Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutCIRI - West Fork
AGoee
GaS DIspoSitIoIl Flles
1995
. f
C I¡¿J - wEsr
-
FOLIC-
w':~;¡~;:;P~¡f~Jw."'IJ"/.4VÆ'/Ø~~/I/JWØ/AJ'íI.4Ø~/I/I/I/I/.I/~~Ø/I/M#/1/1/1/1/láWAW'~áW'/.áV/I/I/I/I/I/I/.ø'/'I/I/lhI1Wl/I/I/""/I/I/#'.I/.I/I.w/1/1/..dWI/#'I/.#/I/I4V/A!YI..wA6f'/I/I/I/ArW'áli~:¡Y%Ø"/I~!'/4~;ff~:a'.~ii¡
Facility:
West Fork Gas Field Facilities
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator: Field(s): Month /Year of Disposition
CIRI Production Co. West Fork Gas Field Februar , 1995
I Dr,eriplio"
Volume MCF*
*If production comes from multiple pools,
indicate contribution of each 001 to total
1. Sold
3,152
None
Pool Percent
Sterlin "A" 1,725 44%
Sterlin hBIt 2,200 56%
3. Flared or vented less than 1 hour
17
None
5. Pilot and Purge
None
6. Used for lease 0 erations
756
Otric:inl Usa Only . l1arillg ^uthori1.&:IIIOII ~ I hr
.,.. ..----. .--. ...-.-.--.-. - ....----
1. Safety
2. Lease Use
3. Conserv. Purpose
7. Other
None
TOTAL
3,925
Note: All volumes must be corrected to pressure of 14.65 psia and to a temprature of 60 degree F. Report due by the 20th of the month following the
month of dis osition. Authorit 20 AAC 25.235.
Remarks:
I hereby certify that the forging is true and correct to the best of my knowledge.
./
Title:
Date: ~ - B -1 ~
RE
MAR. ì 5 1995
A\as\<a Oil & Gas ons.
. Aochora ...
\
,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator: Field(s): Month /Year of Disposition
CIRI Production Co. West Fork Gas Field Janua , 1995
Facility:
West Fork Gas Field Facilities
I Di,eriplion
Volume MCF*
-
1. Sold 11 ,045
2. Reinjected None
3. Flared or vented less than 1 hour 30
4. Flared or vented greater than 1 hour
(Supplemental report required --See 20 AAC 25.235 None
5. Pilot and Purge
None
6. Used for lease operations 1,010
7. Other None
TOTAL 12,085
e
*If production comes from multiple pools,
indicate contribution of each 001 to total
Pool Percent
Starlin -A- 5,600 46%
SterJin -B" 6,485 54%
.......__..,'..._--~...__.,' -'." -.--..-,...-..-.,.-.......-.-.---..,..--.....""..-
I 01licial Ust' Only - Flanng Authorization >1 hr
1. Safety ---
2. Lease Use
3. Conserv. Purpose
Note: All volumes must be corrected to pressure of 14.65 psia and to a temprature of 60 degree F. Report due by the 20th of the month following the
month of dis osition. Authorit 20 AAC 25.235.
Remarks:
I hereby certify that the forging is true an~ correct to the best of my knowledge.
Title: :,2Pf¡vt-~ ~ )II~ .
Form 10-422
Rev. 11/94
...... ,....... ~ ";"¢. ¥ \' ¡:::.!-' r""'~
KtLC¡V~V
Date:
~b!1'5
FEB 2 4 1995
f _ I,', ...
c¡.
Anchorc: -