Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutUNOCAL - BRUCE PLATFORMGAS DISPOSITION FILES
Field
u n~a c ~.
2000
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) onth/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JANUARY 2000
Disposition Volume MCF*
1.5o1d 0
2. Reinjected o
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 53
5. Pilot and Purge 217
6. Used for lease operations 17,631
7.Other 0
TOTAL items 1 - 7 17,901
8. NGL gas equivalent produced 0
9. Purchased gas 12
10. Transferred from: 0
11. Transferred to: 16.495
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~i ~ hL~ ~'~'-C..i Title ACCOUNTING SUPERVISOR Date 02/18/2000
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 73.12
UNDEFINED (GAS) 280500 26.88
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
BRUCE PLATFORM
EXCESS FLARE LOG
Jan-00
& Time
Be an Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equipment Down
ID Number
2-Jan-00 1200 2-Jan-0O 1800 53 Planned PI To Mna, shut valve to GPTF Op PI In None
ALASKA
CONSERV
COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 203
6. Used for lease operations 15,522
7.Other 0
TOTAL items 1 - 7 15,725
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 17.418
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ,~~~~ ° ~~~ ~ ~ ~l Title ACCOUNTING SUPERVISOR Date 03/08/2000
~.
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 73.60
UNDEFINED (GAS) 280500 26.40
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 1U-422
Rev. 4/95
_ ,.,
M
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MARCH 2000
Disposition Volume MCF*
1. Sold 0
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 122
5. Pilot and Purge 217
6. Used for lease operations 16,504
7.Other o
TOTAL items 1 - 7 16.843
S. NGL gas equivalent produced o
9. Purchased gas 419
10. Transferred from: o
11. Transferred to: 18,319
Remarks:
I hereby certify that the fore oing is true and correct to the best of my knowledge.
J
Signature ~~ ~_ ~Z~ :~ ' ~.` ~1~~~ Title ACCT. SUPERVISOR Date 04/11/2000
~~
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 74..80
UNDEFINED (GAS) 280500 25.20
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
,ar___.
BRUCE PLATFORM
EXCESS FLARE LOG
Mar-00
Date 8 Time
16YR4~ ® 0 Date & Time
fvYRP~ 60d@A Event Gas
M~ Produced or
~Fft~P,A Planned or
4~An~ Black Smoke
v~gie Description of
hr ins ec4d&f~edr#d mainten Operational or
O €tnal Reason
0 HR INSPECTIO Actions Taken
ONE Steps Taken To
¢Qip~currence Reported
Car nter Equipment Down
IQr
30mar, 08:00 30Mar, 18:00 122 Produced Planned No 8000 hr inspection and maintenance Operatianai Scheluled maintenance Maint crew out to assist Scheduled maintenanc Carpenter U-0053
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACII,ITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD APRIL 2000
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 134
5. Pilot and Purge 210
6. Used for lease operations 15, 877
7. Other 0
TOTAL items 1 - 7 16,221
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 19, 798
Remarks:
I hereby certify at the foreg ing is true and correct to the best of my knowledge.
.Signature ~~~ ~~~~ Title ACCT. SUPERVISOR Date 05/09/2000
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 77.71
UNDEFINED (GAS) 280500 22.29
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: April-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/11/00 12:00 4/11/00 17:30 134 Y PIPELINE SHUT IN FOR
INSPECTION OPERATIONAL OTHER: DO INTERNAL INSPECTION U-B-0700
Report Date: 7/25/00 Page: 1 of 1
A.-
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlYear of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MAY . 2000
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold o
MIDDLE KENAI 280150 80.23
2. Reinjected o
UNDEFINED (GAS) 280500 19.77
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour 257
(Supplemental report required -See 20 AAC 25.235)
,,i ~
5. Pilot and Purge 217
6. Used for lease operations 17.375
7. Other o
TOTAL items 1- 7 17,849
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: .19,177
1(CIII'di"KJ:
I hereby certify thatl~th~e'~florggo~~in//g is true and correct to the best of my knowledge.
Signature ~~~/~,~,~ ~'~G~%~~ Title ACCOUNTING SUPERVISOR Date 06/13/2000
Form 10-422
Rev. 4/95
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC25.235
.,.~
a
Excess Flare Log Report
Facility Name: BRUCE PLATFORM
Month/Year: May-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-21D Number
5/31/00 9:30 5131/00 20:00 257 N LEAK IN GP-2 PIPELINE OPERATIONAL SCHEDULED MAINTENANCE REPAIR LEAK YEARLY INSPECTIONS 00-00-00
' . i ` i "^ ~' Vii,
Report Date: 6/7/00 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JUNE 2000
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25135) 0
5. Pilot and Purge 210
6. Used for lease operations 16,949
7.Other - 0
TOTAL items 1 - 7 ~ ti ~, ~ ~ '.' - 17,159
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 19,099
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature y~ ~ ~,~~%~!~ Title ACCOUNTING SUPERVISOR Date 07/12/2000
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 79.12
UNDEFINED (GAS) 280500 20.88
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JULY 2000
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold o
MIDDLE KENAI 280150 81.75
2. Reinjected o
UNDEFINED (GAS) 280500 18.25
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour o
(Supplemental report required -See 20 AAC 25.235
5. Pilot and Purge 217
6. Used for lease operations 17,309
7. Other o
TOTAL items 1- 7 v, 526
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 19, 362
Remarks:
I hereby certif"y/~t'~hat the fore ing/is true and correct to the best of my knowledge.
Signature ~ ;!,~~ ~ , ~pG_~i Title ACCOUNTING SUPERVISOR Date 08/17/2000
Form 10-422
Rev. 4/95
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD AUGUST 2000
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold o
MIDDLE KENAI 280150 78.36
2. Reinjected o
UNDEFINED (GAS) 280500 21.64
3. Flared or vented less than 1 hour 2
4. Flared or vented greater than 1 hour 407
(Supplemental report required -See 20 AAC 25.23
5. Pilot and Purge 217
6. Used for lease operations 17,251
7.Other 0
TOTAL items 1- 7 17,877
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: 0
11. Transferred to: 23,484
nemarics:
I hereby certify that the oregoing is true and correct to the best of my knowledge.
Signature~~~~ ( ,~~ Title ACCOUNTING SUPERVISOR Date 09/08/2000
1. Safety ~ MCF
2. Lease Use I MCF
3. Conserv. Purposes ~ MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the ZOth of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: August-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
8/8/00 22:00 B/8/00 23:59 84 N OPERATIONAL UNSCHEDULED MAINTENANCE
6/9/00 0:01 8/9!00 16:30 323 N OPERATIONAL UNSCHEDULED MAINTENANCE
Report-Date: 9/7/00 Page: 1 of 1
.ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD SEPTEMBER2000
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 151
5. Pilot and Purge 210
6. Used for lease operations 16.114
7. Other o
TOTAL items 1- 7 16 , 475
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: 0
11. Transferred to: 28.919
Remarks:
I hereby certify that the fore oing is trae and correct to the best of my knowledge.
Signatur ~~ Title ACCOUNTING SUPERVISOR Date 10/19/2000
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 75.24
UNDEFINED (GAS) 280500 24.76
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
1 V1 L11V-yLL
Rev. 4/95
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: September-00
Date 8 ~ Time Event Gas - Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
9/8100 0:00 9/8/00 4:00 151 Y GAS COMP DOWN FOR TURBINE
WASH OPERATIONAL SCHEDULED MAINTENANCE U-PM-0053
Report Date: 10/5/00 Page: 1 of 1
.. ~ ~' _ ,~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD OCTOBER 2000
Disposition Volume MCF*
1. Sold o
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 396
5. Pilot and Purge 217
6. Used for lease operations NOV 2 Z~OQ 15,896
7. Other Alaska Oil & Gas Co
Anchor s. Commission 0
e
TOTAL items 1- 7 16 , 509
8. NGL gas equivalent produced D
9. Purchased gas 19
10. Transferred from: 0
11. Transferred to: 2$,299
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ,~~{, ~ ~ , ,~--,~'~/ Title ACCOUNTING SUPERVISOR. Date 11/09/2000
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 78.53
UNDEFINED (GAS) 280500 21.47
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~•G~ ~~
.~~~~~
Form 10-422
Rev. 4/95
tt
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: October 2000
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/4/00 0:00 10/4/00 23:59 30.2 N BLOWDOWN WELL #9 OPERATIONAL SCHEDULED MAINTENANCE
10/20/00 10:45 10/20/00 20:15 354 N OPERATIONAL SCHEDULED MAINTENANCE BR-53 GAS COMPRESSOR
4,000 HOUR INSPECTION
10/27/00 0:00 10/27/00 23:59 12 N TANK FARM COMPRESSORE SHUT
DOWN DUE TO PROBLEMS OPERATIONAL UNSCHEDULED MAINTENANCE
Report Date: 11/13/00 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD NOVEMBER 2000
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold o
MIDDLE KENAI 280150 79.32
2. Reinjected o
UNDEFINED (GAS) 280500 20.68
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour 978
(Supplemental report required -See 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 15,647
7.Other o
TOTAL items 1 - 7 16,835
8. NGL gas equivalent produced o
9. Purchased gas 0
10. Transferred from: o
11. Transferred to: 24,s67
xemartcs:
I hereby certify that the fo going is true and correct to the best of my knowledge.
Signature Title ACCOUNTING SUPERVISOR Date 12/07/2000
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority ZO AAC 25.235
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: November 2000
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
11/2/00 6:00 11/2/00 23:59 417 N ALINE PIG LAUNCHER
REMOVAL OPERATIONAL SCHEDULED MAINTENANCE
11/3/00 0:01 11/3/00 21:00 561 N ENSTALL NEW PIG LAUNCHER OPERATIONAL SCHEDULED MAINTENANCE
Report Date: 12/6/00 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GA5 DISPOSITION
Facility Operator Field(s) onth/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE. POINT FIELD DECEMBER 2000
Disposition Volume MCF*
1. Sold 0
2. Reinjected D
3. Flared or vented less than 1 hoar 0
4. Flared or vented greater than 1 hour
(Supplenxatal report required-See 20 AAC 25.235) o
5. Pilot and Purge 217
6. Used for lease operations 16,635
7. Other D
TOTAL items 1- 7 16,852
8. NGL gas equivalent produced D
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 26.954
Remarks:
I hereby certify that th/elforegoing is true and correct to the best of my knowledge.
SignatureL~~.E'~fn~~-~1/,t~j Title ACCOUNTING SUPERVISOR Date 01/16/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 76.10
UNDEFINED (GAS) 280500 23.90
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: December 2000
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 1/11/01 Page: 1 of 1