1999 Facility Report
Files
File Names
Gas Disposition
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) .520120,520550, Month/Year of Disposition
TBU - 520 Steelhead UNOCAL 520152 520190 20195 January 1999
Disposition Total Volumes MCF
1. Sold 5,664,160
L. Reinjected 0
3. Flared or vented less than 1 hour 1,541
4. Flared or vented greater than 1 hour
Su lemental r rt r uired-See 20 AAC 25.235 12,981
S. Pilot and Purge 9,757
6. Used for lease operations 168,600
7. *Other (Shrinkage) 18,000
TOTAL items 1-7 5,875,039
8. NCiLgas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. 't'ransferred to: 't'13Yt~'
TBPF - COV's 255,554
3 137
Remarks:
ere y certi t at t e oregoing >s true an correct tote est o my now e ge.
Signature: ~ 't'itle: Acct. Su ervisor Date: 16-Feb-99
*Indicate contribution of each pool to total.
Pool Name (ode Percent
Hem lock 520120 0.02%
GGS 520550 99.27%
Ci Gone 520150 0.59%
W/F 520190 0.11%
Undefined 'Lone 520195 0.01%
L~tticial Use C)nly - 1~'laring Authc~riaation > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
mmtsstoner atlS e
Note: All volumes must be corrected to ppressure
of 14.65 psia and to a tem erature of 60 degrees F.
Report due by the 20th ofpthe month following the
month of disposition.
Authorit "LU AAC: 2S."L3J.
Form 10-422
Rev. 4(95
STEELHEAD PLATFORM
EXCESS FLARE LOG
Jan-99
Date & Time Date & Time Event Gas Planned or Description of Operational or Reason Actions Taken Equip.Dwn
Even# Began Event Ended MCF Unplanned Incident Safety ID Number
1-9-99 0000 1-9-99 1800 158 Unplanned Leaking valve on "A" separator Operational Repaired valve
1-14-99 0400 1-15-99 0145 12823 planned C-20 straighting veins line, water wash, fix gas leaks. Both
Steelhead Flaring
Subject: Steelhead Flaring
Date: Fri, 15 Jan 1999 16:39:42 -0800
From: "Sullivan, Faye W" <sullifw@unocal.com>
To: "'Wendy Mahan"' <Wendy_Mahan@admin.state.ak.us>
CC: "Bounds, Janet G" <BoundsJ@Orion.UnocaLcom>,
"Whitacre, Dave S" <whitacred@Orion.Unocal.com>,
"Beitia, John T" <beitiaj@Orion.Unocal.com>, "Ross, Gary D" <rossgd@Orion.Unocal.com>
Wendy,
This is to advise that the C-20 Compressor on the Steelhead Platform is
currently down for quarterly maintenance inspection. It was shut-in about
4:00 AM this morning and is expected to be back in service about 8:00 PM.
Approximately 7 MMCF of gas will be flared while the C-20 is down (rate =
13MMCFD) The oil system was shut in .for about 2 hours for scheduled
maintenance during this period which reduced the flare volume. Specific
duration of the event and volume of gas flared will be reported on the
monthly flare log and excess flare report. If you have any questions,
please contact Janet Bounds. at 263-7694.
Faye Sullivan
Advising Environmental Scientist
907-263-7685 (office); 907-263-7901(fax)
907-223-4419 (cell)
1 of 1 1/15/99 3:48 PM
Re: Steelhead Flaring
Subject: Re: Steelhead Flaring
Date: Tue, 19 Jan 1999 08:25:06 -0900
From: Wendy Mahan <Wendy_Mahan@admin.state.ak.us>
Organization: doa-aogcc
To: "Bounds, Janet G" <boundsj@unocal.com>
Hi Janet,
Thanks for the information.
Bounds, Janet G wrote:
> Wendy
> The C-20 compressor was restored to operation at 1:45am on January 16, 1999.
> Approximately 12 MMCF was flared during the down time. The startup was
> delayed due to piping modifications to the inside of stage number 2.
> Flanges and straightening vains were added to improve recycle control The
> excess flare log will record this event.
> If you have questions please contact me.
> Janet G. Bounds
> Environmental Scientist
> Unocal
> (907) 263-7694 (office)
> (907) 263-7901 (fax)
> > From: Sullivan, Faye W
> > Sent: Friday, January 15, 1999 3:39 PM
> > To: 'Wendy Mahan'
> > Cc: Bounds, Janet G; Whitacre, Dave S; Beitia, John T; Ross, Gary D
> > Subject: Steelhead Flaring
> >
> > Wendy,
> > This is to advise that the C-20 Compressor on the Steelhead Platform is
> > currently down for quarterly maintenance inspection. It was shut-in about
> > 4:00 AM this morning and is expected to be back in service about 8:00 PM.
> > Approximately 7 MMCF of gas will be flared while the C-20 is down (rate =
> > 13MMCFD). The oil system was shut in for about 2 hours for scheduled
> > maintenance during this period which reduced the flare volume. Specific
> > duration of the event and volume of gas flared will be reported on the
> > monthly flare Iog and excess flare report. If you have any questions,
> > please contact Janet Bounds at 263-7694.
> > Faye Sullivan
> > Advising Environmental Scientist
> > 907-263-7685 (office); 907-263-7901 (fax)
> > 907-223-4419 (cell)
> >
1 of 1 1/19/99 8:25 AM
s
~-LI,L~..e- ~ i,~-en -t ~~- ~='r~- ~-nan I / lou.~v
9~`
ALASKA OIL AND GAS CONSERVATION COMMISSION ~s~a
PRODUCER S REPORT OF GAS DISPOSITION
Facility Operator Field(s) 520120,520550, Month/Year of Disposition
TBU - 520 Steelhead UNOCAL 520152 520190 20195 Februar 1999
Disposition Total Volumes MCF
1. Sold 4,811,084
'L. reinjected 0
3. Flared or vented less than 1 hour 774
4. Flared or vented greater than 1 hour
Su lemental r ort r uired-See 20 AAC 25.235 1,084
S. Pilot and Purge 10 471
6. Used for lease operations 154,810
7. *Other (Shrinkage) 16,800
TOTAL items 1-7 4,995,023
8. NULgas equivalent produced 0
9. Purchased gas 0
10. Transferred from: p
11. 'liansferred to:'1'BYl{
TBPF - COV's 234,042
3 049
remarks:
ere y certt y t at t e oregomg is true an correct tote est o my now e ge.
Signature: 't'itle: Acct. Su ervisor llate: 22-Mar-99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.03%
GGS 520550 99.23%
U Gone 520150 0.65%
W/F 520190 0.09%
.Undefined 'Gone 520195 0.00%
C)tlicial llsc Unly --- l+'laringAuthorizatton> 1 hr:
1. Safety MCF
2. Lease Use MCF
3. Conserv, Purposes MCF
mmtsstoner atIT e
Note: All volumes must be corrected to ppressure
of 14.65 psia and to a tem erature of 60 degrees F.
Report due by the 20th ofpthe month following the
month of disposition.
Authorit 2UAAC;'LS."L"35.
CO
Form 10-422
Rev. 4/95
STEELHEAD PLATFORM
EXCESS FLARE LOG
Feb-99
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equip.Dwn
ID Number
2/20/99 0400 2/20/99 2400 265 Unplanned M-31 heading after S/I & comp. Problems Operational High Suct. Press. Stablize wells C-20
2/21/99 0001 2/21/99 2400 229 Unplanned c-2o Ustabte Operational High Suct. Press. Stablize wells C-20
2/23/99 0001 2/23199 2400 130 Unplanned Wire line M-32 and C-20 unstable cond. Operational High Suct. Press. Stablize wells C-20
2/24/99 0500 2/24/99 1800 310 Unplanned M-28 S/I & comp. Problems Operational High Suct. Press. Stablize wells C-20
2/28/99 0001 2128/99 2400 150 Unplanned M-28 & 29 AND C-20 UNSTABLE COND. Operational High Suct. Press. Stablize wells C-20
~..LGv~x .~2u-e_r~-4 c~J~c~ut~. W~u~v~ I ~lotcr~,
~ ~rvu c~l-Q ~ l a/ aa,-9 g
~~`,
~S~
ac
oy
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) 520120,520550, Month/Year of Disposition
TBU - 520 Steelhead UNOCAL 520152 520190 20195 March 1999
Disposition Total Volumes MCF
1. Sold 5,559,567
"L. Reinjected 0
3. Flared or vented less than 1 hour 321
4. Flared or vented greater than 1 hour
Su lemental r rt r wired-See 20 AAC 25.235 947
S. Pilot and Purge 11,691
6. Used for lease operations 166,380
7. *Other (Shrinkage) 18,600
TOTAL items 1-7 5,757,506
8. NCiLgasequivalentproduced 0
9. Purchased gas 0
10. Transferred from: 0
11. 'Transferred to: '1'liYJi'
COV's to TBPF 222,388
1480
Remarks:
ere y certt t t t e oregomg is true an correct tote est o my now a ge.
Signature: 'i'itle: Acct. Su erp visor Date: 15-Apr-99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.03%
GGS 520550 99.25%
CJ Gone 520150 0.62%
W/F 520190 0.10%
Undefined 'Gone 520195 0.00%
C~tticial Use Unly - r'laring Authorization > T''hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
mmtsstoner at~-
Note: All volumes must be corrected to pressure
of 14.65 Asia and to a tem erature of 60 degrees F.
Report due by the 20th ofpthe month followtng the
month of dtsposition.
Authorit 'LU AAC: `LS.L3S.
Form 10-422
Rev. 495
STEELHEAD PLATFORM
EXCESS FLARE LOG
Mar-99
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equip.Dwn
ID Number
3/17/99 0300 3/17/99 0400 539 UnPlahned C-20 S/D Operational High Seal Vent PSI RESTART C-20
3/29/99 0400. 3/29/99 1400 280 Unplanned M-29 UNSTABLE Operational High Seal Vent PSI CHOKED WELL C-20
3/30/99 0300 3/31/99 1100 128 Unplanned M-29 UNSTABLE Operational High Seal Vent PSI CHOKED WELL C-21
K2L~i.1<C~ C~XGE'~-~ `, /Ltl~_ C,v:~t Y
~~ /5/-~
~~,~, IIIIILpLs~
ALASKA OI P oD D GAS CONSERVATION COMMISSION ~co
R S REPORT OF GAS DISPOSITION ,p~,
Facility Operator Field(s) 520120,520550, Month/Year of Disposition
TBU - 520 Steelhead UNOCAL .520152 520190 20195 April 1999
Disposition Total Volumes MCF
1. Sold 5,257,743
'L. lleinjected 0
3. Flared or vented less than 1 hour 284
4. Flared or vented greater than 1 hour
Su lemental r rt r uired-Sce 20 AAC 25.235 11,228
S. Pilot and Purge 10,737
6. Used for lease operations 1,62,870
7. *Other (Shrinkage) 18,000
TOTAL items 1- 7 5,460,862
8. NGLgas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. 'liansferred to: '1'13Y1~'
COV's to TBPF 206,840
1536
Remarks:
ere y certi t t e o going is true an correct tote est o my now e ge.
Signature: , ,,~~ 'Title: Acct. Supervisor llate: 23-A -99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.03%
GGS 520550 99.25%
Ci Gone 520150 0.62%
W/F 520190 0.10%
Undefined 'Gone 520195 0.00%
C)llictal Use Unly - NlaringAuthgriration > '1 1>r.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
mmtsstoner atl~e
Note: All volumes must be corrected to pressure
of 14.65 Asia and to a tem erature of 60 degrees F.
Report due by the 20th ofpthe month following the
month of dtsposition.
Authorit `LU AAL' 25.'L35.
Form 10-422
Rev. 4/95
t~.ev~s~c~ F.~ccss ~--/Ct~P ~u~,~
y-/<!- 9~
STEELHEAD PLATFORM
EXCESS FLARE LOG
Apr-99
~.
~(Y
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equip.Dwn
ID Number
4/1/99 0001 4/3/99 0330 436 UNPLANNED M-29 UNSTABLE OPER SEAL VENT PSI CHOKED WELL C-20
4/9/99 0001 4/9/99 2400 118 Unplanned M-29 UNSTABLE OPER SEAL VENT PSI CHOKED WELL C-20
4/11/99 0001 4/11/99 2400 18 Unplanned M-29 UNSTABLE OPER SEAL VENT PSI CHOKED WELL C-20
4/14/99 0630 4/14/99 2400 10555 planned. Quarterly C-20 maint. OPER TURBINE MAINT. Completed maint as planned C-20
4/27/99 2000 4/27/99 2400 101 Unplanned M-29 UNSTABLE OPER SEAL VENT PSI CHOKED WELL C-20
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) 520120,520550, Month/Year of Disposition
TBU - 520 Steelhead UNOCAL 520152 520190 20195 Ma 1999
Disposition Total Volumes MCF
1. So Id 5,489,619
'L. Reinjected 0
3. Flared or vented less than 1 hour 589
4. Flared or vented greater than 1 hour
Su lemental r rt r uircd-Sec 20 AAC 2S.23S 907
J. Pilot and Purge 11,284
b. Used for lease operations 1.67,404
7. *Other (Shrinkage) 18,600
TOTAL items 1-7 5,688,403
8. NCiLgas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. 'Transferred to:'1'13Y>i'
COV's to TBPF 217,836
1619
.Remarks:
ere y certt t t e oregomg true n correct tote est o my now e ge.
Signature: 'Title:. Acct. Su erp visor llate: 17-Jun-99
V
Form 10-422
Rev. 4/9S
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hem lock 520120 0.02%
GGS 520550 99.30°10
U Gone 520150 0.57%
W/F 520190 0.1,1%
Undefined 'Gone 520195 0.00%
C)tticial Use Only - r'laring Authorization ~ 1. hc.
1. Safety MCF
2. Lease Use MCF .
3. Conserv. Purposes MCF
mmisstoner atI~e '-
Note: All volumes must be corrected to pressure
of 14.65 Asia and to a tem erature of 60 degrees F.
Report due by the 20th ofpthe month following the
month of dtsposition.
Authorit "LU AAC 1,5."L35.
STEELHEAD PLATFORM
EXCESS FLARE LOG
May-99
Date & Time Date & Time Event Gas Planned or Description of Operational or Reason Actions Taken Equip.Dwn
Event Began Event Ended MCF Unplanned Incident Safety ID Number
5/13/99 1100 5/14/99 0700 907 Unplanned C-20 SHUT DOWN & WELLS UNSTABLE Operational STABILIZE C-20
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'SREPORT OF GAS DISPOSITION
Facility Operator Field(s) 520120,520550, Month/Year of Disposition
TBU - 520 Steelhead UNOCAL 520152 520190 20195 June 1999
Disposition Total Volumes MCF
1. Sold 5,107,595
"L. Reinjected 0
3. Flared or vented less than 1 hour 1,341
4. Flared or vented greater. than 1 hour
' Su lemental r rt r uired-See ZO AAC 25.235 ~ 0
'
S. Pilot and Purge 11,095
6. Used for lease operations 158,050
7. *Other (Shrinkage) 18,000
TOTAL items 1-7 5,296,081
8. NULgas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. "i'ransferredto:'1'BPIi'
COV's to TBPF 203,080
1 508
Remarks:
ere ycerti~ /fat t e o egomg rs true an correct tote est o my now e ge.
signature: ~' ,Y-C.. ( i 'Title: Acct. Supervisor llate: 16-Jul-99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.02%
GGS 520550 99.38%
Ci Gone ' 520150 0.50%
W/F ' . 520190 ' , 0.10%
Undefined 'Gone ~ 520195 0.00%
(_)i~icial Use Only - flaring authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
mmtsstoner ate
Note: All volumes must be corrected to pressure
of 14.65 Asia and to a tem erature of 60 degrees F.
Report due by the 20th ofpthe month following the
month of dispositton.
Authorit 'LU AAC 'LJ.'L3J.
Form t0-422
Rev. 4195
C~r~~L~ed ~lsed ~a~ /ecc.~
ALASKA OIL AND GAS CONSERVATION COMMISSION.
PROY3UCER'S REPORT OF GAS DISPOSITION
~~,
Facility Operator Field(s) 520120,520550, Month/Year of Disposition s~
TBU - 520 Steelhead UNOCAL 520152 520190 20195 Jul 1999 Q~
Disposition Total Volumes MCF
1. Sold 3,571,583
'L. Reinjected 0
3. Flared or vented less than 1 hour 2,171
4. Flared or vented greater than 1 hour
Su lemental r rt r uircd-See 20 AAC 25.235 43,330
S. Pilot and Purge 8,711
6. Used for lease operations 132,938
7. *Other (Shrinkage) 18,600
TOTAL items 1-7 3,777,333
8. NCiLgas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. 'Transferred to: "1'BYla'
COV's to TBPF 205,299
1077
liemarks:
ere y cert t at t e oregomg >s true an correct tote est o my now e ge.
Signature: "Title: Acct. Supervisor llate: 15-Se -99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.01%
GGS 520550 99.44%
Ci Gone 520150 0.43%
W/F 520190 0.12%
Undefined 'Gone 520195 0.00%
UtYcial Use Only - 1~'laiā¢ing Authorization > 1 }u:
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
mmtss~oner ate
Note: All volumes must he corrected to pressure
of 14.65 Asia and to a tem erature of 60 degrees F.
Report due by the 20th ofpthe month following the
month of dtsposition.
Authorit 'LU AAC: "LS.235.
+~.~''
Form 10-422
Rev 4195
STEELHEAD PLATFORM
EXCESS FLARE LOG
Jul-99
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken
7/2 0500 HRS 7/2 1730 HRS 8813 Planned C-20 Blow Dwh and Sales Gas used to Operational 20 quarterly Inspecti Completed as planned
Lift oil wells For Preventive Maint.
7/3 0000 HRS 7/3 1830 HRS. 608 Unplanned M-25 Oil Well Heading Operational Faulty Gas Lift valves Called out Wireline for Survey
7/5 0400 HRS 7/5 2200 HRS 23 Unplanned M-25 Oil Well Heading Operational Faulty Gas Lift valves Wireline pulling gas lift valves
7/9 1500 HRS 719 1900 HRS 690 Unplanned C-20 Blow Dwn and Sales Gas used to Operational High Seal Vent Pressure Adjusted Seal Gas Regulator
Lift Oil Wells Caused C-20 S/D
7/10 1000 HRS 7/11 2200 HRS 19592 Unplanned C-20 Blow Dwn and Sales Gas used to Operational C-20 Seal Failure Replaced Broken Seal
Lift Oil Wells S/D to Replace Seal
7/19 1430 HRS 7/19 2100 HRS 1329 Planned Blow Down M-16 Gas Well Operational Bringing well back on Completed as planned
after drilling work over
7/21 1630 HRS 7/22 1300 HRS 11020 Planned Blow Down M-16 Gas Well Operational Bringing well back on Completed as planned
after drilling work over
7/24 1200 HRS 7/24 1800 HRS 1255 Unplanned C-20 Blow Dwn and Sales Gas used to Operational Faulty Vibration probe Repaired Vibration probe
Lift oil wells Caused C-20 S/D
July flaring questions
Subject: July flaring questions
Date: Fri, 20 Aug 1999 09:21:20 -0800
From: Wendy Mahan <Wendy_Mahan@admin.state.ak.us>
Organization: doa-aogcc
To: "Bounds, Janet G" <boundsj@unocal.com>
Hi Janet,
I have a few questions for July.
TBPF
7/2 and 7/30 received grayling gas line pigs. Why two times in one
month? What is the normal pigging frequency?
Granite Point Platform
7/5-7, 14, & 16th Well spikes/Wireline work.
What wells and and what kind of Wireline work?
Steelhead
7/9-11/99 High Seal Vent pressure and C-20 seal failure.
Was the seal already broken when the Seal gas regulator was adjusted, or
did the seal break as a result of the adjustment?
Other than that, things look great. The additional comments on the
Steelhead flare log were very helpful, Thanks.
Wendy
8/20/1999 9:23 AM
lofl
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) 520120,520550, Month/Year of Disposition
TBU - 520 Steelhead UNOCAL 520152 520190 20195 Au ust 1999
Disposition Total Volumes MCF
1. Sold 3,483,155
'L. Reinjected 0
3. Flared or vented less than 1 hour 2,880
4. Flared or vented greater than 1 hour
Su lementa! r rt r wired-Set 20 AAC 25.235 4,057
S. Pilot and Purge 7,763
b. Used for lease operations 129,271
7. *Other (Shrinkage) 18,600
TOTAL items 1-7 3,645,726
8. NULgas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. 'liansferred to: '1'J3YN'
COV's to TBPF 189,415
934
Remarks:
ere y certi ~t t e or j~omfg ~ true an correct tote est o my now e ge.
Signature: ~ - ~ 1,J~ V ~ 't'itle: Acct. Su ervisor llate: 14-Se -99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.01%
GGS 520550 99.38%
U 'Lone 520150 0.49%
W/F 520190 0.12%
Undefined 'Gone 520195 0.00%
(~tficial Use Only - Nlarng~uthortzation > 1 hr. ''
1. Safety MCF
2. Lease Use ~ MCF
3. Conserv. Purposes MCF
mmissioner atI~e
Note: All volumes must be corrected to pressure
of 14.65 Asia and to a tem erature of 60 degrees F.
Report due by the 20th ofpthe month following the
month of disposition.
Authorit 'LU AAC~ L5."L3J.
Fom1 10-422
Rev. 4/95
STEELHEAD PLATFORM
EXCESS FLARE LOG
Aug-99
Date & Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equip.Dwn
ID Number
8/3/99 1400 8/3/99 1700 2182 PLANNED C-20 S/D for surge control upgrade Operational Repaired C-20 as planned
I 8/18/99 1830 I 8/1 8/99 21 30 I 1875 I UNPLANNED I C-20 S/D with a bad temprature probe I Operational I I Replaced bad orobel
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) 520120,520550, Month/Year of Disposition
TBU - 520 Steelhead UNOCAL 520152 520190 20195 Se tember 1999
Disposition Total Volumes MCF
1. Sold 2,711,426
'L. Reinjected 0
3. Flared or vented less than 1 hour 3,332
4. Flared or vented greater than 1 hour
Su lemental r rt r uired-see 20 AAC 25.235 0
J. Pilot and Purge 8,746
b. Used for lease operations 113,176
7. *Other (Shrinkage) 18,000
TOTAL items 1-7 2,854,680
8. NCiLgas equivalent produced 0
9. Purchasedgas 0
10. Transferred from: 0
11. '1'ransferredto:'1'BYN
COV's to TBPF 184,132
877
Remarks:
ere y cert ~ t t e rego~~m~~ ~ true an correct tote est o my now a ge.
Signature: ` ` ~ ~;~~~ 'Title: Acct. Supervisor llate: 14-Oct-99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.27%
GGS 520550 99.17%
Ci 'Lone 520150 0.42%
W/F 520190 0.14%
Undefined 'Gone 520195 0.00%
Note: All volumes must be corrected to ppressure
of 14.65 Asia and to a tem erature of 60 degrees F.
Report due, by the 20th ofpthe month followmg the
month of disposition.
Authorit 2U AAC 25.1.35.
Form 10-422
Rev 4/95
rip ..,. ,..
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
y a r, ,-. r
3 tl;
:~
. ~,
r"i. ~ r i ° {( [ [
g....~µ~ ~ ~S 4:L L :i? (f4j iJ 0) ;i~tl~iN}~j4w%;
Facility Operator Field(s) Month/Year of Disposition ~'
Steelhead Platform - TBU Unocal Tradin Ba Unit October 1999
Disposition Total Volumes MCF
1. Sold 5,455,551
2. Reinjected p
3. Flared or vented less than 1 hour 1,416
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 10,564
5. Pilot and Purge 11,026
6. Used for lease operations 174,720
7. *Other (Shrinkage) 18,600
TOTAL items 1-7 5,671,877
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 186,757
2,071
Remarks:
ere y certi at a or oing(( h~is true an correct to
Signature: - -~~ '~ ~ ~. ~ i~~ a est o my owe ge.
Title: Acct. Suner. Date: 17-Nov-99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.46
GGS 520550 99.27
G Zone .520150 0.22
W/F 520190 0.05 %
Undefined Zone 520195 0.00
Official Use Only -Flaring Authorization. > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psis and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authori 20 AAC 25.235.
Form 10-422
Rev. 4/95
STEELHEAD PLATFORM
EXCESS FLARE LOG
Oct-99
Date 8 Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equip.Dwn
ID Number
10/12/99 2000 10/12!99 2400 459 Unplanned M-25 & 29 were shut in for wireline work operational Well maintwireline work Choked wells to
and when we brought them back on they control the heads
headed for 3 hours before smoothing out
10/17/99 0300 10/17-99 2300 300 Unplanned Perforated M-29. Had to flow it after each operational Well mainUwireline work Perforating complete
shot. The well heads under those conditions
10!19/99 0300 10/19/99 1845 174 Unplanned Perforated M-29. Had to flow it after each operational Well mainUwireline work Perforating complete
shot. The well heads under those conditions
10/22!99 0500 10/22/99 2330 9631 Planned C-20 DOWN FOR 8000 HR INSP.B MAINT Operational Annual PM Inspect and repair
;~ _ ; ~ ,.
~~ i° i
,.
., .y
RE: July flaring questions
Subject: RE: July flaring questions
Date: Fri, 1 Oct 1999 11:02:39 -0700
From: "Bounds, Janet G" <boundsj@unocal.com>
To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us>
CC: "Myers, Chris S" <myersc@Orion.Unocal.com>,
"Helton, Carl D (Doc)" <heltonc@Orion.Unocal.com>,
"Santiago, Johnny T" <santiagoj@Orion.Unocal.com>,
"Helton, Carl D (Doc)" <heltonc@Orion.Unocal.com>,
"Ross, Gary D" <rossgd@Orion.Unocal.com>,
"Rhodes, Dustin J" <rhodedj@Orion.Unocal.com>
> Wendy:
> Below are responses to your questions regarding flare events in July.
> Trading Bay Production Facility
> * Pipeline pigs are shipped from Grayling as often as necessary to
> maintain clean lines. Grayling gas line pigs are usually shipped once per
> month. The Grayling gas pigs shipped on July 2 and 30, 1999 were four
> weeks apart.
> * The pig shipped on July 30, 1999 was part of the procedure to clean
> out the line prior to the gas riser inspection and modification.
> Granite Point Platform
> * On July 5, 6, and 7, 1999 well work included replacing all of the
> gas lift valves in GP-50 and 2 gas lift valves in GP 11-13.
> * On July 14 and 16, 1999 two valves suspected of leaking were
> replaced in GP-50 and a gas lift valve was replaced in well GP 31-14. A
> gas survey was also completed.
> Steelhead
> * Adjusting the seal gas regulator did not break the seal. The seals
> were worn out to the point that adjusting the regulator did not stop the
> leaking; therefore, the seals were replaced.
Please let me know if you need more information.
Janet G. Bounds
Environmental Scientist
Unocal
(907) 263-7694 (office)
(907) 263-7901 (fax)
1 of 1 12/22/99 8:40 AM
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER' S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Steelhead Platform - TBU Unocal Tradin Ba Unit November 1999
Disposition Total Volumes MCF
1. Sold 5,455,551
2. Reinjected 0
3. Flared or vented less than 1 hour 528
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 5,183
5. Pilot and Purge 9,919
6. Used for lease operations 182,594
7. *Other (Shrinkage) 18,000
TOTAL items 1-7 5,671,775
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF
COV's to TBPF 172,933
1,527
Remarks:
I ere y certi at a oregomg is true an correct to
\ /I r
Signature: L ~~ - 11~,L~ ~ a est o my owe ge.
Title: Acct. Super. Date: 20-Dec-99
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.48
GGS 520550 99.37
G Zone 520150 0.12%
W/F 520190 0.03
Undefined Zone 520195 0.00%
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authori 20 AAC 25.235.
Form 10-422
Rev. 4/95
-,
STEELHEAD PLATFORM
EXCESS FLARE LOG
Nov-99
~~,`.
~s~
Date 8 Time
Event Began Date & Time
Event Ended Event Gas
MCF Planned or
Unplanned Description of
Incident Operational or
Safety Reason Actions Taken Equ' wn
ID Nu
11/8 0800hrs 11/8 / 1650 hrs 2269 Planned UNLOADING M-4 TO FLARE Operational Unload well of fluid Completed work M-4
11/10 1000hrs 11/10 1400hrs 365 Ptanned COMPRESSORS SLOWDOWN Operational Upgrade Platform Completed work N/A
Control System,
11/23 0700 hrs 11/23 1900 hrs 2552 Planned UNLOADING M-4 TO FLARE Operational Unload well of fluid Completed work M-4
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER' S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Steelhead Platform - TBU Unocal Tradin Ba Unit December 1999
Disposition Total Volumes MCF
1. Sold 5,659,057
2. Reinjected 0
3. Flared or vented less than 1 hour 201
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 9,777
6. Used for lease operations 190,420
7. *Other (Shrinkage) 18,600
TOTAL items 1-7 5,878,055
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0 '
11. Transferred to: TBPF
COV's to TBPF 32,739 ~~
2,109
Remarks:
I ere y certi /at a oregomg is true an correct to
Signature: ,~:~. (` ; ~,~ a est o my owe ge.
Title: Acct. Suner. Date: 21-Jan-00
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.46
GGS 520550 99.40
G Zone 520150 0.11 %
W/F 520190 0.03
Undefined Zone 520195 0.00
Official Use Only - .Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psis and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authori 20 AAC 25.235.