Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutUNOCAL - KING SALMON PLTFRMGAS DISPOSITION FILES Field Zooo Clnoca/ ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER' S REPORT OF GAS DISPOSITION Facility Operator .Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit January 2000 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 8,966 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 186 6. Used for lease operations 128,115 7. *Other (Shrinkage) 7,756 TOTAL items 1-7 145,023 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 97,538 11. Transferred to: Cov's to TBPF 2,575 Remarks: ere y certi t e oregom is tru/e correct to Signature: ' ,~' ? L-d-~'~% a est o my owe ge. Title: Acct. Super. Date: 18-Feb-00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 67.65 GGS 520550 0.00 G Zone 520150 31.16 W/F 520190 1.19 Official Use Only -Flaring Authorization > l hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note.: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authorit 20 AAC 25.235: Form 10-422 Rev. 4/95 RE: Exbess flare`at King Subject: RE: Excess flare at King Date: Thu, 27 Apr 2fl0l3 i 2:15:5" -0700 From: "Bounds, Janet G" <boundsj@unocal.com> To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us> CC: "Devito, Aleja J" <devitoa@Orion.Unocal.com> Hello Wendy, I trust you are enjoying this beautiful weather. Thank you for bringing to my attention that the flare volumes associated with the repairs to the Solar York Compressor were missing from the January excess Flare logs. The January 2000 excess flare log for King Salmon has been revised to include the repairs to the Solar York. This morning I sent a copy of the revised flare log to the Kenai office so that they may correct the monthly report and resubmit it to you. The Solar York was shut down January 20, 2000 to January 22, 2000 due to a leaking gas exchanger. The leaking tubes were repaired. Approximately 895 MCF of gas was flared during this event. I haven~t forgotten about GPP or Anna. Take care.....and thank you Janet G. Bounds Environmental Scientist Unocal (907) 263-7694 (office) (907) 263-7901 (fax) > From: Bounds, Janet G > Sent: Friday, January > To: "Wendy Mahan' (AOGCC) ' > Cc: Myers, Chris S; Beitia, > Subject: RE: Excess flare 28, 2000 3:11 PM John T; Renney, Norm D; Atkins, Mark C at King > Wendy > Repairs on the Solar York were completed faster than anticipated. The > compressor was back in service on January 22, 2000. Flare volumes were > less than 1 MMCFD. > Janet G. Bounds > Environmental Scientist > Unocal > (907) 263-7694 (office) > (907) 263-7901 (fax) > From: Bounds, Janet G > Sent: Thursday, January 20, 2000 4:50 PM > To: "Wendy Mahan' (AOGCC) ' > Cc: Myers, Chris S; Beitia, John T; Renney, Norm D; Atkins, Mark > C > Subject: Excess flare at King > Wendy > The Solar York Gas compressor on the King Salmon Platform has been > shut down due to a gas leak on the heat exchanger. We have located some 4/27/00 11:20 AM 1 of 2 RE: Excess flare at King > of the needed parts, and are currently in the process of tracking down > additional parts. Weather conditions are preventing helicopter flights at > this time. The compressor may be down for several days. > We estimate 1.5 MMCFD will be flared until the compressor is > repaired. Production has been cut back as much as possible while > maintaining discharge pressure. > This event will be recorded on the excess flare log and I will keep > you informed on the progress of the repairs. > Please let me know if you need more information. > Janet G. Bounds > Environmental Scientist > Unocal > (907) 263-7694 (office) > (907) 263-7901 (fax) 4/27/00 11:20 AM 2of2 Excess flare at King . Subject: Excess flare at King Date: Thu, 20 Jan 2000 17:50:49 -0800 From: "Bounds, Janet G" <boundsj@unocal.com> To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us> CC: "Myers, Chris S" <myersc@Orion.Unocal.com>, "Beitia, John T" <beitiaj@Orion.Unocal.com>, "Renney, Norm D" <renneyn@Orion.Unocal.com>, "Atkins, Mark C" <atkinmc@Orion.Unocal.com> Wendy The Solar York Gas compressor on the King Salmon Platform has been shut down due to a gas leak on the heat exchanger. We have located some of the needed parts, and are currently in the process of tracking down additional parts. Weather conditions are preventing helicopter flights at this time. The compressor may be down for several days. We estimate 1.5 NIl~ICFD will be flared until the compressor is repaired. Production has been cut back as much as possible while maintaining discharge pressure. This event will be recorded on the excess flare log and I will keep you informed on the progress of the repairs. Please let me know if you need more information. Janet G. Bounds Environmental Scientist Unocal (907) 263-7694 (office) (907) 263-7901 (fax) 1/21/00 8:24 AM 1 of 1 RE: Excess flare at King Subject: RE: Excess flare at King Date: Fri, 28 Jan 2000 15:11:31 -0800 From: "Bounds, Janet G" <boundsj@unocaLcom> To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us> CC: "Myers, Chris S" <myersc@Orion.Unocal.com>, "Beitia, John T" <beitiaj@Orion.Unocal.com>, "Renney, Norm D" <renneyn@Orion.Unocal.com>, "Atkins, Mark C" <atkinmc@Orion.Unocal.com> Wendy Repairs on the Solar York were completed faster than anticipated. The compressor was back in service on January 22, 2000. Flare volumes were less than 1 MMCFD. Janet G. Bounds Environmental Scientist Unocal (907) 263-7694 (office) (907) 263-7901 (fax) > From: Bounds, Janet G > Sent: Thursday, January 20, 2000 4:50 PM > To: "Wendy Mahan' (AOGCC) ' > Cc: Myers, Chris S; Beitia, John T; Renney, Norm D; Atkins, Mark C > Subject: Excess flare at King > Wendy > The Solar York Gas compressor on the King Salmon Platform has been shut > down due to a gas leak on the heat exchanger. We have located some of > the needed parts, and are currently in the process of tracking down > additional parts. Weather conditions are preventing helicopter flights at > this time. The compressor may be down for several days. > We estimate 1.5 MMCFD will be flared until the compressor is repaired. > Production has been cut back as much as possible while maintaining > discharge pressure. > This event will be recorded on the excess flare log and I will keep you > informed on the progress of the repairs. > Please let me know if you need more information. > Janet G. Bounds > Environmental Scientist > Unocal > (907) 263-7694 (office) > (907) 263-7901 (fax) 1/28/00 2:41 PM 1 of 1 King Well test Subject: King Well test Date: Fri, 28 Jan 2000 15:16:15 -0800 From: "Bounds, Janet G" <boundsj@unocal.com> Toy: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us> CC: "Beitia, John T" <beitiaj@Orion.Unocal.com>, "Johnson, Dwight E" <johnsond@Orion.Unocal.com>, "Atkins, Mark C" <atkinmc@Orion.Unocal.com>, "Smetanka, Jeff W" <smetankaj@Orion.Unocal.com>, "Renney, Norm D" <renneyn@Orion.Unocal.com> Wendy Next week we are planning to perforate and test K-5 on the King Salmon Platform. This will result in increased flaring for 2 to 3 days at a maximum rate of 4 NIMCFD. This event will be reported on the excess flare log as required. Have a good weekend, Wendy! Janet G. Bounds Environmental Scientist Unocal (907) 263-7694 (office) (907) 263-7901 (fax) 1/28/00 2:42 PM 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit February 2000 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 7,512 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 2,604 5. Pilot and Purge 174 6. Used for lease operations 103,038 7. *Other (Shrinkage) 22,483 TOTAL items 1-7 135,811 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 76,942 11. Transferred to: Coves to TsPF 1,641 Remarks: ere y certi at a oregoing is true an correct to Signature: ~ ~ / ~ a est o my owe ge. Title: Acct. Sinter. Date: 15-Mar-00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 69.92 GGS 520550 0.00 G Zone 520150 29.03 W/F 520190 1.05 Official.' Use Only -Flaring .Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: HING SALMON PLATFORM Month/Year: FEB-2000 Report Date: 15-MAR-2000 Page 1 of 1 Date & Time Rvent 6a8 Pbluaed er Desctiptlon of Inddeat Category Reasoa Actlono Takea Steps Taten to 6finlmiae Recurrence P ui ment Ddw SveutBegin Rvent6ndad EICP OnPlsnned q p n IIIP•21DNumber 10•FEB-00 10•FEB•00 1,579 Unplanned SCHEDULED MAINTENANCE OPERATIO SCHEDULED MAINTENANCE PERFORMED MAINTENANCE PROACTIVE MAINTENANCE L-PN•0 11•FEB-00, _ il-FEB-00 1,025 UrryTanned SCHEDULED MAINTENANCE OPERATIO SCHEDULED MAINTENANCE PERFORMED HAINTEHANCE PROACTIVE MAINTENANCE L•PN•0 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit March 2000 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 20,084 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 186 6. Used for lease operations 113,751 7. *Other (Shrinkage) 54,915 TOTAL items 1-7 188,936 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 88,408 11. Transferred to: Cov's to TBPF 1,973 Remarks: ere y certi ate e orpe oin is t e an/J correct to Signature: ~ ( ~ .~ a est o my owe ge. Title: Acct. Super. Date: 18-Apr-00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 73.48 GGS 520550 0.00 G Zone 520150 25.25 W/F 520190 1.27% Official Use Only -Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION COMMISSION ~~~~` `` ~.rl ~~ ~ «t ~s, l ~~ L~ _~~ ~ ~ PRODUCER'S REPORT OF GAS DISPOSITION R@VISG'C' COfJ~/ Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit A ri12000 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 12,326 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 9,268 5. Pilot and Purge 180 6. Used for lease operations 114,867 7. *Other (Shrinkage) 36,717 TOTAL items 1-7 173,358 8. NGL gas equivalent produced 0 9. Purchased gas ,, 0 10. Transferred from: TBPF 86,220 11. Transferred to: COV's to TBPF 1,771 Remarks: ere y certt at a oreg ing is true an correct to Signature: %L ~c%. ~- L~ ~ a est o my owe ge. Title: Acct. Super. Date: 26-Jul-00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 67.43 GGS 520550 0.00 G Zone 520150 31.13 W/F 520190 1.44 Official Use Only -Flaring; Authorization. > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: KING SALMON PLATFORM Revised ~~~ Month/Year: Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 4/9/00 12:30 4/10/00 21:00 203 N TUBES LEAKING ON HEAT EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR SOLAR/YOUR HEAT EXCHANGER LEAKS L-PM-0670 4/9/00 12:30 4/10!00 21:00 430 N TUBES LEAKING ON HEAT EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR SOLAR/YOUR HEAT EXCHANGER LEAKS L-PM-0670 4/23/00 6:00 4/30!00 23:59 899 N TUBES LEAKING ON HEAT EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND RETURN TO NORMAL SOLAR/YORK HEAT EXCHANGER LEAKS L-PM-0670 4!23/00 6:00 4/30/00 23:59 1314 N TUBES LEAKING ON HEAT EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND RETURN TO NORMAL SOLAR/YORK HEAT EXCHANGER LEAKS L-PM-0670 4123/00 6:00 4/30/00 23:59 1151 N TUBES LEAKING ON HEAT EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND RETURN TO NORMAL SOLAIWORK HEAT EXCHANGER LEAKS L-PM-0670 4!23/00 6:00 4/30/00 23:59 817 N TUBES LEAKING ON HEAT EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND RETURN TO NORMAL SOLAR/YORK HEAT EXCHANGER LEAKS L-PM-0670 4/23/00 6:00 4/30/00 23:59 959 N TUBES LEAKING ON HEAT EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND RETURN TO NORMAL SOLAR/YORK HEAT EXCHANGER LEAKS L-PM-0670 4/23/00 6:00 4/30/00 23:59 1221 N TUBES LEAKING ON HEAT EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND RETURN,TO NORMAL SOLAR/YORK HEAT EXCHANGER LEAKS L-PM-0670 4/23/00 6:00 4/30100 23:59 1425 N TUBES LEAKING ON HEAT EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND RETURN TO NORMAL SOLAR/YORK HEAT EXCHANGER LEAKS L-PM-0670 4/23/00 6:00 4/30/00 23:59 849 N TUBES LEAKING ON HEAT EXCHANGER SAFETY UNSCHEDULED MAINTENANCE REPAIR HEAT EXCHANGER AND RETURN TO NORMAL SOLAR/YORK HEAT EXCHANGER LEAKS L-PM-0670 Report Date: 7/25/00 ~ _ _~ ~r r = _ _ Page: 1 of 1 t,;A - ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Yeaz of Disposition King Salmon Platform - TBU Unocal Tradin Bay Unit May 2000 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 15,117 4. Flazed or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 252 5. Pilot and Purge 186 6. Used for lease operations - 128,214 7. *Other (Shrinkage) ' ~~ ° ~ ~~ ~ ~ ~ ~~ 41, 419 TOTAL items 1-7 185,188 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 94,975 11. Transferred to: Cov's to TBPF 2,053 Remarks: ere y certi at a ore mg is true an Signature: ~ 1 ~ correct to a est o my ow ge. Title: Acct. Super. Date: 16-Jun-00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 76.30 GGS 520550 0.00 G Zone 520150 22.24 W/F 520190 1.46 Official Use Only -Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: May-00 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCP Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 5/1/00 0:00 5/1/00 3:00 65 N EXCHANGER TUBES LEAKING GAS SAFETY UNSCHEDULED MAINTENANCE SWAPING TO ANOTHER HEAT EXCHANGER SWAPING TO SPARE HEAT -PM-0670 511!00 11:30 5/1100 13:30 43 N SOLAR/YORK DUMP VALVUE OPERATIONAL UNSCHEDULED MAINTENANCE REBUILT AND REPLACED DUMP VALVE FIXED DUMP VALVE AND RE L-PM-0670 5/11/00 13:22 5/11/00 18:00 91.97 N Circuit breaker failure resulting in ACs shutting down and causing a complete OPERATIONAL OTHER: Isolated problem equipment, restarted ACs and returned to normal L-PM-0900 5/12/00 6:30 5/12/00 9:00 52.29 N r, causing ACs to shut down, resulting in power failure OPERATIONAL OTHER: ected equipment, restarted Acs, returned to normal operations. L-PM-0900 Report Date: 6/16/00 Page: 1 of 1 King Salmon Excess flare April/May 2000 Subject: King Salmon Excess flare ApriUMay 2000 Date: Thu, 4 May 2000 12:43:47 -0700 From: "Bounds, Janet G" <boundsj@unocal.com> To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us> CC: "Atkins, Mark C" <atkinmc@Orion.Unocal.com>, "Beitia, John T" <beitiaj@Orion.Unocal.com> Wendy When the heat exchanger tubes began leaking on the King Salmon Platform on April 23rd it was decided that a replacement was needed. The old heat exchanger has been bypassed and the former standby heat exchanger is now in service. Piping modifications and new heads were installed along with adjustments to the control panel. Four 2-inch spools were fabricated. The new heat exchanger was placed in service on May 1, 2000. It is currently running smoothly. During this time production was cut back and gas lift was adjusted to minimize flaring. Estimated flare volume associated with this event was less than 9.4mmcf. Thank you, Janet G. Bounds Environmental Scientist Unocal (907) 263-7694 (office) (907) 263-7901 (fax) 1 of 1 5/5/00 12:18 PM ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION .Facility Operator Field(s) Month/Yeaz of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit June 2000 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flazed or vented less than 1 hour 21,641 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 1,470 5. Pilot and Purge 180 6. Used for lease operations 132,111 7. *Other (Shrinkage) 32,899 TOTAL items 1-7 ~ `~~ ~n ~~ ~r' 188,301 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 101,300 11. Transferred to: Cov's to TBPF 1,720 Remarks: ere y cerh t e oregom is truejan correct to Signature: ~. ~ !' ~ a est o my owe ge. Title: Acct. Super. Date: 17-Jul-00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 76.33 GGS 520550 0.00 G Zone 520150 21.94 W/F 520190 1.73 Official Use Only -Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF . Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month followmg the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: June-00 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 6/8/00 2:00 6/8/00 4:00 764 N SOLAR YOUR INSPECTION, FOUND OIL LEAK, WAITING FOR PARTS OPERATIONAL SCHEDULED MAINTENANCE INSPECTION WAITING FOR PARTS TO REPAIR L-PM-0670 6/9/00 0:00 6/9/00 14:00 624 N SCHEDULED MAINT. ON SOLAR YORK, FOUND OIL LEAK WAITING FOR PARTS OPERATIONAL SCHEDULED MAINTENANCE Repaired effected parts, returned to service. L-PM-0670 6/14100 13:30 6/14/00 16:30 82 N COOLING WATER SUPPLY PUMPS DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Repaired affected equipment and returned to normal operations. L-PM-0670 Report Date: 7/18/00 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER' S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit July 2000 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 28,470 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 186 6. Used for lease operations 124,455 7. *Other (Shrinkage) 35,282 TOTAL items 1-7 188,393 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 99,447 11. Transferred to: Cov's to TBPF 1,851 Remarks: ere y certn at a oreg nng ns true an correct to Signature: R ~ a est o my owe ge. Title: Acct. Super. Date: 15-Aug-00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 72.67 GGS 520550 0.00 G Zone 520150 25.11% W/F . 520190 2.22% Official Use Only -Flaring Authorization > 1 hr 1. Safety MCF 2. Lease Use MCF 3. Conserd. Purposes MCF Comnnissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit August 2000 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 16,538 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 476 5. Pilot and Purge 186 6. Used for lease operations 121,523 7. *Other (Shrinkage) 40,946 TOTAL items 1-7 , ~ ~ _ Y..~ ,~.;, ` ~' 179,669 8. NGL gas equivalent produced ~ ~ ~ ~ ~~> >;,,- ~:, ~ _.; 0 9. Purchased gas .._ _ - - 0 10. Transferred from: TBPF 93,660 11. Transferred to: cov's to TBPF 1,864 Remarks: ere y certi y t~ e ore o g i/s/true an correct to a est o my owe ge. Signature: - - ~-~~ ' ~/~, Title: Acct. Super. Date: 13-Se -00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 71.35 GGS 520550 0.00 G Zone 520150 26.56 % W/F 520190 2.09% Official Use Only -Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month followmg the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: August-00 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 8/4/00 0:05 8/4!00 2:30 58 N AC GENERATOR #2 SHUT DOWN TAKING #1 AC GENERATOR DOWN ALSO, CAUSING A TOTAL POWER OPERATIONAL OTHER: START AC GENERATORS AND RETURN TO NORMAL OPERATIONS L-PM-0900 8/5/00 8:00 8/5/00 10:45 38 N AC POWER CAUSING A PRODUCTION SHUT DOWN. OPERATIONAL OTHER: STARTED AC GENERATORS AND RETURNED TO NORMAL OPERATIONS 8173!00 16:30 8/13/00 18:30 130 N LOSS OF AC POWER CAUSING PSD OPERATIONAL OTHER: RESTART EQUIP. RETURN TO NORMAL OPERATIONS L-PM-0900 8/29/00 15:00 8/29/00 23:59 250 N OPERATIONAL OTHER: Report Date: 9/5/00 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU i Unocal Trading Bay Unit Se tember 2000 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 19,275 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 641 5. Pilot and Purge ~ 180 6. Used for lease operations 124,401 7. *Other (Shrinkage) 31,106 TOTAL items 1-7 175,603 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 94,578 11. Transferred to: cov's to TBPF 1,637 Remazks: ere y cerh at a oreg ing i true an correct to Signature: ~ a est o my owe ge. r Title: cct. Super. Date: 19-Oct-00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 72.66 GGS 520550 0.00 G Zone 520150 24.62 W/F 520190 2.72% Official Us'~ Only -Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month following the . month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ,~ Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: September-00 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 9/3/00 8:30 9/3 /00 17:30 159 N SOLAR YOURK DOWN FOR 90 DAY PM OPERATIONAL SCHEDULED MAINTENANCE COMPLETED MAINTENANCE, RETURNED TO SERVICE 90DAY PM L-PM-0670 9/16/00 13:22 9/16/00 17:12 482 N SOLAR SOLAR SHUT DOWN DUE TO FIRE EYES. OPERATIONAL OTHER: RESET FIRE EYES AND STARTED SOLAR SOLAR AND RETURNED TO NORMAL OPERATIONS L-PM-0260 Report Date: 10/19/00 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit October 2000 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 26,605 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 1,751 5. Pilot and Purge (~ ~ ~ ' ` ~~E ® 180 6. Used for lease operations NOU 2 0 2~Ot~ 130,631 7. *Other (Shrinkage) Alaska Oil & G Cons, Commission 20,506 TOTAL items 1-7 179,673 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 98,014 11. Transferred to: cov's to TBPF 1,779 Remarks: ere y cerri at a or omg is true an correct to a est o my owe ge. Signature: ,t'-(._.'- ~'~ Title: Acct. Super. Date: 15-Nov-00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 72.78 GGS 520550 0.00 G Zone 520150 24.54 W/F 520190 2.68 Official Use Only -Flaring .Authorization > 1 hr. 1. Safety MCF 2. Lease Use l "1 `S / MCF l 3. Conserv. Pu~oses MCF P ~~ la~- Commissio r Date ~~/ Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: October-00 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 10/30/00 12:30 10130/00 23:59 1730 N OPERATIONAL BLOW DOWN WELL PLATFORM SHUTDOWN FOR MAINTENANCE AND MODIFICATION ' 10/31/00 0:00 10/31/00 1:30 21 N OPERATIONAL SCHEDULED MAINTENANCE SLOWDOWN WELL, PLATFORM SHUTDOWN FOR MAINTENANCE AND Report Date: 11/14/00 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit November 2000 Disposition ~ Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 3,096 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 165 6. Used for lease operations 100,413 7. *Other (Shrinkage) 29,284 TOTAL items 1-7 132,958 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TsPF 69,298 11. Transferred to: COV's to TBPF 1,262 Remarks: ere y certi y t t t e orego g >s//true an correct tote est o my owe ge. Signature: U~ Title: Acct. Suyer. Date: 13-Dec-00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 72.79% GGS 520550 0.00% G Zone 520150 24.54% W/F 520190 2.67% 'Official Use Only -:Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF r / f ~J~, 2~ om 'ssioner Date ~~j~~y Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit December 2000 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 19,480 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 79 5. Pilot and Purge 186 6. Used for lease operations 128,134 7. *Other (Shrinkage) 10,347 TOTAL items 1-7 158,226 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 86,740 11. Transferred to: Cov's to TBPF 1,295 Remarks: ere y cerh at a oregoi g is true an correct to a est o my owe ge. Signature: Title: Acct. Super. Date: 18-Jan-O1 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 74.10% GGS 520550 0.00% G Zone 520150 23.25% W/F 520190 2.65% ` Official Use Only -Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF f 3. Conserv. Purposes MCF ~ u?' Commission Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~~ 3/~z.f Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: December 2000 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 1212/00 0:01 12/2/00 23:59 79 N OPERATIONAL OTHER: FACILITY SHUT GOWN ~ Report Date: 1/8/01 Page: 1 of 1