2~ ~~DALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I BAKER PLATFORM I UNOCAL ALASKA RESOURCES I MIDDLE GROUND SHOAL
Disposition Volume MCF*
1. Sold 85,167
2. Reinjected 0
3. Flared or vented less than 1 hour 508
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 217
6. Used for lease operations 31,168
7.Other 0
TOTAL items 1 - 7 117.060
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify at the foregging is true and correct to the best of my knowledge.
Signature ~,~~~ ~-~//~~,~ .Title ACCOUNTING SUPERVISOR Date 02/18/2000
Form 10-422
Rev. 4/95
ear of Disposition
JANUARY 2000
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 6.37
B C AND D 524112 2.93
E F AND G 524114 11.89
UNDEFINED (GAS) 524500 78.81
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I BAKER PLATFORM I UNOCAL ALASKA RESOURCES ~ MIDDLE GROUND SHOAL
Disposition Volume MCF*
1. Sold 42 , 551
2. Reinjected 0
3. Flared or vented less than 1 hour 460
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) o
5. Pilot and Purge 203
6. Used for lease operations 29.708
7. Other 0
TOTAL items 1 - 7 72,922
S. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
ii. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~,~ f~-,~~~-~` Title ACCOUNTING SUPERVISOR _ Date 03/07/2000
Form 10-422
Rev. 4/95
ear of Lispo
FEBRUARY 2000
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110. 4.87
B C AND D 524112 4.26
E F AND G 524114 22.69
UNDEFINED (GAS) 524500 68.18
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
aL~
R~y~s~
d
Facility Operator Field(s) onth/Year of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MARCH 2000
Disposition Volume MCF*
1. Sold 37,805
2. Reinjected 0
3. Flared or vented less than 1 hour 460
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 217
6. Used for lease operations 33,05
7.Other 0
TOTAL items 1 - 7
~~, , 71,533
_.
8. NGL gas equivalent produced ~" 0
9. Purchased gas - - 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~ ; ~~ ~ ~ ; ~/_ Title ACCOUNTING SUPERVISOR Date 07/12/2000
i
~r1 ~:~~-~z~ r
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 6.71
B C AND D 524112 4.37
E F AND G 524114 23.59
UNDEFINED (GAS) 524500 65.33
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~opl~
J
Form 10-422
Rev. 4/95
.ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
~~~~~~
Facility Operator Field(s) onth/Year of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL APRIL 2000
Disposition Volume MCF*
1. Sold 31,584
2. Reinjected 0
3. Flared or vented less than 1 hour 530
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 210
6. Used for lease operations 30,791.
7. Other 0
TOTAL items 1 - 7 63.115
8. NGL gas equivalent produced o
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature / ,! ~- ~ ~ l~~ Title ACCOUNTING SUPERVISOR Date 07/12/2000
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 10.80
B C AND D 524112 5.39
E F AND G 524114 25.46
UNDEFINED (GAS) 524500 58.35
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
CoA~
Form 10-422 v
Rev. 4195
.ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
~`l~~a
Facility Operator Field(s) onth/Year of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MAY 2000
Disposition Volume MCF*
1. Sold 54,499
2. Reinjected 0
3. Flared or vented less than 1 hour 715
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 922
5. Pilot and Purge 217
6. Used for lease operations 29,86
7. Other 0
TOTAL items 1 - 7 86,214
8. NGL gas equivalent produced ~; ~; ~; -; :•~ , , , 0
9. Purchased gas ~•~ ~ - 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~ ~ ~~~ l~~ Title ACCOUNTING SUPERVISOR Date 07/13/2000
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 7.86
B C AND D 524112 2.48
E F AND G 524114 19.19
UNDEFINED (GAS) 524500 70.47
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
C®~y
Form 10-422
Rev. 4/95
BAKER PLATFORM
EXCESS FLARE LOG
May 2000
Date 8 Time Date & Time Event Gas Planned or Description of Operational or Reason Actions Taken Equipment Down
Event Began Event Ended MCF Unplanned Incident Safety ID Number
5/31/00 ~ 00:00 5/31!00 ~ 2400 922 Planned B Pipeline S/l for mechanical work Operational Scheduled Mainl., Work continues B 16
:r' ~-,
3
_, ..~ a_..r _. ,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) onth/Year of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JUNE 2000
Disposition Volume MCF*
1. Sold 57,703
2. Reinjected 0
3. Flared or vented less than 1 hour 465
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 3,952
S. Pilot and Purge 210
6. Used for lease operations 30,187
7.Other 0
TOTAL items 1 - 7 92,517
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify hat the fo egoing is true and correct to the best of my knowledge.
Signature ~~ ~ f'/.~~! Title ACCOUNTING SUPERVISOR Date 07/13/2000
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 7.67
B C AND D 524112 2.29
E F AND G 524114 18.05
UNDEFINED (GAS) 524500 71.99
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
BAKER PLATFORM
EXCESS FLARE LOG
June 2000
Date 8 Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equipment Down
ID Number
611/00 ~ 00:00 &1/00 ~ 2400 983 Planned B Pipelne S/I for mechanical work Operatbnal Work on'B' Pipeline Work conOnues 0
8/2/00 ~ OD:00 8/2100 ~ 2400 938 Planned B Pipeline Sll for mechanical work & pressure testing Operational Work on'B' Pipeline Work cominues 0
B/3I00 ~ 00:00 6/3!00 ~ 1 t:00 679 Planned 8 Pipeline S/I for mechanical work 8 pressure testing Operatbnal Work on'B' Pipeline This phase of work completed. 0
8/5/00 ~ 10:30 8/5/00 ~ 23:59 521 Planned B Pipeline Sll for valve charge on Cross Timbers "C" Operational Scheduled Maim., Work on'B' PipeBne waking on completbn of work 0
8/8/00 ~ 00:01 8/8/00 (d} 17:00 889 Planned B Pipeline S/I for valve change on Cross Timbers "C" Operatbnal Scheduled Maim., Work on'B' Plpeiine waiting on completbn of work 0
&7/00 ~ 00:01 &7/00 ~ 04:00 164 Planned B Pipeline S/I for valve change On Cross Timbers 'C" Operational Scheduled Maim., Work on'B' Pipeline work completed pipeline back in service 0
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
BAKER PLATFORM Operator
UNOCAL ALASKA RESOURCES Field(s).
MIDDLE GROUND SHOAL Month/Year of Disposition
JULY 2000
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold
59,519 Pool Name Code Percent
A 524110 8.75
2. Reinjected o
B C AND D
524112
81
2
.
.
3. Flared or vented less than 1 hour 1,284 E F AND G 524114 17.96
4. Flared or vented greater than 1 hour
(Sup
lemental report required- See 20 AAC 25
235) 0 UNDEFINED (GAS) 524500 70.48
.
p
5
Pil
d P
t 217
.
an
urge
o
6. Used for lease operations 32,309
7 Oth "
er
TOTAL items 1- 7 93,329
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: 0
11. Transferred to: o
xemar-cs:
I hereby certify that the for 'going is true and correct to the best of my knowledge.
'1
Signature / ~' ~~/ Title ACCOUNTING SUPERVISOR Date 08/09/2000
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
BAKER PLATFORM
UNOCAL ALASKA RESOURCES ~ MIDDLE GROUND SHOAL
'ear of Disposition
AUGUST -2000
Disposition Volume MCF*
1. SOId 29.178
2. Reinjected o
3. Flared or vented less than 1 hour 958
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) o
5. Pilot and Purge 217
6. Used for lease operations 34,246
7.Other o
TOTAL items 1 - 7 64, 599
8. NGL gas equivalent produced 0
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 0
Remarks:
I hereby certify that the fo going is true and correct to the best of my knowledge.
Signature~~~/~ ~'~ /~ ~~~ Title ACCOUNTING SUPERVISOR Date 09/08/2000
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 11.37
B C AND D 524112 5.38
E F AND G 524114 24.08
UNDEFINED (GAS) 524500 59.17
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
~E\lISE C®PV'
U Date
Facility Operator Field(s) Month/Year of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL SEPTEMBER2000
Disposition Volume MCF*
1. Sold 22,984
s
2. Reinjected ~F~,O~/~ tJ~~
0 0
S
3. Flared or vented less than 1 hour ~~Ch°cO~s
~ 369
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) ~ssi°~ 153
5. Pilot and Pnrge 210
6. Used for lease operations 30,664
7. Other o
TOTAL items 1 - 7 54,380
8. NGL gas equivalent produced 0
9. Purchased gas o
10. Transferred from: o
11. Transferred to: o
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~~. f~, ~, ~~~j Title ACCOUNTING SUPERVISOR Date 10/26/2000
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 11.80
B C AND D 524112 .7.23
E F AND G 524114 26.22
UNDEFINED (GAS) 524500 54.75
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name:
BAKER PLATFORM
~~i/BS ~ Ply
t
~ I I~r.
Date
Month/Year: September 2000
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
9le/o0 7:00 9/9/00 9:00 27 N BROKEN CONDUIT CAUSED
COMPRESSOR SHUT DOWN DUE
TO ELECTRICAL SHORT OPERATIONAL UNSCHEDULED MAINTENANCE Repaired by electrician and
brought back on line. Conduit Repaired B-C-0202-1
9/16/00 16:00 9/16/00 19:00 126 N Loss of ~t3 AC generator caused a
loadshed of gas comp and vru. OPERATIONAL UNSCHEDULED MAINTENANCE Repaired AC #3 ASAP
' B-C-0202-2
Report Date: 10/25/00 Page: 1 of 1
ALASKA
AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Disposition Volume MCF*
1. Sold 50,060
2. Reinjected O
3. Flared or vented less than 1 hour 503
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 0
5. Pilot and Purge 217
6. Used for lease operations 31,332
' S19i?
7. Other Alaska ~ oiage D
TOTAL items 1- 7 82,112
8. NGL gas equivalent produced o
9. Purchased gas O
10. Transferred from: O
11. Transferred to: O
Remarks:
I hereby certify th1at the foregoing is true and correct to the best of my knowledge.
Signature ~ "'~~ ~ L ~ ~t> Title ACCOUNTING SUPERVISOR Date 11/09/2000
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 8.79
B C AND D 524112 5.57
E F AND G 524114 15.63
UNDEFINED (GAS) 524500 70.01
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~
~~j~
ALASKA OIL AND GAS CONSERVATION COMMISSION aiaSka ' ~~..~ ~$ r ~~
FACILITY REPORT OF PRODUCED GAS DISPOSITION O,J~ ~'as ?O~a
Facili B ER PLATFORM Operat UNOCAL ALASKA RESOURCES Field(s)MIDDLE GROUND SHOAL Month/Y OVEMBER2 OOsition ~~5ar`7,~~ ~ft~~f~~/fir
Disposition Volume MCF*
1. SOId 53 , 454
2. Reinjected 0
3. Flared or vented less than 1 hour 397
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235 o
5. Pilot and Purge 210
6. Used for lease operations 32,168
7.Other O
TOTAL items 1 - 7 86.229
8. NGL gas equivalent produced 0
9. Purchased gas o
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the forego ng is true and correct to the best of my knowledge.
Signature ~,~,~/~ ~L 2!/~ Title ACCOUNTING SUPERVISOR Date 12/07/2000
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 6.97
B C AND D 524112 4.48
E F AND G 524114 12.77
UNDEFINED (GAS) 524500 75.78
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
BAKER PLATFORM Operator
UNOCAL ALASKA RESOURCES Field(s)
MIDDLE GROUND SHOAL Month/Year of Disposition
DECEMBER 2000
Disposition Volume MCF* *Indicate contribution of each pool to total.
5o1d
1
52
792 Pool Name Code Percent
. ,
'~ =p~.X..~
~ ~ A 524110 6.11
2. Reinjected ~..~ o
B C AND D
524112
4.09
3. Flared or vented less than 1 hour `f'4 ~ ~ ~'t~Q ~ 403 E F AND G 524114 12.06
4. Flared or vented greater than 1 hour d ~ ~
uired -See 20 AAC 25
235)
t
S
l
t
l Cr~ns• ~'cr~r~,~sstrr O
~f UNDEFINED (GAS) 524500 77.74
.
emen
repor
req
(
upp
a aC~
217
5. Pilot and Purge
6. Used for lease operations 33,743
7
Other O
.
TAL items 1- 7
TO
7 155 <4~:~i.~.~~?€TSB`:~p~j"_~~'~a ~~k~#~ait~~;:.::; ~.;~~>: ~;>::;;;:
1
Safet F
.
y
8. NGL gas equivalent produced o
2. Lease Use
~ MCF
9. Purchased gas 0
3. Conserv. Purposes
MCF
10. Transferred from: 0
11. Transferred to: o
Co issioner Date
Remarks:
I hereby certify that the fo egoing is true and correct to the best of my knowledge.
Signature ~~~.E~~j ~ ~ Title ACCOUNTING SUPERVISOR Date 01/09/2001
Form 10-422
Rev. 4/95
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235