1999 Facility Report
Files
File Names Gas Disposition
~,..~. Q'
r i
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/I'ear of Disposition
Bruce Platform Unocal Oil and Gas Granite Point Jan 99
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Srq~plemental report required--See 20 AAC 25.235) 0
' 5. Pilot and Purge - '
' 217
6. Used for lease operations 16,113
7. Othor 0
TOTAL items 1 • 7 16,330
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Bruce Platform 0
GPTF-LEX
11. Transferred to: Anna Platform 26, 223
0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature'-7'~~ ~ Title: Acct. Supervisor Date: 2/16/99
*Indicate contribution of each pool to total.
Pool A'ame Code Percent
Lease 17586 280500 30.91%
Lease 17586 280150 10.92%
Lease 17587' 280150 O.Gl%
Lease 18742 280150 57.56%
Official Use Only •- Flaring Authorizatiai > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form IO~d'23
Rev. 4195
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Bruce Platform Unocal Oil and Gas Granite Point Feb 99
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 17,934
5. Pilot and Purge 196
6. Used for lease operations 14,345
7. Other 0
TOTAL items 1 - 7 32,475
8. NGL gas equivalent produced 0
9. Purchased gas 17
10. Transferred from: Bruce Platform 18,583
GPTF-LEX
11. Transferred to: Anna Platform 1, 573
7,951
Remarks:
I hereby certify that the regoing% ue and correct to the best of my knowledge.
Signature ~ Title: Acct. Supervisor Date: 3/16/99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 9.54%
Lease 17586 280150 14.94%
Lease 17587 280150 0.95%
Lease 18742 280150 74.57%
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10~d22
Rev. J/95
BRUCE PLATFORM
' 1/
EXCESS FLARE LOG
Feb-99
Facility Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Produced or
Purchased Planned or
.Unplanned Black Smoke
Visible Description of
Incident Operational or
Safety Reason Actions Taken Equipment Down
ID Number
BRUCE PLATFORM feb. 3, 99 00:01 Feb. 3, 99 24:00 198 Produced Planned No GP i oil line frozen, Oil beirg shipped via GP 2 gas line. G Safety Excess produced gas NONE 0
BRUCE PLATFORM feb. 4, 99 00:01 Feb. 4, 99 24:00 248 Produced Plarned No GP 1 09 Una frozen, Oil being shipped via GP 2 gas line. G Safety Excess produced gas NONE 0
BRUCE PLATFORM Feb. 5, 99 00:-01 Feb. 5, 99 24:00 800 Produced Planned No GP 1 o9 line frozen, Oil bNng shipped via GP 3 gas Une. G Safely Excess produced gas and Anna gas. NONE 0
BRUCE PLATFORM Feb. 8, 99 00:01 Feb. 6, B9 24:00 911 Produced Planned No GP 100 line frozen, 00 being shipped via GP 2 gas line. G Safety Excess produced gas and Anna pas. NONE 0
BRUCE PLATFORM Feb. 7, 99 00:01 Feb. 7, 99 24:00 1083 Produced Planned No GP 1 00 Une frozen, 00 being shipped via GP 2 gas line. G Safety Excess produced gas and Anna gas. NONE 0
BRUCE PLATFORM Feb. 8, 89 00:01 Feb. 8, 99 24:00 845 Produced Planned No GP 100 Une frozen, 00 being shipped through gas Une. Safety Excess produced gas and Anna gas. NONE 0
BRUCE PLATFORM Feb. 9, 99 00:01 Feb. 9, 99 24:00 935 Produced Planned No GP 1 00 Une frozen, Oil being shipped through gas 6ne. Safety Excess produced pas and Anna pas. NONE 0
BRUCE PLATFORM Feb. 10,99 00:01 Feb. 10,99 24:00 910 Produced Planned No GP 1 oil Une frozen, 00 being shipped through gas Une. Safety Excess produced gas and Anna Bas. NONE 0
BRUCE PLATFORM Feb. 1 t, 99 00:01 Feb. 11, 99 24:00 783 Produced Planned NO GP 1 oil Une frozen, Oil beirp shipped Ituouph gas Une. Safety Excess produced pas and Anna pas. NONE 0 .5? ~: ! `~
BRUCE PLATFORM Feb. 12, 98 OO:Bt Feb.12, 99 24:00 BB4 Produced Planned No GP 7 oN line frozen, Oil beirp shipped lhrouBh gas line. Safety Excess produced Bas and Anna gas. NONE 0
BRUCE PLATFORM Feb. 13, 99 00:01 Feb. 13, 99 24:00 634 produced Planned No GP 1 oil Ilse frozen, 00 being shipped through pas Une. Safety Excess produced pas and Anna gas. NONE 0
BRUCE PLATFORM Feb. 14, 99 00:07 Feb. 14, 8B 24:00 729 Produced Planned No GP 1 00 Une frozen, 09 being shipped through gas IeLe. Safety Excess produced pas and Anna gas. NONE 0
BRUCE PLATFORM Feb. 15,99 00:01 Feb. 15, 99 24:00 701 Produced Planned NO GP 1 oil line frozen, 00 hemp shipped Owuph pas Une. Safety Excess produced gas and Anna pas. NONE 0
BRUCE PLATFOF2M Feb. 18, 99 00:01. Feb, f8, 99 24:00 892 ~ Produced Planned NO CrP 1 00 Ifne frozen, Oil being shipped through gas~Une. Safety Excess produced gas arnlArna gas. NONE 0
BRUCE PLATFORM Feb. 17,89 00:01 Feb. 17, 99 24:00 • 705 Produced Planned No GP 1 d9 Urre frozen, 00 6ekrp shipped daouph gas Une. Safety Excess produced gas and Anna gas. NONE 0
BRUCE PLATFORM Feb. 18. 99 00:01 Feb. ta, B9 24:00 ~ 884 Produced Plarned Ne GP t oIl line frozen, 00 being stepped through gas Une. Safety Excess produced pas and Anna gas. NONE 0
BRUCE PLATFORM feb. 19, 08 00:01 Feb. 19, 99 24:00 898 Produced Plarned No GP 100 arts hrozen, 00 beirp shipped through pas Una. Safety Excess produced gas and Anna gas. NONE 0
BRUCE PLATFORM Feb, 20, 88 00:01 Feb. 20, 99 00:01 742 Produced Planned No GP 1 oN line frozen, OB betrp stepped through gas Una. Safety Excess produced gas and Anna pas. NONE B
BRUCE PLATFORM FeD. 21, 98 00:01 Feb. 21, 89 00:01 729 Produced Planned No GP 1 a0 Ana frozen, 00 behq shipped through gas Una. Safety Excess produced gas aM Anna pas. NONE 0
BRUCE PLATFORM Feb. 22, 99 00:01 Fdt. 22,89 24:00 770 Produced Planned No GP i o0 Une frozen, OII bebr9 stepped through pas Una. Safety Excess produced gas and Anna px. NONE 0
BRUCE PLATFORM Feb. 23, 99 00:01 Feb. 23, 98 24:00 723 Produced Planned No GP t o0 Une frozen, Oil belrq shipped through gas line. Safety Excess produced gas and Arno pas. NONE 0
BRUCE PLATFORM Feb. 24, 9900:01 Feb. 24, 99 24:00 880 Produced Planned No GP 1 oU 0ne frozen, 00 hemp shipped lhrouphgas Une. Safety Excess Droduced pas and Anna Bas. NONE 0
BRUCE PLATFORM Feb. 25, 98 00:01 Feb. 25, 9g 24:00 494 Produced Planned No GP t oil tine frozen, Oil beirq shipped through gas line. Safety Excess produced gas and Anna gas. NONE 0
BRUCE PLATFORM Feb. 28, 99 00:01 Feb. 28, 98 24:00 822 Produce0 Planned No GP 1 00I~e frozen, 00 beirq shipped through gas erre. Safety Excess produced gas and Anna pas. NONE 0
BRUCE PLATFORM Feb. 27, 99 00:01 Feb. 27, 98 24:00 839 Produced Planned Nd GP 1 00 Una frozen, 00 being shipped through gas Gne. Safety Excess produced gas and Anna.Oas. NONE 0
BRUCE PLATFORM Feb. 28, B9 00:01 Feb. 26, 89 24:00 588 PrWUCed Planned No GP 1 o0line frozen, OII being shipped through pas Une. Safety Excess produced gas and Anna pas. NONE ,0
y
•`Yf
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Bruce Platform Unocal Oil and Gas Granite Point March 1999
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental re ort required--See 20 AAC 25.235) 18,13?
5. Pilot and Purge 217
6. Used for lease operations 15,961
7. Other 0
TOTAL items 1 - 7 34,315
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Bruce Platform 14,400
GPTF-LEX
11. Transferred to: Anna Platform 0
0
Remarks:
I hereby certify th the foregoing is true and correct to the best of my knowledge.
Signature ~ Title: Acct. Supervisor Date: 4/8!99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 0.00%
Lease 17586 280150 16.16%
Lease 17587 280150 1.30%
Lease 18742 280150 82.54%
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form I0~422
Rev. d/96
BRUCE PLATFORM
EXCESS FLARE LOG
Date & T1me
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
UnPianned Description of
Incident Operational or
Safety Reason Actions Taken Equipment Down
ID Number
3/1/98 12:01 AM 3/1/99 12:00 AM 551 Planned GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
312/99 12:01 AM 3/2/99 12:00 AM 559 Planned GP 1 oil fine frozen, OII being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
3/3/99 12:01 AM 3/3/99 12:00 AM 580 Planned GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas ventedfor sa t Safety Excess produced gas and Anna gas. NONE 0
3/4/99 12:01 AM 3/4/99 12:00 AM 571 Planned GP 1 oil line frozen, Oil being shipped vta GP 2 gas line. Gas vented far sa t Safety Excess produced gas and Anna gas. NONE 0
3/5/99 12:01 AM 3/5/99 12:00 AM 5110 Planned GP 1 oil Iine3rozen, OA being shipped via GP 2 gas line. Gas vented for sa t .Safety F~ccess produced gas and Anna gas. NONE 0
3/6/99 12:01 AM 3/6/99 72:00 AM 692 Plannetl GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
3/7/99 12:01 AM 3/7/99 12:00 AM 565 Planned GP 1 oil line frozen, Oil being shipped via GP 2 gas Tine. Gas vented for sa 1 Safety Excess produced gas and Anna gas. NONE 0
318/99 12:01 AM 318/99 12:00 AM 619 Planned GP 1 oil line frozen, OII being shipped via GP 2 gas line. Gas vented for sa t Safety Excess producetl gas and Anna gas. NONE 0
3/9/99 12:01 AM 3/9/99 12:00 AM 585 Planned GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
3/10/99 12:01 AM 3/70/99 12:00 AM 599 Planned GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safely Excess produced gas and Anna gas. NONE 0
3/11/89 12:00 AM 3111/99 12:00 AM 542 PWnned GP 1 oil line frozen, Oil being shipped Wa GP 2 gas line. Gas vented for sa t Safety Fxcess produced gas and Anna gas. NONE 0
3/12/99 12:00 AM 3/12/99 72:00 AM 596 Planned GP 1 0ll Gne frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
3/13/99 12:00 AM 3113/99 12:00 AM 592 Planned GP 1 oil Ilne frozen, Oil being shipped Wa GP 2 gas Ilne. Gas vented. for sa t Safety Excess produced gas and Anna gas. NONE 0
3/14/99 12:00 AM 3/14/99 12:00 AM 564 Planned GP 1 oil line frozen, Oil being shipped Wa GP 2 gas Ilne. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
3/15/99 12:00 AM 3/15/99 12:00 AM 574 Planned GP 1 oil line frozen, OII being shipped vIa GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
3/16/99 12:00 AM 3116/99 12:00 AM 601 Planned GP 1 oil line frozen, Oil being shipped Wa GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
3/17/99 12:01 AM 3/17!99 12:00 AM 615 Planned GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
3/78!99 12:01 AM 3118/99 12:00 AM 610 Planned GP 1 oil line frozen, OII being shippetl via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
3/19/9912:01 AM 3119/99 12:00 AM 575 Planned GP 1 oil Ilne frozen, OII being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
3/20/99 12:01 AM 320/99 12:00 AM 560 Planned GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
321/88 12:01 AM 3/21/98 12:00 AM 535 Planned GP 1 0ll line frozen, OII being shipped via GP 2 gas line. Gas vented (or sa t Safety Excess produced gas and Anna gas. NONE 0
3/22/99 12:01 AM 322/99 24:OOPM 545 Planned GP 1 oil Tine frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
323/99 12:01 AM 323/99 24:OOPM 532 Planned GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
324/99/12:01 AM 3124/99 24:OOPM 574 Planned GP 1 oil Ilne frozen, Oil being shipped via GP 2 gas Rne. Gas vented. for sa t Safety Excess produced gas and Anna gas. NONE D
325/9912:OtAM 3/25/99 24:OOPM 535 Planned GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas vented for sa 1 Safety Excess produced gas and Anna gas. NONE 0
326199 12:01 AM 326/99 24:OOPM 562 Plannetl GP t oil line frozen, OG being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
327/99 t2 ;OtAM 3/27/99 24:OOPM 617 Plannetl GP i oil line frozen, Oil being shipped via GP 2 gas line. Gas ventefl for sa t Safety Excess produced gas and Anna gas. NONE 0
328/99 12:01 AM 3/28/99 24:OOPM 601 Plannetl GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safely Excess produced gas and Anna gas. NONE 0
329/99 12:01 AM 3130199 12:00 AM 611 Planned GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safely Excess produced 'gas and Anna gas. NONE 0
3!30199 12:01 AM 3131/99 12:00 AM 639 Planned GP 1 oil line frozen, Oil being shipped via GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
3/31/99 12:01 AM 417/99 12:00 AM 836 Planned GP 1 oil line frozen, Oil being shipped Wa GP 2 gas line. Gas vented for sa t Safety Excess produced gas and Anna gas. NONE 0
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Bruce Platform Unocal Oil and Gas Granite Point April 99
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 16,638
5. Pilot and Purge 210
6. Used for lease operations 14,429
7. Other 0
TOTAL items 1 - 7 31,277
8. NGL gas equivalent produced 0
~r
9. Purchased gas 471
10. Transferred from: Bruce Platform 16,239
GPTF-LEX
11. Transferred to: Anna Platform 2, 308
0
Remarks:
I hereby cert' h the f goi g is r and Corr ct to the best of my knowledge.
Signature ~ Title: Acct. Supervisor Date: 5/20/99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 11.49%
Lease 17586 280150 14.46%
Lease 17587 280150 1.04%
Lease 18742 280150 73.01%
.Official Use Only --.Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
F°rm ~o~azs
Rev. J/95
BRUCE PLATFORM
EXCESS FLARE LOG
Apr-99
facility Date & Time
Event Began Date & Time
Evenf Ended Event Ga
MCF Produced or
Purchased Plannedor
Unplanned Black Smok
Visible Description of
Incident Operational or
Safety Reason Actions Taken Steps Taken
To Min. Recurrence Remarks Equipment Down
ID Number.:.
BRUCE PLATFORM 4/1/99 12:01 AM 4/1/99 12:00 PM 634 Produced Un%anmd No GP 1 o9line hozen, Oil beirg sNpp•d via GP 2 Bas I'uw. G SNely Excess produced pas and Arvw 0u. 1 NONE 0
BRUCE P1A7FORM 4CIJ99 12'01 AM 4/1A9 1200 PM 637 %oduced Unplanned No GP 1 dl Ilro hozen, O6 being stopped via GP 2 gas Nna. G SNely Excess producatl Bas and Ama gas. ShW-in Gas Wag Number 9 NONE 0
BRUCE PLATFORM 46199 12:01 AM 4999 1200 PM 641 Produced Un%nmed No OP / at 8ne hozen, Oil being shipped via GP 2 pu 9ne. O SNaly Excess produced 9u and AMa qu. Shut-In Gu We9 Nurtlber 9 .NONE 0
BRUCE PLATFORM 4/4/99 12:01 AM 1/4!99 12:00 PM 645 Produced Unplanned No GP 1 oil 9n• hozen, Oil bNrg aNpped via GP 2 pu line. G SNety Excess produced pu and Ama pu. Slwl-bt Gu W6 Number 9 NONE 0
BRUCE PLATFORM 4/599 12:01 AM 4/5/99 12:00 PM 657 %oduced Un%anned No OP 1 oil Ilne ho2en, OB bNrp shipped via OP 2 gas lino. G Seely Excess %aduced gas and Pzma gas. ShW-In Gas Wall Number 9 NONE 0
BRUCE PLATFORM 6/6/99 12:01 AM 4599 12:00 PM 640 Produced Un%anned No GP / 06 Line ho2en, OII beirq shipped via GP 2 gas Ilne. G SNely Excess produced pu and Ama pas. ShW-In Gu WNI Nuntbar 9 NONE 0
BRUCE PLATFORM 4/7/99 12:01 AM 4/799 12:00 PM 677 Produced Un%anned No CP 1 dl line hozen. Oil being Nappetl via GP 2 gas Iina. O SNely Excess produced gas and Anna gu. Shut-ut Ou WNI Number 9 NONE 0
BRUCE PLATFORM 4/6/99 12:01 AM 4/6/99 12:00 PM 679 Produced Un%annad No OP 1 dl Iln• hozen, Cil being shipped via GP 2 gu Ilna. G Safely Exwsa %oduud gu and Anne Bu. Shut in Gas WNI Number 9 NONE 0
BRUCE PLATFORM 49/99 12:OD AM 4/5/99 12:00 AM 664 Produced Un%amed No GP i oil Line /row, OII Wino shipped via GP 2 gu line. G Safely Excess poduced pu arM Anna pu. Shut-in Gu WNI Number 9 NONE 0
BRUCE PLATFORM 4/1099 12:00 AM 4/1099 12:00 AM 695 Produced UnPlarned No GP 1 dl6ne /cozen, Oil bNrq stopped via GP 2 gu Ilns. G Safely Excess produced gee eiM Anna pas. Shut-In Gu WNI Number 9 NONE 0
BRUCE PLATFORM 411199 12:00 AM 4/1199 12:00 AM 751 Produced Un%enned No GP 1 dl Nne frozen. OII bNrq aNpp•d via GP 2 pac line. G Safely Excess produced Bu and Ama Baa. ShW-in Gu WNI Number 9 NONE 0
BRUCE PLATFORM 6/1299 12:00 AM 4/11A9 12:00 AM 751 %oducad UnPlarv~ed No GP 706 Nne hozen, OII bNnp sNpp•O Wa GP 2 gu Nne. G Safely Excess produced pu end Anna pea. Shut-hr Gu WNI Number 9 NONE 0 _
BRUCE PLATFORM M7399 12:00 AM 4/1399 12:00 AM 62B %oduced Un%annad No GP 1 o911na hozen, Oil bNrg shipped via OP 2 pu line. O. Safety Excess produced pu and Ama pas. Shin-in Gu We6 Number 9 NONE ~ ,~~; -
BRUCE PLATFORM
4/1499 12:00 AM
4/1499 12:00 AM
696
Produced
Vn%annad
No
GP 1 a8 9rw hozen, 08 being stopped via OP 2 gas line. G
Safely
Ezcess produced pas and Ama gu.
Shin-in Ou Well Number 9
NONE ,
0 ~.,
BRUCE PLATFORM 4/1599 12:00 AM 4/1599 12:00 AM 702 %oduud Un%amwd No GP 1 dl tlne hozen, Oil belrg aldpped via rip 2 pu 8ne. G Solely Excess produced pas and Ama gas. 9hulin Gas We0 Number 9 NONE 0
eRl/CE P1A7FORM 4/1699 1200 AM 4/16/99 12:00 AM 696 Produced Un%anned No rip 1 dl IIM frozen, (\'I being stopped via OP 2 Bas Ilrre. G SNety Ezwss produced Bas aM Anna gu. Shin-in Gas Well NwMer 9 NONE 0
BRUCE PLATFORM 4/1799 12:00 AM 0/1799 12:00 AM 694 Produced Un%eruwd No OP 1 all Iln• hozen, W beirp shipped via P 2 9u Orre. G SNely' Ezcsu produced pu rd Anna Bu. ' ShuL-fn Ou We0 NWMer 9 - MONE 0
BRUCE PLATFORM 4/1589 12:00 AM. .4/16/99 12:00 AM' 891 Produced lm%dvted No GP 709 fine hozen, Oil btlrpsNppad via GP 2 9u line. O Sdsly Ezeass produced pas end Ama gu. Shut-N Ou Well Nunib•r 9~ ~ NONE 0
BRUCE PLATFORM 4/1999 12:00 AM' x/1999 24:OOPM 711 Produced IM%•nned No OP 1 dl Ilna hozen, OU bNrp shipped via GP 2 pas Gns. G SNely Ezeess produced pea and Ama gu. Shut-In Gu WNI Number 9 NONE 0
BRUCE PLATFORM 0/2099 12:00 AM 4/2099 24:OOPM 711 Produced Un%amod No GP 1 dl Ilne frozen, Oil bNnp aNpped via OP 2 pu Ilne. O Safely Excess produced Bas and Ama gas. ShW-N Ou Well Number 9 NONE 0
BRUCE PLATFORM 4/2199 12:00 AM 412199 24:OOPM 719 Produced Un%emed No OP 7 dl 6helrozan, 00 bNrp aLappad vie GP 2 9u IIM. G SNBIY Ezcess produced Bas and Ama pas. ShW-0n Gu WNI NwMer 9 NONE 0
BRUCE PLATFORM 4/21198 12:00 AM 4/2299 24:OOPM 690 Predated Un%anned No OP 1 dl Line hozen, Otl behq sNpped via GP 2 9~ line. G SN•ry Excess producadgu end Psma pu. Shut-in Gu WNI NwMer 9 NONE 0
BRUCE PLATFORM 4/2399 12:00 AM 4/2399 24:OOPM 437 P[oducad Un%anrMd No GP 1 a0 9ne hozen. ql behp shipped vie OP 2 Bu 6rre. G SNNY Ezcesa produced pu and Ama Bu. Shut-In Oas Well Nunptx 9 NONE 0
BRUCE PLATFORM 4/2499 12:00 AM 412199 24:OOPM 367 Produced Un%anmd No OP 1 oil fine hozen, OII bNrg aNpp•d vie GP 2 Bu prw. O SNely Exnsa produced pu aM Ama pea. Shut-In Ou WaN Nurnbw 9 NONE 0
BRUCE PLATFORM 425!99 12:00 AM 4/2589 24:OOPM 165 Produced %amed No VRU down for mtlManerca, wNlinp for parts. OperaOOnN ScltedWed Mdnlenanu Shul-in Ou WNI Number 9 NONE 110209
BRUCE PLATFORM 4/2Br99 12:01 AM 4/2799 12:00 AM 1 t9 Produced %amad No VRU down for mNnuaKe, wNOnp In pile. Operallontl Scheduled MNM., NONE NONE W204
BRUCE PLATFORM 4/2799 12:01 AM ORB99 12:00 AM 111 Produced %arvred No VRU down for mtlnlarv:e, waBlnp for parts. OpxaOonN SchadWed MNnt., NONE NONE W204
BRUCE PLATFORM 412899 12:01 AM 412998 12:00 AM 120 Produced %anxed No VRU down br mainbnce, wNanp tar parts. Opertlbnal SchadWed Mtlnl., NONE NONE 110204.
BRUCE PLATFORM 4/2999 12:01 AM 4(.899 12:00 AM 135 Produced %anrred No VRU down for mtlnlence, wtlOnp for pals. Opera6ond SchedWed MtlM., NONE NONE 110204
ORUCE %ATFORM 4(J099 72:01 AM 5199 12:00 AM 131 Produced %arinW No VRU dean for mtlnlanca, wtltinp for pens. Operallantl SchedWed Mdnl., NONE NONE UO204
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Bruce Platform Unocal Oil and Gas Granite Point MAY 99
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented leas than 1 hour 0
4. Flared or vented greater than. l hour
(Supplemental report required--See 20 AAC 25.235) 663
5. Pilot and Purge 217
6. Used for lease operations 14,926
7. Other 0
TOTAL items 1 - 7 15,806
8. NGL gas equivalent produced 0
9. Purchased gas 11
10. Transferred from: Anna Platform 0
GPTF-LEX
11. Transferred to; Anna Platform 17, 328
0
Remarks:
I hereby certify at the forego' g is)tr~ue and correct to the best of my knowledge.
Signature ~ //~ Title: Acct. Supervisor Date: 6/22/99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 25.05%
Lease 17586 280150 12.35%
Lease 17587 280150 0.71%
Lease 18742 280150 61.89°~
Official Uae Only -- Flaring Authorization> 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes .MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10~d22
Rev. d/95
BRUCE PLATFORM
EXCESS FLARE LOG
May-99
Date Time
gt ~ggp00 Date & Time
M ggt §ytd~p Event Gas
M§F Planned or
U~gd Description of
Irt Operational or
O al Reason
Scheduled Maint. Actions Taken
NONE Equipment Down
ID Ntprtber
511199 12:01 AM 512/99 12:00 AM 106 Planned VRU down for maintence, waiting for parts. Operational Scheduled Maint., NONE 0
5/2199 12:01 AM 5/3/99 12:00 AM 115 Planned VRU down for maintence, waiting for parts. Operational Scheduled Maint., NONE 0
5/3/99 12:01 AM 5/3/99 12:00 AM 84 Planned . VRU down for maintence, waiting for parts., Operational Scheduled Mainl NONE 0
514/99 12:00 AM 5/4/99 12:00 AM 69 Planned VRU down for maintence, waiting for parts. Operational Scheduled Maint . NONE 0
5/5/99 12:00 AM 5!5/99 12:00 AM 59 Planned VRU down for maintence, waiting for parts. Operational Scheduled Mainl NONE 0
516/99 12:00 AM 5/6/99 12:00 PM 24 Planned VRU down for maintence, waiting for parts. Operational Scheduled Maim NONE 0
5/7!99 5:00 AM 5/7199 17:00 PM 175 Planned . Solar Gas Compressor 4000 hour Inspection Operational Scheduled Maint NONE 0
May 25, 99 1000 May 25, 99 1100 31 Planned GPTF COMPRESSOR MAINTENANCE. Operational Scheduled Mainl., NONE GPTF-23
-.- - ~ ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlPear of Disposition
Bruce Platform Unocal Oil and Gas Granite Point June 99
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235} 430
5. Pilot and Purge 210
6. Used for lease operations 14,539
7. Other 0
TOTAL items 1 - 7 15,179
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Anna Platform 0
GPTF-LEX
11.,Transferred to: Anna Platform 20, 646
0
Remarks:
I hereby certify that the foregoing/is true and correct to the best of my knowledge.
Signature ~ j% Title: Acct. Supervisor Date: 7/15/99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 27.21%
Lease 17586 280150 12.29%
Lease 17587 280150 0.84%
Lease 18742 280150 59.66%
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form IO-422
Rev. 4H5
BRUCE PLATFORM
EXCESS FLARE LOG
Jun-99
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equipment Down
ID Number
6/8/99 10:40 6/8/99 17:40 27 Planned VRU'S Maintenance Scheduled Operational Scheduled Maintenance None
6118/99 12:00 AM fi/18/99 12:00 AM 165 Planned Maintenance Scheduled -A line repairs OperaBOnal Scheduled Maintenance Repairs were performed.
BI20199 17:30 6120/99 2400 122 Unplanned Platform Shut-in Safety Modicon Failure Replaced Modicon
6/21/99 0001 6121/99 0600 11fi Unplanned VRU Oiler broke. Safety Unscheduled Maint., VRU Oiler repair. Repairs were performed.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
BRUCE PLATFORM
perator IField(s)
UNOCAL ALASKA RESOURCES GRANITE POINT FIELD
nth/Year of Dispo
JULY 1999
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 2v
6. Used for lease operations ~ 15,657
7. Other 0
TOTAL items 1 - 7 15 , 874
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 25,288
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature~~,~ ~ ~~ l~' Title ACCOUNTING SUPERVISOR Date 08/17/1999
Form 10-422
Rev. 4/95.
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 70.37
UNDEFINED (GAS) 280500 29.63
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
.~f
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Bruce P19tform Unocal Oil and Gas Granite Point August 1999
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 13
4. Flared or vented greater than 1 hour
(Su elemental report re uired-•See 20 AAC 25.235) 1,172
5. Pilot and Purge 217
6. Used for lease operations 16,497
7. Other 0
TOTAL items 1 - 7 17,899
8. NGL gas equivalent produced 0
9. Purchased gas 1
10. Transferred from: Anna Platform 0
GPTF-LEX
11. Transferred to: Anna Platform 21,119
0
Remarks:
I hereby certif tat he foregoing i true~~~ect to the best of my knowledge.
Signature ~ `/ Title: Acct. Supervisor Date: 9!15/99
V
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 26.46%
Lease 17586 280150 12.51%
Lease 17587 280150 0.89%
Lease 18742 280150 60.14%
Official Use Only •- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
F°rm IO~J22
Rev. J/95
BRUCE PLATFORM
EXCESS FLARE LOG
Aug-99
Facility Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Produced or
Purchased Planned or
UnPWnned 81ack Smoke
Visible Description of
Incident Operational or
Safety Reason Actions Taken Steps Taken
To Min. Recurrence
BR E PLATFORM Aug 4, 99 1500 Aug 4, 99 1745 12 Produced Unplanned Np Tank larm trouble and gas line was shut in. Operational Gas line shut in due to tank farm troubles. NONE NONE
9R E PLATFORM Aug 7, 99 0230 Aug 7,99 1600 619 Produced Unplanned No Lost the pear box on Ne gas compressor. Oparanonal Unschetluled Maint, Gas compressor gear box troubles. NONE NONE
BRIE PLATFORM Aug e, 99 2400 Aug 8, 1330 427 Produce0 Unplanned Np Lost the pear hox on the Bas compressor. Operatbnal Unschetluletl Maint., Gas compressor gear box [roubles. NONE NONE
BRUCE PLATFORM Au0 2fi, 07:00 Aug 26. 11:00 77 Produced Planned No VRU Maintenance Operational Scnetlulec Maintenance NONE NONE
BRUCE PLATFORM Aug 27, 07:00 Aug 27, 09:00 37 Protluced Planned No VRU Maintenance Operatbnal Scheduled Maintenance NONE NONE
ir
.i:
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD SEPTEMBER1999
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 210
6. Used for lease operations 16, 796
7.Other 0
TOTAL items 1- 7 17 , 006
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 21,462
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature / ,~~L~~~/I ,~~ ~ p ~~ Title ACCOUNTING SUPERVISOR Date 10/13/1999
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 73.72
UNDEFINED (GAS) 280500 26.28
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
..
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
BRUCE PLATFORM Operator
UNOCAL ALASKA RESOURCES Field(s)
GRANITE POINT FIELI
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 426
5. Pilot and Purge 217
6. Used for lease operations 17,280
7. Other 0
TOTAL items 1 - 7 17,925
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 22,752
Remarks:
I hereby certify t~hpaGtnthe f regoiing i~s/~t.,rue and correct to the best of my knowledge.
Signature ~/~""7"` ~ _Q.6/-,~.~! ~ Title ACCOUNTING SUPERVISOR Date 11/09/1999
Form 10-422
Rev. 4/95
~~: ~.1
~~~ ~~
. .. ,. ,. ~ g, ~~,
,. .~ . ~ i F;3it~a~dJ1,~«.~
~;.:: F u
Month/Year of Disposition
I OCTOBER 1999
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 68.71
UNDEFINED (GAS) 280500 31.29
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
BRUCE PLATFORM
EXCESS FLARE LOG
Oct-99 10/1/99 12:00 AM
Facility Date B Time
Event Began Date & Time
Event Ended Event Gas
MCF Produced or
Purchased Planned or
Unplanned Black Smok
Visible Description of
Incident Operational or
Safety Reason ctions Take Steps Taken
To Min. Recurrence Reported by ADEC
Notification &
ali rs C
ached rna uiptnent Dov
ID Number
BRUCE PLATFORM 10/10/99 8:00 10/10/9918:00 428 Produced Planned No Mainl. 8000 M insp on Bas comp Operational Planned Maintenance NONE NONE Yancey NO U-0053
7 f1,.... ..,i
at
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD NOVEMBER 1999
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 67
5. Pilot and Purge 210
6. Used for lease operations 16,041
7. Other 0
TOTAL items 1 - 7 16.318
8. NGL gas equivalent produced 0
9. Purchased gas 5
10. Transferred from: 0
11. Transferred to: 18.180
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~ ~~ /~L~~j Title ACCT. SUPERVISOR Date 12/15/1999
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 72.17
UNDEFINED. (GAS) 2$0500 27.83
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
BRUCE PLATFORM
EXCESS FLARE LOG
Nov-99
Date dr Time
Event Belton Date & Tlme
Event Ended EvenT Gas
MCF Produced or
Purctwsed Planned or
Unplanned Black Smoke
Visible DescripBon of
Inddenf OperaHOnal or
Safefy Reason Actions Taken Steps Taken
To Min. Recunence Remarks Equipment Dawn
ID Number
11/7/9911:OOAM 11/7/9915:00 30 Produced Plmned None CNbackAmaFlahg OperaMond Pk>eine shut Shut-M Well number9 None
11/5/9911:OOPM I1/B/9914W Z2 Produced Planned None Ct4-back Anna Fiarkig OperaHond P~eene slnR Shut-h WeA number9 None
1 I /25199 6:30 AM I I /25/99 9:00 AM 15 Produced Plumed None PlAging GP A2lo Anna. C)peralbnal Pkrxie0 shut down of pipeline. Shut-In Well number 9 Nana
x: \ facility \ bruce\ 1999\ Brx 1199.x1s
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD DECEMBER 1999
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 217
6. Used for lease operations 17,086
7.Other 0
TOTAL items 1 - 7 17.303
8. NGL gas equivalent produced 0
9. Purchased gas 9
10. Transferred from: 0
11. Transferred to: 16,988
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
n /
Signature ~~~ ~~,~ ~.. ;~~ri Title ACCT. SUPERVISOR Date 01/13/2000
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 76.47
UNDEFINED (GAS) 280500 23.53
Note: Ail volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422 /
J