ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
i--~' Anna Platform
.
.
,. Unocal Oil & Gas Granite Point Dec 98
_
,
i .
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 542
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 499
5. Pilot and Purge 217
6. Used for lease operations 35,932
7. Other 0
TOTAL items 1 - 7 37,190
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Bruce Platform 0
GPTF-LEX
11. Transferred to: Bruce Platform 55,950
0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature i~/ L " Title: Acct. Supervisor Date: 1/15!99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00%
Official Use Only -- Flaring Authorization > 1 h~.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
F°rm 10~a22
Rev. d/95
.~ - - ~.
ANNA PLATFORM
i EXCESS FLARE LOG
December 9998
•
Date & Time
Event Began Date 8 Time
Event Ended Event Gas
MCF Planned or
UnPianned Description of
Incident Operational or
Safety Reason Actions Taken Equipment Down
ID Number
52-03.9815300 52-03-99!1430 175 Planned GPTF Comp S1D OP
12.25.9810000 12-25-9812400 159 Unplanned Cant push into pipeline OP
12-28-98 /0000 12-28-98 /2400 565 Unplanned . Can'! push into pipeline OP
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD NOVEMBER 1998
Disposition Volume MCF*
1. Sold 0
• 2. Reinjected 0
3. Flared or vented less than 1 hour 652
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 1,206
5. Pilot and Purge 210
6. Used for lease operations 33,863
7. Other 0
TOTAL items 1 - 7 35,931
• 8. NGL gas equivalent produced o
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 55,391
Remarks:
I hereby certif/y~that the foregoing is true and correct to the best of my knowledge.
Signature ,~~„ ~~~ ~ _ Title ACCOUNTING SUPERVISOR Date 12/11/1998
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: Alt volumes must be corrected to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
UNOCAL
ANNA PLATFORM
November 1998
EXCESS FLARE LOG
•
Date Event
Hours Volume
MCF
Description of Incident & Cause Planned or
Unplanned Operational
or Safety
eason
Action Taken to Eliminate Cause
1
2
3 16 143 GPTF Comp Unable to handle all gas Unplanned Operational Scrubber Problems None
4
5
6
7
8
9 24 175 High Pipeline Press W.F. down Unplanned Operational High Pipeline Pressure None
10 24 361 High Pipeline Press W.F. down Unplanned Operational High Pipeline Pressure None
11
12 24 210 High Pipeline Press W.F. down Unplanned Operational High Pipeline Pressure None
13
14
15 24 123 High Pipeline Press W.F. down Unplanned Operational High Pipeline Pressure None
16
17
18
19
20
21 24 107 High Pipeline Press W.F. down Unplanned Operational High Pipeline Pressure None
22
23
24
25
26
27
28
29 24 87 High Pipeline Press W.F. down Unplanned Operational High Pipeline Pressure None
30
31
Total I 1206
G/Q~ed ~~ den ~ d~4~S Uo/u~n>o
Ord (?i'l W rC4't(~ !/~+~ -tQ ,SJ~ J~D~ ~S'
ALASKA OIL AND GAS CONSERVATION CON~MISSION °~~~-~,
v~
•
•
Facility Operator Field(s) Month/Yeaz of Dtsposttron
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point Oct 1998
GPTF-LEX
Disposition Volwne MCF*
1. Sold to CIGGS
to GPTF-GPP
to GPTF-AB 101,588
0
0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report requved--See 20 AAC 25.235) 1,525
5. Pilot and Pwge 620
6. Used for lease operations 9,309
7. Other (Meter Error) 13,316
TOTAL items 1 - 7 126,358
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: GPTF-GPP
GPTF-AB
Granite Point Plt.
Anna Platform
Brace Platform 4,422
5,187
40,265
59,394
18,136
t I. Transfered to: GPTF-AB
GPTF-GPP .1,046
0
Remarks:
1 hereby certify~th/at the foregoing is true and corect to the best of my knowledge.
Signature /!~. ~~ Title: Acct. Supervisor Date: 12/15/98
Form to-422
Rev. 4/95
FACILITY REPORT OF PRODUCED GAS DISPOSITION ~` ~
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorization > 1 hr
L Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Conunissioner Dale
Nate: All volumes must be corected to
pressure of 14.65 psia and to a temperaNre of
60 degrees F. Report due by the 20th of the.
month following [he month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Anna Platforrrt Unocal Oil & Gas Granite Point Sept 1998
•
O
~ ~
G7 ~
~D
~_
~•
Q
..!
3~
~x
CJ
PV
~~
l' )
~~
Form 10-022
F:ev. 4/95
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 747
4. Flazed or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 2l0
6. Used for lease operations 31,780
7.Other 0
TOTAL items l - 7 32,737
8. NGL gas equivalent produced 0
9. Purchased gas 0
t0. Transferred from: Bruce Platform 832
GPTF-LEX
1 L Transferred to: Bruce Platform 58,527
0
Remazks:
I hereby certify that the foregoing is true and correct to the best of my Imowledge.
Signature iC.~ Title: Acct. Supervisor Date: l0/l6/98
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00%
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~ ~
~~ ~
-"~~~~<~ ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
\.
•
•
Facility,. '~% _ - Operator Field(s) Month/Year of Disposition
:§rlna Platform Unocal Oil & Gas Granite Point August 1998
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented leas than 1 hour 1,085
4. Flared or vented greater than 1 hour
(Supplemental report required••See 20 AAC 25.235) 298
5. Pilot and Purge 217
6. Used for lease operations 32,664
7. Other 0
TOTAL items 1 - 7 34,264
8. NGL gas equivalent produced 0
9. Purchased gas 45
10. Transferred from: Bruce Platform 0
GPTF•LEX
11. Transferred to: Bruce Platform 55,362
0
Remarks:
I hereby cert' at the fo going is true and correct to the best of my knowledge.
~"
Signatur ~~ Title: Acct. Supervisor Date: 9/15/98
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00%
Official Uae Only •- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form ]0422
Rev. 4/95
t- a
ANNA PLATFORM
EXCESS FLARE LOG
August 1998
•
,~
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equipment Down
ID Number
&13-98, 0.500 &13.98, 2400 198 Unplanned relief valve rwt twldirg set pressure Operational Wom Valve. Replacing Valve Relief Valve, A-906
8-25-98, 1445 8-25-98, 1845 100 Planned Gas compressor down 2 tvs.,planned mainfenece Operational Repair recyGe valve, replace VRU control Repairs Gas Comp. A-053
• ~ --~ ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Anna Platform Unocal Oil & Gas Granite Point July 1998
•
•
Disposition Volume MCF*
1. Sold o
2. Reinjected 0
3. Flared or vented less than 1 hour 225
4. Flared or vented greater than 1 hour
(Su lemental re ort re wired--See 20 AAC 25.235) 6,704
5. Pilot and Purge 217
6. Used for lease operations 32,042
7. Other 0
TOTAL items 1 - 7 39,188
8. NGL gas equivalent produced 0
9. Purchased gas 2,134
10. Transferred from: Bruce Platform 0
GPTF-LEX
11. Transferred to: Bruce Platform 52,089
0
Remarks:
I hereby certify th t the fore oing is true and correct to the bast of my knowledge.
Signature f Title: Acct. Suliervisor Datat S/7/9S
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.0090
l7fficiul U~c C>nly -- 1'I,~rtnE; AutL~:.rizaticn ~, l Llr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10122
Rev. 9/96
ANNA PLATFORM
EXCESS FLARE LOG
July 1998
`f I1
J
•
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Satety Reason Actions Taken Equipment Down
ID Number
7-2-98 /0000 7-2-98 / 2400 269 Unplanned Pipeline pressure hi h. can't et into G.P.T.F. cam Operational Can't push into pipeline None
73-9810000 7-3-98 / 2400 477 UnPlonned Pipeline ressure hi h,also X 3 AC down 6 hrs. Operational Can't push Into pipeline and less fuel used None
7.4-98 /0000 7-4-98 / 2400 251 Unplanned Pipeline pressure hi h. can't et into G.P.T.F. comp. Operational Can't push into pipeline None
75-98 /0000 7-5-98 / 2400 251 Unplanned Pipeline pressure hi h, can't et into G.P.T.F. comp. Operational Can't push into pipeline None
7-7098 /0900 7-10.98 / 1000 95 Unplanned Pipeline pressure hl h can't et Into G.P.T.F. comp. Operational Can't ush Into pipeline None
7-I 1-98 /0000 7-11-98 /2400 84 Unplanned Pipeline pressure hi h can't et Into G.P.T.F. comp. Operational Can't push Into pipeline None
7-12-98 /0000 7-12-9812400 77 Unplanned PI aline ressure hl h can't et Info G.P.T.F. comp. Operational Can'T push Into pipeline None
7-13-98 /0000 7.13-98 /2400 259 UnPlonned Pipeline pressure h h, can't et Into G.P.T.F. comp. OperaTlonal Can't ush Info pi aline None
7-25-98/1300 7-2598/2400 915 Unplanned Gas Com . Fulled to sisrt after platform shut-In. Operational Gas Comp. Down, Mech. Problems Re air work on Gas Compressor
7-26-98/1300 7-26-98/2400 1795 Unplanned Gas Comp. Failed to stet after platform shut-In: Operational Gas Comp. Down, Mech. Problems Repair work on Gas Com ressor
7-27-98/0000 7-27-98/2100 1635 Unplanned Gas Comp. Foiled to stsrt after plaHorm shut-in. Operational Gas Comp. Down, Mech. Problems Repair work on Gas Compressor
7-28-98/0900 7-28-98/1700 596 UnPlonned Low dl pressure on Gas comp. Operational Chan a o4 fitters and repair pump. Repair work on Gas Compressor
r ALASKA OIL AND GAS CONSERVATION. COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
r
~_J
•
Facility Operator Field(s) Month/Year of Disposition
Anna Platform Unocal Oil & Gas Granite Point June 1998
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 800
4. Flared or vented greater than 1 hour
(Su lemental re ort re wired--See 20 AAC 25.235) 2,070
5. Pilot and Purge 210
6. Used for lease operations 33,091
7. Other 0
TOTALitems 1 - 7 36,171
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Bruce Platform 0
GPTF-LEX
11. Transferred to: Bruce Platform 58,307
0
Remarks:
I hereby certify th t the foregoing is true and correct to the best of my knowledge.
Signature _ __ Title: Acct. Supervisor Date: 7/17/98
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100:0090
~ ~lli~inl [ ~.: l inl} 1 siring ~1ut6~`n'fz:3lien ~ 1 hr~~~~
1. Safety ~ _ _ _ MCF i
2. Lease Use ~ MCF
3. Conserv. Purposes I MCF
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/96
ANNA PLATFORM
EXCESS FLARE LOG
June 1998
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Satefy Reason Actions Taken Equipment Down
ID Number
6-8-98 0000 b-8-98 2400 200 Unplanned Pipeline Pressure high, can't get into G.P.T.F. comp. Operaflonal Can't push into pipeline None
6-11-98 0000 6-11-98 2400 463 Unplanned Pipeline Pressure high, can't get Into G.P,T.F. comp. Operational Can't push into plpeline None
b-12-98 0000 6-12-98 2400 409 Unplanned Pipeline Pressure high, can't get Into G.P.T.F. comp. Operational Can't push into plpeline None
3-98 0000 6-13-98 2400 349 Unplanned Pipeline Pressure high, can't get into G.P.T.F. comp. Operational Can't push Into pipeline None
-98 0000 6-17-98 2400 128 Unplanned Pipeline Pressure high, can't get into G.P.T.F. comp. Operational Can't push into pipeline None
6-19-98 0000 6-19-98 2400 144 Unplanned Pipeline Pressure high, can't get into G.P.T.F. comp. Operational Can't push Into plpeline None
b-22-98 0000 6-22-98 2400 261 Unplanned Plpellne Pressure high, can't get Into G.P.T.F, comp. Operational Can't push Into plpeline None
6-23-98 0000 6-23-98 2400 116 Unplanned Plpellne Pressure high, can't get Into G.P.T.F, comp. Operational Can't push Into pipeline None
. ~ ~ ~ ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
J
Facility.., Operator Field(s) Month/Year of Disposition
Anna Platform Unocal Oil & Gas Granite Point May 1998
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 Lease 18742 280150 100.0090
3. Flared or vented less than 1 hour 94
4. Flared or vented greater than 1 hour
(Su lemental re ort re uired--See 20 AAC 25.235) 3,127
5. Pilot and Purge 217
6. Used for lease operations 32,140
7. Other 0
OlTiciull ,!>~'Jj'--F]~ring:lit~^,i:'!~C~an>13u'
TOTAL items 1 - 7 35,578
1. Safety
MCF
8. NGL gas equivalent produced 0
2. Lease Use
MCF
9. Purchased gas 0
3. Conserv. Purposes
MCF
10. Transferred fmm: Bruce Platform 0
GPTF-LEX
I1. Transferred to: Bruce Platform 61,756
0
Commissioner Date
Remarks:
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
I hereby certify the the foregoing is true and correct to the best of my knowledge.
Signature ~~ Title: Acct. Supervisor Data: 6/4/98 60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Foxm 30422
Rev. 9/86
ANNA PLATFORM
EXCESS FLARE LOG
May 1998
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equipment Down
ID Number
5/15/98 12:00 AM 5/15/98 12:00 PM 115 Unplanned Pipeline pressure high Operational Can't push Into pipeline None
5/16/98 12:00 AM 5/16/9812:00 PM 291 Unplanned Tk Farm down Operational Tk Farm down None
5/18/98 12:00 AM 5/18/98 12:00 PM 270 Unplanned Pipeline pressure high Operational Can't push Into pipeline None
5/19/98 12:00 AM 5/19/98 12:00 PM 300 UnPlonned Pipeline pressure high .Operational Can't push Into pipeline None
5 12:00 AM 5/20/98 12;00 PM 249 Unplanned Plpellne pressure high Operational Can't push Into pipeline None
12:00 AM 5/22/98 12:00 PM 261 Unplanned Plpellne pressure high Operational Can't push into pipeline None
5/24/98 12:00 AM 5/24/98 12:00 PM 291 UnPlonned Plpellne pressure high Operational Can't push Into pipeline None
5/27/98 12:00 AM 5/27/98 12:00 PM 131 Unplanned Pipeline pressure high Operational Can't push Into pipeline None
5/28/98 12:00 AM 5/28/98 12:00 PM 715 UnPlonned Tk Farm down Operational Tk Farm down None
5/29/98 9:00 AM 5/29/98 5:00 PM 504 Plarned Tk Farm down Operational Tk Farm down None
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility , Operator Field(s) Month/Year of Disposition
Anna Platform Unocal Oil & Gas Granite Point April 1998
•
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Su lemental re ort re uired--See 20 AAC 25.235) 0
5. Pilot and Purge 210
6. Used for lease operations 34,762
7. Other 0
TOTAL items 1 - 7 34,972
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Bruce Platform 0
GPTF-LEX
11. Transferred to: Bruce Platform 57,765
0
Remarks:
I hereby certify t at the foregoing is true and correct to the best of my knowledge.
Signature ~ Title: Acct. Supervisor Date: 5/8/98
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00'90
nf'fi~ia!C ',nl}' - ~ 1 r ~, * q, *~. •rizati~.n . I Jn
1. Safety ~ MCF
2. Lease Use ~ MCF
3. Conserv. Purposes I MCF
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Foam 10422
Ree. 9/96
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
•
Facility Operator Field(s) Month/Year of Disposition
Anna Platform Unocal Oil & Gas .Granite Point March 1998
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 151
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235} 320
5. Pilot and Purge 217
6. Used for lease operations 30,035
7. Other 0
TOTAL items 1 - 7 30,723
8. NGL gas equivalent produced 0
9. Purchased gas 2,461
10. Transferred from: Bruce Platform 0
GPTF•LEX
11. Transferred to: Bruce Platform 55, 887
0
Remarks:
I hereby certify tha the foregoing is true and correct to the best of my knowledge.
Signature Title: Acct. Supervisor Date: 4F14/98
Form 10-d22
Rev. a/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00%
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
. ,.,~.
~,PR 2 ~
~1!3Sk80t! $c GaS COBS. GMi1tI115^:'»
ANNA PLATFORM
EXCESS FLARE LOG
March 1998
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational o
Satety Reason Actions Taken Equipment Down
ID Number
3-598/ 0800 3-598/ 1400 320 Planned Scheduled Routine Maint. On Gas Compressor Operational Molnt.schedule Performed Maint. A-0053
- - ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
u
•
Facility Operator Field(s) Month/Year of Disposition
Anna Platform Unocal Oil & Gas Granite Point February 1996
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 Lease 18742 280150 100.0090
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than i hour
(Su lemental re ort re uired--See 20 AAC 25.235) 0
5. Pilot and Purge 196
6. Used for lease operations 32,693
7. Other 0
- -
t i ~i::,! i . r:~i~l~, I I .ring; ~ !~ riz:u - 1 1-.,
TOTAL items 1 - 7 32,889
1. Safety MCF
8. NGL gas equivalent produced 0
2. Lease Use
MCF
9. Purchased gas 99
3. Conserv. Purposes
MCF
10. Transferred from: Bruce Platform 0
GPTF-LEX
11. Transferred to: Bruce Platform 50,559
0
Commissioner Date
Remarks:
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
~
I hereby cert'~ tat the foregoing is t e and c rect to est of my knowledge.
Signatur ~' Title: Special Clerk Date: 3/10/98 60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
R.~CEIVED
Form 10-422
Rev. 9/96
~~~ ~ SN d/iA
efaska Oii & Gas Cons. Commission
•
•
Facility
Anna Platform Unocal Oil & Gas Granite Point January 1998
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Su lemental re rt re aired--See 20 AAC 25.235) 467
5. Pilot and Purge
~
~ QQ
~ v ~
vs
217
6. Used for lease operations , ~ 35,596
7. Other
~l w
0 ~
0
TOTAL items 1 - 7 ~ 36,280
8. NGL gas equivalent produced 0
9. Purchased gas g4
10. Transferred from: Bruce Platform 0
11. Transferred to: GPTF-LEX
Bruce Platform 59,077
0
Remarks:
I hereby certify t~ha the foregoing is true and correct to the best of my knowledge.
Signature__~A~ ~~s. p .a Title: Special Clerk
~- _._
Date 2/18/98
ALASKA. OIL AND GAS CONSERVATION COMMISSION :%'~~,~
FACILITY REPORT OF PRODUCED GAS DISPOSITION '~-°```-: ry
~.:,' _>~
~~,.
~.:' "~s .
Operator Field(s) Month/Year of Disposition ` /'~
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 18742 280150 100.00%
QiTi~ial f_!r Only - Fl,arin~; Authorizu[inn> 1 6r
L Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.G5 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Revised Meter 863. Increased sales to CIGGS
Form 10922
Rev. 9/96
ANNA PLATFORM
EXCESS FLARE LOG
January 1998
•
J
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equipment Down
ID Number
I /16/98 gam 1 /76/98 3pm 467 Planned or Tonk Farm compressor down Op pipeMe modiFlCOtbn