FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) 930148 Month/Year of Disposition
West McArthur River Unit Forcenergy Inc. West McArthur River Field January 1999
Disposition Volume MCF Indicate contributions of each pool to total.
Pool Name Code Percent
1. Sold 0
2. Reinjected 0 West McArthur River 930148 100%
3. Flared or vented less than 1 hour. 0
4. Flared or vented greater than 1 hour. ~ 5,260
(Supplemental report req'd-See 20 AAC 25.235) ~:~
5.
Pilot and Purge
= a,
°~ ' ~' ~ fi"""g 1,500
;;.
6. Used for lease operations ~ ~ `- ~~~°` 13,608
7.
Other <_
~ -~ ~~s~ ` 0
TOTAL items 1-7 ~•
20,368
8. NGL gas equivalent produced 0
9. Purchased gas 6,049
10 . Transferred from: 0
11. Transferred to: ~ 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
Official Use Only-Flaring Authorization >1hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
I hereby c ify hat the foregoing is true and correct to the best of my knowledge. Note: Ail volumes must be corrected to pressure of ~4.s5
psia and to a temperature of 60° F. Report due by the
Signature Title Drilling/Production Manager Date 2/12/99 20th of the month following the month in question.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Supplement to Form 10-422
Facility Report of Produced Gas Disposition
West McArthur River Unit
January 1999
In accordance with 20 AAC 25.235(b) for Gas Disposition, the West McArthur River Unit
flared on a continuous basis 6760 MCF during January 1999. The estimated rate
required for pilot and purge is 50 MCF/D or 1,500 MCF for January 1999. The
remaining volume of gas classified as "Flared or vented greater than 1 hour" is therefore
5260 MCF or 14 MCFPD.
Paul White
Drilling/Production Manager
ALASKA OIL AND GAS CONSERVATION COMMISSION REVISED
FACILITY REPORT OF PRODUCED GAS DISPOSITION COPY
Facility Operator Field(s) 930148 Month/Year of Disposition
West McArthur River Unit Forcenergy Inc. West McArthur River Field February 1999
Disposition Volume MCF Indicate contributions of each pool to total.
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 0
4. Flared or vented greater than 1 hour.
(Supplemental report req'd-See 20 AAC 25.235) 8,107
5. Pilot and Purge 6,450
6. Used for lease operations 2 858
7. Other 0
TOTAL items 1-7 17,415
8. NGL gas equivalent produced 0
9. Purchased gas 11,254
10. Transferred from: 0
11. Transferred to: 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
generators.
I hereby that the foregoing is true and correct to the best of my knowledge.
Signature Title Drillin /Production Manager Date 4/15/99
Pool Name I Code I Pe
West McArthur River I 930148 I 100%
Official Use Only-Flaring Authorization >1hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure of
14.65 psia and to a temperature of 60° F. Report due by
the 20th of the month following the month in question.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Supplement to Form 10-422
Facility Report of Produced Gas Disposition for February 1999
West Mc Arthur River Unit
Attention: Wendy Mahan
Re: Flare Event Reporting
In accordance with 20 AAC 25.235(b) for Gas Disposition we submit the following
information.
Recently, in order to determine more accurately the disposition of West Mc Arthur River
gas, Forcenergy has installed additional gas turbine meters and redesigned our flare
system. Below is a more complete description of our gas process and use.
As can be seen on the attached schematic for our normal pilot and purge condition we are
burning 100% of our separator gas as turbine fuel. The deficiency in quantity is made up
of gas purchased from Unocal. The 1200 bbl: tank vent vapors are collected by a vapor
recovery unit and are used as pilot and purge gas. The vapor recovery unit was installed
to avoid releasing tank vents to atmosphere. The compressed tank vapors contain volatile
organic compounds, which condense in turbine fuel controls and make the vapors
unusable for turbine fuel. A gas analysis (attached) has shown the vapors to contain 17%
to 23% nitrogen. Because of the poor quality, and limited quantity, (approx. 215. MCF/D)
processing this gas to a marketable condition for sale, or use on the lease is
uneconomical. The economics of using a nitrogen sieve unit is marginal for 10
MMSCF/D. I include a copy of a letter from Hybon Engineering in answer to my query
on Nitrogen sieve equipment. The best possible use of these vapors is to use them as
pilot and purge to maintain a flare system that is used in case of process upset. The
minimum standards for sales gas in the CIGGS, and subsequently Enstar, pipeline is <1
air, <4% combined inerts, <4 lbs./mcf H2O and a minimum of 950 BTU heating value.
Also pipeline standards require that the gas contain only hydrocarbon liquids that will not
condense at pipeline conditions.
On the second schematic depicting upset condition, or compressor down, purchased gas
from Unocal is supporting the lease power requirement. During this condition the actual
amount vented or flared is equal to the turbine consumption and increases the amount of
gas purchased to support lease operations.
During the month of February due largely to the -40 degree weather we had compressor
problems that made it impossible to compress separator gas for fuel-gas fora 14 day
period. The resulting problems if we had not flared gas during this 14 day period would
have qualified under 20 AAC 25.235 (d)(5) (1), (2), and (3). (1) The flaring was
necessary to continue facility operations. (2) The emergency nature of the flaring was to
prevent other components of the process stream from freeze damage. (3) Typically
Hemlock producers when shut-in and allowed to load up with water do not Borne back on
line at their previous production rates. Thus ultimate recovery would be jeopardized.
The volume of gas flared greater than 1 hour during February was 8,107 MCF. The event
started February 3`d and repairs were complete and normal pilot and purge operations
were resumed on February 16~'.
The approximate disposition of
follows.
Gas produced on lease
Gas burned as turbine fuel
Gas used in process equipment
Pilot and purge gas (tank vents)
Gas purchased
gas during a normal, pilot and purge operation is as
645 MCF/D (430 separator, 215 tank vapor)
580 MCF/D
100 MCF/D
215 MCF/D
250 MCF/D
If you need any additional information please call me at 258-8600.
Thank you,
Paul White
Drilling /Production Manager
Enclosures
Q
n
s
~o
~~
n- ~
~+-
z~
o ~
-~ D
~ ~
Q ~
S
O ~
<--~ ~
Qo r0
~ C
~ ~
~ --
CD ~-
r0
(~
O
Q
_~_
O
West McArthur River Unit
Gas Scher~atic - Upset Condition
UJ/Ua/aa '1'Ur; 11:35 r'nx al5 aa7L:flu
!1Y-BON r:NG. GU.
C~Tj O O1
TO: FORCE ENERGY
ATTENTION: PAUL WHITE
FAX: 907-258-8601
REFERENCE: GAS TREATMEN'1"
ineering Company, Inc.
5-697-2292 915-520-2292 Fax 915-697-2310
P. O. BOX 41 BS MIDLAND, TEXAS 79704
2404 COMMERCE MIDLAND, TEXAS 79703
www.hy-bon.com
FAR MESSAGB
Page 1 of 1
FRbM: DAN DEEMER
Sending i Pages (including this page)
DATH: MARCH 9, 1999
I have not been able to locate anyone that can give me any pricin&
vr~ a Nitrgen Siege Unit. Hare had comments from a couple of people
that it is not economically feasible to install a Nitrogen Sieve
for 250 MSCF/D, it is marginal even on 10 MMSCF/D. Sorry I could
not be pf any help, let us know if you need anything else.
TIXANR `f(OrJ
AN DEEMS
AI'PX.XCA'~ION ENGINEER
HB ROTARY VANE COMPRE55QRS
VAPOR RECOVERY UNITS H8 CENTRIFUGAL PUMPS
01/18/1999 16:56 907-7765246 FORCENEGY
JFi1V. 58.1999 2s 48PM l1r'-~ MCC EFDF 90? 7T6 6883
1'al.C¢ Nri
pact ~-i
Clear/D•fatult Data fnrs q
ECi3t3 BTU Analyser ...• •~-~'~ 1
Clear/DQPault Data }'orc ~~~
EG6~G PTU Anaiyx•r .... Wit'
Ep146 Chatndlvr Engins:Qring
McdQl ~4w BTU Anal:-vr
Test tiap_ Jan. 18 99 1,7:53
T 4 a t #o~ s 138
PAGE 02
N0.681 P.i
C.'+libration his 1
Locals icn No_ :9998
Sband~trd/Dry Analysis
Mo i stx 8TU+1 t~. Den. * GpM+~++
Methane 44.132 446.77 b.244~ --`
EthenR s.7~ti 1ui.71 d-os9~ 1.336
Drapan v 9.765 2Ar4. 76 4. 1478 C. 671x3
i-8~.1'tAne 3.°j49 1l,S•68 t~.i171C l.1oi1
n~~sutane 7.325 2A6.OG O.l~lo 2.3726
i-~entana 3. 9t1E 18fr. 40 V- 0']72 1.4277
-P~rnta-ra
n d. ~1G 16i, c2 0. 1124 i. 6335
I
1 Cr~i'~' ~ 3.72G 1$9. 1.'"1 ~~• 1183 lr CiG~l+?u
Moisture d. GUO C~. C1b 0.6COC~ --~
Nitragvn 7, iC ~j.4<~ O. 16~fi --
C02 ~ 0. 694 U. GG O. GO ] b ~-
Total 1t70_ CO 181.8 1. ifir39 1-~..1}671
~ a UncaT-reCteC 'ror~ corApressibi:ity it 60_CrF ~
*+~s Li.qui.d Vo lume reported eE 6U. Up.
3tandardlDry Attaaysss
Molar Mass 33.855
Reliti.le Darls itY 1.178=1
Compressibili ty Factor ~ Q«991.=1
Heatlnp ValuE 1880n. Btu/1b
H.iting ~alua if~96.3 Stu/CF
Abs,~oluk• Gas Donyity = ?0.199° 16sn/lEsGGGF
~obbr Index = [536. 1k
Unnormalizvd Total s 10;;.141
g+,<turettd/41st Analysts
Mo 1 esC sTu~ a. a.n. +~
• 43.36~- a~9. GD a. 2a0~
~. X34 9~. 9k O. oS~S
9.'336 24C_ 50 O. 141?
:,, i®7 113.57 0. OTOQ
7.394 ~41.77 b. 1,404
3.1334 1,53_ 7~ ~!. d9'.5'3
4. 432 178. K-9 9. i id•
a. ~~~ 16~. sb a. i 163
1 _ 7i.0 Q. 8~ ~r C11Q8
' 16.826 O.Ota d. 1507
0. ~..19c C). OQ (~. OOli
100. ~~6 1,f~53. 4 1.1594
24. 73oCSIra.
SgYurated/W~t Anely~sis
33. 88t?
1. 1689
O. 9915
18642. Ptt~/lb
167_6 Btu/CF
89.4545 1 bm / 1 CyCsOCF
Last Calibrated with Calgas of iU37.w lz'tU/CF f~pr. i8 96 ibt3~i
C6~ Last Updi~t e : GF~A 2t'fi 1 ~9~_l.
C6~+- HTu/C6• 50frS.B, r'6t lbsnlOs~l 5,.6423Cs~ on;d C6~^ I"1oI.4Jt. 9C.C-G.
CJl/10/1777 lb:fib yb~-/!65246 FORCENEGY
JF~V.18.1999 2:49PM ILL MCG ~DF 907 776 6883
E[3~G Ghsnditir Enpinearinp
Modri 292 BTU Ana~lyxor
Tent ti4M. Ja-n.18 99 iBY15
Test #ti34
N0.681
1,S~Il ~Z
~-~- ~9
3~~
Caiibra,tian #1: i
Lecatien No. X9998
PAGE 03;
P.2
_ Standard/ut^y An+~lysi~ 9aturat.d/Uat i~nslysis
Mo 1 QX f~7U+F R. l7an. ~ GPM+~x Mo l o;~ DTU• R. I?~n. +t
Mathane 43. 30".; 438. 81 0, 2401 -- 4Z. X90 43i_ 17 CS, 2359
Eth~nQ k. 739 84. /•2 0. 0494 1.2729 k. 67~r $~. q~ O.O~R®6
Propane 8. 9U~ 224. v°0 ~?. 135°i 2.4530 8. 747' 220.60 0. i=i4.
1-Hutane 3.46? ll,iZ. $4 G. p695 1.13°'6 3. ~rQ2 i 10.8$ O. a6A3
n-Butane 7. 300 23F1. 68 tl. 146~g 8.3oiS 7. 173 23~r. so 4. iA=9
i•-Plntine 3. 7a4 1A6_ 53 0. 0933 1. $.°r53 3.639 14~. 95 O. 8947
n~-I~Qntilna 4. 3G8 175. 3U o. i093 1. "SF391 4.311 173, 23 c-. 1074
t G6+ ) 4. ?4~ 215. ~4 0, 1348 1.6281 4. 1~7i 211.79 G, 1383
Moiyt~lra r O.UO o. 4000 -- 1.740 v. 88 4.o1d8
Nitrogen ~~ 0.00 0.1878 -- 19.079 0.00 0.3885
c cap ~ c~. ~~ g ~. oo v. o~»~ ~- c~. a7o o. ~o o. aa~l
Total i~:U.i?0 1639.E 2. 17~~ 11.9x24 lBU. t:~- iC~12. 0 1. 149
~ ~ Uneorwectee for •eon~ra"s~Tbi~lity at rp.QF & 1v.7~opSIA.
~*-: Liquid Val.~n~. r-epCe~ted at CrO:OF.
StandaT-dtbry Analysis Satut~ated/W.t pnal}~ri*
Molar Marv 33.~l~9 33.6Di
R•latiua DQrsity ~ 1.1818 1.17i~2
Coatprgsrs~,bility Fa.:tpr a 0.9917 Q. 9317
H~~t~Yl~ 1J~L~lo a 18.:80. ~tlLllb 1$120. PtLL/lb
Neat3ny ~a1•u• ~ 16.°/3.3 gtuJCF 15G~.4 St~rlGF
Absolute Gas bencitry ~ 90.~k+-il lbs/iC~G~}CF 89.70`7 lb~-lSOOOGF
Wobbe Ir-dvx ~ 149.17
Unnortd~-iizad Tota~7, i~11.'.ib0
La~•'~ Cakibrated aich C,xlgas of 1U37.4 aZu/GF qp.~_ 18 96 lrr3$
C6+ Last Update= GF'A 2261-90.
G6<- HTU/CF ",,5083. 8, C6+ "lbm/6al 5. b4230~ a-nd C6+ Mb1. Wt. 9`, OC-.
r
_ bl/lti/lyy~ lb: bb yb!-l1b5146 fUf~C;tNtCiY
' AEC .10.1998 10 = 4?Rt'7 I.iN' ~`iL MCG EFDF 907 776 6883
X080 Chandler Er~g~-noerinp
Modal 292 BTl7 Analyser
Test tiee: bec.c~9 9b 19138
Test ~1; iT,7
PAGE 04
NOv460 F'.1 '
~fl ~ G e~ n ~ g~ ~1 ~~ L ~S
CalibratiAn #i 1
LocatiaTt No. 191398
$tandar~QJAr-y An~~,Ysis _ 8atur•ataQ/Wet Analy~iti
Ma l e7~ BtUs- R, t3en, + dAMe~ Mo 1 ~% ~TU~ R. Den. f
Methane 48. X93 492.94 0.2692 -~ 47.747 49a. 38 Q.264~
Ethane 7. 7B7 13A. 12 O, t~BC!! 2. 0827 7. 6'~i'"c 13"x. 72 0.079$
Drop~-ttt 9. 2E6 :333, fr7 O. I411 2. 3`!32 9. 104 229. E*l tl. t3a6
i-Butane ~. 170 70.73 O. 0430 4.7g95i 2. 13~ 69.'34 O. n426
n-Butane 3.680 120.49 0.4739 i. 1616 3.621 i 18.39 O. 077
i -DRntano 1. 2kc't 44. &c'' O, 03~.Q d. 4546 1.221 49.9E G. 4344
n~C~entane 1.348 :54. iS o. 0336 0.488! i. 324 33.24 o. 0330
c cb+ ) 2.634 13p. oo G. o83g 1. 135 2.543 i3i.67 v_ O$R4
Moisture Ct. 6oU 0.00 4.0000 -- 1.740 0.88 C}. Ci108
Nii:
pQen
r . OO
~~.. v
. Ob 0.2
24
~ •-- 2c^. 802 0. G8 0
. 8Q0
3
r
7
. riV7L ~ ~
Vr VV1 ~
1
M. ~~ ~
y
t
~• V~iV
~- y
~r ~6J
~. OQ /
~
y
V. dQ~~J
Total 160.00 1.29^c. O.9$iL4 8.'3869 100.00 1271.3 CI. 9761
+~ Uncorrected for camprvts~.bility at 60. OF b 14.73QPSIA.
+~ae Liqu~.d Voluaoe r~eportad at 60. OF.
gtanear4/Dry Analysis SaturntedlWvt Analysis
Mo 1 ar Mis • ~ 28. 402 28.270
Relative Density +• d. 9869 G. 9807
CanpressiDility Fa~Otc7r = 0.99SQ V. 9949
Heating Value ~ i7~?03. 8~tu/le 17024. Btu/ib
N~zating ~alui 1299.3 $tu/GF 1277.8 8t~,1/,CF
Rbsolute pac Density ~ 70.'3Pg9 lbA/IC~nQCF 75.08!9 ibol/.140OCF
Wgbbe tnd*~ •+ 1266.23
Unnprwitli>cpd Total : 102.334
:.ast Calibrn,ted with Calge~t of 1b57.4 E+tv/CF Apr. !8 96 sCi:38
CE.+~ Last Updates ODOR 2261-9c~.
C6~ $TU/CF ~G65.8i C6+ ],bM/ Os~l °_;.64250y Ord C6+- ~Iol.ltt. 92.00.
.,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) 930148 Month/Year of Disposition
West McArthur R1V~r Unit Forcenergy Inc. West McArthur River Field March 1999
Disposition Volume MCF Indicate contributions of each pool to total.
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 6,749
4. Flared or vented greater than 1 hour. 0
(Supplemental report req'd-See 20 AAC 25.235)
5. Pilot and Purge 6,751
6. Used for lease operations 6.107
7. Other 0
TOTAL items 1-7 19,607
8. NGL gas equivalent produced 0
9. Purchased gas 7,867
10. Transferred from: 0
11. Transferred to: ~ 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
Pool Name
West McArthur River
Code I Percent
930148 1100%
Official Use Only-Flaring Authorization >1hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
hereby c that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60° F. Report due by the
Signature Title Drilling/Production Manager Date 4/16/99 20th of the month following the month in question.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
_-
~~~V~
~~~l` ~ ? Z9~~'
ALASKA OIL AND GAS CONSERVATION COMMISSION
~UaskaOil&GasCons.Cnmrr~issiu FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility _ - - -"- Operator Field(s) 930148 Month/Year of Disposition
West McArthur River Unit Forcenergy Inc. West McArthur River Field April 1999
Disposition Volume MCF Indicate cantributions of each pool to total.
Pool Name Code Percent
1. Sold 0
2. Reinjected 0 West McArthur River 930148 100%
3. Flared or vented less than 1 hour. 351
4. Flared or vented greater than 1 hour. 0
(Supplemental report req'd-See 20 AAC 25.235)
5. Pilot and Purge 6,450
6. Used for lease operations 11.208
7. Other I 0
TOTAL items 1-7 18,009
8. NGL gas equivalent produced 0
9. Purchased gas- 7,254
10. Transferred from: 0
11. Transferred to: 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
generators.
I hereby ce i that the foregoing is true and correct to the best of my knowledge.
Signature Title Drilling/Production Manager Date 5/10/99
Official Use Only-Flaring Authorization >1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60° F. Report due by the
20th of the month following the month in question.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) 930148 Month/Year of Disposition
West McArthur River Unit Forcenergy Inc. West McArthur River Field May 1999
Disposition Volume MCF Indicate contributions of each pool to total.
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 111
4. Flared or vented greater than 1 hour. 0
!Supplemental report req'd-See 20 AAC 25.235)
Pool Name
West McArthur River
Code I Percent
930148 1100%
5. Pilot and Purge 6,758
6. Used for lease operations 11.442
7. ®ther 0
T®TAL items 1-7 18,311
8. NGL gas equivalent produced 0
9. Purchased gas 7,895
10. Transferred from: 0
11. Transferred to: I 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
Official Use Only-Flaring Authorization >1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
I hereby ce that the foregoing is true and correct to the best of my knowledge. Note: Alt volumes must be corrected to pressure of 14.65
Asia and to a temperature of 60° F. Report due by the
SI nature Title Drillin /Productl0n Manager Date 6/10/99 20th of the month following the month in question.
g ~ Authority 20 AAC 25.235.
F®rm 10-422
Rev, 4195
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS C)ISPOSITION
Facility Operator Field(s) 930148 Month/Year of Disposition
West McArthur River Unit Forcenergy Inc. West McArthur River Field June 1999
Disposition Volume MCF Indicate contributions of each pool to total,
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 174
4. Flared or vented greater than 1 hour. 0
tSupplemental report req°d-See 20 AAC 25.235)
Pool Name
West McArthur River
Code I Percent
5. Pilot and Purge 6,522
6. Used for lease operations 10,791
7. Other 0
TOTAL items 1-7 17,487
8. NGL gas equivalent produced 0
9. Purchased gas 7,191
10. Transferred from: 0
11. Transferred to; 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
generators.
930148 1100%
Official Use Only-Flaring Authorization >1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
I hereby ify that the foregoing is true and correct to the best of my knowledge. Note: Aii volumes must be corrected to pressure of 14.65
', Asia and to a temperature of 60° F. Report due by the
Signature Title Drilling/Production Manager Date 7/8/99 20th of the month following the month in question.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95 ~ ;`,i ~_ ~ % ~;~~
A! 4it & Gas Gbrtis. Commission
Anchorage
ALASKA OiL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) 930148 Month/Year of Disposition
West McArthur. River Unit Forcenergy Inc. West McArthur River Field July 1999
Disposition Volume MCF Indicate contributions of each pool to total.
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 654
4. Flared or vented greater than 1 hour. 0
(Supplemental report req'd-See 20 AAC 25.235)
Pool Name
West McArthur River
Code ~ Percent
5. Pilot and Purge 6,758
6. Used for lease operations 10,406
7. Other 0
TOTAL items 1-7 17,818
8. NGL gas equivalent produced 0
9. Purchased gas 7,992
10 . Transferred from: 0
11. Transferred to: 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
generators.
I hereby ce i that the foregoing is true and correct to the best of my knowledge.
Signature ~ Title Drilling./Production Manager Date 8/16/99
Form 10-422 ~ ~ '"`~ ~ z4e' ` `" ~`
Rev. 4/95
~~~'
A'~skaCil.~.. (a1S ~it3fiu, ~a3tait~~l~.~~'ft7o
930148 1100%
Official Use Only-Flaring Authorization >1hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60° F. Report due by the
20th of the month following the month in question.
Authority 20 AAC 25.235.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) 930148 Month/Year of Disposition
West McArthur River Unit Forcenergy Inc. West McArthur River Field August 1999
Disposition Volume MCF Indicate contributions of each pool to total.
Pool Name Code Percent
1. Sold 0
2. Reinjected 0 West McArthur River 930148 100%
3. Flared or vented less than 1 hour. 3
4. Flared or vented greater than 1 hour. 0
(Supplemental report req'd-See 20 AAC 25.235)
5. Pilot and Purge 6,758
6. Used for lease operations 10.705
7. Other 0
TOTAL items 1-7 17,466
8. NGL gas equivalent produced 0
9. Purchased gas 7,641
10. Transferred from: 0
11. Transferred to: ~ 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
Official Use Only-Flaring Authorization >1hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
I hereby c that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected to pressure of 14.65
Asia and to a temperature of 60° F. Report due by the
Signature Title Drilling/Production Manager Date 9/07/99 20th of the month following the month in question.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) 930148 Month/Year of Disposition
West McArthur River Unit Forcenergy Inc. West McArthur River Field September 1999
Disposition Volume MCF Indicate contributions of each pool to total.
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 108
4. Flared or vented greater than 1 hour. 0
(Supplemental report req'd-See 20 AAC 25.235)
Pool Name
West McArthur River
Code I Percent
5. Pilot and Purge 6,540
6. Used for lease operations 10 042
7. Other 0
TOTAL items 1-7 16,690
8. NGL gas equivalent produced 0
9. Purchased gas 8194
10. Transferred from: 0
11. Transferred to: 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
generators.
I hereby certi at the foregoing is true and correct to the best of my knowledge.
Signature Title Drilling/Production Manager Date 10/07/99
930148 1100%
Official Use Only-Flaring Authorization >1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60° F. Report due by the
20th of the month following the month in question.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) 930148 Month/Year of Disposition
West McArthur River Unit Forcenergy Inc. West McArthur River Field October 1999
Disposition Volume MCF Indicate contributions of each pool to total.
Pool Name Code Percent
1. Sold 0
2. Reinjected 0 West McArthur River 930148 100%
3. Flared or vented less than 1 hour. 22
4. Flared or vented greater than 1 hour. 0
(Supplemental report req'd-See 20 AAC 25.235)
5. Pilot and Purge 6,758
6. Used for lease operations 10 164
7. Other 0
TOTAL items 1-7 16,944
8. NGL gas equivalent produced 0
9. Purchased gas 9205
10. Transferred from: 0
11. Transferred to: 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
generators.
Official Use Only-Flaring Authorization >1hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
I hereby e ' y that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected to pressure of ~a.s5
Signature
\ psia and to a temperature of 60° F. Report due by the
'a~M~~-~ Tltle Dfllling/ProdUCtlOn Manager Da#e 10~, 1~1~~ ?0th of the month following the month in question.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
RECEIVED
DEC 1 ~~ 1999
cArthur River Unit
Disposition
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) 930148 Month/Year of Disposition
Forcenergy Inc. West McArthur River Field November 1999
Volume MCF Indicate contributions of each pool to total.
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 22
4. Flared or vented greater than 1 hour. 0
(Supplemental report req'd-See 20 AAC 25.235)
5. Pilot and Purge 6,540
6. Used for lease operations 9 400
7. Other 0
TOTAL items 1-7 15,962
8. NGL gas equivalent produced 0
9. Purchased gas 11,330
10. Transferred from: 0
I hereby c rt that the foregoing is true and correct to the best of my knowledge.
Signature Title urilling/Production Manager Date 12/10199
11. Transferred to: 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
generator .
Pool Name
West McArthur River
Code I Percent
930148 1100%
Official Use Only-Flaring Authorization >1hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
Asia and to a temperature of 60° F. Report due by the
20th of the month following the month in question.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
~-~''~ _ ~ ~r ~ ~ ~.<.
~~ ~ ~ ;;,~
.-.,,~;
Alaska Oil' ~ G:.~s Gans. Gommissor
Facility
West McArthur River Unit
Disposition
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) 930148 Month/Year of Disposition
Forcenergy Inc. West McArthur River Field December 1999
Volume MCF Indicate contributions of each pool to total.
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 999
4. Flared or vented greater than 1 hour. 0
(Supplemental resort read-See 20 AAC 25.235)
5. Pilot and Purge 6,758
6. Used for lease operations 8 644
7. Other 0
TOTAL items 1-7 16,401
8. NGL gas equivalent produced 0
9. Purchased gas 20,699
10. Transferred from: 0
11. Transferred to: 0
Remarks: Gas is approximately 15% nitrogen.
Gas is used for lease operations including heaters and turbine
generators.
I hereby c rfi~f that .theme .foregoing is true and correct to the best of my knowledge.
Signature ~ ~~~~ Title Drilling/Production Manager Date 01114100
Pool Name
West McArthur River
Code I Percent
930148 1100%
Official Use Only-Flaring Authorization >1hr.'
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60° F. Report due by the
20th of the month following the month in question.
Authority 20 AAC 25.235.
Form 10-422