Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutUNOCAL - BRUCE PLATFORMGAS DISPOSITION FILES Field u n~a c ~. 2000 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) onth/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JANUARY 2000 Disposition Volume MCF* 1.5o1d 0 2. Reinjected o 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 53 5. Pilot and Purge 217 6. Used for lease operations 17,631 7.Other 0 TOTAL items 1 - 7 17,901 8. NGL gas equivalent produced 0 9. Purchased gas 12 10. Transferred from: 0 11. Transferred to: 16.495 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~i ~ hL~ ~'~'-C..i Title ACCOUNTING SUPERVISOR Date 02/18/2000 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 73.12 UNDEFINED (GAS) 280500 26.88 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 BRUCE PLATFORM EXCESS FLARE LOG Jan-00 & Time Be an Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equipment Down ID Number 2-Jan-00 1200 2-Jan-0O 1800 53 Planned PI To Mna, shut valve to GPTF Op PI In None ALASKA CONSERV COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 0 5. Pilot and Purge 203 6. Used for lease operations 15,522 7.Other 0 TOTAL items 1 - 7 15,725 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 17.418 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ,~~~~ ° ~~~ ~ ~ ~l Title ACCOUNTING SUPERVISOR Date 03/08/2000 ~. *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 73.60 UNDEFINED (GAS) 280500 26.40 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 1U-422 Rev. 4/95 _ ,., M ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MARCH 2000 Disposition Volume MCF* 1. Sold 0 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 122 5. Pilot and Purge 217 6. Used for lease operations 16,504 7.Other o TOTAL items 1 - 7 16.843 S. NGL gas equivalent produced o 9. Purchased gas 419 10. Transferred from: o 11. Transferred to: 18,319 Remarks: I hereby certify that the fore oing is true and correct to the best of my knowledge. J Signature ~~ ~_ ~Z~ :~ ' ~.` ~1~~~ Title ACCT. SUPERVISOR Date 04/11/2000 ~~ Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 74..80 UNDEFINED (GAS) 280500 25.20 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ,ar___. BRUCE PLATFORM EXCESS FLARE LOG Mar-00 Date 8 Time 16YR4~ ® 0 Date & Time fvYRP~ 60d@A Event Gas M~ Produced or ~Fft~P,A Planned or 4~An~ Black Smoke v~gie Description of hr ins ec4d&f~edr#d mainten Operational or O €tnal Reason 0 HR INSPECTIO Actions Taken ONE Steps Taken To ¢Qip~currence Reported Car nter Equipment Down IQr 30mar, 08:00 30Mar, 18:00 122 Produced Planned No 8000 hr inspection and maintenance Operatianai Scheluled maintenance Maint crew out to assist Scheduled maintenanc Carpenter U-0053 ALASKA OIL AND GAS CONSERVATION COMMISSION FACII,ITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD APRIL 2000 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 134 5. Pilot and Purge 210 6. Used for lease operations 15, 877 7. Other 0 TOTAL items 1 - 7 16,221 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: o 11. Transferred to: 19, 798 Remarks: I hereby certify at the foreg ing is true and correct to the best of my knowledge. .Signature ~~~ ~~~~ Title ACCT. SUPERVISOR Date 05/09/2000 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 77.71 UNDEFINED (GAS) 280500 22.29 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: BRUCE PLATFORM Month/Year: April-00 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 4/11/00 12:00 4/11/00 17:30 134 Y PIPELINE SHUT IN FOR INSPECTION OPERATIONAL OTHER: DO INTERNAL INSPECTION U-B-0700 Report Date: 7/25/00 Page: 1 of 1 A.- ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlYear of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MAY . 2000 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold o MIDDLE KENAI 280150 80.23 2. Reinjected o UNDEFINED (GAS) 280500 19.77 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour 257 (Supplemental report required -See 20 AAC 25.235) ,,i ~ 5. Pilot and Purge 217 6. Used for lease operations 17.375 7. Other o TOTAL items 1- 7 17,849 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: o 11. Transferred to: .19,177 1(CIII'di"KJ: I hereby certify thatl~th~e'~florggo~~in//g is true and correct to the best of my knowledge. Signature ~~~/~,~,~ ~'~G~%~~ Title ACCOUNTING SUPERVISOR Date 06/13/2000 Form 10-422 Rev. 4/95 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC25.235 .,.~ a Excess Flare Log Report Facility Name: BRUCE PLATFORM Month/Year: May-00 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-21D Number 5/31/00 9:30 5131/00 20:00 257 N LEAK IN GP-2 PIPELINE OPERATIONAL SCHEDULED MAINTENANCE REPAIR LEAK YEARLY INSPECTIONS 00-00-00 ' . i ` i "^ ~' Vii, Report Date: 6/7/00 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JUNE 2000 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25135) 0 5. Pilot and Purge 210 6. Used for lease operations 16,949 7.Other - 0 TOTAL items 1 - 7 ~ ti ~, ~ ~ '.' - 17,159 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 19,099 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature y~ ~ ~,~~%~!~ Title ACCOUNTING SUPERVISOR Date 07/12/2000 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 79.12 UNDEFINED (GAS) 280500 20.88 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JULY 2000 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold o MIDDLE KENAI 280150 81.75 2. Reinjected o UNDEFINED (GAS) 280500 18.25 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour o (Supplemental report required -See 20 AAC 25.235 5. Pilot and Purge 217 6. Used for lease operations 17,309 7. Other o TOTAL items 1- 7 v, 526 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: o 11. Transferred to: 19, 362 Remarks: I hereby certif"y/~t'~hat the fore ing/is true and correct to the best of my knowledge. Signature ~ ;!,~~ ~ , ~pG_~i Title ACCOUNTING SUPERVISOR Date 08/17/2000 Form 10-422 Rev. 4/95 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD AUGUST 2000 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold o MIDDLE KENAI 280150 78.36 2. Reinjected o UNDEFINED (GAS) 280500 21.64 3. Flared or vented less than 1 hour 2 4. Flared or vented greater than 1 hour 407 (Supplemental report required -See 20 AAC 25.23 5. Pilot and Purge 217 6. Used for lease operations 17,251 7.Other 0 TOTAL items 1- 7 17,877 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: 0 11. Transferred to: 23,484 nemarics: I hereby certify that the oregoing is true and correct to the best of my knowledge. Signature~~~~ ( ,~~ Title ACCOUNTING SUPERVISOR Date 09/08/2000 1. Safety ~ MCF 2. Lease Use I MCF 3. Conserv. Purposes ~ MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the ZOth of the month following the month of disposition. Authority 20 AAC 25.235 Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: BRUCE PLATFORM Month/Year: August-00 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 8/8/00 22:00 B/8/00 23:59 84 N OPERATIONAL UNSCHEDULED MAINTENANCE 6/9/00 0:01 8/9!00 16:30 323 N OPERATIONAL UNSCHEDULED MAINTENANCE Report-Date: 9/7/00 Page: 1 of 1 .ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD SEPTEMBER2000 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 151 5. Pilot and Purge 210 6. Used for lease operations 16.114 7. Other o TOTAL items 1- 7 16 , 475 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: 0 11. Transferred to: 28.919 Remarks: I hereby certify that the fore oing is trae and correct to the best of my knowledge. Signatur ~~ Title ACCOUNTING SUPERVISOR Date 10/19/2000 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 75.24 UNDEFINED (GAS) 280500 24.76 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 1 V1 L11V-yLL Rev. 4/95 Excess Flare Log Report Facility Name: BRUCE PLATFORM Month/Year: September-00 Date 8 ~ Time Event Gas - Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 9/8100 0:00 9/8/00 4:00 151 Y GAS COMP DOWN FOR TURBINE WASH OPERATIONAL SCHEDULED MAINTENANCE U-PM-0053 Report Date: 10/5/00 Page: 1 of 1 .. ~ ~' _ ,~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD OCTOBER 2000 Disposition Volume MCF* 1. Sold o 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 396 5. Pilot and Purge 217 6. Used for lease operations NOV 2 Z~OQ 15,896 7. Other Alaska Oil & Gas Co Anchor s. Commission 0 e TOTAL items 1- 7 16 , 509 8. NGL gas equivalent produced D 9. Purchased gas 19 10. Transferred from: 0 11. Transferred to: 2$,299 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ,~~{, ~ ~ , ,~--,~'~/ Title ACCOUNTING SUPERVISOR. Date 11/09/2000 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 78.53 UNDEFINED (GAS) 280500 21.47 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~•G~ ~~ .~~~~~ Form 10-422 Rev. 4/95 tt Excess Flare Log Report Facility Name: BRUCE PLATFORM Month/Year: October 2000 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 10/4/00 0:00 10/4/00 23:59 30.2 N BLOWDOWN WELL #9 OPERATIONAL SCHEDULED MAINTENANCE 10/20/00 10:45 10/20/00 20:15 354 N OPERATIONAL SCHEDULED MAINTENANCE BR-53 GAS COMPRESSOR 4,000 HOUR INSPECTION 10/27/00 0:00 10/27/00 23:59 12 N TANK FARM COMPRESSORE SHUT DOWN DUE TO PROBLEMS OPERATIONAL UNSCHEDULED MAINTENANCE Report Date: 11/13/00 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD NOVEMBER 2000 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold o MIDDLE KENAI 280150 79.32 2. Reinjected o UNDEFINED (GAS) 280500 20.68 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour 978 (Supplemental report required -See 20 AAC 25.235) 5. Pilot and Purge 210 6. Used for lease operations 15,647 7.Other o TOTAL items 1 - 7 16,835 8. NGL gas equivalent produced o 9. Purchased gas 0 10. Transferred from: o 11. Transferred to: 24,s67 xemartcs: I hereby certify that the fo going is true and correct to the best of my knowledge. Signature Title ACCOUNTING SUPERVISOR Date 12/07/2000 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority ZO AAC 25.235 Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: BRUCE PLATFORM Month/Year: November 2000 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 11/2/00 6:00 11/2/00 23:59 417 N ALINE PIG LAUNCHER REMOVAL OPERATIONAL SCHEDULED MAINTENANCE 11/3/00 0:01 11/3/00 21:00 561 N ENSTALL NEW PIG LAUNCHER OPERATIONAL SCHEDULED MAINTENANCE Report Date: 12/6/00 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GA5 DISPOSITION Facility Operator Field(s) onth/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE. POINT FIELD DECEMBER 2000 Disposition Volume MCF* 1. Sold 0 2. Reinjected D 3. Flared or vented less than 1 hoar 0 4. Flared or vented greater than 1 hour (Supplenxatal report required-See 20 AAC 25.235) o 5. Pilot and Purge 217 6. Used for lease operations 16,635 7. Other D TOTAL items 1- 7 16,852 8. NGL gas equivalent produced D 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 26.954 Remarks: I hereby certify that th/elforegoing is true and correct to the best of my knowledge. SignatureL~~.E'~fn~~-~1/,t~j Title ACCOUNTING SUPERVISOR Date 01/16/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 76.10 UNDEFINED (GAS) 280500 23.90 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: BRUCE PLATFORM Month/Year: December 2000 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number Report Date: 1/11/01 Page: 1 of 1