PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Steelhead Platform - TBU Unocal Trading Bay Unit January 2000
Disposition Total Volumes MCF
1. Sold 5,554,174
2. Reinjected 0
3. Flared or vented less than 1 hour 70
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 4,070
5. Pilot and Purge 10,332
6. Used for lease operations 185,542
7. *Other (Shrinkage) 18,600
TOTAL items 1-7 5,772,788
8, NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 20,651
2,507
Remarks:
ere y certl ~at a orego g s true correct to
~/,
Signature: ~!. ' ~? ~~~ a est o my owe ge.
Title: Acct. Super. Date: 18-Feb-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.38%
GGS 520550 99.32
G Zone 520150 0.26
W/F 520190 0.04 %
Undefined Zone 520195 0.00
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
STEELHEAD PLATFORM
EXCESS FLARE LOG
JAN.00
Date & Time Date & Time Event Gas Planned or Description of Operational or Reason Actions Taken Equip.Dwn
Event Began Event Ended MCF Unplanned Incident Safety ID Number
01/17/00 1600 01/18/00 0400 4070 Planned C-20 quarterly and engine overhaul Operational Engine vanes needed Repaired HF-4167
replaced
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Steelhead Platform - TBU Unocal Trading Bay Unit February 2000
Disposition Total Volumes MCF
1. Sold 4,930,275
2. Reinjected 0
3. Flared or vented less than 1 hour 10
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 190
5. Pilot and Purge 11, 316
6. Used for lease operations 165,540
7. *Other (Shrinkage) 17,400
TOTAL items 1-7 5,124,731
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 40,400
2,575
Remarks:
ere y certi i e, oregomg s true an correct to
Signature: ~~~~ ~ ~ ~~ f~~ ~ a est o my owe ge.
Title: Acct. Super. Date: 14-Mar-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.82
GGS 520550 99.00
G Zone 520150 0.14
W/F 520190 0.04
Undefined Zone 520195 0.00
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authorit 20 AAC 25.235.
Form 10-422
Rev. 4/95
STEELHEAD PLATFORM
EXCESS FLARE LOG
Feb-00
Date & Time Date & Time Event Gas Planned or Description of Operational or Reason Actions Taken Equip.Dwn
Event Began Event Ended MCF Unplanned Incident Safety ID Number
2/4/00-0130 02/04/00-0430 190 Unplanned Power outage at Trading Bay Operational S/I Steelhead oil line Once Trading Bay
resolved their problem
we got our Gas lift
compressor back on
line.
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER' S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Steelhead Platform - TBU Unocal Trading Bay Unit March
Disposition Total Volumes MCF
1. Sold 4,884,002
2. Reinjected 0
3. Flared or vented less than 1 hour 210
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 28,071
5. Pilot and Purge 9,806
6. Used for lease operations 167,249
7. *Other (Shrinkage) 0
TOTAL items 1-7 5,089,338
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 35,377
2,553
Remarks:
ere y certi t e orego is true an orrect to
Signature: ; kr, `~ ~ ,~ %
,. a est o my owe ge.
Title: Acct. Super. Date: 17-May-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.70
GGS 520550 98.00
G Zone 520150 0.97 %
W/F 520190 0.33
Undefined Zone 520195 0.00
Official Use Only -.Flaring. Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month followmg the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Ezcess Flare Log Report
Facility Name: STEELHEAD PLATFORM
Month/Year: APR-2000
Report Date: 10-MAY-2000
Page 1 of 1
Date & 7'Lne Bveat Oau Planned or Deaerlpflon of Tnofdent Category ltsuoa Aotloas Takea Ste
s Taken to HLimize Beenrrenee B
l
t B
BventBegln
EveatBnded
MCF
Dnl7sensd p pmen
oron
4n
1tP•EIDBnmber
04•APR-00 04-APR•00 13,530 Unplanned C•20 MAINTENANCE OPERATI SCHEDULED MAINTENANCE CHANGED OUT FUEL N02ZELS HANGING OITI NOZZELS 00.00•
05-APR•00 05•APR-00 12,060 Plamed C-20 S/D FOR MAINTENANCE OPERATI SCHEDULED MAINTENANCE CHANGING OUi FUEL NOZZELS CHANGING OUT NOZZELS 00.00•
09•APR-00 09•APR-00 2,083 Planned C•20 DOMN FOR BLEED VALVE CHANGE OUT OPERATI SCHEDULED MAINTENANCE 6TH ST BLEED VLV REPAIR REPARRED BLEED VLV 00.00-
16•APR•00 16•APR•00 398 Unplanned C•20 S/D HIOI LEVEL SUCTION SCRUBBER OPERATIO UNSCHEDULED MAINTENANCE FAULTY LEVEL TRANSMITTER REPAIRED TRANSMITTER 00.00-
Steelhead compressor maintenance
Subject: Steelhead compressor maintenance
Date: Tue, 28 Mar 2000 15:39:06 -0800
From: "Bounds, Janet G" <boundsj@unocal.com>
To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
Bello Wendy
We have scheduled maintenance coinciding with an extended quarterly
inspection of C-20 on the Steelhead platform. The work is scheduled for
April 4 - 6, 2000. We are estimating approximately 25 mmscf will be flared.
In order to reduce flare volumes additional contract personnel will be
brought on board to expedite the process. Replacement components are on
site.
Please contact me should you need further information.
Thank you,
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
1 of 1 3/30/0010:16 AM
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Steelhead Platform - TBU Unocal Trading Ba Unit April 2000
Disposition Total Volumes MCF
1. Sold 4,544,018
2. Reinjected 0
3. Flared or vented less than 1 hour 682
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 10,464
6. Used for lease operations 163,420
7. *Other (Shrinkage) 0
TOTAL items 1-7 4,718,584
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: T13PF
cov'S to TBPF 155,402
2,936
Remarks:
ere y certi at a ore om fis true an correct to
Signature: ~L! C~` ~~/ ,/ a est o my owe ge.
Title: Acct. Singer. Date: 08-Jun-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.88
GGS 520550 98.47
G Zone 520150 0.57
W/F 520190 0.08
Undefined Zone 520195 0.00
Official Use Only -Flaring Authorization. > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month followmg the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: STEELHEAD PLATFORM Month/Year: April-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/4/00 2:00 4/4/00 6:00 13530 N C-20 MAINTENANCE OPERATIONAL SCHEDULED MAINTENANCE CHANGED OUT FUEL NOZZELS HANGING OUT NOZZELS 00-00-00
4/5/00 0:00 4/5/00 17:00 12060 Y C-20 S/d FOR MAINTENANCE OPERATIONAL SCHEDULED'MAINTENANCE CHANGING OUT FUEL NOZZELS CHANGING OUT NOZZELS 00-00-00
4/9/00 10:00 4/9/00 13:30 2083 Y C-20 DOWN FOR BLEED VALVE
CHANGE OUT OPERATIONAL SCHEDULED MAINTENANCE 6TH ST BLEED VLV REPAIR REPARIED BLEED VLV 00-00-00
4/16!00 13:10 4/16/00 14:30 398 N C-20 S/D HIGH LEVEL SUCTION
SCRUBBER OPERATIONAL UNSCHEDULED MAINTENANCE FAULTY LEVEL TRANSMITTER REPAIRED TRANSMITTER 00-00-00
Report Date: 7/25/00 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER' S REPORT OF GAS DISPOSITION
Facility ~ Operator Field(s) Month/Year of Di position
Steelhead Platform - TBU Unocal Trading Bay Unit --1y1 2000
Disposition Total Volumes MCF
1. Sold 4,544,018
2. Reinjected 0
3. Flared or vented less than 1 hour 682
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 10,464
6. Used for lease operations 163,420
7. *Other (Shrinkage) 0
TOTAL items 1-7 4,718,584
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 155,402
2,936
Remarks:
ere y certl y at a ore om is true an correct to
Signature: ,C~(~` (~~ ~/ a est o my owe ge.
Title: Acct. Super. Date: 08-Jun-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.88
GGS 520550 98.47
G Zone 520150 0.57
W/F 520190 0.08
Undefined Zone 520195 0.00
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Steelhead Platform - TBU Unocal Trading Bay Unit June 2000
Disposition Total Volumes MCF
1. Sold 4,415,979
2. Reinjected 0
3. Flared or vented less than 1 hour 402
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 1,435
5. Pilot and Purge 10,447
6. Used for lease operations 159,014
7. *Other (Shrinkage) 0
TOTAL items 1-7 4,587,277
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 191,050
2,502
Remarks:
ere y certl t e ore om is true an correct to
Signature: a est o my owe ge.
Title: Acct. Super. Date: 17-Jul-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.74
GGS 520550 98.51
G Zone 520150 0.68
W/F 520190 0.08
Undefined Zone 520195 0.00
Official Use Only -,Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: STEELHEAD PLATFORM
Month/Year: June-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6!26!00 0:00 6!26/00 5:00 1435 N M-5 WATERED UP. HAD TO
UNLOAD TO FLARE OPERATIONAL BLOW DOWN WELL
Report Date: 7/18!00 , i ° ` . I t~ ~',. ~ Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Steelhead Platform - TBU Unocal Trading Bay Unit July 2000
Disposition Total Volumes MCF
1. Sold 4,585,274
2. Reinjected 0
3. Flazed or vented less than 1 hour 153
4. FIazed or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 4,430
5. Pilot and Purge 9,657
6. Used for lease operations 153,934
7. *Other (Shrinkage) 0
TOTAL items 1-7 4,753,448
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 193,226
2,453
Remarks:
~
ere y certi t e orego g is/true /an correct to
Signature: .~~-/ °`.~.~PO a est o
my owe ge.
Title: acct. Suer. Date: 15-Aug-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.32
GGS 520550 99.44
G Zone 520150 0.22
W/F 520190 0.02
Undefined Zone 520195 0.00
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. ,Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: STEELHEAD PLATFORM Month/Year: July-00
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF ~ Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID 1Vumber
7/9/00 0:00 7/9/00 6:00 3744 N REPAIR FAULLTY WIRING CANNON
CONNECTION C-20 OPERATIONAL UNSCHEDULED MAINTENANCE REPAIRED WIRES
7/18/00 0:00 7/18/00 1:00 182 N BUILDING DISCHARGE PSI ON C-20 OPERATIONAL SCHEDULED MAINTENANCE
7/19/00 0:00 7/19/00 1:00 272 N KICKING OFF M-25 OPERATIONAL SCHEDULED MAINTENANCE
7/21/00 0:00 7/21/00 1:00 147 N KICKING OFF M-25 OPERATIONAL UNSCHEDULED MAINTENANCE
7/31/00 0:00 7/31/00 1:00 85 N ATTEMPTING TO FLOW M-14L
AFTER PERF. JOB OPERATIONAL NORMAL OPERATIONS
Report Date: 8/15/00 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
.PRODUCER'S REPORT OF GAS DISPOSITION
Facility - Operator Field(s) Month/Yeaz of Disposition
Steelhead Platform - TBU Unocal Trading Bay Unit August 2000
Disposition Total Volumes MCF
1. Sold 4,557,405
2. Reinjected 0
3. Flared or vented less than 1 hour 508
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 9,056
6. Used for lease operations 152,000
7. *Other (Shrinkage) 0
TOTAL items 1-7 4,718,969
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 180,862
2,744
Remarks:
ere y certl/~ at a ore omg~ is true an correct to
Signature: L~f ~~//rC.~J a est o my owe ge.
Title: Acct. Super. Date: 13-Sep-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.28
GGS 520550 99.46
G Zone 520150 0.23
W/F 520190 0.03
Undefined Zone 520195 0.00
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
.Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER' S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Steelhead Platform - TBU Unocal Trading Bay Unit September 2000
Disposition Total Volumes MCF
1. Sold 4,055,791
2. Reinjected 0
3. Flared or vented less than 1 hour 2,557
4. Flared or vented greater than 1 hour
{Supplemental report required-See 20 AAC 25.235) 4,607
5. Pilot and Purge 9,988
6. Used for lease operations 136,953
7. *Other (Shrinkage) 0
TOTAL items 1-7 4,209,896
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 85,817
2,332
Remarks:
ere y certt at a oreg g is true an correct to
Signature: a est o my owe ge.
Title: Acct. Surer. Date: 19-Oct-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.24
GGS 520550 99.50
G Zone 520150 0.23
W/F 520190 0.03
Undefined Zone 520195 0.00
Official U~'e Only -Flaring Authorization >_ 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psis and to a temperature of 60 degrees F.
Report due by the 20th of the month followmg the
month of disposition.
Authority 20 AAC 25.235.
Fotm 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: STEELHEAD PLATFORM
Month/Year: September 2000
Date 8 r Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
9/22/00 0:00 9/22/0D 23:59 511 N Trying to get M-25 to lift OPERATIONAL NORMAL OPERATIONS POOR PERFORMANCE C-20 PLAN MAINTAINCE
9/23/00 0:00 9/23!00 23:59 256 N Trying to get M-25 Lift OPERATIONAL NORMAL OPERATIONS POOR PERFORMANCE G20 PLAN C-20 MAINTAINCE
9128/00 0:00 9128/00 22:00 3840 N S/D C-20 for Maint. Lilted Oil Wells
with Sales Gas OPERATIONAL NORMAL OPERATIONS Annual Maintance ANNUAL PM
Report Date: 10/19/00 Page: 1 of 1
Steelhead C-20
Subject: Steelhead C-20
Date: Fri, 29 Sep 2000 14:21:00 -0700
From: "Bounds, Janet G" <boundsj@unocal.com>
To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
CC: "Payment, Glen A" <paymega@Orion.Unocal.com>
Hello Wendy,
Yesterday C-20 on the Steelhead Platform was shut down for 16 hours to
perform an annual preventative maintenance inspection. Flare volume was
increased for less than 4 MMCF during this time. The lift rate on wells was
lowered to reduce flare volumes, plus needed parts were on hand and extra
personnel were brought on board to complete the .work efficiently. This
event will be recorded on the excess flare log as required.
Thank you,
Janet G. Bounds
Environmental Scientist
Unocal
(907).263-7694 (office)
(907) 263-7901 (fax)
1 of 1
t
9/29/00 3:23 PM
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER' S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Steelhead Platform - TBU Unocal Trading Bay Unit October 2000
Disposition Total Volumes MCF
1. Sold 4,167,497
2. Reinjected 0
3. Flared or vented less than 1 hour 363
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 3,755
5.
Pilot and Purge RE C E c
E ®
10,429
6. Used for lease operations N O V 2 Z Q Q p 148 , 066
7. *Other (Shrinkage)
Alaska Oil & Gas C
s. Commission. 0
TOTAL items 1-7 4,330,110
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 34,006
2,569
Remarks:
ere y certi y t e oregot is true an correct to a est o my owe ge.
1
7,
Signature: - . ~. ' ~° (' ' Title: Acct. Super. Date: 15-Nov-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.27
GGS 520550 99.45
G Zone 520150 0.27
W/F 520190 0.01
Undefined Zone 520195 0.00
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use ~ ~ J ~ MCF
3. Conserv. Purposes MCF
W1ti / ~~/ ~ c ~-
Commissione Date
Note: All volumes must be corrected to pressure
of 14.65 Asia and to a temperature of 60 degrees F.
Report due.by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
~~
~~~ /~~~
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: STEELHEAD PLATFORM Month/Year: October 2000
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/18/00 0:00 10/18/00 23:59 3464 N EXCESSIVE FLARE DUE TO
LIFTING OIL WELLS WITH SALES
GAS. OPERATIONAL OTHER: C-20 COUPLER BLEW O-RING.
REPLACED LUBE OIL PUMP
LINES
10/19/00 0:00 10/19/00 2:00 291 N BRINGING WELLS BACK ON AFTER
STATE INSPECTOR OPERATIONAL OTHER:
Report Date: 11/14/00 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Steelhead Platform - TBU Unocal Trading Bay Unit November 2000
Disposition Total Volumes MCF
1. Sold 3,645,708
2. Reinjected 0
3. Flared or vented less than 1 hour 137
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 15,525
5. Pilot and Purge 11,214
6. Used for lease operations 141,680
7. *Other (Shrinkage) 0
TOTAL items 1-7 3,814,264
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 9,739
2,141
Remarks:
ere y cerh y at a ore oing is true an correct to a est o my owe ge.
Signature: Title: Acct. Super. Date: 13-Dec-00
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.28%
GGS 520550 99.44%
G Zone 520150 0.25%
W/F 520190 0.03%
Undefined Zone 520195 0.00%
Official Use Only -Flaring Authorization > l hr.
1. Safety MCF
2. Lease Use /~ ~~..MCF
/
3. Conserv. Purposes MCF
! '° a~-
Commission Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
~l. if G~
~~~ ~~~
Excess Flare Log Report
Facility Name:
STEELHEAD PLATFORM
Month/Year: November 2000
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1119!00 0:00 11/12/00 11:00 1403 N OPERATIONAL NORMAL OPERATIONS BRINGING ON M-2
11/9/00 0:00 11/12/00 11:00 4401 N OPERATIONAL NORMAL OPERATIONS BRINGING ON M-2
11/9/00 0:00 11/12/00 11:00 6350 N OPERATIONAL NORMAL OPERATIONS BRINGING ON M-2
11!9/00 0:00 11!12/00 11:00 2717 N OPERATIONAL NORMAL OPERATIONS BRINGING ON M-2
11/16/00 9:15 11/16/00 11:00 654 N OPERATIONAL BLOW DOWN WELL UNLOADING M-2
Report Date: 1216/00 Page: 1 of 1
Steelhead Excess Flare
Subject: Steelhead Excess Flare
Date: Tue, 14 Nov 2000 14:10:42 -0800
From: "Bounds, Janet G" <boundsj@unocal.com>
To: "Wendy_Mahan (E-mail)" <Wendy_Mahan@admin.state.ak.us>
CC: "Ross, Gary D" <rossgd@Orion.Unocal.com>,
"Smetanka, Jeff W" <smetankaj@Orion.Unocal.com>
Wendy,
In order to improve production form M-2 we need to unload the well. Flare
volumes will increase for a maximmum rate of 10 mmcfd for less than 24
hours. A 100 psi flowing tubing pressure is required to accomplish this
procedure. Since our minimum suction pressure for compression is
approximately 300 psi, the well must be taken to flare. This procedure will
result in higher gas rates and recovery from the M-2 well. We anticipate
conducting this procedure today or tomorrow.
,r) 7 p c 7 7 -•. 1 y T iT': ~~ u "~ ~ 1 c, c +- i (1'? 4.
3.:c Cdi O'" YF_I _y' 1 ~~Li iy' (:l U., i.-.,.....
Janet G.rBounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
11/15/00 8:48 AM
lofl
Steelhead flare
Subject: Steelhead flare
Date: Wed, 8 Nov 2000 17:06:28 -0800
From: "Bounds, Janet G" <boundsj@unocal.com>
To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
CC: "Ross, Gary D" <rossgd@Orion.Unocal.com>,
"Payment, Glen A" <paymega@Orion.Unocal.com>,
"Smetanka, Jeff W" <smetankaj@Orion.Unocal.com>
Hello Wendy
We are planning to begin testing and cleaning out M-2 prior to placing the
well on production. We are estimating that less than 10 mmcfd will be
flared for 24 hours or less. We should begin later today if all goes well.
Thank you,
Janet
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
1 of 1 11/9/00 8:48 AM
Steelhead flare
Subject: Steelhead flare
Date: Wed, 8 Nov 2000 17:06:28 -0800
From: "Bounds, Janet G" <boundsj@unocal.com>
To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
CC: "Ross, Gary D" <rossgd@Orion.Unocal.com>,
"Payment, Glen A" <paymega@Orion.Unocal.com>,
"Smetanka, Jeff W" <smetankaj@Orion.Unocal.com>
Hello Wendy
We are planning to begin testing and cleaning out M-2 prior to placing the
well on production. We are estimating that less than 10 mmcfd will be
flared for 24 hours or less. We should begin later today if all goes well.
Thank you,
Janet
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
1 of 1 1/3/01 8:27 AM
Steelhead Excess Flare
Subject: Steelhead Excess Flare
Date: Tue, 14 Nov 2000 14:10:42 -0800
From: "Bounds, Janet G" <boundsj@unocal.com>
To: "Wendy_Mahan (E-mail)" <Wendy_Mahan@admin.state.ak.us>
CC: "Ross, Gary D" <rossgd@Orion.Unocal.com>,
"Smetanka, Jeff W" <smetankaj@Orion.Unocal.com>
Wendy,
In order to improve production form M-2 we need to unload the well. Flare
volumes will increase for a maximmum rate of 10 mmcfd for less than 24
hours. A 100 psi flowing tubing pressure is required to accomplish this
procedure. Since our minimum suction pressure for compression is
approximately 300 psi, the well must be taken to flare. This procedure will
result in higher gas rates and recovery from the M-2 well. We anticipate
conducting this procedure today or tomorrow.
''lease call or f^epl~' i, f yo~.c have any ~~uestions.
> ~ianks,
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
1 of 1 1/3/01 8:27 AM
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Steelhead Platform - TBU Unocal Trading Bay Unit December 2000
Disposition Total Volumes MCF
1. Sold 3,668,462
2. Reinjected 0
3. Flared or vented less than 1 hour 127
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 13,478
5. Pilot and Purge 12,083
6. Used for lease operations 144,333
7. *Other (Shrinkage) 0
TOTAL items 1-7 3,838,483
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TsPF
COV's to TBPF 4,624
1,788
Remarks:
ere y cerri y t e orego g is true an correct to a est o my owe ge.
Signature: ~ Title: Acct. Super. Date: 18-Jan-O1
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.13%
GGS 520550 99.43%
G Zone 520150 0.32%
W/F 520190 0.12%
Undefined Zone 520195 0.00%
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use /3~~f'7~MCF
3. Conserv. Purposes MCF
Commissio Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
a.u~W
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: STEELHEAD PLATFORM Month/Year: December 2000
Date 8 Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 1D Number
12/23/00 14:00 12/24/00 13:30 1437 Y OPERATIONAL BLOW DOWN WELL ROUTED M-2 GAS TO FLARE TO
UNLOAD FLUID ROUTE GAS TO COMP
ONCE FLOWING
12/23/00 14:00 12/24/00 13:30 9549 Y OPERATIONAL BLOW DOWN WELL ROUTED M-2 GAS TO FLARE TO
UNLOAD FLUID ROUTE GAS TO COMP
ONCE FLOWING
12129/00 0:00 12/29/00 3:30 1186 N COMPRESSOR BLOW DOWN OPERATIONAL NORMAL OPERATIONS ESD II HIGH LEVEL IN FLARE
SCRUBBER COMPLETED START UP
12/31/00 0:00 12/31/00 23:59 7306 N GAS FLARED TO LIFT OIL
WELLS OPERATIONAL UNSCHEDULED MAINTENANCE C-20 RD STAGE GEAR
DESTROYED REPAIRING COMPRESSOR
Report Date: 1/9/01 Page: 1 of 1