Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutUNOCAL - BRUCE PLTFRM.. ~ x~r.,:a~ancararNrtliw;~r/tli.,~i.~u~i.®c~+itlid~mrtlrNrari~ia®/~/~~is~rwi.~iarrm/Niw®idr®i.~s~/ar~a~rsc~i.~cmitlipie/r%s~ri.~ii/.ia~irisiNiw~ioi~ iriiitli..moist.®/Nrtlitlimiris/ersisroimidi w,ar~.ndia~ -~ .~ AGOCC GaS Disposition Files 1998 UNOCAL - B,~uCE p[,TF12M. .... - ,;.d/.#/N.~/~//.6~iaRl/.~/.~/~/N/d/,oI/.~"/~'/.NY.O/~'/N/9C"/B/.Y/.~/.r.~/.®/B/.ice/~/N/s' ~ ~ ~ ':.M/,®/d/N/.~/,~fl~ii//I/./'/,~Y,~/O///i"/N/N/.A~/,p/O/IO/di.,~/~//J/O/..6~`/,~/tl/.~/i'/.~/.®/~/®/N/N/~'a- ~ ' - - '- ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION • Facility Operator Field(s) Month/Year of Disposition Bruce Platform Unocal Oil and Gas Granite Point Dec 98 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 217 6. Used for lease operations 15,453 7. Other 0 TOTAL items 1 - 7 15,670 8. NGL gas equivalent produced 0 9. Purchased gas 0 `" 10. Transferred from: Bruce Platform 0 GPTF-LEX 11. Transferred to: Anna Platform 23,080 0 Remarks: I hereby certify t t the foregoing is true and correct to the best of my knowledge. Signature Title: Acct. Supervisor Date: 1!15/99 *Indicate contribution of each pool to total. Pool Name Code Percent Lease 17586 280500 10.70% Lease 17586 280150 13.83% Lease 17587 280150 0.69% Lease 18742 280150 74.78% Official Use Only -- Flaring Authorization > 1 hY 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65. psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form IO~J2? Nev. A/55 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD. NOVEMBER 1998 Disposition Volume MCF* 1. Sold 0 2. Reinjected o 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) o 5. Pilot and Purge 210 6. Used for lease operations 14,313 7. Other 0 TOTAL items 1 - 7 14,523 8. NGL gas equivalent produced o 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 23,149 Remarks: I hereby certif,y.t/hat the foregoing is true and correct to the best of my knowledge. Signature ,~~ ~i B~ Title ACCOUNTING SUPERVISOR Dafe 12/11/1998 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 79.50 UNDEFINED (GAS) 280500 20.50 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD OCTOBER 1998 Disposition Volume MCF* 1. Sold p 2. Reinjected o 3. Flared or vented less than 1 hour 13 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 207 5. Pilot and Purge 217 6. Used for lease operations 14,044 7. Other p TOTAL items 1 - 7 14,481 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: p 11. Transferred to: 18,136 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature !~, ~,~„ _ n ,, Title ACCOUNTING SUPERVISOR Date .11/17/1998 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 89.29 UNDEFINED (GAS) 280500 10.71 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 BRUCE PLATFORM EXCESS FLARE LOG Oct-98 • Date & Time Date & Time Event Gas Planned or Description of Operational or Reason Actions Taken Equipment Down Event Began Event Ended MCF Unplanned Incident Safety ID Number 10/21/985:00 10121/9817:00 207 Planned Main1.,4000 Hour Inspectlon Gas Compressor Operational Planned Maintenance NONE ll-oo,a • ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION • Form 10-022 ReY- 4/BS Facility Operator Field(s) Month/Year of Disposition Bruce Platform Unocal Oil and Gas Granite Point Sept 1998 Disposition Volume MCF• 1. Sold 0 2. Reinjected 0 3. Flared or vented less than l how 0 4. Flared or vented greater than 1 how (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Pwge 210 6. Used for leaze operations (3,936 7.Other 0 TOTAL items l - 7 14,146 8. NGL gas equivalent produced 0 9. Pwchased gas 0 10. Transferred from: Bruce Platforrrr 0 GPTF-LEX 11. Transferred to: Anna Platform 15,033 832 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signa[we_ t---' Title: Acct. Supervisor Date: 10/16/98 'Indicate contribution of each pool to total. Pool Name Code Percent Lease 17586 280500 l 1.53 Lease 17586 280150 15.91 Lease 17587 280150 0.47% Lease 18742 280150 72.09% Official Use Only -- Flaring Authorization > 1 hr 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Cotnmissioner Dale Note: All volumes must be corrected to presswe of 14.65 psia and to a temperatwe of 60 degrees F. Repott due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION • Facility Operator Field(s) Month/Year of Disposition Bruce Platform Unocal Oil and Gas Granite Point August 1998 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 217 6. Used for lease operations 15,387 7. Other 0 TOTAL items 1 - 7 15,604 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: Bruce Platform 0 GPTF-LEX 11. Transferred to: Anna Platform 19, 610 0 Remarks: I hereby certify that a foregoi g is true and correct,`f~o tihe best of my knowledge. Signature ~ ~ Title: Acct. Supervisor Date: 9/15/98 *Indicate contribution of each pool to total. Pool Name Code Percent Lease 17586 280500 11.53% Lease 17586 280150 15.91% Lease 17587 280150 0.47% Lease 18742 280150 72.09% Official Use Only -- Flaring Authorization > 1 hr 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Focm 10422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION • ~~ Facility Operator Field(s) Month/Year of Disposition Bruce Platform Unocal Oil and Gas Granito Point July 1998 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour Su lemental re ort re uired--See 20 AAC 25.235) 25 5. Pilot and Purge 217 6. Used for lease operations 14,983 7. Other 0 TOTAL items 1 - 7 15,225 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: Bruce Platform 0 GPTF-LEX 11. Transferred to: Anna Platform 18,901 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature _ Title: Acct. Supervisor Date: 8/7/98 *Indicate contribution of each pool to total. Pool Name Code Percent Lease 17586 280500 11.1390 Lease 17586 280150 12.6790 Lease 17587 280150 0.393'0 Lease 18742 280150 75.8190 ~ -_ _ 1 [)Il-i~ial ~. -`~~. Un ll ~rin~, Au ch~.n-i ::_,ti~~r 11_i 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 10-422 Rev. 4/96 _~ BRUCE PLATFORM EXCESS FLARE LOG July 1998 Daie & Time Event B an Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safe Reason Actions Taken Equipment Down ID Number 7/27/98 7/27/98 25 P Bbw down weA number 9 O Remove wafer from well bore Back on Ilne 0 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION `/ 1, u Facility Operator Field(sJ Month/Year of Disposition Bruce Platform Unocal Oil and Gas Granite Point June 1998 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Su lemental re ort re aired--See 20 AAC 25.235) 0 5. Pilot and Purge 210 6. Used for lease operations 14,015 7. Other 0 TOTAL items 1 - 7 14,225 S. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: Bruce Platform 0 GPTF-LEX 11. Transferred to: Anna Platform 18,980 0 Remarks: I hereby certify t t the fore oing is true and correct to the best of my knowledge. Signature_ _ Title: Acct. Supervisor Date: 7/17/98 "Indicate contribution of each pool to total. Pool Name Code Percent Lease 17586 280500 11.3390 Lease 17586 280150 13.78~Y Lease 17587 280150 0.50% Lease 18742 280150 74.393'0 Cd1-i~..i;il I'so t)nla - Flaring Authors?.sti~~r. > ] ~r 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Farm 10-422 Rev. 4/96 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlYear of Disposition Bruce Platform Unocal Oil and Gas Granite Point May 1998 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Su lemental re ort re uired--See 20 AAC 25.235) 170 5. Pilot and Purge 217 6. Used for lease operations 14,440 7. Other 0 TOTAL items 1 - 7 14,827 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: Bruce Platform 0 GPTF-LEX 11. Transferred to: Anna Platform 19,412 0 Remarks: I hereby certify that a foregoing is true and correct to the best of my knowledge. Signature ~ ~.- Title: Acct. Supervisor Date: 614/95 *Indicate contribution of each pool to total. Pool Name Code Percent Lease 17586 280500 11.599'0 Lease 17556 280150 13.7290 Lease 17587 280150 0.379 Lease 18742 280150 74.329 Otli~ial TJso ~?nlg -- 1':;1iin~; Aud;~n~ir;,tir=n > I fir 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Nota: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 10.422 Rev. 4/96 BRUCE PLATFORM EXCESS FLARE LOG May-98 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equipment Down ID Number 5/28/98 12:00 5/28/98 21:30 106 Planned gas compressor maintenance scheduled Safety Scheduled Maint., 0 GPTF-3 5/29/98 10:30 AM 5/29/98 7:00 PM 64 Planned gas compressor maintenance scheduled Safety Scheduled Maint., 0 GPTF-3 ~~ ~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Bruce Platform Unocal Oil and Gas Granite Point April 1998 • I Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 Lease 17586 280500 15.85% 3. Flared or vented less than 1 hour 0 Lease 17586 280150 11.58% 4. Flared or vented greater than 1 hour (Su lemental re ort re uired--See 20 AAC 25.235) 0 Lease 17587 280150 0.409 5. Pilot and Purge 210 Lease 18742 280150 72.17090 6. Used for lease operations 14,072 7. Other 0 r - - -- __ Cnli~~i,~l i i :. ~!nls - Pl:+rir~~; ,~utborizaf ,u - 1 Lr TOTAL items 1- 7 14,282 1. Safety MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv: Purposes MCF 10. Transferred from: Bruce Platform 0 GPTF-LEX 11. Transferred to; Anna Platform 20,432 0 Commissioner Date Remarks: Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~ Title: Acct. Supervisor Data: 5/8/98 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Farm 10422 Rev. 9/96 - ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION • • Facility Operatoi Field(s) Month/Year of Disposition Bruce Platform Unocal Oil and Gas Granite Point March 1998 Disposition .Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required••See 20 AAC 25.235) 383 5. Pilot and Purge 217 6. Uaed for lease operations 14,522 , 7. Other 0 TOTAL items 1 • 7 15,122 8. NGL gas equivalent produced 0 9. Purchased gas 90 10. Transferred from: Bruce Platform 0 GPTF-LEX 11. Transferred to: Anna Platform 15, 938 0 Remarks: I hereby certify that t e foregoing is true and correct to the best of my knowledge. Signature Title: Acct. Supervisor Date: 4/14/98 *Indicate contribution of each pool to total. Pool Name Code Percent Lease 17586 280500 12.55% Lease 17586 280150 10.55% Lease 17587 280150 0.44% Lease 18742 280150 76.46% Official Use Only -- Flaring Authorization > 1 hr 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 10422 Rev. 4195 BRUCE PLATFORM EXCESS FLARE LOG • Date & Time Event Began Date & Time Evenf Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equipment Down ID Number 2Sfvtor B:Opam - 4:OOpm 383 PLANNED Gas compressor down. Safety Scheduled maintenance Compressor maintenance 0 ~._ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Bruce Platform Unocal Oil and Gas Granite Point February 1998 • • Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Su lemental re ort re uired--See 20 AAC 25.235) 0 5. Pilot and Purge 196 6. Used for lease operations 13,170 7. Other 0 TOTAL items 1 - 7 13,366 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: Bruce Platform 0 GPTF-LEX 11. Transferred to: Anna Platform 15,689 0 Remarks: I hereby rti hat the foregoing is t e and co ect tot best of my knowledge. Signat~ Title: Special Clerk Date: 3/9/98 *Indicate contribution of each pool to total. Pool Name Code Percent Lease 17586 280500 11.80 Lease 17586 280150 12.3390 Lease 17587 280150 0.44~Y Lease 18742 280150 75.4390 ~Iii:.ll ~~r_.i;;v -l~l ~,rin~~ ~rl xi,.+ti~-a::lhr 1. Safety ~ MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 70 122 Rev.9/96 • C~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 4~ ~".') `~~','' V"~~+. ,~~~ Facility Operator Field(s) Month/Year of Disposition Bruce Platform Unocal Oil and Gas Granite Point January 1998 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour a; 0 . ~~ ~~' cr 4. Flared or vented greater than 1 hour 0 (Su lemental re rt re aired--See 20 AAC 25.235)+_ 5. Pilot and Purge ~° vj ~ 217 ~: _~ 6. Used for lease operations ' ~ i 15,494 y, ~ ~ 7 Oth 0- ~ 0 . er TOTAL items 1 - 7 15,711 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: Bruce Platform 0 GPTF-LEX 12,579 11. Transferred to: Anna Platform 0 Remarks: I hereby certify that the fore oing is true and correct to the best of my knowledge. Signature Title: Special Clerk Date 2/18/98 *Indicate contribution of each pool to total. Pool Name Code Percent Lease 17586 280500 3.53% Lease 17586 280150 13.66% Lease 17587 280150 0.58% Lease 18742 280150 82.23% Oflicir~l Uac Only - I'lariu~~ :luthori~atiai ? 1 hr 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ,~ LW' ~;"r v/ Form 10422 Rev. 9/96