BPXA -GC 2
.. ,.°p,".1f+4^YS:A1 ~i&:!akp/~%~~~.~~.~/~~~/.®Lei,~YaI~A'/,~~~i.~"i~~~L~/f~.tl/~/.~.~°i~/s~i~/®i,~L~/,@~~/~"~a9i.N;i°G~L~~.NJ,~Y~';~i.R~iiPGILiVi,44~~Ld"/aY~BL®Yfd/~/9~/~ipZ~'id"iAYJI/~~~/.~'/~b®//!~®/BLAY.~G~LdyL~9/~/~~SY/~?~Ys~
=.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
GATHERING CENTER 2 Operator
BP EXPLORATION ALASKA Field(s)
WESTERN OPERATING AREA-PBU Month/Year of Disposition
Dec-98
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 2,460,117 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 14,766
4. Flared or vented greater than 1 hour €°~, ~_° ~'~ j ~§ r, ~:. ` "''~
(Supplemental report required--See 20 AAC 25 ~ ~ .~ 1 ~` ~ ~ ~°` 7,653
5. Pilot and Purge n 23,199
6. Used for lease operations I u. ~ ~ ~ ~ ~ill'[1p;~ISSE"~st
~. 623,786
OfYicial Use Only--Flaring ,Authoii~ation > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
11. Transferred to: CCP 24,497,927
7. Other 0
TOTAL items 1 - 7 3,129,521
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
Remarks:
r
I hereby certify that the fo~egoing is tme and correct to the best of my knowledge.
Signature: f ~ ~ ~ Title: SUPERVISOR
9812 FORM 10-422.x1s/FORM 10-422
•
L BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GG2
GAS FLARING INCIDENT REPORT
DECEMBER, 1998
Un lanned Events less than ore ual to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT &=CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/6/98 1449-1519 167 Not required for unplanned events which Not required for unplanned events whit
12/8/98 0937-1036 5,972 are less than or equal to 1 hour are less than or equal to 1 hour
12/8/98 1201-1218 177
12/8/98 1941-2008 413
12/9/98 0125-0150 313
12/18/98 1350-1418 2,917
12/18/98 1451-1542 3,896
12/21 /98 2037-2101 52
12/23/95 2225-2300 117
12/24/98 2256-2305 31
12/27/98 0433-0443 69
12/27/98 0507-0526 76
12/29/98 0337-0346 31
12/30/98 0001-0026 139
12/30/98 0215-0221 21
12/30/98 2148-2243 375
TOTAL 14,766
Un lanned Events reater than 1 hour
=-.DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE .ACTION TAKEN TO ELIMINATE!'CAUSE
12/11/98 1030-1140 7,292 See Attachments See Attachments
12/18/98 2126-2344 361 See Attachments See Attachments
TOTAL 7,653
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~
:DATE TIME VOLUME- DESCRIPTION OF INCIDENT'& CAUSE ACTION TAKEN TO ELIMINATE'CAUSE
TOTAL 0
Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf
DATE TIME VOLUME' DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 14,766
Unplanned Events> 1 Hour 7,653
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 23.199
TOTAL FLARED VOLUME 45,618
Page 1
• REPORT NO: 98-4644
..
BPX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 11 Dec 98 TOTAL VOLUME: 7292 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: ~ 0:30 TO: 11:40 1 Hrs. 1 O Mins. ^ ® ^ ^ 7,292 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. LPS compressor K-7000 shut down because of control/instrumentation failu re associated with a modification to control
system ATP conversion.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Equipment was restarted at 11:10 hours, slowly ramped up turbine /compressor.
2.
3.
4.
5.
Rev 6/22/97
. • REPORT NO: 98-4655
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 18 Dec 98
TOTAL VOLUME: 7,174 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 13:50 TO: 14:18 0 Hrs. 28 Mins. ^ ® ^ ^ 2,917 MSCF
2. FROM: 14:51 To: 15:42 0 Hrs. 51 Mins. ^ ® ^ ^ 3,896 MSCF
3. FROM: 21 :26 TO: 23:44 2 Hrs. 18 Mins. ® ^ ^ ^ 361 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: _ OTHER: _
First Determination of Cause:
1. GLT compressor K-3200 shut down because of control/instrumentation failure associated with 13:52hrs.
2. GLT compressor K-3200 shut down because of control/instrumentation failure associated with 14:38hrs.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
8°F.
4.
5.
Action Taken to Stop Flaring:
1. No response taken as this was deemed to be of short duration.
2. BPX reduced production rates and shut-in 24 wells equaling 500 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 100mmscfd. Wells were shut-in or choked back starting at 15:30 hours.
3. BPX reduced production rates and shut-in 9 wells equaling 100 mmscfd. ARCO reduced production rates and shut-in 6
wells equaling 160mmscfd. Wells were shut-in or choked back starting at 2126 hours.
4.
5.
Rev 6/22/97
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
Facility Operator Field(s) IMonth/Year of Disposition t
GATHERING CENTER 2 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Nov-98
Disposition
1. Sold 0
2. Reinjected 1,228,261
3. Flared or vented less than 1 hour 4,166
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 639
S. Pilot and Purge 21,302
6. Used for lease operations 596,950
7. Other 0
TOTAL items 1 - 7 1,851,318
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 23,293,905
Remarks:
I hereby certify~that the fo going is true and correct
Signature: ~--~~ ~~,~„~-_- L,~/~ to the best of my knowledge.
~,~~~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Ofi"icial L?s~ Un1Y-1~lariug Authorization > 1 tlr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
9811 FORM 16422.x1s/FORM 16422
BP EXPLORATION (ALASKA) INC.
~" PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
NOVEMBER, 1998
Unplanned Events less than or
DATE TIME
11 /1 /98 1005-1027
11 /1 /98 1451-1529
11 /1 /98 1852-1924
11 /3/98 2110-2136
11/7/98 0433-0524
11/7/98 1142-1212
11 /9/98 2346-2359
11 /12/98 0448-0458
11 /13/98 1442-1500
11 /14/98 0637-0733
. 11/15/98 0954-1043
11 /16/98 .1043-1143
11/19/98 2014-2105
11 /23/98 1655-1706
11/29/98 1720-1746 _
TOTAL
to 1 hour ~
JM RIPTION OF INCIDENT & CAUSE 'ACTION TAKEN TO ELIMINATE CAUSE
150 Not required for unplanned events which Not required for unplanned events whit
271 are less than or equal to 1 hour are less than or equal to 1 hour
333
271
260
125
115
83
125
361
334
388
1,063
176
iii
~, ~ ~~
Un tanned Events reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/9/98 1228-2030 247 See Attachments See Attachments
11/23/98 0245-0440 392 See Attachments See Attachments
TOTAL 639
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~
.DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
• Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ' ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
iOTAI "
Unplanned Events < 1 Hour 4,166
Unplanned Events > 1 Hour 639
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 21 ~~
TOTAL FLARED VOLUME 26,107
Page 1
i •
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: O9 NOV 98
TIME OF FLARING:
1. FROM: 12:2$ To: 20:30
2. FROM: 23:46 To: 23:59
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
$ Hrs. 2 Mins.
0 Hrs. 13 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
REPORT NO:
TOTAL VOLUME:
Intermi ttent Black
Yes No Smoke? Planned?
^ ® ^ ^
® ^ ^ ^
^ ^ ^ ^
^ ^ ^ ^
^ ^ ^ ^
98-4589
362 MscF
VOLUME
247 MSCF
115 MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN: X OTHER:_
First Determination of Cause:
1. W-pad developed a leak which required emergency depressuring for the safety of personnel. W-pad glt was
depressured to GC-2 for safety reasons.
2. While bringing production rates up following W-pad depressuring, unloading wells caused high transit line pressure and
discharged to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. Depressuring was allowed for the safety of personnel and equipment.
2. BPX reduced production rates equaling 60 mmscfd. Wells were choked back starting at 23:50 hours.
3.
4.
5.
Rev 6/22/97
. REPORT NO: 98-4600
BPX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 16 Nov 98 TOTAL VOLUME: $$$ MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:43 TO: 11:43 1 Hrs. 0 Mins. ® ^ ^ ^ 388 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by too much gas for current ambient air temperature (7*F).
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Arco reduced production rates and shut-in 2 wells equaling 30 mmscfd. Wells were shut-in or choked back starting at
08:57 hours.
2,
3.
4.
5.
Rev 6/22/97
REPORT NO: 98-4610 ~
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 23 Nov 98
TIME OF FLARING:
1. FROM: 02:45 To: 04:40
2. FROM: 16:55 To: 17:06
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 55 Mins.
0 Hrs. 11 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
568 MSCF
VOLUME
392 MSCF
176 MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
2. High gas transit line pressure caused by gas changes
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4 wells equaling 60 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 90 mmscfd. Wells were shut-in or choked back starting at 03:00 hours.
2. BPX reduced production rates and shut-in 2 wells equaling 25 mmscfd. Wells were shut-in or choked back starting at
17:55 hours.
3.
4.
5.
Rev 6/22/97
ALASKA OII. AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I1t ulSEti
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 2 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Oct-98
•
Disposition
1. Sold 0
2. Reinjected 2,433,236
3. Flared or vented less than 1 hour 7,917
4. Flared or vented greater than 1 hour 2,745
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 27,485
6. Used for lease operations 619,372
7.Other 0
TOTAL items 1 - 7 3,090,755
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 22,380,358
Remarks:
I hereby certify that the fo/reg~ging is tnre and correct to the best of my knowledge.
Signature: ' .~/ C~~_~_ ~ L ~ ~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Flarin Authorization> 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
9810 FORM 10-422.~ds/FORM 10-422
P
Unplanned Events less than or e~
DATE TIME
10/4/98 1240-1259
10/4/98 1542-1601
10/4/98 1703-1711
10/4/98 2232-2302
10/8/98 0847-0928
10/8/98 2213-2228
10/9/98 0926-0951
10/9/98 1851-1906
10/10/98 0234-0245
10/10/98 1149-1244
10/11 /98 1734-1754
10/11/98 2324-2342
10/12/98 1526-1550
10/13/98 0324-0416
10/13/98 0843-0859
10/13/98 2125-2152
10/15/98 1539-1558
10/15/98 1918-1930
10/24/98 0007-0052
10/24/98 0207-0230
10/24/98 0658-0717
• 10/24/98 1608-1636
10/27/98 0357-0443
10/28/98 2057-2135 _
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDNOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
OCTOBER, 1998
to 1 hour
JME DESCRIPTION OF INCIDENT:& CAUSE' ' ACTION TAKEN TO ELIMINATE CAUSE
224 Not required for unplanned events which Not required for unplanned events whip
264 are less than or equal to 1 hour are less than or equal to 1 hour
122
130
271
84
1,302
90
100
486
194
938
260
250
444
417
233
69
292
319
101
292
639
~4~
i,ai i
Unplanned Events greater than 1 hour ~
~~~~~
DATE
TIME
', VOLUME 'DESCRIPTION OF INCIDENT & CAUSE .
ACTION TAKEN TO ELIMINATE CAUSE
10/3/98 1819-1946 700 See Attachments See Attachments
10/15/98 0100-0309 492 See Attachments See Attachments
10/23/98 1141-1257 1,378 See Attachments See Attachments
10/28/98 1401-1537 175 See Attachments See Attachments
TOTAL 2,745
Page 1
BP EXPLORATION (ALASKA) INC.
.- ~ r PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT Page 2
OCTOBER, 1998
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
.DATE TIME VOLUME DESCRIPTION'OF INCIDENT & CAUSE !ACTION TAKEN TO ELIMINATE'CAUSE
T
TO AL
0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE'. TIME VOLUME DESCRIPTION OF INCIDENT &''CAUSE' ACTION TAKEN TO'ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TQTAL
Unplanned Events < 1 Hour 7,917
Unplanned Events> 1 Hour 2,745
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 27,485
TOTAL FLARED VOLUME 38,147
• REPORT NO: J$-4526
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 03 Oct 98 TOTAL VOLUME: 700 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 18:19 TO: 19:46 1 Hrs. 27 Mins. ® ^ ^ ^ 700 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE D ISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. LPS compressor K-7000 shut down because of control/instr umentation fail ure associated with a fault with 24 Volt
breaker tripping.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 26 wells equaling 281 mmscfd. Wells were shut-in or choked back starting at
18:20 hours.
2.
3.
4.
5.
i Rev 6/22/97
• • REPORT NO: 9$-4550
i + B PX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 15 Oct 98 TOTAL VOLUME: 794. MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 01:00 TO: 03:09 2 Hrs. 9 Mins. ® ^ ^ ^ 492 MSCF
2. FROM: 15:39 TO: 15:58 O Hrs, 19 Mins. ® ^ ^ ^ 233 MSCF
3. FROM: 19:18 TO: 19:30 0 Hrs. 12 Mins. ® ^ ^ ^ 69 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
6°F.
2. High gas transit line pressure caused by FS#1 compressor #1804 startup.
3. High gas transit line pressure caused by CGF low temperature separator problems (loss #1 refrigeration unit).
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 1 wells equaling 40 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 188 mmscfd. Wells were shut-in or choked back starting at 01:15 hours.
2. BPX reduced production rates and shut-in 6 wells equaling 107 mmscfd. ARCO reduced production rates and shut-in 9
wells equaling 250 mmscfd. Wells were shut-in or choked back starting at 15:27 hours.
3. Equipment was restarted at 19:45 hours.
4.
5.
Rev 6/22/97
• REPORT NO: 9$-4554
BPX FLARE REPORT
PRUDHOE BAY t
FACILITY: GC-2 DATE: 23 OCt 98 TOTAL VOLUME: 1 X578 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 11:41 TO: 12:57 1 Hrs. 16 Mins. ® ^ ^ ^ 1,378 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in prod uction. Ambient temperature increased by
20°F. Also K3200 & K3300 GLT compressors tripped to idle at 1239 hrs.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 14 wells equaling 300 mmscfd. ARCO reduced production rates and shut-in
10 wells equaling 240 mmscfd. Wells were shut-in or choked back starting at 1158 hours. Also K3200 & K3300 were
reloaded at 1253 hrs.
2.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 98-4567
i
, B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 2$ OCt 9$ TOTAL VOLUME: 571 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 14:01 TO: 15:37 1 Hrs. 36 Mins. ® ^ ^ ^ 175 MSCF
2, FROM: 20:57 To: 21:35 O Hrs. 38 Mins. ® ^ ^ ^ 396 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
7°F.
2. High gas transit line pressure caused by CCP compressor problems due to low stage 1804 anti-surge valve problem.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 1 well equaling 20 mmscfd. ARCO reduced production rates by shutting in
40 mmscfd. Ambient temp started to drop and booster compressors picked up load.
2. BPX reduced production rates and shut-in 8 wells equaling 120 mmscfd. ARCO reduced production rates and shut-in 6
wells equaling 130 mmscfd. Wells were shut-in or choked back starting at 20:45hours.
3.
4.
5.
ftev 6/22/97
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
~ J
(Facility ( 9'
on
Month/Year of Di e
GATHERING CENTER 2 BP EXPLOKATION ALASKA 8
WESTERN OPERATING AREA-PBU
p
Disposition *Indicate contribution of each pool to total.
1. Sold ~ ~„ ~~~
~ 0 Pool Name Code Percent
~
'f ~ ' .~
.
„a`'
2. Reinjected 2,870,712 PRUDHOE 640150 100
r~
3. Flared or vented less than 1 hour "-`~~~= LIB ~
u~ 2,812
.
4t;
r~.rv .' a
~l
4. Flared or vented greater than 1 hour 9,476
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 24,587
6. Used for lease operations 527,146
Official Use Only--Flaring Authorization > I hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
11. Transferred to: CCP 20,295,473
7. Other 0
TOTAL items 1 - 7 3,434,733
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
Remarks:
I hereby certify that the for oing is true and correct to the best of my knowledge.
Si nature: _ ~ Title: SUPERVISOR
9809 FORM 10-422.x1s/FORM 10-422
-
' BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
SEPTEMBER, 1998
Un tanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION bF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/3/98 0343-0411 52 Not required for unplanned events which Not required for unplanned events whit
9/5/98 0455-0510 38 are less than or equal to 1 hour are less than or equal to 1 hour
9/6/98 0133-0219 162
9/7/98 1435-1516 73
9/13/98 1025-1051 438
9/14/98 0926-1020 563
9/17/98 1932-2022 66
9/27/98 1413-1450 257
9/28/98 0120-0136 1,163
TOTAL 2,812
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE
9/1/98 0610-0941 2,500 See Attachments See Attachments
9/2/98 1145-1259 486 See Attachments See Attachments
9/3/98 0009-0147 208 See Attachments See Attachments
9/5/98 0531-0638 243 See Attachments See Attachments
9/5/98 1522-1649 299 See Attachments See Attachments
9/6/98 1441-1616 333 See Attachments See Attachments
9/7/98 1535-1654 139 See Attachments See Attachments
9/8/98 0239-0358 38 See Attachments See Attachments
9/9/98 0354-0523 87 See Attachments See Attachments
9/10/98 1415-1517 469 See Attachments See Attachments
9/17/98 1044-1214 211 See Attachments See Attachments
• 9/19/98
9/25/98 0958-1116
0444-0624 1,039 See Attachments
3,320 See Attachments See Attachments
See Attachments
9/26/98 1012-1329 104 See Attachments See Attachments
TOTAL 9,476
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~
--
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION',TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf
DATE ' TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
Page 1
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 2,812
Unplanned Events > 1 Hour 9,476
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 24 7
TOTAL FLARED VOLUME 36,875
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GG2
GAS FLARING INCIDENT REPORT
SEPTEMBER, 1998
Page 2
C~
BPX FLARE REPORT
PRUDHOE BAY
REPORT NO: J$-4484
FACILITY: GC-2 DATE: O1 S@p 9H TOTAL VOLUME: 2500 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 06:1 O TO: 09:41 3 Hrs. 31 Mins. ® ^ ^ ^ 2,500 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN: OTHER:_
First Determination of Cause:
1. Ambient temperature increased 3 °F. causing t_PS compressors to b og down and discharge to flare and required cuts in
production. HP and LP wells had to be cut or routed to Annex to allow compressors to regain compression.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 11 wells equaling 50 mmscfd. Wells were shut-in or choked back starting at
06:30 hours.
2.
3.
4.
5.
Rev 6/22/97
•
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 9$-4485
FACILITY: GC-2 DATE: 02 Sep 98 TOTAL VOLUME: 486 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 11:45 TO: 12:59 1 Hrs. 14 Mins. ® ^ ^ ^ 486 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. GLT compressor K-3200 shut down because of control/instrumentation failure associated with pressurized S/D alarm.
GC-2 flared after K-3200 was back on due to the high transit line pressure it created until the system stabilized.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. No response taken as this was deemed to be of short duration.
2.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 98-4486
..
B
PX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: O3 Sep 9H TOTAL VOLUME: 260 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 00:09 TO: 01:47 1 Hrs. 38 Mins. ® ^ ^ ^ 208 MSCF
2. FROM: 03:43 TO: 04:11 0 Hrs. 28 Mins. ® ^ ^ ^ 52 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
2. While bringing production rates up following Trico test separator rig up, LPS compressors exceeded maximum gas
capacity and discharged to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 5 wells equaling 20 mmscfd. Wells were shut-in or choked back starting at
0015 hours.
2. BPX reduced production rates and shut-in 1 wells equaling 15 mmscfd. Wells were shut-in or choked back starting at
0345 hours.
3.
4.
5.
Rev 6/22/97
• REPORT NO: 9H-4487
„ s B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 05 Sep 98 TOTAL VOLUME: 580 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 04:55 TO: 05:10 O Hrs. 15 Mins. ® ^ ^ ^ 3$ MSCF
2. FROM: 05:31 TO: 06:38 1 Hrs. 7 Mins. ® ^ ^ ^ 243 MSCF
3. FROM: 15:22 TO: 16:49 1 Hrs. 27 Mins. ® ^ ^ ^ 299 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
3. High gas transit line pressure caused when CCP compressor #1801 L.S. S/D due to an inverter problem.
4.
5.
Action Taken to Stop Flaring:
1. Arco reduced production rates and shut-in 2 wells equaling 50 mmscfd. Wells were shut-in or choked back starting at
0510 hours.
2. Arco reduced production rates and shut-in 3 wells equaling 75 mmscfd. Wells were shut-in or choked back starting at
05:40 hours.
3. Equipment was restarted at 16:00 hours.
4.
5.
Rev 6/22/97
• ~ REPORT NO: 98-4488
i B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 06 Sep 98 TOTAL VOLUME: 495 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 01:33 TO: 02:19 O Hrs. 46 Mins. ® ^ ^ ^ 162 MSCF
2. FROM: 14:41 To: 16:16 1 Hrs. 35 Mins. ® ^ ^ ^ 333 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
1°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 15 mmscfd. Wells were shut-in or choked back starting at
0200 hours.
2. BPX reduced production rates and shut-in 4 wells equaling 18 mmscfd. Wells were shut-in or choked back starting at
17:00 hours.
3.
4.
5.
Rev 6/22/97
. REPORT NO: 9$-4489
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: Ca C-2 DATE: O7 Sep 98 TOTAL VOLUME: 212 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 14:35 TO: 15:16 0 Hrs. 41 Mins. ® ^ ^ ^ 73 MSCF
2. FROM: 15:35 TO: 16:54 1 Hrs. 19 Mins. ^ ^ ^ ^ 139 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following well work, LPS compressors exceeded maximum gas capacity and
discharged to flare.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
XX°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 1 wells equaling 5 mmscfd. Wells were shut-in or choked back starting at
1511 hours.
2. BPX reduced production rates and shut-in 1 wells equaling 12 mmscfd. Wells were shut-in or choked back starting at
15:50 hours.
3.
4.
5.
Rev 6/22/97
• REPORT NO: 98-4491
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-Z DATE: OH Sep 98 TOTAL VOLUME: $$ MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 02:39 To: 03:58 1 Hrs. ~ 9 Mins. ® ^ ^ ^ 3$ MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN: OTHER:_
First Determination of Cause: _
1. While bringing production rates up following well work, LPS compressors exceeded maxi mum gas capacity and
discharged to flare.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Returned production rate from LPS system to HP system.
2.
3.
4.
5.
Rev 6/22/97
• . REPORT NO: 9$-4493
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2
TIME OF FLARING:
DATE: ~9 Sep 98
1. FROM: 03:54 To: 05:23
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 29 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
87 MSCF
VOLUME
$7 MSCF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. While bringing production rates up following GC3 start-up, LPS compressors exceeded maximum gas capacity and
discharged to flare due to high gas transit line pressure.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 10 mmscfd. Wells were shut-in or choked back starting at
0430 hours.
2.
3.
4.
5.
Rev 6/22/97
. • REPORT NO: 9$-4494
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2
TIME OF FLARING:
DATE: 1 O Sep 98
1. FROM: 14:15 To: 15:17
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 2 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
469 MscF
VOLUME
469 MscF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 5 wells equaling 65 mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 14:25hours.
2.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 98-4508
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 17 Sep 98 TOTAL VOLUME: 277 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:44 TO: 12:14 1 Hrs. 30 Mins. ® ^ ^ ^ 211 MSCF
2. FROM: 19:32 TO: 20:22 0 Hrs. 50 Mins. ® ^ ^ ^ 66 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
6°F. Flaring was LP from slugcatcher. Only one LPS compressor was available and rates had to
be adjusted as the ambient temperature increased.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates by choking back on LP wells and shut-in 1 well equaling 22 mmscfd. Wells were shut-in
or choked back starting at 10:55hours.
2. BPX reduced production rates and shut-in 11 wells equaling 265 mmscfd. ARCO reduced production rates and shut-in 7
wells equaling 50 mmscfd. Wells were shut-in or choked back starting at 1940 hours.
3.
4.
5.
i Rev 6/22/97
• • REPORT NO: 9$-4513
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: CaC-2
TIME OF FLARING:
DATE: 19 Sep 98
1. FROM: 09:58 TO: 11:16
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 1$ Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
1,039 MSCF
VOLUME
1,039 MscF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. LPS compressor K-7000 shut down because of control/instrumentation failure associated with technicians working
in control panel.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 28 wells equaling 187 mmscfd. Wells were shut-in or choked back starting at
10:05 hours until compressor was restarted and loaded.
2. B.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 9$-4519
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: CiC-2
TIME OF FLARING:
DATE: 25 Sep 98
1. FROM: 04:44 To: 06:24
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 40 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
® ^
^ ^
^ ^
^ ^
^ ^
3,320 MscF
VOLUME
3,320 MscF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. GC-2 was in a controlled shutdown condition with oil, gas and water rates slowly falling to a zero rate status. The low
pressure compressor (K-205) lost suction and was shutdown at 0440 hours due to insufficient gas rates. The low
pressure system slowly pressured up and began flaring to the main flares (the burn pit was not open) at 0444 hours.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Flare assist gas was introduced to the flares and smokeless flaring was reported at 0500 hours. Smokeless flaring
continued until all the production wells were completely isolated from GC-2.
2.
3.
4.
5.
Rev 6/22/97
• REPORT NO: 9$-4520
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: CiC-2 DATE: 26 Sep 98 TOTAL VOLUME: 104 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:12 TO: 13:29 3 Hrs. 17 Mins. ® ^ ^ ^ 104 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following GC and TAPS shutdown , flaring occoured w hile oil rates we re being
incresed.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. GC equipment was restarted starting at 0900 hours after planned shutdown.
2.
3.
4.
5.
Rev 6/22/97
GATHERING CENTER 2
Disposition
1. Sold
2. Reinjected
• 3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Sunnlemental reoott reauved-See 20 AAC
Pilot and Purge
Used for lease operations
Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
ALASKA OII. AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Aug-98
Remarks:
I hereby certify that the foregoing is true and correct to/the becst of my knowledge.
Signature: ~~~'~J~,`r,~--- ~~/ ~ y ~t ~s Title:
Form 10-422 (Revised 4/95)
9808 FORM 10-422.bs/FORM 10-422
0
3,254,358
3,150
9,972
21,828
597,329
0
3,886,637
0
0
0
21,045,813
SUPERVISOR
*Indicate contribuflon of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Flarin Authorization > 1 ht.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
lvote:.~u volumes must oe correcteu to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
AUGUST, 1998
Un tanned Events less than ore ual to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE' ACTION TAKEN TO ELIMINATE CAUSE
8/2/98 0050-0120 278 Not required for unplanned events which Not required for unplanned events whit
8/2/98 0529-0544 83 are less than or equal to 1 hour are less than or equal to 1 hour
8/2/98 1146-1208 153
8/2/98 1250-1302 83
8/4/98 1734-1804 208
8/8/98 2240-2309 83
8/11/98 0546-0604 31
8/11/98 1339-1407 42
•
8/18/98 1429-1506 271
8/19/98 1401-1501 104
8/20/98 1745-1811 80
8/22/98 0930-1019 422
8/24/98 1640-1719 243
8/26/98 0956-1008 90
8/28/98 0131-0218 979
TOTAL 3,150
Unplanned Events greater than 1 hour ~
DATE TIME VOLUME DESCRIPTION'OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/1/98 1349-1536 375 See Attachments See Attachments
8/1/98 1738-1905 521 See Attachments See Attachments
8/2/98 1559-1720 264 See Attachments See Attachments
8/7/98 1735-1915 354 See Attachments See Attachments
8/8/98 1433-1557 299 See Attachments See Attachments
• 8/11/98
8/14/98 1847-2047
0850-1150 535 See Attachments
3,250 See Attachments See Attachments
See Attachments
8/14/98 1207-1354 174 See Attachments See Attachments
8/19/98 1744-1847 121 See Attachments See Attachments
8/20/98 0600-0900 507 See Attachments See Attachments
8/22/98 0051-0208 231 See Attachments See Attachments
8/22/98 1249-1538 925 See Attachments See Attachments
8/23/98 0851-1018 160 See Attachments See Attachments
8/24/98 1925-2038 256 See Attachments See Attachments
8/28/98 0728-1131 2,000 See Attachments See Attachments
TOTAL 9,972
Page 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
• ~ GAS FLARING INCIDENT REPORT
AUGUST, 1998
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE' CAUSE
TOTAL 0
•
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour & not
exceeding 5,000 MCF
Planned Events > 1 hour and
exceeding 5,000 MCF
Pilot Purge
TOTAL FLARED VOLUME
TOTAL
3,150
9,972
0
0
21.828
34,950
Page 2
•
• • REPORT NO: 98-4442
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 01 Aug 98 TOTAL VOLUME: 896 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 13:49 TO: 15:36 1 Hrs. 47 Mins. ® ^ ^ ^ 375 MSCF
2. FROM: 17:38 TO: 19:05 1 Hrs. 27 Mins. ® ^ ^ ^ 521 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: _ OTHER: _
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
12°F.
2. While bringing production rates up following GC-2 C Bank S/D, LPS compressors exceeded maximum gas capacity and
discharged to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates equaling 85mmscfd. ARCO reduced production rates and shut-in 8 wells equaling 160
mmscfd. Wells were shut-in or choked back starting at 10:00 hours (when temperature started coming up).
2. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
3.
4.
5.
Rev 6/22/97
• . REPORT NO: 98-4444
B PX FLAR E REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 02 Aug 98 TOTAL VOLUME: ggl MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 00:50 TO: 01:20 0 Hrs. 30 Mins. ® ^ ^ ^ 278 MSCF
2. FROM: 05:29 TO: 05:44 O Hrs. 15 Mins. ^ ® ^ ^ $3 MSCF
3. FROM: 11:46 TO: 12:08 O Hrs. 22 Mins. ^ ® ^ ^ 153 MSCF
4. FROM: 12:50 TO: 13:02 O Hrs. 12 Mins. ^ ® ^ ^ 83 MSCF
5. FROM: 15:59 TO: 17:20 1 Hrs. 21 Mins. ® ^ ^ ^ 264 MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: _ OTHER: _
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
2. High transit line pressure caused by ARCO increasing gas rates. Transit line pressure increased from 574 to 590
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F (62-66)
4. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.66-68).
5. High gas transit line pressure caused by CGF compressor problems due to boosters unloading.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 30 mmscfd. Wells were shut-in or choked back starting at
01:00 hours.
2. BPX reduced production rates equaling 40 mmscfd. ARCO reduced production rates equaling 90 mmscfd. Wells were
shut-in or choked back starting at 04:50 hours.
3. BPX reduced production rates equaling 40 mmscfd. ARCO reduced production rates equaling 130 mmscfd. Wells were
shut-in or choked back starting at 11:55hours.
4. BPX reduced production rates equaling 20 mmscfd. Well was choked back starting at 14:05 hours.
5. Equipment was restarted at 17:02 hours.
Rev 6/22/97
• . REPORT NO: 98-4451
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: CiC-2
TIME OF FLARING:
DATE: 07 Aug 98
~ . FROM: 17:35 To: 19:15
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 40 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
354 MscF
VOLUME
354 MscF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. High transit gas line pressure caused by ARCO bringing on wells following subsidence work.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Arco shut in one well, BPX trimmed back three wells, wells were choked starting at 17:50 hrs
2.
3.
4.
5.
aev srza~s~
i ~ REPORT NO: 98-4454
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 08 Aug 98 TOTAL VOLUME: 882 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 14:33 To: 15:57 1 Hrs. 24 Mins. ® ^ ^ ^ 299 MSCF
2. FROM: 22:40 To: 23:09 0 Hrs. 29 Mins. ® ^ ^ ^ $3 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. High transit gas line pressure caused by ARCO bringing on wells following drill-site work.
2. High gas transit line pressure due to ARCO bringing up rate.
3.
4.
5.
Action Taken to Stop Flaring:
1. Arco shut in 2wells, BPX shut in 5 wells, wells were choked starting at 14:40 hrs. Totall rate si: approx. 280mmscf.
2. BPX reduced production rates and shut-in 2wells equaling 62 mmscfd. ARCO reduced production rates and shut-in 1
well equaling 52 mmscfd. Wells were shut-in or choked back starting at 22:45 hours.
3.
4.
5.
Rev 6/22/97
i • REPORT NO: 98-4457
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 11 Aug 98 TOTAL VOLUME: 608 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 05:46 TO: 06:04 0 Hrs. 18 Mins. ® ^ ^ ^ 31 MSCF
2. FROM: 13:39 TO: 14:07 0 Hrs. 28 Mins. ® ^ ^ ^ 42 MSCF
3. FROM: 18;47 TO: 20:47 2 Hrs. Q Mins. ® ^ ^ ^ 535 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: _ OTHER: _
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
3. While bringing production rates up following GC-1 Annex s/d, LPS compressors exceeded maximum gas capacity and
discharged to flare.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4 wells equaling 100 mmscfd. ARCO reduced production rates and shut-in 3
wells equaling 70 mmscfd. Wells were shut-in or choked back starting at 0550 hours.
2. BPX reduced production rates and shut-in 3 wells equaling 15 mmscfd. ARCO reduced production rates and shut-in 1
wells equaling 70 mmscfd. Wells were shut-in or choked back starting at XXXX hours.
3. BPX reduced production rates and shut-in 2 wells equaling 50 mmscfd. ARCO reduced production rates and shut-in 7
wells equaling 150 mmscfd. Wells were shut-in or choked back starting at 19:16 hours.
4.
5.
Rev 6/22/97
C~
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 9$-4463
FACILITY: GC-2 DATE: 14 Aug 98 TOTAL VOLUME: 3,424 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 08:50 To: 11:50 3 Hrs. 0 Mins. ^ ® ^ ^ $,250 MSCF
2. FROM: 12;07 TO: 13:54 1 Hrs. 47 Mins. ® ^ ^ ^ 174 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: _ RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While reducing production rates following TAPs slow down, low gas rate for LP/IP gas compressor caused compressors
to surge and discharged to flare.
2. While bringing production rates up following TAPs slow down, facility exceeded maximum gas capacity and discharged
to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. Assist gas was added to keep from black smoking, Taps production was resumed and rate incred to plant.
2. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 98-4465
B PX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 19 Aug 98 TOTAL VOLUME: 225 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 14:01 TO: 15:01 1 Hrs. 0 Mins. ® ^ ^ ^ 104 MSCF
2. FROM: 17:44 TO: 18:47 1 Hrs. $Mins. ® ^ ^ ^ 121 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
6°F.
2. CGF refrigeration units shutdown, causing high gas transit line pressure.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 3 wells equaling 30 mmscfd. ARCO reduced production rates and shut-in 3
wells equaling 50 mmscfd. Wells were shut-in or choked back starting at 14:10 hours.
2. BPX reduced production rates and shut-in 12 wells equaling 300 mmscfd. ARCO reduced production rates and shut-in 8
wells equaling 235 mmscfd. Wells were shut-in or choked back starting at 1736 hours.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 98-4469
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 20 Aug 98 TOTAL VOLUME: 587 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 06:00 TO: 09:00 3 Hrs. 0 Mins. ® ^ ^ ^ 507 MSCF
2. FROM: 17:45 TO: 18:11 O Hrs. 26 Mins. ® ^ ^ ^ $0 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
1 °F.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 5 wells equaling 75 mmscfd. ARCO reduced production rates and shut-in 7
wells equaling 150 mmscfd. Wells were shut-in or choked back starting at 07:10 hours.
2. BPX reduced production rates and shut-in 4 wells equaling 65 mmscfd. Wells were shut-in or choked back starting at
1750 hours.
3.
4.
5.
Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
. REPORT NO: 98-4471
FACILITY: GC-2 DATE: 22 Aug 98 TOTAL VOLUME: 1 X57$ MSCF
Intermittent Black
TIME OF FLA RING: DURATION: yes No Smoke? Planned? VOLUME
1. FROM: 00:51 TO: 02:08 1 Hrs. 17 Mins. ® ^ ^ ^ 231 MSCF
2. FROM: 09:30 TO: 10:19 O Hrs. 49 Mins. ® ^ ^ ^ 422 MSCF
3. FROM: 12:49 TO: 15:38 2 Hrs. 49 Mins. ® ^ ^ ^ 925 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following GC1 B-bank shutdown, the gas transit line pressure increased.
2. High gas transit line pressure caused by CGF Tandem Compressor #1883 S/D caused by a false high level on the fuel
gas knock-out vessel.
3. High gas transit line pressure caused by ARCO packing the transit gas line and ambient air temperature increasing 4
degrees.
4.
5.
Action Taken to Stop Flaring:
1. Arco reduced production rates and shut-in 7 wells equaling 300 mmscfd. Wells were shut-in or choked back starting at
0036 hours.
2. Equipment was restarted at 10:30 hours.
3. BPX reduced production rates and shut-in 2 wells equaling 25 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 13:08 hours.
4.
5.
Rev 6/22/97
• • REPORT NO: 9$-4474
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: Ci. C-2
TIME OF FLARING:
DATE: 23 Aug 98
1. FROM: 48:51 To: 10:18
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 27 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
160 MSCF
VOLUME
16Q MSCF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 38 mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 150 mmscfd. Wells were shut-in or choked back starting at 09:00 hours.
2.
3.
4.
5.
Rey sr~zs~
• • REPORT NO: 9$-4476
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: CiC-2 DATE: 24 AUg 98 TOTAL VOLUME: 499 MSCF
Intermittent 81ack
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 16:40 TO: 17:19 0 Hrs. 39 Mins. ® ^ ^ ^ 243 MSCF
2. FROM: 19:25 TO: 20:38 1 Hrs. 13 Mins. ® ^ ^ ^ 256 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: _ OTHER: _
First Determination of Cause:
1. While bringing production rates up following pigging EWE LDF, LPS compressors exceeded maximum gas capacity and
discharged to flare.
2. While bringing production rates up following pigging the EWE LDF, LPS compressors exceeded maximum gas capacity
and discharged to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 5 wells equaling 50 mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 100 mmscfd. Wells were shut-in or choked back starting at 16:39 hours.
2. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
3.
4.
5.
I Rev 6/22/97
• • REPORT NO: J$-4481
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2
TIME OF FLARING:
DATE: 28 Aug 98
1. FROM: 01:31 To: 02:1$
2. FROM: 07:2$ TO: 11:31
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
0 Hrs. 47 Mins.
4 Hrs. 3 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
2,979 MscF
VOLUME
979 MSCF
2,000 MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. While ARCO was bringing production rates up following GC-3 "A" bank shutdown for maintenance, LPS compressors
exceeded maximum gas capacity and discharged to flare.
2. Ambient conditions caused LPS compressors to bog down and discharged to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in ti wells equaling 136 mmscfd. ARCO reduced production rates equaling 100
mmscfd. Wells were shut-in or choked back starting at 01:32 hours.
2. BPX reduced production rates equaling 60 mmscfd. Wells were shut-in or choked back starting at 07:25 hours.
3.
4.
5.
Rev 6/22/97
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
IFacihty GATHERING CENTER 2 ~BP rEXPLORATION ALASKA IWFS (TERN OPERATING AREA-PBUMonth/Year of DisJul 98 n
Disposition *Indicate contribuflon of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 3,243,664 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 11,073
4. Flared or vented greater than 1 hour 7,869
(Supplemental ropoR required-See 20 AAC 25.235)
Pilot and Purge
Used for lease operations
Other
TOTAL items 1- 7
8. NGL gas equivalent produced
•
9. Purchased gas
10. Transferred from:
11 firahsferred to: CCP
.__a
Ret~'arks:
~ `~
~~ I hoc certify that the foregoing is true and correct to the best of my knowledge.
p
Signature: ~~"~~;.2.r-~'''L~~ ~i ~ ,~ ,-,~., Title:
7
Form 10-422 (Revised 4/95)
21,405
608,169
0
3,892,180
0
0
0
21,985,131
SUPERVISOR
__
__
Official Use Onl --Flaritt Autfiozization > 1 hr. ,.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: AIrv~umes must be cotrec~
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
JULY, 1998
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME' DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE.
7/1/98 2337-2352 104 Not required for unplanned events which Not required for unplanned events whit
7/2/98 1502-1552 1,389 are less than or equal to 1 hour are less than or equal to 1 hour
7/6/98 1450-1522 438
7/7/98 2232-2237 35
7/8/98 1233-1324 708
7/9/98 1539-1608 201
7/10/98 1050-1058 111
7/13/98 0906-0950 200
• 7/14/98 0950-1018 250
7/14/98 1937-2027 194
7/15/98 0950-1036 256
7/16/98 1058-1136 333
7/16/98 1749-1818 161
7/17/98 1518-1550 336
7/18/98 0928-0956 250
7/18/98 1540-1608 292
7/20/98 1257-1341 369
7/21 /98 2001-2010 113
7/22/98 1019-1102 597
7/22/98 1743-1836 299
7/24/98 0415-0511 389
7/26/98 0406-0445 271
7/27/98 1218-1246 544
7/27/98 1403-1430 431
7/27/98 1505-1602 208
7/28/98 1334-1356 306
7/28/98 1630-1704 354
7/29/98 0347-0432 278
7/30/98 1459-1522 1,198
7/30/98 1810-1852 458
TOTAL 11, 073
Un tanned Events reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO_ELIMINATE CAUSE
7/3/98 1242-1358 264 See Attachments See Attachments
7/6/98 1034-1204 290 See Attachments See Attachments
7/7/98 1434-1618 389 See Attachments See Attachments
7/11/98 1243-1400 292 See Attachments See Attachments
7/14/98 1612-1923 1,042 See Attachments See Attachments
7/16/98 1307-1514 800 See Attachments See Attachments
7/22/98 0154-0255 466 See Attachments See Attachments
7/22/98 1441-1555 438 See Attachments See Attachments
7/23/98 1208-1404 531 See Attachments See Attachments
Page 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT Page 2
JULY, 1998
7/25/98 1853-2003 729 See Attachments See Attachments
7/26/98 1325-1441 382 See Attachments See Attachments
7/28/98 1103-1318 781 See Attachments See Attachments
7/28/98 2248-2400 625 See Attachments See Attachments
7/30/98 2150-2313 840 See Attachments See Attachments
TOTAL 7,869
Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME VOLUME' DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
• TOTAL 0
Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION'OF INCIDENT &! CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 11,073
Unplanned Events > 1 Hour 7,869
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 21 4
TOTAL FLARED VOLUME 40,347
REPORT NO: 9$_43$5.
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 03 J ul 98 TOTAL VOLUME: 264 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 12:42 TO: 13:58 1 Hrs. 16 Mins. ® ^ ^ ^ 264 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Am bient temperatu re increased by
4°F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in Swells equaling 30 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 50 mmscfd. Wells were shut-in or choked back starting at 13:00 hours.
2.
3.
4.
5.
I Rev 6/22KJ7
• • REPORT NO: 9$-4394
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 06 Jul 98 TOTAL VOLUME: 728 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:34 TO: 12:04 1 Hrs. 30 Mins. ® ^ ^ ^ 290 MSCF
2. FROM: 14:50 TO: 15:22 0 Hrs. 32 Mins. ^ ® ^ ^ 438 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor problems due to governor problems.
2. High gas transit line pressure caused by CGF compressor problems due to governor problems.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 19 wells equaling 150 mmscfd. Wells were shut-in or choked back starting at
1200 hours.
2. BPX reduced production rates and shut-in 4 wells equaling 85 mmscfd. Wells were shut-in or choked back starting at
1450 hours.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 9$-4397
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 07 Jul 98
TIME OF FLARING:
1. FROM: 14:34 To: 16:18
2. FROM: 22:32 To: 22:37
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 44 Mins.
0 Hrs. 5 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
TOTAL VOLUME:
Intermi ttent Black
Yes No Smoke? Planned?
® ^ ^ ^
^ ® ^ ^
^ ^ ^ ^
^ ^ ^ ^
^ ^ ^ ^
424 MscF
VOLUME
389 MSCF
35 MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN: OTHER:
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor problems due to governor problems.
2. High gas transit line pressure caused by Aroc bring on Cycle well.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4 wells equaling 30 mmscfd. Wells were shut-in or choked back starting at
15:00 hours.
2. BPX reduced production rates equaling 25 mmscfd. Wells choked back starting at 22:32 hours.
3.
4.
5.
Rev 6/22/97
• ~ REPORT NO: J$-4405
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: CiC-2 DATE: 11 JUI 98
TIME OF FLARING:
1. FROM: 12:43 To: 14:00
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 17 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
292 MSCF
VOLUME
292 MscF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 3 wells equaling 25 mmscfd. ARCO reduced production rates and shut-in 3
wells equaling 100mmscfd. Wells were shut-in or choked back starting at 13:00 hours.
2.
3.
4.
5.
Rev 6/22/97
•
REPORT NO: 9$-4447
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 14 JUI 98
TOTAL VOLUME: 1 ,48g MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 09:50 TO: 10:18 0 Hrs. 28 Mins. ^ ® ^ ^ 250 MSCF
2. FROM: 16:12 TO: 19:23 3 Hrs. 11 Mins. ® ^ ^ ^ 1,042 MsCF
3. FROM: 19:37 TO: 20:27 0 Hrs. 50 Mins. ® ^ ^ ^ 194 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED BLOWDOWN: _ OTHER: _
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2F.
2. While bringing production rates up following ARCO bringing up rates (Arco wells s/i for wireline were brought back on)
3. While bringing production rates up following cycle well exchange,LPS compressors exceeded maximum gas capacity
and discharged to flare.
4.
5.
Action Taken to Stop Flaring:
1. ARCO reduced production rates and shut-in 1 well equaling 35mmscfd. Well was shut-in or choked back starting at
09:52 hours.
2. ARCO reduced production rates and shut-in 2wells equaling 100mmscfd. Wells were shut-in or choked back starting at
16:20 hours.
3. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
4.
5.
Rev 6/22/97
•
BPX FLARE REPORT
PRUDHOE BAY
REPORT NO: 9$-4409
FACILITY: GC-2 DATE: 16 JUI 98 TOTAL VOLUME: 1 X294. MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:58 TO: 11:36 0 Hrs. 38 Mins. ® ^ ^ ^ 333 MSCF
2. FROM: 13:07 TO: 15:14 2 Hrs. 7 Mins. ® ^ ^ ^ 800 MSCF
3. FROM: 17:49 TO: 18:18 0 Hrs. 29 Mins. ® ^ ^ ^ 161 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 3 wells equaling 27 mmscfd. ARCO reduced production rates and shut-in 3
wells equaling 60 mmscfd. Wells were shut-in or choked back starting at 10:48 hours.
2. BPX reduced production rates and shut-in 6 wells equaling 93 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 33 mmscfd. Wells were shut-in or choked back starting at 13:05 hours.
3. BPX reduced production rates and shut-in 1 wells equaling 20 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 1755 hours.
4.
5.
Rev 6/22/97
REPORT NO: 98-4417
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 22 Jul 98
TOTAL VOLUME: 1 X800 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 01 :54 To: 02:55 1 Hrs. 1 Mins. ^ ® ^ ^ 466 MSCF
2. FROM: 10:19 TO: 11:02 0 Hrs. 43 Mins. ^ ® ^ ^ 597 MSCF
3. FROM: 14:41 TO: 15:55 1 Hrs. 14 Mins. ® ^ ^ ^ 438 MSCF
4. FROM: 17:43 TO: 18:36 0 Hrs. 53 Mins. ® ^ ^ ^ 299 MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit pressure due to gas rate.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
8°F.
3. While bringing production rates up at GC-3 following a B Bank S/D, high transit gas pressure caused GC-2 to flare
intermittently from HP and LPS compressors.
4. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 5 wells equaling 60 mmscfd. Wells were shut-in or choked back starting at
02:00 hours.
2. BPX reduced production rates and shut-in 1 wells equaling 30 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 175 mmscfd. Wells were shut-in or choked back starting at 1025 hours.
3. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
4. BPX reduced production rates and shut-in 2 wells equaling 40 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 55 mmscfd. Wells were shut-in or choked back starting at 1755 hours.
5.
Rev 8/22/97
• ~ REPORT NO: J$-4420
i B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 23 JUI 98 TOTAL VOLUME: 531 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 12:0$ TO: 14:04 1 Hrs. 56 Mins. ® ^ ^ ^ 531 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN: OTHER:_
First Determination of Cause: _
1. High ambient temperature swings resulted in flaring and required cuts in prod uction. Am bient temperature increased by
4°F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Arco reduced production rates and shut-in 7 wells equaling 60 mmscfd. Wells were shut-in or choked back starting at
1240 hours.
2.
3.
4.
5.
i Rev 6/22/97
• . REPORT NO: 98-4424
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 25 Jul 98
TIME OF FLARING:
1. FROM: 18:53 To: 20:03
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 10 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
729 MSCF
VOLUME
729 MSCF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: _ OTHER: _
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4 wells equaling 65mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 100 mmscfd. Wells were shut-in or choked back starting at 19:00 hours.
2.
3.
4.
5.
Rev 6/22/97
C~
. REPORT NO: 98-442,5
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 26 Jul 98
TOTAL VOLUME: 653 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 04:06 TO: 04:45 0 Hrs. 39 Mins. ^ ® ^ ^ 271 MSCF
2. FROM: 13:25 TO: 14:41 1 Hrs. 16 Mins. ® ^ ^ ^ 382 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by ARCO packing the system following CGF refrigeration unit put back on line.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
1 °F.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 37mmscfd. Wells were shut-in or choked back starting at
04:16 hours.
2. BPX reduced production rates and shut-in 2 wells equaling 50 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 1330 hours.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 98-4433
~' B PX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 28 .JUI 98 TOTAL VOLUME: 2,066 MscF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 1 1:03 TO: 13:1$ 2 Hrs. 15 Mins. ® ^ ^ ^ 781 MSCF
2. FROM: 13:34 TO: 13:56 0 Hrs. 22 Mins. ^ ® ^ ^ 306 MSCF
3. FROM: 16:30 TO: 17:04 0 Hrs. 34 Mins. ^ ® ^ ^ 354 MSCF
4. FROM: 22:4$ TO: 24:00 1 Hrs. 12 Mins. ® ^ ^ ^ 625 MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
7°F.
2. GLT compressor K-3200 and K-3300 tripped to idle because of control/instrumentation failure associated with a loose
card in the PLC.
3. While bringing production rates up on wells W-20 and W-22 following subsidence work, LPS compressors exceeded
maximum gas capacity and discharged to flare.
4. To high of rate for ambient temperature.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 8 wells equaling 270 mmscfd. ARCO reduced production rates and shut-in 17
wells equaling 450 mmscfd. Wells were shut-in or choked back starting at 07:45 hours.
2. BPX reduced production rates and shut-in 8 wells equaling 175 mmscfd. Wells were shut-in or choked back starting at
1335 hours. Equipment was loaded back up at 1342 hours.
3. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
4. BPX reduced production rates and shut-in 4 wells equaling 70 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 70mmscfd. Wells were shut-in or choked back starting at 23:OOhours.
5.
Rev 6/22/97
•
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: J$-4440
FACILITY: GC-2 DATE: 30 Jul 98 TOTAL VOLUME: 2,498 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 14:59 TO: 15:22 0 Hrs. 23 Mins. ^ ® ^ ^ 1,198 MSCF
2. FROM: 1$:10 TO: 18:52 0 Hrs. 42 Mins. ® ^ ^ ^ 458 MSCF
3. FROM: 21:50 TO: 23:13 1 Hrs. 23 Mins. ® ^ ^ ^ 840 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. GLT compressors K-3200 and K3300 shut down due to control/instrumentation failure associated with F&G alarm.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
3. High ambient temperature swings resulted in flaring and required cuts in production.
4.
5.
Action Taken to Stop Flaring:
1. Equipment was restarted at 15:19 hours.
2. BPX reduced production rates and shut-in 10 wells equaling 100 mmscfd. Wells were shut-in or choked back starting at
18:15 hours.
3. BPX reduced production rates and shut-in 6 wells equaling 100 mmscfd. ARCO reduced production rates and shut-in 6
wells equaling 80mmscfd. Wells were shut-in or choked back starting at 21:45 hours.
4.
5.
Rev 6/22/97
' ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 2 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Jun-98
•
•
Disposition
1. Sold 0
2. Reinjected 2,436,767
3. Flared or vented less than 1 hour 4,581
4. Flared or vented greater than 1 hour
(Supplemental repot required--See 20 AAC 25.235) 24,214
5. Pilot and Purge 21,012
6. Used for lease operations 530,831
7.Other 0
TOTAL items 1 - 7 3,017,405
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 21,810,788
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Sign ~ ~ ~ ,fir /'~ ~~ ~ /Title: SUPERVISOR
Form 1'0-422 (Revised 4J95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Fladn Anthotization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
JUNE, 1998
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/1/98 0206-0247 151 Not required for unplanned events which Not required for unplanned events whi<
6/1/98 0827-0846 119 are less than or equal to 1 hour are less than or equal to 1 hour
6/3/98 0025-0051 76
6/4/98 0850-0940 213
6/5/98 2310-2333 80
6/6/98 0620-0706 288
6/6/98 1300-1331 151
6!7/98 0958-1057 451
6/7/98 1926-2005 52
• 6/8/98
6/12/98 1802-1832
1427-1517 31
194
6/16/98 1614-1657 250
6/18/98 0755-0830 100
6/18/98 1056-1152 270
6/24/98 1427-1455 194
6/27/98 1006-1102 817
6/27/98 1257-1327 250
6/27/98 2247-2304 130
6/28/98 0855-0913 250
6/28/98 1811-1838 206
6/28/98 2114-2151 308
TOTAL 4,581
Un tanned Events reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/3/98 0659-0802 481 See Attachments See Attachments
6/4/98 1909-2027 45 See Attachments See Attachments
6/5/98 0251-0420 125 See Attachments See Attachments
6/5/98 1538-1705 5,259 See Attachments See Attachments
6/5/98 1740-1846 410 See Attachments See Attachments
6/6/98 1803-1949 63 See Attachments See Attachments
6/22/98 0516-1752 4,988 See Attachments See Attachments
6/23/98 1109-1633 2,250 See Attachments See Attachments
6/24/98 0153-0303 462 See Attachments See Attachments
6/24/98 0318-0424 550 See Attachments See Attachments
6/25/98 1009-1201 1,042 See Attachments See Attachments
6/25/98 1403-1755 1,767 See Attachments See Attachments
6/25/98 2034-2326 325 See Attachments See Attachments
6/26/98 0225-0408 368 See Attachments See Attachments
6/27/98 0651-0831 683 See Attachments See Attachments
6/28/98 1253-1355 517 See Attachments See Attachments
6/29/98 0821-0927 550 See Attachments See Attachments
6/29/98 1738-1920 1,467 See Attachments See Attachments
6/30/98 1120-1414 2,417 See Attachments See Attachments
TOTAL 23,769
Page 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
JUNE, 1998
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/19/98 1146-1635 445 See Attachments See Attachments
TOTAL 445
TOTAL
Unplanned Events < 1 Hour 4,581
• Unplanned Events > 1 Hour 23,769
Planned Events < 1 hour 8c not 0
exceeding 5,000 MCF
Planned Events > t hour and 445
exceeding 5,000 MCF
Pilot Purge 27.012
TOTAL FLARED VOLUME 49,807
Page 2
• REPORT NO: 98-4337
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 03 Jun 98
TIME OF FLARING:
1. FROM: 00:25 To: 00;51
2. FROM: 06:59 To: 08:02
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
0 Hrs. 26 Mins.
1 Hrs. 3 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
557 MSCF
VOLUME
76 MSCF
481 MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following GC2 and FS2 planned maintenance, the gas transit line pressured up.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
6°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 90 mmscfd. Wells were shut-in or choked back starting at
0030 hours.
2. BPX reduced production rates and shut-in 3 wells equaling 50 mmscfd. ARCO reduced production rates and shut-in 6
wells equaling 200 mmscfd. Wells were shut-in or choked back starting at 07:00 hours.
3.
4.
5.
Rev 6/22/97
•
REPORT NO: 9$-4339
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: (aC-2 DATE: O4 JUn 98
TOTAL VOLUME: 2rj$ MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 08:50 TO: 09:40 ' O Hrs. 50 Mins. ® ^ ^ ^ 213 MSCF
2. FROM: 19:09 TO: 20:27 1 Hrs. 18 Mins. ® ^ ^ ^ 45 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED BLOWDOWN: _ OTHER: _
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
6°F.
2. While bringing up production rates to optimize the facilities, the gas transit line pressured up.
3.
4.
5.
Action Taken to Stop Flaring:
1. ARCO reduced production rates and shut-in 3 wells equaling 100 mmscfd. Wells were shut-in or choked back starting at
09:00 hours.
2. BPX reduced production rates and shut-in 2 wells equaling 60 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 60 mmscfd. Wells were shut-in or choked back starting at 1930 hours.
3.
4.
5.
I Rev 6/22/97
• . REPORT NO: 9$-4340
B PX FLARE REPORT
' PRUDHOE BAY -
FACILITY: GC-2 DATE: 05 Jun 98 TOTAL VOLUME: 5,874 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 02:51 TO: 04:20 1 Hrs. 29 Mins. ® ^ ^ ^ 125 MSCF
2. FROM: 15:38 TO: 17:05 1 Hrs. 27 Mins. ^ ® ^ ^ 5,259 MSCF
3. FROM: 17:40 TO: 1$:46 1 Hrs. 6 Mins. ® ^ ^ ^ 410 MSCF
4. FROM: 23:10 TO: 23:33 0 Hrs. 23 Mins. ® ^ ^ ^ $0 MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. While bringing production rates up following GC2 D-bank planned maintenance the gas transit line pressured up.
2. LPS compressor K-7000 shut down because of control/instrumentation failure associated with a faulty UPS inverter.
3. While bringing up production following K-7000 start-up the gas transit line prrssured up.
4. While bringing up production following K-7000 start-up the gas transit line prrssured up.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 3 wells equaling 85 mmscfd. Wells were shut-in or choked back starting at
0251 hours.
2. BPX reduced production rates and shut-in 32 wells equaling 275 mmscfd. Wells were shut-in or choked back starting at
15:45 hours.
3. BPX reduced production rates and shut-in 3 wells equaling 85 mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 150 mmscfd. Wells were shut-in or choked back starting at 1740 hours.
4. BPX reduced production rates and shut-in 2 wells equaling 60 mmscfd. Wells were shut-in or choked back starting at
2310 hours.
5.
Rev 6/22/97
• REPORT NO: 9$-4341
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: O6 ~UI'1 98
TOTAL VOLUME: 502 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 06:20 TO: 07:06 0 Hrs. 46 Mins. ^ ® ^ ^ 288 MSCF
2. FROM: 13:00 TO: 13:31 0 Hrs. 31 Mins. ^ ® ^ ^ 151 MSCF
3. FROM: 18:03 TO: 19:49 1 Hrs. 46 Mins. ® ^ ^ ^ 63 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
3. While optimizing rates at GC2 the gas transit line pressured up.
4.
5.
Action Taken to Stop Flaring:
1. Arco reduced production rates and shut-in 1 wells equaling 70 mmscfd. Wells were shut-in or choked back starting at
06:15 hours.
2. BPX reduced production rates and shut-in 1 wells equaling 50 mmscfd. Wells were shut-in or choked back starting at
13:00 hours.
3. BPX reduced production rates and shut-in 1 wells equaling 60 mmscfd. Wells were shut-in or choked back starting at
1900 hours.
4.
5.
Rev 6/22/97
• ~ REPORT NO: 98-4355
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 19 Jun 98
TIME OF FLARING:
~ . FROM: 11:46 To: 16:35
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
4 Hrs. 49 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
445 MscF
VOLUME
445 MscF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. Sk-18 IP compressor shut down because of a problem associated with low production rates. Assist gas was used to
prevent black smoke.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. The GC was in the process of shutting down and depressuring for maintenance.
2.
3.
4.
5.
Rev 6/22/97
•
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 22 Jun 98
TIME OF FLARING: DURATION:
1. FROM: Q5:16 TO: 17:52 12 Hrs. 36 Mins.
2. FROM: TO: Hrs. Mins.
3. FROM: TO: Hrs. Mins.
4. FROM: TO: Hrs. Mins.
5. FROM: TO: Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
^ ^
^ ^
REPORT NO:
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
98-4359
4,Q$$ MSCF
VOLUME
4,988 MSCF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. Extended flaring event occurred while awaiting GC operator/maintenance evaluation.Sk-18 LP/IP compressor shut down
because of a problem associated with start up of GC after maintenance turnaround.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. LP/IP compressors were started at 18:50 hours.
2.
3.
4.
5.
Rev 6/22/97
F~~~~
`~
v~U~,. ~ ~~ ~~~
~ ~. ~~
Ala ~~r~t' ~~ t . -..
•
BPX FLARE REPORT
PRUDHOE BAY
REPORT NO:
98-4361
FACILITY: GC-2 DATE: 23 Jun 98
TIME OF FLARING:
1. FROM: 11:Q9 TO: 16:33
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
5 Hrs. 24 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
2,250 MSCF
VOLUME
2,250 MSCF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. Extended flaring event occurred while awaiting GC operator/maintenance evaluation. Sk-18 LP compressor shut down
because of a problem associated with low oil rates due to LPS compressor repair. Assist gas used to prevent black
smoke.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. LP compressor was started at 16:28.
2.
3.
4.
5.
' Rev 6P22/97
• i REPORT NO: 98-4363
~' B PX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 24 Jun 98 TOTAL VOLUME: 1,206 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 01:53 TO: 03:03 1 Hrs. 10 Mins. ^ ® ^ ^ 462 MSCF
2. FROM: 03:18 To: 04:24 1 Hrs. 6 Mins. ^ ® ^ ^ 550 MscF
3. FROM: 14:27 To: 14:55 0 Hrs. 2$ Mins. ^ ® ^ ^ 194 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED SLOWDOWN: _ OTHER: _
First Determination of Cause:
1. Extended flaring event occurred while awaiting GC operator/maintenance evaluation. Sk-18 LP compressor shut down
because of a problem associated with low oil rates due to LPS compressor repair. Assist gas used to prevent black
smoke.
2. Sk-18 IP/LP compressors shut down because of unstable plant conditions associated with low oil rates due to LPS
compressor repair. Assist gas used to prevent black smoke.
3. While bringing production rates up following GC-2 s/d, high gas transit line occured.
4.
5.
Action Taken to Stop Flaring:
1. LP/IP compressors were started at 03:02 hrs.
2. LP/IP compressors were started at 04:22 hrs.
3. BPX reduced production rates and shut-in 1 well equaling 42 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 75 mmscfd. Wells were shut-in or choked back starting at 14:30 hours.
4.
5.
Rev 6/22/97
i • REPORT NO: 98-4365
B PX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 25 Jun 98 TOTAL VOLUME: $134 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:09 TO: 12:01 1 Hrs. 52 Mins. ® ^ ^ ^ 1,042 MSCF
2. FROM: 14:03 TO: 17:55 3 Hrs. 52 Mins. ® ^ ^ ^ 1,767 MSCF
3. FROM: 20:34 TO: 23:26 2 Hrs. 52 Mins• ® ^ ^ ^ 325 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following GC-2 turnaround, LPS compressors exceeded maximum gas capacity and
discharged to flare.
2. While bringing production rates up following GLT K-3200 start-up, LPS compressors exceeded maximum gas capacity
and discharged to flare.
3. While bringing production rates up following GLT K-3200 start-up, LPS compressors exceeded maximum gas capacity
and discharged to flare.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4 wells equaling 62 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 55 mmscfd. Wells were shut-in or choked back starting at 10:19 hours.
2. BPX reduced production rates and shut-in 3 wells equaling 55 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 40 mmscfd. Wells were shut-in or choked back starting at 14:27 hours.
3. BPX reduced production rates by choking back on 13 wells equaling 45 mmscfd. Wells were choked back starting at
2000 hours.
4.
5.
Rev 6/22/97
•
• REPORT NO:
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 26 Jun 98
TIME OF FLARING:
1. FROM: 02:25 To: 04:08
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 43 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
TOTAL VOLUME:
Interm ittent Black
Yes No Smoke? Planned?
® ^ ^ ^
^ ^ ^ ^
^ ^ ^ ^
^ ^ ^ ^
^ ^ ^ ^
98-4368
368 MSCF
VOLUME
368 MscF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN: OTHER:
First Determination of Cause:
1. High pressures on slugcatchers associated with wells unloading after K3200 gaslift compressor was put on line
yesterday afternoon. As some wells unloaded others had to be choked back to keep from exceeding LP gas han
capacity.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates by choking back wells to minimize flaring. Flaring was intermittant.
2.
3.
4.
5.
Rev 6/22/97
• ~ REPORT NO: 9$-4371
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 27 .IUn 98
TIME OF FLARING: DURATION:
1. FROM: 06:51 TO: 08:31 1 Hrs. 40 Mins.
2. FROM: 10:06 TO: 11:02 O Hrs. 56 Mins.
3. FROM: 12:57 TO: 13:27 0 Hrs. 30 Mins.
4. FROM: 22:47 TO: 23:04 O Hrs. 17 Mins.
5. FROM: TO: Hrs. Mins.
TOTAL VOLUME:
Intermittent Black
Yes No Smoke? Planned?
® ^ ^ ^
^ ® ^ ^
^ ® ^ ^
^ ® ^ ^
^ ^ ^ ^
1 ~$$O MSCF
VOLUME
683 MSCF
817 MSCF
250 MSCF
130 MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature incre
5°F.
2. GLT compressor K-3200 shut down because of control/instrumentation failure associated with faulty "chip detec
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature incre
4°F.
4. High gas transit line pressure caused while increasing prodution rates following earlier cutbacks.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 25 mmscfd. Wells were shut-in or choked back starti
07:15 hours.
2. BPX reduced production rates and shut-in 5 wells equaling 111 mmscfd. ARCO reduced production rates and sh
wells equaling 50 mmscfd. Wells were shut-in or choked back starting at 10:11 hours.
3. BPX reduced production rates and shut-in 4 wells equaling 30mmscfd. ARCO reduced production rates and shu
wells equaling 45 mmscfd. Wells were shut-in or choked back starting at 13:03 hours.
4. BPX choked back on 3 wells totaling 30 mmscfd. ARCO trimmed back 39 mmscfd.
5.
Rev 6/22/97
•
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 98-4373
FACILITY: GC-2 DATE: 28 JUn 98 TOTAL VOLUME: 1,2$1 MSCF
Interm ittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 08:55 TO: 09:13 O Hrs. 18 Mins. ^ ® ^ ^ 250 MSCF
2. FROM: 12:53 TO: 13:55 1 Hrs. 2 Mins. ^ ® ^ ^ 517 MSCF
3. FROM: 1$:11 TO: 18:38 O Hrs. 27 Mins. ^ ® ^ ^ 206 MSCF
4. FROM: 21:14 TO: 21:51 O Hrs. 37 Mins. ^ ® ^ ^ 308 MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED SLOWDOWN: OTHER:
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor s/d due to nipple leak on discharge.
2. High gas transit line pressure caused by CGF compressor s/d due to nipple leak on discharge.
3. High gas transit line pressure caused by ARCO artificial lift gas compressor unloading.
4. High gas transit line pressure caused by CGF 1801 low stage compressor shutdown.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 10 wells equaling 200 mmscfd. ARCO reduced production rates and s
22 wells equaling 400 mmscfd. Wells were shut-in or choked back starting at 08:55 hours.
2. BPX reduced production rates and shut-in 2 wells equaling 20mmscfd. ARCO reduced production rates and shu
wells equaling 100 mmscfd. Wells were shut-in or choked back starting at 13:36 hours.
3. BPX trimmed back on 3 wells until ARCO loaded compressor.
4. BPX choked back on wells equaling 84 mmscfd. ARCO shutin wells equaling 60 mmscfd. Compressor was
restarted.
5.
Rev 6/22/97
•
• REPORT NO:
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 29.,IU1198
TIME OF FLARING:
1. FROM: 08:21 To: 09:27
2. FROM: 17:38 To: 19:20
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 6 Mins.
1 Hrs. 42 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
TOTAL VOLUME:
Intermittent Black
Yes No Smoke? Planned?
^ ® ^ ^
® ^ ^ ^
^ ^ ^ ^
^ ^ ^ ^
^ ^ ^ ^
98-4376
2,017 MSCF
VOLUME
55O MSCF
1,467 MscF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED SLOWDOWN: OTHER:
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature incre
6°F.
2. Sk-181P compressor shut down because of the high ambient temperatures. All skid 18 compressors were down
due to hi temps.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 5 wells equaling 134 mmscfd. Wells were shut-in or choked back star
09:15 hours.
2. Equipment was restarted at 19:06 hours.
3.
4.
5.
Rev 6/22/97
• •
REPORT NO: 9$-4$79
..
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 30 Jun 98 TOTAL VOLUME: 2417 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
~ . FROM: 11:20 TO: 14:14 2 Hrs. 54 Mins. ^ ® ^ ^ 2,417 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN: OTHER:
First Determination of Cause:
1. While bringing production rates up following GC-1 annex s/d a high gas transit line pressure occured.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 7 wells equaling 160 mmscfd. ARCO reduced production rates and sh
wells equaling 600 mmscfd. Wells were shut-in or choked back starting at 08:00 hours.
2.
3.
4.
5.
Rev 6/22/97
ALASKA OII. AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
2 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU May-98
Disposition
1. Sold I 0
2. Reinjected 3,152,149
3. Flared or vented less than 1 hour 9,387
4. Flared or vented greater than 1 hour 16,472
(Supvlemental repoR requved--See 20 AAC 25.235)
5. Pilot and Purge 26,356
6. Used for lease operations 541,149
7.Other 0
TOTAL items 1 - 7 3,745,513
8. NGL gas equivalent produced 0
•
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP I 25,305,936
Remarks:
I hereby certify that the~fo`regoing is true and correct to the best of my knowledge.
Signature: ~~' /~~~, „ _ / ~~~ /9 q Title: SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Fladq ' Authorization > 1 fir.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must Ue corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
BP EXPLORATION (ALASKA) INC.
. PRUDHOE BAY UNIT- GG2
' GAS FLARING INCIDENT REPORT
MAY, 1998
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/5/98 0159-0206 293 Not required for unplanned events which Not required for unplanned events whit
5/9/98 1508-1558 417 are less than or equal to 1 hour are less than or equal to 1 hour
5/10/98 0323-0354 215
5/10/98 1938-1954 76
5/11 /98 1009-1026 118
5/12/98 0100-0120 382
5/12/98 0214-0251 139
5/12/98 1529-1611 122
5/13/98 1217-1310 479
5/13/98 1727-1759 1,778
• 5/17/98 0904-0937 167
5/19/98 0001-0026 313
5/22/98 0723-0738 833
5/22/98 1534-1628 638
5/24/98 0214-0253 117
5/24/98 1558-1625 229
5/26/98 1340-1418 58i
5/26/98 2306-2359 847
5/27/98 2021-2111 97
5/28/98 1122-1221 451
5/28/98 1530-1559 161
5/28/98 1946-2011 59
5/29/98 1830-1838 28
5/29/98 2004-2010 146
5/29/98 2033-2037 69
5/30/98 0715-0743 128
5/31/98 1600-1657 435
5/31 /98 2240-2316 69
TOTAL 9,387
•
Unplanned Events reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/2/98 1110-1352 178 See Attachments See Attachments
5/8/98 0225-0328 150 See Attachments See Attachments
5/8/98 2151-2254 159 See Attachments See Attachments
5/11/98 1820-2306 1,135 See Attachments See Attachments
5/12/98 0306-0408 9,583 See Attachments See Attachments
5/12/98 0529-0812 233 See Attachments See Attachments
5/12/98 2128-2320 701 See Attachments See Attachments
5/15/98 1152-1518 948 See Attachments See Attachments
5/17/98 0532-0732 683 See Attachments See Attachments
5/25/98 1537-1703 1,553 See Attachments See Attachments
5/28/98 0305-0434 94 See Attachments See Attachments
5/28/98 1329-1448 713 See Attachments See Attachments
5/30/98 1018-1156 214 See Attachments See Attachments
5/30/98 2138-2342 128 See Attachments See Attachments
TOTAL 16,472
Page 1
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
MAY, 1998
TOTAL
Planned Events Exceedin 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
• Planned Events < 1 hour & not
exceeding 5,000 MCF
Planned Events > 1 hour and
exceeding 5,000 MCF
Pilot Purge
TOTAL FLARED VOLUME
TOTAL
9,387
16,472
26.356
52,215
Page 2
• • REPORT NO: 9$_42$$
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: CiC-2
TIME OF FLARING:
DATE: D2 May 98
1. FROM: 11:1 ~ TO: 13:52
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
2 Hrs. 42 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
178 MSCF
VOLUME
178 MSCF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
7°F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4 wells equaling 103 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 70 mmscfd. Wells were shut-in or choked back starting at 11:12 hours.
2.
3.
4.
5.
Rev 6/2?J97
• REPORT NO: 9$_¢297
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2
DATE: C)$ May 9$
TIME OF FLARING:
1. FROM: Q2:25 TO: Q3:28
2. FROM: 21:51 To: 22:54
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 3 Mins.
1 Hrs. 3 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
$Q J MSCF
VOLUME
150 MSCF
159 MscF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. LPS compressors exceeded maximum gas capacity and discharged to flare as new sidetract well, H16, started to
unload.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4 wells equaling 25 mmscfd. Wells were shut-in or choked back starting at
0225 hours.
2. BPX reduced production rates and shut-in 1 wells equaling 10 mmscfd. Wells were shut-in or choked back starting at
2152 hours.
3.
4.
5.
Rev 6/22/97
•
BPX FLARE REPORT
PRUDHOE BAY
REPORT NO: 9$-4305
FACILITY: GC-2 DATE: 11 May 98 TOTAL VOLUME: 1,253 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:09 TO: 10:26 0 Hrs. 17 Mins. ^ ® ^ ^ 118 MSCF
2. FROM: 1$:20 TO: 23:06 4 Hrs. 46 Mins. ® ^ ^ ^ 1,135 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
2. While bringing production rates up following B-dehydrator planned maintenance, LPS compressors exceeded maximum
gas capacity and discharged to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4 wells equaling 80 mmscfd. ARCO reduced production rates and shut-in
2wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 10:15 hours.
2. BPX reduced production rates and shut-in 6 wells equaling 65 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 1826 hours.
3.
4.
5.
I Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 98-430G
FACILITY: GC-2 DATE: 12 May 98 TOTAL VOLUME: 10,459 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 01:00 TO: 01:20 0 Hrs. 20 Mins. ® ^ ^ ^ 382 MSCF
2. FROM: 02:14 TO: 02:51 0 Hrs. 37 Mins. ® ^ ^ ^ 139 MSCF
3. FROM: 03:06 TO: 04:08 1 Hrs. 2 Mins. ^ ® ^ ^ 9,5$3 MSCF
4. FROM: 05:29 TO: 08:12 2 Hrs. 43 Mins. ® ^ ^ ^ 233 MSCF
5. FROM: 15:29 TO: 16:11 0 Hrs. 42 Mins. ® ^ ^ ^ 122 MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. Sk-18 LP compressor shut down due to low gas rates when C-bank shutdown on hight level.
2. While bringing production rates up following C-bank shutdown, LPS compressors exceeded maximum gas capacity and
discharged to flare.
3. LPS compressor K-7000 shut down at 0306 hours because of a problem associated with high discharge temperature.
K-7000 was restarted at 0332 hours, but reloading was delayed to replace a shear pin in the barn door. K-7000 was
reloaded at 0408 hours.
4. Extended flaring event occurred while awaiting GC operator/maintenance evaluation on K7000 LPS compressor high
exhaust temp trouble.
5. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment. The equipment
was restarted at 0118 hours as production rates were ramped up.
2. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
3. BPX reduced production rates and shut-in 61 wells equaling 300 mmscfd. Wells were shut-in or choked back starting at
0306 hours.
4. BPX reduced production rates and shut-in 6 wells equaling 20 mmscfd.
5. BPX reduced production rates and shut-in 4 wells equaling 15 mmscfd. Wells were shut-in or choked back starting at
16:05 hours.
Rev 6/22/97
• • REPORT NO: 9H-4308
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: CaC-2
TIME OF FLARING:
DATE: 12 May 98
1. FROM: 21:2$ TO: 23:20
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 52 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
701 MSCF
VOLUME
701 MSCF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. While bringing production rates up following repairs at FS2, the gas transit line pressured up before production cuts
could be made.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 3 wells equaling 100 mmscfd. ARCO reduced production rates and shut-in 3
wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 2154 hours.
2.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 9$-4313
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: CaC-2
TIME OF FLARING:
DATE: 15 May 98
1. FROM: 11:52 To: 15:18
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
$ Hrs. 26 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
948 MscF
VOLUME
948 MscF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 27mmscfd. ARCO reduced production rates and shut-in 3
wells equaling 50 mmscfd. Wells were shut-in or choked back starting at 12:00 hours.
2.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 98-4314
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 17 May 98 TOTAL VOLUME: 850 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 05:32 To: 07:32 2 Hrs. 0 Mins. ® ^ ^ ^ 683 MSCF
2. FROM: 09:04 TO: 09:37 0 Hrs. 33 Mins. ® ^ ^ ^ 167 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following "B" Bank S/D, LPS compressors exceeded maximum gas capacity and
discharged to flare.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 40 mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 100 mmscfd. Wells were shut-in or choked back starting at 05:33 hours.
2. BPX reduced production rates and shut-in 2 wells equaling 30 mmscfd. Wells were shut-in or choked back starting at
09:05 hours.
3.
4.
5.
Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
. REPORT NO: 9$-4326'
FACILITY: GC-2 DATE: 25 May 98 TOTAL VOLUME: 1,553 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 15:37 TO: 17:03 1 Hrs. 26 Mins. ^ ® ^ ^ 1,553 MsCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED BLOWDOWN: OTHER: _
First Determination of Cause: _
1. High gas transit line pressure caused by CGF compressor problems due to control techs . working on control panel.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 32 wells equaling 528 mmscfd. ARCO reduced production rates and shut-in
19 wells equaling 450 mmscfd. Wells were shut-in or choked back starting at 15:35 hours.
2.
3.
4.
5.
Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 9$-4332
FACILITY: GC-2 DATE: 28 May 98 TOTAL VOLUME: 1 X478 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 03:05 TO: 04:34 1 Hrs. 29 Mins. ® ^ ^ ^ 94 MSCF
2. FROM: 11:22 TO: 12:21 0 Hrs. 59 Mins. ^ ® ^ ^ 451 MSCF
3. FROM: 13:29 To: 14:48 1 Hrs. 19 Mins. ^ ® ^ ^ 713 MSCF
4. FROM: 15:30 TOs 15:59 O Hrs. 29 Mins. ^ ® ^ ^ 161 MSCF
5. FROM: 19:46 TO: 20:11 O Hrs. 25 Mins. ® ^ ^ ^ 59 MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. The gas transit line pressured up as BPX was adjusting production rates for optimization.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
8°F.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
4. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
5. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
1 °F.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 1 wells equaling 30 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 40 mmscfd. Wells were shut-in or choked back starting at 0320 hours.
2. BPX reduced production rates and shut-in 3 wells equaling 30 mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 11:25 hours.
3. BPX reduced production rates and shut-in 5 wells equaling 80 mmscfd. ARCO reduced production rates and shut-in 10
wells equaling 220mmscfd. Wells were shut-in or choked back starting at 13:30 hours.
4. BPX reduced production rates and shut-in 2 wells equaling 30 mmscfd.
Wells were shut-in or choked back starting at 15:30 hours.
5. BPX reduced production rates and shut-in 2 wells equaling 70 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 65 mmscfd. Wells were shut-in or choked back starting at 1950 hours.
Rey srzas~
• • REPORT NO: g8-4334`
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: GC-2 DATE: 30 May 98 TOTAL VOLUME: 470 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 07;15 TO: 07:43 0 Hrs. 28 Mins. ® ^ ^ ^ 128 MSCF
2. FROM: 10:18 TO: 11:56 1 Hrs. 38 Mins. ® ^ ^ ^ 214 MSCF
3. FROM: 21:38 To: 23:42 2 Hrs. 4 Mins. ® ^ ^ ^ 128 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
3. ARCO increassed gas rates to the gas transit line which resulted in higher gas transit line pressures.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 45 mmscfd. ARCO reduced production rates and shut-in 1
wells equaling 40 mmscfd. Wells were shut-in or choked back starting at 07:15 hours.
2. BPX reduced production rates and shut-in 2 wells equaling 50mmscfd. ARCO reduced production rates and shut-in 40
wells equaling 60mmscfd. Wells were shut-in or choked back starting at 10:30hours.
3. BPX reduced production rates and shut-in 3 wells equaling 55 mmscfd. ARCO reduced production rates and shut-in 3
wells equaling 70 mmscfd. Wells were shut-in or choked back starting at 2206 hours.
4.
5.
I Rev 6/22/97
L
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Faci}ity Operator F"ield(s) Month/Year of Disposition
GATHERING CENTER 2 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU A r-98
Disposition
1. Sold 0
2. Reinjected 2,817,452
3. Flared or vented less than 1 hour 3,892
4. Flared or vented greater than 1 hour
(Supplemental repoR mquved-See 20 AAC 25.235) 4,952
S. Pilot and Purge 21,851
6. Used for lease operations 474,093
7.Other 0
TOTAL items 1 - 7 3,322,240
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 20,422,726
Remarks:
I hereby certify that the fo going is true and correct to the best of my knowledge.
Signature: ~, l+^r ~l~( lg~ Title: SUPERVISOR
Form 10-422 (Reviled 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl :--Fladn Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
APRIL, 1998
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/1/98 0019-0054 115 Not required for unplanned events which Not required for unplanned events whi<
4/4/98 0604-0638 118 are less than or equal to 1 hour are less than or equal to 1 hour
4/4/98 0704-0738 111
4/4/98 0803-0814 56
4/9/98 2220-2308 600
4/10/98 0157-0234 206
4/10/98 2252-2306 97
4/11/98 0227-0257 667
4/11/98 0344-0435 496
4/12/98 1312-1343 323
•
4/22/98 0432-0503 603
4/22/98 1531-1601 167
4/22/98 1810-1839 201
4/24/98 2340-2359 132
TOTAL 3,892
Un tanned Events reater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/3/98 i i 30-1310 521 See Attachments See Attachments
4/3/98 1423-1644 729 See Attachments See Attachments
4/3/98 1718-1856 1,083 See Attachments See Attachments
4/4/98 1033-1310 486 See Attachments See Attachments
4/9/98 0851-1003 521 See Attachments See Attachments
4/9/98 1447-1711 486 See Attachments See Attachments
4/10/98 0607-0741 313 See Attachments See Attachments
4/11/98 1231-1332 292 See Attachments See Attachments
4/11/98 2147-2302 521 See Attachments See Attachments
TOTAL 4,952
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
TOTAL
Unplanned Events < 1 Hour 3,892
Unplanned Events> 1 Hour 4,952
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 21,851
TOTAL FLARED VOLUME 30,695
Page 1
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 98-4249
FACILITY: GC-2 DATE: O3 Apr 9$ TOTAL VOLUME: 2,333 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 11:30 TO: 13:1 O 1 Hrs. 40 Mins. ® ^ ^ ^ 521 MSCF
2. FROM: 14:23 TO: 16:44 2 Hrs. 21 Mins. ® ^ ^ ^ 729 MSCF
3. FROM: 17:18 TO: 1$:56 1 Hrs. 3$ Mins. ® ^ ^ ^ 1,083 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
7°F.
3. While bringing production rates up following a rate reduction due to increased ambient temperature, LPS compressors
exceeded maximum gas capacity and discharged to flare.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 5 wells equaling 50 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 70 mmscfd. Wells were shut-in or choked back starting at 11:45 hours.
2. BPX reduced production rates and shut-in 6 wells equaling 75 mmscfd. ARCO reduced production rates and shut-in 7
wells equaling 100 mmscfd. Wells were shut-in or choked back starting at 14:30 hours.
3. BPX reduced production rates and shut-in 8 wells equaling 123 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 100 mmscfd. Wells were shut-in or choked back starting at 17:20 hours.
4.
5.
' Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
. REPORT NO: 9$-4250
FACILITY: GC-2 DATE: 04 Apr 98 TOTAL VOLUME: 771 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 06:04 TO: 06:38 O Hrs. 34 Mins. ® ^ ^ ^ 118 MSCF
2. FROM: 07:04 TO: 07:3$ O Hrs. 34 Mins. ® ^ ^ ^ 111 MSCF
3. FROM: 08:03 TO: 08:14 O Hrs. 11 Mins. ® ^ ^ ^ 56 MSCF
4. FROM: 10:33 TO: 13:10 2 Hrs. 37 Mins. ® ^ ^ ^ 486 MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
4. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
8°F.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 20 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 30 mmscfd. Wells were shut-in or choked back starting at 06:05 hours.
2. BPX reduced production rates and shut-in 1 wells equaling 15 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 25 mmscfd. Wells were shut-in or choked back starting at 07:15 hours.
3. BPX reduced production rates and shut-in 1 wells equaling 10 mmscfd. ARCO reduced production rates and shut-in 1
wells equaling 10 mmscfd. Wells were shut-in or choked back starting at 08:07 hours.
4. BPX reduced production rates and shut-in 6 wells equaling 200 mmscfd. ARCO reduced production rates and shut-in 12
wells equaling 200 mmscfd. Wells were shut-in or choked back starting at 1015 hours.
5.
Rev 6/22/97
C~
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 9$-4259
FACILITY: GC-2 DATE: O9 Apr 98 TOTAL VOLUME: 1,607 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 08:51 TO: 10:03 1 Hrs. 12 Mins. ® ^ ^ ^ 521 MSCF
2. FROM: 14:47 TO: 17:11 2 Hrs. 24 Mins. ® ^ ^ ^ 486 MSCF
3. FROM: 22:20 TO: 23:08 0 Hrs. 48 Mins. ^ ® ^ ^ 600 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED SLOWDOWN: OTHER:
First Determination of Cause:
1. High gas transit line pressure caused by CCP Tandem compressors load being swapped.
2. While bringing production rates up following WeIIPad N S/D, LPS compressors exceeded maximum gas capacity and
discharged to flare. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature increased by 4°F.
3. While bringing production rates up following F-pad shut down, maximum gas capacity of field was exceeded.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 7 wells equaling 123 mmscfd. ARCO reduced production rates and shut-in 22
wells equaling 700 mmscfd. Wells were shut-in or choked back starting at 08:33 hours.
2. BPX reduced production rates and shut-in 6 wells equaling 30 mmscfd. Wells were shut-in or choked back starting at
15:02 hours.
3. BPX reduced production rates and shut-in 2 wells equaling 100 mmscfd. ARCO reduced production rates and shut-in 8
wells equaling 125 mmscfd. Wells were shut-in or choked back starting at 2230 hours.
4.
5.
Rev 6/22/97
•
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: Ci. C-2
DATE: 10 Apr 98
. REPORT NO: 98-4260
TOTAL VOLUME: 616 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: O1 :57 TO: 02:34 O Hrs. 37 Mins. ® ^ ^ ^ 206 MSCF
2. FROM: 06:07 TO: 07:41 1 Hrs. 34 Mins. ® ^ ^ ^ 313 MSCF
3. FROM: 22:52 TO: 23:06 0 Hrs. 14 Mins. ^ ® ^ ^ 97 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:
First Determination of Cause:
1. High gas transit line pressure caused by gas rate.
2. High gas transit line pressure caused by gas rate.
3. High gas transit line pressure caused by gas rate.
4.
5.
CONTROLLED SLOWDOWN: OTHER:
`~ I ^~ T~ ~'~~ S IT 1--1
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 3 wells equaling 40 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 85 mmscfd. Wells were shut-in or choked back starting at 0205 hours.
2. BPX reduced production rates and shut-in 3 wells equaling 75 mmscfd. Wells were shut-in or choked back starting at
06:30 hours.
3. BPX reduced production rates and shut-in 3 wells equaling 100 mmscfd. ARCO reduced production rates and shut-in
Swells equaling 100 mmscfd. Wells were shut-in or choked back starting at 2255 hours.
4.
5.
Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: J$-4261
FACILITY: GC-2 DATE: 11 Apr 98 TOTAL VOLUME: 1 X976 MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 02:27 TO: 02:57 O Hrs. 30 Mins. ^ ® ^ ^ 667 MSCF
2. FROM: 03:44 TO: 04:35 0 Hrs. 51 Mins. ^ ® ^ ^ 496 MSCF
3. FROM: 12:31 TO: 13:32 1 Hrs. 1 Mins. ® ^ ^ ^ 292 MSCF
4. FROM: 21:47 TO: 23:02 1 Hrs. 15 Mins. ® ^ ^ ^ 521 MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. High gas transit pressure due to CCP switching tandem compressors.
2. Hlgh gas transit pressure due to high gas rate.
3. While bringing production rates up following CCP starting up a high stage compressor after maintenance, LPS
compressors exceeded maximum gas capacity and discharged to flare.
4. High gas rate in LP
5.
Action Taken to Stop Flaring:
1. No response taken as this was deemed to be of short duration.
2. BPX reduced production rates and shut-in 8 wells equaling 175 mmscfd. ARCO reduced production rates and shut-in 6
wells equaling 150 mmscfd. Wells were shut-in or choked back starting at 0355 hours.
3. BPX reduced production rates and shut-in 4 wells equaling 65 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 80 mmscfd. Wells were shut-in or choked back starting at 12:40 hours.
4. BPX reduced production rates and shut-in 3 wells equaling 14 mmscfd. Wells were shut-in or choked back starting at
2150 hours.
5.
Rev 6/22/97
•.
i~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
~ ~'. !~ Nye E ~~! -rc+ 4a~e-
Facility Operator Field(s) ~Month/Year of Disposition
GATHERING CENTER 2 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Mar-98 ~#~5~ ~ ~ ~~S ~Qi3 ,
Disposition
1. Sold 0
2. Reinjected 2,954,011
3. Flared or vented less than 1 hour 12,665
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 12,383
5. Pilot and Purge 24,049
6. Used for lease operations 652,951
7.Other 0
TOTAL items 1 - 7 3,656,059
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 24,898,103
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~~~G~~ " / •~~`~~ /~'~' ~~ Title: SUPERVISOR
7/
Form 10-422 (Revised 4/95)
. ~.;
*Indicate contribution of each pool to total. Q `-
Pool Name Code Percent
PRUDxoE 6aolso I00
Official. Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition..
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
MARCH, 1998
Un lanned Events less than ore ual to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE. ACTION TAKEN TO ELIMINATE CAUSE
3/1/98 0710-0725 156 Not required for unplanned events which Not required for unplanned events whi
3/1/98 2106-2126 76 are less than or equal to 1 hour are less than or equal to 1 hour
3/2/98 0812-0840 321
3/3/98 1621-1715 385
3/4/98 1302-1344 302
3/7/98 1132-1220 378
3/8/98 2046-2105 211
3/8/98 2234-2316 613
3/9/98 0520-0608 267
• 3/9/98 2041-2120 1,842
3/10/98 0038-0127 170
3/10/98 0940-1037 1,860
3/10/98 1309-1349 1,306
3/10/98 2247-2317 208
3/11 /98 0538-0620 462
3/17/98 0328-0345 118
3/19/98 1549-1628 406
3/19/98 2305-2337 174
3/20/98 0522-0609 264
3/20/98 1944-2036 285
3/20/98 2221-2248 167
3/21 /98 0830-0928 267
3/21/98 0949-1024 243
3/22/98 0000-0052 542
3/22/98 0123-0153 313
3/22/98 0759-0852 292
3/24/98 0001-0033 222
• 3/24/98
3/25/98 2100-2158
1430-1450 208
139
3/26/98 0852-0905 90
3/30/98 1500-1512 83
3/31 /98 0710-0720 104
3/31 /98 1213-1221 56
3/31 /98 1544-1557 135
TOTAL 12,665
Un lanned Events reater than 1 hour
DATE TIME VOLUME DESCRIPTION-0F INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/3/98 0601-0726 2,951 See Attachments See Attachments
3/6/98 1015-1118 594 See Attachments See Attachments
3/6/98 1618-1808 1,604 See Attachments See Attachments
3/10/98 1541-1927 4,551 See Attachments See Attachments
3/19/98 1017-1124 292 See Attachments See Attachments
3/20/98 0926-1040 333 See Attachments See Attachments
3/21/98 1757-1934 808 See Attachments See Attachments
3/23/98 0144-0314 1,250 See Attachments See Attachments
TOTAL 12,383
Page 1
BP EXPLORATION (ALASKA) INC.
' PRUDHOE BAY UNIT - GC-2
• GAS FLARING INCIDENT REPORT
MARCH, 1998
Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE. ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
0
Planned Events Exceedin f Hour OR Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL
• Unplanned Events < 1 Hour 12,665
Unplanned Events> 1 Hour 12,383
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 24.049
TOTAL FLARED VOLUME 49,097
Page 2
•
REPORT NO: 9$-4ZOO
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: CiC-2 DATE: O3 Mal' 98 TOTAL VOLUME: 3586 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 06:01 TO: 07:26 1 Hrs. 25 Mins. ^ ® ^ ^ 2,951 MSCF
2. FROM: 16:21 TO: 17:15 O Hrs. 54 Mins. ® ^ ^ ^ 385 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. LPS compressor K-7001 shut down due to a problem associated with oil leak on gas generator.
2. While bringing production rates up following K-7000 s/d, LPS compressors exceeded maximum gas capacity and
discharged to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 62 wells equaling 270mmscfd. Wells were shut-in or choked back starting at
05:59 hours.
2. BPX reduced production rates and shut-in 6 wells equaling 45 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 51 mmscfd. Wells were shut-in or choked back starting at 16:22 hours.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: C~$_42OS
B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: CiC-2 DATE: 06 Mal' 98 TOTAL VOLUME: 2,1 Q$ MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:15 TO: 11:18 1 Hrs. 3 Mins. ® ^ ^ ^ 594 MSCF
2. FROM: 16:18 TO: 18:08 1 Hrs. 50 Mins. ® ^ ^ ^ 1,604 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor problems due to surging of compressor #1801
2. While bringing production rates up following GC-3 "D-bank s/d", LPS compressors exceeded maximum gas capacity and
discharged to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 3 wells equaling 52 mmscfd. ARCO reduced production rates and shut-in 8
wells equaling 113 mmscfd. Wells were shut-in or choked back starting at 10:03 hours.
2. Arco reduced production rates and shut-in 9 wells equaling 150 mmscfd. Wells were shut-in or choked back starting at
16:12 hours.
3.
4.
5.
Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
. REPORT NO: J$-4212
FACILITY: GC-2 DATE: 1 O Mar 9S TOTAL VOLUME: $095 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 00:38 TO: 01:27 O Hrs. 49 Mins. ® ^ ^ ^ 170 MSCF
2. FROM: 09:40 TO: 10:37 0 Hrs. 57 Mins. ^ ® ^ ^ 1,860 MSCF
3. FROM: 13:09 TO: 13:49 0 Hrs. 40 Mins. ^ ® ^ ^ 1,306 MSCF
4. FROM: 15:41 To: 19:27 3 Hrs. 46 Mins. ^ ® ^ ^ 4,551 MSCF
5. FROM: 22;47 TO: 23:17 0 Hrs. 30 Mins. ^ ® ^ ^ 208 MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. LP gas rate
2. Sk-18 LP -and IP compressors shut down because of a problem associated with compressors recieving light gas
resulting in no compression.
3. Sk-18 LP and IP compressor shut down because of a problem associated with battery performance check.
4. Sk-18 LP compressor shut down because of a problem associated with compressors recieving light gas resulting in no
compression.
5. While bringing production rates up following XXXXXX, LPS compressors exceeded maximum gas capacity and
discharged to flare.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 6 wells equaling 25 mmscfd. Wells were shut-in or choked back starting at
0140 hours.
2. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment.
3. Flaring was permitted to continue while GC operations personnel attempted to restart the equipment.
4. Equipment was restarted at XXXX hours.
5. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
Rev 6/22/97
•
• REPORT NO: 9$_4226
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 19 Mar 98
TOTAL VOLUME: 872 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:17 To: 11:24 1 Hrs. 7 Mins. ® ^ ^ ^ 292 MSCF
2. FROM: 15:49 TO: 16:28 0 Hrs. 39 Mins. ^ ® ^ ^ 406 MSCF
3. FROM: 23:05 TO: 23:37 0 Hrs. 32 Mins. ® ^ ^ ^ 174 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
6°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
5°F.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
2°F.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 5 wells equaling 80 mmscfd.
2. BPX reduced production rates and shut-in 3 wells equaling 60 mmscfd.
3. BPX reduced production rates and shut-in 1 well equaling 15 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 40 mmscfd. Wells were shut-in or choked back starting at 23:08 hours.
4.
5.
i Rev 6/22/97
•
BPX FLARE REPORT
PRUDHOE BAY
REPORT NO: 98_Q.Q2$
FACILITY: Ca C-2 DATE: 2O Mal' 98 TOTAL VOLUME: 1 ~04.Q MSCF
Intermi ttent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 05:22 TO: 06:09 O Hrs. 47 Mins. ® ^ ^ ^ 264 MSCF
2. FROM: 09:26 TO: 10:40 1 Hrs. 14 Mins. ^ ® ^ ^ 333 MSCF
3. FROM: 19:44 TO: 20:36 0 Hrs. 52 Mins. ® ^ ^ ^ 2$5 MSCF
4. FROM: 22:21 TO: 22:48 O Hrs. 27 Mins. ® ^ ^ ^ 167 MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by ARCO rate increases.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
3. While bringing production rates up following CGF Tandem compressor combustion inspection, LPS compressors
exceeded maximum gas capacity and discharged to flare.
4. While bringing production rates up following CGF Tandem compressor combustion inspection, LPS compressors
exceeded maximum gas capacity and discharged to flare.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in Swells equaling 15 mmscfd. ARCO reduced production rates and shut-in 1
wells equaling 20 mmscfd. Wells were shut-in or choked back starting at 05:30 hours.
2. BPX reduced production rates and shut-in 2 wells equaling 40 mmscfd. ARCO reduced production rates and shut-in 3
wells equaling 60mmscfd. Wells were shut-in or choked back starting at 09:40 hours.
3. BPX reduced production rates and shut-in 2 wells equaling 20 mmscfd. Wells were shut-in or choked back starting at
19:45 hours.
4. BPX reduced production rates and shut-in 2 wells equaling 20 mmscfd. Wells were shut-in or choked back starting at
22:22 hours.
5.
Rev 6/22/97
• REPORT NO: 98-4231
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: (~(~-2 DATE: 21 Mar 98
TOTAL VOLUME: 1,31$ MSCF
Intermittent Black
TIM E OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 08:30 TO: 09:28 0 Hrs. 58 Mins. ® ^ ^ ^ 267 MSCF
2. FROM: 09:49 TO: 10:24 0 Hrs. 35 Mins. ^ ® ^ ^ 243 MSCF
3. FROM: 17:57 To: 19:34 1 Hrs. 37 Mins. ^ ® ^ ^ $O$ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
9°F.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
10°F.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4wells equaling 25 mmscfd.
2. BPX reduced production rates and shut-in 5 wells equaling 100 mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 150 mmscfd. Wells were shut-in or choked back starting at 0930hours.
3. BPX reduced production. rates and shut-in 3 wells equaling 45 mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 125 mmscfd. Wells were shut-in or choked back starting at 18:00 hours.
4.
5.
Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 9$-423
FACILITY: GC-2 DATE: 23 Mar 98 TOTAL VOLUME: 1 X250 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 01:44 To: 03:14 1 Hrs. 30 Mins. ^ ® ^ ^ 1,250 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following GC-3 s/d, LPS compressors exceeded maxi mum gas capac ity and
discharged to flare.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4 wells equaling 90mmscfd. ARCO reduced production rates and shut-in 5
wells equaling 200mmscfd. Wells were shut-in or choked back starting at 01:45 hours.
2.
3.
4.
5.
ae~ si2vs~
ALASKA OII. AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GAIT-IERING CENTER 2 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Feb-98
•
•
Disposition
1. Sold 0
2. Reinjected 2,090,804
3. Flared or vented less than 1 hour 4,234
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 2,942
5. Pilot and Purge 24,584
6. Used for lease operations 636,471
7.Other 0
TOTAL items 1 - 7 2,759,035
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 22,125,335
Remarks:
I hereby certify that the fo going is true and correct to the best of my knowledge.
Signature: 2~ ~/~~ /~0 Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Flarirt Authorization > I hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
GAS FLARING INCIDENT REPORT
FEBRUARY, 1998
Unplanned Events less than ore ual to 1 hour
DATE TIME- VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/1/98 0815-0852 260 Not required for unplanned events which Not required for unplanned events whi
2/3/98 0920-0934 100 are less than or equal to 1 hour are less than or equal to 1 hour
2/3/98 1615-1711 310
2/3/98 1802-1821 104
2/3/98 1913-1950 385
2/5/98 1552-1640 267
2/6/98 0552-0619 150
2/7/98 0820-0839 132
2/8/98 1252-1308 87
2/9/98 1511-1544 138
•
2/26/98 0025-0124 1,410
2/26/98 1309-1315 208
2/27/98 1046-1129 208
2/28/98 0820-0914 475
TOTAL 4,234
Un tanned Events reater than 1 hour
DATf TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE. ACTION TAKEN TO ELIMINATE. CAUSE
2/1/98 1558-1732 650 See Attachments See Attachments
2/4/98 0840-0950 389 See Attachments See Attachments
2/4/98 1054-1211 642 See Attachments See Attachments
2/6/98 0001-0139 535 See Attachments See Attachments
2/7/98 1858-2108 469 See Attachments See Attachments
2/23/98 0521-0733 257 See Attachments See Attachments
TOTAL 2,942
Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
• TOTAL 0
Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
TOTAL
Unplanned Events < 1 Hour 4,234
Unplanned Events> 1 Hour 2,942
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 24.584
TOTAL FLARED VOLUME 31,760
Page 1
• • REPORT NO: 9$-4175
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 01 Feb 98
TIME OF FLARING:
1. FROM: 08:15 To: 08:52
2. FROM: 15:58 To: 17:32
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
0 Hrs. 37 Mins.
1 Hrs. 34 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
91 Q MSCF
VOLUME
260 MscF
650 MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While warming up EWE gas lift line, LPS compressors exceeded maximum gas capacity and discharged to flare.
2. While bringing production rates up following EWE GLT repairs, LPS compressors. exceeded maximum gas capacity and
discharged to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates equaling 10 mmscfd. Wells were shut-in or choked back starting at 08:30 hours.
2. BPX reduced production rates equaling 30 mmscfd. ARCO reduced production rates equaling 40 mmscfd. Wells were
shut-in or choked back starting at 16:20 hours.
3.
4.
5.
Rev 6/22/97
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: 98-4177
FACILITY: GC-2 DATE: 04 Feb 98 TOTAL VOLUME: 1,031 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 08:40 TO: 09:50 1 Hrs. 1 O Mins. ^ ® ^ ^ 3$Q MSCF
2. FROM: 10:54 TO: 12:11 1 Hrs. 17 Mins. ^ ® ^ ^ 642 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: _ RUPTURE DISK:_
X CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperatu re increased by
4°F.
2. High gas transit line pressure caused by high gas rate.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 5 wells equaling 65 mmscfd. ARCO reduced production rates and shut-in 4
wells equaling 40 mmscfd.
2. BPX reduced production rates and shut-in 4 wells equaling 38 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 40 mmscfd. Wells were shut-in or choked back starting at 1104 hours.
3.
4.
5.
Rev 6/22/97
. . REPORT NO: 98-4179
, B PX FLARE REPORT
' PRUDHOE BAY
FACILITY: Ca C-2 DATE: O6 Feb 98 TOTAL VOLUME: 685 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 00:01 TO: 01:39 1 Hrs. 38 Mins. ® ^ ^ ^ 535 MSCF
2. FROM: 05:52 TO: 06:19 0 Hrs. 27 Mins. ^ ® ^ ^ 150 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High gas transit line pressure caused by bringing on R Pad following a S/D.
2. High gas transit line pressure caused by gas rate.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 3 wells equaling 40 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 50 mmscfd. Wells were shut-in or choked back starting at 00:15 hours.
2. BPX reduced production rates and shut-in 2 wells equaling 53 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 40 mmscfd. Wells were shut-in or choked back starting at 0558 hours.
3.
,4.
5.
Rev 6/22/97
• • REPORT NO: 9$-4180
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: CaC-2 DATE: O7 Feb 98
Intermittent
TIME OF FLARING: DURATION: Yes No
1. FROM: OH:2O TO: 08:39 O Hrs. 19 Mins. ^
2. FROM: 18:58 TO: 21:08 2 Hrs. 10 Mins. ® ^
3. FROM: TO: Hrs. Mins. ^ ^
4. FROM: TO: Hrs. Mins. ^ ^
5. FROM: TO: Hrs. Mins. ^ ^
CH ECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_
First Determination of Cause:
1. High gas transit line pressure cause d by gas rate.
2. High gas transit line pressure cause d by gas rate.
3.
4.
5.
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
CONTROLLED SLOWDOWN:
601 MSCF
VOLUME
132 MSCF
469 MscF
MSCF
MSCF
MSCF
OTHER:
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 50 mmscfd. Wells were shut-in or choked back starting at
0825 hours.
2. BPX reduced production rates and shut-in 3 wells equaling 70 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 60 mmscfd. Wells were shut-in or choked back starting at 20:10 hours.
3.
4.
5.
Rev 6/22/97
C~
• REPORT NO: 9$-4189
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 23 F@b 98 TOTAL VOLUME: 257 MSCF
Intermi ttent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 05:21 TO: 07:33 2 Hrs. 12 Mins. ® ^ ^ ^ 257 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: _ RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Am bient temperatu re increased by
5°F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and choked 5 wells equaling 20 mmscfd. Wells were shut-in or choked back starting at
05:59 hours.
2.
3.
4.
5.
Rev 6/22/97
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GATHERING CENTER 2 BP EXPLORATION ALASKA WESTERN OPERATING AREA-PBU Jan-98
•
L~
Disposition
1. Sold 0
2. Reinjected 284,421
3. Flared or vented less than 1 hour 10,230
4. Flared or vented greater than 1 hour
(Supplemental report requved--See 20 AAC 25.235) 7,483
5. Pilot and Purge 20,259
6. Used for lease operations 712,403
7.Other 0
TOTAL items 1 - 7 1,034,796
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 24,031,053
Remarks:
I hereby certify th~at/the foregoing is true and correct to the best of my knowledge.
Signature: (~G'C. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Only--Flarin' Authorization > I hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-2
` GAS FLARING INCIDENT REPORT
JANUARY, 1998
Unplanned Events less than or ec
DATE. TIME
1 /2/98 0717-0758
1 /2/98 1241-1302
1/3/98 1000-1040
1 /5/98 1223-1248
1 /5/98 2209-2234
1 /7/98 2102-2145
1 /8/98 0920-0942
1 /9/98 0102-0130
1 /10/98 2312-2322
1 /11 /98 0050-0106
1 /11 /98 0805-0852
1 /11 /98 1053-1134
1 /11 /98 1733-1740
1 /11 /98 1807-1826
1 /12/98 1934-2001
1/12/98 2137-2154
1 /13/98 0403-0434
1/16/98 0455-0533
1/16/98 2230-2328
1 /17/98 0508-0556
1 /17/98 0710-0737
1 /17/98 1653-1722
1/18/98 0448-0525
• 1/18/98 0536-0625
1/18/98 0643-0654
1/18/98 2002-2027
1 /21 /98 0313-0344
1 /21 /98 1335-1426
1 /22/98 1140-1210
1 /22/98 2011-2031
1 /23/98 0206-0232
1 /23/98 0708-0751
i /25/98 1311-1359
1 /25/98 2247-2308
1 /28/98 1449-1503
1 /30/98 0112-0135
1 /30/98 0416-0435
1 /30/98 0436-0520
1 /31 /98 0527-0612 _
TOTAL
Ito 1 hour ~
_UME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
142 Not required for unplanned events which Not required for unplanned events whit
73 are less than or equal to 1 hour are less than or equal to 1 hour
417
130
200
139
350
97
69
111
244
92
49
83
278
126
347
250
1,094
292
167
139
347
222
75
240
211
244
188
139
153
243
313
104
150
1,198
528
486
inn
i u, cou
Page 1
BP EXPLORATION (ALASKA) INC.
,. PRUDHOE BAY UNIT - GC-2
` GAS FLARING INCIDENT REPORT
JANUARY, 1998
Unplanned Events greater than 1 hour ~
DATE -TIME VOLUME'' DESCRIPTION OF FNCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/2/98 1841-2032 500 See Attachments See Attachments
1/9/98 1244-1504 252 See Attachments See Attachments
1/10/98 1009-1453 322 See Attachments See Attachments
1/15/98 1303-1450 215 See Attachments See Attachments
1/19/98 1634-2010 3,000 See Attachments See Attachments
1/21/98 1940-2152 410 See Attachments See Attachments
1/22/98 0211-0448 742 See Attachments See Attachments
1/22/98 0533-0713 375 See Attachments See Attachments
1/24/98 1611-1721 365 See Attachments See Attachments
1/25/98 1640-1829 361 See Attachments See Attachments
1/26/98 0221-0334 368 See Attachments See Attachments
1/28/98 0437-0629 573 See Attachments See Attachments
TOTAL 7,483
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME YQLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~
DATE: TIME VOLUME: DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOtAL
Unplanned Events < 1 Hour 10,230
Unplanned Events > 1 Hour 7,483
Planned Events < 1 hour & not 0
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 20,259
TOTAL FLARED VOLUME 37,972
Page 2
REPORT NO: J$-4140
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 02 Jan 98
TOTAL VOLUME: 71rj MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 07:17 TO: 07:58 0 Hrs. 41 Mins. ® ^ ^ ^ 142 MSCF
2. FROM: 12:41 TO: 13:02 0 Hrs. 21 Mins. ® ^ ^ ^ 73 MSCF
3. FROM: 18:41 TO: 20:32 1 Hrs. 51 Mins. ® ^ ^ ^ 500 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED BLOWDOWN: _ OTHER:
First Determination of Cause:
1. High gas transit line pressure caused by Arco bring up rates after wells coming on line when well work complete.
2. High gas transit line pressure caused by GLT compressor K-3200/3300 surging problems.
3. LPS flaring due to high discharge pressure caused by high pressure drop through HP coolers.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates equaling 20 mmscfd. Wells were choked back starting at 0718 hours.
2. BPX reduced production rates equaling 30 mmscfd. Wells were choked back starting at 1242 hours.
3. BPX reduced production rates equaling 20 mmscfd. Wells were shut-in or choked back starting at 19:10 hours.
4.
5.
I Rev 6/22/97
• ~ REPORT NO: J$-4148
BPX FLARE REPORT
PRUDHOE BAY
349 MscF
FACILITY: GC-2 DATE: 09 Jan 98
TIME OF FLARING:
1. FROM: 01:02 TO: 01:30
2. FROM: 12:44 To: 15:04
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
0 Hrs. 28 Mins.
2 Hrs. 20 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
® ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_
First Determination of Cause:
1. High gas transit line pressure caused by CCP 1878 compressor problems due to speedtronic malfuction.
2. High gas transit line pressure caused by rate increases by ARCO.
3.
4.
5.
VOLUME
97 MSCF
252 MSCF
MSCF
MSCF
MSCF
OTHER:
Action Taken to Stop Flaring:
1. BPX reduced production rates equaling 85 mmscfd. ARCO reduced production rates equaling 200 mmscfd. Wells
were choked back starting at 01:04 hours.
2. Arco reduced production rates and shutting in 3 wells equaling 55 mmscfd. BPX trimmed back on 2 wells.
3.
4.
5.
Rev 6/22/97
• REPORT NO: 9$-4149
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 1 O Jan 98
TOTAL VOLUME: 391 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 10:09 TO: 14:53 4 Hrs. 44 Mins. ® ^ ^ ^ 322 MSCF
2. FROM: 23:12 TO: 23:22 O Hrs. 1 O Mins. ® ^ ^ ^ 69 MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
7°F.
2. While bringing production rates up following E-PAD shutdown maintenance work, LPS compressors exceeded maximum
gas capacity and discharged to flare.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates by chokeing back 3 wells equaling 55 mmscfd. ARCO reduced production rates and
shut-in wells equaling 50 mmscfd. Wells were shut-in or choked back starting at 11:15 and 14:10 hours.
2. BPX reduced production rates and shut-in 2 wells equaling 80 mmscfd. ARCO reduced production rates equaling 125
mmscfd. Wells were shut-in or choked back starting at 2259 hours.
3.
4.
5.
Rev 6/22/97
• • REPORT NO: 98-4154
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 15 Jan 98
TIME OF FLARING:
1. FROM: 13:03 To: 14:50
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 47 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
215 MscF
VOLUME
215 MSCF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following well work to J-19,J-18, LPS compressors exceeded maximum gas capacity
and discharged to flare.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates equaling 30 mmscfd. Wells were choked back starting at 1308 hours.
2.
3.
4.
5.
Rev 6/22/97
• ~ REPORT NO: J$-4160
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: CaC-2 DATE: 19 fan 98
TIME OF FLARING:
1. FROM: 16:34 TO: 20:1 Q
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
3 Hrs. 36 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
^ ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
3~QQQ MSCF
VOLUME
3,000 MSCF
MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. Sk-18 LP compressor shut down because of a problem associated with false high level indication in V-235.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. Equipment was restarted at 20:09 hours. An oil cut of 20mbo was taken to keep down the VP. To completely stop the
flariing would be full plant s/d. Given the fact it was only temporary It was decided for safety reasons to keep plant
operating. Of the 20mm per day of flaring, only 5mm was from the plant. Assist gas was used to elinate black smoke
2.
3.
4.
5.
I Rev 6/22/97
U
• REPORT NO: J$-4161
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 21 Jan 98
TOTAL VOLUME: 865 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Panned? VOLUME
1. FROM: 03:13 TO: 03:44 0 Hrs. 31 Mins. ® ^ ^ ^ 211 MSCF
2. FROM: 13:35 TO: 14:26 0 Hrs. 51 Mins. ® ^ ^ ^ 244 MSCF
3. FROM: 19:40 TO: 21:52 2 Hrs. 12 Mins. ® ^ ^ ^ 410 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: _ CONTROLLED SLOWDOWN: _ OTHER: _
First Determination of Cause:
1. While bringing production rates up LPS compressors exceeded maximum gas capacity and discharged to flare.
2. While bringing production rates up following K-7000 LPS Compressor work at GC-3, GC-2's LPS compressors
exceeded maximum gas capacity and discharged to flare.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
6°F.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 4 wells equaling 90 mmscfd. Wells were shut-in or choked back starting at
03:25 hours.
2. BPX reduced production rates and shut-in 3 wells equaling 40 mmscfd. Wells were shut-in or choked back starting at
13:40 hours.
3. BPX reduced production rates and shut-in 2 wells equaling 20 mmscfd. Wells were shut-in or choked back starting at
20:05 hours.
4.
5.
ae~ si2vs~
r~
L
• REPORT NO: 9$-4162
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 22 Jan 98
TOTAL VOLUME: 1 ,444. MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 02:11 TO: 04:48 2 Hrs. 37 Mins. ® ^ ^ ^ 742 MSCF
2. FROM: 05:33 TO: 07:13 1 Hrs. 40 Mins. ® ^ ^ ^ 375 MSCF
3. FROM: 11:40 To: 12:10 0 Hrs. 30 Mins. ® ^ ^ ^ 18$ MSCF
4. FROM: 20:11 TO: 20:31 0 Hrs. 20 Mins. ^ ® ^ ^ 139 MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK: CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
3. High gas transit line pressure caused by due to ARCO bringing on several wells after wellwork completed.
4. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by
3°F.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 30 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 40 mmscfd. Wells were shut-in or choked back starting at 02:17 hours.
2. BPX reduced production rates and shut-in 4 wells equaling 70 mmscfd. Wells were shut-in or choked back starting at
06:00 hours.
3. BPX reduced production rates and shut-in 3 wells equaling 35 mmscfd. Wells were shut-in or choked back starting at
11:50 hours.
4. BPX reduced production rates and shut-in 2 wells equaling 24 mmscfd. Wells were shut-in or choked back starting at
20:12 hours.
5.
i Rev 6/22/97
L~
BPX FLARE REPORT
PRUDHOE BAY
• REPORT NO: J$-4165
Y
FACILITY: GC-2 DATE: 24 Jarl 98
TOTAL VOLUME: '
365 MSCF
Intermittent Black
TIME OF FLARING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 16:11 TO: 17:21 1 Hrs. 1 O Mins. ® ^ ^ ^ 365 MSCF
2. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
3. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. High ambient temperature swings re sulted in flaring and required cuts in production. Ambient temperature increased by
4°F.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 25 mmscfd. ARCO reduced production rates and shut-in 2
wells equaling 20 mmscfd. Wells were shut-in or choked back starting at 16:28 hours.
2.
3.
4.
5.
Aev 6/22/97
•
• REPORT NO: J$-4166
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: Ci(;-2 DATE: 25 Jan 98
TOTAL VOLUME: 778 MSCF
Intermittent Black
TIME OF FLA RING: DURATION: Yes No Smoke? Planned? VOLUME
1. FROM: 13:11 TO: 13:59 0 Hrs. 48 Mins. ® ^ ^ ^ 313 MSCF
2. FROM: 16:40 To: 18:29 1 Hrs. 49 Mins. ® ^ ^ ^ 361 MSCF
3. FROM: 22:47 TO: 23:08 0 Hrs. 21 Mins. ® ^ ^ ^ 104 MSCF
4. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
5. FROM: TO: Hrs. Mins. ^ ^ ^ ^ MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:
First Determination of Cause:
1. While bringing production rates up at EWE, the HP separators hit maximum gas pressure and discharged to flare.
2. Adjusting production rates, the HP separators hit maximum gas pressure and discharged to flare. LPS compressors
exceeded maximum gas capacity and discharged to flare.
3. Adjusting production rates, the HP separators hit maximum gas pressure and discharged to flare. LPS compressors
exceeded maximum gas capacity and discharged to flare.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates and shut-in 2 wells equaling 15 mmscfd. Wells were shut-in or choked back starting at
13:20 hours.
2. BPX reduced production rates and adjusted wells.
3. BPX reduced production rates and adjusted wells.
4.
5.
Rev 6/22/97
• REPORT NO: 9$-4167
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: GC-2 DATE: 26 Jan 98
TIME OF FLARING:
1. FROM: 02:21 To: 03:34
2. FROM: TO:
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 13 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
^ ^
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:
First Determination of Cause:
1. LPS compressor K-7001 unloaded some of it's rate.
2.
3.
4.
5.
Action Taken to Stop Flaring:
1. LPS compressor K-7001 was loaded up again. BPX trimmed LP gas rates.
2.
3.
4.
5.
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
36$ MSCF
VOLUME
368 MSCF
MSCF
MSCF
MSCF
MSCF
CONTROLLED SLOWDOWN: OTHER:
Rev 6/22/97
REPORT NO: 9$-4169
BPX FLARE REPORT
PRUDHOE BAY
FACILITY: ~aC-2 DATE: 28 fan 98
TIME OF FLARING:
1. FROM: 04:37 TO: 06:29
2. FROM: 14:49 To: 15:03
3. FROM: TO:
4. FROM: TO:
5. FROM: TO:
DURATION:
1 Hrs. 52 Mins.
0 Hrs. 14 Mins.
Hrs. Mins.
Hrs. Mins.
Hrs. Mins.
Intermittent
Yes No
® ^
^ ^
^ ^
^ ^
TOTAL VOLUME:
Black
Smoke? Planned?
^ ^
^ ^
^ ^
^ ^
^ ^
728 MSCF
VOLUME
573 MSCF
15O MSCF
MSCF
MSCF
MSCF
CHECK ONE: FLARE/RELIEF VALVE: X RUPTURE DISK:_ CONTROLLED BLOWDOWN:_ OTHER:_
First Determination of Cause:
1. While bringing production rates up following GC -3 Skid 4 s/d, LPS compressors exceeded maximum gas capacity and
discharged to flare.
2. High gas transit line pressure caused by wells unloading when put on production at GC-3.
3.
4.
5.
Action Taken to Stop Flaring:
1. BPX reduced production rates on 7 wells equaling 50 mmscfd. ARCO reduced production rates on 3 wells equaling 50
mmscfd. Wells were shut-in or choked back starting at 04:39 hours.
2. BPX stopped bringing production rates up until wells unloaded and flaring was ceased.
3.
4.
5.