ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) onth/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES. GRANITE POINT FIELD JANUARY 2000
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 119
5. Pilot and Purge 217
6. Used for lease operations 35,842
7.Other 0
TOTAL items 1 - 7 36.178
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 46,.885
Remarks:
Y hereby certif/y~ that the foregoing is true and correct to the best of my knowledge.
Signature ~~, f.C,~~~ ~~~~~ Title ACCOUNTING SUPERVISOR Date 02/18/2000
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name. Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ANNA PLATFORM
EXCESS FLARE LOG
January 2000
Date & Time
Event Be an Daie & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Satety Reason Actions Taken Equipment Down
ID Number
1 /1 /20000000 1 /1 /2000 240D 119 Unplanned Intermittent flare due to hi h i aline preuure op II uids buildin u In pipeline Stop seilin as and I Iine from Bruce end
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD FEBRUARY 2000
Disposition Volume MCF*
1. Sold 0
2. Reinjected o
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 747
5. Pilot and Purge 203
6. Used for lease operations 31,713
7. Other 0
TOTAL items 1 - 7 32,663.
8. NGL gas equivalent produced o
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 44,874
Remarks:
I hereby certify t the foreg ing is true and correct to the best of my knowledge.
Signature /P ? I Title ACCOUNTING SUPERVISOR Date 03/08/2000
y ~
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ANNA PLATFORM
EXCESS FLARE LOG
February 2000
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident. Operational or
Safety Reason Actions Taken
~ Equipment Down
ID Number
2.9-00/1500 2--9-00/2400 227 Unplanned Pressure building, can't get all gas in Tine. Operational Liquids building in line Preparing to pig line
2-10-00/1100 2--10-00/1530 520 Planned Shut in pipeline to ship pig and remove liquids Operational Liquids building in line Had to ship pig in opposite direction of normal flow
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 203
6. Used for lease operations 15,522
7.Other 0
TOTAL items 1 - 7 15,725
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 17,418
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
i
Signature ,~~~ ' ~~~ _ r !~~~,~~ Title ACCOUNTING SUPERVISOR Date 03/08/2000
ALASKA
GAS CONSERV
FACILITY REPORT OF PRODUCED GAS DISPOSITION
COMMISSION
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 73.60
UNDEFINED (GAS) 280500 26.40
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-4ZZ
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MARCH 2000
D1SpOSltlOri Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold o
MIDDLE KENAI 2s0150 100.00
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour o
(Supplemental report required -See 20 AAC 25.235)
5. Pilot and Purge 2v
6. Used for lease operations 34,583
7.Other o
TOTAL items 1 - 7 34,800
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: D
11. Transferred to: 48,194
KemarKS:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature L~~(~~yt ~~~C.L~w6! y~ Title ACCT. SUPERVISOR Date 04/11/2000
Form 10-422
Rev. 4/95
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
5 -
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD APRIL 2000
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3: Flared or vented less than 1 hour 134
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 A?aC 25.235) 312
5. Pilot and Purge 210
6. Used for lease operations 32,945
7: Other o
TOTAL items 1- 7 33,501
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 47, 077
Remarks:
I hereby certif~y/t//heat the f regoing isI`tru'e and correct to the best of my knowledge.
Signature/~~:~r,,~~q, . f1~~.~C~fJ Title ACCT. SUPERVISOR Date 05/09/2000
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: ANNA PLATFORM Month/Year: April-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Pianned7 Description of Incident Category. Reason Actions Taken Minimize Recurrence MP-21D Number
4/11/00 8:00 4/11/00 13:00 312 Y PIPELINE Sll FOR BRUCE
PLATFORM RISER INSPECTION OPERATIONAL SCHEDULED MAINTENANCE 00-00-00
Report Date: 7/25/00 Page: 1 of 1
', Flaring on Anna and Bruce
Subject: Flaring on Anna and Bruce
Date: Tue, 11 Apr 2000 09:02:52 -0700
From: "Bounds, Janet G" <boundsj@unocal.com>
To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
Wendy
As part of the project to add the ability of shipping and receiving pigs
between Anna and Bruce Platforms we need to inspect the gas riser on the
Bruce Platform in order to determine if there are inserts inside the line
that will need to be removed. This inspection will require that we shut-in
the gas line between the two facilities. We are anticipating up to 3
NIl~ISCFD may be flared at each facility. This inspection is scheduled to
begin today.
Thank you,
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
4/11/00 8:17 AM
lofl
Flaring on Anna and Bruce
Subject: Flaring on Anna and Bruce
Date: Tue, 11 Apr 2000 09:02:52 -0700
From: "Bounds, Janet G" <boundsj@unocal.com>
To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
Wendy
As part of the project to add the ability of shipping and receiving pigs
between Anna and Bruce Platforms we need to inspect the gas riser on the
Bruce Platform in order to determine if there are inserts inside the line
that will need to be removed. This inspection will require that we shut-in
the gas line between the two facilities. We are anticipating up to 3
NII~ISCFD may be flared at each facility. This inspection is scheduled to
begin today.
Thank you,
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
1 of 1 6/13/00 10:37 AM
__. _ _ -
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE. POINT FIELD MAY 2000
Disposition Volume MCF*
1. Sold 0
2. Reinjected o
3. Flared or vented less than 1 hour O
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 675
5. Pilot and Purge z17
6. Used for lease operations 34,556
7.Other o
TOTAL items 1- 7 35,448
8. NGL gas equivalent produced o
9. Purchased gas 35
10. Transferred from: 0
11. Transferred to: 47, 631
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~/',~l!? ~~ ~ ~ ~ ~ Title ACCOUNTING SUPERVISOR Date 06/13/2000
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name .Code Percent
MIDDLE KENAI 280150 100.00
~, _. .,
r ~,F
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ANNA PLATFORM
EXCESS FLARE LOG
May 2000
Date & Time Date & Time Event Gas Produced or Planned or Black Smok Descri tion of O erational or Reason Actions Taken Ste Taken rt DE & rs~ ma~ en
P p ps
Facility Event Began Event Ended MCF Purchased Unplanned Visible Incident Safety To Min. Recurrence Notific all ached ID Nu
Anna 05-37-OOI900 05-31-00/1500 875 Produced Unplanned G.P. T,F. compressor down to repair a valve. Operational Repair leaky valve Repaired leaky valve Was an unexpected repair Mat was need at G.P.T.F.
~ a
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) onth/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JUNE 2000
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 200
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25135) 0
5. Pilot and Purge 210
6. Used for lease operations 32,861
7. Other 0
TOTAL items 1 - 7 33,271
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: o
11. Transferred to: 41,594
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature L~>C'Glr~ .2 ~~~, /~ ~ Title ACCOUNTING SUPERVISOR Date 07/12/2000
Form 1022
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
ANNA PLATFORM
UNOCAL ALASKA RESOURCES ~ GRANITE POINT FIELD
'ear of Dispo
JULY 2000
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 50
4. Flared or vented greater than 1 hour
(Supplemental report regaittd -See 20 AAC 25.235) loo
5. Pilot and Purge 217
6. Used for lease operations 33.087
7. Other o
TOTAL items 1 - 7 33,454
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 45,36s
Remarks:
I hereby certify that the for oing is true and correct to the best of my knowledge.
,7
Signature '~~ ; ~,(~i3 ' Title ACCOUNTING SUPERVISOR Date 08/17/2000
i ,
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Facility Name
ANNA PLATFORM
Excess Flare Log Report
Month/Year: July-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
7/31/00 2:00 7/31/00 4:00 100 N NEW PIG TRAP INSTALLED OPERATIONAL SCHEDULED MAINTENANCE
Report Date: 8/1/00 Page: 1 of 1
.ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD AUGUST 2000
Disposition Volume MCF*
1. Sold 0
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 9,853
5. Pilot and Purge 217
6. Used for lease operations 33,370
7. Other o
TOTAL items 1- 7 43, 440
8. NGL gas equivalent produced o
9. Purchased gas 4
10. Transferred from: o
11. Transferred to: Zs,47a
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~ r ~~~J Title ACCOUNTING SUPERVISOR Date 09/14/2000
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
P'ornllU-42Z
Rev. 4/95 '
Excess Flare Log Report
Facility Name
ANNA PLATFORM
Month/Year: August-00
Date & Time Event Gas Steps-Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID.Number
8124/00 6:00 8124/00 18:00 1150 N OPERATIONAL SCHEDULED MAINTENANCE
8/25/00 0:00 8/25/00 23:59 1486 N OPERATIONAL SCHEDULED MAINTENANCE
8/26100 0:00 8/26/00 23:59 1486 N OPERATIONAL SCHEDULED MAINTENANCE
8/27/00 0:00 8/27/00 23:59 1486 N OPERATIONAL SCHEDULED MAINTENANCE
6/28/00 0:01 8/28/00 9:30 624 N OPERATIONAL SCHEDULED MAINTENANCE
8/29/00 0:01 8!29/00 23:59 1160 N OPERATIONAL SCHEDULED MAINTENANCE REBOILER SHUT IN
8/30/00 0:01 8/30/00 23:59 1205 N OPERATIONAL SCHEDULED MAINTENANCE REBOILER SHUTDOWN
8/31/00 0:01 8/31/00 23:59 1256 N OPERATIONAL SCHEDULED MAINTENANCE REBOILER SHUT DOWN
Report Date: 9/1/00 Page: 1 of 1
. ~ '~
ALASKA OIL AND GAS CONSERVATION .COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD SEPTEMBER2000
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 771
5. Pilot and Purge 210
6. Used for lease operations 32,204
7. Other 0
TOTAL items 1- 7 33 ,185
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 35 , 471
Remarks:
I hereby certify/~t/h/~at the for oing is t//rue and correct to the best of my knowledge.
Signature~~~l/1~//~ ~ /L~~/4o~ Title. _ACCOUNTING SUPERVISOR Date 10/19/2000
Form 10-422
*Indicate contribution of each pool to total
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Rev. 4/95
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM
Month/Year: September 2000
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
9/1/00 0:01 911/00 23:59 11 N VRU COMPRESSOR DOWN FOR OPERATIONAL SCHEDULED MAINTENANCE VRU REPAIRED T-H-3420
REPAIRS
915/00 0:01 9/5/00 23:59 28 N VRU DOWN WHILE PUMPING & OPERATIONAL. SCHEDULED MAINTENANCE VRU DOWN DUE TO LACK OF T-H-3420
CLEANING TANK 103 GAS
9/6/00 0:01 9/6/00 23:59 22 N VRU DOWN WHILE PUMPING & OPERATIONAL SCHEDULED MAINTENANCE VRU DOWN DUE TO LACK OF TEMPORARILY PUT TANK T-H-3420
CLEANING TANK 103 GAS 103 BACK IN SERVICE
9/10/00 0:01 9/10!00 23:59 26 N DEPRESSURIZE COALESCER YO OPERATIONAL SCHEDULED MAINTENANCE DEPRESSURIZE. COALESCER T-H-3420
INSTALL A PSV
9/11100 0:01 9/11/00 23:59 36 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
TANK 103
9112/00 0:01 9/12/00 23:59 47 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACI OF GAS TO VRU T-H-3420
TANK 103
9/13/00 0:01 9/13/00 23:59 46 N VRU DOWN FOR CLEANING TANK OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
103
9/14/00 0:01 9/14/00 23:59 50 N VRU DOWN FOR CLEANING TANK OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
103
9/15100 0:01 9/15!00 23:59 48 N VRU DOWN FOR CLEANING TANK OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
103
9/16/00 0:01 9/16/00 23:59 46 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
TANK 103
9!17!00 0:01 9/17/00 23:59 52 N VRU DOWN FOR CLEANING TANK OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
fns
9/18/00 0:01 9/18/00 23:59 49 N VRU DOWN FOR CLEANING TANK OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H3420
103
9/19/00 0:01 9/19/00 23:59 42 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
TANK 103
9/20/00 0:01 9/20/00 23:59 43 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
TANK 103
9/21100 0:01 9/21/00 23:59 43 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
TANK 103
Report Date: 1/11/01 Page: 1 of 2
Excess Flare Log Report
S~~,le,,..ber ~~c~rJ
9/22/00 0:01 9/22/00 23:59 43 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
TANK 103
9/23/00 0:01 9/23/OD 23:59 44 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
TANK 103
9/24/00 0:01 9/24/00 23:59 45 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
TANK 103
9/25/00 0:01 9/25/00 23:59 44 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
TANK 103
9126/00 0:01 9/26/00 23:59 44 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H3420
TANK 103
9/27100 0:01 9/27/00 23:59 45 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
TANK 103
9/28/00 0:01 9/28/00 23:59 41 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE . LACK OF GAS TO VRU T-H-3420
TANK 103
9/29/00 0:01 9/29/00 23:59 42 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H3420
TANK 103
9/30/00 0:01 9!30/00 23:59 44 N VRU DOWN FOR CLEANING OF OPERATIONAL SCHEDULED MAINTENANCE LACK OF GAS TO VRU T-H-3420
TANK 103
Report Date: 1/11/01 Page: 2 of 2
Excess Flare Log Report
Facility Name: ANNA PLATFORM Month/Year: September 2000
Date 8~ Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-21D Number
9/1100 0:01 8/1/00 23:59 741 N REBOILER DOWN FOR REPAIR,
PIPELINE WATERED OPERATIONAL SCHEDULED MAINTENANCE GAS DENY WORK REQUIRED INSTALLING NEW FIRE
TUBE IN REBOILER,
EQUIPMENT ID A-0052
9/24/00 19:00 9/24/00 21:00 30 N GENERATOR PROBLEM,
PLATFORM SHUT-IN OPERATIONAL UNSCHEDULED MAINTENANCE STARTED GENERATOR &
STARTED PLATFORM TROUBLESHOOTING
GENERATORS
Report Date: 1/11/01 Page: 1 of 1
Devito, Aleja J
From: Bounds, Janet G
Sent: Tuesday, January 02, 2001 10:51 AM
To: Devito, Aleja J
Subject: FW: September flaring questions
Follow Up Flag: Follow up
Due By: Thursday, January 04, 2001 5:00 PM
Flag Status: Flagged
~~ ~~
ANX0900.x1s Gix0900.xis
Alej a
Wendy Mahan, AOGCC, is seeking more information on September's flare reports for Anna and
GPTF.
Regarding Anna the flare report file from the field has the required information, but this
information was not on the report sent to AOGCC. Please send her a revised flare report.
A similar problem is evident at GPTF. The spreadsheet from the field contains more
information than the data submitted to AOGCC. Please send a revised flare log to her. I
will answer her questions regarding the cleaning of Tank 103 after I get some input from
the field.
I have included attachments of the information
Is there something I can do to help minimize these reporting problems?
Thank you,
Janet
-----Original Message-----
From: Wendy Mahan [mailto:Wendy_Mahan@admin.state.ak.us]
Sent: Wednesday, December 27, 2000 8:44 AM
To: Bounds, Janet G
Subject: September flaring questions
Hi Janet,
I have a few flaring questions for September's gas disposition
submission.
Anna - events 9/1/00 and 9/24/00 lack descriptions. What happened?
Granit Point Tank Farm - 9/1/00 event lacks description. What happened?
VRU down for cleaning tank 103 9/5-30/00. How long does it take to
clean a tank? How big is this tank? Were personnel on site the whole
time? Please provide more information.
Thanks,
Wendy
~~~
~~~ ~ 5 2001
Alaska pit & Gas Gans, Commission
Anchara~e
1
September flaring questions
Subject: September flaring questions
Date: Wed, 27 Dec 2000 08:43:57 -0900
From: Wendy Mahan <Wendy_Mahan@admin.state.ak.us>
Organization: doa-aogcc
To: "Bounds, Janet G" <boundsj@unocal.com>
Hi Janet,
I have a few flaring questions for September's gas disposition
submission.
Anna -events 9/1/00 and 9/24/00 lack descriptions. What happened?
Granit Point Tank Farm - 9/1100 event lacks description. What happened?
VRU down for cleaning tank 103 9/5-30/00. How long does it take to
clean a tank? How big is this tank? Were personnel on site the whole
time? Please provide more information.
Thanks,
Wendy
1 of 1 1/3/01 8:16 AM
~,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD OCTOBER 2000
Disposition Volume MCF*
1. Sold o
2. Reinjected 0
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 1,657
5. Pilot and Purge 2v
6. Used for lease operations N O 31, 474
Alaska (~ ~
7.Other p s
orage 0
TOTAL items 1 - 7 33, 348
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 37,675
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~-C.0~7^ /~ ~~~~~~~ Title ACCOUNTING SUPERVISOR Date 11/09/2000
*Indicate contribution of each pool to total
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
~~~~ ~,~/
~~~'~~~/
1. Safety ~ MCF
12. Lease Use I ~'~ ~ ~ MCF
3. Conserv. Purposes
MCF
lA% / /
Commissi ner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: ANNA PLATFORM Month/Year: October 2000
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/14/00 3:00 10/14/00 21:30 1657 N GAS COMPRESSOR ROUTINE
MAINTENANCE OPERATIONAL SCHEDULED MAINTENANCE A-PM-0540
Report Date: 11/7/00 Page: 1 of 1
October flaring questions
Subject: October flaring questions
Date: Wed, 03 Jan 2001 08:47:39 -0900
From: Wendy Mahan <Wendy_Mahan@admin.state.ak.us>
Organization: doa-aogcc
To: "Bounds, Janet G" <boundsj@unocal.com>
Janet,
I have a few more questions about the October flare event descriptions.
Anna: 10/14/00 Gas compressor routine maintenance. What was done?
King Salmon: 10/30-31/00 Platform shutdown for maintenance and
modification. Please give details.
Steelehead: 10/19/00 bringing wells back on after state inspector. What
was inspected why were the wells shut in?
Granite Point platform: 10/14/00 VRU and OSS compressor down for
scheduled maintenance. Please explain.
10/20/00 brought on well after s/i as per Paul Burtis. Please wexplain.
GPTF-LEX: VRU down for cleaning of tk-103 10/1-3/00 -Same questions as
September info request. 10/14/00 and 10/15/00 events no description.
Pease explain. 10/27/00 Ariel compressor down for scheduled maintenance?
Please explain. 10/28-29/VRU down for scheduled maintenance? Please
explain.
Also provide a description of any steps taken to mitigate flaring, as
required by our regulation and not provided by Unocal.
Thanks,
Wendy
1 of 1 1/3/01 8:47 AM
Unocal Corporation
Agricultural Products
909 West 9th Avenue, P.O. t3ox 196247
Anchorage, A~ska 99519-6247
Telephone {907) 263-7641
Facsimile 263-7901
uNOCa~~
Kathleen P. Mobley
Etwita~merrtal Specialist
Dear Ms. Mahan,
April 2, 2001
Wendy Mahan
AOGCC
333 West 7~' Ave., Suite 100
Anchorage, AK 99501
FLARE LOGS
RESPONSE TO AGOCC QUESTIONS
Attached is detailed information regarding flare logs submitted for Unocal facilities for
September and October, 2000 per your email to Janet Bounds with Unocal. We realize
we have taken longer to respond than we usually do, and we appreciate your patience.
if you have any questions regarding these
please call me at (907)263-7641, or email
Bounds. Again, thank you.
reports or future excess flare log reports,
me at mobleyk _unocal.com and cc Janet
Sincerely,
Kathy Mobley
cc: KPM (Facility air files}
Facilities, cover and facility-specific attachment
Janet Bounds I File
Aleha Devito
c:~oocu~-iectiut-iu.OCncS-r~rempuF 4ti, ; ao2o1 co,~r ~r~:uoc
Response to AOGCC Questions Apri! 2, 2001
Unacal Ataska Page 2 of 8
Anna
9/1/00
Description
Reboiler down for repair, pipeline watered
Reason
Reboiler down caused water to accumulate in pipeline
Actions Taken
Installed new fire tube in reboiler
Steps Taken to Minimize Recurrence
Installed new fire tube in reboiler, equipment ID A-0052
Other AOGCC Questions
None
9124/00
Description
Platform shut-in due to generator problem
Reason
noose wire in generator
Actions Taken
Repaired generator and started platform
Steps Taken to Minimize Recurrence
Repaired generator and started platform
Other AOGCC Questions
None
10H 4/00
Description
Gas compressor down for routine maintenance
Reason
Semi-annual maintenance
Actions Taken
Informed affected facili#ies that Anna compressor would
be offline and unable to send gas to GPTF, so affected
facilities could curtail their operations appropriately.
Steps Taken to Minimize Recurrence
Completed maintenance and returned to normal
operations
Other AOGCC Questions
None
C:IDOCUME-1lSEMCMA-91LOCALS-11TempWares 4th darter, 04020? covarletter.doc
Response to AOGCC Questions Apri12, 2Q01
Unocal Alaska Page 3 of 8
Granite Point Tank Farm (GPTF)
9/1/00
Description
VRU compressor` down for repairs
Reason
General trouble-shooting revealed loose belts
Actions Taken
Tightened belts
Steps Taken to Minimize Recurrence
Tigh#ened belts and retumed to service
Other AOGCC Questions
none
9/3/00 - 8130100
10/1 /00-10/3/00
Description
Tank 103 taken out of service for cleaning
Reason
Lack of gas to VRU, so gas was flared
Actions Taken
Completed work and returned to normal operations.
To ensure a fast turnaround, cleaning of the tank was
scheduled #o coincide with disposal on Bruce.
Steps Taken to Minimize Recurrence
Waste was disposed of on Bruce Platform. Speed was
limited only by space available for waste containers on
the platform; operators worked around the clock, non-
stop, emptying containers, processing and disposing of
the waste.
Other AOGCC Questions
How long does it take to clean a tank?
The waste in Tank 103 was an oily substance
that could not be broken down to reduce the
volume, and therefore took longer to clean than
a tank filled with water.
How big is this tank?
13,200 bbls (554,400 gallons)
Were personnel onsite the whole time?
Yes, at both the Granite Point Tank Farm and
Bruce Platform.
C:1DOCilME--~ISEMCMA-~1laCALS-11TempWarres 4th quarter, 040201 coverletter.doc
Response to AOGCC Questions
Unocal Atastca
April 2, 2001
Page 4 of $
10114/00 (GPTF, continued)
Description
Shut down gas fueled compressors so adequate
amount of gas could be sent back to Anna Platform to
run their equipment
Reason
Scheduled semi-annual maintenance on Anna Platform
Actions Taken
Shut down compressors until Anna came back online
Steps Taken #o Minimize Recurrence
Shut down compressors until Anna came back online
Other AOGCC Questions
None
10/15/00
Description
VRU down for PSM (Preventative Safety Maintenance)
Reason
Scheduled yearly PSM
Actions Taken
Tested pressure and temperature switches
Steps Taken to Minimize Recurrence
Completed testing, re#umed to service
Other AOGCC Questions
None
10127100
Description
Compressor 3200 down
Reason
Ariel compressor down for 8000 hr (annual)
maintenance
Actions Taken
Switched to Compressor 3300
Steps Taken to Minimize Recurrence
Compressor 3300 available to mitigate flaring.
Completed maintenance and returned to service.
Other AOGCC Questions
None
G:IDOCUME-11SEMCMA-?U.OCALS-11TerrrpiFtares 4th quarter; 040201 coverfetter.doc
Response to AOGCC Questions
Unocal Alaska
10!28!04 --14!29!00 {GPTF, continued)
Description
VRU down
Reason
Making repairs to VRU booster
Actions Taken
Completed repairs and returned to service
Steps Taken to Minimize Recurrence
Completed repairs and returned #o service
Other AOGCC Questions
None
April 2, 2001
Page 5 0# 8
C:1aOCt/ME-i15EMCAAA-91tt?CALS-1iTempWeres 4tf- quarter, 0411201 coverietter doc
Response to AOGCC Questions
Unocal Alaska
April 2, 2001
Page 6 of 8
King Salmon Platform
'10130/00 -10131100
Description
Platform shut down fior maintenance and modifications
Reason
Scheduled maintenance, blow dawn well, platform
shutdown & modifications
Actions Taken
Performed major math#ica#ions #o re-pipe crude oil
process flow. Took advan#age of scheduled shutdown to
perform regular inspections on relief valve vent scrubber
and crude surge vessel; replaced electrical gears and
breakers
Steps Taken to Minimize Recurrence
Multiple projects were coordinated to minimize
downtime.
Other AOGCC Questions
None
C:IDOCUME~1ISEMCMA-41LOCALS-11TemplFlares 4th quarter, 041120? cvverletterdoc
Response to AOGCC Questions Aprif 2, 2001
Unocal Alaska Page 7 of 8
Granite Point Platform
10/14/00
Description
GPTF compressor down and unable to buy gas.
Reason
GPTF compressor down 17 hours due to semi-annual
maintenance on Anna Platform, unable to buy gas.
Actions Taken
Recycled excess gas, and trimmed back wells to keep
them stable.
Steps Taken to Minimize Recurrence
Ensured wel{s would not be lost by stabilizing and
monitoring wells while GPTF was down and ensuring
gas would be available to GPTF for their startup.
The platform must keep adequate gas available to
bring GPTF online. In the event a platform well is
destabilized, gas can be sent from GPTF to save
the welt; however, if GPTF is not online,
destabilized platform wells could be lost.
Other AOGCC Questions
None
10/20/00
Description
Brought GP-50 on after shutdown,
Reason
Dummy valve was offseat (not covering properly),
allowing gas to leak through hole in tubing {downhole).
When gas leaks into tubing, it comes back up w/o {ifting.
Actions Taken
A tubing packoff was installed to isolate the
communication between the tubing casing annulus
Steps Taken to Minimize Recurrence
Finished installation of tubing packoff & brought back
online.
Other AOGCC Questions
None
C:IDOC!!ME-915EMGMA-11LOCALS-11TemplFta~s 4fh quarter, 0402D1 coverletter.cfoc
Response to AOGCC Questions Apri12, 2001
Unocal Alaska Page 8 of 8
Steelhead
10!19/00
Description
Checking downhole valves with state safety inspector
Reason
Regular I; month safety inspection
Actions Taken
Shut in wells, completed inspection and returned to
normal operations
Steps Taken to Minimize Recurrence
Completed inspection and returned to normal operations
Other AOGCC Questions
What was inspected?
Subsurface and surface safety valves
Why were the wells shut in?
The inspection cannot be performed on wells
unless they are shut in.
C:IOOCUME^-11SEMGMA-}I~OCA~S~}ITemplFfares 4th quarter, 040201 cover-etter.doc
~~~
ALASKA OIL AND GAS CONSERVATION COMMISSION ,~ ~~~!
FACILITY REPORT OF PRODUCED GAS DISPOSITION ~~~s~ ~~ T8 ~~
Facility Operator Field(s) onth/Year of Disposition ~nfJ ~`~
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD NOVEMBER 2000 ~~~'~~ Cpj11~f~~/~h
Disposition Volume MCF*
1.5o1d 0
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 1, 692
5. Pilot and Purge 210
6. Used for lease operations 30,943
7. Other 0
TOTAL items 1- 7 32.845
S. NGL gas equivalent produced o
9. Purchased gas 0
10. Transferred from: 0
il. Transferred to: 34,953
Remarks:
I hereby certi hat the fo \going is true and correct to the best of my knowledge.
Signature ``` Title ACCOUNTING SUPERVISOR Date 12/07/2000
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must lie corrected to
.pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~,
/ ~~ ~L= L
Form 10-422
Rev. 4/95
Excess Ftare Log Report
Facility Name: ANNA PLATFORM Month/Year: November 2000
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
11/2/00 6:00 11/2/00 23:59 768 Y FLARINGSALES GAS DUE TO
P/L BEING SHUT IN OPERATIONAL SCHEDULED MAINTENANCE MAKING PIG CONNECTIONS ON
THE BRUCE
11/3/00 0:00 11/3/00 20:00 904 Y FLARING SALES GAS DUE TO
P/L BEING SHUT IN OPERATIONAL SCHEDULED MAINTENANCE MAKING PIG TRAP
CONNECTION ON THE BRUCE
Report Date: 12/6/00 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD DECEMBER 2000
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 2DQ ~ o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235 s• ommissiar,
nchorac~e o
5. Pilot and Purge 217
6. Used for lease operations 32. oos
7. Other o
TOTAL items 1 - 7 32,225
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 33.504
Remarks:
I hereby certify that the f~or~egoing is true and correct to the best of my knowledge.
Signature Li~,~Q~Q ail' ~I y'~`~/ Title ACCOUNTING SUPERVISOR Date 01/16/2001
Fornil0-422
Rev. 4195
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235