Alaska Oil & Gas Conservation Commission
1999 Facility Report Files
File Names Gas Disposition
p2%~9/99 14:46 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jan /1999
Flare Name: Flare 1
np anne vents ess t an or equa to our
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
O 1 /01 /99 19:13:00 00:02 1.0 0.0
01/01/9919:59:00 00:01 0.6 0.0
01/03/99 09:12:00 00:03 25.0 7.5
01/03/99 09:16:00 00:29 99.2 101.3
01/03/99 09:46:00 00:14 40.6 42.4
01/03/9910:01:00 00:14 43.7 42.0
01/03/9910:19:00 00:11 22.5 23.6
01/03/9911:25:00 00:05 7.5 6.9
01/03/9913:58:00 00:02 1.4 0.7
01/03/9916:06:00 00:09 3.9 3.2
01/04/99 00:55:00 00:05 1.6 0.7
O 1 /04/99 01:12:00 00:03 1.0 1.1
01/04/99 06:59:00 00:01 0.2 0.0
01/04/99 20:27:00 00:03 1.0 0.3
01/05/99 04:39:00 00:06 2.0 1.2
01/05/9910:28:00 00:02 1.7 1.0
01/06/99 23:42:00 00:03 0.9 0.0
01/06/99 23:53:00 00:07 3.0 3.1
01/07/9912:12:00 00:03 1.8 1.1
01/07/9919:14:00 00:01 0.1 0.0
01/07/9919:27:00 00:03 1.2 0.6
O 1 / 10/99 20:59:00 00:01 0.1 0.0
O 1 / 10/99 21:44:00 00:01 0.4 0.0
01/10/99 21:58:00 00:02 0.6 0.0
01/10/99 22:13:00 00:02 0.3 0.0
O 1 / 10/99 22:59:00 00:01 0.6 0.0
01/10/99 23:29:00 00:01 0.1 0.0
O 1 / 10/99 23:44:00 00:01 0.2 0.0
01/11/99 00:44:00 00:01 0.1 0.0
01/11/99 05:14:00 00:01 0.3 0.0
01/11/99 06:14:00 00:01 0.1 0.0
01/11/9910:28:00 00:02 1.0 0.1
O 1 / 11 /99 11:28:00 00:02 0.6 0.0
O 1 / 11 /99 11:43:00 00:02 1.0 0.2
01/11/9911:55:00 00:05 2.3 1.6
01/11/99 12:11:00 00:04 1.0 0.3
01/11/9912:28:00 00:02 1.0 0.1
01/11/9912:42:00 00:03 0.8 0.4
01/11/9912:57:00 00:03 1.3 0.3
01/11/9913:14:00 00:01 0.4 0.0
01/11/9913:29:00 00:01 0.4 0.0
01/11/99 13:44:00 00:01 0.4 0.0
01/11/9913:59:00 00:01 0.3 0.0
} ~, ~ ~. ~~
,~
BP Exploration Page 1 of 8 Milne Point, Alaska
02/69/99 .° 14:46 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jan /1999
Flare Name: Flare 1
np ann vents ess t an or equa to our
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
01/11/9915:44:00 00:01 0.3 0.0
01/11/9916:13:00 00:02 0.4 0.0
01/11/9916:27:00 00:03 0.9 0.0
01/11/9916:44:00 00:01 1.0 0.2
01/11/9916:57:00 00:03 0.7 0.0
01/11/9917:11:00 00:04 1.3 0.0
01/11/9917:29:00 00:01 0.5 0.0
01/11/9917:44:00 00:01 0.2 0.0
01/11/9917:57:00 00:03 0.9 0.0
01/11/9918:13:00 00:02 0.4 0.0
01/11/9918:44:00 00:01 0.4 0.0
01/11/9918:59:00 00:01 0.3 0.0
01/11/9919:14:00 00:01 0.3 0.0
01/11/9919:28:00 00:02 0.5 0.0
01/11/99 19:43:00 00:02 0.7 0.2
01/11/9919:58:00 00:02 1.0 0.2
01/11/99 20:14:00 00:01 0.2 0.0
01/11/99 20:28:00 00:02 0.7 0.1
01/11/99 20:41:00 00:04 1.5 0.3
01/11/99 20:57:00 00:03 1.5 0.8
01/11/99 21:09:00 00:06 2.2 1.1
01/11/99 21:28:00 00:02 0.6 0.0
01/11/99 21:41:00 00:04 1.4 0.7
O 1 / 11 /99 21:54:00 00:06 2.2 1.4
01/11/99 22:12:00 00:03 1.2 0.3
01/11/99 22:29:00 00:01 0.5 0.0
01/11/99 22:32:00 00:28 10.0 9.5
01/11/99 23:01:00 00:29 12.0 11.9
01/11/99 23:31:00 00:29 11.8 11.9
01/12/99 00:01:00 00:14 6.3 5.6
01/12/99 00:16:00 00:14 5.6 5.7
01/12/99 00:31:00 00:59 20.4 20.0
O 1 / 12/99 01:31:00 00:14 5.1 5.2
01/12/99 01:46:00 00:14 5.1 4.7
01/12/99 02:03:00 00:12 4.2 3.7
O 1 / 12/99 02:26:00 00:04 1.8 1.9
01/12/99 08:06:00 00:09 6.1 5.0
01/12/99 08:23:00 00:07 4.1 4.4
01/12/9917:14:00 00:01 0.3 0.0
01/12/9918:06:00 00:09 3.4 2.4
01/12/9918:29:00 00:01 0.3 0.0
01/12/99 20:14:00 00:01 0.1 0.0
01/12/99 23:10:00 00:05 65.0 60.4
BP Exploration Page 2 of 8 Milne Point, Alaska
Q2/09/99 14:46 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jan /1999
Flare Name: Flare 1
np anne vents ess t an or equa to our
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
01/12/99 23:28:00 00:02 0.5 0.0
01/12/99 23:44:00 00:01 0.6 0.0
01/12/99 23:53:00 00:07 2.1 1.0
01/13/99 00:07:00 00:08 3.2 2.2
01/13/99 00:28:00 00:02 1.7 0.6
01/13/99 00:42:00 00:03 0.6 0.0
01/13/99 00:58:00 00:02 0.7 0.0
01/13/99 01:13:00 00:02 0.7 0.1
01/13/99 01:29:00 00:01 0.3 0.0
01/13/99 01:41:00 00:04 0.8 0.0
01/13/99 01:55:00 00:05 0.9 0.0
01/13/99 03:14:00 00:01 0.2 0.0
01/13/99 03:44:00 00:01 0.1 0.0
01/13/99 05:44:00 00:01 0.2 0.0
01/13/99 05:56:00 00:04 1.5 0.5
01/13/99 06:01:00 00:44 17.0 16.7
01/13/99 06:50:00 00:10 3.9 3.8
01/13/99 07:13:00 00:02 0.6 0.0
O 1 / 13/99 07:41:00 00:19 6.6 5.3
01/13/99 08:04:00 00:11 3.8 3.6
01/13/99 08:23:00 00:22 2.4 2.2
01/13/99 08:58:00 00:02 0.5 0.0
Ol / 13/99 09:13:00 00:02 0.4 0.0
01/13/99 09:27:00 00:03 0.5 0.0
01/13/99 09:44:00 00:01 0.3 0.0
01/13/99 09:57:00 00:03 1.0 0.3
01/13/9910:12:00 00:03 1.1 0.1
01/13/9910:29:00 00:01 0.7 0.7
01/13/9910:44:00 00:01 0.2 0.0
O 1 / 13/99 12:42:00 00:03 1.1 0.4
O 1 / 13/99 17:21:00 00:09 21.4 20.2
01/I3/9917:33:00 00:12 25.7 26.1
01/14/99 03:50:00 00:10 37.6 34.8
O 1 / 14/99 04:12:00 00:03 24.3 9.5
01/14/9914:27:00 00:03 20.1 11.8
01/16/99 00:57:00 00:03 25.9 67.5
01/16/99 01:07:00 00:08 32.4 30.7
01/16/99 01:22:00 00:08 30.3 29.3
01/16/99 01:38:00 00:07 17.6 18.2
01/16/99 01:49:00 00:11 27.7 27.5
O 1 / 16/99 02:04:00 00:11 27.8 29.1
01/16/99 02:20:00 00:10 22.6 22.4
01/16/99 02:31:00 00:14 30.2 28.6
BP Exploration Page 3 of 8 Milne Point, Alaska
02/'J9/99 14:46 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jan /1999
Flare Name: Flare 1
np anne vents ess t an or equa to our
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
01/16/99 02:49:00 00:11 25.7 25.5
01/16/99 03:04:00 00:26 64.8 64.5
01/16/99 03:34:00 00:11 29.1 28.9
01/16/99 03:58:00 00:02 4.9 5.6
O 1 / 16/99 04:13:00 00:02 5.9 5.4
01/16/99 04:42:00 00:03 6.0 5.4
O 1 / 16/99 04:59:00 00:01 3.7 3.2
01/16/99 05:14:00 00:01 2.6 2.2
O 1 / 16/99 09:14:00 00:01 3.5 2.9
01/17/99 08:59:00 00:01 2.0 0.1
01/17/9910:12:00 00:03 1.2 0.2
O 1 / 17/99 10:26:00 00:04 0.8 0.0
01/17/9910:41:00 00:04 1.4 0.1
01/17/9910:54:00 00:06 2.7 1.4
01/17/9911:05:00 00:25 12.7 11.3
01/17/9911:36:00 00:09 3.6 3.0
01/17/9911:49:00 00:11 4.4 3.6
01/17/9912:03:00 00:27 11.1 10.8
01/17/9912:33:00 00:27 96.1 93.2
01/17/9913:08:00 00:07 28.5 31.3
O 1 / 17/99 18:44:00 00:01 0.3 0.0
01/17/9918:50:00 00:10 3.1 1.6
01/17/9919:02:00 00:13 4.8 4.4
O 1 / 17/99 19:17:00 00:13 5.1 4.8
01/17/9919:36:00 00:09 3.4 2.9
O 1 / 17/99 19:51:00 00:09 3.3 2.3
O 1 / 17/99 20:08:00 00:07 2.6 1.9
01/17/99 20:23:00 00:07 2.6 1.3
01/17/99 20:39:00 00:06 2.0 0.7
01/17/99 20:51:00 00:09 3.3 2.2
O 1 / 17/99 21:06:00 00:09 3.5 3.0
01/17/99 21:27:00 00:03 1.1 0.2
01/17/99 21:39:00 00:06 2.4 1.1
01/17/99 21:55:00 00:05 1.9 0.5
01/17/99 22:12:00 00:03 1.2 0.7
01/17/99 23:14:00 00:01 0.3 0.0
O 1 / 18/99 00:44:00 00:01 0.1 0.0
01/18/99 00:59:00 00:01 0.2 0.0
O 1 / 18/99 01:59:00 00:01 0.0 0.0
01/18/99 02:43:00 00:02 0.5 0.0
O 1 / 18/99 02:58:00 00:02 1.2 0.3
01/18/99 03:13:00 00:02 0.8 0.0
01/18/99 03:27:00 00:03 0.6 0.0
BP Exploration Page 4 of 8 Milne Point, Alaska
02/09/99 _• 14:46 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jan /1999
Flare Name: Flare 1
np anne vents ess t an or equa to our
Duration =Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
01/18/99 03:43:00 00:02 1.0 0.1
01/18/99 03:58:00 00:02 0.5 0.0
O 1 / 18/99 04:11:00 00:04 1.7 0.4
O 1 / 18/99 04:24:00 00:06 2.2 1.1
O 1 / 18/99 04:42:00 00:03 0.7 0.1
O 1 / 18/99 04:56:00 00:04 1.1 0.3
01/18/99 05:14:00 00:01 0.3 0.0
01/18/99 05:29:00 00:01 0.4 0.0
01/18/99 05:44:00 00:01 0.0 0.0
01/18/99 05:56:00 00:04 1.7 1.0
O 1 / 18/99 06:09:00 00:06 2.3 1.6
01/18/99 06:28:00 00:02 0.5 0.0
O 1 / 18/99 06:40:00 00:05 2.3 1.5
01/18/99 07:05:00 00:10 3.7 3.0
01/18/99 07:23:00 00:07 2.0 1.1
01/18/99 07:42:00 00:03 1.1 0.5
01/18/99 07:57:00 00:03 1.4 1.5
01/18/99 08:08:00 00:07 3.5 2.7
01/18/99 08:36:00 00:09 2.9 2.1
01/18/99 08:58:00 00:02 1.0 1.0
01/18/99 09:13:00 00:02 0.7 0.0
01/18/99 09:27:00 00:03 1.2 0.5
01/18/99 09:38:00 00:07 2.6 1.6
01/18/99 09:57:00 00:03 1.3 1.0
01/18/9910:19:00 00:11 3.9 2.8
01/18/9910:58:00 00:02 0.8 0.1
01/19/99 07:12:00 00:03 2.2 1.2
01/19/9911:14:00 00:01 0.2 0.0
O 1 / 19/99 15:14:00 00:01 0.3 0.0
O 1 / 19/99 15:29:00 00:01 0.3 0.0
O 1 / 19/99 15:44:00 00:01 0.3 0.0
01/19/9915:59:00 00:01 0.2 0.0
O 1 / 19/99 16:29:00 00:01 0.2 0.0
01/20/99 03:44:00 00:01 0.0 0.0
01/20/99 03:59:00 00:01 0.8 0.1
01/20/99 04:13:00 00:02 0.5 0.0
O 1 /20/99 10:14:00 00:01 0.4 0.0
O 1 /22/99 07:25:00 00:20 49.3 46.9
01/22/99 07:47:00 00:13 32.3 33.7
01/22/99 08:04:00 00:41 105.8 105.1
01/22/99 08:46:00 00:14 28.1 28.0
01/22/99 09:01:00 00:14 25.8 26.4
O 1 /22/99 11:27:00 00:18 16.6 15.5
BP Exploration Page 5 of 8 Milne Point, Alaska
Q2/09/99 14:46 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jan /1999
Flare Name: Flare 1
np anne vents ess t an or equa to our
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
01/22/9911:56:00 00:04 3.9 4.2
O 1 /24/99 09:29:00 00:01 0.2 0.0
01/25/99 05:14:00 00:01 0.3 0.0
01/26/9911:36:00 00:09 5.7 4.7
01/26/9911:59:00 00:01 0.8 0.9
01/26/99 23:57:00 00:03 1.1 0.4
01/27/99 00:12:00 00:03 0.8 0.0
01/27/99 03:27:00 00:03 1.1 0.0
01/27/99 03:36:00 00:24 12.2 11.3
01/27/99 04:10:00 00:05 2.8 3.2
01/28/99 07:29:00 00:01 0.5 0.0
01/28/99 07:43:00 00:02 1.1 0.5
01/28/99 07:58:00 00:02 0.9 0.0
01/28/99 08:14:00 00:01 0.4 0.0
01/28/99 08:44:00 00:01 0.5 0.0
01/28/99 08:58:00 00:02 0.5 0.0
01/28/99 09:29:00 00:01 0.3 0.0
01/28/9911:29:00 00:01 0.4 0.0
01/28/9912:57:00 00:03 0.9 0.0
01/28/9913:13:00 00:02 0.2 0.0
01/28/9913:59:00 00:01 0.3 0.0
01/28/9914:27:00 00:03 0.7 0.0
01/28/9914:42:00 00:03 1.0 0.0
01/28/9914:59:00 00:01 0.3 0.0
01/28/9915:13:00 00:02 0.6 0.0
01/28/9915:59:00 00:01 0.3 0.0
01/28/9916:13:00 00:02 0.7 0.0
01/28/9916:29:00 00:01 0.4 0.0
01/28/9916:43:00 00:02 0.4 0.0
01/29/99 03:01:00 00:14 15.6 0.0
01/29/99 04:13:00 00:02 0.9 0.3
01/29/9915:58:00 00:02 1.3 0.6
01/29/99 22:44:00 00:31 42.2 1.0
01/29/99 23:28:00 00:02 1.9 1.3
01/29/99 23:44:00 00:01 0.5 3.4
O 1 /31 /99 06:44:00 00:01 2.6 0.0
BP Exploration Page 6 of 8 Milne Point, Alaska
02/09/99 14:46 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jan /1999
Flare Name: Flare 1
np ann vents greater t an our
Duration -Volume (NISCF)
Start Time (hh:mm) Flare Assist Cause Comment
01/14/99 01:44:00 02:01 379.3 377.1 This was an emergency unplanned The tubing line was discharging gas
flaring event that occurred when into the compressor module. The
compressor CSS11A was manually sh ut tubing was replaced, the compressor put
down because of a broken tubing line onback in service, and the flaring event
a PSV. stopped.
01/29/99 01:57:00 01:03 224.5 0.7 Unplanned flaring due to PSLL Troubleshoot and restart compressors
shutdown on plant gas injection
compressors
BP Exploration Page 7 of 8 Milne Yoint, Alaska
02!09/99 14:46 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jan /1999
Flare Name: Flare 1
(Planned Events Exceeding 1 hour UK Volumne Exceeul<ng 5uuu lvi,i:r ~
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
01/14/99 13:12:00 01:03 360.4 214.2 This was a planned flaring event that The PSV pilot bolts were removed, new
occurred when compressor CSS11A was bolts & washers installed, and all tubing
manually shut down to repair an lines inspected. The compressor was
ongoing, known problem with broken returned to service and the flaring event
tubing lines on a PSV. stopped.
Flare Assist
Unplanned Events <=1 hour 1,617.2 1,429.3
Unplanned Events > 1 hour 603.8 377.8
Planned Events <=1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 360.4 214.2
Unmetered Assist Gas 10,149.1
TOTAL FLARED VOLUME 2,581.4 12,170.4 MSCF
BP Explorarion Page 8 of 8 Milne Yoint, Alaska
Flaring Incident Report
(exceeding 1 hour)
BP Exploration -Milne Point
January 29 , 1999
.Time and duration of incident 01:57 January 29th 1999, O1hr:03mins.
Flare Volume: 224 Assist Gas Volume: 1
This was an unplanned flaring event that occurred when both Little A (C-5531-A) and
Little B (C-5531-B) injection compressor's shutdown on PSLL on the 3rd Stage .=The
compressors were reset and purged prior to start-up. The compressors were started and
.quickly brought back on line. ~ -
Flaring Incident Report
(exceeding 1 hour)
BP Exploration -Milne Point
January 16 , 1999
Time and duration of incident 00:10 January 16th 1999, 04hr:50mins.
Flare Volume: 653 (estimated) Assist Gas Volume: 0
This was an unplanned flaring event that occurred when the IWAG at C-Pad shutdown
on a bad pressure transmitter. High GOR wells were. shut-in to help mitigate the flaring:.
The flow meter for the flare FI-6201 had just been calibrated and the wrong data sheet.-
was used to set the calibration. The error was noticed immediately during the flare event
and the flare flow transmitter was recalibrated to the correct data sheet.
The flare volume (during the FI-6201 calibration correction) was calculated by looking at
the flare valve trend of valve opening and calculating the flare volume from this data.
The assist gas valve did not open because of FI-6201 problem. The flare volume was
small and there was no Black Smoke incident.
Flaring Incident Report
(exceeding 1 hour)
BP Exploration -Milne Point
January 14 , 1999
Time and duration of incident 13:12 January 14th 1999, Olhr:03mins.
Flare Volume: 360 Assist Gas Volume: 214 ~ .
This was a planned flaring event that occurred when compressor C-SS 11A was manually
shutdown. The compressor was shut down to repair an ongoing problem with broken -
tubing lines on PS.V: 'The PSV pilot bolts were removed, new bolts & washers installed,
all tubing: lines inspected: The compressor was returned to service and flaring stopped: ` ,.
ALASKA OIL AND GAS CONSERVATION CONIl~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point Feb-99
Disposition
Volume MCF*
1. Sold Fuel 15,540
2. Reinjected 435,154
3. Flared or vented less than 1 hour 2,375
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,370
5. Pilot and Purge 335
6. Used for lease operations Fuel
Assist 242,755
11,415
7. Other
TOTAL items 1-7 708,944
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby c t' y that he foregoing is true and correct to the best of my knowledge.
Signature Title (Vl,(~2 ~f~i~ ~(r Date ~j 1(e
~~A'X
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK 525100 88.6
SCH. BLUFF 525140 11.4
Official'. Use Only-Flaring Aut}iorization>l hr:
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
,temperature of 60 degrees F. Report
due by the 20th of the month
folowing the month of disposition.
Authority 20 AAC 25.235.
03/08/99 21:2o Milne Point Unit
Monthly Gas Flaring Incident Report
For: Feb /1999
Flare Name: Flare 1
np anne vents ess t an or equa to our
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
02/01/99 OS:13:00 00:02 1.8 0.0
02/01 /99 06:43 :00 00:02 2.2 0.0
02/03/9917:31:00 00:14 12.2 11.1
02/03/9917:56:00 00:04 4.4 4.9
02/04/9915:28:00 00:02 0.6 0.0
02/04/9915:42:00 00:03 2.0 0.7
02/OS/9913:17:00 00:28 78.6 75.7
02/OS/9913:47:00 00:13 28.9 29.7
02/05/9914:02:00 OO:S8 127.5 125.6
02/OS/9915:02:00 00:13 27.2 28.8
02/OS/9915:29:00 00:01 1.9 3.1
02/06/99 06:59:00 00:16 13.9 12.8
02/06/99 07:19:00 00:11 9.7 10.2
02/06/9910:37:00 00:08 6.5 S.3
02/06/9910:49:00 00:11 10.1 10.6
02/06/9911:29:00 00:01 0.1 0.0
02/06/9911:38:00 00:07 8.2 7.0
02/06/9911:51:00 00:09 8.0 8.6
02/06/9912:44:00 00:01 0.2 0.0
02/06/9912:51:00 00:09 20.3 19.1
02/06/9913:07:00 00:08 9.S 10.1
02/06/9913:18:00 00:12 19.3 17.9
02/06/9913:34:00 00:11 16.0 16.0
02/06/9913:48:00 00:42 61.9 61.5
02/06/9914:35:00 00:10 14.8 15.4
02/06/99 22:14:00 00:01 0.2 0.0
02/07/99 OO:S8:00 00:02 0.8 0.0
02/07/99 01:14;00 00:01 0.2 0.0
02/07/99 01:28:00 00:02 0.4 0.0
02/07/9913:50:00 OO:OS 32.7 30.7
02/07/9914:00:00 OO:1S 34.5 35.0
02/07/9914:16:00 00:14 29.4 29.7
02/07/9914:31:00 00:29 59.6 58.7
02/07/9915:05:00 00:10 14.8 15.9
02/07/99 21:12:00 00:03 1.4 0.4
02/07/99 21:27:00 00:03 1.4 0.6
02/07/99 21:43:00 00:02 0.7 0.4
02/07/99 21:SS:00 00:05 1.7 0.7
02/08/99 01:14:00 00:01 0.2 0.0
02/08/99 08:29:00 00:16 0.4 0.0
02/08/99 08:29:00 00:01 0.4 0.0
02/08/99 09:43:00 00:17 2.1 1.S
02/08/99 09:43:00 00:02 2.1 1.S
BP Exploration Page 1 of 7 Milne Point, Alaska
03/08/99 21:2o Milne Point Unit
Monthly Gas Flaring Incident Report
For: Feb /1999
Flare Name: Flare 1
np anne vents ess t an or equa to our
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
02/08/99 23:02:00 00:58 135.2 133.5
02/09/99 00:07:00 00:08 12.4 13.2
02/09/99 02:44:00 00:01 0.2 0.0
02/09/99 02:59:00 00:01 0.6 0.3
02/09/99 07:38:00 00:07 9.9 7.4
02/09/99 07:46:00 00:14 140.0 114.6
02/09/99 08:03:00 00:12 14.7 13.5
02/09/99 08:18:00 00:12 13.1 13.8
02/09/99 08:44:00 00:01 0.4 0.5
02/ 10/99 01:44:00 00:01 0.2 0.0
02/10/99 05:36:00 00:09 7.8 6.7
02/10/99 05:52:00 00:08 8.0 8.5
02/10/99 23:14:00 00:01 0.3 0.0
02/11/99 00:14:00 00:01 0.2 0.0
02/11/99 01:14:00 00:01 0.2 0.0
02/11/99 01:29:00 00:01 0.1 0.0
02/11/99 01:44:00 00:01 0.3 0.0
02/11/99 04:14:00 00:01 0.3 0.0
02/11/99 08:14:00 00:01 0.5 0.0
02/11/99 08:29:00 00:01 0.2 0.0
02/11/99 09:58:00 00:02 0.9 0.0
OZ/ 11 /99 10:12:00 00:03 0.7 0.0
02/ 11 /99 10:28:00 00:02 0.8 0.0
02/11/9910:42:00 00:03 0.7 0.0
02/11/9910:59:00 00:01 0.7 0.0
02/11/9914:13:00 00:02 0.4 0.0
02/11/9914:27:00 00:03 0.9 0.0
02/11/9914:54:00 00:06 1.8 0.4
02/ 11 /99 15:06:00 00:09 2.6 1.4
02/11/9915:22:00 00:08 2.6 1.1
02/11/9917:44:00 00:01 0.0 0.0
02/11/9919:44:00 00:01 0.6 0.0
02/11/99 20:12:00 00:03 1.7 0.4
02/11/99 20:27:00 00:03 0.8 0.0
02/11/99 20:44:00 00:01 0.2 0.0
02/11/99 20:47:00 00:13 21.0 19.4
02/11/99 21:01:00 00:14 33.5 34.3
02/ 11 /99 21:19:00 00:11 7.1 6.8
02/11/99 21:40:00 00:05 7.4 7.2
02/11/99 21:51:00 00:09 13.9 12.4
02/11/99 22:13:00 00:02 2.9 3.3
02/11/99 23:43:00 00:02 0.4 0.0
02/11/99 23:57:00 00:03 1.0 0.0
BP Exploration Page 2 of 7 Milne Point, Alaska
03/08/99 21:20 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Feb /1999
Flare Name: Flare 1
np anne vents ess t an or equa to our
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
02/12/99 00:05:00 00:10 17.2 15.4
02/12/99 00:28:00 00:02 1.4 1.4
02/12/99 00:42:00 00:03 0.8 0.0
02/12/99 00:49:00 00:11 4.0 4.0
02/12/99 01:13:00 00:02 0.6 0.0
02/12/99 02:43:00 00:02 0.7 0.0
02/12/99 02:59:00 00:01 0.3 0.0
02/12/99 03:08:00 00:07 10.9 10.0
02/12/99 03:56:00 00:04 2.6 1.9
02/12/99 04:27:00 00:03 1.1 0.3
02/12/99 04:38:00 00:07 3.9 3.9
02/12/99 04:53:00 00:07 5.8 5.1
02/12/99 05:41:00 00:04 4.5 3.1
02/12/99 05:53:00 00:07 3.7 3.7
02/12/99 06:09:00 00:06 7.1 7.0
02/12/99 06:28:00 00:02 1.4 0.3
02/12/99 06:42:00 00:03 4.1 4,6
02/12/99 07:10:00 00:05 5.2 3.6
02/12/99 07:23:00 00:07 5.8 5.9
02/12/99 07:40:00 00:05 8.4 7.2
02/12/99 07:52:00 00:08 14.5 14.7
02/12/99 08:01:00 00:14 33.8 33.5
02/12/99 08:39:00 00:06 6.1 5.5
02/12/9911:55:00 00:05 10.4 9.9
02/12/99 21:58:00 00:32 92.9 88.2
02/12/99 22:31:00 00:14 38.4 37.7
02/12/99 22:54:00 00:06 10.3 11.8
02/13/99 01:14:00 00:01 0.3 0.0
02/13/99 03:08:00 00:07 9.1 3.9
02/13/99 03:17:00 00:13 102.7 52.1
02/13/99 04:44:00 00:01 0.3 0.0
02/13/99 07:29:00 00:01 0.1 0.0
02/13/9915:10:00 00:50 36.9 17.6
02/13/9916:13:00 00:02 2.0 1.1
02/13/99 21:29:00 00:01 0.2 0.0
02/13/99 21:55:00 00:05 1.4 0.0
02/13/99 22:08:00 00:07 2.4 0.0
02/13/99 22:18:00 00:12 3.4 0.0
02/13/99 22:43:00 00:02 0.5 0.0
02/13/99 23:29:00 00:01 0.1 0.0
02/13/99 23:42:00 00:03 0.9 0.0
02/13/99 23:48:00 00:12 3.9 0.1
02/14/99 00:01:00 00:14 4.7 0.1
BP Exploration Page 3 of 7 Milne Point, Alaska
~'
S~
~:
~'i=,
~,:
~ ~.
z-a :;
r
r_
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
~. FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
.,Milne Point BP Exploration (Alaska) Inc. Milne Point Jan-99
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold Fuel
16,900 Pool Name
KUPARUK Code
525100 Percent
88.7
SCH. BLUFF 525140 11.3
2. Reinjected 567,064
3. Flared or vented less than 1 hour 1,617
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 964
5. Pilot and Purge 371
6. Used for lease operations Fuel 266,924
Assist 11 798
7. Other
TOTAL items 1-7 865,638
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby c t'fy tha the fore_oing is true and correct to the best of my knowledge.
Signature Title~~ ~ ~~~ +~ Date ~(o
Official i3se -0nly-Flaring 'Authorization>l hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60 degrees F. Report
due by the 20th of the month
folowing the month of disposition.
,Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
03/08/99 21:20 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Feb /1999
Flare Name: Flare 1
np anne vents ess t an or equa to our
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
02/14/99 00:28:00 00:02 0.9 0.0
02/14/99 00:42:00 00:03 0.8 0.0
02/14/99 00:58:00 00:02 0.3 0.0
02/14/99 01:14:00 00:01 0.4 0.0
02/14/99 01:44:00 00:01 0.3 0.0
02/14/99 02:14:00 00:01 0.2 0.0
02/14/99 02:26:00 00:04 1.3 0.0
02/14/99 02:40:00 00:05 1.7 0.0
02/ 14/99 03 :44:00 00:01 0.4 0.0
02/14/99 03:56:00 00:04 1.3 0.0
02/14/99 04:08:00 00:07 1.7 0.0
02/14/99 04:20:00 00:10 3.7 0.0
02/14/99 04:33:00 00:12 4.3 0.0
02/14/99 04:54:00 00:06 1.7 0.0
02/14/99 05:11:00 00:04 1.4 0.0
02/14/99 05:16:00 00:14 41.3 23.7
02/14/99 05:36:00 00:09 3.4 2.8
02/14/99 05:52:00 00:08 2.7 1.8
02/14/99 06:10:00 00:05 1.4 0.0
02/14/99 06:25:00 00:05 2.2 1.3
02/14/99 06:42:00 00:03 1.1 0.0
02/14/99 06:57:00 00:03 1.0 0.0
02/14/99 07:09:00 00:06 2.2 1.1
02/14/99 07:26:00 00:04 1.2 0.2
02/14/99 07:37:00 00:08 22.5 20.5
02/14/99 07:53:00 00:07 10.7 11.7
02/14/99 08:09:00 00:06 2.0 0.7
02/14/99 08:23:00 00:07 2.5 1.2
02/14/99 08:39:00 00:06 2.5 1.6
02/14/99 08:53:00 00:07 2.8 1.5
02/14/99 09:06:00 00:09 3.1 2.1
02/14/99 09:23:00 00:07 2.5 1.4
02/14/99 09:37:00 00:08 2.3 1.0
02/14/99 09:50:00 00:10 3.1 1.8
02/14/9910:14:00 00:01 0.5 0.1
02/14/9910:25:00 00:05 2.1 0.5
02/14/9910:42:00 00:03 0.7 0.0
02/14/9910:59:00 00:01 0.1 0.0
02/14/9911:43:00 00:02 0.6 0.0
02/14/9911:59:00 00:01 0.4 0.0
02/14/99 23:13:00 00:02 0.5 0.0
02/15/99 00:43:00 00:02 0.6 0.0
02/15/99 00:56:00 00:04 1.3 0.0
BP Exploration Page 4 of 7 Milne Point, Alaska
03/08/99 21:20 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Feb /1999
Flare Name: Flare 1
np anne vents ess t an or equa to our
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
02/15/99 01:12:00 00:03 0.9 0.0
02/15/99 01:29:00 00:01 0.5 0.0
02/15/99 01:41:00 00:04 1.0 0.0
02/ 15/99 02: i 4:00 00:01 0.2 0.0
02/15/99 02:27:00 00:03 0.8 0.0
02/15/99 02:42:00 00:03 1.1 0.3
02/15/99 02:57:00 00:03 1.0 0.0
02/15/99 03:11:00 00:04 1.5 0.4
02/15/99 03:25:00 00:05 1.8 0.8
02/15/99 03:43:00 00:02 0.8 0.0
02/15!99 03:53:00 00:07 1.7 0.4
02/15/99 04:14:00 00:01 0.9 0.3
02/15/99 04:19:00 00:11 3.7 2.9
02/15/99 04:39:00 00:06 2.6 1.4
02/15/99 05:25:00 00:05 2.1 0.9
02/15/99 05:40:00 00:05 1.9 1.1
02/15/99 05:59:00 00:01 0.9 0.2
02/15/99 06:28:00 00:02 1.0 0.0
02/15/99 06:41:00 00:04 1.1 0.0
02/15/99 06:57:00 00:03 1.2 0.3
02/15/9917:24:00 00:06 15.1 14.3
02/15/9917:31:00 00:14 32.9 32.8
02/15/9917:49:00 00:11 29.7 29.6
02/16/99 08:29:00 00:01 0.8 0.1
02/16/99 08:40:00 00:05. 4.9 5.0
02/16/99 09:06:00 00:24 15.5 14.0
02/16/99 09:40:00 00:05 3.0 2.8
02/16/99 09:54:00 00:06 4.5 4.5
02/16/9910:05:00 00:10 5.5 4.4
02/16/9910:17:00 00:13 9.1 8.8
02/16/9910:33:00 00:12 11.0 11.6
02/18/9911:44:00 00:01 0.3 0.0
02/18/9911:58:00 00:02 0.8 0.0
02/19/99 04:32:00 00:13 12.1 10.9
02/19/99 04:46:00 00:14 13.5 14.0
02/19/99 05:01:00 00:29 23.8 23.1
02/19/99 05:36:00 00:39 30.7 30.5
02/19/99 06:17:00 00:13 9.8 10.0
02/19/99 06:39:00 00:06 4.1 3.7
02/19/99 07:40:00 00:05 2.4 1.7
02/19/99 07:47:00 00:13 11.7 11.0
02/19/99 08:06:00 00:09 8.6 8.7
02/20/9919:12:00 00:03 4.6 3.6
BP Exploration Page 5 of 7 Milne Point, Alaska
03/08/99 21:zo Milne Point Unit
Monthly Gas Flaring Incident Report
For: Feb /1999
Flare Name: Flare 1
np anne vents ess t an or equa to our
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
02/21/99 02:29:00 00:01 0.1 0.0
02/21/9910:06:00 00:09 4.2 3.1
02/22/9919:43:00 00:02 0.5 0.0
02/22/9919:54:00 00:06 2.6 1.8
02/22/99 20:02:00 00:13 5.8 5.9
02/22/99 20:26:00 00:04 1.6 1.1
02/26/99 05:14:00 00:01 0.0 0.0
02/26/99 20:58:00 00:02 1.2 0.2
02/26/99 21:10:00 00:05 4.2 4.4
02/26/99 23:29:00 00:0 i 0.7 0.0
02/26/99 23:40:00 00:05 6.7 6.7
02/27/99 00:13:00 00:02 1.0 0.4
02/27/99 00:37:00 00:08 13.2 12.5
02/27/99 00:54:00 00:06 5.6 4.5
02/27/99 01:09:00 00:06 6.7 6.3
02/27/99 01:25:00 00:20 22.5 21.2
02/27/99 01:55:00 00:05 4.0 3.8
02/27/99 02:07:00 00:08 7.6 7.1
02/27/99 02:23:00 00:07 10.1 10.6
02/27/99 02:55:00 00:05 6.0 4.7
02/27/99 03:14:00 00:01 1.3 1.9
02/27/99 03:24:00 00:06 6.1 5.5
02/27/99 03:54:00 00:06 7.7 6.1
02/27/99 04:13:00 00:02 2.5 3.5
02/27/99 04:22:00 00:08 12.1 10.8
02/27/99 04:38:00 00:07 8.7 9.3
02/27/99 08:28:00 00:32 69.2 67.0
02/27/99 09:09:00 00:06 18.3 19.9
02/27/99 09:23:00 00:07 9.9 9.4
02/27/9914:02:00 00:13 8.6 7.3
02/27/9914:29:00 00:01 1.5 2.1
02/27/9914:37:00 00:08 9.1 8.0
02/27/9918:01:00 00:14 50.8 26.5
02/27/9918:26:00 00:04 10.7 5.2
02/27/9918:48:00 00:27 21.5 9.7
02/27/99 21:05:00 00:10 11.2 4.6
02/27/99 22:19:00 00:11 9.8 4.0
02/27/99 22:32:00 00:13 4.8 4.6
02/28/9911:59:00 00:01 0.9 0.0
BP Exploration Page 6 of 7 Milne Point, Alaska
03/08/99 21:20 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Feb /1999
Flare Name: Flare 1
~'lanned Events Exceeding 1 hour OR Volumne Excee i~'ng 5000 MSC
Duration -Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause Comment
02/27/99 14:49:00 03:11 1,370.2 553.3 Maint. on C-5511 A&B, off 2nd and SI 4 gas lib wells to reduce oil rate,
3rd stage separators started compressor ASAP
Flare Assist
Unplanned Events <=1 hour 2,374.3 2,030.3
Unplanned Events > 1 hour 0.0 0.0
Planned Events <=1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 1,370.2 553.3
Unmetered Assist Gas 9,166.9
TOTAL FLARED VOLUME 3,744.5 11,750.5 MSCF
BP Exploration Page 7 of 7 Milne Point, Alaska
Flaring Incident Report
(exceeding 1 hour)
BP Exploration -Milne Point
February 27, 1999
Time and duration of incident February 27, 1999 / 14:49 , 03hr:1 lmins.
Flare Volume: 1370 Assist Gas Volume: 553
This was an unplanned flaring event. An unplanned gas compression facility shut down occurred
while doing planned maintenance. A large number of wells were shut in to mitigate flaring prior
to the maintenance and during the gas plant shut down, (see below).
MPU operations and maintenance staff were conducting valve maintenance repairs, which
required shutting down the C-5501/11A compressor. While the compressor was being worked
on, the C-5501/11B compressor shut down on discharge PSHH. The discharge pressure
increased due to an operator set point adjustment. When both of these compressors are down all
gas compression is shut down.
Operations staff immediately initiated a purge sequence to start the C-5501/11B compressor.
Several unsuccessful attempts were made to purge the compressor. After several attempts, the
compressor was successfully started. The flaring stopped shortly after the compressor was
restarted. Repairs were completed on the C-5501/11A and it was restarted.
Action items:
• Additional training will be conducted with all operations staff to increase awareness of the
compressor operations and preventive measures.
• A shut down report will be conducted and entered into our MPU STAR database. The STAR
database is used for tracking and generating reports concerning production impacts and
corrective action items.
• A design package is being developed to shorten the compressor purge times. This will
substantially reduce the flaring volumes during flaring events.
List of shut in wells for flare miti atg ion:
B-Pad wells 3, 4, 6, 9, 10, 15, 20, 21, & 22.
C-Pad wells 4, 7, & 22.
E-Pad wells 6, 8, & 9.
L-Pad we116
ALASKA OIL AND GAS CONSERVATION CON~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point Mar-99
Disposition
Volume MCF*
1. Sold Fuel 18,353
2. Reinjected 548,283
3. Flared or vented less than 1 hour 1,294
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 194
5. Pilot and Purge 372
6. Used for lease operations Fuel
Assist 286,781
10,724
7. Other
TOTAL items 1-7 866,001
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Title Date
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK 525100 89.6
SCH. BLUFF 525140 10.4
Official use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60 degrees F. Report
due by the 20th of the month
folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
04/02/99 0:06 Milne Point Unit
. • Monthly Gas Flaring Incident Report
For: Mar /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Start Time Duration
(hh:mm) =Volume (MSCF) _
Flare Assist Cause Comment
03/01/99 01:29:00 00:01 0.6 0.0
03/01/9912:29:00 00:01 1.2 0.0
03/01/99 21:29:00 00:01 0.4 0.0
03/02/99 06:59:00 00:01 1.4 0.0
03/02/9915:42:00 00:18 15.4 6.7
03/02/9916:14:00 00:01 1.2 0.8
03/02/9916:28:00 00:02 1.6 0.1
03/02/9917:31:00 00:29 114.2 56.0
03/02/9918:04:00 00:11 17.5 9.2
03/04/99 08:57:00 00:03 2.2 0.3
03/04/99 09:07:00 00:08 7.7 4.0
03/05/99 03:43:00 00:02 0.7 0.0
03/05/99 03:57:00 00:03 1.3 0.0
03/05/99 04:13:00 00:02 1.2 0.0
03/05/99 04:26:00 00:04 1.3 0.0
03/05/99 04:39:00 00:06 2.4 0.2
03/05/9910:56:00 00:04 1.9 0.2
03/05/9911:10:00 00:05 1.4 0.0
03/05/9911:23:00 00:07 3.5 1.0
03/05/9911:35:00 00:10 4.3 1.2
03/05/9911:53:00 00:07 2.7 0.2
03/05/9912:13:00 00:02 0.9 0.0
03/05/9912:25:00 00:05 1.6 0.0
03/05/9912:36:00 00:09 2.7 0.2
03/05/9912:55:00 00:05 2.0 0.1
03/05/9913:09:00 00:06 2.2 0.0
03/05/9913:25:00 00:05 1.5 0.0
03/05/9913:40:00 00:05 2.1 0.0
03/05/9913:54:00 00:06 2.1 0.0
03/05/9916:28:00 00:02 0.7 0.0
03/05/9916:57:00 00:03 1.1 0.0
03/05/9917:29:00 00:01 0.3 0.0
03/06/99 08:29:00 00:01 0.3 0.0
03/06/99 08:34:00 00:41 113.4 55.8
03/06/99 09:43:00 00:02 1.8 0.1
03/06/99 09:53:00 00:07 12.7 6.4
03/06/9912:14:00 OO:OI 0.2 0.0
03/07/99 00:41:00 00:04 4.0 1.3
03/07/99 00:50:00 00:10 14.0 6.5
03/07/99 02:41:00 00:04 3.4 1.0
03/07/99 03:43:00 00:02 1.9 0.3
03/07/99 03:49:00 00:11 15.1 7.3
03/07/99 06:03:00 00:12 21.9 9.8
03/07/99 06:29:00 00:01 1.5 1.2
BP Exploration Page 1 of 6 Milne Point, Alaska
04/02/99 0:06 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Mar /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Start Time Duration
(hh:mm) =Volume (MSCF) _
Flare Assist Cause Comment
03/07/99 08:38:00 00:07 7.1 2.9
03/07/99 08:57:00 00:03 2.6 0.3
03/07/99 09:13:00 00:02 2.7 1.7
03/07/9917:23:00 00:07 7.2 2.7
03/07/9917:39:00 00:06 5.8 2.6
03/07/9919:23:00 00:07 6.3 3.3
03/07/99.19:44:00 00:01 0.5 0.0
03/09/9916:14:00 00:01 0.3 0.0
03/09/9916:29:00 00:01 0.1 0.0
03/09/9916:44:00 00:01 0.3 0.0
03/09/9917:44:00 00:01 0.0 0.0
03/09/9917:59:00 00:01 0.4 0.0
03/09/9918:13:00 00:02 0.6 0.0
03/09/9918:29:00 00:01 0.2 0.0
03/09/9918:44:00 00:01 0.3 0.0
03/09/9918:57:00 00:03 1.2 0.0
03/10/99 04:59:00 00:01 0.1 0.0
03/10/99 05:04:00 00:11 10.8 4.9
03/10/99 05:27:00 00:18 15.3 6.2
03/10/99 05:48:00 00:12 9.5 4.7 '
03/10/99 06:08:00 00:07 5.5 2.3
03/10/99 06:24:00 00:06 4.3 l.6
03/10/99 06:36:00 00:09 6.9 3.0
03/10/99 07:13:00 00:02 0.6 0.0
03/10/99 08:35:00 00:10 5.6 1.5
03/10/99 08:49:00 00:11 7.6 3.7
03/10/9910:35:00 00:10 7.4 3.1
03/10!9910:58:00 00:02 1.4 0.2
03/10/9911:10:00 00:05 3.3 0.8
03/10/9911:22:00 00:08 6.9 3.0
03/10/9911:42:00 00:03 2.1 0.7
03/10/9912:34:00 00:11 10.1 4.1
03/10/9912:50:00 00:10 10.0 4.8
03/10/9913:02:00 00:28 24.3 11.7
03/10/9913:33:00 00:12 8.7 4.1
03/10/9913:55:00 00:05 3.4 1.3
03/10/9915:56:00 00:04 3.1 0.7
03/10/9916:07:00 00:08 7.3 3.7
03/10/9916:29:00 00:01 0.4 0.0
03/10/9917:44:00 00:01 0.4 0.0
03/10/9918:43:00 00:02 0.8 0.0
03/10/9918:56:00 00:04 1.9 0.0
03/10/9919:12:00 00:03 1.1 0.0
03/10/99 20:09:00 00:06 21.5 9.1
BP Exploration Page 2 of 6 Milne Point, Alaska
04/02/99 0:06 Milne Point Unit
. Monthly Gas Flaring Incident Report
For: Mar /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
03/10/99 20:21:00 00:09 17.0 8.4
03/10/99 20:33:00 00:12 23.0 11.5
03/10/99 20:55:00 00:05 7.8 4.3
03/11/9916:27:00
00:03
0.7 ,.~ _ _ ~ .
0.0 - -•
03/11/9916:44:00 00:01 0.7 0.0
03/11/99 17:54:00 00:06 2.5 0.1 ~ ~ ° ~ ``
03/11/9918:08:00 00:07 2.8 0.2
03/11/99 18:29:00 00:01 0.1 0.0 '
03/12/99 08:44:00 00:01 0.1 0.0
03/12/9913:58:00 00:02 0.8 0.0
03/13/99 08:29:00 00:01 0.1 0.0
03/13/99 08:59:00 00:01 0.3 0.0
03/15/9919:13:00 00:02 0.8 0.0
03/16/99 09:31:00 00:14 53.8 46.3
03/16/99 09:52:00 00:08 20.3 22.4
03/16/9910:28:00 00:02 0.8 0.0
03/16/9910:58:00 00:02 0.8 0.0
03/16/9911:14:00 00:01 0.0 0.0
03/16/9914:05:00 00:10 10.0 8.6
03/16/9914:16:00 00:14 17.2 16.8
03/16/9914:42:00 00:03 4.3 5.3
03/16/9914:59:00 00:01 0.8 0.3
03/16/9919:40:00 00:05 2.0 1.1
03/16/99 20:27:00 00:03 3.1 1.7
03/16/99 20:44:00 00:01 0.9 1.7
03/17/9918:11:00 00:04 3.8 3.2
03/18/9913:42:00 00:03 2.0 1.4
03/18/9913:56:00 00:04 3.7 2.4
03/18/9914:08:00 00:07 10.4 11.0
03/18/99.18:41:00 00:04 4.0 2.9
03/19/99 05:59:00 00:01 0.3 0.0
03/19/9911:42:00 00:03 3.6 3.0
03/19/9919:27:00 00:03 4.2 3.6
03/20/9918:43:00 00:02 1.7 0.6
03/20/9918:59:00 00:01 2.0 2.5
03/20/99 20:59:00 00:01 0.1 0.0
03/20/99 21:59:00 00:01 0.4 0.0
03/20/99 23:29:00 00:01 0.3 0.0
03/21/9918:57:00 00:03 3.3 2.7
03/22/99 06:59:00 00:01 0.2 0.0
03/22/99 07:44:00 00:01 0.5 0.0
03/22/9918:58:00 00:02 3.4 2.8
03/23/99 04:14:00 00:01 0.3 0.0
03/23/9913:05:00 00:10 17.4 16.7
BP Exploration Page 3 of 6 Milne Point, Alaska
04/02/99 0:06 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Mar /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
03/23/9913:19:00 00:11 10.2 9.4
03/23/9914:09:00 00:06 6.3 5.7
03/23/9916:23:00 00:07 5.1 3.9
03/23/9916:33:00 00:12 12.5 12.3
03/23/9916:59:00 00:01 0.8 1.4
03/23/9919:11:00 00:04 4.0 3.5
03/23/9919:28:00 00:02 0.2 0.0
03/23/9919:44:00 00:01 0.2 0.0
03/23/99 22:29:00 00:01 0.3 0.0
03/23/99 23:43:00 00:02 0.3 0.0
03/24/99 03:29:00 00:01 0.2 0.0
03/24/99 06:44:00 00:01 0.2 0.0
03/24/99 06:57:00 00:03 1.3 0.4
03/24/99 07:28:00 00:02 0.6 0.0
03/24/99 07:44:00 00:01 0.0 0.0
03/24/99 07:57:00 00:03 0.9 0.0
03/24/99 08:25:00 00:05 1.7 0.4
03/24/99 08:44:00 00:01 0.3 0.2
03/24/99 08:56:00 00:04 1.1 0.2
03/24/9918:38:00 00:07 2.3 1.0
03/24/9918:57:00 00:03 4.2 3.7
03/24/99 21:44:00 00:01 0.2 0.0
03/24/99 21:52:00 00:38 133.0 124.1
03/24/99 22:37:00 00:08 21.8 23.0
03/24/99 23:14:00 00:01 0.2 0.0
03/24/99 23:44:00 00:01 0.1 0.0
03/24/99 23:59:00 00:01 0.2 0.0
03/25/99 00:42:00 00:03 0.9 0.0
03/25/99 00:58:00 00:02 0,9 0.3
03/25/99 01:12:00 00:03 1.1 0.1
03/25/99 01:29:00 00:01 0.0 0.0
03/25/99 02:29:00 00:01 0.5 0.0
03/25/99 02:44:00 00:01 0.2 0.0
03/25/99 04:14:00 00:01 0.4 0.0
03/25/99 04:29:00 00:01 0.3 0.0
03/25/99 04:44:00 00:01 0.3 0.0
03!25/99 04:59:00 00:01 0.6 0.0
03/25/99 05:13:00 00:02 0.6 0.0
03/25/99 05:29:00 00:01 0.6 0.0
03/25/99 05:42:00 00:03 1.2 0.0
03/25/99 06:59:00 00:01 0.4 0.0
03/25/99 07:14:00 00:01 0.1 0.0
03/25/9911:36:00 00:09 8.3 7.2
03/25/99 20:12:00 00:03 2.8 2.2
BP Exploration Page 4 of 6 Milne Point, Alaska
04/02/99 07:06 Milne Point Unit
• Monthly Gas Flaring Incident Report
For: Mar /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
03/26/99 06:43:00 00:02 0.8 0.1
03/26/99 06:56:00 00:04 2.2 1.1
03/26/99 07:09:00 00:06 2.4 1.7
03/26/99 07:28:00 00:02 0.9 0.0
03/26/99 07:41:00 00:04 1.0 0.1
03/26/99 07:55:00 00:05 4.4 4.0
03/26/99 08:13:00 00:02 0.8 0.4
03/26/9919:13:00 00:02 2.1 1.5
03/27/9918:58:00 00:02 2.2 1.6
03/28/99 06:58:00 00:02 1.3 0.6
03/28/9919:29:00 00:01 1.1 0.5
03/29/99 07:13:00 00:02 0.7 0.2
03/29/99 13:5 8:00 00:02 0.9 0.1
03/29/9914:02:00 00:13 19.2 18.8
03/29/9915:05:00 00:10 10.7 9.7
03/29/9915:25:00 00:05 4.8 5.1
03/29/9915:56:00 00:19 29.3 28.1
03/29/9916:16:00 00:14 15.8 15.8
03/29/9916:39:00 00:06 10.9 11.5
03/29/9916:52:00 00:08 11.4 10.8
03/29/9917:41;00 00:04 5.4 3.6
03/29/9917:47:00 00:28 43.1 43.6
03/29/9918:20:00 00:25 29.6 29.0
03/29/9918:47:00 00:13 17.0 17.8
03/29/9919:14:00 00:01 0.7 0.6
03/30/9912:27:00 00:03 1.5 0.8
03/31/99 21:44:00 00:01 0.4 0.0
03/31/99 21:56:00 00:04 4.9 4.7
03/31/99 22:14:00 00:01 0.2 0.0
.~. ~ ,,. '
: ,.t ... ~.~. a ......, ..i'
.. ,k ;;:i .~y
BP Exploration Page 5 of 6 Milne Point, Alaska
04/02/99 07:06 Milne Point Unit
• ~ Monthly Gas Flaring Incident Report
For: Mar /1999
Flare Name: Flare 1
~iJnplanned Events greater than 1 hour ~
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
03/07/99 17:48:00 01:27 194.0 96.6 Unplanned S/D C-5502/03/31A & Actively working on shortening
C-5502/03/31B. ESD @ E-Pad compressor purge times. Wells shutin:
B-6, B-9, B-15, B-22.
Flare Assist
Unplanned Events <= 1 hour 1,293.5 850.6
Unplanned Events > 1 hour 194.0 96.6
Planned Events <= 1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas 10,149.1
TOTAL FLARED VOLUME 1,487.5 11,096.3 MSCF
BP Exploration Page 6 of 6 Milne Point, Alaska
Flaring Incident Report
(exceeding 1 hour)
BP Exploration -Milne Point
March 07, 1999
Time and duration of incident March 07, 1999 / 17:48 , Olhr:27mins.
Flare Volume: 194 Assist Gas Volume: 97
This was an unplanned flaring event. An unplanned shutdown of Compressor 5502/03/31A and
Compressor 5502/03/31B which was caused by an ESD on E-Pad. A number of wells were shut
in to mitigate flaring while maintenance was correcting the ESD problem. Operations staff
immediately initiated a purge sequence to start the C-5502/03/31A &B compressors as soon as
the ESD was cleared.. The flaring stopped shortly after the compressor was restarted.
Action items:
• A design package is being developed to shorten the compressor purge times. This will
substantially reduce the flaring volumes during flaring events.
List of high gas wells shut in for flare miti ate
B-Pad wells 6,9,15,22.
ALASKA OIL AND GAS CONSERVATION CONIl-RISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc.
~ Milne Point
~ Apr-99
Disposition I Volume MCF* IlxlnazcaLe conrriUU~lvn ~,. Ca~~~~,~~~ ~~ ~~~a~.
1. Sold Fuel 16,751
2. Reinjected 452,968
3. Flared or vented less than 1 hour 2,481
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 4,069
5. Pilot and Purge 360
6. Used for lease operations Fuel
Assist 254,920
12,379
7. Other
TOTAL items 1-7 743,928
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby c tify th t the fo egoing
Signature is true and/-correc`/t to/~the
Title /~(,(~~(, ~~C i'/4~ best of my knowledge.
Date ~ 1
~. ~ ! ~ ~
,.
,i -
Pool Name (Code (Percent
KUPARUK 525100 87.7
Official Use Only-Flaring Authorization>T hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60 degrees F. Report
,due by the 20th of the month
folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
y+ <{
'3~~4C: x;11 ~ uas Li31i.~2+ ~Di11~ '',
Rnchorage
05/03/99 07:32 Milne Point Unit fla90401.psr
Monthly Gras Flaring Incident Report
For: Apr /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
04/01 /99 07:27:00 00:03 0.9 0.0
04/01/99 07:59:00 00:01 0.5 0.0
04/01/99 08:10:00 00:05 1.5 0.7
04/01/99 08:24:00 00:06 2.3 1.1
04/01/99 23:57:00 00:03 1.0 0.1
04/02/99 00:28:00 00:02 0.7 0.0
04/03/99 09:13:00 00:02 2.8 1.2
04/03/99 09:17:00 00:13 11.5 12.4
04/03/99 09:33:00 00:12 26.5 25.7
04/03/9910:01:00 00:14 20.6 19.5
04/03/9910:17:00 00:13 12.0 12.5
04/03/9911:02:00 00:13 13.6 12.7
04/03/9911:23:00 00:07 5.9 4.9
04/03/9911:33:00 00:27 25.8 25.7
04/03/9912:05:00 00:40 39.8 39.2
04/03/99.12:55:00 00:05 4.2 4.4
04/03/9913:06:00 00:09 7.8 7.0
04/03/9913:19:00 00:11 10.1 9.3
04/03/99 13:42:00
00:03
3.3
3.8 iii
~ < ;~
04/03/99 14:40:00
00:05
4
9
4
3 ` ~ ~
. . ~ ~
04/03/99 15:20:00 00:10 22.7 21.3 ,~~ ~:
04/03/9915:32:00 00:13 14.5 15.4 N
04/03/9916:55:00 00:20 20.6 19.6
04/03/9917:22:00 00:08 6.5 6.5
04/03/99 20:14:00 00:01 0.3 0.0
04/03/99 23:58:00 00:02 0.8 0.0
04/04/99 01:14:00 00:01 0.5 0.0
04/04/99 07:55:00 00:05 3.9 2.7
04/04/99 08:06:00 00:09 9.4 10.0
04/04/99 08:28:00 00:02 2.6 2.1
04/06/99 00:36:00 00:09 7.5 6.3
04/06/99 00:56:00 00:04 3.3 3.8
04/06/99 01:20:00 00:10 8.2 7.0
04/06/99 01:37:00 00:08 7.8 7.4
04/06/99 01:54:00 00:06 6.1 6.7
04/06/99 02:33:00 00:12 12.0 11.4
04/06/99 02:51:00 00:09 8.4 7.0
04/06/99 03:14:00 00:01 1.7 2.5
04/06/99 03:36:00 00:09 9.1 7.9
04/06/99 03:53:00 00:07 6.7 6.6
04/06/99 04:13:00 00:02 1.0 0.7
04/06/99 04:36:00 00:09 7.4 5.8
04/06/99 04:53:00 00:07 6.9 7.4
04/06/99 05:08:00 00:07 7.3 6.1
BP Exploration Page 1 of 7 Milne Point, Alaska
05/03/99 07:32 Milne POint Unit fla90401.psr
Monthly Gas Flaring Incident Report
For: Apr /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
04/06/99 05:23:00 00:07 6.5 6.3
04/06/99 05:37:00 00:08 9.5 9.9
04/06/99 06:19:00 00:11 10.0 8.5
04/06/99 06:44:00 00:01 1.1 1.9
04/06/99 07:14:00 00:01 0.1 0.0
04/06/99 07:19:00 00:11 10.9 10.4
04/06/99 07:43:00 00:02 1.6 0.5
04/06/99 07:48:00 00:12 12.3 12.8
04/06/99 08:26:00 00:04 2.6 1.4
04/06/99 08:41:00 00:04 3.6 4.0
04/07/9912:59:00 00:01 0.5 0.0
04/07/9915:26:00 00:04 1.4 0.6
04/07/9915:58:00 00:02 0.9 0.1
04/07/9916:11:00 00:04 4.0 4.2
04/07/9916:47:00 00:13 12.3 11.0
04/07/9917:06:00 00:09 8.8 8.5
04/07/9917:22:00 00:08 6.2 6.8
04/07/9917:39:00 00:06 5.1 4.5
04/07/9917:57:00 00:03 2.8 1.7
04/07/9918:04:00 00:11 9.1 9.7
04/07/99 20:56:00 00:04 3.1 2.0
04/07/99 21:13:00 00:02 1.9 2.4
04/07/99 21:41:00 00:34 24.3 23.5
04/07/99 22:22:00 00:08 6.8 7.0
04/08/99 02:59:00 00:16 199.7 108.8
04/08/99 03:25:00 00:05 31.3 9.8
04/08/99 05:33:00 00:12 16.8 15.7
04/08/99 05:55:00 00:05 4.4 4.7
04/08/9910:38:00 00:07 5.8 5.1
04/08/9910:57:00 00:03 0.8 0.1
04/08/9911:13:00 00:02 1.2 1.3
04/08/9912:29:00 00:01 0.3 0.0
04/08/9912:44:00 00:01 0.4 0.0
04/08/99 20:09:00 00:06 2.6 1.9
04/09/9911:59:00 00:01 1.2 0.5
04/17/99 01:53:00 00:07 9.8 9.8
04/17/99 04:55:00 00:05 4.8 3.6
04/17/99 05:06:00 00:09 9.4 9.7
04/ 17/99 OS :26:00 00:04 3.5 2.3
04/17/99 05:37:00 00:08 12.8 13.4
04/17/99 07:48:00 00:12 11.3 11.7
04/17/99 08:06:00 00:09 10.0 10.5
04/17/99 09:41:00 00:04 3.3 2.2
04/ 17/99 09:51:00 00:09 8.8 9.3
BP Exploration Page 2 of 7 Milne Point, Alaska
05/03/99 07:32 Milne POint Unlt fla90401.psr
Monthly Gas Flaring Incident Report
For: Apr /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare A ssist Cause Comment
04/17/9912:49:00 00:11 11.8 10.7
04/17/9913:14:00 00:01 1.0 1.5
04/17/9913:29:00 00:01 0.9 0.3
04/17/9913:43:00 00:02 1.2 0.5
04/17/9916:14:00 00:01 0.2 0.0
04/17/9916:17:00 00:13 13.1 12.7
04/17/9919:14:00 00:01 0.7 0.0
04/ 17/99 19:19:00 00:11 10.6 10.6
04/17/9919:32:00 00:13 10.7 10.2
04/17/9919:46:00 00:14 13.4 12.8
04/17/99 20:05:00 00:10 12.4 12.4
04/17/99 20:34:00 00:11 9.9 9.3
04/17/99 21:17:00 00:13 12.0 10.6
04/17/99 21:31:00 00:14 14.8 15.1
04/17/99 22:17:00 00:13 12.7 11.6
04/17/99 22:33:00 00:12 14.4 14.9
04/17/99 22:58:00 00:02 0.8 0.1
04/17/99 23:08:00 00:07 6.8 6.4
04/17/99 23:25:00 00:05 5.6 5.4 '
04/17/99 23:40:00 00:05 3.9 2.7
04/17/99 23:53:00 00:07 7.3 7.8
04/18/99 00:21:00 00:09 11.0 10.4
04/18/99 00:44:00 00:01 0.7 0.1
04/18/99 00:48:00 00:12 13.3 13.3
04/18/99 01:12:00 00:03 2.6 2.0
04/18/99 01:34:00 00:11 12.4 11.2
04/18/99 02:23:00 00:07 5.9 4.6
04/18/99 02:42:00 00:03 3.5 4.1
04/18/99 02:59:00 00:01 0.3 0.0
04/18/99 05:07:00 00:08 8.0 0.0
04/18/99 05:20:00 00:10 7.2 0.0
04/18/99 05:33:00 00:12 27.0 0.0
04/18/9911:50:00 00:10 17.6 18.5
04/18/9915:43:00 00:02 1.1 0.5
04/18/9916:58:00 00:02 1.8 1.2
04/19/99 00:43:00 00:02 1.0 0.4
04/ 19/99 19:44:00 00:01 0.0 0.0
04/19/9919:58:00 00:02 0.7 0.1
04/20/99 21:57:00 00:03 4.7 2.3
04/20/99 22:06:00 00:09 13.3 15.1
04/21/99 02:44:00 00:01 0.1 0.0
04/21/99 02:54:00 00:06 6.6 5.6
04/21/99 04:07:00 00:08 8.2 6.6
04/21 /99 04:21:00 00:09 10.5 11.3
BP Exploration Page 3 of 7 Milne Point, Alaska
05/03/99 07:32 Mllne POlnt Urilt fla90401.psr
Mon thly Gas Flaring Incident Report
For: Apr /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
04/21/99 04:53:00 00:07 6.8 5.5
04/21/99 05:03:00 00:12 9.9 9.9
04/21/99 05:25:00 00:05 5.1 5.2
04/21/99 05:39:00 00:06 5.6 4.3
04/21/99 05:46:00 00:14 12.9 13.1
04/21 /99 06:06:00 00:09 9.2 9.3
04/21/99 06:25:00 00:05 3.5 2.3
04/21/99 06:42:00 00:03 3.8 4.4
04/21/99 06:54:00 00:06 3.9 3.2
04/22/99 02:35:00 00:10 9.0 8.2
04/22/99 03:07:00 00:08 6.7 5.3
04/22/99 03:22:00 00:08 7.8 8.0
04/22/99 05:12:00 00:03 2.3 1.7
04/22/99 05:26:00 00:04 2.3 1.8
04/22/99 05:56:00 00:04 3.1 1.8
04/22/99 06:11:00 00:04 7.0 7.6
04/22/99 06:31:00 00:14. 13.1 11.9
04/22/99 06:49:00 00:11 12.5 12.2
04/22/99 07:28:00 00:02 1.9 0.7
04!22/99 07:34:00 00:11 12.3 12.8
04/22/99 07:58:00 00:02 2.1 2.0
04/22/99 08:02:00 00:13 9.9 8.8
04/22/99 08:34:00 00:11 12.2 11.0
04/22/99 08:56:00 00:04 4.3 4.5
04/22/99 09:31:00 00:14 11.8 10.5
04/22/99 09:49:00 00:11 10.7 11.3
04/22/9911:26:00 00:04 3.5 2.9
04/22/9912:51:00 00:09 7.8 6.8
04/22/9913:09:00 00:06 6.2 6.2
04/22/9913:23:00 00:07 6.0 5.1
04/22/9913:40:00 00:05 4.7 5.2
04/22/9913:51:00 00:09 7.4 6.8
04/22/9914:14:00 00:01 1.2 0.6
04/22/9914:41:00 00:04 2.3 1.2
04/22/9914:46:00 00:14 13.3 13.1
04/22/9915:08:00 00:07 8.2 8.7
04/22/9915:51:00 00:09 10.4 9.1
04/22/9916:08:00 00:07 5.8 6.4
04/22/9916:18:00 00:27 32.2 30.7
04/22/9916:51:00 00:09 10.6 11.4
04/22/9917:07:00 00:08 11.2 10.9
04/22/9917:16:00 00:14 15.9 14.8
04/22/9917:33:00 00:12 14.5 15.2
04/22/9917:51:00 00:09 11.7 11.4
BP Exploration Page 4 of 7 Milne Point, Alaska
05/03/99 07:32 Milne Point Unit fla90401.psr
Mon thly Gas Flaring Incident Report
For: Apr /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
04/22/9918:08:00 00:07 5.9 4.8
04/22/9918:16:00 00:14 13.1 12.9
04/22/9918:35:00 00:10 9.1 9.6
04/22/9918:56:00 00:04 2.9 2.0
04/22/9919:02:00 00:13 12.2 12.1
04/22/9919:28:00 00:02 2.2 2.6
04/22/9919:34:00 00:11 11.3 9.8
04/22/9919:51:00 00:09 9.8 10.3
04/22/99 20:04:00 00:11 9.1 7.7
04/22!99 20:19:00 00:11 10.0 10.3
04/22/99 20:37:00 00:08 6.8 6.6
04/22/99 20:57:00 00:03 2.7 2.3
04/22/99 21:07:00 00:08 7.4 6.3
04/22/99 21:19:00 00:11 8.7 8.4
04/22/99 21:39:00 00:06 6.4 6.7
04/22/99 22:07:00 00:08 8.4 7.2
04/22/99 22:22:00 00:08 7.0 6.9
04/22/99 22:43:00 00:02 1.6 1.7
04/22/99 23:06:00 00:09 8.3 7.7 ,
04/22/99 23:36:00 00:09 9.3 8.7
04/22/99 23:50:00 00:10 8.2 7.4
04/23/99 00:11:00 00:04 3.0 3.6
04/23/99 00:25:00 00:05 3.1 1.8
04/23/99 00:34:00 00:11 10.9 10.5
04/23/99 00:47:00 00:13 12.3 12.7
04/23/99 01:13:00 00:02 2.0 2.1
04/23/9910:39:00 00:06 5.9 5.3
04/23/9912:27:00 00:03 4.1 2.7
04/23/9912:33:00 00:12 10.0 10.8
04/23/9912:59:00 00:01 1.0 0.4
04/23/9916:54:00 00:06 5.0 3.9
04/24/99 00:57:00 00:03 3.7 4.0
04/24/99 02:12:00 00:03 2.4 1.2
04/24/99 02:22:00 00:08 19.3 19.3
04/24/99 02:38:00 00:07 7.1 7.1
04/24/99 03:04:00 00:26 48.8 47.0
04/24/99 03:41:00 00:04 3.6 4.7
04/24/9913:54:00 00:06 6.1 4.9
04/24/9914:07:00 00:08 15.2 15.8
04/24/9917:53:00 00:07 5.1 4.1
04/25/99 07:44:00 00:01 0.5 0.0
04/25/9916:41:00 00:04 2.4 1.8
04/27/99 04:38:00 00:07 8.2 6.6
04/27/99 04:47:00 00:28 51.2 51.5
BP Exploration Page 5 of 7 Milne Point, Alaska
05/03/99 o~:3z Milne Point Unit fla9oaol.psr
Monthly Gas Flaring Incident Report
For: Apr /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) =
Start Time (hh:mm) Flare Assist Cause Comment
04/27/99 05:23:00 00:37 51.6 51.1
04/27/99 06:11:00 00:04 5.6 6.1
04/28/99 07:59:00 00:01 0.2 0.0
04/28/9910:29:00 00:01 0.3 0.0
04/28/9910:56:00 00:04 1.3 0.2
04/28/9911:13:00 00:02 1.0 1.1
04/28/9911:59:00 00:01 0.6 0.0
04/28/9912:14:00 00:01 0.0 0.0
04/28/9913:41:00 00:04 1.4 0.5
04/28/9917:14:00 00:01 0.3 0.0
04/28/9917:26:00 00:04 2.1 1.0
04/30/9914:57:00 00:48 432.7 230.0
04/30/9915:47:00 00:13 53.4 34.1
BP Exploration Page 6 of 7 Milne Point, Alaska
05/03/99 07:32
Flare Name: Flare 1
Milne Point Unit
Monthly Gas Flaring Incident Report
For: Apr /1999
fla90401.psr
~iJnplanned Events greater than 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
04/18/99 03:07:00 01:53 190.0 101.8 Hi-hi level in V-6201 caused fieldwide Reference LCIR 8266
03 o q _ o .S~ ~ S/D.
04/18/99 05:51:00 05:54 1,223.3 643.4 Field restart w/ compressor trouble Reference LCIR 8266
oss-i - I ~ ~S' following fieldwide S/D.
04/23/99 22:43:00 02:02 2,656.0 160.5 Field ramp-up following lengthy Discussed and reviewed procedures
Z2 4 3 - a~ 4 S compressor repair job including a Mod with individuals involved.
55 production S/D.
Flare Assist
Unplanned Events <= 1 hour 2,481.0 2,011.7
Unplanned Events > 1 hour 4,069.3 905.8
Planned Events <=1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas 9,821.7
TOTAL FLARED VOLUME 6,550.3 12,739.1 MSCF
~~
,~ ~'~
.~
~o
~, ~-
~-
a
BP Exploration Page 7 of 7 Milne Point, Alaska
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 03:07 - 1 hr 53 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
® an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Date: 04-18-99
Flare Volume: 190.0
Assist Gas Volume: 101.8
Event descriution
During an operational upset, liquid carry-over to V-6201 (flare scrubber vessel) activated a LSHH
(level safety hi-hi) and caused a fieldwide production shut down. All wells were automatically-
shut-in. Flaring was generated by a safe depressurization of plant equipment and piping systems.
Action taken to stop flaring
Once again, the shut in of all production wells was an automated response to the production shut
down. Ongoing troubleshooting and immediate response to the upset mitigated flaring to the extent
possible.
Action taken to urevent reoccurrence
This incident was formally investigated and reported in a BPXA Loss Control Investigation Report
#1999-LCIR-8266. Actions as a result of the investigation include verifying calibration of the level
transmitters and shut down devices involved, jet wash (clean) the level bridals involved, raise the
priority of adding another booster pump into the system and complete training on jet washing level
control bridals.
Reported by:
Name: Larry Niles
Title: OI Compliance Advisor
Supervisor
Name: Henry Harrington
Title: Facilities Supervisor
990418 Flare incident report.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 05:51 - 5 hr 54 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 04-18-99
Flare Volume: 1,223.3
Assist Gas Volume: 643.4
This flaring event occurred during a production start-up following afield-wide production
shutdown. The following are the sequence of events; (.gas--lift compressor C-5501-B was down for
maintainence repairs. An attempt to start gas lift compressor C-5501-A failed due to a failed
rupture disc in the Trabon lube system. The rupture disk was repaired and the A G/L compressor
was online by 0900 hrs. Reinjection compressor C-5502/3/31-A shutdown shortly after start-up
but was re-started by 11:10 hrs. Reinjection compressor C-5502/3/31-B was online at 11:50 hrs.
Once these three compressors were brought online the plant was returned to normal operation and
the flare was eliminated.
Action taken to stop flaring
The shut-in of all gas lift production wells is an automated response to the compressor shut down.
Field ramp up was delayed until repairs were made. Ongoing troubleshooting and immediate
response to the upset mitigated flaring as much as possible. Maintainence personnel
(instrumentation and mechanics) were expedited to Mod 55 to make speedy repairs on the
compressors.
Action taken to prevent reoccurrence
This incident was formally investigated and reported in a BPXA Loss Control Investigation Report
#1999-LCIR-8266. Actions as a result of the investigation include verifying calibration of the level
transmitters and shut down devices involved, jet wash (clean) the level bridals involved, raise the
priority of adding another booster pump into the system and complete training on jet washing level
control bridals.
Reported by:
Name: Larry Niles/Jerry Gronos
Title: OI Advisor/Facilities Lead Tech
Supervisor
Name: Henry Harrington
Title: Facilities Supervisor
990418 (2) Flare incident report.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 22:43 - 2 hr 02 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
® an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 04-23-99
Flare Volume: 2656
Assist Gas Volume: 160.5
During a field ramp up following a lengthy gas compressor repair job, a gas slug in the slug catcher
tripped the common hi-hi suction pressure switch causing a production shut down of the gas
compression module 55. All four compressors and the assist gas system were effected. Gas flaring
came from the oil separation vessels at that point.
Action taken to stop flaring
All gas lift wells were shut in. Wells that had been shut down for the planned compressor work
remained shut in. The assist gas system was promptly reset and functional. Gas lift header valves
were promptly reset and reopened for assist gas volume. Once a compressor purge was completed
the compressors were started systematically. The gas plant returned to normal operation and the
flare was eliminated
Action taken to prevent reoccurrence
Facilities operations personnel reviewed procedures and held discussions to improve well start-up
practices after long term shut downs. Responses to the initial incident were evaluated as organized
and effective.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
990423 Flare incident report.doc Revised 4-25-99 LEN
ALASKA .OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point May-99
a r
urb
~:
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK 525100 87.8
SCH. BLUFF 525140 12.2
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
t~ ~'-
s' ,., ;
c
1. Sold Fuel 17,753
2. Reinjected 559,282
3. Flared or vented less than 1 hour 1,054
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,255
5. Pilot and Purge 372
6. Used for lease operations Fuel
Assist 269,602
10 984
7. Other
TOTAL items 1-7 860,302
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
hereby certify tha,~ the foregoing is true and correct to the best of my knowledge
~~Signature ~~ u_ ~~ ~ Title ~~R. 7~~-t''~ Date ~p
~'
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60 degrees F. Report
due by the 20th of the month
folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
06/02/99 06:33 Milne Point Unit
Monthly Gas Flaring Incident Report
For: May /1999
Flare Name: Flare 1
;Unplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
05/01/99 07:56:00 00:04 1.6 0.6
05/01/99 09:26:00 00:04 1.3 0.4
05/01/99 09:43:00 00:02 1.2 1.0
05101/9912:14:00 00:01 0.3 0.0
05/01/9915:43:00 00:02 0.7 0.0
05/01/9915:52:00 00:08 2.9 2.1
05/01/9916:13:00 00:02 0.9 0.5
05/01/9918:14:00 00:01 0.5 0.0
05/04/99 07:14:00 00:01 0.3 0.0
05/04/9910:44:00 00:01 0.2 0.0
05/04/9914:13:00 00:02 0.6 0.0
05/04/9915:44:00 00:01 0.0 0.0
05/04/9917:13:00 00:02 0.4 0.0
05/04/9917:29:00 00:01 0.3 0.0
05/04/9918:12:00 00:03 1.8 1.2
05/05/99 07:44:00 00:01 0.3 0.0
05/05/99 08:14:00 00:01 0.6 0.0
05/05/9912:44:00 00:01 0.1 0.0
05/05/9914:43:00 00:02 0.6 0.0
05/05/9917:59:00 00:01 0.1 0.0
05/05/9918:13:00 00:02 0.9 0.0
05/05/9918:28:00 00:02 0.4 0.0
05/05/9919:11:00 00:04 1.6 0.6
05/05/9919:23:00 00:07 2.8 1.6
05/05/9919:44:00 00:01 0.6 0.6
05/06/99 03:01:00 00:14 14.5 13.4
05/06/99 03:26:00 00:04 2.3 2.8
05/06/99 04:43:00 00:02 1.4 0.7
05/06/99 05:13:00 00:02 1.3 0.7
05/06/99 08:29:00 00:01 0.6 0.0
05/06/9910:02:00 00:13 33.8 17.0
05/06/9910:20:00 00:10 18.0 8.0
05/06/9910:39:00 00:06 11.5 5.9
05/06/9911:29:00 00:01 0.1 0.0
05/06/9911:44:00 00:01 0.4 0.0
05/06/9911:59:00 00:01 0.2 0.0
05/06/9917:29:00 00:01 0.4 0.0
05/06/9917:40:00 00:05 5.1 1.8
05/06/99 20:51:00 00:09 19.1 20.1
05/06/99 21:08:00 00:07 10.4 9.0
05/06/99 21:28:00 00:02 4.7 5.7
05/06/99 21:38:00 00:07 8.9 7.5
05/06/99 21:49:00 00:11 19.1 23.0
05/06/99 22:05:00 00:10 13.8 .20.8
BP Exploration Page l of 4 Milne Point, Alaska
06/02/99 06:33 Milne Point Unit
Monthly Gas Flaring Incident Report
For: May /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
05/07/99 05:44:00 00:01 0.4 0.1
05/07/99 08:10:00 00:05 2.0 2.3
05/07/99 09:44:00 00:01 0.1 0.0
05/07/99 09:58:00 00:02 0.4 0.0
05/07/9910:13:00 00:02 1.0 0.4
05/07/9910:43:00 00:02 0.3 0.0
05/07/9913:14:00 00:01 0.4 0.0
05/07/9913:28:00 00:02 0.4 0.0
05/07/9913:44:00 00:01 0.2 0.0
05/07/99 14:27:00 00:03 0.8 0.0
05/07/9914:59:00 00:01 0.1 0.0
05/07/9915:29:00 00:01 0.5 0.0
05/08/99 21:23:00 00:07 9.2 10.1
05/09/9910:13:00 00:02 0.5 0.0
05/09/9910:29:00 00:01 0.6 0.3
05/09/99 15:13:00 00:02 0.8 0.2
05/11/99 20:43:00 00:02 1.1 0.5
05/11/99 23:12:00 00:03 2.4 1.7
05/11/99 23:29:00 00:01 0.8 0.3
05/11/99 23:35:00 00:10 12.0 10.2
05/11/99 23:58:00 00:02 4.6 5.8
05/13/9915:53:00 00:07 11.3 9.2
05/13/9916:13:00 00:02 2.8 4.2
05/18/9917:28:00 00:02 2.4 0.9
05/19/9913:35:00 00:10 9.2 8.5
05/19/9913:49:00 00:11 10.4 9.4
05/19/9914:14:00 00:01 1.0 1.5
05/19/9915:38:00 00:07 2.7 1.8
05/19/9915:59:00 00:01 0.5 0.6
05/22/99 07:42:00 00:03 1.9 1.3
05/22/9919:29:00 00:01 0.3 0.0
05/22/9919:44:00 00:01 0.7 0.3
05/22/99 20:03:00 00:27 224.9 119.7
05/22/99 20:31:00 00:14 45.7 51.2
05/22/99 20:50:00 00:10 119.4 53.1
05/22/99 21:59:00 00:01 0.6 0.0
05/22/99 22:12:00 00:03 1.0 0.3 ;~
,~ r4
05/22/99 22:29:00 00:01 0.5 0.1 ~
~
,~) ~}~~~ ~` ~ `~
05/23/99 00:13:00 00:02 0.5 0.0
05/23/99 00:28:00 00:02 0.9 0.2
05/23/99 00:42:00 00:03 0.4 0.0
05/23/99 00:59:00 00:01 0.4 0.0 °`.~~~15~; `"~j'°" ~'~ ~v; j ""
~`+f1C~lOPu~°"
05/23/9913:17:00 00:28 62.9 61.6
05/23/9913:51:00 00:09 12.5 11.3
BP Exploration Page 2 of 4 Milne Point, Alaska
i
06/02/99 06:33 Milne Point Unit
Monthly Gas Flaring Incident Report
For: May /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (11iSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
05/23/9914:05:00 00:10 15.1 16.6
05/23/9915:59:00 00:01 0.3 0.0
05/23/9916:07:00 00:08 7.5 6.9
05/23/9917:44:00 00:01 0.2 0.0
05/23/9917:51:00 00:09 22.7 20.0
05/23/99 18:09:00 00:06 17.9 19.7
05/23/99 21:42:00 00:03 0.6 0.0
05/23/99 21:59:00 00:01 0.7 0.0
05/24/99 00:13:00 00:02 0.5 0.0
05/25/99 00:03:00 00:12 15.1 14.0
05/25/99 07:44:00 00:01 0.3 0.0
05/25/99 07:50:00 00:10 17.1 16.7
05/25/99 08:39:00 00:06 5.5 4.6
05/25/99 08:46:00 00:14 13.0 12.7
05/25/99 09:06:00 00:09 7.6 7.1
05/25/99 09:20:00 00:10 10.8 11.1
05/25/9911:13:00 00:02 1.7 0.5
05/25/9911:27:00 00:03 3.4 4.0
05/26/99 04:37:00 00:08 15.3 14.0
05/26/99 04:57:00 00:03 2.9 3.6
05/26/9911:40:00 00:05 5.1 3.6
05/26/9911:57:00 00:03 4.6 5.5
05/26/9913:52:00 00:08 9.3 8.7
05/26/9914:47:00 00:28 41.9 40.6
05/26/9915:26:00 00:19 26.9 26.3
05/26/9915:46:00 00:14 19.6 20.0
05/26/9916:11:00 00:04 4.3 4.6
05/26/9918:05:00 00:10 13.5 12.9
05/27/99 01:44:00 00:01 0.3 0.0
05/27/99 06:29:00 00:01 0.1 0.0
05/27/99 07:48:00 00:12 5.4 4.3
05/27/99 09:21:00 00:09 5.0 2.1
05/27/99 09:42:00 00:03 1.0 0.0
05/27/9911:39:00 00:06 1.8 0.7
05/27/9912:59:00 00:01 0.1 0.0
05/28/99 00:37:00 00:08 12.3 10.8
05/28/99 00:56:00 00:04 5.4 6.3
05/29/99 01:29:00 00:01 1.1 0.5
BP Exploration Page 3 of 4 Milne Point, Alaska
06/02/99 06:33 Milne Point Unit
Monthly Gas Flaring Incident Report
For: May /1999
Flare Name: Flare 1
~iJnplanned Events greater than 1 hour ~
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
05/06/99 08:35:00 01:25 536.8 164.8
05/06/9919:31:00 OI:14 542.3 60.2
05/08/99 20:09:00 01:06 141.2 139.6
05/27/99 08:04:00 01:11 34.5 31.3
Flare
Assist
810.6
395.9
0.0
0.0
10,149.1
Unplanned Events <=1 hour 1,054.4
Unplanned Events > 1 hour 1,254.8
Planned Events <= 1 hour and
not exceeding 5,000 MCF 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0
Unmetered Assist Gas
TOTAL FLARED VOLUME 2,309.3
11,355.5 MSCF
BP Exploration Page 4 of 4 Milne Point, Alaska
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 08:35 - 1 hr 25 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: OS-06-99
Flare Volume: 537
Assist Gas Volume: 165
There were two events causing this flare incident. At 08:35 the event started when a false level
indication during a oil skimming operation of V-5412 caused gas to vent to the flare system from
the injection water surge drum in Module 54. Then at 08:52 an unplanned flaring event occurred
when compressor C-5501-A shutdown from PSHH discharge pressure caused by a high cooler
temperature on the gas lift cooler. The second compressor was down for maintenance at the time so
a total gas plant shutdown occurred.
Action taken to stow flaring
Compressor C-5501-A was purged and started . The other gas plant compressors were then brought
back on line. The plant was returned to normal operation and the flaring stopped.
Action taken to prevent reoccurrence
Maintenance personnel have scheduled a PM to complete on the Mod. 55 gas coolers. Pitch blade
adjustments will be made to help in the control of temperarture on the gas lift cooler.
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Henry Harrington
Title: Facilities Supervisor
990506 Flare 1 incident report.doc Revised 425-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 19:31 - 1 hr 14 min
Planned event: ^ yes
®no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: OS-06-99
Flare Volume: 542
Assist Gas Volume: 60
This was an unplanned flaring event which occurred when the LSHH on the gas lift scrubber, (V-
5511) tripped and shutdown the gas compression module. Debris was found in the level control
valve and hindered the level from decreasing. The gain in fluid level was so fast that the LAH 5520
came in after the LAHH 5517, making operating intervention extremely difficult. The initial flare
volume was the blow down of the gas lift and injection compressors. After the blow down of the
gas plant, a purge was immediately started on C-5501/11 A. The gas lift and injection compressors
were brought on systematically to reduce flare duration.
Action taken to stop flaring
The gas lift and injection compressors were immediately started and gas plant was returned to
normal operations.
Action taken to prevent reoccurrence
Maintenance personnel were dispatched to recalibrate and check operation of LAH-5520 on the gas
lift scrubber.
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Henry Harrington
Title: Facilities Supervisor
990506 Flare incident report.2 doc.doc Revised 425-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 20:09 - 1 hr 06 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: OS-08-99
Flare Volume: 141
Assist Gas Volume: 140
The production proration was lifted at 1600 hours. Wells that were shut-in due to the proration
were brought back on line. The pressure in the slug catcher V-5317 exceeded the flare set point and
relieved the excess pressure to flare.
Action taken to stop flarine
Wells were stopped from coming back into production until the pressure reduced and allowed the
PCV to the flare to close. The excessive gas appeared to be coming from B-pad and the slugging
valve was closed to 75°Io to reduce the incoming gas volume.
Action taken to prevent reoccurrence
Control Room board operator's and field operators discussed need to slowly bring high GOR wells
back on line.
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Henr~Harrington
Title: Facilities Supervisor
,: ~,~~
x~l
f..
h~1C~ur., _.
990508 Flare incident report.doc Revised 425-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 08:04 - 1 hr 11 min
Planned event: ^ yes
®no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event descriution
Date: OS-27-99
Flare Volume: 35
Assist Gas Volume: 31
The plant was running normal and at 08:00 hrs. we noticed that we were getting a small amount of
gas to flare header. The facility operators began searching the facility for flare header equipment
that may be leaking by; such as pressure safety valves or pressure control valves. At approx. 09:15
we found a possible small leak-thru on PCV-5305 on V-5301 (2"d stage separator). The downstream
block valve was temporarily closed and the flare ceased.
Action taken to stop flaring
Upon discovery of the PCV-53051eaking by, the instrument technician was immediately dispatched
to correct the calibration and valve seating problem. The downstream block valve was being
monitored until the valve was repaired.
Action taken to arevent reoccurrence
Verification was made to ensure that the PCV-5305 is maintained within the preventive
maintenance program.
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
990527FIare incident report.doc Revised 425-99 LEN
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point Jun-99
Disposition Volume MCF*
1. Sold Fuel 14,939
2. Reinjected 395,880
3. Flared or vented less than 1 hour 1,119
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,268
5. Pilot and Purge 359
6. Used for lease operations Fuel
Assist 223,144
10 663
7. Other
TOTAL items 1-7 647,372
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby ce~fy tt~t the foregoing is true and correct to the best of my knowledge
Signature ~. ~1..(~A~-~l~.G~ Title rW(s~/j. "T1~/r Date
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK 525100 83.6
SCH. BLUFF 525140 16.4
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 Asia and to a
temperature of 60 degrees F. Report
due by the 20th of the month
folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
8:35 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jun /1999
Fr Tare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
06/01/99 07:28:00 00:02 0.3 0.0
06/02/9917:53:00 00:52 208.6 187.4
06/02/9918:47:00 00:13 25.2 25.4
06/02/9919:08:00 00:07 14.1 13.4
06/02/9919:29:00 00:01 1.9 2.6
06/02/99 21:59:00 00:01 0.4 0.0
06/02/99 22:08:00 00:07 10.9 10.7
06/05/9914:44:00 00:01 0.6 0.1
06/07/9915:11:00 00:04 5.1 3.8
06/07/9915:19:00 00:26 36.1 17.5
06/07/9915:50:00 00:40 59.3 29.3
06/07/9916:32:00 00:13 16.3 8.0
06/07/9916:52:00 00:08 8.4 4.0
06/07/9917:05:00 00:10 9.1 3.5
06/07/9917:22:00 00:08 6.6 3.0
06/08/9913:29:00 00:01 1.5 0.1
06/08/9914:37:00 00:08 6.6 2.6
06/08/9915:29:00 00:01 0.4 0.0
06/08/9915:41:00 00:04 4.1 1.6
06/08/9918:46:00 00:14 13.2 5.9
06/08/9919:21:00 00:09 8.8 3.8
06/08/9919:58:00 00:02 0.6 0.0
06/08/99 20:08:00 00:07 3.6 0.8
06/08/99 20:27:00 00:03 4.1 1.0
06/08/99 20:33:00 00:12 10.1 5.5
06/08/99 20:57:00 00:03 1.4 0.0
06/08/99 21:12:00 00:03 1.9 0.3
06/08/99 21:55:00 00:05 4.8 1.7
06/08/99 23:58:00 00:02 0.5 0.0
06/09/99 01:24:00 00:06 10.8 3.5
06/09/99 01:44:00 00:01 2.1 2.3
06/09/99 06:25:00 00:05 2.1 0.4
06/09/99 06:58:00 00:02 1.1 0.0
06/09/9913:54:00 00:06 2.0 0.0
06/09/9914:06:00 00:09 3.6 0.7
06/09/9914:43:00 00:02 0.7 0.0
06/09/9916:26:00 00:19 10.5 4.2
06/09/9916:57:00 00:03 3.7 2.0
06/09/9917:39:00 00:06 6.3 2.5
06/12/99 07:59:00 00:01 0.1 0.0
06/14/9916:21:00 00:09 102.2 2.1
06/14/9916:44:00 00:01 1.9 0.0
06!20/99 04:44:00 00:01 0.6 0.0
06/21/99 09:40:00 00:05 35.5 8.8
BP Exploration Page 1 of 5 Milne Point, Alaska
Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jun /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
06/21/99 09:46:00 00:14 83.2 11.6
06/21/9910:03:00 00:12 69.7 273
06/21/9910:28:00 00:02 10.3 1.0
06/22/99 01:59:00 00:01 0.6 0.0
06/23/99 05:46:00 00:14 14.0 93
06/23/99 06:07:00 00:08 4.2 3.7
06/23/99 07:00:00 00:15 11.0 8.1
06/23/99 07:23:00 00:07 2.6 1.6
06/23/99 07:55:00 00:05 2.1 0.0
06/23/99 08:08:00 00:07 2.8 0.5
06/23/99 08:24:00 00:06 2.2 0.0
06/23/99 08:38:00 00:07 2.1 0.0
06/23/99 08:52:00 00:08 2.4 0.0
06/23/99 09:12:00 00:03 1.1 0.0
06/23/99 09:26:00 00:04 1.1 0.0
06/23/99 09:44:00 00:01 0.2 0.0
06/23/99 09:59:00 00:01 03 OA
06/23/9910:27:00 00:03 1.0 0.0
06/23/9910:44:00 00:01 03 0.0
06/23/9910:58:00 00:02 0.3 0.0
06/23/9911:10:00 00:05 1.2 OA
06/23/9911:26:00 00:04 13 0.0
06/23/9911:44:00 00:01 0.6 0.0
06/23/9911:56:00 00:04 1.2 0.0
06/23/9912:12:00 00:03 0.9 0.0
06/23/9912:27:00 00:03 1.0 0.0
06/23/9912:43:00 00:02 0.4 0.0
06/23/9912:59:00 00:01 03 0.0
06/23/9913:14:00 00:01 0.4 0.0
06/23/9913:28:00 00:02 0.7 0.0
06/23/9913:39:00 00:06 1.9 0.0
06/23/9913:57:00 00:03 0.9 0.0
06/23/9914:08:00 00:07 4.2 1.0
06/23/9914:23:00 00:07 5.9 2.8
06/23/9914:43:00 00:02 0.6 0.0
06/23/9915:10:00 00:05 0.7 0.0
06/23/9915:25:00 00:05 1.5 0.0
06/23/99 15:40:00 00:05 1.5 0.0 ~ ,
06/23/99 15:56:00 00:04 1.4 0.0 _ --- --• ~-
06/23/9916:13:00 00:02 0.9 0.0 .~ E.. a.>;.
06/23/99 16:25:00
00:05
1.6 ,,
iR ;; i
OA ~"'~ ~-°
06/23/9916:43:00 00:02 0.7 OA
06/23/9916:57:00 00:03 13 0.0
06/23/9917:13:00 00:02 0.8 0.0
BP Exploration Page 2 of 5 Milne Point, Alaska
~sss Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jun /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
06/23/9917:55:00 00:05 5.1 1.8
06/23/9918:29:00 00:16 14.0 6.1
06/23/9918:56:00 00:04 4.2 2.2
06/24/99 08:34:00 00:11 9.8 4.3
06/24/9913:54:00 00:06 5.1 1.7
06/24/9914:07:00 00:08 6.8 3.6
06/24/9918:13:00 00:02 0.7 0.0
06/24/9918:22:00 00:23 20.3 9.0
06/24/9918:56:00 00:19 17.8 8.5
06/24/9919:23:00 00:07 2.6 0.9
06/24/9919:43:00 00:02 0.3 0.0
06/24/9919:58:00 00:02 0.5 0.0
06/24/99 20:29:00 00:01 0.4 0.0
06/24/99 20:44:00 00:01 0.3 0.0
06/24/99 21:14:00 00:01 0.4 0.0
06/24/99 21:43:00 00:02 0.3 0.0
06/24/99 23:29:00 00:01 0.3 0.0
06/24/99 23:43:00 00:02 0.5 0.0
06/24/99 23:59:00 00:01 0.4 0.0
06/25/99 00:29:00 00:01 0.3 0.0
06/25/99 00:43:00 00:02 0.5 0.0
06/25/99 05:50:00 00:10 11.4 3.0
06/25/9911:18:00 00:12 5.8 0.0
06/25/9915:51:00 00:09 9.3 9.7
06/25/9917:05:00 00:10 10.2 9.6
06/26/99 07:50:00 00:10 8.5 7.3
06/26/99 08:08:00 00:07 6.2 6.7
06/26/9911:27:00 00:03 2.2 1.1
06/26/9911:41:00 00:04 3.9 4.4
06/26/9917:05:00 00:10 6.1 4.8
06/26/99 21:08:00 00:07 5.9 4.7
06/26199 21:28:00 00:02 2.6 3.2
06/26/99 22:36:00 00:09 8.4 7.3
06/26/99 22:56:00 00:04 4.5 5.0
06/27/9914:55:00 00:20 16.3 15.1
06/27/9915:27:00 00:03 2.6 3.1
06/28/9911:25:00 00:05 4.5 3.3
06/28/9911:38:00 00:07 5.5 6.1
06/28/9916:44:00 00:01 1.3 0.7
06/28/9917:14:00 00:01 1.1 0.4
06/28/9918:28:00 00:02 1.2 0.6
06/28/9919:43:00 00:02 1.5 0.9
06/28/99 20:43:00 00:02 0.9 0.3
06/29/9917:31:00 00:14 16.2 16.8
BP Exploration Page 3 of 5 Milne Point, Alaska
Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jun /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
06/30/99 07:12:00 00:03 1.4 0.7
BP Exploration Page 4 of 5 Milne Point, Alaska
07/05/99 18:35
Milne Point Unit
Monthly Gas Flaring Incident Report
. For: Jun /1999
Flare Name: Flare 1
~iJnplanned Events greater than 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
06/09/99 04:57:00 01:18 81.3 38.2 C-SSO1B s/d for maint after C-SSOIA Closed manual suction valve on
put on line C-SSOlA and flare stopped
06/25/99 04:17:00 01:28 494.9 171.1 C-SSOlA compressor s/d due to PSV Fitting repaired and unit returned to
5569A tubing fitting failure service
06/25/99 09:50:00 01:25 227.8 0.8 CFP Mod 54 accidental halon dump CFP fire and gas suppression systems
caused full field s/d restored and field production restarted
06/25/99 12:41:00 03:04 344.6 294.1 Field s/d following halon discharge in Slowed process of popping high gor
Mod 54 wells
06/29/99 16:22:00 01:08 118.8 117.5 C-5502A compr s/d while maint pm's With one power turbine offline for
on unit maint.sxarted and loaded emerg. gen.
to allow compr restart
Flare Assist
Unplanned Events <=1 hour 1,119.1 578.9
Unplanned Events > 1 hour 1,267.4 621.7
Planned Events <=1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas 9,821.7
TOTAL FLARED VOLUME 2,386.5 11,022.3 MSCF
BP Exploration Page 5 of 5 Milne Point, Alaska
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 04:57 - 1 hr 18 min
Planned event: ^ yes
®no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 06-09-99
Flare Volume: 81
Assist Gas Volume: 38
During the production proration, the following are the sequence of events. C-5501-A was down for
maintenance repairs. Tried to start Big A compressor (C-5501-A) had purge problems and needed a
rupture disc replaced on the trabon system.(started & brought on line at approx. 22:30hrs.) At 05:00
we took Big B (C-5501-B) compressor down for maintenance on the low pressure side. After the
compressor was blown down & prepared for maintenance work. We continued to flare at a low rate.
We closed the manual suction valve on the high pressure side of C-5501/11A and flaring stopped.
Action taken to stop flaring
Immediate response to the upset, mitigated flaring as much as possible. The Gas plant operator was
informed that the suction valve on the high pressure side of C-5501/11A should be closed when
working on the low side.
Action taken to prevent reoccurrence
Steps will be taken to ensure the gas plant operators are aware of the need to close both suction
valves (High & Low pressure) for maintenance work.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Henry Harrington
Title: Facilities Supervisor
990609FIare incident report.doc Revised 425-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 04:17 lhr.28min.
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Date: 06-25-99
Flare Volume: 495
Assist Gas Volume: 171
Event description
MPU experienced an unplanned compressor shut-down on C-5501-A gas lift compressor,
which was caused by PSV-5569A on the 1 ~ stage compressor discharge. This caused the
compressor to shutdown on low low suction pressure on the 1 stage. A broken tubing fitting
on PSV-5569A was found to be the cause of the failure.
Action taken to stop flaring
Repairs were made to the broken tubing fitting and the system was restarted.. The flare gas
was eliminated shortly after the compressor returned to service.
Action taken to prevent reoccurrence
The incident was discussed at the operators morning safety meeting and emphases were directed at
the importance of reporting any possible tubing leaks or high vibration areas on the PSV's.
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Jeff D. Scarbroul?h
Title: Facilities Supervisor
990625FIare incident report.idoc.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 09:50 - 1 hr 25 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
x necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Date: 06-25-99
Flare Volume: 228
Assist Gas Volume: 1
Event descriution
MPU production facility experienced an unplanned field-wide emergency shutdown when Mod-54
experienced a Halon discharge. The Halon discharge was caused by welding work that was being
conducted in the module. The incident investigation determined that the fire detection system had not
been bypassed before the welding work began.
Action taken to stop flaring
After the facility blew down the flare volume dropped off.. Production start up was deferred until after
all fire and gas systems were returned to normal.
Action taken to prevent reoccurrence
Incident was discussed at operators morning safety meeting .
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Jeff D. Scarbrough
Title: Facilities Supervisor
990625FIare incident report.2doc.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 12:41 - 3 hr 04 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 06-25-99
Flare Volume: 345
Assist Gas Volume: 294
MPU production facility was being brought back online after the unplanned field-wide emergency
shutdown when Mod-54 experienced a Halon discharge at 09:50 Hrs. Gas and oil were being
introduced back into the plant ,along with start-up of all the shutdown equipment.
Action taken to stop flaring
The plant and field equipment were brought back online in a expeditious manner to help mitigate
the flaring event.
Action taken to prevent reoccurrence
Discussed with operators to slow process of popping high gor wells at full field startup to mitigate
flaring to minimum.
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Jeff D.Scarbrouch
Title: Facilities Supervisor
990625FIare incident report.3doc.doc Revised 425-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 16:22 1hr.08min.
Planned event: ^ yes
®no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Date: 06-29-99
Flare Volume: 119
Assist Gas Volume: 118
Event description
MPU experienced an unplanned compressor shut-down on C-5502-A injection compressor,
which was caused by LSLL on the V-5503. This caused the compressor to shutdown on
low low level on the vessel. A technician was found to be the cause of the failure while
conducting Preventative Maintenance on instrument..
Action taken to stop flaring
Since only one power turbine was on line at the time, one emergency power generator had to be started and
loaded prior to restarting the gas compressor. The compressor was then purged and restarted. as soon as
possible to mitigate the flaring. The flare gas was eliminated shortly after the compressor returned to service.
Action taken to prevent reoccurrence
The incident was discussed with the Instrument Technicians. Emphases were directed at the
importance of using AFI's to bypass shutdowns during testing.
Reported by:
Name: Charlie W. Parker
Title: Acting Facilities Lead Technician
Supervisor
Name: Henry Harrington
Title: Facilities Supervisor
990629FIare incident report.idoc.doc Revised 4-25-99 LEN
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point (~~3~-99
Disposition
Volume MCF*
1. Sold Fuel 16,268
2. Reinjected 502,537
3. Flared or vented less than 1 hour 2,304
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,208
5. Pilot and Purge 371
6. Used for lease operations Fuel
Assist 252,934
12 386
7. Other
TOTAL items 1-7 788,008
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby ce~~/f~yJ th the fore ing is truevland correct to the best of my knowledge.
Signature_JC~ `!~ ~ Title ~~,(y~ T~X Date g
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK 525100 85.2
SCH. BLUFF 525140 14.8
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 Asia and to a
temperature of 60 degrees F. Report
due by the 20th of the month
folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
08/05/99 ls:as Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jul /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
07/01/9912:14:00 00:01 0.4 0.0
07/01/9912:29:00 00:01 0.5 0.0
07/01/9913:10:00 00:05 2.8 1.5
07/01/9913:29:00 00:01 0.4 0.7
07/01/9914:44:00 00:01 03 0.0
07/01/9917:12:00 00:03 2.2 1.5
07/02/99 23:57:00 00:03 2.5 12
07/03/99 00:59:00 00:01 1.2 0.5
07/03/99 02:55:00 00:05 12.2 11.6
07/03/99 04:24:00 00:21 11.0 9.9
07/03/99 04:47:00 00:28 16.4 16.2
07/03/99 05:16:00 00:14 10.5 10.6
07/03/99 05:42:00 00:03 5.5 3.9
07/03/99 05:57:00 00:03 3.2 3.2
07/03/99 06:09:00 00:06 7.5 6.2
07/03/99 06:28:00 00:02 2.5 3.4
07/03/99 07:13:00 00:02 1.4 0.8
07/03/99 07:55:00 00:05 5.4 4.1
07/03/99 08:06:00 00:09 7.9 8.6
07/03/9916:55:00 00:05 3.7 3.1
07/04/99 02:25:00 00:05 4.8 4.2
07/04/99 03:26:00 00:04 3.2 2.6
07/04/9910:39:00 00:06 5.0 3.3
07/04/9911:14:00 00:01 0.2 0.0
07/04/9911:29:00 00:01 1.4 1.1
07/04/9917:34:00 00:41 193.1 186.6
07/04/9918:27:00 00:03 43 6.6
07/04/9918:41:00 00:04 3.9 3.3
07/05/99 02:55:00 00:05 6.3 5.7
07/05/99 03:11:00 00:04 3.6 3.3
07/05/9910:14:00 00:01 0.4 0.0
07/05/9910:27:00 00:03 3.4 3.2
07/05/9917:09:00 00:21 45.5 44.3
07/05/9917:38:00 00:07 5.4 4.8
07/05/9917:50:00 00:10 11.6 11.2
07/05/9918:06:00 00:09 9.5 10.1
07/05/9918:20:00 00:10 11
6 11
1 -`~
. .
4 S"'
07/05/9918:41:00 00:04 5.1 3.6
07/05/9918:59:00 00:01 0.9 1.8
07/05/99 20:11:00 00:04 4.0 3.4
07/05/99 20:27:00 00:03 3.8 3.4
07/06/99 02:06:00 00:09 19.3 17.7 ~ ~ ,n~~,,r ~,
07/06/99 02:19:00 00:11 28.4 29.4
07/06/99 08:18:00 00:27 66.5 65.3
BP Exploration Page 1 of 6 Milne Point, Alaska
08/05/99 1s:as Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jul /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
07/06/99 08:47:00 00:13 12.4 13.0
07/06/99 09:28:00 00:02 0.8 0.1
07/06/99 09:40:00 00:05 4.8 4.6
07/06/99 20:16:00 00:29 51.6 50.4
07/06/99 20:46:00 00:14 13.0 13.4
07/06/99 22:25:00 00:05 4.1 2.8
07/06/99 22:37:00 00:08 7.8 7.4
07/06/99 22:57:00 00:03 2.3 2.9
07/07/99 03:52:00 00:08 15.3 14.0
07/07/99 04:01:00 00:29 52.1 51.9
07/07/99 04:33:00 00:27 35.6 35.7
07/09/99 04:54:00 00:21 78.5 74.4
07/09/99 05:18:00 00:12 24.2 24.7
07/09/99 05:33:00 00:12 36.6 34.2
07/09/99 05:53:00 00:07 16.1 18.8
07/09/99 06:06:00 00:09 11.2 9.4
07/09/99 06:21:00 00:09 13.5 14.3
07/09/99 06:37:00 00:08 9.8 9.6
07/09/99 07:57:00 00:18 76.9 74.1
07/09/99 08:19:00 00:11 21.7 23.5
07/09/9910:56:00 00:04 3.9 3.3
07/09/9911:28:00 00:02 1.9 1.2
07/09/99 22:56:00 00:04 5.5 3.1
07/09/99 23:01:00 00:14 21.9 23.4
07/09/99 23:25:00 00:05 3.4 2.6
07/09/99 23:31:00 00:14 14.0 14.1
07/09/99 23:59:00 00:01 0.7 0.9
07/10/99 01:23:00 00:07 10.2 9.6
07/10/99 01:59:00 00:01 1.2 0.5
07/10/99 03:20:00 00:10 12.5 11.4
07/10/99 03:44:00 00:01 1.2 1.7
07/10/99 04:56:00 00:04 3.1 1.9
07/10/99 05:11:00 00:04 4.6 5.2
07/10/99 06:45:00 00:15 19.4 18.3
07/10/99 07:11:00 00:04 3.6 4.1
07/10/9913:24:00 00:36 169.4 154.7
07/10/9914:09:00 00:06 10.1 12.5
07/11/9911:56:00 00:04 6.0 3.9
07/11/9912:11:00 00:04 7.1 8.5
07/11/9914:28:00 00:02 0.8 0.1
07/11/9914:32:00 00:13 17.0 16.4
07/11/9914:56:00 00:04 5.0 5.7
07/11/9915:14:00 00:01 0.7 0.0
07/11/9915:26:00 00:04 3.1 3.0
BP Exploration Page 2 of 6 Milne Point, Alaska
08/05/99 ls:as Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jul /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
07/11/9918:39:00 00:06 6.4 5.3
07/11/9918:58:00 00:02 2.1 2.6
07/16/9919:28:00 00:02 1.0 5.6
07/17/99 01:28:00 00:02 1.9 1.2
07/17/99 09:52:00 00:08 14.7 12.9
07/17/9910:05:00 00:10 10.0 10.1
07/17/9910:19:00 00:11 14.9 15.5
07/17/9912:12:00 00:03 2.3 1.1
07/17/99 12:23:00 00:07 6.7 7.2
07/17/9913:49:00 00:11 12.4 11.2
07/17/9914:12:00 00:03 3.3 3.8
07/17/9915:21:00 00:09 11.5 10.2
07/17/9915:44:00 00:01 1.2 1.9
07/19/9919:03:00 00:12 13.2 12.0
07/19/9919:25:00 00:05 5.4 4.7
07/19/9919:33:00 00:12 12.8 12.8
07/19/9919:58:00 00:02 1.8 2.3
07/19/99 21:10:00 00:05 4.8 3.1
07/19/99 21:25:00 00:05 7.4 8.4
07/19/99 21:35:00 00:10 16.0 15.4
07/19/99 22:28:00 00:02 1.0 0.2
07/19/99 22:33:00 00:12 16.3 16.5
07/19/99 22:52:00 00:08 9.5 8.4
07/19/99 23:08:00 00:07 4.6 4.8
07/21/99 03:11:00 00:04 3.7 3.1
07/21/99 04:29:00 00:01 0.1 0.0
07/21/99 09:43:00 00:02 1.2 0.5
07/21/9914:09:00 00:06 4.2 3.3
07/21/9915:44:00 00:01 0.1 0.0
07/21/9916:24:00 00:06 3.3 1.9
07/21/9916:41:00 00:04 2.0 2.0
07/21/9917:40:00 00:05 3.5 2.8
07/21/9918:30:00 00:15 6.6 5.4
07/21/9918:54:00 00:06 4.8 5.1
07/21/99 21:25:00 00:05 4.7 3.2
07/21/99 21:44:00 00:01 1.4 1.8
07/22/99 04:17:00 00:43 52.0 50.8
07/22/99 06:58:00 00:02 1.9 1.3
07/22/99 08:07:00 00:08 11.5 10.8
07/22/99 08:27:00 00:03 2.8 2.4
07/22/99 08:40:00 00:05 3.1 2.0
07/22/99 09:28:00 00:02 1.8 1.1
07/22/99 09:41:00 00:04 4.9 3.6
07/22/99 09:54:00 00:06 8.8 9.6
BP Exploration Page 3 of 6 Milne Point, Alaska
08/OS/99 ls:4s Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jul /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
07/22/99 22:02:00 00:13 5.2 4.2
07/22/99 22:22:00 00:08 4.2 4.4
07/23/99 03:28:00 00:02 0.6 0.0
07/23/9916:28:00 00:02 1.1 0.2
07/23/9916:35:00 00:10 12.7 12.5
07/23/9916:51:00 00:09 11.0 11.1
07/24/9914:14:00 00:01 0.3 0.0
07/25/9915:48:00 00:12 10.8 9.7
07/25/9916:03:00 00:12 11.1 11.6
07/25/9917:09:00 00:06 4.0 3.4
07/25/9917:29:00 00:01 0.8 0.2
07/25/9917:40:00 00:05 3.0 2.3
07/25/9917:52:00 00:08 3.7 2.8
07/25/9918:13:00 00:02 1.0 0.3
07/25/9918:29:00 00:01 0.2 0.0
07/25/9918:59:00 00:01 1.1 0.5
07/25/9919:10:00 00:05 2.5 1.6
07/25/9919:19:00 00:11 9.0 9.3
07/25/9919:32:00 00:13 9.9 9.1
07/25/9919:54:00 00:06 3.3 3.2
07/25/99 20:37:00 00:23 17.4 16.0
07/25/99 21:04:00 00:11 6.6 6.6
07/25/99 21:17:00 00:13 8.5 8.1
07/25/99 21:36:00 00:09 3.4 3.1
07/25/99 21:58:00 00:02 1.1 0.7
07/25/99 22:20:00 00:25 18.2 17.4
07/25/99 22:s2:00 00:08 5.4 4.9
07/25/99 23:13:00 00:02 1.4 1.6
07/26/99 00:28:00 00:02 0.8 0.2
07/26/99 00:43:00 00:02 0.4 0.0
07/26/99 00:56:00 00:04 1.5 0.4
07/26/99 01:05:00 00:10 4.9 4.5
07/26/99 01:23:00 00:07 4.3 3.5
07/26/99 02:03:00 00:12 10.6 9.4
07/26/99 02:20:00 00:10 9.0 9.6
07/26/99 20:34:00 00:11 4.1 3.2
07/27/99 00:59:00 00:01 0.3 0.0
07/27/99 07:52:00 00:08 7.3 6.2
07/27/99 08:11:00 00:04 2.8 3.2
07/27/99 08:23:00 00:52 36.3 34.4
07/27/99 09:17:00 00:13 11.2 11.7
07/27/99 09:41:00 00:34 27.0 25.5
07/27/9910:28:00 00:02 1.4 2.0
07/27/9913:10:00 OO:OS 3.3 2.7
BP Exploration Page 4 of 6 Milne Point, Alaska
08/05/99 15:45 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jul /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
07/27/9913:28:00 00:02 1.1 0.3
07/27/9913:44:00 00:01 0.9 1.1
07/27/9916:49:00 00:11 9.0 8.0
07/27/9917:04:00 00:11 9.6 10.0
07/28/99 01:10:00 00:05 7.2 6.6
07/29/99 01:52:00 00:08 14.7 13.7
07/29/99 02:13:00 00:02 0.7 0.6
07/29/99 02:29:00 00:01 0.7 0.7
07/29/99 09:29:00 00:01 0.0 0.0
07/29/99 09:44:00 00:01 0.9 0.3
07/30/9915:44:00 00:46 47.8 46.6
07/30/9916:41:00 00:04 4.4 5.0
07/30/9916:46:00 00:14 11.6 10.5
07/30/9917:04:00 00:11 7.1 7.6
07/30/9919:57:00 00:03 1.5 0.8
07/31/99 05:48:00 00:12 6.1 3.1
07/31/99 06:19:00 00:11 10.1 4.1
07/31/99 06:38:00 00:07 5.8 2.7
07/31/99 07:28:00 00:02 1.3 0.0
07/31 /99 07:44:00 00:01 1,1 0.0
07/31/9911:13:00 00:02 2.1 0.1
07/31/9911:23:00 00:07 7.7 3.2
07/31/9911:32:00 00:13 11.6 5.9
07/31/9912:26:00 00:04 1.6 0.0
07/31/9915:42:00 00:03 1.8 0.2
07/31/9915:57:00 00:03 2.8 1.5
07/31/9917:11:00 00:04 4.9 1.8
07/31/99 21:41:00 00:04 33.0 13.0
07/31/99 21:46:00 00:14 45.8 43.1
07/31/99 22:02:00 00:13 41.8 41.9
07/31/99 22:26:00 00:04 13.8 14.3
07/31/99 22:34:00 00:26 32.9 32.2
07/31/99 23:07:00 00:08 9.3 9.5
07/31/99 23:25:00 00:05 13.9 12.8
Comment
BP Exploration Page 5 of 6 Milne Point, Alaska
08/05/99 15:45
Flare Name: Flare 1
Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jul /1999
L[Jnplanned Events greater than 1 hour ~
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
07/16/99 16:03:00 01:27 933.6 330.3 C-5501/11-A compr. s/d when 07 power 07 turbine restarted (faulty RTD
turbine tripped off repaced) & compr. online
07/16/99 17:33:00 01:42 183.0 66.8 C-5502/03/31 A&B s/d on delayed 07 turbine restarted (faulty RTD
loadshed from 07 power turbine s/d repaced) & compr. online
07/31/99 04:17:00 01:28 91.2 63.5 C-5511 B down for maint with wells s/i Found C-5501/11 inlet valve leaking
to mitigate flare thru-isolated & flare stopped
Flare Assist
Unplanned Events <=1 hour 2,304.1 2,148.7
Unplanned Events > 1 hour 1,207.8 460.6
Planned Events <=1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas 10,149.1
TOTAL FLARED VOLUME 3,511.9 12,758.3 MSCF
BP Exploration Page 6 of 6 Milne Point, Alaska
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 16:03 lhr. 27min.
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Date: 07-16-99
Flare Volume: 934
Assist Gas Volume: 330
Event description
MPU experienced an unplanned compressor shut-down on C-5501/11-A compressor. This was
caused by an automatic shut down of the 07 power turbine due to RTD failure.
Action taken to stop flaring
Immediate responce to the power turbine /compressor shut down mitigated flaring as much as
possible. E8, E9, E11, G2, G6, H5, J1, J3, J4, J8, K37, L3, L5, L6, L12, & L20 wells were shut
down due to the automatic power shunt protection on the second turbine. The turbine was repaired
& put back in service. The compressor was then purged and restarted to mitigate the flaring. Flaring
was eliminated shortly after the compressor returned to service.
Action taken to prevent reoccurrence
A preventive maintenance plan to replace all RTD end devices on a routine basis was instituted.
Reported by:
Name: David Coston
Title: Facilities Lead Tech
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
990716 Flare incident report i.doc Revised 425-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 17:33 lhr. 42min.
Planned event: ^ yes
®no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 07-16-99
Flare Volume: 183
Assist Gas Volume: 67
MPU experienced an unplanned compressor shut-down on C-5502/03/31-A&B low pressure &
injection compressors. This was caused by an automatic shut down of the 07 power turbine due to
RTD failure.
Action taken to stop flaring
Immediate responce to the power turbine /compressor shut down mitigated flaring as much as
possible. E8, E9, E11, G2, G6, H5, J1, J3, J4, J8, K37, L3, L5, L6, L12, & L20 wells were shut
down due to the automatic power shunt protection on the second turbine. B3, B4, B6, B9, B10, B15,
B20, B21, B22, C4, C5, C7, C9 & D2 wells were shut down to mitigate flaring. The turbine was
repaired & put back in service & compressors restarted. Flaring was eliminated shortly after the
compressor returned to service.
Action taken to prevent reoccurrence
A preventive maintenance plan to replace all RTD end devices on a routine cycle was instituted.
Reported by:
Name: David Coston
Title: Facilities Lead Tech
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 071699 183.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 04:17 - 1 hr 28 min
Planned event: ^ yes
®no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event descriution
Date: 07-31-99
Flare Volume: 91
Assist Gas Volume: 63
Compressor C-SS11B was taken down to perform valve maintenance on the #1 & #3 cylinders
during an uplanned maitenance requirement.. Wells C3,C4,C7,C9,C14,C22a,J6,J8,
J 19a,L3,L20,L32,L36 were all shut-in to mitigate any flaring. There still was a small amount of
flaring.
Action taken to stop flaring
Facility operators were expedited to locate any valves or PSV's that might be leaking. Operators
closed the inlet and pressurizing HV valves on C-5501/11-B gas lift compressor, and the flaring was
eliminated. The 2 valves appear to be leaking thru in the closed status.
Action taken to prevent reoccurrence
Maintenance personnel have been contacted to do corrective maintenance on the above two valves.
This work will take place during the September 11~' TAPS slowdown.
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Henry Harrington
Title: Facilities Supervisor
Flare incident repor 7-31-99.doc Revised 425-99 LEN
ALASKA OIL AND GAS CONSERVATION CONIl~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point Aug-99
Disposition
Volume MCF*
1. Sold Fuel 16,625
2. Reinjected 563,254
3. Flared or vented less than 1 hour 2,662
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 6,194
5. Pilot and Purge 372
6. Used for lease operations Fuel
Assist 248,666
14 155
7. Other
TOTAL items 1-7 851,928
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby ce ify t at the f regoing is true and correct to the best of my knowledge.
Signature Title~(,[~{y ~~ Date
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK 525100 85.5
SCH. BLUFF 525140 14.5
Official Use Only-Flaring Authorizatiari>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
',Note: All volumes must be corrected
to pressure of 14.65 Asia and to a
temperature of 60 degrees F. Report
due by the 20th of the month
folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
~.
Rev. 4/95
09/02/99 1s,36 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Aug /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
08/02/99 03:58:00 00:02 1.9 1.3
08/02/99 22:13:00 00:02 0.6 0.0
08/03/9913:30:00 00:15 21.6 19.8
08/03/9914:17:00 00:13 22.6 23.7
08/03/9914:35:00 00:10 14.s 13.5
08/03/9914:48:00 00:12 17.9 18.6
08/03/9915:06:00 00:09 11.8 11.3
08/03/9915:24:00 00:06 6.2 S.s
08/03/9915:31:00 00:14 12.4 11.9
08/03/9915:47:00 00:13 12.7 13.3
08/03/9916:07:00 00:08 s.s 4.4
08/03/9916:18:00 00:12 13.4 14.0
08/03/9916:3s:00 00:10 9.1 8.8
08/06/99 20:10:00 OO:OS 1.6 0.7
08/06/99 21:13:00 00:02 1.0 0.3
08/06/99 21:28:00 00:02 0.9 0.0
08/06/99 21:44:00 00:01 0.3 0.0
08/06/99 21:57:00 00:03 1.9 0.9
08/06/99 22:14:00 00:01 0.3 0.0
08/06/99 22:25:00 00:05 1.8 1.0
08/06/99 22:40:00 00:05 1.8 0.9
08/07/99 07:29:00 00:01 2.0 l.s
08/07/99 07:42:00 00:03 14.7 11.4
08/07/9910:34:00 00:11 s.3 0.0
08/08/9917:25:00 00:20 89.2 8s.6
08/08/9917:s0:00 00:10 39.s 40.1
08/09/99 03:39:00 00:06 3.2 1.1
08/09/99 03:s8:00 00:02 1.4 0.1
08/10/99 00:33:00 00:12 18.9 21.2
08/10/99 00:57:00 00:03 Ts 0.8
08/10/99 01:22:00 00:08 6.6 ss
08/10/99 01:37:00 00:08 8.3 8.0
08/10/99 01:51:00 00:09 13.4 13.2
08/10/99 02:06:00 00:09 10.7
a,
9.8
08/10/99 02:21:00 00:09 10.1 10.1
08/10/99 02:35:00 00:10 1s.2 13.6
08/10/99 02:s3:00 00:07 9.3 9.s
08/10/99 03:05:00 00:10 9.4 8.9
08/10/99 03:24:00 00:06 s.3 s.2
08/10/99 03:37:00 00:08 8.0 6.7
08/10/99 03:48:00 00:12 19.2 19.1
08/10/99 04:07:00 00:08 7.8 7.7
08/10/99 04:19:00 00:11 11.6 10.6
08/10/99 04:37:00 00:08 7.4 6.7
BP Exploration Page 1 of 7 Milne Point, Alaska
09/02/99 15:36 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Aug /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
08/10/99 04:52:00 00:08 12.9 12.6
08/10/99 05:10:00 00:05 4.3 3.8
08/10/99 05:24:00 00:06 7.6 7.7
08/10/99 05:41:00 00:04 4.4 3.8
08/10/99 05:59:00 00:01 0.0 0.0
08/10/99 06:09:00 00:06 9.1 7.4
08/10/99 06:24:00 00:06 6.7 6.2
08/10/99 06:41:00 00:04 4.6 4.5
08/10/99 06:54:00 00:06 5.8 5.1
08/10/99 07:10:00 00:05 4.4 4.1
08/10/99 07:27:00 00:03 3.2 2.7
08/10/99 07:40:00 00:05 4.8 4.2
08/10/99 07:54:00 00:06 6.2 5.1
08/10/99 08:12:00 00:03 2.7 2.6
08/10/99 08:26:00 00:04 3.4 2.8
08/10/99 08:41:00 00:04 3.4 2.8
08/10/99 08:55:00 00:05 4.4 3.8
08/10/99 09:11:00 00:04 4.5 3.9
08/10/99 09:23:00 00:07 5.9 4.5
08/10/99 09:37:00 00:08 8.8 7.9
08/10/99 09:52:00 00:08 8.6 9.4
08/10/9910:08:00 00:07 7.3 5.4
08/10/9910:23:00 00:07 8.7 8.6
08/10/9910:41:00 00:04 4.2 3.6
08/10/9910:55:00 00:05 6.5 6.0
08/10/9911:11:00 00:04 3.9 3.4
08/10/9911:25:00 00:05 6.2 5.7
08/10/9911:38:00 00:07 7.8 6.6
08/10/9911:56:00 00:04 3.6 3.4
08/10/9912:09:00 00:06 4.3 3.5
08/10/9912:23:00 00:07 7.9 7.1
08/10/9912:41:00 00:04 4.4 4.0
08/10/9912:51:00 00:09 8.8 7.7
08/10/9913:07:00 00:08 7.3 7.2
08/10/9913:25:00 00:05 5.6 5.7
08/10/9913:39:00 00:06 5.4 4.9
08/10/9913:54:00 00:06 7.3 5.9
08/10/9914:08:00 00:07 10.6 10.4
08/10/9914:23:00 00:07 7.4 6.7
08/10/9914:39:00 00:06 5.9 5.9
08/10/9914:53:00 00:07 6.8 5.6
08/10/9915:10:00 00:05 4.9 4.8
08/10/9915:21:00 00:09 11.1 10.7
08/10/9915:37:00 00:08 11.9 10.4
BP Exploration Page 2 of 7 Milne Point, Alaska
09/02/99 15:36 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Aug /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
08/10/9915:55:00 00:05 6.1 6.6
08/10/9916:08:00 00:07 9.0 7.6
08/10/9916:23:00 00:07 6.6 6.8
08/10/9916:37:00 00:08 8.4 7.9
08/10/9916:51:00 00:09 9.7 8.5
08/10/9917:10:00 00:05 7.2 7.5
08/10/9917:22:00 00:08 11.5 10.0
08/10/9917:40:00 00:05 5.7 6.0
08/10/9917:54:00 00:06 6.9 6.3
08/10/9918:12:00 00:03 2.5 2.1
08/10/9918:21:00 00:09 9.9 9.2
08/10/9918:40:00 00:05 5.3 4.5
08/10/9918:52:00 00:08 9.9 8.9
08/ 10/99 19:09:00 00:06 8.0 7.4
08/10/9919:23:00 00:07 8.1 8.3
08/10/9919:40:00 00:05 4.5 4.2
08/10/9919:54:00 00:06 5.8 4.4
08/10/99 20:07:00 00:08 9.7 9.4 '
08/10/99 20:25:00 00:05 5.3 5.1
08/10/99 20:37:00 00:08 7.6 7.2
08/10/99 20:53:00 00:07 10.1 9.4
08/10/99 21:10:00 00:05 5.6 5.3
08/10/99 21:20:00 00:10 9.7 8.3
08/10/99 21:37:00 00:08 7.9 7.9
08/10/99 21:54:00 00:06 5.9 4.5
08/10/99 22:07:00 00:08 8.2 8.1
08/10/99 22:21:00 00:09 8.1 7.5
08/10/99 22:40:00 00:05 5.3 5.3
08/10/99 22:56:00 00:04 6.7 6.3
08/10/99 23:06:00 00:09 9.3 8.0
08/10/99 23:24:00 00:06 6.7 6.7
08/10/99 23:40:00 00:05 3.8 3.1
08/10/99 23:52:00 00:08 10.0 9.4
08/11/99 00:10:00 00:05 5.5 5.1
08/11/99 00:25:00 00:05 7.1 6.6
08/11/99 00:35:00 00:10 14.0 12.8
08/11/99 00:57:00 00:03 3.3 3.3
08/11/99 01:08:00 00:07 7.3 6.7
08/11/99 01:24:00 00:06 6.2 5.7
08/11/99 01:40:00 00:05 6.6 6.0
08/11/99 01:53:00 00:07 7.3 5.4
08/11/99 02:10:00 00:05 5.4 6.0
08/11/99 02:24:00 00:06 5.8 5.4
08/11/99 02:37:00 00:08 8.2 7.6
BP Exploration Page 3 of 7 Milne Point, Alaska
09/02!99 15:36 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Aug /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
08/11/99 02:54:00 00:06 6.4 5.6
08/11/99 03:07:00 00:08 7.4 6.3
08/11/99 03:22:00 00:08 8.7 8.9
08/11/99 03:36:00 00:09 10.2 9.0
08/11/99 03:53:00 00:07 7.7 8.0
08/11/99 04:08:00 00:07 8.3 6.7
08/11/99 04:24:00 00:06 8.7 8.1
08/11/99 04:39:00 00:06 6.9 6.7
08/11/99 04:56:00 00:04 4.9 5.1
08/11/99 05:09:00 00:06 6.6 5.9
08/11/99 05:22:00 00:08 8.5 7.6
08/11/99 05:39:00 00:06 5.8 4.8
08/11/99 05:53:00 00:07 7.8 7.4
08/11/99 06:08:00 00:07 6.3 5.7
08/11/99 06:23:00 00:07 6.6 6.4
08/11/99 06:39:00 00:06 6.2 5.4
08/11/99 06:54:00 00:06 6.5 5.9
08/11/99 07:09:00 00:06 7.1 7.4
08/11/99 07:25:00 00:05 5.1 3.8
08/11/99 07:39:00 00:06 5.2 5.0
08/11/99 07:51:00 00:09 9.4 9.3
08/11/99 08:11:00 00:04 5.0 4.6
08/11/99 08:22:00 00:08 7.7 7.0
08/11/99 08:36:00 00:09 7.8 6.6
08/11/99 08:56:00 00:04 4.1 3.8
08/11/99 09:08:00 00:07 8.0 7.1
08/11/99 09:25:00 00:05 5.1 4.6
08/11/99 09:40:00 00:05 4.2 4.5
08/11/99 09:53:00 00:07 6.5 5.2
08/11/9910:07:00 00:08 9.5 9.6
08/11/9910:38:00 00:07 6.5 5.9
08/11/9910:51:00 00:09 8.1 6.9
08/11/9911:09:00 00:06 5.7 5.6
08/11/9911:26:00 00:04 3.3 2.8
08/11/9911:38:00 00:07 7.4 6.6
08/11/9911:56:00 00:04 3.9 3.0
08/11/9912:07:00 00:08 10.5 10.2
08/11/9912:26:00 00:04 5.5 5.3
08/11/9912:40:00 00:05 5.0 4.3
08/11/9912:51:00 00:09 8.8 7.5
08/11/9913:09:00 00:06 6.3 6.5
08/11/9913:22:00 00:08 9.7 8.4
08/11/9913:39:00 00:06 5.8 5.9
08/11/9913:54:00 00:06 6.9 6.5
BP Exploration Page 4 of 7 Milne Point, Alaska
09/02/99 15:36 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Aug /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
08/11/9914:08:00 00:07 8.6 6.5
08/11/9914:24:00 00:06 8.5 9.4
08/11/9914:38:00 00:07 7.3 6.6
08/11/9914:51:00 00:09 8.6 8.2
08/11/9915:10:00 00:05 5.2 4.1
08/11/9915:23:00 00:07 6.4 6.6
08/11/9915:39:00 00:21 39.0 37.0
08/11/9916:07:00 00:08 12.3 13.2
08/11/9916:25:00 00:05 6.1 5.6
08/11/9916:43:00 00:02 1.8 1.5
08/11/9918:09:00 00:36 115.4 112.9
08/11/9918:54:00 00:06 7.8 9.6
08/11/9919:24:00 00:06 20.4 19.7
08/11/9919:39:00 00:06 14.8 14.2
08/11/9919:47:00 00:13 38.4 36.1
08/11/99 20:05:00 00:10 26.5 25.4
08/11/99 20:18:00 00:12 22.9 22.8
08/11/99 20:34:00 00:11 22.5 23.3
08/11/99 23:12:00 00:03 3.4 2.8
08/11/99 23:26:00 00:04 4.3 3.7
08/11/99 23:43:00 00:02 1.7 0.7
08/11/99 23:54:00 00:06 6.6 6.7
08/12/99 00:07:00 00:08 7.5 7.0
08/12/99 00:23:00 00:07 5.7 4.3
08/12/99 00:41:00 00:04 3.0 3.1
08/12/99 00:57:00 00:03 2.2 1.6
08/12/99 01:56:00 00:04 3.8 2.6
08/12/99 02:11:00 00:04 3.5 2.7
08/12/99 02:29:00 00:01 1.1 1.4
08/12/99 04:18:00 00:12 44.8 43.7
08/12/99 04:33:00 00:12 18.9 18.2
08/12/99 04:47:00 00:43 70.4 70.1
08/12/99 05:43:00 00:02 3.0 4.2
08/13/9913:17:00 00:13 43.2 3.9
08/13/9913:31:00 00:29 108.4 10.0
08/ 13/99 14:03:00 00:12 42.9 4.1
08/13/9914:27:00 00:03 2.5 0.0
08/13/99 23:32:00 00:28 99.1 95.9 '
08/14/99 00:04:00 00:11 32.9 30.2
08/14/99 08:59:00 00:01 1.4 0.7
08/14/99 09:54:00 00:06 23.6 20.7
08/14/9910:05:00 00:10 42.7 37.6
08/14/9913:56:00 00:04 4.1 3.2
08/14/9914:21:00 00:09 30.3 26.8
BP Exploration Page 5 of 7 Milne Point, Alaska
~~
09/02/99 1s.36 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Aug /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
08/14/99 21:27:00 00:03 2.6 2.0
08/15/99 23:36:00 00:09 11.1 9.9
08/16/99 01:19:00 00:11 18.4 17s
08/16/99 04:51:00 00:09 11.8 10.3
08/16/99 05:05:00 00:10 11.4 12.0
08/16/99 06:56:00 00:04 4.2 2.7
08/16/99 07:14:00 00:01 1.2 2.0
08/16/9913:28:00 00:02 1.7 1.0
08/17/9912:57:00 00:03 3.0 1.7
08/17/9913:01:00 00:14 10.3 10.4
08/17/9913:29:00 00:01 0.9 1.4
08/18/9910:s9:00 00:01 0.3 0.0
08/18/9912:57:00 00:03 1.0 0.0
08/18/9913:44:00 00:01 0.3 0.0
08/18/9914:43:00 00:02 0.7 0.1
08/29/99 09:s8:00 00:02 1.0 0.3
08/29/9910:14:00 00:01 0.4 0.0
08/29/99 21:59:00 00:01 0.4 0.0
08/29/99 23:22:00 00:08 36.4 27.0
08/29/99 23:43:00 00:02 4.1 6.s
08/30/99 03:41:00 00:04 2.5 l.s
08/30/99 03:57:00 00:03 2.7 3.0
08/30/99 07:09:00 00:21 2.1 1.0
08/30/99 07:59:00 00:01 0.4 0.0
08/30/99 08:27:00 00:03 0.6 0.0
08/30/99 08:59:00 00:01 0.2 0.0
08/30/9913:17:00 00:13 27.1 13.6
08/30/9913:31:00 00:29 43.4 21.2
08/30/9914:04:00 00:11 15.2 8.1
08/30/9914:20:00 00:10 15.7 10.s
08/30/9914:34:00 00:11 13.7 8.5
08/30/9914:49:00 00:11 11.4 8.6
08/30/9915:02:00 00:13 12.7 7.9
08/30/991s:23:00 00:07 7.4 5.3
08/30/9915:54:00 00:06 4.4 2.0
08/30/9916:10:00 00:05 4.5 3.2
08/30/9917:23:00 00:22 16.9 10.6
08/30/99 20:14:00 00:01 0.3 0.0
08/30/99 20:29:00 00:01 1.4 0.5
BP Exploration Page 6 of 7 Milne Point, Alaska
09/02/99 15:36 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Aug /1999
Flare Name: Flare 1
nplanned Events greater than 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
08/07/99 09:29:00 01:01
08/07/9912:38:00 06:37
08/09/99 01:44:00 01:46
08/09/99 21:59:00 02:31
08/13/9911:37:00 01:38
08/30/9911:32:00 01:43
58.7 0.0 PLC fault in Mod.53 caused Level 3 PLC repair delays occurred and
field s/d and power failure prolonged startup of field
2,664.8 1,349.6 Level 3 field s/d, power failure and all Hi GOR wells s/i to mitigate flare, Gas
gas compressors shutdown compressor valve sequencing delayed
field startup
531.1 320.9 07 power turbinf s/d due to 24v do coil High GOR wells s/i, relay repairs made
relay failure and turbine BOL
2,086.5 239.5 Gas compressors s/d due to high leve Hi GOR wells s/ to mitigate flarei,
liquid 1 in GL suction scrubber Scrubber control vlv repaired and
compressors BOL
660.0 120.0 C-5501/11A s/d due to FSL-SS105B fail 12 High GOR wells s/i to mitigate flare,
switch repaired, compressor BOL
193.1 98.9 C-SSO1B offline for vlv repair/C-SSOlA GL wells initially s/i; then 30 more hi
won't hold full load GOR wells s/i to mitigate flare
Flare Assist
Unplanned Events <=1 hour 2,661.6 2,248.9
Unplanned Events > 1 hour 6,194.2 2,129.0
Planned Events <=1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas 10,149.1
TOTAL FLARED VOLUME 8,855.8 14,526.9 MSCF
BP Exploration Page 7 of 7 Milne Point, Alaska
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 09:29 - 1 hr 1 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 8/07/99
Flare Volume: 59
Assist Gas Volume: 0
MPU production facility experienced an unplanned field-wide emergency shutdown when Mod-53
experienced a malfunction in the Mod. 53 PLC UO rack communications card. This PLC fault in
Module 53 caused an automatic Leve13 field wide production shut down and Power failure.
Numerous problems with the PLC process card caused a delay in the start-up of the gas compression
system.
Action taken to prevent reoccurrence
After all vessel pressure bled down to Zero the flare volume dropped off.. Production start up was
deferred until after all fire and gas and PLC systems were returned to normal operations..
Action taken to prevent reoccurrence
Completed test of PLC output card that was replaced in the Fire and Gas Panel.
Process Control to investigate in more detail of the PLC rack fault and communication module
failure.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Henry Harrington
Title: Facilities Supervisor
Flare incident report 080799 59.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 10:34 - 6 hr 37 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 8/07/99
Flare Volume: 2,665
Assist Gas Volume: 1,350
MPU production facility experienced an unplanned field-wide emergency shutdown when Mod-53
experienced a malfunction in the Mod. 53 PLC UO rack communications card. This PLC fault
triped an automatic Level 3 field wide production shut down. This emergency shut-down caused a
complete field wide shut-down which included a power failure on the power generation system
which resulted in the shut-in of all production wells Numerous problems with the PLC process card
caused a delay in the start-up of the gas compression system. Due to existing problems with the
communication card in the PLC in Module 53, we had to take the field back down in order to
change the communication cazd in the UO rack of the PLC that had faulted..
Action taken to stop flaring
MPU production facility was brought back online after the unplanned field-wide emergency
shutdown from Mod-53 fire & gas system was returned to normal operation. Due to a Level 3 shut-
down, which de-pressurized all production vessels in the facility, wells «~ere brought on line at a
slow rate to establish a stabilized flow & pressure build-in the system. Experienced several
problems with purge sequence on start-up of gas compressors. Maintenance personnel assisted
operations in expediting the return of gas compression as soon as possible. Flaring was eliminated
shortly after the compressor returned to service.
Action taken to prevent reoccurrence
Completed test of PLC output cazd that was replaced in the Fire and Gas Panel.
Process Control to investigate in more detail of the PLC rack fault and communication module
failure.
Engineering working on completion of Compressor Purge problems in'~fodule 55.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Henr~Harrin>;ton
Title: Facilities Supervisor
Flare incident report 080799 2665.doc Revised 425-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 01:46 - 1 hr 46 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 8/09/99
Flare Volume: 531
Assist Gas Volume: 321
MPU production facility experienced an unplanned emergency power shunt when relay K-1516
24vdc holding coil failed in 07 power turbine. The purpose of this relay is to signal "FIRE IN
AREA" to the generator control PLC when de-energized. Since the holding coil failed, it produced
the same shut-down permissive to the PLC as would an actual fire event. The automatic load shed
triped one train of compression, all water flood, essential services, & well pad K.
Action taken to stop flaring
The defective relay was replaced, all equipment returned to service & the flaring stopped.
Action taken to prevent reoccurrence
Inspected failed relay to determine failure mode.
Review and improve the availability of control drawings.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Henr~Harrington
Title: Facilities Supervisor
Flare incident report 080999 531.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 21:59 - 2 hr 31 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event descriution
Date: 8/09/99
Flare Volume: 2086
Assist Gas Volume: 240
This was an unplanned flaring event which occurred when a LSHH on the Gas Lift Suction
Scrubber tripped and shut-down the Gas Compression module which relieved gas to the flare
header. Debris was found blocking off the level control valve on the gas lift scrubber V-5511,
which reduced the ability of the vessel to dump it's fluid level. Attempts were made to eliminate
the black smoke by shutting in wells & the use of Assist Gas.
Action taken to stow flaring
Hi GOR wells were shut in, level control valve cleaned of debris, and gas compression returned to
service. Once the gas compressors were returned to service the flare was eliminated.
Action taken to prevent reoccurrence
A design package is being developed to shorten the compressor purge times. This will substantially
reduce the flaring volumes during flaring events.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 080999 2086.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 11:37 - 1 hr 38 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing .procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 08/13/99
Flare Volume: 660
Assist Gas Volume: 120
MPU experienced an unplanned compressor shut-down on C-5501/11-A. This was caused by a
control wire on switch FSL-55105B going to ground. Support crews responded & corrected the
problem. When we tried bring the compressor back on line a read switch on XV-5519B start-up
recycle valve failed. This read switch had to be replaced before bringing the compressors up.
Action taken to stop flaring
Immediate response to the compressor shut down mitigated flaring as much as possible. B4, B9,
B 10, B 15, B20, B21, B22, C9, C4, C5, C3, & C14 wells were shut down due to flaring. The
compressor was repaired &. put back in service. Flaring was eliminated shortly after the compressor
returned to service.
Action taken to prevent reoccurrence
PMs are scheduled on the compressors during the up-coming shutdown in September.
Engineering is considering the shortening of Compressor Purge times after a normal shutdown. This
could expedite the re-start of the compressors.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 081399 660.doc Revised 425-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 11:32 - 1 hr 43 min
Planned event: yes
x no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 08/30/99
Flare Volume: 193
Assist Gas Volume: 99
We shutdown C-5501-B gas lift compressor in order to repair several bad valves in two different
cylinders. Gas lift wells were shut-in before shutting down the compressor. After shutdown we
noticed-that C-5501-A gas lift compressor could not maintain the normal load. We also had
problems with HCV-5$02 slugging valve for Pads C,L and F. We began shutting in more wells to
mitigate the flaring.
Action taken to stop flaring
Wells shut-in to mitigate flaring were
B 15,B4,B3,B9,B21,B20,C3,B6,J3,L3,J8,L36,C22,C 14,J 19,HS,E8,L32,L 12,L20,F45,K37,F69,L7,F5
O,L2,L13,E4,F53,F61,KS,K6,FS,L29,L25,K17,J18,andB10. The flaring was mitigated.
Action taken to prevent reoccurrence
Work order written to calibrate and repair HCV-5802 slugging valve for C,L,and F Pad.
Maintenance looking at repairing the C-5501-A compressor at the Sept.99 shutdown.
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Henry Harrin on
Title: Facilities Supervisor
Flare incident report 083099 .doc Revised 4-25-99 LEN
ALASKA OIL AND GAS CONSERVATION CON~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point Sep-99 REV 1
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK 525100 87.1
SCH. BLUFF 525140 12.9
REV 1 - gas split corrected
1. Sold Fuel 15,080
2. Reinjected 620,063
3. Flared or vented less than 1 hour 1,268
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 6,841
5. Pilot and Purge 359
6. Used for lease operations Fuel
Assist 219,253
11 436
7. Other
TOTAL items 1-7 874,300
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby ce ify th t the foregoing is true and correct to the best of my knowledge.
Signature ~~ Title ~(~~ j~~C Date ~G
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60 degrees F. Report
due by the 20th of the month
folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point Sep-99
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK 525100 98.7
SCH. BLUFF 525140 1.3
1. Sold Fuel 15,080
2. Reinjected 620,063
3. Flared or vented less than 1 hour 1,268
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 6,841
5. Pilot and Purge 359
6. Used for lease operations Fuel
Assist 219,253
11 436
7. Other
TOTAL items 1-7 874,300
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby cq~tify t17Jat the foregoing is true and correct to the best of my knowledge
Signature~~~ ~~~ ~ Title r~w/r/~ Date
RE~~1VE~
Form 10-422 ~~'~ '~ ~ ~~QQ
Rev . 4 / 9 5 v~++//
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 Asia and to a
temperature of 60 degrees F. Report
due by the 20th of the month
folowing the month of disposition.
Authority 20 AAC 25.235.
Alaskica Oii & Gas Cons. Commission
Anchorage
loio~99 lssa Milne Point Unit
Monthly Gas Flaring Incident Report
For: Sep /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Start Time Duration
(hh:mm) =Volume (MSCF) =
Flare Assist Cause Comment
09/02/99 02:35:00 00:10 8.4 4.4
09/02/99 02:59:00 00:01 0.8 1.1
09/02/99 04:10:00 00:05 5.0 2.8
09/02/99 09:17:00 00:13 23.5 15.1
09/02/99 09:38:00 00:07 7.6 5.9
09/02/99 09:58:00 00:47 180.4 125.1
09/02/9910:58:00 00:02 4.3 3.5
09/11/99 00:56:00 00:04 2.6 1.2
09/11/99 01:01:00 00:14 17.8 1.3
09/11/99 01:26:00 00:04 3.0 0.0
09/11/99 08:21:00 00:09 5.5 0.0
09/11/9915:29:00 00:01 1.6 0.0
09/11/9915:40:00 00:05 3.5 0.0
09/11/9915:56:00 00:04. 2.9 0.0
09!11/9916:13:00 00:02 1.2 0.0
09/11/9916:27:00 00:03 2.0 0.0
09/11/9916:59:00 00:01 1.2 0.0
09/11/9917:14:00 00:01 1.2 0.0
09/12/99 09:58:00 00:02 2.1 0.0
09/12/99 20:29:00 00:01 0.7 0.0
09/12/99 20:40:00 00:05 14.9 2.4
09/12/99 20:59:00 00:01 1.4 2.5
09/ 12/99 22:17:00 00:13 12.7 0.0
09/12/99 22:34:00 00:11 8.9 0.0
09/12/99 22:51:00 00:09 7.3 0.0
09/13/9916:37:00 00:08 7.8 7.0
09/13/9918:29:00 00:01 0.2 0.0
09/13/9919:14:00 00:01 0.2 0.0
09/14/99 02:41:00 00:04 6.1 3.3
09/14/99 02:55:00 00:05 6.2 6.4
09/14/99 03:06:00 00:09 15.1 11.6
09/14/99 03:17:00 00:13 13.7 11.1
09/14/99 03:33:00 00:12 16.4 13.9
09/15/99 09:04:00 00:11 20.0 18.9
09/15/99 09:18:00 00:12 13.4 13.1
09/15/99 09:33:00 00:12 12.2 11.5
09/15/99 09:48:00 00:12 9.7 9.7
09/15/9910:07:00 00:08 12.7 12.8
09/15/9910:18:00 00:12 4.7 4.6
09/15/9910:59:00 00:01 1.5 0.3
09/15/9911:14:00 00:01 0.5 0.4
09/15/9911:36:00 00:09 9.1 8.5
09/15/99 20:55:00 00:05 5.3 4.0
09/15/99 21:10:00 00:05 5.4 6.0
BP Exploration Page 1 of 3 Milne Point, Alaska
10/02/99 lsaz Milne Point Unit
• Monthly Gas Flaring Incident Report
For: Sep /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Start Time Duration
(hh:mm) =Volume (MSCF) _
Flare Assist Cause
09/17/9911:08:00 00:07 7.6 6.4
09/17/9911:25:00 00:05 4.4 3.8
09/17/9911:43:00 00:02 2.4 3.1
09/17/9913:35:00 00:10 9.2 8.0
09/17/9914:36:00 00:09 9.9 9.2
09/17/9914:s2:00 00:08 11.9 10.8
09/17/9918:49:00 00:56 291.2 292.9
09/17/9919:56:00 00:04 5.5 10.6
09/18/9911:27:00 00:03 1.1 0.6
09/18/9911:42:00 00:03 1.6 2.3
09/18/9912:43:00 00:02 1.1 1.0
09/18/9916:29:00 00:01 0.2 0.0
09/18/99 20:43:00 00:02 0.4 0.0
09/21/9917:07:00 00:08 14.1 4.5
09/21/9917:22:00 00:08 6.6 9.8
09/21/9917:42:00 00:03 1.5 2.6
09/21/9917:51:00 00:09 18.2 25.4
09/21/9918:04:00 00:11 14.3 14.8
09/21/9918:21:00 00:09 9.1 8.7
09/21/9918:38:00 00:22 22.3 21.0
09/21/9919:OS:00 00:2s 31.2 30.2
09/21/9919:33:00 00:12 12.3 12.s
09/21/9919:s7:00 00:03 4.9 5.1
09/22/99 02:33:00 00:27 55.0 53.7
09/22/99 03:10:00 00:05 7.9 8.5
09/29/99 02:28:00 00:02 1.3 0.7
09/29/9911:12:00 00:48 226.6 210.7
09/29/9912:12:00 00:03 9.7 13.4
09/30/9913:41:00 00:04 6.0 5.3
Comment
BP Exploration Page 2 of 3 Milne Point, Alaska
10/02/99 15:52 Milne Point Unit
- Monthly Gas Flaring Incident Report
For: Sep /1999
Flare Name: Flare 1
Planned Events Exceeding 1 hour OR Volumne Exceeding 5000 MSCF ~
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
09/11/99 01:34:00 06:41 1,987.4 97.9 Planned flaring for plant turnaround All wells s/i & safed out, compressors
during TAPS proration offline, flowline and vessel pressure
de-inventoried
09/11/99 09:01:00 06:14 342.5 0.9 Planned flaring for plant turnaround N2 (truck & plant source) purged oil
during TAPS proration & gas trains vessels and lines for maint.
09/11/99 19:04:00 14:41 966.3 0.0 Planned flaring for plant turnaround N2 oil train vessels & line pressure test,
during TAPS proration vent to flare
09/12/99 12:14:00 08:01 437.8 0.0 Planned flaring for plant turnaround N2 oil & gas train vessels & line
during TAPS proration pressure test, vent to flare
09/12/99 21:04:00 01:11 63.9 0.0 Planned flaring for plant turnaround N2 oil & gas train vessels & line
during TAPS proration pressure test, vent to flare
09/13/99 05:47:00 10:43 3,043.3 790.5 Planned flaring for plant turnaround Field restarted after turnaround, wells
during TAPS proration brought on by procedure to mitigate
flare
Flare Assist
Unplanned Events <=1 hour 1,268.0 1,084.5
Unplanned Events > 1 hour 0.0 0.0
Planned Events <=1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 6,841.2 889.2
Unmetered Assist Gas 9,821.7
TOTAL FLARED VOLUME 8,109.2 11,795.4 MSCF
BP Exploration Page 3 of 3 Milne Point, Alaska
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 01:34 - 6 hr 41 min
Planned event: x yes
no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
r_I necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 09/11/99
Flare Volume: 1987
Assist Gas Volume: 98
This event was a planned flaring event that occurred after a scheduled TAPS cutback and
total field shutdown. All gas compressors and gas power turbines were taken out of service
for maintenance. All wells were taken out of the system, the gas rate dropped off and gas
compression stopped.
Action taken to stop flaring
Continued to shut down all wells and de-inventory the lines. The flaring stopped after all wells,
vessels and lines were de-inventoried.
Action taken to prevent reoccurrence
N/A
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 091199 i.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 09:01 - 6 hr 14 min
Planned event: x yes
no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event descriution
Date: 09/11/99
Flare Volume: 343
Assist Gas Volume: 1
This event was a planned flaring event that occurred after a scheduled TAPS cutback and
total field shutdown. All gas compressors and gas power turbines were taken out of service
for maintenance. As wells were taken out of the system, gas rates dropped off and gas
compression stopped. This event also include bleeding down of nitrogen used for safe out
procedures so that maintenance work could be conducted.
Action taken to stop flaring
Continued de-inventory vessels & lines. The flaring stopped after all vessels and lines were de-
inventoried again.
Action taken to urevent reoccurrence
N/A
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 091199 2.doc Revised 425-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 19:04-14 hr 41 min
Planned event: x yes
no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 09/12/99
Flare Volume: 966
Assist Gas Volume: 0
This event was a planned flaring event that occurred after a scheduled TAPS cutback and
total field shutdown. De-inventorying all pipelines for maintenance work. All gas
compressors were out of service for maintenance. As each system safe outs was completed,
the flaring would stop. This event and volume was actually nitrogen used for the safe out of
process systems.
Action taken to stop flaring
Continued with the de-inventory of all vessels & lines. The flaring stopped after each vessels and
line was de-inventoried.
Action taken to prevent reoccurrence
N/A
Reported by:
Name: David Colton
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 091299 2.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 12:14-8 hr O1 min
Planned event: x yes
no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 09/12/99
Flare Volume: 438
Assist Gas Volume: 0
This event was a planned flaring event that occurred after a scheduled TAFS cutback and
total field shutdown. De-inventorying all pipelines for maintenance work. All gas
compressors were out of service for maintenance. As each system safe outs was completed,
the flaring would stop. This event and volume was actually nitrogen used for the safe out of
process systems.
Action taken to stop flaring
Continued with the de-inventory of all vessels & lines. The flaring stopped after each vessels and
line was de-inventoried.
Action taken to prevent reoccurrence
N/A
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 091199 3.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 21:04-1 hr 11 min
Planned event: x yes
no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 09/12/99
Flare Volume: 64
Assist Gas Volume: 0
This event was a planned flaring event that occurred after a scheduled TAPS cutback and
total field shutdown. De-inventorying all pipelines for maintenance work. All gas
compressors were out of service for maintenance. As each system safe outs was completed,
the flaring would stop. This event and volume was actually nitrogen used for the safe out of
process systems.
Action taken to stop flarintY
Continued with the de-inventory of all vessels & lines. The flaring stopped after each vessels and
line was de-inventoried.
Action taken to prevent reoccurrence
N/A
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrou;;h
Title: Facilities Supervisor
Flare incident report 091299 1.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 05:47 - 10 hr 43 min
Planned event: x yes
no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 09/13/99
Flare Volume: 3043
Assist Gas Volume: 790
This event was a planned flaring event that occurred after a scheduled TAPS cutback and
total field shutdown. All gas compressors and gas power turbines were taken out of service
for maintenance. As the wells were brought back on line all incoming lines and vessels had
to be pressured up & leak tested. Once this was completed and gas compression was
restarted all flaring stopped.
Action taken to stop flaring
All lines & vessels were pressured up & leak tested as expeditiously as possible. All compressors
were returned to service an the flaring stopped.
Action taken to prevent reoccurrence
N/A
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrouch
Title: Facilities Supervisor
Flare incident report 091399 .doc Revised 425-99 LEN
~~A OIL AND GAS CONSERVATION CONII~lISSION
12 FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point ~ ~P Exploration (Alaska) Inc. Milne Point Oct-99
Disposition
Volume MCF*
1. Sold Fuel 17,488
2. Reinjected 546,073
3. Flared or vented less than 1 hour 753
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 371
6. Used for lease operations Fuel
Assist 260,908
10 310
7. Other
TOTAL items 1-7 835,903
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby c ify t at the foregoing is true and corr~ecetn~to the best of my knowledge.
Signature ~ Title~,(,~L, , ~~c Date f~l'~(~(
l
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK 525100 87.2
SCH. BLUFF 525140 12.8
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60 degrees F. Report
due by the 20th of the month
folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
11/01/99 0¢:2~ Milne Point Unit
n Monthly Gas Flaring Incident Report
For: Oct /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
10/01/99 08:11:00 00:04 2.3 1.0
10/01 /99 08:27:00 00:03 2.1 2.2
10/02/99 06:43:00 00:02 1.6 0.9
10/05/9912:44:00 00:01 0.1 0.0
10/05/9915:14:00 00:01 0.0 0.0
10/05/9915:29:00 00:01 0.1 0.0
10/05/9918:14:00 00:01 0.0 0.0
10/05/99 20:14:00 00:01 0.3 0.0
10/05/99 20:44:00 00:01 0.2 0.0
10/05/99 21:13:00 00:02 0.3 0.0
10/05/99 22:14:00 00:01 0.2 0.0
10/05/99 22:29:00 00:01 0.3 0.0
10/05/99 23:29:00 00:01 0.2 0.0
10/OS/99 23:44:00 00:01 0.2 0.0
10/05/99 23:59:00 00:01 0.2 0.0
10/06/99 00:14:00 00:01 0.3 0.0
i 0/06/99 00:29:00 00:01 0.3 0.0
10/06/99 00:59:00 00:01 0.2 0.0
0/06/99 01:11:00 00:04 0.4 0.0
10/06/99 01:59:00 00:01 0.1 0.0
10/06/99 02:29:00 00:01 0.2 0.0
0/06199 02:43:00 00:02 0.3 0.0
10/06/99 02:59:00 00:01 0.3 0.0
10/06/99 03:44:00 00:01 0.4 0.0
10/06/99 04:29:00 00:01 0.5 0.0
10/06/99 04:59:00 00:01 0.4 0.0
10/06/99 05:14:00 00:01 0.2 0.0
10/06/99 06:29:00 00:01 0.3 0.0
10/06/99 06:44:00 00:01 0.3 0.0
10/06/99 07:29:00 00:01 0.5 0.0
10/06/99 07:44:00 00:01 0.1 0.0
10/06/99 07:59:00 00:01 0.3 0.0
10/06/99 08:13:00 00:02 0.3 0.0
10/06/99 08:59:00 00:01 0.1 0.0
10/06/99 09:58:00 00:02 0.3 0.0
10/06/9910:43:00 00:02 0.2 0.0
10/06/9911:14:00 00:01 0.2 0.0
10/06/9912:14:00 00:01 0.2 0.0
10/06/9912:29:00 00:01 0.1 0.0
10/06/9914:59:00 00:01 0.1 0.0
10/08/99 22:28:00 00:02 0.8 0.1
10/09/99 07:42:00 00:03 23.9 11.4
10/09/99 07:47:00 00:13 68.4 44.0
10/09/99 08:03:00 00:12 66.9 40.4
BP Exploration Page l of 3 Milne Point, Alaska
llioli99 o6:z~ Milne Point Unit
Monthly Gas Flaring Incident Report
For: Oct /1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
10/09/99 08:16:00 00:14 87.0 53.8
10/09/99 08:38:00 00:07 30.3 25.4
10/09/99 08:47:00 00:13 21.9 16.3
10/09/99 09:04:00 00:11 32.2 24.8
10/09/99 09:19:00 00:11 18.9 15.6
10/09/99 09:34:00 00:11 26.8 21.0
10/09/99 09:48:00 00:12 28.6 22.3
10/09/9910:04:00 00:11 21.8 17.6
10/09/9910:18:00 00:12 24.2 17.2
10/09/9910:33:00 00:12 25.6 20.2
10/09/9910:47:00 00:13 20.2 17.3
10/09/9911:05:00 00:10 10.0 8.2
10/09/9911:21:00 00:09 9.9 7.5
10/09/9911:37:00 00:23 57.8 45.1
10/09/9912:07:00 00:08 12.9 9.7
10/09/9912:22:00 00:08 14.0 11.5
10/09/9912:36:00 00:09 11.1 7.3
10109/9912:47:00 00:13 16.5 13.2
10/0909913:06:00 00:09 10.6 7.9
10/09/9913:24:00 00:06 8.8 7.2
10/09/9913:38:00 00:07 10.3 7.0
10/09/9913:50:00 00:10 16.2 12.5
10/09/9914:09:00 00:06 8.3 6.7
10/09/9914:20:00 00:10 13.4 9.5
10/09/9914:44:00 00:01 1.6 2.0
10/10/99 01:59:00 00:01 0.1 0.0
10/11/99 09:41:00 00:04 2.8 1.6
10/11/9910:25:00 00:05 14.8 10.8
10/12/99 08:44:00 00:01 1.2 0.4
10/13/9917:54:00 00:06 2.0 0.7
10/13/9918:08:00 00:07 2.7 2.1
10/25/99 02:14:00 00:01 0.2 0.0
10/26/99 23:14:00 00:01 1.4 0.5
10/27/9918:57:00 00:03 4.6 3.0
10/28/9918:58:00 00:02 1.9 0.9
10/29/9918:58:00 00:02 4.8 3.2
10/30/9919:29:00 00:01 1.4 0.5
BP Exploration Page 2 of 3 Milne Point, Alaska
11/!11/99 C'S:27
Flare Name: Flare 1
Milne Point Unit
Monthly Gas Flaring Incident Report
For: Oct /1999
Unplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
10/31/9918:58:00 00:02 1.8 0.8
Flare Assist
Unplanned Events <= 1 hour
Unplanned Events > 1 hour
Planned Events <=1 hour and
not exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Unmetered Assist Gas
TOTAL FLARED VOLUME
753.4 531.5
0.0 0.0
0.0 0.0
0.0 0.0
10,149.1
753.4 10,680.6 MSCF
BP Exploration Page 3 of 3 Milne Point, Alaska
ALASKA OIL AND GAS CONSERVATION CONIl~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point Nov-99
Disposition
Volume MCF*
1. Sold Fuel 17,001
2. Reinjected 482,647
3. Flared or vented less than 1 hour 106
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,855
5. Pilot and Purge 359
6. Used for lease operations Fuel
Assist 259,612
9 675
7. Other
TOTAL items 1-7 771,255
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby certify at the foregoing is true and /Icorrect to the best of my knowledge.
Signature Title (~/L(~~-T~'.~ Date
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK 525100 88.3
SCH. BLUFF 525140 11.7
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
o
to pressure of 14.65 Asia and to a Q
rT~
temperature of 60 degrees F. Repor ~
C~3 r-j
due by the 20th of the month ~
folowing the month of disposition. °
o ...t
Ul
~,~„
Authority 20 AAC 25.235. ~ '~~'
3 ~
rn
3
"
o
Form 10-422
Rev. 4/95
12/01/1999 os:29 Milne Point Unit
• Monthly Gas Flaring Incident Report
For: Nov 1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
11/O1/199918:44:~ 00:01 1.9 0.9
11/02/199919:13: 00:02 1.6 0.6
11/03/1999 08:43: 00:02 1.1 0.3
11/03/199918:58: 00:02 2.0 1.0
11/04/199919:29: 00:01 1.9 0.9
11/05/199918:43, 00:02 1.7 0.7
11/06/199918:43, 00:02 2.0 1.0
11/07/199918:44: 00:01 1.9 0.9
11/08/199919:28: 00:02 1.6 0.7
11/15/1999 08:29:1 00:01 0.6 0.0
11/16/199910:59:1 00:01 0.2 0.0
I1/16/1999I4:14:i 00:16 0.2 0.0
ll/16/199915:29a 00:01 0.1 0.0
11/16/199915:44:1 00:01 0.3 0.0
11/16/199916:14, 00:01 0.4 0.0
11/16/199916:44:1 00:01 0.6 0.0
11/16/199916:58, 00:02 0.3 0.0
11/16/199917:13: 00:02 0.7 0.0
11/16/199917:43, 00:02 0.3 0.0
11/16/199917:58, 00:02 0.4 0.0
11/16/199918:13, 00:02 0.6 0.0
11/16/199918:27:1 00:03 0.6 0.0
11/16/199918:41: 00:04 1.8 0.0
11/16/199918:54: 00:06 2.6 1.2
11/16/199919:09:1 00:06 2.0 0.5
11/16/199919:26: 00:04 1.0 0.0
11/16/199919:39: 00:06 1.7 0.0
11/16/199919:57: 00:03 1.0 0.0
11/16/1999 20:12, 00:03 1.5 0.1
11/16/1999 20:26: 00:04 0.8 0.0
ll/I6/1999 20:44: 00:01 0.3 0.0
11/16/1999 20:59: 00:01 0.2 0.0
11/16/1999 21:13:1 00:02 0.6 0.0
11/16/1999 21:28: 00:02 0.5 0.0
11/16/1999 21:42: 00:03 0.5 0.0
11/16/1999 21:58: 00:02 1.2 0.0
11/16/1999 22:02: 00:13 6.0 4.7
11/16/1999 22:17: 00:13 5.7 3.6
11/16/1999 22:31: 00:44 21.0 16.8
11/16/1999 23:16: 00:14 4.5 2.8
11/16/1999 23:43: 00:02 0.9 0.3
BP Exploration Page 1 of 3 Milne Point, Alaska
12/01/1999 os:a9 Milne Point Unit
• Monthly Gas Flaring Incident Report
For: Nov 1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
11/16/1999 23:55: 00:05 1.9 0.3
11/17/1999 00:1 l:i 00:04 0.9 0.0
11/17/1999 00:44a 00:01 0.4 0.0
11/17/1999 00:59:1 00:01 0.4 0.0
ll/19/199913:35:~ 00:10 15.6 14.6
11/19/199917:44: 00:01 1.5 0.1
11/24/1999 06:44: 00:01 1.6 0.3
11/25/1999 07:43: 00:02 1.4 0.0
11/26/1999 07:29: 00:01 1.0 0.0
11/27/1999 06:59: 00:01 1.4 0.0
11/28/1999 08:43:1 00:02 1.3 0.0
11/29/1999 07:28: 00:02 2.0 0.4
11/30/1999 07:14a 00:01 1.5 0.1
BP Exploration Page 2 of 3 Milne Point, Alaska
t2ro1n999 og:29 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Nov 1999
Flare Name: Flare 1
Cnplanned Events greater than 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
11/19/1999 11:57: 01:33 1,854.8 159.8 Technician calib error LAH V5501 B & C pad gaslift s/i to mitigate flare,
scrubber & s/d gas train gas train compressors restarted
Flare Assist
Unplanned Events <=1 hour
Unplanned Events > 1 hour
Planned Events <=1 hour and
not exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Unmetered Assist Gas
TOTAL FLARED VOLUME
106.3 52.8
1,854.8 159.8
0.0 0.0
0.0 0.0
9,821.7
1,961.1 10,034.3 1VIS CF
BP Exploration Page 3 of 3 Milne Point, Alaska
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 11:57 - lhr 33 min
Planned event: yes
x no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Date: 11/19/99
Flare Volume: 1855
Assist Gas Volume: 160
Event description
This event was an unplanned-flaring event which occurred when maintenance was
calibrating the level alarm high on V-5501 the gas scrubber. The level increased in the
vessel and caused the LSHH on scrubber to activate thereby shutting down the gas
compression system.
Action taken to stop flaring
The following gas lift wells were closed to mitigate flaring. C-pad wells C- 4,7, and 9. B-pad wells
B-3,4,6,9,10,15,20,21, and 22. The gas compressors were purged and started . The plant was then
brought back on line.
Action taken to prevent reoccurrence
An incident investigation into the proper maintenance procedures to follow when doing PM's on
critical equipment is being reviewed.
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Henry Harrington
Title: Facilities Supervisor
Flare incident report 11-19-99.doc Revised 4-25-99 LEN
~ ~ . ~~
Disposition
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
for Field(s)
ploration (Alaska) Inc. Milne Point
Volume MCF*
1. Sold Fuel 17,639
2. Reinjected 463,299
3. Flared or vented less than 1 hour 1,890
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 2,769
5. Pilot and Purge 372
6. Used for lease operations Fuel
Assist 277,387
10,872
7. Other
TOTAL items 1-7 774,228
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby certify th t the fore oing is true and correct to the best of my knowledge.
Signature ., Title /~/~,(,~., T~~ Date
Month/Year of Disposition I ,
Dec-99
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK 525100 90.0
SCH. BLUFF 525140 10.0
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60 degrees F. Report
due by the 20th of the month
folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ovo3izooo 17:01 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Dec 1999
Flare Name: Flare 1
np at nned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
12/01/1999 06:58: 00:02 1.3 0.1
12/02/1999 07:43: 00:02 1.5 0.1
12/02/199910:03: 00:12 54.8 24.2
12/02/199910:19: 00:11 62.8 25.0
12/02/199910:34: 00:11 60.4 25.4
12/02li99910:54: 00:06 16.2 8.5
12/04/1999 07:13: 00:02 1.4 0.1
12/05/1999 04:44: 00:01 0.4 0.0
12/05/1999 04:47: 00:13 12.6 5.9
12/05/1999 05:13: 00:02 1.4 0.0
12/05/1999 05:41: 00:04 1.7 0.1
12/05/1999 05:58: 00:02 0.9 0.0
12/05/1999 06:28: 00:02 0.6 0.0
12/05/1999 06:42: 00:03 1.8 0.0
12/05/1999 07:29: 00:01 1.5 0.0
12/05/1999 07:39: 00:06 3.0 0.5
12/05/1999 07:55: 00:05 4.1 1.3
12/05/1999 08:41: 00:04 2.8 0.5
12/05/1999 08:55: 00:05 4.5 2.5
12/05/1999 09:06: 00:09 7.2 3.0
12/05/1999 09:25: 00:05 3.0 0.7
12/05/1999 09:42: 00:03 1.8 0.1
12/05/1999 09:55: 00:05 3.6 1.9
12/05/199910:08: 00:07 4.5 1.6
12/05/199910:43: 00:02 0.7 0.0
12/05/199910:53: 00:07 4.5 1.7
12/05/199912:12: 00:03 2.8 0.7
12/05/199912:28: 00:02 1.0 0.0
12/05/199918:53: 00:07 5.5 1.9
12/05/199919:09: 00:06 6.4 3.3
12/06/1999 07:28: 00:02 1.6 0.2
12/06/ 1999 13 :31: 00:44 916.9 0.9 ~` ' ' ~~~
12/06/1999 14:20: 00:10 9.2 0.0 - u. ~a~
12/06/199915:09: 00:06 6.7 0.0
12/06/1999 15:56: 00:04 3.8 0.0 ' `~ ''~
12/06/1999 16:12: 00:03 1.0 0.0 i=~1~;^ 1'~ ;;,` r'
12/06/199916:29: 00:01 0.3 0.0 Sri'>`a~'`~;~~0
12/06/199916:57: 00:03 2.4 0.0
12/06/199917:57: 00:03 1.6 0.0
12/06/1999 18:04: 00:1 i 7.6 0.0
12/06/199918:28: 00:02 1.2 0.0
BP Exploration Page 1 of 5 Milne Point, Alaska
0l/o3/zooo t7:ot Milne Point Unit
Monthly Gas Flaring Incident Report
For: Dec 1999
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour '~
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
12/08/1999 09:24: 00:06 9.2 0.5
12/08/199911:41: 00:04 3.7 1.2
12/08/199911:55: 00:05 4.0 1.6
12/08/199914:04: 00:11 60.4 5.3
12/11/1999 21:28: 00:02 1.0 0.0
12/13/1999 05:29: 00:01 1.5 0.0
12/13/1999 05:41: 00:04 6.0 4.1
12/13/1999 05:53: 00:07 10.5 8.8
12/13/1999 06:10: 00:05 6.3 7.3
12/13/1999 07;49: 00:11 10.8 5.7
12/13/1999 08:01: 00:14 12.9 6.2
12/13/1999 08:18: 00:12 15.6 7.7
12/13/1999 08:33: 00:12 9.3 3.7
12/13/1999 08:49: 00:11 8.9 3.9
12/13/1999 09:06: 00:09 8.2 4.2
12/15/199910:42: 00:03 2.0 0.0
12/15/199911:41: 00:04 3.6 0.9
12/15/199911:56: 00:04 4.2 2.3
12/15/199913:29: 00:01 4.3 3.0
12/15/199913:49: 00:11 9.0 7.1
12/16/199916:50: 00:10 8.0 3.1
12/16/1999 20:25: 00:05 3.9 1.3
12/16/1999 21:10: 00:05 2.5 0.1
12/16/1999 21:21: 00:09 5.8 2.3
12/16/1999 21:39: 00:06 4.6 2.0
12/16/1999 22:10: 00:05 3.9 1.2
12/17/1999 03:25: 00:05 5.6 1.9
12/17/1999 05:28: 00:02 5.3 3.9
12/17/1999 05:56: 00:04 5.1 0.9
12/17/1999 06:40: 00:05 5.6 0.9
12/17/1999 07:39: 00:06 9.2 3.9
12/17/1999 09:09: 00:06 5.8 1.8
12/17/1999 09:27: 00:03 3.3 1.7
12/17/1999 09:58: 00:02 1.8 0.2
12/17/199910:12: 00:03 2.4 0.5
12/17/199914:44: 00:01 0.3 0.0
12/17/1999 ]4:52: 00:08 22.2 10.6
12/17/199915:55: 00:05 3.0 0.2
12/17/199916:07: 00:08 3.2 0.2
12/17/199916:20: 00:25 25.0 10.7
12/171199916:56: 00:04 6.3 3.6
BP Exploration Page 2 of 5 Milne Point, Alaska
ovo3i2ooo 17:01 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Dec 1999
Flare Name: Flare 1
nplanned Events less than, or equal to 1 hour
Start Time Duration
(hh:mm) =Volume (MSCF) _
Flare Assist Cause
Comment
12/18/1999 00:43: 00:02 0.7 0.0 Gas compression S/D due to a blown Technical difficulties prevented an
fuse during maintenance. immediate re-start of the compressors.
12/18/1999 08:13: 00:02 1.8 0.3
12/18/1999 08:43: 00:02 1.2 0.0
12/18/1999 22:32: 00:13 13.6 4.2
12/18/1999 22:55: 00:05 4.0 0.4
12/19/199915:43: 00:02 0.7 0.0
12/19/199915:57: 00:03 1.9 0.0
12/20/199917:11: 00:04 3.9 0.4
12/20/199917:25: 00:35 39.7 0.4
12/20/199918:01: 00:14 12.8 0.0
12/20/199918:39: 00:06 2.5 0.0
12/20/199918:56: 00:04 2.2 0.0
12/20/199919:09: 00:06 3.5 0.0
12/20/199919:28: 00:02 0.9 0.0
12/20/199919:56: 00:04 2.6 0.0
12/20/1999 20:07: 00:08 3.6 0.0
12/20/1999 20:25: 00:05 3.0 0.0
12/20/1999 20:39: 00:06 3.6 0.0
12/20/1999 20:52: 00:08 2.9 0.0
12/20/1999 21:11: 00:04 1.8 0.0
12/21/1999 21:44: 00:01 1.9 0.0
12/22/1999 06:43: 00:02 1.7 0.0
12/22/1999 08:59: 00:01 0.2 0.0
12/22/1999 09:02: 00:13 51.6 15.0
12/23/1999 06:27: 00:03 3.5 2.7
12/24/1999 07:43: 00:02 5.0 1.9
12/24/1999 07:59: 00:01 0.8 3.4
12/24/199916:22: 00:08 57.6 27.1
12/24/199916:40: 00:05 54.8 40.3
12/25/1999 07:25: 00:05 13.8 0.7
.12/25/1999 07:42: 00:03 5.7 10.3
12/26/1999 06:27: 00:03 9.5 2.1
12/27/1999 06:58: 00:02 6.9 2.5
12/28/1999 06:28: 00:02 3.3 2.6
12/29/1999 06:44: 00:01 1.1 0.5
12/29/1999 06:58: 00:02 4.9 4.3
12/30/1999 07:12: 00:03 5.0 4.3
12/31/1999 06:43: 00:02 5.3 4.8
BP Exploration Page 3 of 5 Milne Point, Alaska
ovosi~ooo trot Milne Point Unit
Monthly Gas Flaring Incident Report
For: Dec 1999
Flare Name: Flare 1
Unplanned Events greater than 1 hour _ _ __ ___
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
12/18/199919:49: 02:41 1,783.0 639.2
BP Exploration Page 4 of 5 Milne Point, Alaska
O1 /03/000 17:01
Milne Point Unit
Monthly Gas Flaring Incident Report
For: Dec 1999
Flare Name: Flare 1
fanned Events Exceeding 1 hour OR Volumne Exceeding 5000 MSCF ___ ~
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
12/08/1999 07:48: 01:27 985.7 92.9 Planned compressor desynchronizing Compressors went down. Purge and
test. re-start followed routine procedures.
Flare Assist
Unplanned Events <=1 hour 1,890.5 363.0
Unplanned Events > 1 hour 1,783.0 639.2
Planned Events <= 1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 985.8 92.9
Unmetered Assist Gas 10,149.1
TOTAL FLARED VOLUME 4,659.2 11,244.2 MSCF
BP Exploration Page 5 of 5 Milne Point, Alaska
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 07:48 hrs for 01:27 hrs.
Planned event: ®yes
^ no
This flaring or venting incident was: (check one)
^ necessary for facility operations.
^ necessary for facility upgrades.
® necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 12/8/99
Flare Volume: 986
Assist Gas Volume: 93
This was a planned flaring event to test the desynchronizing of the motors for the gas compressors
to help eliminate excess vibration in Module 55. Several gas lift wells were shut-in before the
testing. We unloaded one of the compressors and tested the ability to slip the motor phases to
eliminate the motors from running in synchronization. The compressors did shutdown and were
immediately purged and brought back on line.
Action taken to stop 1larin~
The following gas lift wells were shut-in before the testing: C-4,C-7,C-9, and B-15,B-10,B-22,B-
9,B-3,B-21,B-20. The assist gas was adjusted downward because it was not needed at the 1:1 ratio.
No black smoke was observed. The test was conducted and the compressors were brought back on
line as quickly as possible to mitigate the flaring event. The assist gas was also returned to normal
operation.
Action taken to prevent reoccurrence
An evaluation of the data collected during the test revealed that additional software logic will be
required. Operations, Process Control, and Engineering are developing the modifications.
Reported by:
Name: Jerry Gronos
Title: Facility Lead Tech.
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
991208 flare report.doc Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 19:49 hrs for 02:41 hrs
Planned event: ~ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
~ necessary for facility upgrades.
~ necessary for facility testing procedures.
~ an emergency that threatened life or property.
~ necessary to prevent loss of ultimate recovery.
Event descr_ption
Date: 12/ 18/99
Flare Volume: 1783
Assist Gas Volume: 639
While performing maintenance on a gas lift cooler vibration switch, a fuse was inadvertently blown.
This resulted in a shutdown of the gas lift scrubber which activated a normal shutdown of the gas
compressors. Subsequent compressor re-start attempts were thwarted by technical issues associated
with permissive switches and a minor valve leak.
Action taken to stow flarin
Production wells B-3, 4A, 6, 9, 10, 15, 20, 21, 22, C-4, 7 & 9 were shut-in. Maintenance personnel
were dispatched to troubleshoot and correct the permissive issues and to repair the leaking valve.
The gas compressors were re-started and the flaring stopped.
Action taken to prevent reoccurrence
Operations and maintenance reviewed and adjusted written procedures concerning the incident that
caused the fuse to blow and discussed the permissive issues that delayed the re-start of the
compressors to ensure adequate measures had been taken to prevent a reoccurrence of this nature.
Reported by:
Name: Jerry Gronos/Larry Niles
Title: Facility Lead Tech.
Supervisor
Name: Henry Harrington/Jeff Scarbrough
Title: Facilities Supervisor
991218 flare report Il.doc Revised 4-25-99 LEN