PRODUCER' S REPORT OF GAS DISPOSITION
Facility Operator .Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit January 2000
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 8,966
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 186
6. Used for lease operations 128,115
7. *Other (Shrinkage) 7,756
TOTAL items 1-7 145,023
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 97,538
11. Transferred to: Cov's to TBPF 2,575
Remarks:
ere y certi t e oregom is tru/e correct to
Signature: ' ,~' ? L-d-~'~% a est o my owe ge.
Title: Acct. Super. Date: 18-Feb-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 67.65
GGS 520550 0.00
G Zone 520150 31.16
W/F 520190 1.19
Official Use Only -Flaring Authorization > l hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note.: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authorit 20 AAC 25.235:
Form 10-422
Rev. 4/95
RE: Exbess flare`at King
Subject: RE: Excess flare at King
Date: Thu, 27 Apr 2fl0l3 i 2:15:5" -0700
From: "Bounds, Janet G" <boundsj@unocal.com>
To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
CC: "Devito, Aleja J" <devitoa@Orion.Unocal.com>
Hello Wendy,
I trust you are enjoying this beautiful weather.
Thank you for bringing to my attention that the flare volumes associated
with the repairs to the Solar York Compressor were missing from the January
excess Flare logs.
The January 2000 excess flare log for King Salmon has been revised to
include the repairs to the Solar York. This morning I sent a copy of the
revised flare log to the Kenai office so that they may correct the monthly
report and resubmit it to you.
The Solar York was shut down January 20, 2000 to January 22, 2000 due to a
leaking gas exchanger. The leaking tubes were repaired. Approximately 895
MCF of gas was flared during this event.
I haven~t forgotten about GPP or Anna.
Take care.....and thank you
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
> From: Bounds, Janet G
> Sent: Friday, January
> To: "Wendy Mahan' (AOGCC) '
> Cc: Myers, Chris S; Beitia,
> Subject: RE: Excess flare
28, 2000 3:11 PM
John T; Renney, Norm D; Atkins, Mark C
at King
> Wendy
> Repairs on the Solar York were completed faster than anticipated. The
> compressor was back in service on January 22, 2000. Flare volumes were
> less than 1 MMCFD.
> Janet G. Bounds
> Environmental Scientist
> Unocal
> (907) 263-7694 (office)
> (907) 263-7901 (fax)
> From: Bounds, Janet G
> Sent: Thursday, January 20, 2000 4:50 PM
> To: "Wendy Mahan' (AOGCC) '
> Cc: Myers, Chris S; Beitia, John T; Renney, Norm D; Atkins, Mark
> C
> Subject: Excess flare at King
> Wendy
> The Solar York Gas compressor on the King Salmon Platform has been
> shut down due to a gas leak on the heat exchanger. We have located some
4/27/00 11:20 AM
1 of 2
RE: Excess flare at King
> of the needed parts, and are currently in the process of tracking down
> additional parts. Weather conditions are preventing helicopter flights at
> this time. The compressor may be down for several days.
> We estimate 1.5 MMCFD will be flared until the compressor is
> repaired. Production has been cut back as much as possible while
> maintaining discharge pressure.
> This event will be recorded on the excess flare log and I will keep
> you informed on the progress of the repairs.
> Please let me know if you need more information.
> Janet G. Bounds
> Environmental Scientist
> Unocal
> (907) 263-7694 (office)
> (907) 263-7901 (fax)
4/27/00 11:20 AM
2of2
Excess flare at King .
Subject: Excess flare at King
Date: Thu, 20 Jan 2000 17:50:49 -0800
From: "Bounds, Janet G" <boundsj@unocal.com>
To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
CC: "Myers, Chris S" <myersc@Orion.Unocal.com>,
"Beitia, John T" <beitiaj@Orion.Unocal.com>,
"Renney, Norm D" <renneyn@Orion.Unocal.com>,
"Atkins, Mark C" <atkinmc@Orion.Unocal.com>
Wendy
The Solar York Gas compressor on the King Salmon Platform has been shut down
due to a gas leak on the heat exchanger. We have located some of the
needed parts, and are currently in the process of tracking down additional
parts. Weather conditions are preventing helicopter flights at this time.
The compressor may be down for several days.
We estimate 1.5 NIl~ICFD will be flared until the compressor is repaired.
Production has been cut back as much as possible while maintaining discharge
pressure.
This event will be recorded on the excess flare log and I will keep you
informed on the progress of the repairs.
Please let me know if you need more information.
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
1/21/00 8:24 AM
1 of 1
RE: Excess flare at King
Subject: RE: Excess flare at King
Date: Fri, 28 Jan 2000 15:11:31 -0800
From: "Bounds, Janet G" <boundsj@unocaLcom>
To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
CC: "Myers, Chris S" <myersc@Orion.Unocal.com>,
"Beitia, John T" <beitiaj@Orion.Unocal.com>,
"Renney, Norm D" <renneyn@Orion.Unocal.com>,
"Atkins, Mark C" <atkinmc@Orion.Unocal.com>
Wendy
Repairs on the Solar York were completed faster than anticipated. The
compressor was back in service on January 22, 2000. Flare volumes were less
than 1 MMCFD.
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
> From: Bounds, Janet G
> Sent: Thursday, January 20, 2000 4:50 PM
> To: "Wendy Mahan' (AOGCC) '
> Cc: Myers, Chris S; Beitia, John T; Renney, Norm D; Atkins, Mark C
> Subject: Excess flare at King
> Wendy
> The Solar York Gas compressor on the King Salmon Platform has been shut
> down due to a gas leak on the heat exchanger. We have located some of
> the needed parts, and are currently in the process of tracking down
> additional parts. Weather conditions are preventing helicopter flights at
> this time. The compressor may be down for several days.
> We estimate 1.5 MMCFD will be flared until the compressor is repaired.
> Production has been cut back as much as possible while maintaining
> discharge pressure.
> This event will be recorded on the excess flare log and I will keep you
> informed on the progress of the repairs.
> Please let me know if you need more information.
> Janet G. Bounds
> Environmental Scientist
> Unocal
> (907) 263-7694 (office)
> (907) 263-7901 (fax)
1/28/00 2:41 PM
1 of 1
King Well test
Subject: King Well test
Date: Fri, 28 Jan 2000 15:16:15 -0800
From: "Bounds, Janet G" <boundsj@unocal.com>
Toy: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
CC: "Beitia, John T" <beitiaj@Orion.Unocal.com>,
"Johnson, Dwight E" <johnsond@Orion.Unocal.com>,
"Atkins, Mark C" <atkinmc@Orion.Unocal.com>,
"Smetanka, Jeff W" <smetankaj@Orion.Unocal.com>,
"Renney, Norm D" <renneyn@Orion.Unocal.com>
Wendy
Next week we are planning to perforate and test K-5 on the King Salmon
Platform. This will result in increased flaring for 2 to 3 days at a
maximum rate of 4 NIMCFD. This event will be reported on the excess flare
log as required.
Have a good weekend, Wendy!
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
1/28/00 2:42 PM
1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit February 2000
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 7,512
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 2,604
5. Pilot and Purge 174
6. Used for lease operations 103,038
7. *Other (Shrinkage) 22,483
TOTAL items 1-7 135,811
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 76,942
11. Transferred to: Coves to TsPF 1,641
Remarks:
ere y certi at a oregoing is true an correct to
Signature: ~ ~ / ~ a est o my owe ge.
Title: Acct. Sinter. Date: 15-Mar-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 69.92
GGS 520550 0.00
G Zone 520150 29.03
W/F 520190 1.05
Official.' Use Only -Flaring .Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: HING SALMON PLATFORM
Month/Year: FEB-2000
Report Date: 15-MAR-2000
Page 1 of 1
Date & Time Rvent 6a8 Pbluaed er Desctiptlon of Inddeat Category Reasoa Actlono Takea Steps Taten to 6finlmiae Recurrence
P
ui
ment Ddw
SveutBegin
Rvent6ndad
EICP
OnPlsnned q
p
n
IIIP•21DNumber
10•FEB-00 10•FEB•00 1,579 Unplanned SCHEDULED MAINTENANCE OPERATIO SCHEDULED MAINTENANCE PERFORMED MAINTENANCE PROACTIVE MAINTENANCE L-PN•0
11•FEB-00, _ il-FEB-00 1,025 UrryTanned SCHEDULED MAINTENANCE OPERATIO SCHEDULED MAINTENANCE PERFORMED HAINTEHANCE PROACTIVE MAINTENANCE L•PN•0
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit March 2000
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 20,084
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 186
6. Used for lease operations 113,751
7. *Other (Shrinkage) 54,915
TOTAL items 1-7 188,936
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 88,408
11. Transferred to: Cov's to TBPF 1,973
Remarks:
ere y certi ate e orpe oin is t e an/J correct to
Signature: ~ ( ~ .~ a est o my owe ge.
Title: Acct. Super. Date: 18-Apr-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 73.48
GGS 520550 0.00
G Zone 520150 25.25
W/F 520190 1.27%
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION ~~~~` `` ~.rl ~~ ~ «t ~s, l ~~ L~ _~~ ~ ~
PRODUCER'S REPORT OF GAS DISPOSITION R@VISG'C' COfJ~/
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit A ri12000
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 12,326
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 9,268
5. Pilot and Purge 180
6. Used for lease operations 114,867
7. *Other (Shrinkage) 36,717
TOTAL items 1-7 173,358
8. NGL gas equivalent produced 0
9.
Purchased gas ,,
0
10. Transferred from: TBPF 86,220
11. Transferred to: COV's to TBPF 1,771
Remarks:
ere y certt at a oreg ing is true an correct to
Signature: %L ~c%. ~- L~ ~ a est o my owe ge.
Title: Acct. Super. Date: 26-Jul-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 67.43
GGS 520550 0.00
G Zone 520150 31.13
W/F 520190 1.44
Official Use Only -Flaring; Authorization. > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM
Revised ~~~
Month/Year:
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/9/00 12:30 4/10/00 21:00 203 N TUBES LEAKING ON HEAT
EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR SOLAR/YOUR HEAT
EXCHANGER LEAKS L-PM-0670
4/9/00 12:30 4/10!00 21:00 430 N TUBES LEAKING ON HEAT
EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR SOLAR/YOUR HEAT
EXCHANGER LEAKS L-PM-0670
4/23/00 6:00 4/30!00 23:59 899 N TUBES LEAKING ON HEAT
EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND
RETURN TO NORMAL SOLAR/YORK HEAT
EXCHANGER LEAKS L-PM-0670
4!23/00 6:00 4/30/00 23:59 1314 N TUBES LEAKING ON HEAT
EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND
RETURN TO NORMAL SOLAR/YORK HEAT
EXCHANGER LEAKS L-PM-0670
4123/00 6:00 4/30/00 23:59 1151 N TUBES LEAKING ON HEAT
EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND
RETURN TO NORMAL SOLAIWORK HEAT
EXCHANGER LEAKS L-PM-0670
4!23/00 6:00 4/30/00 23:59 817 N TUBES LEAKING ON HEAT
EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND
RETURN TO NORMAL SOLAR/YORK HEAT
EXCHANGER LEAKS L-PM-0670
4/23/00 6:00 4/30/00 23:59 959 N TUBES LEAKING ON HEAT
EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND
RETURN TO NORMAL SOLAR/YORK HEAT
EXCHANGER LEAKS L-PM-0670
4/23/00 6:00 4/30/00 23:59 1221 N TUBES LEAKING ON HEAT
EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND
RETURN,TO NORMAL SOLAR/YORK HEAT
EXCHANGER LEAKS L-PM-0670
4/23/00 6:00 4/30100 23:59 1425 N TUBES LEAKING ON HEAT
EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND
RETURN TO NORMAL SOLAR/YORK HEAT
EXCHANGER LEAKS L-PM-0670
4/23/00 6:00 4/30/00 23:59 849 N TUBES LEAKING ON HEAT
EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND
RETURN TO NORMAL SOLAR/YORK HEAT
EXCHANGER LEAKS L-PM-0670
Report Date: 7/25/00 ~ _ _~ ~r r = _ _ Page: 1 of 1
t,;A -
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
King Salmon Platform - TBU Unocal Tradin Bay Unit May 2000
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 15,117
4. Flazed or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 252
5. Pilot and Purge 186
6. Used for lease operations - 128,214
7. *Other (Shrinkage) ' ~~ ° ~ ~~ ~ ~ ~ ~~ 41, 419
TOTAL items 1-7 185,188
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 94,975
11. Transferred to: Cov's to TBPF 2,053
Remarks:
ere y certi at a ore mg is true an
Signature: ~ 1 ~ correct to a est o my ow ge.
Title: Acct. Super. Date: 16-Jun-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 76.30
GGS 520550 0.00
G Zone 520150 22.24
W/F 520190 1.46
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM
Month/Year: May-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCP Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
5/1/00 0:00 5/1/00 3:00 65 N EXCHANGER TUBES LEAKING GAS SAFETY UNSCHEDULED MAINTENANCE SWAPING TO ANOTHER HEAT
EXCHANGER SWAPING TO SPARE HEAT -PM-0670
511!00 11:30 5/1100 13:30 43 N SOLAR/YORK DUMP VALVUE OPERATIONAL UNSCHEDULED MAINTENANCE REBUILT AND REPLACED DUMP
VALVE FIXED DUMP VALVE AND RE L-PM-0670
5/11/00 13:22 5/11/00 18:00 91.97 N Circuit breaker failure resulting in ACs
shutting down and causing a complete OPERATIONAL OTHER: Isolated problem equipment, restarted
ACs and returned to normal L-PM-0900
5/12/00 6:30 5/12/00 9:00 52.29 N r, causing ACs
to shut down, resulting in power failure OPERATIONAL OTHER: ected equipment, restarted
Acs, returned to normal operations. L-PM-0900
Report Date: 6/16/00 Page: 1 of 1
King Salmon Excess flare April/May 2000
Subject: King Salmon Excess flare ApriUMay 2000
Date: Thu, 4 May 2000 12:43:47 -0700
From: "Bounds, Janet G" <boundsj@unocal.com>
To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
CC: "Atkins, Mark C" <atkinmc@Orion.Unocal.com>,
"Beitia, John T" <beitiaj@Orion.Unocal.com>
Wendy
When the heat exchanger tubes began leaking on the King Salmon Platform on
April 23rd it was decided that a replacement was needed. The old heat
exchanger has been bypassed and the former standby heat exchanger is now in
service. Piping modifications and new heads were installed along with
adjustments to the control panel. Four 2-inch spools were fabricated. The
new heat exchanger was placed in service on May 1, 2000. It is currently
running smoothly.
During this time production was cut back and gas lift was adjusted to
minimize flaring. Estimated flare volume associated with this event was
less than 9.4mmcf.
Thank you,
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
1 of 1 5/5/00 12:18 PM
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
.Facility Operator Field(s) Month/Yeaz of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit June 2000
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flazed or vented less than 1 hour 21,641
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 1,470
5. Pilot and Purge 180
6. Used for lease operations 132,111
7. *Other (Shrinkage) 32,899
TOTAL items 1-7 ~ `~~ ~n ~~ ~r' 188,301
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 101,300
11. Transferred to: Cov's to TBPF 1,720
Remarks:
ere y cerh t e oregom is truejan correct to
Signature: ~. ~ !' ~ a est o my owe ge.
Title: Acct. Super. Date: 17-Jul-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 76.33
GGS 520550 0.00
G Zone 520150 21.94
W/F 520190 1.73
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF .
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month followmg the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM Month/Year: June-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/8/00 2:00 6/8/00 4:00 764 N SOLAR YOUR INSPECTION, FOUND
OIL LEAK, WAITING FOR PARTS OPERATIONAL SCHEDULED MAINTENANCE INSPECTION WAITING FOR PARTS
TO REPAIR L-PM-0670
6/9/00 0:00 6/9/00 14:00 624 N SCHEDULED MAINT. ON SOLAR
YORK, FOUND OIL LEAK WAITING
FOR PARTS OPERATIONAL SCHEDULED MAINTENANCE Repaired effected parts, returned to
service. L-PM-0670
6/14100 13:30 6/14/00 16:30 82 N COOLING WATER SUPPLY PUMPS
DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Repaired affected equipment and
returned to normal operations. L-PM-0670
Report Date: 7/18/00 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER' S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit July 2000
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 28,470
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 186
6. Used for lease operations 124,455
7. *Other (Shrinkage) 35,282
TOTAL items 1-7 188,393
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 99,447
11. Transferred to: Cov's to TBPF 1,851
Remarks:
ere y certn at a oreg nng ns true an correct to
Signature: R ~ a est o my owe ge.
Title: Acct. Super. Date: 15-Aug-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 72.67
GGS 520550 0.00
G Zone 520150 25.11%
W/F . 520190 2.22%
Official Use Only -Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserd. Purposes MCF
Comnnissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit August 2000
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 16,538
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 476
5. Pilot and Purge 186
6. Used for lease operations 121,523
7. *Other (Shrinkage) 40,946
TOTAL items 1-7 , ~ ~ _ Y..~ ,~.;, ` ~' 179,669
8. NGL gas equivalent produced ~ ~ ~ ~ ~~> >;,,- ~:, ~ _.; 0
9. Purchased gas .._ _ - - 0
10. Transferred from: TBPF 93,660
11. Transferred to: cov's to TBPF 1,864
Remarks:
ere y certi y t~ e ore o g i/s/true an correct to a est o my owe ge.
Signature: - - ~-~~ ' ~/~, Title: Acct. Super. Date: 13-Se -00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 71.35
GGS 520550 0.00
G Zone 520150 26.56 %
W/F 520190 2.09%
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month followmg the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM
Month/Year: August-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
8/4/00 0:05 8/4!00 2:30 58 N AC GENERATOR #2 SHUT DOWN
TAKING #1 AC GENERATOR DOWN
ALSO, CAUSING A TOTAL POWER OPERATIONAL OTHER: START AC GENERATORS AND
RETURN TO NORMAL
OPERATIONS L-PM-0900
8/5/00 8:00 8/5/00 10:45 38 N AC POWER CAUSING A
PRODUCTION SHUT DOWN. OPERATIONAL OTHER: STARTED AC GENERATORS AND
RETURNED TO NORMAL
OPERATIONS
8173!00 16:30 8/13/00 18:30 130 N LOSS OF AC POWER CAUSING
PSD OPERATIONAL OTHER: RESTART EQUIP. RETURN TO
NORMAL OPERATIONS L-PM-0900
8/29/00 15:00 8/29/00 23:59 250 N OPERATIONAL OTHER:
Report Date: 9/5/00 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU i Unocal Trading Bay Unit Se tember 2000
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 19,275
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 641
5. Pilot and Purge ~ 180
6. Used for lease operations 124,401
7. *Other (Shrinkage) 31,106
TOTAL items 1-7 175,603
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 94,578
11. Transferred to: cov's to TBPF 1,637
Remazks:
ere y cerh at a oreg ing i true an correct to
Signature: ~ a est o my owe ge.
r
Title: cct. Super. Date: 19-Oct-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 72.66
GGS 520550 0.00
G Zone 520150 24.62
W/F 520190 2.72%
Official Us'~ Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 Asia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the .
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
,~
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM Month/Year: September-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
9/3/00 8:30 9/3 /00 17:30 159 N SOLAR YOURK DOWN FOR 90 DAY
PM OPERATIONAL SCHEDULED MAINTENANCE COMPLETED MAINTENANCE,
RETURNED TO SERVICE 90DAY PM L-PM-0670
9/16/00 13:22 9/16/00 17:12 482 N SOLAR SOLAR SHUT DOWN DUE
TO FIRE EYES. OPERATIONAL OTHER: RESET FIRE EYES AND STARTED
SOLAR SOLAR AND RETURNED
TO NORMAL OPERATIONS L-PM-0260
Report Date: 10/19/00 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit October 2000
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 26,605
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 1,751
5. Pilot and Purge (~ ~ ~
' ` ~~E ® 180
6. Used for lease operations
NOU
2 0 2~Ot~ 130,631
7. *Other (Shrinkage)
Alaska Oil & G
Cons, Commission 20,506
TOTAL items 1-7 179,673
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 98,014
11. Transferred to: cov's to TBPF 1,779
Remarks:
ere y cerri at a or omg is true an correct to a est o my owe ge.
Signature: ,t'-(._.'- ~'~ Title: Acct. Super. Date: 15-Nov-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 72.78
GGS 520550 0.00
G Zone 520150 24.54
W/F 520190 2.68
Official Use Only -Flaring .Authorization > 1 hr.
1. Safety MCF
2. Lease Use l "1 `S / MCF
l
3. Conserv. Pu~oses MCF
P ~~ la~-
Commissio r Date
~~/
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM Month/Year: October-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/30/00 12:30 10130/00 23:59 1730 N OPERATIONAL BLOW DOWN WELL PLATFORM SHUTDOWN FOR
MAINTENANCE AND
MODIFICATION '
10/31/00 0:00 10/31/00 1:30 21 N OPERATIONAL SCHEDULED MAINTENANCE SLOWDOWN WELL,
PLATFORM SHUTDOWN FOR
MAINTENANCE AND
Report Date: 11/14/00 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit November 2000
Disposition ~ Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 3,096
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 165
6. Used for lease operations 100,413
7. *Other (Shrinkage) 29,284
TOTAL items 1-7 132,958
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TsPF 69,298
11. Transferred to: COV's to TBPF 1,262
Remarks:
ere y certi y t t t e orego g >s//true an correct tote est o my owe ge.
Signature: U~ Title: Acct. Suyer. Date: 13-Dec-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 72.79%
GGS 520550 0.00%
G Zone 520150 24.54%
W/F 520190 2.67%
'Official Use Only -:Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
r
/ f
~J~,
2~
om 'ssioner Date
~~j~~y
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit December 2000
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 19,480
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 79
5. Pilot and Purge 186
6. Used for lease operations 128,134
7. *Other (Shrinkage) 10,347
TOTAL items 1-7 158,226
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 86,740
11. Transferred to: Cov's to TBPF 1,295
Remarks:
ere y cerh at a oregoi g is true an correct to a est o my owe ge.
Signature: Title: Acct. Super. Date: 18-Jan-O1
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 74.10%
GGS 520550 0.00%
G Zone 520150 23.25%
W/F 520190 2.65%
` Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF f
3. Conserv. Purposes MCF
~ u?'
Commission Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
~~
3/~z.f
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM Month/Year: December 2000
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1212/00 0:01 12/2/00 23:59 79 N OPERATIONAL OTHER: FACILITY SHUT GOWN
~ Report Date: 1/8/01 Page: 1 of 1