Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutUNOCAL - STEELHEAD PLTFRMState of Alaska Alaska Oil & Gas Conservation Commission 1999 Facility Report Files File Names Gas Disposition ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) .520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 January 1999 Disposition Total Volumes MCF 1. Sold 5,664,160 L. Reinjected 0 3. Flared or vented less than 1 hour 1,541 4. Flared or vented greater than 1 hour Su lemental r rt r uired-See 20 AAC 25.235 12,981 S. Pilot and Purge 9,757 6. Used for lease operations 168,600 7. *Other (Shrinkage) 18,000 TOTAL items 1-7 5,875,039 8. NCiLgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. 't'ransferred to: 't'13Yt~' TBPF - COV's 255,554 3 137 Remarks: ere y certi t at t e oregoing >s true an correct tote est o my now e ge. Signature: ~ 't'itle: Acct. Su ervisor Date: 16-Feb-99 *Indicate contribution of each pool to total. Pool Name (ode Percent Hem lock 520120 0.02% GGS 520550 99.27% Ci Gone 520150 0.59% W/F 520190 0.11% Undefined 'Lone 520195 0.01% L~tticial Use C)nly - 1~'laring Authc~riaation > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner atlS e Note: All volumes must be corrected to ppressure of 14.65 psia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of disposition. Authorit "LU AAC: 2S."L3J. Form 10-422 Rev. 4(95 STEELHEAD PLATFORM EXCESS FLARE LOG Jan-99 Date & Time Date & Time Event Gas Planned or Description of Operational or Reason Actions Taken Equip.Dwn Even# Began Event Ended MCF Unplanned Incident Safety ID Number 1-9-99 0000 1-9-99 1800 158 Unplanned Leaking valve on "A" separator Operational Repaired valve 1-14-99 0400 1-15-99 0145 12823 planned C-20 straighting veins line, water wash, fix gas leaks. Both Steelhead Flaring Subject: Steelhead Flaring Date: Fri, 15 Jan 1999 16:39:42 -0800 From: "Sullivan, Faye W" <sullifw@unocal.com> To: "'Wendy Mahan"' <Wendy_Mahan@admin.state.ak.us> CC: "Bounds, Janet G" <BoundsJ@Orion.UnocaLcom>, "Whitacre, Dave S" <whitacred@Orion.Unocal.com>, "Beitia, John T" <beitiaj@Orion.Unocal.com>, "Ross, Gary D" <rossgd@Orion.Unocal.com> Wendy, This is to advise that the C-20 Compressor on the Steelhead Platform is currently down for quarterly maintenance inspection. It was shut-in about 4:00 AM this morning and is expected to be back in service about 8:00 PM. Approximately 7 MMCF of gas will be flared while the C-20 is down (rate = 13MMCFD) The oil system was shut in .for about 2 hours for scheduled maintenance during this period which reduced the flare volume. Specific duration of the event and volume of gas flared will be reported on the monthly flare log and excess flare report. If you have any questions, please contact Janet Bounds. at 263-7694. Faye Sullivan Advising Environmental Scientist 907-263-7685 (office); 907-263-7901(fax) 907-223-4419 (cell) 1 of 1 1/15/99 3:48 PM Re: Steelhead Flaring Subject: Re: Steelhead Flaring Date: Tue, 19 Jan 1999 08:25:06 -0900 From: Wendy Mahan <Wendy_Mahan@admin.state.ak.us> Organization: doa-aogcc To: "Bounds, Janet G" <boundsj@unocal.com> Hi Janet, Thanks for the information. Bounds, Janet G wrote: > Wendy > The C-20 compressor was restored to operation at 1:45am on January 16, 1999. > Approximately 12 MMCF was flared during the down time. The startup was > delayed due to piping modifications to the inside of stage number 2. > Flanges and straightening vains were added to improve recycle control The > excess flare log will record this event. > If you have questions please contact me. > Janet G. Bounds > Environmental Scientist > Unocal > (907) 263-7694 (office) > (907) 263-7901 (fax) > > From: Sullivan, Faye W > > Sent: Friday, January 15, 1999 3:39 PM > > To: 'Wendy Mahan' > > Cc: Bounds, Janet G; Whitacre, Dave S; Beitia, John T; Ross, Gary D > > Subject: Steelhead Flaring > > > > Wendy, > > This is to advise that the C-20 Compressor on the Steelhead Platform is > > currently down for quarterly maintenance inspection. It was shut-in about > > 4:00 AM this morning and is expected to be back in service about 8:00 PM. > > Approximately 7 MMCF of gas will be flared while the C-20 is down (rate = > > 13MMCFD). The oil system was shut in for about 2 hours for scheduled > > maintenance during this period which reduced the flare volume. Specific > > duration of the event and volume of gas flared will be reported on the > > monthly flare Iog and excess flare report. If you have any questions, > > please contact Janet Bounds at 263-7694. > > Faye Sullivan > > Advising Environmental Scientist > > 907-263-7685 (office); 907-263-7901 (fax) > > 907-223-4419 (cell) > > 1 of 1 1/19/99 8:25 AM s ~-LI,L~..e- ~ i,~-en -t ~~- ~='r~- ~-nan I / lou.~v 9~` ALASKA OIL AND GAS CONSERVATION COMMISSION ~s~a PRODUCER S REPORT OF GAS DISPOSITION Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 Februar 1999 Disposition Total Volumes MCF 1. Sold 4,811,084 'L. reinjected 0 3. Flared or vented less than 1 hour 774 4. Flared or vented greater than 1 hour Su lemental r ort r uired-See 20 AAC 25.235 1,084 S. Pilot and Purge 10 471 6. Used for lease operations 154,810 7. *Other (Shrinkage) 16,800 TOTAL items 1-7 4,995,023 8. NULgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: p 11. 'liansferred to:'1'BYl{ TBPF - COV's 234,042 3 049 remarks: ere y certt y t at t e oregomg is true an correct tote est o my now e ge. Signature: 't'itle: Acct. Su ervisor llate: 22-Mar-99 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.03% GGS 520550 99.23% U Gone 520150 0.65% W/F 520190 0.09% .Undefined 'Gone 520195 0.00% C)tlicial llsc Unly --- l+'laringAuthorizatton> 1 hr: 1. Safety MCF 2. Lease Use MCF 3. Conserv, Purposes MCF mmtsstoner atIT e Note: All volumes must be corrected to ppressure of 14.65 psia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of disposition. Authorit 2UAAC;'LS."L"35. CO Form 10-422 Rev. 4/95 STEELHEAD PLATFORM EXCESS FLARE LOG Feb-99 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equip.Dwn ID Number 2/20/99 0400 2/20/99 2400 265 Unplanned M-31 heading after S/I & comp. Problems Operational High Suct. Press. Stablize wells C-20 2/21/99 0001 2/21/99 2400 229 Unplanned c-2o Ustabte Operational High Suct. Press. Stablize wells C-20 2/23/99 0001 2/23199 2400 130 Unplanned Wire line M-32 and C-20 unstable cond. Operational High Suct. Press. Stablize wells C-20 2/24/99 0500 2/24/99 1800 310 Unplanned M-28 S/I & comp. Problems Operational High Suct. Press. Stablize wells C-20 2/28/99 0001 2128/99 2400 150 Unplanned M-28 & 29 AND C-20 UNSTABLE COND. Operational High Suct. Press. Stablize wells C-20 ~..LGv~x .~2u-e_r~-4 c~J~c~ut~. W~u~v~ I ~lotcr~, ~ ~rvu c~l-Q ~ l a/ aa,-9 g ~~`, ~S~ ac oy ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 March 1999 Disposition Total Volumes MCF 1. Sold 5,559,567 "L. Reinjected 0 3. Flared or vented less than 1 hour 321 4. Flared or vented greater than 1 hour Su lemental r rt r wired-See 20 AAC 25.235 947 S. Pilot and Purge 11,691 6. Used for lease operations 166,380 7. *Other (Shrinkage) 18,600 TOTAL items 1-7 5,757,506 8. NCiLgasequivalentproduced 0 9. Purchased gas 0 10. Transferred from: 0 11. 'Transferred to: '1'liYJi' COV's to TBPF 222,388 1480 Remarks: ere y certt t t t e oregomg is true an correct tote est o my now a ge. Signature: 'i'itle: Acct. Su erp visor Date: 15-Apr-99 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.03% GGS 520550 99.25% CJ Gone 520150 0.62% W/F 520190 0.10% Undefined 'Gone 520195 0.00% C~tticial Use Unly - r'laring Authorization > T''hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner at~- Note: All volumes must be corrected to pressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month followtng the month of dtsposition. Authorit 'LU AAC: `LS.L3S. Form 10-422 Rev. 495 STEELHEAD PLATFORM EXCESS FLARE LOG Mar-99 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equip.Dwn ID Number 3/17/99 0300 3/17/99 0400 539 UnPlahned C-20 S/D Operational High Seal Vent PSI RESTART C-20 3/29/99 0400. 3/29/99 1400 280 Unplanned M-29 UNSTABLE Operational High Seal Vent PSI CHOKED WELL C-20 3/30/99 0300 3/31/99 1100 128 Unplanned M-29 UNSTABLE Operational High Seal Vent PSI CHOKED WELL C-21 K2L~i.1<C~ C~XGE'~-~ `, /Ltl~_ C,v:~t Y ~~ /5/-~ ~~,~, IIIIILpLs~ ALASKA OI P oD D GAS CONSERVATION COMMISSION ~co R S REPORT OF GAS DISPOSITION ,p~, Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL .520152 520190 20195 April 1999 Disposition Total Volumes MCF 1. Sold 5,257,743 'L. lleinjected 0 3. Flared or vented less than 1 hour 284 4. Flared or vented greater than 1 hour Su lemental r rt r uired-Sce 20 AAC 25.235 11,228 S. Pilot and Purge 10,737 6. Used for lease operations 1,62,870 7. *Other (Shrinkage) 18,000 TOTAL items 1- 7 5,460,862 8. NGLgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. 'liansferred to: '1'13Y1~' COV's to TBPF 206,840 1536 Remarks: ere y certi t t e o going is true an correct tote est o my now e ge. Signature: , ,,~~ 'Title: Acct. Supervisor llate: 23-A -99 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.03% GGS 520550 99.25% Ci Gone 520150 0.62% W/F 520190 0.10% Undefined 'Gone 520195 0.00% C)llictal Use Unly - NlaringAuthgriration > '1 1>r. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner atl~e Note: All volumes must be corrected to pressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of dtsposition. Authorit `LU AAL' 25.'L35. Form 10-422 Rev. 4/95 t~.ev~s~c~ F.~ccss ~--/Ct~P ~u~,~ y-/<!- 9~ STEELHEAD PLATFORM EXCESS FLARE LOG Apr-99 ~. ~(Y Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equip.Dwn ID Number 4/1/99 0001 4/3/99 0330 436 UNPLANNED M-29 UNSTABLE OPER SEAL VENT PSI CHOKED WELL C-20 4/9/99 0001 4/9/99 2400 118 Unplanned M-29 UNSTABLE OPER SEAL VENT PSI CHOKED WELL C-20 4/11/99 0001 4/11/99 2400 18 Unplanned M-29 UNSTABLE OPER SEAL VENT PSI CHOKED WELL C-20 4/14/99 0630 4/14/99 2400 10555 planned. Quarterly C-20 maint. OPER TURBINE MAINT. Completed maint as planned C-20 4/27/99 2000 4/27/99 2400 101 Unplanned M-29 UNSTABLE OPER SEAL VENT PSI CHOKED WELL C-20 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 Ma 1999 Disposition Total Volumes MCF 1. So Id 5,489,619 'L. Reinjected 0 3. Flared or vented less than 1 hour 589 4. Flared or vented greater than 1 hour Su lemental r rt r uircd-Sec 20 AAC 2S.23S 907 J. Pilot and Purge 11,284 b. Used for lease operations 1.67,404 7. *Other (Shrinkage) 18,600 TOTAL items 1-7 5,688,403 8. NCiLgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. 'Transferred to:'1'13Y>i' COV's to TBPF 217,836 1619 .Remarks: ere y certt t t e oregomg true n correct tote est o my now e ge. Signature: 'Title:. Acct. Su erp visor llate: 17-Jun-99 V Form 10-422 Rev. 4/9S *Indicate contribution of each pool to total. Pool Name Code Percent Hem lock 520120 0.02% GGS 520550 99.30°10 U Gone 520150 0.57% W/F 520190 0.1,1% Undefined 'Gone 520195 0.00% C)tticial Use Only - r'laring Authorization ~ 1. hc. 1. Safety MCF 2. Lease Use MCF . 3. Conserv. Purposes MCF mmisstoner atI~e '- Note: All volumes must be corrected to pressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of dtsposition. Authorit "LU AAC 1,5."L35. STEELHEAD PLATFORM EXCESS FLARE LOG May-99 Date & Time Date & Time Event Gas Planned or Description of Operational or Reason Actions Taken Equip.Dwn Event Began Event Ended MCF Unplanned Incident Safety ID Number 5/13/99 1100 5/14/99 0700 907 Unplanned C-20 SHUT DOWN & WELLS UNSTABLE Operational STABILIZE C-20 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'SREPORT OF GAS DISPOSITION Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 June 1999 Disposition Total Volumes MCF 1. Sold 5,107,595 "L. Reinjected 0 3. Flared or vented less than 1 hour 1,341 4. Flared or vented greater. than 1 hour ' Su lemental r rt r uired-See ZO AAC 25.235 ~ 0 ' S. Pilot and Purge 11,095 6. Used for lease operations 158,050 7. *Other (Shrinkage) 18,000 TOTAL items 1-7 5,296,081 8. NULgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. "i'ransferredto:'1'BPIi' COV's to TBPF 203,080 1 508 Remarks: ere ycerti~ /fat t e o egomg rs true an correct tote est o my now e ge. signature: ~' ,Y-C.. ( i 'Title: Acct. Supervisor llate: 16-Jul-99 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.02% GGS 520550 99.38% Ci Gone ' 520150 0.50% W/F ' . 520190 ' , 0.10% Undefined 'Gone ~ 520195 0.00% (_)i~icial Use Only - flaring authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtsstoner ate Note: All volumes must be corrected to pressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of dispositton. Authorit 'LU AAC 'LJ.'L3J. Form t0-422 Rev. 4195 C~r~~L~ed ~lsed ~a~ /ecc.~ ALASKA OIL AND GAS CONSERVATION COMMISSION. PROY3UCER'S REPORT OF GAS DISPOSITION ~~, Facility Operator Field(s) 520120,520550, Month/Year of Disposition s~ TBU - 520 Steelhead UNOCAL 520152 520190 20195 Jul 1999 Q~ Disposition Total Volumes MCF 1. Sold 3,571,583 'L. Reinjected 0 3. Flared or vented less than 1 hour 2,171 4. Flared or vented greater than 1 hour Su lemental r rt r uircd-See 20 AAC 25.235 43,330 S. Pilot and Purge 8,711 6. Used for lease operations 132,938 7. *Other (Shrinkage) 18,600 TOTAL items 1-7 3,777,333 8. NCiLgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. 'Transferred to: "1'BYla' COV's to TBPF 205,299 1077 liemarks: ere y cert t at t e oregomg >s true an correct tote est o my now e ge. Signature: "Title: Acct. Supervisor llate: 15-Se -99 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.01% GGS 520550 99.44% Ci Gone 520150 0.43% W/F 520190 0.12% Undefined 'Gone 520195 0.00% UtYcial Use Only - 1~'lai•ing Authorization > 1 }u: 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF mmtss~oner ate Note: All volumes must he corrected to pressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of dtsposition. Authorit 'LU AAC: "LS.235. +~.~'' Form 10-422 Rev 4195 STEELHEAD PLATFORM EXCESS FLARE LOG Jul-99 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken 7/2 0500 HRS 7/2 1730 HRS 8813 Planned C-20 Blow Dwh and Sales Gas used to Operational 20 quarterly Inspecti Completed as planned Lift oil wells For Preventive Maint. 7/3 0000 HRS 7/3 1830 HRS. 608 Unplanned M-25 Oil Well Heading Operational Faulty Gas Lift valves Called out Wireline for Survey 7/5 0400 HRS 7/5 2200 HRS 23 Unplanned M-25 Oil Well Heading Operational Faulty Gas Lift valves Wireline pulling gas lift valves 7/9 1500 HRS 719 1900 HRS 690 Unplanned C-20 Blow Dwn and Sales Gas used to Operational High Seal Vent Pressure Adjusted Seal Gas Regulator Lift Oil Wells Caused C-20 S/D 7/10 1000 HRS 7/11 2200 HRS 19592 Unplanned C-20 Blow Dwn and Sales Gas used to Operational C-20 Seal Failure Replaced Broken Seal Lift Oil Wells S/D to Replace Seal 7/19 1430 HRS 7/19 2100 HRS 1329 Planned Blow Down M-16 Gas Well Operational Bringing well back on Completed as planned after drilling work over 7/21 1630 HRS 7/22 1300 HRS 11020 Planned Blow Down M-16 Gas Well Operational Bringing well back on Completed as planned after drilling work over 7/24 1200 HRS 7/24 1800 HRS 1255 Unplanned C-20 Blow Dwn and Sales Gas used to Operational Faulty Vibration probe Repaired Vibration probe Lift oil wells Caused C-20 S/D July flaring questions Subject: July flaring questions Date: Fri, 20 Aug 1999 09:21:20 -0800 From: Wendy Mahan <Wendy_Mahan@admin.state.ak.us> Organization: doa-aogcc To: "Bounds, Janet G" <boundsj@unocal.com> Hi Janet, I have a few questions for July. TBPF 7/2 and 7/30 received grayling gas line pigs. Why two times in one month? What is the normal pigging frequency? Granite Point Platform 7/5-7, 14, & 16th Well spikes/Wireline work. What wells and and what kind of Wireline work? Steelhead 7/9-11/99 High Seal Vent pressure and C-20 seal failure. Was the seal already broken when the Seal gas regulator was adjusted, or did the seal break as a result of the adjustment? Other than that, things look great. The additional comments on the Steelhead flare log were very helpful, Thanks. Wendy 8/20/1999 9:23 AM lofl ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 Au ust 1999 Disposition Total Volumes MCF 1. Sold 3,483,155 'L. Reinjected 0 3. Flared or vented less than 1 hour 2,880 4. Flared or vented greater than 1 hour Su lementa! r rt r wired-Set 20 AAC 25.235 4,057 S. Pilot and Purge 7,763 b. Used for lease operations 129,271 7. *Other (Shrinkage) 18,600 TOTAL items 1-7 3,645,726 8. NULgas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. 'liansferred to: '1'J3YN' COV's to TBPF 189,415 934 Remarks: ere y certi ~t t e or j~omfg ~ true an correct tote est o my now e ge. Signature: ~ - ~ 1,J~ V ~ 't'itle: Acct. Su ervisor llate: 14-Se -99 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.01% GGS 520550 99.38% U 'Lone 520150 0.49% W/F 520190 0.12% Undefined 'Gone 520195 0.00% (~tficial Use Only - Nlarng~uthortzation > 1 hr. '' 1. Safety MCF 2. Lease Use ~ MCF 3. Conserv. Purposes MCF mmissioner atI~e Note: All volumes must be corrected to pressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due by the 20th ofpthe month following the month of disposition. Authorit 'LU AAC~ L5."L3J. Fom1 10-422 Rev. 4/95 STEELHEAD PLATFORM EXCESS FLARE LOG Aug-99 Date & Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equip.Dwn ID Number 8/3/99 1400 8/3/99 1700 2182 PLANNED C-20 S/D for surge control upgrade Operational Repaired C-20 as planned I 8/18/99 1830 I 8/1 8/99 21 30 I 1875 I UNPLANNED I C-20 S/D with a bad temprature probe I Operational I I Replaced bad orobel ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) 520120,520550, Month/Year of Disposition TBU - 520 Steelhead UNOCAL 520152 520190 20195 Se tember 1999 Disposition Total Volumes MCF 1. Sold 2,711,426 'L. Reinjected 0 3. Flared or vented less than 1 hour 3,332 4. Flared or vented greater than 1 hour Su lemental r rt r uired-see 20 AAC 25.235 0 J. Pilot and Purge 8,746 b. Used for lease operations 113,176 7. *Other (Shrinkage) 18,000 TOTAL items 1-7 2,854,680 8. NCiLgas equivalent produced 0 9. Purchasedgas 0 10. Transferred from: 0 11. '1'ransferredto:'1'BYN COV's to TBPF 184,132 877 Remarks: ere y cert ~ t t e rego~~m~~ ~ true an correct tote est o my now a ge. Signature: ` ` ~ ~;~~~ 'Title: Acct. Supervisor llate: 14-Oct-99 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.27% GGS 520550 99.17% Ci 'Lone 520150 0.42% W/F 520190 0.14% Undefined 'Gone 520195 0.00% Note: All volumes must be corrected to ppressure of 14.65 Asia and to a tem erature of 60 degrees F. Report due, by the 20th ofpthe month followmg the month of disposition. Authorit 2U AAC 25.1.35. Form 10-422 Rev 4/95 rip ..,. ,.. ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION y a r, ,-. r 3 tl; :~ . ~, r"i. ~ r i ° {( [ [ g....~µ~ ~ ~S 4:L L :i? (f4j iJ 0) ;i~tl~iN}~j4w%; Facility Operator Field(s) Month/Year of Disposition ~' Steelhead Platform - TBU Unocal Tradin Ba Unit October 1999 Disposition Total Volumes MCF 1. Sold 5,455,551 2. Reinjected p 3. Flared or vented less than 1 hour 1,416 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 10,564 5. Pilot and Purge 11,026 6. Used for lease operations 174,720 7. *Other (Shrinkage) 18,600 TOTAL items 1-7 5,671,877 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: TBPF COV's to TBPF 186,757 2,071 Remarks: ere y certi at a or oing(( h~is true an correct to Signature: - -~~ '~ ~ ~. ~ i~~ a est o my owe ge. Title: Acct. Suner. Date: 17-Nov-99 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.46 GGS 520550 99.27 G Zone .520150 0.22 W/F 520190 0.05 % Undefined Zone 520195 0.00 Official Use Only -Flaring Authorization. > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authori 20 AAC 25.235. Form 10-422 Rev. 4/95 STEELHEAD PLATFORM EXCESS FLARE LOG Oct-99 Date 8 Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equip.Dwn ID Number 10/12/99 2000 10/12!99 2400 459 Unplanned M-25 & 29 were shut in for wireline work operational Well maintwireline work Choked wells to and when we brought them back on they control the heads headed for 3 hours before smoothing out 10/17/99 0300 10/17-99 2300 300 Unplanned Perforated M-29. Had to flow it after each operational Well mainUwireline work Perforating complete shot. The well heads under those conditions 10!19/99 0300 10/19/99 1845 174 Unplanned Perforated M-29. Had to flow it after each operational Well mainUwireline work Perforating complete shot. The well heads under those conditions 10/22!99 0500 10/22/99 2330 9631 Planned C-20 DOWN FOR 8000 HR INSP.B MAINT Operational Annual PM Inspect and repair ;~ _ ; ~ ,. ~~ i° i ,. ., .y RE: July flaring questions Subject: RE: July flaring questions Date: Fri, 1 Oct 1999 11:02:39 -0700 From: "Bounds, Janet G" <boundsj@unocal.com> To: ""Wendy Mahan' (AOGCC)"' <Wendy_Mahan@admin.state.ak.us> CC: "Myers, Chris S" <myersc@Orion.Unocal.com>, "Helton, Carl D (Doc)" <heltonc@Orion.Unocal.com>, "Santiago, Johnny T" <santiagoj@Orion.Unocal.com>, "Helton, Carl D (Doc)" <heltonc@Orion.Unocal.com>, "Ross, Gary D" <rossgd@Orion.Unocal.com>, "Rhodes, Dustin J" <rhodedj@Orion.Unocal.com> > Wendy: > Below are responses to your questions regarding flare events in July. > Trading Bay Production Facility > * Pipeline pigs are shipped from Grayling as often as necessary to > maintain clean lines. Grayling gas line pigs are usually shipped once per > month. The Grayling gas pigs shipped on July 2 and 30, 1999 were four > weeks apart. > * The pig shipped on July 30, 1999 was part of the procedure to clean > out the line prior to the gas riser inspection and modification. > Granite Point Platform > * On July 5, 6, and 7, 1999 well work included replacing all of the > gas lift valves in GP-50 and 2 gas lift valves in GP 11-13. > * On July 14 and 16, 1999 two valves suspected of leaking were > replaced in GP-50 and a gas lift valve was replaced in well GP 31-14. A > gas survey was also completed. > Steelhead > * Adjusting the seal gas regulator did not break the seal. The seals > were worn out to the point that adjusting the regulator did not stop the > leaking; therefore, the seals were replaced. Please let me know if you need more information. Janet G. Bounds Environmental Scientist Unocal (907) 263-7694 (office) (907) 263-7901 (fax) 1 of 1 12/22/99 8:40 AM ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER' S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Steelhead Platform - TBU Unocal Tradin Ba Unit November 1999 Disposition Total Volumes MCF 1. Sold 5,455,551 2. Reinjected 0 3. Flared or vented less than 1 hour 528 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 5,183 5. Pilot and Purge 9,919 6. Used for lease operations 182,594 7. *Other (Shrinkage) 18,000 TOTAL items 1-7 5,671,775 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: TBPF COV's to TBPF 172,933 1,527 Remarks: I ere y certi at a oregomg is true an correct to \ /I r Signature: L ~~ - 11~,L~ ~ a est o my owe ge. Title: Acct. Super. Date: 20-Dec-99 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.48 GGS 520550 99.37 G Zone 520150 0.12% W/F 520190 0.03 Undefined Zone 520195 0.00% Official Use Only -Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authori 20 AAC 25.235. Form 10-422 Rev. 4/95 -, STEELHEAD PLATFORM EXCESS FLARE LOG Nov-99 ~~,`. ~s~ Date 8 Time Event Began Date & Time Event Ended Event Gas MCF Planned or Unplanned Description of Incident Operational or Safety Reason Actions Taken Equ' wn ID Nu 11/8 0800hrs 11/8 / 1650 hrs 2269 Planned UNLOADING M-4 TO FLARE Operational Unload well of fluid Completed work M-4 11/10 1000hrs 11/10 1400hrs 365 Ptanned COMPRESSORS SLOWDOWN Operational Upgrade Platform Completed work N/A Control System, 11/23 0700 hrs 11/23 1900 hrs 2552 Planned UNLOADING M-4 TO FLARE Operational Unload well of fluid Completed work M-4 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER' S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Steelhead Platform - TBU Unocal Tradin Ba Unit December 1999 Disposition Total Volumes MCF 1. Sold 5,659,057 2. Reinjected 0 3. Flared or vented less than 1 hour 201 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 9,777 6. Used for lease operations 190,420 7. *Other (Shrinkage) 18,600 TOTAL items 1-7 5,878,055 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 ' 11. Transferred to: TBPF COV's to TBPF 32,739 ~~ 2,109 Remarks: I ere y certi /at a oregomg is true an correct to Signature: ,~:~. (` ; ~,~ a est o my owe ge. Title: Acct. Suner. Date: 21-Jan-00 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 0.46 GGS 520550 99.40 G Zone 520150 0.11 % W/F 520190 0.03 Undefined Zone 520195 0.00 Official Use Only - .Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authori 20 AAC 25.235. Form 10-422 Rev. 4/95