Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutUNOCAL - DILLON PLATFORMGAS DISPOSITION FILES Field UnoCa1 2000 ~~~~rv~o ~~:~~ 22 2 ~ ASKA OIL AND GAS CONSERVATION COMMISSION ~~ FACILITY REPORT OF PRODUCED GAS DISPOSITION ity ARdtp~~g Operator Field(s) Month/Year of Dispo DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JANUARY 2000 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 0 5. Pilot and Purge 217 6. Used for lease operations 6, 740 7. Other 0 TOTAL items 1 - 7 6,957 8. NGL gas equivalent produced 0 9. Purchased gas 12.727 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the for goin/g/his true and correct to the best of my knowledge. Signature 1c _ l C ' / /~i/ Title ACCOUNTING SUPERVISOR Date 02/18/2000 *Indicate contribution of each pool to total. Pool Name Code Percent E f AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL FEBRUARY 2000 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold o E F AND G 524114 100.00 2. Reinjected 0 3. Flared or vented less than 1 hour o 4. Flared or vented greater than i hour 16 (Supplemental report required -See 20 AAC 25.235) 5. Pilot and Purge 203 6. Used for lease operations 5,556 7.Other 0 TOTAL items 1 - 7 5,775 8. NGL gas equivalent produced 0 9. Purchased gas 10,026 10. Transferred from: 0 11. Transferred to: 0 ~ ~c~u ~t~t;._.~ I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~~~(~(~~~~~,~~~ J Titie. ACCOUNTING SUPERVISOR Date 03/07/2000 Form 10-422 Rev. 4/95 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees. F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Nsme: DILLON PLATFORM Report Date: OS-MAR-2000 MonttJ]'ear: FEB-2000 Page I of i Date & Time 6veat Bas Planed ar Deacriptloa of Inoide¢t Category Beason Aotloae Take¢ Steps Taken to llluimiae Bec¢rreaae BgalpmentDOwa Bve¢tBegia 6ventBaded MCP OnPlan¢ed MP•SIDNamker 02•FEB•00 02•FEB•00 16 Unplanned A.C. SOLAR SHUi•IN OPERATI SCNEIXILED MAINTENANCE NASN (SOAP) A.C. TURBINE D•B•00$O i ~. r ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MARCH 2000 Disposition Volume MCF* 1. Sold o Z. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) lD 5. Pilot and Purge 217 6. Used for lease operations 6.x45 7.Other o TOTAL items 1 - 7 7, 072 8. NGL gas equivalent produced o 9. Purchased gas 11, 097 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. //~~o ff Signature ~~~-.~~~ ;~~ ~~L!~ Title ACCT. SUPERVISOR Date 04/11/2000 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 DILLON PLATFORM EXCESS FLARE LOG March 2000 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken To Minimize Flare Steps Taken To Minimize Recurrence rt tific & II rs ched Equipment Down ID Number 3/10/00 (oa 17:30 3/10/00 18:30 10 Unplanned Solenoid Failure Operational Unschedualed Maint. Replaced Solenoid Retum to normal operations VRU ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL APRIL 2000 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) o 5. Pilot and Purge 217 6. Used for lease operations 6,876 7. Other o TOTAL items 1- 7 7,093 8. NGL gas equivalent produced o 9. Purchased gas 11,502 10. Transferred from: o 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. /' . Signature /~[ -L,f~ ~~~~ Title ACCT. SUPERVISOR Date 05/09/2000 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 Note: All volumes Ynust be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MAY 2000 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 250 5. Pilot and Purge 217 6. Used for lease operations 6,863 7.Other o TOTAL items 1- 7 7,330 '~~~ 8. NGL gas equivalent produced o 9. Purchased gas 7, 712 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify t~/hi~a~/t the foregoi/ng/i/s true and correct to the best of my knowledge. Signature ~/~-~L~ ~~G-%,~~ Title ACCOUNTING SUPERVISOR Date 06/15/2000 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 -~ Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: May-00 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 5/17/00 6:00 5/17/00 18:00 250 Y WELDERS WORKING AROUND GAS COMP AND VRU. OPERATIONAL OTHER: 00-00-00 1a Report Date: 6/15/00 Page: 1 of 1 i 3o i Wd 8£~6 00/8i/S < < (aor~~o) fii69L-S9Z (L 06) < < < TPOOUn < < < ~ST~LIaT~s TL~~LIaUILTO.STnU,~ < < < spunog •,~ ~auPP < < < < < < 'no~Xu~'us <<< •sPb paaPT3 30 ,3SW 000'OSZ ~Ta~P~.urxoadd~ ur ~Tnsaz TTrM sTTaM Tro uroa3 < < < spb<< pPau burs e,0 •XeaT Tro uP ~o aoznos auk auru:aa~ap o~ .zapao ur aou~ua~ureur < < < .zoo < < ~Ppo~ urao3~sTd uoTTrQ auk uo .zossa.zduroo seb auk uMOp bur~~nus aq TTrM aM < < < ~puaM < < < < < < a~o.zM „~ ~auP[> 'spunog„ < < < < ~puaM < < 'sxu~us < < ~poraad a~ur~ ~sqM nano ,3,Sy,7 000'OSZ ~~oaaa°o < < sr aurnTon ~su~ a.zns nod a.zy ~paz~T~ sPb ~o ~unourP auk azrurrurur o~ sda~s < < dun burXs~ Tsooun sI ~ uMOp ac{ o~ .zossaadu~oo auk ~oadxa nod op buoT Mog < < '~au~~ < < < < a.zPT3 ssaoxa uoTTrQ :a~ :~oaCgnS < < ~ Sauer 'spunog :os < < WY TT~TT OOOZ 'LT DPW '~epsaupaM :~uaS < < (sn •Xe •a~e~s •urwps~usgeLl ~puaM:dZWS1 u~upW ~puaM : u~oa,3 < < (aor~3o) ~6gL-S9Z (L 06) < Teooun < ~sr~uaroS Te~uauruoarnug < spunog •9 Sauer < •a.zour uaeaT I se pa~sod nod daaX TTrM I < •aurT uo Xosq .zossa.zduroo auk dab pue ~TXornb < aoueua~ureur sru~ a~aTdwoo o~ ~ao~~a ~aana burXeu~ aap aM •uor~onpo.zd ~o < ssoT sxsr.z uoruM sTTaM Tro auk ur gnus o~ sr bur.zPT3 uo Xoecr ono o~ t~eM ~Tuo < arl~ seb pearl 6urse~ TTaM Tro sr srr~~ aourg •suor~eaado aseaT .zo3 abesn ~Trep < Teora'~~ sr ,~,OW OSZ aus ',.3SW OSZ ~ueaur anew ~snur .zo~eaado aqs •s~.zoa'aa < uor~rsodsrp seb aq~ ~e burXooT aTc7rssodurr sr ~eu~ ~nq ,3,SW 000'OSZ pTo~ < seM I •XeaT auk bursnPO sr ~eqM MouX you op aM ~uaurour sru~ ~~ asneoaq MouX < o~ paeu sir ~nq '~iepo~ s.znou Mai e aXe~ ~Tuo TTrM ~r burdoq sr u:.zo~~eTd aus < ~puaM < :a~oaM „~ ~au~r 'spunog„ .~puaM •pauzaouoo am peu amnion auk - ~au~r sxu~uy ~uioa•j~aoun~fspunoq> „~ ~auef `spunog„ :o,L aa~o~-pop :uoi;~z~u~~ap ~sn•~~•a~~~s•uiuip~~n ue~y~ ~ipuarn> ~~Y~i ~puarn :utoa3 OQ80- t~£~S~b~ I I OOOZ ~~L~I LT `patlcl :a~~Q aa~~ ssaaxa uoliiQ :ag :;aafgns area ssaaxa uoii-Q :ag dillon Excess flare Subject: dillon Excess flare Date: Thu, 18 May 2000 10:33:29 -0700 From: "Bounds, Janet G" <boundsj@unocal.com> To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us> CC: "McCaughey, Tom C" <mccautc@Orion.Unocal.com>, "Beitia, John T" <beitiaj@Orion.Unocal.com> Wendy The gas compressor on Dillon was placed back in service around 8:00 pm last night. Repairs were made to the skid and structural beams. We are planning to bring the compressor down again later this week or next to complete repairs. Flare volumes associated with this event were approximately 125 MCF. Thank you, Janet G. Bounds Environmental Scientist Unocal (907) 263-7694 (office) (907) 263-7901 (fax) 5/18/0010:43 AM lofl ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) onth/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JUNE 2000 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 0 5. Pilot and Purge 210 6. Used for lease operations 6,447 7. Other 0 TOTAL items 1 - 7 6,657 8. NGL gas equivalent produced 0 9. Purchased gas 7,315 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify t at the fore oing is true and correct to the best of my knowledge. a Signature ~~j~,j7;~ ~~ Title ACCOUNTING SUPERVISOR Date 07/07/2000 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JULY 2000 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 1,243 5. Pilot and Purge 217 6. Used for lease operations 3,379 7. Other 0 TOTAL items 1 - 7 4, 839 8. NGL gas equivalent produced 0 9. Purchased gas 9,726 10. Transferred from: 0 11. Transferred to: O Remarks: I hereby certify that the regoing is true and correct to the best of my knowledge. r Signature '~~~~ ~ Title ACCOUNTING SUPERVISOR Date 08/09/2000 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~,. , Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: July-00 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 7/14/00 9:00 7/14/00 12:00 121 N GAS COMPRESSOR DOWN FOR MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE 00-00-00 7/15/00 0:01 7!15/00 12:00 173 N REPAIRING GAS COMPRESSOR OPERATIONAL SCHEDULEO MAINTENANCE 7/16/00 0:01 7/16/0012:00 202 N OPERATIONAL SCHEDULED MAINTENANCE 7/17100 0:01 7/17/00 12:00 219 N OPERATIONAL SCHEDULED MAINTENANCE GAS COMPRESSOR REBUILD 7/18/00 0:00 7/18/00 23:59 216 N GAS COMPRESSOR DOWN FOR REPAIR. OPERATIONAL UNSCHEDULED MAINTENANCE 00-00-00 7/19/00 0:00 7/19/00 23:59 162 N GAS COMPRESSOR DOWN FOR REPAIRS OPERATIONAL UNSCHEDULED MAINTENANCE 7/20/00 0:00 7/20/00 23:59 150 N GAS COMPRESSOR DOWN FOR REPAIR OPERATIONAL UNSCHEDULED MAINTENANCE 00-00-00 Report Date: 8/1/00 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION DILLON PLATFORM UNOCAL ALASKA RESOURCES ~ MIDDLE GROUND SHOAL 'ear of Dispo AUGUST 2000 Disposition Volume MCF* 1. Sold D 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 251 5. Pilot and Purge 217 6. Used for lease operations 5.953 7.Other 0 TOTAL items 1- 7 6,421 8. NGL gas equivalent produced ~ 9. Purchased gas 7.746 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify /h7at the for goindg is true and correct to the best of my knowledge. Signature _~~.-e~l~ ;~. ~y,~,~~ Title ACCOUNTING SUPERVISOR Date 09/08/2000 Form 10-422 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Rev. 4/95 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: August-00 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID~Number 8/12/00 0:01 8/12/00 12:00 131 N OPERATIONAL UNSCHEDULED MAINTENANCE D-PM-0013 8!13/00 0:00 8/13/00 12:00 120 N OPERATIONAL UNSCHEDULED MAINTENANCE Report Date: 9/14/00 Page: 1 of 1 .ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL,' SEPTEMBER2000 Disposition Volume MCF* 1. Sold o 2. Reinjected 0 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemeuta( report required. See 20 AAC 25.235) 0 5. Pilot and Purge 210 6. Used for lease operations 5, 537 7. Other 0 TOTAL items 1 - 7 6, 747 8. NGL gas equivalent produced o 9. Purchased gas 5,5ss 10. Transferred from: 0 11. Transferred to: o Remarks: I hereby certify th/a~t~ t~h~e f/o/r/lego g is true and correct to the best of my knowledge. Signature ~~2~~%~y~.~c (.~, Title ACCOUNTING SUPERVISOR Date 10/10/2000 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114. 100.00 ~ 1. Safety ~ / ,.- MCF 2. Lease Use ~ b/ j' MCF 3. Conserv. Purposes .r' MCF 1 ; , F Com issioner Da e Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL OCTOBER 2000 Disposition Volume 1VICF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) o 5. Pilot and Purge ['~E/'+ (~t._~/ 1\ /C t"1 217 1 V CLJ 6. Used for lease operations 6,329 7. Other Ak'fsk2 Oif & Gas 0 s. CornmiSSlQR TOTAL items 1 - 7 age 6, 546 8. NGL gas equivalent produced 0 9. Purchased gas 7, 772 10. Transferred from: o 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature~.~,r c2 ~' ; ~a~eJ Title ACCOUNTING SUPERVISOR Date 11/09/2000 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 1. Safety 2. Lease Use I ~, r1 ;~~ MCF 3. Conserv. Purposes V MCF Com >issioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 10-422 Rev. 4/95 !~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION ~o~ Facility Operator field(s) Month/Year of Dispo DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL. NOVEMBER 2000 Disposition Volume MCF* 1.5o1d o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour .(Supplemental report required- See 20 AAC 25.235) 0 5. Pilot and Purge 210 6. Used for lease operations 6,510 7. Other o TOTAL items 1 - 7 6, 720 8. NGL gas equivalent produced o 9. Purchased gas a,32o 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the flnolre oin/g~~is true and correct to the best of my knowledge. Signature //~~~ (1 L //~ Title ACCOUNTING SUPERVISOR Date 12/07/2000 ~~ ~~~ ~~~' ~~~ *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G I 524114 I 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION DILLON PLATFORM UNOCAL ALASKA RESOURCES ~ MIDDLE GROUND SHOAL ear of luispo DECEMBER 2000 Disposition Volume MCF* 1. Sold 0 2. Reinjected ~ y o 3. Flared or vented less than 1 hour JAN .~ ~ ~OQ~ o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) a r &An s ions. Com~„assror, Cf10f~gg 0 5. Pilot and Purge 217 6. Used for lease operations 5,951 7.Other 0 TOTAL items 1 - 7 6,16s 8. NGL gas equivalent produced O 9. Purchased gas 9.320 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing/is true and correct to the best of my knowledge. Signature/,d,~1~~~ ~ /~.l ~w3~ Title ACCOUNTING SUPERVISOR Date 01/09/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235