Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutUNOCAL - STEELHEAD PLTFRM AGOCC GaS Disposl~ion Files 1998 NOC L - STEEGNE~4~ PLT F,2M. 1 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 December 1998 • Disposition Total Volumes MCF 1. Sold 5,604,369 'L. Keinjected 0 3. Flared or vented less than 1 hour 769 4. Flared or vented greater than 1 hour Su Icmental r rt r uircd-See 20 AAC 25.235 0 S. Pilot and Purge 9,780 6. Used for lease operations 171,610 7. *Other (Shrinkage) 18,600 TOTAL items 1-7 5,805,128 8. NCiLgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. 'lYansferred to:'1'13Yr' TBPF - COV's 299,022 1714 Kemarks: ere y cert t at t e oregotng is true an correct tote est o my now a ge. Signature: G ~__ 'Title: Acct. Supervisor llate: 13-Jan-99 *Indicate contribution of each pool to total. Pool Name Code Percent Hem lock 520120 0.02% GGS 520550 99.29% Ci Gone 520150 0.56% W/F 520190 0.12% Undetlned 'Lone 520195 0.01% Utlictal Use Only ~- hlartn~ Authorization > 1 Yii. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner ate Note: All volumes must be corrected to ppressure of 14.65 Apsia and to a tem erature of 60 degrees F. Report due_ by the 20th ofpthe month followmg the month of dtspositton. Authorit 'LU AAC; 2S.L3S. Form 10-422 Rev. 4/95 _ ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'SREPORT OF GAS DISPOSITION • • Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 November 1998 Disposition Total Volumes MCF 1. Sold 5,687,408 'l. Reinjected 0 3. Flared or vented less than 1 hour 655 4. Flared or vented greater than 1 hour Su lemental r ort r wired-See 20 AAC 25.235 7,946 S. Pilot and Purge 9,198 6. Used for lease operations 163,050 7. *Other (Shrinkage) 18,000 TOTAL items 1-7 5,886,257 8. N(iLgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. 'Transferred to: '1'13Y1i' TBPF - COV's 284,523 2 124 Remarks: ere y cert t at t e oregotng is true an correct tote est o my now e ge. Signature: 't'itle: Acct. Supervisor Date: 11-Dec-98 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.02% GGS 520550 99.37% G Gone 520150 0.52% W/F 520190 0.08% Undefined "Gone 520195 0.01% Utticial Use C)nly - r'laring [authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner mate Note: All volumes must be corrected to pressure of 14.65 Apsia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of dtsposition. Authorit ZU AAC; "LS."L3S. Form 10-422 Rev. 4/95 STEELHEAD PLATFORM EXCESS FLARE LOG Nov-98 Date 8 Time Event Began Date•& Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational ar Safety Reason Actions Taken Equip.Dwn ID Number 11/14/1998 0600 11-14-98 1800 7590 Unplanned C-20 down for repairs lifting w/sales Operational or Maint n/a 11/28/98 0001 11/28/98 2000 183 planned Unload M-29 & high seal press. C-20 Oper. Wireline Work n/a 11/29/98 0001 11/29/98 1200 173 Planned High seal vent cavity pressure C-20 Operational High Pressure Fixed Steelhead Flare Events lofl Subject: Steelhead Flare Events Date: Tue, 2 Feb 1999 10:23:43 -0800 From: "Bounds, Janet G" <boundsj@unocal.com> To: "'Wendy Mahan"' <Wendy_Mahan@admin.state.ak.us> CC: "Ross, Gary D" <rossgd@Orion.Unocal.com>, "Sides, Ken R" <sideskr@Orion.Unocal.com>, "Beitia, John T" <beitiaj@Orion.Unocal.com> Wendy Your voice mail message requested more information on 3 events during November on Steelhead. Below is a summary of those events. * 11/14/98 There was a leak in the exhaust stack that required shutting down the C-20 compressor. Access to the leak was difficult. It involved cutting a path to the backside of the enclosure. The leaking gasket was repaired. During the repair the well M-25 was shut in to reduce the flare volume. As reported on the excess flare log 7590 MCF was flared during the event. * 11/28/98 Due to production problems M-29 was shut in on 11/27/98. A chemical problem down hole was discovered. There was heading on the well when it was brought back on line on 11/28/98. This causes the suction pressure to rise which results in high seal pressure. In order to keep the compressor from shutting down and for safety reasons the flare pressure was lowered. The amount flared during this event was 183 MCF. * 11/29/98 When M-29 comes back on line after being shut in it takes a time for the pressure to balance out and stop heading. An additional 173 MCF was flared as the well continued to unload from the events on the prior day. If you need more information please call me. Janet G. Bounds Environmental Scientist Unocal (907) 263-7694 (office) (907) 263-7901 (fax) a~ • • 2/2/99 10:22 AM ~/o~ume5 hoc ~lAred Q~b~-rtes P2poc-i-ed 4+ncocr~cJ-iy an ~ ALASKA OIL AND GAS CONSERVATION COMMISSION ~' PRODUCER'SREPORT OF GAS DISPOSITION • Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 October 1998 Disposition Total Volumes MCF 1. Sold 5,303,025 "L. Reinjected 0 3. Flared or vented less than 1 hour 30 4. Flared or vented greater than 1 hour Su lemental r rt r uired-See 20 AAC 25.235 0 S. Pilot and Purge 7,885 6. Used for lease operations 154,352 7. *Other (Shrinkage) 18,600 TOTAL items 1-7 5,483,892 8. N(iLgasequivalentproduced 0 9. Purchased gas 0 10. Transferred from: 0 11. 'Transferred to: '1'I3Yr' TBPF - COV's 260,718 Z 097 Remarks: ere y cert t at t e oregoulg is true an correct tote est o my now e ge. Signature: ,~ 'Title: Acct. Su ervisor llate: 15-Dec-98 ~- Form 10-422 Rev. 4J95 *Indicate contribution of each pool to total. Pool Name Code Percent Hem lock 520120 0.03% GGS 520550 99.23% Ci Gone 520150 0.62% W/F 520190 0.11% Undefined 'Gone 520195 0.01% (~fticial Use Only - r~laring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner atIS e - Note: All volumes must be corrected to pressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of dtsposition. - Authorit 20AAC~'LJ."L35. STEELHEAD PLATFORM EXCESS FLARE LOG Oct-98 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equip.Dwn ID Number ~''., • Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 Se tember 1998 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION METER 6411 VOLUME INCORRECT Disposition Total Volumes MCF 1. Sold 4,884,763 "L. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour Su lemental r ort r uired-See 20 AAC 25.235 16,571 S. Pilot and Purge 6,292 6. Used for lease operations 142,580 7. *Other (Shrinkage) 7,500 TOTAL items 1-7 5,057,706 8. NCiLgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. 'liansferred to: '1'13Y1a' TBPF - COV's 247,221 1698 Remarks: ere y certi t a t e oregomg 1s true an correct tote est o my now a ge. Signature: 'Title: Acct~Supervisor Date: 19-Jan-99 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.03% GGS 520550 99.09°70 U Gone 520150 0.73% W/F 520190 0.14% Undefined 'Gone 520195 0.01% (~tfictal Use Only - N'Iaring Authouzation > 1 hr. ' 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner ate Note: All volumes must be corrected to pressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of dtsposition. Authorit 'LU AAC 'LS.23S. Form 10-422 Rev. 4J95 -+- - STEELHEAD PLATFORM EXCESS FLARE LOG Sep-98 Date & Time Date & Time Event Gas Planned or Description of Operational or Reason Actions Taken Equip.Dwn Event Began Event Ended MCF Unplanned Incident Safety ID Number 9115/98 0400 9-15-98 2300 12003 Planned C-20 engine change out operational 9/16/98 1045 9/16/98 1745 3052 Planned C-20 engine repair operational 9!2798 1030 9/27!98 1400 1516 Unplanned Power failure, lifting oil with sales gas operational ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'SREPORT OF GAS DISPOSITION • Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 Au ust 1998 Disposition Total Volumes MCF 1. Sold 4,574,237 'L. lZeinjected 0 3. Flared or vented less than 1 hour 157 4. Flared or vented greater than 1 hour Su lemental r rt r uired-See 20 AAC 25.235 145,629 S. Pilot and Purge 4,875 b. Used for lease operations 140,930 7. *Other (Shrinkage) 7,500 TOTAL items 1-7 4,873,328 8. NULgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. '1'ransferredto:'1'13Y1+' TBPF - COV's 246,732 1858 Remarks: ere y cert t t e o oing >s true an correct tote est o my now a ge. Signature ~ ~ v ~~ 'Title: Acct. Supervisor Date: 15-Se -98 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name (.ode Percent Hemlock 520120 0.04% GGS 520550 87.88% U Gone 520150 0.98% W/F 520190 0.19% Undefined 'Gone 520195. 0.01% C)ffctal Usc (July -flaring Author~lation > ,1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner ate Note: All volumes must be corrected to ppressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of dtsposition. Authorit 'LU AAC; 'LS.'L35. STEELHEAD PLATFORM EXCESS FLARE LOG Aug-98 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equip.Dwn ID Number 8/1/98 OOOOhrs 8/9/98 1600hr. 142119 Planned C-20 down for maintenance Operational Package Ovrhaul C-20 8/10/98 0800hrs 8/10/98 0900hrs 220 Planned C-20 down for maintenance Operational Package Ovrhaul C-20 0811/98 1000hrs 08/11/98 12hrs 1470 Planned C-20 down for maintenance Operational Package Ovrhaul C-20 08/12/98 0900hrs 08/12/98 1000hrs 540 Planned C-20 down for maintenance Operational Package Ovrhaul C-20 /98 0800hrs 08/13/98 0830hrs 100 Planned C-20 down for maintenance Operational Package Ovrhaul C-20 08/16/98 0900hrs 08/16!98 1100hrs 1180 Planned C-20 down for maintenance Operational Package Ovrhaul C-20 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION ~~ Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 Jul 1998 Disposition Total Volumes MCF 1. Sold 5,032,506 2. Reinjected 0 3. Flared or vented less than 1 hour 90 4. Flared or vented greater than 1 hour Su lemental r ort r uired-See 20 AAC 25.235 310,813 S. Pilot and Purge 4,037 6. Used for lease operations 136,050 7. *Other, (Shrinkage) 7,500 TOTAL items 1-7 5,490,996 8. NCiLgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. 'liansferredto:'1'liYl'' TBPF - COV's 255,796 2 416 Remarks: ere y cert t t t e oregomg ~ true an correct tote est o my now a ge. Signature: ~ 'Title: Acct. Su erp visor llate: 12-A -98 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.03% GG5 520550 99.16% U Gone 520150 0,68% W/F 520190 0.12% Undefined 'Lone 520195 0,01% C~tfictal;Use Only- t~'laring Authorization a 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner atIS e Note: All volumes must be corrected to pressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month followmg the month of dtsposition. Authorit 'LU AAC: 'L5.l35. Fom~ 10-422 Rev. 4J9S STEELHEAD PLATFORM EXCESS FLARE LOG J u i-98 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equip.Dwn ID Number 7/1/98 0630hrs 7/1/98 1630hrs 6399 Planned C-20 down for maintenance operational water-wash, borescope completed maint. C-20 7/9/98 0700hrs 7/9/98 1330hrs. 4110 Planned C-20 down for maintenance operational Turbine inspection 7/14/98 OOOOhrs Not Ended 300304 Planned C-20 down for maintenance operational Package Overhaul ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION i Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152,520190,520195 June 1998 Disposition Total Volumes MCF 1. Sold 4,684,302 2. Reinjected 0 3. Flared or vented less than 1 hour ~ 334 4. Flared or vented greater than 1 hour 5u lemental r ort r uired-See 20 AAC 25.235 2,075 S. Pilot and Purge 5,980 b. Used for lease operations 144,610 7. *Other (Shrinkage) 18,000 TOTAL items 1- 7 4,855,301 8. N(ULgas equivalent produced 0 9. Purchasedgas 0 10. Transferred from: 0 11. 'Transferred to: '1'13Yh' TBPF - COV's 264,653 2 565 Remarks: ere y cert t at t e oregotng is true an correct tote est o my now a ge. Signature: 'Title: Acct. Su erp visor llate: 16-Jul-98 "`Indicate contribution of each pool to total. Pool Name (ode Percent Hemlock 520120 0.04% GGS 520550 98.84% U Gone 520150 0.93% W/F 520190 0.18% Undefined 'Gone 520195 0.01% C~tficial Use Only - r'larinl; E~uthorization > lhr. 1. Safety .MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner ate Note: All volumes must be corrected to pressure of 14.65 psia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month followtng the month of dtsposition. Authorit 2U AAC'LJ.Z3S. Form 10-422 Rev. 4/95 STEELHEAD PLATFORM EXCESS FLARE LOG Jun-98 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equip.Dwn ID Number 6/15/98 1500hr 6/15/98 1700hr 14 Unplanned High Suction to Comp. C-20 Operational Hot weather Rebuild Sched. C-20 6/26/98 1300hrs 6/26/98 230ohrs 140 Unplanned High Suction to Comp. C-20 Operational Hot weather Rebuild Sched. C-20 6/27/98 1300 hrs 6/27/98 1300hrs 161 Unplanned High Suction to Comp. C-20 Operational Hot weather Rebuild Sched. C-20 6/28/98 1300 hrs 6/28/98 1300hrs 82 Unplanned High Suction to Comp. C-20 Operational Hot weather Rebuild Sched. C-20 98 1715 hrs. 6/29/98 1915 hrs. 1334 Unplanned C-20 down on High Seal Gas Vent Press, Operational Rebuild Sched. C-20 0/98 1500hrs 6/30/98 1830hrs 344 Unplanned High Suction to Comp. C-20 Operational Rebuild Sched. C-20 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION • Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 April 1998 Disposition Total Volumes MCF 1. Sold 5,257,173 Z. Reinjected 0 3. Flared or vented less than 1 hour 142 4. Flared or vented greater than 1 hour Su lemental r ort r uired-See 20 AAC 25.235 27,240 S. Pilot and Purge 6,884 6. Used for lease operations 158,220 7. *Other (Shrinkage) 16,800 TOTAL items 1-7 5,466,459 8. NCiLgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. '1'ransferredto:'1'I3Yli' TBPF - COV's 262,424 1802 ttemarks: ere y cert t at t e oregoing >s true an correct tote est o my now e ge. i Signature: ~~+ ~ 't'itle: Acct. Su ervisor llate: 18-Ma -98 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.03% GGS 520550 99.02% U "Lone 520150 0.81% W/F 520190 0.13% Undefined 'Gone 520195 0.01% C~tEicial Usc Unly - r'laring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner ate Note: All volumes must be corrected to pressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of disposition. Authorit 'LUAAC:'LS."L3J. Form 10-422 Rev. 4/95 STEELHEAD PLATFORM EXCESS FLARE LOG Apr-98 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety .Reason Actions Taken Equip.Dwn ID Number 1930 4-24-98 2300 4-24-98 2100 Unplanned C-20 S/D for Det Wash, Lift with Sales operational 0330 4-25-98 2400 4-25-98 11730 Unplanned C-20 Down to repair seal, Lift with Sales operational 0000 4-26-98 2300 4-26-98 13410 Unplanned C-20 Down to repair seal, Lift with Sales operational ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION • • Facility Operator Fields} _ 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 Ma 1998 Disposition Total Volumes MCF 1. Sold 4,220,240 Z. Reinjected 0 3. Flared or vented less than 1 hour 567 4. Flared or vented greater than 1 hour Su lemcntal r rt r uired-See 20 AAC 25.235 0 S. Pilot and Purge 5,255 6. Used for lease operations 140,440 7. *Other, (Shrinkage} 18,600 TOTAL items 1-7 4,3$5,102 8. NCrLgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. "1'ransferredto:'1'BYJ~' TBPF - COV's 251,522 1963 Remarks: ere y certi t a t e oregomg is true an correct tote est o my now a ge. Signature: "Title: Acct. Supervisor Date: 11-Jun-98 *Indicate contribution of each pool to total. Pool Name Code Percent Hem lock 520120 0.04% GGS 520550 98.57% U Gone 520150 1.17% W/F 520190 0.21% Undefined 'Gone 520195 0.01% Cat~cial'Use Unly - 1~'laring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmisstoner ate Note: All volumes must be corrected to ppressure of 14.65 psis and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of dtsposition. Authorit ZU AAC "LS.2:3S. Form 10-422 Rev. 4195 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS .DISPOSITION • C~ Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195. March 1998 Disposition Total Volumes MCF 1. Sold 5,789,202 'L reinjected 0 3. Flared or vented less than 1 hour 96 4. Flared or vented greater than 1 hour Su lemental r ort r uired-See 20 AAC 25.235 179 S. Pilot and Purge 8,843 6. Used for lease operations 167,660 7. *Other. (Shrinkage) 18,600 TOTAL items 1-7 5,984,580 8. NCrLgasequivalentproduced 0 9. Purchased gas 0 10. Transferred from: 0 11. '1'ransferredto:'1'13Y1~' TBPF - COV's 256,755 2 318 remarks: ere y cert t at t e oregoing is true an correct tote est o my now. e ge. Signature: ~~~ 't'itle: Acct. Supervisor Date: 14-A -98 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.03% GGS 520550 99.02% Ci Gone 520150 0.78% W/F 520190 0.16% Undefined 'Gone 520195 0.01% Utl~icial Use Only;',- Nlaring Authorization >' 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtssioner ate Note: All volumes must be corrected to ppressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of dtsposition. Authorit 20 AAC; 'LS.'L"35. Form 10-422 Rev. 4/95 STEELHEAD PLATFORM EXCESS FLARE LOG Date & Time Date & Time Event Gas Planned or Description of Operational or Reason Actions Taken Equip.Dwn Event Began Event Ended MCF Unplanned Incident Safety ID Number 3/11/98 0700 3/11/98 0900 30 Unplanned S/D C-13 TO REPAIR PCD LEAK Operational FIXED 3/17/1998 0001 3/17/98 2400 66 Planned Wireline work on M-31 & 32 Operational Perf. Wells ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'SREPORT OF GAS DISPOSITION • Facility Operator. Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 Februar 1998 Disposition Total Volumes MCF 1. Sold 5,176,339 2. iteinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour Su lemental r rt r wired-See 20 AAC 25.235 10,917 5. Pilot an,d Purge 9,661 6. Used for lease operations 152,510 7. *Other. (Shrinkage) 16,800 TOTAL items 1-7 5,366,227 8. NCiLgas equivalent produced 0 9, Purchased gas 0 10. Transferred from: 0 11. '1'ransferredto:'1'131'li' 234,912 Remarks: ere y c t at t e or ing true correct tote est o my now e ge. Signatur : 'Title: Special Clerk llate: 12-Mar-98 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.03% GGS 520550 99.01% Ci Gone 520150 0.79% W/F 520190 0.16% Undefined "Gone 520195 0.01% C)tYicial Use Unly - ;-'lacing Authorization > »l hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtssioner ate Note: All volumes must be corrected to ppressure of 14.65 psia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of dtsposition. Authorit 'LU AAC 'LS.'L'35. Form 10-422 Rev. 4/95 STEELHEAD PLATFORM EXCESS FLARE LOG Feb-98 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equip.Dwn ID Number 2/11/98 0400 hrs 2/11/98 2130 hrs 10917 Planned Repaired C-20 Exhaust Leak Safety ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION • • Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 Januar 1998 Disposition Total Volumes MCF 1. Sold 5,820,035 'Z. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour Su lemental r ort r wired-See ZO AAC 25.235 820 S. Pilot and Purge 11,208 6. Used for lease operations 173,180 7. *Other (Shrinkage) .18,600 TOTAL items 1-7 ~ 6,023,843 8. NCiLgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. 'liansferred to: '1'13Y1' 247,195 Remarks: ere ycer at t e orego g is try e an correct tote est o my now e ge. Signature:. ~ 'Title: Special (aerk llate: 06-Feb-98 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.03% GGS 520550 99.02% ti Gone 520150 0.80% w/F 520190 0.14% Undefined 'Gone 520195 0.01°10 U licial Use Unly - Jt'lartng Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner atI3 e Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month followmg the month of dtsposition. Authorit 'LU AAC; ZS.23S. Form 10-422 Rev. 4/95 t STEELHEAD PLATFORM EXCESS FLARE LOG Jan-98 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equip.Dwn ID Number 1/4/98 C~ 1430 1/4/98 C~3 1700 820 UNPLANNED PLC FAILURE OPER REPLACED