1. August 12, 2020 Notice of Proposed Enforcement Action
2. August 26, 2020 ENI's Response to NOV
ORDERS
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
333 West Seventh Avenue
Anchorage Alaska 99501
Re: Failure to complete required Sundry Reports of well work ) Other Order No. 171
within the required time ) Docket OTH-20-043
Nikaitchuq Unit SD37-DSPI well (SD37-DSPI) (PTD 2110890)) September 20, 2020
Class I Waste Disposal Well EPA Permit AK1I0I I -C )
Nikaitchuq Unit (NU), Nikaitchuq Field, )
Undefined Waste Disposal Pool )
DECISION AND ORDER
On August 12, 2020, the Alaska Oil and Gas Conservation Commission (AOGCC) issued a Notice
of Proposed Enforcement Action (Notice) to Eni US Operating Company Inc. (Eni) regarding the
SD37-DSP 1 well. Eni failed to obtain AOGCC approval prior to performing well work and failed
to complete a required sundry report of well work within the required time. The Notice proposed
specific corrective actions and a $20,000 civil penalty under AS 31.05.150(a). Eni provided a
response dated August 26, 2020.
Summary of Proposed Enforcement Action:
The Notice identified violations by Eni of
(1) 20 AAC 25.280 (a) ("Workover operations") when it failed to submit to and have
approved by AOGCC an Application for Sundry Approvals (Form 10-403) prior to
installing a plug to isolate a leak in SD37-DSPI that was discovered by diagnostic
evaluations performed by Eni; and
(2) 20 AAC 25.280 (d) ("Workover operations") when it failed to file within 30 days after
completion of workover operations a Report of Sundry Well Operations (Form 10-
404) for well work completed in November 2019 under Sundry 319-183.
The Notice proposed civil penalties of $20,000 as follows:
- $10,000 for failure to submit an Application for Sundry Approvals (Form 10-403) prior
to installing a plug to isolate a leak in the well.
- $10,000 for failure to submit a Report of Sundry Well Operations (Form 10-404) within
the 30 day requirement for well work completed under Sundry 319-183.
Other Order 171
September 20, 2020
Page 2 of 4
The Notice also proposed two actions for Eni to:
(1) Provide a detailed description of its Application for Sundry Approvals (Form 10403) and
Sundry Reporting (Form 10-404) process to AOGCC with an explanation of the root cause
of these violations, as well as corrective actions undertaken by Eni to assure the violations
will not recur;
(2) Provide the Report of Sundry Well Operations (Form 10-404) required for the work
completed in November 2019 under Sundry Approval 319-183.
Violation - Failure to Submit to and have approved by AOGCC an Application for Sundry
Approvals (Form 10-403) prior to installing a plug to isolate a leak in SD37-DSPl:
By email dated July 14, 2020 Eni notified AOGCC that it had secured SD37-DSP 1 after finding a
tubing leak at 4466 ft. Eni provided an attachment titled "Eni SD37-DSPOI End of Work Report
Rigless July 2020" summarizing well work activities for June 12 and 13, 2020 when Eni
determined there was a pressure communication. From July 4, 2020 through July 11, 2020 Eni ran
logs and decided to shut in SD37-DSPOI until such time as it would repair the well. To do so, Eni
set an Evo Trieve plug at 5745 ft to secure the tubing. This was the first notice provided to AOGCC
regarding the loss of mechanical integrity in SD37-DSP 1 and the first notice that a workover had
occurred.
AOGCC regulation 20 AAC 25.280 (a) requires "An Application for Sundry Approvals (Form 10-
403) must be submitted to and approved by the commission in order to enter a well and conduct
one or more of the following types of well workover operations:... (5) repairs to the well."
Eni's response advised AOGCC that it had decided to shut in the well and attempt a workover in
December or January. Because no workover was attempted, in these circumstances AOGCC
agrees a Sundry was not required to shut in the well.
Violation - Failure to submit a Report of Sundry Operations (Form -4041 for workover
operations performed on SD37-DSP1 under Sundry Approval 319-183:
AOGCC's review of the well history after Eni's notification regarding the July 11, 2020 plug
setting revealed that Eni failed to submit a Report of Sundry Operations (Form 10-404) for
workover operations performed on SD37-DSP1 under Sundry Approval 319-183 (this workover
Other Order 171
September 20, 2020
Page 3 of 4
concluded November 17, 2019). After the AOGCC Notice of Proposed Enforcement was issued
on August 12, 2020, Eni submitted the required Sundry Report on Form 10-404 to AOGCC on
August 24, 2020, some eight months late.
Erni failed to file the AOGCC required Report of Sundry Well Operations (Form 10-404) within
the 30 days after completion of workover operations, a violation of 20 AAC 25.280(d).
Mitigating Circumstances:
The factors in AS 31.05.150(g) were considered in determining the appropriate penalty. While the
penalty does not reflect amounts based on per -day assessment, that decision does not minimize
Eni's failure to report well work involving a well's mechanical integrity. Although no injury to
the public occurred, the seriousness of a potential wellbore failure, and the obvious threat it poses
to both public health and the environment cannot be denied. Eni's failure to comply with the
fundamental AOGCC reporting requirements raises the potential for similar behavior with more
serious consequences. Mitigating circumstances were considered in the assessment of the
proposed civil penalty including Eni's compliance history, and its enforcement and notice of
violation history.
Findings and Conclusions:
The AOGCC finds that Eni did not violate 20 AAC 25.280(a) (Workover operations") when it did
not submit to and have approved by AOGCC an Application for Sundry Approvals (Form 10-403)
prior to installing a plug to shut in SD37-DSPl.
The AOGCC finds that Eni violated 20 AAC 25.280(d) when it failed to provide within 30 days
the required Report of Sundry Well Operations (Form 10-404) for Sundry 319-183 work
completed November 17, 2019. Mitigating circumstances outlined above were considered in the
AOGCC's Notice of Proposed Enforcement Action and its assessment as to the appropriate civil
penalty. Eni has committed to an increased level of oversight and review of established training
and process protocols for employees governing sundry operations. The AOGCC finds Eni's
implementation of the proposed actions to be satisfactory to help prevent further occurrence of
these violations.
Other Order 171
September 20, 2020
Page 4 of 4
Now Therefore It Is Ordered That:
Eni is assessed a civil penalty in the amount of $10,000 for violating Regulation 20 AAC
25.280(d). If Eni chooses not to appeal this Order the fine must be paid within 30 days of issuance.
If appealed, the fine will be held in abeyance until the appeal process is complete.
As an Operator involved in an enforcement action, Eni is required to preserve documents
concerning the above action until after resolution of the proceeding.
Done at Anchorage, Alaska and Dated September 20, 2020.
ol9ldltyu9rctlby ftn..' gnMby DlgWy Y9ne byhssk
Jeremy mm"m.°na Daniel T. Wn,ali, mwnll. Jessie L. Mml°lowsa
M. Price°.:3sa ono' Seamount, Jr.� o°�w'.° Chmielowski DZmew2DIDD3.,9 Oa93
Jeremy M. Price Daniel T. Seamount Jessie L. Chmielowski
Chair, Commissioner Commissioner Commissioner
cc: Evan Osborne, USEPA, Region 10 (osbome.evan@epa.gov)
Tim Mayers, USEPA, Region 10 (mayers.timothy@epa.com)
Stefano Pierfelici (stefano.pierfelici@eni.com)
AOGCC Inspectors
As provided in AS 31.05.080(a), within 20 days after written notice of the entry of this order or decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for
reconsideration of the matter determined by it. If the notice was mailed, then the period of time shall be 23 days. An
application for reconsideration must set out the respect in which the order or decision is believed to be erroneous.
The AOGCC shall grant or refuse the application for reconsideration in whole or in part within 10 days after it is filed
Failure to act on it within 10 -days is a denial of reconsideration. If the AOGCC denies reconsideration, upon denial, this
order or decision and the denial of reconsideration are FINAL and may be appealed to superior court. The appeal MUST
be filed within 33 days after the date on which the AOGCC mails, OR 30 days if the AOGCC otherwise distributes, the
order or decision denying reconsideration, UNLESS the denial is by inaction, in which case the appeal MUST be filed
within 40 days after the date on which the application for reconsideration was filed.
If the AOGCC grants an application for reconsideration, this order or decision does not became final. Rather, the order
or decision on reconsideration will be the FINAL order or decision of the AOGCC, and it may be appealed to superior
court. That appeal MUST be filed within 33 days after the date on which the AOGCC mails, OR 30 days if the AOGCC
otherwise distributes, the order or decision on reconsideration.
In computing a period of time above, the date of the event or default after which the designated period begins to run is
not included in the period; the last day of the period is included, unless it falls on a weekend or state holiday, in which
event the period runs until 5:00 p.m. on the next day that does not fall on a weekend or state holiday.
ENI US OPERATING NC.
1200 Smith, Suite 170,
Houston, TX 77002
us operating 713-393-6100
00004 23917 CKS NE 20267 - 0002076126 NNNNNNNNNNNN 2675100006209 K619A1 C
ALASKA OIL AND GAS CONSERVATION
COMMISSION AOGCC
333 WEST 7TH AVENUE
ANCHORAGE AK 99501
VENDOR NO: 0000457972
2076126
PAGE: f
DATE: October 13, 2020
CHECK NUMBER: 2078128
AMOUNT PAID: $10,000.00
ACCOUNT NUMBER: 113344023
Ent US OperatingCo.Inc.05
DIRECT INQUIRIES TO: 713-393£100
F4�
DATE INVOICE NUMBER DESCRIPTION GROSSAMOUNT DISCOUNT NEr AMOUNT
09/20/20 ORDERN0171 SD37-DSP1 WELL CIVIL PENALTY T $10,000.00 $0.00 $10,000.00
TOTALS $10,000.00 $0.00 $10,000.00
us operating
ENI US OPERATING CO. INC.
1200 Smith, Suite 1700
Houston, TX 77002
713-393-6100
PAY ALASKA OIL AND GAS CONSERVATION
TO THE COMMISSION AOGCC
ORDER OF: 333 WEST 7TH AVENUE
ANCHORAGE, AK 99501
JPMoMan Chase Bank N A.
Dallas, TX
CHECK 32-61
NUMBER 2078128 1110
October 13, 2020
VOID AFTER 180 DAYS...
CHECKAMOUNT
EXACTLY *********10,000 DOLLARS AND 00 CENTS
112207811,28118 1:L11000600:
$10,000.00
77S---7�
Authorized Sipalure
1133440 231IN
1 NMm
INDEXES
ens
August 26', 2020
Mr. Jeremy M. Price
Chair Commissioner
Alaska Oil and Gas Conservation Commission
333 West 71^ Avenue, Suite 1020
Anchorage, AK 99501-3572
RE: Notice of Proposed Enforcement Action
crnni us operating
eni us operating co. inc.
3700 Centerpoint Dr., Suite 500
Anchorage, AK 99503
Tel. 907-865-3300 Fax 907-865-3380
RECEIVED
AUG 2 6 2020
AOGCC
Failure to obtain AOGCC approval prior to performing well work
Failure to complete required Sundry Reports of well work within the required time
Nikaitchuq Unit SD37-DSP1 well (SD37-DSP1) (PTD 2110890)
Class I Waste Disposal Well EPA Permit AK11011-C
Nikaitchuq Unit (NU), Nikaitchuq Field, Undefined Waste Disposal Pool
Docket OTH-20-043
Dear Mr. Price,
Referring to the subject and Apparent Violation or Noncompliance (20 AAC 25.535(b)(1)) and
following Basis for Finding the Violation or Noncompliance (20 AAC 25.535(b)(2)), we would like to
clarify that no workover operations or repairs were implemented in the indicated period of time
between June and July 2020, therefore it is our understanding that no violation occurred against 20
AAC 25.280 (a) as no Sundry Approval was necessary to perform the mechanical integrity
verification.
Succeeding the Eni email dated July 14, 2020, a second email was sent to AOGCC to further explain
the sequence of events which led to the shut-in of well SD37-DSPOI which described the following:
On June 12 following a disposal of hot waste, an increased pressure on annulus A was recorded.
Due to the short period of time that had occurred from the last workover, performed in November
2019 and the fact that we had never experienced such a short well lifetime, our main theory was
that there was a thermal expansion of diesel present in the annulus. A behavior that we had
already experienced in the past. As no additional waste was in need of disposal, the well was shut
down accordingly.
In July we had the wire line crew in the field for other activities, a decision was taken to perform a
preventive mechanical integrity test (MIT) in order to eliminate any residual doubt before any
further disposal.
The initial operation of MIT performed by means of standing valve however left a doubt, due to a
recorded drop in pressure, between a possible leak against the standing valve and the ballooning of
production string as differe.., fluids in the annulus were present. These L.�o elements did not allow
to clearly identify the source of the problem.
A final confirmation of communication between tubing and annulus was recorded in July 7th
through an acoustic log.
Following the confirmation of annulus communication, the initial plan we considered was to
perform the workover to restore the tubing integrity accordingly, therefore the decision was made
to prepare the Sundry for the workover in combination with the notification of a recoded
mechanical failure. As the needed jewelry for the workover was not found for the needed time
frame, a revised decision taken on July 11`h, was to perform the WO when the equipment would be
available (in 120-150 days). A report with the full summary of investigation and action taken, in
order to shut in the well for this period of time was then prepared instead of the Sundry and
submitted according to AOGCC.
We recognize that this change of sequence in such a short period of time could have generated a
few days of delay in the communication as per 20 AAC 25.252 (e) and we have ensured that this
accident will not occur again.
As per the described sequence of events above, no workover was conducted in this period of time,
instead, we made the decision to shut in the well.
We do believe that no Sundry was necessary for the shut in operation.
Concerning the Basis for Finding the Violation or Noncompliance (20 AAC 25.535(b)(3)), here
below:
(1) Our Sundry Approval (Form 10-403) process forecasts the preparation upon the internal
confirmation of the work to be done and work program is completed.
Depending on the scope of work the process could require an expedited activity leg. well
integrity).
Once the Sundry Approval is accepted from AOGCC, a copy of Form 10-403 is maintained in
our database for any future reference.
At the end of the operation and once the well handover between our internal department is
completed, we issue the final well report including anything we learned during the completed
operation. The Form 10-404 is then prepared and submitted accordingly.
Although the previous system has proved successful in the past years, during the last period of
time, with the needed implementation of remote smart working we realized that our
procedural system was in need of updating.
In order to correct the identified gap, we have implemented a new procedure which considers
a more transparent and systematic approach to the mandatory activity / notification:
1. We have generated a check list which will become an integral part of our workflow,
2. Both Forms, 10-403 and 10-404 will be uploaded in our international repository system,
3. A refresh training program for State requirement is under preparation and is planned to
begin starting middle September 2020.
With these three implemented actions we believe we are going to overcome the previously
recorded accident.
(2) Report of Sundry Well Operations (Form 10-404) required for the work completed in
November 2019 under Sundry Approval 319-183 has been delivered in August 24`h, 2020 at
the email address aogcc.permitting@alaska.gov. Hard copy here attached.
Therefore, we kindly ask yo, o re-evaluate your proposed civil penalty a..ordingly.
We remain available for any further clarification that may be required.
Regards,
P9"- H�:A
David Hart,
Alaska Operation Manager
Cc: Evan Osborne, USEPA, Region 10 (osborne.evan@epa.gov)
Tim Mayers, USEPA, Region 10 (mayers.timothy@epa.com)
James B Regg, CED, (jim.regg@alaska.gov)
AOGCC Inspectors
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMIS,nON
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon Plug Perforations U Fracture Stimulate U Pull Tubing Operations shutdown Ll
Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑
Hug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter susp well ❑ Other. ❑
2. Operator Name.
4. Well Class Before Work: 5. Permit to Drill Number:
Ent US Operating Go. Inc.
Development ❑ Exploratory ❑ 211-089
Stmtigmphic ❑ Service Q 6. API Number.
3. Address:
3700 Centerpoim Dr, Suite 500, Anchorage AK, 99503 1
5D-629-23451-00-00
7. Property Designation (Lease Number);
8. Well Name and Number:
ADL 0391283
SD37-DSP1
9. Logs (List logs and submit electronic data per 20AAC25.071):
10. Field/Pool(s):
4-12" Tubing Caliper Log run during Rigless operations (1 011 21201 9) prior to WO
Nikaftcli Undefined Waste Disposal Pool
11. Present Well Condition Summary
Total Depth measured 6985 feet Plugs measured WA feet
true vertical 6985 feet Junk measured N/A feet
Effective Depth measured 6985 feet Pallier measured 5635 feet
true vertical 6985 feet true vertical 5635 feet
Casing Length Size MD TVD Burst Collapse
Conductor 160 20 160 160 WA N/A
Surface 4112 13-3/8" 4112 4112 5210 2480
Intermediate 6901 95/8" 6901 6901 6890 4790
Perforation depth Measured depth 5870-5910; 6522-6613 feet
True Vertical depth 5870-5910; 6522-6613 feet
Tubing (size, grade, measured and true vertical depth) 4-12" 13 -Cr L80 5785 It MD 5785 ft TVD
Packers and SSSV (type. measured and true vertical depth) 4-12"x95/8" AHC Packer 5635 ft MD 5635 ft TVD
4-1/2"x9.5/8" Model D Packer 5715 ft MD 5715 ft MD
TRSSSV 2144 ft MD 2144 ft MD
12. Stimulation or cement squeeze summary:
Intervals treated (measured): Cement Squeeze performed in April 2013 on first perforated interval (6542-6573 ft MD/TVD). In August 2013 a 15% HCI add
wash pump job performed on interval 65225613 ft MD/TVD to reduce surface tubing injection pressure.
Treatment descriptions including volumes used and final pressure:
Cmt Squeeze: 1obbl spacer, 32bbl 16.2ppg G Cement, 10bbl spacer, final press. 620psi. Acid Job: 510bb115% HCl (splitted in 3 times), final press. 3220psi.
13, Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation: 4162 386 2821
Subsequent to operation: 2470 258 2378
14. Attachments (rewired Per 20 AAC 25.070.25.071, a 25.283)
15. Well Class after work:
Daily Report of Well Operations ❑�
Exploratory ❑ Development ❑ Service ❑ Stratigraphic ❑
16. Well Status after work: all U Gas WDSPL
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data ❑
GSTOR ❑ W INJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.Sundry Number or N/A if C.O. Exempt:
319-183
Stefano Pierfelid
Authorized Name:
Contact Name: Messio Medea
Well Operations Project Manager
Authorized Title:
e — 08/24/2020 Contact Email: alessio.medea@eni.com
��
Authorized Signature with date: ` Contact Phone:+1 907-346-7889
[Senior Pet. Engineer: (Senior Res. Engineer:
Form 10-404 Revised 312020 Submit Within 30 days of Operations
^oily Report
.te: 111112019
Report #: 1
Page: 1 of 2
Well Header
Well Name:D
37-DSP1
Wellbore Name: e: SD37-
Subsitllary
Well Code: 25754
ADL -388583 ENIPETROLEUM
Job: WORKOVER
ani
WCEILevel: 3
^oily Report
.te: 111112019
Report #: 1
Page: 1 of 2
Well Header
PermltlConcession N° Operator
Subsitllary
Initial Lahr Code
ADL -388583 ENIPETROLEUM
ENI Peholeum Co. Inc
DEVELOPMENT WELL O PC= DI
COLTIVABONE
Rotary Table Elevation (fl) Ground Level (ft) Ftnl Flange (kl RKB BBasa F5nge (B) RKB -Tubing Spool (ft)
32,805.12 13.10 18.80 32,788.32 32.]84.62
Rigs
Rig Name COMreotor Rip Type RI9 Num Rig Sten Date Rig Release Date
RIG 15 OOYON LAND RIG 0]23 11/1/2019
Daily Information
Werther Temperature(°F) vast Days LTl loess) Days to (days) 705
Overcast 26.6 SW @ 14 MPH ] OO ]35.00 104.0
Safety Incidents - Near Miss
Date Category Type Subtype Savedty Cause Lost time]
Comment
Safety Drills
Days Until Next Check
Type
#Occur
Lest Date
Next Data
(days)
Rig Inspection
1
11I1/ID19 11/212019
1
Safely Meeting
1
11It12019 112/2019
1
Casings seat
Cas. Type I
OD (in)
ID (in)
Grade
Top IRKS)
Haltom (ftKB)
TVD Bot. (ftKB) Landing Date
CONWCTOR
20
18.25
-65
0.0
160.0
160.0 8/222011
1331W SURFACE
13318
12.42
L80
-4.0]8.1
4,112.9
4,112.7 9272011
CASING
JX
LASING
9518
LBO
-6,858.9
8,901.8
6,901.4 10182011
CASINO
6,51].0
6,516.8 31292013
Last Cementing
Lamanting Start Data: 18912011 String: ahacord not found> Comment:
atg # Top (W8)
Tap Maas Meth
an (flK8)
Co.
1 1,317.0
Volume i,scurnions
5,901.0
Rig up and test hart lines from Schlumberger to ng V3000 psiA Rig pumps break circulation and pump 110 bbls. of
Mud Push II @ 10.1- rale of 6 bpm Q 301 psiA Shut -down drop bottom plug k SLB mix 8 pump Lead slurry 71 bbls.
12.5 ppg.\ Close Libuselek 1.57 Yield, mix wale, at 5.463 gaVsK - Pump rate of 4.0 bpm ® 460 paA SLB mu and
pump Tail slurry 80 bible. C 15.0 ppg.k Gass G k 1.16 Yield. mu H2O at 5.092 gagsk. - Pump rate of 3.0 bpm ® 500
psi.\ Shut down 8 drop top plug - SLB pump 10 bids H2O and wash up.k Displace wish 189 bbls. ® 10.1 ppg mud with
ng pump at 7 bpm w/200 psi, at 489 bids away slow pump to 2 bpm with 950 psi. FCP with full remrnsk Bump plug to
5001 over FCP to 1500/pat. - Hold for 10 minutes and deed oil- Urea floats are M1dtling- GeodA Cement in place
® 0530 his.
2
Job Information
Jab Phase Planned Start Dale Start Data End Date P80Duration (days)
WORKOVER 1111/2 019 1 3;00 11/11201913:00 800
Daily Summary Operations
24h Forecast
Inject 100 We of Hi -vis pill followed with 500 ids of brine down SD37-DSP1. Doyon to continue prepping dg/area for upcoming rig move. Move in and ng up HES Elise to set Baker 2-1/e' Inflatable Bridge Plug in
SD37-DSP1.
24h Summary
Nipple down BOP stack. Nipple up tubing adapter and wellhead. Vetco completed Passport testing on wallM1ead. Baker conducted final checks on ESP caidelmotor continuity. Doyon continuing M prep nyarea for
upcoming ng move, make crane picks far Generator # 5 and Kodmey unit HES Elise crew, Baker Thm-tubing, and mane support arrived at SID. Begin pumping 100 Mils of Hi-vls Pill down SP37-DSP1.
Operation at 07.00
Prep to Rig Up E -Line
Time Log
5ma
End
Cori
Tim.
Tlme
Dur (hr)
lho
Phase
Opr.
Act
Plan
OPer.Deser.
13:011
18:00
5.00
5.00
MOB
A 1
D
WD MOMW litres antl prep KoomW for emne pick. ConfiRw breakir9 service/m al Ilma under We ng floor, Make up pup
joint for rap drive stability wM1ik, moving, power down lop drive and pull cables to rig floor, RID suitcase lines for valve house 0
Hill, Hellibun in Ellne, Baker Th,ulubing, and crane support anFved M SID.
18:00
00:00
B.OD
11.00
MOB
A 1
P
Crane operations, pick Gen # 5 generator, Koomey uMt move ..it engineer shack. prep SD37 Mr herculite and ng mats.
Gas Readings
Avg Background Gas (%)
Max Background Gas I%)
Avg Connection Gas l%)
Max Connection Gas (%)
Avg Drill Gas (%)
Max DHII Gas (%)
Avg Trip Gas (%)
Max Trip Gas (%)
Cumulative Mud Volumes
Active Volume (bbl) Hak Volume (bbl) Additlons (bbl) Cum Addition. (bbl) Losses (bbi) Cum Losses (bbl)
Daily Contacts
Position
Contact Name
Company
Title
Emus
Office
Mobile
Eni representative
Steve Lawrence
Eni
Drilling SupV.
siddrilling�eni.com
6810715
Eni representative
Mho Gmbh
Fri
During Supv.
siddMling�enl.com
907-686-0715
Eni representative
9i Wilson
Ertl
Onlling Su,.
Ed represent
Wide Thomas
Eni
Rig Led
AM,ClernNyoni 5d�mN.m
907-885.0722
Eni representative
Pat Ahem
Ent
HSE
Eni relaeaeMaBve
Marlk Hubler
End
MSE
Tod Push
Sam Dye
Dothan DMIing
Field Superintendent
Tod Push
Justin Hays
Dayan Oniting
Tod Pusher
ngl5itdoyondnitinOcom
Tod Push
Ted Krug.
Dayon Drilling
Tour Pusher
ngl5@doyondn11ing.com
907-88"716
Tool Push
Cliff ovens
Dotson Defil
HSE
cowers@dopirdtilling.cum
685798
Tool Push
Scott Shnmom
Doyon Dril ltp
HSE
Personnel Log /PCB)
Company
Sam. Type
Work H lhn
Stand-by H(hin
Court
Note
DER
Casing
12.50
o
Flow back
12.50
0 Onling
EPA
Inspector
12.50
jDn1:ingIbis.
0 Drilling
NC Machinery
Mechanic
12.50
0 Drilling
Ent
Engineer
12.50
0 DMIing
ASRC
Clark
12.50
1 DMIing
Well Name: SD37-DSP1
Wellbore Name: SD37-13SP11
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
" oily Report
.Le: 111112019
Report #: 1
Page: 2 of 2
Personnel Log (POB)
Company
Smv. Type
Work H (hr)
Stand4ey H (hr)
Count
Note
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Beecon
Medic
12.50
1
SID Support
Doyon
Find Supenntendent
12.50
1
Drilling
Normem OiBaild Services
pusher
12.50
1
SID Support
Vides (SHOE)
Wellhead
12.50
1
Drilling
ACS
Emscoental
12.50
2
SID Support
ASRC
Company Man
12.50
2
Dri91ng
Beacon
HSE
12.50
2
SID Support
Doyon
Tool pushers
12.50
2
Chiling
Doyon
HSE
12.50
2
Drilling
MI Swaco
Mud Engineer
12.50
2
Drilling
SLB
Cement
12.50
2
Drilling
Baker CeldriliM
ESP Tells
12.50
3
Drilling
Competentie
Logistic
12.50
4
SIDSuppon
Halliburton
Slid Line
12.50
6
Drilling
Ml sum.
Mud Rant
12.50
6
Drilling
Purcell
Security
12.50
6
SID Support
Ml Sweco
WIF
12.50
B
SID Support
ESS
Catering12.50
11
SID Support
Worley
Trod driver l Crane operator
1250
14
Drilling
Doyon
Rig Personnel
1 1250
1
25
Dnlling_Total Drilling Personnel
BOP Stack a Components
Start Dare
Last Certation Date Pressure Wang (psi!
Description
BOP Stack
1012412019
5112015
5,0000
Type
Make
Model
ID Nom (in)
I
W nge (psi)rW24QDlB
Cent Cate
Annular
HydnI
GK 500
13518
5,000
312 ". W VSR
Hydril
MPL 5000
13 98
8.000Blind
Shear Rem
Hdnl
MPL 5000
13 98
5,000412"xT'VBR
Hydnl
MPL 5000
13518
5,000
Slow Circulation Rates
Pump Numbers Make: Wale
Star
MotleI: QUWa2450
Start DateEnd
Date
Li�1er Sim
(in)
Volume Per Stroke Override (bbgstk) Max Preasum (Psi)
411012(118
5
0078
7599.9
Cate
Depm (MKe)
31ow SPtl
Strokes (spm)
P(Psil
ERI%)
QFlow Spun)
Pump Number. 2 Make: Mine Slav
Modal: Queen 2450
Steri Dab End Date
Liner Sim
(in)
Volume Per Stroke Override (bbgstk) Max Pressuro (psi)
41102018
5
0.070
],500.0
Data DeptM1 (RKB)
31ow SPtl
Strokes (spm)
I P (psi)
ER 1%1 Q Flow (spm)
Pump Number. 3 Make: National BUDD
Madel:
12-P-160
Start Deb End Dale
Liner Size(in)VWume
Per Stroke Cvartide (bbyaw) Max Pressum(psi)
V1012019
4114
0.053
],500.0
Dale
i Depth (MKB)
Slow Spd
strokes (spm)
P (psi)
i ER (%) Q Flow (gpm)
Daily Bulk
Supply arm Description: Equipmenl Fuel
Unit Label: Gal
Unit Size: i
New:
Dant Consumetl Wceived
Ratumem Cum Consumetl
Cum WcNvetl Cum
Returned Cum On Loc
Note
11!12019 819.0 819.0
819.0
8190
Supply Mem Descriptor: M Plant Balers
Unti Labeh Gal
Unit Size:
Nate:
Dale Consumetl Receivetl
Wtumatl Cum Consumed
Cum Received Cum
Returned Cum On Loc
Not
111112019 198.0 1950
198.0
198.0 0.0
0.0
Supply Item Description: Rig Fuel
U.M Label:
gal us
Unit Size:1
Nola:
Date Consumetl Wcamed
lRediummul
Cum Consumetl
CUrWceivetl Cum Rafumetl Cum On Loc
Note
11112019 1391.0 9,140.0
1,391.0
9.140.0 0.0
],]49.0
Supply Mem Description: Rig Water
One Label:
bM
Unit Slue:1
Note:
Pete Consumetl Wceivetl
Relunwtl
Cum Consumetl
Cum naceivad Cum Wlumetl Cum On Lac
Note
111112019 0.0 0.0
0.0
0.0 0.0
0.0
Supply Item Description: WIF Bogen
UnM Label:
Gel
Unit Size:
Note:
Date Consumed ReaeNed
Wlumetl
Cum Consumed
m Wceived Cum Returned Cu. On Lee
Note
11/12019 42.0 42.0
42.0
ICU
42.0 00
0.0
Supplyporn peamiption: WIF Injected geael
Unit Label:
Gel
Unit Size:
Note:
pate Consumetl Wceived
Wtumetl
Cum Consumetl
Cum Received Cum Retuman Cum On Loc
Note
11/12019 00 0.0
0.0
0.0 0.0
0.0
Last Authority Visit
Data Tot snap. Nbr
Total I.N.C. number Comment
STOP Cards Submitted
Company
P RPts
Com
Doyon Drilling
]
PJSM'S
Calvin Drilling Inc.
10
Sate Card.
Doyon Crllling Inc.
7
COW
Doyon Drilling Inc.
]
HRWS
MI Swaco
4
RIR's
MI Swaoo
3
HARCIJSA
General Notes
Cammem:
Well Name:D
Wellbore Name: e: SD37-
37-DSP1
Well Code: 25754
• Job: WORKOVER
enf WCEI Level: 3
^wily Report
.Le: 111212019
Report 11: 2
Page: 1 of 3
Well Header
PermitlConcession N'Operator
Subaldiary
InMat Lahee Code
ADL -388583
ENIPETROLEUM
ENI Petroleum Co. Inc.
DEVELOPMENT WELL O PORO Of
COLTIVAZIONE
Rotary Table Elevatlon (ft) Ground Level (11) First Flange (R) RKB-Base Flange IN) RIB - Tubing Spool (ft)
32,805.12 13.10 116.80 32,788.32 32,764.62
Rigs
R Dag Release Date
Rig Name Conbector Rig type Rig Num Rig Stan Ri
RIG 15 DOYON LAND RIG 0]23 111112019
Daily Information
Weather Temperature('F) Wind Days LT! (day.) Days N(days) POB
Cloudy 23.0 SW ® 27 MPH 738.00 736.00 104A
Safety Incidents - Near Miss
Date calegory Type Subtype SeverRy Cause Last time?
Comment
Safety Drills
Days Until Next Check
Type
d Occur
Last Date
Next Date
(days)
Rig Inspection2
11/212019
111312019
1
Safety Meeting
2 11/212019
111312019
1
IT H2S Drill
1 11/2/2019
11/16/2019
14
Casings seat
Cas. Type
OO (in)
ID (int
Grade
ToplttKB)
B.hom(ttKB)
TVD Bot lttKe)
Landing Data
CONDUCTOR
20
18.25
X-65
0,0
i6D.0
160.0
9/1212011
13318"SURFACE
13318
12.42
L60
-40790
4,112.9
4,112.7
9117/2011
CASING
CASING
95/8
L80
-6,8580
6,901.8
6,901.4
101812011
CASING
6,517.0
6,516.6
312911013
Last Cementing
Cementing Start Date: 10/912011 String: co cond not found> Comment:
SIB p
Top (RKB)
Top Meas Meth
Ston (RKB)
Co.
t
4,317.0
Volume Calculations
6,901.0
Rig up and test hard lines from Schimibergm to dg 0000 psiA Rig Pumps- break diwlalion entl pump 110 bbN. of
Mud Push 11 ® 10,1 -rate of 6 bpm a MO pNA Shut -down drop bottom plugA SLB mix & pump Lead dun 71 bbls.
11112.5 ppgd Class, Litecrete\ 1.57 Yield, mix water at 5.463 gai - Pump rate of 4.0 bpm Q 460 psi.\ SLB mix and
pump Tail slurry 80 bbls. ®15.8 pMA Gass G \ 1.16 Yield, mu H2O at 5.092 gairsk. - Pump rate of 3.0 bpm ® 500
psiA Shut down & drop top plug - SLB pump 10 bds H2O and wash up.\ Displace with 489 bbls. @ 10.1 'pg mud with
rig pump at 7 bpm w/200 psi, at 469 bids away slow pump to 2 bpm with 950 psi. FOP with lug returns\ Bump plug to
501 over FOP to 1559/psi. - Hold for 10 minutes and Used off- check floats are holding - GoodA Cement In place
Q 05W his.
2
Job Information
Job phase Planned Stan Date Start Dale End Dale P50 Duration (days)
WORKOVER 11/1/201913:00 11/11201913:59 0.00
Daily Summary operations
24h Forecast
HES Elms to drift with CCL)unk basket then set Baker 2-118" Inflatable Bridge Plug In 4.5" 12.6 lbs tubing joint below XN nipple. Doyon 15 to begin moving over to S W7.
24h Summary
Inject 100 bbl high viscosity spacer forimed by 476 bds of 6.6 ppg brine down Si disposal wall. Continue to prep Doyon 15 and area around SD37 for upcoming it, move. MIRU HES Bins and support
equipment to ddR and set Bake, Inflated. Bride. Plug to pop the wag for Doyon 15. HES was unable to get toads to fall in wellbore due to lack of weight bar on location. HES has same dine weight bar emmue to
SID. Will be delivered to SID on morning tavemra8 HES.
Operation at 07.00
M/U E6ne Gauge Ring, and prep to RIR.
Time Log
Start
End
Cum our
Time
Time
Durni)
(hr)
Phase
Opt.
Act.
Plan
OPer. Descr.
0000
5900
8.00[221,00
MOB
A
2 P
Lay Hrmulite liner e� alp mets for rig foot print in hoot MSDS], prep b move dg. Pump 100 BBL aid high viscasily spacer
at 10.1 PPG, followed by 476 BBL of 8.6 PPG RO water. Pre pump pressures TBG 1600 PSI, A Annulus 451 PSI, Post
pump pressures TBG 2569 PSI, A Annulus 692 PSI. Mentioned A Annulus, with pressure dimdng to 1600 PSI bled pressure
to 40) PSI, continued to mortar Annulus w9h pressure building to 1740 PSI, bled pressure to am PSI.
MOO
0830
2.50
MOB
J
15 P
Spot Etna unit and tad bailer on 5637. HES Dine lib plan meeting with ENI Uging Authority. HES, Wadey. Co man, HSE,
ACS. HES installed PLC in unit
0830
12:30
4.00
MOB
J
15 P
Logisdc r spotting HES Bine PCE trey, conside shrove blocks, N2 race Hydraulic BOP reek, and 300 ton cone. Spoil off
5/1 S' Elmo and ran through grease head and retie cable head 8-2, 28500 pull out weight. Rig dean up BOP and mezzanine
areas, stage equipment for BOP nipple up, 0 in gaps in rig mats to eliminate walking haaerds. Services lop drum, change out
upper and lower IBOP an top drive, continue to prep rig for move.
1230
1830
6.00
MOB
J
15 P
Install tocistrirg in Iub&Mor and verify CCL wasong. Install grease head on 1.1ni. hor. Install sheaves and run 5/18' Eline
through sheaves. Pick up lubricahor and make up Sops. Take candrol of wire. Stab on weceoad. PJSM. Pressure test HES
IubdcatorlPCE to 359.0 psl with LW tram Wife.
Note pressure m 14:30 TBG 22138 PSI, A Annulus 931 p91.
18:30
19:30
100
MOB
J
15 TDD4
HES dine attempted to run in hale w/3.625' junk basket Unable to get hods to fall. Hellibudon does not have enough Eline
weight bar on location le get tools to fall in oregano. Helkbudon having more weight bar ¢pure from Deadhoom shop.
19:30
21.00
150
MOB
J
15 TDOuI
Shut in well antl bleed down. Un-atab ham wall. Add SliWlne weight bar to todstre, to add weight. Stab back on SD37.
Pressure test lubricator to 250D Fai, smell drip on lubricator connection above BOP. Shut in antl bleed down21:00
00:00
300
MOB
J
15 TD04
Un -slab from wellhead. Dedraim mad. to severe well and ley down pressure condrd equipment and wawa far the night. HEB
he. mare Blue weight bar earoute from Deadhome.
Gas Readings
Avg Background Gas (1:) Max Background Gas (%)
Avg Coursed.. Gas 1%)
Max Connection Gas
Avg Drill Gas (%) Max Drill Gas (%)
Avg TOP Gas f e)
Max Trip Gas I%)
Daily Mud Volumes
Tank/Addhon/LOss Type Des Volume (bbl)
Hole
9].5
Loss
O
Tank
DO
Cumulative Mud Volumes
Active Volume (bbl) Hole Vol.. (hot) Atlditions (bbl) Cum Additions (bbl) Losses (bbl) Cum Losses (bbl)
497.5 497 5 0.0 0.0 0.0 0.0
Well Name: SD37-DSP1
Wellbore Name: SD37-DSP1
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
^wily Report
.ce: 11/2/2019
Report #: 2
Page: 2 of 3
Daily Contacts
Fashion
Contact Name
Company
Title
Email
We.
Mobile
Ertl representative
Steve Lawrence
Ens
Drilling Sup,.
siddrilling(Elemoom
BBS0 15
Eni representative
Mike Grubb
Eni
Drilling Supv.
siddrilling®eni.com
90]4585-0]15
Eni representative
Or Wilson
Eni
Drilling Sup.
Eni representative
Wade Thomas
Eni
Rig Clerk
AKRigC1elksDoyoni5@eni.cnm
90]6854)]22
Er representative
Pat Ahem
Eni
HSE
Ent representative
Mark Hubler
Eni
HSE
Tool Push
Sam Dye
Doyon Drilling
Field Superintendent
Tool Push
Justin Hays
Dayan Dring
Tool Pusher
dglS@doyonddiling.com
Tool Push
Ted Kroger
Doyon Drilling
Tour Pusher
dglS@ftyonddiling.com
90]6850]18
Tool Push
amONsins
Doyon Drilling
HSE
ens®doyondnlling.cam
1385-0]98
Tool Push
Scoft Simmons
Doyon Dnlling
IHSE
Personnel Log (POB)
Company
SON. Type
Wank H (br)
Stmday H (hr)
count
Note
GBR
Casing
12.50
0
Dolling
Ery.
Flow back
12.50
0
urging
EPA
Inspector
12.50
0
Drying
NC Machinery
Mechanic
12.50
0
Drying
Enl
Engineer
12.50
0
CrN,
ASRC
Clerk
12.50
1
Drying
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
Doyon
Field Superintendent
12.50
1
Driving
Northam Oilleild Services
Frisker
12.50
1
SID Support
Vetw(BHGE)
WellHead
12.50
1
Singing
ACS
15m,komenlal
12.50
2
SID Support
ASRC
CompaMMan
12.50
2
Drying
Beacon
HSE
12.50
2
SID Support
Doyon
Tod pushers
12.50
2
Drilling
Doyon
HSE
12.50
2
Drilling
MI S..
Mud Engineer
12.50
2
Drying
SLB
Cement
12.50
2
Drilling
Baker Centrift
ESP Techs
12.50
3
Driving
Competenva
Logistic
12.50
4
SID Support
Helliburlon
Slick Line
12.50
6
Driving
MI Swat.
Mud Plaid
12.50
6
Drying
Purcell
Security
12.50
6
SID Support
Ml Sworn
WIF
12.50
0
SID Support
ESS
Catering
12.50
11
SID Support
Worley
Truck driver/Crane operator
12.50
14
Drying
Doycn
I Rig Personnel
I
12.50
25
1 Dnving_Total Drilling Personnel
BOP Stack 6 Components
Description
8taH Dale
Lest Came yiea8on Date Pressure Rating (psi)
BOP Slack
1024/2019
51112015
5,000.0
Type
Make
Model
ID Nom(in)
PRange (psi)
Leat can Date
Annular
MOMGK
500
13518
5,000.0
0112015
3112" V VBR
Hytlnl
MPL5000
13518
5,000.0
884/2018
Blind Sheer Rem
Hydr
MPL 5000
13518
5,000.0
8/24/2018
4112"aT VBR
Hytlnl
MPL 5000
135/8
5,000.0
0112015
Slow Circulation Rates
Pump Number.1 Make: Wake Star
Model: Quatro 2450
Start Date End Date
Liner Size (in)
Volume Par SHoke Ot mambl.atk) Max Pressure(psi)
41IW2018
5
0.078
7,500.0
Data Depth (ftKB)
Slow Sped
I Strokes (spm)
P (psi)
EH
Pump Number: 2 Make: While Star
Model; Quatlo 24W
Sart Dale End Date
Liner St. (in)
Volume Per SNoke Override (bbViAk)Mea Preasure (psi)
41102D18
5
0.078
7,500.0
Data
Depth (MIKE)
Slow Spit
Strokes(apm)
P(psi)
I ER (%)
OFIcw (gym)
Pump Number. 3
Make: Nasional Supply
Model;
12-P-160
Start Dake End Dale
Lane Size (in)
Volume Par Stoke Ovamitle(bbvsUo Max Pressure(Psi)
41102019
41/4
0.053
7,500.0
Date
Depth (ftNB)
Slow Sptl
St.kes (spm)
P (psi)
EH (%)
O Fiber (gym)
Daily Bulk
Supply Hem Deacniptuc Equipment Fuel
Unit Label:
Get
Unit Size: t
Note:
Dale Consumetl Receivetl
Returned
Cum Consumed cum Received
Cum Returned Cum On Los
Note
111212019 9720 9]2.0
1,7910
1,791.0
0.0
0.0
Supply Hem Dicalptlon: MW Plant Balers
Unk Label:
Gal
Unit Size:
Note:
Dab consumed Receivetl
Returnetl
Gum Consumed Cum Received
Cum Returned Gam On Loc
Note
11812019 195.0 U. 0
$96.0
396.0
0.0
0 0
Supply Item tessellation: Rig Fuel
unit Label:
gal us
Unit Size: t
Note:
tea Consumed Receivetl
Retumetl
Cum Consumed Cu. Recrin ed
Cu. Returnetl Co. On LOC
Note
118.2019 1,109.0 3.854.0
2,5000
12,794.0
0.0
102940
Supply Item Dern, on: Rig Water
Unk Label:
bbl
Unit Size:1
Note:
Date Consumed Receivetl
Returned
Cum Consumed Co. Receivetl
Cum Returned Gum On Loc
Note
1188019 20.0 20.0
20.0
20.0
0.0
0.0
Supply hem DeakiRtlon: WIF Siders
Unit Label:
Gal
Unit Size:
Note:
Date Consumetl Received
Returnetl
Cum consumed Cum Received
Cum Returnetl Cum On Loc
Note
11812019 d2.0 42.0
84.0
86.0
0.0
0.0
Supply Hem Deser I, ri: WIF beached Dhsel
Unit Label:
Gal
Unit Size:
Note:
Date Consumetl Received
Ratumetl
Cum Consumed Cum Received
Cum Returned Cum On Loc
Note
1112/2019 00 0.0
0.0
00
0.0
0.0
Well Name: SD37-DSP1
Wellbore Name: SD37-DSP1
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
^airy Report
.e: 111212019
Report 9: 2
Page: 3 of 3
Last Authority Visit
Data Totinsp. Nbr
Total I.N.C. number comment
STOP Cards Submitted
Campany
N Rpt;
Com
Doyon Dniling
Doyon Drilling Inc.
Doyon Drilling Inc.
DWan Drilling Inc.
MI Swaco
Ml Sw co
a
8
8
16
3
4
PJSM'S
HRWS
cow
W. C.M.
RIR's
HARGJSA
General Notes
Commem:
wily Report
AS: 1113/2019
Report #: 3
Page: 1 of 3
Well Header
Well Name:D
37-DSP1,
Wellbore Name: e: SD37-
Operator
Well Code: 25754
Inibal Whes Code
Job: WORKOVER
en i
WCEI Level: 3
wily Report
AS: 1113/2019
Report #: 3
Page: 1 of 3
Well Header
PerrnitlConcession N°
Operator
Subsidiary
Inibal Whes Code
ADI488583
ENI PETROLEUM
ENI Petroleum Co. Inc,
DEVELOPMENT WELL O POZZO DI
COLTIVAZIONE
Rotary Table Elevation(B) Ground Level(it) First Flange tri) RKR - Base Flange (n) RKe- Tubing Spool lit)
32,805.12 13.10 16.80 32,788.32 32,]84.62
I
Rigs
Rig Name Contrastr Rig Typo Rig Num mg Start Date Rig Release Date
RIG 15 DOYON LAND RIG 0723 1111/2019
Daily Information
Weather Temperature l°F) Wind Daya Ln(days) Daysw(days) POB
Overcast 23,0 SW @ 11 MPH ]3].00 ]3].00 108.0
Safety Incidents - Near Miss
Date Category Type Subtype Severity Cause Lost tai
Comment
Safety Drills
Days U.il Next Check
Type
#Occur
Last Deco
Next Date
(days)
Rig Inspection3
111312019 111412019
1
Safety Meeting
3
1182019 11/412019
1
TT Fire Drill
1
11/3/2019 1111]201914
TT H2S D611
1
11/212019 11116/2019
13
Casings seat
Cas. Type
OD (in)
10 (in)
Gmtle
Top fili
Bottom (hKB)
WD Bat. IRKB)
Landing Date
CONDUCTOR
20
18.2f
-65
0.0
180.0
160.0
92212011
13348"SURFACE
13318
12.4B0
-4.076.0
4,112.9
4,112.7
92]12011
CASING
CASING
95/8
BO
-6,858.8
6,901.8
6901.4
IOIW2011
CASING
6,51].0
6,516.6
312912013
Last Cementing
Cam in ing SartDew: 1018/2011 String: «c.fil not fourM> comm..:
Sieg
Top(KKB)
Top Meas Meth
Bt. (RKB)
Com
1
4,317.0
Volume Calculations
6,901.0
Rig up and test hard lines from Schlumberger to ng ✓3000 Psi.\ Rig pumps- break circulation and pump 110 bbls. of
Mud Push II @ 10.1 -rate of 6 bpm @ 300 psi.\ Shut4own drop bottom plug.\ SLB mix & pump Lead slurry 71 Mils.
@ 12,5 ppgA Class, Lescrete\ 1.57 Yield, mix water at 5.983 gagsk. - Pump rate of 4.0 bpm @ 480 psi,\ SLB mix and
pump Tail slurry 80 bbls. @ 15.8 ppgA Gas. G \ 1.16 Veld, mix H2O al 5.02 gaysk, - Pump rale of 3.0 bpm @ $00
psi \ Shut down & drop top plug - SLB pump 10 lows H2O and wash up.\ Displace with 489 bbls. @ 10.1 pp9 mud with
ng pump at l bpm w/200 psi, at 469 bots away slow pump to 2 bpm with 950 psi. FOR Win full reWms1 Bump plug to
NOrpsi, over FCP to 1501 - Hold for 10 minutes and bleed off- check goats are holding - Goed.1 Cement in place
@ 0530 hr..
2
Job Information
Jab Phase Planned Sart Date Sart Data End Data P50 Duration (days)
WORKOVER 11/1(201913:00 1111201913:011 0.00
Daily Summary Operations
24h Forecast
Halliburton E-Ime to set 2-118" Baker Inflatable Bridge Plug Test plug and move wireline of well. Doyon 15 move to SD37.
24h Summary
Continue to prepare for Doyon 15 ng move. General housekeeping, Mi preventive maintenance, continue to clean and paint MIRU HES Bins, drifted w8.625- lank basket ta 5,800' elm and logged 200' OWN,
tail t0 correlate IBP setting depth. Hat ibu ion E -line unable to get shooting panel to work with Baker power source. Halliburton E-lech mobllk ed from Oeatlhmse and fixed panty.
Operation at 07.00
Prep to PIN WASP an Eiine.
Time Log
Start
EndCum
our
Time
Time
our (hr)
(hr)
Phase
OR,.
Act.
Plan
Ope . exact.
00.00
0600F4.00
8.00
MOB
A 1
P
Continue to prepare for ng move, cameral housekeeping, MP2 preventive maintenance, continue to dean and paint.
0600
1000
10.00
MOB
J 15
7004
PJSM with all HES and Won" cane, pick up lubncalor, along with exhe riser. and make up additional elms weight bars in
tool string. Stab lubricator on wellhead, discovered eline robbing on spreader bar sling. Unswb from wellhead and change
sheave orientation. Test lounicalor with LVT.
10.00
1400
1400
MOB
J 15
P
Run in hole with 3625' junk basket and drgted out tubing tel al 578T elm, logged CCL for 200 of tubing tall. Pulloutofhale
with 3,625' junk basket. At 4000' HES Hinegenerator wiled, c rthoued to pug o d dhole WSHA. Inlubriwarw/tws.Shut
in, blow down lubricator with N2, trouble shoot generator. while moblized HES mechanic. Run extension coed Mom tool treller
generator cur temporary powerto Elmo panel in ung. Doyon 15 working on Preventative maintenance.
1400
1]30
1]50
MOB
J 15
TDO4
Unswbfromwelhead.TroubleshootgenareWr. HESattempted checkfire through panel, any gelling 18OV. Bakerattemped
test finng through HES pane, fatted. Troubleshoot HES generator & shooting panty when HES Elmo Tech is anrouts.
1]30
21:30
21.50
MOB
J 15
P
HES Etech on location Troubleshoot HES panel and got working. Elect bypassed pane and set up dined line to slip rings at
drum. Baker still unable to send 4BIV through HES parts[ from Meir Power source but we can se IBP with HES shooting
panel as power source. HES getting good NOV teats from them shooting panel to cable head Will blaslen meter installed on
pin and. Make mwtiple costs, checked good, Discuss plan wmrerd w/Auhorage team, decision made to set IBP in the
m0ming due to news houring out by the time we would get IBP set,
21.30
00:00
2 50
24.00
MOB
A 1
P
Rip down rockwasher and wage. Co.lnue preventative maintenance, general housekeepinglpainting.
Gas Readings
Avg Background Gas l%) Max Background Gas I%) Avg Connection Gas (%)
Max Concedes Gas (%)
Avg Drill Gas I%) Max.1s. Gas( -b) Avg Ino Gas (%)
Max Trip Gas (%)
Daily Mud Volumes
TankfAtlditioNLoss
Type
Des
Valuma(bi
Hole
49].5
Loss
0.0
Tank
0.0
Cumulative Mud Volumes
Active Volume (bbl) Hole Vatume (bbl) Additions Ibbg Cum Additions (bbl) Losses (bbl) Co. Losses (bbl)
497.5 49].5 0.0 00 oO 0.0
Daily Contacts
Position
Contact Name
Company
Title
Email
Office
Mobile
Eni representative
Steve Lawrence
Ens
Dwling 6uPv.
asurning(Qeni.wm
885-W 15
Eni reprecenalive
Mike Grubb
Ent
Drilling Si.
edddlling@enl.cem
9074ilS0715
Eni representative
El, W ant
Eni
Coiling Supv.
Well Name: SD37-DSP1
Wellbore Name: SD37-DSPI(
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
^oily Report
e: 111312019
Report #: 3
Page: 2 of 3
Daily Contacts
Position
Contact Name
Company
TBW
Email
OMw
Mobik
Eni representative
Wade Tremas
Eni
Rig Clark
AKRigCerksDoyon l 5®eni.wm
907-MM722
Emrepresentative
Pat Ahem
Ed
HSE
Emrepreaentalive
Men Hurler
Eni
HSE
Tool Push
Sam Dye
Doyon Drilling
Field Superintendent
Tool Push
Jusfin Hays
Doran Drilling
Tod Pusher
rigl5tfdoyondrilling.wm
Tool Puah
Einar Flaegla
Doyon Dulling
Tod Push
Tool Push
Cliff Owens
Doyon Drilling
HSE
cowens®tlayondnlling.wm
6850798
Tool Push
Scott Simmons
Doyon Drilling
HSE
Personnel Log (POB)
Company
Sew. Type
Work H thry
Stsz d4 y H (hr)
Count
NOW
GBR
Casing
12.50
0
Drilling
Expro
flow bark
12.50
0
Drilling
EPA
Inspector
12.50
0
Drilling
NC Machinery
Mechanic
12.50
0
Onlin,
Ell
Engineer
12.50
0
Dnlling
ASRC
Clerk
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Crone Advisor
12.50
1
SID Support
Season
Mud,.
12.50
1
SID Support
Doyon
Field Superintendent
12.50
1
Ddging
Northern OgfaiM Smvitts
Fueler
12.50
1
SID Support
Vetw(BHGE)
WellHead
12.50
1
Drilling
AGS
Envimmenlel
12.50
2
SID Support
Baker Cenbift
ESP Techs
12.50
2
origin,
Beawn
HSE
12.50
2
SID Support
Devon
Tod pushers
12.50
2
Dmlin,
Doyon
HSE
12.50
2
0611ing
MI Swaw
Mud Engineer
12.50
2
Drilling
SLB
Cement
12.50
2
Onlling
ASRC
Company Man
12.50
3
Dolling
Compebnka
Logistic
12.50
4
SID Support
Halliburtw
Slick Line
12.50
6
Drilling
MI Swnw
Mud Pled
12.50
6
Onlling
Purcell
Security
12.50
6
SIDSuppon
Ml Swaw
WIF
12.50
8
SIDSupport
ESS
Catering
12.50
11
SID Suppon
Worley
Truck driver l Crane operator
12.50
14
Codling
Doyon
I Rig Personnel
12.50
1
27
DrMng_ToWI Dulling Personnel
BOP Stack 8 Components
Descrip0on
BOP Stack
start Dab
1012412019
Last Cetttion DatePressure Rating (psi)
SH2O15 5,000.0
Type
Maka
Model
ID Nom (in)
P Range (psi)
Lest Can Gate
Annular
GK 500
13518
5,000.0
12015
312"-6"VER Hydril
MPL 5000
13518
5,000.0
0242018
�H,.nl
Blind Shear Ram Hydnl
MPL5000
13518
5,0000
8242018
412"x PVBR Hydril
MPL 5000
13518
5,000.0
5/112015
Slow Circulation Rates
Pump Number. 1 Make: Vvbge Star
Modd: Quatro 2450
Start Date End Data
Liner Size (in)
Volume Per Stroke Override (bbitatk) Max Pressure (psi)
VIO201M 1
5
0.078
7,500.0
Gab
Depth (DRUM
I Slow Sptl
I
Strokes (spm)
P (Psi)
EN (%) O Flow (op.)
Pump Number. 2 Make: While Star
Mullah Ou itro 2450
Stan Dab End Dab
Lim r Size (in)
Volume Per Stroke Ceramics (bbVstk) Max Pressure (psi)
NIW2018 1
5
0.078
7,500.0
pate
Depeh(RKB)
Slow SPI
I Strokes (spm)
P(psi)
EN(%)
OFlow (gpm)
Pump Number. 3 Make: National Supply
Madel: 72-P-160
Start Data End Date
Liner Shia (in)
Volume Per Stroke Owri ide(bbilstk) Max Pressure(psi)
411012019
4 114
0.053
1.500.0
Data
I Depth (BKB)
slow Sptl
I
Strokes (cpm)
I P (psi)
EB (%)
G FLOW (Sp.)
Daily Bulk
Supply Item Dasenp8on: Equipment Fun
UnKLabel:
Gel
Unit Size:1
Note:
Deb Consumetl Recelvetl
Returnetl
Cum Consumed Cum fteaeived
Cum
Returned Cum On Lee
Note
11/32019 1.102.0 1,102.0
2,893.0
2.693.0
0.0
0.0
5 lyMem DexripBon: Mud PIard Bolars
UnItLntel:
Gal
Unit Size:
Note:
bb Consumed Recelvetl
Rolumetl
Com Consumed Cum Received
Cum Returned Cum On Loc
Note
11212019 198 0 198.0
591.0
594.0
0.0
0.0
Supply lbm Description: Rig Fud
Unit Label: gal us
Unit Size:1
NOW:
Dab Consumetl Recelvetl
Relumetl Cum Consumetl Cum Received
Cum Returned Cum On Loc
Note
11132019 1,445.0 0.0
3,945.0
12,]94.0
I 0.0
8.849.0
Supply Mem Daccu lou: Rig Water
Ude Label: bbl
Unit Sea 1
Note:
Gab Consumetl Recaiwtl
Rebmed Cum Consumetl Gum Rettivetl
Cum Returned CO. On Loc
Note
11132019 19.0 19.0
39.0
390
I 0.0
0.0
Supply Mem Description: WIF Boilers
Unti Label: Gal
Unit Size:
Note:
Data Consortium
Reeeiwtl
Relumetl Cum Consumed Cum Received
Cum Returned Cum On Lac
Note
1122019 42.0
42.0
126.0
126.0
0.0
0.0
Supply Mem Description: WIF Injected Diesel
UnBLabel: Gal
Unit Size:
Note:
Dab Consumed! Received
Reumed CumConsumed Cum Recelvetl
Cum Returned Cum On Loc
Note
1102019 00 lee
1 0.0
eo
0.0
00
Last Authority Visit
Dab Tot insp. Nbr
Total I.N.C. number Comment
Well Name: SD37-DSP1
Wellbore Name: SD37-DSP1
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
^ally Report
te: 111312019
Report #: 3
Page: 3 of 3
STOP Cards Submitted
Company
# RRpts
Com
Dayan Doping
7
PJSM'S
Doyon Drilling lnc.
7
HRWS
Doyon DMI., Inc.
7
COW
:7
Doyon DAh, Inc
14
Safe Cards
MI Swaco
2
RIR's
Ml Swaco
4
HARCIJSA
General Notes
Comment
"oily Report
e: 111412019
Report #: 4
Page: 1 of 3
Well Header
Well Name:D
37-DSP1
Wellbore Name: e: SD37-
Operator
Well Code: 25754
Initial Lahee Code
Job: WORKOVER
ENIPETROLEUM
WCEILevel: 3
"oily Report
e: 111412019
Report #: 4
Page: 1 of 3
Well Header
PermiaCon cAsum N°
Operator
sain
SNI
Initial Lahee Code
ADL -388583
ENIPETROLEUM
DEVELOPMENT WELL O PORO DI
COLTIVAZIONE
Ratary Table Elevation (it) ...noLevel (ft) First Flange(Rj RKB-Ba se Fbnge(a) mi- Tubing Spool (it)
32,805.12 13.10 1880 32,]88.32 32,784.62
Rigs
Rig Name Contractor Rig Type Rig Num Rig Sesrt Data Rig Release Dale
RIG 15 DOYON LAND RIG 0]23 11/112018
Daily Information
Weather Temperature (°F) Wind Days LTl(days) Days ad (days) POB
Cloudy 15.8 SW @ 23 MPH ]36.00 738.00 108,0
Safety Incidents - Near Miss
Date Category Type Subtype Severity Cause Lost time?
Comment
Safety Drills
Days Until Max' Check
Type
# Occur
Last Data
Next Data
(it a)
Rig lnsPection
4
111412019 111512019
1
Safely Meeting
4
111412019 1115/2019
1
TT Fire 0.11
1
111312019 1111]2019
13
TT H2S Ong
2
11/412019 11118/2019
14
Casings seat
Cas. Type
OD (m)
to (in)
Grade
Top (RKS)
Bottom IRKS)
I TVD But. (ftKB)Lpi
ing Date
CONDUCTOR
20
18.25
X4i5
0.0
180.0
160.0
91222011
13 WW SURFACE
13318
12,42
L80
-4,076.0
/,112.9
4,112.]
912]2011
CASING
CASING
9516
Leo
-6.856.9
8,901.8
6,901.4
10182011
CASING
6,51].0
6,518.6
32912013
Last Cementing
Cementing StartDate: 10/912011 S m,, crecartl ml found, Comment:
Sig #
Top (nKB)
Top Meas Meth
She (it")
Cara
1
4.31].0
Volume Calculations
6.901,0
Rig �up.nd hard lines from Schlumberger to ng 03000 psi.t Rig pumps- break circulation and pump 110 bins. of
Mud Push II Q 10.1 -rate of 6 bpm ® 300 psi.\ ShutAxwn cimp bottom plug.\ SLB mix a pump Lead shirty 71 bids.
12.5 ppgJ Gass, Ulenet i 157 Yield, mix water at 5.463 garsk. - Pump rate N 4.0 bpm a 460 ps0 SLB mu and
pump Tail slurry W able @ 15.6 pp91 Class G % 1.16 Yield, mu H2O at 5,092 gai - Pump rale of 3.0 bpm a 500
psiA Shut down 6 drop top plug - SLB pump 10 the H2O and wash upA Displace with 489 bids. @ 10,1 ppg mud with
ng pump at 7 bpm W200 psi, at 469 able away slow pump to 2 bpm with 950 psi. FOP with full returns%Bump plug to
5W/psi, over FCP to 15001psi. - Hold for 10 minutes and bleed off- check floats are holding - Good.\ Cement in place
® 0539 his.
2
Job Information
Job Phase Planned Start Dees Short Date End Date P50 Duration (days)
WORKOVER 11/1201913:00 1111201913:00 0.00
Daily Summary Operations
24h Forecast
Move Doyon 15 over to SD37. HES Elms, Baker, and Witham testing tool compelibilily.
24h Summary
Doyon contained prep for ng move. NES and Baker ng up to eel Inflatable Bridge Plug- surface function tested - good. Run m hole and log to 5.770P setting position below XN nipple, would not at ager several
attempts. Pull out of hole and Baker unable to gel motor to tum on surface, recommend send W Coachman shop to trouble shom. Velco installed BPV. Decision made to move ng over SD37-DSP01.
Operation at 07.00
Doyon moving he from SP03 to SD37.
Time Log
Start
End
Cum Dur
msms
Time
Durfhn
MO
Phase
Opr.
Act
Plan
Gain, Desm.
00:00
0500
5.00
5.00
MOB
A 1
P
Continue to prep ng and equhro nVaompar ems for ng move,
05:00
0900
4.00
9.00
MOB
J 15
PJSM, initiate permits, pick up lub aid.., Baker made up paces soaroe far IBP in HES unit Conduct voltage checks through
5116" wire, Baker power aouroe too smeY far 25000' of cable. will run off of HES panel. Make up BHA wain Baker ISP, functmn
test motor, taking 14D volts and 140 mA W tum same, fundionalily was wanted by Baker Technician, slab oma wellhead and
pressure test to 3000 PSI with LVT.
09 00
1330
4.50
13.50
MOB
J 15
TW/
Run in hole with Baker IBP, log from 5600'to 5650. Fashion COE at 5770, (center N 9 pup below, XN nipple positioning top
of fishing neck SST behave XN nipple. Attempt to set 18P, staging anent up to 200 valts, with amperage climbing la 1.7
amps, molar appearetl to be seized, repeated process several more times with same ..Wis. Baker recommends pulling to
surface to inapxt BHA and function test motor on surface. Nil out of hole with IBP, removed lubricator and recovered IBP,
function test IBP on surface with same mauls, staging voltage up to M vols and amperage at 1.7 amps, had no indication
of motor function appears W be seared up. Baker recommeMs adding tools to shop in Nominate to troubleshoot.
1330
1]:00
3.50
17.00
MOB
J 15
T00d
Diswss phare forward suanchorege team. Secure wall and begin rigging down HES to move rig over SD37, wi is Baker mM
HES resolve equipment issues. Move HES Unit leel trailer, antl support equipment. yahoo set 4- GW type H BPV In
1
I
Preparation of rte mods. Maomam service lima and skid rig Boor back in position over pipe shed for move. Split pit complex
I
from rig sub complex
1700
00:00
TO
24.00
MOB
A 2
P
Doyon maving no from erw W SOST Remove generator f . mud pump 43, rock washer and geese bins from nosh side of
1
1
islaW. 0ontinue laying mass and positioned pit complex to move ham SPO}NE2 to SC 7RDSPO1.
NOTE: SDS] -DSPC Pressure- Tubing 6 psi. -11A 1,271 psi. - 01A 5 psi.
Gas Readings
Avg Background Gas I%)
Max Background Gas I%)
Avg Connection Gas (%)
Max Connection Gas I%)
Avg Out Gas 1%i
Max Drill Gas f%)
Avg TOP Gas I%)
Max Trip Gas (%)
Daily Mud Volumes
TanWAddiUONLass
Type
Des
Volume (bbl)
Hole
Loss
DO
Tank
0'0
Cumulative Mud Volumes
Active Volume (bbl)Hote Volume (bbl) onshore (bbl) Co. Additions (bbl) Losses (bbl) Cum Losses (bbl)
497.5 497.5 00 0.0 0.0 11.0
Daily Contacts
position
Contact Name
Company
Title
Email
Office
Mobile
Eni rewesantative
Sieve Lawrence
Eni
Drllling Supv.
sidtlntlirggeni.can
885-0715
Ent representative
Davitl Smits
En i
Onin Supv.
siddnling®enl.com
90]-BBSO]is
Well Name: SD37-DSP1
Wellbore Name: SD37-DSP1
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
^wily Report
.e: 1114/2019
ReportN: 4
Page: 2 of 3
Daily Contacts
Position
Contact Name
Company
Title
Email
Office
Mobile
Eni representative
Eli Asson
Eni
Drilling Sup,
Eni representative
Wade Thomas
Eni
Rig Clerk
AKRigCIm1sOoyon15@om.com
907.6850722
Eni repreaardauve
Pat Ahem
Eni
HSE
Eni representable
Mark Nobler
Eni
HSE
Tod Push
Sam Dye
Doyon Drilling
Field Superintended
Tod Push
Justin Hays
Doyon Walling
Tad Pusher
dg156doyondr8ling.com
Tod Push
Einer FI¢aae
Corn Drilling
Tod Push
Tod Push
Cliff Owens
Doyon Onning
HSE
cowensCdoyoriddliing...
SBS0796
Tod Push
Soon Simmons
Doyon Digital
HSE
Personnel Log (P(
B)
Company
Sam. Type
Work INUr)
Standbyrt H(hr)
could
Note
GBR
Open -Sam.
0
Galling
Expro
Flow back
12.50
0
Drilling
EPA
Inspector
12.50
0
Drilling
NO Machinery
Mechanic
12.50
0
Drilling
Eni
Engineer
12.50
0
Drilling
ASRC
CleM
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Ativisor
12.50
1
$10 Support
Beacon
Metllc
12.50
1
SID Support
Doyon
Fidd Superintendent
12.50
1
Drilling
Northam Oilreild Services
Fueler
12.50
1
SID Suppon
Velm(BHGE)
Wephuid
1250
1
Drilling
ACS
Enviromental
12.50
2
SID Support
Barker Centrilift
ESP Techs
12.50
2
Drilling
Beacon
HSE
12.50
2
SID Support
Doyon
Tod Pushen
12.50
2
Origin,
Doyon
HSE
12.50
2
Drilling
MI Sworn
Mud Engineer
12.50
2
DMling
SLB
Cement
12.50
2
Dulling
ASRC
Company Man
12.50
3
Drilling
Competent'.
Logistic
12.50
4
SID Support
Helllburlan
Slid Line
12.50
6
DnIIin9
MI Sw ico
Mud Plant
12.50
6
Drilling
Purcell
Security
12.50
6
SID Suppon
Ml S..
WIF
12.50
6
SID Support
ESS
Cawing
12.50
11
SID SupportWatley
Tmd driver l Crane operator
12.50
14
GNP,
Doyon
I RigPersonnel
1
12.50
27
Dnlling_Total pilling Personnel
BOP Stack B Components
Description
Sh0 Date
Laocedlflcation DatePMesure Rating (psi)
SOP Stack
1012412019
5/112015
5,000.0
Type
Make
Model
ID Nom (in)
P Range (psi)
Last Cad Date
Annular
UK ba'
135/6
5000.0
511/2015
312"-8"VBR
Firm
Hytlnl
MPL 5000
135/8
5,000.0
812412018
Blind Sham Ram
Krim
MPL5000
135/8
5.000.0
812412018
4lir x7"VBR
Hydril
MPL 5000
135/8
5.000.0
5/12015
Slow Circulation Rates
Pump Number: 1 Make: White Star
Model: Ouatra 2450
Stan DoleEntl Date
Liner Sam (in)
Volume Per Stroke Override (bbllstkl Mex Pressure (Psi)
4/102018
5
0.078
;500.0
Date DeptM1 (ftKB)
Slow Spd
strokee(spin)
P(psi)
I Ell I%)
I OFlow (gpm)
Pump Number. 2 Make: While Star
Model: Claim 24W
Skirt Deh Entl Data
Liner Shia (in)
Volume Per Stroke Override(bbllsNr) Max Pressure(psi)
4/102D18
5
0.07877,500.0P
Date
Depth IRKBI
310w 3ptl
Stroke. (spin)PIPs')
ERI%) OFlow (9Pm)
Pump Number 3
Make: National Supply
Model: 12-P-180
Skirt Doh End Date
Liner Shia (I.)
Volume Per Stroke Ovenide tbbystk) Max Pressure (psi)
4111Y2019
4114
0.053
7,500.0
Date
I Depth IRKS)
Slow and
I
Strakes(spm)
I P(psi)
ERI%)
OFlow hip.)
Daily Bulk
Supply Dem Description: Equipment Fuel
Unit Lsb¢l:
Gtl
Unit Size: 1
Note:
Data Consumetl ReceNed
Retumetl
Cum Consumed Cum Receivetl
Cum Returned Cum On Loc
Note
11/42019 1333.0 1,333.0
4,226.0
4,226.0
0.0
e0
Supply Baro Description: Mud Plant Bosere
Unit label:
Gal
Unit Site
Note:
Date Consumetl Receivetl
Returned
Cum Consumed Cum ReceWetl
Cum ReturnedCum On Lee
Nole
11/42019 11980 198.0
7920
792.0
0,0
0.0
Supply man Description: Rig Fuel
Unit Label:
gal us
Unit Size: i
Note:
Date Consumetl Received
Ratomed
Gum Consumed Cum Receivetl
cum Returned Cum On Loc
Note
11/412019 1,108.0 0.0
5,053.0
12,794.0
0.0
],]410
Supply Rem Description: Rig Water
Unit Label:
bbl
Unit Size: 1
Note:
Doh Consumetl Received
Retumetl Cum Consumed Cum Receivetl
Gum Returned Cum On Loc
Note
1114/2019 20.0 20.0
59.0
59.0
00
OD
Supply Rem Description: WIF Boilers
Unit Labol:
Gal
Unit Size:
Note:
Date Consumetl Recaivetl
Retumetl
Cum Consumetl Cum Reprined
Cum Returned Cum On loo
NOM
111412019 420 42.0
1fi8.0
168.0
0.0
0.0
Supply Rem Manhattan: WIF Injected Diesel
Unit Label:
Gal
Unit Size:
Note:
Doh Consumed Receivad
Returned Cu. Consumed Cum Received
Cum ReturnedCum On Loa
NOM
11/41201190.0 0.0
D.0
0.0
0.0
0.0
Last Authority Visit
Data Tot insp. Nbr
Total l.N.C. number Comment
Well Name: SD37-DSP1
Wellbore Name: SD37-DSP1
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
^aily Report
.e: 1114/2019
Report #: 4
Page: 3 of 3
STOP Cards Submitted
Company
p Rpt.
Com
Doyon DNIin9
9
PJSM'S
Doran Drilling Inc.
9
HRWS
Doyon Drilling Inc,
9
COW
Doyon Drilling Inc.
16
Sete Wnda
MI Swaco
3
RIR's
Ml Swaco
2
HARCIJSA
General Notes
Comment:
"wily Report
.a: 1 1/512 01 9
Report #: 5
Page: 1 of 3
Well Header
Well Name: D
37 -DSPC
Wellbore Name: me: SD37-
Subsidiary
Well Code: 25754
ADL -380583 ENI PETROLEUM
Job: WORKOVER
ani
WCEILevel: 3
"wily Report
.a: 1 1/512 01 9
Report #: 5
Page: 1 of 3
Well Header
P4rmIRConcession N° operator
Subsidiary
Iniaai Uhee Code
ADL -380583 ENI PETROLEUM
ENI Petroleum Co. Irrc.
DEVELOPMENT WELL O PC= DI
COLTIVAZIONE
Roteny Table Elewtion(R) Greuntl Level(ft) First Flange (ft) RKB-Base Flange (k) RKB- Tubing pool (ft)
32,805.12 13.10 16.00 32780.32 32764.62
Rigs
Rig Name Contrector Rig TYPe Rig Num Rig SbH Dale Rig Release Date
RIG 15 DOYON IAND RIG 0]23 11/112019
Daily Information
Weather Temperature Wind Daya Ln (days) DaysPo (days) POB
Overcast 28.4 N @ 11 MPH ]39.00 139.00 10] 0
Safety Incidents - Near Miss
Data Category Type Subtype Seventy Cause Lost timer
Comment
Safety Drills
Days Unfit Next Check
Type
0Occur
Last Data
Next Date
(days)
Rig Inspedion
5
11/5/2019
1
Safety Meeting
5
11/5/2019
/8/209
1
TT Fire Drill
1
11�15(2019119
11/312019 1111]/2019
12
TT H2S Drill
2
1114/2019 1111812019
13
TT Man Down Drill
1
111512019 213/2020
90
Casings seat
Cos. Type
OD (in)
ID (in)
Grade
Top (RKB)
I Bottom fmU)
TVD Sot. (ftKB)
Landing Date
CONDUCTOR
20
10.25
%-65
0.0
100.0
180.0
92212011
13318 -SURFACE
13318
1242
L.
-4.0760
4.112.9
4,1127
92912011
CASING
CASING
9518
loll
$,850.9
6,901.8
6,901.d
101&2011
CASING
6,517.0
6.516.6
32912013
Last Cementing
Cementing sort Date: lenoboll SMng:<recatl not imnd> comment.
Stg tl
Top f r,a)
I Top Meas Meth
Stan (RKB)
Corn
1
4.317.0
Volume Czlculations
6,90L0
HIS up and test hard lines from Schlumberger to ng V3000 poiA Rig tamps- break circulation end pump 110 bbls. of
Mud Push It ® 10.1 -rate of 6 bpm Q 300 psiA Shul-0own drop bottom plug \ SLB mix & pump Lead slurry 71 BMs.
Q 12.5 ppg.%Class, LBeorae% 1.57 Yield, mix water 015.483 gallsk. - Pump rate of 4.0 bpm a 480 psiA SLB mu and
pump Tail slurry W bbls.1 15.0 ppgA Class G % 1.16 Yield, mix H2O at 5.092 gairsk. - Pump rale of 3.0 bpm ® 500
psi.%Shut down & drop top plug - SLB pump 10 bbls H2O and wash upA Displace with 489 Ms. 110.1 ppg mud with
ng pump at ] bpm w1200 psi, at 169 blas away slow Pump to 2 bpm with 950 psi. FCP with M1dl rehires%Bump plug to
5001psi, over FCP to 15001psi. - Hold for 10 minutes and bleed off- check floats are holding- GoodA Cement in place
0530 hrs.
2
Job Information
Job Phase Planned- Date Star!Date End Data P50 Duration (days)
WORKOVER 119@01913:00 1111201913:00 000
Daily Summary Operations
Uh Forecast
Run in hale HES Hine & Baker to set IBP - POOH. Load 16.7 ppg kill fluid in pits. Pressure Test IBP 2000 psi. over Tubing Pressure and Need off 10 perform an inflow, lest. Run in hole with WelRech electric
tubing punch two holes minimum and verify tubinglannuius communicxtlon - pug out hole. Circulate 16.7 ppg Mi fluid and momtor. Install BPV and nipple down baa - prop to pull f fte bead.
2M Summary
Doyon move rig from SPO HNU In SD37-DSPO1 and skid Boor mer well. Hook-up interconnects service lines - berm ng. Vetm pull BPV Will lubricator. Spot HaWburton E-I'me unit and rig up BOP and lubricator.
Pick-up BHI 2-11T IBP hood assembly, function test motor -(good lest), prep to test.
operation at 07.00
IBP Failed to at, POOH & Prep to RIH V VEVO Plug
Time Log
Start
End
Cum Dur
Time
Time
Durr r)
(hr)
Phase
Opf.
Act.LPI
Oper. Descd
0000
09:00
9.00
add
MOB
A 2
Mme sub and pit complex down to SD37-DSPOt and align inbrconneds and set pits near to sub complex.
0900
1600
TOO
16.00
MOB
A 2
Set alompers down on beam end skid rig floor well bay, work an berth around rig and hook-up interconnect selvlee lines. Lay
out top dove Nedncel caWez and plug-in, unsecured top ddm from rails and power -up and test same. Baker & HallibuMn
testing standard IBP motor at Hellibudon shop. HES Etech & Baker IBP specialist m Intuition. Ainved on location and get
orientation.
16 00
16: W
2.50
18.50
W.O.
E 5
Mobilized Vetco dubncalor and pull BPV. Spot HES Nina unit add bol trader at Doyon 15 beaver slide. Spot BOP rack and
POE tray. Wad Pump in sub & BOPs In cellon and make up to wellhead Pu11200' of cable off unit. Load grease head on
beaver slide and take to ng floor. Take hoses. T -bar, hoses to rig floor.
1830
2130
3.00
21.50
W.O.
E 5
Load lubncalor m pipe had and lend on skate. Make up Pump in sub. BOP, and risen b wellhead. Riser sticking about 2'
above rotary table. Sol a3 mud pump and Mole -up interconnect.
21 SO
00:00
2.50
24.00
W O.
E 5
P
Function task Baker motor on ..dace, meta goad tOOV 100 Me, INV 124 Me. Make up 2-110" Inflatable Bridge Plug. Slab
on wellhead add prep to test- PT to 3000 psi. Complete iMe endear ll of 93 mud pump.
Gas Readings
Avg Background Gas (%)
Max Background Gas (Y.°)
Avg Connection Gas (%)
Max Connection Gas I%)
Avg Drill Gas (%)
Max Drill Gas 1X)
Avg Trip Ges (Y°°)
Max Trip Gas (Y°)
Daily Mud Volumes
TanklAdtlitionlLosa Type Des Volume (bbd)
Hole
57.5
Loss
00
Tank
0.0
Cumulative Mud Volumes
Active Volume Real) Hoke Valume (bbl) Additions (bbl) Cum AtltlHions (bbl) Losses (bbl) Cum Losses (bbl)
497.5 69].5 O13 00 0.0 0.0
Daily Contacts
Position
Contact Name
Company
Tale
Email
Mae
Mobile
Eni represamalive
Sieve Lawrence
Eni
Drilling Supv.
drillinB®eni.com
6859]15
Eni rcpresenktiva
David Smith
Eni
Onlling Supv.
tln0irq®eni.com
fR,0.rkcD,oml5QSmcmn
9074105.0715
Eni representative
E9 Wilson
Ern
Dulling Supv.
Eni representative
Weds Themes
Enl
Rig Clerk
907-685-0722
Well Name: SD37-DSP1
Wellbore Name: SD37-DSP1
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
^-sily Report
e: 111512019
Report #: 5
Page: 2 of 3
Daily Contacts
Position
Contact Name
Company
Title
Email
Office
Mobile
Ent representative
Pal Aham
Enl
HSE
Ens represenblive
Mark Hublm
Em
HSE
Tool Push
Sam Dye
Doyon Going
Field Superintendent
Tool Push
Justin Hays
Doyon Drilling
Tool Pusher
ngl5Q9ldoyontlriYing.wm
Tool Push
Einar Fleagle
Doyon pining
Tool Push
Tool Push
CIiROutru
Doyon Ming
HSE
cowens@doyontlNling.wm
68S0796
Tool Push
Scoff Simmons
Doyon Ming
HSE
Personnel Log (P(
B)
Company
Sam. Type Work H(hr)
Stan -by H(hr)
Count
Note
GBR
Casing
12.50
0
Drilling
Expro
Row back
12.50
0
Drilling
EPA
Inspector
12.50
0
Drilling
NC Machinery
Mechanic
12.50
0
Drilling
Ent
Engineer
12.50
0
Dolling
ASRC
clerk
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
Doygn
Field Superintendent
12.50
1
Ming
NOMem Oilredd Services
Faster
12.50
1
SID Support
Vetco(BHGE)
WellHead
12.50
1
Ming
ACS
Enviromemil
12.50
2
SID Support
Beeson
HSE
12.50
2
SID SuPpOri
Doyon
Tod pushers
12.50
2
Ming
Doyon
HSE
12.50
2
piling
MI Swam
Mud Engineer
12.50
2
Ming
SLB
Cement
12.50
2
Ming
ASRC
Company Man
12.50
3
Ming
Baker CentrillR
ESP Techs
12.50
3
Ming
Competentia
Logistic
12.50
4
SID Support
Purcell
Security
12.50
5
SID Support
Halliburtm
SliUc line
12.50
6
Ming
MI Swam
Mud Plant
12.50
6
Ming
Ml Swam
WF
12.50
8
SID Support
ESS
Gearing
12.50
11
SID Support
Widay
Truk driver l Crena operator
12.50
14
DMling
Cyon
I Rsg Personnel
12.501
28
1 pMing_Tdal Drilling Personnel
BOP Stack & Components
Description
Stare Data
at Da ..a an DeN Pressure Rating P.
BOP Stack
10/2412019
51112015
51000.0
Type
Maka
Model
ID Nom (in)
PRange (psi)
Last Cert Date
Annular
Hytlnl
GK 500
135&8
5,000.0
5112015
3112"-8"VBR
Hydri
MPLSOW
1a&8
5,000.0
8/242018
Blind Sheer Ram
HydM
MPL 5000
13 5At
5,000.0
&242018
4112"x]"VBR
Hytlnl
MPL 5000
135/8
5,000.0
5112015
Slow Circulation Rates
Pump Number Make: White Star
Model: Quatro 2450
Start Date End Data
Liner Size (in)
Volume Per Stroke Ovanide (bbystle) Max Pressure (psi)
4/102018
5
D.078
7,500.0
Date
Depth (11KB)
Stow Spot
Strokes (spm)
)
P (psi)
En 0 Flow (gpm)
(X)
Pump Number. 2 Make: Mae Star
Madel: Qualm 2450
Start Date End Gee
Liner Size (in)Volume
Per Stroke Override (bbBSM) Max Pressure (psi)
4/102018
5
90]8
7!K)e0
pate Depth (11M)
Slow Sptl Strokes (sPm)
P (psi)
EB I%)
0 Flow (gpm)
Pump Number. 3 Make: National
S.
Model: 12-P-160
Start Date
End Det.
Liner Site (in)
Volume Per Stroke Ov mndp (bbgstk) Max Pressure (pat)
4/1=019
4114
0.053
],500.0
Dote
Depth (RKB)
91ow Sptl
Strokes (spm)
P (psi)
EB (14)
0 Flow (gpm)
Daily Bulk
Supplybem Deseription: Equipmem
Fuel
Unit Label: Gal Unit Size: t
Note:
Gta consumed
Received
Returned Cum Consumed Cum Raceivetl
Cum Returned Cum On Lac Note
11/5/2018 16690
1,669.0
5,895.0 5,0950
0.0
0.0
Supply kaon Description: Mud Plant
Boilers
Unit Label:
Get Unit Size:
Note:
Date Consumetl Racatvn
Relumed
Cum Consumed Cum Received
Qum Returned Com On Loc Note
11/5/2019 1980 198.0
990.0 990.0
be
0.0
Supply hem Description: Rig Fuel
Unit Label:
gal us Unit Size: 1
Note:
Date Consumetl Racaivad
Retume0 Cu. Consumed Cum Raceivetl
Cum Relumed Cu. On Los Nate
111512019 1,890.0 2,050.0
6,]43.0 14.844.0
00
8,101.0
Supply hem Description: Rig Water
Unit Label:
bM Unit Size: 1
Note:
is Consumed Resolved
Returned
Cum Consumed Cum Received
Cum Returned Cum On Loc Nate
111512019 3].0 135.0
98.0 194.0
0.0
98.0
Supply Item Deud 'an: WF Baden
Unh Label:
Gal Unit Size:
Note:
Dere Consumed Raceivetl
Relumed
Cum Consumed Cum Received
Cum Returned Cum On Loc Note
111512019 42.0 42.0
210.0 2100
0.0
0.0
Supply ham Descri n: WIF injected Diesel
UnMlabel: Gal Unit Size:
Note:
Date Consumed Raceivetl
ReNmetl Cum Consumed Cum Received
Cum Returned Cum On Loo Note
11/512019 0.0 0.0
0.0 0.0
0.0
0.0
Last Authority Visit
Data Tot Insp. Nbr
Total I.N.C. number Comment
STOP Cards Submitted
Company
%Rpta
Com
Devon Dolling
8
I PJSM5
Well Name: SD37-DSP1
Wellbore Name: SD37-DSF
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
-)ate: 111512019
Report #: 5
Page: 3 of 3
STOP Cards Submitted
Company
k Rpt:
Co.
Doyon Drilling Inc.
Doyon Drilling Inc.
Doyon Drilling Inc.
MI Swaco
MI Swaco
A
8
8
3
2
sate cams
cow
HRWS
RIR'S
HARC/JSA
General Notes
Comment
Daily Report
late: 111612019
Report #: 6
Page: 1 of 3
Well Header
Well Name:D
Wellbore Name: e: SD37.37•DSF
MM
Well Code: 25754
ADL -388583 ENI PETROLEUM
Job: WORKOVER
ani
WCEILevel: 3
Daily Report
late: 111612019
Report #: 6
Page: 1 of 3
Well Header
Permk/Concesalon N° Operator
bubelEiery
Initial Lohee Code
ADL -388583 ENI PETROLEUM
ENI Patmleum Co. Inc.
DEVELOPMENT WELL O PORO DI
DOLTIVAZIONE
Rotary Table Ehvogon (ft) Ground Level (ft) First Flange (ft) RKB-Base Flange IN) RKB- I bring $pool (it)
32,605.12 13.10 116.80 32,788.32 32,784.62
Rigs
Rig Name Contractor Rig TYPe Rig Num Rlg Start DataRig Release Data
RIG 1s DOYON LAND RIG D723 11/1/2019
Daily Information
Weather Temperature (*F) Wind Days LTl(tlays) Days RI (days) POB
Cloudy 26.6 NE 9 MPH 740.00 740,W 111.0
Safety Incidents - Near Miss
Date Category TyPs' Subtype severity Cause Losllme]
Comment
Safety Drills
Days Until Next Check
Type
0Occur
Last Data
Nexl Date
(days)
Rig Inspection
6
11/6YJ019 11/]2019
1
Safely Meeting
6
111612019 11/]12019
1
TT Camp Evac
1
11/612019 214/2020
90
TT Fire Drill
1
111312019 11/17/2019
11
TT nGS Dell
2
11/412019 1111812019
12
TT Man Down Drill
1
11/512019 11312020
89
TT Well Kill DMI
1
111312019 11/1711019
11
Casings seat
Cas. Type
Do (I.)
ID (in)
Grace
Top(ftKB)
Boftom Ifth8)
TVO Bot(ftKB)
Lantlirig Deh
CONDUCTOR
20
18.25
X-65
0.0
160.0
180.0
912212011
13 SAr SURFACE
133/8
12.42
11
40]60
4,1129
4,112.]
91012011
CASING
CASING
9518
Lao
-6.853.9
6,901.8
6,901.4
10/812011
GAGING
6,517.0
6,518.8
312912013
Last Cementing
ng start Date: lww2oll string:<mcard not bunds Comment
Top (ftKB)
Top Meas Meth
Blm (ftKB)
Co.
4,317.0
Volume Calculations
Bgele
Rig up and test hard lines from Schlumberger long 83000 psiA Rig pumps- break circulation and pump 110 bits. of
Mud Push II @ 10.1 -rale d6 bpm @ 300 psi.\ Shut -down drop bottom plugA SLB mix 8 pump Lead slum/ 71 bbis.
@ 12.5 ppgA Gass. Ulani 1.57 Yield, mu water at 5.463 gaksk - Pump rate of 4.0 bpm @ 460 psiA SLB mix and
pump Tei slurry 80 bbls. @ 15.8 ppgA Class G % 1.16 Yield mu 120 at 5.092 gallsk. - Pump rale at 3.0 bpm @ 500
[Job
psi.1 Shut dam S drop top plug - SLB pump 10 has H2O and wash uA\ Usplace with 489 bbls. @ 10.1 ppg mud with
ng pump at 7 bpm w1200 psi, at 469 bbls away slow pump to 2 bpm with 950 psi. FOP with full Miami Bump plug 0
SOWpsi, over FOP to 15001psi. - Held for 10 minutes and bleed oft- check floats am holding- Good\ Cement in place
0530 me.
formation
Job Phase Planmtl bran are She Dote End Data Pso Duration (days)
WORKOVER 11/112 019 1 3:00 11111201913:00 000
Daily Summary Operations
24h Forecast
Surface test tool, iidwp WellTeen el.ch , tubing punch- urn in hole to full joint above X nipple, pressure on tubing to verify punch (total6 holes)- POOH. Circulate 16.7 ppg kill fluid and monitor. Install BPV and
nipple dam tree- prep to pull false bald, Nipple up SOP slack and test to Sundry, requirements 250.3500 psi.
24h Summary
Run in hale with BHI 2-118' IBP to set at 5,771' would not set- POOH and inspected, Secured well - Halliburton bared out, crew rest Continue makeup stmonneadsaryice lines and spot rig components. Set
EVO plug at COE 5,771' and test. Run junk bobber set at 5,761. L/D tool sti ng and fe-head rope socket. Sent Hellibunon Elim engineer to rest. AOGCC ra49cation on update for BOP testing @1640 firs.
Operation at 07.00
Inspect tubing punch, prep bad up lad to RIH.
Time Log
start End
Cum our
Time Time
our (far)
Inr)
Phase
Opo.
Act.
Pon
Oper. Desc,
DODO 51:OD
1.00
1.00
W.O.
M
5 P
complete hunkered test to 55NFOW psi. antl Now down gm.
01:00 0500
4.00
5.00
W.O.
M
5 P
Run in hole with BHI 2-1/8- IBP logged up to selling depth of COE 5771', midpoint d g Pup below XN nipple. Exuberances
molar to inflate plug with good Indication of sla fuzed voauge of ISD yds it was working. estimated 2228 mine to complete
process. No increase in village to indicate Meeting was plug, continue to urn for 1 Mur. Baker indicated possible hale in
element -pull out fide -no charge in pick-up weight W Include setting of plug.
0500 0700
2.00
-700
WO,
M
5 P
Bleed oft and blow down lubricate, Pull antl hoped IBP aft he immediate evidence of tool (adore. Perform function teat an
surface and motor engaged and ramped up without issues.
0700 12:30
5.so
12.50
W.O.
M
5 P
Halliburton crew time out and weld to reML Continued to make up secondary all, high pressured mud and choke lines M pro
roof, dress shakers in p0s, spot mud pump VFD, repoften mud engineers shed, pertom i emit inspedian. Transfer 16.7
ppg Nli weigh fluid to active pks.
1230 1800
5.50
18.00
W.O.
M
5 Pi
Pmgram EVO plug and make-up DPU. Slab lubricator end lest to 3000 psi. Run in hoe and camelate to set COE at 5771'
WLM. Pull our hole and Install test cap in lubricate. AGGCC was updated at 1610 fin. an notification for BOP testing.
1800 2000
2 OD
20.00
M
5 P
Attempt to pressuraup on EVO plug to 4000 psi. in 250 psi memments from 23W psi. Observed increase In A annulus
pressure from 1046 psi while pressuring up tubing. Shot down at 3900 psi. and monitor for 35 mins, final pressure was tubing
j
[0,
3,150 psi. and A annulus 1691 psi. Bleed oR to 500 psi and monitor far inflow test, communication between tubing and A
annulus. Stood off A annulus he 1000 psi and 11700 psi.
2000 22:30
2.50
22.50
w.G.
M
5 1 P
I Pok -up junk catcher and we in hole set at 51 Pull out hole with running tad assembly and inspect -goad sat.
2230 0000
1501
24.00
1 W.O.
M
5 1 P
Lay dawn tad stung and re-0ead rope socket after 5 running- WellTech testing tools an same -
Operation from 00:00 to 06:00
Start End Cu. our
Time Time our fin (hr) Phase
Opr. Act.
Plan Open. Desi,
00:00 0200 11 26.0 W.O.
M 5
P Complete re -head of rope sacker and pick-up Welfrech tubing hole punch, performed surface checis on and string -(good).
Slab up lubricator and lest,
02:00 W:30 4.50 30.50 W.O.
M 5
P Run in hole with Warl I Man tubing hoar punch - cone millog in place with COL to 5,617'- putting first hole @ 5,633'. Start
process to deploying tool and observed current and voltage exceeding Burgs, appeared to be a short in system. Performed
OHM test on cabs. to an. good resistance to cable head. Pug out of hole to chert tool components.
Gas Readings
Avg Background Gas (°6)
Max Background Gas I%)
Avg Connection Gas (%)
Max Connection Gas I%)
Avg Drill Gas (%)
Max Onll Gas (%)
Avg Trip Gas (%)
Max Trip Gas I%)
Well Name: SD37-DSP1
Wellbore Name: SD37-DSP'
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
gaily Report
.ate: 11/612019
Report #: 6
Page: 2 of 3
Daily Mud Volumes
TanklAdditionlLoss
Type
Des
Volume(bbl)
Hole
49],5
Loss
0.0
Tank
630.0
Cumulative Mud Volumes
Active Volume( bbl) Hole Where,(bbI) Additions 1661) Cum Additions(bbp Losses (the Cum Losses (bbl)
1,127.5 497.5
0.0
0.0
10.0
Daily Contacts
Position
Combat Name
Company
Tulle
Email
Mo.
Mobile
Eni representative
Steve Lawrence
Eni
Drilling Sup,
siddriltimallIsmi.corn
68541715
Eni representative
David Smith
Eni
Drilling Supv.
sidddlli,@ani cam
90768&0715
Eni representa0ve
Chad Guece
Eni
Drilling Sup,
90768&0135
Eni representative
Wade Thomas
Eni
Rig Clerk
AKRigCrelk.Dc,,hl50eni.crim
9078851722
Ertl representative
Pat Ahem
Eni
HSE
End representative
Mark Hubler
Eni
HSE
Tool Push
Sam Dye
Doyon Dolling
Field Superintendent
Tool Push
Justin Heys
Doyon Drilling
Tool Pusher
rigl5Q,loyondnlling.com
Tool Push
Einar Fleagle
Doyon Drilling
Tod Push
Tool Push
ClglOwens
Doyon edging
HSE
cowens@doyronddlidng.com
6BM796
Triol Push
Dave Sana
Doyon Drilling
IHSE lifienubtfil.,aziddlifinecone
168M796
Personnel Log (POB)
Company
So,. Type
Work H (but
Steri H (hr)
Count
Note
GBR
Casing
12.50
0
Drilling
Expro
Flow back
12.50
0
Dnlldng
EPA
Inspector
12.50
0
Drilling
NO Machnery
Mechanic
12.50
0
Drilling
Eni
Engineer
12.50
0
Drilling
ASRC
Clerk
12.50
1
DMling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
x
1
SID Support
Beacon
Medic
12.50
1
SID Support
Doyon
Field Superintendent
12.50
1
entire
Northern Oilhald Services
Feeler
12.50
1
$ID Support
Vat.OBHGE)
WWIHead
12.50
1
tinting
SLB
Cement
12.50
1
Drilling
ACS
Eavimmental
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Support
Doyon
Tad pushare
12.50
2
Grilling
psych
HSE
12.50
2
Dolling
MI S .
Mud Engineer
12.50
2
Drilling
ASRC
Company Man
12.50
3
Dtllling
Baker Hughes
Baker Hughes
12.50
3
Drilling
WeIITec
Weirrec
12.5D
3
Drilling
Compassed.
Logistic
12.50
d
SID Support
Purcell
Security
12.50
5
BID Supprirt
MI S.
Mud Plant
12.50
6
Drilling
Halliburton
Slick Line
12.50
8
Drilling
Ml Sads.
WIF
12.50
8
SID Support
ESS
Catering
12.50
11
SID Support
Worley
Truck driverI Crone operatar
12.50
14
Drilling
Doyon
I Rig Personnel
1250
28
Dnlling_TOW Onlling Personnel
BOP Stack 8 Components
Description
Stag Data
Last Ce ication Date Pressure Rating (Psi)
SOP stack
1012412019
5112015
5,000.0
Type
Make
Model
ID Nam (in)
P Range (pat)
Last Cart Data
Annular
HytlM
GK 500
13518
5,000.0
&12015
3In' WVSR
HytlM
MPL 5000
13518
S,OD0.0
8242018
Blind Shear Ram
Hydril
MPL 5000
13 &8
5,00.0
82412018
412" x 7" VSR
Hydril
MPL 5000
13 &8
5,000.0
51112015
Slow Circulation Rates
Pump Number. 1 Make: While Star
Martel: Quatro 24M
Start Date End Dao
Liner Size (in)
Vale. Par Straka Override(bblotk) Max Pressure lost)
411012018
5
0.078
7,500.0
Dab Depth nURI
Slaw Sptl
I
Strokes(spm)
P(psi)
I ER IX) 1 OFlow(gpm)
Pump Number: 2 Make: White Star
Madel: Quatro 2450
Start Dab End Date
Liner Sim (in)
Volume Per Stroke Override (bbll.thj Max Pressure (psi)
4/102018
5
0.078
],500.0
Date
Depth (11,8)
Skew Spa
Stroke. (spm)
P (psi)
EM (X)
0 Flow (gpm)
Pump Number. 3
Make: National Supply
ModN: 12-P-160
Start Data End Dateliner
Sins (in)
Volume Per Stroke Override (bblistk) Max Pressure (psi)
,Ii4114
0.053
7,500.0
Data
I Depth(hKB)
Slow Spd
Slakes(spm)
I P(poll
Eir
QFlow lgpm)
Daily Bulk
Supply item Doodripaon: Equipmeni Fuel
Unit Label:
Gal
Unit Size:i
Note:
Deb Censum.3 Received
Returned
Co. Consumed Cum Received Cum Returned Cum On Loc
Note
1 M2019 1364.0 1.364.0
7,259.0
7,259.0 0.0
0.0
sup rywm Description: Mud Plenl Borten
Unit Label:
Gal
Unit Size:
Note:
Dab Consumatl Receivetl
Retumatl
Cum Consumed Gum Received Cum Returned Cum On Loc
Note
11/612019 198.0 198.0
1,188.0
1,188,0 00
0.0
Supplyltem Deecrieon: Rig Fuel
Unit Label:
gal us
Unitsize: t
Note:
Dare Consumed Received
Returned
Cu. Consumed Co. Received Cum Returned Cum On Loc
Note
11/62019 1,14].0 2,885.0
7,890.0
1],]29.0 0.0
9,839.0
Supply brim Description: as Wale,
Unit Label: lid
Unit Size: 1
Note:
Well Name: SD37-DSP1
Wellbore Name: SD37•DSP
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
-taily Report
,ate: 1116/2019
Report #: 6
Page: 3 of 3
Date Cons umed Received
Returned Cum Consume 1
Cum Receivetl
Cum 11 1:11L
Lo
Cum On c
Note
111812019 2? O 200.0
123.0
394.0
0.0
2]1.0
Supply eem Description: yin Bakers
Unit "I
Gal
unit Size:
Note:
Dela Consumed Received
Returned
Cum Consumed
Cum Recelvatl
Cum Returned
Cum On Loc
Note
11/612019 42.0 12.0
252.0
252.0
0.0
0.0
Supply Item Description: WIF Injected Diesel
Unit Label:
Due
Unit Size:
Note:
Dale Consumed Received
Returned
Lum Consumed
Cu. Received
Cum Returned
Cu. On Loc
Note
11/812019 00 0.0
0.0
0.0
00
0.0
Last Authority Visit
Date Tot insp. Nbr
Total I.N.C. number Camment
STOP Cards Submitted
Company
y Rpts
Co.
Doyon Grilling
]
PJSM'S
Doyon WIN, Inc.
]
HMS
Doyon Drilling Inc.
]
CAW
Doyon DA,, Inc.
4
Safe Cards
Ml Swaco
4
RII
Ml Sweco
2
MRCNM
General Notes
comment:
')aily Report
Jate: 11/712019
Report #: 7
Page: 1 of 3
Well Header
Well Name:D
37 -DSI
Wellbore Name: e: SD37-
Well Code: 25754
ani
Job: WORKOVER
DEVELOPMENT WELL POMO DI
WCEI Level: 3
')aily Report
Jate: 11/712019
Report #: 7
Page: 1 of 3
Well Header
Permfl/Conceseion N°Subsldiary
Initial Lahee Code
ADL -388583 ENI PETROLEUM
ENI Pelralaum Do. Inc.
DEVELOPMENT WELL POMO DI
GOLTIVAZIONE
Rotary Table Elevation(ft) Ground Least (ft) First Flange (ft) RKB - Base Flange IN) RKB -Tubing Spool(ft)
32,805.12 13.10 16.80 32,188.32 32,784.62
Rigs
Rig Name Contractor Rtp TYPe Rig Num Rig StaidDate Rig Release Date
RIG 15 DDYON LAND RIG 0]23 11/12019
Daily Information
Weather Temperature(°F)Wind Days LTI(days) Days R! (days) POB
Cloudy 15.8 E 26MPH 74100 741.00 111.0
Safety Incidents - Near Miss
Data Category Type Subtype Severity Cause Costume,,
Comment
Safety Drills
Days Until Next Check
Type
POccm
Last Data
Next Data
(days)
Rig Inspection
7
11/712019 11IW2019
1
Safety Meeting
7
11912019 11/02019
1
IT Camp Evac
1
11IW2019 2/412020
89
TT Fine Drill
1
111312019 11/1712019
10
TT 112S Ddli
2
111412019 11/1612019
11
TT Man Down Dell
1
i ll51201g 20202B
80
TT Well Kill Drill
1
1113/2019 11/1]/2019
10
Casings seat
Cas. Type
OD (in)
ID (in)
Crime
Top (ftKB)
I Bell (ftKe)
TVD Bot. (RKB)
Lending Date
CONDUCTOR
20
1625
X-fi5
0.0
180.0
180.0
912212011
13318"SURFACE
133/8
1242
LBO
-0,076.0
4,112.9
4,112]
Bl2]I2011
CASING
CASING
9518
Lao
-6850.9
B,9%.8
6,901.4
10/8/2011
CASING
fi,518.8
329/2013
Last Cementing
Cemmiting Start Date: 10192011 Siring: �oxcoN not mund> Comment:
Ssle Top (RKB)
Top Meas Meth
Bun (RKB)
Com
1 4,317.0
Volume Calculations
8,901.0
Rig up and test hard lines from Schlumberger to rig V3000 psi.%Rig Pumps- break circulation and pump 110 We. of
Mud Push 11 @ 10.1 -rate of 6 bpm @ 300 psl.%Shd-down drop bottom plug.%SLB mu 8 pump Lead slum/ 71 bels.
@ 12.5 ppgA Class. Utecrete% 1.57 Yield, mix water a15.463 gal ak. - Pump rate of 4.0 also @ 460 psi.%SLB mix and
pump Tail sluts 8D MIs. @ 15 8 ppg%Class G \ 1.16 Yield mix H2O at 5.092 gayst - Pump rate of 3.0 bpm @ 500
p A Shut down a drop top plug - SLB Pump 10 NWs H2O ark wash upA Disputes with 4B9 Oaks. @ 10.1 post, mud with
ng pump at 7 bpm w200 psi, at 469 bible away slaw pump to 2 bpm with 950 psi. FOP with full returns\ Bump pug to
5Mpsi, over FOP to IWO/psi. - Hold for 10 modules and Meed o0- check floats are holding - Good\ Cement in place
@ 0530 his.
2
Job Information
Job Phase Planned Smrt Dam Start Date Ead Date P50 Duration (days)
WORKOVER 11Iffi0181390 11/11201913:00 0.00
Daily Summary Operations
M Pat cast
Nipple down ties - install Jim, plate to .If false bowl and Nankin,, plug for resting BOP. Nipple up SOP stack and test to Sundry requirements 2WGW0 psi. Pull string in tension and ng -up Helllbudon and
WAITech to cut 4-12" tubing.
20 Summary
Surface test and pick-up WeIITech electrical tubing punch -ran In hde correlam on depth for first sMl. Encountered electrical short, check surface equipment- (goo ff. Pull out o1 hole - check mals for elec4icol
shod Gars) - re4heed. Retest tool string ran and in holes - di 6 holes in tubing. Pug cut hde, lay down toes and ng down Halliburton a-IineBubricator. Displace well with 161 ppg kill fluid and monitor for 1 plus
hour, verified dead PJSM- install En and proceed to nipple down tree.
Operation at 07.00
NIU ROPE
Time Log
Start
End
Cum our
Time
Time
Dur lhQ
Ihd
OF,
Act
Plan
Open. Desch
00:00
02:00
2.00
2.00
M
5 P
Complete ne-head of rope socket and pickap WenTech tubing hde punch, yecanned eudace checks on tool string -(good).
Stab up lubrketor and test.
02:00
0630
4.50
6.50
M
5 P
Run M hide with Won-ech tubing hale punch -comelalellog in place wits CCL to 5,817- muting first hole @ 5,633'. Sued
process to deploying tool and observed current and voltage exceeding limits, appeared m be a short in system. Performed
rPh
OHM test on cable to show good resistance to cable head, PUN out d Mie to cabal, root components.
M30
1000
-3,50
10.00M
5 U
lisped and ending tool found Inline jar assembly had shoded out. re -headed - service getting punch and surface check -
(good). Stab up lubricator and test to 3000 psi.
1000
13:00
3 00
13.00M
5 P
un In hde with Well -och tubing punch laglconeird in place with CCL .1 5,617- to Put first held a[ 6,633'. Pressure -up WNng
m 1290 psi. and A annulus was 845 psi. Initiated deployment of punch and obsersed Gutter concoct wire trung, which cot 12
MM Me. Pressure increase in TBG pressure m 14M psi. atter remudnd deter wird A annulus mucking. Pulled up hole ark
performed tubing punch W 5.032', 5,631', 5,330' 5,829', antl 5,828'.
1300
1400
1 00
14.00
W.O.
M
5 P
PUN out hole with Waitress tubing punch and inspect tools-
14:00
17:30
3 50
1250
W O.
M
5 P
PJSM - lay down Wa1ITed1 fact string and its down Ha libudon Iubdcakr and Nine equipment Move equipment out m set
accumdalor In place.
1]:30
2030
30D
20.50
W.O.
M
8 P
PJSM- pump down Tubing to displace well with 16.7 poll kill fluid with A annulus returns to tiger tank. ICP 650 psi with 84
gpm and 110 psi on A annulus. FCP 620 psi with 150 giant, and 137 psi on A annulus. Pumped total 448 bels. Monitor B
annulus which increased to 352 psi. Trensmr fluid from tarda to WIF up right tank
20 30
22:00
1.50
22.00
W.O.
M
9
P
Monitor well tubing and A annulus to verified killed -(dead). Blow down lines to tiger tank and continue transferring to WIF up
-fight fame.
22:(10
00:00
2.00
24.00
W.O.
C
S
P
PJSM-Video set BPV and nipple down tee- trouble backing out Gray -Lock damp MNs.
Gas Readings
Avg Background Gas (%)
Max Background Gas (X) Avg Connection Gas (%)
Max Connection Gas (%)
Avg Drill Gas 1%)
Max Drill Ges (%) Avg Trip Gas (x)
Max TOP Gac 1%)
Daily Mud Volumes
TsnktAddRIonlLOss I
Type
Des
Volume INA)
de
412.0
ass
0.0
Tank
355.0
Well Name: SD37-DSP1
Wellbore Name: SD37-DSr
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Jate: 111712019
Report #: 7
Page: 2 of 3
Cumulative Mud Volumes
Active Volume (bbl) Hole Volume (bbl) Additions (bbl) Cum
Additions (bbl) Lasses (bbq Cum Lasses (bbl)
76].0 412.0
0.0
0.0
0.0
0.0
Daily Contacts
Position
Contact Name
Company
Title
Email
Office
Mobile
Eni represe.Who.
Steve Laadence
Eni
Dnking Supv,
siddlling@.me.m
685-0715
Eni representative
David Smith
Eni
Doling Supv.
odddlling®eni.com
907485-0715
5N representative
Chad Guece
Eni
Drilling Sop.
907485-0726
Eni representative
Wade Thames
Eni
Rig Cterk
AKRigGelsDoyon1S@wu.com
9074854722
Eni representative
Pal Ahem
El
HSE
Eni representative
Mark Hubby
Eni
HSE
Tool Push
Sam Dye
Doyon Ptilling
Field Superintendent
Tool Push
Ryan Pankretz
Doyon Drilling
Tool Pusher
ngi5@doymdnlling.com
Tool Push
Einar Rea ile
Doyon Grilling
Tool Push
Tool Push
C1i17 Owens
Doyon Drilling
HSE
cowenstidoymakillinacam
685A798
Tool Push
Dave Sena
Doyon DAling
HSE
dsenaCdorondnlrng,mia
1685A796
Personnel Log (POB)
Company
Serv. Type
Work H lhr)
Sbnd4y H thy)
Court
Noss
Can
Genial
12.50
0
Drilling
Expro
Flow back
12.50
o
Drilling
EPA
Inspector
12.50
o
DAling
NO Machinery
Mechanic
12.50
0
Dolling
Eni
Ergine.
12.50
0
Dolling
ASRC
Gel
12.50
1
DAling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SIDSuppon
Beacon
Medic
12.50
1
SID Support
Doyon
Field Superintendent
1250
1
Waling
N.Ikem Oilidid Services
Faster
12.50
1
SID Support
Vetco(SHGE)
WellHead
12.50
1
Drilling
SLB
Cement
12.50
1
DAling
ACS
Enesommeal
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Suppon
Doyon
Tool pusher,
1250
2
Drilling
Doyon
HSE
12.50
2
Drilling
MI Sweco
Mud Engineer
12.50
2
Doling
ASRC
Corepam Man
12.50
3
Drilling
Baker Hughes
Baker Hughes
12.50
3
Drilling
WNITec
Welnec
12.51)
3
Dlling
Compe entia
Log eas
12.50
4
SID Support
Purcell
Seventy
12.0
5
SIO Support
MI S.
Mud Plant
12.50
6
Drilling
Halbbunon
Slick Line
12.50
8
Drilling
All Swaco
WIF
12.50
8
SID Support
ESS
Catering
12.50
11
SID Support
Watley
Track driver I Crane operator
12.50
14
Drilling
Doyon
I Rig Personnel
12.50
28
Dlling_Total Drilling Personnel
BOP Stack 6 Components
Description
BOP Stack
Sten M4
10124/2019
Last Cenifi.emn DebPressure Rating(Psi)
511/2015 5,000.0
Type
Make
Model
ID Nom(in)
PRamle(psi)
Last Cert Dale
Annular
Hydnl
GK 500
135/8
5.000.0
51112015
3 112 " 6-VSR
Hydl
MPL 5000
13518
5,000.0
8124/2018
Blind Shear Rem
Hydra
MPL 50Da
135/8
5.000.0
8/241018
41IY x T'VSR
Hydl
MPL 501)0
135/8
5.000.0
5MnQ15
Slow Circulation Rates
Pump Number. 1 Make: Whae
Star
Model:
Qualm 2450
sun Date
End Dab
Liner Size (in)
Volume Per Stroke Override (bbVstk) Max Pressure (pail
4/10/2018
1
5
0.075
7,500.0
Data Depth (aKB)
Slow Spd
I
Strokes (spm)
I P (psi)
I ER (%)
O Flow Spm)
Pump Number:2 Make: was Star
McdN: Cocoa 2450
Stan Dale
End out.
Lune-Sive(in)
Volume Per Stroke Override Max Pressure (psi)
4110/2018
5
00]8
7,500.0
Date
Depth (RKB)
Slow Sptl
I
Strelws (spm)
I P (ped)
I ER I%)
O Flow opm)
Pump Number. 3 Make: Norman]
Supply
Madel: 12-P-180
Start Daft
End Data
Liner Size (in)
Volume Per Stroke Over alka (bbVstk) Max Pressure (psi)
VIW2019
1
4 1/4
0.053
7,500.0
Data
Depth(RKB)
Slow Sptl
Strokes spm)
P(Pa.)
ER(%)
0Flow (,pan)
Daily Bulk
Suppty Ilam DeuAPBom Equipment Fuel
Una Label:
Gal
Una Size: 1
Note:
Date Consumetl Receivetl
Returnetl
Cum assumed Cum Rmeivetl
Cum Retumetl Cum On Loc
Note
1117/2019 304.0 304.0
],583.0
],563.0
0.0
0,0
Supply hem Description: MW Plant Ediere
-Unit "bet:
Gal
Unit Size:
Note:
Data Consumetl two
Returned
Cu. Consumed Co. Received
Cum RNumed Cum On Loc
Nate
IR
11/7/2019 198.0 198.0
1,386.0
1356.0
0.0
co
Supply Rem Description: Rig Fuel
Unit Label:
gal us
Unit Size: 1
Note:
Date Consumed Rcounsel
Returned
Cum Consumed Co. Received
Cum Returned Cum On Loc
Note
111]12019 1.6230 0.0
9,513.9
1],729.0
0.0
8.216.0
Supply hem Dertriptlom Rig Water
Unit Label:
bol
Unit Size: 1
Note:
Dab Consumetl Received
Returned
Cum cimumetl Cum Received
Cum Retumetl Cum On Loc
Note
111]12019 51.0 0.0
1]4.0
3940
0.0
2200
Sup ply Rem Description: WIF Bidden
Unit Label:
Gal
Unit Size:
Note:
Date Consumetl Receivetl
RNumetl
Cu. Consumed Cum Received
Co. Returned Our, On Loc
Note
11n/2019 42.0 42.0
294.0
294.0
0.0
0.0
Supply Rem Description: WIF Injected Diesel
UnItLabel: Gel
Unit Size:
Note:
Well Name: SD37-DSPC
Wellbore Name: SD37-DS'
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 111712019
Report M 7
Page: 3 of 3
Data Consumed Received
11O1201H 00 0.0
Returned Cum Conaumetl
0.0
Cum ftecalved Cum Returned Cum on Lac Nae
0.0 0.0 0.0
Last Authority Visit
Date Tat ins, Nbr
Total LN.C. number Comment
STOP Cards Submitted
Company
0 Rats
Co.
Doyon Dnlling
Doyon Drilling Inc.
Doyon Oohing Inc.
Doyon DOW, Inc.
MI S..
Ml S..
4
11
4
4
4
2
PJSM'S
Safe Cells
COW
Haws
RIR's
HARCOSA
eneral Notes
Command:
Daily Report
fate: 111812019
Report #: 8
Page: 1 of 3
Well Header
Well Name:D
37-DSF
Wellbore Name: e: SD37-
PermiVConcession N°
Well Code: 25754
Subsidiary
ENI Petrdaum Co. Inc.
Job: WORKOVER
ani
WCEI Level: 3
Daily Report
fate: 111812019
Report #: 8
Page: 1 of 3
Well Header
PermiVConcession N°
operator
ENI PETROLEUM
Subsidiary
ENI Petrdaum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL O 130220 Of
ADL -388583
COLTIVA210NE
Rdary Table Elevation (11) Ground Leyet in)
First Flan" in) RKB - Base Flange M) RKB-Tubing Spool (ft)
32,805.12 13.10
16.80 32,788.32 3&]84.62
Rigs
Rlg Nama Cantme[or
Rig TYRI mg Num Start Date Rig Release Date
RIG 15 DOYON
LAND RIG 0]23 1119,/2019
Daily Information
Weather Temperature l'F) Wind Days LTl (days) Days R1 (days) POB
Of... 6.6
SE (Q 14 MPH 742.00 742.00 113.0
Safety incidents - Near Miss
Dare Category Type Subtype Severity Cause Loittime2
Comment
Safety Drills
Days Until Next Check
Type
Is Occur
Last Date
Next Date
(days)
Rig Inspection
6
11/80019 111912019
1
Safety Meeting
I18/2 111912019
1
TT Camp Evac
1
111612019 214/2020
BB
TT Fire ONI
1
11/312019 11/1712019
9
TT H2S Nil
2
11/412019 11/1812019
10
TT Man Down Drill
1
11/512019 21312020
87
TT Rig Evac
1
11/62019 2162020
90
TT Well hit Dell
1
111312019 11117x019
9
Casings seat
Co.. Type
Do (in)
ID (in)
Grade
To. IftKBI
Bottom (ftKBI
TVD Bot (HUS)
Lending Date
CONDUCTOR
20
16.25
X-65
0.0
160.0
160.0
91212011
13 Wee SURFACE
13318
1242
L80
-4,0]6.0
4,112.9
4,112.]
912]2it
CASING
CASING
95/8
L80
-6.8589
6'901.a
6,901.4
1WW2011
CASING
6,517.0
6,518.6
3292013
Last Cementing
Cementing StartDere: 10/9/2011 SMng:<mcord net foundx
Comment:
Sig 4 Top IftKB)
1 4.317.0
Top Maas Meth
Volume Calculations
Bon (RKB)
6,901.0
Co.
Rig up and test hard lines from SCNumberger tong 63000 psi.\ Rig pumps -as drwlalion atM pump 110 bbla of
Mud Push II (Q 10.1 -rate of 6 bpm Q 300 psi.\ Shutdown drop bottom plug.\ SLB mix 6 pump Lead slung 71 bbls.
12.5 ppg.\ Gess, Usecmte\ 1.57 Yield, mix water at 5.463 gaVsk. - Pump rate ar4.0 to. (a] 460 psi.\ SLB mu and
pump Tail slum, 80 bbls. ® 15.8 ppg.\ Gass G \ 1.16 YiNd, mix H2O x15.092 gallsk. - Pump rate of 3.0 bpm C 500
psi.\ ShO down 8 drop lap plug - SLB pump 1 O bas H2O and wash up.\ Displace wire 489 bas. 010.1 ppg mud with
dg pump at J bpm w1200 psi, a1469 bass away slow pump to 2 bpm with 950 psi. FOP with full returns\ Bump plug to
5001psi, over FCP to 15001psi. - Hold for 10 minutes and bleed obi- check goats am holding- Goad.\ Cement in place
® 0530 his.
2
Job Information
Job Phase Plandretl Start Data
Start Date Entl Date 1350 Duration (do,.)
WORKOVER 11/120191390
11/11201913:00 Q00
Daily Summary Operations
24h Forecast
Finish rig -up Halliburton E4ineflubdcator and make-up WelRecm tubing cutter to E -me - surface test, pressure test. Run in and cut 4-1/2° tubing, pull out hole with cutler. Calculate bottomsup. Rig -down Hallibudon
E-Iinequbncats, Rigup GBR and pug out laying down 4-1/2' tubing.
24h Summary
Finish nipple down thea, Instal false bowl liking plate and blanking Mug for testing. NipplsUp neer and BOP stack Tort BOP to 25013500 psi as Par AOGCC sundry, Austin Mdnutl waived wimess of lest. Pull BPV.
Metal 0.JZ leasing pint to hanger- back out jock -dooms pin. Work hanger free and psi string in 101, tension - set slips. RIg-up HNliburton and WegTech.
Operation at 07.00
Coding Tubing wrivai Tec Tubing Cuter.
Time Log
End Cum Our
Time Our (hr) (N) Phase Do, Act. Plan Ope, Des.,.
0330 3.50 3.50 111 C 5
P Continue to NO Use, inspect and dean top of tubing hangar- Topped bolt teas in top d false been for puling Mol, and
Installed Voice test dad in landing threads of Nang hanger. Load 4.5" ViiM-TOP tubing in prym shad, while spotgng
7.00 10.50 W.O. C 5
P Install high pressure doer on wellhead, nipple up BOP, inoteli NokelkiR valves/ndoes, hook-up accumulator lines, flow line
1030
and dear conned. Strap and drift 4 5" VAM TOP Nang in pipe shed.
1330 300 13.50 V7O-( 12
L3O
P Fundmntenram , dgupBOPtest equipment make up 5" iertpint to Cert dad adapted inmakeupon tubing
harper Flood stack, and purge air form SOP, shell rest to 3500 psi.
1830 500 16.50 V0_ C 12
P Test BOPE 250 psi. p500 psi. as per sundry an 5° ant 0.12'te dais. Test PVL system, gas atermo, perform accumulatordraw
down testNote:
AOGCC rep. Austin MGoutl waived wool of test
2100 2.50 21.00 W.O. C 5
P Phil and lay down lest joint, pia I ma BPV per Veico. 99Wdown lines ant n0 down test equipment
21:00 00:00 3.00 24.00 WO. L "17-1
P PJSM-make up 4-112' lending Forttehanger-bark out lodr-0own pin. Pick-up working string, whle surging up weight be
2WK and pW steam heat amend outoida of wag head-Wbirp hanger came fee- pickap to IWK and set sips. Contiwe ng
-up ant Spot Hellibu tan E-linelubriceter and Wal -lay out tubing cutter ted string.
Gas Readings
Avg Background Gas I%) Max Background Gas (%) Avg Connection Gas (%)
Max Connection Gas (%)
Avg Drill Gas I%) Max Drill Use (%) Avg TAP Gas (%)
Max Trip Gas (°h)
Daily Mud Volumes
TanklAdditionlLoss
Type Des Volume (bbl)
412.0
Hole
H
0.0
Loss
355.0
Tank
Cumulative Mud Volumes
Active Volume (bbl) Hale Volume (bbl)
Additions (bbl) Cum Additions (bbl) Losses Mall C. Losses (bbl)
757.0 412.0
0.0 0.0 00 0.0
Well Name: SD37-DSP1
Wellbore Name: SD37-DSF
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
)ate: 11/812019
Report #: 8
Page: 2 of 3
Daily Contacts
Position
Cmdact Name
Company
Tftle
Email
Office
Mobile
Eni representative
Steve Levmence
Eni
Dnlling Sups,
siddnlling®eni.wm
6854)715
Eni representative
David Smith
Eni
Nang Sup.
oddnllirg®ani..m
907885-0715
Eni representative
Chad GUe.
Em
Drilling SUP,
907685.0726
Eni representative
Wade Thomas
Eni
Rig Clerk
AKRigCMMSDoyonl SQDani..m
90]-6810]22
Eni representative
Pat Ahem
Eni
HSE
Eni repreaentative
Robert Gonzalez
Eni
HSE
Tool Push
Sam Dye
Doyon Drilling
Field Supenntendenl
Tool Push
Ryan Pertinent
Doyon Dming
Tool Pusher
ng15Cdoyondrilling.wm
Tool Push
Einar Fl.a.
Doyon Drilling
Tool Push
Tool Push
Cliff Owens
Wyon Drilling
HSE
covens®doyonddlling.com
6850796
Tool Push
Dave Sena
Doyon Drilling
I HSE
dema@doyohdrilling.com
16850796
Personnel Log (POB)
Company
Serv. Type
Work H tre)
Stand4by H(Irn
Count
Note
GBR
Casing
12.50
0
DMling
Expro
Flay back
12.50
0
Drilling
EPA
Inspector
12.50
0
pilling
NC Machinery
Mechanic
12.50
0
pgling
Eni
Engineer
12.50
0
piping
ASPIC
Clerk
12.50
1
Drilling
ASPIC
SOA
12.50
1
SID Support
AERO
Crane Advisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
Doyon
Fall Superintendent
12.50
1
Drilling
Northam Oilfeiki Services
Roger
12.50
1
BID Support
Vet. (BHGE)
WellRead
12.50
1
piping
SLB
Cement
12.50
1
pilling
ACS
Emiromental
12.50
2
SID Support
Beeson
HSE
12.50
2
SID Support
Doyon
Tod Posters
12.50
2
piping
Doyon
HSE
12.50
2
pilling
MI Swa.
Mull Engineer
12.50
2
pilling
ASRC
Company Man
12.50
3
pilling
Baker Hughes
Baker Hughes
12.50
3
piping
We11Tec
WHIT.
12.50
3
pilling
Compebntia
Logistic
12.50
4
SID Support
Purcell
Security
12.50
5
SID Support
MI Swa.
Mull Plant
12.50
6
pilling
Ml Swaco
WIF
12.50
8
SID Support
Halliburton
Slick Line
12.50
9
pilling
ESS
causing
12.50
12
SID Support
Worley
Truck driver l Crane operator
12.50
14
pilling
Doyon
I Rig Personnel
1
12.50
1
20
1 DnIdng_Totat Drilling Personnel
BOP Stack 8 Components
Description
Sferi Dale
Last Oetlirted on Date Pressure he (psi)
BOP Stack
10124/2919
5112015
Swo.o
Type
Make
Model
ID Nons(in)
PRange Jul)
I Last can Date
Annular
Hydnl
GK 500
135/8
5,0000
5/1/2015
3//2"-6"VBR
Hyddl
MPL.00
13518
5,000.0
&242018
Blind Shear Rem
Hydril
MPL 5000
13518
5,000.0
8/242018
4 VV x7"VBR
HytlM
MPL 5000
13518
S,OD0.0
5/12015
Slow Circulation Rates
Pump Number.1 Make: MR. Star
Model:
Quatm2490
Start DateEnd Date
Liner Size (In)
Volume Per Stroke OveMde (bblistk) Max Pressure (psi)
41IU2016
5
0.0]6
MWD.0
Date
DaptM1 (kK8)
Slow Sptl
Strokes (spm)
P (psi)
EB (%)
Q Flow (ppm)
Pump Number: 2
Make: Mile Stw
Modal: Quatro 245D
Stall Date Entl Date
Grier Size (in)
Volume per Shake Override (bbgstk) Mex Pressure (poll
4/1D201a
s
0.076
],SDo.a
Date
Depth (kKBj
31ow Sptl
Strokes (spm)
P (psi)
ER (%)
Q Flow (gpm)
Pump Number: 3 Make: National Supply
Madel: 12-P-180
End
Start Date End Dab
Liner sure (in,
Volume Per Stroke Override (Intake) Max Pre ssum (psi)
411012019
41/4
0.053
7,500.0
Date
(ftKB)
Slow Sptl
Strokes tap.)
P (psi)
EM I%)
Q Fbw (gpm)
Daily Bulk
Supply Rem Description: Equipment Fuel
link Label:
Gal
Unit Sae: 1
Note:
Dale Consume) Receivetl
Retumetl
Cum Donsumetl Cum Reeeivetl
Cum Returned Co. On Loc
Note
111812019 2,1]5.0 2.175.0
9,]380
9,]38.0
O.D
0.0
Supply Rem Description: Mull Plant Boden
link Label:
Gal
Unit Size:
Note:
Dab Consumetl Received
Returned
Cum Consumed Cum Receivetl
Cum Returned CUM On Loc
Note
11/82019 198.0 198.0
1.584.0
1,584.0
0.0
co
Supply Rem Description: Rig Fuel
UMt Label:
gal us
Unit Size:1
Note:
Date Consumed Reid
Returned Cum Consumetl Cum Received
Cum Returned Cum On Les
Note
11/.12019 1,950.0 4,000.0
11463.0 21,]2B.0
0.0
10.266.0
Supply Rem Description: Rig Wader
UM Label: bbl
Unit Size:1
Note:
Date Consumetl Receivetl
Returned Cum Consumed Cum Receivetl
Cum Returned cum On Los
Note
11/.12019 109.0 135.0
283 0
529 0
0.0
246.0
Supply Ram Description: WIF Boilers
Unk Label:
Gel
Unit Size:
Note:
Date Consumed Re.iuetl
Retumetl
Cum Consumed Cum Received
Cum Returnetl Cum On Loa
Note
11/812019 42.0 42.0
3360
336.0
00
0.0
Supply Item Descri Ion: WIF lnjectetl DiesM
UnR Label:
Gal
Unit Size:
Nota:
Date 9onsumotl Receivetl
Retumetl
Gum Consumed Cum Received
Cum Returned Gum On Loc
Note
1v.rmta 9.a D.o
o.o
D.o
D.D
0.D
Well Name: SD37-DSP1
Wellbore Name: SD37-DS'
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Jate: 111812019
Report #: 8
Page: 3 of 3
Last Authority Visit
out. Tot insp. Nor
Total I.N.C. number Comment
STOP Cards Submitted
Company
tl Rpt,
Com
Doyon Drilling
12
PJSM'S
Doyon Dolling Inc.
12
HRWS
Doyon Drilling Inc.
12
COW
Doyon Drilling Inc.
5
Safe Curtls
MI Swaco
4
RIR'e
Ml Swaco
2
HARCIJSA
General Notes
eommene
'gaily Report
-ate: 11/912019
Reportli: 9
Page: 1 of 3
Well Header
Well Name: D
37-DSF
Wellbore Name: me: SD37-
PermatConcession N°
Well Code: 25754
ENI Pekdeum Co. Inc.
Job: WORKOVER
ani
WCEILevel: 3
'gaily Report
-ate: 11/912019
Reportli: 9
Page: 1 of 3
Well Header
PermatConcession N°
OperatorSubsl0lary
ENI PETROLEUM
ENI Pekdeum Co. Inc.
Initial Lame Code
DEVELOPMENT WELL O POZZO DI
ADL -388583
COLTIVAZIONE
Rctery Tebh Ehvation (k) Ground Leval (k)
Flret Flange (k) RKB-Base Flange (k) RKB-Tubing Spool (k)
32,805.12 13.10
16.80 32,]88.32 32,784.62
Rigs
Rig Name Contract"
"i
Rig Type Rig Num mg Start Date Rig Release Data
RIG DOYON
LAND RIG 0]23 11/112019
Daily Information
Weather Temperature(°F) M Days LT[days) Days R! (days) POB
Gear 14.0
SW ®15 MPH ]43.00 ]63.00 111.0
Safety Incidents - Near Miss
DaH Category Type Subtype 8everiry Cause Lost times
Comment
Safety Drills
Days Until Next Check
Type
aOccur
Last Date
Next Data
(days)
SOPE Pressure Test
1 111612019
1112212019
13
Rig Inspection
9 11/912019
1111012019
1
Safety Meeting
9 11/912019
1111012019
1
Spill NO
1 1
09/2019 11/2312019
14
TT Camp Evac
1 11168019
2(412020
87
TT Fire Do
i 111312019
1111]12019
8
TT 112S DMI
2 111412019
1111812019
9
TT Kick While Tripping
1 11/98019
1112312019
14
TT Man Down Unit
1 11158019
2138020
86
TT Rig Evac
1 11188019
2188020
89
TT Wull Kit rill
1 I
IIW2019 11111712019
1
8
Casings seat
Cas.Type
OOlin)
to (in)
Grade
Top IkKB)
Bottom(RKB)
rve But.(kKB)
Lending Date
CONDUCTOR
20
18.25
X65
0.0
160.0
180.0
9828011
133/8"SURFACE
13318
12.42
Lee
-4,0]6.0
4,112.9
4,112.7
9/272011
CASING
CASING
II SIS
LBO
-6,858.9
8.901.8
6 RMA
101812011
CASING
m0s17.0
6,516.6
312912013
Last Cementing
C<meMhg Shrf Date: 10/912011 Sbdng: 'race not buntl>
Comment
Sig a
Top IkKB)
Top Meas Meth
End tHI B)
6.901
Corn
Rig up and test hard Imes from Sohlumberl to rig 113000 psi.\ Rig pumps- break circulation and pump 110 bbls. of
1
4,317e
Volume Calculallons
,0
Mud Push II C 10.1 -rate of 6 bpm ® 300 psi %Shut-0own drop bottom plugA SLB mix S pump Lead slurry 71 bids.
a 12.5 ppg.%Gass, LhecreW 1.57 Yield, mix water at 5.483 gOsk - Pump rale of 4.0 bpm ®450 psiA SLB mu and
pump Tat slurry 80 Idols, ® 15.8 ppgA Class G \ 1.16 Yield, mix H2O at 5,092 gapsk - Pump rate of 3.0 bpm a 500
psi.%Shut down B drop top plug - SLB pump 10 bbls H2O and wash up.%Displace with 489 bola. @ 10.1 ppg mud with
rig pump at 7 bpm w1200 psi, at 469Ibis may slow pump to 2 bpm with 950 psi. FCP with full returns%Bump plug to
50olpsi, over FCP to 15001psi. - Hold for 10 minutes and bleed off- check floats are holding - Good.%Cement in place
C 0530 Na.
2
Job Information
Job Phase Plannetl SYarf Doh
SGR Date End Doh P50 Duration (days)
WORKOVER 11/1801913:00
11I1I201913:00 0.W
Daily Summary Operations
24h Forecast
Continue working on removal of alignment - no success - reinshll gland nut and test. Run in to storm packer mak up and Meese put our lay down. Continue pulling 4IM'tubing Ie, down joints. Pick-up 3518'
overehollscrepm/magnet assembly and urn in pick-up F dull pipe.
26h Sommary
Continue rig up HellibukaNWellTarA with tubing coker and urn Inde cut Q 5.685'- pull *of. Rig down Hine tools and lubricotan wine circulate bofloms-up. Poll out hole, lay down tubing hanger, continue pulling 4
.112- tubing from 5,650' to 4,032'. Pick-up Baker storm pecker and so
h 4-112 tubing set M 76 with tubing cut of at 4,112'. Test to 30011500 psi. Attempt to remove alignment pin from web head.
Opefakan at 07.60
POOH, W/ 9.Y Vam Top Tubing.
Time Log
Start End Cum our
Time Time Dur(hr) lir) Phase Op, Ad. Plan Open N.,
00:00 0500 5.00 5.00 W.O. R 15
P Continue as dg up HES E4Lno, make up Well -Teck tubing cutter and function tat same. Make up lubricator ant preswm test
to 5000 PSI (good test).
8.50 WO. R 15
P Run in hole with Well -Teck coker, coRelate on of z nipple and packer. log on depth and perform tubing cut at 5685' midpoint
05:00 08:30 3.50
OF first Bull join) below x nipple. Pull out of hole with colter.
08:30 0900 0.50 9.00 W.O. R 5
P Laydown WaWTeck cutter, observed nose cone missing from its,, a0 blades irdad, no Omer damage obarved.
09:00 1900 1.00 10 00 W O. R 5
P Begin laying down HES equipment, while rigging up circulate bottoms up.
1090 1190 100 11.00 W.O. M 9
P Circulate 1 80.1282 GPM, 375 PSI, cont nue to rig dovm /roses and e-I'me lubricator.
11:00 1330 2.50 13.50 W.O. M 5
P Break out and by tlown F06V, blow dawn top drive, than end Gear rig floor Rig up GBft tools and handling equlpmenL
W O. L 4
P PJSM - Poll lubst, hanger to floor and pertmm jM M inspecfion appears to look good however hanger is not prepped for
13:30 18:30 500 18.50
control line pmt. Continue pulling 4_1 IT tutbang from 5.650'to 4,032'. Up et, 92K1 Dnet, 92K
18:30 21:30 3.00 21.50 W.O. M 5
P PJSM- Pick-up stood packer to rig floor, make-up so to 4112- tubing and x, to T TT 525 do pipe and run Ln 2 joints. Baker
rep set storm poker center of elements at TS' and 4V2' tuning m orf at 4.112'. String weight under storm packer 37K.
Up wt = WK Do W.= 92K.
21:30 22:30 100 22.50 W.O. M 12
P Rig -up and pmswm test storm 300/1500 psi. - (good test). Drain and Now down BOP slack.
22:30 00:00 1.50 24.00 W.O. C 5
U Vetco rep ekemphtlto back out and remove alignment pin from well head be per 80P.
Gas Readings
Avg Background Gas l%1 Max Background Gas (%) Avg Connection Gas l%) Max Connection Gas lkI
Avg DMI Gas (%) Max dill Ga (%) Avg Trip Gas I%)
Max on
Daily Mud Volumes
TanklAtltlkioNLosa
type Des Volume (bop
619.0
Hole
0.0
Loss
3350
Tank
Well Name: SD37-DSP1
Wellbore Name: SD37-DS
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 11/912019
Report #: 9
Page: 2 of 3
Cumulative Mud Volumes
Active Volume(bbi) Hole Volume
]51.0 419.0
Additions (bbl)
0.0
Cum Additions(bb8 Losses (stip Cum Losses (bell
0.0 0.0 0.0
Daily Contacts
Position
Contact Name
Company
Title
Email
Ofica
Mobile
Eni representative
Stave Lawrence
Eni
Drilling Supv,
uddrilling@ani.
6050715
Eni repmsenMtive
Dead! Smith
EN
Drilling Su,.
siddrilling@ed.cono
9076050115
Eni repiesenbfve
Chad Gueca
Eni
Drilling Sup,
950.68S0726
Eni repreardatIN.
Wed. Thome.
Eni
Rig Clerk
AKRigC1mksOoyon15®eni.mm
9016850722
Eni represenlative
Pal Abe.
Eni
HSE
Eni representative
Robert Gonzalez
Eni
HSE
Tool Push
Sem Dye
Doyon Drilling
Field Superintendent
Tool Push
Ryan Pankretz
Doyen Drilling
Tool Pusher
ng15®doyondnlling.com
Tad Push
Einer Fleet&
Doyon Drilling
Tool Push
Tool Push
Gill Owens
Doyon Drilling
MSE
cowemCdoyondrilling.com
fi8S01%
Tool Push
Dave Sena
Doyon Drilling
MSE
IdeemCdcondfifffirig.corn
1685,0796
Personnel Log (POB)
Company
S., Type
Werk H far)
Stantl-0y H (hr)
Count
Note
Expro
Flew back
12.50
0
Drilling
EPA
Inspector
12.50
0
Drilling
NO Machinery
Mechanic
12.50
0
DMling
Em
Engineer
12.50
0
Drilling
ASRC
Gar,
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.5)
1
SID Support
Baker Hughes
Baker Hughes
12.50
1
Drilling
We.
Medic
12.50
1
SID Support
Doyon
Field Superintendent
12.50
1
Drilling
Northam OiIMiM Serwcas
Fueler
12.50
1
SID Supped
Vetco(BHGEj
WaRead
12.50
1
Drilling
SLB
Cement
12.50
1
Drilling
ACS
Environmental
12.50
2
SID Suppod
Beacon
HSE
12.50
2
SID Support
Doyon
Tool pushers
12.50
2
Dulling
Doran
HSE
12.50
2
0nlling
GSR
Cas,
12.50
2
Drdleg
Ml S Icon
Mud Engineer
12.50
2
Crime
ASRC
Camparry Man
12.50
3
coning
War..
WeliTec
12.50
3
Drilling
Competentia
Logistic
12.50
4
SID Support
Purcell
Security
12.50
5
SID Support
Ml Swaco
Mud Plant
12.50
6
Drilling
NO S..
WIF
12.50
8
SID Support
Halliburton
Slick Line
12.50
9
Dulling
ESS
Catering
12.50
12
SID Support
Wodsy
Truck ddwr/ Crane operator
12.50
12
Drilling
Doyon
I Rig Personnel
12.50
28
Dr11mg_ToWI Drilling Personnel
BOP Stack 8 Components
Descdp6oa
BOP Stack
sold Dab
101242019
Last Cadifestion Date Pressure Rating (psi)
5112015 5,000.0
Type
Make
Model
ID Nom (in)
P Range (psi)
Last Cert Deta
Annular
ydril
GK550
13518
5,000.0
511/2015
3112"-fi VBR
Hytlnl
MPL 5000
135/8
5,000.0
&2N2010
Mind Shaer Ram
Hydnl
IN
MPL 5000
13518
5,000.0
&2412010
4112"xT'VBR
Hydril
MPL 5000
13 We
5,000.0
5/112015
Slow Circulation Rates
Pump Number. 1 Make: White Star
Model: Quatro 2450
Stan Date End Data
4/1012018
Liner St. (in)
5
Volume Per Stroke OveMd. (bbgstk) Mea Pressure (psi)
0.010 ],500.0
Data
Depth rue)
Slow Sptl
Sbden. lip.)
P(psi)
EN(%) QFlow (gpm)
Pump Number. 2 Make: Mae Star
Madel: Quatro 2450
Start Date End Date
Liner
St. (in)
Volume Per Stake Override (literati Max Pleasure UWs
41102010 1
5
1 0.010
7,500.0
Data Depth (fti
I Slow Spot I
Strokes (spm)
P (psi)
I ER (%)
Q Flow (gpm)
Pump Number: 3 Make: National Supply
Medal: 12-P-1 N
Stan Date End Date
4/10/2019
Liner
4114
Size (in)
Volume Par Streke Override (bblink) Max Pressure (psi)
0.053 7,500.0
Data
Depth INKS)
ISlow sptl
94okea(,P.)
P(psl)
EN (%) i
Qnos, (go-)
Daily Bulk
Supply Item Description: Equipment Fuel
Unh Label
Gel
unit size: 1
Note:
Date Consumal Rec vad
Remrmd
Cum Consumetl Cum Receluetl
Cum Rehrnetl Cum On Loc
Note
11/92019 1,2]3.0 1,213.D
11,011.0
11011.0
0.0
Ile
Supply Item Description: Mud PIem Boded,
Unit Labei:
Gel
Unit size:
Note:
Date Consumed Re idsit
Returned
Lum Consumetl Cum Received
Co. Returned Cum On Lou
Nate
11192019 198.0 10.0
1,]02.0
1.]82.0
0.0
D.0
Supply Nem Description: Rig Fuel
Unit Label:
gal or
Unitsize:I
Nate:
Data Consumed Received
Ratumed
Cum Consumetl Cum Reserved
Cum Retumed Cum On Loc
Note
111912019 2,106.0 fi25.0
13,569.0
22354.0
0.0
8.785.0
Supp"' hadDelfir. Rig Water
Unit Label: bbl
Unit Size: 1
Note:
Date Consumetl Received
Relumetl Cum Consumetl Cum R.C.Wed
Cum Returned Cum On Lw
Note
1119/2019 840 1350
351.0
664.0
0.0
297.0
supply bad Descripdon: WIF Boilers
Unit Label: Gal
Unit Size:
Note:
Deb Consumetl Received
Returned Cum Consumetl Cum Receival
Cum
Rdmmil Cum On Lou
Note
11/9/2019 42.0 42.0
3180
318.0
0.0
0.0
Supply hem Deseripdon: WIF Irgeclad Diesel
Unit tonsil: Gal
Unit Size:
Note:
Well Name: SD37-DSP1
Wellbore Name: SD37-DS'
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 111912019
Report #: 9
Page: 3 of 3
Date Consumetl Receivetl
11/912019 0.0 0.0
Returned Cum Consumed
0.0
Cum Received Cum Returnee Cum On Loc Note
00 0.0 0.0
Last Authority Visit
Dewe Tot insp. Nbr
Total I.N.C. number Comment
STOP Cards Submitted
Company
IF Rpls
Com
Doyon Daing
Doyon Drilling Inc.
Doyon DNIin9 Inc.
Doyon Dellin9 Inc.
MI Swaco
Ml sen c.
7
5
a
a
4
2
PJSM'S
Safe Cards
CCW
HRWS
RIRs
H RCIJSH
General Notes
Comment:
Daily Report
Date: 1111012019
Report #: 10
Page: 1 of 3
Well Header
Well Name:D
37 -DS'
Wellbore Name: e: SD37-
Operator Subsitllary
ENI
Well Code: 25754
Iridial Lahea Code
NT WELL POZZO DI
Job: WORKOVER
ens
WCEILevel: 3
Daily Report
Date: 1111012019
Report #: 10
Page: 1 of 3
Well Header
PermillCancession N°
Operator Subsitllary
ENI
Petroleum Co. Inc.
Iridial Lahea Code
NT WELL POZZO DI
ADL -388583
ENIPETROLEUM
DEVELOZGENE
Rotary Table Elevation @) Grou.tl Leal Oft) First Flange (k) RKB-Base Flange(fi) RKB-Tubing Spoel (ft)
32,]84.62
32,805.12 13.10 16.80 32,]38.32
Rigs
Rig Nemo CaMncfor cep TYPe wit Num wit mart Dela Rig Release Date
RIG 15 DOYON LAND RIG 0]23 11/12019
Daily Information
WeaUar Temperature(°F) Wintl Days LTl ltlaysl Dxnw(aaya) POB
111.0
Overcast 29.1 15 MPH 1744.00 744.00
Safety Incidents - Near Miss
Data Category Type Subtype Severity Cause Lost time9
Comment
Safety Drills
Days Until Next Check
Type
#Occur
Last We
Next Data
(days)
BOPE Pressure Test
1
11182019 11/22/2019
12
1111012019
11111/2019
1
Rig Inspectionf0
10
1111012019
1111112019
1
Safety Meeting
2
11/1012019
1112412019
14
Spill O611
1
11/612019
2142020
86
TT Camp Evac
1
11132019
11/17/2019
7
TT Fire Dn11
2
11142019
1111812019
8
TT H2S Ong
2
111IW2019
1112412019
14
TT Kick While Tripping
1
111512019
2132020
85
TT Man Down Drill
1
11/812019
2IW2020
88
TT Rig Evac
TT Well Ki# Dn11
1
11/32019
1111]2019
7
Casings seat
Cas. Type
OD (in)
ID (in)
Grade
Top (ftKB)
Bottom IRKS)
WD BOL (ftKB)
Lending Date
CONDUCTOR
20
16.25
X-65
0.0
160.0
160.0
91222011
13 W8 -SURFACE
13318
1242
LBO
-4.076.0
6,112.9
4,112.7
W2712011
CASING
9518
LBO
SB58.9
6,901.8
6,901.4
10182011
CASING
CAB INO
6,517.0
6,516.6
3292013
Last Cementing
Cementing Sart Date: 101912011 String:.mcaM had fountl> Comment:
3[g # Top IftKB)
Top Meas Meth
Blm pa)
8,901.0
Com
pull p- NiAll: chnsfid,ur and pump 110
"!ll) limes.16
1 4,31].0
Volume Caicula8ans
pmu®300 fl.0ahu3-0own drapeg
MtuEpanduMn b.dom Plug,\ SLBink& pump Lead Ad"71lots.
® 12.5 ppg.l Gass, Leacrete11.57 Yield, mixwater x15.463 gallsk. - Pump rate of 4.0 bpm C 460 paiA SLB mix and
pump Tell slurry W this. ® 15.8 ypgA Class G \ 1.16 Yield, mix H2O at 5.092 gallsk. - Pump rate of 3.0 bpm @ 500
psiA Shut down 8 drop top plug - SLB pump 10 bible H2O and wash upA Displace with 489 box. G 10.1 ppg mud with
rig pump at ] bpm W/200 psi, at 469 this away slow pump to 2 bpm with 950 psi. FCP with Mt returnM Bump plug to
500/psi, over FCP to 15001psi. - Hold for 10 minutes and bleed off - check floats she holding- GoadA Cement in place
0530 are.
2
Job Information
Job Phase Plantwtl SW rt Doh Start Data End Dale Pse Duration (days)
0.00
WORKOVER "i120191100 11/1201913:00
Daily Summary Operations
24h Forecast
Contin pulling out hole to +/- 2,500'- pick-up Baker storm Packer and set N- 75' from rotary table, pressure test to 15W psi. PJSM a stat process for change out tubing spool on well head - Nipple down and
nipple up BOP stack- test same.
246 Summary
Working to remove alignment pin gen tubing spool- unsuccessful -reinstall gland nut and test. Run into hole to 75' Baker alarm packer - unseat sump packer- pull out and ley down. Continue pulling old lay
In hole to 5,635' up 5' dral pipe from pipe shed. Wash down from 5,635' to 5,685'- observetl an
down 4112' tubing form 4,032' to tubing cutoff joint Pickup overshot 9518" casing scmpudmagnet-her picking
Circulate bon ma -up and scrape 9.518' seeing from 5,600' to 5,610'. Pull out hole to 4,325'racking
increase (1350 V4O0 on at top of 4 W tubing cul off. Slop pumps continue slacking off to 5,697 (11.5swallowed).
back 5- chill pipe.
Opened.. at 07.00
WD BOPE
Time Log
Start End Cum Dur O r Deacr.
Time Time Our (It) (hr1 Phase Opt. Aar Plan pe
03:30 3.50 3.50 W.O. C 5 U Canbnue with attempt t. remove tubing hangar alignment pin. (unsuccessful), hem ssed screw and installed gland nut
00:00
Tested alignment screw packing agaimt an= packer to 1 WO psi for 15 minutes- (good lest).
6.00 W O. M 5 U Make up overshot on Baker retdevamabc storm packer and open storm valve, veritywall was statc, release paler end altow
03:30 06:00 2.50
elements to relax. Pull out of hole with slam pecker, laid down same and moved paler oft ng floor.
0600 07:00 1.00 0-0 W-0- . M 9 P Rig up and pamp dry job- Rip up GFR tongs and handling equipment.
11.00 W.O. L 4 P Single out of hole on deved.. gam 4,03T to aurfac, laying down tubing recovered joint with Wong IF and 20.0 M M
0700 11:00 4.00 +adjoint.
pint Note wt was smooth with no burs. Tend pipe recover A 134joch"
1.00 12.00 W.O. L 5 Rig down GBR equipment and mar..... White Nean and tleadng ng Boa mabbatl samppw mn BHA equipment W rip
11 00 12:00
flan,.
2.00 14.00 W.O. M 5 P PJSM, Measure and mWrtl 00'10 and lengths cdBHA components, makeup svaper BHA
1200 14:00
21.00 W O. M 4 P Single in hole with mcrepper BHA, pi king up S' TT525 drill pipe with kom ptye shed 1a 5.635E Up w1.=155K and n wl.=
1400 2100 ].00
WK
M 9 P Break circulation and wash down from 5,634' with 128 gpm g 350 psi. observed an increase Be 400 psi. at 5.60 top of d-
21 00 21:30 050 21.50 W.O.
112 -tubing cut off- shut down pumps. Continue slacking with overshot nogg to 5,897 swallowing 11.5' and tag wiU 2K
f.W 22. W W.O. M 9 P Circulate bottoms up 500 gpm id 102] bill Shing 9-518" screper from 5,880' W 5,612' with ec aper and magnet.
21:30 2230
Monitorwell and pumpdryj0b.
2230 00:00 1.50 24,00 W O. M 4 P Pull out of hale from 5,625'to 4.325' -monitor lips displace with Up tank. Up wit, 140K and Dn wt=135K
Gas Readings
Avg Background Gas (%) Max Background Gas (%) Avg Connection Gas 1%) Max Connection Gas I%)
Avg Drill Gas 1%)
Max Drill Gas (%)
Avg T.P Gas (%) Max Trip Gas I%)
Well Name: SD37-DSPC
Wellbore Name: SD37-DSI`
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Gaily Report
Date: 1111012019
Report #: 10
Page: 2 of 3
Daily Mud Volumes
TimWAdditiaNLoss
Type
Des
Volume /bbl)
Hol.409.0
Loss
0.0
Tank
365.0
Cumulative Mud Volumes
Active Volume (bull Hele Volume(bbl) Additions(ball Cum Additions bldl) Losses(bbl)
Cum Losses (MA)
774.0 409.0
0.0
1 0.0
0.0
0.0
Daily Contacts
Position
Contact Name
Company
Tek
Email
Wee
Mobile
End representative
Steve Lawrence
Ent
Drilling Supv.
siddellingslieducom
685-0715
Ent representative
David Smith
Eni
Drilling Supv.
siddrilkngtiem.com
90]-48S0]15
Ent representative
Chad Guam
Ent
Drilling Sup,
907-6850726
Ent representative
Wade Thomas
Ent
Rig Clark
AKRi,Ckk,,Dd nl5@eni.mm
907-6850722
Ent representative
Pat Ahem
Ent
HSE
Ent teprisenhuNt,
Robert Centel
Ent
HSE
Test Push
Sam Dye
Doyon Drlling
Field Superintendent
Test Push
Ryan Panktatx
Dsysn Dmm,
Tool Pusher
dgl5@dopndfiNing.com
Tool Push
enter Reargue
DeyPr Drilling
Tool Push
Test push
am Owens
Doyon UMling
HSE
cowenstIldsyoodrilhng.com
6850196
Ted Push
Dave Sena
Doyon Drilling
IHSE
dsenattdoyondrillilq.com
16850706
Personnel Log (POB)
Co.,.,
Sam. Type
work H (m)
Standdy H (m)
Coatd
Note
Expro
Flow beck
12.50
0
Drilling
EPA
Inapeetter
12.50
0
Doling
NO Machinery
Mechanic
12.50
0
DrAng
Ent
Engineer
12.50
0
Onfling
ASPIC
Gerk
12.50
1
Doping
ASPIC
SOA
12.50
1
SIDSuppon
ASPIC
Crene Advisor
12.50
1
SIDSuppon
Baker Hughes
Baker Hughes
12.50
1
Mud,
Beacon
Medic
12.50
1
SID Support
Doyon
Field Superintendent
12.50
1
Drain,
Northern Odkild Services
Fueler
12.50
1
SID Support
Voted IMAGE)
AN111-head
12.50
1
Dn6ng
SLB
Cement
12.50
1
Drilling
ACS
Enviromental
12.50
2
SID Suppon
Beacon
HSE
12.50
2
SID Suppon
Gotten
Tool pushers
12.50
2
Drilling
Doyon
HSE
12.50
2
Drilling
GBR
Casing
12.50
2
Dollar,
MI Scoots
Mud Engineer
12.50
2
Drilling
ASRC
Company Man
12.50
3
Drilling
WeIITec
WeIITec
12.50
3
Drilling
Campetenaa
Logistic
12.50
4
SID Support
Pineal
Security
12.50
5
SID Support
Ml Swats
Mud Plant
12.50
6
Drilling
Ml Swaco
WIF
12.50
8
SID Support
Halliburton
Slick Line
12.50
9
Drilling
ESS
CMedng
12.50
12
SID Support
Wadey
Truck driver/Crane operator
12.50
12
Drilling
Doyon
I Rig Pemonnal
12.50
28
Onlling_Tokl Drying Personnel
BOP Stack 6 Components
Description
sun Oak
Last Coruscation Dale Pressure Rum, (psi)
SOP Stack
101
5/112015
5.000.0
Type
Make
Model
ID Nom (in)
PRange(Pat)
Last Cert Date
Annular
HydM
GK 500
13518
5,000.0
5-11/2015
31/2 ".6" VOR
Hydd
MR. 5000
13 518
5,000.0
8/2912018
Blind Shear Ram
Hydril
MPL 5000
135/
5.000.0
8/202018
41/Y x7"VBR
Hydril
MPL 5000
135/8
5,000.0
W112015
Slow Circulation Rates
Pump Number. 1 Make: Nide Star
Model: Qua" 2450
surf Deco
End Date
Liner Size (in)
Volume Per Stroke Override (bbysik) Max Pressure (ps)
41IW2018
5
0.078
2500.0
Dale
Depth lkKB)
Slow Sptl
Strobut(spm)
Pips)
ER (%)
aFlow(gpm)
Pump Number: 2
Make: Mite Star
Model: Duarte 2450
Start Data Entl One
Liner Size (in)
Volume Per Stroke Override (bbllstk) Max Pressure )Pa)
4/iW2018
5
0.078
]5000
Date
DepiblkKB)
51. Sptl
Strokes(spm)
P(Pan)
Ekl%) OFlow (gpm)
Pump Numbed
Make: National Suety
Model: 12 -P -16D
Start Date End Data
Liner sire (in)
volume Per Stroke Override (DDysik) Max Pressure pts)
U102019
41/4
0053
],500.0
Date Depth(kKB)
Slow Sptl
Strskes(spm)
P(Pat)
EnI%)
OFlow them)
Dally Bulk
Supply Item Description: Equipment FUM
Unt Label:
Gal
Unit Size:1
Note:
Date Consumed Repelved
Hotprned
Cum Oonsemetl Cum Received Cum Returned Co. On Loc
Note
11/10/2019 1,250.0 1,250.0
12,261.0
12,261.0 0.0
00
Supply hem D:dud POam Mud Plan Boyers
UnittabilL Gel
Unit Size:
Note:
Dak Consumed Recoketl
Retumetl Gum Consumetl Cum Receivetl Cum Retumetl Cum On Loc
Note
11/1W2019 198.0 196.0
1,980.0
1,9800 0.0
00
Supply item Desedptkn: Rig FUM
Unit Label,
gal us
Unit Size: 1
Note:
Dark Consumed Received
Returned
Cum Consumed Cum Received Cu. Retumetl Cum On Lee
Note
111IW2019 1.802A 9,350.0
1
15,371.0 31,704.0 0.0
16,3330
Supply item Description Rag Water
tent La d is ON
Unit Size: 1
Note:
Well Name: SD37-DSP1
Wellbore Name: SD37-DS!
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 11110/2019
Report #: 10
Page: 3 of 3
Date Consumed RettNetl
11/1012019 51.0 0.0
Relumetl Cum Consumed
416.0
Cum Received
664.0
bum Returned
0.0
Cum on Loc
246.0
Note
supply Rem Description: WIF Soilers
Unit Label:
Gal
Unit Size:
Note:
Date Consume. Received
1111012019 42.0 42.0
Returned
Cum Ccnsumed
420.0
Cum Received
4200
Cum Returned
0.0
Cum On Loc
0.0
Note
SUDPIY Item Description: WIF Injected Diesel
Unit Lebel:
Gal
Unit 51xe:
Note:
pate Consumed Recevetl
111112/19 0.0 0,0
Retumetl[Cu.
Consumed
0.0
Cum Received
o.0
Cum Returned
C.0
Cum On Loc
0.0
Note
Last Authority Visit
DataTotinsp. Nbr
Tatal I.N.C. number Comment
STOP Cards Submitted
Company
x Rpt.
Com
Doyon Coling
Doyon Dolling Inc.
Doyon Dulling Ina
Doyon Dulling Ina
MI $.ace
MI swace
9
9
9
12
4
2
PJSM'S
HRWS
COW
Sate Cards
RIR's
HARCJJSA
General Notes
Commem:
Lag
Well Name:D
37 -DS
Wellbore Name: e: SD37-
TIM
Well Code: 25754
Initial Lahey Code
Job: WORKOVER
gni
WCEILevel: 3
Daily Report
Date: 1111112019
Report #: 11
Page: 1 of 3
Well Header
PermiUCanl"Alon N°
Operator
Subsltllary
Initial Lahey Code
ADLJ88583
ENI PETROLEUM
ENI Petroleum Co, Inc.
DEVELOPMENT WELL O POZZO DI
COLTIVAZIONE
Rotary Table Elevaflon(R) Ground Level (ft) First Flange(OI RKB-Base Flange (m RKS-TubIng Spool (ft)
32.805 12 13.10 16.80 32,]88.32 32,784.62
Rigs
Rig Name -Abu Rig Type Rig Num IUB Start Data Rig Release Dace
RIG 15 DOYON LAND RIG 0]23 11/1/2019
Daily Information
Weatherremper.Ure (°F) wino o.ya Ln (nays) Days w (aaye) Poe
Overcast 104 N ®23 MPH ]45.00 745.00 106.0
Safety Incidents - Near Miss
Date Category Type Subtype Seventy Cause Losttime?
Comment
Safety Drills
Days Until Next Check
Type
IfOccur
Last Data
Next Data
Islaysl
ROPE Pressure Test
2
11/1112019 1112512019
14
Rig Inspection
11
11/1112019 11/1212019
1
Safety Meeting
11
1111112019 11/12/2019
1
Spill Drill
2
11/1012019 11/24/2019
13
TT BOPE DSII
1
11/11/2019 21912020
90
TT Camp Evac
1
1116/2019
21412020
85
TT Fire Dnll
2
11111/2019
112512019
14
TT HIM Drill
2
111412019
11/1812019
7
TT Kick While Tripping
2
11/10/2019
1112412019
13
TT Man Down CHI
11/5`2019
21312020
84
TT Rig Evac
1
1118/2019
21612020
87
TT Wall Kill Drill
1
11/312018
11/1]/2019 1
6
Casings seat
Gs. Type
Do (I.)
ID(in)
Grade
Top(nKB)
Bottom(RKe)
I TVD But (PUTS)
Landing DOW
CONDUCTOR
20
18.25
X-65
0.0
180.0
160.0
912212011
13318'SURFACE
13318
1242
LBO
-O,Wfi.O
4,112.9
4,112,]
912]12011
CASING
CASING
95/a
LBO
-fi.858.9
8,901.8
6,901.4
10/812011
CASING
8,517.0
6,516.6
312912013
Last Cementing
Cementing SUM Date: 10192011 Surfing; �Tacfmd not founds Comment:
Stg • Tap (nK8)
Top Meas Meth
B. (fiKB)
Com
1 4,31].0
Vduma Glculations
8,9010
Rig up and test hard lines from Schlumberger to ng 1/3000 par, Rig pumps- break circulation and pump 110 Ms. of
Mud Push II Q 10.1 -results bpm ® 300 psi.\ Shut -down drop bottom plug.%SLB mix 8 pump Lead alum/ 71 WAS.
'
®12,5 p,gA Gass, Liteaete11.57 Yield, mix water at 5.463 gaVsk. - Pump rate of 4.0 bpm @ 480 psi \ SLB mu and
pump Tail slurry 80 bbls. ®15.8 MA Class G \ 1.16 Yield, mix H2O at 5.092 gai - Pump rate of 3.0 bpm (M 500
psiA Shut down 8 drop lop plug - SLB pump 10 bits H2O and wash upA Displace with 489 bels. a 10.1 pp9 mud with
rig Pump At 7 bpm w2o0 psi, at 469 bins away slow pump to 2 bpm with 950 psi. FOP with full relurni Bump plug to
500Ipsi, over FOP to 1500/psl. - Hold for to minutes and Weed off- check floats are holding- Good\ Cement in place
@ 0530 Fra.
2
Job Information
Job Phase PlanmO Start bete Burt Date End Data Pea Duration (days)
WORKOVER 11/1801913:00 1111/201913:00 0.00
Daily Summary Operations
24h Forecast
Installed wear bushing. Redress running tool and pull storm packer to surface and lay down. Continue pulling out with overshollsomperlmagnet assembly and lay down. Pick-up Baker "At' raldevamatic
mechanical set Packer and run in hole, test cawing+/- 5,515' and 2.000', confine pulling out and lay down Baker pacer. PW wear bushing and prep to mn completion.
24h Summery
Pull out from 4,325'to 2.459' with9.518- casing scraper. Redress Baker running had, make-up to storm packer, run set at 75' (overshot at 2,534') - 1500 psi fast Confirm no pressure- break tubing hanger
connection free -nipple down BOP and 13-5/8" mar. Install new tubing spool and valves-nippleap riser and BOP stack -shall test 250135M psi, Note: AOGCO rep Baan Bixby waved witness of shell test. Pull
test plug and perform test on alignment pin and A annular valves connection W011 We psi. lewd test).
Operation at 07.00
RIH W1Retnevamatk Test Parker @ 2,800'
Time Log
start
EM
cam Our
Time
Time
our
(M)
Phase
Opr.
ACL
Man
Oper, Denner.
00:00
0130
1.50
LOU
W O.
L
4 P
Pug out of hole with acrepper and DOW. overshot assembly from 4,325'to TABS. UW 120R. DIV 10UK, Stage whavalhead
M BOP enclosure, and bleed all pressure ofl of B annulus 9 PSI, fluid recovered was diesel.
01:30
02:30
1 00
2.50
W O.
M
1 U
Remove overshot from storm pecker aeM prep to make socena run. Also. wellhead, and remove valves ho. new welliread
to fit through top d well house.
02:30
05:00
250
5.00
Wo
M
4 U
Run in hole and Set storm packer at 76 could not release from packer. Palled out of hale resat valva and soft broke safety
joint run back In hole and set at 75', release from packer and pun out of hole, teat top of storm parker to 300 psi lox ant
1500 psi high.
05 00
08:00
300
8.00
W.O.
C
5 U
Drain shock formal all BOP equipment along with production flow line. Bleed accumulator and disconnected accumulator
hydraulic hoses, break and remove thou lMg lines and valves, nipple down At A annulus valves and masher lbw, line wing
valve, unboit tubing sped to casing head, remove turn besides.
08:00
1000
200
10,00
Wo
C
5 U
Pick stack up with "Install to conNm boss and Tree, set back down nipple down BOP, set beck on stump in cellar area.
Nipple down dam and also Hage in Polar.
10'.00
1400
400
1d.00
W.O.
C
5
U
Remove old upper tubing section from M&237 wellhead and Install new upper section on lower- torque bolls ro spec and
lent primary piston 9 5/8- to 25W psi ler 15 minutes. Note: last was witnessed by Company Men.
14:00
1600
2.00
16,00
W.O.
C
5
U
Continue install flaw d«k, BBV end flow line spool to production inject line menUeld. Remove old upper tubing hanger
section end valvas hone ng cellar arae.
16^00
22:30
6,50
22 50
WO.
C
5
U
Nipple up 135/8 -ria. end BOP slack, nipple up sholus oll valves and hoses, flow near and room flow line. Install
mulabr Fossa and function lest BOP.
2230
00:00
1.50
24.00
WO-
C
12
U
Install test plug wM 412 Answer mW fluid Packer Wan m. Test BOP to 25013500 psi for 5 mins. each. Pug test plug. Note:
AOGCC rep Brian Bixby waived will d shall test at 1353 his.
Gas Readings
Avg Background Gas (%I
Max Background Gas (%)
Avg Connection Gas I%) Max Connection Gas (%)
Avg Drill Gas (%I
Max unit use I%)
Avg Trip Gas (%) Max Trip GAS (%)
Well Name: SD37-DSP1
Wellbore Name: SD37-DS'
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 1 111112 0 1 9
Report #: 11
Page: 2 of 3
Daily Mud Volumes
TankdAdtls klimil
Type
Des
Volume feel)
Hole
421.0
Loss
0.0
Tank
335.0
Cumulative Mud Volumes
Active Volume 1661) Hole Volume(bbl)
Additions (bbl) Cum Additions lbbl) Losses feel) Cum Losses (but
756.0 4210
0.0
0.0
0.0
0.0
Daily Contacts
Position
Contact Name
Company
Title
Email
office
Mobile
Ent representative
Steve tawrerlce
EniDrilling
Supv.
sktlrilling@eni.wm
6850715
Ent representative
CUM Sni
Ent
Onlltng Supv.
aiddrilling@eni.wm
907-68sO715
Eni representative
Chad Grew
Em
ending Supv.
907468is0726
Eni representative
Wade Thomas
Ent
Rig Clerk
AKRigCleiksDoyonl5tteni.cam
907-6851
Enire dwintetive
Pat Ahem
Eni
HSE
Eni representative
Rohan Gonzalez
Ent
HSE
Tool Push
Sam Dye
Doyon Drilling
Field Superintendent
Tool Push
Ryan Pankreta
Doyon truing
Tool Pusher
rtgl5tIlidoyondrilling.wm
Tool Push
Einer Fleagle
Doyon DNlmg
Tool Push
Tool Push
CIiO Owens
Doyon telling
HSE
covens@doyondrilling.com
6850796
Tool Push
Dave Sena
Detrain Dolling
HSE
dsena@doyondrtlling.com
6850796
Personnel Log (POB)
Company
Sew. Type
Work H (hr)
Standby H (len
Court
Note
Exp.
Flow back
12.50
0
Onifig
EPA
Inspector
12.50
0
edging
NC Machinery
Mechanic
1250
0
Cluing
Eni
Engineer
12.50
0
Dnllirg
ASRC
Clark
12.50
1
Drilling
ASRC
SOA
12.50
1
SIDSupport
ASRC
Crane Advises
12.50
1
SIDSUpport
Baker Hughes
Baker Hughes
12.50
1
Drilling
Beacon
Metltc
12.50
1
SID Support
Doyon
Field Superintendent
12.50
1
Drilling
Nodhem Oilleild Servos
Fueler
12.50
1
SID Support
Vetco(BHGE)
WaOHead
12.50
1
Ceding
SLB
cement
12s0
1
Drilling
wellTec
WeOTec
12.60
1
Drilling
ACS
Environmental
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Support
Doyon
Tad pushers
12.50
2
Drilling
Devon
HSE
12.50
2
Drilling
MI See.
Mud Engineer
12.50
2
Drilling
ASRC
Company Man
12.50
3
Drilling
GBR
Casing
12.50
3
Drilling
Corzimundie
Logistic
12.50
4
SID Support
PU.eg
SecuMy
12.50
5
SID Support
MI Sween
Mud Plant
12.50
6
Drilling
Halliburton
Slick line
12.50
7
Drilling
Ml Swew
WIF
12.50
8
SID Support _
ESS
Catering
12.50
11
SIDSuppon
Wadey
Truck driver/Crena operator
12.50
12
Drilling
option
I Rig Personnel
1 12.50
1
27
Dnlling_Total Drilling Personnel
BOP Stack 8 Components
Description
Start DateLaeI
... extion Date Pressure means (pal)
SOP Steck
10124/2019
5/112015
5000.0
Type
Make
Model
ID Nom (in)
P Range (Psi)
Last Cert Data
Annular
Man
GK500
135/8
5,000.0
5/18015
318'-6'VBR
HytlM
MR. 5000
13518
5,000.0
&21/2018
Mind Shear Rem
Hydril
MR. 5000
135/0
5,000.0
511
I18'xT'VBR
Hydnl
MR. 5000
13518
5,000.0
5/18015
Slow Circulation Rates
Pump Number. 1 Make: While Star
Modal: U." 24M
Start cote End Data
Liner Sire (in)
Volume Per Stroke Ovemde (bbllstk) Max Pressure (psi)
QIW2018 1
5
0.078
7,500.0
Data i CUM (RKB)
I Stow Sed
I
Strokes (spm)
P (Psi)
ER I%)
O Flow (gpm)
Pump Number.2 Make: White Star
Model: Cum. 2450
Start Date End Date
Wer 3¢e (in)
Volume Per Stroke Override (bblludi Max Pressure Ipsi)
4110/2016
s
o ole
7,soo.a
Date
i Depth dtKB)
I Slow Sled
I
St.kes(spm)
P(Urst)
I En (%) T OFbw(gpm)
Pump Number.3 Make: rumored Supply
Model: 12-P-160
Stan Data End Date
Liner Sim (in)
Volume Per Stroke Overtide(bbllstk) Max Pressure (psi)
VIMO19
4114
0.053
],500.0
oats
DepM (RKB)
$1. Sptl
I
Strokes (spm)
P (psi)
Eff 1%)
O Flow (gpm)
Daily Bulk
Su ply Item Description: Equipment
Fuel
Unit Label:
Gal
Unit Size:1
Note:
Date Consumed
Recewdl
Returned
Cum Consumetl Cum Recoivetl Cum Returned CUm On Lee
Nate
11I11I2019 1,703.0
1,703.0
13,964.0
13,964.0 0.0
0.0
Supply hem Description: Mud Ram Sollars
Unk idi
Gal
Unit Size:
Note:
DateConsumed Received
Returned
Cum Consumed Cum Received Cum RaWmetl Cum On Loc
Note
1111112019 198.0 198.0
2,1]8.0
2,178.0 0.0
0.0
Supply them Dmcn'on: Rig Fuel
Unit label:
gal us
Unit Size:1
Note:
tate Consumed Received
Returned
Cum Consumed Cum Roonvetl Cum
Returned Cum On Lee
Note
11/118019 1,9110 0.0
1],282.0
31,]04.0 O.0
14,422.0
Supply from Description: Rig Water
Unit Ltl bet
Unit Sim 1
Note:
Well Name: SD37-DSP1
Wellbore Name: SD37-DS'
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
7aily Report
Date: 11/1112019
Reportit: 11
Page: 3 of 3
Date Consumed Received
Returned Cum Oanaeliletl
Cum Received
Cum Retumetl
Cum On Loc
Note
11111/2019 44.0 00
46;
664.0
0.0
202.0
Supply Item Miumpaon: WIF Bollen
Unit Label:
Gel
Unit Size:
Note:
one Conaumetl Revived
Retumetl
Cum Consumetl
Cum Received
Cum Returned
Cum On Loc
Note
1111112019 42.0 42.0
462.0
462.0
0.0
0.0
Supply Item Deserelon: WIF lnjedetl Diesel
Una Label:
Gal
Unit Size:
Note:
Dee Consumed Received
Retumetl
Cum Consumetl
C.0
Co. Received
Cum Retumetl
Co. On Loc
Nate
11111@019 0.0 00
0.0
0.0
0.0
Last Authority Visit
Dae Tot insp. Nbr
Total I.N.C. number Comment
STOP Cards Submitted
Company
C Rpts
Com
Doyon DrOng
15
PJSM'S
Doyon DMling Inc.
11
Sete Cards
Doyon Drilling Inc.
15
COW
Doyon Drilling Inc.
16
HRWS
MI Sworn
4
RIB'S
Ml Swav
2
HARCUSA
General Notes
Comment:
Daily Report
Date: 11/1212019
Report #: 12
Page: 1 of 3
Well Header
Well Name:D
OperatorSubaMlery
37 -DS'
Wellbore Name: e: SD37-
Initial Lahee Code
Well Code: 25754
ani
Job: WORKOVER
DEVELOPMENT WELL O P=0 Of
WCEI Level: 3
Daily Report
Date: 11/1212019
Report #: 12
Page: 1 of 3
Well Header
PermtUConoesston N'
OperatorSubaMlery
Initial Lahee Code
ADL -388583
ENIPETROLEUM
ENI Petroleum Co. Inc.
DEVELOPMENT WELL O P=0 Of
COLTIVAZIONE
Rotary Table Elevation(.) Grountl Level(.) First Flange(B) RKB-dead Flang-M) RKB- Tubing Spool(ft)
32,805.12 13.10 16.80 32,788,32 32,784.62
Rigs
Rig Name Cantreclar Rig Type Rig Num Rig Sort Data Rig Release Dale
RIG 15 I LAND RIG 0723 11/1/2019
Daily Information
Weather Temperature ("F) Wind Days LT1(do,.) Days Ri days)POB
Overcast 66 SW @ 14 MPH ]46.00 746.00 10].0
Safety Incidents - Near Miss
Date Category Type Subtype Severby Cause Lost timet
Comment
Safety Drills
Days Until Next Check
Type
%Occur
Last Data
Next Data
(days)
BOPE Pressure Test
2 11111/2019
11125/2019
13
Rig Inspection
12 1111212019
11/1312019
1
SafetyMeeting
12 1111212019
111132019
1
Spill Drill
2 11/10/2019
1112412019
12
TT ROPE DnII
1 11/112019
21912020
89
TT Camp Ew is
1 11/62019
2/42020
84
TT I,. Dtlll
2 11/11/2019
1112512019
13
TT H2S 0611
2 11/412019
1111812019
6
TT Kick While Drilling
1 11/1212019
11/2612019
14
TT Kick While Tripping
2 11/1012019
1112412019
12
TT Man Down Drill
2 11112/2019
21102020
90
IT Rig Evac
1 11/812019
2/612020
86
TT Well Kill OR
1 11/32019
11/172019
1
5
Casings seat
Cas.Type
OD (in)
10 (in)
Grade
TopSKB)
I Bottom mKB)
WD Oct. IS
Lamm�g Daee
CONDUCTOR
2018.25
x-65
0.0
160.0
160A
922/2011
133/8"SURFACE
13318
12.42
L80
-4,076.0
4,112.9
4,112,7
921.13
CASING
CASING
95/8
180
-6,858.9
8.901.8
Q901.4
10/8.011
CASING
8,51].0
6516.6
3.9.013
Last Cementing
CamHlting Start Date: 10/912011 String: <recoh not found> Comment
Stg a
Tap (111(8)
Top Meas Meth
End (100
Com
1
4,317.0
Volume Calculations
8,901A
Rig up antl test hard lines from Schlumberger to rig V30W psiA Rig pumps- break uroulaticn and pump 1ID bDls. of
Mud Push II @ 10.1 -rate of 6 bpm QD 300 DsiA Shut -down drop bottom plug .\ SLB mu 8 pump Lead slurry 71 Dials.
@ 12.5 ppg./ pass, Dtecrete11.57 Yield mix water at 5.463 gallsk. - Pump rate of 4.0 bpm Qg 460 psiA SLB mix and
pump Tail slum/ 80 able. ® 15.8 ppgA Gass G 11.16 Yield, mix H2O at 5.092 Wsk. - Pump rate of 3.0 bpm @ 500
psiA Shut down 8 drop lop plug - SLB pump 10 bbis H2O and wash up,%Displace with 489 bible. a 10.1 ppg mud with
rig pump at 7 bpm waW psi, at 469 able away slow pump to 2 bpm with 950 psi. FCP with fug retur-M Bump plug to
5001psi, oar FCP to 150 1psi. - Hold for 10 minutes and bkii all- check floats are holding - Good\ Cement m place
0530 hrs.
2
Job Information
Job Phase Planned Start Dela Start Date End Data PSO Duration (days)
WORKOVER 11/1/201913:00 11/1/201913:00 0.00
Daily Summary Operations
24h Forecast
Pull wear bushing. Rig -up to run competition packer and 4-1." Vam Top tubing as per tally.
24h Summary
Install wear bushing. Run in hole and recover storm packer- pull out and lay down, continue out of hole - lay down Rhooduck scraper/overshot assembly. Pick up Baker remevandetic lest packer and run in hole
set at 5,676', test 9 5A8" casing to 1000 psi. Circulate bmlamsup, PWI out of hale with test packer from 5,676 laying down 5" antl pipe to 2,006' set and test to 35W psi. Pull put hole rack bark in deniNt and lay
down teal parker. Geer floor of toots and lay down all S hall pipe tram derrick with mouse relelrotary table,
Operatran et 07.00
RIH W/4.SWam Top TBG ® 1,525'
Time Log
Start End Co. our
Time Time our(M1r) fli Phase Op, Act. Plan Older. Dasum,
00.00 01:30 1.w 1.50 W.O. M 5 U Drain stock and Now down cholospil lines. Install wear bushing per Baker Vac, rep, ID 9"] length 29.80"
01:30 02:00 0.50 2.00 W.O. M 4 U Run in hole to 75' with Baker overshot and engage storm packer. open stone valve, verify static, release packer. Pull out of
hole and lay down storm packer. 1107= 102K and DW=102K.
02:00 05:00 3.W 600 W.O. M 4 P Pull out of hale wiOM scraper and overshot assembly, Rom 2.459'to surface, lay down magnet, Razohaek scraper and
overshot. Note recovered approximately 3 LBS metal on magnet.
0500 0830 3.50 8.50 W.O. M 4 P Piot up Baker reMevamatic feat Packer and ran in hole and set at 5,675' with COE at 5,869'. UW=1 WK and DW=150K
0830 1000 1.51) 10.00 W.O. M 12 P Test 9 51W casing to 1000 psi Rom 5,669' to surface with 16 ] pp9 mud to hole for 30 minutes (chart recorded). Bleed off
pressureant release padwr
1000 12:00 200 12.00 W O. M 9 P Deputies bottoms up at 128 gpm with 300 psi, followed by 25 bbls. of 18.7 ppg ary lob. Cleanlolear and prep ag floor for
singling out of hole.
12:00 18:30 4.50 16.50 W.O. M 4 P l6ungle out of hole laying dawn 5' hag pipe with Baker relrievamatic test packer Rom 5,675' to 2,006' UW= 85K and DW= 90K
16:3 1 1800 1.50 law W D. M 12 PSet test packer at 2,006' with WE at 2,000'. Test MIS' casing to Surface wM 16.7 ppg mud Ln hole stage .,m 3500 psi -
hob for 30 minutes (chart recorded).
i8:001830 0.50 low W.O. M 5 P Bleed oK premum arW rte - releeae Baker reirievamatic lest packer -Naw tlown chokehJll lines, ag-down test
18:30 20:30 2.00 20.50 W.C. M 4 P PWI out of hate racking back 5- in words Rom 2.Uut, M packer- lay down per Baker rep.
20:30 00:00 3.07 24.00 W.O. of 4 P Olear and Dean floor- Mob mouse one installed in rotary table. Lay down 5' doll pipe from handed, to pipe shed from 2,006' to
urfce.
a
Gas Readings
Avg Background Gas (%)
Max Background Gas (%)
Avg Connection Gas (N)
Max Connection Gas (°6)
Avg Drill Gas (%)
Max Drill Gas (%)
Avg Trip Gas (54)
Max Trip Gas 1%I
Well Name: SD37-DSP1
Wellbore Name: SD37-DSF
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Jate: 1111212019
Report #: 12
Page: 2 of 3
Daily Mud Volumes
TanWAdditionlLoss
Type
Des
Volume(bbU
Hole
d3].0
Lass
0.0
Tank
291.0
Cumulative Mud Volumes
Volue(bbi) Auditors (hot) Cu- Additions(bbt) Losses(bb0 Cum Lesses(bbl)
Active Volume (bull Ho le m
]29.0 43].0
0.0
0.0
0.0
0.0
Daily Contacts
Position
Contact Name
Company
Title
Email
We.
Mobile
Ens representative
Slave Lewrerroa
EN
Drilling Supv,
skdrilling®eni.mm
6858715
Ens representative
David Smith
EN
Drilling Supv,
siddnlling®ens.mm
907.885.0715
Ed representative
Chad Guam
EN
Dnllsng Sup,
907885.0728
Ertl representative
Wed. Thomm
EN
Rig Clark
AKRigCI.dxDoyon15®eni.mm
907885.0722
Eni representative
Pat Ahem
Ens
HSE
Ens representative
Robert Gamble.
Ens
HSE
Tool Push
Sam Dye
Doyon Drilling
Field Superintendent
Tool Push
Ryan Panlvetz
Doyon Dnllsng
Tod Pusher
ng15@doyondnlling.mm
Tod Push
Filmer Fleagle
Doyon Wine
Tod Push
Tool Push
Cliff Owens
Doyon Drilkng
HSE
cowensadoyondrillsng.mm
6854796
Tool Push
Dave Sena
Doyon DriknO
IHSE I
dsene@Eoyondn1Img.com
1685.0793
Personnel Log (POB)
Company
Serv. Type
Work H (hr)
Sta hWay H @y
Count
Note
Expro
Flow beck
12.50
0
DNling
EPA
Inspector
12.50
0
Drilling
NC Machinery
Mechanic
12.50
0
Dealing
Ens
Engineer
12.50
0
Dealing
ASRC
Clerk
12.50
1
Drilling
ASRC
SOA
12.50
1
SIDSupport
ASRC
Crane Advisor
12.50
1
SIDSupport
Baker Hughes
Baker Hughes
12.50
1
Drilling
Brecon
Medic
12.50
1
SIDSupport
Doyon
Field Superintendent
12.50
1
Drying
Northam Oilleild Services
Fueler
12.50
1
SIDSupport
Veber RHGE)
WellHead
12.50
1
pilling
SLB
Cement
12.50
1
DNling
miff.
weirs.
12.50
1
DNling
ACS
Enviromemal
12.50
2
SIDSupport
Beacon
HSE
12.50
2
SIDSupport
Doyon
Tool pushers
12.50
2
DNling
Doyon
HSE
12.50
2
DNling
MI Sween
Mud Engineer
12.50
2
Drilling
ASRC
Company Man
12.50
3
DNling
GBR
Casing
12.50
3
DNling
Compdentia
Lopielic
12.50
4
SIDSupport
MI Swam
Mud Plant
12.50
6
DNling
Purcell
Security
12.50
6
SIDSupport
Heliburten
Sick Line
12.50
8
Drilling
Ml Swam
WIF
12.50
8
SIDSupport
ESS
Causing
12.50
11
SID support
Worley
Truck driver 1 Crane operator
12.50
12
Drilling
Wynn
Rig Personnel
12.50
1
Zfi
1 DNling_Total Dealing Personnel
BOP Stack 8 Components
Description
Slert Data
Last Cedatoation Date Pressure Rating (psi)
BOP Stack
10@412019
31112015
5,000.0
Type
Make
Model
ID Nom(in)
PRange (psi)
Last Cert Dale
Annular
Hod
GK
135/8
5,000.0
5/1/2015
3112'-6'VBR
Hytlnl
50
MPL 5000
135/8
5,000.0
8242018
Blind Shear Be.
Hytld
WL5000
IMPL$OW
135/8
5,000.0
8242018
412"x7-VBR
Hydra
1398
5,000.0
912015
Slow Circulation Rates
Pump Number.( Make: White star
Model: Qualm 24W
Start Dato
End Wte
Liner St. (in)
Volume Per Stroke Override (bbllstk) Max Pressure (psi)
41102018
5
0.078
],500.0
Wte
Depth take)
Slow Spd
Strokes (spm)
P (Pat)
EN (%)
Q Flow (gpm)
Pump Number] Make: White Star
Modd: Quatro 2450
Start Dato
End Woe
Liner Size (to)
Volume Per Stroke Override(bbllstk) Max Pressum (psi)
411012018
I 5
0 0]8
7.500.0
Dale Depth (WER
Slew Sptl
I Strokes (spm)
P (psi)
I BR 1%)
Q Flow (9Pm)
Pump Numbar.3 Make: National
Supp'"
Modid: 12-P-160
Ston Data
End Wle
Liner Size (in)Vdume
Per Stroke Override(bbgstk) Max Pressure (poll
41102019
I
41/4
0.053
],500.0
Date
Depth(RkB)
Slow Sptl
Strokes(apm)
P("I)
Enl%)
QFlow hurm
Daily Bulk
Su pty keen Wacription: Equipment Fed
Unit Label:
Gal
Unit Size: i
Note:
Wto Consumetl Raceivetl
Returned
Cum Consumed Cum Received Cum Returned Gum On Loc
r
Note
111122019 80].0 80].0
14,771.0 14.]]1.0 0.0
00
Su tyNem
MIS. Mud Plant Boilers
Una Label:
Gal
Unit Size:
Note:
Dale Consumed Raceivetl
Retum.d
Cum Consumed Co. Received Cu. Returned cum On Le
Note
11/1212019 198.0 1980
2,37fi0
2,376.0 0.0
0.0
Supp'"Nem Description: Rig Ford
Unit Label:
gal us
Unit St. 1
Note:
Dale Consumed Received
Returned
Cum Consumed cum Received Cum Returnetl Cum On Loc
Note
1111212019 2.353.0 0.0
19,635.0
31,704.0 0.0
12,009.0
Supply Nem Description: Rip Willer
Unit Label: bbl
Unit Size: 1
Note:
Well Name: SD37-DSP1
Wellbore Name: SD37-DSI
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
7aily Report
Date: 11/1212019
Report #: 12
Page: 3 of 3
Deb
IC ..ad Receivetl
1t/12f2019 100.0 135.0
Returned Cum Consumed
562.0
Cum Received
799.0
Cum Returned
00
Cu. On Lee
239.0
Note
Supply Ram DasedPuon: WIF Sailers
unitLabel:
Gel
unit Size:
Now:
Dale Consumetl Rece ved
11(1212019 42.0 42.01
Retumetl
Cum Consuntetl
504.0
Cum Received
504.0
Cum Retumetl
0.0
Cu. On Loc
0.0
Note
Supply Item DesoriPdon: WIF Injected Diesel
unitLabel:
Gel
Unit Size:
Note:
Date Conaunum receive.
i 1112/2019 0.0 00
Returned
Cum Consumed
0.0
Cum Received
0.0
Cum Retuned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Deb Tot insp. Nbr
Total LN.C. number Comment
STOP Cards Submitted
Company
%Rets
Com
Doyon Onlling
Doyon Drilling Ina.
Doyon Dulling Inc.
Doyon Drilling Inc.
Ml Swam
MI Swaco
10
9
18
18
2
4
PJSWS
Sale Cards
HRWS
COW
HARGJSA
RIR's
General Notes
Comment:
Well Name: D
Wellbore Name: me: SD37-
37 -DSI
Well Code: 25754
Job: WORKOVER
ani WCEILevel: 3
laily Report
Date: 11/1312019
Report #: 13
Page: 1 of 3
Well Header
Perme00man"kin N' Operator
SubaMlary
Inittal laM1ee Code
ADL -388583 ENI PETROLEUM
ENI Petroleum Ca. Inc
DEVELOPMENT WELL O Pi DI
COLTIVAZIONE
Rotary Table Elevation ln) Ground Level (it)
First Flange(it) Me -Base Hange(n) Rrub -Tubing Spool (it)
53.40 13.10
116.N 36.60 32.90
Rigs
we Name Contractor
wg Type Rig Num Rig Sqd Date Rig Release Date
RIG 15 DOYON
LAND RIG 0]23 11/12019
Daily Information
Weather Temperature ('F) Wind Days LTI (days) Days0 (days) POB
Overcast 9.8
ENE,19MPH ]42DD ]4].00 113.0
Safety Incidents - Near Miss
Dara Category Type SublyPa Seventy Cause Losttime7
Comment
Safety Drills
Days Until Next Check
Type
aOccur
Last Date
Next Date
(days)
BOPE Pressure Test
2
11111/2019 1112512019
12
Kla While Tapping
1
1111312019 1112712019
14
Rig hopedion
13
111IW2019 11/1412019
1
Safety Meeting
13
1111W2019 11/142019
1
Spill Ora
2
111102019 11/242019
11
TT ROPE Call
1
11/1112019
219/21)2D
88
TT Camp Evac
1
11/612019
2/42020
83
TT Fire Drill
2
11/112019
111252019
12
TT H2$ Ono
2
111920/9
1111812019
5
TT Kick White Drilling
1
1111MD19
11IM2019
13
TT Net While Tripping
3
11/132019
11127/2019
14
TT Man Down Drill
21111212019
2110QD20
89
TT Rig Evac
1
11182919
2182020
85
TT Well Kill Drill
1
111&2019 111117MO19
4
Casings seat
Co.. Type
00 (in)
ID (in)
I Grace
Top InKB)
Eatom(RKB)
I TVD Bot. fnKB)
Landing Data
CONDUCTOR
20
18.25
X435
0.0
160.0
160.0
91222011
13318"SURFACE
13318
12.42
L80
-4,076.0
4,112.9
4,112)
912]/2011
CASING
CASING
95/8
1.80
-6,858.9
8,901.6
6,901.4
1WW2011
CASING
B,5R0
8,518.6
312912013
Last Cementing
Cementing Start Date: 101912011 Shrub, erewrd not founds
Comment:
at, a Top (mrB)
Top Maas Mmh
earn (nKB)
Co.
1 4.317.0
Volume Calculations
8,9 1.0
RIg up and test ham lines from Schlumberger to rig V3000 palA Rig pumps- break circulation and pump 110 bbl,. of
Mud Push II ® 10.1 -rale of 8 bpm a 300 palA Shutdown drop bottom plug\ SLB mix & pump Lead slurry ]1 bls.
@ 12.5 ppgA Class. Litecreti 1.57 Yield, mix water at 5.453 gallsk. - Pump rate of 4.0 bpm a 460 psi.\ SLB mix and
pump Tail slurry SO bbl,. @ 15.8 ppgA Gass G \ 1.16 Yield, mix H2O at 5.092 gallsk. - Pump rate of 3.0 bpm ® 500
pain Shut down & drop top plug - SLB pump 10 this H2O and wash upA Displace with 489 bible ® 10.1 ppg mud with
rig pump all bpm w20D psi, at 469 bbl, away all pump to 2 bpm wM 950 psi. FOP with full returns%Bump plug to
500/psi, over FOP to 15001psi. - Hold for 10 minutes and bleed Off- cheU floats are holding - Good l Cement in place
@ 0530 his.
2
Job Information
Job Phase %enrfatl 9rort Date
StartDoh End Date - P50 Duration (days)
WORKOVER 1101/201913:00
11/11201913:011 0.00
Daily Summary Operations
24h Forecast
Finished replacing 4- valve on begun line. Prep active pits far displacement. Displace 16.7 ppg kill fluid hon well W 12.2 ppg completion fluid. Land tubing hangar and test Freeze protect A annulus with LVT.
Set BPV and nipple down BOP -nipple up We and test.
Lh Summary
Prep equipment- pick-up Hal iburlon completion jewel and run in hole
piedi 4.12" Vam Top tubing to 4,338. Install Scblumberger SCSSSV and pressure to 7500 psi. -monitor pressure, good test. Perform
Mdc doll!, mobilized tubing hanger to rig fimr, clean and service no. Continue mnnin9 in hole from 4,338' to 5.692' tag no go. Pick-up to space out and install tubing hanger- VataalSchlum"Mer dressed and
tested. PJSM to displace wall 12.2 ppg - transfer fluids amend adive pits -12.2 ppg aumplation fluid and 16.7 ppg Mg flub.
Operation at 07.00
Peace protecting A -annus with LVT.
Time Log
Start End Cum our
Time Time Do,(hrj I (hr) phase Opr. I Act Plan Oper. Near.
0090 0300 3.00 3.00 W.O. A 5
P PMI wear buabing- Rig up Gaff tangs and barque Wm wtuipired Fri Schlumbergercentral fine specter and stresses -
atage and prep tads to M. compiefion.
0300 0400 1.00 4.00 W.O. K 4
P Make up Hdlibudon completion assembly per holy to 92'.
0400 1000 6.00 1D.00 W.O. K 4
P Run In hole went completion assembly on 412" Vam-Top (12.8 PPF 13c4 timing, from 9V to 3.528 - torque tum and recon
values of each cannectlo t. Up wt. 90K on wt= WK
1090 10:30 D SO 10.50 W.O. K 12
P Makeup Sddumbergm SCSSSV TRMAAX and Metal conhcl line - pressure test fine to 75W psi far 15 minutes a0 good -
monitor pressure when con in hale. Note: Test rammed an data ancestor, Run from 3,528'to 3.552' with SCSSSV.
10 30 1290 1.50 1200 W.O. K 4
P Continue in hale with completion assembly from 3,552' 10 4,387' pick-up 4-112" Vam4a (12.13 PPF 13cr) tubing. Toque Wm
and record values of each connection Schlumberger installed Oeeader Once, coupling protectors on each connection fa
SCSSSV control line. Up cel: 100K On veal, 100K
1200 1600 4.00 16.00 W.O. K 1
P Moblfizad tubing hanger to he floor. perform stick drill, dean and service fig and Warned ng maintenance.
1600 18:3o 250 18.50 W.O. K 4
P Continue mnning 4+12" completion pkking-up 4.112' Van Tap tubing from 4.331 to 5,892' W no go - tag twice to mMmm.
Toque turn cannedion and recon. Install Ofleader=as coupling pratedon for com of line.
1030 2090 150 20.00 W.O. K 4
P pall ad at Me 10 5,581' install space pope no 5,6511 Up wLat 110K on W.=110K Continue toque turn connection and
installing erns coupling protedas for conbot fine.
2090 22:30 2.50 2250 W.O. K 12
P %bicap lending antl tu979 hangeapup 'ammake-up to 4-112- tubing completion 9ring-Vet. watchetl dummy penetrator
and Schlumb firi install SSSV banned line and lest von to MOD psi for 15 mine gcotl fast, Schlumberger pressure central
the beck to 7500 psi for pumping. Install teal of damps total 52 full damps and 1 half damp.
--mud
2230 0000 1.50 24.00 W.O. K 8
P PJSM-Maks-up top drive and prep to displace. Transferred 12 2 ppg Reids from to adive 05 and continue
offloading 18.7 ppg kill fluid from above pita.
Well Name: SD37-DSP1
Wellbore Name: SD37-DS!
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 1111312019
Report #: 13
Page: 2 of 3
Gas Readings
Avg Background Gas I%)
Max Background Gas (%)
Avg Connection Gas (%) Max Connection Gas (%)
Avg Drill Gas I%)
Max Drill Gas (X)
Avg Trip Gas (X) Max Trip Gas (%)
Daily Mud Volumes
TanklAddi ionli- ss
Type
Des
Volume (bbl)
Hole
412.0
Loss
00
Tank
2480
Cumulative Mud Volumes
Aetive vuh ma (bbl) Hole Volume (bbl) Addition. (bbl) Cum Additions (661) Losses (ball Cum Losses (ball
MOOD 412.0 0.0 0.0 0.0 0.0
Daily Contacts
Position
Contact Name
Company
Title
Email
Ontce
Mobile
Eni representative
Nelson Cassell.
Eni
Drilling Superintendent
nelson..rballo@eni.com
Ent representative
Steve Laster.
Ed
Drilling SUPV,
sldddlling l ed.mm
685-0715
Eni representative
David Smith
Ed
engine Supv,
siddrJlingtC.N.wm
907-685-0715
Eni representative
Chad Guam
Eni
Calling Sup,
901-6850728
Enimpresentetive
Mdmh Ellington
EM
Rig Gen,
AKRigC1eUzCoyonl 5@kmyPPm
907-UI&0722
Eni representative
Cory Houghton
Ent
HSE
Ent representative
Roert Gonzalez,
Ed
HSE
Tod Push
Sam Dye
Doyon Drilling
Field Superintendent
Tod Push
Ryan PankrAa
Coyon Dmlmg
Tod Pusher
rg15tilida antldlling..m
Tod Push
Ted"an
Doyon Grain,
Tour Pusher
milSifilImnandnlling.mm
90]-158S0]16
Tod push
Harold Richardson
Doyon Calling
HSE
hnchardsonfIdoyandrilling.mm
6650786
Tad Push
I Dave Sem
jDayon Drilling
IHSE IdsentaCaloyanagling.con,
6850796
Personnel Log (POB)
Company
Tsui Type
Work H (hr)
Stantlby H (hr)
Count
Note
ASRC
Clark
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Baker Hughes
Baker Hughes
12.50
/
Ddltng
Sae.n
Medic
12.50
1
SIO Support
Dayan
Fidd Superintendent
12.50
1
Drilling
Northern Otani Services
Fueler
12.50
1
$ID Support
WHIT.
Weir.
12.50
1
Drilling
Eni
Drilling Superintendent
12.50
1
Drilling
ACS
Environmental
12.50
2
SID Support
Bascom
HSE
12.50
2
SID Support
Doyon
Toolpuahers
12.50
2
Drilling
Doyon
HSE
12.50
2
Ddltng
Halliburton
Mud loggers
12.50
2
Onlltng
Ml S..
Mud Engineer
12.50
2
Oniting
Vetco(BHGE)
Wei
12.50
2
Drilling
Si
Cement
12.50
2
Drilling
ASRC
Corti Man
12.50
3
Drilling
GBR
Casio,
12.50
3
Drilling
Competent'.
Logistic
12.50
4
SID Support
MI Swam
Mud Plant
12.50
6
Drilling
Formal
Security
12.50
6
51D Support
Halturban
Slick Line
12.50
6
Drilling
Ml Swam
WIF
12.50
B
SID Support
ESS
Calmar,
1250
11
SID Support
Wadey
Truck driver l Crane opeator
12.50
13
Drilling
Doyon
I Rig Personnel
12.50
26
Dr'Ibng_Tdal Drilling Personnel
BOP Stack 8 Components
Description Stan Del.last Ce cation Date Pressure Rating (psi)
BOP Stack 102412019 51112015 5,000.0
Type
Make
Model
ID Nam (in)
P Range (psi)
I Last Cert Date
AnnularHydnl
GK SOD
13518
5.0000
511/2015
312" -6 -Van
Hydal
MPL 5000
13518
5,000.0
6242016
Blind Shear Ram
Hydal
MPL 5000
135/8
5,000.0
8124/2016
412"x T' VER?
Hydril
MPL 5000
13518
5,000.0
511/2015
Slow Circulation Rates
Pump Number: 1 Make: While Me, Madel: Durk. 24`A
Start Oat. End DateLiner Sim (in) Volume Per Stroke Override (olothi ) Max Pressure (psi)
4/102018 5 10,078 1.507.0
Date Depth (RKB) I Slow Sptl I
Strokes (apm)
P (psi) En (%)
O Flow (gpm)
Pump Number 2 Make: White Star
Modal: Quatro 2450
Start Dafe End Date Lt., St. (in) Volume Per Stroke Override(bbgsik) Max Pressure(psi)
4/1012018 5 0078 ],500.0
Cate
Depm IRKS)
Slow Sptl
Strakes(spin)
P(psi) En(%)
OFlow (gpm)
Pump Number 3 Make: National Supply Model: 12-P-160
SbR Date End Date Uner $1. (in) Volume Per Stroke Ovmrtde (bblisik) Max Pressure (pat)
VIW2018 4114 0053 ],500.0
Date I Depth(ttKEU
Slow Sptl
ke
Shas(spm)
P(psi)
ER rA)
OFlaw lgpm)
Daily Bulk
Supply tem Description: Equipment Fuel MR Labal:
Gal Una Size: 1 Nate:
Data consumed Recelved Retuned
Cum Cansumed Cum Received Cum Returned Cum On La Note
11,mol8 1,278.0 1,2]6.0
161 16,04].0 0.0 0.0
Supply lam Description: Mud Plant Boilers Unit Lead:
Gal unit Size: Note:
Date Consumed Received Returned
Cum Canaumetl Cum Received Cum Returned Cum On Loc Note
11/1312019 198.0 198.0
2,5740 2.514.0 0.0 0.0
Well Name: SD37-DSP1
Wellbore Name: SD37-DSI
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
7aily Report
Date: 1111312019
Report #: 13
Page: 3 of 3
Daily Bulk
Supply Nem Description: Rig Fuel
Unit Label:
gal us
Unit Size:1
Note:
Date Consumed Received
11/1312019 2.193.0 e0
Renamed
Cum Consumetl
21,825.0
Cum Re..lead
31,104.0
Cu. Returned
0.0
Cu. On Lee
9,876.0
Note
Supply Nem Description: Rig Water
UnR 1a5el:
bbl
Unit Size: i
Note:
Dale Consumed Received
11/1312019 43.0 0.0
Retunned
Cum Consumed
805.0
Cum Received
]99.0
Cum Returned
0.0
Cum On Lac
184.0
Nota
Supply Item Description: WIF Sellers
Unit Label:
Gal
Unit Size:
Note:
Date Consumed Received
.... 2019 42.0 42.0
Returned
Cu. Consumed
548.0
Cu. Receivetl
546.0 10.0
Cum Returned
Cu. On Lea
0.0
Note
Supply Nem Description: WIF Injected Diesel
UnNLabel:
Gel
Unit Size:
Note:
Dune Consumed Received
11/132019 0.0 0,0
Returned
Cum Containment
0.0
Cum Raciness
0.0
Cum Returcetl
0.0
Cum On Us
0.0
Note
Last Authority Visit
pub Tot map. Nor
Total LN.C. number Comment
STOP Cards Submitted
Company
M Rpt.
Co.
Doyon Drilling
Doyon Drilling lnc
Doyon Drilling Inc
Doyen Drilling Inc
Ml Swaw
MI Swaw
6
6
6
9
5
4
PJSM'S
COW
HRWS
Safe Cells
HARCUSA
MR.
General Notes
Comment:
laily Report
JaW 1111412019
Report #: 14
Page: 1 of 3
Well Header
Well Name:S0SP1
Wellbore Name: e: S037-DSF
PermitlCOndaudon N°
Well Code: 25754
Job: WORKOVER
ani
WCEI Level: 3
laily Report
JaW 1111412019
Report #: 14
Page: 1 of 3
Well Header
PermitlCOndaudon N°
Operaror
Subsidiary
Initial Li Code
ADL -388583
ENI PETROLEUM
ENI Petroleum Co. Inc.
DEVELOPMENT WELL O POi2O DI
COLTIVAZIONE
Rotary Table Elevation Rt) Ground Level (ft)
First FMnge (ft) RKB-ease Flange (ft) RKB-Tubing Spo01 (ft)
53.40 13.10
18.80 36.60 32.80
Rigs
Rig Name Comnctor
RIB Type Rig Num Rig Sftrt Date Rig Release Gate
RIG 15 DOVON
LAND RIG OR3 11/112011
Daily Information
Weather Temperature (°F)Wind Days LTI(days) Drys RI(day.) POB
Overcast 8.7
NE a 17 MPH 746.00 748.00 109.0
Safety Incidents - Near Miss
Data Category Type subtype Severiry Cause Lost time?
Commend
Safety Drills
Days Until Next Check
Type
dOccur
Last Data
Next Date
(days)
ROPE Pressure Test
2
11/1112019 1125/2019
11
Fire Drill
2
1111412019 1112812019
14
Kick While Tripping
1
11/1312019 11/27/2019
13
Rig Inspection
14
11/142019 11/1511019
1
Be" Meeting
14
111142019 11/1512019
1
Spill Drill
2
1111012019 11124/2019
10
TT ROPE Dn11
1
1111112019 2/9/2020
87
TT Camp Evac
1
111612019 2/412020
62
TT Fire Drill
2
11/1112019 1112512019
11
TT Hi Drill
2
111412019 1111812019
4
TT Kick While Drilling
1
11/122019 1112612019
12
TT Kick While Tripping
3
1111012019 1112712011
13
IT Man Down Drill
2
11112/2019 211012020
88
TT Rig Evac
1
11/612019 2162020
84
IT Wall 411 Dell
1
IIWD19 111M712019
1
3
Casings seat
C.S. Type
I OD (ii
10 fin)
Grade
Top (ftKB)
Bottom(RKB)
TVD Bot fftKB)
Lending Date
CONDUCTOR
20
18.25
X-fi5
0.11
11.0
180.0
92212011
13316"SURFACE
13 YB
12.42
L80
-4,078.0
4,112.9
4,112.7
62712011
CASING
CASING
9518
L80
4.858.9
8,901.8
6,901.4
10/82011
CASING
8,517.0
6,518.6
31292013 '
Last Cementing
Demand g5tertData: 101920[1 string:<record not founds
Comment:
Stg is Top (RKB)
Top Meas Mash
Blm (ftKB)
Com
1 4.317.0
Volume Calculations
e, 01.
Rig up and test hard lines from Schlumberger to rig 83000 psiA Rig pumps- break circulation antl pump 110 day. of
Mud Push II C 10.1 -rate o16 bpm a 300 psi.\ Shut -down drop bottom A.,A SLB mix 8 pump Lead slurry 71 bbls.
® 12.5 ppg.l Gass, Urethral 1.57 Yield, max water at 5.483 galls[ - Pump rate of 4.0 born ® 460 p31.1 SLB mu and
Pump Tap slurry 80 Wis. a 15.6 ppg.%Class G % 1.16 Yield, mu H2O at 5.092 gallsk. - Pump rete of 3.0 bpm @ 500
psi \ Shut down 8 drop top plug - SLB pump 10 bids H2O and wash upd Displace with 489 bbts. Q 10.1 Wgr mud with
ng pump at 7 bpm w1200 psi, at 469 bbls away slow pump to 2 bpm SAM 950 psi. FCP with full returns%Bump plug to
5001psi, over FOP to 15001psi. - Hold for 10 minutes and bleed off- treat floats are holding - Good\ Cement in place
Q 0530 firs.
2
Job Information
Job Phase Pianne l Start Date
Start Deft End Dare Peb DlualgM1{Myi}.-.'-
WORKOVER 11111201913'.00
1111201813:00 O.W'
Daily Summary Operations
24h Forecast
Test Halliburton lubm awr. Run in hole and set standing valve in XN. Pull out hole with running tool. Set Halliburton AHC packer. Run in hole, pull Standing valve. Test Halliburton packer lop to 3500 psi from A
annulus side and last bottom pa&er ham tubing We. Perform negative test on SCSSSV. Hallibudon can magnets to recover cutter cone, pull junk cmclur and EVO plug. Pertmm pemport lest.
24h Salomon,
Displacewell from 16.7 PPG WBM to 12.2 PPG Inhibited Sodium Bromide, freeze protect A annulus with LVT, set Bi and nipple down SOP. Dress control line and nipple up tree - test void and body, good test.
Pull way-dreck valve. Rigup Hallibudon lubricator and BOP. Make-up standing valve to tool swing sal lubricator- prep to test,
Operation at 07.00
Preparing to set Halliburton packer.
Time Log
Start End Cum Our
Time Time Dur(b) (hr) Phase Oar. Act. Plan Oper-Do..,
00:00 04:00 4.00 4.00 W O. 9
P PJSM-Displace wal from 16.7 PPG mud to 12.2 PPG inhibited saduir bromide at 3 BP cote, max pressure seen was
1400 PSI, FOP 70 PSI, pumped a total of 478 BEL, MM 70 BBL of interface.
04:00 06:30 2.50 650 W O. C 5
P Drain slack, engage tubing haps alignment pin, land tubing hanger with Hallibudon A hydreulic packet at 5635', On vol.
120K engage lock downscrews and test tubing hangar seals to 5000 PSI for 15 minutes, good test.
06:30 09:00 2.50 900 W.O. K 9
P HIS up and reverse circulate 125 BBL 0/ LV I down A annulus and up wung t0 freeze protect well at 2-3 BPM, war a max
pressum of 750 PSI, Shut in, blow down and remove lines, removed landing joint and installed BPV.
09:00 1000 1. W 10.00 W.O. K 5
P Clean and Wer ng floor removing Schlumberger tools and spades based off and remove accumulator hoses.
10:00 1600 6.00 16.00 W.O. C 5
Tr- PJSM - Remove tum buckles, pull flow line out of nser, remove choke and kill line bases, remove sterling and dam Shia fran
around deer, remove rises and dean drip pan. Prep BOP for removal, break baps between SOP add riser, lift BOP and sed an
swmp. Remove HP roar end sol in BOP endosure.
1600 1830 2.50 18. W W.O. C 5
P Claan and press well head-BNlumbeouffietco hat Had WSSSV control line through the "a bonnet Nipple up tree and
ter irrete moral line. Test tubing flat neck seals w 5000 par for /5 mins. - (good test). Rig Post equipment down.
18:30 2000 1,501 20.00 WO. C t2
PPuO BPV end inzftlletl two-way drech-shellftat treaft5000 PSI for lS mins.-(goodtesO. P911two-waycheckvaive-
aecuretl well.
20:00 2330 3.50 23.$0 W O. K 5
P PJSM - Rig -up Hallibudon slick line lubdMidOF and SOP on rig flow and Millar to run standing valve to Set 9-518" Halliburton
AHC production packer.
23:3000:00 0.50 24.00 W.D. K 5
P Agedmd standing valve on Hallibudon tool string - conned lubdcator and fluid pack and prep to pressure test.
Gas Readings
Avg Background Gas IV.) Max Background Gas (%)
Avg Connection Gas (v.1
Max Connection Gas (%I
Avg DHII Gas (%) Max Drill Gas (%)
Avg Trip Gas (%)
Max Trip Gas (%)
Well Name: SD37-DSP1
Wellbore Name: SD37-DSF
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
-)aily Report
Jate: 11/14/2019
Report #: 14
Page: 2 of 3
Daily Mud Volumes
TankrAtltlBion Loss
Type
Des
Veto.. (tibl)
Hole
412.0
Loss
0.0
Tank
1]5.0
Cumulative Mud Volumes
Active Volume (bolt Hole volume thug Addition.(bbl)Cum
Additions(bbl) Losses lbbg Cum Losses (bbl)
07.0 412.0
0.0
0.0
0.0
0.0
Daily Contacts
Position
Contact Name
Company
The
Email
Once
Mobile
Ent representative
Steve Lawrence
Ent
Drilling Supv.
siddrilling@eni.wm
885-0715
Ere representative
David Smith
Ent
Drilling Supv.
siddnlllnsCeni.com
90888&0715
Ent represaniative
Chad Gueco
Ent
Drilling Supv.
9076850726
Em representative
Milch BiNnglon
Ent
Rig Clerk
AKRigClerksDeyon15@em.com
9076850722
Ent representative
Cory Houghton
Ent
HSE
Ent representative
Robert Gimei
Ent
HSE
Tool Push
Sam Dye
Doyon Drilling
Field Sup.6imodent
Tool Push
Ryan Pankrah
Doyon Drilling
Tool Pusher
ng15@doy*ndm1in,.
Tool Push
Tad Kroger
Doyon DdOir,
Tour Pusher
rigl5tfdoyondrAlin,cnm
907-685-0716
Tool Push
Harold Rlctardson
Doyon Drilling
HSE
brichardsonChloyondnllin9.com
605-0796
Tool Push
Dave Sena
Doyon origin,
HSE
dseneoEoyonErilling.com
168&0793
Personnel Log (POB)
Company
So,. Type
Work H(hr)
Stentl-0y H flan
Count
Note
Ent
Dreting Superintendent
12.50
0
Drilling
ASRO
Clerk
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
Mac
Crane Advisor
12.50
1
SID Support
Baker Hughes
Baker Hughes
12.50
1
Drilling
Beacon
Medic
12.50
1
SID Support
Dayon
Field Superintendent
12.50
1
Drilling
Northern OXf rid Services
Fueler
12.50
1
SID support
SLB
Cement
12.50
1
Dolling
W.UT.d
WeIITec
12.50
1
Drilling
ACS
Enviromenlai
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Support
Rayon
Tool pushers
12.50
2
Dolling
Doyon
HSE
12.50
2
Drilling
GBR
Casing
12.50
2
Drilling
Halliburton
Mud loggers
12.50
2
Drilling
MI a..
Mud Engineer
12.0
2
Drilling
Velco(BHGE)
WeIlHead
1250
2
Drilling
ASRC
Company Man
12.50
3
Drilling
Competing.
Logislic
12.50
4
SID Support
Halliburlon
Slick line
12.50
6
Drilling
MI Swaco
Mud Plant12.50
8
grilling
Purcell
security
12.50
6
SIO Support
MI Swats
MF
1250
8
SID Support
ESS
Catering
12.50
10
SID Support
Worley
Truck driver l Crane operator
12.50
15
Dulling
Doyon
Rig Personnel
12.50
26
Onlling_Total ending Personnel
BOP Stack 8 Components
Description
Sort DW
at an Us on Date Pressure Rating P.
BOP Stack
10292019
51112015
Some
Type
Make Model
IO Nom (in)
P Range (psi)
I Last Cert Dale
Annular
GK 500
135/8
5,000.0
51112015
3112 % W VBR
Hydril
MPL 5000
13 5/8
SODO.0
824/2018
Blinal Shear Ram
�H,anl
Hydril
WILSON
135/8
5,000.0
8242018
412°x7"VSR
Hydril
MPL 5000
135/8
5,000.0
5112015
Slow Circulation Rates
Pump Number..1 Make: Wis. Star
Motlel: Quake 2450
StartDate End Dale
Lt., Size hn)
Volume Per Stroke Override (bbtistk) Max Pressure (psi)
41102018
5
0.078
],500.0
Data
Depth (HKB)
Slow Spot
Strokes (spm)
P (psi)
ER 1X)
0 Flow (9pm)
Pump Number 2
Make: White Star
Media: Quatro 24W
StartDate End Oat;
Lino, Size (in)
Volume Per Stroke Override (bbys80 Max Pressure (psi)
VIW2018
5
0.076
7.500.0
Date
Depth (RKB)
Slow Spd
Shouse(spm)
P(psl)
Eff I%)
gFlow (9pm)
Pump Nu ikon 3
Make: National Supply
Markel: 12-8160
Start Dab End Data
Ltner Sha lint
Volume Per Shake override lbblunk) Max P. an.(pai
4/102019
4 114
0.053
7,500.0
Data
Depth(RKB)
Slaw Spd
Shokea(spm)
P(psi)
Ea 1%)
0Flow(gpm)
Daily Bulk
Supply Nero Description: Equipment Fuel
UMt Label:
Gal
Unit Sae: 1
Note:
Date Consumed Received
Retumed
Cum Consumed Cum Recelved
Cu. Returned Cum On Lee
Nate
111142019 1,973.0 1,973.0
18,020.0
18,020.0
0.0
P.
Supply Nem De urriptlon: Mud Man[ Eager.
UnB Label:
Gat
unit size:
Note:
Data Consumed Received
Return"
Cu. Consumed Cum Received!
Cum Returned Cum On Lac
Nab
111142019 198.0 198.0
2,]72.0
27]2.0
0.0
I 40
Supply Baro Description: Rig Fuel
Unit label:
gal ua
Unit Size: 1
Note:
D;b Conwmetl Received
Retumed
Cum Co rcumatl Lum ReceWed
Cum Returned Cum On Loc
Note
11/1412019 2.545.0 36040
24,1]3.0
35.304.0
0.0
11131.0
Sup ly Mem Deseriptbn: Rig WaterUna
Label:
bbl
Unit Size: 1
Note:
gab Consumetl Recebetl
Returnetl
Cum Consumed Cum Received
Cu. Relumetl Cum On Los
Note
11/1412019 135.0 135.0
740.0
934.0
0.0
194.0
Well Name: SD37-DSP1
Wellbore Name: SD37-DSF
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 11114/2019
Report #: 14
Page: 3 of 3
Daily Bulk
Supply Nem Oesarlptlon: WIF 56Ims
Una Labeb Gal
Unit Size:
We:
WH Oonaumetl Receivetl
Retumed Cum Consumed
Cum ReceWetl Cum Returned
Cum On Loc
Note
t11twl9 62.0 420
588.0
588.0 0.0
10.0
Supply Nem Daecriptlon: WlF bilact"Ga.
unNLamn:
Gal
Unit Size:
Note:
Data Consumed Recelvetl
Retumatl
Cum Consumed
Cum Rnateetl Cum Returned
Cu. On Lac
We
1111W2019o.o o.o
o.0
0.0 0.0
0.0
Last Authority Visit
Data Tot inap. Nbr
Tatal I.N.C. number Comment
STOP Cards Submitted
Company
R Rpts
Com
Doyon DnllinN
13
PJSM'S
Wynn Dnllin8 Me.13
COW
Wyon Drilling Ina.
13
HRWS
Wyon Driving Inc
5
Safe Cards
MI Swam
4
VkRCIJSJk
MI Swaw
8
RIR'S
General Notes
CammenL
Daily Report
Date: 1111512015
Reportft: 15
Page: 1 of 3
Well Header
Well Name: D
37 -DS'
Wellbore Name: me: SD37-
Operator
Well Code: 25754
Initial Lehae Code
Job: WORKOVER
ani
WCEILevel: 3
Daily Report
Date: 1111512015
Reportft: 15
Page: 1 of 3
Well Header
Permiticoncesston N'
Operator
Subsidiary
Initial Lehae Code
ADL -388583
ENI PETROLEUM
ENI Pelreleum Co. Inc.
DEVELOPMENT WELL O POMO DI
COLTIVAZIONE
Rotary Table Elevation (R) Ground Level (R) First Flange (PI) RKB -Base Flange (tt) RKB - Tubing Spool (S)
53.40 13.10 16.80 36.60 32.90
I
Rigs
Rig Name ConGaaMr Rig Type Rte Num Rig Start Deb Rig Release Date
RIG 15 DOYON I LAND RIG 0723 11/112019
Daily Information
Weather Temperelu a (°F) Wind Days LTI (days) Days Po (days) POS
Mostly Cloudy 104 S4MPH 749.00 749.00 11180
Safety Incidents - Near Miss
Dere Category Type Subtype Severity cause Lost timet
Comment
Safety Drills
Days Until Next Check
Type
#Occur
Last Data
Next Date
(days)
BOPE Pressure Test
2
111112019 1112512019
1D
Fire Dill
2
1111412019 1112&2019
13
Kick While Tripping
1
1111312019 11/2712019
12
Rig Inspection
15
1111512019 11/162019
1
Safety Meeting
15
1111512019 11/162019
1
Spill Drill
2
1111012019 11/2412019
9
TT SOPE Drill
1
111112019 21912020
Be
TT Camp Evac
1
111612019 2142020
61
TT Fire Drill
2
1111112019 111252019
10
TT H2S Drill
3
11I15I2019 1112812019
14
TT Nek While Getting
1
11/122019 1112612019
11
TT N& While Tripping
3
11/13/2019 11272019
12
TT Man Down Drill
2
11/122019 211012020
07
TT Rig Evae
1
111812019 2MM20
83
TT Wall W'II Drill
1
11/312019 11111712019
2
Casings seat
Cas. Type
OD (in)
ID (in)
Grade
Top (PIKE)
Bottom (INS)
TVD Bot. (RKB)
Landing Data
CONDUCTOR
20
18.25
X-65
0.0
180.0
1fi0.0
91222011
CASING
13 We
12.42
1860
0.0
4,1129
4,112.]
912]2011
CASING
9 518
LBO
0.0
6,901.6
6,901.d
10182011
LINER
0.0
0.0
31292019
Last Cementing
CameMing Stag Drte: W292013 String: Comment: Test SLE cement lines to $0015500 psi. Pump and spot 10 bbls spacer t 36 bels 16,2 ppg G cement * 10 buts spacer.
Sting into retainer and perform hesitation squeeze cement as per program squeezing 34 phis below retainer wl Grief
pressure of 75D psi. CIP @ 2252 hi
BID If
Top (RKB)
Top Meas Meth Bpm IRKS)
Co.it
Job Information
Job Phase Phoned Short Otte Start Date End Date P50 Duration (days)
WORKOVER 1111/201913:00 111WO1913:00 0.00
Daily Summary Operations
24h Forecast
Run in bible with 2.5' magnet, nee me with 4' GR tod t0 pug junk basket catcher, if Successful con in lids t0 equalize EVO plug and pull out change loops and con in pull EVO plug, moment passport test.
24h Summary
Ri9-up Halliburton slick tine, run in hole set standing valve and pull out note. Be Halliburton 4518' AHC Packer. Run in hole pall standing valve. Pressure test packer to 3500 PSI - (Blood lest). Rig up on tubing -
pressue, to 2000 PSI against EVC plug and bottom of AND pacer - (good test). Close SCSSSV, bleed off to 1000 PSI- perform patients test- (goad test), pressure up to 2000 PSI open SCSSSV. Bleed of all
pressure. Make-up lubricator with 3.623" magnet - pressure lest - con in hole to 5,741' SLM and pullout hole surface - no fish. Change out magnet to 2.5-.
Operation at 07.00
Penum rg to equalize EVO dug.
Time Log
Start
End
Co. Our
Time
Time
our (hr)
(hr)
Phaes
Opr.
Ad.
Plan
Oper. Desa,
0000
04-M
4.00
4.00
W.O.
K
12
P
Make up Halliburton PCE and lubmaloq lest same to 4WD had 2 different sing leaks an lubricator, replaced brings and
achieved sucwsshol test
04'.00
0700
3.00
TOO
W.O.
K
5
P
Run in hale with CAT standibe valve and ant same in XN dppfe at Sets, pull oul of hole, drain lubricelor, remove Haflibudon
Iubnaator and installed night cep.
0700
W W
1.00
BOO
Wo.
K
9
P
Perform parker adding sequence, pressure tubing to 500 PSI for 5 minutes. A annulus at 560 PSI, increases tubing pressure
to 4000 PSI and monitored pressure for 30 minutes, A annulus pressure at 710 PSI, observed setting pin shear al two PSI.
Na. Packer aehing depth 5,635'.
te
0800
10:30
250
few
Wo.
K
4
P
Slab up Haflibur t n lubm alar, and teat to 3500 PSI, all eased. Run in hose with GR retrieving tool, engaged standing valve
and pulled out of hole, blow down lumnawa removedteals and teand installed night cap.
1030
12'00
1.50
12.00
W.O.
K
12
P
Pressure test packer W 35M PSI, for 3O minutes, pumping down A anlulna. Shut in pressure 3650 PSI in15 minutes
pressure at 5495 PSI, had a 155 PSI pressure Was in 30 minutes preesure at 3444 PSI, SO PSI pressure loss, monitored
pressure for an additional 15 minutes with pressure M 3,138 PSI, for a final pressure how 06 PSI, and Wed pressure off.
Note 43 6818 to praseu s up 4.7 BSL Weed back
1200
1430
2.50
14.50
W.O.
K
12
P
Pressure test bdow new pecker on top of Eve plug and ON packer W 2000 PSI for 30 mmuho, goad test, Spend
Schlumberger TRMA%X SCSSSV, Wed tubing pressure to Iwo PSI to perform negative pressure test, pressure increased to
1500 PBI in 15 minutes. Re-prewuretl Whine to 2000 PSI, and SMlumbergerryded valve Ignore open and dosed,
repealed test with SCSS%V dosed bled pressure to 1008 Pe and monitored tubing for pressure build up, good test.
1430
1700
250
17.00
W.O.
K
12
P
Purge and prime at lines Be evacuale ell alt, pump dawn A annWue to pressure Best pecker W WOO PSI, staged pressure up
in 1500 PSI'mcrements. Wes able to achieve a SO minute straight line, Starting B annulus pressure 0 PSI, during lest 87 PSI.
tubing was open ended and flowed 10 gallons of brine until Best pressure was achieved and was statin
17.00
20:00
300
MOD
W.O.
K
13
P
Blow dawn and ng down mud linea test hoses ant pressure testing equipment. Stab up Halliburton PCE and Iubricatorwfh
36" magnet and test tub ocator to 4000 PSI. Slick line damaged due to sheave misalignment -remove damage section
NOW) and re -head rope socket
2000
21:00
1 00
21.00
W.O.
K
13
P
Run in hole with Halliburton 3.8' magnet to set down at 5.662SLM-"as by o Post attempt, continue running to 5741' SW
Monitor SCSSSV hydreufie gauge (TWO psi) while slick fine in hale.
2100
2390
230
23.00
W.O.
K
13
P
Pull Out hole from 5.741' to names, [etch into tubing catcher of lubricator. chose upper swab wave.
2300
100
24.00
W.O.
K
13
P
PJSM - Onum lubricator and confirm no pressure. Break lubricator at OTS. Did not recover fish (WNRech culler now cone)
10000
1
haw small amount of metal debris on bottom. Change out intends to 2.5".
Well Name: SD37-DSP1
Wellbore Name: SD37-DS'
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 1111512019
Report #: 15
Page: 2 of 3
Gas Readings
Avg Background Gas 1%)
Max Background Gas 1%)
Avg Connection Gas (%)
Max Connection Gas (%)
Avg Drill Gas (%)
Max Drill GSs i%)
Avg TAP Gas (%)
Max Trip Gas (%)
Daily Mud Volumes
TankJAtltlitionlLoss
Type
Des
Volume (bbl)
Hole
412.0
Loss
0.0
Tank
133 0
Cumulative Mud Volumes
Amme Volume (bbl) Hale Volume @bl) Atltlitions (bbl) Cum Atldigons )bbl) Losses (bbl) Cum Losses (bbl)
565.0 412.0 0.0 0 0 0.0 0.0
Daily Contacts
Position
Contact Name
Company
TSIs
Email
Mo.
Mobile
Eni representative
Steve Lawrence
Ens
Drilling Supv.
siddnIUirM@az.conn
8850715
Eni representative
David Smith
Eni
Drilling Supv.
siddrilling®eni.mm
90]-885-0]15
Eni representative
Chad Guem
Eni
Drilling Sup,
90]-685-0]28
Eni represented"
Milch Billington
Ed
Rig Clerk
AKRigChxksDoyonl 5@hn.com
960-6850722
Eni representative
Cory Houghton
Eni
HSE
Eni represented.
Robert Gonzelez
Eni
HSE
Tad Push
Ryan Pan uatz
Doyon Drilling
Tod Pusher
ng15@doyondnllinamm
Tool Push
Ted Kruger
Dotson Drilling
Tour Pusher
rigl5dildoyandrilling.com
90]-685A]16
Tool %an
Herold Richardson
Doyon Drilling
HSE
hrichaMson@dorondnlling.com
6850796
Tool Push
Dave Sena
Doyon Drilling
HSE
dsenaCd0yondtillinecom
6850]96
Personnel Log (POB)
Campany
Sere. Type
Work H(hr)
SMnd4r, H(hr)
Count
Note
Baker Hughes
Baker Hughes
12.50
0
IXilling
Doyon
Field Superintendent
12.50
0
Drilling
ASRC
as*
12.50
1
Galling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
Vctm (SHGE)
Well -lead
12.50
1
Onlling
SLB
Cement
12.60
1
Drilling
SLB
sCSSV
12.60
1
Drilling
ACS
Erearomental
12.60
2
SID Support
Beaten
HSE
12.50
2
SID Supped
Doyon
Tod pushers
12.50
2
Drilling
Doyon
HSE
12.50
2
Onlling
GBR
Casing
12.50
2
Dulling
Helliburon
Mud loggers
12.50
2
Drilling
MI Swam
Mud Engineer
12.50
2
Drilling
Northam OlSegd Serr.ms
Fuller
12.50
2
SID Support
W.U..
WelRec
12.50
2
Drilling
ASRC
Compan, Man
12.50
3
Doping
Competentla
Logutsc
12.50
6
SID Support
MI Swem
Mud Plant
12.50
a
Dolling
Purcell
Security
12.50
a
BlD Support
Halliburton
Slid Line
12.50
a
Dulling
MI swap,
WIF
12.50
8
610 Support
ESS
Catering
12.50
10
SID support
Wooley
Truck driver l Crane operator
12.50
15
Dulling
Doyen
Rig Personnel
12.50
26
Onlling_Tdal Dulling Personnel
BOP Stack 8 Components
Description Siert Deb Last C.,Wr..atlen Date Pressure Rating (psi)
BOP Stad lW412D19 5/112015 5.000.0
Type
Make
Model
I ID Nom (In)
P Per, (psi)
Last Cert Date
AnnularHydnl
GK 500
16 we
5,000.0
5112015
3112 % W WR
Hydnl
MPL 5000
135/8
5,000.0
&242018
Mind Shear Ram
Hydnl
MPL 5000
135/8
5,000.0
81242016
412"x7'VBR
Kid
MPL 5000
135/8
5,000.0
5/12015
Slow Circulation Rates
Pump Number. 1 Make: White Star Model: Quatro 2450
Sort Date End Date Liner Size (in) Volume Per Stroke Override (bbgsti) Max Pressure (psi)
41102016 5 0.078 1,500.0
Data
Depth (ftmB
Slow Spit
Strokes (spm) P (psi)
EM (%) O Flow (gpm)
Pump Nunter.2 Make: While Enter kloden Quatro 2450
Start Dale
End Data Liner Size (in) Volume Per Stake Override (bbllstk) Max Pressure (psi)
*102018
5 0.018 1,'.A0.0
Date
Depth (PIKE) Slaw Sptl I
Stake. (spm)
I P (psi) ER (%)
O Flow (gpm)
Pump Nuanben3 Make: Netloml
supply Motlel: 12-P-180
Start Date
End Date Liner St. (in) Volume Par Stroke Overnite (bbysik) Max Pressure (psi)
*1012019
0 110 0.053 1,500.0
Dant Depth lftKB) Slow Sptl I
Strokes (apm)
P (psi)
ER (%)
0 Flow apm)
Daily Bulk
Supply Sem Description: Equipment Fuel Unit"bel:
Gal Unit Size:1 Note:
Dab lConsurned Received Retumetl
Cum Consumed Cum Remivetl Cum Returnetl Cum On Loc Note
11/1512019 11,8010 1,601.0
I
19,521.0 19,8210 100 10.0
Supply Ilam Description: Mull Plant Boilers Unit Label: Gal Unit Size: Note:
Det. Consumed Receiveit Retumetl Co. C ...... tl Cum Receivetl Cum Returned Cum On Las NOM
1111&2018 196.0 198.0 2,970.0 2,910.0 0.0 0.0
I
Supply Sam Description: Rig Fuel Unit label: gal us Unit Size: 1 Note:
Well Name: SD37-DSP1
Wellbore Name: SD37-DSr
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
r)aily Report
Date: 1111512019
Report #: 15
Page: 3 of 3
Date Consumed Recelvetl
Returned Cum Consumed
Cum Received
Co. Returned
Co. On Loc
Note
11/152018 2.381.0 0.0
26,554.0
135.304.0
0.0
B,750.0
Supply Hem Desch on: Rig Water
Unit Whal:
bbl
unit Size:1
Note:
Dela Consumed I Recaivetl
lReturnard
Cum Consumed
Cum Received
Cum Returned
Cum On Loc
Note
1111512019 87.0 0.0
82].0
9340
0.0
10].0
Supply Hem Description: WIF Boilers
unit label: Gel
Unit size:
Note:
Dale Conametl Recelvetl
Returnetl Cum Consumetl
Cum Received
Cum Returnetl
Cum On Lou
Note
11/1512019 420 62.0
830.0
630.0
0.0
0.0
Supply Hem Description: WIF Injected
Dlesel
UnH Lebec:
Gal
Unit 5ize:
Note:
pateConsumed
Received
Returnetl
Cum Consumetl
Cum Recelvetl
Cu. Returned
Cum On Lac
Note
ro152D19 0.0
0.0
0.0
0.0
0.0
0.0
Last Authority Visci
Data Tot snap. Nbr
Total I.N.C. number Comment
STOP Cards Submitted
Company
9 Rpts
Co.
Doyon DMling
7
PJ5M'S
Doyon Court; Inc.
6
Sale Cads
Doyon DrHing Inc.
7
HRWS
Doyon Drilling Inc.
7
COW
Ml Sworn
8
HARCOSA
MI Sweco
4
RIR's
General Notes
Comment:
_
Well Name: D
Wellbore Name: e: SD37-37-DS
TM
Well Code: 25754
Initial Unity Code
DEVELOPMENT WELL O POZZO DI
Job: WORKOVER
coni
WCEILevel: 3
Daily Report
Date: 11116/2019
Report #: 16
Page: 1 of 3
Well Header
ParmR7Cxcession N' Operator
Subsialary
ENI Petroleum Ce. Inc
Initial Unity Code
DEVELOPMENT WELL O POZZO DI
ADL488583 ENIPETPOLEUM
COLTIVAZIONE
Rotary Table Elevation (R) Ground Level (ft)
Fint Flange (ft) RKB -Base Flange (R) RKB-Tubing Spool (ft)
MAO 13.10
16.80 36.60 92,90
Rigs
Rib Noma Contfect4r
Rig Typo Rig NamMe seed Oete Rig Release Date
RIG 15 OOYON
LAND RIG 0723 1111/2019
Daily Information
Weather Temperature (-F) Wina Gays LTl hays) Days Id (days) POB
Overcast WC b' d.0
WSW07MPH ]ow 75000 99.o
Safety Incidents - Near Miss
Data Category Type Subtype Seveniry Gauen Lost time?
Cim mew
Safety Drills
Days Until Next Check
Type
afOccur
Last Data
Next Date
(days)
TOPE Pressure Test
2
11/112018
1112520 9
9
Fire one
2
111142019
1128/2019
12
Kick While Tripping
1
11/132019
11272019
11
Rig Inspection
16
111182019
11/172019
1
Safety Meeting
16
1111612019
11/1712019
1
Spill Out
2
11/1012019
11/2412019
8
TT ROPE Drill
1
11/1112019
2/92020
85
TT Camp Even,
1
11/52019
2!42020
50
IT Camp Fire Drill
1
11116/20/8
211412020
tip
TT Fire Ong
2
111112019
11/252018
9
TT H2S Doll
3
111152019
111292019
13
TT Kick While Mating
1
11/1212019
11IM12019
10
TT Kick While Tripping
3
11/152019
1112712019
11
TT Man Down Dill
2
11/12)2019
2/1012020
86
TT Rig Evac
1
11/52019
2182020
82
TT Well IGH Dill
1
11/52019
11/172019
1
Casings seat
Cas. Type
I Milo)
1D (in/
Gretle
Top (RKB)
Bottom/RKB)
ITVG Bot. (RKB)
Landing Oate
CONDUCTOR
20
8.25
X65
0.0
180.0
180.0
91222011
GATING
13 We
12A2
LBO
0.0
4,1129
4,112]
91272011
CASING
8518
L80
O.D
8,801.0
6,901.4
1552011
LINER
0.0
0.0
3282019
Last Cementing
Cemendng Sort Oats: 312912013 Strfne:
Comment: Test SLB cement Imes to 50015500 psi. Pump and spot 10 bola spacer I W able 16.2 ppg G cement 410 bbls spacer.
Sting into retainer and perform hesitation squeeze cement as per program squ in ing 34 bible below retainer all final
pressure of 750 pat. CIP ® 2252 his.
Sig a
Top (RKB)
Top Meas Mem
Stam (RKB)
Co.
Job Information
Job Phase PIanMO start Date
Start Date End Gate Pyo Duction (says)
WORKOVER 11/1201913:00
1111201913:00 0.00
Daily Summary operations
24h Forecast
Remove Voice lubricator and perform Use cap test, maw injection line from WIF to disposal well, PJSM with WIF/Produchin before hydraulic test x well - lest tines and perform a hydraulic test. Prep and move rig
to SP 2,50.
20 Summary
Run in hole with 2.5' magnet- pug out with no recovery. Change to 4" OR tool, con in tag and pulled junk caud er- recovered fish and hwo screws. Dress 4' OR dog less- run in hole and pressure equalized below
EVO plug- pull out hole. Install does in 4' OR rod, con in hole and pull EVO plug. Installed two-way check in wen and perform passport test. Installed wricator-initiative pressure end pull two-way check.
Operation at 07.00
Preparing IS for move W SP12-SE3.
Time Log
start dCum Dar
Time Tie Dur lhrl (M1r) Phase Opt. I Act. Plan Ocer. Das<,
m
0900 3.00 3.00 W.O. K 13
P Make up 2.5" magnet, con in M1da and taglunk cetaei nt 5,741' SIM pull od d hoie no recovery.
moo 2.00 5.00 Wo. K 13
P Run in hole with 4' OR pwling tool, and erylegejunk beeket, pug out of hole, recovered Wes ea tuwnn wirer bull nose
along with 2 of 3 screws that sustained bug ncx m ortkr, in addition Were were metal ordains tram tubing cut and puna.
0990 4aD 9.00 W O. K 5
P Make up dog kss 4- Gft removing tad last lubrkztpr to 2500 PSI, pressure tubing b 1600 PSI. Run in hole OR dog les. to
5,754' St engaged eo ofil ar in EVO plan and observed tubing pressure fag to 600 PSI. Pull out of hold with deg less GR
Widening tow.
10.00 W O. K 5
F14:3O
P Run in hole with conventional GR and engaged EVO plug at 5,754' SUM, pulled loose, allowed element to ran. and pulled
10:00 1.00
out of holo-100%recovery
4.50 14.50 W.O. K 5
P Rig down Hellibumm wireline equipment from rig Hoar move and stage equipment in front of SP1 2, Van. rigged up CHIN
14,311
lubricator antl set V CIW Type -H' TWC,
20:30 San 20.50 W.O. C 12
P perform Passport tiling of baa all testa suoceesfd except had issues with the SSV teting mould nor aaieve positive test.
00:00 3.50 24.00 W.O. C 12
P Cycle and lubricated STV several dome retested. Beed last, remove TWC with CH 100lubricated and install tree cap and prop
to test game.
Gas Readings
Avg Background Gas (%) Max Background! Gas b) Avg Connection Gas 1%) Max Connection Gas I%)
Avg DTIII Gas (%)
Max Drill Gas led Avg Trip Ws I%) Max Tdp
Daffy Mud Volumes
T.nuAdanlowLxa
canoe
Doo
volume robs)
Hob
Loss
Tank
Cumulative Mud Volumes
Active Volume (bbl)-Voiume (bbl)
-.o-
Addition. (bbl) Cum Mind... (bol) Losses (bbl) Cum Losses (bbl)
0.0 lo
0.0 0.0 o.o o.D
Well Name: SD37-DSP1
Wellbore Name: SD37-DS(
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
7aily Report
Date: 11/1612019
Report #: 16
Page: 2 of 3
Daily Contacts
Position
Contact Name
Company
Title
Email
Wee Mobile
Eat representative
Slave Uwpmce
Enl
Drilling Supv.
siddrilling®eni.com
885-0715
Eni representative
Davk Smith
Ent
Drilling Supv.
oddnllingQeni.com
90)485-0)15
Em rep resemauve
Chad Gueco
Ent
Drilling Supv.
97.13854)]26
Ent representative
Mileh SiOirgton
Ent
Rig Clark
AKRigClerksDoyohISCeni.com
907,88W22
End representative
Cory Houghbm
Ent
HSE
Ent representative
Robert Gonzalez
Ent
HSE
Tool Push
Ryan Pankratz
Doyon Drilling
Tod Pusher
rig1SCtloyondnlling.com
Tool Push
Ted Kruger
Doyon Drilling
Tom Pusher
ngl5@doycnddiling.com
97-605-0716
Tool Push
Harold Richardson
Doyon Offing
HSE
hnchardaon®doycndming.com
685-796
Tool Push
Dave Gem
Doyon Drilling
HSE
dsenatlidoyon inling.wm
8854796
Personnel Log (P(
IB)
Company
Serv. Type
Work H (M1r)
Standby H (hr)
Count
Nate
Baker Hughes
Baker Hughes
12.50
0
Drilling
Doyon
Field Superintendent
12.50
0
Drilling
Hallibudon
Slick Line
12.50
0
Drlling
WelRac
Werra.
12.50
0
Drlling
ASM
Gem
12.50
1
Drilling
ASPIC
SOA
12.50
1
SID Support
ASPIC
Crane Advisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
Vat.(BHGE)
Wellilead
12.50
1
Drilling
SLB
Cement
12.50
1
Drilling
SLB
SCSSV
12.50
1
Drilling
ACS
Envtromentel
12.07
2
SID Support
Beacon
HSE
12.50
2
SID Support
Doyon
Tod pushers
12.50
2
Drilling
Doyon
HSE
12.50
2
Drilling
GBR
Casing
12.50
2
Dfling
Hagiburton
Mud loggers
12.50
2
Dfling
Mt Bwace
Mud Engineer
12.50
2
Drilling
Northern Cilloild Services
Fueler
12.50
2
SID Support
ASRC
Company Man
12.50
3
Dnllirg
Competentia
Logistic
12.50
4
SID Support
MI a..
Mud Plant
12.50
8
"Hing
Purcell
Security
12.50
8
SID Support
MI a..
WIF
12.50
8
SID Support
EBB
Catering
12.50
10
SID Support
Worley
Trusts driver /Come operator
12.50
13
Dreing
Doyon
Rig Personnel
1
12.50
1
26
DNling_Total DNling Personnel
BOP Stack 8 Components
Description
SOP Stash,
Start Data
t0124n019
cosi Certification Date Pressure Ratin9(psp
&112015 5,000.0
Type
Make
Model
ID Nom (in)
P Range (psi)
Last Cert Date
Annular Hytlnl
GK 500
13&8
5,000.0
5/in015
31/2"-8'VBR HO
MPL5000
13518
5.000.0
U02016
Blind Shear Ram Hyd19
MPL 5000
13 Bra
5,000.0
B24n018
4112'xT'VBR Hydril
MPL 5000
13518
5,000.0
51112015
Slow Circulation Rates
Pump Numbed Make: Mae Star
Modal: Quatro 2450
Start Date End Oats
Liner Boa (tri)
Volume Per Stroke Override (bbUstk) Max Pressure (psi)
4/1=018
5
0.078
),500.0
Data
DepM (flK8)
Slow Spd
Strokes (spm)
P (psi)
EB (%)
O Flow (ppm)
Pump Number. 2 Make: MU Star
Model: Quatro 2450
Start Data
End Dab
Liner St. (in)
Volume Per Stroke Override( bbUstk) Mex Pressure("")
4110'2018
5
00)8
],500.0
Date
Card
Slow Spel
Strokes (spm)
P (psi)
ER 1%)
O Flew (gpm)
Pump Number 3 Make: Netemad
Supply
Model: 12-P-107
Start Daw
End Data
Liner Size (in)
Volume Per Stroke Override (bbVstk) Mex Pressure (psi)
4n012019
4114
0.053
7,500.0
Data
Darin
Slow Spot
I
Strokes (spm)
P (psi)
ER (%)
Q Flow (gpm)
Daily Bulk
Suppty Rem DoscNpton: Equipment
Fuel
Unit Label:
Gel
Unit Size: 1
Note:
Data Consumetl
Receivetl
Retumetl
Cum Consumetl Cum Receload
Cum Returned Cum On U.
Note
11Ii8n019 148).0
1,487.0
21,308.0
21,308.0
OA
0.0
Supply hem Desertptlon: Mud Plant BNlers
Um Label: Gal
Unit Size:
Note:
Data consumed Recatvatl
Retumed Cum Consumed Cum Received
Cum Retumetl cum On Lx
Note
11/1812011 1980 193.0
3,168.0
3,168.0
0.0
0.0
Supply Rem Description: Rig Fuel
Unk Label: gel us
Unit size: 1
Note:
.ata Consumetl Received
Retumetl com Consumed Cum Received
Cum Returned Cum On Loc
Note
11/i6n019 2,2330 5,250.0
28,787.0
40,554.0
0.0
11,76].0
Supply Nem Description: Rig Water
Unit Label:
bbl
Unit Size: 1
Note:
Deta Consumed Receiwtl
BW --
Returnee
Cum Consumed Cu. Received
Cum Returned! Co. On Loc
Note
" 'Cl. 50.0 0.0
934.0
0.0
570
Supply "amDesed en: WIF Boilers
Unit Label: Gel
Unit Size:
Note:
DoH Consumed Received
Retumed Cum Consumetl Cum Received
Cum Returned Cum on Lec
Note
it/18n0/9 420 42.0
672.0
6720
0.0
0.0
Suppty Nam Desai on: WIFInlected
Diesel
UnN Label:
Gel
Unit Size:
Nate:
Deb Consumetl
Received
Retumed
Cum Consumed Cum Received
Cum Returned cum On Los
Note
nnw2ols o.0
00
0.0
0.0
0.0
0.0
Last Authority Visit
Dant Tot tnsp. liter
Total I.N.C. number comment
Well Name: SD37-DSP1
Wellbore Name: SD37-DSF
Well Code: 25754
Job: WORKOVER
WCFI Level, 3
"aily Report
Date: 1 111 612 01 9
Report #: 16
Page: 3 of 3
STOP Cards Submitted
C.Pany
V Rets
Com
Doyon Drilling
9
Prisms
Doyon Drilling Inc.
15
Sale Cartls
Doyon Drilling Inc.
9HRws
Doyon Drilling Inc.
9
Dow
Ml Swaco
8
HARCIJSA
MI Swaco
5
RIR's
General Notes
Comment.
'oily Report
Date: 11117/2019
Report #: 17
Page: 1 of 3
Well Header
Well Name:D
37 -DSI
Wellbore Name: e: SD37-
Permiuccas esaion N°
Well Code: 25754
SobslElary
ENI Pe Do. Inc.
Job: WORKOVER
eniWCEI
Level: 3
'oily Report
Date: 11117/2019
Report #: 17
Page: 1 of 3
Well Header
Permiuccas esaion N°
Operator
SobslElary
ENI Pe Do. Inc.
Intal Lehee Cotle
DEVELOPMENT WELL O POZZO DI
ADLJBB583
ENI PETROLEUM
nhown
COLTIVAZIONE
Rotary Table FJevanan (ft) Ground Level at)
First Flange aft)RKB-Base Flange (R) RKB -Tubing a ... I (ft)
53.40 13.10
16.80 36.60 32.90
Rigs
Riq Name COM.ctor
Rig Type Rig Nom Rig Start Oeta Rig Release Data
RIG 15 OOYON
LANG RIG 0]23 ""Gala 11H]I2019
Daily Information
Weather Temperate. ('F) Wind Days LTi (days) Days W (days) POB
Overcast WC -8° B.]
W@14 MPH ]51.00 751.00 9].0
Safety Incidents - Near Miss
Deb We'd, TYPe sidyps Seventy Cause Lost fire?
Comment
Safety Drills
Days Until Next check
Type
NOccur
Last Cate
Next Date
Ideysl
BOPS Pressure Test
2
11/112019 111252019
6
Fire Drill
2
11/142019 1128G019
11
Kick While Tripping
1
11/132019 11/2712019
10
Rig Inspection
17
1111712019 1111812019
1
Safety Meeting
i7
1111]/2019 11/1812019
1
Spill Drill
2
11/1012019 1112412019
7
TT BOPE Dril
1
11/1112019 219/2020
84
TT Camp Evac
1
1IW2019 2142020
79
TT Camp Fire Nil
1
11/1642019 21142020
89
TT Fire Dn0
2
111112019 11/252019
8
TT H2S D611
3
1111512019 1112912019
12
TT Kick While Drilling
1
11112/201911/28/2019
9
TT Kick While Tripping
3
111IW2019 1112712019
10
TT Man Down Drill
2
11/12/2018 211012020
85
IT Rig Evac
1
11/812019 216/2020
B1
TT Spill DMI
1
11/172019 12/12019
14
TT Well Kill DMI
1
11/32019 11/1712019
1
0
Casings seat
Cas. Type
Do (I.)
IO (in)
Gratle
Top (RKB)
Be"., IRKBI
ND Bot (RKBI
Landing Dale
CONDUCTOR
2018.25
X£5
0.0
180.0
160.0
9122120 1
CASING
133/8
12.42
X80
0.0
_ 4.112.9
4,112.]
912]12011
CASING
9 w
Lle
0.0
8.901.8
6,901.4
11WW2011
LINER
0.0
0.0
1 3/2912019
Last Cementing
Cementing Stan We: 31292013 string:
Comment: Teel SLB cement lines to 50015500 psi. Pump and spot 10 bids spacer+36 this 16.21 G cement+ 10 bis spacer.
Sting into retainer and perform hesitation squeeze cement as per program squeezing 34 bbls below retainer wl trial
pressure of 750 psi. CIP Q 2252 me.
Stg 4
Top (RKB)
Top Meas Meth
she fftKB)
Com
Job Information
Job Phase Plannetl Stag Date
Stan Date End Data P50 Duration (days)
WORKOVER 11/120191390
11/11201913:00 1111]120191]:00 0.00
Daily Summary Operations
241, Foredest
Move dg and spot over SP12SE3 for work over.
This is lest RM repot tar S037 -DSPC.
24h Summary
Complete passport test of SDS]-0SP1. Prep and skid rig floor and relred stompers. &ow down pit and remove suit case split pit and sub complex Thaw out injection line and tested, WIF perform hydraulic test.
Nota: Released ng to SP12-SE3 a117:00 ds.
Operation at 07.00
Time Log
Start End Com our
Time Time our (m) I Ihr) Phase Opr. Act Plen Ope, Cato,
00:00 02:00 2.00 2.00 W.O. C 12
P Continue to Pull TWC wW CHJ W I.W ., mW Wry d. same, makeup bee cep and lest to 3000 Pallor 10 minutan. Rig
dawn and secure well.
02:00 03:30 1.50 3.50 W.O. A 2
P Prop rig floor for skidding ope.tlans, secure lop drive, unplug top drive and blow dawn rig floor. Attempt to perform hydraulic
test was unable due to frozen line. Instal tem around line and Installed hot air healer to begin thawing injection line.
0330 0500 1.00 5.00 W.O. A 2
P Skid rig floor into rig move post ant talked dampers. Continue to thaw line.
0500 0:00 2.00 Too W.O. A 2
P Blow 4. pumplpit complex, sp6 aped from sub complex and well house. Continue to have line.
0]00 10:00 3.00 100o W.O. A 1
P Dlsconnxanit. me mmainhg suRcoses ham east side INng patM1 to SP12-SE3. Continue to thaw line.
1000 14;00 4A0 14.00 W.O. A 1
P Lay hamate liner end meta for dg f0oipdnt and Intention. Continue to thaw line.
1700 3.00 17.00 W.O. C 12
P Continua to ley mats, Spritrig antl walk big away fromwee try. NrM SD37lioe thawed, the WIF pressure test One end
1400
line connections (0 3450 PSI, all good Pumped 10 BBL dlateJ pm flush to dear lines, perf.lned hydraulic test, pumped 500
BBL d RO water at 2S SPM with 2258-2597 PSI, freeze p bled wet with 26 BSL of diesel and dosed SCBBSV. Note:
Schlumberger SCSSSV ladmidan monitoring conlral fine pressured during hydraulic lest.
17:00 Released rig to 81?12 9
Gas Readings
Avg Background Gas l%) Max Background Gas l'/.I
Avg Connection Gas(%)
Max Connection Gas l%)
Avg Drill Gas (%) Max O111, Gas (%)
Avg Trip Gas I%)
Max Trip Gas (%)
Daily Mud Volumes
TanWAddR10nlLoss
Type
Des
Volume /bbl)
Hale
Was
Tank
Well Name: SD37-DSP1
Wellbore Name: SD37-DSI
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
7aily Report
Date: 1111712019
Reportp: 17
Page: 2 of 3
Cumulative Mud Volumes
Active volume(bbl) Hole Volume(bbl) Additions (bbl) Cum Additions (bbl) Losses(bb0 Cum Least. (hot)
0.0 0.0 0.0 0.0 0.0 0.0
Daily Contacts
Position
Contact Name
Company
Title
Email
Omce
Mobile
Eni representative
Steve Lawrence
EM
Drilling Supv. siddrilling(�enicom
68S015
Eni represantaliva
David Smith
EM
Dnihne Supv. siddnlling@eni.com
907-68S015
Eni representative
Mad Guam
Ent
Dnlling Sup,
907-NW26
Eni represund.b.
Much DMingum
EM
Rig Clark
AKRigCIemsCk onl5@erUcom
907-6850722
Eni representative
Cory Houghton
Ent
HSE
Eni representative
Robert Gorlxelaz
Eni
HSE
Tool Push
Ryan Pankretz
Doyon Drilling
Tool Pusher
Ngl5@d�o�biling.com
Tool Push
Ted Kruger
Doyon Dtllling
Tour Pusher
ngl5@doyondrilling.com
907.6850716
Tool Push
Herold Richardson
Doyon Drilling
HSE
nnehameon®dorondnning.eom
685.0796
Tool Push
Dave Sena
Doyon WON
HSE
tlsenaldoyonddlling.com
685.0796
Personnel Log /P(B)
Company
Serv. Type
Work H(hr)
Stantl-0y Han
Count
Note
Baker HUBhac
Baker Hughes
12.50
D
Drilling
Doyon
Field Superintendent
12.50
0
Drilling
Halliburton
Slick Line
12.50
0
Drilling
WellTec
WelRee
12.50
0
Drilling
ASRC
Clerk
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SIDSuppUt
Beacen
Moh.
12.50
1
SIDSuppot
Northam Ogfeild Services
Fualer
12.50
1
SID Support
SIB
Cement
12.50
1
Wiing
ACS
Enviremental
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Support
Doyon
Tool pushem
12.50
2
Drilling
Doyon
HSE
12.50
2
Drilling
GBR
Casing
12.50
2
Drilling
Halllble"on
Mud Icggere
12.50
2
Drilling
MI a..
Mud Engineer
12.50
2
Drilling
Vagce(BHGE)
WMIHead
12.50
2
Dnuing
SLB
SCSSV
12.50
2
Ceding
ASRC
Company Man
12.50
3
Doling
Compatcham
LoBislk
12.50
4
SID Support
Purcell
Security
12.50
5
SID Support
MI Swarm
Mud Rant
12.50
6
Drilling
NO Swaco
WIF
12.50
8
SID Support
ESS
Catering
12.50
10
SID Support
Wmtey
Truck driver l Crane operator
12.50
11
Drilling
Doyon
Rp Personnel
12.50
1 26
DnBing_Total Dulling Personnel
BOP Stack & Components
Description Sort Dant Lest Certification Data Pressure Ratln9 (Pall
BOP Stack IWV2019 5112015 5,000.0
TypeMake
Model
ID Nom lin)
PRange(put)
Last Cert Data
Annular
Hydhl
GK50D
13518
5,500.05/112015
312"-fi"VBR
Hydril
MR. 5000
135/8
5.000.0
8/24/2018
Blind Shear Ram
Hydril
WILSON
13
5,000.0
812412018
4112-x7 VBR
Hydnl
MR. 5000
13518
5,500.0
5n2D15
Slow Circulation Rates
Pump Number.1 Maka: Wnlle Star INAW: Ouagre 2450
Siad Dade
End Data Liner Stu (in) Volume Per Smoke Override lbbih W) Max Pressure (psi)
v1=01e
5 0.0]0 7,5110.0
Date
Depth (RKB)
$low Spat
Strokes (spm)
P (pei)
ER (%) G Flow (gpm)
Pump Num ber:2 Make: White Star Madel: muen 2450
Shed pate Entl Deb Liner St. Volume Per Stroke Overrae(bbYstk) Max Pressure(psi)
411012018 5 0.078 ],500.0
Date
DepM (RKB) Slow Sptl
Strekea (spm)
Pipd) ER (X)
OFlow (gpm)
Pump Number: 3 Make: Naglerlag
Supply Maki 12-P-160
Stan Date
Entl Dab Liner Size (In) Volume Per Streke Override(bbitsM) Max Preccure(psl)
4/1012019
4114 0.053 ],500.0
Gah
pepM (RKB)
Slow Spd
Strokes (spm) I P (Pail
ER 1%)
G Ft.. (gpm)
Daily Bulk
9upplY Rem Deacripuon: Equipment Fuel Unit Label: Gel Unit Size: 1 Note:
Deb Concumetl Receivetl Returran Gum Consumetl Gum Rebeivetl Cum ReturnedLum On Los Nota
111172D19 1.5]2.0 1,572.0 22,880.0 22,800.0 0.0 0.0
Supplykern Wmofptbn: MWPIMU Umers Unift"wn:
GM Unit Size: Note:
Duh Consumetl
Cum Consumetl Lum Receivetl Cum Relumetl Gum On Lou Note
Pool.. comes
1111712019 198.0 196.0
3,388.0 3,368.0 00 0.0
Supply sem Daaedpuon: Rig Fuel Unit Labe'gal Us Unit Size:1 NOW
Dote Consumetl Receivetl Ragumetl Cum Consumetl Cum Received Cum Returned Gum On Loc Note
C.0
1111712019 1,182.0 0.0 28,918.0 40,554.0 11,636.0
Supply Mem peseriptlon: Rig Wager Unn label: bbl Unit Size:1 Note:
Date Consumetl Receivetl Returnatl Cum Consumetl Cum Received Cum Retumetl Cum On Loc Note
1111)12019 135.0 135.0 t,012.0 1,069.0 0.0 57.0
Supply Item Deaedptlon: WIF 6oilms UnRLabel:
Gal Unit Size: Note:
Dab Consumetl Receivetl Retumetl
Cum Consumed Cum Receiveat Cum Returned Cum On Loc Note
11/17/2019 42.0 42.0
714.0 ]14.(1 0.0 0.0
Supply Rem Description, WW injectedD V Unit Label:
Gal Unit Size: Note:
Wb Consumetl Receivetl Returns.
Lum Consumetl Cum Resolved Co. Returned Oum On Lac Note
1111]/2019 1,638.0 1,638.0
1,630.0 1,838.0 0.0 0.0
Well Name: SD37-DSP1
Wellbore Name: SD37-DS'
Well Code: 25754
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 1111712019
Report #: 17
Page: 3 of 3
Last Authority Visit
Me Tot in.p. Nbr
Tote) I.N.C. number Comment
STOP Cards Submitted
Company
%Rpt.
Com
Dayon Drilling
Myon DMlir Inc.
(Myon Dnllin9 Inc.
Doyon Drilling Inc.
Ml S..
MI Sw..
7
9
7
7
8
5
PJSM'S
Safe Cad.
HRWS
COW
HARCIJSA
RIR'a
General Notes
Comment
CASED Memory Multi -Finger Caliper
HOLE Log Results Summary
Company:
ENI Petroleum
Well:
SD37-DSPOl
Log Date:
October 12, 2019
Field:
Spy Island
Log No.:
1&2
State:
Alaska
Run No.:
15710
API No.
50-629-23451-00-00
Pipe Description:
4.5 inch 12.6 Ib. 13 -CR VAM TOP
Top Log Interval:
Surface
Pipe Use:
Tubing
Bottom Log Interval:
5,785 Ft. (MD)
Pipe Description:
9.625 inch 47 Ib.
Top Log Interval:
5,785 Ft. (MD)
Pipe Use:
Casing
Bottom Log Interval:
5,861 Ft. (MD)
Inspection Type : Corrosive & Mechanical Damage Inspection
COMMENTS:
This caliper data is tied into the WLEG at 5,785 feet (Driller's Depth).
During the Run 1 caliper log, the depths did not match the wellbore schematic and the bottom log
interval did not start deep enough to record the entire 4.5 inch tubing. It was originally thought that
the schematic depths were incorrect. After further investigation, the slickline counter head was
loose which artificially added depth incrementally while logging which resulted in longer than actual
joint lengths and why we did not log as deep as originally planned. The counter head was tightened
prior to starting the second caliper run so the recordings presented in this report are from the
second caliper log and match the schematic depths as expected.
This log was run to assess the condition of the tubing and casing with respect to internal corrosive and
mechanical damage.
The caliper recordings indicate the 4.5 inch tubing appears to range from good to poor condition, with a
maximum recorded wall penetration of 79% (82% in run 1) in a line of pits in joint 45 (1,925 ft). Additional
wall penetrations ranging from 40% to 75% wall thickness are recorded in 148 of the 155 joints logged.
Recorded damage appears as isolated pitting and a line of pits. No significant areas of cross-sectional wall
loss or I.D. restrictions are recorded throughout the tubing logged.
The caliper recordings indicate the 9.625 inch casing logged appears to be in poor condition with respect to
internal corrosive and mechanical damage, with maximum wall penetrations of 67% in joint 1 (5,820 ft) and
56% in joint 2 (5,842 ft). No significant areas of cross-sectional wall loss or I.D. restrictions are recorded
throughout the casing logged. Although no significant I.D. restrictions are recorded, the caliper recorded
buckling from 5,785 feet to 5,822 feet with slight oval deformation recorded at 5,803 feet, restricting the I.D.
to 8.49 inches. A 3-D log plot overlay of the centered and un -centered caliper recordings across the casing
logged is included in this report.
The body region analysis and joint tabulation data for the 4.5 inch tubing and 9.625 inch casing are
combined.
MAXIMUM RECORDED WALL PENETRATIONS:
Line of Pits
79
45
1,925 Ft. (MD)
Line of Pits
75
48
2,055 Ft. (MD)
Isolated Pitting
74
82
3,456 Ft. (MD)
Line of Pits
70
9
409 Ft. (MD)
Line of Pits
69
61
2,616 Ft. (MD)
READ Cased Hole Inc. J P.O. Box 1369, Staff_ '497
Phone: (281) 431-7100 or (888) 565-9085 Fax: (281) 431-7125 E-mail. ANSA-NorthAmericaCalreadcasedhole.com
Prudhoe Bay Field Office Phone: (907) 659-2307 Fax: (907) 659-2314
MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS:
No significant areas of cross-sectional wall loss (> 7%) are recorded throughout the tubing and casing
logged.
MAXIMUM RECORDED ID RESTRICTIONS:
No significant I.D. restrictions are recorded throughout the tubing and casing logged.
B. Suhanek & D. Henley C. Waldrop Simonson & Belemmi & Gueco
READ Cased Hole Inc. / P.O. Box 1369, Stafford, TX 77497
Phone: (281) 431-7100 or (888) 565-9085 Fax: (281) 431-7125 E-mail: ANSA-NorthAmerlca@readcasedhole.com
Prudhoe Bay Field Office Phone: (907) 659-2307 Fax: (907) 659-2314
-- HOLED Multifinger Caliper 3D Log Plot
Company: ENI Petroleum Field: Spy Island
Well: SD37-DSP01 Date: October 12, 2019
Description: Overlay of Centered and Un -Centered Caliper Recordings Across 9.625 Inch Casing.
I I
Correlation of Recorded Damage to Borenole Profile
'Pipe 1 4.5 in (25.3'-5,785.5') Well: SD37-DSPO1
Pipe 2 9.625 in (5,785.5'- 5,861.0') Field: Spy Island
Company: ENI Petroleum
Country: USA
Survey Date: October 12, 2019
■ Approx. Tool Deviation ■ Approx.
Borehole
Profile
1
31
20
855
40
1,685
GLM 1
60
2,535
�
LL
EC
80
1
3,367 a
o
O
100
4,196
120
5,027
1
5,785
2
5,826
0 50
100
Damage Profile (% wall) / Tool
Deviation
(degrees)
Bottom of Survey = 2
Body Region Analysis
Survey Date: October 12, 2019
Tool Type: UW MFC 40 Ext. No. 218452
Tool Size: 2.75 inches
No. of Fingers: 40
Pipe Nom.OD
4.5 in.
9.625 in.
CASED
Nom.ID
3.958 in.
8.681 in.
I op Depth
25 ft.
5,785 ft.
HOLE
Well:
SD37-DSP01
Field:
Spy Island
Company:
ENI Petroleum
Country:
USA
Body Region Analysis
Survey Date: October 12, 2019
Tool Type: UW MFC 40 Ext. No. 218452
Tool Size: 2.75 inches
No. of Fingers: 40
Pipe Nom.OD
4.5 in.
9.625 in.
Weight Grade & Thread
12.6 ppf 13 -CR VAM TOP
47 ppf
Nom.ID
3.958 in.
8.681 in.
I op Depth
25 ft.
5,785 ft.
tsonom uepm
5,785 ft.
5,861 k.
Damage Configuration (body)
100
80
60
40
20
0
Isolated General Line Other Hole /
Pitting Corrosion Corrosion Damage Pos. Hole
damagedNumber of ioints 1= 152)
55 0 97 0 0
Damage Profile (% wall)
Penetration (% wall)
150
100
-
50
0
0 to 20 to 40 to over
20% 40% 85% 85%
Numbergf6 ints analyzed=1
7 48 100 0
Damage Configuration (body)
100
80
60
40
20
0
Isolated General Line Other Hole /
Pitting Corrosion Corrosion Damage Pos. Hole
damagedNumber of ioints 1= 152)
55 0 97 0 0
Damage Profile (% wall)
Well: SD37-DSPO1
Field: Spy Island
Company: ENI Petroleum
CASED
HOLE
Joint Tabulation Sheet
Survey Date: October 12, 2019
Analyst: Waldrop
Pipe
Description
4.5 in. 12.6 ppf 13 -CR VAM TOP Tubing
9.625 in. 47 ppf Casing
Nom. ID Body Wall
3.958 in. 0.271 in.
8.681 in. 0.472 in.
Top Depth Bottom Depth
25 ft 5,785 ft.
5,785 ft. 5,861 ft.
joint
No.
jt. Depth
(Ft.)
Pen.
Upset
(in.)
Pen. --Fen--i
Body
(in.)
%
etal
Loss
%
Min.
I.D.
(in.)
Comments
Damage Profile
I% wall)
0 50 100
0.1
25
0
0.03
10
1
3.91
Pup
0.2
28
0
0.03
10
2
3.90
Pu
1
31
0.06
0.09
32
3
3.89
Line of Pits. Lt. Deposits.
1.1
77
0.05
0.08
30
2
3.91
Pup Isolated Pitting
1.2
82
0
0.05
18
1
3.91
Pu Shallow Line of Pits.
1.3
88
0.05
0.08
30
2
3.91
Pup Line of Pits.
2
94
0
0.11
42
3
3.90
Line of Pits. Lt. Deposits.
3
136
0.07
0.11
39
2
3.91
Line of Pits.
4
177
0.06
0.10
35
4
3.90
Isolated Pitting.
5
219
0
0.13
48
3
3.90
Line of Pits.
6
260
0.09
0.09
33
3
3.89
Line of Pits. Lt. Deposits.
7302
0
0.11
41
3
3.90
Isolated Pittin
8
343
0.09
0.11
41
3
3.89
Line of Pits. Lt. Deposits.
9
385
0.12
0.19
70
4
3.91
Line of Pits.
10
426
0.05
0.14
50
3
3.92
Line of Pits.
11
468
0.05
0.12
44
3
3.91
Line of Pits.
12
509
0
0.14
50
3
3.92
Line of Pits.
13
551
0
0.12
44
3
3.91
Line of Pits.
13.1
592
0
0.07
25
2
3.94
Pup Line of Pits.
13.2
598
0
0
0
0
3.83
4.7 X Nipple
13.3
600
0
0.02
7
1
3.95
Pu
14
606
0.09
0.12
44
4
3.92
Line of Pits.
15
647
0.11
0.16
59
1 6
3.92
Isolated Pittin
16
689
0.15
0.14
53
4
3.93
Line of Pits.
17
730
0.09
0.14
50
4
3.93
Line of Pits.
18
772
0.10
0.17
62
3
3.93
Line of Pits.
19
813
0.17
0.13
48
4
3.93
Line of Pits.
20
855
0.09
0.11
40
3
3.93
Isolated Pittin
21
896
0.08
0.14
50
4
3.93
Line of Pits.
22
938
0
0.12
46
3
3.92
1 Isolated Pitting
23
979
0
0.11
41
3
3.92
Line of Pits.
24
1021
0.10
0.09
3 5
3
3.9 3
Line of Pits.
25
1063
0.04
0.12
44
4
3.93
Line of Pits.
26
1104
0.08
0.17
61
4
3.93
Isolated Pittin .
271146
0.07
0.13
49
4
3.94
Line of Pits.
28
1187
0.13
0.11
41
4
3.92
Line of Pits.
29
1228
0.07
0.15
54
3
3 93
Line of Pits.
30
1270
0.07
0.11
39
3
3.93
Isolated Pittin
31
1312
0
0.15
54
3
3.94
Isolated Pittin
32
1353
0.14
0.14
50
4
3.94
Line of Pits.
33
1394
0
0.16
A
4
3.93
Line of Pits.
34
1436
0.15
0.13
48
4
3.94
Isolated Pitting -
35
1478
0.08
0.15
54
3
3.93
Line M Pits.
36
1519
0.05
0.17
62
3
3.93
Line of Pits.
37
1561
0
0.14
50
4
3.94
Line of Pits.
38
1602
0.14
0.14
51
6
3.94
Line of Pits.
39
1644
0
0.06
22
3
3.93
Isolated Pitting.
40
1685
0
0.14
1 52
1 3 1
3.93
Isolated Pittin
41
1727
0.18
0.18
1 66
1 5 1
3.93
1 Line of Pits.
42
1 1769
1 0.1_'
0.15
1 56
1 4 1
3.94
1 Line of Pits.
'Penetration Body
Metal Loss Body
Page 1
Well: SD37-DSP01
Field: Spy Island
Company: ENI Petroleum
CASED
HOLE
joint Tabulation Sheet
Survey Date: October 12, 2019
Analyst: Waldrop
Pipe
Description
4.5 in. 12.6 ppf 13 -CR VAM TOP Tubing
9.625 in. 47 ppf Casing
Nom. ID Body Wall
3.958 in. 0.271 in.
8.681 in. 0.472 in.
Top Depth Bottom Depth
25 ft 5,785 ft.
5,785 ft. 5,861 ft.
Joint
No.
Jt. Depth
(Ft.)
Pen.
Upset
(in.)
Pen.
Body
(in.)
Pen.
%
Metal
Loss
%
Min.
I.D.
(in.)
Comments
Damage Profile
0 50 100
43
1810
0.19
0.16
58
3
3.93
Line of Pits.
44
1852
0.08
0.17
64
6
3.92
Line of Pits.
45
1893
0.15
0.21
79
4
3.91
Line of Pits.
46
1935
0
0.17
63
4
3.92
Line of Pits.
47
1976
0.14
0.13
46
3
3.93
Isolated Pittin
48
2018
0.12
0.20
75
6
3.92
Line of Pits.
48.1
2059
0
0.07
25
3
3.94
Pup Line of Pits.
48.2
2065
0
0
0
0
3.87
GLM 1 No Deviation
48.3
2072
0
0.07
25
3
3.91
Pup Line of Pits.
49
2078
0
0.14
51
3
3.93
Line of Pits.
50
2120
0.15
0.16
59
3
3.91
Line of Pits.
51
2162
0
0.19
68
4
3.91
Line of Pits.
52
2203
0
0.17
61
6
3.91
Line Corrosion.
53
2245
0
0.13
48
3
e of Pits.
54
2286
0.08
0.11
41
3
lated Pittin .55
2328
0
0.13
49
3
e of Pits.56
2369
0
0.12
43
4
19M
lated Pittin57
2411
0.04
0.16
59
4
e of Pits.58
2452
0.07
0.15
54
2
e of Pits.59
2494
0
0.10
36
4
e of Pits.60
2535
006
0.13
47
3
e of Pits.
61
2577
0.04
0.19
69
5
3.921
ine of Pits.
62
2619
0
0.16
57
4
3.92
Line of Pits.
63
2660
0
0.13
49
4
3.91
Line of Pits.
64
2702
0
0.11
41
3
3.92
Isolated Pitting.
65
2743
0
0.13
48
4
3.91
Line of Pits.
66
67
2785
2826
0
0
0.15
0.14
56
50
6
3
3.92
3.91
Isolated Pittin
Line of Pits.
68
69
2868
2909
0
0
0.14
0.13
51
48
5
3
3.90
3:90
Line of Pits.
Line of Pits.
70
2951
0.05
0.12
45
3.92
Isolated Pittin
71
72
2993
3034
0
0
0.12
0.13
45
46
4
6
3.93
3.90
Line of Pits.
Isolated Pittin
73
3076
0
0.13
49
4
3.89
Line of Pits. Lt. De osits.
74
3117
0
0.10
37
3
3.92
Isolated Pittin .
75
3159
0
0.10
38
2
3.92
Isolated Pittin
76
3200
0.05
0.12
44
3
3.90
Isolated Pittin
77
3242
0.05
0.12
43
4
3.89
Line of Pits. Lt. De osits.
78
3284
0
0.12
43
3
3.92
Isolated Pittin
79
3325
0
0.12
45
4
3.92
Line of Pits.
80
3367
0.06
0.14
53
4
3.88
Isolated Pittin Lt. De Dosits.
81
3408
0
0.13
49
4
3.89
Isolated Pittinp Lt. De osits.
82
3450
0
0.20
74
5
3.90
Isolated Pittin
83
84
3491
3533
0
0
0.14
0.14
50
52
3
5
3.90
3.90
Line of Pits.
Isolated Pittin
85
86
3574
3616
0
0.04
0.10
0.14
38
51
3
5
3.91
3.89
Line of Pits.
Isolated Pitting. Lt. De osits.
87
3658
0.07
0.13
48
4
3.91
Isolated Pitting.
88
3699
0.05
0.14
53
3
3.91
Line of Pits.
89
1 3741
0
1 0.12
1 44
1 3
3.90
1 Isolated Pitting.
'Penetration Body
Metal Loss Body
Page 2
Well: SD37-DSPO1
Field: Spy Island
Company: ENI Petroleum
HOLE
joint Tabulation Sheet
Survey Date: October 12, 2019
Analyst: Waldrop
Pipe
Description
4.5 in. 12.6 ppf 13 -CR VAM TOP Tubing
9.625 in. 47 ppf Casing
Nom. ID Body Wall
3,958 in. 0.271 in.
8.681 in. 0.472 in.
Top Depth Bottom Depth
25 ft 5,785 ft.
5,785 ft. 5,861 ft.
Joint
No.
)t. Depth
(Et.)
Pen.
Upset
(in.)
Pen.
Body
(in.)
Pen.
%
Metal
Loss
%
Min.
I.D.
(in.)
Comments
Damage Profile
(%wall)
0 50 100
90
3782
0
0.12
44
3
3.90
Isolated Pittin
91
3823
0.09
0.11
41
4
3.90
Isolated Pittin
92
3864
0
0.11
39
3
3.90
Isolated Pittin
93
3906
0
0.08
30
2
3.90
Isolated Pittin
94
3948
0
0.12
45
3
3.88
Line of Pits. Lt. Deposits.
95
3989
0.05
0.11
39
3
3.89
Line of Pits. Lt. Deposits.
96
4030
0
0.10
36
3
3.89
Isolated Pittin Lt. Deposits.
97
4072
0.06
0.10
37
3
3.89
Line of Pits. Lt. Deposits.
98
99
4113
4155
0
0.05
0.16
0.16
58
57
3
3
3.90
3.87
Line of Pits. Lt. De osits.
Isolated Pitting, Lt. Deposits.
100
4196
0
0.15.
55
3
3.88
Isolated Pittin Lt. Deposits.
101
4238
0
0.11
41
3
3.89
Line of its. Lt. Deposits.
102
4279
0.06
0.15
55
4
3.88
Line of Pits. Lt. Deposits.
103
4321
0
0.15
54
3
3.85
Line of Pits. Lt. De osits.
104
4363
0
0.11
41
3
3.89
Line of Pits. Lt. De osits.
105
4404
0
0.11
42
3
3.89
Line of Pits. Lt. De osits.
106
4445
0
0.11
40
3
3.88
Isolated Pitting Lt. De osits.
107
4487
0
0.12
46
2
3.87
Isolated Pitting Lt. De osits.
108
4529
0
0.13
49
3
3.89
Isolated Pitting It De osits.
109
4570
0
0.11
42
3
3.89
Line of Pits. Lt. De osits.
110
4612
0
0.09
31
3
3.88
Isolated Pittin Lt. Q - -its
111
4653
0
0.08
29
3
3.88
Isolated Pitting, Lt. Deposits.
112
4695
0.05
0.10
37
3
3.89
Line of Pits. Lt. De osits.
113
4736
0.05
0.09
31
3
3.89
Line of Pits. Lt. De osits.
114
4778
0.06
0.09
34
3
3.88
Isolated Pittin Lt. De osits.
115
4819
0
0.11
40
3
3.88
Line of Pits. Lt. Deposits.
116
4861
0.04
0.07
26
3
3.87
Isolated Pittin . Lt. De osits.
117
4903
0
0.08
30
3
3.87
Isolated Pittin Lt. De osits.
118
4944
0
0.08
30
3
3.88
Line of Pits. It De osits.
119
4986
0.07
0.09
35
2
3.86
Line of Pits. Lt. De osits.
120
5027
0
0.10
38
2
3.88
Line of Pits. Lt. De osits.
121
5069
0
0.10
37
3
3.87
Line of Pits. Lt. Deposits.
122
5110
0
0.15
54
2
3.88
Isolated Pitting, Lt. Deposits.
123
5152
0
0.09
35
3
3.86
Line of Pits. Lt. Deposits.
124
5193
0.05
0.08
31
2
3.85
Isolated Pitting, Lt. Deposits.
125
5235
0
0.07
27
2
3.87
Line of Pits. Lt. Deposits.
126
5276
0
0.15
55
1 2 1
3.87
Line of Pits. Lt. Deposits.
127
5318
0
0.12
1 45
1 2 1
3.86
Isolated Pitting. Lt. Deposits.
128
5360
0
0.09
1 33
1 2 1
3.87
Line of Pits. Lt. Dep"'
129
5401
0.06
0.13
49
3
3.85
Isolated Pitting, Lt. Deposits.
130
5443
0
0.06
23
2
3.87
Line of Pits. Lt. Deposits.
131
5484
0
0.07
27
3
3.87
Line of Pits. Lt. Deposits.
132
5526
0
0.06
23
2
3.85
Line of Pits. Lt. Deposits.
133
5567
0
0.09
31
3
3.87
Line of Pits. Lt. De osits.
134
5609
0
0.06
23
3
3.86
Isolated Pitting, Lt. Deposits.
134.1
5650
0
0.04
15
2
3.88
Pup Shallow Pittin Lt. Deposits.
134.2
5656
0
0
0
0
3.79
4.5" X Nipple
134.3
5658
0
0.04
15
1
ne, Lt. Deposits.
135
5664
0
0.07
24
4
3.88
Isolated Pittin . Lt. De osits.
135.1
5705
0
0.05
1 17
1 2
1 3.91
1 Pup Shallow Line of Pits.
Penetration Body
Metal Loss Body
Page 3
Field:
Company:
=90
SD37-DSP01
Spy Island
ENI Petroleum
CASED
HOLE
IWell:
Joint Tabulation Sheet
Survey Date: October 12, 2019
Analyst: Waldrop
Pipe
Description
4.5 in. 12.6 ppf
9.625 in. 47 ppf
13-CR VAM TOP Tubing
Casing
Nom. ID Body Wall
3.958 in. 0.271 in.
8.681 in. 0.472 in.
Top Depth
25 ft
5,785 ft.
Bottom Depth
5,785 ft.
5,861 ft.
Joint
No.
Jt. Depth Pen.
(Ft.) Upset
(in.)
Pen.
Body
(in.)
Pen.
%
Metal
Loss
%
Min.
1. D.
(in.)
Comments
Damage Profile
(% wall)
0 50 100
135.2
5710
0
0
0
0
3.83
Seal Assembly
135.3
5726
0
0
0
0
3.84
4.5' x 9.625' Model D Packer
135.4
5738
0
0.05
20
2
3.91
Pu Line of Pits.
135.5
5744
0
0.08
30
3
3.90
Pu Line of Pits.
135.6
5754
0
0.07
27
2
3.91
Pu Line of Pits.
135.7
576040.070.06
0
0
3.73
4.5' XN Nipple
135.8
5762
25.
3
3.88
Pu Line of Pits. Lt. De osits.
135.9
5767
21
2
3.89
Pu Isolated Pitting Lt. De osits.
136.1
5778
24
4
3.90
Pu Line of Pits.
1
0
WLEG1
5785
67
7
8.24
Bucklin . Sli ht Oval Deformati2
5826
56
6
8.60
Line of Pits. Lt. Deposits.
Penetration Body
Metal Loss Body
Page 4
CASED
HOLE
Cross-sectional Illustration
Well:
SD37-DSPOI
Survey Date:
October 12, 2019
Field:
Spy Island
Tool Type:
UW MFC 40 Ext. No. 218452
Company:
ENI Petroleum
Tool Size:
2.75 inches
Country:
USA
No. of Fingers:
40
Tubing:
4.5 in. 12.6 p 13 -CR VAM TOP
Analyst:
Waldrop
Cross Section for Joint 45 at depth 1,925.440 ft.
Tool speed = 51
Nominal ID = 3.958
Nominal OD = 4.5
Remaining wall area = 96%
Tool deviation = 4°
Finger = 6 Penetration = 0.213 in.
Line of Pits 0.21 in. = 79% Wall Penetration HIGH SIDE = UP
=_ I CASED Cross-sectional Illustration
HOLE
Well: S037-DSPOI Survey Date: October 12, 2019
Field: Spy Island Tool Type: UW MFC 40 Ext. No. 218452
Company: ENI Petroleum Tool Size: 2.75 inches
Country: USA No. of Fingers: 40
T..r.:..... n ❑ ;., 13 -CR VAM TOP Analyst: Waldrop
Cross Section for Joint 48 at depth 2,055.340 ft.
Tool speed = 51
Nominal ID = 3.958
Nominal OD = 4.5
Remaining wall area = 94%
Tool deviation = 3°
i
t
:I
i
Finger = 13 Penetration = 0.202 in.
Line of Pits 0.20 in. = 75% Wall Penetration HIGH SIDE = UP
4-Y2' 12.6 ppf 13- Cr Vam Top Production Tubing
Conductor, 20" Uninsulated set at 160' MDITVD
Wellhead — Vetco Gray. 5000 psi WP
Surf.
13-31
A 12'
TO(
MDi
6.901' MDITVD
I cap 7.9 ppg
UID - Nipple, 3.81"'X' Profile
a
us
SD37-DSPOl
Spy Island
Disposal Well
As completed
April 2019
8' MDITVD - GLM. KBG-2, 4-'/:- x V. with 2.500 psi
-to -Tub shear valve
ibing. 4-'/:" 12.6# 13 -Cr Vam Top
658' MDITVD - Nipple, 3.81"'X' Profile
715 MD/TVD - Packer, 4-%' x 9.518" Model D Packer with
BH Anchor Seal Assy
761' MD(TVD - Nipple, 3 725" 'XN' Profile
785' MDITVD — Bottom of VULEG
868' MDr FVD — Suspected Casing Damage/Leak
New Perforations
9112114
5,870.5.910' MDlTVD
Initial Perforations
6.522-6.613' MDffVD
SD37-DSP01 October 12, 2019
ME Ak
CASED
HOLE 4.5" Tubing (Sw ,ace - 5,785')
Run 2 Caliper Log Tied Into WLEG at 5,785'
Database File sd37-dsp01 run 2.db
Dataset Pathname 45
Presentation Format 40-451p
Dataset Creation Mon Oct 14 01:3533 2019
Charted by Depth in Feet scaled 1:240
0 Deviation (deg) 100 0.83
--------------------
0 Rotation (deg) 360 -0.17
--------------------
0 Line Speed (ft/min) 200 -1.17
3.5 Nominal I.D. (in) 4.5 -2.17
.1 -------------- ----------------------------- --------------
3.5 Maximum Diameter (in) 4.5
3.5 Average Diameter (in) 4.5
3.5 Minimum Diameter (in) 4.5
i
Line Spee
` Deviatio
i
1 �-- Rotation
- --- — 50
t '
Min, Max AvgDiamete
FING10 in
FING20 (in)
FING30 (in)
FING40 (in)
2.331
M
250
350
i
0
i
M
250
350
dI I
450
Nipple
am
0
M
750
:SII
■Mm
---- j 1000
1050
1100
1150
1200
Fh s
X11
1450
1550
1600
1650
2400
2450
2500
m
2650
2700
2750
KM
2900
mirM
-- J-1-:: 1 3000
3100
3150
3200
fid#_
3250
3300
-� -- -
Aff- 3350
3400
3550
I
3650
4850
oil
4950
-ME
5550
MAN
3.5
3.5
3.5
Line Speed (Wnim)
Nominal I.D. (in)
-----------------------------------
Maximum Diameter (in)
Average Diameter (in)
Minimum Diameter (in)
4.5
-1.17 FING30 (in)
-2.17 ( G40 (in)
_f I CASED
HOLE
SD37-DSP01 October 12, 2019
9.625" Casing (5,, 85'- 5,861')
Run 2 Caliper Log Tied Into WLEG at 5,785'
Database File sd37-dsp01 run 2 -db
Deviation (deg)
Line Speed (ft/min)
100
200
Dataset Pathname 45
0.475
FING10 (in)
Presentation Format 40-96251p
-0.525 FING20 (in)
Dataset Creation Mon Oct 14 01:35:33 2019
7
----------------------------------------------------------
7
Nominal I.D. (in)
Maximum Diameter (in)
Charted by Depth in Feet scaled 1:240
-1.525
0 Deviation (deg) 100
6.6
0.475
FING10 (in)
8.6
-----------------
0 Line Speed (fUmin) 200
Average Diameter (in)
4525
FING20 (in)
7.6
7 Nominal I.D. (in) 10
7 Minimum Diameter (in) 10
-1.525
FING30 (in)
6.6
- ---------------------------------------------------------
7 Maximum Diameter (in) 10
-2.525
FING40 (in)
5.6
7 Average Diameter (in) 10
7 Minimum Diameter (in) 10
— 5850
0
--------------------
0
Deviation (deg)
Line Speed (ft/min)
100
200
0.475
FING10 (in)
b.e
-0.525 FING20 (in)
7.6
7
----------------------------------------------------------
7
Nominal I.D. (in)
Maximum Diameter (in)
10
10
-1.525
FING30 (in)
6.6
-2.525 FING40 (in)
5.6
7
Average Diameter (in)
10
7 Minimum Diameter (in) 10
THE STATE
}ALASKA
GOVERNOR LIIC F AFL 1. DUN LL -%VY
August 12, 2020
Sent by Email
Mr. David Hart
Sr. Operations Manager
Eni US Operating Company Inc
3700 Centerpoint Dr., Suite 500
Anchorage, AK 99503
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433.
Fax: 907.276.7542
www.aogcc.olaska.gov
Re: Notice of Proposed Enforcement Action
Failure to obtain AOGCC approval prior to performing well work
Failure to complete required Sundry Reports of well work within the required time
Nikaitchuq Unit SD37-DSPI well (SD37-DSPI) (PTD 2110890)
Class I Waste Disposal Well EPA Permit AK1I011-C
Nikaitchuq Unit (NU), Nikaitchuq Field, Undefined Waste Disposal Pool
Docket OTH-20-043
Dear Mr. Hart:
The Alaska Oil and Gas Conservation Commission (AOGCC) hereby notifies Eni US Operating
Company Inc. (Eni) of a proposed enforcement action.
Nature of the Apparent Violation or Noncompliance (20 AAC 25.535(b)(1)).
Eni violated 20 AAC 25.280 (a) ("Workover operations") when it failed to submit to and have
approved by AOGCC an Application for Sundry Approvals (Form 10-403) prior to installing a
plug to isolate a leak in SD37-DSPI that was discovered by diagnostic evaluations performed by
Eni.
Eni violated 20 AAC 25.280 (d) ("Workover operations") when it failed to file within 30 days
after completion of workover operations a Report of Sundry Well Operations (Form 10-404) for
well work completed in November 2019 under Sundry 319-183.
Basis for Findin¢ the Violation or Noncompliance (20 AAC 25.535(b)(2)).
By email dated July 14, 2020 Eni notified AOGCC that it had secured SD37-DSPI after finding a
tubing leak at 4466 ft. Eni provided an attachment titled "Eni SD37-DSPOI End of Work Report
Rigless July 2020" summarizing well work activities for June 12 and 13, 2020 when Eni
Notice of Proposed Enforcement Action SD37-DSPI
August 12, 2020
Page 2 of 3
determined there was a pressure communication and from July 4, 2020 through July 11, 2020 when
Eni ran logs and set an Evo Trieve plug at 5745 ft to secure the tubing. This was the first notice
provided to AOGCC regarding the loss of mechanical integrity in SD37-DSP 1 and the first notice
that a workover had occurred.
AOGCC regulation 20 AAC 25.280 (a) requires "An Application for Sundry Approvals (Form
10-403) must be submitted to and approved by the commission in order to enter a well and
conduct one or more of the following types of well workover operations:... (5) repairs to the
well. "
In addition, AOGCC's review of the well history after Eni's notification regarding the plug
revealed that Eni failed to submit a Report of Sundry Operations (Form 10-404) for workover
operations performed on SD37-DSPI under Sundry Approval 319-183 (this workover concluded
November 17, 2019).
AOGCC regulation 20 AAC 25.280 (d) requires "The operator shall file with the commission,
within 30 days after completion of workover operations, on a Report of Sundry Well Operations
(Form 10-404), a complete record of the work performed and the tests conducted, and a
summary of daily well operations as described in 20 AAC 25.070(3)... "
Proposed Action (20 AAC 25.535(b)(3)).
Within two weeks of the date of the AOGCC's final decision, Eni shall:
(1) Provide a detailed description of its Application for Sundry Approvals (Form 10-403) and
Sundry Reporting (Form 10-404) process to AOGCC with an explanation of the root cause
of these violations, as well as corrective actions undertaken by Eni to assure the violations
will not recur;
(2) Provide the Report of Sundry Well Operations (Form 10-404) required for the work
completed in November 2019 under Sundry Approval 319-183.
For these violations the AOGCC intends to impose civil penalties on Eni as follows:
$10,000 for failure to submit an Application for Sundry Approvals (Form 10-403) prior
to installing a plug to isolate a leak in the well.
$10,000 for failure to submit a Report of Sundry Well Operations (Form 10-404) within
the 30 -day requirement for well work completed under Sundry 319-183.
The total proposed civil penalty is $20,000. The proposed penalty reflects the AOGCC's
consideration of the criteria set forth in AS 31.05.150(g). Violations relating to Underground
Injection Control well integrity practices warrant the imposition of civil penalties. While the
penalty does not reflect amounts based on per -day assessment, that decision does not minimize
Eni's failure to report and seek approval for correcting the well's loss of mechanical integrity.
AS 31.05.150(a) provides for not more than $100,000 for the initial violation and not more than $10,000 for each
day thereafter on which the violation continues.
Notice of Proposed Enforcement Action SD37-DSPI
August 12, 2020
Page 3 of 3
Although no injury to the public occurred, the seriousness of a potential wellbore failure, and the
obvious threat it poses to both public health and the environment cannot be denied. Eni's failure
to comply with the fundamental AOGCC approval and reporting requirements raises the potential
for similar behavior with more serious consequences. Mitigating circumstances were considered
in the assessment of the proposed civil penalty including Eni's compliance history, enforcement
and notice of violation history, and the existing conclusion for the Nikaitchuq Unit that there are
no known sources of freshwater.
Rights and Liabilities (20 AAC 25.535(b)(4
Within 15 days after receipt of this notification — unless the AOGCC grants an extension for good
cause shown — Eni may file with the AOGCC a written response that concurs in whole or in part
with the proposed action described herein, requests informal review, or requests a hearing under
20 AAC 25.540. If a timely response is not filed, the proposed action will be deemed accepted by
default. If informal review is requested, the AOGCC will provide Eni an opportunity to submit
documentary material and make a written or oral statement. If Eni disagrees with the AOGCC's
proposed decision or order after that review, it may file a written request for a hearing within 10
days after the proposed decision or order is issued. If such a request is not filed within that 10 -day
period, the proposed decision or order will become final on the 1 Ph day after it was issued. If such
a request is timely filed, the AOGCC will hold its decision in abeyance and schedule a hearing.
If Eni does not concur in the proposed action described herein, and the AOGCC finds that Eni has
violated or failed to comply with a provision of AS 31.05, 20 AAC 25, or an AOGCC order, permit
or other approval, then the AOGCC may take any action authorized by the applicable law including
ordering one or more of the following: (i) corrective action or remedial work; (ii) suspension or
revocation of a permit or other approval; (iii) payment under the bond required by 20 AAC 25.025;
and (iv) imposition of penalties under AS 31.05.150. In taking action after an informal review or
hearing, the AOGCC is not limited to ordering the proposed action described herein, as long as
Eni received reasonable notice and opportunity to be heard with respect to the AOGCC's action.
Any action described herein or taken after an informal review or hearing does not limit the action
the AOGCC may take under AS 31.05.160.
Sincerely,
Jeremy M. Price
Chair, Commissioner
cc: Evan Osborne, USEPA, Region 10 (osbome.evan@epa.gov)
Tim Mayers, USEPA, Region 10 (mayers.timothy@epa.com)
Stefano Pierfelici (stefano.pierfelici@eni.com)