lOjan95
LOCATION CLEARANCE REPORT
·
State of Alaska
OIL AND GAS CONSERVATION COMMISSION
Memorandum To File: API NO.
spud~Y~ ¢} TD: 1¢~~ , Completed
No%e casing size, wt, depth, ~t vol, & procedure.
Sf~ Csg: ~ .~ ~~ /
Liner: ~
Perf inte~als - tops~~/ ~
Review the well file, and comment on plugging, well head
status, and location clearance - provide loc. clear, code.
'
Well head cut off: ~_~
Marker post or plate.' ~~
Location Clearance:
ALASKA OIL AND GAS
CONSERVATION COMMISSION
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 278-7542
July 26, 1994
Mark H Wittow
Preston Gates & Ellis
420 L St Ste 400
Anchorage, AK 99501-1937
Re: Z-Energy Spacing Exception Request
Dear Mr Wittow:
In the course of its deliberations in the above-referenced matter, the Commission has found it helpful
to refer to its public files of well records and production records relating to the Beluga River field and
surrounding areas. This letter is to ensure that you are aware that the Commission takes official
notice of the contents of these public well files:
Beluga River Unit 212-35 Beluga River Unit
Beluga River Unit 212-25 Beluga River Unit
Beluga River Unit 232-04 Beluga River Unit
Beluga River Unit 233-27 Beluga River Unit
a~li '~ ~ ~::'~!i ~'~ ~ River Unit
Beluga
Beluga River Unit 244-04
Beluga River Unit 212-24
Beluga River Unit 241-34
Beluga River Unit 224-13
Beluga River Unit 212-18
Beluga River Unit 221-23
Beluga River Unit
Beluga River Unit
Beluga River Unit
Burglin
Pretty Creek Unit
214-35
232-09
224-23
232-26
BRWD-1
211-03
224-34
214-26
X33-12
#1
Data specifically referenced in the files included open hole well logs, completion information,
including perforation intervals and production data.
If you wish to rebut any of the material in these files, please notify the Commission no later than
August 8, 1994. Such notification should include a statement of whether you wish to submit a
rebuttal in writing or at an oral headng and, if the latter, the reasons you believe a written submission
would be insufficient.
Chairman
jo/rpc~-energy
CX::~ p~inted on recycled paper
ALASKA OIL AND GAS
CONSERVATION COMMISSION
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
July 26, 1994
D A Grove, BRU/Kup Staff Mgr
ARCO Alaska Inc
P O Box 100360
Anchorage, AK 99510-0360
Re: Z-Energy Spacing Exception Request
Dear Ms Grove:
In the course of its deliberations in the above-referenced matter, the Commission has found it helpful
to refer to its public files of well records and production records relating to the Beluga River field and
surrounding areas. This letter is to ensure that you are aware that the Commission takes official
notice of the contents of these public well files:
Beluga River Unit 212-35 Beluga River Unit 214-35
Beluga River Unit 212-25 Beluga River Unit 232-09
Beluga River Unit 232-04 Beluga River Unit 224-23
Beluga River Unit 233-27 Beluga River Unit 232-26
Beluga River Unit 14-19 Beluga River Unit BRWD-1
Beluga River Unit 244-04 Beluga River Unit 211-03
Beluga River Unit 212-24 Beluga River Unit 224-34
Beluga River Unit 241-34 Beluga River Unit 214-26
Beluga River Unit 224-13 Burglin X33-12
Beluga River Unit 212-18 Pretty Creek Unit #1
Beluga River Unit 221-23
Data specifically referenced in the files included open hole well logs, completion information,
including perforation intervals and production data.
If you wish to rebut any of the material in these files, please notify the Commission no later than
August 8, 1994. Such notification should include a statement of whether you wish to submit a
rebuttal in writing or at an oral hearing and, if the latter, the reasons you believe a written submission
would be insufficient.
Chairman ~
jo/rpc~z-energy
r~'_~,~ printed on recycled p~,p(,¢ h y C;. ~;
ALASKA OIL AND GAS
CONSERVATION COMMISSION
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
July 26, 1994
Rosanne M Jacobsen, Atty
ARCO Alaska Inc
P O Box 100360
Anchorage, AK 99510-0360
Re: Z-Energy Spacing Exception Request
Dear Ms Jacobsen:
In the course of its deliberations in the above-referenced matter, the Commission has found it helpful
to refer to its public files of well records and production records relating to the Beluga River field and
surrounding areas. This letter is to ensure that you are aware that the Commission takes official
notice of the contents of these public well files:
Beluga River Unit 212-35 Beluga River Unit 214-35
Beluga River Unit 212-25 Beluga River Unit 232-09
Beluga River Unit 232-04 Beluga River Unit 224-23
Beluga River Unit 233-27 Beluga River Unit 232-26
Beluga RiverUnit 14-19 Beluga River Unit BRWD-1
Beluga River Unit 244-04 Beluga River Unit 211-03
Beluga River Unit 212-24 Beluga River Unit 224-34
Beluga River Unit 241-34 Beluga River Unit 214-26
Beluga River Unit 224-13 Burglin X33-12
Beluga River Unit 212-18 Pretty Creek Unit #1
Beluga River Unit' 221-23
Data specifically referenced in the files included open hole well logs, completion information,
including perforation intervals and production data.
If you wish to rebut any of the matedal in these files, please notify the Commission no later than
August 8, 1994. Such notification should include a statement of whether you wish to submit a
rebuttal in writing or at an oral hearing and, if the latter, the reasons you believe a written submission
would be insufficient.
_D.av!d W Johnston \ .-'" ~
Chairman
\ I
jo/rpc~z-energy
~ printed on ~ecycled pape~ h y {;. ~}
ALASKA OIL AND GAS
CONSERVATION COMMISSION
WALTEFI J. HICKEL, GOVERNOFI
~..
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
July 26, 1994
Paul Craig, President
Z-Energy Inc
2900 Boniface Pkwy ~10
Anchorage, AK 99504-3132
Re: Z-Energy Spacing Exception Request
Dear Mr Craig:
In the course of its deliberations in the above-referenced matter, the Commission has found it helpful
to refer to its public files of well records and production records relating to the Beluga River field and
surrounding areas. This letter is to ensure that you are aware that the Commission takes official
notice of the contents of these public well files:
Beluga River Unit 212-35 Beluga River Unit 214-35
Beluga River Unit 212-25 Beluga River Unit 232-09
Beluga River Unit 232-04 Beluga River Unit 224-23
Beluga River Unit 233-27 Beluga River Unit 232-26
Beluga River Unit 14-19 Beluga River Unit BRWD-1
Beluga River Unit 244-04 Beluga River Unit 211-03
Beluga River Unit 212-24 Beluga River Unit 224-34
Beluga River Unit 241-34 Beluga River Unit 214-26
Beluga River Unit 224-13 Burglin X33-12
Beluga River Unit 212-18 Pretty Creek Unit #1
Beluga River Unit 221-23
Data specifically referenced in the files included open h01e well logs, completion information,
including perforation intervals and production data.
If you wish to rebut any of the matedal in these files, please notify the Commission no later than
August 8, 1994. Such notification should include a statement of whether you wish to submit a
rebuttal in wdting or at an oral headng and, if the latter, the reasons you believe a written submission
Chairman ~
jo/rpc~z-energy
P. O. BOX 7-839 ° ANCHORAGE ° ALASKA
EXPLORATION DEPARTMENT
ANCHORAGE DISTRICT
E. $. PARKER
DISTRICT SUPERINTENDENT
July t0, 1964
State of Alaska
Department of Natural Resources
800 "L" Street
Anchorage, Alaska
Attention Mr. Thomas R. Marshall, Jr.
Dear Sir:
Enclosed are the following for the Standard Oil Company
of California, Operator, ~well:
i. One sepia and one blue!ine of the Induction-
Electrical Survey~ scale 1" = 50'
2. One sepia and one blueline of the Lithology
Log
3. $ne copy of Completion Report
Please consider this information confidential and hold in
this statuM for the prescribed two-year period.
Very truly yours,
E. S. Parker...~
A~S: eag
Enel.
EXPLORATION DEPARTMENT
ANCHORAGE DISTRICT
E. $. PARKER
DISTRICT SUPERINTENDENT
P. O. BOX 7-839 · ANCHORAGE ' ALASKA
July 10, 1964
State of Alaska
Department of Natural Resources
800 "L" Street
Anchorage~ Alaska
RE, CEIV[D
jUL
"-'N MIblES & M~F4ERALS
DIV iai,,--,' OF
ANCHORAGE
Attention Mr. Thomas R. Marshall, Jr.
Dear Sir:
With reference to a telephone conversation between
Mr. A. B. Scouler and ~. T. R. Marshall on July 9¢
a complete suite of ditch samples for the Standard
Oil Company of California, Operator¢~well
was delivered this date to the American Stratigraphic
Company per your request.
Please hold this information confidential for the
prescribed two-year period.
Very truly yours,
ABS: cag
,/
..-
PRODUCING DEPARTMENT
TELEPHONE BR. 7--6='01
C. V. CHAT-rERTON
DISTRICT ~U PERINTENDENT
P. O. BOX 7-839 ~ ° ANCH'ORAGE ° ALASKA
DIVISION OF MiNF-.S
ANCHORAGE
~:- : ~ease Date
ii State of Alaska
Depar~nt of Natural Resources
DIVISION OF MINES AND MINERALS
Petroleum Branch
6-15-66
_
INDIVIDUAL W~LL RECORD
R,
~&~L__ Meridian
Permit No..
Operator.' Standard Oil Co. of calZ~Ocation
Lease No. A-029658
or Owner ~ae!~_~a River UniC ___ LOC. (Bottom) .
Well No. .... 14-19 _ Area Belu~s._River ~.
Spud Date.. 12-28-63 _ Drilling ceased
Suspended Abandoned._. 5-15-64
Issued 11-29-63_
(Surface) .... 661' _FST. & 661' F~L. Sec. !9
Total Depth. 14,948'
26'- Grd.
Elevation , . 26' E; i;
Completed (F-GL-P) IP
B/D, Gray
API Cut ...... ._ %
Gas MCF/D, Bean ~ /64
Casing: Size Depth Sx Cmt Perf =
CP psi,
22~ 209' /+20
TP ..... ._ psi
PI,ugs-' 8752'-8591' w/ 140
~ 120'_,surf. w/ 60,.$x
16" ...... 2551 ' 2800
500 @ shoe
_LD_3/A!L ~ _5.olgD.V__col. 4464'
GEOLOGIC FORMATIONS
Surface LOwest Tested,
.-~ _. .... ._ . , . _ .~ - ~
PRODUCTIVE HORIZONS
Name- Depth Contents
..
Jan Feb Mar ..... Apr
WE_LL STATUS
May June July Aug Sept Oct Nov Dec
Remarks =
. Rowan Drilling ,.Company_
K.B..Co Cop of casinR 23.21'
CO~I~ION REPORT - NEW WELL
STANDARD OIL COMPANY OF CALIFORNIA - WESTE~ OPE~C~TIONS; INC. -. 0..1~
AREA: Cook Inlet, Alaska
PROPERTY: Beluga River Unit
LAND OFFICE: Anchore~e
LEASE NOS: A-029658
WELL NO: BRU 14-19 Section 19, T. 13 N., R. 9 W., Seward B & M
LOCATION: Surface: 661' N & 661' E from Southwest Corner of Section T. 13 N., R. 9 W., Seward B & M.
ELEVATION: 46' K. B.
DATE: June 10, 1964
BY:
/ .h- . ~. ,' '----~¢---~- -..
~. ..... . ,~ ,% .~'/..' :...,.,.,~,/.
C. V. CHATTERTON, District ~uPe~int~t
i i 1
DRIT.f.w.D BY: Rowmn Drilling Company, Rig
DATE CO~ENCED DRILLING:' December 28, 1963
DATE C0~PLETED DRILLING: ~ay 15, 1964
DATE OF INITIAL PRODUCTION: None. Well plugged and abandoned
TOTAL DEPTH: 14,948'
JUNK: None
22" cemented at 209 '
16" cemented at 2551'
l0 3/4" cemented at 8635'
PLUGS: 0-120 '
8581'-8752'
Page 2
PERFORATIONS: None
WELL SURVEYS:
1. Schlumberger Induction-Electrical Log, Interval 209' - 14,914'
2. Schlumberger Microlog- Caliper, Interval 209' - 14,914'
3. Schlumberger Sonic Log - Gamma Ray, Interval 209' - 14,914'
4. Schlumberger Dual Induction-Laterolog, Interval 2551' - 14,914'
5- Schlumberger Formation Density Log, Interval 2551' - 5619 ' (Failed
~ 6. Schlumberger Continuous Dipmeter, Interval 2551' - 14,914'
7. Schlumberger Cement Bond LOg, Interval Surface 2551'
SIDEWALL SAMPLES: 6776' - 8630' (Recovered 16 samples)
8860' - 11255' (Recovered 30 samples)
11442' - 12630' (Recovered 37 samples)
DRILL STEM TESTS: None
BELUGA RIVER UNIT 14-19
Section 19~ T. 13 N.~..R. 9 W'~ Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA - W.O.I. - OPERATOR
Page 3
December.28~ 1963
Spudded at 11:00 A.M. 12-28-63. Drilled 14 3/4" hole to 215'. Opened
hole to 26" to 185'.
December 29~ 1~6~ 72 pcf mud
Opened hole to 26" to 215'. Ran and cemented 22", 100.75~ Grade B casing.
CEMENTING DETAIL
Cemented 22" casing at 209' in one stage with 420 sacks of neat Class "A"
cement, using Halliburton power equipment. Used displacement method.
Cemented around shoe with 420 sacks of cement. Pumped 20 bbls. of water
ahead, mixed 420 sacks of cement in 35 rains, using Halliburton truck,
displace~ with 10 bbls. water in 5 mins using Halliburton pumps. Average
slurry weight ll7~.
Note: Had full circulation throughout job and good cement returns to sur-
face.
December 30; 1963
Cut off 22" casing and welded on 22" x 20" flange. Installed 20" BOPE.
December 31~ 1963
Tested BOPE with 350 psi. OK. (Test witnessed by drilling foreman. )
Drilled out cement and shoe 191'-215' and drilled to 220' with 20" hole
opener and 14 3/4" pilot bit. Drilled 14 3/4" hole to 352'.
January 1, 1964
Drilled 14 3/4" hole to 1283'.
January 2~ .1964
72-73 pcf mud
Drilled 14 3/4" hole to 1974'
January 3~ 1964
71-72 pcf mud
Drilled 14 3/4" hole to 2500'. Conditioned hole for logs. 72-74 pcf mud
January 4~ 1964
Ran Schlumberger Induction-Electrical Log, Sonic Log-Gamma Ray, and Micro-
log 2500 ' -208' .
Drilled 14 3/4" hole to 2550'. Ran 20" reamer and 14 3/4" pilot bit and
opened hole to 414'.
72-73 pcf mud
BELUGA RIVER UNIT 14-19
Section 19~ T. 13 N.~ R. 9 W.~ Sewar..d' B & M
STANDARD 0IL COMPANY OF CALIFORNIA - W.O.I. - OPERATOR
Page 4
January 5,. 1964
While opening hole at 2505', 4½" D.P. backed off at tool joint, leaving
1751' of drilling assembly in hole. Ran 8 1/8" O.D. socket to 815' with-
out locating fish. R~n 9 7/8" Baash Ross socket with ll½" guide to top
of fish at 759' and worked over fish to 763'. Engaged fish and recovered
same. (8 hours lost time.) Ran 20" H.O. and 14 3/4" pilot bit and opened
hole to 2508'.
January 6~ 19~64
Opened hole to 20" to 2550'. Circulated and conditioned mud.
January 7~ 1964
Ran 16" casing.
CEMENTING DETAIL
Cemented 16" casing at 2551' in one stage with 2800 sacks of cement, using
Halliburton power equipment. Used one top rubber plug.
1st Stage around shoe with 2800 sacks of cement. Pumped 40 bbls. of water
ahead, mixed 2800 sacks of cement in 2hr. 15 mins. using Halliburton skid
unit, displaced in 35 mins. using rig pumps. Average slurry weight lll-
ll3~ first 2100 sacks and ll6-117# last 700 sacks. Bumped plug with 1200
psi. Good circulation except during middle of displacement. Had partial
circulation for about l0 mins. and estimate 145 bbls. mud lost to forma-
tion. Cement in place at 7:00 P.M. 1-7-64. Hookload weight of casing:
before cementing 178,000~
after cementing before landing casing 172,000~
at time of landing casing 162,000~
Note: Casing reciprocated during cementing operations. No cement to surface.
CASING DETAIL
Above K.B. 4.23'
Landing joint 27.62'
K.B. to top of casing 23,39'
23 joints 16", 84~, J-55, 8R Rg 2 731.65'
57 Joints 16", 75~, J-55, 8R Rg 2
incl. Halliburton guide shoe and float collar _1,795.96'
Casing cemented at ..... 2,551.00'
K.B. Depth
23.39'
755.04'
2,551.00'
January 8~ 1964
Landed 16" casing. Welded on 16" KD head on 16" casing.
CEMENTING DETAIL -- "Top Job"
Cemented 16" x 22" annulus with cement as follows:
l) Ran 303' of l" line pipe from surface down into 16" x 22" annulus and
16" x 20" hole to 300'. No trouble running pipe.
BELUGA RIVER UNIT=~-" 19
Section 19, T. 1...3 .N., R. 9 ~W~.~ ..~S~.w. ard.B & M
STANDARD OIL COMPANY OF CALIFORNIA - W.O.I. - OPERATOR
Page 5
Jan. 8 continued
~) ' ~Ump'e~ clear fresh water down l" pipe, using Halliburton equipment.
Pumped unti 1 clear water returns were noted at surface. Pumped 60
bbls. water. Alkalinity tests of displaced mud and fresh water
returns indicated no cement contamination 'to 300'.
3) Mixed and pumped 340 sacks Class "A" cement down 1" pipe, using Halli-
burton equipment. Good circulation throughout Job and cement returns
to surface.
4) Cement in place at 1:30 A.M. 1-8-64
January 9, 1~64
Tested KD head with 3000 psi for 15 mins. OK. Cemented around casing
· 4½" drill
with 24 sacks cement Installed BOPE and tested blind rams,
pipe rams, Kelly Kock and 2" plug valve at well head with 2000 psi. OK.
Tested Hydril Bag, would not hold.
January_ 10, 1964
Ran to 2505' and circulated. Stood cemented and waited on replacement
part for Hydril.
JanuarY ll, 1964
Installed replacement part in Hydril and tested same to 2000 psi. OK.
Circulated and conditioned mud. Drilled out cement and shoe to 2555.'..
67-70 pcf mud
January 12 - J~anuary 1_6.~ .1964
Drilled 14 3/4" Hole to 5638'.
75-78 pcf mud
January~ 17, 1964
Circulated and conditioned mud. Ran following Schlumberger logs:
Induction-Electrical 2551'-5634'
Dual Induction-Laterolog 2551'-5615'
Microlog-Caliper 2551' -5618'
Sonic log- Gamma Ray 2551'-5621'
Continuous Dipmeter 2551'-5613'
Formation~ Density Failed
78 pcf mud
January
Ran Cement Bond Log. Tool failed. Reduced hole size at 5638'. Drilled
13 3/4" hole to 5905'.
77 pcf mud
January 19..-.February 2~ 1_.964
Drilled 13 3/4" hole to 8604'.
78-80 pcf mud
Februar~ 3, 1964
Drilled 13 3/4" hole to 8634'. Circulated and pulled out. Ran ~chlumberger
Dual Induction--Laterolog, Induction Electrical, and Sonic Log - Gamma ~ay
and Microlog 8634'-5615'. 79.5 pcf mud
BELUGA RIVER UNIT i ~19 ~
Section 19~ T. 13 1t.~. R. 9 W.~ Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA - W.O.I. - OPERATOR
Page 6
February 4, lp64
Conditioned hole. Ran Continuous Dipmeter 8628'-5613' and Cement Bond
Log 2551' -20'. Took Sidewall Samples at 8630', 8618', 8605 ', 8599',
8588', 8474', 8444', 8425', 8412', 8380', 8370', 8196', 8192', 6786',
6783', and 6776'. Attempted 19 samples, recovered 16.
February 5..--, 6, 1~964
~onditioned hole for 10 3/4" casing. Ran 10 3/4" casing.
CEMENTING DETAIL
Cemented 10 3/4" casing at 8634' in two stages with 1000 sacks of cement
(bottom 500 sacks treated with 0.5% HR-4) using Halliburton power equip-
ment. Used one top rubber plug.
~.s.t .Stage around shoe with 500 sacks of cement. Pumped 40 bbls. of water
ahead, mixed 500 sacks of cement in 30 mins. using Halliburton truck, dis-
placed in 52 mins. using rig pumps. Average slurry weight llT~. Bumped
plug with 2000 psi, Full circulation.
2nd Sta~e through DV at 4466'. Dropped DV bomb, opened DV ports in 35
mins. Pumped 40 bbls. of water ahead, mixed 500 sacks of cement in 25
mins. using Halliburton truck, displaced in 27 mins. using rig pumps.
Average slurry weight ll7#. Closed DV ports with 2500 psi. Full circu-
lation. Cement in place at 4:30 P.M. 2-6-64
Hookload weight of casing .
before cementing 398,000~
after cementing before landing 392,000~
at time of landing casing 392,000~.
CASING DETAIL
Above K.B.
Cut and recovered (1 jt. + 6.29')
K.B. to top of casing
9 Joints 10 3/4", 55.5~, P-110, SdR, R3
104 joints 10 3/4", 51~, P-110, SdR, R3
DV collar
17 Joints 10 3/4", 51~, P-110, SdR, R3
87 joints 10 3/4" 55.5#, P-il0, SdR, R3
K.B. Depth
- 20.43' 23.21'
23.21' 23.21'
356.53' 379.74'
4,086.59' 4,466.33'
± 4.00' 4,470.3~'
688.0 3' 5,158.36'
incl. Halliburton conventional float shoe 3,477.30'
Casing landed at (casing measurement) 8,635.66'
8,635.66'
February.7: z, 964
Landed casing and removed 16" BOPE. Installed 10" series 1500 BOPE.
Tested secondary packoff with 3500~. OK.
February.. 8, %964
Tested BOPE and l0 3/4" casing to DV with 5000~. OK. Drilled out DV
collar.
BELUGA RIVER UNIT i~ z9
Section 19, T. 13 N.~ R. 9 W:! Seward B & M
STANDARD 0IL COMPANY OF CALIFORNIA, W.0.I.
OPERATOR
Page 7
February .9, 1~64
Tested DV and tested with 5000~ for 15 mins. O.K.. Drilled out baffle
plate, cement, and shoe and drilled 9 5/8" hole to 8700'.
February lO-March 1, 1964
Drilled 9 5/8" hole to 11,267'.
88-90 pcf mud
March 2, 1964
Ran Dual Induction-Laterolog 11271'-8636', Gamma Ray--Sonic log 11270'-9900'.
Conditioned hole. Reran Gamma R~y-Sonic Log 11270'-86B0'. Ran Induction-
Electrical Log 11272'-8640' and Continuous Dipmeter 11270'-8640'.
91-92 pcf mud
March 3, 1964
Took sidewall samples 8860'8954;9095;9125;9137;9233;924o;9370;9380;9534;9539;
9925; 9970; 9975; loo4o; 10044; lO114; 10124; 10355; 10360; 10585; 10590; 10685; 10671
10730;11075;11080;11207;11251;11255. Drilled 9 5/8" hole to 11344'
,,March 4-..16~ 1964
Drilled 9 5/8" hole to 12,613'.
91-92 pcf mud
92-109 pcf mud
March 17, 1964
Cored 8 1/2" hole 12613-12628'. 15' cored. Core ~1 12613'-12628'. Cut
15', recovered 4'.
107-110 pQf mud
March 18~ 1964
Ran I.E.S. Log 12633'-11275'; Induction-Laterolog 12630'-8636'; Sonlc-Gemm~
Ray 12633'-11270'; Micro LOg 12630'-8636'. Opened 8 1/2" hole to 9 5/8",
12613'-12628'. Condition hole for logs.
108-109 pcf mud
Mar ch 19~ 1964
Reran Induction-Electrical log 11275'-12631', and Sonic-GemmaR~ Log
11270'-12628'. Circulated and conditioned hole.
BELUGA RIVER UNIT 1~. _9
Section 19~ T. 13 N.~ R. 9 .W..; Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA, W.O.I. -
OPERATOR
Page 8
March 20~ 1964
Ran Continuous Dipmeter 12630'-11270'. Ran 3 Sidewall S~mple Guns.
Gun#l: Recovered 3 cores at 12630', 12575' and 12392', two broken at 12618'
and 12590'.
Gun~: Recovered 9 cores at 12556' 12310' 12~05' 12274' 12268' 1~262'
12257' 12207' and 12184'
, ·
Gun#B: Recovered 25 cores at 12397', 12~94', 12365', 12345', 12~BO', 12065'
11992', 11970', 11960', 11955', 118~2', 11824', 11755'
11620' ll610' 11565' 11559' 11554' 11522' 11485'
Attempted a total of 48 samples recovered 37.
, 11645' 11635' l162R'
, 11465 ' and 11442'.
Lost 5 sidewall containers in hole. Drilled 9 5/8" hole to 12665'.
104-107 pcf mud
March 21, 1964
Reamed 12615'-12665'. Drilled 9 5/8" hole to 12666'. Lost 3 cones and bear-
ings of bit ~66 when drilling on junk from sidewall sample gun. Picked up
7 3/4" magnet.
107-109 pcf mud
.Marc~.22~ 1964
Trip in with Brown Oil Tool reverse circulating magnet. Recovered 3 bearings
and small pieces of sidewall samples container. Ban in with bit and Reed Junk
Basket, reamed to bottom and drilled on junk. Recovered sm~ll pieces of iron.
Ran in with drill collars and checked circulation through magnet. Would not
circulate properly. Ran bit and junk basket.
108pcf mud
March 23~ 1964
Drilled on junk. Recovered 60~ of junk from Junk sub.
K & G Magnet. Recovered l~bearings and small pieces.
bearing basket. Drilled 9 5/8" hole to 1~669'.
Trip in with 9"
Ran in with bit and
103-109.5 pcf mud
.Ma~ch 24, 1964
Recovered i lb. of junk and bearings in bearing basket.
to 12697' ·
Drilled 9 5/8" hole
lO7-110 pcf mud
Ma.rch .25-26~ 1964
Drilled 9 5/8" hole to 12,858'
107-110 pcf mud
BELUGA RIVER UNIT
Section 19, T~_._13_ N., R. 9 w., Seward B & M
STANDARD 0IL COMPANY OF CALIFORNIA, W.O.I., OPERATOR
Page
March
Drilled 9 5/8" hole to 12,970'. Earthquake at 5:40 P.M.. Drill pipe
swarmed in derrick and muffler parted on ~ engine. No injuries or
other damage. Received tidal wave warning and moved crews to camp.
109-109.5 pcf mud
March ~,8~ 1964
Repair exhaust. Rechecked substructure and derrick for damage; none found.
Trip in hole - O.K. Circulated out and checked mud 3 hrs., O.K.. Resumed
drilling 12:30 P.M., 3/28/64. Drilled 9 5/8" hole to 13,047'.
107-109.5 pcf mud
March 29, 1964
Drilled 9 5/8" hole tO 13,214'.
108-110 pcf mud
March 30~ 1964
Drilled 9 5/8" hole to 13,230'. Pipe stuck at 13,125' at 11:30 P.M..
lO7-110 pcf mud
March 31~..1964
Worked stuck pipe. Bit at 13,125,. Top drill collar at 12,551'. Mixed
gel pill and pumped around.
lO?-109 pcf mud
A~ril. 1~ 1964
Work stuck pipe. Ran Ford Alexander Free Point Indicator and string shot.
Pipe partially stuck at 10,100. Backed off at 10,086. Recovered 108 stands
4 1/2" D.P.. 2028.61' of drilling assembly, left in hole. Top of fish
10086.39. Picked up 9-6" Drill Collars, 4 Driltrols, 2 X-Over, bit subs and
bumper sub. Start in hole.
108-112 pcf mud
BELUGA RIVER UNIT ~14-19
Section 19~ T. l~ N., R. ~...W.I Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA~ W.O.I. - OPERATOR
Page l0
Ap.ril 2 ~ 1964
Flniched trip in hole. Circulated and c~nditioned hole.. Stood back wash
pipe and picked up fishing tools. Screwed into 4 1/2" drill pipe at 10087'.
Ran Free Point Indicator and string shot.
112-113 pcf mud
April 3, 1964
Ran Free Point Indicator and string shot. Backed off at 10429. Recovered
ll its. (342') 4 1/2" drill pipe. Ran 8 1/8" wash pipe to 10429. Trip
out and ran 9 5/8" bit, Reamed 10280 10429'. Conditioned hole for wash
pipe.
ll2 pcf mud
April 4 ~ 1964'
Ran wash pipe and washed over from 10429' to 10652'. Pulled wash
pipe and ran in open ended and screwed into fish at 10429'.. W~rked .'
fish loose and recovered all of fish. Laid down wash pipe and fishing
tools. Ran new bit.
April 5- 15, 1964
Drilled 9 5/8" hole to 13,862'.
112 pcf mud
109-113 pcf mud
April 16~ 1964
Drilled 9 5/8" hole to 13~911'. Conditioned hole for Core ~2. Co~ed 8 1/2" hole
13,911-13,917'.
lll-ll3 pcf mud
April 17~ 1964
Cored 8 1/2" hoZe to 13931' Core ~2: 13931' Cut and recovered 20'
· ~ ·
Ran Schlumberger Inductio~.Electrical~Log 13936'-12633'. Dual Inductloa-
Laterolog 13936'-12633' ~nd Microlog Caliper 13937'-12633'.
111-112 pcf mud
BELUGA
Section l~ T l~ N., R 9 W Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA, W. 0. I. - OPERATOR
Page 11
April 18~ 1~64
Opened 8 1/2" hole to 9 5/8" to 13931'. Conditioned hole. Attempted to
run Sonic Log-Gamma Ray. Tool stopped at 12,400'. Ran in with Dipmeter.
ill-ill.5 pcf mud
April 19~' 1964
Dipmeter tools ztopped at 13,970'. Attempted to pull out, but found tool
stuck. Pulled loose and restuck at 13,820'. Worked loose and pulled out.
R¢~med 9 5/8" hole 13982'-13990'. Drilled 9 5/8" hole to 14018'.
April 19-24, 1964
Drilled 9 5/8" hole to 14,336'.
109-112 pcf mud
111-112 pcf mud
April 25, 1964
Drilled 9 5/8" hole to 14,374'. Lost bearings from one cone in hole.
109-112 pcf mud
April 26~ 1964
Recovered 4 bearings in Junksub. Drilled 9 5/8" hole to 14422'.
llO-112 pcf mud
April 27- May 6~ 1~64
Drilled 9 5/8" hole to 14,938'.
ll0-115 pcf mud
May 3, 1964
Stuck at 14925', while running new bit. Worked pipe. R~n Ford Alexander
Free Point and back off shot. Pipe stuck at 10455. Backed off at 10424 and
recovered lll stands and double of 4 1/2" drill pipe, leaving 4501' of
drilling assembly in hole. Ran 9 5/8" bit and condi{ioned hole to top of fish
at 10424'. Pulled and made up 8 1/8".wash pipe.
110-113 pcf mud
BELUGA RIVE~ UNIT ~14-19
Section 19, T. 13 N.~ R. ~ W.~ Seward B & M
STANDARD OIL CO~PANY OF CALIFORNIA, W. O. I. - OPERATOR
Page 12
Ran 9 Joints of 8 1/2" wash pipe with 8 5/8" shoe, Bowen Jars, 9 drill collar~,
7 Driltrols and Bumper subs. Washover 10424'-10461'. Fish fell 13'
to bottom. Top of fish at 10437'. Pull out, stood back wash pipe.
Ran 20" B~m~per sub, Jars, 9 Drill Collars, 3 Drittrols~ bum~er sub and x-over
sub to screw into fish. Eagaged fish and p~lled out. .
May 9.1 1~64
113-114 pcf mud
Recovered fish. Laiddown fishing string. Laid down and replaced 19 bent
Joints of drill pipe. Ran 9 5/8" bit and reamed and wiped hole at 9787';
tight at 9800' and 10260'-10275'. Reamed to 10~25'~ C~rcul~ted and con-
ditioned hole. Tight at 11076' and 11818'-11878' ~hen pulling out.
111-112 pcf mud
Circulated and conditioned hole. Ra~ Schlumberger Induction-Electrical
log 14914'-13700', Continuous Dipmeter 14914'-12400' and D~ [~uction-
Laterolog 14914'-13700'.
112-113 pcf mud
Ran Sonic log-Gamma RaM 14914'-12400' and Microlog 14914'-13700'.. Drilled
9 5/8"' hole to 1~9~8'. Conditioned hole for. coring.
111-113 pcf mud
12, 1964
Ran in with 8 1/2"x 4"Christinsen Core Barrel. Stuck string at 14872'.
Ran Ford Alexander F.P.I.. Backed off at 104~8' and recovered 335 jloints
of 4 1/2" drill pipe, leaving 4434' of drilling assembly in ~ole. Circulated
aud conditi~ned hole. Pulled out and picked up washover string.
111.5-113 pcf mud
Ran 8 1/8" wash pipe. ~a~hed10438-10455'. Fish dropped 76' to bottom.
Pulled wash pipe. ~ade up screw in string & recovered all of fish. Total
fish recovered 4434.02'.
112 pcf mud
BELUGA RIVER UNIT ~14-19
Section .l~ T. lSL N.~ R ~ W:.~. Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA, W. O. i. - OPE/~ATOR
Page 13
May 1.4 ~ 1964
Laid down core barrel, approximately 100 joints crooked drill pipe, 6 Joints
8 1/8" wash pipe 9-6" drill collars and fishing tools. Ran open ended drill
pipe to 8600' and circulated prior to cementing· Ran 4 1/2" drill pipe to
8752' and equalized 140 sacks Class A cement using Halliburton equipment.
Cement in place at 3:45 PM. Total displacement 120 barrels. Laid down 63
Joints-4 1/2" drill pipe,~18-?'' d~itl collars and 6 driltrols.
112 pcf mud
May !5~ 1964
Stood cemented. Tagged cement plug at 8591 at 4'00 AM O.K. Cemented
II ··'
top of 10 3/4" casing through 4 1/2 drill pipe hung 120' with 60 saaks
Class A cement· Cement in place at 12:30 P.M.. Good returns to surface.
Laid down drill pipe. Rig released 11:59 P.M. May 15, 1964.
~4qlTED STATES ,
(Other inltructrono on re-
DEPARTMENT OF THE INTERIOR
GEO~ICAL SURVEY
SUNDRY NOTICES AND REPORTS ON WELLS
· (Do mot mgm thi8 tom for prop<m~ls to dr~dl or to deepem or pluw back to a 4tfferent reoervolr.
Uae "Air.CATION FOR PERMIT--" for ~ propommb.)
. B~_ v,anrd 011 .C._,:---~_ny of Ca~foz'-~a, Western
I. 'An~ off
· . O. BOX,. 7-8]9 Anchoraae, Alaska
%. ~c&~lo~ ~ warm (Re~rt lo~auon c]earl~and t~ accordance with a~ S~at~
See al~e e~eee 17 below.)
661' North and 661' East from Southwest Corner Section 19
Form approved.
......... pu_dt~_t_ ~ u_r_~_u 2~o.
~. LIAMI DI~ILIOMATION AND IIIIIAL
M, ALLO~B OR ~'l~ll WAml
8. rAl~ 0i' LB&Il MAMB
1%. PIIWlT MO.
ILiVATIOS~--(-S]:i~-~"h~t~t~-D~--RT-,'~e~C':~ ........... 12. COUIqTY Da PAIIWtlI
Elevation at Kelly_ BushAn~._. ~6' J Cook. Inlet l
Box To Indicme Nafure oF Notice, Reporf, or Ofher Dina
NO. lC! O~ INTIIMTIO~ TO :
TBIIT WATBI IHUT-OI'I' [----'] PULL OR AI,TIBR
I~RACTUIIg TItBAqf MULTIFIJC COMPLETE
IHOK)T Ol ACIDI:~B ABANDON'
~JI~AXIt W~LL CHANGm PLAN8
.... P~_l,,~n R~v~_r Dnj t
[0. FIELD A~D POOL. 0]1 'WU.D~AT
1 I. IlO,~ f., I., If., OI II~g, A~ · UI~IY OIt Alma
Sect. ton :L~ T. ]..3 N.,
18. ITAT!
8L'BSI}QUENT RBPOJT Off :
WATER 8[IUT-llF~ .~ }(~PAIRINII WILL ---- ]
FRAt"rI'RE TRgATM~NT ' AbTERING CABIN~
~HOOTING Off A('IDiZING~ J ~B.~NIH)MM~N'r°
~()ther) _ . _~
tN,,T~: R~rt reeult8 ~ multiple ~mp]et~n on W~
(Other) ............... ~ ........... *',.,,,platt,,,, ,,r Ree,!mpltth,,,.Rf~rt~ a_nd
lT. DBICIIBI PRO~HED OR COMPI.KTED OI'gRATh)N8 ICloarly state all I.'rtln,'nt dvtails, and give pertinent (larDs, including ~tlmatvd date ~ s~rtlng
~ro~ ~rL If w~! il dimUon~y d~l]~, give su~ [~tl,)ns and m,.naured and tr.e v,-rtk'at depths for all marker, and ~nea ~rtl-
~t ~ ~ w~) ·
~ ~-~ ~s ~ed ~ 1~,~' wit~t enco~e~ ~ si~lfi~nt oil or ~B
~. A 10 ~/~" p~~i~ stri~ ~s ce~n~d at 8,635'. ~ ~ ~s sub~que~
a~d aa fol~s:
l. A cement brid&e was placed across the shoe of the 10 3/~" ca81~ wlt~
· acks of c~neat from 8,752'-8,~81'. T<~ of firm cement
2. ~ 10 3/~" elsin~ wa pleiad from 120' ~o the surface wit~ 60 sac]gl o~
~~f~2 .... '' , . DIVISION OF MINES
UNITED STATES :~ a.~, om_~ An~~
DEPARTMENT OF I'HE INTERIOR ~s~ ,~..~,,,A-02969~ ....
GEOLOGICAL SURVEY
LESSEE'$ MONTHLY REPORT OF OPERATIONS
Alaska
t~EC. A~D [
14 o~ ~ Tw~,
~9' !13N
9W
istuck! at 1k, 925~. Wqrked fish ~ose an~ ~ver
~n ~gs. ~lled 9 ~5/8" ~le~o 1~,9~'.
'-co~ ~, stuc~ at 14,872'. ~rke~ ~ih ~ose
~11 o~ ~sh. Piu~ed and a~~ne~ ~ as fell
, e~n~d ~th 1~ sacks cedar' ~, 752'-8; 581'.
~eme~ed ~th ~ sac~s ce~nt 1
i
Rig released 11
I
59
I
I
While ~unntng ~w bit, pipe
ed all of fish.
· ruxmin~ diamond
and recovered
20 ' -atlrf$ ce.
!
I
'
RECf IV O
DIVISION OF ~tl,4ES &
ANcHORAGE
NoTE.---There were ........................................ rune. or sales of oil; ............................................ M cu. ft,. of gas sold;
.............................................. rUll~ or sales of ~asoline during the month. (Write "no" where applicable.)
NOT~:.-- lIcport on this form is required for each calendar month, rega, rdlcss of the slatus of operations, and must be filed in
duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor.
Form 9-:129
(lautlary 1.9~0) 16-- 215760-8 U S. OOYtRNItl~N$' ?r~lN¥1Na OF,~ICF
Form 9-331
ED STATES
DEPARTMENT OF THE INTERIOR
l( )1 hlq' IIINI rllPt [f,hN ~,ii t',,
GEOLOGICAL SURVEY
SUNDRY NOTICES AND REPORTS ON WELLS
r/DO Ih,{ list' thts f<,rm f,,r pr,,po~;xls l,, dr!ii ,,v ti} dq,el.,n or phlg back t. a different r.servotr,
Ils,. "Ai'I'I.I('ATION FOIl ]'Ell.MIT. "fo1 such
1.
~. NAMm OF OPE, RATOR
__~_n~r~ 0il ~o~s~ 05 Cal.tf~rniaj West_e~. ~~lo~s~ Inc.
~ ~. ADDRESS OF OP~RaT08
~. I.OCATION oF ~ I. Rep- I.,'~thm eh.fly .~.,~ in :,~'~. ,rd; h.,. With .nv ~tate m-quir.~euts.·
8~ ~lso apttc- 17 bel,,w. }
At ~urface
661' North and 661' East t'r-om Southwest Corner of Section 19
~ ~'-PE~ M-~T-~0. - 1'5.
16.
63_-~
......... ~levat, ion at Kell_y_Bush.in6 = 1.2'
7 [ Nil ~,II}:L'd[.NT NAME
Beluga }liver
· , ~.' %1: \ .,11 I F. % :i [',
~lu~ Alver
9 % KI I.
J ~-~9
]~LFl,.ID ~%1~ ~'~,IL. ,~( ~& ~I ],UAl
J
Sec%ion Lg, T. 13 N.,
_.
Check Appropr,afe Box To Indicate Nature of Notice, Report, or Other Dora
, N,,'r~:: Rep,)rt re~uJtq of inllJ[lJ)Je completto~ on Well
............
dirm ti,maily .lr~lhsl. ~%e s'absurfac,- J,~CaLl.,li~ t;iJ ;lll,;l~Ol',.IJ t:,,J l rH,. %,'rticd] dt J}lJl~ f,,l* all markvl'S and zones ~rtl-
(Comflr~d. ng phone conversation 5/13/64 Boogh - Soyster)
~ 1~-19 was drilled to lh, 9~8' without encoutering any significa~a~ oil or ~n,a
slmows. A 10 3/4" prol;ecttve string was cemenl;ed at 8,635'.
propose well aba~~nt as follows:
1. Bridge across shoe or Do 3/~" casing with cement from ~8735'-8535'~.
2. Check location of cement bridge for top and hardness (To be above 8~85'
3. Plug '10 ~/1." casing from 100' to surface with ce~nt.
.)
4. Weld steel plate across 16" casing, install suitable marker, and abandon
well.
N(YrE: All open hole and casing above a~ l~low cement will be left i~All
of 112 pcf drilling fludd.
*See Inmuctio.. on Reverse Side
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
LESSEE'S MONTHLY REPORT OF OPERATIONS
,g~.at',~ ...... Alaska ................ Co~t~ty ...... _C_.o__~l~_..__I~_e__t_ ............ PYeld ._ ~i~__R~yeI FieZd ...........
';?i,e /~[lou'i/~ i,~ a correct report of operation.s az'~d product~;o~ (i~,cludin~ drilli~,~ ttlld
wells) for th,~ ~t,ontA of ............... ~ril, ............... )~__~ ................ Bel~a River unit
, ~a~d~Oil _ Co. --of.C~ ifo~
~{~e~:'~ addr~.~.~ ................. P._ 0~ BOX_ 7-839 ........... CO.},pa,~t ~e~
~ODO, 80 ) ~ cuntont uf.g~
a~u~ ~,~ ~-~9 (5) ,
~pe ,t~ a~ 13,125'. ;.Worked ~ish loos~
SE 1~ ~
SE 1~4 ~d recovered ~ of fish. ~led 9
home ~3}s3o' ~- ~3,~'. CoreaO ~/~" hole
13,9~1' t- 13,~31'. R~ logs, 8~~berg~r
I.E.$., ~ ~~tion ~terolo~;~ ~d
~crolo& ~~er. ~[ed 9 5/~;' hole 1~,931'
- 14,~'.
Drlllin~ abes
Distrib~
U.S.G.S
State
ROCo
ROCo
Shell
Files
le
. M. H. Soyster
· T. R. Marshall
Mr. C. W. Perry
Mr. R o R. Ritter
Mr. R. R' Robison~
Producing Department
Ex~loratl¢ m Depa~ sent
Land Department
t
-2.
Nox,~..---There were ...................................... rums or sales of oil; ......................................... ' M cu. ft. of gas sold;
............................................. runs or sales of gasoline during the month. (Write "no" where applicable.)
NoT~. Report on this form is required for each calendar month, regardless of the status of operations, and must be filed
duplicate with the supervisor by the 0th of the succeeding month, unloss o[herwlse (tireeted by the supervisor.
~ 9-3~ 10---25766-8 u.
(January 19~)
UNITED STATES
DEP, ARTMENT OF "THE INTERIOR
GEOLOOICAL SURV£Y
~E Nu..E. .... A--.0~9658 ...........
LESSEE'S MONTHLY REPORT OF OPERATIONS
-F
~tate ....... ~A~~ .............. Co~ty ....... _~.O~ .o~...~n!~_t ......... Field ............. . ~.l~!uga.....B ~.ve.r ......... ' .................
· · Tke follo~n~ is a eorree~ report of operatio~ and prod~etion (inchtJin~ drillin~ and produ~n~
'wells) for ~e month of ...................... ~~ ........... ', I~ ............. ~_~.~~ ~ ...................................
Plw~e .................................. ~ .~r_~Q~ .................................. ~en~' s title ..~~ "~r~tea~
NO. .~ BARRg~ O~ O~ ~RA~TY OU. F~. O~ ~A8 [ OA~0L~E ' ~VATEB (If (I~ drilling, de~th; if sbu~ d~a, ~;
,- { { ~ (In tho~ds) ~ R~ovgago nofie, ~ state) d~t~ ~dr~ul~ of t~t for
~ __ - ' ..........................., : ............................................. ~*"~.'f~L
Fi~: ng. ,
Diet~t i ~n:
;S. kMr. M. lt. 8oyster -2-
St~t~ -~Mr. T. R. Mlr shal~ -1-
Mr. C. W. Perry -1-
Mr. R. l~. Ritter -1-
Xlei IMf. R. R. Robison -1-
' F - Produc~ug -1-
! [ lb~lor~ti, ~ -1-
runs or s.al~ of gasolin~dur~ng themonth. (Write "no" where applicable.)
NoT~.--Report. on this form is requ/red for each calendar month, regardless of the status of operations, and must be filed in
duplicato .w~th the supervisor by the 6th of the~uoceeding month, unless otherwise directed by th~ ~upervisor.
(JS~l~ry 19~0) 10--~7~-I$ u.s. ~ov~n.s:.~ ~u,~m~.o oerlca_
No~..--There-were ...................................... runs or sales of oil; .............................................. M cu. ft. of gas ~old;
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
EE'S MONTHLY REPORT OF OPERATIONS
~ollowi~ is ~ co~reet ~port of op~rat~on.~ an~ prod~ct~o~ (inclu~di.~ drillin~ an~d prod~in~
a~r~.~:~ Po '0, Box 7-~ ................................... Compan~ ~ee~~~~e~~~..O~"g~;"vf C~[~o~aXa~nc, ...........
..... :' " / i ~ -~ ~ :. / ' - - "
................................. ~OhOr.~g~ ~. ~j~ ............................. ~rS'n¢a .... ~ ...... "L'-' L4C-;~.~-J,~-"~: .............
TWP. NO. PaGeSCan, , (In thou~mds) GASOLINE Y~a~Eg (I[ , '(If d~lli~, d~gth; if ...t,:~l ,h>wn,
~ECOYEI~ED l~O~O, ~0 ~at(-) dal,~ ~'1 r~ult ~f t~t for
13N Dr~!ed t3 3/4~ hole. to a34'0/ Ran lods. Cem~t~ 10 3/4" casing
aS 8~35' (c~.~meas~re~nt) wi~h 500 sacks c~':~nd shoe and
500 ~acks thr~gh D~.collar afl ~64~ ~at~~,~: BO~ and
testSd to'.50~psi ~ OK. Dri ~ed ~t D7, c~e~t~a~ shoe and
NoT~.--Thero were ...................................... runs or sales of off; ................................................. M cu. ft. of ga~ sold;
............................................. runs or sales of gasoline during the month. (Write "no" where appli0able.)
NoTr.--Repor~ on this fonn is required for each calendar month, regardless of the status oS operations, amd must be filed in
duplicate with the sapervisor by the 6th o£ the suoceeding month, unless otherwise directed by the supervisor.
($anuary 1950) 1G--~257§6~ O.s. ~OYE~II~NT PFII#TI~IG Oil~lCl'
'i
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
LESSEE'S MONTHLY REPORT OF OPERATIONS
Sta~e ......~$k~ ................ Uou.~-~ty __.~__o. ok._._I!l&et ..... Field.. Belu6~ R2ver .........
The £ollowin.£~ is a correc~ repo/'2 of opcr.~:~tio~t.z a)~d productior, r.;~,~-/?:<ti/~;"., ,.h't~h~ a~t.d produ, ci/'~
'x'ells)/~r the montl~ o/ ........ J~ry ....... [9_6~ ...... gel~ River Unit
.............. ~dard Oil Co'.'-'Of C~'if-°~'~[a
.tgent's ~,~r~'~'.~' .... P. O' _~ox 7-.8~ ........................ Co,,~pan~ ~mter~- ~~ons,' ~c. -- -
.................................................. Sz~ ~ed ........ ~.. ~. , ...............
.......... ~ ........ . ............................. -_~.~ -- ~-;~ .
sac, ks, I
~ or ~4 Twr. iHAX,:r !,
{
·
~.9 l~s r 9w~
sr ~/~
~ z/~ !
t
i
I
t
i
,
:
DI I~: {
i Cu. i:T.
'~¥ELLD&Ta B) RRELq OF OIL!
NO. P.,~c~ : { ([t~ thou$and.Q
~i~ed Z~ 3/~ ho~e to
~ned :hole to ~ 20" to 25~0'.
Cemented i6" casing at 2551' (csg~. meas~ent )
with 3140~ sack$ c~ent. ~eins~l!ed ~d ~ested
BOPE. ~l~ed{out cemen~ ~d shoe ~d ~i~ed
hole to 8356'.
Drilling ahead ~
i.
(~)
(~)
(~)
(~)
(z)
(~)
m,,Id~.d Mi, Ns a~d ~
,dill O,l,l. d 14~'~ blv'II
Nors.~There were ........................................ runs or sales of oil; ............................................. M cu. ft. of gas sold;
................................................ runs or sales of gasoline during the month. (Write "no" where applicable.)
No~s.--1Zcpor¢ on thh for~n is required for each calendar month, rcgardlesu of the stat~s of operations, and must be flied in
duphca~e with the supervkor by the 6th of the succeeding month, unless otherwise dice':ted by the supervisor.
krm 9-329
(January 19~) :~2o700-.a u. ~ ,.*v.,.~m~: ~,,,,i.G o~r~c~
E.X P L ORA T OR Y- &
CONFIDENTIAL
UNI'FED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAl. SURVEY
LESSEE'S MONTHLY REPORT OF OPERATIONS
Alaska
7'he fi.,llou:i~?.~.; ~.:s ts ,:orreei; report of oprragions a..~,l l>ro,dtsciiors {yin. cladin~l clrillin~ ~z;d prudu('it;&~
u.,q!.~)/o~ t~..~o.~, of ... _Po_c_e_~.~_r ................. ,:-,.63 . Be.!uga ~v6r ~nit .......................
.~e~,t'~adJr~..~..':._ P. 0. Box_ 7-83~ ......................
~chorage, Alaska
.;trent s ti~Ze-~.Distric~ Super~tendent.
AND
19 13N
t :
-
SpUdded Dece~
i
ented 22"
ent. Dril
rRtBUTION:
U.S.G.S. - M.
State - T. R.
({A.~O~ 'N 1,' WATE}¢ (~ I If drilling, ~qath: it' mhut down, oau~;
;
)er 25, 1963. D~illed t
.'asing at 209' ~ith 420
H. S~.yster - 2
Marshall - 1
215'
acks
NoTE.--Thcre were ........................................ ruas or sales of o,;I; .............................................. M cu. fh. of gas sold;
............................................ runs or sales o£ ga,sollno during the month. (Write "no" wixcre applicable.)
NoT~,:.--Report on this forln i8 required for each calendar month, regardlc~ of tho status of operations, and nlu:~t bo fi~d in
duplicate with the supervisor by the 6th of ~he s,zocec~iing month, a~s otherwise df~cted by the supervisor,
Feb. 1~61)
(SUBMIT IN TRIPLICATE)
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
SUNDRY NOTICES AND REPORTS ON WELLS
~ ..................... _~__ SUi~EQUENT REPORT OF SHOOTING OR AC, IDIZ1NG ................ I .....
NOTICE OF INTENTION TO TEST WATER ~OT-OFF .................... .~J~.~EQOENT REPoR~r OF ALT~RIN~ CA$1N~ ....................... I .....
i
NOTICE OF INTENTION TO RE-DRILL OR REPAIR WELL ........ ! ....SUBSEQUENT REPORT OF RE-DRILLiI~K~ OR REPAIR ............... J .....
N?TICE'OF INTENTION TO SHOOT OR ACIDIZE ..................... SUBSEQUENT REPO~Fr OF ABANDONMENT .......................... J .....
NOTICE OF INTENTION TO PULL OR ALTER CASING ...................SUPPLEMENTARY WELL HISTORY ................................ / .....
NOTICE OF INTENTIQN TO ABANDON WELL ...................... i ........................................................................... ] .....
(INDICA'11~ A~OVE ~Y CHECK MARK NATUI~I~ OF R~OI~T, NOTICE, O~ OTH[R DATA)
............................ Jaau~._~_.3Z, ...................... 19.~.
Beluga River ~ ~
WeLl No. _l~_-_L9 .... is located _661 .... ft. from._ line and ___6__6_~ .... ft. from line of sec ....... ~._.
S.~._~./'_ ~___S_E__l/~_h..~c.~__19 ___ .~__R___: .......... -9--~- ......... ~e~r_d_~_.&..t~ ....
(~ 8e~. aaa I~e. No.) (Twp.) (Range) (Meridian)
........ B~__~__~x~r ........ - ........... ..~.~. ...................
(Field) (County or Subdivision) (Stats or Territory)
The elevation of the~~t~ve sea level is .... ~____ ft.
DETAILS OF WORK
(State n-m~ of and aspmctmcl d*pth, to obj~cti~ ~nds~ show *1~*, weiwhta, a~ It~ths
inl ~ntm, and all ot~ im~tmnt ~
Referring to step 4 in original Notice of Intention to drill.
We now plan to run logs and cemen% lO 3/h" protective casin~ a.t ~ 8500' in
two stages. Second stage through DM at ±4OOO'.
Will then reinstall BOPE and drill ahead!i as ~e~C~i~~ No~lce.}
'5
~ of Mines ar
! u~~ that thi. plan o~
~m~ y __~~_E 0_~. _C_~~___~__~ ~ ~,_. ~_~_T_~_~_. P_~_~ SQ~,. _.~,. ....................
GPO 862'040
Fora 9-881 a
(Feb. 1~61) .-
C ~ ~ I ~ £ N T ] A L
(SUBMIT IN TRIPLICATE)
UNITED STATES
DEPARTMENT OF THE INTERIOR
Budget Hureau No. 42 R358.4.
Approve! expirvs 12-:11 riO.
'~cho rage
029658
GEOLOGICAL SURVEY
SUNDRY NOTICES AND REPORTS ON WELLS
NOTICE OF INTENTION TO DRILL
NOTICE OF INTENTION TO CHANGE PLANS ~ _
NOTICE OF INTENTION TO TEST WATER SHUT-OFF
NOTICE OF INTENTION TO RE-DRILL OR REPAIR WELL
NOTICE OF INTENTION TO SHOOT OR ACIDIZE .......
NOTICE OF INTENTION TO PULL OR ALTER CASING
.......... SUBSEQUENT REPORT OF WATER SHUT-OFF
SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING
SUBSEQUENT REPORT OF ALTERING CASING
SUBSEQUENT REPORT OF RE-DRILLING OR REPAIR
SUBSEQUENT REPORT OF ABANDONMENT
SUPPLEMENTARY WELL HISTORY
NOTICE OF INTENTION TO ABANDON WELL
(INDICATE AROVE BY CHECK MARK NATURE OF REPORT. NOTICE. OR OTHER DATA)
.......... Noveaber._22o ..................... 19._.fi3
Well No. 13RU 14~-19_ is located 660 ft. from
~W~, .s_~_k,_ _~_e._c_, _!9 ._
(;~' Sec. a~a ~. No.)
Beluga__~we~ _ _
( Field )
K. B.
The elevation of the~ above s~ level
, line and 6 50 ft. from ~X 1 line of
sec.
13 N 9 W Seward B & M
_ -. . . Alaska ................
(C'ou.ty or 8ubdivisi(,.) (state or T.rritory)
~ 30 ft.
19
DETAILS OF WORK
(State names of and expected depths to objective oends; show sims, weights, end lengths of proposed casi nee; lndleatte muddinf jobs, cement-
ing points, and &Il other important proposed work)
1 Drill to 200' 22"
· , cement conductor and install BC?.
2. I~ill to 2500-', Log, Cement 16" surface pipe and install
3. Drill to 10,000', Log and Core as warranted.
4. Cement 10 3/4" protective string at 10,000'+ .
5. Drill £o ±15,300'. Log, and core as warranted.
6. Complete or abandon as warranted.
RECEIVED
NOTE:
TtIIS IS A WILDCAT WELI..
NOV 27 1963
Petroleum Branch
Division of Mines and Minerals
Alaska Dept. of Natural Resource~
! understand that this plan o~ werk must receive approval in wrtti~ by tho Geological £urvey before DiCtations may be commenced,
Company __ST. AlfOAKD. OIL_ COMPA~IY_OF___~Ot~La, _}gaSIglL~t._~P£tL~TIONS.._/NC ..................
Address .... ~_._O_.__~ox__Z_-_839 .....................
......... ~hnchorage.__Alaska_ .........................
C. V. CHATTERTON
Title District Supexl~u~encienlL._-._.AL~. Dist.
qPr 8 62n40
acres in lease: k - ·
I 1512
If lease, purchased with one or more
Iwells drilled, fron~ whom purchased:
N~me
] Approx. date Work will 8ta,-t
!
Number of wells on lease, including this well,
completed in or drilling to this reservoir:
(company), and that
pared under my
the best of
Approval Date:
Ad dre~s_
to. make this report; and that this XePort was pre-
._
Alaska Oil and Gas Conservation Commission
AppUeation to Drill, De~ pen~
FOrm l~o.-
Aum~ by Order No. I .
See Instruction on