Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
205-118
STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM, ON REPORT OF SUNDRY WELL OPERATIONS 1.Operations Performed: Abandon r Repair w ell r Rug Perforations r Perforate P Other r Alter Casing r Pull Tubing r Stimulate-Frac r Waiver r Time Extension r Change Approved Program rOperat. Shutdown r Stimulate-Other r Re-enter Suspended Well r 2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Development Exploratory r 205-118 3.Address: 6.API Number: P. O. Box 100360,Anchorage,Alaska 99510 Stratigraphic r Service 50-103-20514-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL 380075,380096,25530 CD2-01 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): none Colville River Field/Alpine Oil Pool 11.Present Well Condition Summary: Total Depth measured 17513 feet Plugs(measured) none true vertical 7047 feet Junk(measured) none Effective Depth measured 17513 feet Packer(measured) 12100 true vertical 7047 feet (true vertical) 6829 Casing Length Size MD TVD Burst Collapse CONDUCTOR 77 16 114 114 SURFACE 3220 9.625 3257 2377 INTERMEDIATE 12919 7 12953 7053 Perforation depth: Measured depth: 12850-12950 SCANNED JUL 1 0 2014 PIECE/ True Vertical Depth: 7048-7053 V ® JUN 13 2074 Tubing(size,grade,MD,and TVD) 4.5 x 3.5, L-80, 12159 MD,6856 TVD A®G Packers&SSSV(type,MD,and TVD) PACKER-BAKER PREMIER PACKER @ 12100 MD and 6829 TVD �Sr SSSV-CAMCO TRMAXX-5E SSSV @ 2243 MD and 1869 TVD 12.Stimulation or cement squeeze summary: Intervals treated(measured): no stimulation or cement squeeze during this operation Treatment descriptions including volumes used and final pressure: ' 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation shut-in Subsequent to operation 83 1487 826 - 206 14.Attachments 15.Well Class after work: Copies of Logs and Surveys run Exploratory r Development [✓ Service r Stratigraphic r 16.Well Status after work: Oil r' Gas r WDSPL r Daily Report of Well Operations XXX GSTOR r WIND r WAG r GINJ r SUSP r SPLUG r 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 314-180 Contact Mick Davasher(a,265-6870 Email Mick.J.Davasher(cilconocophillips.com Printed Name Mick Davasher Title Sr. Wells Engineer Signature Phone:265-6870 Date p � �Z-( 2O iLf v,F 01�� RBCMS JUN 13 20141" 6/r/� Form 10-404 Revised 10/2012 Submit Original Only CD2-01 WELL WORK SUMMARY DATE SUMMARY 4/12/2013 RIH WITH MOTOR AND MILL, ENCOUNTER FIRST MOTOR WORK AT 10900', WORKED DOWN TO 12200' CTMD, AT 12050' CTMD WHP DROPPED FROM 1200 PSI TO 50 PSI, F/P TBG WHILE POOH, JOB IN PROGRESS 4/13/2013 RIH TO PERFORM N2 FCO, TAGGED UP AT 12929' CTMD, MUTLIPLE ATTEMPTS WHILE PUMPING, NOT PUMPING, PUMPING DN THE BACKSIDE UNSUCCESSFUL, INJECTIVITY TEST TOOK 1.5 BBLS TO INCREASE WHP FROM 300 PSI TO 2000 PSI, F/P TBG WHILE POOH, JOB COMPLETE 5/3/2013 TAGGED AT A DEPTH OF 12,119'. ACTIVATED TRACTORED MILL BIT AND REACHED THE NIPPLE AT 12, 147'. 4/3/2014 DRIFT WITH 41' OF RIGID TS INCLUDING 2.64" CENT & 10' X 2.5" BAILER TO 12,626' SLM & STALL OUT IN DEVIATION, NO ISSUES ENCOUNTERED, READY FOR E-LINE 4/4/2014 PUMPED 8BBLS CRUDE DOWN TUBING. ESTABLISHED INJECTIVITY RATE OF 0.4BBLS/MIN @ 2450PS1. JOB COMPLETE. 4/5/2014 ATTEMPTED TO DRIFT TO 12,950' WITH TRACTOR AND 20' PERFORATING GUN. UNABLE TO TRACTOR PAST 12,740'. 5/10/2014 ATTEMPTED TO PERFORM FCO, AT 9063' CTMD CIRC PRESSURE INCREASED. PULLED UP HOLE TO 7494' CTMD AND STUCK COIL. WORKED COIL FREE AND POOH TO SURFACE LAYING IN FREEZE PROTECT. CHANGED PACK OFFS. JOB IN PROGRESS. 5/11/2014 STANDBY FOR LRS TO HEAT FLUIDS. LRS DOWN FOR MECHANICAL REPAIR. 5/12/2014 PERFORMED FCO TO 13,000.2' CTMD USING SEAWATER AND FLOVIZ SWEEPS. MAINTAINED 1:1 RETURNS THROUGHOUT CLEANOUT. FREEZE PROTECTED WELL TO 2000' TVD. IN PROGRESS. 5/13/2014 ATTEMPTED TO PERFORATE INTERVAL AT 12950' TO 12900' MD. GEAR LUBE PUMP FAILED AFTER MAKING UP TOOLS. UNABLE TO RIH WITHOUT PUMP. REAPAIRED PUMP. RESTART IN MORNING. 5/14/2014 PERFORATED INTERVAL FROM 12950'TO 12,930' MD USING 2.5" MILLENIUM II, 6 SPF, 60 DEGREE PHASING PERFORATING GUN. FREEZE PROTECTED WELL. PERFORMED WEEKLY BOPE TEST. JOB IN PROGRESS. 5/15/2014 PERFORATED USING MILLENIUM II 6 SPF 60 DEGREE PHASING 20' GUNS FROM 12,930' MD TO 12,890' MD. FREEZE PROTECTED WELL. JOB IN PROGRESS. 5/16/2014 PERFORATE USING HES TCP 2.5" OD X 20 FT, MILLENIUM II, 6 SPF, 60 DEG PHASE. PERFORATE INTERVALS FROM 12890' CTMD TO 12870' CTMD AND 12870' CTMD TO 12850' CTMD. DEPTHS WERE CORRECTED TO THE XN NIPPLE AT 12147' RKB. WNS PROD CD2-01 ConocoPhillips tWell Attributes Max Angle&MD TD Alaska,Inc. Wellbore API/UWI Field Name Wellbore Status Incl(') MD(ftKB) Act Btm(ftKB) r�nocoFtmupc 501032051400 ALPINE PROD 93.78 17218.21 17,513.0 ••• Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) -Rig Release Date CD2-01,5/27201410:30:03 AM SSSV:TRDP Last WO: 43.86 9/16/2005 Venal schematic/actuary Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag:SLM 12740.0 4/5/2014 Rev Reason:Perforations lehallf 5/27/2014 HANGER;326 Casing Strings Casing Description OD(In) ID(In) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread CONDUCTOR 16 15.062 37.0 114.0 114.0 62.50 H-40 WELDED IA Kiir Casing Description OD(in) ID(In) Top(ftKB) Set Depth(ORB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread SURFACE 95/8 8.835 36.7 3,256.6 2,377.3 40.00 L-80 BTC Casing Description OD(in) ID(In) Top(ORB) Set Depth MEI) Set Depth(TVD)...Wt/Len(I...Grade Top Thread INTERMEDIATE 7 6.276 34.5 12,953.2 7,0532 26.00 L-80 BTCM Casing Description OD(In) ID(In) Top(ORB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(L..Grade Top Thread OPEN HOLE 618 12,953.0 17,513.0 Tubing Strings Tubing Description String Ma...ID(in) Top MB) Set Depth(ft...'Set Depth(TVD)(...Wt(lb/ft) Grade Top Connection Favogypeenywympeop4ft TUBING 312 2.992 32.6 12,159.5 6,856.1 9.30 L-80 EUE-MOD 1lD6121(yai 4.5x3.5�a 123' CONDUCTOR;37.0114.0 Completion Details Nominal ID Top(ftKB) Top(TVD)(ftKB) Top Inc)(') Item Des Com (in) 7 32.6 32.6 0.10 HANGER FMC TUBING HANGER 4.500 �( 123.1 123.1 0.25 XO Reducing TUBING CROSS-OVER 4.5"x3.5" 3.500 2,242.9 1,869.4 57.03 SAFETY VLV CAMCO TRMAXX-5E SSSV 2.812 12,016.5 6,791.4 62.90 SLEEVE BAKER CMD SLIDING SLEEVE w/2.813'X'PROFILE 2.813 SAFETY VLV;2,2428 - -® 12,099.9 6,829.3 63.13 PACKER BAKER PREMIER PACKER 2.870 !� 12,147.4 6,850.7 6324 NIPPLE HOWCO XN NIPPLE 2.81"PROFILE w/2.75"NO GO 2.750 12,159.0 6,855.9 63.26 WLEG WIRELINE GUIDE 3.000 Perforations&Slots Shot Dens Top(TVD) Btm(TW) (shots/f Top(ftKB) atm(ftKB) (race) (ftKB) Zone Date t) Type Com 12,8Ad.0 12,930.0 7,047.9 7,052.3 5/15/2014 6.0 APERF 6 SPF 60 DEG PHASING SURFACE;36.6.3,28.6- 12,850.0 12,890.0 7,048.6 7,050.6 5/16/2014 6.0 APERF 6 SPF 60 DEG PHASING 12,930.0 12,950.0 7,052.3 7,053.0 5/14/2014 6.0 (PERF 6 SPF 60 DEG GAS UFT;5,439.5 t G PHASING C Mandrel Inserts st a6 on Top(TVD) VaNe Latch Port Size TRO Run N Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Com { 5,439.5 3,476.0 CAMCO KBMG 1 GAS LIFT DMY BK 0.000 0.0 5/25/2007 11:30 2 9,886.5 5,716.2 CAMCO KBMG 1 GAS LIFT GLV BK 0.188 1,885.0 5/25/2007 10:00 GAS LIFT;9,6865 3 11,929.5 6,752.2 CAMCO KBMG 1 GAS LIFT OV BK 0.250 0.0 9/1/2007 5:30 Notes:General&Safety End Date Annotation 9/16/2005 NOTE:SIDETRACKED WELLBORE RETAINED CD2-01,API#501032051400,14700-17513' 9/16/2005 NOTE:See Letter&Permit,dated Sept.1,2005&Sept.8,2005,respectively 9/162005 NOTE:ORIGINAL WELLBORE PLUGGED BACK(CD2-0IPBI,API#501032051470)12953'-14835' GAS UFT,11,529 5 8242010 NOTE:VIEW SCHEMATIC w/A)aska Schematic9.0 SLEEVE;12,016.5 1 PACKER;12.099.9 41 ( NIPPLE;12,147.4 I WLEG;12,155.0 I APERF;12,850.0.12,090.0 APERF;12.8900-12.930.0-- -.. ~ ~ IPERF;12,930.0-12,960.0 INTERMEDIATE;34.512,953.2-�. OPEN HOLE;12,953.0-17513.0 .•e • � �\�\11���4- `fid illk. y AT i L � '.. ✓moi_ c y 5_, — 333 Wesi Seventh Avenue ':„: (;O ERNOR SEAN PARNEI_1_ Anchorage, AiasKa 99501 3572 VI - , Mon 907.970 1433 ;;*"� 90/ 77/.7547 Mr. Patrick Amole '� Graduate Engineer r( ConocoPhillips Alaska, Inc. Y 1 1 3 P.O. Box 100360 - -- Anchorage Alaska, 99510-0360 Re: Colville River Unit, Alpine River Field, CD2-01 Sundry Number: 314-200 Dear Mr. Amole: Enclosed is the approved application for sundry approval relating to annular disposal of drilling wastes in the above-referenced well. Please note that any disposal into the surface/production casing annulus of a well approved for annular disposal must comply with the requirements and limitations of 20 AAC 25.080. As provided in 20 AAC 25.080 (d) (1), after review of the information provided to demonstrate that compliance with the 35,000 barrel limitation is imprudent, the commission has determined to authorize disposal of drilling waste in a volume of not greater than 70,000 barrels through the annular space of CD3-320. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, r77Le ,`/e"--- Cathy P. Foerster Chair DATED this /l;day of April, 2014 STATE OF ALASKA E EIV ED AL._..A OIL AND GAS CONSERVATION COMML .ON APR 0 1 2014 • APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280OCC 1.Type of Request: Abandon r Plug for Redrill r Perforate New Pool r Repair w ell r Change A r d ogram r Suspend r Rug Perforations r R,L Perforate r Pull Tubing r Time Extension r Operational Shutdown r Re-enter Susp.Well r -tr46rvrCStimulate F`, Alter casing r Other: r- 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: r F . ConocoPhillips Alaska, Inc. Exploratory r Development 205-118 ' 3.Address: Stratigraphic r Service r 6.API Number: P.O. Box 100360,Anchorage,Alaska 99510 50-103-20514-00 ' 7.If perforating, 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require spacing exception? Yes r No F CD2-01 • 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL 380075,380096,25530 , Colville River Field/Alpine Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 17513 7047 17513' 7047' none none Casing Length Size MD TVD Burst Collapse CONDUCTOR 77 16 114' 114' SURFACE 3220 9.625 3257' 2377' INTERMEDIATE 12919 7 12953' 7053' Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): open hole completion 12953-17513 ' 7053-7047' 4.5 x 3.5 L-80 12159 Packers and SSSV Type: Packers and SSSV MD(ft)and ND(ft) PACKER-BAKER PREMIER PACKER MD=12100 TVD=6829 ' SSSV-CAMCO TRMAXX-5E SSSV MD=2243 TVD=1869 • 12.Attachments: Description Summary of Proposal F.• 13. Well Class after proposed work: Detailed Operations Program r BOP Sketch r Exploratory r Stratigraphic E Development F'- Service r 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: 4/14/2014 Oil F. Gas r WDSPL r Suspended r 16.Verbal Approval: Date: WINJ r- GINJ r WAG r Abandoned r Commission Representative: GSTOR r SPLUG r 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Patrick Amole @ 265-6219 Email: Patrick.Amole0,conocophillips.com Printed Name tric. Amole Title: Graduate Engineer Signature /,i! Phone:265-6219 DateG j�2-; /261 v Commission Use Only Sundry Number: Conditions of approval: Notify Commission so that a representative may witness 3 k'-2C)U Plug Integrity r BOP Test r Mechanical Integrity Test r Location Clearance r Other: RBDM,zip MAY (19 2014 Spacing Exception Required? Yes ❑ No d Subsequent Form Required: /0 — 4 p 4 APPROVED BY ,�(( / Approved by: COMMISSIONER THE COMMISSION Date: `�''I I (/ pp a IQ�I V II t r 2 months trom he date of approval. Form 10-403(Revise 10/2012) V V 1 H � l�I� Submit Form and Attachments in Duplicate Ai-O= $lz /I JIC ‘c0r 5 Lilttlly CD2 — 01 Sundry Application Alpine well CD2-01 was drilled and completed in September 2005 as horizontal producer targeting the Alpine C-sand formation. It is constructed with 6 1/8" open hole completion from 12953' to 17513' MD, and 3-1/2" 9.3# L-80 tubing from surface to 12159'MD. It has not been fractured to date. The well will be fracture-stimulated placing approximately 302k# 16/20 CarboLite in six 0-7-PPA stages at 20-bpm. Proposed Procedure: Schlumberger Pumping Services: 1. Conduct Safety Meeting and Identify Hazards. Inspect Wellhead and Pad Condition to identify any pre existing conditions. 2. Ensure all Pre-frac Well work has been completed and confirm the tubing and annulus are filled with a freeze protect fluid to 2,000' TVD. 3. Ensure the 10-403 Sundry has been reviewed and approved by the AOGCC. 4. MIRU 6 clean insulated Frac tanks, with a berm surrounding the tanks that can hold a single tank volume plus 10%. Load tanks with 100° F seawater(approx. 2370 bbls are required for the treatment with breakdown, maximum pad, and 450 bbls usable volume per tank). 5. Ensure lift plan is reviewed and signed prior to RU of Frac equipment requiring lifts. 6. MIRU Stinger Tree Saver Equipment and SLB Frac Equipment. 7. PT Surface lines to 9,000 psi using a Pressure test fluid. ✓ 8. Test IA Pop off system to ensure lines are clear and all components are functioning properly. 9. Pump the 180 bbl breakdown stage (linear gel) according to the attached excel SLB pump schedule. Bring pumps up to maximum rate of 20 BPM as quick as possible, ,/ pressure permitting. Slowly increase annulus (IA) pressure from 2,500 psi to 3,500 psi as the tubing pressures up. Ensure sufficient volume is pumped to load the well with Frac fluid, prior to shut down. 10. Perform a hard shut down, Obtain ISIP and fluid efficiency estimates. 11. Pump the Frac job by following schedule @ 20 bpm with a maximum expected treating pressure of 6200 psi. Stage 1 • 600 bbl Schlumberger fluid Pad • 240 bbl Schlumberger fluid w/2 PPA • 440 bbl Schlumberger fluid w/4 PPA • 230 bbl Schlumberger fluid w/4 PPA • 800 bbl Schlumberger fluid w/7 PPA • Flush with 135 bbl of linear fluid and freeze protect • Total Sand: Approx. 301,500-lb of 16/20 CarboLite Proppant 12. Monitor the surface pressure fall-off at the end of the job for 30 minutes, if the well does not screen out. 13. RDMO SLB Equipment. Freeze Protect the tubing and wellhead if not able to complete following the flush. 14. Well is ready for Post Frac well prep for flowback (Slickline and possibly CTU). Cement Evaluation of CD2-01 and wells within 1/4 mile of CD2-01 CD2-01: 7" Casing cement job was pumped on 9/6/2005 as designed, indicating competent cement operations. The cement pumped was 15.8 ppg Class G cement, displaced by 9.8 ppg mud. The plug was bumped @ 1,100 psi and floats held. CD1-30: 7" Casing cement job was pumped on 9/26/2000 as designed, indicating competent cement operations. The cement pumped was 15.8 ppg Class G cement, displaced by 9.6 ppg mud. The floats held. CD1-31: 7" Casing cement job was pumped on 9/8/2000 as designed, indicating competent cement operations. The cement pumped was 15.8 ppg Class G cement, displaced by 9.8 ppg mud. The floats held. CD2-08: 7" Casing cement job was pumped on 1/30/2003 as designed, indicating competent cement operations. The cement pumped was 15.8 ppg Class G cement, displaced by 9.9 LSND ppg mud. The plug was bumped @ 1,300 psi and floats held. Full returns maintained throughout the job. Summary Based on engineering evaluation of the wells referenced in this application, ConocoPhillips has determined that this well can be successfully fractured within its design limits. It has also been determined that the frac will not adversely affect wells within a % mile radius or other nearby well. • • c o ck ¢ k3»»> d 2 O E •a a ` ov,tiaZZZZZ .a �W 0. 2 to aaaa ca Ga Qb, 2¢ Eamm - m(3z ¢ e > a RW z . 0, 3ooc.) yZaoo >.sscnava0=___¢¢ Q LL.uZZOWc a � O fn Z rn `m� Dm + • • • . . . . . . . • • . » m . ' e ULU Z o U • U • N • LL E M r• N <7.• Z� U1 p U� 0...•••• N Urrr r' O ..'d . U U•,• ' , r • M IU U• N M .0 •r,. mf • • U• 4 O ti CV • C7:1 a c:, °� Q Lc) • .m teo z v ' . �*,cs1 a m `.. ... �. `. • tUOVV .. 0 Vim. 0•• ;•w•.'••r:;�� Qi• •.•...... CO U CO ~• .to r' a. ♦... . N o '�••... N•� •. • Stimulation Surface Rig-Up Bead TaleT Tattle 11011 1ro1 001 1 ((( r i 11 • 11 • Minimum pressure rating on all surface treating lines 10,000 psi • Main treating line PRV is set to 95%of max 011111011 treating pressure • IA parallel PRV set to 3500 psi • Frac pump trip pressure setting are staggered and g 0 004 set below main treating line PRV • Tree saver used on all fracs rated for 15,000 psi. tl 1:1/11 .., OV1►♦ i Y I x1 dwnd U Pop-Off Tank Pop-0If Tank ( Pump Truck PE 104 Frac Pump {'s.1 D84-- — J -fV'i- Frac Pump Frac Pump — — --� Frac Pump • Frac Pump --1:91-*j- Frac Pump I • Stimulation Tree Saver OPEN POSITION CLOSED POSITION (PRIOR TO MANDREL INSERTION) (MANDREL INSERTED) FRAC IRON /coNNEcraN Dr- itl, i i -,' TT _,REMOTEOPERATED „., MASTER VALVE ___ I *Al +r$ ! A%�st Alt# , MANUAL OPERATED $Or lD..1f..... MASTER VALVE fir.+ inlie 1111111111•111111111111111 011111M11•1110111111010 ( Off? • 0,07.47 allIZIM r/ Stinger I I 1I MANDREL �J CLL __,/) -c===r► . I - N. VENT •..:0I.4--VALVE _ OPEN ItiL /rklk %1///. /,,,y: N ���_ ELOWTEEANO � 1i `r '+� �� VENT VALVE WELLHEAD `t } Sl w►�li11' VALVES %/gle /. OPEN l h li t4 n 4''",,,,t. }.da, 1. �, 'F, ill ". ` WELLHEAD VALVES It CLOSED 1,,,,,,..� `C r, .... ,„„:„..ti '. OUAD PACKOEF MI ASSEMBLY IN 'I .r d L. 'NI PLACE IN TUBING I0 ,I*z f- •1 'd 147 TUBING a i lea • The universal tool is rated for 15,000 psi and has 84" of stroke. • Tool ID 2.25" down 4 %2 tubing and 1.75" down 3 '/2 tubing. • Max rate with 2.25"mandrel is 60 bpm and with 1.75"mandrel 36 bpm • WNS PROD CD2-01 - COnOCoPhiflip5 •Wats Well Attributes Max Angle&MD TD Wellbore APIIUWI Field Name Wellbore Status Incl(°) MD(ftKB) Act Btm(ftKB) . Alaska.InC• �r ,;,F, 501032051400 ALPINE PROD 93.78 17,218.21 17513.0 Comment H2S(ppm) Date Annotation End Date KB-Grd(R) Rig Release Date --• Well Unita.-CD2-01,9/620132:10:25PM SSSV:TRDP Last WO: 43.86 9/16/2005 Schematic-Actual Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag: Rev Reason:DRILLING DEPTHS/DATES osbod 9/6/2013 Casing Strings HANGER,33-- Casing Description String 0... String ID...Top(ftKB) Set Depth(f...Set Depth(TVD)...String Wt...String...String Top Thrd CONDUCTOR 16 15.062 37.0 114.0 114.0 62.50 H-40 WELDED - Casing Description String 0... String ID...Top(ftKB) Set Depth(f...Set Depth(TVD)...String WE..String...String Top Thrd SURFACE i 5/8 8.835ID 36.7 3,256.6 2,377.3pt40.00 L-80 BTC Casing Description String 0... String ID...Top(ftKB) Set Depth(f...Set Depth(ND)...String Wt...String...String Top Thrd INTERMEDIATE 7 6.276 34.5 12,953.2 7,053.1 26.00 L-80 BTCM --- Casing Description String 0... String ID...Top(ftKB) Set Depth(f...Set Depth ITVD)...String Wt...String...String Top Thrd OPEN HOLE 6 1/8 12,953.0 17,513.0 Tubing Strings • I Tubing Description String 0... String ID...Top(ftKB) Set Depth(f...Set Depth(TVD)...String WE..String...String Top Thrd TUBING 31/2 2.992 32.6 12,159.5 6,855.2 9.30 L-80 EUE-MOD 4.5x3.5@123' Completion Details Top Depth CONDUCTOR, (TVD) Top incl Noml... 37-114 Top(ftKB) IRKS) Ii Item Description Comment ID(In) 32.6 32.6 0.25 HANGER FMC TUBING HANGER 4.500 I� 123.1 123.1 0.25 XO Reducing TUBING CROSS-OVER 4.5"x3.5" 3.500 I2,242.9 1,869.4 57.07 SAFETY VLV CAMCO TRMAXX-5E SSSV 2.812 12,016.5 6,791.4 62.90 SLEEVE BAKER CMD SLIDING SLEEVE w2.183'X'PROFILE 2.750 1 12,099.9 6,829.3 63.13 PACKER BAKER PREMIER PACKER 2.870 SAFETY VLV, Pi- 12,147.4 6,849.2 61.66 NIPPLE HOWCO XN NIPPLE 2.8r PROFILE w2.75"NO GO 2.750 2.243 illii IF 12,159.0 6,854.9 61.99 WLEG WIRELINE GUIDE 3.000 c Notes:General&Safety End Date Annotation 9/16/2005 NOTE:ORIGINAL WELLBORE PLUGGED BACK(CD2-01PBI,AP 1#501032051470)12953.-14835' 9/16/2005 NOTE:See Letter 8 Permit,dated Sept.1,2005 8 Sept.8,2005,respectively 9/16/2005 NOTE:SIDETRACKED WELLBORE RETAINED CD2-01,API#501032051400,14700-17513' 8/24/2010 NOTE:VIEW SCHEMATIC w/Alaska Schematic9.0 SURFACE,__ 37-3,257 I GAS LIFT, 5,439 GAS LIFT, 9.587 GAS LIFT, A r--:71 930 SLEEVE, 12,016 PACKER._ - 12.1170 NIPPLE,12,147 Mandrel Details Top Depth Top Port 5... (TVD) Incl OD Valve Latch Size TRO Run N...Top(ftKB) (RKB) ("I Make Model (in) Sery Type Type (in) (psi) Run Date Corn... WLEG.12.159 1 5,439.5 3,476.0 59.90 CAMCO KBMG 1 GAS LIFT DMY BK 0.000 0.0 5/25/2007 11:30 2 9,886.5 5,715.9 58.90 CAMCO KBMG 1 GAS LIFT GLV BK 0.188. 1,885.0 5/25/2007 10:00 3 11,929.5' 6,752.2 63.52 CAMCO KBMG 1 GAS LIFT OV BK 0.250 0.0 9/1/2007 5:30 NTERMEDIATE. 3412,953 OPEN HOLE, 12,95317,513 1111111 TD(CD2-01), 17,513 Ferguson, Victoria L (DOA) From: Hazen, Mike C <Michael.C.Hazen@conocophillips.com> Sent: Thursday,April 03, 2014 4:07 PM To: Ferguson,Victoria L(DOA) Cc: Amole, Patrick Z; Blakney, Robert G Subject: FW: CD2-01 Fracture Stimulation Victoria, Hard shut down refers to shutting down all pumps at the exact same time, from treating rate (in this case 20-bpm)to zero. We trend the pressure response from there as the formation naturally de-pressures and assume the frac discontinues to grow. From there we determine ISIP or instantaneous shut-in pressure. We also use frac design modeling software such as SLB's FracCADE, and others such as GOHFER, and StimPlan,to help interpret the data and analyze reservoir parameters such as closure pressure, fluid efficiency and leak off rate. With this data we may optimize the main frac treatment with respect to pad volume and/or proppant stage increases or decreases. I don't remember the calculations for fluid efficiency; I would need to look them up in a reference again, but the plots generated are generally the Nolte plot,the Nolte log-log, and then square-root of shut-in time plots. Let us know if you have any additional questions. Regards, Mike Mike Hazen Wells Engineer—ConocoPhillips Alaska, Inc. Office(907)265-1032;Mobile(907)268-9279; Home(907)868-3424;700 G Street,ATO-2048,Anchorage,AK 99501 "Our work is never so urgent or important that we cannot take the time to do it safely and in an environmentally prudent manner." From: Ferguson, Victoria L (DOA) [mailto:victoria.ferguson@alaska.gov] Sent: Wednesday, April 02, 2014 11:24 AM To: Amole, Patrick Z Subject: [EXTERNAL)CD2-01 Fracture Stimulation Patrick, Step 10 reads: Perform a hard shut down, Obtain ISIP and fluid efficiency estimates. Could you explain the procedure and calculations to determine fluid efficiency estimates. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 victoria.ferquson(a�alaska.gov 1 w \��%%•A 1 HE STATE f L e � O,` I' ti= ��/ !V`.. .C'''.�!E _ �% 1 t 333 West Seventh Avenue " - GOVERNOR SEAN � ARNELI.> Anchorage, Alaska 99501-3572 Main: 907 279 1433 pp AL A��ea ax: 9C'7.276 75,42 Mick Davasher 1 Q� Wells os tU Sr. Engineer a ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510 Re: Colville River Field, Alpine Oil Pool, CD2-01 Sundry Number: 314-180 Dear Mr. Davasher: %MINED J U L 2 2 2014 Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, •f/ Daniel T. Seamount, Jr. Commissioner DATED this Z day of March, 2014. Encl. • STATE OF ALASKA . AL k OIL AND GAS CONSERVATION COMMS )N e APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1.Type of Request: Abandon r Plug for Redrill r Perforate New Pool r Repair w ell r Change Approved Ftpgram r Suspend r Rug Perforations r Perforate r i Pull Tubing r Time Extension r Operational Shutdown r Re-enter Susp.Well r Stimulate r Alter casing r Other: 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Exploratory r Development F,7 + 205-118 • 3.Address: 6.API Number: Stratigraphic r Service r P.O. Box 100360,Anchorage,Alaska 99510 50-103-20514-00 I 7.If perforating, 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require spacing exception? Yes r No Fi , CD2-01 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL 380075,380096,25530 ` Colville River Field/Alpine Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 17513 - 7047 - 17513' - 7047' none none Casing Length Size MD TVD Burst Collapse CONDUCTOR 77 16 114' 114' SURFACE 3220 9.625 3257' 2377' INTERMEDIATE 12919 7 12953' 7053' Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): open hole completion 12953-17513 - 7053-7047' 4.5 x 3.5 L-80 12159 Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft) PACKER-BAKER PREMIER PACKER MD=12100 TVD=6829 SSSV-CAMCO TRMAXX-5E SSSV MD=2243 TVD=1869 . 12.Attachments: Description Surrrnary of Proposal P.4 13. Well Class after proposed work: Detailed Operations Program r BOP Sketch r Exploratory r Stratigraphic r Development P. Service r 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: 3/25/2043444wes4 Oil P. 4 Gas r WDSPL r Suspended r • 16.Verbal Approval: Date: WINJ r- GINJ r WAG r Abandoned r Commission Representative: GSTOR r SPLUG r 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Mick Davasher @ 265-6870 Email: Mick.J.DavasherAconocophillips.com Printed Name Mick Davashe Title: Sr. Wells Engineer Signature OA / ----- Phone:265-6870 Date 3 fQ/Zr LI Commission Use Only Sundry Number: Conditions of approval: Notify Commission so that a representative may witness 3`"C V3 0 Plug Integrity r BOP Test r Mechanical Integrity Test r Location Clearance r Other: RBDMSS MAY 10 2014 Spacing Exception Required? Yes 0 No Subsequent Form Required: _.,F.1, 4 APPROVED BY 3Z.S j /� J Approved by: % COMMISSIONER THE COMMISSION Date: A6proved application is valid for 12 months trom th to of approval. Form 10-403(Revised 10/2012) ''`" 32d6P/ Submit Form and Attachments in Duplicate kir3/Z5 i + ORIGINAL1097:241),c, Jic cob' cPr Si - ri {' ConocoPhillips Alaska ,;4 ' P.O. BOX 100360 ANCHORAGE,ALASKA 99510-0360 10th March 2014 State of Alaska Alaska Oil &Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Re: Sundry Permit—Request to perforate Dear Sir/Madam: ConocoPhillips Alaska, Inc. hereby applies for an Application for Sundry Approval to perforate the 7" intermediate casing. The 7" intermediate casing penetrates the Alpine C from 12850' to 12950' MDRT. This is the interval to be perforated. Please find attached existing downhole diagram, proposed downhole diagram and a wellpath diagram showing casing shoe location in relation to the reservoir. If you have any questions or require any further information, please contact me at 265-6870. Sincerely, Mick D asher Wells ngineer CPAI Drilling and Wells f 1 , ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE,ALASKA 99510-0360 Existing Well Diagram vacs PROD CD2-01 ConocoPhillips well Attributes ,.. a taxa aro TD._ :,.--.14,.0 ,,3,F 171,1 m 1',11.; lwx S:I 17.513:' .., t. �s .ww s I[r.1 lien l''..-1•,i71,6' .S.ietil' Re P.I..W bI. •T':_T .at': 54•,Pn 6.16:;31 <w..4 4.4,. 1.;rxm twcn. .al Tu I. Tu.4444,_LFI LINGt€PTHS,a4TF 3 r_.....,...- I-0543013 Casino Strings ....cm rJ - .l.... wN ID-1 0.100 .J.g4eON ..SE. .00..lmqL.WS.M.1• ...Tcyl.G r7:33,5.437.7:,, 51IS Y:1 37: 1.4: 1,11 Si.Y 344,3 V.ELLEJ 7U371:•�. 1•. :_f.. !! !! F-FVC 4'..i 6.513 Completion Details 11.10.012.1 '7,,,r l 9'•to Tx ms,a, Ms3,I l�Mtn c..vp+a ,..., 0I. 'rash 325 J SN LE- 5VC'..6/.Cw.Nzn .000 �e1.•,..' 3.t 45.1.14,,,, 44,74 L,4•J35L'.FR 4,530 33 4 SOO 0 1,fiED.4 5. L4 _44C,73 .MW-`r YSYV 2E'. 31 0 0.0 .,75.4 6.i510.E S333,374.,71337.5,15.,13C,SLEEVE•4t:1334•F5CFIIF 2755 •: TA.3 6,920.'s 9'613 04C0E3 044=P 5FEVIEA 0521,44P 2003 ..liTr.al. 1.i 1 c 5,810: E130.o:Fr.E -C61\.0 4.1 WIRE 2 Sr?FUFLE 4,t,73,31I3 wC 2.."544* 2.10.x ■ '.1!r,.0 <.Kf 0 hi:0 W.P.. NI+F..I.F LIU._E 3600 Notes:General&Safety 6 6.60• 1,350.04..1.654EL3.0.0E Fa'4'sD 36Cr 6x54 al,,E,.4P05:•:i:034?3,1:,,3.•4033 I 8•a_XS hCTE.5.13.4,3.7ret e w 5.yl..3554 FE JAS n.rwraww 1.6013 )4 FE E,LETr,&E.0111.LBCFE NE:NEED L.:01,40iii'01.20514 O'470:L175413 LR.t2 I 0:43310 NOTE.,EVE .8EMATIC..41r.5,...1.34.9 0 3J 1 n Gt.Aft 3 G. i .1 LET 1H-r . NI :Q IMI ena,aen Let Mandrel Detais vote tEet F... Iwo Itle, 1• It 5, w43): 34760 5,J . .:.Lilt,_.nE:V: 1 U. I � ..I.FT GMT an MK 12 'S OCa; 001253::7 •.1.35 5,416i1 5,7,50 S5.YsCMV,_4.5.64317. 11„45 I FT 060 34. 5*M l$05 v253)0: '6.00 3 t1,4205 9,751 53.42 C.3,1/CC 60140 10.451.FT tri 3t. 329: 001LOW 430 I Y•) a. SffiNE] Y • ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE,ALASKA 99510-0360 Proposed Perforation Location WNS PROD CD2-01 ConocoPhillips I 1Weit em+outes Max) •a aro TO 17.51)t ,..•••••••0••• SS1Y TFCF• .ao �.,floor? T•q .-r .«..... • ......, a.. r.'Fr'w':e•Tt ...��.... a0.0011 '''^*��� aa�ne senna. _ uMOI n— q� O�IM— X90._ feI1 Tee Mei_ sem'. N[Mph44.0 r- : wt_.Y1-Y**ILM1s J Us.=}'i I IS 10 3'u 1410 Ieto Y1E1LlL SUF1f•.�AOs 14•m0_ 1m•mN_i.1 Y 19 e..N 13771q_i+4: 1.46 �•9TAT.F SNFfkF 95e Fm1c. 3E' 729.3 21771 1.'b3 ,.7 b'C 11111Z 111. T'.-•4..•••••• Mm 0. w•q A.1vema sr c.o. _M 04001110,_ .•.\.1..4r••_••o.for 1M 1.1,10441%..71 •1'F- 141 -r.1; 7,0%11 20 00 4x1 KC. ;...-.4wwr•r I..o 4.44 o q'own I•woo.S.140.1164,Immo we 1•••m >••••1 rN14•4 ���\m•i:F f•4 1;.'/1, Tuode�smapl . TOW: 3 a3�fa Ca�pmpWga DeW 11:.31 .t,.,-Am...:• .13.•_ •!.3145 4,74.4 6 62 S.Ff-.4 'hu' ,:wob C•_t FF.F..r- 11;:i 12,7419 &C93 SI 1fP411F, 6. 464 F-.44662 WM v I 1..N;4 4.034: 41196.4P,E rN..G>_1.1. tr,•• .r fJ0 NJJII .c-F.. .. .. :.4- -.474 t ASE. n•-7;-NF�' F 3.•4 ¢•F1 a ssl4K •...... :'i:Y,.:-e.3.nvt:•'ld n,.:.J:.•3,•:1..LI•P.uY•.:�L,=�fa�.,�-r-r u�- • =,..6.•6.'..-•L Js:s•.•T L.•.i vµ w ...t. s,3�•s_FF.1 h1:F 77'A1.-_-.:.1,{r'I1*'..TJ,13.ti'4:..617,1 A •• yF.Fn i:1.Ee.3',*'.......-..r... ■ 1111 I New Perforations- - ■ Interval from 12,850'-12,950'MDRT ■ bir■ '•' 00 l-. M tee••• 04. ska our. /0.1 is�• `I ~,3:v .i.v.•:.3...3.11_..YMt ^I.l:e. 211~ 8 +6A IIO 5.,./DC-7 !t.. 6.6366 5 !S6 St J1l_�kEUG 1CAE •. u4 5A a1Y'AMU S2S7. W0.• 7 tr 9:y' 0:752:6157- 'ti 3bYG I F" 76 b. 32S: 00'67200) Sb 'C..C11„; .a .s, ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE,ALASKA 99510-0360 As J :' Casing Shoe @ 12,950' RKB . r 1 J •1 , , . IT" . !....—.. I j 1— ! A•LPIN"E" C San �T ., — — ; 11C— i )* ....11...oft.. .... a lid 1 4441",t.4 i i N n r 4J N tl b 0t.11Mo{ . y_7 a r,„,,„,I,,1fIIIII►,,, II II,,II,I,,,,,,,,!,„,,,,„ ,,„,i, r�,��t �f�f,�� n .1 .n g n O n n %+ .n .n n c r, o r i n rF.. n A A A R n n & n 4 n n 7, 4 , h n r n 1 1 OF Tjv ww�� \ \I%4 sA THE STATE Al Oil and Gas of l 1L1 1s Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue , h. O p Anchorage, Alaska 99501 -3572 ALAS Main: 907.279.1433 SCANNED APR ° 8 2D Fax: 907.276.7542 Robert Blakney f � Completions Engineer ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510 Re: Colville River Field, Alpine Oil Pool, CD2 -01 Sundry Number: 313 -154 Dear Mr. Blakney: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, /24 .6„,,,, - Cathy P. oerster Chair DATED this 5 day of April, 2013. Encl. 11 t. S STATE OF ALASKA 41‘ 4, 5U3 i)(/ A•KA OIL AND GAS CONSERVATION COMSION APPLICATION FOR SUNDRY APPROVALS e 20 AAC 25.280 AOGCC Type of Request: Abandon I — Plug for Redrill j" Perforate New Pool r Repair w ell f - Change Approved Program 1..._ Suspend j Plug Perforations P Tubing Time Extension V p 9 � Perforate (�` g (µ' Operational Shutdow n r Re -enter Susp. Well I- Stimulate g,i - Alter casing f — Other: t' - 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development s--,•• . Exploratory r 205 - 118 3. Address: Stratigraphic [ Service j— 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50 - 103 - 2051400 7. If perforating, What 8. Well Name and Number. Regulation or Conservation Order govems well spacing in this pool? Will planned perforations require spacing exception? Yes 1 — No f++ CD2 - 01 9. Property Designation (Lease Number): , 10. Field /Pool(s): ADL 380075, 380096, 25530 Colville River Field / Alpine Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): V 17513 7047 - 17513' 7047' none • none _ Casing Length Size MD TVD Burst Collapse CONDUCTOR 77 16 114' 114' SURFACE 3220 9.625 3257' 2377' PRODUCTION 12919 7 12953' 7053' Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): - open hole 12953' 17513' 7053 4.5 x 3.5 _ L - 80 12159 Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft) PACKER - BAKER PREMIER PACKER ' MD= 12100 TVD= 6829 SSSV - CAMCO TRMAXX -5E SSSV ' MD =2243 TVD1869 12. Attachments: Description Summary of Roposal • ri 13. Well Class after proposed work: Detailed Operations Program r BOP Sketch r Exploratory E Stratigraphic F Development ;; , Service f 14. Estimated Date for Commencing Operations: 15. Well Status after proposed work: 4/10/2013 Oil 1� • Gas 1-" WDSPL r Suspended r 16. Verbal Approval: Date: VVINJ GINJ r" WAG I — Abandoned r Commission Representative: GSTOR 1 --- SPLUG 1-" 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Robert Blakney © 265 -6417 Email: Robert.G.Blaknev @conocophillips.com Printed Name r oe Blakne Title: Completions Engineer /13 Signature Phone: 265 -6417 Date / � g Commission Use Only 3-15 Sundry Number: Conditions of approval: Notify Commission so that a representative may witness Plug Integrity f- BOP Test 1 — Mechanical Integrity Test r Location Clearance E I Other: '?BDAAS APR 0 8 2Oi3 Spacing Exception Required? Yes ❑ No d Subsequent Form Required: I d d 4- APPROVED BY Approved by: � , • • • • ap plication is vaRf� �r from th te lgOlAval. Date: t{ — ( 3 c 174-1 Submit Form and Attachments in Duplicate a ry l 4/ 5 1/ 3 ,M.„ ./i,,:," i\\'- z� WNS CD2 -01 • ConOCOPhilhipS Well Attributes Max Ankle` &'MD TD i Wellbore API /UWI Field Name Well Status Inc! (°) r.46 (ftKB) Act Btm (ftKB) � AIaSkB,IffC. `- ,� „ ps � = - s 501032051400 ALPINE PROD 93.78 17,218.21 17,513.0 Comment H2S (ppm) Data Annotation End Date KB-Ord (ft) Rig Release Date Well Confl9 - CD2 -07,1129 /20129'32:10 AM SSSV: TRDP Last WO: 43.86 9/16/2005 Schematic -Actual Annotation Depth (505) End Date Annotation Last Mod ... End Date Last Tag: Rev Reason: MANDREL LATCH ORIENTAION ninam 11/29/2012 Casing Strings Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd CONDUCTOR 16 15.062 37.0 114.0 114.0 62.50 H-40 WELDED HANGER, 33 Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd SURFACE 95/8 8.835 36.7 3,256.6 2,377.3 40.00 L-80 BTC Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String... String Top Thrd _ I pi. PRODUCTION 7 6.276 34.5 12,953.2 7,053.1 26.00 L-80 BTCM Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd OPEN HOLE 6 1/8 12,953.0 17,513.0 Tubing Strings Tubing Description String 0... String ID ... Top (ftKB) Set Depth (1... Set Depth (TVD) ... String Wt... String ... String Top Thrd TUBING 4.5x3.5 31/2 2.992 32.6 12,159.5 6,855.2 9.30 L -80 EUE -MOD I Completion Details Top Depth (TVD) Top Inc! Nomi... Top (ftKB) (ftKB) ( °) item Description Comment ID (In) 32.6 32.6 0.25 HANGER FMC TUBING HANGER 4.500 CONDUCTOR, 37 -114 123.1 123.1 0.25 XO Reducing TUBING CROSS -OVER 4.5x3.5 w 3.500 MK 2,242.9 1,869.4 57.07 SAFETY VLV CAMCO TRMAXX -5E SSSV 2.812 It 12,016.5 6,791.4 62.90 SLEEVE BAKER CMD SLIDING SLEEVE w/2.183 X' PROFILE 2.750 12,099.9 6,829.3 63.13 PACKER BAKER PREMIER PACKER 2.870 1. 12,147.4 6,849.2 61.66 NIPPLE HOWCO XN NIPPLE 2.81" PROFILE w12.75" NO GO 2.750 12,159.0 6,854.9 61.99 WLEG WIRELINEGUIDE 3.000 SAFE v22v _-- Notes: General & Safety End Date Annotation 9/16/2005 NOTE: ORIGINAL WELLBORE PLUGGED BACK (CD2- 01PBI, API #501032051470)12953' - 14835' a 9/16/2005 NOTE: See Letter & Permit, dated Sept. 1, 2005 & Sept. 8, 2005, respectively 9/16/2005 NOTE: SIDETRACKED WELLBORE RETAINED CD2 -01,API 8501032051400,14700-17513' 8/24/2010 NOTE: VIEW SCHEMATIC w /Alaska Schematic9.0 SUR FACE, , 37-3,257 1 GAS LIFT, 5,439 GAS LIFT, 9,887 1 1 GAS LIFT, 11,930 1 SLEEVE, 12,016 1 PACKER, l 12,100 1. NIPPLE,12,147 11 Mandrel Details Top Depth Top Port (TVD) Inc! OD Valve Latch Size TRO Run Stn Top (SKB) (ftKB) (°) Make Model (in) Sery Type Type (in) (psi) Run Date Com... WLEG, 12,159 1 5,439.5 3,476.0 59.90 CAMCO KBMG 1 GAS LIFT DMY BK 0.000 0.0 5/25/2007 11:30 2 9,886.5 5,715.9 58.90 CAMCO KBMG 1 GAS LIFT GLV BK 0.188 1,885.0 5/25/2007 10:00 3 11,929.5 6,752.2 63.52 CAMCO KBMG 1 GAS LIFT OV BK 0.250 0.0 9/1/2007 5:30 PRODUCTION, 34- 12,953 OPEN HOLE. 12,953 - 17,513 TD (C132 -01), 17,513 • • CD2 -01 Sundry Application CD2 -01 was completed in September of 2005 targeting the Alpine C formation. This well is an open hole style completion with 3.5" tubing. It has not been fractured to date. We intend to stimulate the Alpine C formation with a single stage treatment of the open hole section. If the stimulation is successful we intend to place -300,000#'s of 16/20 Carbolite and anticipate an increased production of 150 bpd in 2013. Proposed Procedure: Schlumberger Pumping Services: (Alpine C Frac) 1. Conduct Safety Meeting and Identify Hazards. Inspect Wellhead and Pad Condition to identify any pre existing conditions. 2. Ensure all Pre -frac Well work has been completed and confirm the tubing and annulus are filled with a freeze protect fluid to 2,000' TVD. 3. Ensure the 10 -403 Sundry has been reviewed and approved by the AOGCC. 4. MIRU 7 clean insulated Frac tanks, with a berm surrounding the tanks that can hold a single tank volume plus 10 %. Load tanks with 100° F seawater (approx. 4950 are required for the treatment with breakdown, maximum pad, and 450 bbls usable volume per tank). 5. Ensure lift plan is reviewed and signed prior to RU of Frac equipment requiring lifts. 6. MIRU Stinger Tree Saver Equipment and SLB Frac Equipment. 7. PT Surface lines to 8,000 psi using a Pressure test fluid. 8. Test IA Pop off system to ensure lines are clear and all components are functioning properly. 9. Pump the 300 bbl breakdown stage (25# linear gel, WF125) according to the attached excel SLB pump schedule. Bring pumps up to maximum rate of 40 BPM as quick as possible, pressure permitting. Slowly increase annulus pressure from 2,500 psi to 3,500 psi as the tubing pressures up. Ensure sufficient volume is pumped to load the well with Frac fluid, prior to shut down. 10. Perform a hard shut down, Obtain ISIP and fluid efficiency estimates. 11. Pump the Frac job by following schedule @ 40bpm with a maximum expected treating pressure of 3700 psi. Stage 1 • 600 bbls YF125ST Pad • 240 bbls YF125ST w/ 2 ppa 16/20 Carbolite • 480 bbls YF125ST w/ 4 ppa 16/20 Carbolite • 2400 bbls YF125ST w/ 4 ppa 16/20 Carbolite • 800 bbls YF125ST w/ 7 ppa 16/20 Carbolite • Flush with 150 bbls of linear fluid (WF125) and freeze protect • Total Sand: Approx. 300,000 lbs 16/20 Carbolite 12. Monitor the surface pressure fall -off at the end of the job for 30 minutes, if the well does not screen out. 13. RDMO SLB Equipment. Freeze Protect the tubing and wellhead if not able to complete following the flush. 14. Well is ready for Post Frac well prep for flowback (Slickline and possibly CTU). RB • • 15. Flowback will be initiated through Expro until the fluids clean up at which time it will be turned over to production. (initial flowback fluids to be taken to appropriate disposal well until they are clean enough for production.) Cement Evaluation of CD2 -01 and wells within' /4 mile of CD2 -01 CD2 - 01: 7" Casing cement job was pumped on 9/6/2005 as designed, indicating competent cement operations. The cement pumped was 15.8 ppg Class G cement, displaced by 9.8 ppg mud. The plug was bumped @ 1,100 psi and floats held. CD1 - 30: 7" Casing cement job was pumped on 9/26/2000 as designed, indicating competent cement operations. The cement pumped was 15.8 ppg Class G cement, displaced by 9.6 ppg mud. The floats held. CD1 - 31: 7" Casing cement job was pumped on 9/8/2000 as designed, indicating competent cement operations. The cement pumped was 15.8 ppg Class G cement, displaced by 9.8 ppg mud. The floats held. CD2 - 08: 7 Casing cement job was pumped on 1/30/2003 as designed, indicating 9 job p p g competent cement operations. The cement pumped was 15.8 ppg Class G cement, displaced by 9.9 LSND ppg mud. The plug was bumped @ 1,300 psi and floats held. Full returns throughout the job. Summary Based on engineering evaluation of the wells referenced in this application, ConocoPhillips has determined that this well can be successfully fractured within its design limits. It has also been determined that the frac will not adversely affect wells within a %4 mile radius or any other nearby well. RB • • Stimulation Surface Rig -Up z u. \ 11 \ . Bleed 1 Tattle Tale Tank 115011 11014 POO • 1:1 f• me • Minimum pressure rating on all surface treating lines 10,000 psi #a:1 1101 P • Main treating line PRV is set to 95% of max treating pressure • IA parallel PRV set to 3500 psi = t ► • Frac pump trip pressure setting are staggered and set below main treating line PRV • Tree saver used on all fracs rated for 15,000 psi. If i V a IS e 71 001111Y i Karu j duay , Pop-Off Tank 1 1 Di D Pump Truck Pop-00' Tank Iii •1001 4 ffi 4 Di 1 Frac Pump — --- P'+ Frac Pump L Rae Pum ,§? — 1'V Frac Pump Frac Pump n `�--- Frac Pump RB • • Stimulation Tree Saver OPEN POSITION CLOSED POSITION (PRIOR TO MANDREL INSERTION) (MANDREL INSERTED( Ai IRpN ,// CONNECT Ip• s r ♦ e �/ r • r f / I r i 1 r r r r r t �R£MO E OPERATED ,,T MASTER VALVE I 11 I► n� i j j * s* * ' MANUAL OPERATED I .r... ,,. MASTER VALVE , tttiii err, wwr 1/411 tri Stinger I ...," 0 MANDREL I . I III -...-.... i \ 1%.‘ . i* 1 .4-- ^ VALVE � = 11 J .7 OPEN I U / �5 ii t tk ohm. _ for, � � ; — � 1 ,' ° i z , \ FLOW TEE AND / F* f/ 7' VENT VALVE WELLHEAD xI It 3k id 1 41 VALVES Ili t „, # r // OPEN '` ,L, WELLHEAD " VALVES U1 Ir;, r . � t ° C _..„ LOSED . r. . � t: _ OUAD RACKOFF w , 4 tt. ASSEMBLY IN �s. ww CT PLACE IN TUBING + ` ► ` x ". TUBING ,, I �+ • The universal tool is rated for 15,000 psi and has 84" of stroke. • Tool ID 2.25" down 4 ' /2 tubing and 1.75" down 3 '/2 tubing. • Max rate with 2.25" mandrel is 60 bpm and with 1.75" mandrel 36 bpm RB • • CD2 -08 • CD2 -465 CD2 - 01 • CD2 -07: • • 4 CD2 -10 CD1 -47 • +CD2 -07PB2 CO. - 22B CD2 -10PB1 ALPINE 3 • • CD2 - 13 • • C 1- 22BPB1 CD2 -01 PB2 CD2 -01 PB1 CD2 -07PB1 CD2 -13PB2 CD1 -47PB1 Legend • CD1 D1 - CD2 -01 Open Hole Section • • 'cd2- 01v2$' Events CD1 -30 • CD1 -31 • x Well D2 463 CD1 - — Suspended • P + CD2 - 28: • Service • • 1 CD2 -13PB1 • Producer • Observation CD2 - 17R • CD2 - • Injection: SW 4 D1 732 Injection: SAPW • Injection: PW • Injection: MWAG , k131-21PB1 • ACTIVE, INJ, MG • • ACTIVE, INJ, IWAG • CD2 - CD1 -36 • ACTIVE, INJ, GAS • • CD1 -30PB1 • • ACTIVE. INJ, DG • • • ACTIVE, INJ, <Null> .00- 2 \CD1 -41 • ti` • Disposal r 3 1/4 Mile Radius ALPINE 1A Perforations • CD2 - .. p ConocoPhillips Operated Units CD1- up Nanuq Nanuq Participating Area C9 1 \ r, NPR -A boundary ... . _ ... _.. _. .t\ • obi-44 . .,.... t l • , , ConocoPhillips : \,? 2013 CD2 -01 ` " 3:. `_:'" ' ~ �, Fracture Locations CD2`18 :: � , ' r a: ^ 0 .°�.44111116. N CONFIDENTIAL *• - 0 .25 0.5 :.%"` "` '!32 a CD2 -34PB1 I Miles FreePro•ram2013.mul CSR 1 -10 -2013 • CD2-01 Alpine C Frac Model 1 stage stimulation • i 1 F rac Design Job Description Step Pump Fluid Name Step Fluid Gel Prop. Prop. • Name Rate Volume Conc. Type and Mesh Conc. (bbl /min) (gal) (lb/mgal) (PPA) Pad 20.0 YF125ST 25200 25.0 0.00 2.0 PPA 20.0 YF125ST 9269 25.0 CarboLite 16/20 2.00 4.0 PPA 20.0 YF125ST 17157 25.0 CarboLite 16/20 4.00 4.0 PPA 20.0 YF125ST 8578 25.0 CarboLite 16/20 4.00 7.0 PPA 20.0 YF125ST 25721 25.0 CarboLite 16/20 7.00 Flush 20.0 WF125 6079 25.0 0.00 Fluid Totals • 85,924 gal of YF125ST 6079 gal of WF125 Proppant Totals 301,500 lb of CarboLite 16/20 M odel Initial Fracture Top TVD 7046.0 ft Initial Fracture Bottom TVD 7110.0 ft Propped Fracture Half- Length 316.2 ft EOJ Hyd Height at Well 128.5 ft Average Propped Width 0.486 in • Disclaimer Notice: — This model was generated using vendor supplied modeling • software and is based on engineering estimates of reservoir properties. ConocoPhillips is providing these model results as an informed prediction of actual results. Because of the inherent limitations in assumptions required to generate this model, and for other reasons, actual results may differ from the model results. • 21572 WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. April 23, 2012 Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 SCANNED APR 0 8 2013 RE: Bottom Hole Pressure Survey: CD2 -01 Run Date: 4/19/2012 The technical data listed below is being submitted herewith. Please any problems or concerns to the attention of: Klinton Wood, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 CD2 -01 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50- 103 - 20514 -00 Bottom Hole Pressure Survey 1 Color Log 50 -103- 20514 -00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Klinton Wood 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907 - 273 -3527 Fax: 907 - 273 -3535 Klinton Wood @halliburton.com Date: Yt`t)/1 �- Signed: k , DATA SUBMITTAL COMPLIANCE REPORT 10/29/2007 Permit to Drill 2051180 Well Name/No. COLVILLE RIV UNIT CD2-01 MD 17513 TVD 7047 Completion Date 9/15/2005 REQUIRED INFORMATION Mud Log No Operator CONOCOPHILLIPS ALASKA INC API No. 50-103-20514-00-00 Completion Status 1-OIL Current Status 1-OIL UIC N Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: GR/Res Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name (data taken from Logs Portion of Master Well Data Maint Log Log Run Interval OH / Scale Media No Start Stop CH Received Comments D D Asc Directional Surrey 14688 17513 Open 10/26/2005 IIFR 'ED D Asc Directional Survey 0 14483 Open 10/26/2005 IIFR PB 1 ~D D Asc Directional Survey 4400 14825 Open 10/26/2005 IIFR PB 2 `jED ED I D D Asc Directional Survey i l S 14688 17513 Open 10/26/2005 MWD i Asc D rectiona urvey 0 14483 Open 10/26/2005 MWD PB 1 ,~ / w ED D Asc Directional Survey 10400 14825 Open 10/26/2005 MWD PB 2 ~D C Pdf 13790~ductionlResistivity 114 17513 Open 3/9/2006 ROP DGR EWR Graphics files (.emf & .pdf) PB 1 114- 14483 ROP DGR EWR PB 2 114-14825 ED D Lis / 13800+ilnduction/Resistivity 3229 17448 Open 3/9/2006 GR EWR4 ABI ROP PWD GeoPilot pt 13800 LIS Verification 3229 17448 Open 3/9/2006 GR EWR4 ABI ROP PWD GeoPilot r ~ 1.!?D D Lis 13801,.-dnduction/Resistivity 3229 14445 Open 3/9/2006 PB 1 GR EWR4 ROP PWD GeoPilot pt 13801 LIS Verification 3229 14445 Open 3/9/2006 PB 1 GR EWR4 ROP PWD GeoPilot I D Lis 13802 ~I'iduction/Resistivity 3229 14760 Open 3/9/2006 PB 2 GR EWR4 ABI ROP PWD PeoPilot ~t 13802 L15 Verification 3229 14760 Open 3/9/2006 PB 2 GR EWR4 ABI ROP PWD PeoPilot r ~b ` ' C .Las C,tS 14469 Induction/Resistivity 3229 17513 Open 1/29/2007 LIS Veri, GR, FET, ROP ~ ~ w/Graphics VIED C .Las~..(.S 14469 Induction/Resistivity 3229 17513 Open 1/29/2007 P61 LIS Veri, GR, FET, ~~ I_ __ --- - ROP w/Graphics DATA SUBMITTAL COMPLIANCE REPORT 10/29/2007 Permit to Drill 2051180 Well Name/No. COLVILLE RIV UNIT CD2-01 Operator CONOCOPHILLIPS ALASKA INC API No. 50-103-20514-00-00 MD,. 17513 TVD 7047 Completion Date 9/15/2005 Completion Status 1-OIL Current Status 1-OIL UIC N D C ,L-as~,~s 14469 Induction/Resistivity 3229 14825 Open 1/29/2007 PB2 LIS Veri, GR, FET, ROP w/Graphics Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y N~ Daily History Received? ~N Chips Received? ~Y)`Td-- Formation Tops ~N Analysis '1`fN^ Received? Comments: Compliance Reviewed By: ._ Date: i f • • ~ -' -~ ConocoPhillips A{aska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 11, 2007 Mr. Tom Maunder b~ ~ ~, Alaska Oil & Gas Commission a,~ 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Maunder: Sorry for the inconvenience, however it was observed that a spreadsheet sent to you and dated 3/31/07 was incomplete. Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). It was noticed that Alpine well CD2-404 was unintentionally left out of spreadsheet dated 3/31/07. Please find enclosed updated spreadsheet, and replace. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions. Sincerely, ~.. ~~ M.. Loveland ConocoPhillips Well Integrity Project Supervisor • ~ ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Alpine Field March 31.2007 Well Name PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft al CD2-4 205-118 4" na 4" na 2 2/18/2007 CD2-2 205-109 6" na 6" na 2.5 2!18/2007 CD2-404 206-054 6" na 6" na 1.8 3/22/2007 CD2-7 203-187 16" na 16" na 7.5 2/17/2007 CD2-9 202-129 22" na 22" na 10.5 2/17/2007 CD2-12 203-073 16" na 16" na 7.5 2/17/2007 CD2-14 201-177 4" na 4" na 2 2/17/2007 CD2-15 201-159 12" na 12" na 5.7 2/17/2007 CD2-16 202-144 11'7" 1.6 4" 4/16/2003 1 3/8/2007 CD2-17 205-017 18' 2.5 4" 4!16!2003 1 3/8/2007 CD2-18 203-151 36" na 36" na 17 2/17/2007 CD2-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007 CD2-21 204-245 6" na 6" na 2.5 2/18/2007 CD2-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007 CD2-24 201-095 6" na 6" na 1 3/8/2007 CD2-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007 CD2-28 202-217 29" na 29" na 11 3/8/2007 CD2-30 203-135 8" na 8" na 3 3/8/2007 CD2-31 204-082 15" na 15" na 6 3/8/2007 CD2-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007 CD2-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007 CD2-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007 CD2-37 202-211 29" na 29" na 13.8 2/18/2007 CD2-38 202-171 18" na 18" na 8.5 2/18/2007 CD2-39 201-160 34" na 34" na 16.2 2/18/2007 CD2-44 202-165 13" na 13" na 6.2 2/18/2007 CD2-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007 CD2-47 201-205 25" na 25" na 11.9 2/18/2007 CD2-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007 CD2-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007 CD2-53 204-089 4" na 4" na 2 2/18/2007 CD2-54 204-178 8" na 8" na 3.7 2/18/2007 CD2-55 203-118 13" na 13" na 6 2!18/2007 CD2-57 204-072 8" na 8" na 1 3/8/2007 CD2-58 203-085 6" na 6" na 1 3/8/2007 CD2-59 204-248 6" na 6" na 1.5 3/8/2007 CD2-60 205-068 6" na 6" na 1 3/8/2007 ~.. onocoPhillis Alaska P.0. BOX 100360 ANCHORAGE, ALASKA 99510-0360 March 31, 2007 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Maunder: :~ - ~p~- ~~ ~ Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). Some of these wells were found to have a void in the conductor by surface casing annulus. The voids that were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions. Sincerely, Jerry Dethlefs ConocoPhillips Well Integrity Proj Supervisor Attachment • • ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Alpine Field March 31,2007 Well Name PTD # Initial top of cement Vol. of cement pumped Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft gal CD2-1 205-118 4" na 4" na 2 2/18/2007 CD2-2 205-109 6" na 6" na 2.5 2/18/2007 CD2-7 203-187 16" na 16" na 7.5 2/17/2007 CD2-9 202-129 22" na 22" na 10.5 2/17/2007 CD2-12 203-073 16" na 16" na 7.5 2/17/2007 CD2-14 _ 201-177 4" na 4" na 2 2/17/2007 CD2-15 201-159 12" na 12" na 5.7 2/17/2007 CD2-16 202-144 11'7" 1.6 4" 4/16/2003 1 3/8/2007 CD2-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007 CD2-18 203-151 36" na 36" na 17 2!17/2007 CD2-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007 CD2-21 204-245 6" na 6" na 2.5 2/18/2007 CD2-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007 CD2-24 201-095 6" na 6" na 1 3/8/2007 CD2-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007 CD2-28 202-217 29" na 29" na 11 3/8/2007 CD2-30 203-135 8" na 8" na 3 3/8/2007 CD2-31 204-082 15" na 15" na 6 3/8/2007 CD2-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007 CD2-33 201-125 T 1.0 4" 4/16/2003 1 3!8/2007 CD2-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007 GD2-37 202-211 29" na 29" na 13.8 2!18/2007 CD2-38 202-171 18" na 18" na 8.5 2/18/2007 CD2-39 201-160 34" na 34" na 16.2 2/18/2007 CD2-44 202-165 13" na 13" na 6.2 2/18/2007 CD2-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007 CD2-47 201-205 25" na 25" na 11.9 2/18/2007 CD2-48 202-108 10'6" 1.4 7" 4/16!2003 3.3 2/18/2007 CD2-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007 CD2-53 204-089 4" na 4" na 2 2/18/2007 CD2-54 204-178 8" na 8" na 3.7 2/18/2007 CD2-55 203-118 13" na 13" na 6 2/18/2007 CD2-57 204-072 8" na 8" na 1 3/8/2007 CD2-58 203-085 6" na 6" na 1 3/8/2007 CD2-59 204-248 6" na 6" na 1.5 3/8/2007 CD2-60 205-068. 6" na 6" na 1 3/8/2007 • • WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 November 16, 2006 RE: MWD Formation Evaluation Logs: CD2-O1_PBl_PB2, CD2-03_L1, CD2-OS_L1. The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 CD2-Ol_PB 1_PB2: 20 ~ - ~1 ~ ~t ~ ~-/~/(~ Digital Log Images: 1 CD Rom 50-103-20514-00, 70, 71 CD2-03 L1: 20~ -Og a ~ SOS ' ~ 13 Digital Log Images: '~ ~~L/~~ ~ ~l~l~~ 1 CD Rom 50-103-20512-00, 60 CD2-OS_Ll: ~®<(-p~ ~. 2a</-/S~ Digital Log Images: +~ ~yL/~5 r ~~.~,~~~ 1 CD Rom 50-103-20495-00,60 ~ ~ WELL LOG TRANSMITTAL To: State of Alaska March 8, 2006 Alaska Oil and Gas Conservation Comm. Attn.: Ceresa Tolley 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 RE: MWD Formation Evaluation Logs: CD2-O1, PB1 &PB2, AK-MW-3898251 CD2-Ol, PBl &PB2: Digital Log Images: 50-103-20514-00, 70, 71 ~ ~ 1 CD Rom f PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 Date: r Signed: G ~,~~-~/ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Ceresa Tolley 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 RE: MWD Formation Evaluation Logs: CD2-Ol, February 27, 2006 AK-MW-3898251 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention o£ Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 ~ ~ ~ 1 LDWG formatted Disc with verification listing. API#: 50-103-20514-00. 9~. ~c ~~/ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Ceresa Tolley 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 February 27, 2006 RE: MWD Formation Evaluation Logs: CD2-O1 PBl, AK-MW-3898251 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention o£ Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 5 0-103 -20514-70. ~~ygul ~~~06 ~~ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Ceresa Tolley 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 February 27, 2006 RE: MWD Formation Evaluation Logs: CD2-O1 PB2, AK-MW-3898251 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-103-20514-71. °~, ~ ~ ~j~'~~. II ~,' I ,4 ~dpww,y UUwJ ConocoPhillips December 7, 2005 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 G. C. Alvord Alpine Drilling Team Leader Drilling & Wells P. O. Box 100360 Anchorage, AK 99510-0360 Phone: 907-265-6120 ~~~ ~ ~ 2005 j.,f Al~~k~ Ail ~ Aas inns. "omrrrission Anchorage Subject: Well Completion Report for CD2-01 (APD 205-118) Dear Commissioner: ConocoPhillips Alaska, Inc. submits the attached Well Completion Reports for the recent drilling operations on the Alpine wells CD2-01. If you have any questions regarding this matter, please contact me at 265-6120. Sincerely, .~~ ~ ~~ G. C. Alvord Alpine Drilling Team Leader CPAI Drilling and Wells GCA/skad E(~VEL STATE OF ALASKA ~ DEC ~ $ 20Q5 ALASKA OIL AND GAS CONSERVATION COMMISSION a S. COmmisSian WELL COMPLETION OR RECOMPLETION REPOR~ ~`-~~`~,~'„o 1a. Well Status: Oil O Gas Plugged Abandoned Suspended ^ WAG ^ 20AAC 25.105 20AAC 25.110 GINJ ^ WINJ ^ WDSPL ^ No. of Completions _ Other 1b. Well Class: Development Q Exploratory ^ Service ^ Stratigraphic Test ^ 2. Operator Name: ConocoPhillips Alaska, Inc. 5. Date Comp., Susp., orAband.: September 15, 2005 / 12. Permit to Drill Number: 205-118 / 3. Address: P. O. Box 100360, Anchorage, AK 99510-0360 6. Date Spudded: August 23, 2005 ~ 13. API Number. ~ 50-103-20514-00/-20514-70, --20514-71 4a. Location of Well (Governmental Section): Surface: 1577' FNL, 1562' FEL, Sec. 2, T11 N, R04E, UM 7. Date TD Reached: September 13, 2005 ` 14. Well Name and Number: CD2-01 /CD2-01 P61 /CD2-01 P62 At Top Productive Horizon: 458' FSL, 497' FEL, Sec. 25, T12N, R04E, UM 8. KB Elevation (ft): 36.7' RKB ! 52.6' BPMSL ~ 15. Field/Pool(s): Colville River Field Total Depth: 650' FNL, 2629' FEL, Sec. 25, T12N, R04E, UM 9. Plug Back Depth (MD + TVD): 17513' MD / 7047' TVD Alpine Oil Pool 4b. Location of Well (State Base Plane Coordinates): Surface: x- 371682 y- 5974781 ' Zone- 4 10. Total Depth (MD + TVD): 17513' MD / 7047' TVD ~ 16. Property Designation: ADL 380075, 380096, 25530 TPI: x- 378144 y- 5981988 Zone- 4 Total Depth: x- 376081 ' - 5986195 ' Zone- 4 11. Depth where SSSV set: SSSV @ 2243' 17. Land Use Permit: ALK ASRC NPRA02 18. Directional Survey: Yes Q No ^ 19. Water Depth, if Offshore: N/A feet MSL 20. Thickness of Permafrost: 1847' MD 21. Logs Run: GR/Res 22. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 16" 62.58# H-40 37' 114' 37' 114' 42" Portland Cement 9-5/8" 40# L-80 37' 3257' 37' 2377' 12.25" 534 sx ASLite, 234 sx Class G 7" 26# L-80 37' 12953' 37' 7053' 8.5" 187 sx Class G abandonment plug @ 12645'-13245' kick off plug @ 10423'-11023' 23. Pertorations open to Production (MD + TVD of Top and Bottom 24. TUBING RECORD Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET 3.5" 12159' 12100' open hole from 12953'-17513' MD ~ 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED kickoff plug 280 sx 17# abandonment plug 240 sx 15.8# 26. PRODUCTION TEST Date First Production November 18, 2005 Method of Operation (Flowing, gas lift, etc.) Oil producer Date of Test 12/4!2005 Hours Tested 12 hours Production for Test Period --> OIL-BBL 2155 GAS-MCF 1298 WATER-BBL 531 CHOKE SIZE 99% GAS-OIL RATIO 868 Flow Tubing press. 333 psi Casing Pressure 583 Calculated 2a-Hour Rate -> OIL-BBL 3791 GAS-MCF 3290 WATER-BBL 1048 OIL GRAVITY -API (corr) not available 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". - NONE ~ ~ ~, LEC ~ ~ 2005 }s ,.-`l.•~S'PS ,_,_~ - Form 10-407 Revised 12/2003 -' /"~ {'~ ~ ~ ~ J~ ~ CONTINUED ON REVERSE r 28. 29. GEOLOGIC MARKERS FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". CD2-01 Seabee Formation 3322' 2411' Nanushak 6175' 3860' Gamma Ray Shale 11421' 6500' Kalubik 12212' 6880' Kuparuk Formation 12316' 6923' Miluveach 12456' 6971' Top Alpine D 12713' 7033' Top Alpine C 12820' 7046' Base Alpine C 17513' 7047' N/A TD 17513' 7047' CD2-01 PB1 TD 14483' 7035' CD2-01 PB2 TD 14825' 7041' 30. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey 31. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Vern Johnson @ 265-6081 Printed Name hi Alvord Title: Alpine Drilling Team Leader 12 °1 ~~~ ~ ' Signature Phone ZLS. (, (LO Date INSTRUCTIONS Prepared by Sharon Allsup-Drake General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: True vertical thickness. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state. in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other (explain). Item 27: If no cores taken, indicate "none". Item 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 • ConocoPhillips Alaska Operations Summary Report Legal Well Name: CD2-01 Common Well Name: CD2-01 Event Name: ROT -DRILLING Contractor Name: Doyon Drilling Inc Rig Name: Doyon 19 Date From - To Hours Code Code Phase 8/22/2005 116:00 - 20:00 I 4.00 I MOVE I MOVE I MOVE 20:00 - 21:30 21:30 - 22:30 22:30 - 00:00 8/23/2005 00:00 - 01:30 01:30 - 02:30 02:30 - 12:00 1.501 DRILL I RIRD I SURFAC 1.00 DRILL PULD SURFAC 1.50 DRILL PULD SURFAC 1.50 ~ DRILL ~ PULD SURFAC 1.00 DRILL OTHR SURFAC 9.501 DRILL I DRLG I SURFAC 12:00 - 00:00 I 12.001 DRILL I DRLG I SURFAC 8/24/2005 100:00 - 09:30 I 9.50 I DRILL I DRLG I SURFAC 09:30 - 10:30 1.00 DRILL CIRC SURFAC 10:30 - 16:00 5.50 DRILL WIPR SURFAC 16:00 - 17:30 1.50 DRILL TRIP SURFAC 17:30 - 19:00 1.50 DRILL CIRC SURFAC 19:00 - 21:00 I 2.00 I DRILL I TRIP I SURFAC 21:00 - 22:00 1.00 DRILL TRIP SURFAC 22:00 - 23:30 1.50 DRILL PULD SURFAC 23:30 - 00:00 0.50 DRILL OTHR SURFAC 8/25/2005 00:00 - 01:30 1.50 CASE OTHR SURFAC 01:30 - 05:30 4.00 CASE RUNC SURFAC 05:30 - 06:00 0.50 CASE CIRC ~ SURFAC 06:00 - 08:00 i 2.001 CASE I RUNC I SURFAC Page 1 of 9 Spud Date: 8/19/2005 Start: 8/22/2005 End: 9/16/2005 Rig Release: 9/16/2005 Group: Rig Number: Description of Operations Move pipe shed, pit & motor complex -skid floor - PU feet -Move sub f/ CD2-02 to CD2-01 -Over well @ 1800 hrs. -set feet -skid floor -set pit/motor complex -set pipe shed -Hook up service lines Accept rig @ 2000 hrs. -Nipple up riser & flow line -set mouse hole - hook up drain lines PU 2 - 8" NM DC's & jars -Std back in derrick PU motor & begin MU MWD * Taking on spud mud @ 2230 hrs. Continue to MU BHA -Upload MWD (held pre spud meeting w/crew while plugged into MWD) Orient UBHO PU NM flex DC's -RIH to 114' -Fill hole & check for leaks OK - Pressure test mud lines to 3500 psi OK Spud in @ 0230 hrs. -Drill 12 1/4" hole f/ 114' to 910' MD 888' TVD ADT - 4.15 hrs. =ART 1.38 hrs. AST 2.77 hrs. WOB 25/35 k RPM 0/45 GPM 500 @ 1200 psi String wt. PU 115 SO 115 Rot 115 Torque on/off btm. - 7500/4500 ft. lbs. Drill 12 1/4" hole f/ 910' to 2407' MD 1956' TVD ADT - 6.73 hrs. =ART 4.95 hrs. AST - 1.78 hrs. WOB 25/35 k RPM 0/45 GPM 550 to 650 @ 1160 to 2250 psi String wt. PU 125 SO 115 Rot 120 Torque on/off btm. - 8500/6500 ft lbs. Drilled 12 1 /4" hole f/ 2407' to 3267' MD 2382' TVD ADT - 6.9 hrs. =ART 5.91 hrs. AST .99 hrs. WOB 25/35 k RPM 0/65 GPM 650 @ 2400 psi String wt. PU 135 SO 110 Rot 125 Torque on/off btm.- 9500/8000 ft. lbs. Circulate hole clean for wiper trip - 650 gpm @ 2100 psi / 70 rpm's Wiper trip f/ 3267' to 888' - w/ pump 550 gpm @ 1680 psi w/ 60 rpm's - slowed pump to 500 gpm @ 1400 psi & 450 gpm @ 1170 psi - observed hole unloading with cuttings @ shakers during trip Flow check well {static) RIH fl 888' to 3172' -hole in good condition going in -Flow check(static) - Wash down f/ 3172' to 3267' Stage pumps up f/ 400 gpm to 650 gpm @ 2150 psi -Circulate hole clean for trip out Flow check(static) -POOH on TT f/ 3267' to 888' -hole in good condition -hole took proper fill POOH & Std. back HWDP -Hole in good condition -proper fill Handle BHA -Flush BHA w/ fresh water -Std. back NM flex DC's & jars - Down load MWD - LD MWD -motor & bit Clean rig floor - LD stab & subs to pipe shed RU to run 9 5/8" casing -Held pre job safety meeting Ran 9 5/8" 40# L-80 MBTC casing as follows: Float shoe (Ray Oil Tools Silver bullet) - 2 jts. -Float collar (Weatherford) - 2 jts. (first four connections made up w/ BakerLoc -filled pipe & checked floats) 46 jts. to 1885' (50 jts. total) * Note :took wt. @ 1140' -worked casing down to 1200' -Filled pipe & establish circulation -wash down to 1248' - OK - Ran pipe with no problems to 1885' Establish circulation -Stage pumps to 4.5 bbls/min & circulate btms up - ICP 360 psi FCP 230 psi Continue to run 9 5/8" 40# L-80 MBTC casing - 35 jts f/ 1885' to 3217' Total jts. ran 85) PU hanger & landing jt. -Land casing on landing ring Printed: 10/31/2005 3:35:35 PM • ConocoPhillips Alaska Page 2 of 9 Operations Summary Report Legal Well Name: CD2-01 Common Well Name: CD2-01 Spud Date: 8/19/2005 Event Name: ROT -DRILLING Start: 8/22/2005 End: 9/16/2005 Contractor Name: Doyon Drilling tnc Rig Release: 9/16/2005 Group: Rig Name: Doyon 19 Rig Number: Date From - To Hours Code Code Phase 8/25/2005 { 06:00 - 08:00 { 2.00 ~ CASE ~ RUNC ~ SURFAC 08:00 - 08:30 0.50 CASE ~OTHR SURFAC 08:30 - 10:30 2.00 CEMEN CIRC SURFAC 10:30 - 12:00 f 1.50 f CEMENII PUMP I SURFAC 12:00 - 13:00 I 1.001 CEMENTDISP I SURFAC 13:00 - 13:45 0.75 CEMENI~OTHR SURFAC 13:45 - 15:30 1.75 CEMEN PULD SURFAC 15:30 - 16:30 1.00 DRILL PULD SURFAC 16:30 - 17:30 1.00 WELCT NUND SURFAC 17:30 -18:30 1.00 WELCT NUND SURFAC 18:30 - 19:00 0.50 WELCT BOPE SURFAC 19:00 - 20:30 1.50 WELCT NUND SURFAC 20:30 - 00:00 3.50 WELCT BOPE SURFAC 8/26/2005 100:00 - 02:00 02:00 - 05:00 05:00 - 06:30 06:30 - 15:00 15:00 - 15:45 15:45 - 18:30 2.001 WELCTIJ ROPE I SURFAC 3.00 DRILL PULD SURFAC 1.50 RIGMNT RSRV SURFAC 8.50 DRILL PULD SURFAC 0.75 DRILL PULD SURFAC 2.75 DRILL PULD SURFAC 18:30 - 21:15 21:15 - 00:00 2.75 DRILL TRIP SURFAC 2.75 CEMEN DSHO SURFAC Description of Operations w/ FMC fluted mandrel hanger w/ Shoe @ 3256.59' & FC @ 3176.47' - PU wt. 180 SO wt. 130 * Note: Ran casing f/ 1885' to 3256' w/ no problems LD fill up tool -blow down TD - MU cmt head & lines Establish circulation @ 2.5 bbls/min & stage pumps to 6 bbls/min. - Circulate and condition for cement job -ICP - 350 psi FCP -440 psi - PU wt. 160 SO wt 135 Held pre job safety meeting Cemented 9 5/8" casing as follows: Pumped 40 bbls Biozan water w/ nut plug as marker -Switched over to Dowell -Pumped 3 bbls water - Tested lines to 2800 psi -Dropped btm plug -Mixed 8~ pumped 45 bbls 10.7 ppg MudPush spacer @ 5 bbls/min @ 170 psi -Mixed & pumped 10.7 ppg lead slurry (Arctic Set Lite) @ 8 bblslmin @ 240 psi to 350 psi - Observed nut plug marker @ shakers w/ 400 bbls lead slurry pumped - Pumped down surge can -pumped total of 423 bbls lead slurry - Switched to tail slurry mixed & pumped 48.4 bbls -15.8 ppg (Class G w/ .2% DO-46, .3°!o D065, 2% S001) @ 5.2 bbls/min - 320 psi -Dropped top plug w/ 20 bbls water Reciprocated pipe while pumping until just prior to beginning tail slurry - hole becoming sticky -set down onto landing ring for remainder of job Switched back to rig pumps & displaced cement w/ 222 bbls 9.6 ppg mud @ 6 bbls /min ICP 300 psi -pre bump pressure 670 psi -Slow rate to 3.5 bbls /mins for last 32 bbls of displacement -bumped plug w! 1100 psi - Checked floats OK - CIP @ 1250 hrs. -Full returns through out job w/ 160 bbls cement to surface RU & pressure test 9 5/8" casing to 2500 psi for 30 mins. RD cement lines & cmt head -landing jt. -long bails & csg elevators RU riser & starting head NU wellhead & test to 1000 psi NU BOPE RU to test BOPE Attempt to test - AIP ring leaking - ND BOPE -repair leak - NU BOPE RU & Test BOPE -Tested Hydril to 250 & 3500 psi -Pipe rams -choke manifold valves -Choke & kill line valves to 250 & 5000 psi Continue testing ROPE -manual choke & kill valves -lower pipe & blind rams - TIW & dart valves - to 250 & 5000 psi -performed accumulator closure test -Witnessing of test wavied by Jeff Jones AOGCC - RD & pull test plug -Blow down choke & kill lines -set wear bushing PJSM - PU 5" drill pipe f/ pipe shed - 96 jts. to 3040' PJSM -Cut & slip drill lines 60' -service TD POOH & std. back w/ 32 stds (96 jts) - PU 8 RIH w/ 96 jt to 3040' - POOH & std. back w/ 32 stds(96 jts) - PU &RIH w/ 60 jts to 1908' - POOH & std. back 20 stds (60 jts) - Plcked up 252 jts total PU Geo Span to rig floor & RU PJSM - MU BHA #2 - 8 112" bit - GeoPilot - MWD -Upload MWD - NM flex DC's - 1 std. HWDP -Test Geo Span i~ lines to 3500 psi RIH f/ 250' to 1868' w/Jars &HWDP - PU 5" DP f/shed & PU Ghost reamers -RIH f/ 1868' picking up remaining 33 jts of 5" DP f1 pipe shed & DP f! derrick to 3000' Establish circ & wash down f/ 3000' to 3156' (top of cmt) Clean out cmt -wiper plug & drill on FC @ 3176' PU 150 SO 100 Rot 120 Printed: 10/31/2005 3:35:35 PM ConacoPhillips Alaska Page 3 of 9 Operations Summary Report Legal Well Name: CD2-01 Common Well Name: CD2-01 Event Name: ROT -DRILLING Contractor Name: Doyon Drilling Inc Rig Name: Doyon 19 Date From - To Hours Code Code Phase 8/26/2005 21:15 - 00:00 2.75 CEMEN~ DSHO SURFAC 8/27/2005 00:00 - 03:00 3.00 CEMEN DSHO SURFAC 03:00 - 03:45 { 0.751 DRILL {LOT SURFAC 03:45 - 12:00 I 8.251 DRILL !DRLG I INTRM1 Spud Date: 8119/2005 Start: 8/22/2005 End: 9/16/2005 Rig Release: 9/16/2005 Group: Rig Number: Description of Operations Torque onloff btm - 9000!8000 ft. Ibs Continue drill out float collar @ 3176' -hard cmt to 3254' -drill out FS @ 3254' to 3256' -clean out rat hole to 3267' & Drill 20' new hole to 3287' -Circulate hole clean 550 gpm @ 1710 psi w150 rpms RU & perform LOT to 16.8 ppg EMW - 900 psi w/ 9.5 ppg mud @ 2377' TVD-RD Drill 8 1/2" hole w/ GeoPilot f! 3287' to 4400' MD 2958' TVD ADT - 5.02 hrs. WOB 14 k RPM 140 GPM 650 @ 1970 psi String wt. - PU 155 SO 108 Rot 126 Torque onloff bim. - 10,000!9,500 ft. lbs. ECD -10.3 to 11.4 ppg 12:00 - 00:00 12.001 DRILL DRLG INTRMI 8/28/2005 100:00 - 12:00 12.001 DRILL DRLG INTRMI 12:00 - 00:00 I 12.001 DRILL I DRLG I INTRM1 8/29!2005 { 00:00 - 12:00 I 12.001 DRILL (DRLG I INTRM1 12:00 - 00:00 12.001 DRILL DRLG INTRMI 8!3012005 f 00:00 - 12:00 12.00 I DRILL DRLG { INTRM1 12:00 - 12:15 I 0.251 DRILL I DRLG I INTRM1 NOTE: Changed over to 9.6 ppg LSND mud on the fly Drill 8 112" hole w/ GeoPilot f14400' to 5861' MD 3692' TVD ADT - 6.85 hrs. WOB 15!20 k RPM 100/150 GPM 650 @ 2390 psi String wt. PU 155 SO 130 Rot 135 Torque onloff btm. - 10,00019,000 ft. lbs. ECD-11.1 to 11.6 Drilled 8 1/2" hole w/ GeoPilot f! 5861' to 7574' MD 4562' TVD ADT - 7.75 hrs. WOB 10/25 RPM 140 GPM 650 @ 2500 psi String wt. PU 210 SO 122 Rot 155 Torque onloff btm. - 15,500!15,000 ft. lbs. ECD - 11.2 to 11.5 ppg Drilled 8 112" hole w/ GeoPilot f! 7574' to 9383' MD 5466' TVD ADT - 7.10 hrs. WOB 15125 k RPM 1401170 GPM 650 @ 2360 psi String wt. PU 245 SO 135 Rot 170 Troque onloff btm. - 19,000118,000 ft. lbs. ECD -10.9 to 11.2 ppg Drilled 8 1!2" hole w/GeoPilot f! 9383' to 11,000' MD 6281' TVD ADT - 7.96 hrs. WOB 25 RPM 140 GPM 650 @ 2450 psi String wt. PU 260 SO 140. Rot 180 Torque onloff btm - 19,000118,000 ft. lbs. ECD - 10.9 to 11.3 ppg Drilled 8 1/2" hole w/ GeoPilot f111,000' to 12,123' MD 6849' TVD ADT - 8.82 hrs. WOB 10/25 RPM 140 GPM 600 to 650 @ 2450 to 2700 psi String wt. PU 245 SO 155 Rot 195 Torque on/off btm. - 18,000!17,000 ft. Ibs. ECD - 10.8 to 11.0 ppg Note: Observed slight trickle on last connection Drilled 8 112" hole w/GeoPilot f/ 12,230' to 13,245' MD 17060' TVD. ADT=8.36hrs PUW=260K SOW=148K ROT=195K TO onloff=20K717K aN @ 13,189'. SPR #1=30stk/310psi, 40stW430psi SPR #2=30stk/310psi, 40stk/430psi @13,185'. Drilled from 13,245' to 13,267' MD / 7062' TVD. ADT=0.16 PUW=265K SOW=145K ROT=195K TO onloff=20.5K/19.5K SPR Printed: 11N31l2005 335:35 PM • ConocoPhillips Alaska Operations Summary Report Legal Well Name: CD2-01 Common Well Name; CD2-01 Event Name: ROT -DRILLING Contractor Name: Doyon Drilling Inc Rig Name: Doyon 19 Date From - To Hours Code Code Phase 8/30/2005 12:00 - 12:15 0.25 DRILL DRLG INTRM7 12:15 - 14:15 2.00 DRILL CIRC INTRM7 14:15 - 14:45 0.50 DRILL CIRC INTRM7 14:45 - 18:45 4.00 DRILL DRLG INTRM7 18:45 - 19:45 1.00 DRILL PULD INTRMI 19:45 - 20:30 0.75 DRILL PULD INTRMI 20:30 - 20:45 0.25 i DRILL ( REAM INTRM7 20:45 - 00:00 3.25 DRILL DRLG INTRM7 8!31/2005 00:00 - 01:00 1.00 DRILL DRLG INTRM7 01:00 - 01:45 0.75 DRILL PULD INTRM7 01:45 - 03:15 1.501 DRILL DRLG INTRM7 03:15 - 04:00 I 0.751 DRILL I PULD I INTRM7 04:00 - 05:00 I 1.001 DRILL I DRLG I INTRMI 05:00 - 07:00 2.00 DRILL CIRC INTRM7 07:00 - 11:00 4.00 DRILL TRIP INTRM7 11:00 - 12:00 1.00 DRILL TRIP INTRMI 12:00 - 17:30 5.50 DRILL TRIP INTRM7 17:30 -19:30 2.00 DRILL TRIP INTRM7 19:30 - 20:00 0.50 DRILL TRIP INTRMI 20:00 - 22:00 2.00 DRILL PULD I INTRMI 22:00 - 22:30 0.50 DRILL PULD INTRMI 22:30 - 23:00 0.50 CEMEN PLUG INTRMI 23:00 - 00:00 1.00 CEMEN PLUG INTRM7 9!1!2005 00:00 - 00:30 0.50 CEMEN TRIP INTRMI 00:30 - 01:30 1.00 CEMEN TRIP INTRM7 01:30 - 02:45 1.25 RIGMNT RSRV INTRM7 02:45 - 09:00 .6.25 CEMEN TRIP INTRM7 09:00 - 09:30 0.50 CEMEN CIRC INTRMI 09:30 - 10:00 0.50 CEMEN CIRC INTRMI 10:00 - 12:00 2.00 CEMEN CIRC INTRM7 12:00 - 12:15 0.25 CEMEN RURD INTRM7 12:15 - 13:15 1.00 CEMEN PLUG ~ INTRM7 13:15 - 14:30 1.25 CEMEN TRIP INTRM7 14:30 - 15:30 1.00 CEMEN CIRC INTRM7 15:30 -16:30 1.00 CEMEN TRIP INTRMI 16:30 - 17:00 0.50 CEMEN i OTHR INTRMI Start: 8/22/2005 Rig Release: 9!1612005 Rig Number: Page 4 of 9 Spud Date: 8/19/2005 End: 9!16/2005 Group: Description of Operations #1=30stk/340psi, 40stkI420psi SPR #2=30stk/340psi, 40stk/420psi all @ 13,267'. Circa 3 btms up while weigthing up mud to 10.0 ppg. Flow check static from 13,267' to 12,808'. Orate=600 gpm @ 2510 psi, 140 rpm, and 19.5K TQ. RIH from 12,808' to 13,257'. PU 11 jts of 5" DP from shed. Checked flow, static. Alpine sand quality sub-par; decision made to drill and evaluate. Est'd circ. and drilled from 13,267' to 13,728' MD 17077' TVD. ADT=2.93 Checked flow, static. POOH from 13,728' to 13,157'. RIH from 13,157' to 13,669'. PU 5" DP from shed. PUW=290K SOW=150K Checked flow, static. Est'd circ. and washed down from 13.669' to 13,729'. Orate=600gpm @ 2650 psi, 140 rpm, 19K TQ. Drilled from 13,729' to 14,045' MD ! 7058' TVD. ADT=1:9 Drilled from 14,045' to 14,235'. POOH from 14,235' to 14,045'. PU 6 jts 5" DP from shed, TIH to 14,235'. Drilled from 14,235' to 14,425'. SPR #1=30stk/360psi, 40stkl440psi SPR #2=30stk/360psi, 40stk/440psi @ 14,425'. POOH from 14,425' to 14,235'. PU 6 jts 5" DP from shed, TIH to 14,425'. Drilled from 14,425' to 14,483' MD ! 7035' TVD ADT=3.18 Orate=600gpm @ 2600 psi and 140 rpm. PUW=265K SOW=135K ROT=190K TOon/off=21 K120.5K all @14,483'. Circa @ 14,483' standing back one stand every BU to 14,300'. Pumped out from 14,300' to 11,476'. Checked flow, static. POOH on TT from 11,476' to 11,000'. Cont'd to POOH on TT to 3,100'. Checked flow for 15 min, static. Cont'd to POOH on TT to 700'. Checked flow, static. Cont'd to POOH to 70'. Stood back HWDP and flex collars. Flushed MWD and Geo-pilot with water. Downloaded data and LID from 70'. Cleaned floor, L/D subs and bit. P1U 3.5" tbg equipment. Held PJSM. RIH w13.5" EUE tbg to 473'. P/U and RIH 3.5" tbg from 467' to 1,006'. RIH with 5" DP from 1,006' to 3,096'. Slipped and cut 60' of drilling line. RIH from 3,096' to 13,435' filling pipe every 3,000'. Broke circ and spotted hi-vis pill @ 13,435 with 400 gpm and 1140 psi. POOH to 13,245' and CBU. Circa BU with 420 gpm and 1140 psi. R/U to pump cement, held PJSM. Pumped 600' cement plug as follows. 20 bbl H2O spacer ahead @ 350 psi and 4 BPM. Followed by 50 bbls 15.8# cement @ 203 psi and 5.3 BPM. Followed by 3 BBL H2O spacer then displaced with 214 bbls 10.1 # drilling mud with rates varying from start of 8 BPM @ 610 psi to 4 BPM @ 430 psi when finished. POOH on TT from 13,245' to 12,170'. Checked flow, static. Circa BU @ 12 BPM with 1220 psi. Checked flow, static. POOH with pump from 12,170' to 11,300' @ 4 BPM with 400 psi. Spotted gel pill @ 11,300'. Printed: 10/31/2005 3:35:35 PM • ConocoPhillips Alaska Page 5 of 9 Operations Summary Report Legal Well Name: CD2-01 Common Well Name: CD2-01 Event Name: ROT -DRILLING Contractor Name: Doyon Drilling Inc Rig Name: Doyon 19 Date From - To Hours Code Code Phase 9!1!2005 17:00 -17:30 0.50 CEMEN TRIP INTRM1 17:30 - 18:15 0.75 CEMEN~CIRC INTRM1 18:15 - 19:15 1.00 CEMEN PLUG INTRM1 19:15 - 20:15 1.00 CEMEN~TRIP INTRMI 20:15 - 22:15 2.00 CEMEN CIRC INTRMI 22:15-00:00 1.75 CEMEN TRIP INTRMI 9!2!2005 00:00 - 05:30 5.50 CEMEN TRIP INTRM1 05:30 - 06:00 0.50 CEMEN RURD INTRM1 06:00 - 07:30 1.50 CEMEN PULD iNTRM1 07:30 - 08:00 0.50 CEMEN RURD INTRM1 08:00 - 10:45 I 2.751 DRILL I PULD I INTRMI 10:45 - 12:00 1.25 DRILL TRIP INTRM1 12:00 - 17:30 5.50 DRILL TRIP INTRM1 17:30 - 19:00 1.50 DRILL REAM INTRM1 19:00 - 19:45 0.75 DRILL DRLG INTRM1 19:45 - 00:00 4.25 DRILL DRLG INTRMI 9!312005 100:00 - 12:00 I 12.001 DRILL I DRLG I INTRMI 12:00 - 19:45 7.75 DRILL DRLG INTRM1 19:45 - 20:15 0.50 RIGMNT RGRP INTRM1 20:15 - 00:00 3.751 DRILL DRLG INTRM1 914!2005 100:00 - 08:30 I 8.501 DRILL I DRLG 1 INTRM1 08:30 - 11:00 2.501 DRILL CIRC ~ INTRM1 11:00 - 12:00 1.00 DRILL WIPR INTRM1 12:00 - 13:30 1.50 DRILL I WIPR INTRM1 13:30 - 14:15 0.75 DRILL WIPR ' INTRM1 14:15 - 16:30 2.25 DRILL CIRC INTRM1 16:30 - 18:30 I 2.001 DRILL I TRIP I INTRM1 Spud Date: 8/19/2005 Start: 8/2212005 End: 9/16/2005 Rig Release: 9/16/2005 Group: Rig Number: Description of Operations POOH on TT from 11,300' to 11,024'. Checked flow, static. R!U to pump cement. Circa 50 bbls @ 6 BPM with 350 psi. Pumped 600' cement plug as follows. 20 bbl H2O spacer ahead. Followed by 50 bbls 17# cement @ 480 psi and 5.5 BPM. Followed by 3 bbl H2O spacer then displaced with 175 bbls 10.1# drilling mud with rates varying from start of 6 BPM and finish of 3 BPM. 550 psi as cement turned the corner and 220 psi at finish with 3 BPM. POOH on TT from 11,024' to 10,073'. Checked flow, static. Circa hole clean. Pumped 200 bbls @ 10 BPM with 810 psi and 460 bbls @ 7 BPM with 450 psi. POOH on TT from 10,073' to 9,311'. Checked flow, static POOH from 9,311' to 1008'. R!U tubing tongs. UD 3.5" tbg tongs from 1008' to mule shoe. R/D tbg tongs, cleaned rig floor, drip pan, slips and elevators. Function tested BOP's including top rams, annular, blinds, and bottom pipe rams. P/U BHA, uploaded MWD, tested Geo-Span to 3500 psi. Pulse tested MWD @ 811'. RIH from 811' to 2,345'. RIH from 2,345' to 10,334' . Filled pipe every 2,000'. Broke circ, washed and reamed to 10,420' with some packing off. 500 gpm, 130 RPM, 1880 psi. Drilled cement stringers and cleaned out to kick off point @ 10,459'. Kicked off plug and time drilled from 10,459' to 10,526' MD / 6,031' TVD ADT=3.51 PUW=265 SOW=143 ROT=190 TQon/off=22Kl22K SPR#1=30stkl240psi, 40stk/320psi SPR#2=30stk/240psi, 40stk/330psi all @ 10,524'. Drilled from 10,526' to 11,550' MD / 6568' TVD ADT=8.95 PUW=245K SOW=145K ROT=185K TQon/off=18.5K/16.5K SPR#1=30stk/380psi, 40stk/480psi SPR#2=30stk/380psi, 40stk/480psi all @ 11,475'. Drilled from 11,550' to 12,081' MD / 6821' TVD ADT=6.0 Trouble shoot Geo-Span (plugged with sweep marker, reversed out successfully). Drilled from 12,081' to 12,377' MD 16947' TVD ADT=2.28 PUW=250K SOW=155K ROT=195K TOonloff=18Kl17K @ 12,377' SPR#1=30stk/410psi, 40stkl500psi SPR#2=30stkl400psi, 40stk1490psi @ 12,238'. Drilled from 12,377' to 12,999' MD ! 7,053' TVD. ADT=7.18 PUW=260K SOW=155K ROT=195K TQonloff=18.5Kl16K SPR #1=30stkl370psi, 40stk/450psi SPR#2=30stW370psi, 40Stkf450psi all @ 12,997'. Circa 3X BU from 12,999' to 12,808' @ 600gpm, 120rpm, 2800psi. Flow checked well, static. Pumped out from 12,808' to 12,333' @ 500gpm, 70rpm, 2340psi. POOH wlpump from 12,333' to 11,381' @ 500gpm, 70rpm, 2310psi. Flow checked well, static. RIH from 11,381 to 12,904'. Broke circ, pumped hi-vis sweep and washed to 12,963'. Circa hole clean @ 500gpm, 150rpm, 2340psi. Spotted strengthening pill and tube pill across HRZ. Flow checked well, static. POOH wlpump @ 3bpm, spotting pills to 11,381'. Flow checked well, static. Printed: 10!31/2005 3:35:35 PM • ConocoPhillips Alaska Page 6 of 9 Operations Summary Report Legal Well Name: CD2-01 Common Well Name: CD2-01 Event Name: ROT -DRILLING Contractor Name: Doyon Drilling Inc Rig Name: Doyon 19 Date From - To Hours Code Phase Code 9/4/2005 18:30 - 20:45 2.25 DRILL TRIP INTRMI 20:45 - 21:15 0.50 DRILL OBSV INTRM1 21:15 - 21:45 0.50 DRILL TRIP INTRM1 21:45 - 22:45 1.00 DRILL TRIP INTRM1 22:45 - 00:00 1.25 DRILL TRIP INTRMI 9!512005 00:00 - 00:30 0.50 DRILL TRIP INTRM1 00:30 - 04:30 4.00 DRILL TRIP INTRM1 04:30 - 06:30 2.00 DRILL TRIP INTRM1 06:30 - 08:15 1.75 DRILL PULD INTRM1 08:15 - 08:45 0.50 WELCT EQRP ~ INTRM1 Spud Date: 8119!2005 Start: 8/22/2005 End: 9/16/2005 Rig Release: 9/16/2005 Group: Rig Number: Description of Operations Cont'd to POOH to 9,478'. Monitored well, static. Pumped dry job and blew down top drive. POOH on TT to 8,726'. Tight spot, pulled 75K over. POOH w/pump from 8,726' to 8,621' @ 7bpm, 70rpm, 410psi. POOH on TT to 8,559'. Still tight cont'd POOH w/pump. Worked tight spot @ 8,523' to 8,526'. POOH fro 8,526' to 8,050' with 300gpm, 70rpm, 800psi. POOH from 8,050' to 3,291' on TT. Checked flow, static. POOH on TT from 3,291' to BHA @ 1,869'. L/D BHA and download MWD data. Pulled wear bushing. 08:45 - 09:15 0.50 WELCT EQRP INTRMI 09:15 - 09:45 0.50 WELCT EQRP INTRM1 09:45 -10:00 0.25 WELCT EQRP INTRMI 10:00 - 11:45 1.75 CASE RURD INTRM1 11:45 -12:00 0.25 CASE SFTY INTRMI 12:00 - 15:30 3.50 CASE RUNC INTRMI 15:30 - 16:00 0.50 CASE CIRC INTRMI 16:00 - 20:00 4.00 CASE RUNC INTRM1 20:00 - 21:15 1.25 CASE CIRC INTRM1 21:15 - 00:00 2.751 CASE RUNC INTRM1 9/6/2005 00:00 -01:30 1.50, CASE RUNC INTRM1 01:30 - 03:15 1.75 CASE CIRC INTRM1 03:15 - 08:00 4.751 CASE RUNC INTRM1 08:00 - 08:30 0.50 CEMEN RURD INTRMI 08:30 -11:15 2.75 CEMEN CIRC INTRM1 11:15 - 12:00 0.75 CEMEN PUMP INTRM1 12:00 - 13:30 1.50 CEMEN PUMP INTRMI 13:30 - 14:15 0.75 CASE MIT INTRM1 14:15 - 18:30 4.25 CASE MIT INTRM1 18:30 - 19:15 0.75 CASE RURD INTRMI 19:15 - 20:15 1.00 WELCT EQRP INTRMI 20:15 - 21:15 ' 1.00 WELCT EQRP ~ INTRMI 21:15 - 00:00 2.75 WELCT BOPE ~ INTRMI 9/7/2005 ~ 00:00 - 04:30 I 4.50 (WELCTu BOPE INTRM1 04:30 - 05:30 I 1.001 WELCTLI BOPE I INTRMI 05:30 - 06:00 i 0.50 ~ WELCTL BOPE INTRM1 Installed test p{ug. Changed top pipe rams to 7" solid body. Tested ram doors to 250/5K psi for 5 minutes. R/U to run 7" casing. Held PJSM, PIU 1stjt. 7" casing. RIH wt 7" casing to 3,181' (75jts). Circa 1 casing volume, staged pump to 5bpm, 350psi. PUW=125K SOW=115K. RIH wl 7" casing from 3,181' to 6,404' (150 jts). Circa BU+, staged pump to 4.5bpm, 350psi. PUW=185K SOW=115K. RIH w! 7" casing to 8,166' (191 jts). PUW=245K SOW=135K w/o pump. RIH wl 7" csg from 8,166' to 9,626'. Circa BU @ 3.5bpm, 570psi. RIH w! 7" csg from 9,626' to 12,999'. PUW=330K SOW=130K @ 12,953'. R/U cement head. Circa and conditioned for cement job @ 12,999. Cement as per dowel!. Pumped 5 bbls CW100. Tested lines to 3,700psi. Pumped 45 bbls CW100, 40 bbls 12.6# Mudpush, 38 bbls 15.8# cement, dropped top plug followed by 20 bbls H2O. Displaced w! rig @ 6.3 bpm @ 670 psi to 870 psi. Bumped plug @ 4747 stks wl 1100 psi and checked float, OK. PUW=335K SOW=150K. CIP @ 1323 hrs. Test casing to 3500 psi for 30 mins. R/D casing equip. Fluid flowing back thru float equip. Held 200 psi on casing, bled off and still flowing. Pressure up to 300 psi. R/D casing equip. & L/D landing jt. Pulled 7" wear ring and install 7"X9.625" pack-off. Run in lock downs and test to 5000 psi w/ FMC for 10 min. Held PJSM, changed rams to 3.5"X6" variables. Tested BOPS, top rams, choke manifold, auto and manual IBOP to 250 and 5000 psi. Tested BOP equipment including; rams, HCR, and manuals on stack to 250l5000psi. Cf0 test plug rubber seal, 1 needle vavle on tesp pump, 2 valves on test manifold. Greased HCR, choke, and kill valves. Annular preventer did not test. Performed visual inspection from rig floor, retested. Confirmed good test on chart. Annular preventer did not test. Performed visual inspection from rig floor, retested. Confirmed good test on chart. Pulled test plug and set wear ring. Printed: 10/31/2005 3:35:35 PM fl-__~ ConocoPhillips Alaska Operations Summary Report Legal Well Name: CD2-01 Common Well Name: CD2-01 Event Name: ROT -DRILLING Contractor Name: Doyon Drilling Inc Rig Name: Doyon 19 Date From - To Hours Code Phase Code 9/7/2005 06:00 - 06:30 0.50 DRILL RIRD INTRMI 06:30 - 09:30 3.00 DRILL PULD INTRMI 09:30 - 10:15 0.75 RIGMNT RGRP INTRM1 10:15 - 12:00 1.75 DRILL PULD INTRMI 12:00 - 17:30 5.50 DRILL PULD INTRM1 17:30 - 20:30 3.00 DRILL PULD INTRM1 20:30 - 00:00 3.50 DRILL PULD INTRM1 91812005 00:00 - 06:00 6.00 DRILL PULD INTRMI 06:00 - 07:30 1.50 RIGMNT RSRV INTRMI 07:30 - 08:30 1.00 DRILL TRIP INTRMI 08:30 -10:00 1.50 DRILL DRLG INTRM1 10:00 - 10:30 0.50 DRILL DRLG INTRM1 10:30 - 12:00 1.50 DRILL CIRC INTRMI 12:00 - 12:45 0.75 DRILL FIT ~ INTRMI 12:45 -14:45 I 2.00 f DRILL I CIRC I INTRM1 14:45 - 00:00 9.251 DRILL DRLG PROD 9/9/2005 00:00 - 12:00 12.001 DRILL DRLG PROD 12:00 - 00:00 i 12.001 DRILL 1 DRLG I PROD 9110/2005 00:00 - 12:00 12.00 I DRILL DRLG PROD 12:00 - 14:00 2.00 DRILL I DRLG PROD 14:00 - 14:45 0.75 DRILL CIRC PROD 14:45 - 15:30 0.75 DRILL REAM PROD 15:30 - 00:00 I 8.501 DRILL I DRLG !PROD 9/11/2005 00:00 - 02:30 2.50 ~ DRILL DRLG PROD 02:30 -12:00 9.501 DRILL DRLG PROD 12:00 - 00:00 I 12.001 DRILL I DRLG !PROD Start: 8/22/2005 Rig Release: 9/16/2005 Rig Number: Page 7 of g Spud Date: 8/19/2005 End: 9/16!2005 Group: Description of Operations R/U bails and elevators, blow down choke and top drive. L/D excess 5" DP. Replaced lower brake band roller on drillers side. L/D excess 5" DP. L/D excess 5" DP. Changed elevators to 4" capable. P/U BHA #4 for 6.125" hole section including: bit, motor, float sub, MWD, 3x DGs, XO, 3x HWDP, jars, 2x HWDP from derrick to 376'. Performed pulse test on MWD. P1U 4" DP from pipe shed to 4,569' (132jts) filling every 2,000'. P/U d" DP from shed from 4,569' to 12,492'. Slipped and cut drilling line, tubed rig. RIH from 12,492' to12,805' with 200gpm, 50rpm, 2050psi. Drilled cement and FC @ 12,860' to 12863' to FS @12,948' to 12,950'. Drilled from 12,950' to13,019' for total of 20' new hole. PUW=240K SOW=135K ROT=165K TQonloff=12K/10.5K @ 12,998' CBU for FIT @ 13,019' with 225gpm, 50rpm, 2210 psi. R1U to perform FIT. Performed FIT to 810 psi or 12.5# EMW. R/D & blow down kill line. Displaced well from 10.2# LSND mud to 9.8# Flo-Pro system with 220 gpm, 50rpm, and ICP=2480psi FCP=2030psi. Performed survey and SPR. SPR #1=20stk1700psi, 30stk/950psi SPR #2=20stk/710, 30stkl940psi @ 13,019'. Drilled from 13,019' to 13,445' MD/ 7,051' TVD. ADT=4.29 ART=2.95 AST=1.34 PUW=205K SOW= 148K ROT=175K TQon/off=9K/8.5K @ 13,445' Drilled from 13,445' to 13,959'. ADT=5.49hrs AST=2.46hrs ART=3.03hrs PUW=205K SOW=145K ROT=170K TQonloff=9.5K/8K SPR #2=20stk/720psi, 30stk1970psi all @ 13,590'. Drilled from 13,959' to 14,495' MD 17,046' TVD. ADT=5.66hrs ART=3.18hrs AST=2.48hrs PUW=210K SOW=145K ROT=174K TQon/off=11.5K/10K SPR #1=20stk/780psi, 30stk1990psi SPR #2=20stk/740psi, 30stk/990psi all @ 14,495'. Drilled from 14,495' to 14,804' MD ! 7,041' TVD. ADT=9.65hrs ART=8.77hrs AST=0.88hrs PUW=215K SOW=135K ROT=167K TQonloff--11.OK110.5K SPR #1=20stk/800psi, 30stkl1030psi SPR #2=20stk/800psi, 30stk/1040psi all @ 14,782'. Drilled from 14,804' to 14,825' MD / 7041.2' TVD. ADT=1.82hrs AST=O.OOhrs CBU and POOH to 14,686' for sidetrack @ 220gpm, 2380psi, 70rpm. Work through tight spot from 14,686' to 14,700 @ 220gpm, 2380psi. Reset Sperry surface computer, Time drilled from 14,700' to 14,727' MD 17,045' TVD. ADT=4.67hrs ART=O.OOhrs AST=4.67hrs PUW=215K SOW=140K ROT=167K TQon/off=11.OKl10.OK SPR #1=20stk/750psi, 30stk/1020psi SPR #2=20stkl750psi, 30stkf990psi all @ 14,724'. Drilled from 14,727' to 14,825' to complete sidetrack. Drilled from 14,727' to 15,244' MD 17,054' TVD. ADT=6.63hrs ART=4.07hrs AST=2.56hrs PUW=215K SOW=130K ROT=168K TQon/off=11 K111 K @ 15,163' SPR #1=20stk/870psi, 30stk11120psi SPR #2=20stkl880psi, 30stk/1120psi all @ 15,068'. Drilled from 15,244' to 15,831' MD / 7,050' TVD. ADT=6.08hrs ART=4.43hrs AST=1.65hrs PUW=220K SOW=135K ROT=170K TQon/off=12.5K/10.5K @ 15,831' SPR #1=20stk1810psi, Printed: 10/31/2005 3:35:35 PM ConocoPhillips Alaska Page 8 of 9 Operations Summary Report Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: CD2-01 CD2-01 ROT -DRILLING Doyon Drilling Inc Doyon 19 Spud Date: 8!19/2005 Start: 8!22/2005 End: 9/16/2005 Rig Release: 9/16/2005 Group: Rig Number: Date From - To Hours Code Cade Phase 9/11/2005 12:00 - 00:00 12.00 DRILL DRLG PROD 9/12!2005 00:00 - 12:00 12.00 DRILL DRLG PROD 12:00 - 00:00 I 12.001 DRILL I DRLG I PROD 9!13/2005 00:00 - 12:00 1 12.00 ~ DRILL i DRLH PROD 12:00 - 14:15 I 2.25 I DRILL I DRLH I PROD 14:15 - 16:00 I 1.75 I DRILL I WIPR I PROD 16:00 - 16:45 ~ 0.75 DRILL TRIP PROD 16:45 - 17:00 0.25 DRILL REAM PROD 17:00 - 19:15 2.25 DRILL CIRC PROD 19:15 - 21:45 2.501 DRILL CIRC PROD 21:45 - 00:00 2.25 DRILL TRIP PROD 9/14/2005 00:00 - 01:00 1.00 DRILL I TRIP PROD 01:00 - 02:00 I 1.001 RIGMNTI RGRP I PROD 02:00 - 03:30 I 1.501 DRILL I TRIP I PROD 03:30 - 04:30 I 1.001 DRILL I OTHR I PROD 04:30 - 05:00 0.50 DRILL TRIP PROD 05:00 - 15:00 10.00 DRILL TRIP PROD 15:00 - 15:15 0.25 ~ DRILL OTHR PROD 15:15 - 17:00 1.751 DRILL PULD I PROD 17:00 -18:15 1.25 CMPLTN RURD CMPLTN 18:15 - 00:00 5.75 CMPLTN RUNT CMPLTN 9115/2005 100:00 - 05:30 I 5.501 CMPLTNI RUNT {CMPLTN Description of Operations 30stkJ1170psi SPR #2=20stk/850psi, 30stk11170psi all @ 15,783'. Drilled from 15,831' to 16,499' MD J 7,060' TVD. ADT=6.48hrs ART=5.32hrs AST=1.16hrs PUW=220K SOW=130K ROT=168K TQonloff=12KJ11 K @ 16,499' SPR #1=20stk/890psi, 30stk/1100psi SPR #2=20stk/870psi, 30stk/1090psi all @ 16,308'. Drilled from 16,499' to 16,918' MD ! 7,064' TVD. ADT=4.43hrs ART=2.95hrs AST=1.48hrs PUW=220K SOW=130K ROT=168K TOontoff=12.5K/11 K @ 16,881' SPR #1=20stk/890psi, 30stk/1150psi SPR #2=20stkJ840psi, 30stk/1140psi all @ 16,881'. Drilled 6 118" horz. hole wJ motor f/ 16,918' to 17,454' MD 7048' TVD ADT - 5.31 hrs. =ART - 4.47 hrs. AST .84 hrs. WOB 6110 k RPM 70 GPM 220 @ 2800 psi String wt. PU 220 SO 125 Rot 168 Torque on/off btm. - 12,500111,500 ft. lbs. ECD - 11.3 ppg Drilled 6 118" horz. hole wJ motor f/ 17,454' to 17,513' MD 7046.7' TVD WOB 719 k RPM 70 GPM 220 @ 2790 psi String wt. PU 220 SO 130 Rot 168 Torque on/off btm. -12,500111,500 ft. lbs. ECD - 11.3 ppg Flow check well (static) -Wiper trip fJ 17,513' to 16,595' w/pump 220 gpm @ 2420 psi w/80 rpm's RIH f/ 16,595' to 17,454' Break circ -Wash & ream f/ 17,454' to 17,513' Pupm hi-vis pill & circulate btms up - 220 gpm @ 2480 psi w/ 70 rpm's - Flow check well (static) PJSM -Displace well to 9.8 ppg brine - 220 gpm - ICP 2480 psi FCP 2150 psi -monitor well while cleaning surface -fluid level dropped 4-6" below flow line POOH on TT (/ 17,513' to 16,022' -lose rate approx. 7 to 10 bblsJhr. Continue POOH on TT -f! 16,022' to 14,590' -hole in good condition - no over pull -hole taking proper fill + 7 to 10 bblsl hr losses Monitor well on TT -repair iron roughneck (static losses 7 to 10 bblsJhr.) Continue POOH on TT f/ 14,590' to 12,873' - hole in good condition - no over pull -hole taking proper fill + 10 bblslhr Monitor well @ 7" casing - losse rate 10 bbls/hr. -Spot 35 bbls LCM pill @ 220 gpm @ 1440 psi Continue to POOH on TT f/ 12873' to 12,396' Continue to POOH - LD excess 4" DP f/ 12,396' to 375' (378 jts.) Monitor well for 10 mins., loss rate 4-5 bbls/hr. -Std back HWDP & jars to 189' Flush BHA wJ freash water w! 10 gals Conqor 404 Std back 4 3/4" NM flex DC's -Down load MWD - LD MWD -float sub - stab -motor & bit Pull wear bushing - RU to run 3 1/2" completion -Held Pre job meeting Run 3 112" completion (all jts. 3 112" 9.3# L-80 EUE-Mod tbg) as follows: WELG - pup jt - XN nipple w! RHC plug installed -pup jt -Baker Premier packer - pup jt. (all connections below packer made up wt BakerLoc) 2 jts. -Baker CMD sliding sleeve - 2 jts. -Camco GLM w/ dummy valve installed - 130 jts. - to 4302' (135 jts.of 382 to run) Continue running 3 1/2" completion t! 4302' to 9902' as follows: 77 jts. 3 112" 9.3# L-80 EUE mod tbg -pup jt -Camco GLM - pup jt. - 102 jts 3 Printed: 10!3112005 3:35:35 PM r~ L~ ConocoPhillips Alaska Page 9 of 9 Operations Summary Report Legal Well Name: CD2-01 Common Well Name: CD2-01 Spud Date: 8/19/2005 Event Name: ROT -DRILLING Start: 8122/2005 End: 9!16/2005 Contractor Name: Doyon Drilling Inc Rig Release: 9/16/2005 Group: Rig Name: Doyon 19 Rig Number: Date From - To Hours Code Code Phase `Description of Operations 9/15/2005 00:00 - 05:30 5.50 CMPLTN RUNT CMPLTN 112" 9.3# L-80 EUE Mod tbg (314 jts. total) 05:30 - 06:30 1.00 CMPLTN RUNT CMPLTN PU Camco SCSSV assembly (pup jt. -SCSSV -pup jt.) -Install control line & test to 5000 psi 9/16/2005 06:30 -10:30 4.00 CMPLTN RUNT CMPLTN Continue running 3 1/2" completion - 68 jts. 9.3# L-80 EUE Mod tbg fl 9926' to 12035' (382 jts total) banding control line to tbg wf stainless steel bands (used total of 73 bands) 10:30 - 12:45 2.25 CMPLTN RUNT CMPLTN Change to 4 1/2" tools - MU XO (3 1/2" EUE to 4 1/2" IBTM) 2 jts. 4 1/2" 12.6# L-80 IBTM -FMC tbg hanger -connect control line to hanger & test to 5000 psi -Land tbg in wellhead on FMC tbg hanger w/ tbg tail @ 12,159' - XN nipple @ 12,147' -Packer @ 12,100' -Sliding sleeve @ 12,016' -GLM #1 @ 11,929' -GLM #2 @ 9886' -GLM #3 @ 5439' - SCSSV @ 2243' 12:45 -13:45 1.00 CMPLTN RUNT CMPLTN RI lock downs - LD landing jt. A - Install TWC - MU landing jt. B -Test metal to metal seals on hanger to 5000 psi - LD landing jt. B 13:45 -15:30 1.75 CMPLTN NUND CMPLTN PJSM - ND riser & ROPE stack -change out saver sub in TD 15:30 - 17:30 2.00 CMPLTN NUND CMPLTN Terminate control line through wellhead - NU tree & test to 5000 psi - Pull TWC 17:30 - 00:00 6.50 CMPLTN CIRC CMPLTN RU test manifold & hard lines to tbg & annulus -PJSM -Test lines to 2600 psi -Conventionally circulate around tbg tail - 184 bbls 9.5 ppg brine - 78 bbls 9.5 ppg inhibited brine & 173 bbls diesel (tbg vol + 2000' TVD into the annulus for freeze protection) w/ Dowell - RU lubricator 8 drop packer setting rod /ball assembly -Retest lines to 5000 psi - Pressure up on tbg to 4800 psi to set packer -Test tbg for 30 mins. Initial pressure 4808 psi -15 mins. 4480 psi -Final 4408 psi -Bleed tbg pressure to 1000 psi -Pressure up 3 112" x 7" annulus to 3500 psi & test for 30 mins, Initial pressure 3501 psi - 15 mins. 3457 psi -Final 3431 psi 00:00 - 00:30 0.50 CMPLTN OTHR CMPLTN Flush & vac out hardlines & test manifold - RD lines 00:30 - 01:30 1.00 CMPLTN OTHR CMPLTN RU & test FMC lubricator -Set BPV 01:30 - 02:00 0.50 CMPLTN OTHR ~ CMPLTN Dress tree -Secure well Release rig @ 0200 hrs. Move to CD2-11 Printed: 10/31/2005 3:35:35 PM conocoPhillips Alaska, lnc. A/aska North Slope North Siope, A/aska A/pine CD-2 CD2-01 Job No. AK ZZ-0003898251, Surveyed; 13 September, 2005 Survey Report 26 September, 2005 Your Ref,•501032051400 Surtace Coordinates: 5974781.09 N, 371681.81 E (70° 20' 21.5938" N, 151 ° 02' 28.5741" IAA Grid Coordinate System: NAD27 A/aska Sfate Pianes, Zone 4 Surtace Coordinates relative to Project H Reference: 974781.09 N, 128318.19 W (Grid) Surtace Coordinates relative to Structure: 337.52 N, 41,46 W (True) Kelly Bushing Elevation: 52,55ft above Mean Sea Level Kelly Bushing Elevation: 52.55ft above Project V Reference Kelly Bushing Elevafion: 52.55ft above Structure ~ ~""' ~"'° # ~ ~ ~ ~ ~ ' ~ ~ Survey Ref.• svy516 A tl~ailtburtan GompBny ConocoPhillips Alaskan lnc. Survey Report forA/pine CD-2 - CD2-01 Your Ref.• 501032051400 Job No. AK-ZZ-0003898251, Surveyed: 13 $epfember, 2005 Alaska Noah Slope Measured Depth (ft) 14688.33 14700.00 14736.55 14783.13 14831.78 14879.13 14927.40 14974.61 15022.68 15067.13 True Sub-Sea Vertical Incl. Azim. Depth Depth (ft) (ft) 90.340 330.890 6993.20 7045,75 90.740 330.780 6993.09 7045.64 87.440 332.140 6993.67 7046.22 86.890 332.820 6995.97 7048.52 90.570 334.960 6997.05 7049.60 90.140 89.890 88.780 88.760 89.130 15118.01 89.130 15165.65 88.680 15214,38 89.890 15261,16 89, 970 15310.02 89.650 15353.71 90.380 15405.28 90.080 15500.81 89.460 15596.17 88.350 15642.20 88.190 15691.71 87.670 15737.82 89.030 15786.97 90.530 15833.55 90.060 15882.52 89.750 15928.54 15977.74 16025.34 16073.01 16120.75 89.950 92.120 91.570 91.140 90.630 16167.97 16214.15 16263.33 16310.09 16358.69 90.160 89.830 89.790 89.480 88.970 334.530 335.910 337.340 337.600 337.440 336.080 334.960 332.470 331.860 331.180 330.800 330.710 330.580 329.740 329.710 329.410 330.040 329.010 330.870 331.820 331.230 332.640 333.050 333.520 332.680 332.170 332.340 333.120 333.540 332.830 6996.76 6996.74 6997.29 6998.32 6999.14 6999.91 7000.82 7001.43 7001.49 7001.65 7001.64 7001.43 7001.82 7003.64 7005.03 7006.82 7008.14 7008.33 7008.09 7008,17 Local Coordinates Northings Eastings (ft) (ft) 8961.06 N 5458.28 E 8971.25 N 5452.59 E 9003.35 N 5435.14 E 9044.61 N 5413.64 E 9088.28 N 5392.24 E 9131.10 N 9174.92 N 9218.25 N 9262.64 N 9303.71 N 9350.46 N 9393.80 N 9437.49 N 9478.85 N 9521.80 N 9560.01 N 9605.01 N 9688.27 N 9770.97 N 9810.70 N 5372.04 E 5351.81 E 5333.08 E 5314.66 E 5297.67 E 5277.60 E 5257.86 E 5236.28 E 5214.44 E 5191.14 E 5169.96 E 5144.76 E 5097.93 E 5050.49 E 5027.30 E Global Coordinates Northings Eastings (ft) (ft) 5983647.43 N 377292.65 E 5983657.72 N 377287.13 E 5983690.11 N 377270.23 E 5983731.73 N 377249,44 E 5983775.75 N 377228,79 E 5983818.92 N 377209.33 E 5983863.08 N 377189.85 E 5983906.73 N 377171.86 E 5983951.43 N 377154.21 E 5983992,78 N 377137,92 E 5984039.86 N 377118.65 E 5984083.54 N 377099.66 E 5984127.58 N 377078.84 E 5984169.32 N 377057.70 E 5984212.66 N 377035.14 E 5984251.22 N 377014.61 E 5984296.64 N 376990.19 E 5984380.70 N 376944.79 E 5984464.20 N 376898.78 E 5984504.32 N 376876.27 E North Slope, Alaska Dogleg Vertical Rate Section Comment (°/100ft) 10192.02 Tie-On Point 3.555 10200.01 Window Point 9.765 10225.33 1.876 10258.16 8.749 10293.31 1.284 10328.02 2.905 10363.68 3.834 10399.32 0.542 10436.06 0.907 10470,07 2.673 10508.55 2.533 10543.90 5.681 10579.02 1.315 10611.85 1.538 10645.74 1.884 10675.75 0.607 10711.02 0.663 10776.23 1.460 10840.71 0.354 10871.57 9853.36 N 5002.23E 5984547.40 N 376851.93E 1.212 10904.65 9893.16 N 4978.99E 5984587.60 N 376829.38E 3.250 10935.57 9935.52 N 4954.07E 5984630.38 N 376805.18E 3.702 10968.41 9975.83 N 4930.74E 5984671.08 N 376782.55E 4.119 10999.78 10018.81 N 4907.25E 5984714.45 N 376759.80E 2.041 11033.64 7008.29 7060.84 10059.26 N 4885.31E 5984755.27 N 376738.56 E 7007.41 7059.96 10102.66 N 4862.17E 5984799.06 N 376716,16 E 7005.87 7058.42 10144.99 N 4840.46E 5984841.76 N 376695.18 E 7004.75 7057.30 10187.56 N 4819.03E 5984884.69 N 376674.48 E 7004.01 7056.56 10230.13 N 4797.44E 5984927.62 N 376653.62 E 7003.68 7056.23 10271.99 N 4775.58E 5984969.85 N 376632.48 E 7003.69 7056.24 10312.86 N 4754.08E 5985011.08 N 376611.68 E 7003.85 7056.40 10356.57 N 4731.55E 5985055.17 N 376589.90 E 7004.15 7056.70 10398.35 N 4710.56E 5985097.31 N 376569.63 E 7004.81 7057.36 10441.72 N 4688.64E 5985141.05 N 376548.46 E 7049.31 7049.29 7049.84 7050.87 7051.69 7052.46 7053.37 7053.98 7054.04 7054.20 7054.19 7053.98 7054.37 7056.19 7057.58 7059.37 7060,69 7060.88 7060.64 7060.72 1.354 11065.56 5.260 11099.94 1.441 11133.72 1.336 11167.82 2.058 11201.87 1.469 11235,15 0.804 11267.61 1.588 11302.46 1.116 11335.95 1.799 11370.66 C7 • 26 September, 2005 -16:21 Page 2 of 4 DrillQuest 3.03.06.008 GonocoPhillips Alaska, lnc. Survey Report forA/pine CD-2 - CD2-01 Your Ref.• 501032051400 Job No. AK ZZ-0003898251, Surveyed: 13 Sepfember, 2005 A/aska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) (ft) (ft) 16405.72 88.480 332.710 7005,85 7058.40 10483.53 N 4667.13E 5985183.22 N 376527.66 E 16454.19 89.340 333.420 7006.77 7059.32 10526.73 N 4645.17E 5985226.79 N 376506.45 E 16501.87 88.760 333.660 7007.56 7060.11 10569.41 N 4623.93E 5985269.82 N 376485.94 E 16549.99 88.840 332.460 7008.57 7061.12 10612.30 N 4602.14E 5985313.08 N 376464.89 E 16596.09 90.430 333,810 7008.87 7061.42 10653.42 N 4581.31E 5985354.55 N 376444.76 E 16645.44 90.010 334.040 7008.68 7061.23 10697.75 N 4559.61E 5985399.24 N 376423.83 E 16690,57 89.480 333.860 7008.88 7061.43 10738.29 N 4539.80E 5985440.12 N 376404.71 E 16740,96 89.540 334.250 7009.31 7061.86 10783.60 N 4517.75E 5985485.80 N 376383.44 E 16786,88 89.630 334.230 7009.64 7062.19 10824.96 N 4497.79E 5985527.49 N 376364.20 E 16836.45 89.400 333.420 7010.06 7062.61 10869.44 N 4475.93E 5985572.34 N 376343.10 E 16$82.79 89.210 333.310 7010.62 7063.17 10910.86 N 4455.16E 5985614.11 N 376323.04 E 16931.92 90.440 333.870 7010.77 7063.32 10954.87 N 4433.30E 5985658.48 N 376301.94 E 16978.06 91.060 334.620 7010.17 7062.72 10996.42 N 4413.26E 5985700.37 N 376282.61 E 17027.68 90.650 335.090 7009.43 7061.98 11041.33 N 4392.17E 5985745.64 N 376262.30 E 17075.03 90.160 335.340 7009.09 7061.64 11084.32 N 4372.33E 5985788.96 N 376243.19 E 17122.93 91.250 335.610 7008.50 7061.05 11127.89 N 4352.44E 5985832.87 N 376224.05 E 17170.99 92.130 337.920 7007.09 7059,64 11172.03 N 4333.49E 5985877.32 N 376205.86 E 17218.21 93.780 338.300 7004.65 7057.20 11215.79 N 4315,91E 5985921.37 N 376189.03 E 17264.59 93.120 338.360 7001.86 7054.41 11258.81 N 4298.82E 5985964.68 N 376172.68 E 17313.56 92.470 337.930 6999.47 7052.02 11304,21 N 4280.61E 5986010.39 N 376155.25 E 17408.99 91.500 336.920 6996,17 7048.72 11392,27 N 4244.00E 5986099.06 N 376120.15 E 17468.18 90.940 336.740 6994.91 7047.46 11446.67 N 4220.71E 5986153.86 N 376097.80 E 17513.00 90.940 336.740 6994.17 7046.72 - 11487.84 N 4203.02 E - 5986195.32 N 376080.81E ' All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to RKB = 52.55'. Northings and Eastings are relative to Well. - Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 17.600° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 17513.OOft., The Bottom Hole Displacement is 12232.58ft., in the Direction of 20.096° (True). Dogleg Vertical Rate Section (°/100ft) 1.073 11404.00 2.301 11438.55 1.316 11472.80 2.499 11507.09 4.524 11539.99 0.970 11575.69 1.240 11608.34 0.783 11644.86 0.201 11678.25 1.699 11714.04 0.474 11747.24 2.751 11782.57 2.109 11816.12 1.257 11852.55 1.162 11887.53 2.344 11923.05 5.141 11959.39 3.586 11995.79 1,429 12031.63 1.591 12069.39 1.467 12142.26 0.994 12187.08 0.000 12220.97 North Slope, A/aska Comment • Projected Survey . 26 September, 2005 -16:21 Page 3 of 4 Dril/Quest 3.03.06.008 ConocoPhillips A/aska, lnc. Survey Report forA/pine CD-2 -CD2-01 Your Ref 501032051400 Job No. AK ZZ-0003898231, Surveyed; 13 September, 2005 A/aska North Slope Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 14688.33 7045.75 8961.06 N 5458.2$ E Tie-On Point 14700.00 7045.64 8971.25 N 5452.59E Window Point 17513.00 7046.72 11487.84 N 4203.02E Projected Survey Survey tool program for CD2-07 From Measured Vertical Depth Depth (ft) (ft) 0.00 0.00 614.00 610.15 To Measured Vertical Depth Depth (ft) (ft) 614.00 610,15 17513.00 7046.72 Survey Tool Description CB-SS-Gyro (CD2-01PB1) MWD+IIFR+MS+SAG (CD2-01PB1) North Slope, A/aska • • 26 September, 2005 - 16:21 Page 4 of 4 Drf//Quest 3,03.06.008 ConocoPhillips A/aska, lnc. A/aska North Siope North Slope, Alaska Alpine CD-2 CD2-01 PB 1 Job No. AK ZZ-0003898251, Surveyed: 31 August, 2005 Surrey Report 26 September, 2005 Your Ref.• 501032051470 Surtace Coordinates: 5974781.09 N, 371681,81 E ~(70° 20' 21.5938" N, 151 ° 02' 28.5741 " VI/) • Grid Coordinate System: NAD27 A/aska Sfafe Planes, Zone 4 Surface Coordinates relafive to Project H Reference: 974781,09 N, 128318.19 W (Grid) Surtace Coordinates relative io Structure: 337.52 N, 41.46 W (True) Kelly Bushing Elevation: 52.55ft above Mean Sea Levei Kelly Bushing Elevation: 52.55ft above Project V Reference Ke/ly Bushing Elevation: 52.55ft above Structure ~' ~ ~" ~•` ~` ~ ~ ~ ~ ~ ~ Survey Ref.• svy510 A HautbrrccMr Campa~y ConocoPhillips Alaska, lnc. Survey Report forA/pine CD-2 - CD2-01P81 Your Ref.• 501032051470 Job No, AK ZZ-0003898251, Surveyed: 31 August, 2005 A/asks North Slope North Slope, Alaska Measured True Subsea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft} (ft) (ft) (ft} (ft) (ft} (°1100ft) 0.00 0.000 0.000 -52.55 0.00 0.00 N 0.00E 5974781.09 N 371681.81E 0.00 Ct3-SS-Gyro 79.00 0.250 300.000 26.45 79.00 0.09 N 0.15 W 5974781.18 N 371681.66E 0,316 0.04 179.00 0.250 340.000 126,45 179.00 0.40 N 0.41 W 5974781.50 N 371681.40E 0.171 0.26 259.00 1.500 72.000 206,44 258.99 0.89 N 0.52E 5974781.97 N 371682.35E 1.912 1.00 349.00 3.800 64.000 296,34 348.89 2.56 N 4.32E 5974783.58 N 371686.18E 2.582 3.75 439.00 7.500 46.000 385.89 438.44 7.95 N 11.23E 5974788.85 N 371693.18E 4.510 10.97 529.00 11.000 46.000 474.71 527.26 18.00 N 21.64E 5974798.71 N 371703.75E 3.889 23.70 614.00 14.500 48.000 557.60 610.15 30.75 N 35,38E 5974811.23 N 371717.72E 4.150 40.01 MWD+IIFR+MS+SAG 659.02 15.550 52.040 601.08 653.63 38.24 N 44.33E 5974818.56 N 371726.79E 3.293 49,85 746.98 17.590 48.360 685.39 737.94 54.32 N 63,56E 5974834.32 N 371746.29E 2.607 71,00 837.77 20.560 49.440 771.18 823.73 73.81 N 85.93E 5974853.42 N 371768.99E 3.294 96.34 932.35 24.150 46.450 858.64 911.19 97,95 N 112.58E 5974877.10 N 371796.05E 3.980 127.40 1028.76 25.800 46.360 946.03 998,58 126.02 N 142.06E 5974904.66 N 371826.01E 1.712 163.07 1124.14 29.080 46,830 1030.67 1083.22 156.21 N 173.99E 5974934.30 N 371858.45E 3.446 201.51 1219.26 32.190 46.330 1112.50 1165.05 189.53 N 209.19E 5974967.01 N 371894.21E 3.280 243.91 1314.67 32.230 46.020 1193.23 1245.78 224.74 N 245.88E 5975001.59 N 371931,50E 0.178 288.57 1409.86 35.270 47.540 1272.37 1324.92 260.93 N 284.43E 5975037.11 N 371970.66E 3.314 334.72 1505.22 38.620 48.300 1348.57 1401.12 299.32 N 326.97E 5975074.77 N 372013.86E 3.545 384.18 1599.84 41.680 48.700 1420.89 1473.44 339.74 N 372.67E 5975114.40 N 372060.24E 3.245 436.52 1695.23 45.350 48.780 1490.05 1542.60 383.05 N 422.03E 5975156.86 N 372110.33E 3.848 492.73 1790.27 50,100 48.800 1553.97 1606.52 429.36 N 474.92E 5975202.26 N 372164.01E 4.998 552.87 1885.48 53.210 48.710 1613.03 1665.58 478.59 N 531.06E 5975250.52 N 372220.98E 3.267 616.76 1980.76 54.410 49.390 1669,29 1721.84 528.98 N 589.14E 5975299.91 N 372279.91E 1.385 682.36 2076.18 55.480 49.720 1724,09 1776.64 579.65 N 648.58E 5975349.56 N 372340.22E 1.157 748.63 2171.35 56.220 50.210 1777,52 1830,07 630.31 N 708.89E 5975399.18 N 372401.38E 0.887 815.15 2266.61 57.300 48.110 1829.74 1882.29 682.42 N 769.15E 5975450.24 N 372462.53E 2.164 883.04 2361.73 58.220 46.870 1880.48 1933.03 736.78 N 828.45E 5975503.59 N 372522.75E 1.467 952.79 2407.29 58.070 46.200 1904.53 1957.08 763.40 N 856.54E 5975529.72 N 372551.29E 1.292 986.66 2457.10 59.240 45.780 1930.44 1982.99 792.96 N 887,13E 5975558.75 N 372582.38E 2.457 1024.08 2552.08 60.120 46.770 1978.39 2030.94 849.63 N 946.38E 5975614.40 N 372642.60E 1.291 1096.01 2647.15 59.660 46.390 2026.08 2078.63 906.15 N 1006.12E 5975669.89 N 372703.29E 0.595 1167.96 2742.18 61.160 47.220 2073.00 2125,55 962.71 N 1066.36E 5975725.41 N 372764.49E 1.752 1240.08 2837,45 61.380 48.110 2118.80 2171.35 1018.97 N 1128.12E 5975780.61 N 372827.20E 0.851 1312.38 2932.27 62.490 49.280 2163.41 2215,96 1074.19 N 1190.97E 5975834.75 N 372890.99E 1.599 1384.03 3027.23 61.220 49.300 2208.20 2260,75 1128.81 N 1254.44E 5975888.26 N 372955,39E 1.338 1455.27 26 September, 2005 -16;02 Page 2 of 7 DriflQuest 3.03.06.008 GonocoPhillips Alaska, Inc. Survey Report forA/pine CD-2 - CD2-01PB1 Your Ref 501032051470 Job No. AK ZZ-0003898251, Surveyed: 31 August, 2005 A/aska North Slope Measured Depth Incl. (ft) 3122.30 59.230 3217.90 58.690 3260.74 58.860 3355.70 58.860 3451.47 60.250 3546.92 60.100 3642.83 59.670 3738.12 59.340 3834.06 59.610 3928.90 60.350 True Sub-Sea Azim. Depth (ft) 49.530 2255.41 49.680 2304.70 49.920 2326.91 49.540 2376.02 50.720 2424.55 50.320 2472.02 49.520 2520.14 50.230 2568.50 48.160 2617.23 46.860 2664.68 4022.89 59.860 46.610 2711.53 4118.04 59.850 45.620 2759.31 4213.23 59.520 44,360 2807.36 4308.44 58.710 45.670 2856.23 4403.63 58.420 45.990 2905.88 4498.77 58.210 46.370 2955.85 4594.01 60.140 48.020 3004.65 4689.15 61.080 50.870 3051.35 4784.06 60.810 51.150 3097.44 4879.45 60.650 51.610 3144.08 4974.33 5069.46 5164.64 5259,49 5354.18 5449,66 5544.87 5640.28 5735.51 5830.79 5926.08 6021.45 6116.83 6211.90 6306.93 Vertical Depth (ft) 2307.96 2357.25 2379.46 2428.57 2477.10 2524.57 2572.69 2621.05 2669.78 2717.23 2764.08 2811.86 2859.91 2908.78 2958.43 3008.40 3057.20 3103.90 3149,99 3196.63 3243.21 3290,17 3337.63 3385.30 3433.07 3481.13 3529.67 3578.83 3627.73 3677.75 3728.72 3779.67 3829.95 3879.35 3926.82 Local Goordinates Northings Eastings (ft) (ft) 1182.49 N 1317.11 E 1235.57 N 1379.49 E 1259.22 N 1407.47 E 1311.75 N 1469.48 E 1364.67 N 1532.85 E 1417.32 N 1596.77 E 1470.74 N 1660.25 E 1523.65 N 1723.03 E 1577,66 N 1785.58 E 1633,13 N 1846.13 E 1688.97 N 1905.46 E 1746.01 N 1964.77 E 1804.12 N 2022.86 E 1861.88 N 2080.65 E 1918.48 N 2136,90 E 1974.53 N 2197.32 E 2030.09 N 2257.32 E 2083.97 N 2320.30 E 2136.17 N 2384.79 E 2188.11 N 2449.80 E 2239:34 N 2514.67 E 2290.71 N 2579.52 E 2342.10 N 2644.07 E 2393.35 N 2708.08 E 2443.90 N 2772.33 E 2494.78 N 2837.27 E 2546.58 N 2900.72 E 2600.95 N 2961.78 E 2657.98 N 3020.30 E 2715.25 N 3077.70 E 2772.00 N 3134.82 E 2827.79 N .3193.01 E 2882.34 N 3252.95 E 2935.98 N 3313.94 E 2990.21 N 3375.88 E Global Coordinates Northings Eastings (ft) (ft) 5975940.87 N 373018.96 E 5975992.87 N 373082.24 E 5976016.04 N 373110.62 E 5976067.50 N 373173,53 E 5976119.33 N 373237.79 E 5976170.88 N 373302.60 E 5976223.20 N 373366.98 E 5976275.03 N 373430.66 E 5976327.96 N 373494.13 E 5976382.38 N 373555.62 E 5976437.21 N 373615.90 E 5976493.22 N 373676.17 E 5976550.33 N 373735.25 E 5976607.09 N 373794.02 E 5976662.68 N 373853.23 E 5976717.73 N 373912.60 E 5976772.26 N 373973.54 E 5976825.05 N 374037.44 E 5976876.14 N 374102.80 E 5976926.96 N 374168.70 E 5976977.07 N 374234.43 E 5977027.32 N 374300.16 E 5977077.59 N 374365.57 E 5977127.74 N 374430,45 E 5977177.19 N 374495.55 E 5977226.95 N 374561.36 E 5977277.65 N 374625.69 E 5977330.97 N 374687.67 E 5977386.99 N 374747.15 E 5977443.28 N 374805.53 E 5977499.03 N 374863.61 E 5977553.82 N 374922.75 E 5977607.34 N 374983.61 E 5977659.93 N 375045.51 E 5977713.09 N 375108.36 E North Slope, A/aska Dogleg Vertical Rate Section Comment (°/100ft) 2.104 1525.39 0.581 1594.85 0.622 1625.85 0.343 1694,68 1.799 1764,28 0.396 1833.79 0.849 1903.90 0.729 1973.33 1.880 2043.71 1.420 2114.89 0.570 2186.07 0.900 2258.37 1.194 2331.32 1.455 2403.86 0.418 2475.41 0.405 2546.51 2,514 2617.61 2.791 2688.01 0.384 2757.27 0,453 2826.43 0.196 0.414 0.423 0.360 1.240 1.053 1.631 3.357 1.346 1.390 0.107 1.696 1.298 0.828 2.695 2894.88 2963.45 3031.95 3100.16 3167.77 3235.91 3304.46 3374.75 3446.81 3518.76 3590.12 3660.89 3731.02 3800.59 3871.00 C7 26 September, 2005 - 16:02 Page 3 of 7 Dril/Quest 3,03.06.008 60.550 60.290 59.890 59.770 59.630 59.930 58.770 59,220 58.990 57.670 57.660 57.760 58.610 58.780 61.280 51.790 51.450 51.500 51.130 52.480 51.370 50.170 46.470 45.000 45.130 45.250 47,160 48,220 49.120 48.480 3190.66 3237.62 3285.08 3332.75 3380.52 3428.58 3477.12 3526.28 3575.18 3625.20 3676.17 3727.12 3777.40 3826.80 3874.27 ii Alaska North Slope Measured True Subsea Depth Incl. Azim. Depth (ft) (ft) 6402.11 61.530 48.030 3919.82 6497.21 61.560 48.010 3965.14 6592.54 60.930 47.610 4011.00 6687.81 60.630 47.120 4057.50 6783.14 60,110 46.980 4104.63 6877.68 60.860 47.300 4151.21 6972.96 59.540 47.320 4198.56 7068.42 58.530 46.650 4247.68 7163.98 58.140 46.510 4297.84 7258.99 58.560 47.050 4347.69 7354.90 58.910 47.000 4397.47 7450.25 59.450 47.220 4446.32 7545.07 60.120 47.780 4494.04 7640.17 60.480 47.530 4541.16 7735.07 60.230 46.970 458$.10 7830.14 59.490 46.470 7925.07 59.690 46.890 8020.34 60.010 47.050 8115.34 60.570 46.860 8210.59 60.960 47.200 8305.69 60.440 47.010 8400.96 59,690 47.190 8496.29 59.860 47.520 8591.32 60.060 47.260 8686.49 60.070 47.320 8781.77 8876.97 8972.28 9067.64 9162.76 59.410 59.140 59.360 59.640 59.860 48.570 48.580 48.560 47.810 47.790 9258.31 9353.36 9448.23 9543.11 9638.45 60.200 59.790 59.910 61.630 60.220 4635.84 4683.89 4731.74 4778.82 4825.34 4871.88 4919.42 4967.41 5014.98 5062.47 5110.49 5159.13 5207.86 5256.26 5304.18 Vertical Depth (ft) 3972.37 4017.69 4063.55 4110.05 4157.18 4203.76 4251.11 4300.23 4350.39 4400.24 4450.02 4498.87 4546.59 4593.71 4640.65 4688.39 4736.44 4784.29 4831.37 4677.89 4924.43 4971.97 5019.96 5067.53 5115.02 5163.04 5211.68 5260.41 5308.81 5356.73 ConocoPhillips A/aska, lnc. Survey Report forA/pine CD-2 - CD2-01P81 Your Ref 501032057470 Job No. AK-ZZ-0003898251, Surveyed: 31 August, 2005 Local Coordinates Northings Eastings (ft) (ft) 3045.85 N 3438.23 E 3101.78 N 3500.38 E 3157.90 N 3562.31 E 3214.22 N 3623.48 E 3270.68 N 3684.13 E 3326.64 N 3744.43 E 3382.70 N 3805.21 E 3438.54 N 3865.06 E 3494.44 N 3924.13 E 3549.83 N 3983.07 E 3605.71 N 4043.05 E 3661.44 N 4103.05 E 3716.80 N 4163.46 E 3772.44 N 4224.51 E 3828.43 N 4285.08 E 3884.79 N 4344.93 E 3940.96 N 4404.50 E 3997.17 N 4464.72 E 4053.49 N 4525.02 E 4110.15 N 4585.84 E 4166.59 N 4646.59 E 4222.80 N 4707A7 E 4278.60 N 4767.66 E 4334.29 N 4828.21 E 4390.23 N 4888.81 E 4445.36 N 4949.91 E 4499.51 N 5011.27 E 4553.71 N 5072.68 E 4608.49 N 5133.92 E 4663.68 N 5194.79 E Global Coordinates Northings Eastings (ft) (ft) 5977767.66 N 375171.66 E 5977822.51 N 375234.76 E 5977877.57 N 375297.64 E 5977932.83 N 375359.76 E 5977988.24 N 375421.37 E 5978043.16 N 375482.63 E 5978098.17 N 375544.35 E 5978152.98 N 375605.15 E 5978207.86 N 375665.17 E 5978262.23 N 375725.05 E 5978317,08 N 375785.98 E 5978371.78 N 375846.92 E 5978426.09 N 375908.27 E 5978480.68 N 375970.26 E 5978535.62 N 376031.78 E 5978590.95 N 376092.59 E 5978646.09 N 376153.11 E 5978701.27 N 376214.28 E 5978756.55 N 376275.53 E 5978812.15 N 376337.31 E 5978867.56 N 376399,03 E 5978922.71 N 376460.46 E 5978977.47 N 376521.99 E 5979032.12 N 376583.48 E 5979087.01 N 376645003 E 5979141.09 N 376707.07 E 5979194.18 N 376769.35 E 5979247.32 N 376831.68 E 5979301,04 N 376893.85 E 5979355.19 N 376955.65 E 48.270 5351.91 5404.46 4719.03 N 5256.33E 5979409.48 N 377018.13 E 50.570 5399.45 5452.00 4772.58 N 5318.84E 5979461.94 N 377081.55 E 52.190 5447.10 5499.65 4823.78 N 5382.93E 5979512.04 N 377146.51 E 50.430 5493.43 5545.98 4875.54 N 5447.55E 5979562.69 N 377212.00 E 44.050 5539.80 5592.35 4932.04 N 5508.70E 5979618.14 N 377274.11 E Dogleg Rate (°I100ft) 0.491 0.037 0.756 0.548 0.560 0.846 1.386 1.217 0.427 0.655 0.368 0.600 0.872 0.442 0.577 0.902 0,436 0, 366 0.615 0.514 0.574 0.804 0.348 0.317 0.056 1.328 0.284 0.232 0.739 0.232 0.562 2.139 1.482 2.430 6.032 North S/ope, A/aska Vertical Section Comment 3942.89 4015.00 4087.22 4159.39 4231.55 4303,13 4374.94 4446.26 4517.41 4588.02 4659.43 4730.69 4801.72 4873.22 4944.90 5016.72 5088.27 5160.06 5231.98 5304.37 5376.55 5448.41 5519.92 5591,31 5662.96 5733.98 5804.14 5874.38 5945.11 6016.13 6087.50 6157.43 6225.61 6294.49 6366.84 C] 26 September, 2005 -16:02 Page 4 of 7 DrillQuest 3.03.06.008 ConocoPhillips Alaska, inc. Survey Report forA/pine CD-2 - CD2.01PB1 Your Ref 501032051470 Job No. AK-ZZ-0003898251, Surveyed: 31 August, 2005 Alaska North Slope Measured Depth (ft) 9733.83 9829.53 9924.77 10019.58 10114.42 10209.17 10304.42 10400.11 10494.61 10590.31 10684.63 10779.69 10875.06 10970.47 11065.19 11160.36 11255.47 11350.69 11445.92 11541.12 11636.42 11731.65 11826.72 11921,78 12017,22 True Incl. Azim. 59.860 60.290 59.260 60.140 60.840 61.070 61.140 61.000 60.420 59.790 44.650 47.500 50.060 49.460 49.290 48.790 48.770 48.710 48.830 49.280 58,920 57.400 57.480 57.720 57.790 58.040 57.850 59.000 59.790 63.740 63.160 62.390 63.730 64.830 66.040 48.210 47.620 47.510 47.640 48.040 48.620 48.580 49.440 42.080 32.610 31.300 29.940 25.970 24.780 22.950 Sub-Sea Depth (ft) 5587.43 5635.18 5683.13 5730,96 5777.68 5823.68 5869.70 5915.99 5962.23 6009.92 6058.00 6108.15 6159.48 6210.60 6261.14 6311.69 6362.17 6412.02 6460.56 6505.67 6548.26 6591.83 6634.92 6676.17 6715.85 vertical Depth (ft) 5639.98 5687.73 5735.68 5783.51 5830.23 5876.23 5922,25 5968,54 6014.78 6062.47 6110.55 6160.70 6212.03 6263.15 6313.69 6364.24 6414.72 6464.57 6513.11 6558.22 6600.81 6644.38 6687.47 6728.72 6768.40 Local Coordinates Northings Eastings (ft) (ft) 4991,13 N 5566.46 E 5048.66 N 5626.19 E 5102.88 N 5688.08 E 5155.76 N 5750.56 E 5209.50 N 5813.21 E 5263.80 N 5318.76 N 5373.99 N 5428.31 N 5482.68 N 5536.18 N 5590.30 N 5644.54. N 5698.89 N 5752.66 N 5806.27 N 5859.57 N 5912.78 N 5969.92 N 6036,55 N 6108.88 N 6181.75 N 6256.60 N 6333.97 N 6413.35 N 5875.76 E 5938.49 E 6001,44 E 6063.43 E 6126.09 E. 6187.10 E 6247.03 E 6306.35 E 6365.82 E 6425.20 E 6485.44 E 6545.90 E 6607.14 E 6665.78 E 6716.46 E 6761.58 E 6804.71 E 6844.42 E 6881.11 E 6916.22 E Global Coordinates Northings Eastings (ft) (ft) 5979676.23 N 377332.87 E 5979732.72 N 377393,58 E 5979785.88 N 377456.38 E 5979837.69 N 377519.76 E 5979890.35 N 377583.32 E 5979943.57 N 377646.79 E 5979997.44 N 377710.45 E 5980051.58 N 377774.34 E 5980104.84 N 377837.24 E 5980158.13 N 377900.63 E 5980210.58 N 377962.74 E 5980263.67 N 378023.60 E 5980316,88 N 378083.84 E 5980370.20 N 378144.22 E 5980422.95 N 378204.52 E 5980475.52 N 378265.66 E 5980527.78 N 378327.03 E 5980579.93 N 378389,17 E 5980636.06 N 378448,78 E 5980701.82 N 378500.60 E 5980773.36 N 378546.95 E 5980845.48 N 378591.32 E 5980919.64 N 378632.30 E 5980996.38 N 378670.31 E 5981075.14 N 378706.77 E 12112.60 67.320 20.330 6753.61 6806.16 6494.76 N 6948.51E 5981155.98 N 378740.45 E 12207.84 69,500 15.000 6788.68 6841.23 6579.11 N 6975.34E 5981239.86 N 378768.72 E 12303.08 70.810 9.630 6821.03 6873.58 6666.59 N 6994,42E 5981327,01 N 378789.29 E 12398.52 71.660 5.630 6851.74 6904.29 6756.14 N 7006.41E 5981416,33 N 378802.81 E 12493.85 73.680 359.930 6880.16 6932.71 6846.99 N 7010.79E 5981507.09 N 378808.75 E 12588.93 76.630 350.510 6904.57 6957.12 6938.44 N 7003.10E 5981598.67 N 378802.62 E 12683.97 76.350 343.360 6926.80 6979.35 7028.39 N 6982.22E 5981688.97 N 378783.29 E 12779.24 77.310 341.530 6948.50 7001.05 7116.83 N 6954.24E 5981777.87 N 378756.83 E 12874.72 78.760 340.580 6968.30 7020.85 7205.17 N 6923.92E 5981866.72 N 378728.02 E 12969.08 83.400 338.630 6982.93 7035.48 7292.52 N 6891.43E 5981954.60 N 378697.03 E Dogleg Rate (°/100ft) 0.663 2.620 2.562 1.077 0.754 0.521 0.076 0.156 0.624 0.774 1.343 1.684 0.128 0.277 0.365 0.579 0.203 1.432 6.702 9e691 1.372 1.505 3.980 1.616 2.156 2.857 5.684 5.479 4.067 6.088 10.065 7.321 2.124 1.804 5.324 North Slope, Alaska Vertical Section Comment 6440.63 6513.52 6583.92 6653,22 6723.39 6794.06 6865.41 6937.09 7007.61 7078.38 7147.83 7217.54 7287.18 7356.96 7426.17 7495.48 7564.57 7633.81 7706.00 7784.84 7867.43 7949.92 8033.28 8118.13 8204.40 8291,76 8380.28 8469.44 8558.41 8646.34 8731.18 8810.61 8886.45 8961.49 9034.92 • • 26 September, 2005 - 76:02 Page 5 of 7 DrillQuest 3.03.06.008 ConocoPhillips Alaska, inc. Survey Report forA/pine CD-2 - CD2-01P81 Your Ref,• 501032051470 Job No. AK-ZZ-0003898251, Surveyed: 31 August, 2005 Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Depth .Incl. Azim. Depth Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) (ft) (ft) 13064.33 84.880 337.340 6992.65 7045.20 7380.36 N 6855.91E 5982043.04 N 378663 02 E 13159.27 85.180 335.990 7000.88 7053.43 7467.20 N 6$18.45 E 5982130.51 N , 378627 05 E 13234.46 86.300 335.340 7006.46 7059.01 7535.52 N 6787.55E 5982199.35 N . 378597 33 E 13317.96 86,910 335.150 7011.41 7063.96 7611.21 N 6752.65E 5982275.63 N . 378563.73 E 13413.19 85.850 335.330 7017.42 7069.97 7697.51 N 6712.85E 5982362.60 N 378525.40 E 13508.43 85.800 335.140 7024.35 7076.90 7783.77 N 6673.06E 5982449.52 N 378487 10 E 13603.89 89.210 334.790 7028.51 7081.06 7870.16 N 6632.70E 5982536.59 N . 378448 23 E 13696.76 93.090 334.180 7026.64 7079.19 7953.94 N 6592.72E 5982621.04 N . 378409 68 E 13729.71 93.080 334.310 7024.87 7077.42 7983.58 N 6578.42E 5982650.92 N . 378395 89 E 13825.04 92.840 334.320 7019.95 7072.50 8069.37 N 6537.16E 5982737.41 N . 378356.10 E 13920.13 93.520 334,190 7014.67 7067.22 8154.89 N 6495.92E 5982823.62 N 378316.33 E 14015.23 93.580 334.610 7008.79 7061.34 8240.49 N 6454.90E 5982909.91 N 378276 79 E 14110.90 93.090 335.020 7003.22 7055.77 8326.92 N 6414.26E 5982997.02 N . 378237 63 E 14205.15 93.150 335.130 6998.09 7050.64 8412.26 N 6374.60E 5983083.03 N . 378199 44 E 14300.37 93.210 335.870 6992.81 7045.36 8498.78 N 6335.17E 5983170.20 N . 378161.50 E 14394.75 93.400 335.990 6987.37 7039.92 8584.81 N 6296.75E 5983256.88 N 378124 55 E 14451.32 92.770 335.620 6984.32 7036.87 8636.33 N 6273.59E 5983308.79 N . 378102 28 E 14483.00 92.770 335.620 6982.79 7035.34. 8665.15 N 6260.53E 5983337.83 N . 378089.72 E All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to RKB = 52.55'. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Welf and calculated along an Azimuth of 17.600° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14483.OOft., The Bottom Hole Displacement is 10690.14ft., in the Direction of 35.848° (True). Dogleg Rate (°/100ft) 2.057 1.451 1.721 0.765 1.129 0.206 3.591 4:229 0.395 0.252 North Slope, Alaska Vertical Section Comment 9107.91 9179.36 9235.14 9296.74 9366:96 9437.14 9507.30 9575.06 959$.99 9668.29 0.728 9737.33 0.445 9806:53 0.667 9876.62 0.133 9945.98 0.779 10016.52 0.238 10086.90 1.291 10129.02 0,000 10152.54 • Projected Survey • 26 September, 2005. 16:02 page 6 of 7 Dril/Quest 3.03.06.008 ConocoPhiilips Alaska, lnc. Survey Report forA/pine CD-2 -CD2-01P81 Your Ref.' 501032051470 Job No. AK ZZ-0003898251, Surveyed: 31 August, 2005 Alaska North Slope Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 14483.00 7035.34 8665.15 N 6260.53 E Survey too/ program for CD2-U~PB1 From Measured Vertical Depth Depth (ft) (ft) 0.00 0.00 614..00 610.15 To Measured Vertical Depth Depth (ft) (ft) 614.00 610.15 14483.00 7035.34 Survey Tool Description CB-SS-Gyro MWD+IIFR+MS+SAG North Slope, Alaska -, Comment Projected Survey 26 September, 2005 -16:02 Page 7 of 7 DrillQuest 3.03,06.008 ConocoPhillips Alaska, inc. Alaska North S/ope North Slope, Alaska Alpine CD-2 CD2-D7PB2 Job No. AK ZZ-0003898251, Surveyed: 10 September, 2005 Survey Report 26 September, 2005 Your Ref.• 501032051471 Surface Coordinates; 5974781.09 N, 371681.81E (70° 20' 21.5938" N, 151 ° 02' 28.5741 " VI!) Grid Coorolinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates ne/ative to Project H Reference: 974781.09 N, 128318.19 W (Grid) Surface Coordinates relative to Structure: 337.52 N, 41.46 W (True) Kelly Bushing Elevafion: 52.55ft above Mean Sea Level Kelly Bushing Elevation: 52.55ft above Project V Reference Kelly Bushing Elevation: 52.55ft above Structure ~' ~ ~•'• ~ t ~ ~ ~ ~ ~ ~ ~ Survey Ref.• svy511 A Haliiburtat Co;npssny ConocoPhillips Alaska, lnc. Survey Report forA/pine CD-2 - CD2-01PB2 Your Ref 501032051471 Job No. AK-ZZ-0003898251, Surveyed: 10 September, 2005 A/aska North Slope North Slope, A/aska Measured True Subsea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 10400.11 61.000 48.710 5915.99 5968.54 5373.99 N 6001.44E 5980051.58 N 377774.34E 6937.09 Tie-On Point 10459.00 60.640 48.780 5944.71 5997.26 5407.89 N 6040.10E 5980084.82 N 377813.57E 0.620 6981.09 Window Point 10492.39 59.860 49.410 5961.27 6013.82 5426.87 N 6062.00E 5980103.43 N 377835.80E 2.853 7005 81 10589.56 57.610 49.540 6011.70 6064.25 5480.84 N 6125.13E 5980156.31 N 377899.84E 2.318 . 7076.34 10686.17 58.420 45.020 6062.90 6115.45 5536.42 N 6185.30E 5980210.85 N 377960.95E 4.056 7147.51 10779.74 58.420 40.300 6111.92 6164.47 5595.01 N 6239.30E 5980268.51 N 378015.94E 4.297 7219 69 10874.75 59.460 36.570 6160.95 6213.50 5658.76 N 6289.86E 5980331.38 N 378067.59E 3.536 . 7295 74 10970.11 59.050 35.710 6209.70 6262.25 5724.94 N 6338.20E 5980396.73 N 378117.05E 0.886 . 7373 44 11064.80 58.760 32.870 6258.61 6311.16 5791.92 N 6383.87E 5980462.91 N 378163.87E 2.586 . 7451 10 11160.58 58.05Q 27.040 6308.82 6361.37 5862.55 N 6424.60E 5980532.84 N 378205.79E 5.237 . 7530.73 11255.77 56.880 24.770 6360.02 6412.57 5934.73 N 6459.66E 5980604.40 N 378242.09E 2.356 7610 13 11350.60 57.400 19.480 6411.50 6464.05 6008.48 N 6489.64E 5980677.63 N 378273.32E 4.717 . 7689 50 11445,78 58.060 12.380 6462.36 6514.91 6085.79 N 6511.68E 5980754,55 N 378296.69E 6.344 . 7769 86 11540.66 59.210 6.720 6511.77 6564.32 6165.64 N 6525.09E 5980834.16 N 378311,46E 5.235 . 7850 02 11635.71 60.060 0.620 6559.86 6612.41 6247.42 N 6530.32E 5980915.84 N 378318.09E 5.608 . 7929.56 11730.79 61.360 356.290 6606.39 6658.94 6330.29 N 6528.06E 5980998.73 N 378317.25E 4.200 8007 86 11827.10 61.420 356.130 6652,51 6705.06 6414.65 N 6522.48E 5981083.18 N 378313.11E 0.159 . 8086 59 11921.69 63.580 354.800 6696.18 6748.73 6498.28 N 6515.83E 5981166.91 N 378307.90E 2.602 . 8164 29 12016.51 62.900 354.330 6738.87 6791.42 6582.57 N 6507.82E 5981251.32 N 378301.32E 0.843 . 8242 21 12111.91 63.160 352.140 6782.14 6834.69 6666.99 N 6497.80E 5981335.91 N 378292.75E 2.064 . 8319.65 12207.09 63.370 350.550 6824.96 6877.51 6751.02 N 6485.01E 5981420.15 N 378281.40E 1.508 8395 88 12302.23 66.100 348.690 6865.57 6918.12 6835.64 N 6469.49E 5981505.01 N 378267.33E 3.370 . 8471.85 12397.52 70.450 348.520 6900.83 6953.38 6922.40 N 6452.00E 5981592.06 N 378251.34E 4.568 8549 25 12492.78 73.540 346.590 6930.28 6982.83 7010.84 N 6432.47E 5981680.82 N 378233.32E 3.773 . 8627 66 12588.18 75.780 343.900 6955.52 7008.07 7099.79 N 6409.03E 598170.16 N 378211.41E 3.593 . 8705.35 12683.14 79.200 342.130 6976.09 7028.64 7188.43 N 6381.95E 5981859.25 N 378185.84E 4.035 8781.66 12777.56 83.900 341.390 6989.96 7042,51 7277.11 N 6352.72E 5981948.42 N 378158.14E 5.038 8857 34 12872.72 87.300 338.360 6997.26 7049.81 7366.17 N 6320.08E 5982038.02 N 378127.02E 4.779 . 8932 37 12966.50 88.030 336.410 7001.08 7053.63 7452.66 N 6284.05E 5982125.12 N 378092.48E 2.219 . 9003 92 13019.55 90.880 335.840 7001.58 7054.13 7501.17 N 6262.58E 5982173.98 N 378071.84E 5.479 . 9043.66 13065.60 90.980 335,440 7000.84 7053.39 7543.11 N 6243.59E 5982216.25 N 378'053.57 E 0.895 9077.90 13112.59 90.770 335.590 7000.12 7052.67 7585.87 N 6224.11E 5982259.33 N 378034.83E 0.549 9112 77 13154.74 90.660 334.690 6999.59 7052.14 7624.11 N 6206.40E 5982297.87 N 378017.77E 2.151 . 9143.86 13209.81 91.120 334.540 6998.74 7051.29 7673.86 N 6182.79E 5982348.02 N 377995.02E 0.879 9184.14 13260.01 89.890 333,420 6998.29 7050.84 7718.97 N 6160.77E 5982393.49 N 377973.78E 3.314 9220.48 • • 26 September, 2005 -16:17 Page 2 of 4 Dril/Quest 3.03.06.008 GonocoPhillips Alaska, lnc, Survey Report forA/pine CD-2 - CD2-07P82 Your Ref 501032051471 Job No. AK ZZ 0003898251, Surveyed: 10 September, 2005 Alaska North Slope North Slope, A/aska Measured True Subsea Vertical Local Coordi nates Global Coordinates Dogleg Vertical Depth incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100tt) 13305.08 89.480 333.740 6998.54 7051.09 7759.33 N 6140.72E 5982434.19 N 377954.42E 1.154 9252 89 13356.05 89.030 333.080 6999.21 7051.76 7804.90 N 6117.90E 5982480.15 N 377932.39E 1,567 . 9289 43 13400.82 89.580 331.500 6999.75 7052,30 7844.53 N 6097,09E 5982520.13 N 377912.25E 3.737 . 9320 91 13448.95 90.100 331.400 6999.88 7052.43 7886.81 N 6074.09E 5982562.80 N 377889.98E 1 100 . 9354 26 13495.24 89.580 331,080 7000.01 7052.56 7927.39 N 6051,81E 5982603.75 N 377868.40E . 1.319 . 9386.20 13545.85 91.030 331,080 6999.74 7052.29 7971.69 N 6027.34E 5982648.46 N 377844.69E 2.865 9421 03 13591.24 90.310 329.700 6999.21 7051.76 8011.15 N 6004.92E 5982688.30 N 377822.95E 3,429 . 9451 86 • 13650.11 90.960 328.740 6998.56 7051.11 8061.72 N 5974.79E 5982739.38 N 377793.69E 1.969 . 9490 95 13687.10 90.880 328.790 6997.97 7050.52 8093.34 N 5955.61E 5982771.33 N 377775.06E 0.255 . 9515 30 13732.80 90.100 327.990 6997,57 7050.12 8132.26 N 5931.66E 5982810.65 N 377751.77E 2.445 . 9545,15 13782.70 89.660 327.890 6997.68 7050.23 8174.55 N 5905.17E 5982853.39 N 377726.01E 0.904 9577 45 13827.04 90.010 326.760 6997.81 7050.36 8211,87 N 5881.24E 5982891.11 N 377702.72E 2.668 . 9605 79 13878.03 89.650 326.220 6997.96 7050.51 8254.39 N 5853.09E 5982934,10 N 377675.30E 1 273 . 9637 80 13925.63 90.160 326.870 6998.04 7050.59 8294.10 N 5626.85E 5982974.26 N 377649.74E . 1.736 . 9667 72 13973.38 90,570 326.910 6997.73 7050.28 8334.10 N 5800.76E 5983014.70 N 377624.35E 0.863 . 9697.96 14021.69 90,530 328.260 6997.27 7049.82 8374.88 N 5774.87E 5983055.91 N 377599.16E 2 796 9729 00 14068,81 91.430 328.660 6996.46 7049,01 8415.03 N 5750.22E 5983096.48 N 377575,20E , 2.090 . 9759 82 14114.44 91.000 329.230 6995.50 7048.05 8454.11 N 5726.69E 5983135.96 N 377552.34E 1,565 . 9789 96 14164.01 89.970 329.650 6995.08 7047.63 8496.79 N 5701.49E 5983179.07 N 377527.87E 2 244 . 9823 02 14211.11 89.460 329.600 6995.31 7047.86 8537.43 N 5677.67E 5983220.10 N 377504.76E . 1.088 . 9854.55 14259.55 89.420 330.830 6995.78 7048.33 8579.47 N 5653.61.E 5983262.55 N 377481.42E 2.540 9887 35 14305.99 90.590 332.870 6995.78 7048.33 8620.41 N 5631.70E 5983303.86 N 377460.21E 5.064 . 9919 75 14355.32 90.340 332.810 6995.38 7047.93 8664.30 N 5609.19E 5983348.13 N 377438.45E p.521 . 9954 78 14402.23 91.110 334.080 6994.79 7047.34 8706.26 N 5588.22E 5983390.44 N 377418.20.E 3.166 . 9988 43 14450.38 91.020 334.170 6993.89 7046.44 8749.57 N 5567:21 E 5983434.11 N 377397.94E 0.264 . 10023.37 14497.21 91.150 333.590 6993.00 7045.55 8791.61 N 5546.59E 5983476,49 N 377378.05E 1.269 10057.20 14545,59 89.850 333.430 6992,58 7045.13 8834.91 N 5525.02E 5983520.15 N 377357.21E 2.707 10091 95 14590.79 88.740 332.660 6993.14 7045.69 8875.19 N 5504.53E 5983560.78 N 377337.42E 2.989 . 10124 16 14640.67 90.410 331.590 6993.51 7046.06 8919.28 N 5481.21E 5983605.26 N 377314.86E 3.976 . 10159 13 14688.33 , 90.340 330.890 6993.20 7045.75 8961.06 N 5458.28E 5983647.43 N 377292.65E 1.476 . 10192,02 14735.90 91.960 330.440 6992.24 7044.79 9002.52 N 5434.98E 5983689.28 N 377270.06E 3.534 10224 50 14780.24 92.440 331.690 6990.54 7043.09 9041.30 N 5413.54E 5983728.42 N 377249.29E 3.018 . 10254 97 14825.00 92.440 331.690 6988.63 7041.18 9080.67 N 5392.34E 5983768.15 N 377228.76E 0.000 . 10286.09 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North, Vertical depths are relative to RKB = 52.55'. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. __- 26 September, 2005 -16:17 Page 3 of 4 Dri//Quest 3.03.06.008 ConocoPhillips Alaska, lnc. Survey Report forAlpine CD-2 -CD2-01P62 Your Ref.• 501032051471 Job No. AK-2.Z-0003898251, Surveyed: 10 September, 2005 Alaska North Slope North Slope, A/aska The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 17.600° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14825.OOft., The Bottom Hole Displacement is 10561.05ft., in the Direction of 30.703° (True). Comments Measured Station Coordinates Depth TVD Northings Easfings • Comment (ft) (ft) (ft) {ft) 10400.11 5968.54 5373,99 N 6001.44E Tie-4n Point 10459.00 5997.26 5407.89 N 6040.10E Window Point 14825.00 7041.18 9080.67 N 5392.34E Projected Survey Survey tool program for CD2-01PB2 From To Measured Vertical Measured Vertical Depth Depth Depth Depth Survey Tool Description (ft) (ft) {ft) (ft) 0.00 0.00 614.00 610.15 CB-3S-Gyro (CD2-01 P61) 614.00 610,15 14825.00 7041.18 MWD+IIFR+MS+SAG (CD2-01P61) • 26 September, 2005 - 16:17 Page 4 of 4 DrillQuest 3.03.06.008 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well CD2-01 Dear Dear Sir/Madam: Enclosed is one disk with the .PTT and *.PDF files. Tie-on Survey: 14,688.33' MD Window /Kickoff Survey: 14,700.00' MD (if applicable) Projected Survey: 17,513.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date ~~ 1.1i~~S~ Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) I ~ ~1 ...r • 07-t~~t~0 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well CD2-01 PB1 Dear Dear SirlMadam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 0.00' MD Window 1 Kickoff Survey: 0.00' MD (if applicable) Projected Survey: 14,483.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGN{NG AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 ,,~/ n .n / ,~ Date V Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) ~~~~~~~ • Q'7-~~t-q5 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well CD2-01 PB2 Dear Dear SirlMadam: Enclosed is one disk with the *.PTT and ~`.PDF files. Tie-on Survey: 104,400.11' MD Window /Kickoff Survey: 10,459.00' MD (if applicable) Projected Survey: 14,825.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date_~~~~~;~~, '~~Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) ~~~- ~~ • • O7-Oct-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well CD2-01 MWD Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 14,688.33' MD Window /Kickoff Survey: 14,700.00' MD {if applicable) Projected Survey: 17,513.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 ,~ f /~ ~ ~ , Date ~~ Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) ~~ J -~ G ~ • AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well CD2-01 PB1 MWD Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 0.00' MD Window 1 Kickoff Survey: 0.00' MD (if applicable} Projected Survey: 14,483.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Bfvd. Anchorage, AK 99518 Date ~ Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) ~~~~~~~~ ~ • 07-Oct-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well CD2-01 PB2 MWD Dear Dear SirlMadam: Enclosed is one disk with the *.PTT and "`.PDF files. Tie-on Survey: 10,400.11 ' MD Window /Kickoff Survey: 10,459.00' MD (if applicable) Projected Survey: 14,825.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 ! 2 ~j Date ~'1 ~V ~ Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) ~tl~ -~~~ Re: CD2-O1 Sidetrack aos- ~~~~ r Sul<iject: Rc: CD2-!! I Sicl~tr~trk From: Thumas Maunder ~ _tom r7~aunder(c~iadminatat~.akus-> Date: ti~lon, 1? Sch ?~i(~ 1(i:!:1:1? -(18O) 7'0: ",fot~ns~~n, ~~~ern" <=Vern_Johnson(~~coiloe~ptiillips.con~~. CC: ":~1~~~~rd. Chip" <C'hij~.~~1~~_~rd'uconoe~~phillips.a~n~=, Stew D~~~ics =~ste~~c davies~u.acltl~in.slate.akus> Vern, I concur with your determination, PB2 it is. Tom Maunder, PE AOGCC Johnson, Vern wrote, On 9J12J2005 3:56 PM: Tom, As discussed on the weekend, we made the decision to sidetrack CD2-01. After drilling out of 7" casing (12953' MD), we drilled to 14825' MD after drilling out of the top of the Alpine C formation at 14742' MD. We pulled back and open hole sidetracked the well at 14700' MD leaving ± 42' of sand in the "abandoned" leg. Due to the reason for the sidetrack and the relatively short interval, I propose we consider the "abandoned" hole to be a plug back, PB2 with API suffix -71. Let me know if you need further details or documentation. Vern Johnson 1 of 1 9/1212005 4:03 PM STATE OF ALASKA - ~~vos~oa OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: ~ir:~ re~~L~~adrr:i~.state.a>i.~~:s ao~c: pr~_Ed3o2 b~:y~ads~in.s#ae.alE.us b~I:i TEevl~eTla_teei_li'3~£~t_~erE~e€'3_.5_te'~_t~.~?i.llC Contractor: Doyon Rig No.: 19 DATE: 9/7/2005 Rig Rep.: KrupalLupton Rig Phone: 670-4302 Rig Fax: 670-4303 Operator: Conoco Phillips Alaska Op. Phone: 670-4300 Op. Fax: 670-4301 Rep.: HilUKuenzler Field/Unit & Well No.: Colville Rv CD2-01 PTD # ?A!'r-118 Operation: Drlg: x Test: Initial: Test Pressure; Rams: 250/5000 Workover: Weekly: Annular: 250/3500 Explor.: Bi-Weekly x Valves: 250/5000 MISC. INSPECTIONS: Test Result Location Gen.: P Well Sign P Housekeeping: P Drl. Rig P PTD On Location P Hazard Sec. P Standing Order Posted P BOP STACK: Quantity Size Test Result Annular Preventer 1 13-5/8 P Pipe Rams 1 3-1l2x 6 P Lower Pipe Rams 1 3-112x 6 P Blind Rams 1 blinds P Choke Ln. Valves 1 3-1/8 P HCR Valves 2 3-1/8 P Kill Line Valves 1 3-1/8 P Check Valve 0 NA MUD SYSTEM: Visual Test Alarm Test Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector P P H2S Gas Detector P P TEST DATA Test Result FLOOR SAFETY VALVES: Quantity Test R Upper Kelly 1 P Lower Kelly 1 P Ball Type 1 P Inside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Valves 16 P Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test Result System Pressure 3000 P Pressure After Closure 1550 P 200 psi Attained 32 P Full Pressure Attained 2 min 44 sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 4 @2200 Test Results Number of Failures: 0 Test Time: 8.25 Hours Components tested 28 Repair or replacement of equipment will be made within n/a days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at: ~ir:~ req~~~3adn:i:~.stat~.a~.~s Remarks: C/O test plug rubber-4 needle valves-grease both HCR valves-killlchoke-all equipment tested Qo after these items were adressed. 24 HOUR NOTICE GIVEN YES X NO Waived By Louis Grimaldi Date 09/04/05 Time 08:OOPM Witness LuptonlKuenzle est start 9:15gm9/6 Finish 5:30am9/7 BOP Test (for rigs) BFL 11/09/04 Doyon19 09-7-05 CD2-01.x1s r n jj a ALA-rlFil, DIL A1QD GAS CO1~T5ERQATIOI~T C41rIl~II5SIOIQ Chip Alvord Alpine Drilling Team Leader ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 FAaNK H. MURKOWSKl, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 27&7542 Re: Colville River CD2-01 (revised) ConocoPhillips Alaska, Inc. Permit No: 205-118 Surface Location: 1577' FNL, 1562' FEL, SEC. 2, T 11 N, R04E, UM Bottomhole Location: 660' FNL, 2703' FEL, SEC 25, T 12N, R04E Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. This revision is necessary since the proposed bottomhole location has been changed by more than 500' laterally due to encountering thinner than expected sands along the original trajectory. In accordance with 20 AAC 25.005(f~, all records, data and logs acquired for the originally plugged back wellbore section must be clearly differentiated in both name (CD2-01 PB 1 } and API number (50-103-20514-70) from records, data and logs acquired from CD2-01. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty- four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659- 3607 (pager). • DATED this day of September, 2005 cc: Department of Fish 8s Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 September 1, 2005 Alaska Oil and Gas Conservation Commission 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501 ConocoPhillips ~" ;, s3 ~; . ~> Re: Application for Permit to Drill- and plug back operations CD2-01 Dear Sir or Madam: ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the Alpine CD2 drilling pad. Drilling operations on CD2-01 began on 8-22-05 with Doyon 19 (permit no. 205-118) and the well was drilled to the planned landing point in the Alpine reservoir. The sand was thinner than expected at the planned landing point, and additional 8-1/2" hole was drilled horizontally to confirm formation tops and check if the sand became thicker further along the planned wellbore. Unfortunately sand quality and thickness were not sufficient for the well to be economically viable. It was decided to plug back the existing wellbore with cement, and sidetrack to another location north-west of the original landing location. After plugging back above the Alpine C with cement, a kick off plug will be set from +/- 10440' MD to 11040' MD. It is planned to kick off from 10640' ~MD and re-drill the intermediate section of CD2-01. The intermediate section will be drilled and landed in the Alpine sand horizontally; 7" casing will then be run and cemented in place. CD2-01 will be completed as an openhole producer. 'At the end of the work program the well will be shut in awaiting slickline well work and surface connection. The originally drilled 8-1/2" hole will be re-named CD2-01PB1 with API extension -70 and the new sidetracked hole will become CD2-01. If insufficient sand is found when drilling the second intermediate hole, the well will be plugged and abandoned. Please find attached the information required by 20 ACC 25.005 {a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a). 2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1). 3. A proposed plug back and drilling program 4. Proposed completion diagram. 5. Pressure information as required by 20 ACC 25.035 (d)(2). 6. Directional drilling /collision avoidance information as required by 20 ACC 25.050 (a). Also, a copy of the CD2-01 PB1 surveys are included. Information pertinent to this application that is presently on file at the AOGCC is: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). • • 2. A description of the drilling fluids handling system. 3. Diagram of riser setup which replaces diverter If you have any questions or require further information, please contact Vern Johnson or 265-6081, respectively. Chip Alvord can also be reached by calling 265-6120. Si rely, ~~~o ~-- v v-~ ern Johnson Drilling Engineer Attachments cc: CD2-01 Welt File /Sharon Allsup Drake Chip Alvord Vern Johnson Tim Schneider Steve MoothartlJeff Yeaton Bill Esco Lanston Chin ATO 1530 ATO 1700 ATO 1702 ATO 1768 ATO 1756!1752 Anadarko -Houston Kuukpik Corporation ti coz-os coz-zo CD2-12 2-23 24 T12N, R4E, U.M. CD2-01 \g~~C, ~2PB1 ~~; Openhole ~`$° 25 Completic CD2-01 R vised °O C02-07 ,1b coz-1o • r,r~ ~ • 6 • CD2-1J s,~ • ~.._i ~_ • t • by t,S f; O , ~pC~J V~~• C VV ` ~D 1-3D 9 ?~ ~ _~ - ~'i G02- /` GD2-18 CO 174 C -J jOO \~" ~~_ \` ~0 2-14 CD2-?? GDt C02-19 CRU CD2-01 Revised Alpine Oil Pool 2051180 Confidential wells shown as red S F D 9/6/2005 C01-3~ COt-19 cDt-oz CD1-22A -O1 Fi~SCH UND I ~J' J/ '' -/ Feet t 0 1 ,000 2,000 3,000 4,000 STATE OF ALASKA • AL OIL AND GAS CONSERVATION CO~SION PERMIT TO DRILL 20 AAC 25.005 7 ..~`1 1a. Type of Work: DriN Q Redrill ~ Re-entry ~ 1b. Current Well Class: Exploratory Development Oil ~ Multiple Zone Stratigraphic Test ~ Service ~ Development Gas ~ Single Zone 2. Operator Name: ConocoPhillips Alaska, Inc. 5. Bond: Blanket ~ Single Well ~ Bond No. 59-52-180 ~ 11. Well Name and Number: CD2-01 3. Address: PO Box 100360, Anchorage AK 99510-0360 6. Proposed Depth: , MD: ~ 75~g `~ TVD: 7048 12. Field/Pool(s): Colville River Field 4a. Location of Well (Governmental Section): Surface: 1577' FNL & 1562" FEL; Sec02-T11 N-R04E UM / 7. Property Designation: ~~~ ~:j,~_,~.y ADL 380075, 380096, .~8, 25530 Alpine Oil Pool Top of Productive Horizon: 4744' FNL & 538' FEL; Sec25-T12N-R04E 8. Land Use Permit: ASRC NPRA02 13. Approximate Spud Date: ~_Sg _(}~ Total Depth: 660' FNL & 2703' FEL; Sec25-T12N-R04E 9. Acres in Property: .2560 14. Distance to Nearest Property: 5940 Fsi_ AIOL 255526 4b. Location of Well (State Base Plane Coordinates): ~ ~.,} Surface:x- 37 8 a7iC~~ ~417~~`;~y Zone- y 4 q, 10. KB Elevation (Height above GL): 36.7 feet 15. Distance to Nearest Well Within PooL• GD2-08 980 16. Deviated weNs: Kickoff depth: feet j ,~ ~,y Maximum Hole Angle: /4 G`/G'90 degrees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3191 ' Surface: X480 ' 18. Casing Program: Size Specifications Setting Depth Top Bottom Quantity of Cement c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8.5" na 12615 6963 13215 7058 Abandonment plug 15.8 235 sx 8.5" na 10440 5988 11040 6300 Kick off plug 17ppg 272 sx 8.5" 7" 26# L80 BTC-M 12863 37 37 12900 7053 162 Sx 15.8 ppg class G 6.125" 3.5" 9.3# L80 EUE-M 12180 32 32 12212 6881 Tubing 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured}; Casing Length Size Cement Volume MD ND Structural Conductor Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth ND (ft): 20. Attachments: Filing Fee ~ BOP Sketch Drilling Program ~ Time v. Depth Plot Shallow Hazard Analysis Property Plat ~ Diverter Sketch ~ Seabed Report ~ Drilling Fluid Program ~ 20 AAC 25.050 requirements Q 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact V. Johnson 265-6081 Printed Name Brian Noel / Title for Alpine Drilling Team Leader Chip Alvord Signature ~~------ `~• ~"~ g~~l ~-~ Phone 907-265-6979 Date 1-Sep-05 Commission Use Only Permit to Drill \ !,- Number: ~-~~~ ~~ j~~< API Number: ~ / 50- ~~~~ ~~'~.~~ `~ '" ~~~~~~ Permit Approval Date: ~ ~`~ See cover letter for other requirements. Conditions of approval Sam q ed Yes ~ No ~ Mud log required Yes ~ No ogen de measures Yes ~ No ~ Directional survey required Yes .,®" No Other: ~ .._ ~ ` +~~. ~~J ~ ~~ `~ ~.., APPROVED BY Approved b . THE COMMISSION Date: Form 10-401 Revised 06/2004 Submit inRuplicate • • Alpine :CD2-01 Procedure Procedure 1. POOH with 8-1/2" hole drilling assembly. 2. Pick up 3-1/2" tubing stinger and run in hole to 13415' MD. 3. Pump +/- 200 ft hi-vis pill. 4. Pull out to 13215' MD and pump +/- 600 ft MD balanced bottom isolation plug (top Alpine C at 13091'MD, " well CD2-01 P61 TD at 14483' MD) 5. Pick up to 12615' MD and circulate hole clean. 6. Pull out to +/- 11240' MD and spot a +/- 200ft MD hi vis pill 7. Pick up to +/- 11040' MD and pump a +/- 600 ft MD balanced kick off plug (17 ppg). 8. Pick up to 10440' MD and circulate hole clean. 9. Pull out of hole and lay down tubing stinger. r ~~~~: `~~ 1 ~ ~-~L ~ ~ 10. Pick up 8-1/2" hole drilling assembly and run in hole to kick off point at 10A~0' MD. Kick off cement plug and dri11 to 7" casing point in the Alpine C sand. (LWD Program: GR/RES/ WD)° 11. Run and cement 7" casing as per program. Top of cement > 885' MD above Alpine C sand. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 12. Pressure test casing to 3500 psi. 13. ROPE test to 5000 psi. 14. Run drilling assembly. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg EMW. 15. Displace well to Mineral oil based mud. 16. Drill 6-1/8" horizontal section to well TD (LWD Program: GR/RES/PWD). 17. Circulate the hole clean and pull out of hole. 18. Run 3-%2, 9.3#, L-80 tubing with SCSSSV, gas lift mandrels, landing nipple, sliding sleeve and packer. Land hanger. 19. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 20. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 21. Circulate tubing to diesel and install freeze protection in the annulus. 22. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi / 30 mins. 23. Set BPV and secure well. Move rig off. ORIGINAL • • Well Proximity Risks: Per original permit. Drilling Area Risks: Per original permit. Annular Pumping Operations: Per original permit. DRILLING FLUID PROGRAM Per original permit. ~R,iGINAL • • Completion Schematic Updated 09/01/2005 16" Conductor to 114' Sperry Sun Directional v WP04 3-'/:" x 4-'/~' cross-over, 2 jts below 4-'/:" hanger 3-1/2" Camco TRM-4E SSSV Nipple (2.813" ID) at 1904' TVD = 2300' MD -2.813" X-Over -Single'/."x0.049" s/s control line TOC ~ +l- 11940' MD / 6754' TVD 9-5/8" 40 ppf L-80 BTC Surface Casing ~ 3256' MD / 2377' TVD cemented to surface Camco KBUG GLM (2.667" ID) at 3500' TVD for Packer Fluid mix: E Dummy with 1" BK-2 Latch Diesel in tubing and annulus 3-1/2" 9.3 ppf L-80 IBT Mod. R3 ' ' Com lep lion M[2 IYl2 n Seal tubing run with Jet Lube Run pipe dope Tubing Hanger 32' 32' 4-'/i' 12.6 #!ft IBT-Mod Tubing (2) Crossover 3-1/2", 9.3#/ft, IBT-Mod Tubing Camco TRM4E SCSSSV 2300' 1904' 3-1/2", 9.3#/ft, IBT-Mod Tubing Camco KBUG GLM (2.867" ID) Camco KBUG GLM (2.867" ID) 5487' 3500' at 5600' TVD for 3-1 /2", 9.3#/ft, IBT-Mod Tubing E Dummy with 1" BK-2 Latch CamCO KBUG GLM (2.867" ID) 9654' 5600' 3-1/2", 9.3#/ft, IBT-Mod Tubing Camco KBUG GLM (2.867" ID) 11940' 6754' 3-1/2" tubing joints (2) Baker 3-1/2"CMD sliding sleeve 12040' 6802' w/ 2.81" X Profile Camco KBUG GLM (2.867" ID) 3-1/2" tubing joint (2) 2 joints above sliding sleeve Baker Premier Packer 12140' 6849' E Dummy with t" BK-2 Latch 3-112" tubing joints (1) HES "XN" (2.75" ID)-64.5° inc 12200' 6875' 3-1/2" 10' pup joint WEG 12212' 6881' > Baker 3-'h" CMD sliding sleeve with 2.81 "'X' Profile set 2 joints above packer CW 2.81" X Profile Baker Premier Packer at+/- 121 04' MD Well TD at ~ 17523' MD / 7048' ND Top Alpine C at 12825' MD / 7047' TVD 7" 26 ppf L-80 BTC Mod Production Casing @ 12900' MD / 7053' TVD @ 86° Planned Kick off point from CD2-01 PB1 is at 10640' MD. = TD of the abandoned CD2-01 P61 is at 14483' MD ~R161NAL • PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 (c) (3,4) and as required in 20 ACC 25.035 (d) (2)) • The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size (in) Csg Setting Depth MD/TVD ft Fracture Gradient (Ibs. / al Pore pressure (psi) ASP Drilling (psi) 16 114 / 114 10.9 52 53 9 5/8 3268/2390 14.5 1081 1563 7" 12900/7053 16.0 3191 2486 N/A 17523 / 7048 16.0 3189 - N/A NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to minimum 3500 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE fASP,] ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1 ]D Where: ASP =Anticipated Surface pressure in psi FG =Fracture gradient at the casing seat in Ib/gal 0.052 =Conversion from !b./gal to psUft 0.1 =Gas gradient in psUft D =true Vertical depth of casing seat in ft RKB OR 2) ASP = FPP - (0.1 x D) Where; FPP =Formation Pore Pressure at the next casing point ASP CALCULATIONS Drilling below conductor casing (16") ASP = [(FG x 0.052) - 0.1] D =[(10.9x0.052)-0.1]x114=53 psi OR ASP =FPP - (0.1 x D) = 1081 - (0.1 x 2390) =842 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052) - 0.1] D _ [(14.5 x 0.052) - 0.1] x 2390 = 1563 psi OR ASP =FPP - (0.1 x D} = 3191 - (0.1 x 7053') = 2486 psi 3. Drilling below intermediate casing (7") ASP =FPP - (0.1 x D) = 3189 - (0.1 x 7048') = 2484 psi ORIGINAL • • Pilot Bole Cementing Requirements Cement Plug #1 :13215' MD to 12615' MD = 600'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 600' X 0.3941 ft3lft X 1.15 (15% excess) = 271.4 ft3 => 235 Sx @ 1.16 ft /sk Cement Plug #2:11040' MD to 10440' MD = 600'. Cement with Class G + additives @ 17 ppg. Assume 15% excess on open hole volume. Slurry: 600' X 0.3941 ft /ft X 1.15 (15% excess} = 271.9 ft => 272 Sx @ 1.00 ft3lsk 7" Intermediate Casing run to 12900' MD / 7053' TVD Cement from 12900' MD to +1-11940 MD (200 ft above packer setting depth) with Class G + adds @ 15.8 PPG. Assume 40% excess annular volume. Tail: (12900' -11940'} X 0.1268 ft /ft X 1.4 (40% excess) =170.4 ft3 annular vol. 80' X 0.2148 ft3/ft = 17.2 ft3 shoe joint volume Total volume = 170.4 + 17.2 = 187.6 ft => 162 Sx @ 1.16 fl~lsk System: 162 Sx Class G + 0.2% D046 antifoamer, 0.30% D065 dispersant, 0.04% D800 retarder and 0.35% D167 fluid loss additive @ 15.8 PPG yielding 1.16 ft31sk ORIGINAL C7 ConocoPhillips Alaska ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 Drilling: CD2-01 Drilling: CD2-01 Pian: CD2-o1wp04 Proposal Report 31 August, 2005 r: HAL.L~E3URTQN Sperry tt'~riling Services ORIGINAL `-~ C~k YWOn M,llgd: MMImun Curv~n~ E"«6,..~ lscwsA Project: Colville River Unit ConotoPfl~lli 5 scrn Mstlcd. T.,.-. gn"de. No.m Ertor Surlece: EBytlce~ Conk l~ Slte: AIp1r1e CD2 Alaska Wrnlrp Matlod~ iNba Bored o.6a.m v NAi71NAOC~coNUSI 8ac~1 Well: Drilling: CD2-01 Wellt7ore: Drilling: CD2-01 HALLIBURTON c«„~„n~e~Pr ls.wo RKB. CD2-01 (~ 52 900tI (CD2-01 a 51.9' alxrve MSI i Plan: CD2-01wp04 Sperry Drilling Services ortlriixyASP Y: X74781.0900 E 5t~g~ASP 7C 371881.8100 ANNOTATIONS 0 1900 3aoo 4900 6000 7500 9000 10500 12000 TVD MD Annota[bn 60482 10580.310 Tern Poir8; 10980' MD, 8062' TVD 8067.857 10600.000 KickoR PoinC 10840' MD, BOBT TVD, Stan DLS 4 TFO.100 6874.635 11771.428 Start Hold 336 6633 e9z 121mra wart Dis a 7>=043 7053886 12800.000 7" Csg Pt 12900' MD, 7053' TVD 7057988 13023778 Target (Heap: 13023' MD, 705T TVD 7047.705 17523778 Target (Taal; 17527 MD, 7047 TVD SECTION DETALS O c_ 0 0 u1 t a m O m v r m d 0 - 1600 ~ 95/8" 3000 ----- 4600 -- 6000 Csg Pt, 12900 MD, 7053 ND CD2-01wp04 n.. 7soo Target (Heel); 13023' MD, 7057' TVD Tie-in Poir1t;10590' MD, 6062' TVD Kickoff Point; 10640' MD, 608T TVD, Start DLS 4 TFO -100 Start Hold 336 Sx MD tc A3f TVD +NIS *EI-W DLeg TFace 119ec Target 1 10930310 96.768 492800 0082482 59B26M 6126165 090 09000 7078389 2 ta640nm 59.130 a6ra7 6oa79s7 581n746 etsa496 134 zz641s7 x14935 3 ttm,a6 61.m 35636St 6674615 6374579 6s1o99s aro-~aa74sz eoaaeee 4 121W.7u et.m 35B.30S2 6a33693 n67n2r 6482007 ono n90o0 8321.028 5 13023278 90.000 3319774 7057900 7506.47 6202674 400 43.7603 98418(14 C@O1wpO4Hetl 6 13036278 9n130 3319774 7067ffi5 7517A12 6236.566 180 OBODD 9060806 7 175L4Z78 9n130 3319774 7047.705 11477967 4126490 080 0.0000 121lgD13 cawNO oETr~us No iVD MO Neme !@e 1 2362.42 3366.!80 B 6M' 8-0A z 76s3.666 lzsoo.oo6 r 7 7 7011.70s 17533.377 ~ 12' 412 Start DLS 4 TFO d3 T' Target (Tce); 17523' MD, 7047' TVD ~y,~ C~n~~~rl1~'~~ps GlalrllmMMrvd MkinmOMw sa,~''r"~:';cK,a~.H~.~ ,.,ei,,,,o°r'~"~ Project: ColvilleRlverUnit Site: Alpine CD2 A,^.,,," °iodi1QM"4` ~ e9u~D~'aom~ Well: Drilling: CD2-01 Wellbore: Drilling: C02-01 HALLIBURTON ~~``~"~`ie'he coiol szeaxtlcosal ~; sze~,ib~eMSt.i q Plan: CD2-01wp04 Sp@rry ~rt~t1119 S@rVll:@5 ,nhii,y~ASP V'. 5974781.0900 E.isbng'ASP%: 371661.8100 -zaoo o zooo 4000 a 1rz° i ion.7m ilmzn 41Q ~1n Target (Heel); 13023' MD, 7057' TVD T' Csg Pt; 12900' MD, 7053' TVD Start DLS 4 TFO X13 Start Hold 336 \Kickoff Point; 10640' MD, 6087 TVD, Start DLS 4 TFO -100 Tie-in PoirTt;10590' MD, 6062' TVD soon eooo west(-YAK+) (~ ~+) ANNOTATgNS TVD MD Anrgla0on 8082.48210590.310 Tie-in Point; 10590' MD, 8062' ND 8087.85710840.000 KickoR Point; 10840' MD, 808T TVD, Start DLS 4 TFO -100 8674.83511771.428 Start Hold 338 8633.89212107.714 Start DLS 4 TFO d3 7053.89612900.000 7" Csg %: 12900' MD, 7053' TVD 7057.89913023.278 Target (Heed; 13023' MD, 7057 NO 7047.70517523.278 Target (TOeI; 17523' MD, 7047 TVD SECTION DETAI.S Sec MD Y1c A>! TVD +NIS +E!-V1l DLeg TFaoe VSec Target 1 10590.310 59.788 492800 6062.482 5482.640 6128.185 0.00 0.0000 7078.369 2 10640.000 59.330 48.7187 6087.857 5510.746 6158.498 1.34226.4347 7114.935 3 11771.426 81.772356.3452 6874.635 8374.579 6510.895 4.00100.7462 8044.888 4 12107.714 81.772356.3452 6833.693 6670171 11492.007 0.00 0.0000 8321.028 5 13023278 90.000331.9774 7057.900 7505.537 8242.674 4.00 43.7803 9041.804 CD2-01wp0A Heel 6 13036.278 90.130331.9774 7057.885 7517.012 6236.566 1.00 0.0000 9050.896 7 17523.278 90.130331.9774 7047.70511477.957 4128.490 0.00 0.000012189.013 ConocoPhillips Alaska Databases EDM 2003.11 Single User Db Company:' ConocoPhiUips Alaska inc. Project: Colville River Unit Site: Alpine GD2 Wall: Drilling: CD2-01 Wslibore: Drilling: CD2-01 Design: CD2-01wp04 Sperry Drilling Services HALLIBURTGN Planning Report -Geographic Sperry Drilling Services LocaFCo~rclinats Reference: Weil Drilling: CD2-01 TVD Reference: CD2-01 (~ 52.900ft (CD2-01 ~ 52.9' above MSL) MD Reference: CD2-01 ~ 52.900ft (CD2-01 ~ 52.9' atwvs MSL) North Reference: True Survey Calculation Method: Minimum Curvature ProJsct Colville River Unit, North Sbpe Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Weil Drilling: CD2-01 Welt Position +NI-S 0.000 ft Northing: 5,974,781.0900 ft Latitude: 70° 20' 21.594" N +E1-W 0.000 ft Easting: 371,681.8100 ft Longitude: 151 ° 02' 28.574" W Position Uncertainty 0.000 ft Wellhead Elevation: ft Ground Level: 15.900 ft Weiibore Drilling: CD2-01 Magnetics Mods1 Name Sample Date Decihtation D(p Angle field Strength BGGM2005 8/31/2005 23.5808 80.6418 57,496 Design CD2-01wp04 Audit Notes: Version: Phase: PLAN Tie On Depth: 10,590.310 Vertical Section: Depth From (TVOj +NI-S +Ef 1lV Direction (ft) (ft) (~ l°) 37.000 0.000 0.000 17.6000 Plan Summary Measured Vertical Depth.... Inclination Azimuth Depth +Ni-S +E!-W (~U (°1" {°) (PU (ft) (fU 10,590.310 59.788 49.2800 6,062.482 5,482.640 6,126.165 10,640.000 59.330 48.7187 6,087.657 5,510.746 6,158.496 11,771.426 61.772 356.3452 6,674.635 6,374.579 6,510.895 12,107.714 61.772 356.3452 6,833.693 6,670.271 6,492.007 ', 13,023.278 90.000 331.9774 7,057.900 7,505.537 6,242.674 i i 13,036.278 i 90.130 331.9774 7,057.885 7,517.012 8,236.566 17,523.278 90.130 331.9774 7,047.705 11,477.957 4,128.490 Dogleg Build Turn Rate Rate Rate T>=O 0.00 0.00 0.00 0.0000 1.34 -0.92 -1.13 226.4347 4.00 0.22 -4.63 -100.7462 0.00 0.00 0.00 0.0000 4.00 3.08 -2.66 -43.7603 1.00 1.00 0.00 0.0000 0.00 0.00 0.00 0.0000 8/31/2005 4:20:47PM Page 2 of 5 COMPASS 2003.11 Build 50 t ' / ~ ConocoPhilli 5 I' q~~ Database: EDM 2003.11 Single User Db Company:. ConocoPhiiGps Alaska Inc. Project: Colville River Unit Site: Alpine CD2 Wall: Drilling: CD2-01 Wellbore: Dolling: CD2-01 Design: CD2-01wp04 ---- Sperry Drilling Services HALLIBURTON Planning Report -Geographic Sperry Drilling Services hoCal Co-ordNwte Reference: Well Drilling: CD2-01 TVD References CD2-01 ~ 52.9DOft (CD2-01 ®52..9' above AASL) MD Reference: CD2-01 ~ 52.900ft (CD2-01 ~ 52:9' above MSL) North Reference: True Survey Calculation Methods Minimum Curvature --- - -- ---_ __- ' r Planned Survey CD2-01wp04 Mep Map AAD inclination Azimuth TYD SSND +pl/.S ~/-W Northing Eastfng DLSEY Pert Section (RJ, (°) (°Y ifs) (ft) (R) (ft) (tt} (~l (71o0fti (fU 10,590.310 59.788 49.2800 6,062.482 6,009.58 5,482.640 6,126.165 5,980,157.6482 377,900.4007 0.00 7,078.37 10,600.000 59.699 49.1714 6,067.364 6,014.46 5,488.107 6,132.503 5,980,183.0048 377,906.8313 1.34 7,085.50 10,640.000 59.330 48.7187 6,087.657 6,034.76 5,510.746 6,158.496 5,980,185.1940 377,933.2060 1.34 7,114.94 l Kickoff Point; 10640' MD , 6087' ND, Start DLS 4 TFO - 100 10,700.000 58.912 45.9670 6,118.456 6,065.56 5,545.633 6,196.363 5,980,219.4251 377,971.6605 4.00 7,159.64 10,800.000 58.346 41.3289 6,170.534 6,117.63 5,607.383 6,255.275 5,980,280.1528 378,031.6164 4.00 7,236.31 10,900,000 57.950 36.6426 6,223.328 6,170.43 5,673.376 6,308.684 5,980,345.2171 378,088.1525 4.00 7,315.37 11,000.000 57.727 31.9245 6,276.581 6,223.68 5,743.291 6,356.359 5,980,414.3009 378,135.0031 4.00 7,398.42 11,100.000 57.681 27.1924 6,330.032 6,277.13 5,816.788 6,398.038 5,980,487.0677 378,177.9303 4.00 7,479.08 11,200.000 57.811 22.4646 6,383.422 6,330.52 5,893.508 6,433.528 5,980,563.1630 378,214.7249 4.00 7,562.94 11,300.000 58.116 17.7594 6,436.489 6,383.59 5,973.078 6,462.656 5,980,642.2160 378,245.2076 4.00 7,647.59 11,400.000 58.592 13.0939 6,488.977 6,436.08 6,055.109 6,485.279 5,980,723.8417 378,269.2300 4.00 7,732.83 11,500.000 59.236 8.4837 6,540.628 6,487.73 6,139.203 6,501.289 5,980,807.6423 378,286.6749 4.00 7,817.63 11,800.000 60.041 3.9423 6,591.192 6,538.29 6,224.948 6,510.606 5,980,893.2096 378,297.4575 4.00 7,902.18 11,700.000 60,999 359.4807 6,640.422 6,587.52 6,311.930 6,513.186 5,980,980.1266 378,301.5252 4.00 7,985.86 11,771.426 61.772 356.3452 6,674.635 6,621.73 6,374.579 6,510.895 5,981,042.8001 378,300.3062 4.00 8,044.89 Start Hold 336 11,800.000 61.772 356.3452 6,688.150 6,635.25 6,399.704 6,509,290 5,981,067.9465 378,299.1317 0.00 8,068.35 11,900.000 61.772 356.3452 6,735.448 6,682.55 6,487.632 6,503.673 5,981,155.9507 378,295.0212 0.00 8,150.47 12,000.000 61.772 356.3452 6,782.746 6,729.85 6,575.580 6,498.057 5,981,243.9550 378,290.9107 0.~ 8,232.58 12,100.000 61.772 356.3452 6,830.044 6,777.14 6,663.488 6,492.441 5,881,331.9592 378,286.8002 0.00 8,314.69 12,107.714 61.772 356.3452 6,833.693 6,780.79 6,670.271 6,492.007 5,981,338.7482 378,286.4831 0.00 8,321.03 Start DLS 4 TFO.43 12,200.000 64.466 353.5180 6,875.420 6,822.52 6,752.242 6,484.712 5,981,420.8254 378,280.5920 4.00 8,396.96 12,300.000 67.444 350.5939 6,916.166 6,863.27 6,842.662 6,472.084 5,981,511.4412 378,269.4949 4.00 8,479.32 12,400.000 70.474 347.7946 6,952.070 6,899.17 6,934.314 8,454.546 5,981,603.3716 378,253.5484 4.~ 8,561.38 12,500.000 73.544 345.0990 6,982.955 6,930.06 7,026.750 6,432.241 5,981,696.1686 378,232.8302 4.00 8,642.75 12,600.000 76.648 342.4880 7,008.673 6,955.77 7,119.521 6,405.258 5,981,789.3802 378,207.4412 4.00 8,723.02 12,700.000 79.778 339.9436 7,029.098 6,876.20 7,212.175 6,373.729 5,981,882.5523 378,177.5050 4.00 8,801.80 12,800.000 82.928 337.4490 7,044.130 6,991.23 7,304.260 6,337.808 5,981,975.2310 378,143.1677 4.00 8,878.71 12,900.000 86.090 334.9882 7,053.696 7,000.80 7,395.327 6,297.669 5,982,0[;6.9647 378,104.5963 4.00 8,953.38 7" Csg Pt; 12900' MD, 7053' ND - 7" 13,000.000 89.260 332.5461 7,057.749 7,004.85 7,484.934 6,253.508 5,982,157.3065 378,061.9790 4.00 9,025.44 13,023.278 90.000 331.9774 7,057.900 7,005.00 7,505.537 6,242.674 5,982,178.0900 378,051.5000 4.01 9,041.80 Target (Heel); 13023' MD, 7057' ND - C D2-01wp04 Heel 13,036.278 90.130 331.9774 7,057.885 7,004.99 7,517.012 6,236.566 5,982,189.6678 378,045.5901 1.00 9,050.90 13,100.000 90.130 331.9774 7,057.741 7,004.84 7,573.263 6,206,629 5,982,248.4182 378,016.6219 0.00 9,095.46 13,200.000 90.130 331.9774 7,057.514 7,004.61 7,661.539 6,159.647 5,882,335.4781 377,971.1614 0.00 9,165.40 13,300.000 90.130 331.9774 7,057.287 7,004.39 7,749.815 6,112.685 5,982,424.5379 377,925.7008 0.00 9,235.34 13,400.000 90.130 331.9774 7,057.060 7,004.16 7,838.091 6,065.683 5,982,513.5978 377,880.2403 0.00 9,305.28 13,500.000 90.130 331.9774 7,056.833 7,003.83 7,926.367 6,018.701 5,982,602.6577 377,834.7798 0.00 9,375.21 13,600.000 90.130 331.9774 7,056.606 7,003.71 8,014.643 5,871.719 5,982,691.7176 377,789.3192 0.00 9,445.15 13,700.000 90.130 331.9774 7,056.379 7,003.48 8,102.919 5,924.738 5,982,780.7774 377,743.8587 0,00 9,515.09 13,800.000 90.130 331.9774 7,056.152 7,003.25 8,191.195 5,877.758 5,982,869.8373 377,698.3981 0.00 9,585.03 13,900.000 90.130 331.9774 7,055.926 7,003,03 8,279.471 5,830.774 5,982,958.8972 377,652.9376 0.00 9,854.97 14,000.000 90.130 331.9774 7,055.699 7,002.80 8,367.747 5,783.792 5,983,047.9571 377,607.4770 0.00 9,724.90 14,100.000 90.130 331.9774 7,055.472 7,002.57 8,456.023 5,736.810 5,983,137.0169 377,562.0165 0.00 9,794.64 14,200.000 90.130 331.9774 7,055.245 7,002.34 8,544.299 5,689.828 5,983,226.0768 377,516.5558 0.00 9,864.78 8/3112005 4:20:47PM Page 3 of 5 COMPASS 2003.11 Build 50 ORIGINAL ~ C Philli Sperry Drilling Services NAL.L.IBURTt7N onoco ps Planning Report -Geographic Alaska Spsrry Drilling Services Database: EDM 2003.11 Single User Db local Gaor!dinate Reference: Well Drill~g: CD2-01 Company; ConocoPhillips Alaska Inc. TVD Reference: CD2-01 ~ 52.900ft (CD2-01 ~ 52.9' above MSL) Project: Colville River Unit MD Reference:. CD2-01 ~ 52.900fl (CD2 01 ~ 52.9' above MSL} SIW: Alpine CD2 North Reference: Ttue We11: Drilling: CD2-01 Survey Catculatian Method: Minimum Curvature Wellhore; ' Drilling: CD2-01 Design: CD2-01wp04 ~ Planned Survey CD2-01wp04 Map Map MD Inclination Azimuth TVD 83TVD +NhS +EhW Northing Fasting DISEV VertSaction tft) (% (') (ft) (fU (ff) (h) (~ (ff) (°l100ft) (ftJ 14,300.000 90.130 331.9774 7,055.018 7,002.12 8,632.575 5,642.846 5,983,315.1367 377,471.0954 0.00 9,934.72 14,400.000 90.130 331.9774 7,054.791 7,001.89 8,720.851 5,595.865 5,883,404.1966 377,425.6349 D.OD 10,004.66 14,500.000 90.130 331.9774 7,054.564 7,001.66 8,809.127 5,548.883 5,983,493.2564 377,380.1743 0.00 10,074.59 14,600.000 90.130 331.9774 7,054.337 7,001.44 8,897.403 5,501.901 5,983,582.3163 377,334.7138 0.00 10,144.53 14,700.000 90.130 331.9774 7,054.110 7,001.21 8,985.679 5,454.919 5,983,671.3762 377,289.2532 0.00 10,214.47 14,800.000 90.130 331.9774 7,053.883 7,000.98 8,073.955 5,407.937 5,983,760.4361 377,243.7927 0.00 10,284.41 14,900.000 90.130 331.9774 7,053.657 7,000.76 9,162.231 5,360.955 5,883,849.4959 377,198.3321 0,00 10,354.34 15,000.000 90.130 331.9774 7,053.430 7,000.53 9,250.507 5,313.973 5,983,938.5558 377,152.8716 0.00 10,424.28 15,100.000 90.130 331.9774 7,053.203 7,000.30 9,338.783 5,266.992 5,984,027.6157 377,107.4110 0.00 10,494.22 15,200.000 90.130 331.9774 7,052.976 7,000.08 9,427.059 5,220.010 5,984,116.6756 377,061.9505 O.OD 10,564.16 15,300.000 90.130 331.8774 7,052.749 6,989.85 9,515.335 5,173.028 5,984,205.7354 377,016.490D D.00 10,634.10 15,4D0.000 90.130 331.9774 7,052.522 6,999.62 9,603.611 5,126.046 5,984,29A.7953 376,971.0294 0.00 10,704.03 15,500.000 90.130 331.9774 7,D52.295 6,999.40 9,691.887 5,079.064 5,984,383.8552 376,925.5689 0.00 10,773.97 15,800.000 90.130 331.9774 7,052.068 6,999.17 9,780.163 5,032.082 5,984,472.9151 376,880.1083 0.00 10,843.91 15,700.000 90.130 331.9774 7,051.841 6,998.94 8,868.439 4,985.100 5,984,561.9749 376,834.6478 0.00 10,913.85 15,800.000 90.130 331.8774 7,051.615 6,998.71 9,956.715 4,938.119 5,984,651.0348 376,789.1872 0.00 10,983.79 15,900.000 90.130 331.9774 7,051.388 6,998.49 10,044.991 4,891.137 5,984,740.0947 376,743.7267 0.00 11,053.72 18,000.000 80.130 331.9774 7,051.161 6,998.26 10,133.267 4,844.155 5,984,828.1546 376,698.2661 0.00 11,123.66 16,100.000 90.130 331.9774 7,050.934 6,998.03 10,221.544 4,797.173 5,984,918.2144 376,652.8056 0.00 11,183.60 16,200.000 80.130 331.9774 7,050.707 6,997.81 10,309.820 4,750.191 5,985,007.2743 376,607.3451 0.00 11,263.54 16,300.000 90.134 331.9774 7,050.480 6,997.58 10,398.096 4,703.209 5,885,096.3342 376,561.8845 0.00 11,333.48 16,400.000 90.130 331.9774 7,050.253 6,997.35 10,486.372 4,856.227 5,985,185.3941 376,516.4240 0.00 11,403.41 16,500.000 90.130 331.9774 7,050.026 6,987.13 10,574.648 4,609.246 5,985,274.4538 376,470.9634 0.00 11,473.35 16,600.000 90.130 331.9774 7,049.799 6,996.90 10,662.824 4,562.264 5,885,363.5138 376,425.5028 0.00 11,543.29 18,700.000 90.130 331.9774 7,049.573 6,998.67 10,751.200 4,515.282 5,985,452.5737 376,380.0423 0.00 11,613.23 16,800.000 90.130 331.9774 7,049.346 6,996.45 10,839.476 4,468.300 5,985,541.6336 378,334.5818 0.00 11,683.17 18,800.000 90.130 331.9774 7,049.119 6,996.22 10,927.752 4,421.318 5,985,630.6934 376,289.1212 0.00 11,753.10 17,000.000 90.130 331.9774 7,048.892 6,995.99 11,016.028 4,374.336 5,985,719.7533 376,243.6607 D.00 11,823.04 17,100.000 80.130 331.9774 7,048.665 6,995.76 11,104.304 4,327.354 5,985,808.8132 376,198.2001 0.00 11,892.98 17,200.000 90.130 331.9774 7,048.438 6,995.54 11,192.580 4,280.373 5,985,897.8731 376,152.7396 0.00 11,962.92 17,300.000 90.130 331.9774 7,048.211 6,995.31 11,280.856 4,233.391 5,985,986.9329 376,107.2791 0.00 12,032.86 17,400.000 90.130 331.9774 7,047.984 6,995.08 11,369.132 4,186.409 5,986,075.8928 376,061.8185 0.00 12,102.79 17,500.000 90.13D 331.9774 7,047.757 6,994.86 11,457.408 4,139.427 5,986,165.0527 376,016.3580 0.00 12,172.73 ~ 17,523.278 90.130 331.9774 7,047.705 ~ 6,994.80 11,477.857 4,128.490 5,986,185.7844 376,005.7755 0.00 12,189.01 Target (Toe!; 1 7523' MD, 7047 TVD - 4 112" _ Geologic Targets: Drilling:. CD2-01 I TW Target Name tNI.S +Et-W Northing Eastinp (Ri . Shays R it (ft) (ft) 7,057.900 CD2-01wp04 Heel 7,505.537 6,242.674 5,982,178.D900 378,051.5000 - Point 8!31/2005 4:20:47PM Page 4 of 5 COMPASS 2003.11 Build 50 ORIGINAL ConocoPhillips Alaska Database: EDM 2003.11 Single User Db Gompany:; ConocoPhilNps Alaska Inc. Project: CofviNe River Unit Site: Alpine CD2 Well: Drilling: CD2-01 Wellbote Drilling: CD2-01 Design: C02-01wp04 Sperry Drilling Services HALLtC3URT4N Planning Report -Geographic Sperry Drilling Services loca{'Co-ortt€nate Reference: Well Drilling: CD2-01 TVD Referet~: CD2-01 (~ 52.900ft (GD2-Ot ~ 52.9' above MSL} MD Reference: CD2-01 ~ 52.900ft (CD2-01 t~ 52.9' above MSL) tdorth Reterenc®: True Survey Calcuietion Method: AAinimum Curvature Proynosed Casing Poir-ts Measured Depth (ft} 3,288.590 12, 900.000 17,523.277 Vertical Casing Nole Depth Diameter Diameter 2,382.482 9-5f8 12-1/4 7,053.896 7 8-112 7,047.705 4-1/2 6-1l8 8/31/2005 4:20:47PM Page 5 of 5 COMPASS 2003.11 Build 50 o~~~~~~ ConocoPhillips Alaska ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 Drilling: CD2-01 Drilling: CD2-01 CD2-01wp04 Anticollision Report 31 August, 2005 • HALLIE3trtRTOtV Sperry Drilling Services ORIGINAL O V Z ~~ COI'10C0~'ll~~lp5 A4~kH HALLIBURTON Sperry Drllllrlg Services ""..:Lli".~m. ~: ANTI-COLLISION SET71NG5 Rr69rPOlaeon MaMed: MD InYrral: 80.4faYOrra CakWatlen MNhod: Minimum Lervrtun Depm Rang<F!om 706/0 Te 76000 Error McON: ISLWSA Madmum RanOr. 6000 Scan Mr;hed. Trav. Cylinder NorM Erta Surfaw: EIIIptlW Cenb R9t9r9nw WNI: Plan: LOT-01wp0{ WaminO Method: Rub Bash SURVEY PROGRAM Dale: TaaS-0e-JIT00:Oe:W VJdarN: Yn Verdau: DepN Fr°ur Deprh To Surrry/PIaR Tod T9.OM 610.000 CBGYROSS 659.870 10590310 MWD+IrR-AK-CALSC 75 From CMew Te eD -s50 .. -- ~ __ -- , .- ~ - .. ; ti... -,-nr54 - :- . :!xa - aw 1540-nm rsx,-!Uwns~r^-x!]w -1504 3 -a000 rSiN-i4.p0}!]sa-~S)00 xsx-x-x Snncoa-nxu .- 4T SY1.-SSU, -- -ti500 -. x!mw-~.~. -~.,. ~-sss44 -azw ~a5m-ura ...- ' - nx-sew ~.!ra-vev4v~~; _--.w. - uso: - -N150 -Sn• r• ~- ,mnsa- ~ - - -Iffu!ex4-!e -ras4 - ,!1350-!1!a#n 81h--!H ]SSOI - .- -!53x3Y.04-a>w _ fiISC-45Mn !3]50-!Y!"fT51Yl-!9500]5]x-iEloO ~~~~ T ~.. E.wo'asvc J~~9e~~rOBN ~ X -770 33p / ~ J\~'.. ~ 30 /y .610 -5~ j~ '~' - r\ l/~i ~~~ ~! ~ Igo ~ ` ~~ 7y / 300 ~/~ i % - ~~ ~ ~ ~~ w ~ ~/.--- IOO ~~ '.~~>! N //' . / ~~ /(. _ 1 1 ~T~ L,~~ j ~~~ T a ~~ / ~ ~ ~ ~ , ~_ / ~ /~/ i/. Y~ \V 1 _ , ! ~, i. ~~ ~~II 1~~t i~ ~ ',I~! I!~ i~' CDt-]t I Cpt-N CAZ cO5-MFR ~ III r r / / ,' ///~ t60 .~ / I ~ /. ~ /j~ / rfr 210 ~~ j / `v r % i~ / j ~ ' 7Tg /i~- ~ j/~. ~ ~ ~~,~!; Critical Issues: 7 Tm 3 1311 CD1J0 r -. ~" :727 Sg Tr:ncllinF (\linder .yr.imulh i 13'l /. ~/1! 1- 5'~ CSV!tre br Centre Separarion +0 U/in SECTION DETAILS Srr MD Inc Azi TVD +ry/-S +E/-W Dire TFace VSec Target 1 10590.)10 59.7W 19.2800 6062.182 SfY2.6M 1136.165 0.00 0.0000 7078.369 3 10610.000 59.)30 18.7187 6087.6<7 SSIO.iK 6158.196 1.11 T36.Uf7 7111.9)5 3 11171.f36 6L773 756.1132 K71.US 6)71.579 6510.895 1.00 -100.7162 MII.BBB 1 12107.710 61.777 )56.7152 6833.693 6670.271 bf9T.007 0.00 0.0000 837 I.OIB 5 1)033.718 90.000 331.9771 7057.900 7505.577 6217.671 1.00 -0.3.7607 90d1.80f CDT-0Iuy0l Hal 6 17076.278 90.130 731.f771 7057.885 7<17.012 62M.566 L00 0.0000 9050.896 7 17523.278 90.1)0 731.9771 70f7.7M IIf77.957 )178.190 0.00 0.0000 12189.017 Trartllin8 Cylinder Azimuth (TFO+AZI)1°I yr Centre t0 Centre Separation 1806/1 8/31/2005 4:25 PM ConocoPhillips Alaska Company: ConocoPhNlips Alaska Inc. Project: Colville River Unit Reference Site: Alpine CD2 Site Error. O.000ft Reference Well:. Drilling: CD2-01 Well Error: O.000ff Reference Wegbor's DriNing: CD2-01 Reference Design: CD2-01wp04 Sperry Drilling Services Anticollision Report locd Co-orxlinate Reference: TVD Reference: MD R~erence: tilalh Reference: Survey Calculation Method: Outputerrws are at Database: Offset TVD Reference: • ALLIBURTON Sperry Drilling Services WeN DrNlirtg: CD2-01 CD2-01 ~ 52.900(1 (CD2-01 ~ 52.9' above MSL) CD2-01 ~ 52.900ft (CD2-01 ~ 52.9' above MSL) True Minimum Curvature 1.00 sigma EDM 2003.11 Single User Db Offset Datum reference CD2-01wp04 ~ilter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria nterpolation Method: MD Interval 25.000ft Error Model: ISCWSA )epth Ranite: 10,640.000 to 25,000.OOOff Scan Method: Tray. Cylinder NoAh results Limked by: Maximum center-center distance of S,000.OOOff Error Surface: Elliptical Conic Narniryt Levels evaluated at 0.00 Sigma iurvaY Toot Program Date 8131/2005 .From To Iftl (ffj Survay(Weilborej Tool Name t)escription 79.000 614.000 CD2-O1P61 Ris1 Gyro (CD2-O1PB1) CB-GYRO-SS Camera based gyro single shot 659.020 10,590.310 CD2-01 P81 Rip IFR (CD2-01 PB1) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10,590.310 17,523.278 CD2-01wp04 (Drilling: CD2-01) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC summon Reference Offset Centro to No•Go Allowable Msasw^ad Measured Centre Distance Deviation Warning Sits Name Depth OePm Distance (itj from Plan Offset Well-. Welibore -Design (ft) (it) (ff) (ft} Alpine CD1 CD1-30 - CDi-30 - CDt-30 12,225.816 12,850.000 822.002 418.02 437.641 Pass -Major Risk CDt-31 - CD1-31 - CDi-31 11,774.589 13,875.000 712.150 403.56 353.912 Pass -Major Risk CD1-31-CD7-31 CAZ-CD7-31 CAZ 11,525.727 13,500.000 731.028 192.24 558.146 Pass-Major Risk CDt-3t - CDi-31 IIFR - CDt-31 IIFR 11,768.771 13,875.000 712.235 243.16 485.889 Pass -Major Risk CDt-32 - CD1-32 - CD1-32 Out of range Alpine CD2 CD2-02 -CD2-02 -CD2-02 Rig Surveys Out of range CD2-02 -CD2-02L1 -CD2-02L1 Rig Surveys Out of range CD2-03 -CD2-03 -CD2-03 Rig Surveys Out of range CD2-03 -CD2-03L1 -CD2-03L1 Rig Surveys Out of range CD2-06 - CD2-O6 - CD2-O6 Out of ransie CD2-07 -CD2-07 -CD2-07 17,506.715 13,425.000 3,965.806 239.57 3,730.657 Pass -Major Risk CD2-07 -CD2-07PB1 -CD2-07PB1 15,457.379 11,375.000 3,937.233 792.88 3,749.718 Pass -Major Risk CD2-07 -CD2-07P82 -CD2-07PB2 17,506.257 13,425.000 3,954.832 236.01 3,722.944 Pass -Major Risk CD2-08 -CD2-08 -CD2-08 17,126.399 16,500.000 967.347 236.09 734.051 Pass -Major Risk CD2-09 - CD2-09 -CD2-09 Out of range CD2-09 -CD2-09L1 -CD2-09L1 Out of range CD2-09 -CD2-09P81 -CD2-09P81 Out of range CD2-10 -CD2-10 -CD2-10 Out of range CD2-10 -CD2-10P81 -CD2-tOP61 Out of range CD2-12 -CD2-12 -CD2-12 Out of range CD2-13 -CD2-13 -CD2-13 12,049.247 11,200.000 2,394.480 186.87 2,223.371 Pass -Major Risk CD2-13 -CD2-13P62 -CD2-13P62 12,049.247 11,200.000 2,394.480 186.36 2,223.878 Pass -Major Risk CD2-15 -CD2-15 -CD2-15 Out of range CD2-15 -CD2-15PB1 -CD2-15PBt Out of range CD2-15 -CD2-15P62 -CD2-15P82 Out of range CD2-18 -CD2-18 -CD2-18 Out of range CD2-20 -CD2-20 -CD2-20 Out of range CD2-21 -CD2-21 -CD2-21 Out of range CD2-21 -CD2-21PB1 -CD2-21P81 Out of range CD2-23 -CD2-23 -CD2-23 Out of range CD2-24 -CD2-24 -CD2-24 Out of ransle Plat: CD2-04 -Plan: CD2-04 -Plan: CD2-04 ( Out of range Plat: CD2-11 -Plan: CD2-11 -CD2-1 twp08 Out of range Alpine Satellites Alpine#3 -Alpine #3 -Alpine #3 16,416.648 7,050.000 1,123.842 148.49 984.729 Pass -Major Risk CC -Min centre to center distance or coverrlent point, SF -min separation factor, ES -min ellipse separation 8/31/2005 4:20: IOPM Page 2 of 2 COMPASS 2003.118ui1d 50 • • ~~ AJaska State Plane Zone: 4 Welt: GC-2-01 PB1 Plan: GD2-01Pt31 Rig Surveys Verticall Section Plane: 12.60 31, 2135 MD Inc. Azim. SS~1/D TVD N/S E/W Y X DLS V.S. SVY # (ft); (Deg) (Deg) (ft) (ft} (ft) (ft) „(ft) (ft} ~ ' °1100ft (ft) Tie-On 37.00 0.00 0':00 -15.90 37.00 0.00 N 0.00 E 5974781.09 N 371681.81 E 0.00 0.00 1 79:00 0.25 300.00 26.10 79.00 0.05 N 0:08 W 5974781.14 N 371681.73 E 0.60 0.02 2 179.00 0.25 340':00 126.10 179.00 0.36 N 0;34' W 5974781.46 N' 371681.47 E 0.17 0.24 3 259:00' 1.50 72.00 206.09 258.99 0.85 N 0:59 E 5974781.93 N 371682.42 E 1.91 0.99 2 349.00 3.80 64:00 295.99 348.89 2.52 N ' 4.40 E 5974783.53 N 371686.25 E 2.58 3.73 3 439':00 7.50 46.00 385.54 438.44 7.91 N 11.30 E 5974788.80 N 371693.25 E 4.51 10.96 4 529.00 11.00 46:00 474.36 527.26 17.96 N 21,71 E 5974798.67 N 371703.82 E 3.89 23.68 3 6'14.00 14.50 48.00 557.25 61'0:15 30.71 N 35.45 E 5974811.19 N 371717.78 E 4.15 40.00 4 659.02 15.55 52.04 600.73 653.63 38.20 N 44.40 , E 5974818.52 N 371726.86 E 3.30 49.84. 5 746.98 17.59 48:36 685.03 737;93 54.29 N 63.64 E 5974834.28 N 371746.36 E 2.61 70.99 4 837.77 20.56 49.44 770.83 823.73 73.77 N 86.01 E'E 5974853.37 N 371769.06 E 3.29 96.32 5 932.35 24.15 46:45 858.29 91'1.19 97.91 N ..1.12.65 E 5974877.05 N 371796.11 E 3.98 127.38 6 102$.76 25.80 46.36 945.68 998.58 125.98 N 142.13 E, 5974904.61 N 371826.06 E 1.72 163.05 5 1124.14 29.08 46.83 1030.32 1'083:22 156.17 N 174:07 E 5974934.25 N 371858.51 E 3.44 201.49 6 1219.26' 32.20 46.33 1112.15 1165.05 189.49 N .209.26 E 5974966.95 N 371894.27 E 3.29 243.89 7 1314.:67 32.23 46:02 1192.88 1245.78 224.71 N 245:96 .E 5975001.54 N 371931.55 E 0.18 288.55 6 1409:86 35.27 .47.54 1272.02 1324.92 260.90 N 284.51 ' E` 5975037.06 N 371970.72 E 3.31 334.70 7 1505:22 38.62 48`.30 1348.22 1401.12 299.29 N 327.05 ; E 5975074.72 N .372013.91 E' 3.55 384.16 8 1599:84 41.68 48.70 1420.53 1473.43 339.71 N 372.74. E 5975114.34 N 372060:28 E 3.24 436.50 7 1695.:23 45.35 48.78 1489.69 1'542.59 383.02 N 422.11' E 5975156.80 N 372110.38 E 3.85 492.71 8 1790.27 50.10 48;80 1553.61 1606.51. 429.33 N 475.00 E 5975202.20 N 372164.05 E 4.99 552.85 9 1885::48 53.21 48.71 1612.67 1665.57 478.56 N 531.14 E 5975250.45 N 372221.02 E 3.27 616.74 8 1'980.76 54.41 49.39. 1668.93 1721.83 528.95 N .589.22 E 5975299.84 N 372279:94 E 1.39 682.33. 9 2076:18 55.48 49.72 1723.74 1776.64 579.62 N 648.66 !E 5975349.48 N 372340.24 E 1.16 748.60 10 2171.35 56.22 50.21 1777.16 1830.06 630.28 N 708.96 E 5975399.09 N 372401.40. E 0.89 815.12 9 2266.6'1 57.30 48.11 1829.38 .1882.28 682.38 N 769:23 E 5975450.16 N 372462.54'. E 2.16 883.01 10 2361.73 58.22 46.87. 1880.13 1933.03 736.75 N 828.53 E 5975503.49 N 372522.76 E 1.47 952.76 11 2407.29' 58.07 46.20 1904.17 1957.07 763.37 N 856.62 E 5975529.63 N 372551.29 E 1.29 986.63 10 2457.10 59.24 45.78 1930.08 1982.98 792.93 N :887.21 E 5975558.65 N 372582.39 E 2.46 1024.05 11 2552:08 60.12 46.77 1978.03 2030.93. 849.59 N 946.46 E 5975614.29 N 372642:60° E 1.29 t095.98 12 ..2642.15 59.66 46.39 2025.72 2078.62 906.12 N 1006';20 E 5975669.79 N 372703.28 E 0.60 1167.92 11 2742:18 61.16 47.22 2072.65 2125.:55 962.68 N 1066.44 E' 5975725.30 N 372764.48 E 1.75 1240.04 12 2837:45 61.38 48.11 2118.44 2171.34 1018.94 N 1128:20 E 5975780.49 N 372827.19' E 0.85 1312.34 13 2932:27 62.49 ' 49.28 2163.05 2215:95 1074.16 N 11.91.05 E" 5975834.63 N 372890.97 E 1.60 1383.98 14 3027:23 61.22 49.30 2207.85 2260.75 1128.77 N 1254:52 E 5975888.14 N 372955.36 E 1.34 1455.23 15 3122.30 59.23 49.53 2255.06 230T:96 1182.46 N 1317.18 E 5975940.74 N 373018.93 E 2.11 1525.34 16 3217:90. 58.69 49:68 2304.35 2357.25 1235.54 N 1379(57 E 5975992.74 N 373082.21 E; 0.58 1594.80 17 3260.74 58.86 49.92 2326.56 2379.46 1259.18 N 1407.55 E 5976015.90 N .373110.59 E 0.62 1625.80 18 3266.59! 58.86 49.90 2329.58 2382.48 1262.41 N 14'11.38 E 5976019.06 N 373114.47 E 0.34 1630.03 19 3355.70 58.86 49.54 2375.66 2428!:56 1311.72 N 1'469:56 E ' 5976067.36 N ' 373173.48 .E 0.34 1694.62 20 3451.47 60.25 50.72 2424.19 2477.09 1364.64 N 1532.93 E 5976119.19 N 373237:25; ''E 1.80 1764.23 21 3546.92 60.10 50.32 247'1.67 2524.57 1417.29 N 1596;85 E 5976170.73 N 373302.54 E 0.40 1833.73 22 3642:83 59.68 49.52 2519.79 2572.69 1470.71 N 1660.33 E 5976223.05 N 373366.92 E 0.85 1903.84 23 3738.12 59.34 50:23 2568.14 2621.04 1523.62 N 1723:.1.1 E 5976274.88 N 373430:60 E 0.73 1973.26 24 3834.06.. 59.61 48.16 2616.88 2669.78 1577.63 N 1785.66 E 5976327.80 N 373494.06 "E 1.88 2043.65 25 3928.90 60.35 46:86 2664.33 2717.23 1633.09 N 1846.21 E 5976382.22 N 373555.54 E. 1.43 2114.83 26 4022.89 59.86 46.61 2711.17 2764.07 1688.94 N 1905:54 E 5976437.04 N 373615.82 E' 0.58 2186.00 27 4118.04 59.85 45.62 2758.96 .2811:86 1745.98 N 1964:84 E 5976493.05 N 373676.08 E 0.90 2258.30 28 4213.23 59.52 44.36 2807.01 2859.91 1804.09 N 2022:94 E' 5976550.15 N 373735.16' E 1.20 2331.25 29 4308.44 58.71 45.67 2855.88 2908.78 1861.85 N 2080.73 E' 5976606.91 N 373793.92 E 1.45 2403.78 30 4403.63 58.42 45.99 2905.52 2958.42 1918.45 N 2138.98 E'' 5976662.50 N 373853.14 E 0.42 2475.34 31 4498.77 58.21 •46.37 2955.49 3008:39 1974.50 N :2197.40 E 5976717.54 N 373912.49 E 0.41 2546.43 32 4594.01 60.14 48A2 3004.30 3057.20 2030.06 N 2257.40 E 5976772.06 N 373973.44 E 2.52 2617.53 33 4689.15 61.08 50.87 3050.99 3103:89 2083.94 N 2320.38 E 5976824.85 N 374037.32 E 2.79 2687.93 ORIGINAL • ,~~. r~. r'~ ~ 27 Alaska State Pla ne Zane: 4 we!!. cDS-a1 PB1 Plan: Cpl-01RB1 Rig$urveys Vertical Section Plane:. 1fi.60 tac~ust 31, 20015 MD inc Azim. SSTVD ND N/S ElW Y X DLS V.S. SVY # (ft) (Deg) (Deg) (ft) (ft) (ft) (ft) (ft) (ft) °/100ft (ft) 34 4784.06 60.81 51.15 3097.09 3149:99 2136.14 N 2384.87. E 5976875.94 N 374102.69 E 0.39 2757.19 35 4879,45 60.65 51.61 3143.73 3196.63 2188.08 N 2449.88 E'; 5976926.75 N 374.168.57. E 0.45 2826.35 36 4974.33 60.55 51.79 3190.30 3243.20 2239.31 N 2514:75 € 5976976.86 N 374234.31 E 0.20 2894.80 37 5069.46 60.29 51.45 3237.26 3290.16 2290.68 N 2579.60 E 5977027.10 N 374300.03 E 0.42 2963.36 38 5164.64 59.89 51.50 3284.72 3337.62 2342.07 N 2644.15 E 5977077.37 N 374365.44 E 0.42 3031.86 39 5259.49 59.77 51.13 3332.39 3385.29 2393.32 N 2708:16 E 5977127.52 N '374430.31 E 0.36 3100.07 40 5354.18 59.63 52.48 3380.16 3433:06 2443.87 N 2772.41 E 5977176.96 N 374495.41 E 1.24 3187.68 41 5449:66 59.93 51.37 3428.22 3481.12 2494.75 N 2837.35 E' 5977226.72 N 374561.21 E 1.05 3235.81 42 5544;87 58.77 50.17 3476.76 3529.66 2546.55 N 2900.80 E, 5977277.42 N 374625.53 "E 1.63 3304.36 43 5640.28 59.22 46:47 3525.92 3578.82 2600.92 N 2961:86 E 5977330.73 N 374687.50 E. 3.36 3374.65 44 5735:51 58.99 45:00 3574.82 3627.72 2657.95 N 3020.38 E 5977386.75 N 374746.98 E 1.35 3446.71 45 5830:79 57.67 45.13. 3624.84 3677.74 2715.22 N 3077.78 E6 5977443.03 N 374805.35' E 1.39 3518.66 46 5926:08 57.66 45.25 3675.81 .3728.71 2771.97 N 3134.90 E> 5977498.78 N 374863.43, E 0.11 3590.01 47 6021.45 57.76 47.16 3726.76 3779.66 2827.76 N 3193;09 E 5977553.56 N 374922.56 E 1.70 3660.79 48 6116:83 58.61 48.22 3777.04 3829.94 2882.31 N 3253.03 € 5977607.08 N 374983:42 E 1.30 3730.91 49 6211.90 58.78 49.12 3826.44 3879.34 2935.95 N 3314:03 "'E 5977659.66 N 375045.32 E 0.83 3800.48 50 6306.93 61.28 48.48 3873.91 3926.81 2990.18 N 3375:96 E 5977712.82 N 3751D8.17 E 2.70 3870.89 51 6402.11 61.53 48:03 3919.46 3972.36 3045.82 N 3438.31 E 5977767.38 N 375171.46 E 0.49 3942.78 52 6497:21 61.56 48.01 3964.78 4017.68 3101.75 N 3500.46 E 5977822.23 N 375234.56 <E 0.04 4014.88 53 6592':54 60.93 47.61 4010.64 4063.54 3157.87 N 3562.39 E 5977877.28 N 375297.42 °E 0.76 4087.10 54 6687.81 60.63 47.12 4057.14 4110.04 3214.19 N 3623.56. E ' 5977932.54 N 375359.54 "E 0.55 4159.27 55 6783:14 60.11 46.98 4104.27 4157.17 3270.65 N 3684.21 E' 5977987.95 N 375421.15 E' 0.56 4231.43 56 6877.68 60.86 47.30 4150.85 4203.75 3326.61 N 3744.52 ;,E 5978042.87 N 375482.40 E 0.85 4303.00 57 6972.96 59.54 47.32 4198.20 4251.10 3382.67 N 3805.29 E 5978097.87 N ' 375544.12 E 1.39 4374.81 58 7068.42 58.53 46.65 4247.32 4300:22 3438.51 N .3865.14 E 5978152.67 N 375604.91 E 1.21 4446.13 59 7463.98. 58.14 46.51 4297.48 4350.38 3494.41 N 3924.21 E. 5978207.55 N " 375664.93 E 0.43 4517.28 60 7258.99 58.56 47.05 4347.33 4400.23 3549.80 N 3983.15 E 5978261.92 N 375724.80.. ,E 0.66 4587.89 61 7354.90 58.91 47.00 439'7.10 4450.00 3605.68 N 4043.14 E 5978316.77 N 375785.73 E 0.37 4659.30 62 7450:25 59.45 47.22 4445.96 4498.86 3661.41 N 4103.13 E 5978371.45 N 375846.66 E' 0.60 4730.56 63 7545.07 60.12 47.78 4493.68 4546.58 3716.77 N 4163.54: E 5978425.76 N 37.5908.00 E 0.87 4801.58 64 7640.17 60.48 47:53 4540.80 4593.70 3772.41 N 4224.59 E 5978480.35 N 375970.00 E 0.44 4873.08 65 7735.07 60.23 46.97 4587.75 4640.65 3828.39 N 4285.1'6 E 5978535.28 N 376031.50 E 0.58 4944.75 66 7830.14 59.49 46.47. 4635.49 4688.39 3884.75 N 4345.01 E 5978590.61 N 376092.31 iE 0.90 5016.57 67 7925:07 59.69 46:89 4683.54 4736.44 3940.92 N 4404.57 E 5978645.74 N 376152:82 E 0.44 5088.12 68 8020.34 60.01 47.05 4731.39 4784.29 3997.14 N 4464:80 'E 5978700.92 N 376213.99..' E' 0.37 5159.91 69 81.15.34 60.57 46.86 4778.47 4831.37 4053.46 N 4525.10 'E 5978756.19 N 376275.24. E 0.61 5231.83 70 8210.59 60.96 47.20 4824.99 4877.89 4110.11 N 4585.91 E 5978811.79 N 376337.01 E 0.51 5304.21 71 '8305.69' 60.44 47.01 4871.54 4924.44 4166.56 N 4646:67 'E 5978867.18 N 376398.72 E 0.57 5376.39 72 8400.96 59.69 47.19 4919.08 4971.98 4222.76 N 4707.14:. E 5978922.33 N 376460.14 E 0.81 5448.24 73 8496.29 59.86 47.52 4967.07 5019:97 4278.56 N 4767.73 E 5978977.09 N 376521.67 E 0.35 5519.75 74 8591.32 60.06 47.26 5014.64 5067.54 4334.25 N 4828.28 E 5979031.73 N 376583.1'8 'E 0.31 5591.14 75 868(1:49 60.07 47.32 5062.13 5115.03 4390.20 N 4888:88 E 5979086.62 N 376644.70 ,E 0.06 5662.79 76 878'1.77 59.41 48.57 5110.15 5163:05 4445.32 N 4949:98 E 5979140.69 N 376706:74 E 1.33 5733.81 77 8876:97 59.14 .48.58 5158.79 5211.69 4499.47 N 50T1.35 'E 5979193.78 N 376769.01 E 0.28 5803.97 78 8972.28 59.36 48.56 5207.52 5260:42 4553.67 N 5072:76 'E 5979246.91 N 376831.34 ' E> 0.23 5874.20 79 9067.64 59.64 47.81 5255.92 5308.82 4608.45 N 5134:00 E 5979300.64 N 376893'::50 E 0.74 5944.93 80 9162.76 59.86 47.79 5303.84 5356.74 4663.64 N 5194:87 E' 5979354.78 N 376955.30 'E 0.23 6015.95 81 9258,:31 60.20 48.27 5351.57 5404.47 4719.00 N 5256.41 E 5979409.06 N " 377017.77 E 0.56 6087.32 82 9353.36' 59.79 50.57 5399.10 5452.00 4772.54 N 5318.91 E 5979461.52 N 377081.18 E 2.14 6157.25 83 9448:23 59.91 52.19 5446.76 5499.66 4823.74 N 5383.01 E 5979511.61 N 377146.14 E 1.48 6225.43 84 9543.11 61.63 50.43 5493.09 5545.99 4875.50 N 5447.62 E 5979562.26 N 37721'1.62 E 2.43 6294.30 85 9638:45 60.22 44.05 5539.46 5592.36 4932.00 N 5508.77 E 5979617.70 N 377273.73 E 6.03 6366.65 86 9733:83 59.86 44:65 5587.09 5639.99 4991.10 N 5566.54 E 5979675.79 N 377332.49 `E 0.66 6440.44 87 9829.53' 60.29 47:50 5634.84 5687.74 5048.62 N 5626.27 E ' 5979732.28 N 377393.1'9 E 2.62 6513.33 ORIGINAL .~.~. r1, • _._ ND 2= Alaska State Plane Zone: 4 Welt. GD2-01 P'B1 Ptan: CD2-01PB1 Rig Surveys Vertical Section Plane: 17.60 SVY' 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 MD (ft) 9924.77 10019:58 10114.42 1'0209:1'7 10304.42 10400.11 10494.61 10590:31 10684.63 10779'.69 10875.06 1:0970:47 11065.19 11160.36 11255.47 11350:69 11445.92 11541.12 11636.42 11.731.65 11826.72 1!1:921.:78 12017.22 12412.60 12207.84 12303:08 12398.52 12493385 12588.93 12683.97 12779.24 12874.72 12948.26 12969.08 13039:48 13064.33 13159.27 13234.46 13317:96 13413.19 13508:43 13603.89 1.3696.76 13729:71 13825.04 1'.3920:1!3 14015.23 14110;90 14205.15 14300:37 14394:75 14451.32 14483:00 Inc (Deg)' 59.26 60.14 60.84 61.07 61.14 61.00 60.42 59.79 58.92 57.40 57.48 57.72 57.79 58.04 57.86 59.00 59.79 63.74 63.16 62.39 63.73 64.83 66.04 67.32 69.50 70.81 71.66 73.68 76.63 76.35 77.31 78.76 82.38 83.40 84.49 84.88 85.18 86.30 86.91 85.85 85.80 89.21 93.09 93.08 92.84 93.52 93.58 93.09 93.15 93.21 93.40 92.77 92.77 Azim. (Deg) 50:06 49.46 49.29 48.79 48.77 48.71 48.83 49.28 .48.21 47.62 47.51 47.64 48.04 48.62 48.58 49.44 42:08 32.61 31.30 29.94 25.97 24.78 22.95 20.33 15,00 9.63 5.63 359.93 350.51 343.36 341.53 340.58 339.06 338.63 337.68 337.34 335.99 335.34 335.15 335.33 335.14 334.79 334.18 334.31 334.32 334.19 334.64 335.02 335.13 335.87 335.99 335.62 :335.62. SSND (ft) 5682.79 5730.62 5777.34 5823.34 5869.36 5915.65 5961.88 6009.58 6057.66 6107.81 6159.14 6210.26 6260.80 6311.35 6361.82 641 1.68 6460.21 6505.32 6547.91 6591.48 6634.57 6675.82 6715.50 6753.26 6788.33 6820.68 6851.39 6879.81 6904.22 6926.45 6948.15 6967.95 6980.00 6982.58 6990.00 6992.30 7000.53 7006.12 7011.06 7017.07 7024.00 7028.16 7026.30 7024.52 7019.60 7014.33 700.8.44 7002.87 6997.74 6992.46 6987.02 6983.97 6982.44 • ND (ft) 5735:69 5783.52 5830.24 5876.24 5922.26 5968.55 6014.78 6062.48 6110.56 6160.71 .6212.04 6263.16 6313.70 6364.25 6414.72 6464.58 6513.11 6558.22 6600.81 6644.38 6687:47 6728.72 6768.40 6806.16 6841.23 6873.58 6904.29 6932.71 6957.12 6979.35 7001.:05 7020.85 7032.90 7035.48 7042.90 7045.20 7053.43 7059;02 7063.96 7069.97 7076.90 7081.06 7079.20 7077.42 7072.50 7067.23 7061.34 7055.77 7050.64 7045.36 7039.92 7036.87 7035.34 N/S (ft) 5102.85 5155.73 5209.47 5263.77 5318.72 5373.95 5428.27 5482.64 5536.15 5590.27 5644.50 5698.85 5752.62 5806.23 5859.54 5912.74 5969.88 6036.52 6108.85 6181.71 6256.56 6333.94 6413.32 6494.73 6579.07 6666.56 6756.10 6846.95 6938.41 7028.36 7116.80 7205.14 7273.22 7292.48 7357.46 7380.32 7467.17 7535.49 7611.18 7697.48 7783.73 7870.13 7953.91 7983.54 8069.34 8154.86 8240.46 8326.88 8412.23 8498.74 8584.77 8636.30 8665.12 E/W' (ft) 5688.1.5. E 5750.64 'E 5813.28 E 5875:83 E 5938:56 E 6001.51 E 6063.50 E 6126:17 E .6187..1!7 E 6247.10 E 6306.43 E 6365.89 '`E 6425.27 E 6485.51 E' 6545.98 E 6607.21 E 6665:85 E 6716.54 E' 6761.66 E 6804.79" E 6844.49 E 6881.18 E 6916.30 E 6948:59 E 6975:42 E 6994.50 ''E 7006.48 E 7010.87 E 7003.17 E 6982.30 E 6954.32 E 6923.99.: E 6898.96 'E 6891:51' E 6865.46 E 6855c99 E 681$.53 E 6787.63 E 6752.73 6712.92 E 6673.13 E 6632.78 E 6592'.79 E .6578.50 E 6537:23 E 6495.99 E 6454:98 E 6414.34 E .6374.68..E 6335.25 € 6296.82 E 6273.67 '€ 6260.61 E' N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Y (ft) 5979785.44 5979837.24 5979889.89 5979943.11 5979996.97 5980051.11 5980104.36 5980157.65 5980210.10 5980263.18 5980316.39 5980369.70 5980422.45 5980475.01 5980527.28 5980579.42 5980635.54 5980701.30 5980772.84 5980844.95 5980919.10 5980995.84 5981074.59 5981155.43 5981239.30 5981326.44 5981415.76 5981506.51 5981598.08 5981688.37 5981777.26 5981866.10 5981934.60 5981953.98 5982019.39 5982042.41 5982129.87 5982198.71 5982274.98 5982361.94 5982448.86 5982535.92 5982620.37 5982650.24 5982736.72 5982822.93 5982909.21 5982996.31 5983082.32 5983169.48 5983256.15 5983308.06 5983337.10 ORIGINAL X. (ft) N 377455.99 E N 377519.36 E N 377582.91 E N 377646.38 E N 377710.03 E N 377773.92 E N 377836.82 E N 377900:41) E N 377962.31 E N 378023.1:5 E N 378083.39. E N 378143.77 E N 378204.06 E N 378265.20 E N 378326.57 E' N 378388.70 E N 378448.31 E N 378500.12 E N 378546.46- E N 378590.83 `E N' 378631.81 E N 378669.82 E N 378706.28 E N 378739.95 E N 378768.22 E N 378788.79 E N 378802.31 _ E N 378808.25 ' f N 378802,12 _E N 378782.79 'E N .378756.33 € N 378727.52 E N 378703.66 E N 378696.54 E N 378671.61' E N 378662.53 E N 378626.57 E N ' 378596.84 E . N 378563.24 E N 378524.93 E N 378486.62 E N 378447:76 E N 378409.21 E' N 378395.43 E N 378355.64 E N 3783.15.87 E N 378276:33: E N 378237.18' E N 378198:99 E N 378'181.05 `E N 378124.10 E N 378101.84 E N 378089.27 E DLS °i100ft 2.56 1.08 0.75 0.52 0.08 0.16 0.62 0.78 1.34 1.69 0.13 0.28 0.37 0.58 0.20 1.43 6.70 9.69 1.37 1.51 3.98 1.62 2.16 2.86 5.68 5.48 4.07 6.09 10.07 7.32 2.12 1.80 5.33 5.33 2.05 2.05 1.45 1.72 0.77 1.13 0.21 3.59 4.23 0.40 0.25 0.73 0.45 0.67 0.13 0.78 0.24 1.29 0.00 V.S. (ft) 6583.73 6653.03 6723.19 6793.86 6865.21 6936.88 7007.40 7078.17 7147.62 7217.32 7286.96 7356.74 7425.95 7495.26 7564.35 7633.58 7705.78 7784.62 7867.20 7949.70 8033.05 8117.90 8204.18 8291.54 8380.05 8469.21 8558.19 8646.11 8730.96 8810.39 8886.23 8961.27 9018.60 9034.71 9088.77 9107.70 9179.15 9234.93 9296.53 9366.76 9436.95 9507.10 9574.87 9598.80 9668.10 9737.15 9806.35 9876.44 9945.80 10016.35 10086.73 10128.85 10152.37 STATE OF ALASKA 11/09/04 OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: jim re~~~~adrr:in.stUte.a>i.u~~ aogc^ pr~Ed~oe ba ~ad:~in.stae.ak.us ~~:i~ ieckenatein~'~3adn:i'3.stute.ak.us Contractor: Doyon Rig No.: 19 DATE: 8/26/2005 Rig Rep.: Welsh/Lupton Rig Phone: 670-4302 Rig Fax: 670-4303 Operator: Conoco Phillips Alaska Op. Phone: 670-4300 Op. Fax: 670-4301 Rep.: Mickey Field/Unit & Well No.: Colville Rv CD2-01 PTD # Z~-111 Operation: Drlg: x Workover: Explor.: Test: Initial: x Weekly: Bi-Weekly Test Pressure: Rams: 250/5000 Annular: 250/3500 Valves: 250/5000 TEST DATA MISC. INSPECTIONS: Test Result Location Gen.: P Well Sign Housekeeping: P Drl. Rig PTD On Location P Hazard Sec. Standing Order Posted P BOP STACK: Quantity Size Test Result Annular Preventer 1 13-5/8 P Pipe Rams 1 3-1/2x 6 P Lower Pipe Rams 1 3-1/2x 6 P Blind Rams 1 blinds P Choke Ln. Valves 1 3-1/8 P HCR Valves 2 3-1/8 P Kill Line Valves 1 3-1/8 P Check Valve 0 NA MUD SYSTEM: Visual Test Alarm Test Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector P P H2S Gas Detector P P FLOOR SAFETY VALVES: Test Result Quantity Test R P Upper Kelly 1 P P Lower Kelly 1 P P Ball Type 1 P Inside BOP 1 P Test Results CHOKE MANIFOLD: Quantity Test R No. Valves 16 P Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test Resu System Pressure 2975 P Pressure After Closure 1600 P 200 psi Attained 31 P Full Pressure Attained 2 min 39 sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 4 @2200 Number of Failures: 0 Test Time: 4 Hours Components tested 28 Repair or replacement of equipment will be made within n/a days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Supervises at: dim req~t:~,,,adr~:i:~.state.ak.ur (Remarks: Good test. 24 HOUR NOTICE GIVEN YES X NO _ Date 08/24/05 Time Waived By 07:OOAM Witness Jeff Jones Lu est start 9:30pm8/25 Finish BOP Test (for rigs) BFL 11/09/04 Doyon19 08-26-05 CD2-01.x1s ~ ~ ~~ ~ ~, FRANK H. MURKOWSK/, GOVERNOR ~~ OII/ ~ ~ 333 W. 7~" AVENUE, SUITE 100 COI~TSER~A7'I011T COlril-IISSI011T ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Chip Alvord Alpine Drilling Team Leader ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 Re: Colville River CD2-O1 ConocoPhillips Alaska, Inc. Permit No: 205-118 Surface Location: 1577' FNL, 1562' FEL, SEC. 2, T11N, R04E, UM Bottomhole Location: 459.1' FNL, 2763' FEL, SEC 24, T12N, R04E Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty- four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petrole field inspector at (907) 659- 3607 (pager). K. DATED this day of August, 2005 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. 1 ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 ConocoPhillips August 1, 2005 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 R E ~ ~ ~ ~P l~ t-1 Aug o ~ zoo5 Re: Application for Permit to Drill CD2-01 Dear Sir or Madam: Alaska Oil & Oas Cons, Commission Anchorage ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the Alpine CD2 drilling pad. The intended spud date for this well is August 16, 2005. It is intended that Doyon Rig 19 drill the well. The intermediate section of CD2-01 will be drilled and landed in the Alpine sand horizontally; 7" casing will then be run and cemented in place. CD2-01 will be completed as an openhole producer. ' At the end of the work program the well will be shut in awaiting slickline well work and surface connection. Note that it is planned to drill the surface hol__e`wit_hout adiverter: There have been 56 wells drilled on CD2 pad and 43 wells drilled on CD1 pad with no significant indication ' of gas or shallow gas hydrates. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a). 2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1). 3. A proposed drilling program 4. A drilling fluids program summary. 5. Proposed completion diagram. 6. Pressure information as required by 20 ACC 25.035 (d)(2). 7. Directional drilling /collision avoidance information as required by 20 ACC 25.050 (b). Information pertinent to this application that is presently on file at the AOGCC is: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser setup which replaces diverter If you have any questions or require further information, please contact Vern Johnson or 265-6081, respectively. Chip Alvord can also be reached by calling 265-6120. S' rely, ~-- ~~ ~~ j, / o Vern John on Drilling Engineer Attachments cc: CD2-01 Well File /Sharon Allsup Drake ATO 1530 Chip Alvord ATO 1700 Vern Johnson ATO 1702 Tim Schneider ATO 1768 Steve Moothart/Jeff Yeaton ATO 1756/1752 Bill Esco Anadarko -Houston Lanston Chin Kuukpik Corporation STATE OF ALASKA ~SKA OIL AND GAS CONSERVATION C .MISSION PERMIT TO DRILL 20 AAC 25.005 lll..~i,~ A.I U_ Ytia.~ er__.., C~_........_°__= 1a. Type of Work: Drill ~ Redrill ~ Re-entry ~ 1b. Current Well Class: Exploratory ~ Developme e Stratigraphic Test ~ Service ~ Development Gas O~iPZone 2. Operator Name: ConocoPhillips Alaska, Inc. 5. Bond: Blanket ~ Single Well Bond No. 59-52-180 ~ 11. Well Name and Number: CD2-01 3. Address: PO Box 100360, Anchorage AK 99510-0360 6. Proposed Depth: MD: ~ 921.2 '` TVD: 7032 12. Field/Pool(s): Colville River Field 4a. Location of Well (Governmental Section): Surface: 1577' FNL & 1562' FEL; Sec02-T11 N-R04E UM ~ 7. Property Designation:, ~~ , AIJL 380075, 380096, 25558 ~ ~'-.~~~~ ~'`t'~`~' Alpine O+I Pool Top of Productive Horizon: 4608' FNL & 4814' FEL; Sec30-T12N-R05E 8. Land Use Permit: ASRC NPRA02 13. Approximate Spud Date: 16-AU -05 Total Depth: 4591' FNL & 2763' FEL; Sec24-T12N-R04E ~ 9. Acres in Property: 2560 14. Distance to Nearest Property: 4591 FNL AFL 25ci5_s 4b. Locatio II State Base Pla o tQs): ~j',r Surtace:x- y- J Zone- 4 10. KB Elevation (Height above GL): 36.7 feet 15. Distance to Nearest Well Within Pool: CD1.30 101 1 16. Deviated wells: Kickoff depth: 200 feet ~ Maximum Hole Angle: 90 degrees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3186 ~ Surface: 283 18. Casing Program: Size Specifications Setting Depth Top Bottom Quantity of Cement c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 16" 62.5# H-40 Weld 77 37 37 114 114 Portland Cement 12.25" 9.625" 36# J55 BTC 3231 37 37 3268 2394 618 Sx AS Lite & 230 sx Litecrete 8.5" 7" 26# L80 BTC-M 13180 37 37 13217 7040 267 Sx 15.8 ppg class G 6.125" 3.5" 9.3# L80 EUE-M 11830 32 32 11862 6688 Tubing 19. PRESENT WELL COi~iDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Structural Conductor Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Filing Fee ~ BOP Sketch Drilling Program ~ Time v. Depth Plot Shallow Hazard Analysis Property Plat ~ Diverter Sketch ~ Seabed Report ~ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true an~i,,c//orrect to the best of my knowledge. Contact V. Johnson 265-0681 Printed Name Brian Noel -~,. (,~j,~ /~/~~ Title for Alpine Drilling Team Leader Chip Alvord Signature ~1~-~--' f~' ~~ Phone 907-265-6979 Date 1-Aug-05 Commission Use Only Permit to Drill Number: ~C-~~ ~~~t API Number: / 50- ~C~~ _ ~-~-a` ~ ~~ ` C..~ Permit Approval Date: ~ ~ D~j See cover letter for other requirements. Conditions of approval Sa ples equired Yes ~ No ~ Mud log required Yes ~ No dro sulfide measures Yes ~ No ~ Directional survey required Yes ~" No [] Other: 3 ~ ..° ~G?~-c ~~'r-. h ~voc-'«.~ ~-~c~~~.~e7c aO A~.~.aS ,b~ SC,-~~ ~? APPROVED BY Approved THE COMMISSION Date: Form 10-401 Re sed 06/2004 (~ (~ t ~'"~ ~ A ~ ~ ~ Submit inDuplicate ~ • CD2-01 Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) 12-1/4" Hole / 9-5/8" Casing Interval Event Risk Level Miti ation Strate Conductor Broach Low Monitor cellar continuous) Burin interval. Well Collision Low G ro sin le shots as re wired Gas Hydrates Low Monitor well at base of permafrost, increased mud weight, decreased mud viscosity, increased circulating times, controlled drilling rates, low mud tem eratures Running Sands and Gravel Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps. Abnormal Pressure in Low Increase mud weight Surface Formations >2000' TVD Lost Circulation Low Reduce pump rates, mud rheology, lost circulation material, use of low densit cement slurries 8-1/2" Hole / 7" Casing Interval Event Risk Level Miti ation Strate Abnormal Pressure in Low BOPE drills, Keep mud weight above 9.6 ppg. Surface Formations Check for flow during connections and if needed, >2000' ND increase mud wei ht. Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheolo ,lost circulation material Hole swabbing on trips Moderate Reduced trip speeds, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted swee s. Abnormal Reservoir Low Well control drills, increased mud weight. No Pressure mapped faults occur within 700' of the planned wellbore. Hydrogen Sulfide gas Low HZS drills, detection systems, alarms, standard well control ractices, mud scaven ers 6-1/8" Hole /Horizontal Production Hole Event Risk Level Miti ation Strate Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheolo ,lost circulation material Hole swabbing on trips Moderate Reduced trip speeds, Pump out to 7" shoe, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitorin ,wei hted swee s. Abnormal Reservoir Medium BOPE drills, Keep mud weight above 8.8 ppg. Pressure J Check for flow during connections and if needed, increase mud weight. Well control drills, increased mud wei ht. Hydrogen Sulfide gas Low HZS drills, detection systems, alarms, standard well - control ractices, mud scaven ers ORIGINAL Alpine : CD2-01 Procedure Procedure 1. Move on Doyon 19. 2. Rig up on riser 3. Drill 12-'/." hole to the surface casing point as per the directional plan. 4. Run and cement 9-5/8" surface casing. 5. Pressure test casing to 2500 psi. 6. Install and test BOPE to 5000 psi. .~..~ 7. Pick up and run in hole with 8-1/2" drilling BHA. 8. Drill out 20' of new hole. Perform leak off test. i 9. Drill 8-%2' hole to intermediate casing point in the Alpine Sands. (LWD Program: GR/RES/PWD) 10. Run and cement 7" casing as per program. Top of cement > 1493' MD above Alpine C sand. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 11. Pressure test casing to 3500 psi. 12. ROPE test to 5000 psi. 13. Run drilling assembly. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg EMW. 14. Displace well to Mineral oil based mud. 15. Drill 6-1/8" horizontal section to well TD (LWD Program: GR/RES/PWD). 16. Circulate the hole clean and pull out of hole. 17. Run 3-%2, 9.3#, L-80 tubing with SCSSSV, gas lift mandrels, landing nipple, sliding sleeve and packer. Land hanger. 18. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 19. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 20. Circulate tubing to diesel and install freeze protection in the annulus. 21. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi / 30 mins. 22. Set BPV and secure well. Move rig off. ORIGINAL Well Proximity Risks: • Directional drilling /collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD2-02 will be the closest well to CD2-01. Well separation is 5.7' @ 275' MD. Accounting for survey uncertainties, the ellipse-to-ellipse separation is 4.9' @ 275' MD. Drilling Area Risks: There are no high-risk events (e.g. over-pressures zones) anticipated. ~ Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost circulation. Standard LCM material has proved effective in dealing with lost circulation in previous development wells. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular Pumping Operations: Incidental fluids developed from drilling operations on well CD2-01 will be injected into a permitted annulus on CD2 pad or the class 2 disposal well on CD1 pad. The CD2-01 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there will be 500' of cement fill above the top of the Alpine as per regulations. Upon completion of CD2-01 form 10-403, Application for Sundry Operations,will be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C-40}. These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) " (0.052) ` (Surf. Shoe TVD) + 1,500 psi _ (12.0 ppg) * (0.052)'` (2390') + 1,500 psi = 2,990 psi Pore Pressure = 1,081 psi Therefore Differential = 2991 - 1081 = 1910 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: OD Wt (ppf) Grade Range Connection Type Collapse 85% of Collapse Burst 85% of Burst 9-5/8" 36 J-55 3 BTC 2,020 psi 1,717 psi 3,520 psi 2,992 psi 7" 26 L-80 3 BTC-Mod 5,410 psi 4,599 psi 7,240 psi 6,154 psi ui~IGINAL CD2-01 DRILLING FLUID PROGRAM • SPUD to 9-5/8"surface casing oint -12 '/4" Intermediate hole to 7" casing point - 8 %2" Production Hole Section - 6 1/8" Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 8.1-8.8 ppg PV 10 - 25 10 -15 YP 20 - 60 15 - 25 25 -30 Funnel Viscosity 100 - 200 Initial Gels 4 - 8 10-15 10 minute gels <18 12-20 API Filtrate NC -10 cc / 30 min 4 -12 cc/30 min (drilling) NA HPHT Fluid Loss at 160 12-14 cc/30 min PH 8.5 - 9.0 9.0 - 10.0 9.0-9.5 KCL 6% Oil /water ratio Approx. 80/20 Surface Hole: A standard high viscosity fresh water J gel spud mud is recommended for the surface interval. Keep flowline viscosity at ± 200 sec/gt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Section: Fresh water gel /polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is , penetrated. Maintain mud weight at or below 9.6 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. Production Hole Section The horizontal production interval will be drilled with a 80/20 oil/water ratio M-I Versa-Pro mineral oil based drill-in fluid. The base fluid will consist of high flashpoint (>200 F) mineral oil with 25% by weight calcium chloride as the internal phase. Calcium carbonate bridging material will be added to minimize formation damage. ORIGINAL ~ • Completion Schematic Updated 08/01/2005 16"Conductor to 114' Sperry Sun Directional v WP01 3-'/2" x 4-'/2' cross-over, 2 jts below 4-'/~' hanger 3-1/2" Camco TRM-4E SSSV Nipple (2.813" ID) at 1904' TVD = 2300' MD -2.813" X-Over -Single Y;'x0.049" s/s control line 9-5/8" 36 ppf J-55 BTC Surface Casing @ 3268' MD / 2390' TVD cemented to surface Camco KBUG GLM (2.867" ID) at 3500' ND for Packer Fluid mix: E Dummy with 1" BK-2 Latch Diesel in tubing_and annulus Completion ~ IYp 3-1/2" 9.3 ppf L-80 IBT Mod. R3 tubing run with Jet Lube Run'n'Seal Tubing Hanger 32' 32' pipe dope 4-'/~' 12.6 #/ft IBT-Mod Tubing (2) Crossover 3-1/2", 9.3#/ft, IBT-Mod Tubing Camco TRM4E SCSSSV 2300' 1904' 3-1/2", 9.3#/ft, IBT-Mod Tubing Camco KBUG GLM (2.867" ID) 5481' 3500' " 3-1/2", 9.3#/ft, IBT-Mod Tubing Camco KBUG GLM (2.867 ID) ' Camco KBUG GLM (2.867" ID) 9667' 5600' ND for at 5600 E Dummy with 1" BK-2 Latch 3-1/2", 9.3#/ft, IBT-Mod Tubing Camco KBUG GLM (2.867" ID) 11610' 6572' 3-1/2" tubing joints (2) Baker 3-1/2" CMD sliding sleeve 11690' 6610' w/ 2.81" X Profile 3-1/2" tubing joint (2) Camco KBUG GLM (2.867" ID) Baker Premier Packer 11770' 6647' 2 joints above sliding sleeve 3-1 /2" tubing joints (1) E Dummy with 1" BK-2 Latch HES "XN" (2.75" ID)-64° inc 11850' 6683' / 3-1/2" 10' pup joint WEG 11862' 6688' Baker 3-''/z' CMD sliding sleeve with 2.81"'X' Profile set 2 joints above packer CW 2.81" X Profile Baker Premier Packer at +/- 11770' MD TOC @ +/- 11570' MD / 6553' ND Top Alpine C at 13063' MD / 7030' TVD -------'-~~°'°• 7" 26 ppf L-80 BTC Mod Production Casing @ 13217' MD 17040' ND @ 87.6° Well TD at 19212' MD I - 7032' ND ORIGINAL • PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 (c) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size (in) Csg Setting Depth MDJTVD ft Fracture Gradient (Ibs. ! al Pore pressure (psi) ASP Drilling (psi) 16 1141114 10.9 52 53 9 5/8 3268 / 2390 14.5 1081 1563 7" 13217 / 7040 16.0 3186 2482 N/A 19212 / 7032 16.0 3182 N/A NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to minimum 3500 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1]D Where: ASP =Anticipated Surface pressure in psi FG =Fracture gradient at the casing seat in Ib/gal 0.052 =Conversion from Ib./gal to psilft 0.1 =Gas gradient in psi/ft D =true Vertical depth of casing seat in ft RKB OR 2) ASP = FPP - (0.1 x D) Where; FPP =Formation Pore Pressure at the next casing point ASP CALCULATIONS Drilling below conductor casing (16") ASP = [(FG x 0.052) - 0.1] D =[(10.9x0.052)-0.1]x114=53 psi OR ASP =FPP - (0.1 x D) = 1081 - (0.1 x 2390) = 842 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052) - 0.1) D _ [(14.5 x 0.052) - 0.1) x 2390 = 1563 psi OR ASP =FPP - (0.1 x D) = 3186 - (0.1 x 7040') = 2482 psi ~ 3. Drilling below intermediate casing (7") ASP =FPP - (0.1 x D) = 3182 - (0.1 x 7032') = 2479 psi ORIGINAL • • 9 518" Surface Ca51nE run to 3268' MD / 2390' TVD. Cement from 3268' MD to 2768' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2777' to surface with Arctic Set Lite 3. Assume 300°lo excess annular volume in permafrost and 50% excess below the permafrost (1747' MD). Lead slurry: (2768'-1847') X 0.3132 ft3/ft X 1.5 (SO% excess) = 432.7 ft3 below permafrost 1847' X 0.3132 ft3tft X 4 (300% excess) = 2313.9 ft3 above permafrost Total volume = 432.7 + 2313.9 = 2746.6 ft3 => b 18 Sx @ 4.45 ft3/sk System: 618 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.45 ft3lsk, Class G + 30% DOS3 thixotropic additive, ~~-~' 0.6% D046 antifoamer, 1.5% D079 extender, 1.S% 5001 accelerator, SO% D124 extender and 9% BWOWt D044 freeze suppressant Tail slurry: 500' X 0.3132 ft3/ft X 1.S (SO% excess} = 234.9 ft3 annular volume 80' X 0.4341 ft3tft = 34.? ft3 shoe joint volume Total volume = 234.9 + 34.7 = 269.6 ft3 => 230 Sx @ 1.17 ft3lsk System: 230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 2% 5001 accelerator @ 15.8 ,,,~ PPG yielding 1.17 ft3lsk 7" Intermediate Casine run to 13217 MD t 7040' TVD Cement from 13217' MD to +/-11570 MD (200 ft above packer setting depth) with Class G + adds @ 15.8 PPG. Assume 40% excess annular volume. Tail: (13217' - 11570') X 0.1268 ft3/ft X 1.4 (40% excess) = 292.4 ft3 annular vol. 80' X 0.2148 ft3tft = 17.2 ft3 shoe joint volume Total volume = 292.4 + 17.2 = 309.6 ft3 => 267 Sx @ 1.16 ft3lsk System: 267 Sx Class G + 0.2% D046 antifoamer, 0.30% D065 dispersant, 0.04% D800 retarder and 0.35°l0 D167 fluid loss additive @ IS.8 PPG yielding 1.16 ft3lsk By Weight Of mix Water, all other additives are BWOCement • ConocoPhillips Alaska ConocoPhiNips Alaska Inc. Colville River Unit Alpine CD2 Plan: CD2-01 Plan: CD2-01 Pian: CD2-01wp01 Proposal Report 22 July, 2005 I~iALLIBUR'TQnt Sperlry Drii~ng Selrvices ORIGINAL ` " c.Ia,ribn Method: Mlnknun arN.wr. ConocoPhillips ~~~ IscwsA Project: Colvillel2iverUnit Scrn MWnQ Tray. CYYrds 1J°rth Ertor Surfau: Elllplkal Conk Sete: Alpine CD2 Wamkq Meihod: iWlss Based i41a5ka o.ea.ik D.a.n: NAD 19ncoNUS1 Well: Plan: CD2-01 MyrMlc Modal: Wellbore: Plan: CD2-01 HALLIBURTOIV GrowdLevel 19900 Plan: CD2-01wp01 RKB: CD2-01 g 529008 ICD2-01 ;¢ 52 9' atx MS~~ ~JOrthirgrASP Y: SB74781fA00 Sperry Drilling Services FavigASax 371ee1.eloo TVD MD AnrgtaUOn 371100 3700D $HL; 1511' FNL 81587 FF1; 53002•T11N6204E 200AOD 200.Om Be931 Dir; 3° DLS, 0° TFO, 2(10' MD, 200' TVD 18SL738 21985tA Start Sail; 98.9° N1C, 2198' M0, 1657 T/D 2390.000 3284406 958" Ceg R 3268' MD, ISBiV TVD 8682.175 11385698 Begin Dir, 4° DLS, 4lY TFO, 11385 MD, 8187 TVD 7oansD3 13217.000 r' CSg Pc 1321r MD, 7010' ND; molt FNL a mu' FEL; Sec30•r12NRO5E 7012900 13337565 Target (Heelf 1339T MD, 7067 TVD 7032.900 19'212438 Target RD31: 19217 MD, 7037 TVD; 459t' FNL 8 2783 Fi3; Ser14T12N~RME SECTION DEfAIS SHL; 1577 FNL 8 1562' FEL; Sec02-T11Na204E Begin Dir; 3° DLS, 0° TFO, 200' MD, 200' ND Start Sail; 59.9° INC, 2196' MD, 1852' ND 9-5/8" Csg Pt; 3268' MD, 2390' ND ~r~O E ,_ /\~ __ O ~3~ _ N V1_ a ....n. = m G ~= m _U t' D_ ~ € ~ ~ C~ C-3O \ C-20 K-3 Marker Basal K-3 Sand /i ~ K-2 Marker Base K-2 Cycle Albian 97 Albian 96 .~. HRZ Base HRZ _ K-1 Marker Kuparuk Fm - LCU-Miluveach Miluveach A~ Alpine D Alpine C CD2-01wp01 14-1/2" Target (Heel); 13337' MD, 7042' TVD I Target (Tce); 19212' MD, 7032' ND; 4591' FNL & 2763' FEL; Sec24-T12N-R04E 0 lsoo 3000 asoo fi0oo 7500 9000 10500 12000 13500 Vertical Section at 17.60° (1500 ft/in) sec MD trio ad tw .ws +FJ-w DLeg trace vsec Target 1 37.000 onoo ooogo 37000 0.000 amo om omoo agoo z zgooo0 omo 09000 zoonoo 0000 ono0 ago 00000 omo 3 2196.909 C6E89 441017 1852138 635579 708406 300 0.0000 87DD06 4 11385G18 59ffi9 441017 64fi'L175 9!14206 6675315 0.00 0.0000 7689047 5 133375% 90098 3319774 7042900 7640563 6827501 400 x,8910 9047.136 CD2471 (Fice~ 6 19212436 90.096 3319774 7032900 12826667 4067360 0110 00000 13456106 CD2-01(TOe) FOa.MTOJ T~ DEfAIS No TVn NO Nome Size 1 2]90.000 3266.616 9 SI6' 9413 2 7od°_w1 t]217.ooa 7• 7 ] 70]].900 t92t2.1]7 <-t2" 41(2 CASINO DETAILS W 7VDPaN MOPaIh Fdneem 1 ]203.900 2897.m7 C<0 2 2403.900 72%.153 C30 3 2773.900 6033.666 C+7D 6 3666.900 6172530 K3 Mark 5 m39.900 6557243 Basal K3 Sad 6 4064 900 6607.076 K2 Marker 7 6164.900 fi806.609 Base K2 CYUe 6 5641.900 9750.559 Albian 97 9 fi082.900 10629.616 Albian % 10 6579.900 11617351 /!Q 11 67%.900 12170.631 8a 1•RZ 12 6855.900 12287960 K-1 Marker 13 6901.900 126/0685 KLparWtFm 10 6919.900 12606.375 LCUMirn9 ch 15 6969.900 12785A77 Milwea°hA 16 7015.900 12913.311 Alpine D 17 7029.900 13062950 AlpineC Begin Dir; 4° DLS, -83° TFO, 11385' MD, 6462' ND / T' Csg Pt;1321 T MD, 7040' TVD; 4608' FNL 8i 4814' FEL; Sec30 T12Na205E `' ConocoPhi~~i S I~I ~ p Cal°illm MMfoQ Mlnh~an CUrva4~ s~kw°aT~",><.°cy~,a.N~,h ~~ Project: Colville River Unit ~ Site: Alpine CD2 f+~=~=~ °ivditlc ~ ~ m"~"amo.OO`~ Well: Plan: CD2-01 Welll3ore: Plan: CD2-01 HALLIBURTON kKH coio~ ,. sz~wn ieuz.~~ ;~ sz9 an,,.,, nnc G1J1irdteve1 '~~~~ Plan: CD2-01wp01 ---- - -- - NortliinlyA$P V 5974761.nW? Sperry Drilling Services fasting~ASP%: 371661.8100 4-12" C O N L O Z r 0 (A ANNOTATpNS ND MD Mrgtatlon 37.000 77.000 SHL; 1577 FNL 8 1567 FEL; Sec02-711 N-R04E 200.000 200.000 Begin DIr; 3° DLS, 0° TFO, 200' MD, 200' TVD 1852.138 2198.309 Start Sail; 59.9° INC, 2198' MD, 1852' ND 2390.000 3268.446 9-518" Csg Pk 3268' MD, 2390' ND 8462.17511385.838 8epin Dir; 4° DLS, d3° TFO. 11385' MD, 848Y ND 7040.50313217.000 T Csg P[; 13217 MD, 7M0' ND; 4808' FNL 84811' FEL; SecJOT12N-ROSE 7042.90013337.555 Target (Heell: 17377' MD, 7047 ND 7032.90019212.438 Target (TOeI; 19212' MD, 7037 ND; 4981' FNL 8 2783' FEL: Sec24T12N-R04E SECTION DETALS Set MD Inc Azi TVD +WS +H-W DLeg TFate VSec Target 1 37.000 0.000 0.0000 37.000 0.000 0.000 0.00 0.0000 0.000 2 200.000 0.000 0.0000 200.000 0.000 0.000 0.00 0.0000 0.000 3 2196.309 59.889 48.1017 1852.138 635.579 708.406 3.00 0.0000 820.006 4 11385.638 59.869 48.1017 6462.175 5944206 6625.315 0.00 0.0000 7669.047 5 13337.555 90.098331.9774 7042.900 7640.553 6827.501 4.00 $2.8500 9347.138 CD2-01 (HeeQ 8 19212.438 90.09$131.8774 7032.90012826.667 4067.360 0.00 0.000013456.106 CD~24)1 (Tce) Target (Tce); 19212' MD, 7032' TVD; 4591' FNL 8 2763' FEL; Sec24T12N-R04E FORMATgN TOP DETAILS CA9HD OETAl9 ~w7. NDPa61 MDPath Formation ~ 2203.900 2897.487 C40 Ib ND kD Nm 9° 2 2403.900 3296.157 C-30 1 x 1 ~~ ~~ d~ 1168 11894 1az17D00 r 7 i 2773.900 d033.588 C-20 x iW2900 i11xTL4J/ 41? 4-V! s 3848.900 8772.530 K•3 Marker 5 4039.900 6557.243 basal K3 Sand a 4064.900 8607.076 K-2 Marker 7 4184.900 8806.409 Base K-2 Cycki 8 5641.900 9750.559 Albian 97 9 6082.90010629.618 Al Dian 96 i t0 6575.90011817.353 HRZ 11 8798.90012130.831 Base HR2 12 6855.90012287.980 K-i Marker 13 6901.90012430.865 Kuparuk Fm 14 6949.90012604.775 LCU-Miluveach Target (Heel); 13337 MD, 7042' TVD 15 6989.90012785.477 Miluveach A 16 7015.90012943.311 Alpine D 17 7029.90013062.950 Alpine C T' Csg Pt; 1321 T MD, 7040' TVD; 4608' FNL 84814' FEL; Sec30 T12Na205E Begin Dir; 4° DLS, ~3° TF0,11385' MD, 6462' TVD 9-0/8" Csg Pt; 3268' MD, 2390' TVD il; 59.9° INC, 2196' MD,1852' TVD Begin Dir; 3° DLS, 0° TFO, 200' MD, 200' TVD SHL; 1577' FNL 81562' FEL; Sec02-711 N-R04E -zsoo o zsoo saoo 7500 1ao0o 12500 15000 ns0o 20000 West(-yEast(+) (2500 Win) ConocoPhillips Alaska Database: EDM 2003.11 Single User Db Company: Cono~Phillips Alaska Inc. Project: Colville River Unit Site: Alpine CD2 Well: Plan: CD2-01 Weilbore: Plan: CD2-01 Design: CD2-01wp01 Sperry Drilling Services Planning Report -Geographic Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: • HALLIBURT(QN Sperry Drilling Services Well Plan: CD2-01 CD2-01 ~ 52.900ft (CD2-01 ~ 52.9' above MSL) CD2-01 @ 52.900ft (CD2-01 ~ 52.9' above MSL) True Minimum Curvature Project Colville River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Weil Plan: CD2-01 Well Position +N/-S 0.000 ft Northing: 5,974,781,0900 ft Latitude: 70° 20' 21.594" N +E/-W 0.000 ft Easting: 371,881.8100 ft Longitude: 151 ° 02' 28.574" W Position Uncertainty 0.000 ft Wellhead Elevation: ft Ground Level: 15.900 ft Welibore Plan: CD2-Ot Magnetics Model Name Sample Date Declination Dip Angie Field Strength bggm2004 319!2005 23.6476 80.6067 57,525 Design CD2-01wp01 Audit Notes: Version: 1 Phase: PLAN Tie On Depth: 37.000 Vertical Section: Depth From (ND) +N/S +E/-W Direction (~) (~! ht) (°) 37.000 0.000 0,000 17.5973 Plan Summary Measured Vertical Dogleg Build Twn Depth Inclination Azimuth Depth +N/-S +E/-W Rate Rate Rate TFO , tff) t°) (°) tfg (ttj (s) (°ilooe) t°~~ooft) (°/looft) t°) 37.000 0.000 0.0000 37.000 0.000 0.000 0.00 0.00 0.00 0.0000 200.000 0.000 0.0000 200.000 0.000 0.000 0.00 0.00 0.00 0.0000 2,196.308 59.889 48.1017 1,852.138 635.579 708.406 3.00 3.00 0.00 0.0000 11,385.638 58.889 48.1017 6,462.175 5,944.206 6,625.315 0.00 0.00 0.00 0.0000 13,337.555 90.098 331.9774 7,042.900 7,640.553 6,827.501 4.00 1.55 -3.90 -82.8500 19,212.438 90.098 331.9774 7,032.900 12,826.667 4,067.360 0.00 0.00 0.00 0.0000 7122/2005 7:27:23AM Page 2 of 9 COMPASS 2003.11 Build 50 • Sper Drilling Services Cono~oPhilli S ~ HALLIBURTQN p Planning Report -Geographic Alaska Sperry Drifting Services Database: EDM 2003.11 Single User Db Local Co-ordinate Reference: Well Plan: CD2-01 Company: ConocoPhillips Alaska Inc. TvD Reference: CD2-01 ~ 52.900ft (CD2-01 ~ 52.9' above MSL) Project: Colville River Unit MD Reference: CD2-01 G~ 52.900ft (CD2-01 (~ 52.9' above MSL) :Site: Alpine CD2 North Reference: True i Well: Plan: CD2-01 Survey Calculation Method: Minimum Curvature ~ Wellbore: Plan: CD2-01 Design: CD2-01wp01 Planned Survey CD2-01wp01 Map Map MD Inclination Azimuth TVD SSTVD +N/-S +E/-W Northing Fasting DISEY Vert Section ~ Ift) (°) (°) (ft) (ftl (ft) (tt) (ft) tft) (%1OOfU (ft) I 37.000 0.000 0.0000 37.000 -15.90 0.000 0.000 5,974,781.0900 371,681.8100 0.00 0.00 SHL; 1577 FNL 8 1562' FEL; Sec02-T11N-R04E 100.000 0.000 0.0000 100.000 47.10 0.000 0.000 5,974,781.0900 371,681.8100 0.00 0.00 200.000 0.000 0.0000 200.000 147.1D 0.000 0.000 5,974,781.0900 371,681.8100 0.00 0.00 Begin Dir; 3° DL5, 0° TFO, 200' MD, 200' TVD 300.000 3.000 48.1017 299.854 247.05 1.748 1.948 5,974,782.8042 371,683.7877 3.00 2.26 400.000 6.000 48.1017 399.635 346.73 6.987 7.787 5,974,787.9421 371,689.7153 3.00 9.01 500.000 9.000 48.1017 498.768 445.87 15.703 17.502 5,974,796,4895 371,699.5766 3.00 20.26 600.000 12.000 48.1017 597.082 544.18 27.871 31.065 5,974,808.4232 371,713.3445 3.00 35.96 700.000 15.000 48.1017 694.308 641.41 43.459 48.439 5,874,823.7102 371,730.8814 3.00 56.07 800.000 18.000 48.1017 790.179 737.28 62.424 69.576 5,974,842.3089 371,752,4388 3.00 80.54 900.000 21.000 48.1017 884.432 831.53 84.713 94.420 5,974,864.1681 371,777.6581 3.00 109.29 1,000.000 24.000 48.1017 976.810 923.91 110.266 122.901 5,974,889.2280 371,806.5699 3.00 142.26 1,100.000 27.000 48.1017 1,067.058 1,014.16 139.013 154.942 5,974,917.4198 371,839.0951 3.00 179.35 1,200.000 30.000 48.1017 1,154.930 1,102.03 170.875 190.454 5,974,948.6665 371,875.1446 3.00 220.46 1,300.000 33.000 48.1017 1,240.184 1,187.28 205.764 229.341 5,974,982.8821 371,914.6196 3.00 265.47 1,400.000 36.000 48.1017 1,322.587 1,269.69 243.584 271.495 5,975,019.9731 371,957.4117 3.00 314.27 1,500.000 39.000 48.1017 1,401.913 1,349.01 284.234 316.802 5,975,059.8376 372,003.4038 3.00 366.71 1,600.000 42.000 48.1017 1,477.945 1,425.05 327.599 365.137 5,975,102.3665 372,052.4698 3.00 422.66 1,700.000 45.000 48.1017 1,550.474 1,497.57 373,563 416.367 5,975,147.4432 372,104.4752 3.00 481.96 1,800.000 48.000 48.1017 1,619.302 1,566.40 421.999 470.353 5,975,194.9441 372,159.2775 3.00 544.45 1,900.000 51.000 48.1017 1,684.239 1,631.34 472.774 526.946 5,975,244.7380 372,216.7264 3.00 609.96 2,000.000 54.000 48.1017 1,745.109 1,692.21 525.749 585.991 5,975,296.6915 372,276.6645 3.00 678.31 2,100.000 57.000 48.1017 1,801.743 1,748.84 580.779 647.326 5,975,350.6591 372,338.9275 3.00 749.30 2,196.309 59.889 48.1017 1,852.138 1,799.24 635.579 708.406 5,875,404.4016 372,400.9307 3.00 820.01 Start Sail; 59.9° INC, 2196 ' MD, 1862' TVD 2,200.000 59.889 48.1017 1,853.990 1,801.09 637.711 710.782 5,975,406.4928 372,403.3433 0.00 822.76 2,300.000 59.889 48.1017 1,904.157 1,851.26 695.461 775.171 5,975,463.1473 372,468.7061 0.00 897.29 2,400.000 59.889 48.1017 1,954.324 1,901.42 753.250 839.560 5,975,519.8017 372,534.0690 0.00 871.82 2,500.000 59.889 48.1017 2,004.492 1,951.59 811.020 903.949 5,975,576.4562 372,599.4318 0.00 1,046.35 2,600.000 59,889 48.1017 2,054.659 2,001.76 868.789 968,338 5,975,633.1107 372,664.7946 0.00 1,120.89 2,700.000 59.889 48.1017 2,104.826 2,051.93 926.559 1,032.727 5,975,689.7651 372,730.1574 0.00 1,195.42 2,800.000 59.889 48.1017 2,154.993 2,102.09 984.328 1,097.116 5,975,746.4196 372,795.5202 0.00 1,269.95 2,897.487 59.889 48.1017 2,203.900 2,151.00 1,040.646 1,159.887 5,975,801.6503 372,859.2404 0.00 1,342.61 C-40 2,900.000 59.889 48.1017 2,205.161 2,152.26 1,042,098 1,161.505 5,875,803.0741 372,860.8830 0.00 1,344.48 3,000.000 59.889 48.1017 2,255.328 2,202.43 1,099.867 1,225.894 5,875,859.7285 372,926.2459 0.00 1,419.02 3,100.000 59.889 48.1017 2,305.495 2,252.60 1,157.637 1,290.283 5,975,916.3830 372,991.6087 0.00 1,493.55 3,200.000 59.889 48.1017 2,355.663 2,302.76 1,215.406 1,354.672 5,875,973.0375 373,056.9715 0.00 1,568.08 3,268.446 59.889 48.1017 2,380.000 2,337.10 1,254.947 1,388.743 5,976,011.8151 373,101.7096 0.00 1,619.10 9-5/8" Csg Pt; 3268' MD, 2390' TVD - 9 6/8" 3,286.153 59.888 48.1017 2,403.900 2,351.00 1,270.953 1,416.583 5,976,027.5125 373,119.8199 0.00 1,639.75 C-30 3,300.000 59.889 48.1017 2,405.830 2,352.93 1,273.175 1,419.060 5,876,029.6920 373,122.3343 0.00 1,642.61 3,400.000 59.889 48.1017 2,455.997 2,403.10 1,330.945 1,483.449 5,976,086.3464 373,187.6971 0.00 1,717.15 3,500.000 59.889 48.1017 2,506.164 2,453.26 1,388.714 1,547.838 5,976,143.0009 373,253.0600 0.00 1,791.68 3,600.000 59.889 48.1017 2,556.332 2,503.43 1,446.484 1,612.227 5,976,199.6554 373,318.4228 0.00 1,866.21 7!22!2005 7:27:23AM Page 3 of 9 COMPASS 2003.11 Build 50 +~ Cono~ Phillips ' Alaska Sperry Drilling Services Planning Report -Geographic Database: EDM 2003.11 Single User Db Company: ConocoPhillips Alaska Inc. Project: ColviAe River Unit Sits: Alpine CD2 Well: Plan: CD2-01 Weiibore: Plan: CD2-01 Design: CD2-01wp01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: HALLIBURTQN Sperry Drilling Services Well Plan: CD2-01 CD2-Ot ~ 52.900ft (CD2-01 ~ 52.9' above MSL) CD2-01 (i~ 52.900ft (CD2-01 ~ 52.9' above MSL) True Minimum Curvature Planned Survey CD2-01wp01 Map Map. ~ MD Inclination Azimuth TVD SSTVD +N/S +E/-W Northing Fasting p~Ey Vert Section (ft) (°) (°) (ft) (8) {ftj {ft) {ff) {ffl (°/7OOft) ift) 3,700.000 59.889 48.1017 2,606.499 2,553.60 1,504.253 1,676.616 5,976,256.3098 373,383.7856 0.00 1,940.75 3,800.000 59.889 48.1017 2,656.666 2,603.77 1,562.023 1,741.005 5,976,312.9643 373,449.1484 0.00 2,015.28 3,900.000 59.889 48.1017 2,706.834 2,653.93 1,619.792 1,805.394 5,976,368.6188 373,514.5112 0.00 2,089.81 4,000.000 59.889 48.1017 2,757.001 2,704.10 1,677.562 1,869.783 5,976,426.2733 373,579.8740 0.00 2,164.34 4,033.686 59.889 48.1017 2,773.900 2,721.00 1,697.022 1,891.473 5,976,445.3576 373,601.8919 0.00 2,189.45 C-20 4,100.000 58.889 48.1017 2,807.168 2,754.27 1,735.331 1,934.172 5,976,482.9277 373,645.2369 0.00 2,238.88 4,200.000 59.889 48.1017 2,857.335 2,804.44 1,793.101 1,898.561 5,976,539.5822 373,710.5997 0.00 2,313.41 4,300.000 59.889 48.1017 2,907.503 2,854.60 1,850.870 2,062.949 5,876,596.2367 373,775.9625 0.00 2,387.94 4,400.000 59.889 48.1017 2,957.670 2,904.77 1,908.640 2,127.338 5,976,652.8911 373,841.3253 0.00 2,462.47 4,500.000 59.889 48.1017 3,007.837 2,954.94 1,966.409 2,191.727 5,976,709.5456 373,906.6881 0.00 2,537.01 4,600.000 59.889 48.1017 3,058.005 3,005.10 2,024.179 2,256.116 5,976,766.2001 373,972.0509 0.00 2,611.54 4,700.000 59.889 48.1017 3,108.172 3,055.27 2,081.948 2,320.505 5,976,822.8545 374,037.4138 0.00 2,686.07 4,800.000 59.889 48.1017 3,158.339 3,105.44 2,139.718 2,384.894 5,976,879.5090 374,102.7766 0.00 2,760.60 4,900.000 59.889 48.1017 3,208.506 3,155.61 2,197.487 2,449.283 5,976,936.1635 374,168.1394 0.00 2,835.14 5,000.000 59.889 48.1017 3,258.674 3,205.77 2,255.257 2,513.672 5,976,992.8180 374,233.5022 0.00 2,909.67 5,100.000 59.889 48.1017 3,308.841 3,255.94 2,313.026 2,578.061 5,977,049.4724 374,298.8650 0.00 2,984.20 5,200.000 59.889 48.1017 3,359.008 3,306.11 2,370.795 2,642.450 5,977,106.1269 374,364.2279 D.OD 3,058.73 5,300.000 59.889 48.1017 3,409.176 3,356.28 2,428.565 2,706.839 5,977,162.7814 374,429.5907 0.00 3,133.27 5,400.000 59.889 48.1017 3,459.343 3,406.44 2,486.334 2,771.227 5,977,219.4358 374,494.9535 0.00 3,207.80 5,500.000 59.889 48.1017 3,509.510 3,456.61 2,544.104 2,835.616 5,977,276.0903 374,560.3163 0.00 3,282.33 5,600.000 59.889 48.1017 3,559.677 3,506.78 2,601.873 2,900.005 5,977,332.7448 374,625.6791 0.00 3,356.86 5,700.000 59.888 48.1017 3,609.845 3,556.94 2,659.643 2,964.394 5,977,389.3992 374,691.0419 0.00 3,431.40 5,800,000 59.889 48.1017 3,660.012 3,607.11 2,717.412 3,028.783 5,977,446.0537 374,756.4048 0.00 3,505.93 5,900.000 59.889 48.1017 3,710.179 3,657.28 2,775.182 3,093.172 5,977,502.7082 374,821.7676 0.00 3,580.46 6,000.000 59.889 48.1017 3,760.347 3,707.45 2,832.951 3,157.561 5,977,559.3627 374,887.1304 0.00 3,654.99 8,100.000 59.889 48.1017 3,810.514 3,757.61 2,890.721 3,221.950 5,977,616.0171 374,952.4932 0.00 3,729.53 6,172.530 59.889 48.1017 3,846.900 3,794.00 2,932.621 3,268.651 5,977,657.1085 374,999.9007 0.00 3,783.58 K-3 Marker 6,200.000 58.888 48.1017 3,860.681 3,807.78 2,948.490 3,286.339 5,977,672.6716 375,017.8560 0.00 3,804.06 6,300.000 59.889 48.1017 3,910.848 3,857,95 3,006.260 3,350.728 5,977,729.3261 375,083.2188 0.00 3,878.59 6,400.000 59.889 48.1017 3,961.016 3,908.12 3,064.029 3,415.117 5,977,785.9805 375,148.5817 0.00 3,953.12 6,500.000 59.889 48.1017 4,011.183 3,858.28 3,121.788 3,479.505 5,977,842.6350 375,213.9445 0.00 4,027.66 6,557.243 59.889 48.1017 4,039.900 3,987.00 3,154.867 3,516.363 5,977,875.0655 375,251.3599 0.00 4,070.32 Basal K-3 Sand 6,600.000 59.889 48.1017 4,061.350 4,008.45 3,179.568 3,543.894 5,977,899.2895 375,279.3073 0.00 4,102.19 6,607.076 59.889 48.1017 4,064.900 4,012.00 3,183.656 3,548.450 5,977,903.2983 375,283.8323 0.00 4,107.46 K-2 Marker 6,700.000 59.889 48.1017 4,111.517 4,058.62 3,237.338 3,608.283 5,977,955.8440 375,344.6701 0.00 4,176.72 6,800.000 58.889 48.1017 4,161.685 4,108.78 3,295.107 3,672.672 5,878,012.5984 375,410.0329 0.00 4,259.25 6,806.409 59.889 48.1017 4,164.900 4,112.00 3,298.810 3,676.798 5,978,016.2294 375,414.2221 0.00 4,256.03 Base K-2 Cycle 6,900.000 59.889 48.1017 4,211.852 4,158.95 3,352.877 3,737.061 5,978,069.2529 375,475.3958 0.00 4,325.79 7,000.000 59.889 48.1017 4,262.018 4,209.12 3,410.646 3,801.450 5,978,125.9074 375,540.7586 0.00 4,400.32 7,100.000 59.889 48.1017 4,312.187 4,259.29 3,468.416 3,865.839 5,978,182.5618 375,606.1214 0.00 4,474.85 7,200.000 58.889 48.1017 4,362.354 4,309.45 3,526.185 3,930.228 5,978,238.2163 375,671.4842 0.00 4,549.38 7,300.000 59.889 48.1017 4,412.521 4,359.62 3,583.954 3,994.617 5,978,295.8708 375,736.8470 0.00 4,623.92 7,400.000 59.889 48.1017 4,462.688 4,409.78 3,641.724 4,059.006 5,978,352.5252 375,802.2088 0.00 4,698.45 7/22/2005 7:27:23AM Page 4 of 9 COMPASS 2003.11 Build 50 ~~~~/~ ConocoPhillips ' Alaska Sperry Drilling Services Planning Report -Geographic HALLIBIJFtTCiN Sperry Drilling Services Database: EDM 2003.11 Single User Db Local Co-ordinate Reference: Well Pian: CD2-01 Company: ConocoPhillips Alaska Inc. TYD Reference: CD2-01 @ 52.900ft (CD2-01 (c~ 52.9' above MSL) Project: Coiville River Unit MD Reference: GD2-01 @ 52.900ft (CD2-01 ~ 52.9' above MSL) Sites Alpine CD2 North Reference: True Well:. Plan: CD2-01 Survey Calculation Method: Minimum Curvature Wellbore: Plan; CD2-01 Design: CD2-01wp01 Planned Survey CD2-01wp01 Map AAap 1 MD Inclination Azimuth TVD SSND +N/S +E!-W Northing Fasting` DLSEV Vert Section i (ft) (°) (°I lftl !ftl (ft) (ft) (Rj 1ff) (°MOOft? (ftl 7,500.000 59.889 48,1017 4,512.856 4,459.96 3,699.493 4,123.395 5,978,409.1797 375,867.5727 0.00 4,772.98 7,600.000 59.889 48.1017 4,563.023 4,510.12 3,757.263 4,187.783 5,978,465.8342 375,932.9355 0.00 4,847.51 7,700.000 59.689 48.1017 4,613.190 4,560.29 3,815.032 4,252.172 5,978,522.4887 375,998.2983 0.00 4,922.05 7,800.000 59.889 48.1017 4,663.358 4,610.46 3,872.802 4,316.561 5,978,579.1431 376,063.6611 0.00 4,996.58 7,800.000 59.888 48.1017 4,713.525 4,660.62 3,930.571 4,380.950 5,978,635.7976 376,129.0239 0.00 5,071.11 8,000.000 59.889 48.1017 4,763.692 4,710.79 3,988.341 4,445.339 5,978,682.4521 376,194.3867 0.00 5,145.64 8,100.000 59.889 48.1017 4,813.859 4,760.96 4,046.110 4,509.728 5,978,749.1065 376,259.7496 0.00 5,220.18 8,200.000 59.889 48.1017 4,864.027 4,811.13 4,103.880 4,574.117 5,978,805.7610 376,325.1124 0.00 5,294.71 8,300.000 59.889 48.1017 4,914.194 4,861,29 4,161.649 4,638.506 5,978,862.4155 376,390.4752 0.00 5,369.24 8,400.000 59.889 48.1017 4,964.361 4,911.46 4,219.419 4,702.895 5,978,919.0699 376,455.8380 0.00 5,443.77 8,500.000 59.889 48.1017 5,014.529 4,961.63 4,277.188 4,767.284 5,978,975.7244 376,521.2008 0.00 5,518.31 8,600.000 59.889 48.1017 5,064.696 5,011.80 4,334.958 4,831.673 5,979,032.3789 376,586.5637 0.00 5,592.84 8,700.000 59.889 48.1017 5,114.863 5,061.96 4,392.727 4,896.061 5,979,089.0334 376,651.9265 0.00 5,667.37 8,800.000 59.889 48.1017 5,165.030 5,112.13 4,450.497 4,960.450 5,979,145.6878 376,717.2893 0.00 5,741.90 8,900.000 59.889 48.1017 5,215.198 5,162.30 4,508.266 5,024.839 5,979,202.3423 376,782.6521 0.00 5,816.44 9,000.000 59.889 48.1017 5,265.365 5,212.46 4,566.036 5,089.228 5,979,258.9968 376,848.0149 0.00 5,890.97 9,100.000 59.889 48.1017 5,315.532 5,262.63 4,623.805 5,153.617 5,979,315.6512 376,913.3777 0.00 5,965.50 9,200.000 59.889 48.1017 5,365.700 5,312.80 4,681.575 5,218.006 5,979,372.3057 376,978.7406 0.00 6,040.03 9,300.000 59.889 48.1017 5,415.867 5,362.97 4,739.344 5,282.385 5,979,428.9602 377,044.1034 0.00 6,114.57 9,400.000 58.889 48.1017 5,466.034 5,413.13 4,797.113 5,346.784 5,979,485.6147 377,109.4662 0.00 6,189.10 i 9,500.000 59.889 48.1017 5,516.201 5,463.30 4,854.883 5,411.173 5,979,542.2691 377,174.8290 0.00 6,263.63 9,600.000 58.888 48.1017 5,566.369 5,513.47 4,912.652 5,475.562 5,979,596.9236 377,240.1918 0.00 6,338.16 9,700.000 59.889 48.1017 5,616.536 5,563.64 4,970.422 5,538.950 5,979,655.5781 377,305.5546 0.00 6,412.70 9,750.559 59.889 48.1017 5,641.900 5,589.00 4,998.630 5,572.505 5,979,684.2220 377,338.6014 0.00 6,450.38 Albian 97 9,800.000 59.889 48.1017 5,666.703 5,613.80 5,028.191 5,604.339 5,979,712.2325 377,370.9175 0.00 6,487.23 9,900.000 59.889 48.1017 5,716.871 5,663.97 5,085.961 5,668.728 5,979,768.8870 377,436.2803 0.00 6,561.76 10,000.000 59.889 48.1017 5,767.038 5,714.14 5,143.730 5,733.117 5,979,825.5415 377,501.6431 0.00 6,636.30 10,100.000 59.889 48.1017 5,817.205 5,764.31 5,201.500 5,797.506 5,979,882.1959 377,567.0059 0.00 6,710.83 10,200.000 59.889 48.1017 5,867.372 5,814.47 5,259.269 5,861.895 5,979,938.8504 377,632.3687 0.00 6,785.36 10,300.000 59.889 48.1017 5,917.540 5,864.64 5,317.038 5,926.284 5,979,995.5049 377,697.7316 0.00 6,859.89 10,400.000 59.889 48.1017 5,967.707 5,914.81 5,374.808 5,990.673 5,980,052.1594 377,763.0944 0.00 6,934.43 10,500.000 59.889 48.1017 6,017.874 5,964.97 5,432.578 8,055.062 5,980,108.8138 377,828.4572 0.00 7,008.96 10,600.000 59.889 48.1017 6,068.042 6,015.14 5,480.347 6,119.451 5,980,165.4683 377,893.8200 0.00 7,083.49 10,629.618 59.889 48.1017 6,082.900 6,030.00 5,507.457 6,138.521 5,980,182.2482 377,913.1791 0.00 7,105.57 Albian 96 10,700.000 59,889 48.1017 6,118.208 6,065.31 5,548.117 6,183.840 5,980,222.1228 377,959.1828 0.00 7,158.02 10,800.000 59.889 48.1017 6,168.376 6,115.48 5,605.886 6,248.228 5,980,278.7772 378,024.5456 0.00 7,232.56 10,800.000 59.888 48.1017 6,218.543 6,165.64 5,663.656 6,312.617 5,980,335.4317 378,089.9085 0.00 7,307.09 11,000.000 59.889 48.1017 6,268.711 6,215.81 5,721.425 6,377.006 5,980,392.0862 378,155.2713 0.00 7,381.62 11,100.000 59.889 48.1017 6,318.878 6,265.98 5,779.195 6,441.395 5,980,448.7406 378,220.6341 0.00 7,456.15 11,200.000 59.889 48.1017 6,369.045 6,316.15 5,836.964 6,505.784 5,980,505.3951 378,285.9969 0.00 7,530.69 11,300.000 59.889 48.1017 6,419.212 6,366.31 5,894.734 6,570.173 5,980,562.0496 378,351.3597 0.00 7,605.22 11,385.638 58.889 48.1017 6,462.175 6,409.27 5,944.206 6,625.315 5,980,610.5675 378,407.3353 0.00 7,669.05 Begin Dir; 4° DL5, -83° TFO, 11385' MD, 8482' 7VD 11,400.000 59.962 47.4453 6,469.372 6,416.47 5,952.559 6,634.517 5,980,618.7608 378,416.6790 3.99 7,679.79 11,500.000 60.561 42.8903 6,518.995 6,466.09 6,013.762 6,696.061 5,980,678.8972 378,479.2562 4.00 7,756.74 11,600.000 61.313 38.3954 6,567.590 6,514.69 6,080.072 6,752.961 5,980,744.2178 378,537.2774 4.00 7,837.14 7!22/2005 7:27:23AM Page 5 of 9 COMPASS 2003.11 Build 50 ConocoPhillips Alaska Sperry Drilling Services Planning Report -Geographic Database: EDM 2003.11 Single User Db Company: ConocoPhillips Alaska Inc. Project: Colville River Unit Site; Alpine CD2 Well: Plan: CD2-01 Welltrore: Plan: CD2-01 flesigrt: CD2-01wp01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: HALLIBURTGN Sperry Drilling Services Well Plan: CD2-01 CD2-01 @. 52.900ft (CD2-01 ~ 52.9' above MSL) CD2-01 ~ 52.900ft (CD2-01 @ 52.9' above MSL) True Minimum Curvature Planned Survey CD2-O1wp01 MD Inclination Azimuth TVD SSTVD +N/-3 (ft) (°) (°) (ftl (ft) tit) 11,617.353 61.459 37.6202 6,575.900 6,523.00 6,092.075 HRZ 11,700.000 62.212 33.9707 6,614.919 8,562.02 6,151.164 11,800.000 63.249 29.6241 6,660.754 6,607.85 6,226.693 11,900.000 64.415 25.3608 6,704.869 6,651.97 6,306.291 12,000.000 65.703 21.1840 6,747.051 6,694.15 6,389.570 12,100.000 67.103 17.0947 6,787.093 6,734.19 6,476.124 12,130.631 67.553 15.8575 6,798.900 6,746.00 6,503.227 Base HRZ 12,200.000 68.605 13.0918 6,824.801 6,771.90 6,565.531 12,287.980 70.004 9.6377 6,855.900 6,803.00 6,646.205 K-1 Marker 12,300.000 70.200 9.1728 6,859.981 6,807.09 6,657.356 12,400.000 71.879 5.3336 6,892.491 6,839.59 6,751.151 12,430.685 72.410 4.1689 6,901.900 6,849.00 6,780.258 Kuparuk Fm 12,500.000 73.632 1.5689 6,922.144 6,869.24 6,846.461 12,600.000 75.451 357.8724 6,948.804 6,895.90 6,942.819 12,604.375 75.533 357.7103 6,949.900 6,897.00 6,947.051 LCU-Miluveach 12,700.000 77.327 354.2373 6,972.342 6,919.44 7,039.757 12,785.477 78.970 351.1712 6,989.900 6,937.00 7,122.721 Miluveach A 12,800.000 79.251 350.6560 6,992.643 6,939.74 7,136.803 12,900.000 81.216 347.1205 7,009.608 6,956.71 7,233.483 12,943.311 82.079 345.5996 7,015.900 6,963.00 7,275.124 Alpine D 13,000.000 83.214 343.6226 7,023.156 6,970.26 7,329.327 13,062.950 84.486 341.4343 7,029.900 6,977.00 7,389.022 Alpine C 13,100.000 85.236 340.1538 7,033.218 6,980.32 7,423.868 13,200.000 87.276 336.7054 7,039.747 6,986.85 7,516.644 13,217.000 87.625 336.1188 7,040.503 6,987.60 7,532.208 T" Csg Pt; 13217' MD, 7040' TVD; 4608' FNL 8 4814' F EL; Sec30-T12N-R05E - 7" 13,300.000 89.326 333.2687 7,042.711 6,989.81 7,607.205 13,337.555 90.098 331.9774 7,042.900 6,990.00 7,640.553 Target (Heel); 13337' MD, 7042' TVD -CD2-01 (Heel) 13,400.000 90.098 331.9774 7,042.794 6,989.89 7,695.677 13,500.000 90.098 331.9774 7,042.623 6,989.72 7,783.953 13,600.000 80.098 331.9774 7,042.453 6,989.55 7,872.229 13,700.000 90.D98 331.9774 7,042.283 6,989.38 7,960.505 13,800.000 90.098 331.9774 7,042.113 6,989.21 8,048.781 13,900.000 90.098 331.9774 7,041.943 6,989.04 8,137.057 14,000.000 90.098 331.8774 7,041.772 6,968.87 8,225.334 14,100.000 90.098 331.9774 7,041.602 6,988.70 8,313.610 7/22f2005 7:27:23AM ~ ~ ~a6~fs ° Map Map +g/_yy Northing Eaating DLSEY Vert Section 6,762.341 5,980,756.0578 378,546.8608 4.01 7,851.42 6,804.939 5,980,814.4046 378,590.4599 4.00 7,920.62 6,851.742 5,980,889.1156 378,638.5448 4.00 8,006.77 6,893.142 5,980,967.9867 378,681.2976 4.00 8,095.16 6,928.937 5,981,050.6338 378,718.5101 4.00 8,185.36 6,958.954 5,981,136.6542 378,750.0011 4.00 8,276.94 6,966.969 5,981,163.6140 378,758.4781 4.01 8,305.20 6,983.045 5,981,225.6287 378,775.6171 4.00 8,369.45 6,999.248 5,981,306.0079 378,793.1961 4.D0 8,451.24 7,001.094 5,981,317.1241 378,795.2332 3.98 8,462.43 7,013.013 5,981,470.6943 378,808.7540 4.00 8,555.44 7,015.431 5,981,439.7525 378,811.6698 4.01 8,583.92 7,018.743 5,981,505.8837 378,816.1135 4.00 8,648.02 7,018.256 5,981,602.2284 378,817.2760 4.00 8,739.72 7,018.093 5,981,606.4623 378,817.1851 4.05 8,743.71 7,011.555 5,981,699.2592 378,812.2356 4.00 8,830.10 7,000.926 5,981,782.3858 378,803.0280 4.00 8,905.97 6,998.673 5,981,796.5031 378,801.0171 3.99 8,918.71 6,979,672 5,881,893.4865 378,783.6750 4.00 9,005.12 6,969.566 5,981,935,2908 378,774.2839 4.00 9,041.76 6,954.645 5,981,989.7370 378,760.2839 4.00 9,088.82 8,935.854 5,982,049.7397 378,742.5281 4.00 9,140.14 6,923.714 5,882,084.7855 378,730.9876 3.99 9,169.68 6,887.030 5,982,178.1689 378,695.8989 4.00 9,247.03 6,880.233 5,982,193.8457 378,689.3707 4.01 9,259.81 6,844.770 5,982,269.4325 378,655.1988 4.00 9,320.57 6,827.501 5,982,303.0680 378,638.5040 4.01 9,347.14 6,798.163 5,982,358.6811 378,610.1164 0.00 8,380.81 6,751.181 5,982,447.7411 378,564.6558 0.00 9,460.75 6,704.188 5,982,536.8012 378,519.1953 0.00 9,530.70 6,657.218 5,982,625.8612 378,473.7348 0.00 9,600.64 6,610.236 5,982,714.9212 378,428.2742 0.00 9,670.58 6,563.254 5,982,803.9812 378,382.8137 0.00 9,740.52 6,516.272 5,982,893.0412 378,337.3532 0.00 9,810.46 6,469.290 5,982,982.1012 378,291.8926 0.00 9,880.40 COMPASS 2003.11 Build 50 / Sperry Drilling Services HALLIBURTON ConocoPhiNips Planning Report -Geographic Alaska Sperry Drilling Services Database: EDM 2003.11 Single User Db Local Coordinate Reference: Weil Plan: CD2-01 Company: ConocoPhillips Alaska Inc. TVD Reference: CD2-01 ~ 52.900ft (CD2-01 (~ 52.9' above MSL) Project: Colville River Unit MD Reference: CD2-01 ~ 52.900ft (CD2-01 (tD 52.9' above MSL) Site: Alpine CD2 North Reference: True Weil: Plan: GO2-01 Survey Calculation Method: Minimum Curvature Welibore: Plan: CD2-01 Design: CD2-01wp01 Planned Survey CD2-01wp01 Map Map MD Inclination Azimuth ND SSND +N/S +E!-W Northing Easdng DLSEV Vert Section ~ tR) (°) (°) (R) IR) (R) (R) (ftj {tt) 1°I100R) -1ft) 14,200.000 90.098 331.9774 7,041.432 6,988.53 8,401.886 6,422.308 5,983,071.1612 378,246.4321 0.00 9,950.34 14,300.000 90.098 331.8774 7,041.262 6,988.36 8,490.162 6,375.326 5,983,160.2212 378,200.9716 0.00 10,020.29 14,400.OD0 90.098 331.9774 7,041.092 6,988.19 8,578.438 6,328.345 5,983,249.2812 378,155.5110 0.00 10,090.23 14,500.000 90.098 331.9774 7,040.921 6,98$.02 8,666.714 6,281.363 5,983,338.3412 376,110.0505 0.00 10,160.17 14,600.000 90.098 331.9774 7,040.751 6,987.85 8,754.990 6,234.381 5,983,427.4012 378,064.5900 0.00 10,230.11 14,700.000 90.098 331.9774 7,040.581 6,987.88 8,843.267 6,187.399 5,883,516.4612 378,019.1294 0.00 10,300.05 14,800.000 90.098 331.9774 7,040.411 6,987.51 8,931.543 6,140.417 5,983,605.5212 377,973.6688 0.00 10,369.99 14,900.000 90.098 331.9774 7,040.240 6,987.34 9,019.819 6,093.435 5,983,694.5812 377,928.2084 0.00 10,439.93 15,000.000 90.098 331.9774 7,040.070 6,987.17 9,108.095 6,046.454 5,983,783.6413 377,882.7478 0.00 10,509.88 15,100.000 90.D98 331.9774 7,039.900 6,987.00 9,196.371 5,999.472 5,983,872.7013 377,837.2873 0.00 10,579.82 15,200.000 90.098 331.9774 7,039.730 6,986.83 9,284.647 5,952.490 5,983,961.7613 377,791.8268 0.00 10,649.76 15,300.000 80.098 331.9774 7,039.560 6,986.66 9,372.923 5,905.508 5,984,050.6213 377,746.3662 0.00 10,719.70 15,400.000 90.098 331.9774 7,039.389 6,986.49 9,461.199 5,858.526 5,984,139.8813 377,700.9057 0.00 10,789.64 15,500.000 90.098 331.9774 7,038.219 6,986.32 9,549.476 5,811.544 5,984,228.9413 377,655.4452 0.00 10,859.58 15,600.000 90.098 331.9774 7,039.049 6,986.15 9,637.752 5,764.562 5,984,318.0013 377,609.9846 0.00 10,929.52 15,700.000 90.098 331.9774 7,038.879 6,985.98 9,726.028 5,717.581 5,984,407.0613 377,564.5241 0.00 10,998.47 15,800.000 90.098 331.9774 7,038.709 6,985.81 9,814.304 5,670.598 5,984,496.1213 377,518.0636 0.00 11,069.41 15,90D.000 90.098 331.9774 7,038.538 6,985.64 9,902.580 5,623.617 5,984,585.1813 377,473.6030 0.00 11,139.35 16,000.000 90.098 331.9774 7,038.368 6,985.47 9,990.856 5,576.635 5,984,674.2413 377,428.1425 0.00 11,209.29 16,100.000 90.098 331.9774 7,038.198 6,985.30 10,079.132 5,529.653 5,964,763.3013 377,3$2.6820 0.00 11,278.23 16,200.000 90.098 331.9774 7,038.028 6,885.13 10,167.409 5,482.671 5,9$4,852.3613 377,337.2214 0.00 11,349.17 16,300.000 90.098 331.9774 7,037.857 6,984.96 10,255.685 5,435.689 5,984,941.4214 377,291.7609 0.00 11,419.11 16,400.000 90.098 331.9774 7,037.687 6,984.79 10,343.961 5,388.708 5,985,030.4814 377,246.3004 0.00 11,489.06 16,500.000 90.098 331.9774 7,037.517 6,984.62 10,432.237 5,341.726 5,985,119.5414 377,200.8398 0.00 11,559.00 16,600.000 90.098 331.9774 7,037.347 6,984.45 10,520.513 5,294.744 5,985,208.6014 377,155.3783 0.00 11,628.94 16,700.000 90.098 331.9774 7,037.177 6,984.28 10,608.789 5,247.762 5,985,297.6614 377,109.9188 0,00 11,698.88 16,800.000 90.098 331.9774 7,037.006 6,984.11 10,697.065 5,200.780 5,985,386.7214 377,064.4582 0.00 11,768.82 16,900.000 90.098 331.9774 7,036.836 6,983.94 10,785.342 5,153.798 5,985,475.7814 377,018.9977 0.00 11,838.76 17,000.000 90.098 331.9774 7,036.666 6,983.77 10,873.618 5,106.817 5,985,564.8414 376,973.5372 0.00 11,908.70 17,100.000 90.098 331.9774 7,036.496 6,983.60 10,961.894 5,059.835 5,985,653.9014 376,928.0766 0.00 11,978.65 17,200.000 90.098 331.9774 7,036.325 6,983.43 11,050.170 5,012.853 5,985,742.9614 376,882.6161 0.00 12,048.59 17,300.000 90.098 331.9774 7,036.155 6,983.26 11,138.446 4,965.871 5,985,832.0214 376,837.1556 0.00 12,118.53 17,400.000 90.098 331.9774 7,035.985 6,983.09 11,226.722 4,818.888 5,985,921.0814 376,791.6950 0.00 12,188.47 17,500.000 90.098 331,9774 7,035.$15 6,982.91 11,314.998 4,871.907 5,988,010.1414 376,746.2345 0.00 12,258.41 17,600.000 90.098 331.9774 7,035.645 6,982.74 11,403.275 4,824,925 5,988,099.2014 376,700.7740 0.00 12,328.35 17,700.000 90.098 331.9774 7,035.474 6,982.57 11,491.551 4,777,944 5,986,188.2615 376,655.3134 0.00 12,388.29 17,800.000 90.098 331.9774 7,035.304 6,982.40 11,579.827 4,730.962 5,986,277.3215 376,609.8529 0.00 12,468.24 17,900.000 90.098 331.9774 7,035.134 6,982.23 11,668.103 4,683.880 5,986,366.3815 376,564.3924 0.00 12,538.18 18,000.000 90.098 331.9774 7,034.964 6,982.06 11,756.379 4,636.998 5,986,455.4415 376,518.9318 0.00 12,608.12 18,100.000 90.098 331.9774 7,034.794 6,981.89 11,844.655 4,590.016 5,986,544.5015 376,473.4713 0.00 12,678.06 18,200.000 90.098 331.9774 7,034.623 6,981.72 11,932.931 4,543.034 5,986,633.5615 376,428.0108 0.00 12,748.00 18,300.000 90.098 331.9774 7,034.453 6,981.55 12,021.208 4,496.052 5,986,722.6215 376,382.5502 0.00 12,817.94 18,400.000 90.098 331.9774 7,034.283 6,981.38 12,109.484 4,449.071 5,986,811.6815 376,337.0897 0.00 12,887.88 18,500.000 90.088 331.9774 7,034.113 6,981.21 12,197.760 4,402.089 5,986,800.7415 376,291.6292 D.00 12,957.83 18,600.000 90.098 331.9774 7,033.942 6,981.04 12,286.036 4,355.107 5,986,989.8015 376,246.1687 D.00 13,027.77 18,700.000 90.098 331.9774 7,033.772 6,980.87 12,374.312 4,308.125 5,987,078.8615 376,200.7081 D.00 13,097.71 18,800.000 90.098 331.9774 7,033.602 6,980.70 12,462.588 4,261.143 5,987,167.9215 376,155.2476 0.00 13,167.65 18,900.000 90.088 331.9774 7,033.432 6,980.53 12,550.864 4,214.161 5,987,256.9815 376,109.7871 O.DO 13,237.59 19,000.000 90.098 331.9774 7,033.262 6,980.36 12,639.141 4,187.180 5,987,346.0416 376,064.3265 0.00 13,307.53 19,100.000 90.098 331.9774 7,033,091 6,980.19 12,727.417 4,120.198 5,987,435.1016 376,018.8660 0.00 13,377.47 18,200.000 90.098 331.9774 7,032.921 6,980.02 12,815.693 4,073.216 5,987,524,1616 375,973.4055 0.00 13,447.42 7/222005 7:27:23AM Page 7 of 9 COMPASS 2003.11 Build 50 OR~G~NAL ConocoPhiliips Alaska • Database: EDM 2003.11 Single User Db Company: ConocoPhillips A{aska Inc. Project: Colville River Unit Site: Alpine CD2 Well: Plan: CD2-01 Wellbore: Plan: CD2-01 Design: CD2-01wp01 • Sperry Drilling Services HALLIBURTQN Planning Report -Geographic Sperry Drilling Services Local Co-0rdinate Reference: Well Plan: CD2-01 TVD Reference: CD2-01 ®52.900ft (CD2-01 ~ 52.9' above MSL) MD Reference: C02-01 ~ 52.900ft (CD2-01 ~ 52.9' above MSL) North Reference: True Survey Calculation Method: Minimum Curvature Planned Survey CD2-01wp01 Map Map MD Inclination Azimuth ND SSTVD +N/S +E!-W Northing Eastin9 DLSEV Vert Section (it) (°) (°) (R) Ift) (ff) (ffl (ftj (Rl (°/i00ft) fik) 19,212.438 90.088 331,9774 7,032.900 6,980.00 12,626.667 4,067.360 5,987,535.2330 375,867.7390 0.00 13,456.11 Target (Toe); 19212' MD, 7032' TVD; 459 1' FNL & 2763' FEL; Sec24-T12N-R04E - 4-1l2" -CD2-01 (Toe) Geologic Targets Plan: CD2-01 TVD Target Name +N/-S +E/-W Northing Fasting (R) -Shane ft ft (ft) (ff) , 7,042.900 CD2-01 (Heel) 7,640.553 6,827.501 5,982,303.0680 378,638.5040 - Point 7,032.900 CD2-01 (Toe) 12,826.667 4,067.360 5,987,535.2330 375,867.7390 - Point Prognosed Cas)ng Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ff1 (ft) (") (") 3,268.446 2,390.000 9-5/8 12-1/4 13,217.000 7,040.503 7 8-112 19,212.437 7,032.900 4-1/2 6-118 7/22f2005 7:27:23AM Page 8 of 9 COMPASS 2003. i i Build 50 ,~ ConocoPhillips Alaska Database: EDM 2003.11 Single User Db Company: ConocoPhillips Alaska Inc. Project: Colville River Unit Site: Alpine CD2 Well: Plan: CD2-Ot Weifbore: Plan: CD2-01 Design: C02-01wp01 Sperry Drilling Services Planning Report -Geographic Local Co-ordinate Reference: T'VD Reference: MD Reference: North Reference: Survey Calculation Method: • HALLIBURTQN Sperry Drilling Services Weil Plan: CD2-01 CD2-01 ~ 52.900ft (CD2-01 ~ 52.9' above MSL) CD2-01 (cD 52.900ft (CD2-01 cQ 52.9' above MSL) True Minimum Curvature Prognosed Formation Intersection Points Measured Vertical Depth Inclination Azimuth Depth +N!-E +E/-W H e i~) 1°) t°) IK) lRl Ift) N n 2,897.487 59.89 48.10 2,203.900 1,040.65 1,159.89 C-40 3,296.153 59.89 48.10 2,403.900 1,270.95 1,416.58 C•30 4,033.686 59.89 48.10 2,773.900 1,697.02 1,891.47 C-20 6,172.530 59.89 48.10 3,846.900 2,932.62 3,268.65 K-3 Marker 6,557.243 59.89 48.10 4,039.900 3,154.87 3,516.36 Basal K-3 Sand 6,607.076 59.89 48.10 4,064.900 3,183.66 3,548.45 K-2 Marker 6,806.409 59.89 48.10 4,164.900 3,298.81 3,676.80 Base K-2 Cycle 9,750.559 59.89 48.10 5,641.900 4,999.63 5,572.50 Albian 97 10,629.618 59.89 48.10 6,082.900 5,507.46 6,138.52 Albian 96 11,617.353 61.46 37.62 6,575.900 6,092.08 6,762.34 HR2 12,130.631 67.55 15.86 6,798.900 6,503.23 6,966.97 Base HRZ 12,287.980 70.00 9.64 6,855.900 6,646.21 6,999.25 K-1 Marker 12,430.685 72.41 4.17 6,901.900 6,780.26 7,015.43 Kuparuk Fm 12,604.375 75.53 357.71 6,949.900 6,947.05 7,018.09 LCU-Miluveach 12,785.477 78.97 351.17 6,989.900 7,122.72 7,000.93 Miluveach A 12,943.311 82.08 345.60 7,015.900 7,275.12 6,969.57 Alpine D 13,062.950 84.49 341.43 7,029.900 7,389.02 6,935.85 Alpine C 7/22/2005 7:27:23AM OR161NAL COMPASS 2003.11 Build 50 ConocoPh i l l i s Alaska ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 Plan: CD2-01 Plan: CD2-01 CD2-01wp01 Anticollision Report 21 July, 2005 HALLIBURTQlV Sperry Drilling services OR161NAL ~Ot1000~lI~~IpS .~i4~i14r,7 MALLIt3URTON Sperry DAlling Services P,eiro: csNa. R:. twr Ssr: A1aw CD2 9M1: Pw:cD3-0i tNaeN wd: w.rne,. w,. wxa+ TO ' V coe.,ppa, r cOSaru ~'~~ ..~~„o~. ~w,.: cOw3 c07-,vu+ A}+IPe3 c0ai3 ANTI-COLLISION SETTING'. bbrpobtlan Metl100: MD Inbrval: 603btlona Cakula0on Memod: Minimum CYrvabn D<pm Range r,orr 77.000 Te 99272.771 Ert«MOtlel ISCWSA MaAnwm Range. 6000 - I,„de. Norm Ertor Surbu: EIIIpOUI Conk Rebm+ee NNII: Plan: CD2-01vg09 Waminf M.tl+oO: Ruba Based SDRVEY PROGRAM D1K: 3005717-31700:00:00 Vdldeted:Yn Version: 1.000 Depth Fran Depth To ServerlRao Tod }7.000 850.0011 CD3JIIwp01 CBCYRO-SS a90.000 19x1273q C03-0IwpOi MWMIFR-AK{A7.SC room 4e1et. T. re - -d150 ,a cgGE.;; TH~n-17a5n ,. riot- . - .. .. ... -__-1zn¢ ,- ma - n-. - -,smen~-+es. - s7w-"- uxse ____- ,mlv.,-_ -- - _ nuA., Critical Issues: 8'to tolsrane• line of CD2.02wp02 around 280' MD. 6'to tolerance lino of CD2-03 around 600' MD. 27' to tolerance line of CD2.07 around 800' MD. 84' to tolerance line of CD2.13 around 7760' MD. CD1-30 to be shut-in while drilling CD2-Ot. Minor Risk rule 11200 applied. 267'to Tolerance Line for CD1.30 at 72800' on CD2-Otwp01 Traselline C.lindcr-i>.imulh ll Fl /-3/II' .•I.nlr, l,~l ,or,. ~~liar.il~~~,'=11 SECr10N DEfA1LS Sex MD k< Asi 1 37.000 0.000 O.OOW x xoo.olw 0.000 0.0000 3 x196.109 59.gg9 7q.1017 1 11385.638 59.189 71.101] 5 17377.555 90.09q 331.9fl7 f 19212AIq 90.09q 131.97]7 TVD +N/-S 37.000 O.OW xla.tNa aaae Ig52.llq 63(579 6762.1]5 5977.206 ]0.12.900 76711.553 ]032.9W 13826.667 +F/-W 0.000 o.ogg 708A06 66x5.115 612].501 JU6].160 Dlsq TF.re VSer Target 0.00 0.00110 0.0110 aoo a.aooo o.oao 3.00 0.0000 exo.oo6 0.00 0.0000 7K9.a17 7.00 -82.8500 93J7.Ilq CDx-01 (Heep 0.00 U.OOW 13756.106 CD2-01 (r«) • 7/21/2005 4:23 PM 79m:c0a+Tw TrarelGne Cylinder Azimuth ITFO+.~ZI1 I°~ vs Centre l0 Centre Separation IJO fUinl ConocoPhitlips - Alaska Company: ConocoPhillips Alaska Inc. Project: Colville River Unit Reference Site: Alpine CD2 Site Error. O.000ft Reference Well: Plan: CD2-01 Well Error: O.000ft Reference Weilbore Plan: CD2-01 Reference Design: CD2-01wp01 Sperry Drilling Services Anticollision Report Local Coordinate Reference: TW Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: MALLIBUF~70N Sperry Drilling Services Well Plan: GD2-01 CD2-01 C~ 52.900ft (CD2-01 (~ 52.9' above MSL) CD2-01 @ 52.900ft (CD2-01 @ 52.9' above MSL) True Minimum Curvature 1.00 sigma EDM 2003.11 Single User Db Offset Datum Reference CD2-01wp01 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method MD interval 25.000ft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Trav. Cylinder North Results Limited by: Maximum center-center distance of S,000.OOOft Error Surface: Elliptical Conic Warning Levels evaluated at: 0.00 Sigma Survey Soul Program .Date 7121!2005 From To (g) (ft) Survey (Weilbore) Tool Name Description 37.000 850.000 CD2-01wp01 (Plan: CD2-01) CB-GYRO-SS Camera based gyro single shot 850.000 19,212.438 CD2-01wp01 (Plan: CD2-01) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC CC -Min centre to center distance or coverpent point, SF -min separation factor. ES -min ellipse separation 7/21/2005 3:09:39PM Page 2 of 4 COMPASS 2003.11 Build 50 / ~ S er Drillin Services P rY 9 ConocoPhillips Anticollision Report Alaska HAI_LIBUFiTON Sperry Drilling Services Company: ConocoPhillips Alaska Inc. Local Co-ordinate Reference: Well Plan: CD2-01 Project: Colville River Unit TVD Reference: CD2-01 ~ 52.900ft (CD2-01 ~ 52.9' above MSL) Reference Site: Alpine CD2 MD Reference: CD2-01 @ 52.900ft (CD2-01 e~ 52.9' above MSL) Site Error: O.000ft North Reference: True Reference Well: Plan: CD2-01 Survey Cabulatbn Method: Minimum Curvature Well Error. O.000ft Output errors are at 1.00 sigma Reference Wellbore Plan: CD2-01 Database: EDM 2003.11 Single User Db Reference Design: CD2-01wp01 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Ailowabte Measured Measure Centre Distance Deviation Warning Site Name Depth d Distance (ft) from Plan Offset Well - Welllwre -Design IffI (tt! iftl Alpine CD1 CD1-30 - CD1-30 - CD1-30 12,499.950 12,850.000 298.422 38.81 267.848 Pass -Minor 1/200 CD1-31 - CD1-31 - CD1-31 11,255.404 13,275.000 780.671 386.55 504.401 Pass -Major Risk CD1-31 - CD7-31 CAZ - CD1-31 CAZ 11,255.362 13,200.000 785.900 249.75 628.973 Pass -Major Risk CD1-31 - CD1-31 IIFR - CD1-31 IIFR 11,262.204 13,325.000 776.347 282.38 592.486 Pass -Major Risk CD1-32-CD1-32-CD1-32 9,917.159 13,600.000 1,619.324 423.50 1,344.897 Pass-Major Risk Alpine CD2 CD2-05 -CD2-05 -CD2-05 224.955 225.000 41.051 4.68 36.368 Pass -Major Risk CD2-OS -CD2-OSL1 -CD2-OSL1 224.955 225.000 41.051 4.68 36.368 Pass -Major Risk CD2-06 -CD2-O6 -CD2-06 518.042 525.000 42.921 10.01 33.053 Pass -Major Risk CD2-07 -CD2-07 -CD2-07 713.718 725.000 33.489 15.35 18.761 Pass -Major Risk CD2-07 -CD2-07PB1 -CD2-07PB1 713.718 725.000 33.488 15.46 18.652 Pass -Major Risk CD2-07 -CD2-07PB2 -CD2-07PB2 713.718 725.000 33.489 15.46 18.652 Pass -Major Risk CD2-08 -CD2-OS -CD2-08 469.916 475.000 69.535 9.46 60.104 Pass -Major Risk CD2-09 -CD2-09 -GD2-09 465.935 475.000 81.520 10.00 71.534 Pass -Major Risk CD2-09 -CD2-09L1 -CD2-09L1 465.935 475.000 81.520 10.00 71.534 Pass -Major Risk CD2-09 -CD2-09PB1 -CD2-09P61 465.935 475.000 81.520 10.00 71.534 Pass -Major Risk CD2-10 -CD2-10 -CD2-10 249.372 250.000 90.292 4.59 85.705 Pass -Major Risk CD2-10 -CD2-10PB1 -CD2-10PB1 249.372 250.000 90.292 4.73 85.560 Pass -Major Risk CD2-12 -CD2-12 -CD2-12 345.344 350.000 112.217 7.33 104.886 Pass -Major Risk CD2-13 -CD2-13 -GD2-13 1,832.392 1,900.000 81.434 38.49 52.714 Pass -Major Risk CD2-13 -CD2-13PB1 -CD2-13P61 1,832.392 1,900.000 81.434 38.49 52.714 Pass- Major Risk CD2-13 -CD2-13P62 -CD2-13PB2 1,832.392 1,900.000 81.434 38.50 52.714 Pass -Major Risk CD2-14 -CD2-14 -CD2-14 248.129 250.000 130.196 4.56 125.634 Pass -Major Risk CD2-15 -CD2-15 -CD2-15 272.385 275.000 140.837 5.52 135.318 Pass -Major Risk CD2-15 -CD2-15P81 -CD2-15PB1 272.385 275.000 140.837 5.63 135.209 Pass -Major Risk CD2-15 -CD2-15P82 -GD2-15PB2 272.385 275.000 140.837 5.63 135.209 Pass -Major Risk CD2-16 -CD2-16 -CD2-16 272.135 275.000 150.472 5.47 145.003 Pass -Major Risk CD2-16 -CD2-16 (Sag) -CD2-16 (Sag) 272.135 275.000 150.473 4.94 145.537 Pass -Major Risk CD2-18 -CD2-18 -CD2-18 295.598 300.000 170.776 6.23 164.544 Pass -Major Risk CD2-18 -CD2-18P61 -CD2-18PB1 295.598 300.000 170.776 6.23 164.544 Pass -Major Risk CD2-19 -CD2-19 -CD2-19 248.049 250.000 180.303 4.55 175.750 Pass -Major Risk CD2-20 -CD2-20 -CD2-20 318.670 325.000 190.254 6.76 183.499 Pass -Major Risk CD2-21 -CD2-21 -CD2-21 270.568 275.000 201.268 5.57 195.694 Pass -Major Risk CD2-21 -CD2-21PB1 -CD2-21PB1 270.568 275.000 201.268 5.68 195.585 Pass -Major Risk CD2-22 -CD2-22 -CD2-22 247.507 250.000 210.481 4.54 205.938 Pass -Major Risk CD2-23 -CD2-23 -CD2-23 317.092 325.000 220.570 6.46 214.119 Pass -Major Risk CD2-23 -CD2-23P81 -CD2-23P61 317.092 325.000 220.570 6.46 214.119 Pass -Major Risk CD2-24 -CD2-24 -CD2-24 246.808 250.000 230.545 4.54 226.008 Pass -Major Risk CD2-24 -CD2-24P61 -CD2-24PB1 246.808 250.000 230.545 4.54 226.008 Pass -Major Risk Drilling: CD2-03 -Drilling: CD2-03 -CD2-03 Rig Survey: 473.894 475.000 17.084 9.93 7.233 Pass -Major Risk Drilling: CD2-03 -Drilling: CD2-03 -CD2-03wp03 498.449 499.998 15.779 10.67 5.224 Pass -Major Risk Plan: CD2-02 - Pian: CD2-02 -CD2-02wp02 274.688 275.000 10.657 5.70 4.953 Pass -Major Risk Plan: CD2-04 -Plan: CD2-04 - Pian: CD2-04 (wp02 250.424 250.000 30.398 4.64 25.758 Pass -Major Risk Plan: CD2-04 -Prelim: CD2-04PB1 -CD2-04PB1wp 250.424 250.000 30.399 4.64 25.758 Pass -Major Risk Plan: CD2-11 -Plan: CD2-11 -CD2-11wp07 297.743 299.999 100.831 6.22 94.612 Pass -Major Risk Plan: CD2-11 -Prelim: CD2-11 P61 -CD2-11 PB1wp 297.743 299.999 100.831 6.22 94.612 Pass -Major Risk Plan: CD2-17 -CD2-17 -CD2-17 272.014 275.000 160.114 5.03 155.087 Pass -Major Risk Plan: CD2-17 -Plan: CD2-17A -Plan: CD2-17A (wp 272.014 275.000 160.114 5.03 155.087 Pass -Major Risk Alpine Satellites Alpine#3 -Alpine #3 -Alpine #3 16,886.482 7,050.000 1,703.679 158.08 1,557.673 Pass -Major Risk CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 7/21/2005 3:09:39PM Page 3 of 4 COMPASS 2003.11 Build 50 ORIGINAL • ! `-r' Sperry Drilling Services ConocoPhiili 5 p A lli i ti R rt tiALLIBURTGN _ co on n s epo Alaska Sperry Drilling Services Company: ConocoPhillips Alaska Inc. Local Co-orcilnate Reference: Well Plan: CD2-01 Pro)ect: Golville River Unit TVD Reference: CD2-01 ~ 52.900ft (CD2-01 ~ 52.9' above MSL) Referents Site: Alpine CD2 MD Reference: CD2-01 cQ 52.90oR (CD2-Ot Q 52.9' above MSL) Site Error: O.000ft North Reference: True Reference. Wefl: Plan: CD2-Ot Survey Calculation Method: Minimum Curvature Wets Error: O.000ft Output snore are at 1.00 sigma Reference Wellbore Plan: CD2-01 Database: EDM 2003.11 Single User Db Reference pesign: CD2-01wp01 Offset TYD Reference: Offset Datum CC -Min centre to center distance or coverpent point. SF -min separation factor, ES -min ellipse separation 7/21/2005 3:09:39PM Page 4 of 4 COMPASS 2003.11 Buifd 50 ORIGINAL ,~ ,..~ - 1111 SHARON K. ALLSUP-DR AKE CONOCOPHILLIPS ~ -1a131~ G~ ~ AT01530 2 ~ oaTE 700 G ST. ANCHORAGE AK 99501 ' `', Y TO THE ~ Qf 7 ~ ~ ~~~ Y PA d ORDER OF ~~ p, Q~-~-W[[]i~t$ LG ne~a~o~ `~ r ~'~ CHASE cnase McNnattan sank usn, a.a. 2W WhileGby Lenter Dr., Newark, DE 19)tt Valid Up To 5000 DOliars 7 ~, E°. ;, MEMO i:03LL00L44~: ._. _- 2~847L9079276u~LLLL ,.; ,_ _>n~ .~. ~~,.. _ ,- • TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ~-~ ~ '~ ~ ~~~~1 PTD# ~~ CHECK WHAT ADD-ONS "CLUE" APPLIES OPTIONS) MULTI The permit is for a new wellbore segment of LATERAL existing well , Permit No, API No. (If API number Production should continue to be reported as last two (2) digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(f), all (PIS records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 - 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce/infect is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev: 04/01/05 C1j ody\transm itta!_checklist WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, ALPINE OIL -120100 PTD#:2051180 Company CONOCOPHILLIPS ALASKA INC Initial Class(Type Well Name: COLVILLE RIV UNIT CD2-01 Program DEV Well bore seg ^ DEV! PEND GeoArea 890 Unit 50360 OnlOff Shore ~ Annular Disposal ^ Administration 1 Permit_feeattached_____-__------------------------------ Yes_ __-__-__--------------------------------------------- -...._.__---- 2 Lease number appropriate_ _ - - _ Yes . .. , ...Surface location in ADL 380075;-passes thrra ADL 0380096; topprod interval and-TD in ADL 02553Q.- - - - - , . . 3 Uniquewell-name andnumber--------------- --- -- ------ -~---- Yes --........ - ------- -------------- -- ... ----- --- - 4 Vyelllocated'fna_defnedpool_-_-__________________________________ Yes- _____-Colville-RiverUnit, Alpine Oil Pool,governed-by CO443A,______-________--_-_-__-_-__-„ 5 Well located proper distance from drilling unit-boundary_ Yes More Pharr 5QQ feet from.the exterior_boundary of the affected area. _ _ - - _ 6 Well located proper distance $om Qther wells- _ _ _ _ - . _ - Yes - _ - - - _ _ More than 5Q0 lineal feet from another Alpine Oil Pool development well _ - _ _ - - _ _ - _ _ _ - . 7 Sufficient acreageayailableindri{ling unit .............................._ Yes- _---------____-___--__.- ---------------------------------------------- 8 If deviated, is.wellbore plat included . - - - - - - - Yes - - - - - - - - _ _ _ - - - - 9 Operator only affected party - - ... _ - - - - Yes - - - _ _ _ - - - 10 Ope[atorhasappropriatebondinf4rce----------- -- ------------- --- Yes- ---- ----- --------------..... - ~- - ----------------- --- ~ -- -- 11 Permitcanbeissraedwithoutconservati4r14rder_-_-_-_---________--__--- Yes_ ________________________________--______-_-_-_-_--_._--_________--.__- Appr Date 12 Permit-can be issued without administrative.approval..______________________ Yes_ -__--__--__-__--__________________-,-_„_.,-__-_---____- ___-_--_-.-_- SFD 9/6/2005 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized bylnjeGtionOrde[#(put1O#in_comments)_(For_ NA__ ________________________________________--_-___--_---_--__-__ _- 15 All wells within1/4-mile area ofreyiewidentified(Forservicewellgnly),,,.__-------- NA__ _______________„___.,_,_,_____-___-_- 16 Pre-produced injector; duration of preproduction less than-3 months,{Fgr service well only) _ _ NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 17 ACMP_FindingofConsistency_hasbeenissued_for_thispr_oject_________-_.__ NA__ _______________________________________--__--_-...,,..-,-.-_________-_- Engineering 18 Conductorstring-provided------------------------_-_---_ -____Yes-- -------_---------.------__----------------.........._---- _--- 19 Surface casing_protectsall_knownUSDWs______________________ _______KA__-- __.Noaquifers,-pe[AIO.18Acpnclusion3,_____________--__-__---_--_---_-__-__-_ 20 CMT_vo(adequate_tocircul_ate_onconductor&su_rf_csg________________ _-_.Yes__ __--__---_.__--______________ -- --- 21 CMT_vol adegraate_to tie-in long string tosurf csg- - - - - - - - - - - - - - - - - - - - - - - - - - No- _ - _ - _ - -Annular disposal maybe planned.-All-hydrocarbons will be covered._ _ _ _ _ _ _ . - _ _ - _ _ - - _ _ . 22 CMT_willeoyerallknown-productivehorizons_______________________ _______ No-__ _-,.Open_holecompletion planned,_____________-__--_-___--__--__-_____--. 23 Casing designs adequate for C,TB&permafrost__------_--------_ --__---Yes--- ._......--------------------------------------------------...._- -_ 24 gdequate tankage_or reserve pit _ _ _ - - _ _ - - _ _ Yes Rig is-equipped with steel_pits.. Noreserve-pitplanned, All waste to-approved annulus of disposal well. 25 Ifa_re-drill,has_a10-403forabandonmentbeen approved-__----------- ------- NA--_- __--Nosundryneededto_plugback,__-__--_-_--__-_____-___________--_____--__-_ 26 Adequate wellbore separationproposed_ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _Yes _ - _ - _ _ -Proximity analysis performed: Traveling cylinerpath calculated. Gyrosprobable.- - _ _ - - _ _ _ . _ , _ , _ - _ - - - 27 Ifdiverterrequired,doesitmeetregulations_______________________ ______ NA__- ___.BOPstackalreadyiRplace,_______________-_-___--_-_-_--_________-__-_--._ Appr Date 28 Drilling fluidprogram Schematic $ equip list adequate- _ - Yes _ _ Maximum expected formation pressure 8,7_EMW~ MW planned 8.1 _- 8,8. ppg.- - - .. - _ _ _ - . - TEM 9!7/2005 29 BOPEs,dotheymeetregulation__--_------------ --------- -------Yes--- ---.---------___-_-..---.-----.---------------------------- 4A ~~/~ ~ 30 BOPS-prase rating appropriate; tr t to.(put prig in comments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ MASP calculated at 2486 psi: 3500-psi-appropriate. CPAI usually tests to 5000-psi. _ - - - _ _ _ _ _ - _ _ - - - - - - ,i l'j 31 Choke_manifoldcomplieswlAPl_RP-53~May84)__________________ ____Yes___ _____--.______ -- -- - - -- 32 Work will occur without operation shutdown______________________ ____Yes___ _______---__-_ 33 Is presencR-of H2S gasRrpbable- - -- - - -- - -- - - - - - - - - - - - - - - - - - - - - - - - - - - No_ _ _ _ _ _ _ - H2S has notbeen repodedatAlpine. _Rig is equipped with sensors andalarmS.- . _ _ .. - _ - _ _ _ _ _ - - - - - . . 34 Mechanical condition of wells within AQR verified (For service well only - - - - - - - - - - - - - - NA- _ _ _ - _ _ - - _ Geology 35 Permitcan be issued w!o_ hydrogensulfide measu[es _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ - - - - - -Expected resen!oirpre_ssure is 8.7_ppg EMW based on-offset well data and_modeling, Will be_ 36 Data-presented on-potential overpressure zooes.___-,----_-._____ _______Yes_ ___drilledwith_-8.8ppg_oil-based mud.---__-_-__--_---_-_-___----.-________--__-- Appr Date 37 Seismic analysis-of shallow gas_zones . . . . . . . .... . ......... . . . . . . . . . . . . . NA_ _ _ _ _ _ _ _ No shallow gas or pressure epcountered to date in surface holes drilled-from.Dl)2.pad.. - _ _ - _ _ _ _ _ _ - .. _ - - SFD 9!6!2005 38 Seabed condition survey_(if off-shore) . . . . . . . . . . . . . . . . .... . . ...- NA - - -- --- - - - 39 _COntactnamelphoneforweeklyprogress_reports[exploratoryonly]-.__-__ -___._-NA-___ ________________________________-__-__-___--_,..,--_______--_____.- Geologic Date: Engineering Date Public Date The first attempt at drilling CD2-01 ended at 14,483' (almost 1 mile short of CPAI's proposed bottomhole location) due to poor ~ Commissioner: Commissioner; Commissioner reservoir conditions. That initial wellbore was plugged back and renamed CD2-01P61. This new wellbore will be kicked off at it h `-~~ >> / 9~ ~'~, f~ '~ ! /,J~%~~~ ~~7 _ 10,640' measured depth, and it will be drilled west of Plugback 1 to a bottom-hole location that is approx. 114 mile south of the JKN ~~ originally proposed CD2-01 bottomhole location. SFD • Plan: CD2-01wp01 (Plan: CD2-01/Plan: CD2-01) u . ,.., C~ ~-r C~ .~ ~--~ rrQ~ll V ~~ ~--~ ~~ ~ G~ 3j, U r._._ Measured Depth [ft] • CD2-01wp0] A-pine#3,Alpine#3,Alpine #3 V4 CDl-30,CD1-30,CD1-30 VI CDl-31,CD1-31CAZ,CDI-31CAZt~~ CDl-31,CD1-31IIFR,CDI-31IIFRVI CDl-31,CD1-31,CD1-31 V6 ~ CDI-32,CD1-32,CD1-32 V1 CD2-0S,CD2-0S,CD2-0SV9 ~ CD2-05, CD2-0SLI,CD2-0SL1V4 CD2-06,CD2-0fi,CD2-06V6 CD2-07, CD2-07, CD2-07 V l2 ~ CD2-07, CD2-07PB 1, CD2-07PB l V!t'~ CD2-07, CD2-07PB2, CD2-07PB2 V2'~~ CD2-08, CD2-08, CD2-08 V 14 CD2-09, CD2-09, CD2-09 V2 CD2-09,CD2-09L1,CD2-09L1 Vl ~ CD2-09,CD2-09PBI,CD2-09PBl V~~ CD2-l0,CD2-l0,CD2-lOV7 ~ CD2-10,CD2-IOPBl,CD2-IOPBI Vf~~ CD2-l2,CD2-12,CD2-12V7 CD2-13,CD2-13,CD2-13V1 ~ CD2-13,CD2-13PBl,CD2-13PB1V'td'~ CD2-13,CD2-13PB2,CD2-13PB2V4'- CD2-14,CD2-14,CD2-14V1 ~ CD2-15,CD2-15,CD2-15V3 CD2-15,CD2-15PB1,CD2-15PB1Vr~ CD2-IS,CD2-ISPB2,CD2-15PB2V2~- CD2-16,CD2-16 (Sag), CD2-16(Sag)~~ CD2-16,CD2-16,CD2-16 V7 CD2-18,CD2-18,CD2-18V19 CD2-l8,CD2-18PBl,CD2-18PB1 Vim' CD2-19,CD2-19,CD2-19 V8 ~ CD2-20,CD2-20,CD2-20 V4 ~ CD2-21,CD2-21,CD2-21 Vll ~ CD2-21,CD2-21PB1,CD2-21PB1 V7 CD2-22, CD2-22, CD2-22 V 1 ~ CD2-23, CD2-23, CD2-23 V2 ~ CD2-23, CD2-23PB 1, CD2-23PB1 Vt~ CD2-24, CD2-24, CD2-24 VO CD2-24, CD2-24PB l,CD2-24PB 1 V 1 Drilling: CD2-03, Drilling: CD2-03, ~bt~3 Ri~SIu~~ID'A03, Drilling: CD2-03, CDl~?3w(a(3~'V®2-02, Plan: CD2-02, CD2-02w~2 V 1PIan: CD2-04, Plan: CD2-04, Plan: Cry-ir: (w~2-04, Prelim: CD2-04PBl, CD2-04PB1wp02#2 VO Plan: CD2-11, Plan: CD2-l 1, CD2-I . wrnN ~ Van: CD2-11, Prelim: CD2-I l PBI, C-v2-i i P~l~~>I0, CD2-l7, CD2-17 VO Plan: CD2-17, Plan: CD2-17A, Plan: CD2-17A (wp01) VS 0 200 400 600 800 1000 1200 1400 1600 `' c.~.uan MMlnd MYiwm o.va.~ ConocoPhiliips Alaska o.~o+,n Nnol9vMeocoNCar.~ Myr11c MoCVF env..~mi HALLIBURTON '~°"°' RK8 C02D7~52.9oort (CD201~sz.s aeove MSL) vorthin(yASV V: 9971781.0900 Sperry Drilling Services F~r:,gASFx: 371e91.s1ao AMlOTAT10N5 TVD MD MrohBan 37.000 37.000 SHL; 157T FNL 8 1587 FEL; Sec02-711 N-R04E 200.000 200.000 Begin Dir; 3° DLS, 0° TFO, 200' M0, 200' TVD ~vt9 ~ 111 9100. iIq Cf~rr Cail~ S9 9° IN(: 2198' MD_ 1857 TVD 8482'7VD FNL 64814' FEL; S8cJ0•T12N3205E CA9N00EfA13 Ne 1UD AO /Ins 9Y~ t )388009 »A16 98C f48 ] 7010001 132AOm T 7 i T032900 18IV~7141Q' 412 1NaLBORE TARGET OEfA1.S P"1~ COOfmrJa.TFS) Project: Colville River Unit Site: AI ine CD2 P Well: Plan: CD2-01 Welibore: Plan: CD2-01 Name coz-01 Roei C;D2-01 oe Cvcle coz-01 ) ADZ-011-~1 Ctde rvo +ws 7D3z.9oo 12826.667 7032900 12826.867 7042900 7840563 7oa29oo 764os51 +E/-w 4067.160 4067.360 6827.501 BBZ7sD1 Northing Easa,g 59875352330 r5967.719o 58875152130 175967.7390 59623D3D680 176838.5040 5eaz1D1n6eo 176818.x040 S<>ape PoM CFCIe (Radius: 1120.000) Poi1t Circle 1~ 1~0.0~) Plan: CD2-01wp01 I {000 -2500 0 2500 5000 7500 10000 12500 15000 1750() West(-)/East(+) (2500 Win) Spatial Calculator ~...... CD2-Ol wp01 Heel CD1-30 Toe ~~ Displacement (ft) 2-D Closure Angle (deg from True North) 2-D Closure Distance (ft in horizontal plane) 3-D Distance (ft) Coords. -ASP Coords. -TRUE N(+)/S(-) Lat. (~ E(+)/W(-) Dep. (~) TVD (ft) N(+)/S(-) Lat. (~ E(+)/W(-) Dep. (~ 5982302.27 378638.91 7042.90 5981399.82 379095.51 7045.36 S -894.50 E 471.96 2.46 SE 152.18 1011.38. 1011.38 ' Closure Angle Initial Point ~'-. Closure Distance•~ ~~ti Final Point • • Heel to Toe Page 1 of 2 (CD2-01wp01 Heel & 12500' MD to Toe Spatial Calculator.xls) 7/19/2005 12:33 PM 15 CD2-03 T12N, R4E, U.M. coz-lo coz-zo CD2-t2 CD CD2 17A C02-14 f 24 Openhole Completion CD2-O1 ~9~~~ j cD2-oa 1$p0~' ~ 2,a 11';=' - -..~> 1~"~~ CD2-13 \Gj~ 1 L'~Q GDS- CD 1~ l C02-18 C -3 jpO~C' O C01-42 \~ ~ ~ ., CRU CD2-01 Proposed 1-Oil Alpine Oil Pool 2051180 Confidential wells shown as red SFD 8/3/2005 CD1-19 ~ Co 1-02 ~co1-3s GD 1-22A CD1-21 CD1-ol .,\ ~•,,` \ ~~,,~ ~,gl1F¢ CHh~UtJD 1 -3B ~ Feet 1 0 1 ,04D 2,~OG 3,090 x,000 1,` ~, -, ~ t V', ~~ i \-2~, • ,.,. ~.,r.,F__~.,,,~....~.~._-.,.,,..,.-,,.,,_.T... SHARON K. ALLSUP-DRAKE 1108 CONOCOPHILLIPS ATO1530 7 ~~~~ 700 G ST. DATE u. Z ~.'~iJ~~ ~ . ANCHORAGE AK 99501 s2-1 a/311 ~ .. s~ PAV TO THE ~ r,/_ /~~S ~ //~ ~/' ~ J~- OO ,,, ORDER OF (~' /-(" pt' (_- ,q F~:' '_ Chase Manhattan Bank USA, N.A. ~= ~ CHASE Valid Up To 5000 Dollars ~, 100 Wftirc Clay Center Dr., Na„vark. DC 19111 'S MEMO /~/~. ~<~ _ __~ --- _ j(_~! _ ___ _ ~ IVN x:03 ~ X00 L4~,~:2 i84 7 190 79 2 761I' l L08 • TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO SE INCLUDED IN TRANSMITTAL LETTER WELL NAME ~/~~~~ ~~ ~ ~'' PTD# ~~~~ ~~~. CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS MULTI The permit is for a new wellbore segment of LATERAL existing well , Permit No, API No. (If API number Production should continue to be reported as last two (2} digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(f), all (pT~ records, -data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 - 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce/infect is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev: 04/01/05 C1 j odyltra nsm itta!_ch ecklist WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, ALPINE OIL-120100 Well Name: COLVILLE RIV UNIT CD2-01 Program DEV Well bore seg ^ PTD#:2051180 Company CONOCOPHILLIPS ALASKA INC Initial ClasslType DEV I PEND GeoArea 890 Unit 50360 OnlOff Shore On Annular Disposal ^ Administration 1 Permit_fee attached - - - - Yes - - - - - - - 2 Lease number appropriate_ - - - - _ - - - - Yes - - - - - Surface location in ADL 38Q075;-passes thru ADL 0380096; top prod interval in ADL 025558~TD in ADL 025530.. 3 Uni_quewell_nameandnumber________________________________ ______Yes- -_.--_----.._ ------------------------------------------------------------- 4 Well located ina_tl_efined_pool_________________________________ _____ Yes_ _-_-Colville_RiverUnit, Alpine Oil Pool,goyerned_byCO443A.-______--_-_____--_--______--_--_- 5 Well located proper distance from drilling uaitboundary- .. - - . - - - - .. - - -Yes -More than 500 feet f[om the exterig[boundary_of the affected area. - _ _ - - _ - _ 6 Well located proper distance from other wells_ _ _ - - - - - Yes - . - - -More than 500 lineal feet from another Alpine Oil Pool development well _ _ - - _ _ _ _ _ _ - _ - 7 Suffcientacreageayail_ablein_drillingunit_-____-_---________- _--_-.Yes_ __---___-__-_. -- -- - - 8 If_deviated,is_wehboreplat-included______---___________________ ______Yes- --_____-_-_. -------------------------------------------------------------- 9 Operator only affected party - - - Yes - - - - 10 Operatofhasappropriate_bondinforce--------------------------- ------Yes- ----------------.--------.-----------.-.----_.-_-. ----------------------- 11 Permit_canbeissuedwithoutco_nservationorder______________________ ______Yes_ ______-_____-___--_--________----___.___--_---____-_ -_____--_--____-.- Appr Date 12 Permit_can be issued without administrative_approva_I _ _ - - - - - - Yes _ SFD 8/212005 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized bylnjectionOrde[#(put1O#in-comme nts)_(for_NA__ _____ _________________ _.-__-.--.--. -_---.___--__.-.--____-._---__.- 15 Allwells_withinll4_mileareaofreviewidentified(Forservicewellgnly)_--_-___ __--_.NA_. _____-__________________________-_,--_ 16 Pre-produced injector: duration of preproduction I_essthan-3 months_(For service wel l only) _ _ NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 17 ACMPFindingofConsistency-hasbeenissued_forthispr_oject______________ ______NA-. -_____ _._______-...-___ _-..-_--_ ----------------------------------- Engineering 18 Conductor string_provided _ - . _ _ _ - _ _ _ Yes _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 19 SurfacecasingprotectsallknownUSDWs_________________________ ______NA__ ____NQaquifers,_perA1O.18A conclusion 3._-_______._---______ 20 _C_MT_vol_adequate_tocircul_ate_o_nconductor&su_rf_csg____---_________ ______Yes_ _.-..-________-.-_ 21 CMT-vol_ adequate_to tie-in long string to surf csg_ _ - - - - No_ Annular disposal may be planned._ All_ hydrocarbons will be covered._ _ - 22 CMT_will cover all know_n_productiye horizons_ - - _ N_o_ _ . . - - Open_hol_e completion planned, - - - - 23 Casing designs adequate for C, T,B&-permafrost_____________________ ____ _Yes_ ---________----_______----________.-________-.-. ___---._______._-____ 24 Adequate tankage_or reserve pit _ _ _ - _ _ - _ - Yes Rig is-equipped with steel_pits. _ No reserve-pitplanned. All waste to approved annulus or disposal wel_L _ - - - - - 25 If a_re-drill, has-s 1.0-403 fo_r abandonment been approved - - - NA- _ _ - - 26 Adequate wellbore separation-proposed_ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes . _ - - - - -Proximity analysis perfo[med, Traveling cylinerpath calculated. Gyrosprobable.- _ . _ - - _ _ - _ _ _ . - _ - _ _ _ _ 27 If_diverter required, does it meet regulations_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ _ - . _ _ _ Diverter waiver has_been given-for CD-2 pad. - _ _ . _ _ - _ _ _ _ _ _ _ _ - - - _ _ _ _ ------------------- Appr Date 28 Dtil_ling fluid_ program schematic & equip list adequate- Yes - - .. - -Maximum expected formation pressure 8,7_EMW._ MW planned 8.1 _- 8,8 ppg, - - - - TEM 814! 05 29 BOPEs,dotheymeet_regulation----------------------------- Yes- --------------------.------------------------------------------- 30 BOPE.press rating appropriate; test to_(put prig in comments)_ - - - - - - - - . -Yes - MA$P calculated at 2483psi, 3500_psi-appropriate. CPAI usually tests to 5000_p_si. _ _ _ - - - oe-manroldcompiesw-_RP-5_ ay_4-______---_______ --_--__es_ __----___ - - 32 Work will occur without operation shutdown------------------------- ------Yes_ -_----______-_.--.-_--__.....-___---...--__--__-.-- spresence_o___gas_probable------------------------ ----- N_o_ H2S has n9t_been reported at Alpine. -Rig is equipped with sensors and-alarms._ _ _ _ _ _ - 34 Mechanical-condition of wells within AOR verified (For service well onlya - - _ - _ - - NA- - _ - - - _ - -- -- -- - Geology 35 Permit_can be issued w/o hydrogen_sulfidemeosures - - . - - - .. - Yes . - - - - - -Expected reservoirpressure is 8,7_ppg EMW based on offset well data and_modeling, Will be - 36 Data-presentedon_potentialove_rpressurezones______________________ ____ _Yes- ----_drilletl_with_8.1--_8.8ppgmud,---___-__-_____-__-_______-_---____--__-___ Appr Date 37 Seismic analysis of shallow gas zones_ - - - - - - - - - NA_ _ - - No shallow gas or pressure encountered to date in surface holes drilled from CD2-pad.. - - SFD 812/2005 38 Seabed condition survey_(if cff-shore) _ _ - - _ - , NA -- 39 - Contact namelphone for_weekly progress-reports [exploratory only]- _ - - _ _ NA- - - Geologic Commissioner: Engineering Publ' Date: Co mmissioner: Date Com iss' r Date m C~7.~~2GL~ ~`S ~'~ ~ ~J Q v • • Well History File APPENDIX • Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to sim.pfify rending information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. e Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue Feb 21 11:18:33 2006 Reel Header Service name .............LISTPE Date .....................06/02/21 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library Tape Header • Scientific Technical Services n G V Service name .............LISTPE ~ ~ v Date .....................06/02/21 „ff Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Colville River Unit (Alpine) MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA MWD RUN 2 JOB NUMBER: MW0003898251 LOGGING ENGINEER: R. KRELL OPERATOR WITNESS: D. MICKEY MWD RUN 5 JOB NUMBER: MW0003898251 LOGGING ENGINEER: M. HANIK OPERATOR WITNESS: L. HILL SURFACE LOCATION SECTION: TOWNSHIP; RANGE; FNL; FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: #~ WELL CASING RECORD OPEN HOLE CD2-O1 501032051400 ConocoPhillips Alaska, Inc. Sperry Drilling Services 21-FEB-06 MWD RUN 3 MWD RUN 4 MW0003898251 MW0003898251 M. HANIK M. HANIK L. HILL L. HILL 2 11N 4E 1577 1562 52.55 15.90 CASING DRILLERS ~~) -~rd r BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 8.500 9.625 3256.0 2ND STRING 6.125 7.000 12953.0 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. CD2-O1 EXITS THE CD2-O1 PB2 WELLBORE AT 14700'MD/7045'TVD BY MEANS OF AN OPEN-HOLE SIDETRACK. 4. MWD RUN 1 WAS DIRECTIONAL ONLY AND IS NOT PRESENTED. 5. MWD RUNS 2 AND 3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), PRESSURE WHILE DRILLING (PWD), AND GEO-PILOT ROTARY STEERABLE BHA (GP). MWD RUNS 4 AND 5 COMPRISED DIRECTIONAL, DGR, EWR4, PWD, AND AT-BIT INCLINATION (ABI). 6. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE LOGGING REQUIREMENTS AT PHILLIPS/VENDOR MEETING HELD ON 26 SEPTEMBER 2001. 7. MWD RUNS 1-5 REPRESENT WELL CD2-O1 WITH API#: 50-103-20514-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 17513'MD/7046'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. File Header Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 • FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 3229.5 17448.0 RPD 3235.0 17455.5 RPS 3235.0 17455.5 RPM 3235.0 17455.5 FET 3235.0 17455.5 RPX 3235.0 17455.5 ROP 3267.5 17513.0 • BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD BIT RUN NO MERGE TOP 2 3229.5 3 10459.5 4 12998.0 5 14700.5 REMARKS: MERGED MAIN PASS. MERGE BASE 10459.0 12998.0 14700.0 17513.0 Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD OHMM 4 1 68 4 2 RPM MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 FET MWD HOUR 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FT/H 4 1 68 28 8 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 3229.5 17513 10371.3 28568 3229.5 17513 RPD MWD OHMM 0.1 2000 13.1342 28442 3235 17455.5 RPM MWD OHMM 0.22 1743.45 10.8754 28442 3235 17455.5 RPS MWD OHMM 0.21 2000 10.1968 28442 3235 17455.5 RPX MWD OHMM 0.4 2000 7.96877 28442 3235 17455.5 FET MWD HOUR 0.11 110.31 1.19423 28442 3235 17455.5 GR MWD API 46.9 433.9 100.376 28438 3229.5 17448 ROP MWD FT/H 0.1 565.04 174.102 28492 3267.5 17513 First Reading For Entire File..........3229.5 Last Reading For Entire File...........17513 ~ • File Trailer Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 3229.5 10459.0 RPD 3235.0 10459.0 RPM 3235.0 10459.0 RPX 3235.0 10459.0 RPS 3235.0 10459.0 FET 3235.0 10459.0 ROP 3267.5 10459.0 LOG HEADER DATA DATE LOGGED: 31-AUG-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 10459.0 TOP LOG INTERVAL (FT): 3267.0 BOTTOM LOG INTERVAL (FT) 10459.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 57.4 MAXIMUM ANGLE: 93.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134758 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 8.500 DRILLER'S CASING DEPTH (FT) 3256.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel • MUD DENSITY (LB/G) 9.60 MUD VISCOSITY (S) 38.0 MUD PH: 9.2 MUD CHLORIDES (PPM): 200 FLUID LOSS (C3) 7.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 1.550 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .750 152.6 MUD FILTRATE AT MT: 1.300 70.0 MUD CAKE AT MT: 1.650 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ............. .....0 Data Specification Block Type .....0 Logging Direction ............ .....Down Optical log depth units...... .....Feet Data Reference Point ......... .....Undefined Frame Spacing ................ .....60 .lIN Max frames per record ........ .....Undefined Absent value ................. .....-999 Depth Units .................. ..... Datum Specification Block sub -type...0 Name Service Order Units Size N sam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD020 OHMM 4 1 68 4 2 RPM MWD020 OHMM 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPX MWD020 OHMM 4 1 68 16 5 FET MWD020 HOUR 4 1 68 20 6 GR MWD020 API 4 1 68 24 7 ROP MWD020 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3229.5 10459 6844.25 14460 3229.5 10459 RPD MWD020 OHMM 0.1 2000 9.76704 14449 3235 10459 RPM MWD020 OHMM 0.22 1743.45 6.00835 14449 3235 10459 RPS MWD020 OHMM 0.21 2000 6.17016 14449 3235 10459 RPX MWD020 OHMM 0.4 2000 5.91985 14449 3235 10459 FET MWD020 HOUR 0.11 66.93 0.629969 14449 3235 10459 GR MWD020 API 46.9 198.75 107.233 14460 3229.5 10459 ROP MWD020 FT/H 2.52 501.8 239.391 14384 3267.5 10459 First Reading For Entire File..........3229.5 Last Reading For Entire File...........10459 File Trailer Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 • File Type ................LO • Next File Name...........STSLIB.003 Physical EOF File Header Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPX 10459.5 12952.5 FET 10459.5 12952.5 ROP 10459.5 12998.0 GR 10459.5 12960.0 RPM 10459.5 12952.5 RPD 10459.5 12952.5 RPS 10459.5 12952.5 LOG HEADER DATA DATE LOGGED: 04-SEP-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 12998.0 TOP LOG INTERVAL (FT) 10459.0 BOTTOM LOG INTERVAL (FT) 12998.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 56.9 MAXIMUM ANGLE: 88.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134758 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT) 3256.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) 10.10 MUD VISCOSITY (S): 40.0 MUD PH: 10.0 MUD CHLORIDES (PPM): 400 FLUID LOSS (C3) 9.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 1.200 68.0 • MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 .560 1.100 2.500 Name Service Order Units Size Nsam Rep Code Offset Channel 1 ~6 68.0 68.0 DEPT FT 4 1 68 0 1 RPD MWD030 OHMM 4 1 68 4 2 RPM MWD030 OHMM 4 1 68 8 3 RPS MWD030 OHMM 4 1 68 12 4 RPX MWD030 OHMM 4 1 68 16 5 FET MWD030 HOUR 4 1 68 20 6 GR MWD030 API 4 1 68 24 7 ROP MWD030 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10459.5 12998 11728.8 5078 10459.5 12998 RPD MWD030 OHMM 1.57 28.23 6.66978 4987 10459.5 12952.5 RPM MWD030 OHMM 1.52 26.59 6.43701 4987 10459.5 12952.5 RPS MWD030 OHMM 1.56 26.12 5.95235 4987 10459.5 12952.5 RPX MWD030 OHMM 1.53 23.85 5.76761 4987 10459.5 12952.5 FET MWD030 HOUR 0.27 110.31 0.67469 4987 10459.5 12952.5 GR MWD030 API 49.14 433.9 135.646 5002 10459.5 12960 ROP MWD030 FT/H 2.51 241.83 110.001 5078 10459.5 12998 First Reading For Entire File..........10459.5 Last Reading For Entire File...........12998 File Trailer Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.004 Physical EOF File Header Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPS 12953.0 14700.0 FET 12953.0 14700.0 RPM 12953.0 14700.0 RPX 12953.0 14700.0 RPD 12953.0 14700.0 GR 12960.5 14700.0 ROP 12998.5 14700.0 LOG HEADER DATA DATE LOGGED: 10-SEP-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 14700.0 TOP LOG INTERVAL (FT) 12998.0 BOTTOM LOG INTERVAL (FT) 14700.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 88.7 MAXIMUM ANGLE: 92.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 160788 EWR4 Electromag Resis. 4 156404 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 6.125 DRILLER'S CASING DEPTH (FT) 12953.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 9.80 MUD VISCOSITY (S) 43.0 MUD PH: 8.8 MUD CHLORIDES (PPM) 90000 FLUID LOSS (C3): 2.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .080 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .040 143.6 MUD FILTRATE AT MT: .070 70.0 MUD CAKE AT MT: .120 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: • Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD040 OHMM 4 1 68 4 2 RPM MWD040 OHMM 4 1 68 8 3 RPS MWD040 OHMM 4 1 68 12 4 RPX MWD040 OHMM 4 1 68 16 5 FET MWD040 HOUR 4 1 68 20 6 GR MWD040 API 4 1 68 24 7 ROP MWD040 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 12953 14700 13826.5 3495 12953 14700 RPD MWD040 OHMM 5.19 61.59 20.7695 3495 12953 14700 RPM MWD040 OHMM 4.45 57.62 19.0315 3495 12953 14700 RPS MWD040 OHMM 3.74 65.4 17.5807 3495 12953 14700 RPX MWD040 OHMM 2.41 48.32 11.9088 3495 12953 14700 FET MWD040 HOUR 0.48 103.63 4.07187 3495 12953 14700 GR MWD040 API 52.09 92.25 69.7621 3480 12960.5 14700 ROP MWD040 FT/H 0.27 272.34 111.439 3404 12998.5 14700 First Reading For Entire File..........12953 Last Reading For Entire File...........14700 File Trailer Service name .............STSLIB.004 Service Sub Level Name... Version Number....,......1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.005 Physical EOF File Header Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPM 14700.5 17455.5 ROP 14700.5 17513.0 RPX 14700.5 17455.5 RPS 14700.5 17455.5 RPD 14700.5 17455.5 GR 14700.5 17448.0 FET 14700.5 17455.5 LOG HEADER DATA DATE LOGGED: 13-SEP-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 17513.0 TOP LOG INTERVAL (FT) 14700.0 BOTTOM LOG INTERVAL (FT) 17513.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 87.7 MAXIMUM ANGLE: 93.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 160788 EWR4 Electromag Resis. 4 156404 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 6.125 DRILLER'S CASING DEPTH (FT) 12953.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) 9.80 MUD VISCOSITY (S) 45.0 MUD PH: 9.5 MUD CHLORIDES (PPM): 74000 FLUID LOSS (C3) 3.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) .090 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .040 163.4 MUD FILTRATE AT MT: .070 70.0 MUD CAKE AT MT: .120 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: S • Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel • DEPT FT 4 1 68 0 1 RPD MWD050 OHMM 4 1 68 4 2 RPM MWDO50 OHMM 4 1 68 8 3 RPS MWD050 OHMM 4 1 68 12 4 RPX MWD050 OHMM 4 1 68 16 5 FET MWD050 HOUR 4 1 68 20 6 GR MWD050 API 4 1 68 24 7 ROP MWD050 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 14700.5 17513 16106.8 5626 14700.5 17513 RPD MWD050 OHMM 7.25 43.64 22.9702 5511 14700.5 17455.5 RPM MWD050 OHMM 5.11 50.06 22.4798 5511 14700.5 17455.5 RPS MWD050 OHMM 3.3 63.36 19.9122 5511 14700.5 17455.5 RPX MWD050 OHMM 2.15 53.89 12.8339 5511 14700.5 17455.5 FET MWD050 HOUR 0.47 21.46 1.31882 5511 14700.5 17455.5 GR MWD050 API 50.41 104.7 69.619 5496 14700.5 17448 ROP MWD050 FT/H 0.1 565.04 102.947 5626 14700.5 17513 First Reading For Entire File..........14700.5 Last Reading For Entire File...........17513 File Trailer Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name......,....STSLIB.006 Physical EOF Tape Trailer Service name .............LISTPE Date .....................06/02/21 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library Reel Trailer Scientific Technical Services Service name .............LISTPE Date .....................06/02/21 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library Physical EOF Physical EOF Scientific Technical Services End Of LIS File • Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue Feb 21 07:50:45 2006 Reel Header Service name .............LISTPE Date .....................06/02/21 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library Tape Header Service name .............LISTPE Date .....................06/02/21 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library Physical EOF Comment Record TAPE HEADER Colville River Unit (Alpine) MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA MWD RUN 2 JOB NUMBER: MW0003898251 LOGGING ENGINEER: R. KRELL OPERATOR WITNESS: D. MICKEY SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING • Scientific Technical Services Scientific Technical Services 13~°` CD2-O1 PB1 501032051470 ConocoPhillips Alaska, Inc. Sperry Drilling Services 21-FEB-06 2 11N 4E 1577 1562 52.55 15.90 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 3256.0 ~.~ ~®l I ~ • . REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 WAS DIRECTIONAL ONLY AND IS NOT PRESENTED. 4. MWD RUN 2 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), PRESSURE WHILE DRILLING (PWD), AND GEO-PILOT ROTARY STEERABLE BHA (GP). 5. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE LOGGING REQUIREMENTS AT PHILLIPS/VENDOR MEETING HELD ON 26 SEPTEMBER 2001. 6. MWD RUNS 1 AND 2 REPRESENT WELL CD2-Ol PB1 WITH API#: 50-103-20514-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 14483'MD/7035'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. File Header Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 3229.5 14445.0 RPD 3235.0 14437.0 RPM 3235.0 14437.0 RPS 3235.0 14437.0 RPX 3235.0 14437.0 FET 3235.0 14437.0 ROP 3267.5 14483.0 BASELINE CURVE FOR SHIFTS: . • CURVE SHIFT DATA (MEASURED DEPTH) • --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 2 3229.5 14483.0 REMARKS: MERGED MAIN PASS. Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .1IN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD OHMM 4 1 68 4 2 RPM MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 FET MWD HOUR 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FT/H 4 1 68 28 8 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 3229.5 14483 8856.25 22508 3229.5 14483 RPD MWD OHMM 0.1 2000 8.55206 22405 3235 14437 RPM . MWD OHMM 0.22 17 43.45 6.06059 22405 3235 14437 RPS MWD OHMM 0.21 2000 5.96334 22405 3235 14437 RPX MWD OHMM 0.4 2000 5.73897 22405 3235 14437 FET MWD HOUR 0.11 66.93 0.593571 22405 3235 14437 GR MWD API 46.9 3 52.57 111.698 22432 3229.5 14445 ROP MWD FT/H 2.52 501.8 209.403 22432 3267.5 14483 First Reading For Entire File..........3229.5 Last Reading For Entire File...........14483 File Trailer Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 3229.5 14445.0 RPD 3235.0 14437.0 RPM 3235.0 14437.0 RPS 3235.0 14437.0 RPX 3235.0 14437.0 FET 3235.0 14437.0 ROP 3267.5 14483.0 LOG HEADER DATA DATE LOGGED: 31-AUG-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 14483.0 TOP LOG INTERVAL (FT) 3267.0 BOTTOM LOG INTERVAL (FT) 14483.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 57.4 MAXIMUM ANGLE: 93.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134758 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 3256.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): Fresh Water Gel 9.60 38.0 9.2 200 7.2 1.550 70.0 .750 152.6 1.300 70.0 1.650 70.0 i ~ TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .1IN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD020 OHMM 4 1 68 4 2 RPM MWD020 OHMM 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPX MWD020 OHMM 4 1 68 16 5 FET MWD020 HOUR 4 1 68 20 6 GR MWD020 API 4 1 68 24 7 ROP MWD020 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3229.5 14483 8856.25 22508 3229.5 14483 RPD MWD020 OHMM 0.1 2000 8.55206 22405 3235 14437 RPM MWD020 OHMM 0.22 17 43.45 6.06059 22405 3235 14437 RPS MWD020 OHMM 0.21 2000 5.96334 22405 3235 14437 RPX MWD020 OHMM 0.4 2000 5.73897 22405 3235 14437 FET MWD020 HOUR 0.11 66.93 0.593571 22405 3235 14437 GR MWD020 API 46.9 3 52.57 111.698 22432 3229.5 14445 ROP MWD020 FT/H 2.52 501.8 209.403 22432 3267.5 14483 First Reading For Entire File..........3229.5 Last Reading For Entire File...........14483 File Trailer Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF Tape Trailer Service name .............LISTPE Date .....................06/02/21 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name .............LISTPE Date .....................06/02/21 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Physical EOF Physical EOF Writing Library. Scientific Technical Services End Of LIS File • Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue Feb 21 10:12:53 2006 Reel Header Service name .............LISTPE Date .....................06/02/21 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library. Tape Header Service name .............LISTPE Date .....................06/02/21 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library. Physical EOF Comment Record TAPE HEADER Colville River Unit (Alpine) MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA MWD RUN 2 JOB NUMBER: MW0003898251 LOGGING ENGINEER: R. KRELL OPERATOR WITNESS: D. MICKEY SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD OPEN HOLE BIT SIZE (IN) 1ST STRING 8.500 2ND STRING 6.125 3RD STRING 12953.000 PRODUCTION STRING • Scientific Technical Services Scientific Technical Services I~$ J~ CD2-O1 PB2 501032051471 ConocoPhillips Alaska, Inc. Sperry Drilling Services 21-FEB-06 MWD RUN 3 MWD RUN 4 MW0003898251 MW0003898251 M. HANIK M. HANIK L. HILL L. HILL 2 11N 4E 1577 1562 52.55 15.90 CASING DRILLERS SIZE (IN) DEPTH (FT) 9.625 3256.0 7.000 3256.0 -dj -,t~ REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. CD2-O1 PB2 EXITS THE CD2-O1 PB1 WELLBORE AT 10459'MD/5997'TVD BY MEANS OF AN OPEN-HOLE SIDETRACK (OFF OF A CEMENT PLUG). 4. MWD RUN 1 WAS DIRECTIONAL ONLY AND IS NOT PRESENTED. 5. MWD RUNS 2 AND 3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), PRESSURE WHILE DRILLING (PWD), AND GEO-PILOT ROTARY STEERABLE BHA (GP). MWD RUN 4 COMPRISED DIRECTIONAL, DGR, EWR4, PWD, AND AT-BIT INCLINA- TION (ABI) . 6. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE LOGGING REQUIREMENTS AT PHILLIPS/VENDOR MEETING HELD ON 26 SEPTEMBER 2001, 7. MWD RUNS 1-4 REPRESENT WELL CD2-O1 P82 WITH API#: 50-103-20514-71. THIS WELL REACHED A TOTAL DEPTH (TD) OF 14825'MD/7041'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. File Header Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 3229.5 14760.5 FET 3235.0 14767.5 • RPD 3235.0 14767.5 RPS 3235.0 14767.5 RPM 3235.0 14767.5 RPX 3235.0 14767.5 ROP 3267.5 14825.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 2 3229.5 10459.0 MWD 3 10459.5 12998.0 MWD 4 12998.0 14825.0 REMARKS: MERGED MAIN PASS. Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .1IN Max frames per record .............Undefined Absent value .................:....-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD OHMM 4 1 68 4 2 RPM MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 FET MWD HOUR 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3229.5 14825 9027.25 23192 3229.5 14825 RPD MWD OHMM 0.1 2000 10.7966 23066 3235 14767.5 RPM MWD OHMM 0.22 17 43.45 8.10246 23066 3235 14767.5 RPS MWD OHMM 0.21 2000 7.85592 23066 3235 14767.5 RPX MWD OHMM 0.4 2000 6.78713 23066 3235 14767.5 FET MWD HOUR 0.11 1 10.31 1.19114 23066 3235 14767.5 GR MWD API 46.9 433.9 107.664 23063 3229.5 14760.5 ROP MWD FT/H 0.27 501.8 189.948 23116 3267.5 14825 First Reading For Entire File..........3229.5 Last Reading For Entire File...........14825 File Trailer Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 • • Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 3229.5 10459.0 FET 3235.0 10459.0 RPX 3235.0 10459.0 RPS 3235.0 10459.0 RPM 3235.0 10459.0 RPD 3235.0 10459.0 ROP 3267.5 10459.0 LOG HEADER DATA DATE LOGGED: 31-AUG-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 10459.0 TOP LOG INTERVAL (FT) 3267.0 BOTTOM LOG INTERVAL (FT) 10459.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 57.4 MAXIMUM ANGLE: 93.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134758 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT): 3256.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G): 9.60 MUD VISCOSITY (S) 38.0 MUD PH: 9.2 MUD CHLORIDES (PPM): 200 FLUID LOSS (C3): 7.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 1.550 7~ MUD AT MAX CIRCULATING TERMPERATURE: .750 152.6 MUD FILTRATE AT MT: 1.300 70.0 MUD CAKE AT MT: 1.650 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD020 OHMM 4 1 68 4 2 RPM MWD020 OHMM 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPX MWD020 OHMM 4 1 68 16 5 FET MWD020 HOUR 4 1 68 20 6 GR MWD020 API 4 1 68 24 7 ROP MWD020 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3229.5 10459 6844.25 14460 3229.5 10459 RPD MWD020 OHMM 0.1 2000 9.76704 14449 3235 10459 RPM MWD020 OHMM 0.22 17 43.45 6.00835 14449 3235 10459 RPS MWD020 OHMM 0.21 2000 6.17016 14449 3235 10459 RPX MWD020 OHMM 0.4 2000 5.91985 14449 3235 10459 FET MWD020 HOUR 0.11 66.93 0.629969 14449 3235 10459 GR MWD020 API 46.9 1 98.75 107.233 14460 3229.5 10459 ROP MWD020 FT/H 2.52 501.8 239.391 14384 3267.5 10459 First Reading For Entire File..........3229.5 Last Reading For Entire File...........10459 File Trailer Service name .............STSLIB.002 Service Sub Level Name..o Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF • File Header Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 10459.5 12952.5 RPS 10459.5 12952.5 GR 10459.5 12960.0 RPX 10459.5 12952.5 RPM 10459.5 12952.5 RPD 10459.5 12952.5 ROP 10459.5 12998.0 LOG HEADER DATA DATE LOGGED: 04-SEP-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 12998.0 TOP LOG INTERVAL (FT) 10459.0 BOTTOM LOG INTERVAL (FT) 12998.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 56.9 MAXIMUM ANGLE: 88.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134758 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 3256.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: Fresh Water Gel 10.10 40.0 I0.0 400 9.8 1.200 68.0 .560 152.6 1.100 68.0 2.500 68.0 NEUTRON TOOL MATRIX: . MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel • DEPT FT 4 1 68 0 1 RPD MWD030 OHMM 4 1 68 4 2 RPM MWD030 OHMM 4 1 68 8 3 RPS MWD030 OHMM 4 1 68 12 4 RPX MWD030 OHMM 4 1 68 16 5 FET MWD030 HOUR 4 1 68 20 6 GR MWD030 API 4 1 68 24 7 ROP MWD030 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10459.5 12998 11728.8 5078 10459.5 12998 RPD MWD030 OHMM 1.57 28.23 6.66978 4987 10459.5 12952.5 RPM MWD030 OHMM 1.52 26.59 6.43701 4987 10459.5 12952.5 RPS MWD030 OHMM 1.56 26.12 5.95235 4987 10459.5 12952.5 RPX MWD030 OHMM 1.53 23.85 5.76761 4987 10459.5 12952.5 FET MWD030 HOUR 0.27 110.31 0.67469 4987 10459.5 12952.5 GR MWD030 API 49.14 433.9 135.646 5002 10459.5 12960 ROP MWD030 FT/H 2.51 241.83 110.001 5078 10459.5 12998 First Reading For Entire File..........10459.5 Last Reading For Entire File...........12998 File Trailer Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.004 Physical EOF File Header Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 • File Type ................LO Previous File Name.......STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPM 12953.0 14767.5 RPX 12953.0 14767.5 RPD 12953.0 14767.5 FET 12953.0 14767.5 RPS 12953.0 14767.5 GR 12960.5 14760.5 ROP 12998.5 14825.0 LOG HEADER DATA DATE LOGGED: 10-SEP-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 14825.0 TOP LOG INTERVAL (FT) 12998.0 BOTTOM LOG INTERVAL (FT) 14825.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 88.7 MAXIMUM ANGLE: 92.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 160788 EWR4 Electromag Resis. 4 156404 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 6.125 DRILLER'S CASING DEPTH (FT) 12953.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) 9.80 MUD VISCOSITY (S) 43.0 MUD PH: 8.8 MUD CHLORIDES (PPM): 90000 FLUID LOSS (C3) 2.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) .080 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .040 143.6 MUD FILTRATE AT MT: .070 70.0 MUD CAKE AT MT: .120 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: • • Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD040 OHMM 4 1 68 4 2 RPM MWD040 OHMM 4 1 68 8 3 RPS MWD040 OHMM 4 1 68 12 4 RPX MWD040 OHMM 4 1 68 16 5 FET MWD040 HOUR 4 1 68 20 6 GR MWD040 API 4 1 68 24 7 ROP MWD040 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 12953 14825 13889 3745 12953 14825 RPD MWD040 OHMM 5.19 61.59 20.5642 3630 12953 14767.5 RPM MWD040 OHMM 4.14 57.62 18.726 3630 12953 14767.5 RPS MWD040 OHMM 2.83 65.4 17.1812 3630 12953 14767.5 RPX MWD040 OHMM 1.98 48.32 11.6399 3630 12953 14767.5 FET MWD040 HOUR 0.48 103.63 4.13439 3630 12953 14767.5 GR MWD040 API 52.09 124.38 70.527 3601 12960.5 14760.5 ROP MWD040 FT/H 0.27 272.34 106.419 3654 12998.5 14825 First Reading For Entire File..........12953 Last Reading For Entire File...........14825 File Trailer Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.005 Physical EOF Tape Trailer Service name .............LISTPE Date..... ...............06/02/21 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library Scientific Technical Services Reel Trailer Service name .............LISTPE Date .....................06/02/21 Origin ...................STS • Reel Name ................UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library Physical EOF Physical EOF Scientific Technical Services End Of LIS File REV DATE BY CK APP DESCRIPTION REV DATE BY CK APP DESCRIPTION 2 11/7/05 AG DB C.A. PER K05146ACS 3 11/08/06 CZ GD PER K06058ACS 34 J Z 35 36 P r, 32 3 DR L SIV - 6 G) T12 T11 N Y J W_ 2 O ELI 6 5 0 V Lj VICINITY MAP (NTS) PLANT N O CD2 -01 CD2 -02 ASPC 0 CO2-03*CD2-04 N O CD2-05,CD2-06 r� CD2 -0700O2-08 6°03'35" D2-09 .CD2 -10 • CD2 -11 . CO2 -12 CD2 -13 0CD2-14 CD2 -15 *.CD2 -16 CD2 -17 00O2-18 CD2 -19 0CD2-20 CD2 -21 0 CD2 -22 LCM F CD2 -230 cD2-2a CD2 -250 C12-26 a CD -2 02-27: CD2 -28 PAD CD2 -29 . CD2 -30 CD2 -31 .CD2 -32 CD2 -33 00O2-34 D2-310 CD2 -36 CD2-37:CD2-38 LEGEND: DD2-39• 10' O PROPOSED CONDUCTOR CD2 -41 O.CD2-42 1 CD2 -430 • CD2 -44 • EXISTING CONDUCTOR CD2-45:CO2-46 CD2 -47: CD2 -48 NOTE: coz-a1 CD2 -50 02-51 • NO CHANGE TO CONDUCOTR LAYOUT CD2 -530 SINCE 4/9/2004. S CD2 -54 1)2-550 CD2 -56 CD2 -57 . CD2 -58 CD2 -59 0 CD2 -60 T E]KUUKPIK IMMFul. 139 E.51d Aw. - Andmm%Ala" 99503 - (907)2731590 Alpine Office (90]) 6]04739 Alpine Survey Office �.� ALPINE MODULE:CD20 UNIT: CD Cin®c®Phiips ALPINE PROJECT CD -2 WELL CONDUCTORS Alaska, Inc. AS—BUILT LOCATIONS CADD FILE N0. DRAWING N0: PART: REV: 01-02-05-1 05-27-1 CD—CD20-121 1 OF 3 3 REV I DATE I BY CK APP DESCRIPTION IREVI DATE IBYI CKIAPPI DESCRIPTION 0 5/29/01 G. D. J. Z. C. A. PER A01004ACS 6 4/13/06 CZ BD I C.A. PER K06058ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC.2, T 11 N, R 4 E, U. M. SEC.LINE 0/S PLAN WELL Y' X' LAT.(N) LONG.(W) FNL FEL GND PAD i* i* I* CD2 -1 5, 974,781 .09 371 681.81 70° 20' 21.594" 151 ° 02' 28.574" 1577' 1562' 8.7 15.9 CD2 -2 5,974,770.84 371 682.85 70° 20' 21.493" 151' 02' 28.539" 1587' 1561' 8.7 15.9 CD2 -3 5,974,761.44 371 683.77 70° 20' 21.401" 151° 02 28.507 1597' 1560' 8.7 15.9 CD2 -4 5,974,751.48 371,684.73 70° 20' 21.303" 151° 02 28.474 1606 1559 8.7 15.9 CD2 -5 5,974,741.17 371 685.60 70° 20' 21.202" 151 ° 02' 28.443" 1617' 1558' 8.7 15.9 CD2 -6 5,974,731.13 371 686.73 70° 20' 21.103" 151 ° 02' 28.406' 1627' 1556' 8.7 15.9 CD2 -7 5,974.721.46 371 688.17 70° 20' 21.008" 151' 02' 28.359" 1636' 1555' 1 8.7 15.9 CD2 -8 5, 974 711.45 371 688.72 70° 20' 20.910" 151' 02' 28.337" 1646' 1554' 8.7 15.9 CD2 -9 5,974,701.48 371 690.14 70° 20' 20.812" 151 ° 02 28.291 1656' 1552' 8.7 15.9 CD2 -10 5,974,691.64 371 691.07 70° 20' 20.716" 151 ° 02' 28.259" 1666' 1551' 8.7 15.9 CD2 -11 5,974,681.62 371 692.02 70° 20' 20.617" 151 ° 02' 28.226" 1676' 1550' 8.7 15.9 CD2 -12 5,974,671.61 371 692.98 70° 20' 20.519" 151 ° 02' 28.193" 1686' 1549' 8.7 15.9 CD2 -13 5,974,661.90 371,694.26 70° 20' 20.424" 151° 02' 28.151" 1696' 1548' 8.7 15.9 CD2 -14 5,974,652.12 371,695.50 70° 20' 20.328" 151° 02' 28.110" 1706' 1546' 8.7 15.9 CD2 -15 5,974,641.66 371,696.24 70° 20' 20.225" 151° 02' 28.083" 1716' 1545' 8.7 15.9 CD2 -16 5,974,631.95 371,697.39 70° 20' 20.130" 151° 02' 28.044" 1726' 1544' 8.7 15.9 CD2 -17 5,974,622.10 371,698.48 70° 20' 20.033" 151° 02' 28.008" 1736' 1543' 8.7 15.9 CD2 -18 5,974,612.15 371 699.38 70° 20' 19.935" 151 ° 02' 27.976" 1746' 1542' 8.7 15.9 CD2 -19 5,974,602.64 371 700.50 70° 20' 19.842" 151 ° 02' 27.939" 1755' 1541' 8.7 15.9 CD2 -20 5,974,592.18 371 701.77 70° 20' 19.739" 151 02' 27.897" 1765' 1539' 8.7 15.9 CD2 -21 5,974,582.28 371 702.51 70° 20' 19.642" 151' 02' 27.870" 1775' 1 1538' 8.7 1 15.9 CD2 -22 5,974572.39 371,704.15 70° 20' 19.545" 151° 02 27.817 1785 1536' 8.7 1 15.9 CD2 -23 5,974,562.21 371,704.52 70° 20' 19.445" 151° 02 27.801 1795 1536' 8.7 15.9 CD2 -24 5,974,552.30 371 705.92 70° 20' 19.348" 151 ° 02 27.756 1805' 1534' 8.7 15.9 CD2 -25 5,974,542.33 371 706.81 70° 20' 19.250" 151 ° 02 27.725 1815' 1533 8.7 15.9 CD2 -26 5,974,532.34 371 707.80 70° 20' 19.152" 151° 02 27.691 1825' 1532' 8.7 15.9 CD2 -27 5,974,522.31 371,709.10 70° 20' 19.053" 151° 02 27.648 1835 1531 8.7 15.9 CD2 -28 5,974,512.60 371 709.87 70' 20' 18.958" 151 ° 02 27.620 1844' 1530' 8.8 15.9 CD2 -29 5, 974 502.63 371 711.26 70° 20' 18.860" 151' 02' 27.575" 1855' 1528' 8.8 15.9 CD2 -30 5,974,492.75 371 712.00 70' 20' 18.763" 151' 02' 27.548" 1865' 1527' 8.8 15.9 CD2 -31 5,974,482.74 371,713.04 70° 20' 18.665" 151° 02 27.513 1875 1526' 8.8 15.9 CD2 -32 5,974,472.57 371 714.18 70° 20' 18.565" 151 ° 02 27.474 1885' 1525 8.8 15.9 CD2 -33 5,974,463.34 371,715.28 70° 20' 18.475" 151' 02 27.438 1894 1523 8.8 15.9 CD2 -34 5,974,452.65 371 716.13 70° 20' 18.370" 151 ° 02' 27.407" 1905' 1522' 8.8 15.9 CD2 -35 5,974,442.90 371 717.49 70° 20' 18.274" 151 ° 02' 27.363" 1915' 1521' 8.8 15.9 CD2 -36 5,974,433.20 371 718.42 70° 20' 18.179" 151 ° 02 27.331 1924 1520 8.7 15.9 CD2 -37 5,974,423.05 371,719.40 70° 20' 18.079" 151' 02 27.297 1934 1519' 8.7 15.9 CD2 -38 5,974,413.52 371 720.66 70° 20' 17.986" 151' 02 27.256 1944' 1517' 8.7 15.9 CD2 -39 5,974,403.28 371 721.83 70° 20' 17.885" 151° 02' 27.216' 1954' 1516' 8.7 15.9 CD2 -40 5,974,393.27 371,722.68 70° 20' 17.787" 151° 02' 27.187" 1964' 1515' 8.7 15.9 CD2 -41 5,974,383.33 371 723.84 70° 20' 17.689" 151 ° 02' 27.148" 1974' 1514' 8.7 15.9 CD2 -42 5,974,373.69 371 724.77 70° 20' 17.595" 151° 02 27.116' 1984' 1513' 8.7 15.9 CD2 -43 5 974 363.45 371 725.60 70° 20' 17.494" 151' 02 27.087 1994 1512 8.7 15.9 CD2 -44 5,974,353.42 371 726.94 70° 20' 17.396" 151 ° 02' 27.042" 2004' 1510' 8.6 15.9 CD2 -45 5,974,344.11 371 728.07 70° 20' 17.304" 151 ° 02 27.005 2013' 1509' 8.6 15.9 CD2 -46 5,974,333.52 371 729.06 70° 20' 17.200" 151 ° 02' 26.971 2024' 1508' 8.6 15.9 CD2 -47 5,974,323.53 371 730.13 70° 20' 17.102" 151 ° 02 26.934 2034 1506 8.6 15.9 CD2 -48 5,974,313.77 371,731.19 70° 20' 17.006" 151° 02 26.898 2043 1505' 8.6 15.9 CD2 -49 5,974,303.80 371 732.05 70° 20' 16.908" 151' 02 26.868 2053' 1504' 8.5 15.9 CD2 -50 5,974,293.84 371,733.00 70° 20' 16.811" 151° 02 26.836 2063' 1503 8.5 1 15.9 CD2 -51 5,974,283.88 371,734.28 70° 20' 16.713" 151° 02 26.793 2073 1502 8.5 15.9 CD2 -52 5,974,274.18 371 735.18 70' 20' 16.618" 151 ° 02 26.762' 2083' 1501' 8.5 15.9 CD2 -53 5,974,264.07 371,736.31 70° 20' 16.518" 151° 02 26.724 2093 1499 8.5 15.9 CD2 -54 5,974,254.19 371 737.50 70° 20' 16.421" 151° 02 26.684 2103 1498 8.5 15.9 CD2 -55 5,974,244.05 371,738.44 70° 20' 16.322" 151° 02 26.652 2113' 1497' 8.5 15.9 CD2 -56 5,974,234.27 371 739.42 70° 20' 16.226" 151 ° 02 26.618 2123' 1496' 8.5 15.9 CD2 -57 5,974,224.26 371 740.55 1 70° 20' 16.128" 1 151 ° 02' 26.580" 2133' 1494' 8.5 15.9 CD2 -58 5,974,214.18 371 741.60 1 70° 20' 16.029" 1 151 ° 02 26.544 2143 1493 8.5 15.9 CD2 -59 5,974,204.48 371 742.95 1 70° 20' 15.934" 1 151' 02' 26.544" 2152' 1492' 8.5 15.9 CD2 -60 5,974,194.47 371,743.77 1 70° 20' 15.835" 1 151° 02 26.471' 2162' 1491' 8.5 15.9 NOTES: 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 27. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) 3. * INDICATES DATA PER LOUNSBURY AS -BUILT. 1r/ ALPINE MODULE:CD20 UNIT: CD ConocoPhillips ALPINE PROJECT CD -2 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE N0. DRAWING N0: PART: REV: 01-02-05-1 05-27-01 CE-CD20-121 2 of 3 6 REV I DATE I BY CK APP DESCRIPTION REV DATE BY CK APP DESCRIPTION 5 4/13/0 AG I BD C.A. PER K03074ACS 1 6 11/08/0 CZ GD C. A. PER K06058ACS NOTES: 1. ALL COORDINATES SHOWN ARE ALASKA STATE PLANE, ZONE 4, NAD 27. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL. ORIGINAL GROUND ELEVATIONS ARE INTERPOLATED FROM MICHAEL BAKER JR. DWG. CE-CD20-102, SHEET 1, REV 0. 3. BASIS OF COORDINATES: ALPINE PERMANENT CONTROL MONUMENTS PER SURVEY BY KUUKPIK/LCMF, JUNE 2001. 4. CONDUCTOR CD2-35 WAS AS-BUILT 3/12/98 BY LOUNSBURY AND ASSOC., CONDUCTORS CD2-23 AND CD2-39 WERE AS-BUILT 3/22/00 BY LOUNSBURY. AS-BUILT COORDINATES ARE FROM DWG. NO. CE-CD20-664D2, SHEET 2, REV. 1. 5. DATES OF AS-BUILT SURVEYS: WELL CONDUCTORS CD2-37, CD2-32 & CD2-24, 05/06/01, FB 2001-14 PGS 76-78; CONDUCTOR CD2-49, 5/07/01, FB2001-15 PG 2; CONDUCTOR CD2-33, 5/08/01, FB 2001-15 PGS 11-13; CONDUCTORS CD2-05, CD2-15 & CD2-50, 5/09/01, FB 2001-15 PGS 21-22; CONDUCTORS CD2-13, CD2-14, CD2-16, CD2-17 & CD2-19, 9/09/01, FB 2001-25 PGS 12-13; CONDUCTORS CD2-25, CD2-26, CD2-28, CD2-36, CD2-45, CD2-47 & CD2-48, 10/04/01, FB 2001-26 PGS 36-38; CD2-34, 10/12/01, FB 2001-27 PGS 12-13; CONDUCTORS CD2-22 & CD2-38, 4/01/02, FB 2002-13 PG 44; CONDUCTOR CD2-29, 4/02/02, FB 2002-13 PG 51; CONDUCTORS CD2-30, CD2-40, CD2-44, CD2-51, CD2-53, CD2-55 & CD2-57, 4/09/02, FB 2002-15 PGS 2-5; CONDUCTORS CD2-41 & CD2-46, 4/19/02, FB 2002-16 PG 73; CONDUCTOR CD2-08, 4/27/02, FB 2002-17 PG 47; CONDUCTORS CD2-07, CD2-10, CD2-11, CD2-12, CD2-18 & CD2-20, 9/10/02, FB 2002-24 PGS 3-9; CONDUCTORS CD2-06, CD2-09, CD2-43, CD2-54, CD2-56 & CD2-58, 4/10/03, FB 2003-08 PGS 43-46; CONDUCTORS CD2-21 & CD2-27, 4/25/03, FB 2003-09 PGS 47-50; CONDUCTORS CD2-31 & CD2-521 5/14/03, FB 2003-09 PGS 73-74, CONDUCTORS CD 2-1 THRU CD2-4 & CD2-59, CD2-60, 4/9/04 LCMF FB 2004-06 PG. 29 & PGS. 33-38. SURVEYOR'S CERTIFICATE ���•�'���\�� I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED ♦♦♦ �� OF ALj ��� TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA, THAT THIS ♦ " S/F- ♦ AS-BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT �P•..•••••••••.. G;.• •••'09 �1� :♦ SUPERVISION, THAT THE MONUMENTS SHOWN HEREON ACTUALLY EXIST AS DESCRIBED, AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. i 49th , ■= / """""""""/ .....:.. • .............. DATE: REGISTRATION N0. LS-8629 �.......�...............................::.�o. 19 / Janice M. Zilko Aff AlF •�. sT'•� No. LS-8629 .���`AV ♦♦♦4I1 pROFESS I ONA� \' •��♦♦♦• K U U K P I K P ,,.........- LCMFuc 119 E.61MAw. • Anchouga, Mata DOM • (W7)Z73-18M Alpine Office 6704739 (907) Alpine Survey Office �.� ALPINE MODULE:CD20 UNIT: CD C®n cePhillips ALPINE PROJECT CD-2 WELL CONDUCTORS Alaska, Inc. AS-BUILT LOCATIONS CADD FILE N0. 01-02-05-1 05-27-01 I DRAWING NO: CE-CD20-121 PART: 3 OF 3 REV: 6