HomeMy WebLinkAbout2000 Tabasco Oil PoolpupsPHILLIPS Alaska,
A Subsidiary of PHILLIPS PETROLEUM COMPANY
John C. Braden
Supervisor
Greater Kuparuk Area Development
ATO - 1276
Phone 263-4536
March 29, 2001
IJIs. Julie Heusser, Commissioner
Alaska Oil and Gas Conservation Commission
333 West 71h Ave. Suite #100
Anchorage, Alaska 99501-3539
Re: 2000 Tabasco Oil Pool Annual Reservoir Surveillance Report
Dear Ms. Heusser:
In compliance with Rule 11, Conservation Order No. 435, Phillips Alaska, Inc.,
operator of the Kuparuk River Field, is hereby submitting the annual report on
the Tabasco Oil Pool. This report documents the required information pertinent
to the field development and enhanced recovery operations from January
through December 2000. The following is an outline of the information
provided:
a. A summary of the enhanced recovery project (Attachment 1).
b. Voidage balance, by month, for produced and injected fluids
(Attachment 2, Attachment 3).
c. Analysis of reservoir pressure surveys taken in 2000 (Attachment 4).
d. Results of production surveys, and any special surveys, taken on the
Tabasco Oil Pool in 2000 (Attachment 5).
e. Results of well allocation and test evaluation for Rule 7, and any other
special monitoring (Attachment 6).
f. Future development plans (Attachment 7).
If you have any questions concerning this data, please contact Jim Ennis at
(907) 265-1544.
Sincerely,
John C. Braden
GKA Development Supervisor
bcc: Central Files ATO - 320
Jim Ennis ATO - 1208
Ron Marquez NSK - 69
Balog & Doman NSK - 69
Attachment 1
Kuparuk River Unit
Tabasco Oil Pool
2000 Annual Reservoir Surveillance Report
Summary of the Enhanced Recovery Project
Tabasco produced 1910 MSTB of crude, 203 MMSCF of formation gas, and
4408 MB of water during 2000. Water injection was 5545 MB over the same
period. Cumulative oil, gas, and water production and water injection through
year end 2000 were 4315 MSTBO, 620 MMSCF, 5804 MBW, and 8322 MBWI,
respectively. The cumulative injection/withdrawal ratio was 0.8 on a reservoir
barrel basis through year end 2000. Reservoir pressure declined from
approximately 1220 psi to 1100 psi during 2000.
Two new producers were completed with openhole gravel packs and electric
submersible pumps were installed for artificial lift. Resulting production from
the new wells is significantly poorer than anticipated. A workover of injector 2T-
210 was unsuccessful at repairing mechanical problems which continue to
prevent water injection. Year end 2000 Tabasco well count (all at Kuparuk
River Unit Drill Site 2T) was:
Producers: 7 completed 7 on line
Injectors: 2 completed 1 on line
Water production increased to a year end water:oil ratio of 3.1 bbl water per
STBO. Water breakthrough occurred at all 7 producers. Production and
injection logs, coupled with the structural positions and water breakthrough
histories of the producers, suggest that the water production mechanism is
dominated by gravity -induced slumping.
Attachment 2
Tabasco Oil
Pool
2000 Annual
Reservoir Surveillance
Report
Produced Fluid
Volumes
OIL
GAS
WATER
CUM OIL
CUM GAS
CUM WATER
MO
YR
STB
MSCF
BBL
STB
MSCF
BBL
1
2000
218596
21663
213955
2623041
438238
1609442
2
2000
177861
18857
288396
2800902
457095
1897838
3
2000
167362
16954
278430
2968264
474049
2176268
4
2000
176325
17125
367238
3144589
491174
2543506
5
2000
167387
16393
412309
3311976
507567
2955815
6
2000
156973
17791
385476
3468949
525358
3341291
7
2000
155250
17715
403917
3624199
543073
3745208
8
2000
136003
15511
391067
3760202
558584
4136275
9
2000
125005
14133
404654
3885207
572717
4540929
10
2000
147469
16503
409172
4032676
589220
4950101
11
2000
141645
15353
414915
4174321
604573
5365016
12
2000
140691
15329
438678
4315012
619902
5803694
2000 TOTAL 1910567 203327 4408207
Attachment 3
Tabasco Oil Pool
2000
Annual Reservoir Surveillance
Report
Injected Fluid Volumes
WATER
GAS
NGLS CUM WATER
CUM GAS
CUM NGLS
MO
YR
STB
MSCF
MSCF STB
MSCF
MSCF
1
2000
392436
0
0 3170115
0
0
2
2000
413716
0
0 3583831
0
0
3
2000
529421
0
0 4113252
0
0
4
2000
550341
0
0 4663593
0
0
5
2000
511120
0
0 5174713
0
0
6
2000
466871
0
0 5641584
0
0
7
2000
476327
0
0 6117911
0
0
8
2000
447992
0
0 6565903
0
0
9
2000
432215
0
0 6998118
0
0
10
2000
448669
0
0 7446787
0
0
11
2000
447578
0
0 7894365
0
0
12
2000
428168
0
0 8322533
0
0
2000 TOTAL
5544854
0
0
Attachment 4
Kuparuk River Unit
Tabasco Oil Pool
2000 Annual Reservoir Surveillance Report
Reservoir Pressure Surveys
Rule 8 Form 10-412 follows
�^f)
(D E
N c2 t2 02 r
C)
O
m
a
i
�
m H
O
U a
6
C9
o
_ c
�
B �
a
U
o c
a
J O
O
U
O
c
m
6 �
J �
U)
'6
all0000
o
m
U
UD
q
0
p
u)
M
O
a
.0
m
o 00 00
Y
U
2
m
r3
O
m
C
m
a
T=
OO
O
0 00 00
c
c
Q
M
E
a
2 m
O
d v
M
Q
6
Z
l
x
M 1� n O
N 0 000 o
m
m
5
c m N
r
Q
w N
oO
O
a`
n
O N N to N
_
i n
E
lz go
m�
7 OU
75 }
Q
Cl) Cl) c^'7 V 'C
2 o
a
�
Y �
NM O 0 0) 0
O
m Z
c
D :Q
m
3 a
i N a
O
C
(o N o) Lo
O) M O V
C
m
m
C
E O
a
=
O n
m °
a
0 0 0 0 0
W
m mcflvr<or
O O O O O
m N
m
m
n C c%) co c0
O Q
p
�
0 0 0 0 0
Y
U (�
m
6 `o §
O O O O O
O
B
m
0 0 0 0�} 0�+0
Q
N � � CO
�
Cl)M
m
Q�
z
N N N N N
co Cl) co M Cl)
O O O O O
m
>
L
y
O O O O O
Un Un Lo u) Ln
O
m
2
a
O U
C
E D
Y
O�
f-
z
Q a
O p
m
p
t
U
m
E
0^ O7
T
m Q
E-
2
z
0 0 �
N N N N N
m Cm
E
O C
Attachment 5
Kuparuk River Unit
Tabasco Oil Pool
2000 Annual Reservoir Surveillance Report
Production Logs and Special Surveys
Well
Date
Type
Comments
None
N/A
None
No logs or production surveys were run during the calendar year 2000,
Attachment 6
Kuparuk River Unit
Tabasco Oil Pool
2000 Annual Reservoir Surveillance Report
Wells Allocation and Test Evaluation Summary
A minimum of two well tests per month were taken on production wells. Fluid
samples were obtained on a regular basis, and water cut corrections were
applied to well tests as required based on the subsequent lab analysis.
Generally, very good agreement was observed between the phase dynamics
and the shakeout analysis. Production volumes were tracked through the
Setcim production monitoring system. Tabasco production was applied an
allocation factor of 1.0 for 2000.
Attachment 7
Kuparuk River Unit
Tabasco Oil Pool
2000 Annual Reservoir Surveillance Report
Future Development Plans
Tabasco Drill Site 2T development plans for 2001 and beyond were created to
take advantage of the gravity -induced water slumping. Horizontal producers
are planned near the top of the interval to provide vertical standoff from the
water. The design phase for a horizontal producer was begun in 1999. Studies
of horizontal hole stability, drill -in and completion fluids, and completion
equipment are in progress. It is expected that the first horizontal producer will
be drilled in early 2002. Current plans include drilling a total of three horizontal
producers.
Injection plans call for increasing injection to accomplish a cumulative net zero
voidage and restore original reservoir pressure. Another workover to mitigate
mechanical problems at injector 2T-210, which prevent water injection, is being
considered. Two new vertical injectors or a structurally low horizontal injector
are planned to support the additional offtake from planned future producers.
However, conversion(s) of an existing producer(s) to water injection is also
being considered as an alternative to new injectors. The feasibility of polymer
flooding was studied in 2000 and laboratory tests are ongoing to confirm
viability. A full -field reservoir model is currently being built to optimize potential
water and/or polymer injection schemes.
Screening evaluations indicate that Tabasco development beyond Drill Site 2T
is most prospective at Kuparuk River Unit Drill Sites 3H and 3G. Tabasco
geologic and engineering studies in 1999 identified Drill Site 3H appraisal well
locations which may be drilled as early as fourth quarter 2002.