 See attachments See attachments
10/28/98 2041-2215 979 See attachments See attachments
TOTAL 16,318
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~
DATE TIME, VOLUME DESCRIPTION OF INCIDENT:&'CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~
_~.~.~
DATE .TIME ! VOLUME DESCRIPTION'OFINCIDENT'& CAUSE ACTION TAKENTTOELIMINATE CAUSE
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 15,280
Unplanned Events > 1 Hour 16,318
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 37,330
TOTAL FLARED VOLUME 68,928
Page 2
• ~ REPORT NO: 98-453
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-1 DATE: O1 OCt 98
TOTAL VOLUME: 2,56$ MSCF
Intermittent Black
TIM E OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 01:20 TO: 06:50 5 Hrs. 30 Mins. ^ ® ^ ^ 2,360 MSCF
2. FROM: 15:30 TO: 15:45 O Hrs. 15 Mins. ^ ® ^ ^ 208 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. Extended flaring event occurred while awaiting electrical troubleshooting of K-106 LP gas compressor. (the assist gas
was used to prevent black smoke)
2. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor floodinglTEG carryover when
gas rates exceeded the 1145 mmscfd operability limit.
3.
4.
5.
Action Taken to Stop Flaring:
1. Equipment was started at 06:50 hours.
2. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
3.
4.
5.
~~
~~ ~~ ~~~
~ Rev 6/2297
• REPORT NO: 9$-4538
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-1 DATE: O9 OCt 98
TIME OF FLARING:
1. FROM: 09:07 To: 10:08
2. FROM: 18:44 To: 18:58
3. FROM: TO:
4. FROM: TO:
5. FROM; TO:
DURATION:
1 Hrs. 1 Mins.
0 Hrs. 14 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
13,129 MscF
VOLUME
12,979 MSCF
15O MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor problems due to booster air leak repair
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. Equipment was restarted at 9:45 hours.
2. BPX reduced production rates and shut-in 3 wells equaling 105 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 60 mmscfd. Wells were shut-in or choked back starting at 18:45 hours.
3.
4.
5.
Rev 6/22/97
• ~ REPORT NO: J$-4566
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-1 DATE: 28 OCt 98 TOTAL VOLUME: 1,692 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 05:49 TO: 05:54 0 Hrs. 5 Mins. ^ ® ^ ^ 278 MSCF
2. FROM: 19:55 TO: 20:01 0 Hrs. 6 Mins. ^ ® ^ ^ 313 MSCF
3. FROM: 23:52 TO: 23:56 0 Hrs. 4 Mins. ^ ® ^ ^ 122 MSCF
4. FROM: 20:41 TO: 22:15 1 Hrs. 34 Mins. ^ ® ^ ^ 979 MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor flooding/TEG carryover when
gas rates exceeded the 1150 mmscfd operability limit.
2. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor flooding/TEG carryover when
gas rates exceeded the 1150 mmscfd operability limit.
3. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor floodinglTEG carryover when
gas rates exceeded the 1150 mmscfd operability limit.
4. High gas transit line pressure caused by CCP compressor problems due to low stage 1804 anti-surge valve problem.
5.
Action Taken to Stop Flaring:
1. BPX choked back 2 wells to minimum and slowly opened up.
2. BPX choked back 1 well to minimum and slowly opened up.
3. BPX choked back 2 wells to minimum and slowly opened up.
4. BPX reduced production rates and shut-in 8 wells equaling 120 mmscfd. ARCO reduced production rates and shut-in 6
wells equaling 130 mmscfd. Wells were shut-in or choked back starting at 20:45hours.
5.
Rev 6/22/97
• . REPORT NO: 98-4572
B PX FLARE REPORT
,
' PRUDHOE BAY
FACILITY: GC-1 DATE: 31 Oct 98 TOTAL VOLUME: 475 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 09:50 TO: 11:06 1 Hrs. 16 Mins. ^ ® ^ ^ 475 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: ~ Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by CGF Refrigeration Compressor #1 S/D due to b roken tubing in the
instrumentation.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 3 wells equaling 55 mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 100 mmscfd. Wells were shut-in or choked back starting at 10:00 hours.
2.
3.
4.
5.
Rev 6/22/97
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
(Facility
I ( Month/Year of Di,S u
s9'
on
S
GATHERING CENTER 1 BP EXPLOKATION ALASKA p
8
WE
TERN OPERATING AREA-PBU
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
}
., g, v'4 ?'r,. 3 A
~
~
2. Reinjected `
: 0 PRUDHOE 640150 100
,. 4f.
3. Flared or vented less than 1 hour t 4,613
u
1. ISS. f1t`tPI,lrN47~Mif
«~l1ChGtf~
~r.
4. Flared or vented greater than 1 hour 36,077
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 31,252
6. Used for lease operations 781,600
Official Use Only--Planng Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
11. Transferred to: CCP 53,011,977
7. Other 0
TOTAL items 1- 7 853,542
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
Remarks:
I hereby certify that the fo egoing is true and correct to the best of my knowledge.
~'
Signature: ~~' a, c Title: SUPERVISOR
C~
9809 FORM 10-422.x1s/FORM 10-422
10/2/98 BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
SEPTEMBER, 1998
Unplanned Events less than or eq ual to 1 hour
~_. ~
DATE ~
TIME VOLUME DESCRIPTION OF INCIDENT-~ CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/10/98 1811-1905 1,238 Not required for unplanned events which Not required for unplanned events whit
9/13/98 1028-1041 90 are less than or equal to 1 hour are less than or equal to 1 hour
9/15/98 1000-1005 17
9/15/98 1109-1133 250
9/15/98 1449-1500 92
9/16/98 1111-1142 172
9/17/98 1928-2001 504
9/19/98 2303-2356 552
9/20/98 0347-0429 450
9/20/98 0811-0844 275
9/20/98 0947-1036 408
9/23/98 1029-1105 450
9/23/98 2135-2157 115
TOTAL 4,613
Unplanned Events greater than 1 hour ~
DATE TIME -VOLUME DESCRIPTION OFJNCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/16/98 1702-1904 31,686 See attachments See attachments
9/17/98 1122-1237 294 See attachments See attachments
9/17/98 1248-1423 188 See attachments See attachments
9/18/98 1240-1626 1,883 See attachments See attachments
9/19/98 0832-1019 892 See attachments See attachments
9/19/98 1410-1524 617 See attachments See attachments
9/22/98 1621-1737 517 See attachments See attachments
TOTAL 36,077
Planned Events Less Than or E ual 1 Mour AND Not Exceedin 5000 Mcf
.DATE TIME ..VOLUME " ' DESCRIPTION OF:.INCIDENT'>k CAUSE ACTION TAKEN TO,ELIIVIIINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~
DATE TIME VOLUME DESCRIPTION OF! INCIDENT ~ CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Page 1
10/2/98
TOTAL
Unplanned Events < 1 Hour 4,613
Unplanned Events > 1 Hour 36,077
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 31 25
• TOTAL FLARED VOLUME 71,942
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
SEPTEMBER, 1998
Page 2
•
BPX FLARE REPORT
PRUDHOE BAY
REPORT NO: 9$-4504
FACILITY: GC-1 DATE: 16 Sep 98 TOTAL VOLUME: $1 ~$rj$ MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 11:11 TO: 11:42 0 Hrs. 31 Mins. ^ ® ^ ^ 172 MSCF
2. FROM: 17:02 TO: 19:04 2 Hrs. 2 Mins. ^ ^ ^ ^ 31,6$6 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
2. GHX-2 Annex TEG regeneration system shut down due to a problem associated with power failure.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 30 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 45 mmscfd. Wells were shut-in or choked back starting at 11:00 hours.
2. BPX reduced production rates and shut-in 32 wells equaling 550 mmscfd. Wells were shut-in or choked back starting at
18:00 hours.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 98-450a
, B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-1 DATE: 17 Sep 98 TOTAL VOLUME: J86 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 1 1 :22 TO: 12:37 1 Hrs. 15 Mins. ® ^ ^ ^ 294 MSCF
2. FROM: 12:48 TO: 14:23 1 Hrs. 35 Mins. ® ^ ^ ^ 188 MSCF
3. FROM: 19:28 TO: 20:01 O Hrs. 33 Mins. ^ ® ^ ^ 504 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 3 wells equaling 45 mmscfd. ARCO reduced production rates and shut-in 3
wells equaling 55 mmscfd. Wells were shut-in or choked back starting at 11:23 hours.
2. BPX reduced production rates and shut-in 3 wells equaling 45 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 40 mmscfd. Wells were shut-in or choked back starting at 12:49 hours.
3. BPX reduced production rates and shut-in 11 wells equaling 265 mmscfd. ARCO reduced production rates and shut-in 7
wells equaling 50 mmscfd. Wells were shut-in or choked back starting at 1940 hours.
4.
5.
Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 98-4509
FACILITY: GC-1 DATE: 1$ Sep 9$ TOTAL VOLUME: 1,$$$ MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 12:40 To: 16:26 $ Hrs. 46 Mins. ^ ® ^ ^ 1,883 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ ~' MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Am bient temperatu re increased by
14°F, also CGF took one of their refrigeration units off line for survey.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 10 wells equaling 310 mmscfd. ARCO reduced production rates and shut-in
12 wells equaling 600 mmscfd. Wells were shut-in or choked back starting at 12:40 hours.
2.
3.
4.
5.
Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 98-451 ~
FACILITY: GC-1 .DATE: 19 Sep 98 TOTAL VOLUME: 2,061 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 0$:32 TO: 10:19 1 Hrs. 47 Mins. ^ ® ^ ^ 892 MSCF
2. FROM: 14:10 TO: 15:24 1 Hrs. 14 Mins. ^ ® ^ ^ 617 MSCF
3. FROM: 23:03 TO: 23:56 0 Hrs. 53 Mins. ^ ® ^ ^ 552 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 44 mmscfd. Wells were shut-in or choked back starting at
10:03 hours.
2. BPX reduced production rates and shut-in 3 wells equaling 40 mmscfd. Wells were shut-in or choked back starting at
15:03 hours.
3. BPX reduced production rates and shut-in 3 wells equaling 40 mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 90 mmscfd. Wells were shut-in or choked back starting at 23:08 hours.
4.
5.
Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 9$-4517
FACILITY: GC-~ DATE: 22 Sep 98 TOTAL VOLUME: j17 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 16:21 TO: 17:37 1 Hrs. 16 Mins. ® ^ ^ ^ 517 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings re sulted in flaring and required cuts in production. Am bient temperatu re increased by
3°F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Arco reduced production rates and shut-in 3 wells equaling 130 mmscfd. Wells were shut-in or choked back starting at
16:40 hours.
2.
3.
4.
5.
Rev 6/22/97
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I,_.-~_.
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 1 BP EXPLORATION ALASKA wFSTERN OPERATING AREA-PBU Au -98
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 8,205
4. Flared or vented greater than 1 hour 25,293
(Supplemental report requved-See 20 AAC 25.235)
S. Pilot and Purge 33,603
6. Used for lease operations 924,625
7.Other 0
TOTAL items 1 - 7 991,726
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 65,489,268
Remarks:
I hereby certify that the for oing is true and correct to the best of my knowledge.
Signature: °~~~ ~~~ /n, ~ Title: SUPERVISOR
Fnrm 10-422 (Revised 4/951
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official'Use Onl --Flatin Authc~riza6on >''1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
9808 FORM 10-422.~ds/FORM 10-422
9/3/98
Unplanned Events less than or
.~
DATE TIME U
8/1 /98 1129-1145
8/1 /98 1630-1633
8/1/98 2206-2213
8/2/98 0523-0537
8/2/98 0949-1016
8/2/98 1258-1330
8/2/98 1403-1420
• 8/8/98 1439-1508
8/13/98 0154-0201
8/19/98 1751-1832
8/19/98 2212-2235
8/20/98 0734-0749
8/21/98 1020-1045
8/21/98 1310-1320
8/22/98 0533-0547
8/22/98 1259-1349
8/23/98 0143-0149
8/24/98 1542-1607
8/26/98 0431-0443
8/27/98 0929-1004
8/28/98 0128-0144
8/31 /98 0632-0638
• TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
AUGUST, 1998
ial to 1 hour
NE DESCRIPTION'OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
170 Not required for unplanned events which Not required for unplanned events whip
730 are less than or equal to 1 hour are less than or equal to 1 hour
389
730
180
1,670
120
342
150
214
128
156
694
104
146
521
125
347
67
681
333
Ana
tS,LVO
Unplanned Events greater than 1 hour ~
,DATE TIME VOLUME DESCRIPTIONOF INCIDENT&CAUSE ACTION TAIfEN TO ELIMINATE CAUSE:
8/11/98 1624-1942 3,550 See attachments See attachments
8/14/98 0816-1704 11,000 See attachments See attachments
8/22/98 0923-1036 10,139 See attachments See attachments
8/23/98 0843-0958 604 See attachments See attachments
TOTAL 25,293
Page 1
BP EXPLORATION (ALASKA) INC.
• , PRUDHOE BAY UNIT - GC-1
9/3/98 GAS FLARING INCIDENT REPORT Page 2
AUGUST, 1998
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME ' ` VOLUME ` pESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceedin 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTiON'OFINCIDENT& CAUSE ACTION TAKEN TOELIMINATE CAUSE
TOTAL 0
•
TOTAL
Unplanned Events < 1 Hour 8,205
Unplanned Events > 1 Hour 25,293
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 33
TOTAL FLARED VOLUME 67,101
•
• • REPORT NO: 9$-4458
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: C'aC-1 DATE: 11 AUg 98 TOTAL VOLUME: 3,55Q MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 16:24 TO: 19:42 3 Hrs. 18 Mins. ^ ® ® ^ 3,550 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN: OTHER:
First Determination of Cause: _
1. L.P./I.P. compressors lost suction causing michines to surge during low oil rates caused by GHX-2 Annex and A-Bank
slugcather shutdown, black smoke was intermittent during surge period.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Assit gas was added to stop black smoke flaring and Equipment was restarted with production rates increased to keep
L.P./I.P. compressors from surging.
2.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 98-4461
BPX FLARE REPORT
~~~ PRUDHOE BAY
FACILITY: GC-1 DATE: 14 Aug 98 TOTAL VOLUME: 11 X000 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 08:16 TO: 17:04 $ Hrs. 48 Mins. ^ ® ^ ^ 11,000 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN: OTHER:_
First Determination of Cause: _
1. Flare assist gas added to prevent black smoke due to low oil rate. Rate low due to TAPs slowdown.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Brought oil/gas rate back up when TAPs allowed us to and restarted compressors.
2.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 98-4472
,
~' B PX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-1 DATE: 22 Aug 98 TOTAL VOLUME: 10806 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 05:33 TO: 05:47 0 Hrs. 14 Mins. ^ ® ^ ^ 146 MSCF
2. FROM: 09:23 TO: 10:36 1 Hrs. 13 Mins. ^ ® ^ ^ 10,139 MSCF
3. FROM: 12:59 TO: 13:49 0 Hrs. 50 Mins. ^ ® ^ ^ 521 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High Gas Transit Line pressure due to making Field Optimization moves.
2. High gas transit line pressure caused by CGF Tandem Compressor #1883 S/D caused by a false high level on the fuel
gas knock-out vessel.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
4.
5.
Action Taken to Stop Flaring:
1. Arco reduced production rates and shut-in 4 wells equaling 100 mmscfd. Wells were shut-in or choked back starting at
05:25 hours.
2. Equipment was restarted at 10:30 hours.
3. Arco reduced production rates and shut-in 3 wells equaling 75 mmscfd. Wells were shut-in or choked back starting at
13:05 hours.
4.
5.
Rev 6/22/97
• • REPORT NO: 9$-4473
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: CaC-1
TIME OF FLARING:
DATE: 23 Aug 98
1. FROM: 01:43 To: 01:49
2. FROM: 08:43 TO: 09:58
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
O Hrs. 6 Mins.
1 Hrs. 15 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
729 MSCF
VOLUME
125 MSCF
604 MscF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: _ OTHER: _
First Determination of Cause:
1. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor floodinglTEG carryover when
gas rates exceeded the 1150 mmscfd operability limit.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. Trimmed back on 2 wells to reduce gas rate to allowable limits.
2. Arco reduced production rates and shut-in 7 wells equaling 150 mmscfd. Wells were shut-in or choked back starting at
08:30 hours.
3.
4.
5.
Rev 6/22/97
u
•
s
ALASKA OIL. AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
(Facility (OperatorField(s) (Month/Year of Disposition
GATHERING CENTER 1 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Jul-98
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 18,020
4. Flared or vented greater than 1 hour 17,883
(Supplemental reportrequired--See 20 AAC 25.235)
Pilot and Purge 33,497
Used for lease operaflons 946,254
Other 0
TOTAL items 1 - 7 1,015,654
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 66,576,946
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: <~' ~~.r _ .,~~~ ~",~ ~~ ~~~~ Title: SUPERVISOR
~r {.
Form 10.422 (Revised 4/95)
_._
_..
Official Use Onl --Flazin Authorization > I hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
'8,14/98
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
JULY, 1998
Unplanned Events less than or equal to 1 hour ~
DATE ':TIME VOLUME DESCRIPTION OF INCIDENT.&`CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/1/98 0808-0818 208 Not required for unplanned events which Not required for unplanned events whip
7/2/98 1504-1550 1,757 are less than or equal to 1 hour are less than or equal to 1 hour
7/3/98 2219-2225 100
7/4/98 0302-0321 200
7/4/98 1310-1350 1,528
7/4/98 1456-1522 831
7/4/98 1742-1756 100
• 7/5/98 0841-0913 224
7/6/98 1446-1515 342
7/7/98 1007-1029 229
7/8/98 1306-1322 211
7/22/98 1021-1046 1,354
7/23/98 1333-1353 435
7/25/98 1328-1418 357
7/25/98 1539-1605 144
7/25/98 2002-2034 378
7/27/98 1219-1243 2,602
7/27/98 1409-1431 504
7/28/98 1331-1346 1,275
7/28/98 2332-2349 94
7/30/98 0632-0725 550
7/30/98 1500-1522 3,375
• 7/30/98 2148-2220 1,222
TOTAL 18,020
Unplanned Events greater than 1 hour ~
~~.~_~
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/3/98 1340-1631 244 See attachments See attachments
7/10/98 1052-1259 17,639 See attachments See attachments
TOTAL 17,883
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~
DATE TIME VOLUME ` DESGRIPTiON OF'1NCIDENT & CAUSE: 'ACTION TAKEN TO ELIMINATE CAUSE
Page 1
TOTAL 0
BP EXPLORATION (ALASKA) INC.
'gi4~gg PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
JULY, 1998
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE '' TIME VOLUME DESCRIPTION OF INCIDENT?& CAUSE
TOTAL 0
;TOTAL"
Unplanned Events < 1 Hour 18,020
Unplanned Events> 1 Hour 17,883
• Planned Events < 1 hour 8c not
exceeding 5,000 MCF 0
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 33,497
TOTAL FLARED VOLUME 69,400
ACTION TAKEN TO ELIMINATE CAUSE
Page 2
~ •
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-1 DATE: 03 Jul 98
TIME OF FLARING:
1. FROM: 13:40 To: 16:31
2. FROM: 22:19 To: 22:25
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
2 Hrs.. 51 Mins.
0 Hrs. 6 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
• REPORT NO:
TOTAL VOLUME:
Intermi ttent Black
Yes No Smoke? Planned?
® ^ ^ ^
^ ® ^ ^
^ ^ ^ ^
^ ^ ^ ^
^ ^ ^ ^
98-4387
344 MscF
VOLUME
244 MscF
100 MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
8°F.
2. While bringing production rates up following ARCO compressor maintenance, transit line pressure increased causing
LPS to discharged to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 40mmscfd. Wells were shut-in or choked back starting at
14:00 hours.
2. BPX reduced production rates equaling 125 mmscfd. Wells were shut-in or choked back starting at 21:54 hours.
3.
4.
5.
Rev 6/22/97
•
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO:
98-4402
FACILITY: GC-1 DATE: 10 Jul 98
TIME OF FLARING:
~ . FROM: 10:52 To: 12:59
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
2 Hrs. 7 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
17,639 MscF
VOLUME
17,639 MscF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor problems due to booster compressor 1802 shutdown.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 15 wells equaling 200 mmscfd. ARCO reduced production rates and shut-in 8
wells equaling 500 mmscfd. Wells were shut-in or choked back starting at 11:15 hours.
2.
3.
4.
5.
Rev 6/22/97
~,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Form 10-422
•
•
(Facility GA1'!-)EKING CENTER 1 IBP~EXPLORATION ALASKA IWES (TERN OPERATING AREA-PBUMonth/Yeaz of Di Jposi9hg n
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 7,255
4. Flared or vented greater than 1 hour
(Supplemental report requved--See 20 AAC 25.235) 4,677
5. Pilot and Purge 32,409
6. Used for lease operations 893,633
7.Other 0
TOTAL items 1 - 7 937,974
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 62,127,826
Remarks:
I hereby certify that the foregoing/is true and correct to the best of my knowledge.
Siggata~_ /A w. ! ~ ~! f ~ .~ _ l _Title: SUPERVISOR
Form 10-422 (Revised 4J~5)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Flarin Authotzafion > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
_ PRUDHOE BAY UNIT - GC-1
'7/6/98 GAS FLARING INCIDENT REPORT
JUNE, 1998
Unplanned Events less than or equal to 1 hour ~
DATE
TIME
VOLUME 'DESCRIPTION OF INCIDENT & CAUSE: ~_,...~
ACTION TAKEN TO ELIMINATE'CAUSE
6/10/98 0136-0141 350 Not required for unplanned events which Not required for unplanned events whip
6/18/98 2214-2228 369 are less than or equal to 1 hour are less than or equal to 1 hour
6/19/98 1139-1206 525
6/20/98 2110-2144 425
6/21/98 1128-1145 354
6/21/98 1556-1621 382
6/23/98 1251-1304 135
• 6/25/98 1440-1455 156
6/25/98 1618-1639 277
6/25/98 1727-1753 144
6/26/98 0344-0349 347
6/27/98 1006-1046 778
6/27/98 1412-1446 543
6/27/98 1741-1756 115
6/28/98 0858-0943 1,125
6/28/98 1322-1402 199
6/28/98 2140-2149 325
6/29/98 1732-1749 142
6/29/98 1945-2014 564
TOTAL 7,255
Unplanned Events greater than 1 hour
• DATE
6/21/98 .TIME
0634-0802 VOLUME DESCRIPTION..OF INCIDENT & CAUSE
672 See attachments ACTION TAKEN TO ELIMINATE CAUSE
See attachments
6/29/98 0916-1019 1,138 See attachments See attachments
6/30/98 1124-1416 2,867 See attachments See attachments
TOTAL 4,677
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~
:DATE .:TIME VOLUME DESCRIPTION OF INCIDENT'& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
u
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Page 1
c
a
®
~
Y?= :,~
~
W
~ ~ ~
:v
~ ~ ~~
~ __B ~ ~
~'~
-TOTAL
Unplanned Events < 1 Hour 7,255
•
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
7/6/98 GAS FLARING INCIDENT REPORT
JUNE, 1998
Unplanned Events > 1 Hour 4,677
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 32,409
TOTAL FLARED VOLUME 44,341
Page 2
C~
• • REPORT NO: 98-4357
BPX FLARE REPORT
PRUDHOE BAY
1 ,408 MSCF
FACILITY: CaC-1 DATE: 21 .JUn 98
TIME OF FLARING:
1. FROM: 06:34 TO: 0$:02
2. FROM: 11:28 To: 11:45
3. FROM: 15:56 To: 16:21
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 28 Mins.
0 Hrs. 17 Mins.
0 Hrs. 25 Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
VOLUME
672 MSCF
354 MscF
3$2 MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. D-bank 2nd stage flare valve opened during upset conditions.
2. Sk-18 LP compressor shut down because of a problem associated with unstable gas conditions.
3. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor flooding/TEG carryover when
gas transit line pressure became to low after K-3200 glt compressor was restarted.
4.
5.
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted to stablize upset conditions.
2. Equipment was restarted at 11:41 hours.
3. Arco raised the gas transit line pressure.
4.
5.
Rev 6/22/97
• • REPORT NO: 9$-4$75
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-1 DATE: 29 JUn 9$ TOTAL VOLUME: 1,$44 MSCF
Interm ittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 09:16 TO: 10:19 1 Hrs. 3 Mins. ^ ® ^ ^ 1,13$ MSCF
2. FROM: 17:32 TO: 17:49 O Hrs. 17 Mins. ^ ® ^ ^ 142 MSCF
3. FROM: 19:45 TO: 20:14 O Hrs. 29 Mins. ^ ® ^ ^ 564 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN: OTHER:
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature incre
6°F.
2. While bringing production rates up following P-Pad shut down due to bad card, LPS compressors exceeded max
gas capacity and discharged to flare.
3. The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor floodinglTEG carryove
gas pressure dropped below low limit setting.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 5 wells equaling 134 mmscfd. Wells were shut-in or choked back star
09:15 hours.
2. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
3. Had to wait for ARco to etablish higher back pressure at CCP. Both EOA 8- WOA have facilities down due to high
ambient temp. Flare assist gas added to prevent black smoke.
4.
5.
Rev 6/22/97
• ~
REPORT NO: 9$-4377
BPX FLARE REPORT .
' PRUDHOE BAY
FACILITY: GC-1 DATE: 30 JUn 98 TOTAL VOLUME: 2,867 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 11;24 To: 14:16 2 Hrs. 52 Mins. ^ ® ^ ^ 2,$67 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: RUPTURE DISK:_ CONTROLLED BLOWDOWN: OTHER:
First Determination of Cause:
1. While bringing production rates up following GC-1 annex s/d a high gas transit line pressure occured.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 7 wells equaling 160 mmscfd. ARCO reduced production rates and sh
wells equaling 600 mmscfd. Wells were shut-in or choked back starting at 08:00 hours.
2.
3.
4.
5.
Rev 6/22/97
i .... -
' Form 10-422 (Revised 4/95)
Faality
GATHERING CENTER 1
Disposition
1. Sold
• 2. Reinjected
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC
Pilot and Purge
Used for lease operations
Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
I1. Transferred to: CCP
ALASKA OII, AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
EXPLORATION ALASKA
0
0
8,954
28,152
33,477
998,368
0
1,068,951
0
0
0
~Month/Year of Dispositon
OPERATING AREA-PBU May-98
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Flarin Autlioriza6on > I hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
67,466,333
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~y /J~~,~_ 6 (a g ~ Title: SUPERVISOR
Form 10.422 (/R~ev~ised 4/95)
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
•
6/2/98
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
MAY, 1998
Unplanned Events less than or equal to 1 hour
~~~~ I I I I ~
I I I I I I 1 1 1 1 1 1 1 1 I PI*
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 'ACTION TAKEN TO ELIMINATE CAUSE
5/2/98 1207-1235 382 Not required for unplanned events which Not required for unplanned events whip
5/2/98 1509-1609 1,000 are less than or equal to 1 hour are less than or equal to 1 hour
5/4/98 2022-2035 90
5/5/98 1600-1642 496
5/5/98 1908-1953 531
5/8/98 2011-2044 229
5/9/98 1633-1657 500
5/10/98 0326-0349 144
5/10/98 1201-1215 90
5/10/98 1940-1952 83
5/11/98 0310-0322 75
5/13/98 0005-0025 56
5/22/98 0658-0732 4,415
5/25/98 1309-1324 83
5/26/98 0637-0648 76
5/26/98 2309-2359 704
TOTAL 8,954
Unplanned Events greater than 1 hour ~
DATE -TIItAE- vOLUME DESCRIPTION OF INCIDENT & CAUSE. ACTION TAKEN TO ELIMINATE CAUSE
5/10/98 0743-0846 350 See attachments See attachments
5/11/98 0959-1105 550 See attachments See attachments
5/15/98 0706-0824 14,896 See attachments See attachments
5/25/98 1402-1514 1,800 See attachments See attachments
5/25/98 1527-1643 10,556 See attachments See attachments
TOTAL 28,152
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE "TIME VOLUME DESCRIPTION OF INCIDENT'& CAUSE' ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
~'OTAI.
Unplanned Events < 1 Hour 8,954
Unplanned Events > 1 Hour 28,152
Page 1
•
b/z/98
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 33 477
TOTAL FLARED VOLUME 70,583
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
MAY, 1998
Page 2
I~~
•
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 9$-42$$
FACILITY: CiC-1 DATE: O2 May 9$ TOTAL VOLUME: 1,3$2 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 12:07 TO: 12:35 0 Hrs. 28 Mins. ® ^ ^ ^ 382 MSCF
2. FROM: 15:09 TO: 16:09 1 Hrs. 0 Mins. ^ ® ^ ^ 1,000 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
7°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4 wells equaling 103 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 70 mmscfd. Wells were shut-in or choked back starting at 11:12 hours.
2. BPX reduced production rates and shut-in 1 wells equaling 60 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 15:10 hours.
3.
4.
5.
Rev 6/22/97
~J
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 98-4303
FACILITY: GC-1 DATE: 10 May 98 TOTAL VOLUME: 667 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 03:26 TO: 03:49 0 Hrs. 23 Mins. ^ ® ^ ^ 144 MSCF
2. FROM: 07:43 TO: 08:46 1 Hrs. 3 Mins. ^ ® ^ ^ 350 MSCF
3. FROM: 12:01 TO: 12:15 0 Hrs. 14 Mins• ^ ® ^ ^ 90 MSCF
4. FROM: 19:40 TO: 19:52 0 Hrs. 12 Mins. ^ ® ^ ^ $$ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following GC2 K7000 LPS compressor start-up, the gas transit line pressured up.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
XX°F.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
XX°F.
4. High ambient temperature swings while Arco was bring up Drill Sitr #2 resulted in flaring and required cuts in production.
Ambient temperature increased by 3°F.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 8 wells equaling 130 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 85 mmscfd. Wells were shut-in or choked back starting at 0323 hours.
2. BPX reduced production rates and shut-in 1 well equaling 30 mmscfd. Wells were shut-in or choked back starting at
08:00 hours.
3. BPX reduced production rates equaling 15 mmscfd. Wells were choked back starting at 12:07 hours.
4. BPX reduced production rates and shut-in 3 wells equaling 80 mmscfd. ARCO reduced production rates and shut-in 10
wells equaling 238 mmscfd. Wells were shut-in or choked back starting at 19:41 hours.
5.
ae~ sna~s~
• ~ REPORT NO: 98-43Q-4
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-1 DATE: 11 May 98 TOTAL VOLUME: 625 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 03:10 TO: 03:22 0 Hrs. 12 Mins. ^ ® ^ ^ 75 MSCF
2. FROM: 09:59 TO: 11:05 1 Hrs. 6 Mins. ^ ® ^ ^ 550 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
2. High ambient temperature swings caused CGF compressors to bog down which resulted in flaring and required cuts in
production. Ambient temperature increased by 4°F. (27-31 °F)
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates equaling 35 mmscfd. Wells were shut-in or choked back starting at 03:;11 hours.
2. BPX reduced production rates and shut-in 4 wells equaling 100 mmscfd. ARCO reduced production rates and shut-in
2wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 10:15 hours.
3.
4.
5.
I Rev 6/22/97
• ~ REPORT NO: Q$-43~ 2
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-1 DATE: 15 May 98 TOTAL VOLUME: 14,896 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 07:06 TO: 08:24 1 Hrs. 18 Mins. ^ ® ^ ^ 14,$96 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN: _ OTHER:_
First Determination of Cause:
1. Asset Area TEG regeneration system shut down because of control/instrumentation failu re associated with lost
circulation. TEG pump shut down.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 60 wells equaling 500 mmscfd. Wells were shut-in or choked back starting at
07:30hours.
2.
3.
4.
5.
i Rev 6/22/97
•
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 9$-432.5
FACILITY: GC-1 DATE: 25 May 98 TOTAL VOLUME: 12,439 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 13:09 TO: 13:24 0 Hrs. 15 Mins. ^ ® ^ ^ $3 MSCF
2. FROM: 14:02 TO: 15:14 1 Hrs. 12 Mins. ^ ® ^ ^ 1,800 MSCF
3. FROM: 15:27 TO: 16:43 1 Hrs. 16 Mins. ^ ® ^ ^ 10,556 MsCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
2. K-105 & K-106 was s/d to repair corroded valve
3. High gas transit line pressure caused by CGF compressor problems due to control techs. working on control panel.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates equaling 69 mmscfd. Wells were choked back starting at 13:10 hours.
2. Equipment was restarted at 15:14 hours.
3. BPX reduced production rates and shut-in 32 wells equaling 528 mmscfd. ARCO reduced production rates and shut-in
19 wells equaling 450 mmscfd. Wells were shut-in or choked back starting at 15:35 hours.
4.
5.
Rev 6/22/97
1
ALASKA OII, AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Month/Year of Disposition
•
GATHERING CENTER 1 ABP EXPLORATION ALASKA ~WFSTERN OPERATING AREA-PBU Apr-98 ~
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 9,314
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 16,916
5. Pilot and Purge 33,998
6. Used for lease operations 960,399
7.Other 0
TOTAL items 1 - 7 1,020,627
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 61,413,724
Remarks:
I hereby certify that the fo oing is true and correct to the best of my knowledge.
Signature: ~,; ,~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
OfficialT7s~ Onl` --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF.
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
I 5/4/98 GAS FLARING INCIDENT REPORT
APRIL, 1998
Unplanned Events less than or equal to 1 hour ~
I I I ~ I I I I I I I I I I I I I I I
DATE ~A
TIME ~~
VOLUME DESCRIPTION'OF INCIDENT.&ICAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/6/98 1032-1058 3,611 Not required for unplanned events which Not required for unplanned events whit
4/7/98 1814-1900 1,597 are less than or equal to 1 hour are less than or equal to 1 hour
4/8/98 2101-2123 153
4/9/98 0752-0834 375
4/12/98 1308-1355 620
4/14/98 1049-1116 190
4/14/98 2214-2242 194
•
4/16/98 0949-0957 56
4/16/98 1305-1328 240
4/17/98 2010-2027 118
4/18/98 1713-1724 76
4/21 /98 0425-0518 200
4/24/98 0407-0412 69
4/24/98 0546-0552 83
4/24/98 0637-0644 97
4/24/98 1752-1808 140
4/26/98 1326-1353 563
4/26/98 1956-2025 132
4/27/98 0326-0417 500
4/28/98 2054-2138 300
TOTAL 9,314
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION'-0F INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE. C~
4/20/98 1737-2012 16,146 See attachments See attachments
4/27/98 1555-1837 770 See attachments See attachments
TOTAL 16,916
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~
....I I. 1~1~~.. I I I I I I I I L1~~1~ ~ ~
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTIONDF INCIDENT'.& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
.....':TOTAL
Unplanned Events < 1 Hour 9,314
Page 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
5/4/98 GAS FLARING INCIDENT REPORT Page 2
APRIL, 1998
Unplanned Events > 1 Hour 16,916
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 33,998
TOTAL FLARED VOLUME 60,228
• • REPORT NO: 98_4,27
BPX FLARE REPORT ,
' PRUDHOE BAY
FACILITY: Ci. C-1 DATE: 2O Apr 98 TOTAL VOLUME: 16,140 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 17:37 TO: 20:12 2 Hrs. 35 Mins. ^ ® ^ ^ 16,146 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: _ RUPTURE DISK:_ CONTROLLED BLOWDOWN: X OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor problems due to Tandem 1886 S/D. EOC requested BP flare
175mmscfd. rate for this compressor trouble.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Equipment was restarted at 19:46 hours.
2.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 9S_4LS~
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-1 DATE: 27 Apr 98 TOTAL VOLUME: 1 ,270 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 03:26 TO: 04:17 0 Hrs. 51 Mins. ® ^ ^ ^ 500 MSCF
2. FROM: 15:55 TO: 18:37 2 Hrs. 42 Mins. ® ^ ^ ^ 77p MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN: OTHER:_
First Determination of Cause:
1. While bringing production rates up following well testing, LPS compressors exceeded maximum gas capacity and
discharged to flare.
2. Sk-18 LP compressor shut down because of a problem associated wi th low rates. Assist gas was added to prevent
black smoke.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates equaling 30 mmscfd. Wells were choked back starting at 03:45 hours.
2. Equipment was restarted at 18:34.
3.
4.
5.
Rev 6/22/97
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION ~ PR ~ i' ~q
Form 10-422
Operator
GATHERING CENTER 1 BP EXPLORATION ALASKA
.r
Month/Year of Dispositic~a~~r„~~k~~~~g~~~ ~{,°i€9€~l~';?~~';
OPERATING AREA-PBU Mar-98 ~y(;~ ;
PRUDHOE I 640150 I 100
•
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0
3. Flared or vented less than 1 hour 12,556
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 31,580
5. Pilot and Purge 37,756
6. Used for lease operations 957,099
7.Other 0
TOTAL items 1 - 7 1,038,991
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 62,727,587
Remarks:
I hereby certify that the f regoing is true and correct to the best of my knowledge.
Signature: i:.~l J !7C G~'~ Title: SUPERVISOR
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
t'Orm tU-4'll (K0V1SeU 4/YJ)
4/2/98
•
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
MARCH, 1998
Unplanned Events less than or equal to 1 hour ~
DATE TIME VOLUME: ; ' DESCRIPTION;OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/1/98 1411-1415 208 Not required for unplanned events which Not required for unplanned events whip
3/1/98 1840-1926 319 are less than or equal to 1 hour are less than or equal to 1 hour
3/4/98 0822-0917 2,865
3/8/98 1606-1612 33
3/11/98 0737-0816 125
3/16/98 1423-1519 350
3/17/98 0804-0825 3,865
3/19/98 1213-1243 4,617
3/27/98 1708-1713 174
TOTAL 12,556
Unplanned Events greater than 1 hour
~
~
~
~
~ ~
DATE TIME R1PTfO
N
OF
VNCIDENT& CAUSE
VOLUME DES
C ACTION TAKEN TO ELIMINATE CAUSE
3/10/98 0012-0115 963 See attachments See attachments
3/10/98 0736-0842 7,361 See attachments See attachments
3/14/98 0235-1200 7,850 See attachments See attachments
3/19/98 0012-0320 15,406 See attachments See attachments
TOTAL 31,580
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTI01>t OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~
DATE `.TIME VOLUME ``DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'ELIMINATE CAUSE
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 12,556
Unplanned Events> 1 Hour 31,580
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 37,756
TOTAL FLARED VOLUME 81,892
~ Page 1
~~
m
~~y~
c0
• ~ REPORT NO: J$-4213
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-1 DATE: 1 O Mar 98
TIME OF FLARING:
1. FROM: 00:12 To: 01:15
2. FROM: 07:36 To: 08:42
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 3 Mins.
1 Hrs. 6 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
® ^
^ ^
^ ^
^ ^
8,324 MSCF
VOLUME
963 MSCF
7,361 MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARElRELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN: X OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor 1802 being taken out of service for maint.
2. LPS compressor K-7000 shut down because of control/instrumentation failure associated with a faulty vibration alarm.
(611. valve opened when flare header pressure reached 50 psig).
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 5 wells equaling 144 mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 120 mmscfd. Wells were shut-in or choked back starting at 23:30 hours.
2. BPX reduced production rates and shut-in 19 wells equaling 260 mmscfd. Wells were shut-in or choked back starting at
07:47 hours.
3.
4.
5.
Rev 6/22/97
. REPORT NO: 9$-4219
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC.-1 DATE: 14 Mar 98 TOTAL VOLUME: 7~$rjO MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 02:35 TO: 12:00 9 Hrs. 25 Mins. ^ ® ^ ^ 7,850 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: _ RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. LPS compressor K-7000 shutdown for mainte nance. Copus starter used to spin rotor du ring maintenance.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1.
2.
3.
4.
5.
Rev 6/22/97
• REPORT NO: 9$-4225 ?
b
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-1 DATE: 19 Mar 98 TOTAL VOLUME: 20,023 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 00:12 To: 03:20 3 Hrs. $Mins. ^ ® ^ ^ 15,406 MSCF
2. FROM: 12:13 TO: 12:43 0 Hrs. 30 Mins. ^ ® ^ ^ 4,617 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following a total GC S/D, LPS compressors would not load resulting in high S/C
pressure and discharging to flare.
2. Test conducted determine anomalies related to unusual high pressures in V118 flare relief scrubber. The high
pressures occurred during the GC1 shutdown incident on 3/17/98.
3.
4.
5.
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted find the cause of the problem. A valve was
found stuck open and was subsequently closed.
2. Flaring was stopped when the 30 minute test was terminated.
3.
4.
5.
Rev 6/22/97
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
u
Form 10-422
Facility Operator Field(s) 'Month/Year of Disposition
GATTIERING CENTER 1 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Feb-98
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 10,337
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 38,986
5. Pilot and Purge 34,436
6. Used for lease operations 943,254
7.Other 0
TOTAL items 1 - 7 1,027,013
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 59,949,617
Remarks:
I hereby certify~tha~ft the f going is true and correct to the best of my knowledge.
Signature: ~" ~j/ 4~ ~`°~/g~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
'OfficiaCUse Onl --Flarin Authatzadon a; l hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
3/3/98
•
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
FEBRUARY, 1998
Unplanned Events less than or equal to 1 hour ~
DATE 'TIME VOLUME DESCRIPTION OF INCIDENT &' CAUSE ACTION TAKEN TO ELIMINATE CAUSE'
2/11/98 2204-2300 537 Not required for unplanned events which Not required for unplanned events whit
2/26/98 1305-1313 194 are less than or equal to 1 hour are less than or equal to 1 hour
2/27/98 0011-0014 26
2/27/98 0306-0318 31
2/28/98 0357-0452 9,549
TOTAL 10,337
Unplanned Events greater than 1 hour ~
DATE ' 'TIME VOLUME DESCR'1PTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/7/98 1700-1802 3,229 See attachments See attachments
2/20/98 0524-0834 35,757 See attachments See attachments
TOTAL 38,986
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE ,'.TIME VOLUME DESCRIPTION OF,,INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT &' CAUSE ACTION TAKEN TO ELIMINATE CAUSE.
•
TOTAL 0
_TOTAL
Unplanned Events < 1 Hour 10,337
Unplanned Events > 1 Hour 38,986
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 34,436
TOTAL FLARED VOLUME 83,759
Page 1
0
'E
~
rn
~ ~ ~
i
LLJ
~ ~
O ~
V ,..,.. _, ~
Nw
W ~ C° Q
+~ ~ o
a
• • REPORT NO: 9$-4181
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: ('~(;-1 DATE: 07 Feb 98 TOTAL VOLUME: 3,229 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 17:00 TO: 18:02 1 Hrs. 2 Mins. ^ ® ^ ^ 3,229 MSCF
2. FROM: TO; Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor booster 1801 shutdown
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 1 wells equaling 50 mmscfd. ARCO reduced production rates and shut-in 10
wells equaling 190 mmscfd. Wells were shut-in or choked back starting at 17:02 hours.
2.
3.
4.
5.
Rev 6/22/97
RECFIVEp
MAR 7 8 1998
Alaska 0i1 & Gail ,
r
• • REPORT NO: 98-4187
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-1 DATE: 2O Feb 98
TIME OF FLARING:
i . FROM: 05:24 To: 08:34
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
3 Hrs. 10 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
35,757 MscF
VOLUME
35,757 MscF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. GHX-2 Annex TEG regeneration system shut down due to a problem associated loss of recirculation pumps .
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates by choking back to minmum 35 wells equaling 1129 mmscfd. Wells were choked back
starting at 05:30 hours.
2.
3.
4.
5.
I Rev 6/22/97
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
u
i
Form 10.422
(Facility GA'TI-IERING CENTER 1 ~BPErXPLORATION ALASKA IFWESTERN OPERATING AREA-PBUMonth/Year of Dist ns9S n
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 7,766
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 38,557
6. Used for lease operations 1,075,711
7.Other 0
TOTAL items 1 - 7 1,122,034
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 68,998,365
Remarks:
I hereby certify that the fore ing is true and correct to the best of my knowledge.
Signature: ~~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
official Use Only--Flavin Authorization >'l fir.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
A w
2/3/98
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
JANUARY, 1998
Unplanned Events less than or equal to 1 hour ~
DATE TIME VOLUME DESCRIPTION,OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/2/98 0408-0413 174 Not required for unplanned events which Not required for unplanned events whic
1/2/98 1326-1332 208 are less than or equal to 1 hour are less than or equal to 1 hour
1/7/98 0258-0315 142
1 /13/98 2042-2047 62
1/16/98 0710-0740 6,250
1 /16/98 2245-2305 111
1 /28/98 1720-1727 194
1 /30/98 0122-0131 625
TOTAL 7,766
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME ' DESCRIPTION OF INCIDENT &' CAUSE ' ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Unplanned Events greater than 1 hour ~
DAl'E TIME '' VOLUME ' DESCRIPTION<OF INCIDENT & CAUSE. ACTION TAKEN TO ELIMINATE CAUSE'
See attachments See attachments
• Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf _
DATE TIME VO~L M 'DESCRIPTION OF INCIDENT & CAUSE
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour & not
exceeding 5,000 MCF
Planned Events > 1 hour and
exceeding 5,000 MCF
Pilot Purge
TOTAL FLARED VOLUME
TOTAL
7, 766
0
0
0
38,557
46, 323
ACTION !`
Page 1