Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutBPXA - MILNE POINTState of Alaska Alaska Oil & Gas Conservation Commission 1999 Facility Report Files File Names Gas Disposition p2%~9/99 14:46 Milne Point Unit Monthly Gas Flaring Incident Report For: Jan /1999 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment O 1 /01 /99 19:13:00 00:02 1.0 0.0 01/01/9919:59:00 00:01 0.6 0.0 01/03/99 09:12:00 00:03 25.0 7.5 01/03/99 09:16:00 00:29 99.2 101.3 01/03/99 09:46:00 00:14 40.6 42.4 01/03/9910:01:00 00:14 43.7 42.0 01/03/9910:19:00 00:11 22.5 23.6 01/03/9911:25:00 00:05 7.5 6.9 01/03/9913:58:00 00:02 1.4 0.7 01/03/9916:06:00 00:09 3.9 3.2 01/04/99 00:55:00 00:05 1.6 0.7 O 1 /04/99 01:12:00 00:03 1.0 1.1 01/04/99 06:59:00 00:01 0.2 0.0 01/04/99 20:27:00 00:03 1.0 0.3 01/05/99 04:39:00 00:06 2.0 1.2 01/05/9910:28:00 00:02 1.7 1.0 01/06/99 23:42:00 00:03 0.9 0.0 01/06/99 23:53:00 00:07 3.0 3.1 01/07/9912:12:00 00:03 1.8 1.1 01/07/9919:14:00 00:01 0.1 0.0 01/07/9919:27:00 00:03 1.2 0.6 O 1 / 10/99 20:59:00 00:01 0.1 0.0 O 1 / 10/99 21:44:00 00:01 0.4 0.0 01/10/99 21:58:00 00:02 0.6 0.0 01/10/99 22:13:00 00:02 0.3 0.0 O 1 / 10/99 22:59:00 00:01 0.6 0.0 01/10/99 23:29:00 00:01 0.1 0.0 O 1 / 10/99 23:44:00 00:01 0.2 0.0 01/11/99 00:44:00 00:01 0.1 0.0 01/11/99 05:14:00 00:01 0.3 0.0 01/11/99 06:14:00 00:01 0.1 0.0 01/11/9910:28:00 00:02 1.0 0.1 O 1 / 11 /99 11:28:00 00:02 0.6 0.0 O 1 / 11 /99 11:43:00 00:02 1.0 0.2 01/11/9911:55:00 00:05 2.3 1.6 01/11/99 12:11:00 00:04 1.0 0.3 01/11/9912:28:00 00:02 1.0 0.1 01/11/9912:42:00 00:03 0.8 0.4 01/11/9912:57:00 00:03 1.3 0.3 01/11/9913:14:00 00:01 0.4 0.0 01/11/9913:29:00 00:01 0.4 0.0 01/11/99 13:44:00 00:01 0.4 0.0 01/11/9913:59:00 00:01 0.3 0.0 } ~, ~ ~. ~~ ,~ BP Exploration Page 1 of 8 Milne Point, Alaska 02/69/99 .° 14:46 Milne Point Unit Monthly Gas Flaring Incident Report For: Jan /1999 Flare Name: Flare 1 np ann vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 01/11/9915:44:00 00:01 0.3 0.0 01/11/9916:13:00 00:02 0.4 0.0 01/11/9916:27:00 00:03 0.9 0.0 01/11/9916:44:00 00:01 1.0 0.2 01/11/9916:57:00 00:03 0.7 0.0 01/11/9917:11:00 00:04 1.3 0.0 01/11/9917:29:00 00:01 0.5 0.0 01/11/9917:44:00 00:01 0.2 0.0 01/11/9917:57:00 00:03 0.9 0.0 01/11/9918:13:00 00:02 0.4 0.0 01/11/9918:44:00 00:01 0.4 0.0 01/11/9918:59:00 00:01 0.3 0.0 01/11/9919:14:00 00:01 0.3 0.0 01/11/9919:28:00 00:02 0.5 0.0 01/11/99 19:43:00 00:02 0.7 0.2 01/11/9919:58:00 00:02 1.0 0.2 01/11/99 20:14:00 00:01 0.2 0.0 01/11/99 20:28:00 00:02 0.7 0.1 01/11/99 20:41:00 00:04 1.5 0.3 01/11/99 20:57:00 00:03 1.5 0.8 01/11/99 21:09:00 00:06 2.2 1.1 01/11/99 21:28:00 00:02 0.6 0.0 01/11/99 21:41:00 00:04 1.4 0.7 O 1 / 11 /99 21:54:00 00:06 2.2 1.4 01/11/99 22:12:00 00:03 1.2 0.3 01/11/99 22:29:00 00:01 0.5 0.0 01/11/99 22:32:00 00:28 10.0 9.5 01/11/99 23:01:00 00:29 12.0 11.9 01/11/99 23:31:00 00:29 11.8 11.9 01/12/99 00:01:00 00:14 6.3 5.6 01/12/99 00:16:00 00:14 5.6 5.7 01/12/99 00:31:00 00:59 20.4 20.0 O 1 / 12/99 01:31:00 00:14 5.1 5.2 01/12/99 01:46:00 00:14 5.1 4.7 01/12/99 02:03:00 00:12 4.2 3.7 O 1 / 12/99 02:26:00 00:04 1.8 1.9 01/12/99 08:06:00 00:09 6.1 5.0 01/12/99 08:23:00 00:07 4.1 4.4 01/12/9917:14:00 00:01 0.3 0.0 01/12/9918:06:00 00:09 3.4 2.4 01/12/9918:29:00 00:01 0.3 0.0 01/12/99 20:14:00 00:01 0.1 0.0 01/12/99 23:10:00 00:05 65.0 60.4 BP Exploration Page 2 of 8 Milne Point, Alaska Q2/09/99 14:46 Milne Point Unit Monthly Gas Flaring Incident Report For: Jan /1999 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 01/12/99 23:28:00 00:02 0.5 0.0 01/12/99 23:44:00 00:01 0.6 0.0 01/12/99 23:53:00 00:07 2.1 1.0 01/13/99 00:07:00 00:08 3.2 2.2 01/13/99 00:28:00 00:02 1.7 0.6 01/13/99 00:42:00 00:03 0.6 0.0 01/13/99 00:58:00 00:02 0.7 0.0 01/13/99 01:13:00 00:02 0.7 0.1 01/13/99 01:29:00 00:01 0.3 0.0 01/13/99 01:41:00 00:04 0.8 0.0 01/13/99 01:55:00 00:05 0.9 0.0 01/13/99 03:14:00 00:01 0.2 0.0 01/13/99 03:44:00 00:01 0.1 0.0 01/13/99 05:44:00 00:01 0.2 0.0 01/13/99 05:56:00 00:04 1.5 0.5 01/13/99 06:01:00 00:44 17.0 16.7 01/13/99 06:50:00 00:10 3.9 3.8 01/13/99 07:13:00 00:02 0.6 0.0 O 1 / 13/99 07:41:00 00:19 6.6 5.3 01/13/99 08:04:00 00:11 3.8 3.6 01/13/99 08:23:00 00:22 2.4 2.2 01/13/99 08:58:00 00:02 0.5 0.0 Ol / 13/99 09:13:00 00:02 0.4 0.0 01/13/99 09:27:00 00:03 0.5 0.0 01/13/99 09:44:00 00:01 0.3 0.0 01/13/99 09:57:00 00:03 1.0 0.3 01/13/9910:12:00 00:03 1.1 0.1 01/13/9910:29:00 00:01 0.7 0.7 01/13/9910:44:00 00:01 0.2 0.0 O 1 / 13/99 12:42:00 00:03 1.1 0.4 O 1 / 13/99 17:21:00 00:09 21.4 20.2 01/I3/9917:33:00 00:12 25.7 26.1 01/14/99 03:50:00 00:10 37.6 34.8 O 1 / 14/99 04:12:00 00:03 24.3 9.5 01/14/9914:27:00 00:03 20.1 11.8 01/16/99 00:57:00 00:03 25.9 67.5 01/16/99 01:07:00 00:08 32.4 30.7 01/16/99 01:22:00 00:08 30.3 29.3 01/16/99 01:38:00 00:07 17.6 18.2 01/16/99 01:49:00 00:11 27.7 27.5 O 1 / 16/99 02:04:00 00:11 27.8 29.1 01/16/99 02:20:00 00:10 22.6 22.4 01/16/99 02:31:00 00:14 30.2 28.6 BP Exploration Page 3 of 8 Milne Point, Alaska 02/'J9/99 14:46 Milne Point Unit Monthly Gas Flaring Incident Report For: Jan /1999 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 01/16/99 02:49:00 00:11 25.7 25.5 01/16/99 03:04:00 00:26 64.8 64.5 01/16/99 03:34:00 00:11 29.1 28.9 01/16/99 03:58:00 00:02 4.9 5.6 O 1 / 16/99 04:13:00 00:02 5.9 5.4 01/16/99 04:42:00 00:03 6.0 5.4 O 1 / 16/99 04:59:00 00:01 3.7 3.2 01/16/99 05:14:00 00:01 2.6 2.2 O 1 / 16/99 09:14:00 00:01 3.5 2.9 01/17/99 08:59:00 00:01 2.0 0.1 01/17/9910:12:00 00:03 1.2 0.2 O 1 / 17/99 10:26:00 00:04 0.8 0.0 01/17/9910:41:00 00:04 1.4 0.1 01/17/9910:54:00 00:06 2.7 1.4 01/17/9911:05:00 00:25 12.7 11.3 01/17/9911:36:00 00:09 3.6 3.0 01/17/9911:49:00 00:11 4.4 3.6 01/17/9912:03:00 00:27 11.1 10.8 01/17/9912:33:00 00:27 96.1 93.2 01/17/9913:08:00 00:07 28.5 31.3 O 1 / 17/99 18:44:00 00:01 0.3 0.0 01/17/9918:50:00 00:10 3.1 1.6 01/17/9919:02:00 00:13 4.8 4.4 O 1 / 17/99 19:17:00 00:13 5.1 4.8 01/17/9919:36:00 00:09 3.4 2.9 O 1 / 17/99 19:51:00 00:09 3.3 2.3 O 1 / 17/99 20:08:00 00:07 2.6 1.9 01/17/99 20:23:00 00:07 2.6 1.3 01/17/99 20:39:00 00:06 2.0 0.7 01/17/99 20:51:00 00:09 3.3 2.2 O 1 / 17/99 21:06:00 00:09 3.5 3.0 01/17/99 21:27:00 00:03 1.1 0.2 01/17/99 21:39:00 00:06 2.4 1.1 01/17/99 21:55:00 00:05 1.9 0.5 01/17/99 22:12:00 00:03 1.2 0.7 01/17/99 23:14:00 00:01 0.3 0.0 O 1 / 18/99 00:44:00 00:01 0.1 0.0 01/18/99 00:59:00 00:01 0.2 0.0 O 1 / 18/99 01:59:00 00:01 0.0 0.0 01/18/99 02:43:00 00:02 0.5 0.0 O 1 / 18/99 02:58:00 00:02 1.2 0.3 01/18/99 03:13:00 00:02 0.8 0.0 01/18/99 03:27:00 00:03 0.6 0.0 BP Exploration Page 4 of 8 Milne Point, Alaska 02/09/99 _• 14:46 Milne Point Unit Monthly Gas Flaring Incident Report For: Jan /1999 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration =Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 01/18/99 03:43:00 00:02 1.0 0.1 01/18/99 03:58:00 00:02 0.5 0.0 O 1 / 18/99 04:11:00 00:04 1.7 0.4 O 1 / 18/99 04:24:00 00:06 2.2 1.1 O 1 / 18/99 04:42:00 00:03 0.7 0.1 O 1 / 18/99 04:56:00 00:04 1.1 0.3 01/18/99 05:14:00 00:01 0.3 0.0 01/18/99 05:29:00 00:01 0.4 0.0 01/18/99 05:44:00 00:01 0.0 0.0 01/18/99 05:56:00 00:04 1.7 1.0 O 1 / 18/99 06:09:00 00:06 2.3 1.6 01/18/99 06:28:00 00:02 0.5 0.0 O 1 / 18/99 06:40:00 00:05 2.3 1.5 01/18/99 07:05:00 00:10 3.7 3.0 01/18/99 07:23:00 00:07 2.0 1.1 01/18/99 07:42:00 00:03 1.1 0.5 01/18/99 07:57:00 00:03 1.4 1.5 01/18/99 08:08:00 00:07 3.5 2.7 01/18/99 08:36:00 00:09 2.9 2.1 01/18/99 08:58:00 00:02 1.0 1.0 01/18/99 09:13:00 00:02 0.7 0.0 01/18/99 09:27:00 00:03 1.2 0.5 01/18/99 09:38:00 00:07 2.6 1.6 01/18/99 09:57:00 00:03 1.3 1.0 01/18/9910:19:00 00:11 3.9 2.8 01/18/9910:58:00 00:02 0.8 0.1 01/19/99 07:12:00 00:03 2.2 1.2 01/19/9911:14:00 00:01 0.2 0.0 O 1 / 19/99 15:14:00 00:01 0.3 0.0 O 1 / 19/99 15:29:00 00:01 0.3 0.0 O 1 / 19/99 15:44:00 00:01 0.3 0.0 01/19/9915:59:00 00:01 0.2 0.0 O 1 / 19/99 16:29:00 00:01 0.2 0.0 01/20/99 03:44:00 00:01 0.0 0.0 01/20/99 03:59:00 00:01 0.8 0.1 01/20/99 04:13:00 00:02 0.5 0.0 O 1 /20/99 10:14:00 00:01 0.4 0.0 O 1 /22/99 07:25:00 00:20 49.3 46.9 01/22/99 07:47:00 00:13 32.3 33.7 01/22/99 08:04:00 00:41 105.8 105.1 01/22/99 08:46:00 00:14 28.1 28.0 01/22/99 09:01:00 00:14 25.8 26.4 O 1 /22/99 11:27:00 00:18 16.6 15.5 BP Exploration Page 5 of 8 Milne Point, Alaska Q2/09/99 14:46 Milne Point Unit Monthly Gas Flaring Incident Report For: Jan /1999 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 01/22/9911:56:00 00:04 3.9 4.2 O 1 /24/99 09:29:00 00:01 0.2 0.0 01/25/99 05:14:00 00:01 0.3 0.0 01/26/9911:36:00 00:09 5.7 4.7 01/26/9911:59:00 00:01 0.8 0.9 01/26/99 23:57:00 00:03 1.1 0.4 01/27/99 00:12:00 00:03 0.8 0.0 01/27/99 03:27:00 00:03 1.1 0.0 01/27/99 03:36:00 00:24 12.2 11.3 01/27/99 04:10:00 00:05 2.8 3.2 01/28/99 07:29:00 00:01 0.5 0.0 01/28/99 07:43:00 00:02 1.1 0.5 01/28/99 07:58:00 00:02 0.9 0.0 01/28/99 08:14:00 00:01 0.4 0.0 01/28/99 08:44:00 00:01 0.5 0.0 01/28/99 08:58:00 00:02 0.5 0.0 01/28/99 09:29:00 00:01 0.3 0.0 01/28/9911:29:00 00:01 0.4 0.0 01/28/9912:57:00 00:03 0.9 0.0 01/28/9913:13:00 00:02 0.2 0.0 01/28/9913:59:00 00:01 0.3 0.0 01/28/9914:27:00 00:03 0.7 0.0 01/28/9914:42:00 00:03 1.0 0.0 01/28/9914:59:00 00:01 0.3 0.0 01/28/9915:13:00 00:02 0.6 0.0 01/28/9915:59:00 00:01 0.3 0.0 01/28/9916:13:00 00:02 0.7 0.0 01/28/9916:29:00 00:01 0.4 0.0 01/28/9916:43:00 00:02 0.4 0.0 01/29/99 03:01:00 00:14 15.6 0.0 01/29/99 04:13:00 00:02 0.9 0.3 01/29/9915:58:00 00:02 1.3 0.6 01/29/99 22:44:00 00:31 42.2 1.0 01/29/99 23:28:00 00:02 1.9 1.3 01/29/99 23:44:00 00:01 0.5 3.4 O 1 /31 /99 06:44:00 00:01 2.6 0.0 BP Exploration Page 6 of 8 Milne Point, Alaska 02/09/99 14:46 Milne Point Unit Monthly Gas Flaring Incident Report For: Jan /1999 Flare Name: Flare 1 np ann vents greater t an our Duration -Volume (NISCF) Start Time (hh:mm) Flare Assist Cause Comment 01/14/99 01:44:00 02:01 379.3 377.1 This was an emergency unplanned The tubing line was discharging gas flaring event that occurred when into the compressor module. The compressor CSS11A was manually sh ut tubing was replaced, the compressor put down because of a broken tubing line onback in service, and the flaring event a PSV. stopped. 01/29/99 01:57:00 01:03 224.5 0.7 Unplanned flaring due to PSLL Troubleshoot and restart compressors shutdown on plant gas injection compressors BP Exploration Page 7 of 8 Milne Yoint, Alaska 02!09/99 14:46 Milne Point Unit Monthly Gas Flaring Incident Report For: Jan /1999 Flare Name: Flare 1 (Planned Events Exceeding 1 hour UK Volumne Exceeul<ng 5uuu lvi,i:r ~ Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 01/14/99 13:12:00 01:03 360.4 214.2 This was a planned flaring event that The PSV pilot bolts were removed, new occurred when compressor CSS11A was bolts & washers installed, and all tubing manually shut down to repair an lines inspected. The compressor was ongoing, known problem with broken returned to service and the flaring event tubing lines on a PSV. stopped. Flare Assist Unplanned Events <=1 hour 1,617.2 1,429.3 Unplanned Events > 1 hour 603.8 377.8 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 360.4 214.2 Unmetered Assist Gas 10,149.1 TOTAL FLARED VOLUME 2,581.4 12,170.4 MSCF BP Explorarion Page 8 of 8 Milne Yoint, Alaska Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 29 , 1999 .Time and duration of incident 01:57 January 29th 1999, O1hr:03mins. Flare Volume: 224 Assist Gas Volume: 1 This was an unplanned flaring event that occurred when both Little A (C-5531-A) and Little B (C-5531-B) injection compressor's shutdown on PSLL on the 3rd Stage .=The compressors were reset and purged prior to start-up. The compressors were started and .quickly brought back on line. ~ - Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 16 , 1999 Time and duration of incident 00:10 January 16th 1999, 04hr:50mins. Flare Volume: 653 (estimated) Assist Gas Volume: 0 This was an unplanned flaring event that occurred when the IWAG at C-Pad shutdown on a bad pressure transmitter. High GOR wells were. shut-in to help mitigate the flaring:. The flow meter for the flare FI-6201 had just been calibrated and the wrong data sheet.- was used to set the calibration. The error was noticed immediately during the flare event and the flare flow transmitter was recalibrated to the correct data sheet. The flare volume (during the FI-6201 calibration correction) was calculated by looking at the flare valve trend of valve opening and calculating the flare volume from this data. The assist gas valve did not open because of FI-6201 problem. The flare volume was small and there was no Black Smoke incident. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 14 , 1999 Time and duration of incident 13:12 January 14th 1999, Olhr:03mins. Flare Volume: 360 Assist Gas Volume: 214 ~ . This was a planned flaring event that occurred when compressor C-SS 11A was manually shutdown. The compressor was shut down to repair an ongoing problem with broken - tubing lines on PS.V: 'The PSV pilot bolts were removed, new bolts & washers installed, all tubing: lines inspected: The compressor was returned to service and flaring stopped: ` ,. ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Feb-99 Disposition Volume MCF* 1. Sold Fuel 15,540 2. Reinjected 435,154 3. Flared or vented less than 1 hour 2,375 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,370 5. Pilot and Purge 335 6. Used for lease operations Fuel Assist 242,755 11,415 7. Other TOTAL items 1-7 708,944 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby c t' y that he foregoing is true and correct to the best of my knowledge. Signature Title (Vl,(~2 ~f~i~ ~(r Date ~j 1(e ~~A'X *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 88.6 SCH. BLUFF 525140 11.4 Official'. Use Only-Flaring Aut}iorization>l hr: 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a ,temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. 03/08/99 21:2o Milne Point Unit Monthly Gas Flaring Incident Report For: Feb /1999 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 02/01/99 OS:13:00 00:02 1.8 0.0 02/01 /99 06:43 :00 00:02 2.2 0.0 02/03/9917:31:00 00:14 12.2 11.1 02/03/9917:56:00 00:04 4.4 4.9 02/04/9915:28:00 00:02 0.6 0.0 02/04/9915:42:00 00:03 2.0 0.7 02/OS/9913:17:00 00:28 78.6 75.7 02/OS/9913:47:00 00:13 28.9 29.7 02/05/9914:02:00 OO:S8 127.5 125.6 02/OS/9915:02:00 00:13 27.2 28.8 02/OS/9915:29:00 00:01 1.9 3.1 02/06/99 06:59:00 00:16 13.9 12.8 02/06/99 07:19:00 00:11 9.7 10.2 02/06/9910:37:00 00:08 6.5 S.3 02/06/9910:49:00 00:11 10.1 10.6 02/06/9911:29:00 00:01 0.1 0.0 02/06/9911:38:00 00:07 8.2 7.0 02/06/9911:51:00 00:09 8.0 8.6 02/06/9912:44:00 00:01 0.2 0.0 02/06/9912:51:00 00:09 20.3 19.1 02/06/9913:07:00 00:08 9.S 10.1 02/06/9913:18:00 00:12 19.3 17.9 02/06/9913:34:00 00:11 16.0 16.0 02/06/9913:48:00 00:42 61.9 61.5 02/06/9914:35:00 00:10 14.8 15.4 02/06/99 22:14:00 00:01 0.2 0.0 02/07/99 OO:S8:00 00:02 0.8 0.0 02/07/99 01:14;00 00:01 0.2 0.0 02/07/99 01:28:00 00:02 0.4 0.0 02/07/9913:50:00 OO:OS 32.7 30.7 02/07/9914:00:00 OO:1S 34.5 35.0 02/07/9914:16:00 00:14 29.4 29.7 02/07/9914:31:00 00:29 59.6 58.7 02/07/9915:05:00 00:10 14.8 15.9 02/07/99 21:12:00 00:03 1.4 0.4 02/07/99 21:27:00 00:03 1.4 0.6 02/07/99 21:43:00 00:02 0.7 0.4 02/07/99 21:SS:00 00:05 1.7 0.7 02/08/99 01:14:00 00:01 0.2 0.0 02/08/99 08:29:00 00:16 0.4 0.0 02/08/99 08:29:00 00:01 0.4 0.0 02/08/99 09:43:00 00:17 2.1 1.S 02/08/99 09:43:00 00:02 2.1 1.S BP Exploration Page 1 of 7 Milne Point, Alaska 03/08/99 21:2o Milne Point Unit Monthly Gas Flaring Incident Report For: Feb /1999 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 02/08/99 23:02:00 00:58 135.2 133.5 02/09/99 00:07:00 00:08 12.4 13.2 02/09/99 02:44:00 00:01 0.2 0.0 02/09/99 02:59:00 00:01 0.6 0.3 02/09/99 07:38:00 00:07 9.9 7.4 02/09/99 07:46:00 00:14 140.0 114.6 02/09/99 08:03:00 00:12 14.7 13.5 02/09/99 08:18:00 00:12 13.1 13.8 02/09/99 08:44:00 00:01 0.4 0.5 02/ 10/99 01:44:00 00:01 0.2 0.0 02/10/99 05:36:00 00:09 7.8 6.7 02/10/99 05:52:00 00:08 8.0 8.5 02/10/99 23:14:00 00:01 0.3 0.0 02/11/99 00:14:00 00:01 0.2 0.0 02/11/99 01:14:00 00:01 0.2 0.0 02/11/99 01:29:00 00:01 0.1 0.0 02/11/99 01:44:00 00:01 0.3 0.0 02/11/99 04:14:00 00:01 0.3 0.0 02/11/99 08:14:00 00:01 0.5 0.0 02/11/99 08:29:00 00:01 0.2 0.0 02/11/99 09:58:00 00:02 0.9 0.0 OZ/ 11 /99 10:12:00 00:03 0.7 0.0 02/ 11 /99 10:28:00 00:02 0.8 0.0 02/11/9910:42:00 00:03 0.7 0.0 02/11/9910:59:00 00:01 0.7 0.0 02/11/9914:13:00 00:02 0.4 0.0 02/11/9914:27:00 00:03 0.9 0.0 02/11/9914:54:00 00:06 1.8 0.4 02/ 11 /99 15:06:00 00:09 2.6 1.4 02/11/9915:22:00 00:08 2.6 1.1 02/11/9917:44:00 00:01 0.0 0.0 02/11/9919:44:00 00:01 0.6 0.0 02/11/99 20:12:00 00:03 1.7 0.4 02/11/99 20:27:00 00:03 0.8 0.0 02/11/99 20:44:00 00:01 0.2 0.0 02/11/99 20:47:00 00:13 21.0 19.4 02/11/99 21:01:00 00:14 33.5 34.3 02/ 11 /99 21:19:00 00:11 7.1 6.8 02/11/99 21:40:00 00:05 7.4 7.2 02/11/99 21:51:00 00:09 13.9 12.4 02/11/99 22:13:00 00:02 2.9 3.3 02/11/99 23:43:00 00:02 0.4 0.0 02/11/99 23:57:00 00:03 1.0 0.0 BP Exploration Page 2 of 7 Milne Point, Alaska 03/08/99 21:20 Milne Point Unit Monthly Gas Flaring Incident Report For: Feb /1999 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 02/12/99 00:05:00 00:10 17.2 15.4 02/12/99 00:28:00 00:02 1.4 1.4 02/12/99 00:42:00 00:03 0.8 0.0 02/12/99 00:49:00 00:11 4.0 4.0 02/12/99 01:13:00 00:02 0.6 0.0 02/12/99 02:43:00 00:02 0.7 0.0 02/12/99 02:59:00 00:01 0.3 0.0 02/12/99 03:08:00 00:07 10.9 10.0 02/12/99 03:56:00 00:04 2.6 1.9 02/12/99 04:27:00 00:03 1.1 0.3 02/12/99 04:38:00 00:07 3.9 3.9 02/12/99 04:53:00 00:07 5.8 5.1 02/12/99 05:41:00 00:04 4.5 3.1 02/12/99 05:53:00 00:07 3.7 3.7 02/12/99 06:09:00 00:06 7.1 7.0 02/12/99 06:28:00 00:02 1.4 0.3 02/12/99 06:42:00 00:03 4.1 4,6 02/12/99 07:10:00 00:05 5.2 3.6 02/12/99 07:23:00 00:07 5.8 5.9 02/12/99 07:40:00 00:05 8.4 7.2 02/12/99 07:52:00 00:08 14.5 14.7 02/12/99 08:01:00 00:14 33.8 33.5 02/12/99 08:39:00 00:06 6.1 5.5 02/12/9911:55:00 00:05 10.4 9.9 02/12/99 21:58:00 00:32 92.9 88.2 02/12/99 22:31:00 00:14 38.4 37.7 02/12/99 22:54:00 00:06 10.3 11.8 02/13/99 01:14:00 00:01 0.3 0.0 02/13/99 03:08:00 00:07 9.1 3.9 02/13/99 03:17:00 00:13 102.7 52.1 02/13/99 04:44:00 00:01 0.3 0.0 02/13/99 07:29:00 00:01 0.1 0.0 02/13/9915:10:00 00:50 36.9 17.6 02/13/9916:13:00 00:02 2.0 1.1 02/13/99 21:29:00 00:01 0.2 0.0 02/13/99 21:55:00 00:05 1.4 0.0 02/13/99 22:08:00 00:07 2.4 0.0 02/13/99 22:18:00 00:12 3.4 0.0 02/13/99 22:43:00 00:02 0.5 0.0 02/13/99 23:29:00 00:01 0.1 0.0 02/13/99 23:42:00 00:03 0.9 0.0 02/13/99 23:48:00 00:12 3.9 0.1 02/14/99 00:01:00 00:14 4.7 0.1 BP Exploration Page 3 of 7 Milne Point, Alaska ~' S~ ~: ~'i=, ~,: ~ ~. z-a :; r r_ ALASKA OIL AND GAS CONSERVATION CONII~lISSION ~. FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition .,Milne Point BP Exploration (Alaska) Inc. Milne Point Jan-99 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold Fuel 16,900 Pool Name KUPARUK Code 525100 Percent 88.7 SCH. BLUFF 525140 11.3 2. Reinjected 567,064 3. Flared or vented less than 1 hour 1,617 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 964 5. Pilot and Purge 371 6. Used for lease operations Fuel 266,924 Assist 11 798 7. Other TOTAL items 1-7 865,638 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby c t'fy tha the fore_oing is true and correct to the best of my knowledge. Signature Title~~ ~ ~~~ +~ Date ~(o Official i3se -0nly-Flaring 'Authorization>l hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. ,Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 03/08/99 21:20 Milne Point Unit Monthly Gas Flaring Incident Report For: Feb /1999 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 02/14/99 00:28:00 00:02 0.9 0.0 02/14/99 00:42:00 00:03 0.8 0.0 02/14/99 00:58:00 00:02 0.3 0.0 02/14/99 01:14:00 00:01 0.4 0.0 02/14/99 01:44:00 00:01 0.3 0.0 02/14/99 02:14:00 00:01 0.2 0.0 02/14/99 02:26:00 00:04 1.3 0.0 02/14/99 02:40:00 00:05 1.7 0.0 02/ 14/99 03 :44:00 00:01 0.4 0.0 02/14/99 03:56:00 00:04 1.3 0.0 02/14/99 04:08:00 00:07 1.7 0.0 02/14/99 04:20:00 00:10 3.7 0.0 02/14/99 04:33:00 00:12 4.3 0.0 02/14/99 04:54:00 00:06 1.7 0.0 02/14/99 05:11:00 00:04 1.4 0.0 02/14/99 05:16:00 00:14 41.3 23.7 02/14/99 05:36:00 00:09 3.4 2.8 02/14/99 05:52:00 00:08 2.7 1.8 02/14/99 06:10:00 00:05 1.4 0.0 02/14/99 06:25:00 00:05 2.2 1.3 02/14/99 06:42:00 00:03 1.1 0.0 02/14/99 06:57:00 00:03 1.0 0.0 02/14/99 07:09:00 00:06 2.2 1.1 02/14/99 07:26:00 00:04 1.2 0.2 02/14/99 07:37:00 00:08 22.5 20.5 02/14/99 07:53:00 00:07 10.7 11.7 02/14/99 08:09:00 00:06 2.0 0.7 02/14/99 08:23:00 00:07 2.5 1.2 02/14/99 08:39:00 00:06 2.5 1.6 02/14/99 08:53:00 00:07 2.8 1.5 02/14/99 09:06:00 00:09 3.1 2.1 02/14/99 09:23:00 00:07 2.5 1.4 02/14/99 09:37:00 00:08 2.3 1.0 02/14/99 09:50:00 00:10 3.1 1.8 02/14/9910:14:00 00:01 0.5 0.1 02/14/9910:25:00 00:05 2.1 0.5 02/14/9910:42:00 00:03 0.7 0.0 02/14/9910:59:00 00:01 0.1 0.0 02/14/9911:43:00 00:02 0.6 0.0 02/14/9911:59:00 00:01 0.4 0.0 02/14/99 23:13:00 00:02 0.5 0.0 02/15/99 00:43:00 00:02 0.6 0.0 02/15/99 00:56:00 00:04 1.3 0.0 BP Exploration Page 4 of 7 Milne Point, Alaska 03/08/99 21:20 Milne Point Unit Monthly Gas Flaring Incident Report For: Feb /1999 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 02/15/99 01:12:00 00:03 0.9 0.0 02/15/99 01:29:00 00:01 0.5 0.0 02/15/99 01:41:00 00:04 1.0 0.0 02/ 15/99 02: i 4:00 00:01 0.2 0.0 02/15/99 02:27:00 00:03 0.8 0.0 02/15/99 02:42:00 00:03 1.1 0.3 02/15/99 02:57:00 00:03 1.0 0.0 02/15/99 03:11:00 00:04 1.5 0.4 02/15/99 03:25:00 00:05 1.8 0.8 02/15/99 03:43:00 00:02 0.8 0.0 02/15!99 03:53:00 00:07 1.7 0.4 02/15/99 04:14:00 00:01 0.9 0.3 02/15/99 04:19:00 00:11 3.7 2.9 02/15/99 04:39:00 00:06 2.6 1.4 02/15/99 05:25:00 00:05 2.1 0.9 02/15/99 05:40:00 00:05 1.9 1.1 02/15/99 05:59:00 00:01 0.9 0.2 02/15/99 06:28:00 00:02 1.0 0.0 02/15/99 06:41:00 00:04 1.1 0.0 02/15/99 06:57:00 00:03 1.2 0.3 02/15/9917:24:00 00:06 15.1 14.3 02/15/9917:31:00 00:14 32.9 32.8 02/15/9917:49:00 00:11 29.7 29.6 02/16/99 08:29:00 00:01 0.8 0.1 02/16/99 08:40:00 00:05. 4.9 5.0 02/16/99 09:06:00 00:24 15.5 14.0 02/16/99 09:40:00 00:05 3.0 2.8 02/16/99 09:54:00 00:06 4.5 4.5 02/16/9910:05:00 00:10 5.5 4.4 02/16/9910:17:00 00:13 9.1 8.8 02/16/9910:33:00 00:12 11.0 11.6 02/18/9911:44:00 00:01 0.3 0.0 02/18/9911:58:00 00:02 0.8 0.0 02/19/99 04:32:00 00:13 12.1 10.9 02/19/99 04:46:00 00:14 13.5 14.0 02/19/99 05:01:00 00:29 23.8 23.1 02/19/99 05:36:00 00:39 30.7 30.5 02/19/99 06:17:00 00:13 9.8 10.0 02/19/99 06:39:00 00:06 4.1 3.7 02/19/99 07:40:00 00:05 2.4 1.7 02/19/99 07:47:00 00:13 11.7 11.0 02/19/99 08:06:00 00:09 8.6 8.7 02/20/9919:12:00 00:03 4.6 3.6 BP Exploration Page 5 of 7 Milne Point, Alaska 03/08/99 21:zo Milne Point Unit Monthly Gas Flaring Incident Report For: Feb /1999 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 02/21/99 02:29:00 00:01 0.1 0.0 02/21/9910:06:00 00:09 4.2 3.1 02/22/9919:43:00 00:02 0.5 0.0 02/22/9919:54:00 00:06 2.6 1.8 02/22/99 20:02:00 00:13 5.8 5.9 02/22/99 20:26:00 00:04 1.6 1.1 02/26/99 05:14:00 00:01 0.0 0.0 02/26/99 20:58:00 00:02 1.2 0.2 02/26/99 21:10:00 00:05 4.2 4.4 02/26/99 23:29:00 00:0 i 0.7 0.0 02/26/99 23:40:00 00:05 6.7 6.7 02/27/99 00:13:00 00:02 1.0 0.4 02/27/99 00:37:00 00:08 13.2 12.5 02/27/99 00:54:00 00:06 5.6 4.5 02/27/99 01:09:00 00:06 6.7 6.3 02/27/99 01:25:00 00:20 22.5 21.2 02/27/99 01:55:00 00:05 4.0 3.8 02/27/99 02:07:00 00:08 7.6 7.1 02/27/99 02:23:00 00:07 10.1 10.6 02/27/99 02:55:00 00:05 6.0 4.7 02/27/99 03:14:00 00:01 1.3 1.9 02/27/99 03:24:00 00:06 6.1 5.5 02/27/99 03:54:00 00:06 7.7 6.1 02/27/99 04:13:00 00:02 2.5 3.5 02/27/99 04:22:00 00:08 12.1 10.8 02/27/99 04:38:00 00:07 8.7 9.3 02/27/99 08:28:00 00:32 69.2 67.0 02/27/99 09:09:00 00:06 18.3 19.9 02/27/99 09:23:00 00:07 9.9 9.4 02/27/9914:02:00 00:13 8.6 7.3 02/27/9914:29:00 00:01 1.5 2.1 02/27/9914:37:00 00:08 9.1 8.0 02/27/9918:01:00 00:14 50.8 26.5 02/27/9918:26:00 00:04 10.7 5.2 02/27/9918:48:00 00:27 21.5 9.7 02/27/99 21:05:00 00:10 11.2 4.6 02/27/99 22:19:00 00:11 9.8 4.0 02/27/99 22:32:00 00:13 4.8 4.6 02/28/9911:59:00 00:01 0.9 0.0 BP Exploration Page 6 of 7 Milne Point, Alaska 03/08/99 21:20 Milne Point Unit Monthly Gas Flaring Incident Report For: Feb /1999 Flare Name: Flare 1 ~'lanned Events Exceeding 1 hour OR Volumne Excee i~'ng 5000 MSC Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 02/27/99 14:49:00 03:11 1,370.2 553.3 Maint. on C-5511 A&B, off 2nd and SI 4 gas lib wells to reduce oil rate, 3rd stage separators started compressor ASAP Flare Assist Unplanned Events <=1 hour 2,374.3 2,030.3 Unplanned Events > 1 hour 0.0 0.0 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 1,370.2 553.3 Unmetered Assist Gas 9,166.9 TOTAL FLARED VOLUME 3,744.5 11,750.5 MSCF BP Exploration Page 7 of 7 Milne Point, Alaska Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point February 27, 1999 Time and duration of incident February 27, 1999 / 14:49 , 03hr:1 lmins. Flare Volume: 1370 Assist Gas Volume: 553 This was an unplanned flaring event. An unplanned gas compression facility shut down occurred while doing planned maintenance. A large number of wells were shut in to mitigate flaring prior to the maintenance and during the gas plant shut down, (see below). MPU operations and maintenance staff were conducting valve maintenance repairs, which required shutting down the C-5501/11A compressor. While the compressor was being worked on, the C-5501/11B compressor shut down on discharge PSHH. The discharge pressure increased due to an operator set point adjustment. When both of these compressors are down all gas compression is shut down. Operations staff immediately initiated a purge sequence to start the C-5501/11B compressor. Several unsuccessful attempts were made to purge the compressor. After several attempts, the compressor was successfully started. The flaring stopped shortly after the compressor was restarted. Repairs were completed on the C-5501/11A and it was restarted. Action items: • Additional training will be conducted with all operations staff to increase awareness of the compressor operations and preventive measures. • A shut down report will be conducted and entered into our MPU STAR database. The STAR database is used for tracking and generating reports concerning production impacts and corrective action items. • A design package is being developed to shorten the compressor purge times. This will substantially reduce the flaring volumes during flaring events. List of shut in wells for flare miti atg ion: B-Pad wells 3, 4, 6, 9, 10, 15, 20, 21, & 22. C-Pad wells 4, 7, & 22. E-Pad wells 6, 8, & 9. L-Pad we116 ALASKA OIL AND GAS CONSERVATION CON~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Mar-99 Disposition Volume MCF* 1. Sold Fuel 18,353 2. Reinjected 548,283 3. Flared or vented less than 1 hour 1,294 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 194 5. Pilot and Purge 372 6. Used for lease operations Fuel Assist 286,781 10,724 7. Other TOTAL items 1-7 866,001 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Title Date *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 89.6 SCH. BLUFF 525140 10.4 Official use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 04/02/99 0:06 Milne Point Unit . • Monthly Gas Flaring Incident Report For: Mar /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Start Time Duration (hh:mm) =Volume (MSCF) _ Flare Assist Cause Comment 03/01/99 01:29:00 00:01 0.6 0.0 03/01/9912:29:00 00:01 1.2 0.0 03/01/99 21:29:00 00:01 0.4 0.0 03/02/99 06:59:00 00:01 1.4 0.0 03/02/9915:42:00 00:18 15.4 6.7 03/02/9916:14:00 00:01 1.2 0.8 03/02/9916:28:00 00:02 1.6 0.1 03/02/9917:31:00 00:29 114.2 56.0 03/02/9918:04:00 00:11 17.5 9.2 03/04/99 08:57:00 00:03 2.2 0.3 03/04/99 09:07:00 00:08 7.7 4.0 03/05/99 03:43:00 00:02 0.7 0.0 03/05/99 03:57:00 00:03 1.3 0.0 03/05/99 04:13:00 00:02 1.2 0.0 03/05/99 04:26:00 00:04 1.3 0.0 03/05/99 04:39:00 00:06 2.4 0.2 03/05/9910:56:00 00:04 1.9 0.2 03/05/9911:10:00 00:05 1.4 0.0 03/05/9911:23:00 00:07 3.5 1.0 03/05/9911:35:00 00:10 4.3 1.2 03/05/9911:53:00 00:07 2.7 0.2 03/05/9912:13:00 00:02 0.9 0.0 03/05/9912:25:00 00:05 1.6 0.0 03/05/9912:36:00 00:09 2.7 0.2 03/05/9912:55:00 00:05 2.0 0.1 03/05/9913:09:00 00:06 2.2 0.0 03/05/9913:25:00 00:05 1.5 0.0 03/05/9913:40:00 00:05 2.1 0.0 03/05/9913:54:00 00:06 2.1 0.0 03/05/9916:28:00 00:02 0.7 0.0 03/05/9916:57:00 00:03 1.1 0.0 03/05/9917:29:00 00:01 0.3 0.0 03/06/99 08:29:00 00:01 0.3 0.0 03/06/99 08:34:00 00:41 113.4 55.8 03/06/99 09:43:00 00:02 1.8 0.1 03/06/99 09:53:00 00:07 12.7 6.4 03/06/9912:14:00 OO:OI 0.2 0.0 03/07/99 00:41:00 00:04 4.0 1.3 03/07/99 00:50:00 00:10 14.0 6.5 03/07/99 02:41:00 00:04 3.4 1.0 03/07/99 03:43:00 00:02 1.9 0.3 03/07/99 03:49:00 00:11 15.1 7.3 03/07/99 06:03:00 00:12 21.9 9.8 03/07/99 06:29:00 00:01 1.5 1.2 BP Exploration Page 1 of 6 Milne Point, Alaska 04/02/99 0:06 Milne Point Unit Monthly Gas Flaring Incident Report For: Mar /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Start Time Duration (hh:mm) =Volume (MSCF) _ Flare Assist Cause Comment 03/07/99 08:38:00 00:07 7.1 2.9 03/07/99 08:57:00 00:03 2.6 0.3 03/07/99 09:13:00 00:02 2.7 1.7 03/07/9917:23:00 00:07 7.2 2.7 03/07/9917:39:00 00:06 5.8 2.6 03/07/9919:23:00 00:07 6.3 3.3 03/07/99.19:44:00 00:01 0.5 0.0 03/09/9916:14:00 00:01 0.3 0.0 03/09/9916:29:00 00:01 0.1 0.0 03/09/9916:44:00 00:01 0.3 0.0 03/09/9917:44:00 00:01 0.0 0.0 03/09/9917:59:00 00:01 0.4 0.0 03/09/9918:13:00 00:02 0.6 0.0 03/09/9918:29:00 00:01 0.2 0.0 03/09/9918:44:00 00:01 0.3 0.0 03/09/9918:57:00 00:03 1.2 0.0 03/10/99 04:59:00 00:01 0.1 0.0 03/10/99 05:04:00 00:11 10.8 4.9 03/10/99 05:27:00 00:18 15.3 6.2 03/10/99 05:48:00 00:12 9.5 4.7 ' 03/10/99 06:08:00 00:07 5.5 2.3 03/10/99 06:24:00 00:06 4.3 l.6 03/10/99 06:36:00 00:09 6.9 3.0 03/10/99 07:13:00 00:02 0.6 0.0 03/10/99 08:35:00 00:10 5.6 1.5 03/10/99 08:49:00 00:11 7.6 3.7 03/10/9910:35:00 00:10 7.4 3.1 03/10!9910:58:00 00:02 1.4 0.2 03/10/9911:10:00 00:05 3.3 0.8 03/10/9911:22:00 00:08 6.9 3.0 03/10/9911:42:00 00:03 2.1 0.7 03/10/9912:34:00 00:11 10.1 4.1 03/10/9912:50:00 00:10 10.0 4.8 03/10/9913:02:00 00:28 24.3 11.7 03/10/9913:33:00 00:12 8.7 4.1 03/10/9913:55:00 00:05 3.4 1.3 03/10/9915:56:00 00:04 3.1 0.7 03/10/9916:07:00 00:08 7.3 3.7 03/10/9916:29:00 00:01 0.4 0.0 03/10/9917:44:00 00:01 0.4 0.0 03/10/9918:43:00 00:02 0.8 0.0 03/10/9918:56:00 00:04 1.9 0.0 03/10/9919:12:00 00:03 1.1 0.0 03/10/99 20:09:00 00:06 21.5 9.1 BP Exploration Page 2 of 6 Milne Point, Alaska 04/02/99 0:06 Milne Point Unit . Monthly Gas Flaring Incident Report For: Mar /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 03/10/99 20:21:00 00:09 17.0 8.4 03/10/99 20:33:00 00:12 23.0 11.5 03/10/99 20:55:00 00:05 7.8 4.3 03/11/9916:27:00 00:03 0.7 ,.~ _ _ ~ . 0.0 - -• 03/11/9916:44:00 00:01 0.7 0.0 03/11/99 17:54:00 00:06 2.5 0.1 ~ ~ ° ~ `` 03/11/9918:08:00 00:07 2.8 0.2 03/11/99 18:29:00 00:01 0.1 0.0 ' 03/12/99 08:44:00 00:01 0.1 0.0 03/12/9913:58:00 00:02 0.8 0.0 03/13/99 08:29:00 00:01 0.1 0.0 03/13/99 08:59:00 00:01 0.3 0.0 03/15/9919:13:00 00:02 0.8 0.0 03/16/99 09:31:00 00:14 53.8 46.3 03/16/99 09:52:00 00:08 20.3 22.4 03/16/9910:28:00 00:02 0.8 0.0 03/16/9910:58:00 00:02 0.8 0.0 03/16/9911:14:00 00:01 0.0 0.0 03/16/9914:05:00 00:10 10.0 8.6 03/16/9914:16:00 00:14 17.2 16.8 03/16/9914:42:00 00:03 4.3 5.3 03/16/9914:59:00 00:01 0.8 0.3 03/16/9919:40:00 00:05 2.0 1.1 03/16/99 20:27:00 00:03 3.1 1.7 03/16/99 20:44:00 00:01 0.9 1.7 03/17/9918:11:00 00:04 3.8 3.2 03/18/9913:42:00 00:03 2.0 1.4 03/18/9913:56:00 00:04 3.7 2.4 03/18/9914:08:00 00:07 10.4 11.0 03/18/99.18:41:00 00:04 4.0 2.9 03/19/99 05:59:00 00:01 0.3 0.0 03/19/9911:42:00 00:03 3.6 3.0 03/19/9919:27:00 00:03 4.2 3.6 03/20/9918:43:00 00:02 1.7 0.6 03/20/9918:59:00 00:01 2.0 2.5 03/20/99 20:59:00 00:01 0.1 0.0 03/20/99 21:59:00 00:01 0.4 0.0 03/20/99 23:29:00 00:01 0.3 0.0 03/21/9918:57:00 00:03 3.3 2.7 03/22/99 06:59:00 00:01 0.2 0.0 03/22/99 07:44:00 00:01 0.5 0.0 03/22/9918:58:00 00:02 3.4 2.8 03/23/99 04:14:00 00:01 0.3 0.0 03/23/9913:05:00 00:10 17.4 16.7 BP Exploration Page 3 of 6 Milne Point, Alaska 04/02/99 0:06 Milne Point Unit Monthly Gas Flaring Incident Report For: Mar /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 03/23/9913:19:00 00:11 10.2 9.4 03/23/9914:09:00 00:06 6.3 5.7 03/23/9916:23:00 00:07 5.1 3.9 03/23/9916:33:00 00:12 12.5 12.3 03/23/9916:59:00 00:01 0.8 1.4 03/23/9919:11:00 00:04 4.0 3.5 03/23/9919:28:00 00:02 0.2 0.0 03/23/9919:44:00 00:01 0.2 0.0 03/23/99 22:29:00 00:01 0.3 0.0 03/23/99 23:43:00 00:02 0.3 0.0 03/24/99 03:29:00 00:01 0.2 0.0 03/24/99 06:44:00 00:01 0.2 0.0 03/24/99 06:57:00 00:03 1.3 0.4 03/24/99 07:28:00 00:02 0.6 0.0 03/24/99 07:44:00 00:01 0.0 0.0 03/24/99 07:57:00 00:03 0.9 0.0 03/24/99 08:25:00 00:05 1.7 0.4 03/24/99 08:44:00 00:01 0.3 0.2 03/24/99 08:56:00 00:04 1.1 0.2 03/24/9918:38:00 00:07 2.3 1.0 03/24/9918:57:00 00:03 4.2 3.7 03/24/99 21:44:00 00:01 0.2 0.0 03/24/99 21:52:00 00:38 133.0 124.1 03/24/99 22:37:00 00:08 21.8 23.0 03/24/99 23:14:00 00:01 0.2 0.0 03/24/99 23:44:00 00:01 0.1 0.0 03/24/99 23:59:00 00:01 0.2 0.0 03/25/99 00:42:00 00:03 0.9 0.0 03/25/99 00:58:00 00:02 0,9 0.3 03/25/99 01:12:00 00:03 1.1 0.1 03/25/99 01:29:00 00:01 0.0 0.0 03/25/99 02:29:00 00:01 0.5 0.0 03/25/99 02:44:00 00:01 0.2 0.0 03/25/99 04:14:00 00:01 0.4 0.0 03/25/99 04:29:00 00:01 0.3 0.0 03/25/99 04:44:00 00:01 0.3 0.0 03!25/99 04:59:00 00:01 0.6 0.0 03/25/99 05:13:00 00:02 0.6 0.0 03/25/99 05:29:00 00:01 0.6 0.0 03/25/99 05:42:00 00:03 1.2 0.0 03/25/99 06:59:00 00:01 0.4 0.0 03/25/99 07:14:00 00:01 0.1 0.0 03/25/9911:36:00 00:09 8.3 7.2 03/25/99 20:12:00 00:03 2.8 2.2 BP Exploration Page 4 of 6 Milne Point, Alaska 04/02/99 07:06 Milne Point Unit • Monthly Gas Flaring Incident Report For: Mar /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 03/26/99 06:43:00 00:02 0.8 0.1 03/26/99 06:56:00 00:04 2.2 1.1 03/26/99 07:09:00 00:06 2.4 1.7 03/26/99 07:28:00 00:02 0.9 0.0 03/26/99 07:41:00 00:04 1.0 0.1 03/26/99 07:55:00 00:05 4.4 4.0 03/26/99 08:13:00 00:02 0.8 0.4 03/26/9919:13:00 00:02 2.1 1.5 03/27/9918:58:00 00:02 2.2 1.6 03/28/99 06:58:00 00:02 1.3 0.6 03/28/9919:29:00 00:01 1.1 0.5 03/29/99 07:13:00 00:02 0.7 0.2 03/29/99 13:5 8:00 00:02 0.9 0.1 03/29/9914:02:00 00:13 19.2 18.8 03/29/9915:05:00 00:10 10.7 9.7 03/29/9915:25:00 00:05 4.8 5.1 03/29/9915:56:00 00:19 29.3 28.1 03/29/9916:16:00 00:14 15.8 15.8 03/29/9916:39:00 00:06 10.9 11.5 03/29/9916:52:00 00:08 11.4 10.8 03/29/9917:41;00 00:04 5.4 3.6 03/29/9917:47:00 00:28 43.1 43.6 03/29/9918:20:00 00:25 29.6 29.0 03/29/9918:47:00 00:13 17.0 17.8 03/29/9919:14:00 00:01 0.7 0.6 03/30/9912:27:00 00:03 1.5 0.8 03/31/99 21:44:00 00:01 0.4 0.0 03/31/99 21:56:00 00:04 4.9 4.7 03/31/99 22:14:00 00:01 0.2 0.0 .~. ~ ,,. ' : ,.t ... ~.~. a ......, ..i' .. ,k ;;:i .~y BP Exploration Page 5 of 6 Milne Point, Alaska 04/02/99 07:06 Milne Point Unit • ~ Monthly Gas Flaring Incident Report For: Mar /1999 Flare Name: Flare 1 ~iJnplanned Events greater than 1 hour ~ Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 03/07/99 17:48:00 01:27 194.0 96.6 Unplanned S/D C-5502/03/31A & Actively working on shortening C-5502/03/31B. ESD @ E-Pad compressor purge times. Wells shutin: B-6, B-9, B-15, B-22. Flare Assist Unplanned Events <= 1 hour 1,293.5 850.6 Unplanned Events > 1 hour 194.0 96.6 Planned Events <= 1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 0.0 0.0 Unmetered Assist Gas 10,149.1 TOTAL FLARED VOLUME 1,487.5 11,096.3 MSCF BP Exploration Page 6 of 6 Milne Point, Alaska Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point March 07, 1999 Time and duration of incident March 07, 1999 / 17:48 , Olhr:27mins. Flare Volume: 194 Assist Gas Volume: 97 This was an unplanned flaring event. An unplanned shutdown of Compressor 5502/03/31A and Compressor 5502/03/31B which was caused by an ESD on E-Pad. A number of wells were shut in to mitigate flaring while maintenance was correcting the ESD problem. Operations staff immediately initiated a purge sequence to start the C-5502/03/31A &B compressors as soon as the ESD was cleared.. The flaring stopped shortly after the compressor was restarted. Action items: • A design package is being developed to shorten the compressor purge times. This will substantially reduce the flaring volumes during flaring events. List of high gas wells shut in for flare miti ate B-Pad wells 6,9,15,22. ALASKA OIL AND GAS CONSERVATION CONIl-RISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. ~ Milne Point ~ Apr-99 Disposition I Volume MCF* IlxlnazcaLe conrriUU~lvn ~,. Ca~~~~,~~~ ~~ ~~~a~. 1. Sold Fuel 16,751 2. Reinjected 452,968 3. Flared or vented less than 1 hour 2,481 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 4,069 5. Pilot and Purge 360 6. Used for lease operations Fuel Assist 254,920 12,379 7. Other TOTAL items 1-7 743,928 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby c tify th t the fo egoing Signature is true and/-correc`/t to/~the Title /~(,(~~(, ~~C i'/4~ best of my knowledge. Date ~ 1 ~. ~ ! ~ ~ ,. ,i - Pool Name (Code (Percent KUPARUK 525100 87.7 Official Use Only-Flaring Authorization>T hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report ,due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 y+ <{ '3~~4C: x;11 ~ uas Li31i.~2+ ~Di11~ '', Rnchorage 05/03/99 07:32 Milne Point Unit fla90401.psr Monthly Gras Flaring Incident Report For: Apr /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 04/01 /99 07:27:00 00:03 0.9 0.0 04/01/99 07:59:00 00:01 0.5 0.0 04/01/99 08:10:00 00:05 1.5 0.7 04/01/99 08:24:00 00:06 2.3 1.1 04/01/99 23:57:00 00:03 1.0 0.1 04/02/99 00:28:00 00:02 0.7 0.0 04/03/99 09:13:00 00:02 2.8 1.2 04/03/99 09:17:00 00:13 11.5 12.4 04/03/99 09:33:00 00:12 26.5 25.7 04/03/9910:01:00 00:14 20.6 19.5 04/03/9910:17:00 00:13 12.0 12.5 04/03/9911:02:00 00:13 13.6 12.7 04/03/9911:23:00 00:07 5.9 4.9 04/03/9911:33:00 00:27 25.8 25.7 04/03/9912:05:00 00:40 39.8 39.2 04/03/99.12:55:00 00:05 4.2 4.4 04/03/9913:06:00 00:09 7.8 7.0 04/03/9913:19:00 00:11 10.1 9.3 04/03/99 13:42:00 00:03 3.3 3.8 iii ~ < ;~ 04/03/99 14:40:00 00:05 4 9 4 3 ` ~ ~ . . ~ ~ 04/03/99 15:20:00 00:10 22.7 21.3 ,~~ ~: 04/03/9915:32:00 00:13 14.5 15.4 N 04/03/9916:55:00 00:20 20.6 19.6 04/03/9917:22:00 00:08 6.5 6.5 04/03/99 20:14:00 00:01 0.3 0.0 04/03/99 23:58:00 00:02 0.8 0.0 04/04/99 01:14:00 00:01 0.5 0.0 04/04/99 07:55:00 00:05 3.9 2.7 04/04/99 08:06:00 00:09 9.4 10.0 04/04/99 08:28:00 00:02 2.6 2.1 04/06/99 00:36:00 00:09 7.5 6.3 04/06/99 00:56:00 00:04 3.3 3.8 04/06/99 01:20:00 00:10 8.2 7.0 04/06/99 01:37:00 00:08 7.8 7.4 04/06/99 01:54:00 00:06 6.1 6.7 04/06/99 02:33:00 00:12 12.0 11.4 04/06/99 02:51:00 00:09 8.4 7.0 04/06/99 03:14:00 00:01 1.7 2.5 04/06/99 03:36:00 00:09 9.1 7.9 04/06/99 03:53:00 00:07 6.7 6.6 04/06/99 04:13:00 00:02 1.0 0.7 04/06/99 04:36:00 00:09 7.4 5.8 04/06/99 04:53:00 00:07 6.9 7.4 04/06/99 05:08:00 00:07 7.3 6.1 BP Exploration Page 1 of 7 Milne Point, Alaska 05/03/99 07:32 Milne POint Unit fla90401.psr Monthly Gas Flaring Incident Report For: Apr /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 04/06/99 05:23:00 00:07 6.5 6.3 04/06/99 05:37:00 00:08 9.5 9.9 04/06/99 06:19:00 00:11 10.0 8.5 04/06/99 06:44:00 00:01 1.1 1.9 04/06/99 07:14:00 00:01 0.1 0.0 04/06/99 07:19:00 00:11 10.9 10.4 04/06/99 07:43:00 00:02 1.6 0.5 04/06/99 07:48:00 00:12 12.3 12.8 04/06/99 08:26:00 00:04 2.6 1.4 04/06/99 08:41:00 00:04 3.6 4.0 04/07/9912:59:00 00:01 0.5 0.0 04/07/9915:26:00 00:04 1.4 0.6 04/07/9915:58:00 00:02 0.9 0.1 04/07/9916:11:00 00:04 4.0 4.2 04/07/9916:47:00 00:13 12.3 11.0 04/07/9917:06:00 00:09 8.8 8.5 04/07/9917:22:00 00:08 6.2 6.8 04/07/9917:39:00 00:06 5.1 4.5 04/07/9917:57:00 00:03 2.8 1.7 04/07/9918:04:00 00:11 9.1 9.7 04/07/99 20:56:00 00:04 3.1 2.0 04/07/99 21:13:00 00:02 1.9 2.4 04/07/99 21:41:00 00:34 24.3 23.5 04/07/99 22:22:00 00:08 6.8 7.0 04/08/99 02:59:00 00:16 199.7 108.8 04/08/99 03:25:00 00:05 31.3 9.8 04/08/99 05:33:00 00:12 16.8 15.7 04/08/99 05:55:00 00:05 4.4 4.7 04/08/9910:38:00 00:07 5.8 5.1 04/08/9910:57:00 00:03 0.8 0.1 04/08/9911:13:00 00:02 1.2 1.3 04/08/9912:29:00 00:01 0.3 0.0 04/08/9912:44:00 00:01 0.4 0.0 04/08/99 20:09:00 00:06 2.6 1.9 04/09/9911:59:00 00:01 1.2 0.5 04/17/99 01:53:00 00:07 9.8 9.8 04/17/99 04:55:00 00:05 4.8 3.6 04/17/99 05:06:00 00:09 9.4 9.7 04/ 17/99 OS :26:00 00:04 3.5 2.3 04/17/99 05:37:00 00:08 12.8 13.4 04/17/99 07:48:00 00:12 11.3 11.7 04/17/99 08:06:00 00:09 10.0 10.5 04/17/99 09:41:00 00:04 3.3 2.2 04/ 17/99 09:51:00 00:09 8.8 9.3 BP Exploration Page 2 of 7 Milne Point, Alaska 05/03/99 07:32 Milne POint Unlt fla90401.psr Monthly Gas Flaring Incident Report For: Apr /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare A ssist Cause Comment 04/17/9912:49:00 00:11 11.8 10.7 04/17/9913:14:00 00:01 1.0 1.5 04/17/9913:29:00 00:01 0.9 0.3 04/17/9913:43:00 00:02 1.2 0.5 04/17/9916:14:00 00:01 0.2 0.0 04/17/9916:17:00 00:13 13.1 12.7 04/17/9919:14:00 00:01 0.7 0.0 04/ 17/99 19:19:00 00:11 10.6 10.6 04/17/9919:32:00 00:13 10.7 10.2 04/17/9919:46:00 00:14 13.4 12.8 04/17/99 20:05:00 00:10 12.4 12.4 04/17/99 20:34:00 00:11 9.9 9.3 04/17/99 21:17:00 00:13 12.0 10.6 04/17/99 21:31:00 00:14 14.8 15.1 04/17/99 22:17:00 00:13 12.7 11.6 04/17/99 22:33:00 00:12 14.4 14.9 04/17/99 22:58:00 00:02 0.8 0.1 04/17/99 23:08:00 00:07 6.8 6.4 04/17/99 23:25:00 00:05 5.6 5.4 ' 04/17/99 23:40:00 00:05 3.9 2.7 04/17/99 23:53:00 00:07 7.3 7.8 04/18/99 00:21:00 00:09 11.0 10.4 04/18/99 00:44:00 00:01 0.7 0.1 04/18/99 00:48:00 00:12 13.3 13.3 04/18/99 01:12:00 00:03 2.6 2.0 04/18/99 01:34:00 00:11 12.4 11.2 04/18/99 02:23:00 00:07 5.9 4.6 04/18/99 02:42:00 00:03 3.5 4.1 04/18/99 02:59:00 00:01 0.3 0.0 04/18/99 05:07:00 00:08 8.0 0.0 04/18/99 05:20:00 00:10 7.2 0.0 04/18/99 05:33:00 00:12 27.0 0.0 04/18/9911:50:00 00:10 17.6 18.5 04/18/9915:43:00 00:02 1.1 0.5 04/18/9916:58:00 00:02 1.8 1.2 04/19/99 00:43:00 00:02 1.0 0.4 04/ 19/99 19:44:00 00:01 0.0 0.0 04/19/9919:58:00 00:02 0.7 0.1 04/20/99 21:57:00 00:03 4.7 2.3 04/20/99 22:06:00 00:09 13.3 15.1 04/21/99 02:44:00 00:01 0.1 0.0 04/21/99 02:54:00 00:06 6.6 5.6 04/21/99 04:07:00 00:08 8.2 6.6 04/21 /99 04:21:00 00:09 10.5 11.3 BP Exploration Page 3 of 7 Milne Point, Alaska 05/03/99 07:32 Mllne POlnt Urilt fla90401.psr Mon thly Gas Flaring Incident Report For: Apr /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 04/21/99 04:53:00 00:07 6.8 5.5 04/21/99 05:03:00 00:12 9.9 9.9 04/21/99 05:25:00 00:05 5.1 5.2 04/21/99 05:39:00 00:06 5.6 4.3 04/21/99 05:46:00 00:14 12.9 13.1 04/21 /99 06:06:00 00:09 9.2 9.3 04/21/99 06:25:00 00:05 3.5 2.3 04/21/99 06:42:00 00:03 3.8 4.4 04/21/99 06:54:00 00:06 3.9 3.2 04/22/99 02:35:00 00:10 9.0 8.2 04/22/99 03:07:00 00:08 6.7 5.3 04/22/99 03:22:00 00:08 7.8 8.0 04/22/99 05:12:00 00:03 2.3 1.7 04/22/99 05:26:00 00:04 2.3 1.8 04/22/99 05:56:00 00:04 3.1 1.8 04/22/99 06:11:00 00:04 7.0 7.6 04/22/99 06:31:00 00:14. 13.1 11.9 04/22/99 06:49:00 00:11 12.5 12.2 04/22/99 07:28:00 00:02 1.9 0.7 04!22/99 07:34:00 00:11 12.3 12.8 04/22/99 07:58:00 00:02 2.1 2.0 04/22/99 08:02:00 00:13 9.9 8.8 04/22/99 08:34:00 00:11 12.2 11.0 04/22/99 08:56:00 00:04 4.3 4.5 04/22/99 09:31:00 00:14 11.8 10.5 04/22/99 09:49:00 00:11 10.7 11.3 04/22/9911:26:00 00:04 3.5 2.9 04/22/9912:51:00 00:09 7.8 6.8 04/22/9913:09:00 00:06 6.2 6.2 04/22/9913:23:00 00:07 6.0 5.1 04/22/9913:40:00 00:05 4.7 5.2 04/22/9913:51:00 00:09 7.4 6.8 04/22/9914:14:00 00:01 1.2 0.6 04/22/9914:41:00 00:04 2.3 1.2 04/22/9914:46:00 00:14 13.3 13.1 04/22/9915:08:00 00:07 8.2 8.7 04/22/9915:51:00 00:09 10.4 9.1 04/22/9916:08:00 00:07 5.8 6.4 04/22/9916:18:00 00:27 32.2 30.7 04/22/9916:51:00 00:09 10.6 11.4 04/22/9917:07:00 00:08 11.2 10.9 04/22/9917:16:00 00:14 15.9 14.8 04/22/9917:33:00 00:12 14.5 15.2 04/22/9917:51:00 00:09 11.7 11.4 BP Exploration Page 4 of 7 Milne Point, Alaska 05/03/99 07:32 Milne Point Unit fla90401.psr Mon thly Gas Flaring Incident Report For: Apr /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 04/22/9918:08:00 00:07 5.9 4.8 04/22/9918:16:00 00:14 13.1 12.9 04/22/9918:35:00 00:10 9.1 9.6 04/22/9918:56:00 00:04 2.9 2.0 04/22/9919:02:00 00:13 12.2 12.1 04/22/9919:28:00 00:02 2.2 2.6 04/22/9919:34:00 00:11 11.3 9.8 04/22/9919:51:00 00:09 9.8 10.3 04/22/99 20:04:00 00:11 9.1 7.7 04/22!99 20:19:00 00:11 10.0 10.3 04/22/99 20:37:00 00:08 6.8 6.6 04/22/99 20:57:00 00:03 2.7 2.3 04/22/99 21:07:00 00:08 7.4 6.3 04/22/99 21:19:00 00:11 8.7 8.4 04/22/99 21:39:00 00:06 6.4 6.7 04/22/99 22:07:00 00:08 8.4 7.2 04/22/99 22:22:00 00:08 7.0 6.9 04/22/99 22:43:00 00:02 1.6 1.7 04/22/99 23:06:00 00:09 8.3 7.7 , 04/22/99 23:36:00 00:09 9.3 8.7 04/22/99 23:50:00 00:10 8.2 7.4 04/23/99 00:11:00 00:04 3.0 3.6 04/23/99 00:25:00 00:05 3.1 1.8 04/23/99 00:34:00 00:11 10.9 10.5 04/23/99 00:47:00 00:13 12.3 12.7 04/23/99 01:13:00 00:02 2.0 2.1 04/23/9910:39:00 00:06 5.9 5.3 04/23/9912:27:00 00:03 4.1 2.7 04/23/9912:33:00 00:12 10.0 10.8 04/23/9912:59:00 00:01 1.0 0.4 04/23/9916:54:00 00:06 5.0 3.9 04/24/99 00:57:00 00:03 3.7 4.0 04/24/99 02:12:00 00:03 2.4 1.2 04/24/99 02:22:00 00:08 19.3 19.3 04/24/99 02:38:00 00:07 7.1 7.1 04/24/99 03:04:00 00:26 48.8 47.0 04/24/99 03:41:00 00:04 3.6 4.7 04/24/9913:54:00 00:06 6.1 4.9 04/24/9914:07:00 00:08 15.2 15.8 04/24/9917:53:00 00:07 5.1 4.1 04/25/99 07:44:00 00:01 0.5 0.0 04/25/9916:41:00 00:04 2.4 1.8 04/27/99 04:38:00 00:07 8.2 6.6 04/27/99 04:47:00 00:28 51.2 51.5 BP Exploration Page 5 of 7 Milne Point, Alaska 05/03/99 o~:3z Milne Point Unit fla9oaol.psr Monthly Gas Flaring Incident Report For: Apr /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) = Start Time (hh:mm) Flare Assist Cause Comment 04/27/99 05:23:00 00:37 51.6 51.1 04/27/99 06:11:00 00:04 5.6 6.1 04/28/99 07:59:00 00:01 0.2 0.0 04/28/9910:29:00 00:01 0.3 0.0 04/28/9910:56:00 00:04 1.3 0.2 04/28/9911:13:00 00:02 1.0 1.1 04/28/9911:59:00 00:01 0.6 0.0 04/28/9912:14:00 00:01 0.0 0.0 04/28/9913:41:00 00:04 1.4 0.5 04/28/9917:14:00 00:01 0.3 0.0 04/28/9917:26:00 00:04 2.1 1.0 04/30/9914:57:00 00:48 432.7 230.0 04/30/9915:47:00 00:13 53.4 34.1 BP Exploration Page 6 of 7 Milne Point, Alaska 05/03/99 07:32 Flare Name: Flare 1 Milne Point Unit Monthly Gas Flaring Incident Report For: Apr /1999 fla90401.psr ~iJnplanned Events greater than 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 04/18/99 03:07:00 01:53 190.0 101.8 Hi-hi level in V-6201 caused fieldwide Reference LCIR 8266 03 o q _ o .S~ ~ S/D. 04/18/99 05:51:00 05:54 1,223.3 643.4 Field restart w/ compressor trouble Reference LCIR 8266 oss-i - I ~ ~S' following fieldwide S/D. 04/23/99 22:43:00 02:02 2,656.0 160.5 Field ramp-up following lengthy Discussed and reviewed procedures Z2 4 3 - a~ 4 S compressor repair job including a Mod with individuals involved. 55 production S/D. Flare Assist Unplanned Events <= 1 hour 2,481.0 2,011.7 Unplanned Events > 1 hour 4,069.3 905.8 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 0.0 0.0 Unmetered Assist Gas 9,821.7 TOTAL FLARED VOLUME 6,550.3 12,739.1 MSCF ~~ ,~ ~'~ .~ ~o ~, ~- ~- a BP Exploration Page 7 of 7 Milne Point, Alaska BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 03:07 - 1 hr 53 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ® an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Date: 04-18-99 Flare Volume: 190.0 Assist Gas Volume: 101.8 Event descriution During an operational upset, liquid carry-over to V-6201 (flare scrubber vessel) activated a LSHH (level safety hi-hi) and caused a fieldwide production shut down. All wells were automatically- shut-in. Flaring was generated by a safe depressurization of plant equipment and piping systems. Action taken to stop flaring Once again, the shut in of all production wells was an automated response to the production shut down. Ongoing troubleshooting and immediate response to the upset mitigated flaring to the extent possible. Action taken to urevent reoccurrence This incident was formally investigated and reported in a BPXA Loss Control Investigation Report #1999-LCIR-8266. Actions as a result of the investigation include verifying calibration of the level transmitters and shut down devices involved, jet wash (clean) the level bridals involved, raise the priority of adding another booster pump into the system and complete training on jet washing level control bridals. Reported by: Name: Larry Niles Title: OI Compliance Advisor Supervisor Name: Henry Harrington Title: Facilities Supervisor 990418 Flare incident report.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 05:51 - 5 hr 54 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 04-18-99 Flare Volume: 1,223.3 Assist Gas Volume: 643.4 This flaring event occurred during a production start-up following afield-wide production shutdown. The following are the sequence of events; (.gas--lift compressor C-5501-B was down for maintainence repairs. An attempt to start gas lift compressor C-5501-A failed due to a failed rupture disc in the Trabon lube system. The rupture disk was repaired and the A G/L compressor was online by 0900 hrs. Reinjection compressor C-5502/3/31-A shutdown shortly after start-up but was re-started by 11:10 hrs. Reinjection compressor C-5502/3/31-B was online at 11:50 hrs. Once these three compressors were brought online the plant was returned to normal operation and the flare was eliminated. Action taken to stop flaring The shut-in of all gas lift production wells is an automated response to the compressor shut down. Field ramp up was delayed until repairs were made. Ongoing troubleshooting and immediate response to the upset mitigated flaring as much as possible. Maintainence personnel (instrumentation and mechanics) were expedited to Mod 55 to make speedy repairs on the compressors. Action taken to prevent reoccurrence This incident was formally investigated and reported in a BPXA Loss Control Investigation Report #1999-LCIR-8266. Actions as a result of the investigation include verifying calibration of the level transmitters and shut down devices involved, jet wash (clean) the level bridals involved, raise the priority of adding another booster pump into the system and complete training on jet washing level control bridals. Reported by: Name: Larry Niles/Jerry Gronos Title: OI Advisor/Facilities Lead Tech Supervisor Name: Henry Harrington Title: Facilities Supervisor 990418 (2) Flare incident report.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 22:43 - 2 hr 02 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ® an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 04-23-99 Flare Volume: 2656 Assist Gas Volume: 160.5 During a field ramp up following a lengthy gas compressor repair job, a gas slug in the slug catcher tripped the common hi-hi suction pressure switch causing a production shut down of the gas compression module 55. All four compressors and the assist gas system were effected. Gas flaring came from the oil separation vessels at that point. Action taken to stop flaring All gas lift wells were shut in. Wells that had been shut down for the planned compressor work remained shut in. The assist gas system was promptly reset and functional. Gas lift header valves were promptly reset and reopened for assist gas volume. Once a compressor purge was completed the compressors were started systematically. The gas plant returned to normal operation and the flare was eliminated Action taken to prevent reoccurrence Facilities operations personnel reviewed procedures and held discussions to improve well start-up practices after long term shut downs. Responses to the initial incident were evaluated as organized and effective. Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Jeff Scarbrough Title: Facilities Supervisor 990423 Flare incident report.doc Revised 4-25-99 LEN ALASKA .OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point May-99 a r urb ~: Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 87.8 SCH. BLUFF 525140 12.2 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date t~ ~'- s' ,., ; c 1. Sold Fuel 17,753 2. Reinjected 559,282 3. Flared or vented less than 1 hour 1,054 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,255 5. Pilot and Purge 372 6. Used for lease operations Fuel Assist 269,602 10 984 7. Other TOTAL items 1-7 860,302 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: hereby certify tha,~ the foregoing is true and correct to the best of my knowledge ~~Signature ~~ u_ ~~ ~ Title ~~R. 7~~-t''~ Date ~p ~' Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 06/02/99 06:33 Milne Point Unit Monthly Gas Flaring Incident Report For: May /1999 Flare Name: Flare 1 ;Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 05/01/99 07:56:00 00:04 1.6 0.6 05/01/99 09:26:00 00:04 1.3 0.4 05/01/99 09:43:00 00:02 1.2 1.0 05101/9912:14:00 00:01 0.3 0.0 05/01/9915:43:00 00:02 0.7 0.0 05/01/9915:52:00 00:08 2.9 2.1 05/01/9916:13:00 00:02 0.9 0.5 05/01/9918:14:00 00:01 0.5 0.0 05/04/99 07:14:00 00:01 0.3 0.0 05/04/9910:44:00 00:01 0.2 0.0 05/04/9914:13:00 00:02 0.6 0.0 05/04/9915:44:00 00:01 0.0 0.0 05/04/9917:13:00 00:02 0.4 0.0 05/04/9917:29:00 00:01 0.3 0.0 05/04/9918:12:00 00:03 1.8 1.2 05/05/99 07:44:00 00:01 0.3 0.0 05/05/99 08:14:00 00:01 0.6 0.0 05/05/9912:44:00 00:01 0.1 0.0 05/05/9914:43:00 00:02 0.6 0.0 05/05/9917:59:00 00:01 0.1 0.0 05/05/9918:13:00 00:02 0.9 0.0 05/05/9918:28:00 00:02 0.4 0.0 05/05/9919:11:00 00:04 1.6 0.6 05/05/9919:23:00 00:07 2.8 1.6 05/05/9919:44:00 00:01 0.6 0.6 05/06/99 03:01:00 00:14 14.5 13.4 05/06/99 03:26:00 00:04 2.3 2.8 05/06/99 04:43:00 00:02 1.4 0.7 05/06/99 05:13:00 00:02 1.3 0.7 05/06/99 08:29:00 00:01 0.6 0.0 05/06/9910:02:00 00:13 33.8 17.0 05/06/9910:20:00 00:10 18.0 8.0 05/06/9910:39:00 00:06 11.5 5.9 05/06/9911:29:00 00:01 0.1 0.0 05/06/9911:44:00 00:01 0.4 0.0 05/06/9911:59:00 00:01 0.2 0.0 05/06/9917:29:00 00:01 0.4 0.0 05/06/9917:40:00 00:05 5.1 1.8 05/06/99 20:51:00 00:09 19.1 20.1 05/06/99 21:08:00 00:07 10.4 9.0 05/06/99 21:28:00 00:02 4.7 5.7 05/06/99 21:38:00 00:07 8.9 7.5 05/06/99 21:49:00 00:11 19.1 23.0 05/06/99 22:05:00 00:10 13.8 .20.8 BP Exploration Page l of 4 Milne Point, Alaska 06/02/99 06:33 Milne Point Unit Monthly Gas Flaring Incident Report For: May /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 05/07/99 05:44:00 00:01 0.4 0.1 05/07/99 08:10:00 00:05 2.0 2.3 05/07/99 09:44:00 00:01 0.1 0.0 05/07/99 09:58:00 00:02 0.4 0.0 05/07/9910:13:00 00:02 1.0 0.4 05/07/9910:43:00 00:02 0.3 0.0 05/07/9913:14:00 00:01 0.4 0.0 05/07/9913:28:00 00:02 0.4 0.0 05/07/9913:44:00 00:01 0.2 0.0 05/07/99 14:27:00 00:03 0.8 0.0 05/07/9914:59:00 00:01 0.1 0.0 05/07/9915:29:00 00:01 0.5 0.0 05/08/99 21:23:00 00:07 9.2 10.1 05/09/9910:13:00 00:02 0.5 0.0 05/09/9910:29:00 00:01 0.6 0.3 05/09/99 15:13:00 00:02 0.8 0.2 05/11/99 20:43:00 00:02 1.1 0.5 05/11/99 23:12:00 00:03 2.4 1.7 05/11/99 23:29:00 00:01 0.8 0.3 05/11/99 23:35:00 00:10 12.0 10.2 05/11/99 23:58:00 00:02 4.6 5.8 05/13/9915:53:00 00:07 11.3 9.2 05/13/9916:13:00 00:02 2.8 4.2 05/18/9917:28:00 00:02 2.4 0.9 05/19/9913:35:00 00:10 9.2 8.5 05/19/9913:49:00 00:11 10.4 9.4 05/19/9914:14:00 00:01 1.0 1.5 05/19/9915:38:00 00:07 2.7 1.8 05/19/9915:59:00 00:01 0.5 0.6 05/22/99 07:42:00 00:03 1.9 1.3 05/22/9919:29:00 00:01 0.3 0.0 05/22/9919:44:00 00:01 0.7 0.3 05/22/99 20:03:00 00:27 224.9 119.7 05/22/99 20:31:00 00:14 45.7 51.2 05/22/99 20:50:00 00:10 119.4 53.1 05/22/99 21:59:00 00:01 0.6 0.0 05/22/99 22:12:00 00:03 1.0 0.3 ;~ ,~ r4 05/22/99 22:29:00 00:01 0.5 0.1 ~ ~ ,~) ~}~~~ ~` ~ `~ 05/23/99 00:13:00 00:02 0.5 0.0 05/23/99 00:28:00 00:02 0.9 0.2 05/23/99 00:42:00 00:03 0.4 0.0 05/23/99 00:59:00 00:01 0.4 0.0 °`.~~~15~; `"~j'°" ~'~ ~v; j "" ~`+f1C~lOPu~°" 05/23/9913:17:00 00:28 62.9 61.6 05/23/9913:51:00 00:09 12.5 11.3 BP Exploration Page 2 of 4 Milne Point, Alaska i 06/02/99 06:33 Milne Point Unit Monthly Gas Flaring Incident Report For: May /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (11iSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 05/23/9914:05:00 00:10 15.1 16.6 05/23/9915:59:00 00:01 0.3 0.0 05/23/9916:07:00 00:08 7.5 6.9 05/23/9917:44:00 00:01 0.2 0.0 05/23/9917:51:00 00:09 22.7 20.0 05/23/99 18:09:00 00:06 17.9 19.7 05/23/99 21:42:00 00:03 0.6 0.0 05/23/99 21:59:00 00:01 0.7 0.0 05/24/99 00:13:00 00:02 0.5 0.0 05/25/99 00:03:00 00:12 15.1 14.0 05/25/99 07:44:00 00:01 0.3 0.0 05/25/99 07:50:00 00:10 17.1 16.7 05/25/99 08:39:00 00:06 5.5 4.6 05/25/99 08:46:00 00:14 13.0 12.7 05/25/99 09:06:00 00:09 7.6 7.1 05/25/99 09:20:00 00:10 10.8 11.1 05/25/9911:13:00 00:02 1.7 0.5 05/25/9911:27:00 00:03 3.4 4.0 05/26/99 04:37:00 00:08 15.3 14.0 05/26/99 04:57:00 00:03 2.9 3.6 05/26/9911:40:00 00:05 5.1 3.6 05/26/9911:57:00 00:03 4.6 5.5 05/26/9913:52:00 00:08 9.3 8.7 05/26/9914:47:00 00:28 41.9 40.6 05/26/9915:26:00 00:19 26.9 26.3 05/26/9915:46:00 00:14 19.6 20.0 05/26/9916:11:00 00:04 4.3 4.6 05/26/9918:05:00 00:10 13.5 12.9 05/27/99 01:44:00 00:01 0.3 0.0 05/27/99 06:29:00 00:01 0.1 0.0 05/27/99 07:48:00 00:12 5.4 4.3 05/27/99 09:21:00 00:09 5.0 2.1 05/27/99 09:42:00 00:03 1.0 0.0 05/27/9911:39:00 00:06 1.8 0.7 05/27/9912:59:00 00:01 0.1 0.0 05/28/99 00:37:00 00:08 12.3 10.8 05/28/99 00:56:00 00:04 5.4 6.3 05/29/99 01:29:00 00:01 1.1 0.5 BP Exploration Page 3 of 4 Milne Point, Alaska 06/02/99 06:33 Milne Point Unit Monthly Gas Flaring Incident Report For: May /1999 Flare Name: Flare 1 ~iJnplanned Events greater than 1 hour ~ Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 05/06/99 08:35:00 01:25 536.8 164.8 05/06/9919:31:00 OI:14 542.3 60.2 05/08/99 20:09:00 01:06 141.2 139.6 05/27/99 08:04:00 01:11 34.5 31.3 Flare Assist 810.6 395.9 0.0 0.0 10,149.1 Unplanned Events <=1 hour 1,054.4 Unplanned Events > 1 hour 1,254.8 Planned Events <= 1 hour and not exceeding 5,000 MCF 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 0.0 Unmetered Assist Gas TOTAL FLARED VOLUME 2,309.3 11,355.5 MSCF BP Exploration Page 4 of 4 Milne Point, Alaska BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 08:35 - 1 hr 25 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: OS-06-99 Flare Volume: 537 Assist Gas Volume: 165 There were two events causing this flare incident. At 08:35 the event started when a false level indication during a oil skimming operation of V-5412 caused gas to vent to the flare system from the injection water surge drum in Module 54. Then at 08:52 an unplanned flaring event occurred when compressor C-5501-A shutdown from PSHH discharge pressure caused by a high cooler temperature on the gas lift cooler. The second compressor was down for maintenance at the time so a total gas plant shutdown occurred. Action taken to stow flaring Compressor C-5501-A was purged and started . The other gas plant compressors were then brought back on line. The plant was returned to normal operation and the flaring stopped. Action taken to prevent reoccurrence Maintenance personnel have scheduled a PM to complete on the Mod. 55 gas coolers. Pitch blade adjustments will be made to help in the control of temperarture on the gas lift cooler. Reported by: Name: Jerry Gronos Title: Facilities Lead Technician Supervisor Name: Henry Harrington Title: Facilities Supervisor 990506 Flare 1 incident report.doc Revised 425-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 19:31 - 1 hr 14 min Planned event: ^ yes ®no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: OS-06-99 Flare Volume: 542 Assist Gas Volume: 60 This was an unplanned flaring event which occurred when the LSHH on the gas lift scrubber, (V- 5511) tripped and shutdown the gas compression module. Debris was found in the level control valve and hindered the level from decreasing. The gain in fluid level was so fast that the LAH 5520 came in after the LAHH 5517, making operating intervention extremely difficult. The initial flare volume was the blow down of the gas lift and injection compressors. After the blow down of the gas plant, a purge was immediately started on C-5501/11 A. The gas lift and injection compressors were brought on systematically to reduce flare duration. Action taken to stop flaring The gas lift and injection compressors were immediately started and gas plant was returned to normal operations. Action taken to prevent reoccurrence Maintenance personnel were dispatched to recalibrate and check operation of LAH-5520 on the gas lift scrubber. Reported by: Name: Jerry Gronos Title: Facilities Lead Technician Supervisor Name: Henry Harrington Title: Facilities Supervisor 990506 Flare incident report.2 doc.doc Revised 425-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 20:09 - 1 hr 06 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: OS-08-99 Flare Volume: 141 Assist Gas Volume: 140 The production proration was lifted at 1600 hours. Wells that were shut-in due to the proration were brought back on line. The pressure in the slug catcher V-5317 exceeded the flare set point and relieved the excess pressure to flare. Action taken to stop flarine Wells were stopped from coming back into production until the pressure reduced and allowed the PCV to the flare to close. The excessive gas appeared to be coming from B-pad and the slugging valve was closed to 75°Io to reduce the incoming gas volume. Action taken to prevent reoccurrence Control Room board operator's and field operators discussed need to slowly bring high GOR wells back on line. Reported by: Name: Jerry Gronos Title: Facilities Lead Technician Supervisor Name: Henr~Harrington Title: Facilities Supervisor ,: ~,~~ x~l f.. h~1C~ur., _. 990508 Flare incident report.doc Revised 425-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 08:04 - 1 hr 11 min Planned event: ^ yes ®no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event descriution Date: OS-27-99 Flare Volume: 35 Assist Gas Volume: 31 The plant was running normal and at 08:00 hrs. we noticed that we were getting a small amount of gas to flare header. The facility operators began searching the facility for flare header equipment that may be leaking by; such as pressure safety valves or pressure control valves. At approx. 09:15 we found a possible small leak-thru on PCV-5305 on V-5301 (2"d stage separator). The downstream block valve was temporarily closed and the flare ceased. Action taken to stop flaring Upon discovery of the PCV-53051eaking by, the instrument technician was immediately dispatched to correct the calibration and valve seating problem. The downstream block valve was being monitored until the valve was repaired. Action taken to arevent reoccurrence Verification was made to ensure that the PCV-5305 is maintained within the preventive maintenance program. Reported by: Name: Jerry Gronos Title: Facilities Lead Technician Supervisor Name: Jeff Scarbrough Title: Facilities Supervisor 990527FIare incident report.doc Revised 425-99 LEN ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Jun-99 Disposition Volume MCF* 1. Sold Fuel 14,939 2. Reinjected 395,880 3. Flared or vented less than 1 hour 1,119 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,268 5. Pilot and Purge 359 6. Used for lease operations Fuel Assist 223,144 10 663 7. Other TOTAL items 1-7 647,372 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby ce~fy tt~t the foregoing is true and correct to the best of my knowledge Signature ~. ~1..(~A~-~l~.G~ Title rW(s~/j. "T1~/r Date *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 83.6 SCH. BLUFF 525140 16.4 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 8:35 Milne Point Unit Monthly Gas Flaring Incident Report For: Jun /1999 Fr Tare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 06/01/99 07:28:00 00:02 0.3 0.0 06/02/9917:53:00 00:52 208.6 187.4 06/02/9918:47:00 00:13 25.2 25.4 06/02/9919:08:00 00:07 14.1 13.4 06/02/9919:29:00 00:01 1.9 2.6 06/02/99 21:59:00 00:01 0.4 0.0 06/02/99 22:08:00 00:07 10.9 10.7 06/05/9914:44:00 00:01 0.6 0.1 06/07/9915:11:00 00:04 5.1 3.8 06/07/9915:19:00 00:26 36.1 17.5 06/07/9915:50:00 00:40 59.3 29.3 06/07/9916:32:00 00:13 16.3 8.0 06/07/9916:52:00 00:08 8.4 4.0 06/07/9917:05:00 00:10 9.1 3.5 06/07/9917:22:00 00:08 6.6 3.0 06/08/9913:29:00 00:01 1.5 0.1 06/08/9914:37:00 00:08 6.6 2.6 06/08/9915:29:00 00:01 0.4 0.0 06/08/9915:41:00 00:04 4.1 1.6 06/08/9918:46:00 00:14 13.2 5.9 06/08/9919:21:00 00:09 8.8 3.8 06/08/9919:58:00 00:02 0.6 0.0 06/08/99 20:08:00 00:07 3.6 0.8 06/08/99 20:27:00 00:03 4.1 1.0 06/08/99 20:33:00 00:12 10.1 5.5 06/08/99 20:57:00 00:03 1.4 0.0 06/08/99 21:12:00 00:03 1.9 0.3 06/08/99 21:55:00 00:05 4.8 1.7 06/08/99 23:58:00 00:02 0.5 0.0 06/09/99 01:24:00 00:06 10.8 3.5 06/09/99 01:44:00 00:01 2.1 2.3 06/09/99 06:25:00 00:05 2.1 0.4 06/09/99 06:58:00 00:02 1.1 0.0 06/09/9913:54:00 00:06 2.0 0.0 06/09/9914:06:00 00:09 3.6 0.7 06/09/9914:43:00 00:02 0.7 0.0 06/09/9916:26:00 00:19 10.5 4.2 06/09/9916:57:00 00:03 3.7 2.0 06/09/9917:39:00 00:06 6.3 2.5 06/12/99 07:59:00 00:01 0.1 0.0 06/14/9916:21:00 00:09 102.2 2.1 06/14/9916:44:00 00:01 1.9 0.0 06!20/99 04:44:00 00:01 0.6 0.0 06/21/99 09:40:00 00:05 35.5 8.8 BP Exploration Page 1 of 5 Milne Point, Alaska Milne Point Unit Monthly Gas Flaring Incident Report For: Jun /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 06/21/99 09:46:00 00:14 83.2 11.6 06/21/9910:03:00 00:12 69.7 273 06/21/9910:28:00 00:02 10.3 1.0 06/22/99 01:59:00 00:01 0.6 0.0 06/23/99 05:46:00 00:14 14.0 93 06/23/99 06:07:00 00:08 4.2 3.7 06/23/99 07:00:00 00:15 11.0 8.1 06/23/99 07:23:00 00:07 2.6 1.6 06/23/99 07:55:00 00:05 2.1 0.0 06/23/99 08:08:00 00:07 2.8 0.5 06/23/99 08:24:00 00:06 2.2 0.0 06/23/99 08:38:00 00:07 2.1 0.0 06/23/99 08:52:00 00:08 2.4 0.0 06/23/99 09:12:00 00:03 1.1 0.0 06/23/99 09:26:00 00:04 1.1 0.0 06/23/99 09:44:00 00:01 0.2 0.0 06/23/99 09:59:00 00:01 03 OA 06/23/9910:27:00 00:03 1.0 0.0 06/23/9910:44:00 00:01 03 0.0 06/23/9910:58:00 00:02 0.3 0.0 06/23/9911:10:00 00:05 1.2 OA 06/23/9911:26:00 00:04 13 0.0 06/23/9911:44:00 00:01 0.6 0.0 06/23/9911:56:00 00:04 1.2 0.0 06/23/9912:12:00 00:03 0.9 0.0 06/23/9912:27:00 00:03 1.0 0.0 06/23/9912:43:00 00:02 0.4 0.0 06/23/9912:59:00 00:01 03 0.0 06/23/9913:14:00 00:01 0.4 0.0 06/23/9913:28:00 00:02 0.7 0.0 06/23/9913:39:00 00:06 1.9 0.0 06/23/9913:57:00 00:03 0.9 0.0 06/23/9914:08:00 00:07 4.2 1.0 06/23/9914:23:00 00:07 5.9 2.8 06/23/9914:43:00 00:02 0.6 0.0 06/23/9915:10:00 00:05 0.7 0.0 06/23/9915:25:00 00:05 1.5 0.0 06/23/99 15:40:00 00:05 1.5 0.0 ~ , 06/23/99 15:56:00 00:04 1.4 0.0 _ --- --• ~- 06/23/9916:13:00 00:02 0.9 0.0 .~ E.. a.>;. 06/23/99 16:25:00 00:05 1.6 ,, iR ;; i OA ~"'~ ~-° 06/23/9916:43:00 00:02 0.7 OA 06/23/9916:57:00 00:03 13 0.0 06/23/9917:13:00 00:02 0.8 0.0 BP Exploration Page 2 of 5 Milne Point, Alaska ~sss Milne Point Unit Monthly Gas Flaring Incident Report For: Jun /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 06/23/9917:55:00 00:05 5.1 1.8 06/23/9918:29:00 00:16 14.0 6.1 06/23/9918:56:00 00:04 4.2 2.2 06/24/99 08:34:00 00:11 9.8 4.3 06/24/9913:54:00 00:06 5.1 1.7 06/24/9914:07:00 00:08 6.8 3.6 06/24/9918:13:00 00:02 0.7 0.0 06/24/9918:22:00 00:23 20.3 9.0 06/24/9918:56:00 00:19 17.8 8.5 06/24/9919:23:00 00:07 2.6 0.9 06/24/9919:43:00 00:02 0.3 0.0 06/24/9919:58:00 00:02 0.5 0.0 06/24/99 20:29:00 00:01 0.4 0.0 06/24/99 20:44:00 00:01 0.3 0.0 06/24/99 21:14:00 00:01 0.4 0.0 06/24/99 21:43:00 00:02 0.3 0.0 06/24/99 23:29:00 00:01 0.3 0.0 06/24/99 23:43:00 00:02 0.5 0.0 06/24/99 23:59:00 00:01 0.4 0.0 06/25/99 00:29:00 00:01 0.3 0.0 06/25/99 00:43:00 00:02 0.5 0.0 06/25/99 05:50:00 00:10 11.4 3.0 06/25/9911:18:00 00:12 5.8 0.0 06/25/9915:51:00 00:09 9.3 9.7 06/25/9917:05:00 00:10 10.2 9.6 06/26/99 07:50:00 00:10 8.5 7.3 06/26/99 08:08:00 00:07 6.2 6.7 06/26/9911:27:00 00:03 2.2 1.1 06/26/9911:41:00 00:04 3.9 4.4 06/26/9917:05:00 00:10 6.1 4.8 06/26/99 21:08:00 00:07 5.9 4.7 06/26199 21:28:00 00:02 2.6 3.2 06/26/99 22:36:00 00:09 8.4 7.3 06/26/99 22:56:00 00:04 4.5 5.0 06/27/9914:55:00 00:20 16.3 15.1 06/27/9915:27:00 00:03 2.6 3.1 06/28/9911:25:00 00:05 4.5 3.3 06/28/9911:38:00 00:07 5.5 6.1 06/28/9916:44:00 00:01 1.3 0.7 06/28/9917:14:00 00:01 1.1 0.4 06/28/9918:28:00 00:02 1.2 0.6 06/28/9919:43:00 00:02 1.5 0.9 06/28/99 20:43:00 00:02 0.9 0.3 06/29/9917:31:00 00:14 16.2 16.8 BP Exploration Page 3 of 5 Milne Point, Alaska Milne Point Unit Monthly Gas Flaring Incident Report For: Jun /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 06/30/99 07:12:00 00:03 1.4 0.7 BP Exploration Page 4 of 5 Milne Point, Alaska 07/05/99 18:35 Milne Point Unit Monthly Gas Flaring Incident Report . For: Jun /1999 Flare Name: Flare 1 ~iJnplanned Events greater than 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 06/09/99 04:57:00 01:18 81.3 38.2 C-SSO1B s/d for maint after C-SSOIA Closed manual suction valve on put on line C-SSOlA and flare stopped 06/25/99 04:17:00 01:28 494.9 171.1 C-SSOlA compressor s/d due to PSV Fitting repaired and unit returned to 5569A tubing fitting failure service 06/25/99 09:50:00 01:25 227.8 0.8 CFP Mod 54 accidental halon dump CFP fire and gas suppression systems caused full field s/d restored and field production restarted 06/25/99 12:41:00 03:04 344.6 294.1 Field s/d following halon discharge in Slowed process of popping high gor Mod 54 wells 06/29/99 16:22:00 01:08 118.8 117.5 C-5502A compr s/d while maint pm's With one power turbine offline for on unit maint.sxarted and loaded emerg. gen. to allow compr restart Flare Assist Unplanned Events <=1 hour 1,119.1 578.9 Unplanned Events > 1 hour 1,267.4 621.7 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 0.0 0.0 Unmetered Assist Gas 9,821.7 TOTAL FLARED VOLUME 2,386.5 11,022.3 MSCF BP Exploration Page 5 of 5 Milne Point, Alaska BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 04:57 - 1 hr 18 min Planned event: ^ yes ®no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 06-09-99 Flare Volume: 81 Assist Gas Volume: 38 During the production proration, the following are the sequence of events. C-5501-A was down for maintenance repairs. Tried to start Big A compressor (C-5501-A) had purge problems and needed a rupture disc replaced on the trabon system.(started & brought on line at approx. 22:30hrs.) At 05:00 we took Big B (C-5501-B) compressor down for maintenance on the low pressure side. After the compressor was blown down & prepared for maintenance work. We continued to flare at a low rate. We closed the manual suction valve on the high pressure side of C-5501/11A and flaring stopped. Action taken to stop flaring Immediate response to the upset, mitigated flaring as much as possible. The Gas plant operator was informed that the suction valve on the high pressure side of C-5501/11A should be closed when working on the low side. Action taken to prevent reoccurrence Steps will be taken to ensure the gas plant operators are aware of the need to close both suction valves (High & Low pressure) for maintenance work. Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Henry Harrington Title: Facilities Supervisor 990609FIare incident report.doc Revised 425-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 04:17 lhr.28min. Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Date: 06-25-99 Flare Volume: 495 Assist Gas Volume: 171 Event description MPU experienced an unplanned compressor shut-down on C-5501-A gas lift compressor, which was caused by PSV-5569A on the 1 ~ stage compressor discharge. This caused the compressor to shutdown on low low suction pressure on the 1 stage. A broken tubing fitting on PSV-5569A was found to be the cause of the failure. Action taken to stop flaring Repairs were made to the broken tubing fitting and the system was restarted.. The flare gas was eliminated shortly after the compressor returned to service. Action taken to prevent reoccurrence The incident was discussed at the operators morning safety meeting and emphases were directed at the importance of reporting any possible tubing leaks or high vibration areas on the PSV's. Reported by: Name: Jerry Gronos Title: Facilities Lead Technician Supervisor Name: Jeff D. Scarbroul?h Title: Facilities Supervisor 990625FIare incident report.idoc.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 09:50 - 1 hr 25 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) x necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Date: 06-25-99 Flare Volume: 228 Assist Gas Volume: 1 Event descriution MPU production facility experienced an unplanned field-wide emergency shutdown when Mod-54 experienced a Halon discharge. The Halon discharge was caused by welding work that was being conducted in the module. The incident investigation determined that the fire detection system had not been bypassed before the welding work began. Action taken to stop flaring After the facility blew down the flare volume dropped off.. Production start up was deferred until after all fire and gas systems were returned to normal. Action taken to prevent reoccurrence Incident was discussed at operators morning safety meeting . Reported by: Name: Jerry Gronos Title: Facilities Lead Technician Supervisor Name: Jeff D. Scarbrough Title: Facilities Supervisor 990625FIare incident report.2doc.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 12:41 - 3 hr 04 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 06-25-99 Flare Volume: 345 Assist Gas Volume: 294 MPU production facility was being brought back online after the unplanned field-wide emergency shutdown when Mod-54 experienced a Halon discharge at 09:50 Hrs. Gas and oil were being introduced back into the plant ,along with start-up of all the shutdown equipment. Action taken to stop flaring The plant and field equipment were brought back online in a expeditious manner to help mitigate the flaring event. Action taken to prevent reoccurrence Discussed with operators to slow process of popping high gor wells at full field startup to mitigate flaring to minimum. Reported by: Name: Jerry Gronos Title: Facilities Lead Technician Supervisor Name: Jeff D.Scarbrouch Title: Facilities Supervisor 990625FIare incident report.3doc.doc Revised 425-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 16:22 1hr.08min. Planned event: ^ yes ®no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Date: 06-29-99 Flare Volume: 119 Assist Gas Volume: 118 Event description MPU experienced an unplanned compressor shut-down on C-5502-A injection compressor, which was caused by LSLL on the V-5503. This caused the compressor to shutdown on low low level on the vessel. A technician was found to be the cause of the failure while conducting Preventative Maintenance on instrument.. Action taken to stop flaring Since only one power turbine was on line at the time, one emergency power generator had to be started and loaded prior to restarting the gas compressor. The compressor was then purged and restarted. as soon as possible to mitigate the flaring. The flare gas was eliminated shortly after the compressor returned to service. Action taken to prevent reoccurrence The incident was discussed with the Instrument Technicians. Emphases were directed at the importance of using AFI's to bypass shutdowns during testing. Reported by: Name: Charlie W. Parker Title: Acting Facilities Lead Technician Supervisor Name: Henry Harrington Title: Facilities Supervisor 990629FIare incident report.idoc.doc Revised 4-25-99 LEN ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point (~~3~-99 Disposition Volume MCF* 1. Sold Fuel 16,268 2. Reinjected 502,537 3. Flared or vented less than 1 hour 2,304 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,208 5. Pilot and Purge 371 6. Used for lease operations Fuel Assist 252,934 12 386 7. Other TOTAL items 1-7 788,008 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby ce~~/f~yJ th the fore ing is truevland correct to the best of my knowledge. Signature_JC~ `!~ ~ Title ~~,(y~ T~X Date g *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 85.2 SCH. BLUFF 525140 14.8 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 08/05/99 ls:as Milne Point Unit Monthly Gas Flaring Incident Report For: Jul /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 07/01/9912:14:00 00:01 0.4 0.0 07/01/9912:29:00 00:01 0.5 0.0 07/01/9913:10:00 00:05 2.8 1.5 07/01/9913:29:00 00:01 0.4 0.7 07/01/9914:44:00 00:01 03 0.0 07/01/9917:12:00 00:03 2.2 1.5 07/02/99 23:57:00 00:03 2.5 12 07/03/99 00:59:00 00:01 1.2 0.5 07/03/99 02:55:00 00:05 12.2 11.6 07/03/99 04:24:00 00:21 11.0 9.9 07/03/99 04:47:00 00:28 16.4 16.2 07/03/99 05:16:00 00:14 10.5 10.6 07/03/99 05:42:00 00:03 5.5 3.9 07/03/99 05:57:00 00:03 3.2 3.2 07/03/99 06:09:00 00:06 7.5 6.2 07/03/99 06:28:00 00:02 2.5 3.4 07/03/99 07:13:00 00:02 1.4 0.8 07/03/99 07:55:00 00:05 5.4 4.1 07/03/99 08:06:00 00:09 7.9 8.6 07/03/9916:55:00 00:05 3.7 3.1 07/04/99 02:25:00 00:05 4.8 4.2 07/04/99 03:26:00 00:04 3.2 2.6 07/04/9910:39:00 00:06 5.0 3.3 07/04/9911:14:00 00:01 0.2 0.0 07/04/9911:29:00 00:01 1.4 1.1 07/04/9917:34:00 00:41 193.1 186.6 07/04/9918:27:00 00:03 43 6.6 07/04/9918:41:00 00:04 3.9 3.3 07/05/99 02:55:00 00:05 6.3 5.7 07/05/99 03:11:00 00:04 3.6 3.3 07/05/9910:14:00 00:01 0.4 0.0 07/05/9910:27:00 00:03 3.4 3.2 07/05/9917:09:00 00:21 45.5 44.3 07/05/9917:38:00 00:07 5.4 4.8 07/05/9917:50:00 00:10 11.6 11.2 07/05/9918:06:00 00:09 9.5 10.1 07/05/9918:20:00 00:10 11 6 11 1 -`~ . . 4 S"' 07/05/9918:41:00 00:04 5.1 3.6 07/05/9918:59:00 00:01 0.9 1.8 07/05/99 20:11:00 00:04 4.0 3.4 07/05/99 20:27:00 00:03 3.8 3.4 07/06/99 02:06:00 00:09 19.3 17.7 ~ ~ ,n~~,,r ~, 07/06/99 02:19:00 00:11 28.4 29.4 07/06/99 08:18:00 00:27 66.5 65.3 BP Exploration Page 1 of 6 Milne Point, Alaska 08/05/99 1s:as Milne Point Unit Monthly Gas Flaring Incident Report For: Jul /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 07/06/99 08:47:00 00:13 12.4 13.0 07/06/99 09:28:00 00:02 0.8 0.1 07/06/99 09:40:00 00:05 4.8 4.6 07/06/99 20:16:00 00:29 51.6 50.4 07/06/99 20:46:00 00:14 13.0 13.4 07/06/99 22:25:00 00:05 4.1 2.8 07/06/99 22:37:00 00:08 7.8 7.4 07/06/99 22:57:00 00:03 2.3 2.9 07/07/99 03:52:00 00:08 15.3 14.0 07/07/99 04:01:00 00:29 52.1 51.9 07/07/99 04:33:00 00:27 35.6 35.7 07/09/99 04:54:00 00:21 78.5 74.4 07/09/99 05:18:00 00:12 24.2 24.7 07/09/99 05:33:00 00:12 36.6 34.2 07/09/99 05:53:00 00:07 16.1 18.8 07/09/99 06:06:00 00:09 11.2 9.4 07/09/99 06:21:00 00:09 13.5 14.3 07/09/99 06:37:00 00:08 9.8 9.6 07/09/99 07:57:00 00:18 76.9 74.1 07/09/99 08:19:00 00:11 21.7 23.5 07/09/9910:56:00 00:04 3.9 3.3 07/09/9911:28:00 00:02 1.9 1.2 07/09/99 22:56:00 00:04 5.5 3.1 07/09/99 23:01:00 00:14 21.9 23.4 07/09/99 23:25:00 00:05 3.4 2.6 07/09/99 23:31:00 00:14 14.0 14.1 07/09/99 23:59:00 00:01 0.7 0.9 07/10/99 01:23:00 00:07 10.2 9.6 07/10/99 01:59:00 00:01 1.2 0.5 07/10/99 03:20:00 00:10 12.5 11.4 07/10/99 03:44:00 00:01 1.2 1.7 07/10/99 04:56:00 00:04 3.1 1.9 07/10/99 05:11:00 00:04 4.6 5.2 07/10/99 06:45:00 00:15 19.4 18.3 07/10/99 07:11:00 00:04 3.6 4.1 07/10/9913:24:00 00:36 169.4 154.7 07/10/9914:09:00 00:06 10.1 12.5 07/11/9911:56:00 00:04 6.0 3.9 07/11/9912:11:00 00:04 7.1 8.5 07/11/9914:28:00 00:02 0.8 0.1 07/11/9914:32:00 00:13 17.0 16.4 07/11/9914:56:00 00:04 5.0 5.7 07/11/9915:14:00 00:01 0.7 0.0 07/11/9915:26:00 00:04 3.1 3.0 BP Exploration Page 2 of 6 Milne Point, Alaska 08/05/99 ls:as Milne Point Unit Monthly Gas Flaring Incident Report For: Jul /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 07/11/9918:39:00 00:06 6.4 5.3 07/11/9918:58:00 00:02 2.1 2.6 07/16/9919:28:00 00:02 1.0 5.6 07/17/99 01:28:00 00:02 1.9 1.2 07/17/99 09:52:00 00:08 14.7 12.9 07/17/9910:05:00 00:10 10.0 10.1 07/17/9910:19:00 00:11 14.9 15.5 07/17/9912:12:00 00:03 2.3 1.1 07/17/99 12:23:00 00:07 6.7 7.2 07/17/9913:49:00 00:11 12.4 11.2 07/17/9914:12:00 00:03 3.3 3.8 07/17/9915:21:00 00:09 11.5 10.2 07/17/9915:44:00 00:01 1.2 1.9 07/19/9919:03:00 00:12 13.2 12.0 07/19/9919:25:00 00:05 5.4 4.7 07/19/9919:33:00 00:12 12.8 12.8 07/19/9919:58:00 00:02 1.8 2.3 07/19/99 21:10:00 00:05 4.8 3.1 07/19/99 21:25:00 00:05 7.4 8.4 07/19/99 21:35:00 00:10 16.0 15.4 07/19/99 22:28:00 00:02 1.0 0.2 07/19/99 22:33:00 00:12 16.3 16.5 07/19/99 22:52:00 00:08 9.5 8.4 07/19/99 23:08:00 00:07 4.6 4.8 07/21/99 03:11:00 00:04 3.7 3.1 07/21/99 04:29:00 00:01 0.1 0.0 07/21/99 09:43:00 00:02 1.2 0.5 07/21/9914:09:00 00:06 4.2 3.3 07/21/9915:44:00 00:01 0.1 0.0 07/21/9916:24:00 00:06 3.3 1.9 07/21/9916:41:00 00:04 2.0 2.0 07/21/9917:40:00 00:05 3.5 2.8 07/21/9918:30:00 00:15 6.6 5.4 07/21/9918:54:00 00:06 4.8 5.1 07/21/99 21:25:00 00:05 4.7 3.2 07/21/99 21:44:00 00:01 1.4 1.8 07/22/99 04:17:00 00:43 52.0 50.8 07/22/99 06:58:00 00:02 1.9 1.3 07/22/99 08:07:00 00:08 11.5 10.8 07/22/99 08:27:00 00:03 2.8 2.4 07/22/99 08:40:00 00:05 3.1 2.0 07/22/99 09:28:00 00:02 1.8 1.1 07/22/99 09:41:00 00:04 4.9 3.6 07/22/99 09:54:00 00:06 8.8 9.6 BP Exploration Page 3 of 6 Milne Point, Alaska 08/OS/99 ls:4s Milne Point Unit Monthly Gas Flaring Incident Report For: Jul /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 07/22/99 22:02:00 00:13 5.2 4.2 07/22/99 22:22:00 00:08 4.2 4.4 07/23/99 03:28:00 00:02 0.6 0.0 07/23/9916:28:00 00:02 1.1 0.2 07/23/9916:35:00 00:10 12.7 12.5 07/23/9916:51:00 00:09 11.0 11.1 07/24/9914:14:00 00:01 0.3 0.0 07/25/9915:48:00 00:12 10.8 9.7 07/25/9916:03:00 00:12 11.1 11.6 07/25/9917:09:00 00:06 4.0 3.4 07/25/9917:29:00 00:01 0.8 0.2 07/25/9917:40:00 00:05 3.0 2.3 07/25/9917:52:00 00:08 3.7 2.8 07/25/9918:13:00 00:02 1.0 0.3 07/25/9918:29:00 00:01 0.2 0.0 07/25/9918:59:00 00:01 1.1 0.5 07/25/9919:10:00 00:05 2.5 1.6 07/25/9919:19:00 00:11 9.0 9.3 07/25/9919:32:00 00:13 9.9 9.1 07/25/9919:54:00 00:06 3.3 3.2 07/25/99 20:37:00 00:23 17.4 16.0 07/25/99 21:04:00 00:11 6.6 6.6 07/25/99 21:17:00 00:13 8.5 8.1 07/25/99 21:36:00 00:09 3.4 3.1 07/25/99 21:58:00 00:02 1.1 0.7 07/25/99 22:20:00 00:25 18.2 17.4 07/25/99 22:s2:00 00:08 5.4 4.9 07/25/99 23:13:00 00:02 1.4 1.6 07/26/99 00:28:00 00:02 0.8 0.2 07/26/99 00:43:00 00:02 0.4 0.0 07/26/99 00:56:00 00:04 1.5 0.4 07/26/99 01:05:00 00:10 4.9 4.5 07/26/99 01:23:00 00:07 4.3 3.5 07/26/99 02:03:00 00:12 10.6 9.4 07/26/99 02:20:00 00:10 9.0 9.6 07/26/99 20:34:00 00:11 4.1 3.2 07/27/99 00:59:00 00:01 0.3 0.0 07/27/99 07:52:00 00:08 7.3 6.2 07/27/99 08:11:00 00:04 2.8 3.2 07/27/99 08:23:00 00:52 36.3 34.4 07/27/99 09:17:00 00:13 11.2 11.7 07/27/99 09:41:00 00:34 27.0 25.5 07/27/9910:28:00 00:02 1.4 2.0 07/27/9913:10:00 OO:OS 3.3 2.7 BP Exploration Page 4 of 6 Milne Point, Alaska 08/05/99 15:45 Milne Point Unit Monthly Gas Flaring Incident Report For: Jul /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause 07/27/9913:28:00 00:02 1.1 0.3 07/27/9913:44:00 00:01 0.9 1.1 07/27/9916:49:00 00:11 9.0 8.0 07/27/9917:04:00 00:11 9.6 10.0 07/28/99 01:10:00 00:05 7.2 6.6 07/29/99 01:52:00 00:08 14.7 13.7 07/29/99 02:13:00 00:02 0.7 0.6 07/29/99 02:29:00 00:01 0.7 0.7 07/29/99 09:29:00 00:01 0.0 0.0 07/29/99 09:44:00 00:01 0.9 0.3 07/30/9915:44:00 00:46 47.8 46.6 07/30/9916:41:00 00:04 4.4 5.0 07/30/9916:46:00 00:14 11.6 10.5 07/30/9917:04:00 00:11 7.1 7.6 07/30/9919:57:00 00:03 1.5 0.8 07/31/99 05:48:00 00:12 6.1 3.1 07/31/99 06:19:00 00:11 10.1 4.1 07/31/99 06:38:00 00:07 5.8 2.7 07/31/99 07:28:00 00:02 1.3 0.0 07/31 /99 07:44:00 00:01 1,1 0.0 07/31/9911:13:00 00:02 2.1 0.1 07/31/9911:23:00 00:07 7.7 3.2 07/31/9911:32:00 00:13 11.6 5.9 07/31/9912:26:00 00:04 1.6 0.0 07/31/9915:42:00 00:03 1.8 0.2 07/31/9915:57:00 00:03 2.8 1.5 07/31/9917:11:00 00:04 4.9 1.8 07/31/99 21:41:00 00:04 33.0 13.0 07/31/99 21:46:00 00:14 45.8 43.1 07/31/99 22:02:00 00:13 41.8 41.9 07/31/99 22:26:00 00:04 13.8 14.3 07/31/99 22:34:00 00:26 32.9 32.2 07/31/99 23:07:00 00:08 9.3 9.5 07/31/99 23:25:00 00:05 13.9 12.8 Comment BP Exploration Page 5 of 6 Milne Point, Alaska 08/05/99 15:45 Flare Name: Flare 1 Milne Point Unit Monthly Gas Flaring Incident Report For: Jul /1999 L[Jnplanned Events greater than 1 hour ~ Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 07/16/99 16:03:00 01:27 933.6 330.3 C-5501/11-A compr. s/d when 07 power 07 turbine restarted (faulty RTD turbine tripped off repaced) & compr. online 07/16/99 17:33:00 01:42 183.0 66.8 C-5502/03/31 A&B s/d on delayed 07 turbine restarted (faulty RTD loadshed from 07 power turbine s/d repaced) & compr. online 07/31/99 04:17:00 01:28 91.2 63.5 C-5511 B down for maint with wells s/i Found C-5501/11 inlet valve leaking to mitigate flare thru-isolated & flare stopped Flare Assist Unplanned Events <=1 hour 2,304.1 2,148.7 Unplanned Events > 1 hour 1,207.8 460.6 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 0.0 0.0 Unmetered Assist Gas 10,149.1 TOTAL FLARED VOLUME 3,511.9 12,758.3 MSCF BP Exploration Page 6 of 6 Milne Point, Alaska BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 16:03 lhr. 27min. Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Date: 07-16-99 Flare Volume: 934 Assist Gas Volume: 330 Event description MPU experienced an unplanned compressor shut-down on C-5501/11-A compressor. This was caused by an automatic shut down of the 07 power turbine due to RTD failure. Action taken to stop flaring Immediate responce to the power turbine /compressor shut down mitigated flaring as much as possible. E8, E9, E11, G2, G6, H5, J1, J3, J4, J8, K37, L3, L5, L6, L12, & L20 wells were shut down due to the automatic power shunt protection on the second turbine. The turbine was repaired & put back in service. The compressor was then purged and restarted to mitigate the flaring. Flaring was eliminated shortly after the compressor returned to service. Action taken to prevent reoccurrence A preventive maintenance plan to replace all RTD end devices on a routine basis was instituted. Reported by: Name: David Coston Title: Facilities Lead Tech Supervisor Name: Jeff Scarbrough Title: Facilities Supervisor 990716 Flare incident report i.doc Revised 425-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 17:33 lhr. 42min. Planned event: ^ yes ®no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 07-16-99 Flare Volume: 183 Assist Gas Volume: 67 MPU experienced an unplanned compressor shut-down on C-5502/03/31-A&B low pressure & injection compressors. This was caused by an automatic shut down of the 07 power turbine due to RTD failure. Action taken to stop flaring Immediate responce to the power turbine /compressor shut down mitigated flaring as much as possible. E8, E9, E11, G2, G6, H5, J1, J3, J4, J8, K37, L3, L5, L6, L12, & L20 wells were shut down due to the automatic power shunt protection on the second turbine. B3, B4, B6, B9, B10, B15, B20, B21, B22, C4, C5, C7, C9 & D2 wells were shut down to mitigate flaring. The turbine was repaired & put back in service & compressors restarted. Flaring was eliminated shortly after the compressor returned to service. Action taken to prevent reoccurrence A preventive maintenance plan to replace all RTD end devices on a routine cycle was instituted. Reported by: Name: David Coston Title: Facilities Lead Tech Supervisor Name: Jeff Scarbrough Title: Facilities Supervisor Flare incident report 071699 183.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 04:17 - 1 hr 28 min Planned event: ^ yes ®no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event descriution Date: 07-31-99 Flare Volume: 91 Assist Gas Volume: 63 Compressor C-SS11B was taken down to perform valve maintenance on the #1 & #3 cylinders during an uplanned maitenance requirement.. Wells C3,C4,C7,C9,C14,C22a,J6,J8, J 19a,L3,L20,L32,L36 were all shut-in to mitigate any flaring. There still was a small amount of flaring. Action taken to stop flaring Facility operators were expedited to locate any valves or PSV's that might be leaking. Operators closed the inlet and pressurizing HV valves on C-5501/11-B gas lift compressor, and the flaring was eliminated. The 2 valves appear to be leaking thru in the closed status. Action taken to prevent reoccurrence Maintenance personnel have been contacted to do corrective maintenance on the above two valves. This work will take place during the September 11~' TAPS slowdown. Reported by: Name: Jerry Gronos Title: Facilities Lead Technician Supervisor Name: Henry Harrington Title: Facilities Supervisor Flare incident repor 7-31-99.doc Revised 425-99 LEN ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Aug-99 Disposition Volume MCF* 1. Sold Fuel 16,625 2. Reinjected 563,254 3. Flared or vented less than 1 hour 2,662 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 6,194 5. Pilot and Purge 372 6. Used for lease operations Fuel Assist 248,666 14 155 7. Other TOTAL items 1-7 851,928 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby ce ify t at the f regoing is true and correct to the best of my knowledge. Signature Title~(,[~{y ~~ Date *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 85.5 SCH. BLUFF 525140 14.5 Official Use Only-Flaring Authorizatiari>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date ',Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 ~. Rev. 4/95 09/02/99 1s,36 Milne Point Unit Monthly Gas Flaring Incident Report For: Aug /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 08/02/99 03:58:00 00:02 1.9 1.3 08/02/99 22:13:00 00:02 0.6 0.0 08/03/9913:30:00 00:15 21.6 19.8 08/03/9914:17:00 00:13 22.6 23.7 08/03/9914:35:00 00:10 14.s 13.5 08/03/9914:48:00 00:12 17.9 18.6 08/03/9915:06:00 00:09 11.8 11.3 08/03/9915:24:00 00:06 6.2 S.s 08/03/9915:31:00 00:14 12.4 11.9 08/03/9915:47:00 00:13 12.7 13.3 08/03/9916:07:00 00:08 s.s 4.4 08/03/9916:18:00 00:12 13.4 14.0 08/03/9916:3s:00 00:10 9.1 8.8 08/06/99 20:10:00 OO:OS 1.6 0.7 08/06/99 21:13:00 00:02 1.0 0.3 08/06/99 21:28:00 00:02 0.9 0.0 08/06/99 21:44:00 00:01 0.3 0.0 08/06/99 21:57:00 00:03 1.9 0.9 08/06/99 22:14:00 00:01 0.3 0.0 08/06/99 22:25:00 00:05 1.8 1.0 08/06/99 22:40:00 00:05 1.8 0.9 08/07/99 07:29:00 00:01 2.0 l.s 08/07/99 07:42:00 00:03 14.7 11.4 08/07/9910:34:00 00:11 s.3 0.0 08/08/9917:25:00 00:20 89.2 8s.6 08/08/9917:s0:00 00:10 39.s 40.1 08/09/99 03:39:00 00:06 3.2 1.1 08/09/99 03:s8:00 00:02 1.4 0.1 08/10/99 00:33:00 00:12 18.9 21.2 08/10/99 00:57:00 00:03 Ts 0.8 08/10/99 01:22:00 00:08 6.6 ss 08/10/99 01:37:00 00:08 8.3 8.0 08/10/99 01:51:00 00:09 13.4 13.2 08/10/99 02:06:00 00:09 10.7 a, 9.8 08/10/99 02:21:00 00:09 10.1 10.1 08/10/99 02:35:00 00:10 1s.2 13.6 08/10/99 02:s3:00 00:07 9.3 9.s 08/10/99 03:05:00 00:10 9.4 8.9 08/10/99 03:24:00 00:06 s.3 s.2 08/10/99 03:37:00 00:08 8.0 6.7 08/10/99 03:48:00 00:12 19.2 19.1 08/10/99 04:07:00 00:08 7.8 7.7 08/10/99 04:19:00 00:11 11.6 10.6 08/10/99 04:37:00 00:08 7.4 6.7 BP Exploration Page 1 of 7 Milne Point, Alaska 09/02/99 15:36 Milne Point Unit Monthly Gas Flaring Incident Report For: Aug /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 08/10/99 04:52:00 00:08 12.9 12.6 08/10/99 05:10:00 00:05 4.3 3.8 08/10/99 05:24:00 00:06 7.6 7.7 08/10/99 05:41:00 00:04 4.4 3.8 08/10/99 05:59:00 00:01 0.0 0.0 08/10/99 06:09:00 00:06 9.1 7.4 08/10/99 06:24:00 00:06 6.7 6.2 08/10/99 06:41:00 00:04 4.6 4.5 08/10/99 06:54:00 00:06 5.8 5.1 08/10/99 07:10:00 00:05 4.4 4.1 08/10/99 07:27:00 00:03 3.2 2.7 08/10/99 07:40:00 00:05 4.8 4.2 08/10/99 07:54:00 00:06 6.2 5.1 08/10/99 08:12:00 00:03 2.7 2.6 08/10/99 08:26:00 00:04 3.4 2.8 08/10/99 08:41:00 00:04 3.4 2.8 08/10/99 08:55:00 00:05 4.4 3.8 08/10/99 09:11:00 00:04 4.5 3.9 08/10/99 09:23:00 00:07 5.9 4.5 08/10/99 09:37:00 00:08 8.8 7.9 08/10/99 09:52:00 00:08 8.6 9.4 08/10/9910:08:00 00:07 7.3 5.4 08/10/9910:23:00 00:07 8.7 8.6 08/10/9910:41:00 00:04 4.2 3.6 08/10/9910:55:00 00:05 6.5 6.0 08/10/9911:11:00 00:04 3.9 3.4 08/10/9911:25:00 00:05 6.2 5.7 08/10/9911:38:00 00:07 7.8 6.6 08/10/9911:56:00 00:04 3.6 3.4 08/10/9912:09:00 00:06 4.3 3.5 08/10/9912:23:00 00:07 7.9 7.1 08/10/9912:41:00 00:04 4.4 4.0 08/10/9912:51:00 00:09 8.8 7.7 08/10/9913:07:00 00:08 7.3 7.2 08/10/9913:25:00 00:05 5.6 5.7 08/10/9913:39:00 00:06 5.4 4.9 08/10/9913:54:00 00:06 7.3 5.9 08/10/9914:08:00 00:07 10.6 10.4 08/10/9914:23:00 00:07 7.4 6.7 08/10/9914:39:00 00:06 5.9 5.9 08/10/9914:53:00 00:07 6.8 5.6 08/10/9915:10:00 00:05 4.9 4.8 08/10/9915:21:00 00:09 11.1 10.7 08/10/9915:37:00 00:08 11.9 10.4 BP Exploration Page 2 of 7 Milne Point, Alaska 09/02/99 15:36 Milne Point Unit Monthly Gas Flaring Incident Report For: Aug /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 08/10/9915:55:00 00:05 6.1 6.6 08/10/9916:08:00 00:07 9.0 7.6 08/10/9916:23:00 00:07 6.6 6.8 08/10/9916:37:00 00:08 8.4 7.9 08/10/9916:51:00 00:09 9.7 8.5 08/10/9917:10:00 00:05 7.2 7.5 08/10/9917:22:00 00:08 11.5 10.0 08/10/9917:40:00 00:05 5.7 6.0 08/10/9917:54:00 00:06 6.9 6.3 08/10/9918:12:00 00:03 2.5 2.1 08/10/9918:21:00 00:09 9.9 9.2 08/10/9918:40:00 00:05 5.3 4.5 08/10/9918:52:00 00:08 9.9 8.9 08/ 10/99 19:09:00 00:06 8.0 7.4 08/10/9919:23:00 00:07 8.1 8.3 08/10/9919:40:00 00:05 4.5 4.2 08/10/9919:54:00 00:06 5.8 4.4 08/10/99 20:07:00 00:08 9.7 9.4 ' 08/10/99 20:25:00 00:05 5.3 5.1 08/10/99 20:37:00 00:08 7.6 7.2 08/10/99 20:53:00 00:07 10.1 9.4 08/10/99 21:10:00 00:05 5.6 5.3 08/10/99 21:20:00 00:10 9.7 8.3 08/10/99 21:37:00 00:08 7.9 7.9 08/10/99 21:54:00 00:06 5.9 4.5 08/10/99 22:07:00 00:08 8.2 8.1 08/10/99 22:21:00 00:09 8.1 7.5 08/10/99 22:40:00 00:05 5.3 5.3 08/10/99 22:56:00 00:04 6.7 6.3 08/10/99 23:06:00 00:09 9.3 8.0 08/10/99 23:24:00 00:06 6.7 6.7 08/10/99 23:40:00 00:05 3.8 3.1 08/10/99 23:52:00 00:08 10.0 9.4 08/11/99 00:10:00 00:05 5.5 5.1 08/11/99 00:25:00 00:05 7.1 6.6 08/11/99 00:35:00 00:10 14.0 12.8 08/11/99 00:57:00 00:03 3.3 3.3 08/11/99 01:08:00 00:07 7.3 6.7 08/11/99 01:24:00 00:06 6.2 5.7 08/11/99 01:40:00 00:05 6.6 6.0 08/11/99 01:53:00 00:07 7.3 5.4 08/11/99 02:10:00 00:05 5.4 6.0 08/11/99 02:24:00 00:06 5.8 5.4 08/11/99 02:37:00 00:08 8.2 7.6 BP Exploration Page 3 of 7 Milne Point, Alaska 09/02!99 15:36 Milne Point Unit Monthly Gas Flaring Incident Report For: Aug /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 08/11/99 02:54:00 00:06 6.4 5.6 08/11/99 03:07:00 00:08 7.4 6.3 08/11/99 03:22:00 00:08 8.7 8.9 08/11/99 03:36:00 00:09 10.2 9.0 08/11/99 03:53:00 00:07 7.7 8.0 08/11/99 04:08:00 00:07 8.3 6.7 08/11/99 04:24:00 00:06 8.7 8.1 08/11/99 04:39:00 00:06 6.9 6.7 08/11/99 04:56:00 00:04 4.9 5.1 08/11/99 05:09:00 00:06 6.6 5.9 08/11/99 05:22:00 00:08 8.5 7.6 08/11/99 05:39:00 00:06 5.8 4.8 08/11/99 05:53:00 00:07 7.8 7.4 08/11/99 06:08:00 00:07 6.3 5.7 08/11/99 06:23:00 00:07 6.6 6.4 08/11/99 06:39:00 00:06 6.2 5.4 08/11/99 06:54:00 00:06 6.5 5.9 08/11/99 07:09:00 00:06 7.1 7.4 08/11/99 07:25:00 00:05 5.1 3.8 08/11/99 07:39:00 00:06 5.2 5.0 08/11/99 07:51:00 00:09 9.4 9.3 08/11/99 08:11:00 00:04 5.0 4.6 08/11/99 08:22:00 00:08 7.7 7.0 08/11/99 08:36:00 00:09 7.8 6.6 08/11/99 08:56:00 00:04 4.1 3.8 08/11/99 09:08:00 00:07 8.0 7.1 08/11/99 09:25:00 00:05 5.1 4.6 08/11/99 09:40:00 00:05 4.2 4.5 08/11/99 09:53:00 00:07 6.5 5.2 08/11/9910:07:00 00:08 9.5 9.6 08/11/9910:38:00 00:07 6.5 5.9 08/11/9910:51:00 00:09 8.1 6.9 08/11/9911:09:00 00:06 5.7 5.6 08/11/9911:26:00 00:04 3.3 2.8 08/11/9911:38:00 00:07 7.4 6.6 08/11/9911:56:00 00:04 3.9 3.0 08/11/9912:07:00 00:08 10.5 10.2 08/11/9912:26:00 00:04 5.5 5.3 08/11/9912:40:00 00:05 5.0 4.3 08/11/9912:51:00 00:09 8.8 7.5 08/11/9913:09:00 00:06 6.3 6.5 08/11/9913:22:00 00:08 9.7 8.4 08/11/9913:39:00 00:06 5.8 5.9 08/11/9913:54:00 00:06 6.9 6.5 BP Exploration Page 4 of 7 Milne Point, Alaska 09/02/99 15:36 Milne Point Unit Monthly Gas Flaring Incident Report For: Aug /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 08/11/9914:08:00 00:07 8.6 6.5 08/11/9914:24:00 00:06 8.5 9.4 08/11/9914:38:00 00:07 7.3 6.6 08/11/9914:51:00 00:09 8.6 8.2 08/11/9915:10:00 00:05 5.2 4.1 08/11/9915:23:00 00:07 6.4 6.6 08/11/9915:39:00 00:21 39.0 37.0 08/11/9916:07:00 00:08 12.3 13.2 08/11/9916:25:00 00:05 6.1 5.6 08/11/9916:43:00 00:02 1.8 1.5 08/11/9918:09:00 00:36 115.4 112.9 08/11/9918:54:00 00:06 7.8 9.6 08/11/9919:24:00 00:06 20.4 19.7 08/11/9919:39:00 00:06 14.8 14.2 08/11/9919:47:00 00:13 38.4 36.1 08/11/99 20:05:00 00:10 26.5 25.4 08/11/99 20:18:00 00:12 22.9 22.8 08/11/99 20:34:00 00:11 22.5 23.3 08/11/99 23:12:00 00:03 3.4 2.8 08/11/99 23:26:00 00:04 4.3 3.7 08/11/99 23:43:00 00:02 1.7 0.7 08/11/99 23:54:00 00:06 6.6 6.7 08/12/99 00:07:00 00:08 7.5 7.0 08/12/99 00:23:00 00:07 5.7 4.3 08/12/99 00:41:00 00:04 3.0 3.1 08/12/99 00:57:00 00:03 2.2 1.6 08/12/99 01:56:00 00:04 3.8 2.6 08/12/99 02:11:00 00:04 3.5 2.7 08/12/99 02:29:00 00:01 1.1 1.4 08/12/99 04:18:00 00:12 44.8 43.7 08/12/99 04:33:00 00:12 18.9 18.2 08/12/99 04:47:00 00:43 70.4 70.1 08/12/99 05:43:00 00:02 3.0 4.2 08/13/9913:17:00 00:13 43.2 3.9 08/13/9913:31:00 00:29 108.4 10.0 08/ 13/99 14:03:00 00:12 42.9 4.1 08/13/9914:27:00 00:03 2.5 0.0 08/13/99 23:32:00 00:28 99.1 95.9 ' 08/14/99 00:04:00 00:11 32.9 30.2 08/14/99 08:59:00 00:01 1.4 0.7 08/14/99 09:54:00 00:06 23.6 20.7 08/14/9910:05:00 00:10 42.7 37.6 08/14/9913:56:00 00:04 4.1 3.2 08/14/9914:21:00 00:09 30.3 26.8 BP Exploration Page 5 of 7 Milne Point, Alaska ~~ 09/02/99 1s.36 Milne Point Unit Monthly Gas Flaring Incident Report For: Aug /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 08/14/99 21:27:00 00:03 2.6 2.0 08/15/99 23:36:00 00:09 11.1 9.9 08/16/99 01:19:00 00:11 18.4 17s 08/16/99 04:51:00 00:09 11.8 10.3 08/16/99 05:05:00 00:10 11.4 12.0 08/16/99 06:56:00 00:04 4.2 2.7 08/16/99 07:14:00 00:01 1.2 2.0 08/16/9913:28:00 00:02 1.7 1.0 08/17/9912:57:00 00:03 3.0 1.7 08/17/9913:01:00 00:14 10.3 10.4 08/17/9913:29:00 00:01 0.9 1.4 08/18/9910:s9:00 00:01 0.3 0.0 08/18/9912:57:00 00:03 1.0 0.0 08/18/9913:44:00 00:01 0.3 0.0 08/18/9914:43:00 00:02 0.7 0.1 08/29/99 09:s8:00 00:02 1.0 0.3 08/29/9910:14:00 00:01 0.4 0.0 08/29/99 21:59:00 00:01 0.4 0.0 08/29/99 23:22:00 00:08 36.4 27.0 08/29/99 23:43:00 00:02 4.1 6.s 08/30/99 03:41:00 00:04 2.5 l.s 08/30/99 03:57:00 00:03 2.7 3.0 08/30/99 07:09:00 00:21 2.1 1.0 08/30/99 07:59:00 00:01 0.4 0.0 08/30/99 08:27:00 00:03 0.6 0.0 08/30/99 08:59:00 00:01 0.2 0.0 08/30/9913:17:00 00:13 27.1 13.6 08/30/9913:31:00 00:29 43.4 21.2 08/30/9914:04:00 00:11 15.2 8.1 08/30/9914:20:00 00:10 15.7 10.s 08/30/9914:34:00 00:11 13.7 8.5 08/30/9914:49:00 00:11 11.4 8.6 08/30/9915:02:00 00:13 12.7 7.9 08/30/991s:23:00 00:07 7.4 5.3 08/30/9915:54:00 00:06 4.4 2.0 08/30/9916:10:00 00:05 4.5 3.2 08/30/9917:23:00 00:22 16.9 10.6 08/30/99 20:14:00 00:01 0.3 0.0 08/30/99 20:29:00 00:01 1.4 0.5 BP Exploration Page 6 of 7 Milne Point, Alaska 09/02/99 15:36 Milne Point Unit Monthly Gas Flaring Incident Report For: Aug /1999 Flare Name: Flare 1 nplanned Events greater than 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 08/07/99 09:29:00 01:01 08/07/9912:38:00 06:37 08/09/99 01:44:00 01:46 08/09/99 21:59:00 02:31 08/13/9911:37:00 01:38 08/30/9911:32:00 01:43 58.7 0.0 PLC fault in Mod.53 caused Level 3 PLC repair delays occurred and field s/d and power failure prolonged startup of field 2,664.8 1,349.6 Level 3 field s/d, power failure and all Hi GOR wells s/i to mitigate flare, Gas gas compressors shutdown compressor valve sequencing delayed field startup 531.1 320.9 07 power turbinf s/d due to 24v do coil High GOR wells s/i, relay repairs made relay failure and turbine BOL 2,086.5 239.5 Gas compressors s/d due to high leve Hi GOR wells s/ to mitigate flarei, liquid 1 in GL suction scrubber Scrubber control vlv repaired and compressors BOL 660.0 120.0 C-5501/11A s/d due to FSL-SS105B fail 12 High GOR wells s/i to mitigate flare, switch repaired, compressor BOL 193.1 98.9 C-SSO1B offline for vlv repair/C-SSOlA GL wells initially s/i; then 30 more hi won't hold full load GOR wells s/i to mitigate flare Flare Assist Unplanned Events <=1 hour 2,661.6 2,248.9 Unplanned Events > 1 hour 6,194.2 2,129.0 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 0.0 0.0 Unmetered Assist Gas 10,149.1 TOTAL FLARED VOLUME 8,855.8 14,526.9 MSCF BP Exploration Page 7 of 7 Milne Point, Alaska BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 09:29 - 1 hr 1 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 8/07/99 Flare Volume: 59 Assist Gas Volume: 0 MPU production facility experienced an unplanned field-wide emergency shutdown when Mod-53 experienced a malfunction in the Mod. 53 PLC UO rack communications card. This PLC fault in Module 53 caused an automatic Leve13 field wide production shut down and Power failure. Numerous problems with the PLC process card caused a delay in the start-up of the gas compression system. Action taken to prevent reoccurrence After all vessel pressure bled down to Zero the flare volume dropped off.. Production start up was deferred until after all fire and gas and PLC systems were returned to normal operations.. Action taken to prevent reoccurrence Completed test of PLC output card that was replaced in the Fire and Gas Panel. Process Control to investigate in more detail of the PLC rack fault and communication module failure. Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Henry Harrington Title: Facilities Supervisor Flare incident report 080799 59.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 10:34 - 6 hr 37 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 8/07/99 Flare Volume: 2,665 Assist Gas Volume: 1,350 MPU production facility experienced an unplanned field-wide emergency shutdown when Mod-53 experienced a malfunction in the Mod. 53 PLC UO rack communications card. This PLC fault triped an automatic Level 3 field wide production shut down. This emergency shut-down caused a complete field wide shut-down which included a power failure on the power generation system which resulted in the shut-in of all production wells Numerous problems with the PLC process card caused a delay in the start-up of the gas compression system. Due to existing problems with the communication card in the PLC in Module 53, we had to take the field back down in order to change the communication cazd in the UO rack of the PLC that had faulted.. Action taken to stop flaring MPU production facility was brought back online after the unplanned field-wide emergency shutdown from Mod-53 fire & gas system was returned to normal operation. Due to a Level 3 shut- down, which de-pressurized all production vessels in the facility, wells «~ere brought on line at a slow rate to establish a stabilized flow & pressure build-in the system. Experienced several problems with purge sequence on start-up of gas compressors. Maintenance personnel assisted operations in expediting the return of gas compression as soon as possible. Flaring was eliminated shortly after the compressor returned to service. Action taken to prevent reoccurrence Completed test of PLC output cazd that was replaced in the Fire and Gas Panel. Process Control to investigate in more detail of the PLC rack fault and communication module failure. Engineering working on completion of Compressor Purge problems in'~fodule 55. Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Henr~Harrin>;ton Title: Facilities Supervisor Flare incident report 080799 2665.doc Revised 425-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 01:46 - 1 hr 46 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 8/09/99 Flare Volume: 531 Assist Gas Volume: 321 MPU production facility experienced an unplanned emergency power shunt when relay K-1516 24vdc holding coil failed in 07 power turbine. The purpose of this relay is to signal "FIRE IN AREA" to the generator control PLC when de-energized. Since the holding coil failed, it produced the same shut-down permissive to the PLC as would an actual fire event. The automatic load shed triped one train of compression, all water flood, essential services, & well pad K. Action taken to stop flaring The defective relay was replaced, all equipment returned to service & the flaring stopped. Action taken to prevent reoccurrence Inspected failed relay to determine failure mode. Review and improve the availability of control drawings. Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Henr~Harrington Title: Facilities Supervisor Flare incident report 080999 531.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 21:59 - 2 hr 31 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event descriution Date: 8/09/99 Flare Volume: 2086 Assist Gas Volume: 240 This was an unplanned flaring event which occurred when a LSHH on the Gas Lift Suction Scrubber tripped and shut-down the Gas Compression module which relieved gas to the flare header. Debris was found blocking off the level control valve on the gas lift scrubber V-5511, which reduced the ability of the vessel to dump it's fluid level. Attempts were made to eliminate the black smoke by shutting in wells & the use of Assist Gas. Action taken to stow flaring Hi GOR wells were shut in, level control valve cleaned of debris, and gas compression returned to service. Once the gas compressors were returned to service the flare was eliminated. Action taken to prevent reoccurrence A design package is being developed to shorten the compressor purge times. This will substantially reduce the flaring volumes during flaring events. Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Jeff Scarbrough Title: Facilities Supervisor Flare incident report 080999 2086.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 11:37 - 1 hr 38 min Planned event: ^ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing .procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 08/13/99 Flare Volume: 660 Assist Gas Volume: 120 MPU experienced an unplanned compressor shut-down on C-5501/11-A. This was caused by a control wire on switch FSL-55105B going to ground. Support crews responded & corrected the problem. When we tried bring the compressor back on line a read switch on XV-5519B start-up recycle valve failed. This read switch had to be replaced before bringing the compressors up. Action taken to stop flaring Immediate response to the compressor shut down mitigated flaring as much as possible. B4, B9, B 10, B 15, B20, B21, B22, C9, C4, C5, C3, & C14 wells were shut down due to flaring. The compressor was repaired &. put back in service. Flaring was eliminated shortly after the compressor returned to service. Action taken to prevent reoccurrence PMs are scheduled on the compressors during the up-coming shutdown in September. Engineering is considering the shortening of Compressor Purge times after a normal shutdown. This could expedite the re-start of the compressors. Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Jeff Scarbrough Title: Facilities Supervisor Flare incident report 081399 660.doc Revised 425-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 11:32 - 1 hr 43 min Planned event: yes x no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 08/30/99 Flare Volume: 193 Assist Gas Volume: 99 We shutdown C-5501-B gas lift compressor in order to repair several bad valves in two different cylinders. Gas lift wells were shut-in before shutting down the compressor. After shutdown we noticed-that C-5501-A gas lift compressor could not maintain the normal load. We also had problems with HCV-5$02 slugging valve for Pads C,L and F. We began shutting in more wells to mitigate the flaring. Action taken to stop flaring Wells shut-in to mitigate flaring were B 15,B4,B3,B9,B21,B20,C3,B6,J3,L3,J8,L36,C22,C 14,J 19,HS,E8,L32,L 12,L20,F45,K37,F69,L7,F5 O,L2,L13,E4,F53,F61,KS,K6,FS,L29,L25,K17,J18,andB10. The flaring was mitigated. Action taken to prevent reoccurrence Work order written to calibrate and repair HCV-5802 slugging valve for C,L,and F Pad. Maintenance looking at repairing the C-5501-A compressor at the Sept.99 shutdown. Reported by: Name: Jerry Gronos Title: Facilities Lead Technician Supervisor Name: Henry Harrin on Title: Facilities Supervisor Flare incident report 083099 .doc Revised 4-25-99 LEN ALASKA OIL AND GAS CONSERVATION CON~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Sep-99 REV 1 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 87.1 SCH. BLUFF 525140 12.9 REV 1 - gas split corrected 1. Sold Fuel 15,080 2. Reinjected 620,063 3. Flared or vented less than 1 hour 1,268 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 6,841 5. Pilot and Purge 359 6. Used for lease operations Fuel Assist 219,253 11 436 7. Other TOTAL items 1-7 874,300 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby ce ify th t the foregoing is true and correct to the best of my knowledge. Signature ~~ Title ~(~~ j~~C Date ~G Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Sep-99 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 98.7 SCH. BLUFF 525140 1.3 1. Sold Fuel 15,080 2. Reinjected 620,063 3. Flared or vented less than 1 hour 1,268 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 6,841 5. Pilot and Purge 359 6. Used for lease operations Fuel Assist 219,253 11 436 7. Other TOTAL items 1-7 874,300 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby cq~tify t17Jat the foregoing is true and correct to the best of my knowledge Signature~~~ ~~~ ~ Title r~w/r/~ Date RE~~1VE~ Form 10-422 ~~'~ '~ ~ ~~QQ Rev . 4 / 9 5 v~++// Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Alaskica Oii & Gas Cons. Commission Anchorage loio~99 lssa Milne Point Unit Monthly Gas Flaring Incident Report For: Sep /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Start Time Duration (hh:mm) =Volume (MSCF) = Flare Assist Cause Comment 09/02/99 02:35:00 00:10 8.4 4.4 09/02/99 02:59:00 00:01 0.8 1.1 09/02/99 04:10:00 00:05 5.0 2.8 09/02/99 09:17:00 00:13 23.5 15.1 09/02/99 09:38:00 00:07 7.6 5.9 09/02/99 09:58:00 00:47 180.4 125.1 09/02/9910:58:00 00:02 4.3 3.5 09/11/99 00:56:00 00:04 2.6 1.2 09/11/99 01:01:00 00:14 17.8 1.3 09/11/99 01:26:00 00:04 3.0 0.0 09/11/99 08:21:00 00:09 5.5 0.0 09/11/9915:29:00 00:01 1.6 0.0 09/11/9915:40:00 00:05 3.5 0.0 09/11/9915:56:00 00:04. 2.9 0.0 09!11/9916:13:00 00:02 1.2 0.0 09/11/9916:27:00 00:03 2.0 0.0 09/11/9916:59:00 00:01 1.2 0.0 09/11/9917:14:00 00:01 1.2 0.0 09/12/99 09:58:00 00:02 2.1 0.0 09/12/99 20:29:00 00:01 0.7 0.0 09/12/99 20:40:00 00:05 14.9 2.4 09/12/99 20:59:00 00:01 1.4 2.5 09/ 12/99 22:17:00 00:13 12.7 0.0 09/12/99 22:34:00 00:11 8.9 0.0 09/12/99 22:51:00 00:09 7.3 0.0 09/13/9916:37:00 00:08 7.8 7.0 09/13/9918:29:00 00:01 0.2 0.0 09/13/9919:14:00 00:01 0.2 0.0 09/14/99 02:41:00 00:04 6.1 3.3 09/14/99 02:55:00 00:05 6.2 6.4 09/14/99 03:06:00 00:09 15.1 11.6 09/14/99 03:17:00 00:13 13.7 11.1 09/14/99 03:33:00 00:12 16.4 13.9 09/15/99 09:04:00 00:11 20.0 18.9 09/15/99 09:18:00 00:12 13.4 13.1 09/15/99 09:33:00 00:12 12.2 11.5 09/15/99 09:48:00 00:12 9.7 9.7 09/15/9910:07:00 00:08 12.7 12.8 09/15/9910:18:00 00:12 4.7 4.6 09/15/9910:59:00 00:01 1.5 0.3 09/15/9911:14:00 00:01 0.5 0.4 09/15/9911:36:00 00:09 9.1 8.5 09/15/99 20:55:00 00:05 5.3 4.0 09/15/99 21:10:00 00:05 5.4 6.0 BP Exploration Page 1 of 3 Milne Point, Alaska 10/02/99 lsaz Milne Point Unit • Monthly Gas Flaring Incident Report For: Sep /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Start Time Duration (hh:mm) =Volume (MSCF) _ Flare Assist Cause 09/17/9911:08:00 00:07 7.6 6.4 09/17/9911:25:00 00:05 4.4 3.8 09/17/9911:43:00 00:02 2.4 3.1 09/17/9913:35:00 00:10 9.2 8.0 09/17/9914:36:00 00:09 9.9 9.2 09/17/9914:s2:00 00:08 11.9 10.8 09/17/9918:49:00 00:56 291.2 292.9 09/17/9919:56:00 00:04 5.5 10.6 09/18/9911:27:00 00:03 1.1 0.6 09/18/9911:42:00 00:03 1.6 2.3 09/18/9912:43:00 00:02 1.1 1.0 09/18/9916:29:00 00:01 0.2 0.0 09/18/99 20:43:00 00:02 0.4 0.0 09/21/9917:07:00 00:08 14.1 4.5 09/21/9917:22:00 00:08 6.6 9.8 09/21/9917:42:00 00:03 1.5 2.6 09/21/9917:51:00 00:09 18.2 25.4 09/21/9918:04:00 00:11 14.3 14.8 09/21/9918:21:00 00:09 9.1 8.7 09/21/9918:38:00 00:22 22.3 21.0 09/21/9919:OS:00 00:2s 31.2 30.2 09/21/9919:33:00 00:12 12.3 12.s 09/21/9919:s7:00 00:03 4.9 5.1 09/22/99 02:33:00 00:27 55.0 53.7 09/22/99 03:10:00 00:05 7.9 8.5 09/29/99 02:28:00 00:02 1.3 0.7 09/29/9911:12:00 00:48 226.6 210.7 09/29/9912:12:00 00:03 9.7 13.4 09/30/9913:41:00 00:04 6.0 5.3 Comment BP Exploration Page 2 of 3 Milne Point, Alaska 10/02/99 15:52 Milne Point Unit - Monthly Gas Flaring Incident Report For: Sep /1999 Flare Name: Flare 1 Planned Events Exceeding 1 hour OR Volumne Exceeding 5000 MSCF ~ Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 09/11/99 01:34:00 06:41 1,987.4 97.9 Planned flaring for plant turnaround All wells s/i & safed out, compressors during TAPS proration offline, flowline and vessel pressure de-inventoried 09/11/99 09:01:00 06:14 342.5 0.9 Planned flaring for plant turnaround N2 (truck & plant source) purged oil during TAPS proration & gas trains vessels and lines for maint. 09/11/99 19:04:00 14:41 966.3 0.0 Planned flaring for plant turnaround N2 oil train vessels & line pressure test, during TAPS proration vent to flare 09/12/99 12:14:00 08:01 437.8 0.0 Planned flaring for plant turnaround N2 oil & gas train vessels & line during TAPS proration pressure test, vent to flare 09/12/99 21:04:00 01:11 63.9 0.0 Planned flaring for plant turnaround N2 oil & gas train vessels & line during TAPS proration pressure test, vent to flare 09/13/99 05:47:00 10:43 3,043.3 790.5 Planned flaring for plant turnaround Field restarted after turnaround, wells during TAPS proration brought on by procedure to mitigate flare Flare Assist Unplanned Events <=1 hour 1,268.0 1,084.5 Unplanned Events > 1 hour 0.0 0.0 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 6,841.2 889.2 Unmetered Assist Gas 9,821.7 TOTAL FLARED VOLUME 8,109.2 11,795.4 MSCF BP Exploration Page 3 of 3 Milne Point, Alaska BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 01:34 - 6 hr 41 min Planned event: x yes no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. r_I necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 09/11/99 Flare Volume: 1987 Assist Gas Volume: 98 This event was a planned flaring event that occurred after a scheduled TAPS cutback and total field shutdown. All gas compressors and gas power turbines were taken out of service for maintenance. All wells were taken out of the system, the gas rate dropped off and gas compression stopped. Action taken to stop flaring Continued to shut down all wells and de-inventory the lines. The flaring stopped after all wells, vessels and lines were de-inventoried. Action taken to prevent reoccurrence N/A Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Jeff Scarbrough Title: Facilities Supervisor Flare incident report 091199 i.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 09:01 - 6 hr 14 min Planned event: x yes no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event descriution Date: 09/11/99 Flare Volume: 343 Assist Gas Volume: 1 This event was a planned flaring event that occurred after a scheduled TAPS cutback and total field shutdown. All gas compressors and gas power turbines were taken out of service for maintenance. As wells were taken out of the system, gas rates dropped off and gas compression stopped. This event also include bleeding down of nitrogen used for safe out procedures so that maintenance work could be conducted. Action taken to stop flaring Continued de-inventory vessels & lines. The flaring stopped after all vessels and lines were de- inventoried again. Action taken to urevent reoccurrence N/A Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Jeff Scarbrough Title: Facilities Supervisor Flare incident report 091199 2.doc Revised 425-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 19:04-14 hr 41 min Planned event: x yes no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 09/12/99 Flare Volume: 966 Assist Gas Volume: 0 This event was a planned flaring event that occurred after a scheduled TAPS cutback and total field shutdown. De-inventorying all pipelines for maintenance work. All gas compressors were out of service for maintenance. As each system safe outs was completed, the flaring would stop. This event and volume was actually nitrogen used for the safe out of process systems. Action taken to stop flaring Continued with the de-inventory of all vessels & lines. The flaring stopped after each vessels and line was de-inventoried. Action taken to prevent reoccurrence N/A Reported by: Name: David Colton Title: Facilities Lead Technician Supervisor Name: Jeff Scarbrough Title: Facilities Supervisor Flare incident report 091299 2.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 12:14-8 hr O1 min Planned event: x yes no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 09/12/99 Flare Volume: 438 Assist Gas Volume: 0 This event was a planned flaring event that occurred after a scheduled TAFS cutback and total field shutdown. De-inventorying all pipelines for maintenance work. All gas compressors were out of service for maintenance. As each system safe outs was completed, the flaring would stop. This event and volume was actually nitrogen used for the safe out of process systems. Action taken to stop flaring Continued with the de-inventory of all vessels & lines. The flaring stopped after each vessels and line was de-inventoried. Action taken to prevent reoccurrence N/A Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Jeff Scarbrough Title: Facilities Supervisor Flare incident report 091199 3.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 21:04-1 hr 11 min Planned event: x yes no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 09/12/99 Flare Volume: 64 Assist Gas Volume: 0 This event was a planned flaring event that occurred after a scheduled TAPS cutback and total field shutdown. De-inventorying all pipelines for maintenance work. All gas compressors were out of service for maintenance. As each system safe outs was completed, the flaring would stop. This event and volume was actually nitrogen used for the safe out of process systems. Action taken to stop flarintY Continued with the de-inventory of all vessels & lines. The flaring stopped after each vessels and line was de-inventoried. Action taken to prevent reoccurrence N/A Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Jeff Scarbrou;;h Title: Facilities Supervisor Flare incident report 091299 1.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 05:47 - 10 hr 43 min Planned event: x yes no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 09/13/99 Flare Volume: 3043 Assist Gas Volume: 790 This event was a planned flaring event that occurred after a scheduled TAPS cutback and total field shutdown. All gas compressors and gas power turbines were taken out of service for maintenance. As the wells were brought back on line all incoming lines and vessels had to be pressured up & leak tested. Once this was completed and gas compression was restarted all flaring stopped. Action taken to stop flaring All lines & vessels were pressured up & leak tested as expeditiously as possible. All compressors were returned to service an the flaring stopped. Action taken to prevent reoccurrence N/A Reported by: Name: David Coston Title: Facilities Lead Technician Supervisor Name: Jeff Scarbrouch Title: Facilities Supervisor Flare incident report 091399 .doc Revised 425-99 LEN ~~A OIL AND GAS CONSERVATION CONII~lISSION 12 FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point ~ ~P Exploration (Alaska) Inc. Milne Point Oct-99 Disposition Volume MCF* 1. Sold Fuel 17,488 2. Reinjected 546,073 3. Flared or vented less than 1 hour 753 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 371 6. Used for lease operations Fuel Assist 260,908 10 310 7. Other TOTAL items 1-7 835,903 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby c ify t at the foregoing is true and corr~ecetn~to the best of my knowledge. Signature ~ Title~,(,~L, , ~~c Date f~l'~(~( l *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 87.2 SCH. BLUFF 525140 12.8 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 11/01/99 0¢:2~ Milne Point Unit n Monthly Gas Flaring Incident Report For: Oct /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 10/01/99 08:11:00 00:04 2.3 1.0 10/01 /99 08:27:00 00:03 2.1 2.2 10/02/99 06:43:00 00:02 1.6 0.9 10/05/9912:44:00 00:01 0.1 0.0 10/05/9915:14:00 00:01 0.0 0.0 10/05/9915:29:00 00:01 0.1 0.0 10/05/9918:14:00 00:01 0.0 0.0 10/05/99 20:14:00 00:01 0.3 0.0 10/05/99 20:44:00 00:01 0.2 0.0 10/05/99 21:13:00 00:02 0.3 0.0 10/05/99 22:14:00 00:01 0.2 0.0 10/05/99 22:29:00 00:01 0.3 0.0 10/05/99 23:29:00 00:01 0.2 0.0 10/OS/99 23:44:00 00:01 0.2 0.0 10/05/99 23:59:00 00:01 0.2 0.0 10/06/99 00:14:00 00:01 0.3 0.0 i 0/06/99 00:29:00 00:01 0.3 0.0 10/06/99 00:59:00 00:01 0.2 0.0 0/06/99 01:11:00 00:04 0.4 0.0 10/06/99 01:59:00 00:01 0.1 0.0 10/06/99 02:29:00 00:01 0.2 0.0 0/06199 02:43:00 00:02 0.3 0.0 10/06/99 02:59:00 00:01 0.3 0.0 10/06/99 03:44:00 00:01 0.4 0.0 10/06/99 04:29:00 00:01 0.5 0.0 10/06/99 04:59:00 00:01 0.4 0.0 10/06/99 05:14:00 00:01 0.2 0.0 10/06/99 06:29:00 00:01 0.3 0.0 10/06/99 06:44:00 00:01 0.3 0.0 10/06/99 07:29:00 00:01 0.5 0.0 10/06/99 07:44:00 00:01 0.1 0.0 10/06/99 07:59:00 00:01 0.3 0.0 10/06/99 08:13:00 00:02 0.3 0.0 10/06/99 08:59:00 00:01 0.1 0.0 10/06/99 09:58:00 00:02 0.3 0.0 10/06/9910:43:00 00:02 0.2 0.0 10/06/9911:14:00 00:01 0.2 0.0 10/06/9912:14:00 00:01 0.2 0.0 10/06/9912:29:00 00:01 0.1 0.0 10/06/9914:59:00 00:01 0.1 0.0 10/08/99 22:28:00 00:02 0.8 0.1 10/09/99 07:42:00 00:03 23.9 11.4 10/09/99 07:47:00 00:13 68.4 44.0 10/09/99 08:03:00 00:12 66.9 40.4 BP Exploration Page l of 3 Milne Point, Alaska llioli99 o6:z~ Milne Point Unit Monthly Gas Flaring Incident Report For: Oct /1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 10/09/99 08:16:00 00:14 87.0 53.8 10/09/99 08:38:00 00:07 30.3 25.4 10/09/99 08:47:00 00:13 21.9 16.3 10/09/99 09:04:00 00:11 32.2 24.8 10/09/99 09:19:00 00:11 18.9 15.6 10/09/99 09:34:00 00:11 26.8 21.0 10/09/99 09:48:00 00:12 28.6 22.3 10/09/9910:04:00 00:11 21.8 17.6 10/09/9910:18:00 00:12 24.2 17.2 10/09/9910:33:00 00:12 25.6 20.2 10/09/9910:47:00 00:13 20.2 17.3 10/09/9911:05:00 00:10 10.0 8.2 10/09/9911:21:00 00:09 9.9 7.5 10/09/9911:37:00 00:23 57.8 45.1 10/09/9912:07:00 00:08 12.9 9.7 10/09/9912:22:00 00:08 14.0 11.5 10/09/9912:36:00 00:09 11.1 7.3 10109/9912:47:00 00:13 16.5 13.2 10/0909913:06:00 00:09 10.6 7.9 10/09/9913:24:00 00:06 8.8 7.2 10/09/9913:38:00 00:07 10.3 7.0 10/09/9913:50:00 00:10 16.2 12.5 10/09/9914:09:00 00:06 8.3 6.7 10/09/9914:20:00 00:10 13.4 9.5 10/09/9914:44:00 00:01 1.6 2.0 10/10/99 01:59:00 00:01 0.1 0.0 10/11/99 09:41:00 00:04 2.8 1.6 10/11/9910:25:00 00:05 14.8 10.8 10/12/99 08:44:00 00:01 1.2 0.4 10/13/9917:54:00 00:06 2.0 0.7 10/13/9918:08:00 00:07 2.7 2.1 10/25/99 02:14:00 00:01 0.2 0.0 10/26/99 23:14:00 00:01 1.4 0.5 10/27/9918:57:00 00:03 4.6 3.0 10/28/9918:58:00 00:02 1.9 0.9 10/29/9918:58:00 00:02 4.8 3.2 10/30/9919:29:00 00:01 1.4 0.5 BP Exploration Page 2 of 3 Milne Point, Alaska 11/!11/99 C'S:27 Flare Name: Flare 1 Milne Point Unit Monthly Gas Flaring Incident Report For: Oct /1999 Unplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 10/31/9918:58:00 00:02 1.8 0.8 Flare Assist Unplanned Events <= 1 hour Unplanned Events > 1 hour Planned Events <=1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Unmetered Assist Gas TOTAL FLARED VOLUME 753.4 531.5 0.0 0.0 0.0 0.0 0.0 0.0 10,149.1 753.4 10,680.6 MSCF BP Exploration Page 3 of 3 Milne Point, Alaska ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Nov-99 Disposition Volume MCF* 1. Sold Fuel 17,001 2. Reinjected 482,647 3. Flared or vented less than 1 hour 106 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,855 5. Pilot and Purge 359 6. Used for lease operations Fuel Assist 259,612 9 675 7. Other TOTAL items 1-7 771,255 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby certify at the foregoing is true and /Icorrect to the best of my knowledge. Signature Title (~/L(~~-T~'.~ Date *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 88.3 SCH. BLUFF 525140 11.7 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected o to pressure of 14.65 Asia and to a Q rT~ temperature of 60 degrees F. Repor ~ C~3 r-j due by the 20th of the month ~ folowing the month of disposition. ° o ...t Ul ~,~„ Authority 20 AAC 25.235. ~ '~~' 3 ~ rn 3 " o Form 10-422 Rev. 4/95 12/01/1999 os:29 Milne Point Unit • Monthly Gas Flaring Incident Report For: Nov 1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 11/O1/199918:44:~ 00:01 1.9 0.9 11/02/199919:13: 00:02 1.6 0.6 11/03/1999 08:43: 00:02 1.1 0.3 11/03/199918:58: 00:02 2.0 1.0 11/04/199919:29: 00:01 1.9 0.9 11/05/199918:43, 00:02 1.7 0.7 11/06/199918:43, 00:02 2.0 1.0 11/07/199918:44: 00:01 1.9 0.9 11/08/199919:28: 00:02 1.6 0.7 11/15/1999 08:29:1 00:01 0.6 0.0 11/16/199910:59:1 00:01 0.2 0.0 I1/16/1999I4:14:i 00:16 0.2 0.0 ll/16/199915:29a 00:01 0.1 0.0 11/16/199915:44:1 00:01 0.3 0.0 11/16/199916:14, 00:01 0.4 0.0 11/16/199916:44:1 00:01 0.6 0.0 11/16/199916:58, 00:02 0.3 0.0 11/16/199917:13: 00:02 0.7 0.0 11/16/199917:43, 00:02 0.3 0.0 11/16/199917:58, 00:02 0.4 0.0 11/16/199918:13, 00:02 0.6 0.0 11/16/199918:27:1 00:03 0.6 0.0 11/16/199918:41: 00:04 1.8 0.0 11/16/199918:54: 00:06 2.6 1.2 11/16/199919:09:1 00:06 2.0 0.5 11/16/199919:26: 00:04 1.0 0.0 11/16/199919:39: 00:06 1.7 0.0 11/16/199919:57: 00:03 1.0 0.0 11/16/1999 20:12, 00:03 1.5 0.1 11/16/1999 20:26: 00:04 0.8 0.0 ll/I6/1999 20:44: 00:01 0.3 0.0 11/16/1999 20:59: 00:01 0.2 0.0 11/16/1999 21:13:1 00:02 0.6 0.0 11/16/1999 21:28: 00:02 0.5 0.0 11/16/1999 21:42: 00:03 0.5 0.0 11/16/1999 21:58: 00:02 1.2 0.0 11/16/1999 22:02: 00:13 6.0 4.7 11/16/1999 22:17: 00:13 5.7 3.6 11/16/1999 22:31: 00:44 21.0 16.8 11/16/1999 23:16: 00:14 4.5 2.8 11/16/1999 23:43: 00:02 0.9 0.3 BP Exploration Page 1 of 3 Milne Point, Alaska 12/01/1999 os:a9 Milne Point Unit • Monthly Gas Flaring Incident Report For: Nov 1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 11/16/1999 23:55: 00:05 1.9 0.3 11/17/1999 00:1 l:i 00:04 0.9 0.0 11/17/1999 00:44a 00:01 0.4 0.0 11/17/1999 00:59:1 00:01 0.4 0.0 ll/19/199913:35:~ 00:10 15.6 14.6 11/19/199917:44: 00:01 1.5 0.1 11/24/1999 06:44: 00:01 1.6 0.3 11/25/1999 07:43: 00:02 1.4 0.0 11/26/1999 07:29: 00:01 1.0 0.0 11/27/1999 06:59: 00:01 1.4 0.0 11/28/1999 08:43:1 00:02 1.3 0.0 11/29/1999 07:28: 00:02 2.0 0.4 11/30/1999 07:14a 00:01 1.5 0.1 BP Exploration Page 2 of 3 Milne Point, Alaska t2ro1n999 og:29 Milne Point Unit Monthly Gas Flaring Incident Report For: Nov 1999 Flare Name: Flare 1 Cnplanned Events greater than 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 11/19/1999 11:57: 01:33 1,854.8 159.8 Technician calib error LAH V5501 B & C pad gaslift s/i to mitigate flare, scrubber & s/d gas train gas train compressors restarted Flare Assist Unplanned Events <=1 hour Unplanned Events > 1 hour Planned Events <=1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Unmetered Assist Gas TOTAL FLARED VOLUME 106.3 52.8 1,854.8 159.8 0.0 0.0 0.0 0.0 9,821.7 1,961.1 10,034.3 1VIS CF BP Exploration Page 3 of 3 Milne Point, Alaska BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 11:57 - lhr 33 min Planned event: yes x no This flaring or venting incident was: (check one) ® necessary for facility operations. ^ necessary for facility upgrades. ^ necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Date: 11/19/99 Flare Volume: 1855 Assist Gas Volume: 160 Event description This event was an unplanned-flaring event which occurred when maintenance was calibrating the level alarm high on V-5501 the gas scrubber. The level increased in the vessel and caused the LSHH on scrubber to activate thereby shutting down the gas compression system. Action taken to stop flaring The following gas lift wells were closed to mitigate flaring. C-pad wells C- 4,7, and 9. B-pad wells B-3,4,6,9,10,15,20,21, and 22. The gas compressors were purged and started . The plant was then brought back on line. Action taken to prevent reoccurrence An incident investigation into the proper maintenance procedures to follow when doing PM's on critical equipment is being reviewed. Reported by: Name: Jerry Gronos Title: Facilities Lead Technician Supervisor Name: Henry Harrington Title: Facilities Supervisor Flare incident report 11-19-99.doc Revised 4-25-99 LEN ~ ~ . ~~ Disposition ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION for Field(s) ploration (Alaska) Inc. Milne Point Volume MCF* 1. Sold Fuel 17,639 2. Reinjected 463,299 3. Flared or vented less than 1 hour 1,890 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 2,769 5. Pilot and Purge 372 6. Used for lease operations Fuel Assist 277,387 10,872 7. Other TOTAL items 1-7 774,228 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby certify th t the fore oing is true and correct to the best of my knowledge. Signature ., Title /~/~,(,~., T~~ Date Month/Year of Disposition I , Dec-99 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 90.0 SCH. BLUFF 525140 10.0 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ovo3izooo 17:01 Milne Point Unit Monthly Gas Flaring Incident Report For: Dec 1999 Flare Name: Flare 1 np at nned Events less than or equal to 1 hour Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 12/01/1999 06:58: 00:02 1.3 0.1 12/02/1999 07:43: 00:02 1.5 0.1 12/02/199910:03: 00:12 54.8 24.2 12/02/199910:19: 00:11 62.8 25.0 12/02/199910:34: 00:11 60.4 25.4 12/02li99910:54: 00:06 16.2 8.5 12/04/1999 07:13: 00:02 1.4 0.1 12/05/1999 04:44: 00:01 0.4 0.0 12/05/1999 04:47: 00:13 12.6 5.9 12/05/1999 05:13: 00:02 1.4 0.0 12/05/1999 05:41: 00:04 1.7 0.1 12/05/1999 05:58: 00:02 0.9 0.0 12/05/1999 06:28: 00:02 0.6 0.0 12/05/1999 06:42: 00:03 1.8 0.0 12/05/1999 07:29: 00:01 1.5 0.0 12/05/1999 07:39: 00:06 3.0 0.5 12/05/1999 07:55: 00:05 4.1 1.3 12/05/1999 08:41: 00:04 2.8 0.5 12/05/1999 08:55: 00:05 4.5 2.5 12/05/1999 09:06: 00:09 7.2 3.0 12/05/1999 09:25: 00:05 3.0 0.7 12/05/1999 09:42: 00:03 1.8 0.1 12/05/1999 09:55: 00:05 3.6 1.9 12/05/199910:08: 00:07 4.5 1.6 12/05/199910:43: 00:02 0.7 0.0 12/05/199910:53: 00:07 4.5 1.7 12/05/199912:12: 00:03 2.8 0.7 12/05/199912:28: 00:02 1.0 0.0 12/05/199918:53: 00:07 5.5 1.9 12/05/199919:09: 00:06 6.4 3.3 12/06/1999 07:28: 00:02 1.6 0.2 12/06/ 1999 13 :31: 00:44 916.9 0.9 ~` ' ' ~~~ 12/06/1999 14:20: 00:10 9.2 0.0 - u. ~a~ 12/06/199915:09: 00:06 6.7 0.0 12/06/1999 15:56: 00:04 3.8 0.0 ' `~ ''~ 12/06/1999 16:12: 00:03 1.0 0.0 i=~1~;^ 1'~ ;;,` r' 12/06/199916:29: 00:01 0.3 0.0 Sri'>`a~'`~;~~0 12/06/199916:57: 00:03 2.4 0.0 12/06/199917:57: 00:03 1.6 0.0 12/06/1999 18:04: 00:1 i 7.6 0.0 12/06/199918:28: 00:02 1.2 0.0 BP Exploration Page 1 of 5 Milne Point, Alaska 0l/o3/zooo t7:ot Milne Point Unit Monthly Gas Flaring Incident Report For: Dec 1999 Flare Name: Flare 1 nplanned Events less than or equal to 1 hour '~ Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 12/08/1999 09:24: 00:06 9.2 0.5 12/08/199911:41: 00:04 3.7 1.2 12/08/199911:55: 00:05 4.0 1.6 12/08/199914:04: 00:11 60.4 5.3 12/11/1999 21:28: 00:02 1.0 0.0 12/13/1999 05:29: 00:01 1.5 0.0 12/13/1999 05:41: 00:04 6.0 4.1 12/13/1999 05:53: 00:07 10.5 8.8 12/13/1999 06:10: 00:05 6.3 7.3 12/13/1999 07;49: 00:11 10.8 5.7 12/13/1999 08:01: 00:14 12.9 6.2 12/13/1999 08:18: 00:12 15.6 7.7 12/13/1999 08:33: 00:12 9.3 3.7 12/13/1999 08:49: 00:11 8.9 3.9 12/13/1999 09:06: 00:09 8.2 4.2 12/15/199910:42: 00:03 2.0 0.0 12/15/199911:41: 00:04 3.6 0.9 12/15/199911:56: 00:04 4.2 2.3 12/15/199913:29: 00:01 4.3 3.0 12/15/199913:49: 00:11 9.0 7.1 12/16/199916:50: 00:10 8.0 3.1 12/16/1999 20:25: 00:05 3.9 1.3 12/16/1999 21:10: 00:05 2.5 0.1 12/16/1999 21:21: 00:09 5.8 2.3 12/16/1999 21:39: 00:06 4.6 2.0 12/16/1999 22:10: 00:05 3.9 1.2 12/17/1999 03:25: 00:05 5.6 1.9 12/17/1999 05:28: 00:02 5.3 3.9 12/17/1999 05:56: 00:04 5.1 0.9 12/17/1999 06:40: 00:05 5.6 0.9 12/17/1999 07:39: 00:06 9.2 3.9 12/17/1999 09:09: 00:06 5.8 1.8 12/17/1999 09:27: 00:03 3.3 1.7 12/17/1999 09:58: 00:02 1.8 0.2 12/17/199910:12: 00:03 2.4 0.5 12/17/199914:44: 00:01 0.3 0.0 12/17/1999 ]4:52: 00:08 22.2 10.6 12/17/199915:55: 00:05 3.0 0.2 12/17/199916:07: 00:08 3.2 0.2 12/17/199916:20: 00:25 25.0 10.7 12/171199916:56: 00:04 6.3 3.6 BP Exploration Page 2 of 5 Milne Point, Alaska ovo3i2ooo 17:01 Milne Point Unit Monthly Gas Flaring Incident Report For: Dec 1999 Flare Name: Flare 1 nplanned Events less than, or equal to 1 hour Start Time Duration (hh:mm) =Volume (MSCF) _ Flare Assist Cause Comment 12/18/1999 00:43: 00:02 0.7 0.0 Gas compression S/D due to a blown Technical difficulties prevented an fuse during maintenance. immediate re-start of the compressors. 12/18/1999 08:13: 00:02 1.8 0.3 12/18/1999 08:43: 00:02 1.2 0.0 12/18/1999 22:32: 00:13 13.6 4.2 12/18/1999 22:55: 00:05 4.0 0.4 12/19/199915:43: 00:02 0.7 0.0 12/19/199915:57: 00:03 1.9 0.0 12/20/199917:11: 00:04 3.9 0.4 12/20/199917:25: 00:35 39.7 0.4 12/20/199918:01: 00:14 12.8 0.0 12/20/199918:39: 00:06 2.5 0.0 12/20/199918:56: 00:04 2.2 0.0 12/20/199919:09: 00:06 3.5 0.0 12/20/199919:28: 00:02 0.9 0.0 12/20/199919:56: 00:04 2.6 0.0 12/20/1999 20:07: 00:08 3.6 0.0 12/20/1999 20:25: 00:05 3.0 0.0 12/20/1999 20:39: 00:06 3.6 0.0 12/20/1999 20:52: 00:08 2.9 0.0 12/20/1999 21:11: 00:04 1.8 0.0 12/21/1999 21:44: 00:01 1.9 0.0 12/22/1999 06:43: 00:02 1.7 0.0 12/22/1999 08:59: 00:01 0.2 0.0 12/22/1999 09:02: 00:13 51.6 15.0 12/23/1999 06:27: 00:03 3.5 2.7 12/24/1999 07:43: 00:02 5.0 1.9 12/24/1999 07:59: 00:01 0.8 3.4 12/24/199916:22: 00:08 57.6 27.1 12/24/199916:40: 00:05 54.8 40.3 12/25/1999 07:25: 00:05 13.8 0.7 .12/25/1999 07:42: 00:03 5.7 10.3 12/26/1999 06:27: 00:03 9.5 2.1 12/27/1999 06:58: 00:02 6.9 2.5 12/28/1999 06:28: 00:02 3.3 2.6 12/29/1999 06:44: 00:01 1.1 0.5 12/29/1999 06:58: 00:02 4.9 4.3 12/30/1999 07:12: 00:03 5.0 4.3 12/31/1999 06:43: 00:02 5.3 4.8 BP Exploration Page 3 of 5 Milne Point, Alaska ovosi~ooo trot Milne Point Unit Monthly Gas Flaring Incident Report For: Dec 1999 Flare Name: Flare 1 Unplanned Events greater than 1 hour _ _ __ ___ Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 12/18/199919:49: 02:41 1,783.0 639.2 BP Exploration Page 4 of 5 Milne Point, Alaska O1 /03/000 17:01 Milne Point Unit Monthly Gas Flaring Incident Report For: Dec 1999 Flare Name: Flare 1 fanned Events Exceeding 1 hour OR Volumne Exceeding 5000 MSCF ___ ~ Duration =Volume (MSCF) _ Start Time (hh:mm) Flare Assist Cause Comment 12/08/1999 07:48: 01:27 985.7 92.9 Planned compressor desynchronizing Compressors went down. Purge and test. re-start followed routine procedures. Flare Assist Unplanned Events <=1 hour 1,890.5 363.0 Unplanned Events > 1 hour 1,783.0 639.2 Planned Events <= 1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 985.8 92.9 Unmetered Assist Gas 10,149.1 TOTAL FLARED VOLUME 4,659.2 11,244.2 MSCF BP Exploration Page 5 of 5 Milne Point, Alaska BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 07:48 hrs for 01:27 hrs. Planned event: ®yes ^ no This flaring or venting incident was: (check one) ^ necessary for facility operations. ^ necessary for facility upgrades. ® necessary for facility testing procedures. ^ an emergency that threatened life or property. ^ necessary to prevent loss of ultimate recovery. Event description Date: 12/8/99 Flare Volume: 986 Assist Gas Volume: 93 This was a planned flaring event to test the desynchronizing of the motors for the gas compressors to help eliminate excess vibration in Module 55. Several gas lift wells were shut-in before the testing. We unloaded one of the compressors and tested the ability to slip the motor phases to eliminate the motors from running in synchronization. The compressors did shutdown and were immediately purged and brought back on line. Action taken to stop 1larin~ The following gas lift wells were shut-in before the testing: C-4,C-7,C-9, and B-15,B-10,B-22,B- 9,B-3,B-21,B-20. The assist gas was adjusted downward because it was not needed at the 1:1 ratio. No black smoke was observed. The test was conducted and the compressors were brought back on line as quickly as possible to mitigate the flaring event. The assist gas was also returned to normal operation. Action taken to prevent reoccurrence An evaluation of the data collected during the test revealed that additional software logic will be required. Operations, Process Control, and Engineering are developing the modifications. Reported by: Name: Jerry Gronos Title: Facility Lead Tech. Supervisor Name: Jeff Scarbrough Title: Facilities Supervisor 991208 flare report.doc Revised 4-25-99 LEN BP Exploration Milne Point Unit Flaring Incident Report (exceeding 1 hour) Location: Central Facilities Pad Time and duration of incident(s): 19:49 hrs for 02:41 hrs Planned event: ~ yes ® no This flaring or venting incident was: (check one) ® necessary for facility operations. ~ necessary for facility upgrades. ~ necessary for facility testing procedures. ~ an emergency that threatened life or property. ~ necessary to prevent loss of ultimate recovery. Event descr_ption Date: 12/ 18/99 Flare Volume: 1783 Assist Gas Volume: 639 While performing maintenance on a gas lift cooler vibration switch, a fuse was inadvertently blown. This resulted in a shutdown of the gas lift scrubber which activated a normal shutdown of the gas compressors. Subsequent compressor re-start attempts were thwarted by technical issues associated with permissive switches and a minor valve leak. Action taken to stow flarin Production wells B-3, 4A, 6, 9, 10, 15, 20, 21, 22, C-4, 7 & 9 were shut-in. Maintenance personnel were dispatched to troubleshoot and correct the permissive issues and to repair the leaking valve. The gas compressors were re-started and the flaring stopped. Action taken to prevent reoccurrence Operations and maintenance reviewed and adjusted written procedures concerning the incident that caused the fuse to blow and discussed the permissive issues that delayed the re-start of the compressors to ensure adequate measures had been taken to prevent a reoccurrence of this nature. Reported by: Name: Jerry Gronos/Larry Niles Title: Facility Lead Tech. Supervisor Name: Henry Harrington/Jeff Scarbrough Title: Facilities Supervisor 991218 flare report Il.doc Revised 4-25-99 LEN