Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutBPXA - MILNE POINT~. %~/.~/~/~/i~/~~d'Y~/®6/~Y~/~/~'/~/.~/®/®/B/~/~/~Y~/<Y/~/.~'/,a~/.~/.d'/~/.~/,N°~~/.~'/.~/~/~/~',',~/.&/,~;'~Y®/6B/~/.~/~'/~/FY/~%~/~/.~'~/.~~.~/~/~/.,~/.~/.~/.~/~/~'/fI/.a4~/®."inb'/.AP/.~/ r 1~/~od ~.v~iw - t~xa~ 866[ sall,~ uol~ISOdsIQ S~~ ~~0~~ .. .~ , ~sm~.w-~~ iu~.e~izru~er~.~iriri~iarisisieims~rie~riei.~ir~w~s~srsWi®iw.~siscsr~i.®v~erisi~rc~irrirr~~.~~.rr~zacr~~~ iei.~c~i,~~~i.~ieri~i.Qrisi.~i.~~.,~:an.~ur~sim~~~~si.~i<sr.®i.,riirie~iem:.~car,~::riwi u ,~ ... BP EXPLORATION January 18, 1999 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn. Wendy Mahan: BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Attached are the Monthly Producer's Report of Gas Disposition for the month of December 1998. Should you have any questions, please conl:act Bob Wilks at (907) 564-5670. Sincerely, Robert A. Reynolds Manager, State Taxes and Royalty ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition - Milne Point BP Exploration (Alaska) Inc. Milne Point Dec-98 G~ SF° n cn ~~ u-, ~ ~ C' ux ci ~. S~ i_+ .-•~. C~ t_C.1 tD Disposition Volume MCF* 1. Sold Fuel 13,923 2. Reinjected 488,155 . Flared or vented less than 1 hour 11,316 Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 22,829 Pilot and Purge 371 6. Used for lease operations Fuel Assist 230,806 33 630 7. Other TOTAL items 1-7 801,030 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby c~ifgy that the foregoing is true and correct to the best of my knowledge. Signature L ~ _ 1\_~ a ~~~ ~ Title ~~~ '~ Date *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 89.3 SCH. BLUFF 525140 10.7 Officia Use Only-Flaring Authorization>l hr:' 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 olio2i99 uas Milne Point Unit Monthly Gas Flaring Incident Repo For: Dec /1998 Flare Name: Flare 1 np anne vents greater t an our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 12/07/98 04:41:00 01:04 310.1 517.9 This was an unplanned flaring event Numerous high GOR wells were shut in that occurred when the IWAG gas to mitigate the flare injection compressor shut down due to a rupture disk failure. 12/07/98 16:03:00 02:57 1,225.5 187.3 This was an unplanned flaring event The 08 turbine shutdown caused a full that occurred when a restart was field shutdown due to a lack of power attempted on the gas lift compressors generation, as the 07 turbine was stilt and it shut down the 08 turbine. offline for maintenance. 12/08/98 08:16:00 13:29 5,011.7 2,193.0 This was an unplanned flaring event A number of process problems arose that occurred while bringing wells back during startup of the facility. online after the full field shutdown on Maintenance and operations personnel Dec 7th. worked throughout the day and night making repairs. 12/08/98 22:42:00 01:18 62.1 61.0 This was an unplanned flaring event A number of process problems arose that occurred when starting up the plant during startup of the facility. and bringing in cold wells after the full Maintenance and operations personnel field shutdown. worked throughout the day and night making repairs. 12/09/98 02:54:00 01:36 60.6 59.0 This was an unplanned flaring event A number of process problems arose that occurred when starting up the plant during startup of the facility. and bringing in cold wells after the full Maintenance and operations personnel field shutdown. worked throughout the day and night making repairs. 12/09/98 09:16:00 01:44 87.3 87.2 This was an unplanned flaring event A number of process problems arose that occurred when starting up the plant during startup of the facility. and bringing in cold wells after the full Maintenance and operations personnel field shutdown. worked throughout the day and night making repairs. 12/11/98 19:31:00 01:14 486.5 269.3 This was an unplanned flaring event Numerous pieces of plant equipment that occurred when the 07 Turbine shut were shut down to reduce load on the down due to gas leaks in the turbine remaining turbine and numerous high module from a broken J tube. GOR wells were shut in to mitigate the flare. The 07 turbine was returned to service and the flaring event stopped. 12/11/98 22:34:00 01:26 128.1 76.3 This was an unplanned flaring event Numerous pieces of plant equipment that occurred when the 07 Turbine shut were shut down to reduce load on the down due to gas leaks in the turbine remaining turbine and numerous high module from a broken J tube. GOR wells were shut in to mitigate the flare. The 07 turbine was returned to service and the flaring event stopped. 12/12/98 01:17:00 01:28 136.4 81.5 This was an unplanned flaring event An E Pad shutdown also caused the that occurred while bringing wells back C5531 AB gas injection compressors online after the 07 turbine shutdown. to shut down. HIgh GOR wells were once again shut in to help mitigate the flare. 12/12/98 02:47:00 02:28 311.3 186.8 This was an unplanned flaring event An E Pad shutdown also caused the that occurred while bringing wells back C5531 AB gas injection compressors online after the 07 turbine shutdown. to shut down. HIgh GOR wells were once again shut in to help mitigate the flare. 12/12/98 05:18:00 08:57 1,426.3 795.9 This was an unplanned flaring event An E Pad shutdown also caused the that occurred while bringing wells back C5531 AB gas injection compressors online after the 07 turbine shutdown. to shut down. HIgh GOR wells were once again shut in to help mitigate the flare. 12/13/98 06:50:00 01:25 319.7 311.8 This was an unplanned flaring event Numerous high GOR wells were shut in when the C Pad IWAG injection to mitigate the flare. Maintenance compressor shutdown froom a crews were dispatched and the flaring mechanical problem with the Trabon even stopped when the IWAG lubrication system. compressor was brought back online. BP Exploration Page 18 of 21 Milne Point, Alaska 01/02/99 11:18 Milne Point Unit Monthly Gas Flaring Incident Repor~ For: Dec /1998 Flare Name: Flare 1 np ann vents greater t an our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 12/14/98 13:51:00 01:39 142.9 140.7 This was an unplanned flaring event High GOR wells were shut in to that occurred during unplanned mitigate the flare. The flaring even maintenance on the 07 turbine which stopped when maintenance crews were shut down on a fuel gas problem able to restart the 07 turbine. (similar to Dec 11th). 12/14/98 20:49:00 02:41 474.1 472.8 This was an unplanned flaring event High GOR wells were shut in to that occurred during unplanned mitigate the flare. The flaring even maintenance on the 07 turbine which stopped when maintenance crews were shut down on a fuel gas problem able to restart the 07 turbine. (similar to Dec 1 lth). 12/15/98 02:37:00 01:23 242.1 235.0 This was an unplanned flaring event As this was a repeat failure it was that occurred due to another shutdown decided to leave the turbine offline until of the 07 turbine due to a gas leak in the the root cause of the failures could be module from a broken J tube. determined. Numerous plant equipment and high GOR wells were shut in to optimize power and mitigate the flare. 12/15/98 04:02:00 01:13 154.2 153.5 This was an unplanned flaring event As this was a repeat failure it was that occurred due to another shutdown decided to leave the turbine online until of the 07 turbine due to a gas leak in the the root cause of the failures could be module from a broken J tube. determined. Numerous plant equipment and high GOR wells were shut in to optimize power and mitigate the flare. 12/15/98 05:19:00 16:11 2,292.5 2,292.8 This was an unplanned flaring event Additional high GOR wells were shut that occurred when the IWAG gas in and a large volume of produced gas injection compressor shut down as an had to be removed from the system to end result to the 07 turbine problems stop the flaring event. 12/15/98 21:33:00 01:12 169.9 170.4 This was an unplanned flaring event Additional high GOR wells were shut that occurred when the IWAG gas in and a large volume of produced gas injection compressor shut down as an had to be removed from the system to end result to the 07 turbine problems stop the flaring event. 12/16/98 04:31:00 01:29 130.4 131.1 This was an unplanned flaring event High GOR wells were shut in for that occurred during unplanned several days to mitigate the flare. This maintenance on the 07 turbine due to a even occurred when one well was fuel gas leak. Experts were brought on brought online to prevent freezing. site to troubleshoot the turbine. Once the initial gas cap was blown down, the flaring event stopped. 12/18/98 15:46:00 01:29 666.2 108.4 This was an unplanned flaring event High GOR wells were already shut in to that occurred during a complete gas mitigate the flare. The flaring event plant shutdown that happened during stopped when the gas compressors were attempted startup after the 07 turbine successfully brought back online. work was completed. 12/18/98 18:19:00 03:11 791.0 775.2 This was an unplanned flaring event off A large number of high GOR wells the gas lift header while the C Pad were left shut in to mitigate the flare. IWAG gas injection compressor was Maintenance technicians were having startup problems after the 07 dispatched to make expeditious repairs turbine work. on the compressor. The flaring event stopped once the repairs were made and the compressor was back online. 12/18/98 21:31:00 01:14 246.2 239.7 This was an unplanned flaring event off A large number of high GOR wells the gas lift header while the C Pad were left shut in to mitigate the flare. IWAG gas injection compressor was Maintenance technicians were having startup problems after the 07 dispatched to make expeditious repairs turbine work. on the compressor. The flaring event stopped once the repairs were made and the compressor was back online. BP Exploration Page 19 of 21 Milne Point, Alaska 01/02/99 11:18 Milne Point Unit Monthly Gas Flaring Incident Repor~ For: Dec /1998 Flare Name: Flare 1 np anne vents greater t an our Duration -Volume (M SCF) Start Time (hh:mm) Flare Assist Cause Comment 12/18/98 22:47:00 01:13 183.7 185.1 This was an unplanned flaring event off A large number of high GOR wells the gas lift header while the C Pad were left shut in to mitigate the flare. IWAG gas injection compressor was Maintenance technicians were having startup problems after the 07 dispatched to make expeditious repairs turbine work. on the compressor. The flaring event stopped once the repairs were made and the compressor was back online. 12/19/98 19:08:00 01:37 608.7 583.2 This was an unplanned flaring even that High GOR gas lift wells were shut in to occurred when the C Pad IWAG mitigate the flare while maintenance injection compressor shut down on low crews got the unit back online. oil pressure. 12/20/98 00:02:00 01:58 524.0 508.7 This was an unplanned flaring even that High GOR gas lift wells were shut in to occurred when the C Pad IWAG mitigate the flare while maintenance injection compressor shut down on low crews got the unit back online. oil pressure. 12/22/98 11:03:00 05:27 2,600.3 1,019.5 This was an emergency unplanned The repairs took longer than expected. flaring event that occurred when the Gas lift was halted to the high GOR CSS11A compressor was manually shut wells to mitigate the flare. The event down because of a broken tubing line on stopped when maintenance crews were a PSV that was venting gas into the able to re-install the PSV and restart the module. compressor. 12/28/98 10:43:00 01:17 450.1 225.3 Unplanned flaring due to Trabon All lift gas and numerous high GOR lubrication system failure on a gas lift wells were shut in to mitigate the flare. compressor. 12/28/98 12:01:00 01:44 149.3 74.7 Unplanned flaring due to Trabon All lift gas and numerous high GOR lubrication system failure on a gas lift wells were shut in to mitigate the flare. compressor. BP Exploration Page 20 of 21 Milne Point, Alaska 01/02/99 uas Milne Point Unit r • Monthly Gas Flaring Incident Repor~ For: Dec /1998 Flare Name: Flare 1 anne vents xcee mg our o umne gcee mg Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 12/02/98 06:31:00 03:59 1,450.1 746.0 This was a planned flaring event that occurred during planned maintenance on the 07 turbine. 12/03/98 03:16:00 04:14 666.0 332.4 This was a planned flaring event that occurred during planned maintenance on the 07 turbine. 12/03/98 08:05:00 05:10 1,322.4 803.0 This was a planned flaring event that occurred during planned maintenance on the 07 turbine. Planned maintenance routines were also being performed on the Gas Lift compressor SSOIA and Injection Compressor 5531B. A partial field shutdown was in effect for work at C, F, and L Pads which mitigated the flare. Planned maintenance routines were also being performed on the Gas Lift compressor SSOIA and Injection Compressor 5531B. A partial field shutdown was in effect for work at C, F, and L Pads which mitigated the flare. Planned maintenance routines were also being performed on the Gas Lift compressor SSOlA and Injection Compressor 5531B. A partial field shutdown was in effect for work at C, F, and L Pads which mitigated the flare. Flare Assist Unplanned Events <=1 hour 11,315.6 9,827.8 Unplanned Events > 1 hour 19,391.1 12,142.7 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 3,438.4 1,881.3 Unmetered Assist Gas 10,149.1 TOTAL FLARED VOLUME 34,145.1 34,000.9 MSCF BP Exploration Page 21 of 21 Milne Point, Alaska BP Exploration -Milne Point December 2 , 1998 Flaring Incident Report (exceeding 1 hour) Time and duration of incident 06:30 December 2nd 1998 3hr.59min. Flare Volume: 1450 Assist Gas Volume: 746 This was a planned flaring event that occurred during planned maintenance on the 07 turbine. Planned maintenance routines were also being performed on the Gas Lift compressor 5501 A and Injection compressor 5531B. A partial field shut down~was in effect for work at C. F and L pads which mitigated the flare. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 3 , 1998 Time and duration of incident 03:16 December 3rd 1998 4hr.14min. Flare Volume: 666 Assist Gas Volume: 332 Time and duration of incident 08:05 December 3rd 1998 Shr.lOmin. Flare Volume: ;1322. Assist Gas Volume: 803 ~ ? ,_ This was a planned flaring event that occurred during planned maintenance on the 07 turbine. Planned maintenance routines were also being performed on the Gas Lift -' compressor 5511B and Injection compressor 5531B. A partial field shut down was in effect for work at C. F and L pads and mitigated the flare. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 07, 1998 Time and duration of incident 04:41 December 07th 1998 1hr.04min. Flare Volume: 310 Assist Gas Volume: 518 - Time and duration of incident .16:03 December 07th 1998 2hr.57min. .Flare Volume: 1225 Assist Gas Volume: 187 - The first was a unplanned flaring event that occurred when the IWAG compressor shutdown from a rupture disk blowing out. Wells were shut-in to help mitigate the ' - flaring. The second was a unplanned flaring event that occurred when bringing on the gas compressors it shutdown the 08 generator. This caused a field wide shutdown. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 08 , 1998 Time and duration of incident 08:16 December 08th 1998 13hr.29min. Flare Volume: 5012 Assist Gas Volume: 2193 • - ~~ ~ ~ ~ -~ This was an unplanned flaring event that occurred while bringing wells on line after the previous day's field wide shut down. A multitude of process problems arose while attempting to start the facility. Maintenance and operations personnel worked throughout the day and night making repairs. Time and duration of incident 22:42 December 08th 1998 Olhr.l8min. Flare Volume: 62 Assist Gas Volume: 61 This was an unplanned flaring event that occurred when starting up the plant and bringing on the cold wells after the field wide shutdown. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 09 , 1998 Time and duration of incident 09:16 December 09th 1998 lhr.44min. Flare. Volume: 87 Assist Gas Volume: 87 This was a unplanned flaring event that occurred while bringing on the plant equipment and opening wells back to production facility after the field wide shutdown. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 11 , 1998 U Time and duration of incident 19:31 December 1 lth 1998 lhr.l4min. Flare Volume: 486 Assist Gas Volume: 269 Time and duration of incident 22:34 December 11th 1998 lhr.26min. Flare Volume: 128 Assist Gas Volume: 76 These were unplanned flaring events that occurred when Generator ®7 shutdown because . of gas leaks in the turbine compartment. Several wells were shut-in to help mitigate the ' flaring. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 12 , 1998 Time and duration of incident 01:17 December 12th 1998 lhr.28min. Flare Volume: 136 Assist Gas Volume: 81 Time and duration of incident 02:47 December 12th 1998 2hr.28min. Flare Volume: 311 Assist Gas Volume: 187 Time and duration of ineident 05:18 December 12th 1998 8hr.57min. Flare Volume: 1426 Assist Gas Volume: 796 This was unplanned flaring events that occurred while bringing wells on after the 07 turbine work and a shutdown of 07 turbine from fuel leaks. An E-Pad shutdown also occurred which cause the C-5531 A/B compressors to shut down. High GOR wells were shut-in to help mitigate the flaring. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 13 , 1998 Time and duration of incident 06:50 December 13th 1998 1hr.25min. Flare Volume: 320.. Assist Gas Volume: 312 ..This was a unplanned flaring event that occurred when the 1WAG compressor on C-Pad shutdown from a mechanical problem with the Trabon lubrication system. Wells were shut-in to help mitigate the flaring. ~ - - - • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 14 , 1998 • Time and •duration of incident 13:51 December 14th 1998 lhr.39min. ~} Mare Volumed 143 Assist Gas Volume: 141 - ~ ~ • ,, Time and duration of incident 20:49 December 14th 1998 2hr.41min. ?Aare Volume. 474 Assist Gas Volume: 473 These were unplanned flaring events that occurred during unplanned maintenaaice on the - _ 07. turbine. ~ .The 07 turbine shutdown on a fuel problem. Production wells were shut-in'lo help mitigate the flaring. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 15 , 1998 Time and duration of incident 02:37 December 15th 1998 lhr.23min. Flare Volume: 242 Assist Gas Volume: 235 Time and duration of incident 04:02 December 15th 1998 lhr.l3min. Flare Volume: 154 Assist Gas Volume: 154 These were unplanned flaring events that occurred during unplanned S/D on the 07 turbine. A gas leak occurred inside the turbine enclosure. High GOR wells were shut=in to mitigate flaring. Time and duration of incident 05:19 December 15th 1998 16hr.1 lmin. Flare Volume: 2292 Assist Gas Volume: 2293 Time and duration of incident 21:33 December 15th 1998 lhr.l2min. Flare Volume: 170 Assist Gas Volume: 170 These events were unplanned flaring due to the IWAG compressor shutting down. More production wells were shut in to mitigate additional flaring. A large volume of produced gas had to be removed from the system to eventually stop the flaring. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 16 , 1998 • Time and duration of incident 04:31 December 16th 1998 lhr.29min. .Flare Volume: 130- t~ssist Gas Volume: 131 This was a unplanned flaring event that occurred during unplanned maintenance on the 07 turbine. High GOR wells had been shut in for several days to mitigate flaring. This event . occurred when one of the wells were brought online to prevent freezing. Once the initial gas cap on the well was blown down, the flaring was mitigated.. LJ BP Exploration -Milne Point December 18 , 1998 Flaring Incident Report (exceeding 1 hour) • Time and duration of incident 15:46 December 18th 1998 1hr.29min. Flare Volume: 666 Assist Gas Volume: 108 This was an unplanned flaring event that occurred when the gas compression facility S/D~ on high temperature. High GOR wells were shut in to mitigate flaring. ,The compressors ,; were started to stop the flaring. Time and duration of incident 18:19 December 18th 1998 3hr.1 lmin. ~ - - • Flare Volume: 791 Assist Gas Volume: 775 Time and duration of incident 21:31 December 18th 1998 lhr.l4min. Flare Volume: 246 Assist Gas Volume: 240 This event was an unplanned flaring event off the lift gas header while I-WAG was having startup problems, high GOR wells were left S/I to mitigate flaring. Maintenance technicians were dispatched to make expeditious repairs on the IWAG compressor. Repairs were made and the compressor was started. The flaring was eliminated once all the compressors were back on line. ~ ~~''~ ~ r~ (t. t'~~ .~ u- ~~ ~ 2ti :~,~1 ~~(3 ~ ~ ~~~ xt~ ~~cS. ~~~~ BSc ~~~ r' rl~ ~J a ~''~ l~~ ~ X0~ ~~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 19 , 1998 Time and duration of incident 19:08 December 19th 1998 lhr.37min. Flare Volume: 609 Assist Gas Volume: 583 • This was a unplanned flaring event that occurred when IWAG compressor shutdown on low oil pressure. Several wells were shut-in to help mitigate flaring. C~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 20 , 1998 C~ Time and duration of incident 00:02 December 20th 1998 1hr.58min. Flare Volume: 524 .Assist Gas Volume: 509 This .was a unplanned flaring-:event that occurred when I-WAG shut down'on low oil :.:pressure.., Several Hi GOR wells shut-in to mitigate flaring. U Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 22 , 1998 LJ Time and duration of incident 11:03 December 22nd 1998 OShr.27min. Flare Volume: 2600 Assist Gas Volume: 1019 This. was an emergency unplanned flaring event that occurred. when compressor. C-S51 lA was manually shutdown because of a broken tubing line on PSV. -The tubing line was ~ . discharging gas into the compressor module. The repairs took longer than`,expected'. The high GOR gas lift wells were shut-in to help mitigate the flaring. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point December 28 , 1998 Time and duration of incident 10:43 December 28th 1998 OIhr.l7min. Flare Volume: 450 Assist Gas Volume: 225 Time and duration of incident 12:01 December 28th 1998 Olhr.44min. Flare Volume: 149 Assist Gas Volume: 75 This was an unplanned flaring event that occurred when compressor C-5511A (Big A) shutdown because of a Trabon (lubricating system) problem. Also a broken nipple was discovered and repaired. The gas lift wells were shut-in and some high GOR-wells were shut-in to help mitigate the flaring. U BP EXPLORATION December 18, 1998 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn. Wendy Mahan: • BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Attached are the Monthly Producer's Report of Gas Disposition for the month of November 1998. Should you have any questions, please contact Bob Wilks at (907) 564-5670. Sincerely, .~ . Robert A. Reynolds Manager, State Taxes and Royalty ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Nov-98 Disposition Volume MCF* 1. Sold Fuel 16,621 2. Reinjected 655,036 3. Flared or vented less than 1 hour 2,019 4. Flared or vented greater than 1 hour 1SUpp lemental report required--See 20 AAC 25.235) 1,281 5. Pilot and Purge 360 6. Used for lease operations Fuel Assist 265,855 11 919 7. Other TOTAL items 1-7 953,091 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby c t' y at the f regoing is true and// ~~c77orrect to Signature<_ Title 1'U~I~IC~ ~~ the best of my Date knowledge. ~zi 5 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 90.2 SCH. BLUFF 525140 9.8 Official i3se Only'F aring:Authorization>l hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 l2ic~i9s li:2s Milne Point Unit ` • Monthly Gas Flaring Incident Reporf~ For: Nov /1998 Flare Name: Flare 1 np ann vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 11/02/9815:29:00 00:01 0.4 0.0 11 /02/98 16:44:00 00:01 0.4 0.0 11/02/9816:55:00 00:05 1.5 0.3 11/02/9817:14:00 00:01 0.5 0.3 11/03/98 09:59:00 00:01 1.3 0.7 11/03/9819:57:00 00:03 0.8 0.0 11/05/98 04:55:00 00:05 1.9 0.9 11/05/98 05:08:00 00:07 3.1 3.4 11/06/98 04:58:00 00:02 1.7 1.1 11/06/98 05:12:00 00:03 1.8 1.2 11/06/9810:26:00 00:04 10.4 15.1 11/06/9810:36:00 00:09 9.5 13.3 11/06/9810:52:00 00:08 11.8 17.3 11/06/9811:08:00 00:07 9.1 11.4 11/06/9811:23:00 00:07 9.4 14.7 11/06/9811:38:00 00:07 8.2 10.9 11/06/9811:55:00 00:05 6.3 10.6 11/06/9812:06:00 00:09 11.6 15.6 11/06/9812:25:00 00:05 7.9 12.7 11/06/9812:34:00 00:11 13.7 18.9 11/06/9812:54:00 00:06 14.2 22.2 11/06/9813:07:00 00:08 11.6 16.9 11/06/9813:21:00 00:09 11.8 17.2 11 /06/98 13:40:00 00:05 10.6 15.4 11 /06/98 13:49:00 00:11 12.8 17.6 11/06/9814:07:00 00:08 9.1 13.0 11/06/9814:24:00 00:06 11.8 18.5 11/06/9814:34:00 00:11 11.9 17.1 11/06/9814:50:00 00:10 13.7 19.9 11 /06/98 15:09:00 00:06 10.2 14.7 11/06/9815:22:00 00:08 17.0 25.9 11/06/9815:38:00 00:07 7.9 10.3 11/06/9815:52:00 00:08 14.7 22.7 11/06/9816:05:00 00:10 16.5 26.4 11/06/9816:22:00 00:08 9.1 15.7 11/06/9816:35:00 00:10 14.2 23.5 11/06/9816:52:00 00:08 11.8 19.6 11/06/9817:05:00 00:10 13.4 20.8 11/06/9817:22:00 00:08 13.4 18.1 11/06/9817:38:00 00:07 8.4 13.3 11/06/9817:50:00 00:10 11.3 15.4 11 /06/98 18:12:00 00:03 4.9 8.8 11/06/98 20:53:00 00:07 8.0 8.3 BP Exploration Page 1 of 6 Milne Point, Alaska lzimi9s li:2s Milne Point Unit . ' ~ Monthly Gas Flaring Incident Repor~ For: Nov /1998 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 11/06/98 21:09:00 00:06 6.5 7.6 11/06/98 21:31:00 00:14 62.4 51.4 11/06/98 21:56:00 00:04 5.9 6.9 11/07/98 03:28:00 00:02 0.6 0.0 11/07/98 03:40:00 00:05 2.4 1.4 11/07/98 03:50:00 00:10 5.8 4.7 11/07/98 04:08:00 00:07 3.9 4.0 11/07/98 04:27:00 00:03 1.5 0.7 11/07/98 05:14:00 00:01 0.7 0.1 11/07/98 05:56:00 00:04 1.2 0.1 11/07/98 06:11:00 00:04 1.5 1.2 11/07/98 21:12:00 00:03 1.2 0.3 11/08/98 00:44:00 00:01 0.7 0.0 11/10/9814:47:00 00:43 104.8 227.9 11/10/9815:34:00 00:11 17.9 56.5 11/10/9815:56:00 00:04 3.9 11.5 11 / 12/98 02:13:00 00:02 3.8 1.6 11/12/98 02:28:00 00:02 5.0 11.0 11/12/9818:43:00 00:02 0.7 0.8 11/13/98 09:28:00 00:02 1.1 1.1 11/15/9816:35:00 00:25 35.1 98.9 11/15/9817:11:00 00:04 4.8 16.5 11/16/98 00:44:00 00:01 0.1 0.0 11/16/98 03:27:00 00:03 1.8 4.8 11/17/9817:27:00 00:03 1.8 4.9 11/18/9810:59:00 00:01 0.5 0.1 11/18/9811:14:00 00:01 1.0 3.8 11/19/9812:43:00 00:02 1.2 2.9 11/19/9819:14:00 00:01 0.2 0.1 11/19/98 23:59:00 00:01 0.0 0.0 11/20/98 01:14:00 00:01 0.1 0.0 11/20/98 01:29:00 00:01 0.1 0.0 11/20/98 03:14:00 00:01 0.1 0.0 11/20/98 03:29:00 00:01 0.2 0.1 11/20/9811:14:00 00:01 0.2 0.1 11/20/9811:29:00 00:01 0.0 0.0 11!20/9812:14:00 00:01 0.2 0.0 11/20/9813:14:00 00:01 0.2 0.1 11/20/9813:29:00 00:01 0.3 0.3 11/20/9813:44:00 00:01 0.1 0.0 11/22/98 09:59:00 00:01 1.2 3.0 11/22/9817:32:00 00:43 131.6 271.5 11/22/9818:20:00 00:10 17.2 53.9 BP Exploration Page 2 of 6 IvTilne Point, Alaska 12ia~i9s 1 i:2s Milne Point Unit Monthly Gas Flaring Incident Repo For: Nov /1998 Flare Name: Flare 1 np ann vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 11/23/98 09:58:00 00:02 1.6 4.2 11/23/9812:27:00 00:18 131.4 125.3 11/23/9812:47:00 00:13 106.4 63.9 11/23/9813:11:00 00:04 29.8 20.1 11/24/9818:13:00 00:02 0.8 0.1 11/24/9818:17:00 00:43 58.3 44.7 11/24/9819:07:00 00:08 7.1 5.0 11/24/9819:20:00 00:10 8.8 6.9 11/24/9819:44:00 00:01 0.2 0.0 11/24/98 20:25:00 00:05 5.8 3.2 11/24/98 20:40:00 00:20 28.8 21.0 11/24/98 21:02:00 00:13 17.5 13.6 11/24/98 21:18:00 00:27 34.9 25.3 11/24/98 21:46:00 00:29 40.0 29.8 11/24/98 22:20:00 00:10 15.8 12.6 11/24/98 22:33:00 00:12 14.4 9.6 11/24/98 22:53:00 00:07 7.3 5.9 11/24/98 23:06:00 00:09 16.7 12.0 11/24/98 23:19:00 00:41 46.3 33.6 11/25/98 00:09:00 00:06 11.4 7.1 11/25/98 00:16:00 00:44 56.3 42.3 11/25/98 01:13:00 00:02 2.4 2.4 11/25/98 01:19:00 00:11 17.7 12.7 11/25/98 01:33:00 00:12 15.1 10.3 11/25/98 01:55:00 00:05 4.7 4.0 11/25/98 02:04:00 00:11 9.1 5.7 11/25/98 02:20:00 00:10 10.6 8.3 11/25/98 03:07:00 00:08 16.1 11.4 11/25/98 03:22:00 00:08 10.9 6.9 11/25/98 03:40:00 00:20 24.8 18.2 11/25/98 04:06:00 00:09 9.8 7.9 11/25/98 04:26:00 00:04 2.9 1.0 11/25/98 04:34:00 00:11 10.7 8.4 11/25/98 04:49:00 00:11 10.6 7.1 11/25/98 06:11:00 00:04 3.5 1.8 11/25/98 06:36:00 00:09 8.9 5.7 11/25/98 07:06:00 00:09 13.7 9.6 11/25/9815:19:00 00:11 36.2 9.5 11/25/9815:41:00 00:04 3.9 0.6 11/25/9816:20:00 00:10 34.5 15.5 11/25/9816:33:00 00:12 25.4 13.5 11/25/9816:49:00 00:11 28.2 13.3 11/25/9817:05:00 00:10 25.1 11.5 BP Exploration Page 3 of 6 NTilne Point, Alaska l2io~li9s li:2s Milne Point Unit Monthly Gas Flaring Incident Repor~ For: Nov /1998 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 11/25/9817:17:00 00:13 42.6 22.2 11/2s/9817:40:00 OO:OS 14.9 7.2 11/25/9819:11:00 00:04 3.8 0.8 11/25/9819:17:00 00:13 14.1 6.9 11/2s/9819:35:00 00:10 13.6 6.4 11/25/98 20:10:00 00:20 35.2 16.3 11/25/98 20:37:00 00:08 10.8 6.0 11/2s/98 21:11:00 00:04 3.7 0.7 11/25/98 21:28:00 00:02 3.0 2.0 11/26/98 03:42:00 00:03 2.2 0.3 11/26/98 03:59:00 00:01 1.3 0.8 11/26/98 23:29:00 00:01 0.1 0.0 11/26/98 23:s9:00 00:01 0.1 0.0 11/27/98 00:44:00 00:01 0.1 0.0 11/27/98 OO:s9:00 00:01 0.8 0.0 11/27/98 01:28:00 00:02 0.6 0.0 11/27/98 01:44:00 00:01 0.9 0.3 11/27/98 O1:s8:00 00:02 0.4 0.0 11/27/98 02:14:00 00:01 0.1 0.0 11/27/98 02:27:00 00:03 O.s 0.0 11/27/98 02:43:00 00:02 0.9 0.0 11/27/98 03:58:00 00:02 1.0 0.0 11/27/98 04:13:00 00:02 0.8 0.0 11/27/98 04:28:00 00:02 0.7 0.0 11/27/98 04:40:00 00:05 1.6 0.2 11/27/98 04:57:00 00:03 0.7 0.0 11/27/98 05:11:00 00:04 1.1 0.0 11/27/98 Os:28:00 00:02 0.6 0.0 11/27/981s:14:00 00:01 0.2 0.0 11/27/9815:28:00 00:02 1.9 l.s 11/27/9816:43:00 00:02 2.1 1.5 11/27/9816:57:00 00:03 2.2 l.s 11/27/98 20:13:00 00:02 0.6 0.0 11/27/98 21:14:00 00:01 0.2 0.0 11/27/98 22:s9:00 00:01 0.3 0.0 11/28/98 05:14:00 00:01 0.3 0.0 11/28/9811:45:00 OO:IS 11.3 10.1 11/28/9817:41:00 00:04 2.8 2.2 11/29/98 00:28:00 00:02 1.2 0.3 11/29/98 00:36:00 00:09 10.2 9.6 11/29/98 OO:s0:00 00:10 8.8 9.3 11/29/98 01:03:00 00:27 33.7 32.7 11/29/98 01:44:00 00:01 1.5 2.0 BP Exploration Page 4 of 6 IvTilne Point, Alaska 12iosi9s ~ 1 i zs Milne Point Unit • Monthly Gas Flaring Incident Report For: Nov /1998 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 11 /29/98 02:18:00 00:12 12.0 11.2 BP Exploration Page s of 6 Milne Point, Alaska 12/(Pi/98 ~ 11:25 Milne Point Unit • Monthly Gas Flaring Incident Reporf~ For: Nov /1998 Flare Name: Flare 1 np anne vents greater t an our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment -- 11/25/98 09:30:00 05:45 1,280.7 235.1 Unplanned flare caused by a full field The shutdown cause was found and shutdown which depressured the plant corrected, then the field was re-started. Unplanned Events <=1 hour Unplanned Events > 1 hour Planned Events <=1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Unmetered Assist Gas TOTAL FLARED VOLUME Flare Assist 2,019.0 2,222.5 1,280.7 235.1 0.0 0.0 0.0 0.0 9,821.7 3,299.7 12,279.3 MSCF BP Exploration Page 6 of 6 NTilne Point, Alaska r Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point November 25, 1998 Time and duration of incident 9:30 25 November 1998 Shr.45min. Flare Volume: 1281 Assist Gas Volume: 235 This was an unplanned flaring event that occurred when a fuse failed in the PLC. The fuse failing caused a false level safety high high indication on Oil Reserve Tank: The false LSHH initiated a full field production shut down. Black smoke was observed during the initial plant blow down of this incident. The flaring was eliminated after repairs were made to the PLC and the gas compression facility was restarted. BP EXPLORATION November 19, 1998 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn. Wendy Mahan: BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Attached are the Monthly Producer's Report of Gas Disposition for the month of October 1998. Should you have any questions, please contact Bob Wilks at (907) 564-5670. Sincer ly, Fob Ro ert A. Reynolds Manager, State Taxes and Royalty 1 i,i ~~, ~ z Y ~ t i~JJV ?as~r.~ ~'~1 has Dons. Contmiss)nr~ _'~ ~r+~cr~~e ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION _ Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Oct-98 C ....i --.I i~C~ CA duo Disposition Volume MCF* ~~ 1. Sold Fuel 16,450 2. Reinjected 513,620 3. Flared or vented less than 1 hour 10,051 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 8,982 5. Pilot and Purge 255 6. Used for lease operations Fuel Assist 25.4,067 25,447 7. Other TOTAL items 1-7 828,872 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby certify t t the foregoing is true and correct to the best of my knowledge. Signature .~f'`~~'~/!~'~7// _ Title,,/ ~ Y.,t% Date //,/~~pd *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 88.1 SCH. BLUFF 525140 11.9 Official Use Only-filaring Authozization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. J Form 10-422 Rev. 4/95 11%03/98 ~17:s2 Milne Point Unit • Monthly Gas Flaring Incident Repor~ For: Oct /1998 Flare Name: Flare 1 np anne vents greater t an our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 10/08/98 01:27;00 03:18 245.6 243.8 Unplanned flaring due to a gasket leak The compressor was shut down and in C5531A injection compressor #4 repaired. cylinder. 10/10/98 03:01:00 01:14 139.0 138.9 Unpalnned IWAG shut down due to High GOR wells were shut in to lube system failure. mitigate the flare. 10/15/98 00:39:00 02:21 1,269.4 691.0 Unplanned shut down of CSS11A gas The compressor was shut down and lift compressor. A PSV sensing line repaired. broke. 10/15/98 09:21:00 02:54 2,757.5 1,300.1 Unplanned flaring due to a gas plant 'The gas plant was restarted after all shut down caused by a high pressure alarms were cleared. Numerous restart alarm. attempts were necessary on the compressors. 10/15/98 12:36:00 02:09 533.6 514.4 Unplanned IWAG shutdown due to the High GOR wells were SI to mitigate the gas plant shutdown. flare. 10/15/98 18:34:00 01:11 136.0 134.9 Unplanned IWAG shutdown due to the High GOR wells were SI to mitigate the gas plant shutdown. flare. 10/16/98 14:47:00 01:58 768.1 272.5 Unplanned flaring due to a turbine High GOR wells were SI to mitigate shutdown which load shed three flaring compressors 10/16/98 16:46:00 01:44 124.3 30.6 Unplanned flaring due to a turbine High GOR wells were SI to mitigate shutdown which load shed three flaring compressors 10/16/98 18:32:00 01:13 65.4 12.8 Unplanned flaring due to a turbine High GOR wells were SI to mitigate shutdown which load shed three flaring compressors 10/16/98 22:01:00 01:59 166.9 40.1 Unplanned flaring when the wells shut in previously during the day were brought on line 10/22/98 07:47:00 01:43 74.3 74.1 Unplanned flaring due to bad valves in The compressor was shut down and C5531A compressor. repaired. 10/27/9812:10:00 04:35 2,199.0 1,705.9 10/28/98 10:28:00 01:47 502.7 562.8 Unplanned IWAG compressor shut Three pads accounting for 2/3 of down due to automation work at the pad Milne's production were also inadvertently shut in. No further shut in were required. Flare Assist Unplanned Events <=1 hour 10,050.8 9,327.8 Unplanned Events > 1 hour 8,981.8 5,722.0 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 0.0 0.0 Unmetered Assist Gas 10,652.8 TOTAL FLARED VOLUME 19,032.6 25,702.6 MSCF BP Exploration Page 32 of 32 IvLlne Point, Alaska • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point October 8, 1998 n U Time and duration of incident 03:18 8 October 1998 3hr.18min. Flare Volume: 246 Assist Gas Volume: 244 This was an unplanned flaring event that occurred when the C-5531A injection compressor developed a gas leak on the #4 cylinder gasket. The compressor was shut down; repaired and brought back on line. No black smoke was flared during this incident. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point October 10, 1998 ~J Time and duration of incident 03:01 to 04:15 October 10, 1998 1 hr 14 min. Flare Volume: 139 Assist Gas Volume: 139 This event was in conjunction with the 1WAG compressor lubrication system failure. Wells were shut in to mitigate flaring. No black smoke events occurred during this excursion. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point October 15, 1998 Time and duration of incident 00:39 - 2 hr 21 min Flare Volume: 1,269 Assist Gas Volume: 691 Time and duration of incident 09:21 - 2 hr 54 min Flare Volume: 2,757 Assist Gas Volume: 1,300 Time and duration of incident 12:36 - 2 hr 9 min Flare Volume: 534 Assist Gas Volume: 514 Time and duration of incident 18:34 - 1 hr 11 min Flare Volume: 136 Assist Gas Volume: 135 The first Flaring event at 00:39 hrs was due to an unplanned shut down of C-SS11A gas lift compressor. The compressor was shut down to repair of broken sensing line on PSV-5575A. The second flaring event at 09:21 hrs was due to an unplanned shut down of gas compressor module. The compressors shut down was due to an automated safety device PSHH on the discharge of C-5501-A lsr stage. The third & fourth event was due to an unplanned shut down of the 1WAG compressor. The compressor was shutdown when a PSHH shutdown alarm in module 55 caused the IWAG injection gas compressor to shut-down on low suction pressure. Maintenance crews were dispatched to correct problem. Once IWAG injection compressor was returned to service the flare was eliminated. Several hi GOR wells were shut in to mitigate flaring in all four flaring events. The Compressors were put back on line and the flaring stopped. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point October 16, 1998 Time and duration of incident 14:47 - 1 hr 58 min Flare Volume: 768 Assist Gas Volume: 273 Time and duration of incident 16:46 - 1 hr 44 min Flare Volume: 124 Assist Gas Volume: 31 Time and duration of incident 18:32 - 1 hr 13 min Flare Volume: 65 Assist Gas Volume: 13 This was an unplanned flaring event which occurred when the 08 power turbine was shut-down when a faulty wire connection tripped the TSHH on the fuel gas manifold of 08 turbine. When this connector failed it caused the turbine to initiate a fast shut down of the turbine. The automated load shed system tripped breakers on three gas compressors which sent gas to the flare header. Maintenance crews were dispatched to correct the problem on 08. Several high GOR wells were shut in to mitigate flaring. The turbine & Compressors were put back on line and the flaring stopped. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point October 16, 1998 Time and duration of incident 22:01 - 1 hr 59 min Flare Volume: 167 Assist Gas Volume: 40 This event was in conjunction with the unplanned shut down of the OS power turbine. Wells were shut in to mitigate flaring. When wells were being brought back on a gas slug came through the production separators causing this event. After it passed through the system flaring stopped. • BP Exploration -Milne Point October 22, 1998 • Flaring Incident Report (exceeding 1 hour) Time and duration of incident 07:47 - 1 hr 43 min Flare Volume: 74 Assist Gas Volume: 74 The Flaring event was due to an unplanned shut down of C-5531A compressor. The compressor was shut down to repair bad valves. Maintenance crews were dispatched to correct the problem. The Compressor was put back on line and the flaring stopped. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point October 28, 1998 f~ U Time and duration of incident 10:28 28 October 1998 lhr.47min. Flare Volume: 503 Assist Gas Volume: 563 This was an unplanned flaring event that occurred when work was being performed on the automation system at C-pad. An erroneous bit was latched causing a production shutdown of F and L pad as well as the C-pad injection gas compressor (IWAG) and line heater. Maintenance crews were immediately sent to the IWAG to restart the unit. No additional wells were shut in as 2/3 of the field's productivity was shut in already and the flare volume was the gas in the system working itself through the facilities. No black smoke was observed during this incident. BP EXPLORATION October 19, 1998 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn. Wendy Mahan: BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Attached are the Monthly Producer's Report of Gas Disposition for the month of September 1998. Should you have any questions, please contact Bob Wilks at (907) 564-5670. Sincerely, l:(,. Robert A. Reynolds Manager, State Taxes and Royalty ~ ~ t e ~ ,. 'Y5; l ~ ~. ~t .:''.4tt4U~ 1„ ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION G. i1t :i. C3 ~ ~ . ~ -~ S F _~ ~- ~-~ K.f.} o ~. ~' ~`~ ui' n ` o Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Sep-98 Disposition Volume MCF* 1. Sold Fuel 15,067 2. Reinjected 510,523 3. Flared or vented less than 1 hour 4,025 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 6,233 5. Pilot and Purge 2,010 6. Used for lease operations Fuel Assist 231,845 18,209 7. Other TOTAL items 1-7 787,912 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby ce i t t the foregoing is true and correct to the best of my knowledge. Signature Title ~VIL. 5%lA°~~ ~PCSC'Y (AWN Date ~~ ~'j *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 88.6 SCH. BLUFF 525140 11.4 Official Uss Only-Flaring,AUthar.ization>l hr;- 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 10/04/98 11:17 Milne Point Unit - • Monthly Gas Flaring Incident Repor~ For: Sep /1998 Flare Name: Flare 1 np ann vents greater t an our Duration -Volume (MSCF) - Start Time (hh:mm) Flare Assist Cause Comment 09/07/9817:55:00 01:05 09/08/9810:10:00 03:05 09/13/98 03:32:00 01:13 09/17/98 06:56:00 01:34 193.4 343.6 Unplanned flaring due to IWAG Mechanics were dispatched and the compressor shutdown. compressor was re-started. 538.8 1,022.4 Unplanned shutdown of the IWAG Maintenance was immediately injection compressor due to a PLC dispatched. failure 60.8 90.6 Unplanned flaring, C5531A gas Maintenance crews were dispatched injection compressor developed a leak immediately to fix the leak. on the compressor discharge and was shut in. 520.4 212.5 Unplanned Haze event due to a field Flare was due to the vessels and shutdown caused by a false high compressors de-pressuring. The field pressure alarm on the slug catcher. was re-started. BP Exploration Page 12 of 13 Milne Point, Alaska 10/04/98 11:17 Milne Point Unit ' ~ Monthly Gas Flaring Incident Repor~ For: Sep /1998 Flare Name: Flare 1 ann vents xc mg our o umne xc ing Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 09/03/98 10:37:00 05:08 1,721.4 1,678.9 Planned flaring during maintenance on High GOR and all gas lift wells were SI C5501 B gas lift compressor to mitigate Haze 09/05/98 06:49:00 03:26 1,104.1 1,293.6 Planned flaring for C5501/11B gas lift All lift gas wells and select high GOR compressor maintenance. wells were shut in to mitigate the flare. 09/24/98 05:21:00 01:24 48.0 47.6 Planned flaring for turbine All gas lift wells and numerous other maintenance during a TAPS proration wells were shut in to mitigate the flare. 09/24/98 20:10:00 03:35 124.3 123.7 Planned flaring for turbine All gas lift wells and numerous other maintenance during a TAPS proration wells were shut in to mitigate the flare. 09/25/98 04:18:00 02:57 254.2 175.8 Planned flaring for a slug catcher The slug catcher was filled with safeout during a TAPS proration. nitrogen and opened to the Haze to reduce LELs. 09/27!98 08:07:00 07:53 1,667.3 124.7 Planned Haze event after a TAPS High and medium GOR and all gas lift proration. Main compressors and power wells remained off during this event. turbines were taken out of service for maintenance. Flare Assist Unplanned Events <=1 hour 4,025.2 4,096.0 Unplanned Events > 1 hour 1,313.4 1,669.1 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 4,919.3 3,444.3 Unmetered Assist Gas 11,010.0 TOTAL FLARED VOLUME 10,257.9 20,219.3 MSCF BP Exploration Page 13 of 13 IvTilne Point, Alaska • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point September 3, 1998 • Time and duration of incident: 10:37 August 28, 1998 5 hr 8 min. Flare Volume: 1721 Assist Gas Volume: 1679 This event was a planned flaring that occurred during maintenance of C-SSO1B compressor. All gas lift wells and several other high GOR wells were S/I to mitigate flaring After maintenance was completed on the compressor, it was restarted and the flaring was eliminated. i Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point September 5, 1998 Time and duration of incident: 06:49 September 5, 1998 3 hr 26 min. Flare Volume: 1104 mcsf Assist Gas Volume: 1294 mscf. This event...was an planned flaring event thatoccurred when Compressor C-SSOI/11 B was shutdown:for maintenance. All Gas. Lift wells were shut-in to mitigate the flaring. The maintenance was rapidly completed. The compressor was started and the flaring< stopped. ~ s Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point September 07, 1998 Time and duration of incident: 17:55 September 07, 1998 O1 hr OS min. Flare Volume: 193 mcsf Assist Gas Volume: 344mscf. This event was an unplanned flaring event that occurred when C-Pad `s IWAG compressor. shutdown. The maintenance personnel were contacted of the problem. The IWAG was started and the flaring ended. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point September 8, 1998 Time and duration of incident: 10:10 September 8, 1998 3 hr OS min. Flare Volume: 549 mcsf Assist Gas Volume: 1022 mscf. This event was an unplanned flaring event that occurred when a PLC malfunction shutdown the C-pad IWAG injection compressor: High GOR C pad wells were SI to mitigate flaring. The PLC was changed out and the compressor brought on line with no additional problems. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point September 13, 1998 • Time and duration of incidents 02:23 - 1 hr 13 min Flare Volume: 61 Assist Gas Volume: 91 A un-planned flaring event occurred when the C-5531-A injection gas compressor was shutdown due to a gas leak on the discharge of compressor. Once the gasket was replaced the compressor was returned to service with no further flaring. Flaring Incident. Report (exceeding 1 hour) BP Exploration -Milne Point September 17, 1998 Time and duration ,of incidents 06:56 hrs - 1:34 hr Flare Volume: 520 Assist Gas Volume: 212 This was an unplanned flaring event that occurred when a High Pressure Alarm was tripped on the Slug Catcher. A wire to the alarm was unintentionally moved during a construction project causing a Field Production Shutdown. Production was restarted with no further incidents. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point September 24, 1998 • Time and duration of incident: 05:21 September 24, 1998 lhr 24 min. 20:10 September 24, 1998 3hr 35 min. Flare Volume: 48 mcsf Assist Gas Volume: 47.6 mscf. 124 mscf 124 mscf These were planned flaring events that occurred prior to the scheduled Trans Alaska Pipeline Service (Alyeska) slowdown. The 07 turbine was taken off line for maintenance. This necessitated one compression train being shut down. All gas lift wells and numerous high GOR wells were shut in to mitigate flaring. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point September 25, 1998 • Time and duration of incident: 04:18 September 25, 1998 2 hr 57 min. Flare Volume: 254 mcsf Assist Gas Volume: 176 mscf. This event was an planned flaring event that occurred when Slugcatcher V-5317 was being safed-out and purged. This was-part of the scheduled Trans Alaska Pipeline Service (Alyeska) slowdown. The Slugcatcher was filled with nitrogen and then opened to flare to reduce the Lower Explosive Limit concentration. This event was a continuation of the previous day's activities. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point September 27, 1998 Time and duration of incident 08:07 September 27, 1998 7 hr 53min. Flare Volume: 1,667 Assist Gas Volume: 125 This event was a planned flaring event that occurred- after a scheduled Trans Alaska Pipeline Service (Alyeska) slowdown. Milne Point field was shut down for opportunity maintenance. Gas lift compressor and gas power turbines were taken out of service for maintenance. All gas lift and numerous high GOR wells were left shut-in to mitigate flaring during start up. Flaring stopped when the process facility was restarted after the shut down. ~ ~ BP EXPLORATION September 18, 1998 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn. Wendy Mahan: BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Attached are the Monthly Producer's Report of Gas Disposition for the month of August 1998 . Should you have any questions, please contact Bob Wilks at (907) 564-5670. Sincerely, Robert A. Reynolds Manager, State Taxes and Royalty ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION ' Facility Milne Point Operator BP Exploration (Alaska) Inc. Field(s) Milne Point Month/Year of Disposition Aug-98 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold Fuel 16,177 Pool Name KUPARUK Code 525100 Percent 89.2 SCH. BLUFF 525140 10.8 2. Reinjected 587,975 3. Flared or vented less than 1 hour 1,968 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 6,893 5. Pilot and Purge 2,077 6. Used for lease operations Fuel 251,689 Assist 20,163 7. Other TOTAL items 1-7 886,942 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby certif hat t e foregoing is true and correct to the best of my knowledge. Signature ,~f Title fib[". ,fr`ia/ ~~ST Date d g Official Use Only-Flaring Authozization>l hr, 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 1OK422 Rev. 4/95 09/02/98 11:33 Milne Point Unit • Monthly Gas Flaring Incident Report For: Aug /1998 Flare Name: Flare 1 (Unplanned Events greater th an 1 hour Duration -Volume (MSCF) Start Time rob~nlm) Flare Assist Cause Comment 08/14/98 10:09:00 02:21 114.4 228.2 This was an unplanned flaring event Gas injection compressor C5531A was that occurred when field production was S/D to perform maintenance on the #2 cut back due to an unplanned TAPS cylinder. Maintenance crews were event on the pipeline. dispatched to make repairs. Some high GOR wells were S/I to mitigate flaring. 08/15/98 07:06:00 03:24 673.5 670.8 This was an unplanned flaring event Numerous high GOR wells were S/I to that occurred when the 08 power mitigate the flare. No black smoke generation turbine unexpectedly S/D occurred during this event. caused by a false high reading on a temperature transmitter. BP Exploration Page 6 of 7 Milne Point, Alaska 09/02/98 11:33 Milne Point Unit .Monthly Gas Flaring Incident Report For: Aug /1998 Flare Name: Flare 1 nne vents xcee ing our o umne xcee mg Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 08/02/98 20:18:00 07:42 1,994.5 1,838.6 This was a planned flaring event that occurred while CSS11A Compressor was shutdown for repairs. 08/27/98 08:16:00 09:14 1,422.9 2,152.4 This was a planned flaring event that occurred when the IWAG injection compressor was S/D due to planned maintenance. 08/28/98 09:51:00 11:09 808.5 1,204.2 This was a planned flaring event that occurred during maintenance of C5531A injection compressor. 08/28/98 21:07:00 01:53 111.0 166.4 This was a planned flaring event that occurred during maintenance of C5531A injection compressor. 08/29/98 10:46:00 11:44 1,768.3 1,629.6 This was a planned flaring event that occurred during maintenance of CSS11B and 5531B injection compressors. Numerous high GOR wells were shut in to mitigate the flare condition. High GOR production wells were S/I to mitigate the flare. The compressor was returned to service and the flare was eliminated. Numerous high GOR wells were S/I to mitigate the flare. The compressor was returned to service and the flare was eliminated. Numerous high GOR wells were S/I to mitigate the flare. The compressor was returned to service and the flare was eliminated. Ten high GOR wells were S/I to mitigate flaring. The compressor maintenance was completed and the flaring event eliminated. Flare Assist Unplanned Events <=1 hour 1,967.6 2,972.9 Unplanned Events > 1 hour 787.9 898.9 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 6,105.1 6,991.4 Unmetered Assist Gas 11,377.0 TOTAL FLARED VOLUME 8,860.6 22,240.2 MSCF BP Exploration Page 7 of 7 Milne Point, Alaska C~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point August 03, 1998 • Time and duration of incident 20:18 02 August 1998 7 hr 42 min. Flare Volume: 1995 Assist Gas Volume: 1839 This event was a planned flaring event that occurred while C-551 lA Compressor was Shutdown for repairs. Numerous high GOR wells were shut-in to mitigate condition. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point August 14, 1998 Time and duration of incidents 10:09 - 2 hr 21 min Flare Volume: 114 Assist Gas Volume: 228 A un-planned flaring event occurred when field production was cut back due to a TAPS event on the pipeline. Gas injection compressor C-5531-A was shut-down to perform maintenance on the #2 cylinder. Maintenance crews were dispatched to make repairs. Some high GOR wells were shut-in to mitigate flaring. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point August 15, 1998 Time and duration of incident 07:06 15 August 1998 3 hr 24 min. Flare Volume: 673 Assist Gas Volume: 671 This event was an unplanned flaring event that occurred when the 08 power generation turbine unexpectedly shutdown caused by a false high reading on a temperature transmitter . Numerous high GOR wells were shut-in to mitigate condition. No black smoke occurred during this event. C~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point August 27,1998 Time and duration of incidents 08:16 for 9hrs. 14 min. Flare Volume: 1,423 Assist Gas Volume: 2,152 This event was a planned flaring event that occurred when the IWAG injection gas compressor was shutdown due to planned maintenance High GOR production wells were shut-in to mitigate flaring. Compressor was returned to service and the flare was eliminated. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point August 28, 1998 i Time and duration of incident 09:51 to 21:00 August 28, 1998 11 hr 09 min. - 21:07 to 23:00 August 28, 1998 1 hr. 53 min. Flare Volume: 919 Assist Gas Volume: 1370 This event was a planned flaring that occurred during maintenance of C- 5531A, compressor, several hi GOR wells S/I to mitigate flaring i .~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point August 29, 1998 • Time and duration of incident 10:46 to22:30 August 29, 1998 11 hr 44 min. Flare Volume: 1768 Assist Gas Volume: 1630 This event was a planned flaring that occurrE~d during maintenance of C- 5511 B & 5531 B compressors, 10 high GOR wells S/I to mitigate flaring. The compressor maintenance was completed and the flaring stopped. BP EXPLORATION August 14, 1998 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn. Wendy Mahan: BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Attached are the Monthly Producer's Report of Gas Disposition for the month of July 1998 . Should you have any questions, please contact Bob Wilks at (907) 564-5670. Sincerely, ,1..~( Robert A. Reynolds Manager, State Taxes and Royalty ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Jul-98 • • Disposition Volume MCF* 1. Sold Fuel 16,340 2. Reinjected 574,420 3. Flared or vented less than 1 hour 1,655 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 4,515 5. Pilot and Purge 2,077 6. Used for lease operations Fuel Assist 257,180 15,302 7. Other TOTAL items 1-7 871,489 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: il. Transferred to: Remarks: I hereby certify hat the foregoing is true and correct to the best of my knowledge. ~zoau c?il/lj Signature Title .%~..0 L ySf Date ~/D *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 89.4 SCH. BLUFF 525140 10.6 Official Use Only-Flaring Authorization>l hx. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 08/02/98 09:45 Milne Point Unit • • Monthly Gas Flaring Incident Repor~ For: Jul /1998 Flare Name: Flare 1 np anne vents greater t an our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 07/09/98 17:15:00 11:30 1,698.9 2,094.6 This was an unplanned Hazing event Operations & maintenance staff were - a ~ ; ~ ~ caused by an emergency Fire & Gas S/Dimmediately dispatched to make repairs on the PU-0007 power turbine, caused & production wells were S/I to mitigate by three circuit relay failures in the Hazing. Repairs were made, the power F&G control panel. Load shed system turbine restarted, and Hazing was S/D C-5501/11A which caused flaring stopped. from the oil separation vessels. 07/11/98 17:57:00 01:33 239.7 426.0 This was an unplanned Hazing event The gas compression facility efficiency - E 9 :3 a that occurred due to high ambient became drastically reduced b/c of the temperature. inability to cool the processed gas. Ambient temperature dropped shortly after the event commenced which _ eliminated the flaring. 07/12/98 09:46:00 04:59 1,674.7 531.3 Unplanned event caused by a full field Operations and maintenance staff were - »-; $s_ shutdown initiated by a blown fuse immediately dispatched to make repairs. during removal of a hazd jumper while During field ramp-up, the gas performing maintenance on the HH compressors had a problem w/ low level switch on the oil reserve tank. suction pressure and S/D. Flaring Load shed S/D C-5501/11AA which stopped after the gas facility was caused flaring off the oil sep vessels returned to normal operation. 07/12/98 16:51:00 04:09 153.5 215.3 This was an unschedule event caused by Maintenance crews were dispatched and z ~ o o a PSV failure on the low pressure fuel flaring was halted when the faulty PSV gas system. was identified, reseaed, and returned to service. 07/19/98 02:11:00 02:34 748.2 720.1 An unplanned flaring event occurred High GOR wells were S/I to mitigate when the Cpad process module was S/D Hazing. Once the incident was under c+~ ,~,,, by an ESD when the C09 production control the IWAG injection compressor well choke washed out and vented gas was returned to service and the Haze into the module. The IWAG injection was eliminated. compressor S/D causing gas to vent to the Haze tip. Flare Assist Unplanned Events <=1 hour 1,655.5 2,014.4 Unplanned Events > 1 hour 4,515.0 3,987.4 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF O,p 0.0 Unmetered Assist Gas 11,377.0 TOTAL FLARED VOLUME 6,170.5 17,378.8 MSCF BP Exploration Page 4 of 4 NTilne Point, Alaska • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point July 9 & 10, 1998 Time and duration of incidents 17:15 - 11 hr 30 min ~ - Flare Volume: 1699 Assist Gas Volume: 2095 This was an unplanned flaring event caused by an emergency fire and gas shut down on the PU-0007 power turbine. The event was caused by a failure of three circuit relays in the fire and gas control panel. The load shed system. shut down C-5501/11A which caused flaring from the oil separation vessels. Operations and maintenance-staff were immediately dispatched to make repairs.. Production wells were shut in to mitigate the flaring. Repairs were made to the fire and gas control system and the power turbine was restarted. The flaring stopped after the facility was returned to normal operation. • • BPX BLACK SMOKE REPORT MILNE POINT Facility: MILNE POINT Report # 98-02 BLACK SMOKE FLARING Date and Time of Flaring: Date: 7-9-98 Duration of Black Smoke Produced: Time: 17:15 0 hrs 50 min Was the Black Smoke Intermittent?: Yes X No Initial Cause for Black Smoke Event: (identify any AOCP permitted equipment, if involved) Milne Point's 07 Power turbine shut down due to a failure in a circuit relay inside the fire and gas control panel. When the relay failed, it activated a fast shut down of the power turbine. Problems with the assist gas system also occurred and manual intervention was required. Action Taken to Stop Btack Smoke Flaring: Several production wells were shut in to mitigate flaring. The assist gas system was manually operated to eliminate the black smoke during the flaring event. Maintenance personnel made repairs to the 07 power turbine, and assist gas controllers. All of the process equipment was then returned to normal service. Type of Material Burned: (Check One) Gas: Natural Gas Other: N/A Approximate Volume Flared which Created Black Smoke: 117 MSCF .Black Smoke was Result of: (Check One) Flare Relief Valve: Other: Ambient Air Temperature: 47 Wind Velocity :13-28 mph Direction: Time Taken: 18:00 When black smoke is produced for more than three (3) minutes, notification must be made within 24 hours to the Alaska Department of Environmental Conservation. NOTIFICATION: By direction of BPX Milne Production Supervisor, notification was made to ADEC by: ^ Phone: (907) 465-5100 ADEC ^ Phone: (907) 271-4336 (answering machine after hours/weekends) ^ FAX: (907) 465-5129 (confirmation report must be attached) Notification Made By Controlled Slowdown: X (Name) (Date) (Time) Milne Point Production Supervisor Date FAX To: Allison Cooke, Environmental Compliance, 564-5020 • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point July 11, 1998 Time and duration of incident 17:57 1 hr 33 min. Flare Volume: 233.7 Assist Gas Volume: 426.0 • This was an unplanned flaring event that occurred due to high ambient temperature. The gas compression facility efficiency became drastically reduced because of the inability to cool the processed gas. Ambient temperature dropped shortly after this event occurred, which eliminated the flaring. • • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point July 12, 1998 Time and duration of incidents 09:46- 4 hr 59 min Flare Volume: 1675 Assist Gas Volume: 531 This was an unplanned flaring event caused by an unplanned field shutdown -while performing maintenance on .the HH level switch on the oil reserve tank. While :removing a hard jumper, a fuse blew creating the field shutdown. The load shed system-shut down- C-5501/11Awhkh-caused flaring from the oil separation vessels. Operations and - maintenance staff were immediately dispatched to make repairs... While the field was being ramped up, the gas compressors had a problem with low suction pressure and shut- down.. The flaring stopped after the gas facility was returned to normal operation. Time and duration of incidents 16:51- 4 hr 09 min Flare Volume: 154 Assist Gas Volume: 215 This was an unplanned flaring event caused by a PSV failure on the low pressure fuel gas system. When the PSV was identified it was reseated and returned to service. • BPX BLACK SMOKE REPORT MILNE POINT Facility: MILNE POINT Report # 98-03 BLACK SMOKE FLARING Date and Time of Flaring: Date: 7-12-98 Time: 09:46 Duration of Black Smoke Produced: 2 hrs 20 min Was the Black Smoke Intermittent?: Yes X No Initial Cause for Black Smoke Event: (identify any AOCP permitted equipment, if involved) Milne Point had a complete field shutdown caused when a fuse failed while performing maintenance on the instrumentation on the oil reserve tank high high level switch. Problems with the assist gas and gas flowback systems and low suction pressures on the gas compressors also occurred and manual intervention was required once the gas facility was brought on line. Action Taken to Stop .Black Smoke Flaring: The produced gas flowback system shutdown on low temperature causing the assist gas system to shutdown. Maintenance and operations personnel identified problem switches and made repairs. Once the gas facility was pressured up the assist gas' system was returned to service to eliminate the black smoke. All of the process equipment was then returned to normal service. The black smoke was then elliminated. Type of Material Burned: (Check One) Gas: Natural Gas Other: N/A Approximate Volume Flared which Created Black Smoke: 987 MSCF Black Smoke was Result of: (Check One) Flare Relief Valve: Controlled Slowdown: X Other: Ambient Air Temperature 51 Wind Velocity : 9-15 mph Direction: wsw Time Taken: 1030 When black smoke is produced for more than three (3) minutes, notification must be made within 24 hours to the Alaska Department of Environmental Conservation. NOTIFICATION: By direction of BPX Milne Production Supervisor, notification was made to ADEC by: ^ Phone: (907) 465-5100 ADEC ^ Phone: {907) 271-4336 (answering machine after hours/weekends) ^ FAX: (907) 465-5129 (confirmation report must be attached) Notification Made By (Name) (Date) (Time) Milne Point Production Supervisor Date FAX To: Allison Cooke, Environmental Compliance, 5645020 _ • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point July 19, 1998 Time and duration of incident 02:11 2 hr 34 min. Flare Volume: 748 Assist Gas Volume: 720 This was an unplanned flaring event that occurred when C-pad process module was shut- down by an ESD when the C-9 production well choke washed out and vented gas into the' module. IWAG injection compressor was shutdown along with this event causing gas to vent to the flare tip. Production wells were shut-in to mitigate flaring. Once the incident was under control the IWAG injection compressor was returned to service and the flare was eliminated. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 22, 1998 Time and duration of incident 21:33 21 June 1998 2 hr 42 min. Flare Volume: 163 Assist Gas Volume: 244 Time and duration of incident .01:51 22 June 1998 1 hr 24 min. Flare Volume: 137 Assist Gas Volume: 186 Time and duration of incident 04:03 22 June 1998 1 hr 12 min. Flare Volume: 120 Assist Gas Volume: 179 Time and duration of incident 05:16 22 June 1998 1 hr 59 min. Flare Volume: 180 Assist Gas Volume: 271 Time and duration of incident 07:49 22 June 1998 2 hr 11 min. Flare Volume: 118 Assist Gas Volume: 177 Time and duration of incident 11:46 22 June 1998 1 hr 44 min. Flare Volume: 86 Assist Gas Volume: 128 Time and duration of incident 16:10 22 June 1998 1 hr 20 min. Flare Volume: 70 Assist Gas Volume: 105 This event was an unplanned flaring event that occurred while Compressor C-5531B was Shutdown for valve repair. Numerous high GOR wells were shut-in to mitigate condition. ~~; _ ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Jun-98 Disposition Volume MCF* 1. Sold Fuel 15,938 2. Reinjected 401,516 3. Flared or vented less than 1 hour 16,311 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 7,474 5. Pilot and Purge 2,010 6. Used for lease operations Fuel Assist 247,001 62,924 7. Other TOTAL items 1-7 753,174 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby c tify hat the foregoing is true and correct to the best of my knowledge. Signature ~.~ _ ~ ~~ Title i ~W i~ b L~Ef T'iAik ~-/~1 Date ~ /~,} /~~, *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 89.0 SCH. BLUFF 525140 11.0 Official Us'e Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 07!06/98 02:53 Milne Point Unit Monthly Gas Flaring Incident Report For: Jun /1998 Flare Name: Flare 1 np ann vents greater t an our Duration -Volume (MSCF) Start Time (tih~nlm) Flare Assist Cause Comment 06/03/98 13:02:00 01:43 1q--9 S 06/13/98 05:47:00 03:13-o~ua 06/14/98 22:47:00 01:58 °°~S - oS- 5 06/22/98 04:03:00 01:12 06/25/98 23:31:00 01:14 ~o~S' 168.3 335.4 184.1 285.9 81.9 80.8 IWAG 120.3 179.4 96.4 281.9 IWAG Unplanned flaring that occurred when the 2nd and 3rd stage injection gas compressor was S/D for head gasket repairs. Maintenance crews were dispatched ASAP and when the compresor was RTS the flare was eliminated. This was an unplanned flaring event that occurred during maintenace of the IWAG gas injection compressor that took longer than originally planned. Numerous high GOR wells were S/I to mitigate flare. BP Exploration Page 24 of 27 Milne Point, Alaska 07/06/98 oz:s3 Milne Point Unit Monthly Gas Flaring Incident Repor~ For: Jun /1998 Flare Name: Flare 1 (Planned Events Exceeding 1 hour UK Volumne Exceeding SUUU MJt;IN' Duration -Volume (M5CF) Start Time (hh:mm) Flare Assist Cause Comment 06/01/98 09:46:00 02:44 223.9 670.2 IWAG planned maintenance A planned flaring event occurred when the IWAG injection compressor was S/D for planned maintenance, over 4 to s days, to tune the engine. Maintenance crews aze making repairs and some high GOR wells were S/I to mitigate Hazing. 06/01/98 12:33:00 06a7 600.2 1,792.3 IWAG planned maintenance A planned flaring event occurred when the IWAG injection compressor was S/D for planned maintenance, over 4 to s days, to tune the engine. Maintenance crews are making repairs and some high GOR wells were S/I to mitigate flaring. 06/02/98 04:16:00 01:29 111.7 335.1 IWAG planned maintenance A planned Hazing event occurred when the IWAG injection compressor was S/D for planned maintenance, over 4 to 5 days, to tune the engine. Maintenance crews aze making repairs and some high GOR wells were S/I to mitigate flaring. 06/02/98 18:16:00 03:29 347.0 689.9 IWAG planned maintenance A planned flaring event occurred when the IWAG injection compressor was S/D for planned maintenance, over 4 to s days, to tune the engine. Maintenance crews aze making repairs and some high GOR wells were S/I to mitigate flaring. 06/02/98 22:46:00 02:14 228.1 450.9 IWAG planned maintenance A planned flaring event occurred when the IWAG injection compressor was S/D for planned maintenance, over 4 to s days, to tune the engine. Maintenance crews are making repairs and some high GOR wells were S/I to mitigate Hazing. 06/03/98 03:46:00 01:29 150.7 300.6 IWAG planned maintenance A planned flaring event occurred when the IWAG injection compressor was S/D for planned maintenance, over 4 to 5 days, to tune the engine. Maintenance crews aze making repairs and some high GOR wells were S/I to mitigate flaring. 06/03/98 Os:16:00 Ol:s9 201.8 398.4 IWAG planned maintenance A planned flaring event occurred when the IWAG injection compressor was S/D for planned maintenance, over 4 to s days, to tune the engine. Maintenance crews are making repairs and some high GOR wells were S/I to mitigate flaring. 06/03/98 07:17:00 01:13 122.2 237.1 IWAG planned maintenance A planned flaring event occurred when the IWAG injection compressor was S/D for planned maintenance, over 4 to 5 days, to tune the engine. Maintenance crews aze making repairs and some high GOR wells were S/I to mitigate flaring. 06/03/98 09:31:00 01:14 115.9 231.1 IWAG planned maintenance A planned Hazing event occurred when the IWAG injection compressor was S/D for planned maintenance, over 4 to RECEIVED s days, to tune the engine. Maintenance crews aze making repairs and some high GOR wells were S/I to mitigate flaring. 06/03/98 20:46:00 06:14 691.8 1,2ss.6 IWAG pla~-~,d mainte~p e cJ l~` L ~ 7 I~y~ A planned flaring event occurred when the IWAG injection compressor was S/D for planned maintenance, over 4 to AlaSlca OiJ & Gas Cons. Commission 5 days, to tune the engine. Maintenance Anchorage crews aze making repairs and some high GOR wells were S/I to mitigate Hazing. BP Exploration Page 2s of 27 Milne Point, Alaska 07/06/98 02:53 Milne Point Unit Monthly Gas Flaring Incident Report• For: Jun /1998 Flare Name: Flare 1 anne vents gcee ing our o umne gcee ing Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 06/04/98 03:32:00 05:58 621.2 1,054.6 IWAG planned maintenance A planned flaring event occurred when the IWAG injection compressor was S/D for planned maintenance, over 4 to 5 days, to tune the engine. Maintenance crews are making repairs and some high GOR wells were S/I to mitigate flaring. 06/05/98 21:24:00 01:51 344.0 1.7 IWAG planned maintenance A planned flaring event occurred when -z,.~. ~ S the IWAG injection compressor was S/D for planned maintenance, over 4 to 5 days, to tune the engine. Maintenance V` crews are making repairs and some high GOR wells were S/I to mitigate flaring. 06/20!98 02:34:00 07:11 1,121.4 1,117.3 TAPS planned event This event was a planned flaring event that occurred during a planned TAPS cutback. Gas lift compressors and gas power turbine were taken out of service for maintenance. Numerous high GOR wells were S/I to mitigate the flare. 06/20/98 21:11:00 02:49 302.0 365.7 TAPS planned event This event was a planned flaring event that occurred during a planned TAPS cutback. Gas lift compressors and gas power turbine were taken out of service for maintenance. Numerous high GOR wells were S/I to mitigate the flare. 06/21/98 00:01:00 06:59 612.9 656.1 TAPS planned event This event was a planned flaring event that occurred durmg a planned TAPS cutback. Gas lift compressors and gas power turbine were taken out of service for maintenance. Numerous high GOR wells were S/I to mitigate the flare. 06/21/98 21:33:00 02:42 162.8 243.7 TAPS planned event This event was a planned flaring event that occurred during a planned TAPS cutback. Gas lift compressors and gas power turbine were taken out of service for maintenance. Numerous high GOR wells were S/I to mitigate the flare. 06/22/98 01:51:00 01:24 137.3 186.1 TAPS planned event This event was a planned flaring event that occurred during a planned TAPS cutback. Gas lift compressors and gas power turbine were taken out of service for maintenance. Numerous high GOR wells were S/I to mitigate the flare. 06/22/98 05:16:00 01:59 180.1 271.2 TAPS planned event This event was a planned flaring event that occurred durmg a planned TAPS cutback. Gas lift compressors and gas power turbine were taken out of service for maintenance. Numerous high GOR wells were S/I to mitigate the flare. 06/22/98 07:49:00 02:11 117.9 176.5 TAPS planned event This event was a planned flaring event that occurred during a planned TAPS cutback. Gas lift compressors and gas power turbine were taken out of service for maintenance. Numerous high GOR wells were S/I to mitigate the flare. 06/22/98 11:46:00 01:44 86.0 128.5 TAPS planned event This event was a planned flaring event that occurred during a planned TAPS cutback. Gas lift compressors and gas power turbine were taken out of service for maintenance. Numerous high GOR wells were S/I to mitigate the flare. BP Exploration Page 26 of 27 1Vlilne Point, Alaska 07/06/98 o2:s3 Milne Point Unit . Monthly Gas Flaring Incident Repor~ For: Jun /1998 Flare Name: Flare 1 (Planned Events Exceeding 1 hour OR Volumne Exceeding SUUU MSCF Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 06/22/98 16:10:00 01:20 70.1 104.8 TAPS planned event This event was a planned flaring event that occurred during a planned TAPS cutback. Gas lift compressors and gas --~__.________.... power turbine were taken out of service for maintenance. Numerous high GOR wells were S/I to mitigate the flare. 06/24/98 13:46:00 01:14 103.0 203.4 IWAG planned maintenance This was a planned flaring event that occurred while the IWAG gas injection compressor was S/D for repairs on a glycol leak. Numerous high GOR wells were S/I to mitigate the flare. 06/25/98 14:08:00 01:22 171.3 404.0 IWAG planned maintenance This was a planned flaring event that occurred while the IWAG gas injection compressor was S/D for repairs on a glycol leak. Numerous high GOR wells were S/I to mitigate the flare. Flare Assist 41,485.2 1,163.4 0.0 11,274.9 11,010.0 Unplanned Events <=1 hour 16,311.3 Unplanned Events > 1 hour 651.1 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 6,823.0 Unmetered Assist Gas TOTAL FLARED VOLUME 23,785.4 64,933.4 MSCF BP Exploration Page 27 of 27 Milne Point, Alaska Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 1, 1998 U Time and duration of incidents 09:46 - 9 hr 41 min Flare Volume: 824 Assist Gas Volume: 2,462 A planned flaring event occurred when the IWAG injection compressor was S/D for planned maintenance: Maintenance crews are working on compressor over the next 4 to 5 - days in order to tune the IWAG engine. Maintenance crews were dispatched to make repairs. Some high GOR wells were shut-in to mitigate flaring. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 2, 1998 L J Time and duration of incidents 04:16 - 4 hr 58 min Flare Volume: 459 Assist Gas Volume: 1025 Planned flaring event occurred because the IWAG injection gas compressor is shuf= down for engine overhaul. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 3, 1998 Time and duration of incidents 00:01 - 9 hr 52 min Flare Volume: 987 Assist Gas Volume: 1953 i Planned flaring event occurred because the IWAG injection gas compressor is 'shut down for engine overhaul. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 4, 1998 Time and duration of incidents 00:01 - 12 hr 12 min Flare Volume: 1313 Assist Gas Volume: 2311 • Planned flaring event occurred because the IWAG injection gas compressor is shut down for engine overhaul. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 5, 1998 • Time and duration of incidents 21:24 - 1 hr 51 min Flare Volume: 344 Assist Gas Volume: 2 Planned flaring event occurred because the 1WAG injection gas compressor has been shut down for engine overhaul. Compressor overhaul has been finished and was brought on line just before midnight at 23:55 hrs. 5~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 15, 1998 • Time and duration of incidents 22:47 14 June - 00:45 15 June 1 hr 58 min Flare Volume: 82 Assist Gas Volume: 81 This event was an unplanned flaring event that occurred when the second and third stage injection gas compressor was shutdown for head gasket repairs. Maintenance crews were dispatched to correct problem ASAP. When compressor was returned to service the flare was eliminated. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 20, 1998 Time and duration of incident 02:34 - 09:45 20 June 1998 7 hr l lmin. Flare Volume: 1121 Assist Gas Volume: 1117 Time and duration of incident 21:11 - 24:00 20 June 1998 2 hr 49 min Flare Volume: 302 Assist Gas Volume: 366 These events were a planned flaring event that occurred during a scheduled TAPS cutback. Gas lift compressor and gas power turbine were taken out of service for maintenance. Numerous high GOR wells were shut-in to mitigate condition. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 21, 1998 Time and duration of incident 00:01 - 06:59 21 June 1998 7 hr 0 min. Flare Volume: 613 Assist Gas Volume: 656 .This event was a planned flaring event that occurred during scheduled maintenance of gas power turbine. Numerous high GOR wells were shut-in to mitigate condition. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 24, 1998 Time and duration of incident 13:46 24 June 1998 1 hr 14 min. Flare Volume: 103 Assist Gas Volume: 203 This event was a planned flaring event that occurred while the 1WAG compressor was shut down for repair of a glycol leak. Numerous high GOR wells were shut-in to mitigate condition. C~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 25, 1998 Time and duration of incident 13:46 25 June 1998 1 hr 14 min. Flare Volume: 103 Assist Gas Volume: 203 Time and duration of incident 14:08 25 June 1998 1 hr 22 min. Flare Volume: 171 Assist Gas Volume: 404 This event was an planned flaring event that occurred while I-WAG Compressor was Shuttdown for repairs. Numerous high GOR wells were shut-in to mitigate condition. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point June 26, 1998 i Time and duration of incident 23:31 25 June 1998 1 hr 14 min. Flare Volume: 96 Assist Gas Volume: 282 This event was a unplanned flaring event that occurred during maintenance of I-WAG. Numerous high GOR wells were shut-in to mitigate condition. BP EXPLORATION June 15, 1998 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn. Wendy Mahan: • BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Attached are the Monthly Producer's Report of Gas Disposition for the month of May 1998 . Should you have any questions, please contact Bob Wilks at (907) 564-5670. Sincerely, ~~, Pa D. Bly M Hager, Volume, Royalty & Severance ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point- BP Exploration (Alaska) Inc. Milne Point May-98 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold Fuel 17,002 2. Reinjected 551,646 3. Flared or vented less than 1 hour 7,585 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 925 5. Pilot and Purge 2,077 6. Used for lease operations Fuel Assist 268,303 24,281 7. Other TOTAL items 1-7 871,819 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby certify t at the foregoing is true and correct to Signature Title ..O~v,~JrC/f~ the best of my Date knowledge. ~ /s /G IKUPARUKame ICode525100'Percent g0.9 SCH. BLUFF 525140 9.1 Official Ltse Only Flazing Authorization>l hr; 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. 1 Form 10-422 Rev. 4/95 06/08/98 1,3:53 Milne Point Unit Monthly Gas Flaring Incident Repor~ For: May /1998 Flare Name: Flare 1 np anne vents greater t an our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 05/12/98 21:31:00 02:59 444.9 755.1 Unplanned event when the IWAG C-5531B was taken off line due to a gas injection compressor on C-Pad S/D. leak. High GOR wells were S/I to elminate Haze, and the maintenance crew fmished repair and the unit was started to end the Haze event. 05/14/98 20:02:00 02:13 325.8 474.8 Unplanned event that occurred when the Maintenance crews were dispatched to IWAG injection compressor on C-Pad correct the problem but were shut down. unsuccessful in starting the compressor. Gas lift wells were shut in to eliminate flaring. 05/14/98 22:31:00 01:14 154.5 242.4 See above on same day. See above. Further gas rate cuts were made and Haze incident was successfully terminated. Flare Assist Unplanned Events <=1 hour 7,584.7 13,508.1 Unplanned Events > 1 hour 925.3 1,472.4 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 0.0 0.0 Unmetered Assist Gas 11,377.0 TOTAL FLARED VOLUME 8,510.0 26,357.5 MSCF BP Exploration Page 16 of 16 Milne Point, Alaska • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point May 12 & 13, 1998 Time and duration of incidents 2131- 2 hr 59 min Flare Volume: 445 Assist Gas Volume: 755 C~ Unplanned flaring event occurred when the 1~VAG injection gas compressor was shut down for repairs. At 2131, C-5531B was taken off line because of a gas leak. Maintenance crew finished repair of the 1WAG compressor and unit was started to end the flare event. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point May 14, 1998 Time and duration of incidents 20:02 hrs - 2:13 hr Flare Volume: 326 Assist Gas Volume: 475 This event was an unplanned flaring event that occurred when the IWAG injection compressor on C-pad shut-down. Maintenance crews were dispatched to correct problem but were unsuccessful at starting the compressor. Gas lift wells were shut-in to eliminate flaring. Time and duration of incidents 22:31 hrs - 1:14 hr Flare Volume: 155 Assist Gas Volume: 242 This event was an unplanned flaring event that occurred after the ]WAG injection compressor on C-pad shut-down. Maintenance crews were dispatched to correct problem but were unsuccessful at starting the compressor. Gas lift wells were shut-in to eliminate flaring. Further gas rate cuts were made and flare incident was successfully terminated. BP EXPLORATION May 15, 1998 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn. Wendy Mahan: BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Attached are the Monthly Producer's Report of Gas Disposition for the month of April 1998 . Should you have any questions, please contact Bob Wilks at (907) 564-5670. Sincerely, I!• Paul D. Bly Manager, Volume, Royalty & Severance ALASKA OIL AND GAS CONSERVATION CONIl~lI33ION FACILITY REPORT OF PRODZ7CED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point ADr-9R 1. Sold Fuel 16,385 2. Reinjected 489,850 3. Flared or vented less than 1 hour 4,689 4. Flared or vented greater than 1 hour 7,114 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 2,010 6. Used for lease operations Fuel 260,600 Assis 33,706 7. Other TOTAL items 1-7 814,354 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby cert' y that the f regoing is true and correct to the best of my knowledge. M~ • dam, ~0~ ~~Y f ,/ (~ Signature ~• Title Date ~.~`~'•~(,~ Form 10-422 Rev. 4/95 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 91.4 SCH. BLUFF 525140 8.6 Official Use Only-.Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. ,Authority 20 AAC 25.235. r 05/02/98 12:09 Milne Point Unit • ~ Monthly Gas Flaring Incident Repo>r~ For: Apr /1998 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration =Volume (MSCF) ; Start Time (hh:mm) Flare Assist Cause Comment 04/(12/98 03:37:00 00:23 67.9 140.5 04/(12/98 04:08:00 00:07 7.7 31.5 04/(15/98 14:25:00 00:05 4.7 20.1 04/U6/98 16:43:00 00:02 1.3 4.3 04/06/98 16:58:00 00:02 7.6 12.0 04/06/98 20:23:00 00:07 27.8 33.9 04/06/98 20:38:00 00:07 13.6 49.1 04/06/98 22:34:00 00:11 44.7 73.1 04/08/98 13:25:00 00:05 11.6 25.6 04/10/98 13:28:00 00:02 1.2 3.8 04/10/98 15:02:00 00:43 180.3 288.8 04/10/98 15:55:00 00:05 6.8 40.1 04/10/98 17:13:00 00:02 1.0 7.1 04/10/98 21:53:00 00:07 21.4 31.7 04/10/98 22:02:00 00:13 31.4 67.5 04/10/98 22:28:00 00:02 1.9 6.5 04/11/98 06:42:00 00:18 76.6 85.8 04/11/98 08:13:00 00:02 2.3 7.5 04/11/98 08:17:00 00:58 181.9 393.0 04/11/98 09:20:00 00:10 17.3 69.1 04/11/98 12:58:00 00:02 3.4 1.9 04/11/98 13:02:00 00:13 7$.4 20.9 04/12/98 00:28:00 00:17 63.3 73.9 04/12/98 00:54:00 00:06 5.8 18.7 04/12/98 04:53:00 00:07 26.2 33.4 04/12/98 05:05:00 00:10 27.2 64.0 04/12/98 07:38:00 00:22 91.5 144.2 04/12/98 08:01:00 00:29 126.2 132.6 04/12/98 08:32:00 00:13 8.8 95.9 04/12/98 08:57:00 00:03 2.3 42.1 04/12/98 13:56:00 00:04 4.5 24.1 04/13/98 12:05:00 00:10 9.9 31.1 04/16/98 08:23:00 00:07 22.0 35.0 04/16/98 08:32:00 00:58 216.5 331.8 04/16/98 09:31:00 00:14 36.1 105.3 04/16/98 09:47:00 00:28 134.7 168.5 04/16/98 10:17:00 00:13 50.2 67.8 04/16/98 10:39:00 00:06 8.6 38.0 04/16/98 10:51:00 00:09 29.9 64.7 04/16/98 11:06:00 00:09 28.6 58.6 04/16/98 11:22:00 00:08 15.5 51.9 04/16/98 11:34:00 00:11 22.6 65.2 04/16/98 11:48:00 00:12 15.7 68.4 $P Exploration Page 1 of 6 Milne Point, Alaska osio2i9s 12:09 Milne Point Unit • Monthly Gas Flaring Incident Repor~ For: Apr /1998 Flare Name: Flare 1 np ann vents ess t an or equa to our Duration ~ Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 04/16/9812:05:00 00:10 25.5 64.6 04/16/9812:24:00 00:36 72.7 211.1 04/16/9813:02:00 00:28 123.7 48.5 04/16/9813:35:00 00:10 17.0 66.4 04/ 16/98 13:51:00 00:09 15.8 60.6 04/16/9814:06:00 00:09 17.3 54.3 04/16/9814:22:00 00:08 8.4 50.0 04/16/9814:36:00 00:09 9.0 55.5 04/16/9814:53:00 00:07 21.6 47.7 04/16/9815:05:00 00:10 11.0 58.5 04/16/9815:22:00 00:08 13.8 53.0 04/16/9815:36:00 00:09 13.2 56.8 04/16/9815:50:00 00:10 18.9 66.0 04/16/9816:08:00 00:07 8.4 37.6 04/16/9816:21:00 00:09 18.2 57.8 04/16/9816:36:00 00:09 13.2 61.7 04/16/9816:51:00 00:09 9.8 58.2 04/16/9817:07:00 00:08 11.2 58.3 04/16/9817:22:00 00:08 14.2 49.2. 04/16/9817:36:00 00:09 9.0 .54.8 04/16/9817:53:00 00:07 10.1 53.1 04/16/9818:01:00 00:44 85.0 201.5 04/16/98 20:18:00 00:12 51.2 87.8 04/16/98 20:44:00 00:01 0.8 89.5 04/16/98 20:56:00 00:04 16.3 36.3 04/16/98 22:25:00 00:05 4.7 94.8 04/16/98 23:09:00 00:06 13.1 95.0 04/16/98 23:42:00 00:03 2.7 63.0 04/17/9814:07:00 00:08 13.7 27.1 04/17/9814:35:00 00:10 15.1 29.4 04/17/9814:59:00 00:01 1.1 3.1 04/18/9811:15:00 00:15 13.0 25.6 04/18/9814:46:00 00:14 12.7 39.1 04/18/9819:39:00 00:06 5.8 6.1 04/21 /98 08:06:00 00:09 31.1 64.2 04/21/98 08:17:00 00:13 12.4 104.3 04/21/98 08:34:00 00:11 3.8 104.3 04/21/9811:01:00 00:29 28.8 207.8 04/21/9811:33:00 00:12 4.9 104.3 04/21/9811:59:00 00:01 0.6 104.4 04/21/9812:13:00 00:02 0.5 104,4 04/21/9812:24:00 00:06 1.5 103.5 04/21/9812:41:00 00:04 1.1 104,5 BP Exploration Page 2 of 6 Milne Point, Alaska osio2i9s 12:09 Milne Point Unit ` ~ Monthly Gas Flaring Incident Repor~ For: Apr /1998 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 04/21/98 21:46:00 00:14 62.6 103.6 04/21/98 22:12:00 00:03 2.3 63.7 04/22/98 09:12:00 00:33 93.8 21 s.7 04/22/98 09:49:00 00:56 130.7 407.1 04/22/9810:49:00 00:11 14.1 101.6 04/22/9811:09:00 00:06 24.3 42.6 04/22/9813:02:00 00:13 6.0 104.1 04/22/9813:63:00 00:07 8.9 96.0 04/22/9814:28:00 00:02 0.7 96.6 04/22/9814:36:00 00:10 10.7 96.6 04/22/9814:69:00 00:01 0.6 94.4 04/22/9816:08:00 00:07 18.9 93.6 04/22/9816:20:00 00:10 24.8 89.1 04/22/9816:39:00 00:06 11.7 89.3 04/22/9816:63:00 00:07 16.7 88.3 04/22/9816:44:00 00:01 27.2 123.0 04/22/9816:67:00 00:03 35.4 74.6 04/22/9817:03:00 00:12 37.8 73.2 04/22/9817:18:00 00:12 38.0 66.6 04/22/9817:42:00 00:18 22.2 167.6 04/22/9818:08:00 00:07 2.7 89.4 04/22/9818:33:00 00:12 31.0 77.8 04/22/9818:67:00 00:03 4.8 93.9 04/22/9819:10:00 00:05 13.6 76.9 04/22/9819:29:00 00:01 1.2 94.4 04/22/9819:44:00 00:01 0.7 94.3 04/22/9819:65:00 OO:OS 15.6 93.3 04/22/98 20:26:00 00:04 16.1 60.7 04/22/98 20:39:00 00:06 10.0 82.9 04/22/98 20:66:00 00:04 8.7 94.3 04/22/98 21:66:00 00:05 8.3 94.3 04/22/98 22:09:00 00:06 6.9 94.2 04/22/98 23:24:00 00:06 18.1 47.4 04/22/98 23:40:00 OO:OS 8.3 67.4 04/22/98 23:61:00 00:09 22.7 64.9 04/23/98 00:14:00 00:01 0.4 66.3 04/23/98 00:38:00 00:07 20.8 84.8 04/23/98 00:65:00 00:05 6.5 83.6 04/23/98 01:42:00 00:03 3.4 60.2 04/23/98 02:12:00 00:03 3.7 16.8 04/23/98 02:27:00 00:03 7.8 76.9 04/23/9817:58:00 00:02 1.7 ll.s 04/23/9818:41:00 00:04 3.3 4.s BP Exploration Page 3 of 6 Milne Point, Alaska osio2i9s 12:09 Milne Point Unit • Monthly Gas Flaring Incident Repor~ For: Apr /1998 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (h~~n~m) Flare Assist Cause Comment 04/23/9819:14:00 00:01 0.7 0.6 04/23/9819:25:00 00:05 5.1 7.8 04/23/9819:41:00 00:04 4.5 6.6 04/23/98 20:02:00 00:13 11.6 16.7 04/23/98 20:27:00 00:03 9.1 13.5 04/23/98 20:41:00 00:04 3.9 5.7 04/24/9814:36:00 00:10 27.5 52.2 04/24/9814:50:00 00:10 5.3 81.3 04/24/9815:08:00 00:52 76.7 343.7 04/24/9816:01:00 00:14 14.1 92.6 04/24/9816:21:00 00:09 3.5 103.2 04/24/9816:41:00 00:04 1.6 96.1 04/24/9817:06:00 00:09 15.4 58.0 04/25/98 06:10:00 00:20 63.8 69.9 04/25/98 06:31:00 00:14 34.6 44.9 04/25/98 06:58:00 00:02 2.2 2.7 04/25/98 07:08:00 00:37 106.9 127.0 04/25/98 07:49:00 00:11 21.1 59.9 04/25/98 08:01:00 00:29 80.1 102.6 04/26/98 08:32:00 00:13 22.1 32.4 04/26/98 08:47:00 00:13 12.7 17.8 04/26/98 01:43:00 00:02 0.6 O.s 04/26/98 03:44:00 00:01 0.2 0.1 04/26/98 04:43:00 00:02 0.4 0.2 04/26/98 04:59:00 00:01 0.3 0.2 04/26/9819:66:00 00:04 1.6 2.0 04/26/98 20:11:00 00:04 1.2 1.5 04/26/98 20:28:00 00:02 0.9 1.0 04/29/9810:32:00 00:58 160.8 247.3 04/29/9811:32:00 00:13 23.3 48.5 04/29/9811:48:00 00:12 26.8 40.5 04/29/9812:02:00 00:28 38.9 77.0 04/29/9812:34:00 00:11 17.0 33.2 04/29/9812:53:00 00:07 20.7 34.6 04/29/9813:05:00 00:25 44.0 73.2 04/29/9813:33:00 00:12 15.4 30.0 04/29/9813:60:00 00:10 16.1 33.1 04/29/9814:06:00 00:09 18.9 28.3 04/29/9814:17:00 00:13 17.6 34.6 04/29/9814:34:00 00:11 18.6 35.7 04/29/98 14:48:00 00:12 1 s.0 30.1 04/29/9816:01:00 00:14 20.7 40.0 04/29/9815:16:00 00:14 22.6 46.2 BP Exploration Page 4 of 6 Milne Point, Alaska osio2i9s 12:09 Milne Point Unit • ~ Monthly Gas Flaring Incident Repor~ For: Apr /1998 Flare Name: Flare 1 np anne vents ess t an or equa to our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 04/29/98 15:35:00 00:10 17.7 30.2 04/29/98 15:50:00 00:10 25.4 39.5 04/29/98 16:06:00 00:09 16.9 32.1 04/29/98 16:18:00 00:12 22.1 41.2 04/29/98 16:35:00 00:10 13.6 27.3 04/29/98 16:47:00 00:13 19.0 37.8 04/29/98 17:06:00 00:24 36.7 70.7 04/29/98 17:34:00 00:11 20.2 38.4 04/29/98 17:50:00 00:25 32.5 64.9 04/29/98 18:19:00 00:11 20.7 35.4 04/29/98 18:55:00 00:05 4.9 9.7 04/30/98 06:08:00 00:07 11.5 22.8 04/30/98 11:24:00 00:06 13.6 24.9 04/30/98 11:32:00 00:13 16.3 34.1 04/30/98 11:57:00 00:03 2.7 5.8 04/30/98 13:25:00 00:05 5.6 10.3 04/30/98 13:33:00 00:12 16.0 32.9 04/30/98 15:08:00 00:07 8.9 15.4 04/30/98 15:19:00 00:11 17.3 35.9 04/30/98 16:42:00 00:03 1.7 2.7 04/30/98 16:54:00 00:06 5.9 11.4 04/30/98 17:04:00 00:11 18.6 38.1 04/30/98 17:28:00 00:02 1.8 2.8 04/30/98 17:41:00 00:04 5.6 12.0 04/30/98 19:03:00 00:12 19.8 39.4 BP Exploration Page 5 of 6 Milne Point, Alaska 05/02/98 12:09 Milne Point Unit • Monthly Gas Flaring Incident Repor~ For: Apr /1998 Flare Name: Flare 1 np anne vents greater t an our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause 04/05/98 08:56:00 05:19 oBSa ^ F'}15r 04/06/98 20:49:00 01:41 zo~i°I - 220 04/08/9811:44:00 01:31 I1'fq-1318 04/12/9811:10:00 02:35 ~ ~ la -- 134J 04/13/98 08:46:00 03:14 08+6 - 120 0 04/16/9818:49:00 01:26 i8~r°~ - ZoiS 04/17/9812:40:00 01:20 17/10 „ X900 04/18/9811:35:00 03:10 -13 5 ~ I-t4S 04/18/9815:04:00 4:26 iSo~l - 1°13 04/21/98 09:02:00 01:58 c'~gol-Izoo 04/21/9813:51:00 07:54 1351 - ZI'-4S 04/22/98 11:27:00. 01:33 112 - 1300 Comment 291.3 1,164.3 Unplanned event caused by fuel gas Found and fixed problem. volume vessel PSV prematurely lifting. 315.8 659.4 Unplanned IWAG event due to engine High GOR wells were shutin to problems. mitigate flare. 352.7 586.9 Unplanned IWAG S/D, low lube oil. High GOR wells were SI to mitigate flaring. 740.0 1,035.4 Unplanned event, lift gas compressor High GOR wells were SI to mitigate S/D to replace leaking PSV. flare. 1,449.5 1,139.3 Unplanned event, tubing on gas lift Lift gas and high GOR wells were SI to compressor broke and required reduce flaring replacement. 216.9 433.2 Unplanned event, CSSOIB gas lift PSV was exchanged and the flare was compressor shut down due to bad PSV. eliminated. 302.1 462.4 Unplanned IWAG S/D, high level in Drained liquid, re-started compressor suction separator after some startup problems 351.8 812.0 Unplanned event, S/D of both injection The cooling medium was re-established compressors due to failure of the and the compressors returned to service. interstage exchanger. 269.9 687.1 See above on same day. 266.9 810.4 Unplanned IWAG S/D, oxygen mixture High GOR wells were shut in. problem 2,471.3 3,189.7 Loss of 0701 power turbine, bad speed Additional wells were shut in as the sensor. turbine load shed scheme shut down one main gas lift compressor. 85.8 691.6 Unplanned IWAG S/D, unkown cause. High GOR wells were shut in. Additional problems with starter prevented immediate re-start. Flare Assist Unplanned Events <=1 hour 4,689.2 13,034.7 Unplanned Events > 1 hour 7,113.9 11,671.7 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 0.0 0.0 Unmetered Assist Gas 11,010.0 TOTAL FLARED VOLUME 11,803.2 35,716.4 MSCF BP Exploration Page 6 of 6 Milne Point, Alaska Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point Apri15, 1998 Time and duration of incidents 08:56 - 5 hr 19 min Flare Volume: 291 Assist Gas Volume: 1,164 An Unplanned flaring event occurred when the Fuel Gas Volume Vessel PSV was found pre-maturely lifting to the flare header. Operations personnel found problem with leaking seat on PSV and corrected problem. Once PSV was reset the flare was eliminated with no further incident. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point April 6, 1998 Time and duration of incidents 20:49 - 1 hr 41 min Flare Volume: 316 Assist Gas Volume: 659 • An Unplanned flaring event occurred when the IWAG injection compressor S/D after backfiring causing gas off the lift gas header to vent to the flare header. Maintenance crews were dispatched to make repairs. Changed spark plugs on engine and returned to service with no further incident. High GOR were shut-in in order to mitigate flaring. r~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point Apri18, 1998 • Time and duration of incidents 11:44 hrs - 1:31 hr Flare Volume: 353 Assist Gas Volume: 587 This event was: an unplanned flaring event that occurred when the IWAG injection compressor on C-pad shut-down due to a low Tube oil status alarm. Maintenance crews were dispatched to correct problem. Once maintenance was completed, the injection compressor was returned to service and the flare was eliminated with no further'incident. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point April 12, 1998 Time and duration of incidents 11:10 - 2hr 35 min Flare Volume: 740 Assist Gas Volume: 1,035 A planned flaring event occurred when a Gas Compressor was Shut Down to replace an interstage PSV. Production wells were shut into control flare. Upon bringing the Gas Compressor back on line the flaring discontinued. r~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point April 13, 1998 Time and duration of incidents 08:46 - 3hr 14 min Flare Volume: 1,450 Assist Gas Volume: 1,139 An unplanned flaring event occurred when a Gas Compressor was Shut Down because tubing to an interstage PSV broke. All Gas Lift wells were Shut in as well'as ocher ESP production wells to control flare. Maintenance Crews were dispatched to repair the PSV immediately. Upon bringing the Gas Compressor back on line the flaring discontinued. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point April 16, 1998 Time and duration of incidents 18:49 - 1 hr 26 min Flare Volume: 217 Assist Gas Volume: 433 ~~ Unplanned flaring event occurred when the C-5501/11B Gas Lift Compressor was shut down due. to a B/O PSV-5570B. The PSV was exchanged. and Compressor was returned to'service. When the compressor was returned to service, the flare was eliminated: Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point April 17, 1998 Time and duration of incidents 12:40 - 1 hr 20 min Flare Volume: 302 Assist Gas Volume: 462 i Unplanned flaring event occurred when the IWAG injection gas compressor shut down due to high liquid in suction separator. Tried to restart the Compressor after liquid was drain from separator. Compressor had some difficulty in starting. When the compressor was returned to service, the flare was eliminated. L~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point April 18, 1998 Time and duration of incident 11:35 - 3 hr 10 min Flare Volume: 352 Assist Gas Volume: 812 Time and duration of incident 15:04 - 4 hr 26 min Flare Volume: 270 Assist Gas Volume: 687 Flare events were due to an unplanned shut down of both gas injection compressors CM-5502/03/31A and CM-5502/03/31B in Module 55. The compressors shutdown because of high discharge temp. The cause of the high temp was failure of the Interstage exchanger X-5513. The cooling medium flow was reestablished and the compressors restarted. During the time of the compressor shutdown a relief valve on the fuel gas system relieved. The relief valve was reset and flaring stopped. The Injection gas system was returned to normal operation. r~ ~~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point Apri121, 1998 Time and duration of incident 9:02 - 1 hr 58 min Flare Volume: 267 Assist Gas Volume: 810 ~~ Time and duration of incident 13:51 - 7 hr 54 min Flare Volume: 2,471 Assist Gas. Volume: 3,190 - The first Flaring event was due to an unplanned shut down of IWAG compressor. The compressor shutdown because of an Oxygen mixture problem. The Compressor was restarted and the flaring stopped. The Second flaring event was cause by the lost of 0701 Power Generation turbine due to the lost of the turbine speed sensor. The Power load shed scheme worked and shutdown CM-5501/11B Gas-lift compressor and CM- 5502/03/31B Gas injection compressor. After replacing the sensor the Turbine was restarted . The power was restored to normal capacity. The Compressors were put back on line and the flaring was eliminated. The Power Generation and gas injection systems were returned to normal operation. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point April 22, 1998 Time and duration of incidents 11:27- 1 hr 33 min Flare Volume: 86 Assist Gas Volume: 693 Unplanned flaring event occurred when the IWAG injection gas compressor shut down due to unknown problems. Tried to restart IWAG but discovered problem with starter. Maintenance crews were dispatched to troubleshoot problem and repair starters` High GOR wells were shut in. Also found PCV-5804 Gas-lift header pressure controller leaking. Reset the PCV and the flaring stopped off the Gas lift header. The compressor was returned to service and the flare was eliminated. ' SENT BY=BPX-MPOC 8- 2-98 8=42AM ; BPX-M [LIVE POINT i Flaring Incident Report (exceeding 1 hoar) BP Exploration -Milne Point April 12, 1998 '1'irne and duration of incidents 11:10 - 2hr 35 min Flare Volume: 740 Assist Gas Volume: 1,035 907 276 7542;# 1/ 2 A plz~nned flaring event occurred when a Gas Compressoe• was Shut I7c~wn to replace an inte~rstage PSV. Production wells were shut in to control dare. Upon bringuig lk~e Gas Compressor back an line the t7aring discontinued. past-iY' Fax Note 7671 ~a1e g _ 2 •~, 8 pages - ~ To W`N ~ ~y F'°'" pQ/k~/T ~~ASbK~ CoJDupt. /4o(wCC ~O~ l'~vKA_. MPV Phw~e A ~°la'I 79j ' I $ S b Phone ~ ~~~a,l` t"5 9 -(~`t~`I 1 r-m k Fax ~ ~(nt off (~~~ 6„r ,C,av~~,lf Ct,., !~7' 6q E.rGG( _ ~~.. f' M a~~ ~~ c~~r ~~ r~ y~. SENT BY~BPX-MPOC 8- 2-98 8~42AM ; • Flaring Yncident Report (exceeding 1 hewr) i3P Exploration -Milne Point April 16, 199B Tinr~e and darration of incldenls 18:49 - 1 hr 26 min Flare Volume; 217 As.~cist Gas Volume: 433 907 276 7542;# 2/ 2 Unplanned flaring event occurred when the C-SSOI/! 1S Ga5 Lift Compressor was shut down due to a B/O PSV-557OB. The f?SV 'WSS exGllanged and Compressor was returnui to service. When the compressor was returned tc- service, the flare was elimin~t~d. ~i~:~Cl V AuG ~ 3 1998 BPX-M I L]VE POINT-' caU~& Gas Cons. Commission ~n~t-o~e9e u BP EXPLORATION April 16, 1998 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn. Wendy Mahan: L~ BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Attached are the Monthly Producer's Report of Gas Disposition for the month of March 1998 . Should you have any questions, please contact Bob Wilks at (907) 564-5670. Sincerely, ~~~ Paul D. Bly Manager, Volume, Royalty & Severance ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition r Milne Point BP Exploration (Alaska) Inc. Milne Point Mar-98 Disposition I Volume MCF* 1. Sold Fuel 17,341 2. Reinjected 530,337 3. Flared or vented less than 1 hour 3,829 4. Flared or vented greater than 1 hour (SUPPlemental report required--See 20 AAC 25.235) 6,857 5. Pilot and Purge 2,077 6. Used for lease operations Fuel Assist 279,773 26,467 7. Other TOTAL items 1-7 866,681 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby cer ify that the foregoing is true and correct to the best of my knowledge. Signature ~ TitleM~• V~/~-~ w[ ~J'~'• Date ~ ~~Jr `U *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 89.9 SCH. BLUFF 525140 10.1 Official Use Only-Flaring Authorization>1 hr, 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 04/03/98.16:07 Milne Point Unit • ~, • Monthly Gas Flaring Incident Repor~ For: Mar /1998 Flare Name: Flare 1 np anne vents greater t an our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 03/02/98 05:48:00 05:27 ~lolS~ 03/04/9814:11:00 01:04 - l5 "lS 03/05/98 01:25:00 01:05 - Z. ~ 3 0 03/08/9811:32:00 07:43 1~ ' 1~ zo 1`l- ~2;vo 03/11/98 20:44:00 05:16 03/17/9817:36:00 O1:(~9 a~' 3~ - I~ ~,x ~.. 03/21/9817:04:00 02:41 19'.oq - Iq ~ qs~ 03/23/9813:52:00 02:38 13:5L - Ib'.3~ 03/28/9817:47:00 01:13 1,724.9 1,929.9 Unplanned event, CSS lA gas lift Gas lift wells were shut in to mitigate compressor S/D due to leaking PSV flare 337.8 200.1 Unplanned IWAG S/D due to a Tube oil Gas lift was shut off to several wells to leak in the #4 cylinder mitigate the flare 136.3 121.3 Unplanned event due to a required SI of Compressor was re-started as soon as gas lift compressor C551 lA to re-seat a PSV reset PSV 1,493.9 1,978.2 Unplanned event due to gas lift High GOR wells were SI to mitigate compressor CSS11B was S/D to repair flaring bad valves on #4 cylinder. 1,529.2 544.8 215.5 460.7 Unplanned IWAG SD due to stepper High GOR wells were SI to mitigate valve problems flare 1,160.3 920.3 Unplanned event due to gas lift Gas lift and high GOR wells were SI to compressor CSS11A S/D on high Tube mitigate flare oil temp. 163.1 1,021.7 Unplanned S/D due to bad valves in High GOR wells were SI to mitigate IWAG compressor flare 96.3 143.8 Unplanned event due to a SI on The leak was repaired and compressor C5531 B gas injection compressor to returned to service repair a leaking packing gland. Flare Assist Unplanned Events <=1 hour 3,828.4 9,846.2 Unplanned Events > 1 hour 6,857.3 7,321.0 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 0,0 0.0 Unmetered Assist Gas 11,377.0 TOTAL FLARED VOLUME 10,685.7 28,544.2 MSCF BP Exploration Page 7 of 7 Milne Point, Alaska • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point March 2, 1998 Time and duration of incidents 05:48 - 5 hr 27 min Flare Volume: 1,725 Assist Gas Volume: 1,930 An Unplanned flaring. event occurred when the C-5511-A gas lift compressor was shut down due to a leaking interstage PSV. Veco maintenance crews were dispatched to repair the bad pilot on the PSV, which was relieving pre-maturely to the flare header. Gas lift . was shut-off to all wells to mitigate excessive flaring. When the compressor was returned to service, the flare was eliminated. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point March 4, 1998 Time and duration of incidents 14:11 - 1 hr 04 min Flare Volume: 338 Assist Gas Volume: 200 ~~ An Unplanned flaring event occurred when the IWAG injection compressor at C-pad was shut-down due to a trabon lubricator oil leak on #5 cylinder. Maintenance crews were dispatched to repair the oil lubricator. Gas lift was shut-off to several wells to mitigate excessive flaring. When the compressor was returned to service, the flare was eliminated. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point March 5, 1998 Time and duration of incidents 1:25 - 1 hr OS min Flare Volume: 136 Assist Gas Volume: 121 An Unplanned flaring event occurred when the C-5511-A gas lift compressor was shut- down in order to reset a leaking interstage PSV. Compressor was restarted shortly after PSV was reset. When the compressor was returned to service, the flare was eliminated. r~ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point March 8, 1998 Time and duration of incidents 11:32 - 7 hr 43 min Flare Volume: 1,494 Assist Gas Volume: 1,978 An Unplanned flaring event occurred when the C-5511-B gas lift compressor was shut- down for maintenance due to bad suction and discharge valves on #4 cylinder:. Maintenance crews were dispatched to repairs to the problems with the compressor cylinder. High GOR production wells were shut-in to mitigate flaring. When the compressor was returned to service, the flare was eliminated. SENT BY~BPX-MPOC 6- 4-98 3~54PM ; • BPX-M I [..IVE POINT Flaring Incident l7epoirt (ex~ccdip~ 1 hour] BP Exploration -Milne Point Mac~;h 11, 199A Time and duration of i~ncident,~ 20:44 - S hr 16 min Flare Volume; 1,529 Assist Cas Volume: 54.5 947 276 7542;# 1/ 1 An tJnplanned flaring event occurred when condensate in the C;as Lift Compressor Suction Scrubber reached a high level and tripped a CCae Compression Shut Down, Pre Shut down level alarms had malfunctioned and maintenance crews were dispatched to repair the problem. High GOR gas lift wells shut in with the gas compressor facility, tJpon bringing the Gas Compression Facility back on line the flaring discontinued. Post-its' Fan Note 7671 '~ W ND ~1g~ co.tDept. AaLzC Phone #I l~~ ~ Fax li Date From ~ ~o. I Phone p Fak ~ - ~'' YV ~~ Asti ~c~3a~ ~u~ 0 4 X998 aaska0U8~ is~i~- Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point March 18, 1998 Time and duration of incidents 17:36- 1 hr 9 min Flare Volume: 215 Assist Gas Volume: 461 i Unplanned flaring event occurred when .the IWAG injection gas compressor shut down due to stepper valve problems. Maintenance crews were dispatched to troubleshoot problem and replaced rupture disc. High GOR wells were shut in. When the compressor was returned to service, the flare was eliminated. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point March 21, 1998 Time and duration of incidents 1704 - 2 hr 41 min Flare Volume: 1160 Assist Gas Volume: 920 ~J Unplanned flaring event occurred when the C-550.1/11A Gas Lift Compressor`shut down due to a high Tube oil temperature condition. Maintenance crew was dispatched immediately to investigate problem. Temperature sensor was found to be out of calibration. High GOR wells were shut in to mitigate flaring. When the compressor was returned to service, the flare was eliminated. `~ ~ • i Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point March 28, 1998 Time and duration of incidents 17:47 - 1 hr 13 min Flare Volume: 96 Assist Gas Volume: 144 An Unplanned flaring event occurred when the C-5531-B gas inj:eclion compressor was shut-down in order to repair a leaking packing gland in the #4 cylinder of the compressor. Maintenance crews were dispatched. to make repairs. Compressor was. restarted shortly after .repairs were complete, and the flare was eliminated with no further incident. BP EXPLORATION March 16, 1998 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn. Wendy Mahan: • BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6f (907) 561-5111 Attached are the Monthly Producer's Report of Gas Disposition for the month of February 1998 . Should you have any questions, please contact Bob Wilks at (907) 564-5670. Sincerely, ~~~ Paul D. Bly Manager, Volume, Royalty & Severance ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Milne Point BP Exploration (Alaska) Inc. Milne Point Feb-98 Disposition I Volume MCF* 1. Sold Fuel 15,539 2. Reinjected 453,396 3. Flared or vented less than 1 hour 1,477 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 7,928 5. Pilot and Purge 1,876 6. Used for lease operations Fuel Assist 255,284 17,890 7. Other TOTAL items 1-7 753,390 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. ~///~ lhC~. dC~,1pOY~ SAY D Signature Y ~• Title Date 3 ~0 l8 k *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 90.0 SCH. BLUFF 525140 10.0 Official Use Only-Flaring Authorization>l hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 03/OZ/98 12:55 Milne Point Unit Monthly Gas Flaring Incident Repo For: Feb /1998 Flare Name: Flare 1 np anne vents greater t an our Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 02/18/98 01:06:00 18:24 02/21/98 09:39:00 01:21 02/25/9819:05:00 01:10 5,003.6 3,296.3 Unplanned SD of gas lift compressor Wells were taken off line until flare was C-5501/11A due to a shorted out motor eliminated. lead. 71.4 142.3 Unplanned flaring event caused by PSV was located and reset, flare leaking PSV on fuel gas system. stopped. 147.2 285.7 Unplanned flaring event due to IWAG Field was curtailed for TAPS proration compressor fail to start caused by bad and was being re-started. Re-start effort spark plug in #7 cylinder. halted until repairs were made. BP Exploration Page 3 of 5 Milne Point, Alaska 03/02/98 12as Milne Point Unit • Monthly Gas Flaring Incident Repor~ For: Feb /1998 Flare Name: Flare 1 anne vents- ess t an or equa to our o ume of zcee -ng Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 02/05/98 11:32:00 00:28 72.1 96.3 See above for 215. See above for 2/5. 02/05/98 15:03:00 00:12 30.6 41.3 See above for 2/5. See above for 2/5. 02/05/98 15:17:00 00:28 65.3 93.0 See above for 2/5. See above for 2/5. 02/05/98 21:19:00 00:11 24.8 38.2 See above for 2/5. See above for 2/5. 02/05/98 21:37:00 00:38 109.3 160.3 See above for 2/5. See above for 2/5. 02/05/98 22:19:00 00:11 27.6 34.5 See above for 2/5. See above for 2/5. 02/05/98 22:35:00 00:10 27.2 33.1 See above for 2/5. See above for 2/5. 02/05/98 22:54:00 00:06 16.8 20.2 See above for 2/5. See above for 2/5. 02/05/98 23:05:00 00:25 61.2 85.3 See above for 2/5. See above for 2/5. 02/05/98 23:33:00 00:12 19.9 30.1 See above for 2/5. See above for 2/5. 02/05/98 23:55:00 00:05 9.0 14.3 See above for 2/5. See above for 2/5. BP Exploration Page 4 of 5 Milne Point, Alaska 03/02/98 i.z:ss Milne Point Unit • Monthly Gas Flaring Incident Repo For: Feb /1998 Flare Name: Flare 1 Planned Events-E xceeding 1 hour UK V olumne Exceeding 5uuu lv~~trr ~ Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 02/05/98 03:05:00 08:25 1,488.6 2,044.1 Planned maintenance on the IWAG High GOR wells were SI to mitigate injection compressor. Installed new flare. governor, replaced valves & oil pump. 02/05/98 12:02:00 01:28 215.7 316.4 See above for 2/5. See above for 2/5. 02/05/98 13:32:00 01:28 204.7 286.2 See above for 2/5. See above for 2/5. 02/05/98 15:49:00 03:11 472.2 661.1 See above 1'or 2/5. See above for 2/5. 02/05/98 19:03:00 02:12 324.6 452.8 See above for 2/5. See above for 2/5. Flare Assist Unplanned Events <= 1 hour Unplanned Events > 1 hour Planned Events <= 1 hour and not exceeding 5,000 MCF 1,013.3 1,358.2 5,222.2 3,724.3 463.8 646.5 Planned Events > 1 hour or exceeding 5,000 MCF 2,705.9 3,760.7 Unmetered Assist Gas TOTAL FLARED VOLUME 10,276.0 9,405.1 19,765.7 MSCF BP Exploration Page s of s Milne Point, Alaska .ti • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point February 5, 1998 Time and duration of incidents 03:05 hrs - 8 hrs 25 min Flare Volume: 1,489 Assist Gas Volume: 2,044 Time and duration of incidents 12:02 hrs - 2 hrs 56 min Flare Volume: 421 Assist Gas Volume: 602 Time and duration of incidents 15:49 hrs - 5 hrs 23 min Flare Volume: 797 Assist Gas Volume: 1,114 These were planned flaring events that occurred when the IWAG injection compressor was shut-down due to scheduled maintenance. Maintenance crews had organized several repairs on the 1WAG which included, installation of a new governor, an exhaust valve repair on engine, compressor valve replacement, and a oil system vacuum pump replacement. High GOR production wells were shut-in to mitigate flaring. The overall project was scheduled for 39 hrs of maintenance but due to effective planning of maintenance and operations personnel the IWAG injection compressor was down less than 24 hrs. Once repairs were completed, the gas lift compressor was returned to service and the flare was eliminated. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point February 25, 1998 Time and duration of incidents 19:05 - 1 hr 10 min Flare Volume: 147 Assist Gas Volume: 286 • Unplanned flaring event occurred when the IWAG injection gas compressor shut down due to a dead spark plug on #7 cylinder. Maintenance crews were dispatched to change out the faulty spark plug. Production had been curtailed on February 24`h when wells were shut in because of bad weather in Valdez, and we were in the process of bringing the plant backup to full production. This process was halted and no new wells were opened to production until the problem was corrected. When the compressor was returned to service, the flare was eliminated. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point February 18, 1998 Time and duration of incidents 01:06 - i 8 hrs 24 min Flare Volume: 5004 Assist Gas Volume: 3296 Flare event due to an unplanned shut down on one of our gas compressors CM-5501/11A in Module 55. The compressor motor shorted. out one of the electric motor leads. The cause of the wiring failure is unknown at this time and is being evaluated. High GOR production wells were initially shut down to mitigate flaring. We then continued shutting in wells until the flaring was eventually stopped. ., • Flaring Incident Report (,exceeding 1 hour) BP Exploration -Milne Point February 21, 1998 Time and duration of incident 09:39 - 1 hr 21 min Flare Volume: 71 Assist Gas Volume: 142 Unplanned flare event due to PSV-5564 on Fuel Gas Volume Vessel V-5543 in Module 55 prematurely lifting. This event occurred in conjunction with an offload of source water from vessel V-5411, which causes V-5411 gas pressure to reach flare pressure through PCV-5401. When the source water flare event ceased and the flare did not stop, the operator in Module 55 was notified and found PSV-55641eaking. The PSV was reset' and the flaring stopped. BP EXPLORATION February 16, 1998 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn. Wendy Mahan: • BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Attached are the Monthly Producer's Report of Gas Disposition for the month of January 1998 . Should you have any questions, please contact Bob Wilks at (907) 564-5670. Sincerely, ~,~,~ ~' ` Paul D. Bly Manager, Volume, Royalty & Severance Disposition Volume MCF* 1. Sold Fuel 17,012 2. Reinjected 594,046 3. Flared or vented less than 1 hour 2,981 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 16,952 5. Pilot and Purge 2,077 6. Used for lease operations Fuel Assist 285,099 29,947 7. Other TOTAL items 1-7 948,114 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby cert'fy that the oregoing is true and correct to the best of my knowledge. Signature ~. ~ Title ~~~ ~~ ~ ~~ ~./(,ti 8 Date *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK 525100 93.9 SCH. BLUFF 525140 6.1 Official Use Only-Flaring Authorization>1 hr`. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION o2io2i9s iozo Milne Point Unit Monthly Gas Flaring Incident Report For: Jan /1998 Flare Name: Flare 1 np anne vents greater t an_ our - Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 01/03/98 07:18:00 02:57 •31~- Io/S 01/06/9811:56:00 02:04 ~Isb- a4~o 01/06/9814:57:00 01:33 lyi 5 7 - lb3a O 1 /06/98 17:10:00 11:20 I~lo ~ c7'3o 01/08/9819:33:00 04:42 I~33 ~O1S 01/09/98 22:08:00 10:52 z~o~ - aq~O 01/14/9817:07:00 04:38 I ~o "~ - Z I -¢~ 01/16/98 09:59:00 02:01 og5°~ - IZ®'~ 01/18/9815:35:00 02:55 M ~S3 s • 18 3~ 01/19/98 08:14:00 02:46 ogle I10 0 01/26/98 08:47:00 01:28 o4~fi~ 'loss 01/31/9817:04:00 05:11 1~~~ - Zzl S 1,158.4 1,174.5 Unplanned SD of C pad IWAG compressor due to fuel/air mixture problems with carburetor. 1,372.8 1,709.7 Unplanned flaring event occurred when C-5531-B injection compressor had leak on #4 cylinder head gasket. 49.6 74.5 See above. 570.3 1,674.5 3,122.0 2,272.8 609.9 970.6 944.9 343.2 618.8 614.3 Unplanned flaring event still triggered by gas leak on #4 cylinder. Continued problems with high pressure rod packing causing leak-by past cylinder. 1,602.4 Unplanned SD of C pad IWAG injection compressor. Continued problems with carburetor. 3,036.2 Unplanned SD again with IWAG carburetor problems. 1,130.4 Unplanned flare event due to full field/plant shutdown. Inadvertently activated emergency shutdown (level 3) system while performing PM in Mod 55 fire/gas alarm system. 761.9 Unplanned shutdown of C-2605 IWAG compressor. 949.8 Unplanned flare event occurred when C-2605 IWAG compressor was shutdown due to high CO levels in module. 909.7 Unplanned IWAG compressor S/D for high exhaust temp. 497.2 Unplanned IWAG S/D due to a governor failure. 952.8 Unplanned event, C-SSOlA compressor developed a leaking PSV. Maintenance crews dispatched to repair. SI high GOR wells B21, B22, C07, C09, E06, L06 for flare relief. Maintenance crews were dispatched for immediate repairs in Mod 55. SI high GOR well E06 for flare relief until compressor RTS. Flare was intermittent until repairs complete. High GOR well E06 remained SI until repairs complete & compressor BOL stabilized. This was a difficult problem to troubleshoot & identify root cause of gas leak-by. High GOR well E06 remained SI for flare relief. Maintenance crews called out for repairs. Still troubleshooting problem & looking for still unidentified root cause. High GOR well E06 SI for flare relief. Maintenance crews dispatched for further troubleshooting. SI high GOR wells B10, C03, E06 & L06 for flare relief. Flaring continued until sufficient well capacity was on line to restart gas processing equipment. Maintenance crews were dispatched to replace sparkplugs & eliminate engine backfiring. SI high GOR wells B 10 and C09 for flare control. Wells BOL after compressor RTS. Maintenance crews were dispatched to correct problem. SI high GOR wells C04, O5, 07 for flare relief during repairs. Wells BOL after compressor RTS. Maintenance crews were dispatched to correct problem. SI high GOR wells for flare relief during repairs. Wells BOL after compressor RTS. Maintenance crews were dispatched to correct problem. SI high GOR wells for flare relief during repairs. Wells BOL after compressor RTS. Maintenance crews were dispatched to correct problem. SI high GOR wells for flare relief during repairs. Wells BOL after compressor RTS. BP Exploration Page 5 of 6 Milne Point, Alaska ouozi9s io:zo Milne Point Unit . ~onthly Gas Flaring Incident Report • For: Jan /1998 Flare Name: Flare 1 anne vents xcee mg our OR Volumne xcee mg Duration -Volume (MSCF) Start Time (hh:mm) Flare Assist Cause Comment 01/12/98 03:59:00 14:3 3,243.6 3,188.5 Flare event due to planned & unplanned SI following wells during planned o~ ~~ _ 18 ~ ~ maintenance on C-2605 compressor. maintenance: CO1,C03, C09, C21, Performed opportunity maintenance on C23, C26, E06, L06 for flare relief. #4 cylinder in conjunction with pad Later SI B09 and B22 for add'1 relief power SD. Event turned to unplanned when flaring became unplanned. High during restart when a leak occurred on GOR wells BOL after compressor RTS. 3rd stage PSV. Flare Unplanned Events <=1 hour 2,981.3 Unplanned Events > 1 hour 13,707.7 Planned Events <=1 hour and not exceeding 5,000 MCF 0.0 Planned Events > 1 hour or exceeding 5,000 MCF 3,243.6 Unmetered Assist Gas Assist 4,044.8 13,413.3 0.0 3,188.5 11,377.0 TOTAL FLARED VOLUME 19,932.6 32,023.6 MSCF BP Exploration Page 6 of 6 Milne Point, Alaska • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 3, 1998 Time and duration of incidents 07:18 hrs - 2 hrs 57 min Flare Volume: 1,158 Assist Gas Volume: 1,174 This event was an unplanned flaring event that occurred when the IWAG injection compressor on C-pad shut-down due to a fuel /air mixture problem with carburetor: Maintenance crews were dispatched to correct problem. High GOR production wells were shut-in to mitigate flaring. Once repairs were completed, the injection compressor was returned to service and the flare was eliminated with no further incident. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 6, 1998 Time and duration of incidents 11:56 - 2 hrs 04 min Flare Volume: 1,373 Assist Gas Volume: 1,710 This event was"an unplanned flaring event that occurred when the C-5531-B injection compressor in .Module 55 was shut-down due to a gas leak on #4 cylinder head gasket.. Maintenance crews were dispatched to correct problem. High GOR production wells were shut-in to mitigate flaring. Once repairs were completed, the injection compressor was returned to service. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 7, 1998 Time and duration of incidents 17:10 - 11 hrs 20 min Flare Volume: 570 Assist Gas Volume: 614 ~J This event was an unplanned flaring event that occurred when the G5531-B injection ..compressor in Module 55 was shut-down due to a gas leak on #4 cylinder high pressure -rod packing. The high pressure packing in this cylinder leaked by several imes in'the past month. Maintenance crews have been trouble shooting the problem with .this cylinder rod packing, and have identified the root cause. High GOR production wells were shut-in to mitigate flaring. Once repairs were completed, the injection compressor was returned to service. • Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 8, 1998 Time and duration of incidents 19:33 - 4 hrs 42 min Flare Volume: 1,674 Assist Gas Volume: 1,602 .This event was an unplanned flaring event that occurred when the 1WAG injection-'gas compressor shutdown due to carburetor problems. Maintenance crews were dispatched to correct. problem ASAP. High GOR production wells were shut-in to mitigate flaring. Once repairs. were completed, the injection compressor was returned to service. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 9, 1998 Time and duration of incidents 22:08 - 10 hrs 52 min Flare Volume: 3,122 Assist Gas Volume: 3,036 CJ This event was an unplanned flaring event that occurred when the IWAG injection gas compressor shutdown due to continued .carburetor problems. Maintenance crews were dispatched to correct problem ASAP. High GOR production wells were shut-in to mitigate flaring. Once repairs were completed, the injection compressor was returned to service with no further incident. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 12, 1998 Time and duration of incidents 03:59 - 14 hrs 31 min Flare Volume: 3,244 Assist Gas Volume: 3,189 Had both planned and unplanned flaring during C-2605 compressor (IWAG) for planned maintenance on #4 cylinder- 2"a stage. Opportunity work was performed iri conjunction with an A and C pad shutdown for, power line jumper repair. Following wells were shut- in due. to .electrical outage: COl, C03, C21, C23, C26. Also SI high GOR wells C09, E06, L06 for additional flare relief. Event turned into unplanned incident during restart attempts at approximately 1500 hrs. A gas leak was identified on 3rd stage PSV pilot & shutdown was extended to repair leak. SI following high GOR wells: B09, B22 for further flare mitigation under compressor RTS at 1900 hrs. i Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 14, 1998 Time and duration of incidents 17:07 - 4 hrs 38 min Flare Volume: 2,273 Assist Gas Volume: 1,130 Flare event due to unplanned full field/plant shutdown... CFP emergency shutdown system (Level 3) was unintentionally activated while performing preventative maintenance on fire/gas alarm. system in Mod 55. Flaring continued until sufficient well capacity was on line to restart gas processing equipment. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 16, 1998 Time and duration of incidents 09:59 - 02 hrs O1 min Flare Volume: 610 Assist Gas Volume: 762 Unplanned flare. event due to unplanned SD of C pad IWAG .compressor (C-2605).•. Maintenance crews were dispatched to .replace worn sparkplugs & eliminate engine backfiring: High GOR wells B 10 and C09 were SI for flare relief. Wells were put BOL after compressor RTS. U Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 18, 1998 Time and duration of incidents 05:35 hrs - 2 hrs 55 min Flare Volume: 971 Assist Gas Volume: 950 This event was an unplanned flaring event that occurred when the IWAG injection compressor on C-pad was shut-down. The compressor was shut down because of an engine exhaust leak inside the module that caused high carbon monoxide levels. Maintenance crews were .dispatched to correct problem. High GOR production wells were shut-in to mitigate flaring. Once repairs were completed, the injection compressor was returned to service and the flare was eliminated with no further incident. LJ Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 19, 1998 Time and duration of incidents 08:14 hrs - 2 hrs 46 min Flare Volume: 945 Assist Gas Volume: 910 LJ This event was an unplanned flaring event that occurred when the IWAG injection. compressor on C-pad shut-down due to high exhaust temperature. A fuel mixure problem was discovered. Maintenance crews were dispatched to correct problem. High GOR production wells were shut-in to mitigate flaring. Once repairs were completed, the injection compressor was returned to service and the flare was eliminated with no further incident. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 26, 1998 Time and duration of incidents 01:28 hrs - 1 hrs 28 min Flare Volume: 343 Assist Gas Volume: 497 V . This event. was an unplanned flaring event that occurred when the IWAG injection compressor on C-pad shut-down due to a governor failure. Maintenance crews were dispatched to correct problem. High GOR production wells were shut-in to mitigate flaring.. Extensive maintenance was required which caused intermittent flaring most of the day. The event exceeding one hour occurred between the time the compressor shut down and the shut in wells effects were seen. Once repairs were completed, the injection compressor was returned to service and the flare was eliminated with no further incident. Flaring Incident Report (exceeding 1 hour) BP Exploration -Milne Point January 31, 1998 Time and duration of incidents 17:04 hrs - 5 hrs 11 min Flare Volume: 619 Assist Gas Volume: 953 i This event was an unplanned flaring event that occurred when the C-5501-A gas lift compressor was, shut down in order to repair. a leaking interstage-PSV that: was venting to the flare header. Maintenance crews were dispatched to replace internal parts on the interstage PSV. High GOR production wells were shut-in to mitigate flaring: Once repairs were completed, the gaslift compressor was returned to service and the. flarewas eliminated.