Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-144MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Thursday, July 21, 2022
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Matt Herrera
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
ConocoPhillips Alaska, Inc.
CD2-16
COLVILLE RIV UNIT CD2-16
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 07/21/2022
CD2-16
50-103-20426-00-00
202-144-0
W
SPT
6929
2021440 1732
2339 2339 2339 2337
520 530 525 525
4YRTST P
Matt Herrera
6/27/2022
MIT-IA Performed to 3000 PSI Per Operations
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:COLVILLE RIV UNIT CD2-16
Inspection Date:
Tubing
OA
Packer Depth
460 2970 2880 2850IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitMFH220629142927
BBL Pumped:2.4 BBL Returned:2.3
Thursday, July 21, 2022 Page 1 of 1
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday,June 11,2018
TO: Jim Regg `
P.I.Supervisor 1"-N b f i l i$ SUBJECT: Mechanical Integrity Tests
C t CONOCOPHILLIPS ALASKA,INC.
CD2-16
FROM: Brian Bixby COLVILLE RIV UNIT CD2-16
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry
NON-CONFIDENTIAL Comm
Well Name COLVILLE RIV UNIT CD2-16API Well Number 50-103-20426-00-00 Inspector Name: Brian Bixby
Permit Number: 202-144-0 Inspection Date: 6/5/2018 V
Insp Num: mitBDB180610163549
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well CD2-16 Type Inj W TVD 6929 Tubing 1980 ' 1980 - 1980 " 1980
PTD 2021440 "Type Test SPT Test psi 1732 • IA 750 2795 ' 2730 - 2730
BBL Pumped: 1.9 - BBL Returned: 1.8 OA 640 • 640 ' 640 - 640 -
Interval 4YRTST P/F P ✓
Notes:
SCANNWJUN 21 4016
Monday,June 11,2018 Page 1 of 1
. (
(
Image 'Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
Q.O~ - L ~k Well History File Identifier
Organizing (done)
0 Two-sided 1111111111111111111
~scan Needed 1111111111111111111
RESCAN
~olor Items:
0 Greyscale Items:
DI'TAL DATA
.\)21' Diskettes, No.3
0 Other, NolType:
OVERSIZED (Scannable)
0 Maps:
0 Other Items Scannable by
a Large Scanner
0 Poor Quality Originals:
OVERSIZED (Non-Scannable)
D Other:
0 Logs of various kinds:
NOTES:
Scanning Preparation
\~
x 30 =
c¡o
0 Other:: I f
Date/O ~O if /sl m P
, 1111111111111111111
Date/Ó ~ OC¡- /sl Vl1P
, I
+ d-- = TOTAL PAGES Cìd-
(Count d, oesr,ot ir-:lude cover ~~~~ VJ
Date: t 0 ~ °'t Isl IV~'r
. 1111111111111111111
BY:
Helen ~
""'--" :.
Project Proofing
BY:
Helen CMaria )
BY:
Helen ("Maria '")
Production Scanning
Stage 1 Page Count from Scanned File: 13 . (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: V YES
Hele~ DateJD/~O<f
If NO in stage 1, page(s) discrepancies were found: YES NO
BY:
NO
/s/ n1P
Stage 1
BY: Helen Maria Date: Isl
Scanning is complete at this point unless rescanning is required. IIIII1 u 11111111111
ReScanned 1IIIIII1I1111111111
BY: Helen Maria Date: /51
Comments about this file: Quality Checked 111IIII111111111111
8/24/2004 Well History File Cover Page.doc
• •
ConocoPhillips
Alaska RECEIVED
P.O. BOX 100360
ANCHORAGE, ALASKA 99510 -0360
AK 0 4 2011
April 01, 2011 Wks & fi83 Cans. Commission
me orag6
Commissioner Dan Seamount
Alaska Oil & Gas Commission 0 °� - ` it
333 West 7 Avenue, Suite 100 �/`
Anchorage, AK 99501 1 \\)1k
V� f
Commissioner Dan Seamount:
Enclosed please find a spreadsheet with a list of wells from the Alpine field (CRU). Each of
these wells was found to have a void in the conductor. These voids were filled with cement and
corrosion inhibitor, engineered to prevent water from entering the annular space. As per
previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the
treatments took place and meets the requirements of form 10 -404, Report of Sundry Operations.
The corrosion inhibitor /sealant was pumped March 13 -15 and March 27 -28, 2011. The attached
spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on
each conductor.
Please call MJ Loveland or Perry Klein at 907 - 659 -7043, if you have any questions.
Sincerely,
MJ Loveland
ConocoPhillips Well Integrity Projects Supervisor
• 0
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
Alpine Field
Date 04/01/2011 CD2 PAD
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name API # PTD # cement pumped cement date inhibitor sealant date
ft bbls ft gal
CD2 -14 50103203900000 2011770 4" n/a 16" n/a 5.4 3/14/2011
CD2 -16 50103204260000 2021440 4" n/a 14" n/a 3.6 3/14/2011
CD2 -17A 50103204060100 2051700 4" n/a 14" n/a 3.6 3/14/2011
CD2 -24 50103203770000 2010950 6" n/a 14" n/a 3.4 3/15/2011
CD2 -25 50103204180000 2020740 4" n/a 14" n/a 3.9 3/28/2011
CD2 -26 50103203970000 2012320 4" n/a 16" n/a 2.7 3/27/2011
CD2 -33B 50103203810200 2011250 4" n/a 15" n/a 2.7 3/27/2011
CD2 -41 50103204240000 2021260 4" n/a 14" n/a 4.3 3/28/2011
CD2 -50 50103204150000 2020490 8" n/a 16" n/a 3.5 3/27/2011
CD2 -51 50103204410000 2022490 5'10" 0.80 15" 3/21/2007 3.9 3/27/2011
CD2 -56 50103204980000 2041500 SF n/a 15" n/a 3.8 3/27/2011
CD2 -58 50103204570000 2030850 6" n/a 6" _ n/a 3.5 3/28/2011
CD2 -59 50103205050000 2042480 6" n/a 6" n/a 5 3/27/2011
CD2 -60A 50103205110100 2091150 6" n/a 6" n/a 5.25 3/27/2011 I
CD2 -74 50103205910000 2081970 10'9" _ 1.20 9" 3/26/2011 1.7 3/27/2011
CD2 -76 50103206030000 2090980 32" n/a 32" n/a 9.7 3/27/2011
CD2 -78 50103206010000 2090660 6" n/a 6" n/a 1.7 3/27/2011
CD2 -466 50103205760000 2080950 8" n/a 17" n/a 3.4 3/27/2011
MEMORANDUM
To: Jim Regg ~7
P.I. Supervisor ~ ~ ` f Z~'IO
FROM: Jeff Jones
Petroleum Inspector
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, July 26, 2010
SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CD2-16
COLVILLE RIV.LTNIT CD2-16
Src: Inspector
NON-CONFIDENTIAL
Reviewed By:
P.I. Suprv ~l~K~_'-
Comm
Well Name: COLVILLE RIV UNIT CD2-16 API Well Number: 50-103-20426-00-00 Inspector Name: Jeff Jones
Insp Num: mitJJ100719121345 Permit Number: 202-144-0 Inspection Date: 6/11/2010
Rel Insp Num:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well cD2a Type Inj. ~ W '
TVD 69z9 ~ CIA 6ao zloo '' 202o zooo ~
i ___
P.T.D~ 2ozlaao 'TypeTest ~ sPT LTest psi I~sz ~ OA s2o sao sao sao
Interval aYRTST p~ P ~ Tubing Iloo Ioso Ioso Ioso
Notes: 2,7 BBLS diesel pumped. 1 well inspected; no exceptions noted. -
1n
„r t:: Cpl ~~ ~~~''
e . ,.
Monday, July 26, 2010 Page 1 of 1
y
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
April 11, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West ih Avenue, Suite 100
Anchorage, AK 99501
&CANNED APR 2'1 2007
dÞa-.- ~ \.{ 4
Dear Mr. Maunder:
Sorry for the inconvenience, however it was observed that a spreadsheet sent to you and dated
3/31/07 was incomplete.
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). It was
noticed that Alpine well CD2-404 was unintentionally left out of spreadsheet dated 3/31/07.
Please find enclosed updated spreadsheet, and replace. As per previous agreement with the
AOGCC, this letter and spreadsheet serves as notification that the treatments took place and
meets the requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
~n:;y ~/
M.~ove:and
ConocoPhillips Well Integrity Project Supervisor
.,....
,-//.
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Alpine Field
March 31,2007
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD# cement pumped cement date inhibitor sealant date
ft bbls ft gal
C02-1 205-118 4" na 4" na 2 2/18/2007
C02-2 205-109 6" na 6" na 2.5 2/18/2007
C02-404 206-054 6" na 6" na 1.8 3/22/2007
C02-7 203-187 16" na 16" na 7.5 2/17/2007
C02-9 202-129 22" na 22" na 10.5 2/17/2007
C02-12 203-073 16" na 16" na 7.5 2/17/2007
CD2-14 201-177 4" na 4" na 2 2/17/2007
CD2-15 201-159 12" na 12" na 5.7 2/17/2007
CD2-16 202-144 11'7" 1.6 4" 4/16/2003 1 3/8/2007
CD2-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007
CD2-18 203-151 36" na 36" na 17 2/17/2007
CD2-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007
CD2-21 204-245 6" na 6" na 2.5 2/18/2007
CD2-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007
CD2-24 201-095 6" na 6" na 1 3/8/2007
CD2-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007
CD2-28 202-217 29" na 29" na 11 3/8/2007
CD2-30 203-135 8" na 8" na 3 3/8/2007
C02-31 204-082 15" na 15" na 6 3/8/2007
CD2-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007
CD2-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007
CD2-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007
CD2-37 202-211 29" na 29" na 13.8 2/18/2007
CD2-38 202-171 18" na 18" na 8.5 2/18/2007
CD2-39 201-160 34" na 34" na 16.2 2/18/2007
CD2-44 202-165 13" na 13" na 6.2 2/18/2007
CD2-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007
CD2-47 201-205 25" na 25" na 11.9 2/18/2007
CD2-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007
CD2-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007
CD2-53 204-089 4" na 4" na 2 2/18/2007
CO2-54 204-178 8" na 8" na 3.7 2/18/2007
CO2-55 203-118 13" na 13" na 6 2/18/2007
CD2-57 204-072 8" na 8" na 1 3/8/2007
CO2-58 203-085 6" na 6" na 1 3/8/2007
CO2-59 204-248 6" na 6" na 1.5 3/8/2007
CD2-60 205-068 6" na 6" na 1 3/8/2007
.
.
.
~
ConocoPhillips
Alaska
/2\.:J
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
;;,.
March 31, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
~.. \44
~uo-
~PR 0 5 2007
scANNEO .
Dear Mr. Maunder:
...,....~..
Enclosed please find a spreadsheet with a list of wells ITom the Alpine field (ALP). Some of
these wells were found to have a void in the conductor by surface casing annulus. The voids that
were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The
remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered
to prevent water ITom entering the annular space. As per previous agreement with the AOGCC,
this letter and spreadsheet serves as notification that the treatments took place and meets the
requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
~~C
.... Jerry Dethlefs
ConocoPhillips Well Integrity Proj Supervisor
Attachment
.
.
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD# cement pumped cement date inhibitor sealant date
ft bbls ft gal
CD2-1 205-118 4" na 4" na 2 2/18/2007
CD2-2 205-1 09 6" na 6" na 2.5 2/18/2007
CD2-7 203-187 16" na 16" na 7.5 2/17/2007
CD2-9 202-129 22" na 22" na 10.5 2/17/2007
CD2-12 203-073 16" na 16" na 7.5 2/17/2007
CD2-14 201-177 4" na 4" na 2 2/17/2007
CD2-15 201-159 12" na 12" na 5.7 2/17/2007
CD2-16 202-144 11'7" 1.6 4" 4/16/2003 1 3/8/2007
CD2-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007
CD2-18 203-151 36" na 36" na 17 2/17/2007
CD2-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007
CD2-21 204-245 6" na 6" na 2.5 2/18/2007
CD2-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007
CD2-24 201-095 6" na 6" na 1 3/8/2007
CD2-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007
CD2-28 202-217 29" na 29" na 11 3/8/2007
CD2-30 203-135 8" na 8" na 3 3/8/2007
CD2-31 204-082 15" na 15" . na 6 3/8/2007
CD2-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007
CD2-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007
CD2-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007
CD2-37 202-211 29" na 29" na 13.8 2/18/2007
CD2-38 202-171 18" na 18" na 8.5 2/18/2007
CD2-39 201-160 34" na 34" na 16.2 2/18/2007
CD2-44 202-165 13" na 13" na 6.2 2/18/2007
CD2-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007
CD2-47 201-205 25" na 25" na 11.9 2/18/2007
CD2-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007
CD2-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007
CD2-53 204-089 4" na 4" na 2 2/18/2007
CD2-54 204-178 8" na 8" na 3.7 2/18/2007
CD2-55 203-118 13" na 13" na 6 2/18/2007
CD2-57 204-072 8" na 8" na 1 3/8/2007
CD2-58 203-085 6" na 6" na 1 318/2007
CD2-59 204-248 6" na 6" na 1.5 3/8/2007
CD2-60 205-068 6" na 6" na 1 3/8/2007
Alpine Field
March 31,2007
MEMORANDUM
.
State of Alaska .
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
·/}K š~1 Sb',1 ù&
' et1 ~.
DATE: Wednesday, August 30, 2006
SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CD2-16
COLVILLE RIV UNIT CD2-16
~o:t-~ \ Lt 4-
FROM:
Chuck Scheve
Petroleum Inspector
Src: Inspector
Reviewed By:
,-.-~
P.I. Suprv. 1.t
Comm
NON-CONFIDENTIAL
Well Name: COLVILLE RIV UNIT CD2-16 API Well Number 50-103-20426-00-00 Inspector Name: Chuck Scheve
Insp Num: mitCS060827 193645 Permit Number: 202-144-0 Inspection Date: 8/27/2006
Rei Insp Num
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well CD2-16 Type Inj. w TVD 6929 IA 800 2490 2450 2450
P.T. 2021440 TypeTest SPT Test psi 173;2-5 OA 650 650 650 650
Interval 4YRTST P/F P ,/ Tubing 1680 1680 1680 1680
Notes Pretest pressures were observed and found stable. Well demonstrated good mechanical integrity.
SCANNED S EP 0 8 2005
Wednesday, August 30,2006
Page I ofl
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marl<:er.doc
J. L1 J-t¡J- ~ ~
DATA SUBMITTAL COMPLIANCE REPORT
9/7/2004
Stt-t.r¿ 7 ~ ~
API No. 50-103-20426-00-00
Q
Permit to Drill 2021440
MD 15200"""
Well Name/No. COLVILLE RIV UNIT CD2-16
Operator CONOCOPHILUPS ALASKA INC
TVD 711:,.-- Completion Date 8/24/2002 ",..,-- Completion Status WAGIN
Current Statu~ ~
-----~---
~----~-~
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
--~--~.~~-------
DATA INFORMATION
Types Electric or Other Logs Run: GRlRes
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
~.-."
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
~.
~
~
~
~D
~D
-'"F(¡5t
~
Rpt
Log Log Run
Scale Media No
Interval OH /
Start Stop CH
Received Comments
~-----~-_..~--
A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 7/10/2002.
5 Col 0 9289 Case 10/1/2002 With Temperature and
Pressure
528 12500 Open 10/3/2002 rr~f'L
528 12500 Open 10/3/2002 rrF~
528 12500 Open 1 0/3/2002 MWD
528 12500 Open 1 0/3/2002 MWD
0 528 Open 1 0/3/2002 GYRO
0 528 Open 10/3/2002 GYRO
2483 12500 ~11/6/2002
2483 12500 ~ 11/612002
~-~-~--_._-------~--- ~~
Sample
Set
Sent Received Number Comments
Directional Survey
Directional Survey
Directional Survey
Directional Survey
Directional Survey
Directional Survey
~IS Vorific3tion '
....-
LIS Verification
Well Cores/Samples Information:
Name
Interval
Start Stop
Permit to Drill 2021440
MD 15200 TVD 7150
ADDITIONAL INFORMATION
Well Cored? Y&
Chips Received? 9 Y / N
Analysis
Received?
~ Y I ~~
Comments:
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
9/7/2004
Well Name/No. COLVILLE RIV UNIT CD2-16
Completion Date 8/24/2002
I ,
<""\
t""""
Operator CONOCOPHILLlPS ALASKA INC
Completion Status WAGIN
Daily History Received?
Formation Tops
Current Status WAGIN
~:
Date:
API No. 50-103-20426-00-00
UIC Y
~~------- -.-
--~----~_.-"~---
0 ~~==:==
--~~ vr
ConocoPhillips Alaska, Inc.
Surface Casing by Conductor Annulus Cement Top-Off
Alpine Field, CD-1 CD-2
DEPTH VOLUME
BBlS
CD1-1 2.25' 0.3
CD1-2 4' 0.6
CD1-3 10' 1.4
CD1-4 7.33' 1
CD1-5 4' 0.6
CD1-6 10.42' 1.4
CD1-16 14.33' 2
CD1-17 8.75' 1.2
CD1-21 13' 1.8
CD1-22 1.83' 0.3
CD1-23 15.42' 2.1
CD1-24 2' 0.3
CD1-25 5.66' 0.8
;)O(j-t::fjv> CD1-27 18.83' 2.6
CD1-28 6.75' 1
\"t,-\oLt CD1-32 8.33' 1.2
JDQ::~~3 \~c;-\\) g~~~;: ~~:~;: ;:~
.dC:o~D03>-. CD1-38 3.5' 0.5
\~~-\\<; CD1-42 5.83' 0.8
d'~.-~ '-\...'"\ r CD2-16 11.66' 1.6
;)\))\::)\':) CD2-17 18' 2.5
.' ,Jf:J-2J \ ~ d - ÇQ~:_19 !1~_~~~_-- 1 .6
J\Jd-~~) CD2-22 13.5' 1.8
död~]'-\ CD2-25 27.25' 3.7
. JD\-ð"'J? CD2-26 10.42' 1.4
JQ ~ d~ -SD~:.32 --_8..:?":'_--- 1.2
J,-()\ -\)~ CD2-33 - 7' 1
dO \-\ ~ \ ,CD2-34 4' 0.6
,- .. , , d'()d:-\?:~. CD2-41 11.83' 1.6
d-Od-~a~ã- ðû;)-\Q1J ___g:~L _J7Ö:':;'-===1 \
~O \ -- d '¥\ CD2-49 9.33' 1.3
: d D d-t>~ CD2-50 1.66' 0.25
WEllS
1
\ ~ <;.- ()''1. (q._]
;~\X).-\~ )
\<\~,-\~O
¡dOO-~\.~
\~c:,- \ð~ ¡
: :;X:O-O~~
\ ~~-ù~L\ :
¡ ;)C)()-. \4 ç
d 0\- OÖ<.o '
\~"'- àS:)
,\SC;-()<o"'S JQO'" \ \ 0
\ ~\-bd c..
d (j::)~tfJ '6 . ,t
.deJc)- \"-"
...,
J.O\..- \:} '-\
~\ - \ ð 5
TYPE
WI
WI
MI
P
MI
GI
WI
P
MI
P
MI
P
P
P
P
P
P
WI
P
MI
INJ
INJ
P
--_._-~----
INJ
P
INJ
INJ
P
P
P
INJ
INJ
------------
INJ
P
SACKS
Cement
1.8
3.6
8.5
6.0
3.6
8.5
12.1
7.2
10.9
1.8
12.7
1.8
4.8
15.7
6.0
7.2
34.4
13.9
3.0
4.8
9.7
15.1
9.7
10.9
22.3
8.5
7.2
6.0
3.6
9.7
6.0
----'
8.5
7.8
1.5
ConocJP'hilIi ps
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
April 23, 2003
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Dear Mr. Maunder:
Enclosed please find a spreadsheet with a list of wells from the Alpine field (CRU). Each of these wells
was found to have a void in the conductor by surface casing annulus. The voids were filled with cement to
the top of the conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serves
as notification that the treatments took place.
In the fall of2002, CDI-23 was reported to have a "wobbly" tree. The top of cement was measured at 15-
feet below the top of the conductor. Plans were made to stabilize the wellhead by top-filling cement later
in the winter when the ice road to Alpine had been installed. Since that is considerable effort and expense
for pumping a small load of cement, a survey was made of each conductor to see if voids were present. A
list of 34 wells was put together that would need additional cement.
The top-fill operation was started on April 15th and was completed on April 16th, 2003. Dowell-
Schlumberger batch-mixed Arctic Set I cement to 15.7 ppg in a blender. The cement was pumped via
high-pressure hose into the conductor. The cement was brought to the top of conductor on each well. The
blender/pump and hose worked down the line, filling the identified wells until the list was completed. The
attached spreadsheet presents the well name, top of cement depth prior to filling, and the number of sacks
used on each conductor.
Please call MJ Loveland or Nina Woods at 907-659-7224, or me at 659-7043 if you have any questions.
Sincerely,
Jerry Dethlefs
ConocoPhillips Problem Well Supervisor
Attachment
A/ph Ie l,;ement lOp rill
Subject: Alpine Cement Top Fill
Date: Wed, 23 Apr 2003 17:38:26 -0800
From: "Jerry C Dethlefs" <Jerry.C.Dethlefs@conocophillips.com>
To: Tom Maunder <tom_maunder@admin.state.ak.us>
CC: "n1617" <n1617@conocophillips.com>
Tom: Attached is a letter and spreadsheet with the data mentioned in the
previous email. Thanks for the relief on all the Sundry's! Let me know if
you need additional information.
Jerry Dethlefs
Problem Well Supervisor
ConocoPhillips Alaska(See attached file: AOGCC ALPINE cement top outs
04-16-03.xls)(See attached file: Cement Top Fill AOGCC Letter 04-23-03.doc)
Tom Maunder <tom_maunder@admin.state.ak.us>
04/23/2003 12:51 PM
To: Jerry C Dethlefs/PPCO@Phillips
cc:
Subject: Re: Sundry's for topping off cement
Hi Jerry,
I agree Jerry that individual404's aren't necessary. Send a "global
document"
with the information you list. There should also be some sort of
introduction
that describes why you did what you did and how you did it.
Tom
Jerry C Dethlefs wrote:
> Tom: Last week we had a cement crew go down the line at Alpine, top
filling
> the conductors with cement. I believe 34 wells were treated. Chuck Scheve
> and John Crisp were notified but declined to witness when we told them
what
> we were doing. Some time past we had agreed to submit a 10-404 for this
> kind of work. Due to the number of these, is a 10-404 needed on each
well?
> I don't want to commit the time to doing this if it is not necessary;
> 10-404's are time consuming to prepare. Would a list of the jobs suffice,
> or something similar? We have the well numbers, depth to cement top, and
> sacks used to fill the void. My proposal would not affect future
> submissions of 10-404's for this work. What do you think? Thanks!
>
> Jerry Dethlefs
(See attached file: tom_maunder.vcf)
1 of 2
...., ....'" ;
4/24/2003 7:55 AM
Alpine ~ement lOp rill
.. ,. , . . {...
" . Name: AOGCC ALPINE cement top outs 04-16-03.xls
~AOGCC ALPINE cement top outs 04-16-03.xls Type: EXCEL File (application/msexcel)
. :Encoding: base64
--'--'__--_H"'._..-.-.._O_-"'.."'-"-'--"""""W.'-.._._......_--_....__._-~----_.._-_.._..._.._._._.---_.-----'''''''''-'-''''-''''-----'''----'''-'---------'---
.-..-.....-.-----.-...---.
Name: Cement Top Fill AOGCC Letter 04-23-03.doc
DCement Top Fill AOGCC Letter 04-23-03.doc Type: WINWORD File (application/msword)
,Encoding: base64 >
Tom Maunder <tom maunder@admin.state.ak.us> '
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
2of2
4/24/20037:55 AM
(
{
dOd- \ '-\~~E'''-iVED
Casing Detail
9 518" Surface Casing
8PHllLlPS Alaska, Inc.
A Subsidiary of PHilLIPS PETROLEUM COMPANY
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN
MAR 1 1 2003 Well: CD2-16
Al8aQtl&G~Con¡.Ccr~1frd~orPate: 8/8/2002
k~~,.
Jts 3 to 59
Doyon 19 RKB to LOS
FMC Gen V Hanger
9-5/8" 36# J-55 BTC Csg
Davis Lynch Float Collar
9-5/8" 36# J-55 BTC Csg
Davis Lynch Float Shoe
57 Jts
Jts 1 to 2
2 Jts
LENGTH
36.40
2.40
2397.65
1.48
83.30
1.70
9- 5/8" shoe @
TO 12 1/4" Surface Hole
RUN TOTAL 32 BOWSPRING CENTRALIZERS-
1 per jt on Jt #1 - #12 (On stop rings of Jt #1 & #2)
#14,16,18,20,22,24,26,28,30,32,34,36,38,
40,42,44,46,48,50,52,54, &56
68 joints total in shed - 59 joints total to run
Last 9 joints stay out, # 60 thru # 68.
Use API Mod Best 0 Life Artic Grade Csg Compound.
Remarks: Up Wt - 155K Ibs
On Wt - 145K Ibs
Block Wt 75K Ibs
Supervisor: David Burley
DEPTH
TOPS
36.40
38.80
2436.45
2437.93
2521.23
2522.93
2532.10
~~
~
~~
('
(
ConocoPhillips Alaska
Cementing Report
Legal Well Name: CD2-16
Common Well Name: CD2-16
Event Name: ROT - DRILLING
Hole Size:
TM D Set:
Date Set:
Csg Type:
Csg Size:
Primary
12.250 (in)
2,523 (ft)
8/9/2002
Surface Casing
(in.)
Cmtd. Csg: OPEN HOLE
Cement Co: Dowell Schlumberger
Report #:
Start:
1
8/7/2002
Cement Job Type: Primary
Squeeze Open Hole
Hole Size:
sa TMD: (ft)
sa Date:
sa Type:
Cmtd. Csg:
Squeeze Casing
Hole Size:
TMD Set:
Date Set:
Csg Type:
sa TMD:
sa Date:
Cmtd. Csg:
Page 1 of 3
Spud Date: 8/7/2002
Report Date: 8/10/2002
End: 8/24/2002
Plug
Hole Size:
Top Set:
BTM set:
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
(ft)
(ft)
Cementer: Jim Thompson
Pipe Movement
Pipe Movement: Reciprocating
Rot Time Start:: Time End:: RPM:
Rec Time Start: 08:30 Time End: 11 :22 SPM: 1
Init Torque: (ft-Ibf)
Stroke Length: 20.0 (ft)
Avg Torque: (ft-Ibf)
Drag Up: 155 (Ibs)
Max Torque: (ft-Ibf)
Drag Down: 145 (Ibs)
Type: Cement Casing
Volume Excess %: 145.00
Meas. From: 108
Time Circ Prior
To Cementing: 1.50
Mud Circ Rate: 378 (gpm)
Mud Circ Press: 400 (psi)
Start Mix Cmt: 10: 11
Start Slurry Displ: 10:12
Start Displ: 11 :08
End Pumping: 11 :30
End Pump Date: 8/9/2002
Top Plug:
Bottom Plug:
Disp Avg Rate: 9.50 (bbl/min) Returns: 100
Disp Max Rate: 10.00 (bbl/min) Total Mud Lost: (bbl)
Bump Plug: Cmt Vol to Surf: (bbl)
Press Prior: (psi)
Press Bumped: (psi)
Press Held: (min)
Float Held:
Mud Data
Ann Flow After:
Mixing Method:
Density Meas By: densometer
Type: Density: (ppg) Visc: (s/qt)
Bottom Hole Circulating Temperature: (OF)
Displacement Fluid Type:
PVIYP: (cp)/ (lb/100ft2) Gels 10 sec: (lb/100ft2) Gels 10 min: (lb/100ft2)
Bottom Hole Static Temperature: (OF)
Density: (ppg) Volume: (bbl)
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure:
(OF)
Stage No: 1 Slurry No: 1 of 4
To: (ft)
Description: water /w biozan & nut pi Class:
Cmt Vol: 40.0 (bbl) Density: 8.30 (ppg) Yield: (ft3/sk)
Slurry Vol: (sk) Water Vol: 40.0 (bbl) Other Vol: 0
Purpose: Pre-wash
Mix Water: (gal)
Foam Job: N
Temperature: (OF)
Temperature: CF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
CF)
(OF)
Pressure
(psi)
(psi)
Printed: 9/12/2002 3:15:04 PM
('
~8'~
r¡r¡t
I~
Legal Well Name: CD2-16
Common Well Name: CD2-16
Event Name: ROT - DRILLING
Slurry Data
Fluid Type: Spacer
Slurry Interval: (ft)
Water Source:
ConocoPhillips Alaska
Cementing Report
Page 2 of 3
Report #:
Start:
1
8/7/2002
Spud Date: 8/7/2002
Report Date: 8/10/2002
End: 8/24/2002
Stage No: 1 Slurry No: 2 of 4
To: (ft)
Description: MUDPUSH XL Class:
Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg) Yield: (ft3/sk)
Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure:
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
(OF)
Slurry Data
Fluid Type: LEAD
Slurry Interval: 2,023.00 (ft)To: (ft)
Water Source: lake water
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Stage No: 1 Slurry No: 3 of 4
Description: AS Lite Class:
Cmt Vol: 307.0 (bbl) Density: 10.70 (ppg) Yield: 4.44 (ft3/sk)
Slurry Vol:391 (sk) Water Vol: (bbl) Other Vol: 0
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure:
Temperature: CF)
Temperature: (OF)
Temperature: CF)
(OF)
Stage No: 1 Slurry No: 4 of 4
Slurry Data
Fluid Type: TAIL Description:
Slurry Interval: 2,523.00 (ft)To: 2,023.00 (ft) Cmt Vol: 49.0 (bbl)
Water Source: Slurry Vol231 (sk)
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure:
Temperature: CF)
Temperature: (OF)
Temperature: (OF)
(OF)
Class: G
Density: 15.80 (ppg) Yield: 1.17 (ft3/sk)
Water Vol: (bbl) Other Vol: 0
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Trade Name
Stage No: 1 Slurry No: 4 of 4 - Additives
Units
0-46
0-65
S1
Type
DEFOAMER
DISPERSANT
ACCELERATOR
Concentration
0.20%
0.30%
1.00%
Liquid Cone.
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Pressure
(psi)
(psi)
Purpose: PRIMARY
Mix Water: (gal)
Foam Job: N
Pressure
(psi)
(psi)
Purpose: PRIMARY
Mix Water: (gal)
Foam Job: N
Pressure
(psi)
(psi)
Units
GAL
Printed: 9/12/2002 3:15:04 PM
('
(
~~
,cD
ConocoPhillips Alaska
Cementing Report
Page 3 of 3
Legal Well Name: CD2-16
Common Well Name: CD2-16
Event Name: ROT - DRILLING
Report #:
Start:
1
8/7/2002
Spud Date: 8/7/2002
Report Date: 8/10/2002
End: 8/24/2002
Casing Test
Shoe Test
Liner Top Test
Test Press: (psi)
For: (min)
Cement Found between
Shoe and Collar:
Pressure: (ppge)
Tool:
Open Hole: (ft)
Hrs Before Test:
liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool:
Tool:
Tool:
Log/Sû rveyEvaluation
Interpretation Surnmary
CBL Run:
Under Pressure: (psi)
Bond Quality:
Cet Run:
Bond Quality:
Temp Survey:
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient:
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required:
Number of Remedial Squeezes:
Remarks
Pumped 40 bbls of biozan preflush with nutplug for marker, line up to cementers. Tes
t lines to 2500 psi, pumped 50 bbls of 10.5 ppg Mudpush XL spacer, 391 sxs of 10.7
ppg lead and 230 sxs of 15.8 ppg tail cement. Displaced cement with 20 bbls of FW fr
om cementers followed by 168 bbls of 9.6 ppg mud. Reciprocated pipe untill tail @ sh
oe, average displacement rate 10 bpm, plugs bumped - floats held - CIP @ 1130 hrs.
Full returns throughout job, dumped 108 bbls of 10.7 ppg cement back to surface.
Printed: 9/12/2002 3:15:04 PM
Phillips Alaska, Inc.
Daily Drilling Report
I JOB NUMBER I EVENT CODE 124 HRS PROG TMD I TVD I DFS
CD2-16 ODR 2,532.0 2,358.0 3.00
I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAILY TANG
Doyon 19 Alpine 13,894.0 0.00
ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD
0.00
DATE OF LAST SAFETY MEETING DAILY TOTAL
Drill out cmt, PIT, drill 8 1/2" hole 8/9/2002 306,648
I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE
WCD.W3A.0006.01
LAST SURVEY: DATE TMD INC AZlM LAST CASING NEXT CASING
8/8/2002 2,473.25 30.210 78.240 9.625 (in) @ 2,523.0 (ft) 7.000 (in) @ 9,465.0 (ft)
DENSITY(ppg) I 9.40 I PP I IECD MUDDATAI DAILY CaST I 0.00 I CYMcaST I
FV PVIYP GELS WUHTHP FCIT.saL alLlWAT %Sand/MBT Ph/pM Pf/Mf CI Ca H2S
44 9/5 1/2 11.6/ 11 / 0.1115.0 8.6/ 11 40
('
/.m~
, ,
~
WELL NAME
SUPERVISOR
David Burley
CURRENT STATUS
RIH with BHA #2 - picking up 4" drill pipe.
24 HR FORECAST
UTHOLOGY
I3H~Na. I 1 I
SHAWT.BELaW JARS
STRING WT. UP
BAA I HOLECONQITIONS
STRING WT. DN STRING WT. RaT
ITEM DESCRIPTlaN
NO. JTS
1
1
1
1
1
1
1
1
1
1
1
1
3
1
23
Bit
Mud Motor
Drill Collar - Non Mag
Stabilizer - Non Mag
MWD
Sub - Float
Sub - Bottom Hole Orienting
Drill Collar - NonMag
Drill Collar - NonMag
Stabilizer - NonMag
Drill Collar - Non Mag
Crossover
Drill Pipe - Heavy Wgt
Jars
Drill Pipe - Heavy Wgt
LENGTH
1.00
29.53
14.89
4.59
28.17
2.44
3.44
29.10
26.99
5.11
30.84
1.42
90.47
32.81
687.77
BIT I RUN
1/
SI0fS
SIZE MANUF. TYPE SERIAL NO.. JETS aR TFA
12.250 HUGHES-CHR MX-C1 6000046 10/12/12/1/
BIT OPERATIONS
RPM I GPM I PRESS I P BIT I HRS I 24Hr DIST I 24Hr Rap I CUM HRS I CUM DEPTH I CUM Rap
OPEAA0fIONS'SeI¡MMARY
PHASE DESCRIPTlaN
SURFAC S tan db a C k h w d pan d 8" 0 C' s - I a y do w n s tab s, L
WD and pony collars, bit and motor - clear tools
from floor.
SURFAC R U S lip s, e I e vat 0 r s, f i 11- u P too I and power ton 9 s
to run 9 5/8" casing.
SURFAC He Ids a f e t y and 0 p t s me e tin 9 wit her e w.
SURFAC Ran 59 j 0 i n t s 0 f 9 5/8", 3 6 #, J - 5 5 B T C cas in 9 M U
hanger and LJ, land casing with shoe @ 2523',
FC @ 2436'.
BIT I RUN
waB
FRaM TO. HaURS Co. DE TRaUBLE SUB
00:00 02:30 2.50 DRILL P PULD
02:30 04:00 1.50 CASE P RURD
04:00 04:15 0.25 CASE P SFTY
04:15 08:00 3.75 CASE P RUNC
0.:0.
12.250
8.000
8.000
8.200
8.000
8.050
8.050
7.850
8.050
8.120
8.100
6.500
5.000
6.250
5.000
Page 1 o.f2
I REPT NO. IDA TE
4 8/9/2002
I CUM. TANG
0.00
CUM INTANG WI MUD
0.00
CUM COST WI MUD
697,559
AUTH.
LAST BOP PRES TEST
0.00
LIME ES
TaRQUE I UNITS
I BIT NO.. I 1
BHA LENGTH
988.57
caNNSIZE Co.NN TYPE
3.750
5.250
3.250
2.875
1.900
2.813
2.813
3.250
3.250
2.813
2.813
3.000
3.000
2.250
3.000
DEPTH IN DATE IN I-a-D.L.B-G.a-R
0.0 8nI20021-3-WT-H-E-I-PN-TD
Printed: 9/12/2002 3:42:03 PM
WELL NAME
CD2-16
(
(
Page 2 of 2
Phillips Alaska, Inc.
Daily Drilling Report
I JOB NUMBER I EVE~TDC~DE 124 HRS PROG j T~~532.0
FROM TO HOURS CODE TROUBLE SUB
08:00 08:30 0.50 CASE P RURD
08:30 09:45 1.25 CEMENT P CIRC
09:45 10:00 0.25 CEMENT P
10:00 11:00 1.00 CEMENT P
11 :00 11 :30 0.50 CEMENT P
11 :30 13:30 2.00 CEMENT P
13:30 16:30 3.00 WELCTL P
16:30 21:00 4.50 WELCTL P
21 :00 00:00 3.00 WELCTL P
CIRC
PUMP
DISP
RURD
NUND
NUND
BOPE
j1VD I DFS I REPT NO. I DATE
2,358.0 3.00 4 8/9/2002
OPERATIONS SUMMARY
PHASE DESCRIPTION
SURFAC Lay do w n f i 11- u P too I and M U c e men the ad.
SURFAC S tag e d p u m p sup to 8 B P M - c i r can d con d it ion m
ud for cementing - final circ pressure 340 psi.
SURFAC P u m p e d 40 b b Iso f b i 0 Z an pre flu s h wit h nut p lug f
or marker, line up to cementers.
SURFAC T est I i n est 0 2 500 psi, P u m P e d 50 b b Iso f 1 O. 5 P
pg Mudpush XL spacer, 391 sxs of 10.7 ppg lead
and 230 sxs of 15.8 ppg tail cement.
SURFAC D i s P I ace d c em e n t wit h 20 b b Iso f F W fr 0 m c em e n
ters followed by 168 bbls of 9.6 ppg mud. Recipr
ocated pipe untill tail @ shoe, average displace
ment rate 10 bpm, plugs bumped - floats held. Fu
II returns throughout job, dumped 108 bbls of 10.
7 ppg cement back.
SURFAC Flu s h Sur f ace s t a c k and f low I i n e, L D cern en the a
d, landing joint, running tools and long bails.
SURFAC N D D i v e r t e r s y s t em, ins t a II F M C Un ¡he a d - t est e d
M/M seal to 1000 psi - 10 min.
SURFAC NUB 0 Pst a c k - c h a n g e d 0 utA n nul a r Pre v e n t e r-
NU bell nipple, flowline, turn buckles and servic
e Ii n e s.
SURFAC T est BOP E, 250 I 5000 psi - Ann u I a r Pre ve n t e r - 2
50/3500 psi. Repaired leaks on wellhead flanges.
24 HR SUMMARY: LD bha, Run and cement 9 5/8" csg. ND diverter, nu wellhead and BOP stack - change out annular preventer. Test BOPE.
COMPANY
Doyon
BHI
ARCA
DSR
SERVICE
ITEM
UNITS
gals
bbls
Fuel
Water, Drilling
TYPE
CD2-50
NO.
2,439 CD2-16
USAGE
1,311
420
PERSONNEL DATA
NO. HOURS COMPANY
25 Dowell
2 MI
5 Sperry-Sun
4 PPCO
NO.
2
3
2
1
HOURS
SERVICE
MATERIALS I CONSUMPTION
ON HAND ITEM
-4,007 Water, Potable
-2,823
UNITS
bbls
USAGE
115
ON HAND
-465
REMARKS
SUPPORT CRAFT
TYPE
NO.
REMARKS
Printed: 9/12/2002 3:42:03 PM
PRESSURE INTEGRITY TEST
PHilliPS Alaska, Inc.
Doyon 19 I Date: 8/10/2002 I Volume Input Volume/Stroke
Pump used: I #1 Mud Pump ... Strokes ... 0.1000 Bbls/Strk ...
... Pumping down annulus and DP. ...
Well Name:
Drilling Supervisor:
CD2-16
I Rig:
David Burley
Type of Test: Casing Shoe Test LOT/FIT
Hole Size: 18-1/2" L. Casing Shoe Depth
RKB-CHF: 34.6 Ft 2,523 Ft-MD 2,352 Ft- TVD
Casinq Size and Description: 19-5/8" 36#/Ft ]-55 BTC
Casinq Test
Mud Weight: 9.5 ppg
Mud 10 min Gel 30.0 Lb/100 Ft2
Test Pressure 2,500 psi
Rotating Weight 125,000 Lbs
BlockslTop Drive Weight: 75,000 Lbs
Estimates for Test: 1.6 bbls
Hole Depth
2,552 Ft-MD 2,377 Ft- TVD
I.
Pressure InteqritvTes1
Mud Weight: 9.4 ppg
Mud 10 min Gel: 22.0 Lb/100 Ft2
Rotating Weight: 125,000 Lbs
BlockslTop Drive Weight: 75,000 Lbs
Desired PIT EMW: 16.0 ppg
Estimates for Test: 813 psi
0.5 bbls
I.
I.
EMW = leak-off Pressure + Mud Weight = 820 9 35
0.052 x TVD 0.052 x 2352 + .
EMW at 2523 Ft-MD (2352 Ft-TVD) = 16.1 ppg
PIT 15 Second
Shut-in Pressure, psi
805
3000 -
- Lost 30 psi during test, held
= 98.8% of test pressure.
2500 -
A
-'
/
/
.~..1.
.U i\¡\"'.'ìln
2000 -
w
n::
::>
~ 1500-
W
n::
a.
1000 -
500 -
0
0
2
3 0
5 10 15 20 25
Shut-In time, Minutes
0 PIT Point
Barrels
~CASING TEST
-8-LEAK-OFF TEST
Comments:
30
Casing Test
Pumping Shut-in
Strks psi Min psi
0 0 0 2500
2 240 1 2500
4 550 2 2500
6 760 3 2500
8 900 4 2500
10 1050 5 2500
12 1240 6 2500
14 1410 7 2490
16 1620 8 2490
18 1800 9 2490
20 2050 10 2490
22 2300 15 2480
24 2510 20 2480
25 2470
30 2470
Volume Volume
Pumped Bled Back
2.4 ~bls _~bls
Pump Rate:
5.0 Strk/min
...
Pressure Integrity Tes1
Pumping Shut-in
Strks psi Min psi
0 0 0 815
1 40 0.25 805
2 % 120 0.5 795
3 ~ D 190 1 785
4 G {) 250 1.5 77r~ "',
5 'b~ 350 2 76t>
6 \aò 470 2.5 755
7 ~~ 550 3 745
8 '1 (j 620 3.5 740
9 G0680 4 735
10 5Ò 730 4.5 730
11 6ò 780 5 725
12 4:(J820 5.5 720
6 715
6.5 710
7 705
7.5 700
8 695
8.5 690
9 685
9.5 68~"
10 68 .
Volume Volume
Pumped Bled Back
1.2 ~bls - Bbls
Phillips Alaska, Inc.
('
Casing Detail
7" Intermediate Casing
Jt Number Num of Jts
Jts 3 to 232
Jts 1 to 2
Remarks:
230 Jts
2 Jts
Up Wf =345
COMPLETE DESCRIPTION OF EQUIPMENT RUN
Doyon 19 RKS to LOS
FMC 11" X 7" Hanger
7" 26# L-80 STCM Csg
7" Davis Lynch Float Collar
7" 26# L-80 STCM Csg
7" Davis Lynch Float Shoe
7" shoe @
8-1/2" TO
1 straight blade centralizer per jt # 1 thru # 26
#'s 168, 169, 170 then every other jt f/ #172 to # 228.
Total Centralizers: 58
237 joints in pipe shed - 232 total jts. to run - last 5 joints stay out
Use Best-o-Life 2000 pipe dope
On Wf = 165 Block Wf= 75K
Supervisor:Mickey/ Bowie
Well: CD2-16
Date: 8/14/2002
LENGTH
34.60
1.67
9409.54
1.41
79.73
1.70
DEPTH
TOPS
34.60
36.27
9445.81
9447.22
9526.95
9528.65
9540.00
~ -Ã
('PHILLiPS',
TfI'iI
~
{,
(
ConocoPhillips Alaska
Cementing Report
Legal Well Name: CD2-16
Common Well Name: CD2-16
Event Name: ROT - DRILLING
Hole Size:
TMD Set:
Date Set:
Csg Type:
Csg Size:
Primary
8.500 (in)
9,529 (ft)
8/17/2002
Intermediate Casing/U
(in.)
Report #:
Start:
2
8/7/2002
Cement Job Type: Primary
Squeeze Open Hole
Hole Size:
sa TMD: (ft)
sa Date:
sa Type:
Cmtd. Csg: Intermediate Casing/Un Cmtd. Csg:
Cement Co: Dowell Schlumberger
Squeeze Casing
Hole Size:
TM D Set:
Date Set:
Csg Type:
sa TMD:
sa Date:
Cmtd. Csg:
Cementer: Jim Thompson
Pipe Movement
Pipe Movement: Reciprocating
Rot Time Start:: Time End:: RPM:
Rec Time Start: 11 :30 Time End: 14:30 SPM: 1
Type: Cement Casing
Volume Excess %: 40.00
Meas. From: none
Time Circ Prior
To Cementing: 1.50
Mud Circ Rate: 55 (gpm)
Mud Circ Press: 450 (psi)
Page 1 of 3
Spud Date: 817/2002
Report Date: 8/17/2002
End: 8/24/2002
Plug
Hole Size:
Top Set:
BTM set:
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
(ft)
(ft)
Init Torque: (ft-Ibf)
Stroke Length: 20.0 (ft)
Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf)
Drag Up: 325,000 (Ibs) Drag Down: 175,000 (Ibs)
Start Mix Cmt: 13:38
Start Slurry Displ: 13:39
Start Displ: 13:50
End Pumping: 14:45
End Pump Date: 8/17/2002
Top Plug: Y
Bottom Plug: Y
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
7.00 (bbl/min)
7.20 (bbl/min)
Y
530 (psi)
1,100 (psi)
10 (min)
Y
Returns: 100
Total Mud Lost: (bbl)
Cmt Vol to Surf: (bbl)
Ann Flow After: N
Mixing Method:
Density Meas By: densometer
Type: Non-Disp. LS Density: 9.7 (ppg) Visc: 36 (s/qt)
Bottom Hole Circulating Temperature: (OF)
Displacement Fluid Type: Mud
PV/yP: 8 (cp)/15 (lb/10Oft2) Gels 10 sec: 4 (lb/100ft2) Gels 10 min: 10 (lb/10Oft2)
Bottom Hole Static Temperature: (OF)
Density: 9.7 (ppg) Volume: 362.00 (bbl)
Slurry Data
Fluid Type: Wash
Slurry Interval: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure:
(OF)
Mud Data
To: (ft)
Description: ARCO wash Class:
Cmt Vol: 20.0 (bbl) Density: 8.30 (ppg) Yield: (ft3/sk)
Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Printed: 9/12/2002 3:15:55 PM
(
~,~
~
~
ConocoPhillips Alaska
Cementing Report
Page 2 of 3
Legal Well Name: CD2-16
Common Well Name: CD2-16
Event Name: ROT - DRILLING
Report #:
Start:
2
8/7/2002
Spud Date: 8/7/2002
Report Date: 8/17/2002
End: 8/24/2002
Stage No: 1 Slurry No: 2 of 3
Slurry Data
Fluid Type: Spacer
Slurry Interval: (ft)
Water Source:
To: (ft)
Description: MUDPUSH XL Class:
Cmt Vol: 50.0 (bbl) Density: 12.50 (ppg) Yield: (ft3/sk)
Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure:
Temperature: (OF)
Temperature: CF)
Temperature: CF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
(OF)
Stage No: 1 Slurry No: 3 of 3
Slurry Data
Fluid Type: TAIL Description:
Slurry Interval: 9,529.00 (ft)To: 8,303.00 (ft) Cmt Vol: 42.0 (bbl)
Water Source: lake water Slurry Vol:207 (sk)
Class: G
Density: 15.80 (ppg) Yield: 1.15 (ft3/sk)
Water Vol: 25.0 (bbl) Other Vol: 0
Purpose: PRIMARY
Mix Water: 5.09 (gal)
Foam Job: N
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure:
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
(OF)
Trade Name
Type
DEFOAMER
DISPERSANT
RETARDR MID-T
FLAC
Concentration
Units
Liquid Cone.
Units
D-46
D-65
D-800
D-167
0.20 %BWOC
0.30 %BWOC
0.04 %BWOC
0.35 %BWOC
Printed: 9/12/2002 3:15:55 PM
(
(
~~
T¡r¡I
~~
ConocoPhillips Alaska
Cementing Report
Page 3 of 3
Legal Well Name: CD2-16
Common Well Name: CD2-16
Event Name: ROT - DRILLING
Report #:
Start:
2
8/7/2002
Spud Date: 8/7/2002
Report Date: 8/17/2002
End: 8/24/2002
Casing Test
Shoe Test
Liner Top Test
Test Press: 3,500 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: N
Pressure: 12.50 (ppge)
Tool: N
Open Hole: 30 (ft)
Hrs Before Test:
Liner lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Tool: N
Tool: N
Log/Su rveyEvaJ uation
Interpretation ,,'Summary
CBl Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run:
Bond Quality:
Temp Survey: N
Hrs Prior to log:
N
Cement Top: (ft)
How Determined:
TOC Sufficient: N
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required:
Number of Remedial Squeezes:
N
OPERATIONAL DETAil Break circulation - circulate & condition mud for cement job
lower YP to 15 Stage pumps up @ .5 BPM fl 2.5 BPM to 5.5 BMP Inital pump press
ure 720 psi - final pump pressure 460 psi recip. pipe (2) 15' strokes every 10 mins u
p wt. 300 - 325 dn wt. 175 - 160 PJSM - Cement 7" casing - Pumped 5 bbls Arco was
h - Tested lines to 3500 psi - Pumped 15 bbls Arco wash @ 8.3 ppg - 4.5 B/P @ 465 P
si - Pumped 50 bbls Mud Push Xl spacer @ 12.5 ppg - 4.5 B/M @ 575 psi - Dropped b
ottom plug - Mixed & pumped 42 bbls (207 sks) Tail slurry - Class G wI .20 % 0046, .
30% 0065, .04% 0800, & .35% 0167 @ 15.8 ppg - 4.5 B/M @ 790 psi - Dropped top pi
ug wI 20 bbls fresh water f/ Dowell - switch to rig pumps & displaced wI 338 bbls 9.7
ppg lSND mud - 7 B/M @ 170 to 720 psi for 322 bbls - slowed pump to 3.5 B/M @ 450
to 530 psi for 16 bbl - Bumped plug wI 338 bbls mud wI 1100 psi - floats held CIP @
1445 hrs. Full returns through job - pipe movement wI 68 bbls left to displace - bum
ped plug wI total of 358 bbls - calc displacement 362 bbls
Printed: 9/12/2002 3:15;55 PM
('
Page 1 of 3
, ,
~I
Phillips Alaska, Inc.
Daily Drilling Report
I JOB NUMBER I EVENT CODE 124 HRS PROG I TMD . IlVD I DFS I REPT NO. I DATE
CD2-16 ODR 9,540.0 7,138.0 11.00 12 8/17/2002
SUPERVISOR I RIG NAME & NO. I FIELD NAME IOCS NO. AUTH MD I DAILY TANG I CUM. TANG
Mickey I Bowie Doyon 19 Alpine 13,894.0 0.00 0.00
CURRENT STATUS ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD CUM INTANG WI MUD
Tih w/6 1/8" bit & drlg assembly {8600'@ Rpt time} 0.00 0.00
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL CUM COST WI MUD
Complete trip,test Csg, drlg out & L.O.T., drlg ahd 8/12/2002 288,716 1,939,885
LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE AUTH.
16.01 WCD.W3AOO06.01
LAST SURVEY: DATE TMD INC AZlM I LAST CASING I NEXT CASING LAST BOP PRES TEST
8/16/2002 9,454.01 83.120 349.700 7.000 (in) @ 9,529.0 (ft) (in) @ (ft) 8/17/2002
DENSITY(ppg) I 9.70 I PP I I ECD I IMUDDATA I DAILY COST I 0.00 I CUM COST I 0.00
FV PVIYP GELS WUHTHP FCIT.SOL OILlWAT %Sand/MBT Ph/pM PflMf CI Ca H2S LIME ES
39 7/18 6/8 5.0/11.0 1/ I 0.0/21.2 8.6/ 0.05/1 20
eHANO. I 3 I BHAiIHOL.ECONDITIONS
SHAWT. BELOW JARS STRING WT. UP STRING WT. ON STRING WT. ROT
WELL NAME
BIT NO. I 3
,BHA LENGTH
377.83
CONN SIZE CONN TYPE
TORQUE / UNITS
LENGTH
0.75
34.06
5.67
2.47
24.44
8.55
10.86
11.23
31.15
30.78
31.15
1.13
92.14
32.12
61.33
O.D.
6.125
4.750
4.820
4.750
4.750
4.720
4.720
4.730
4.680
4.750
4.680
4.750
4.000
4.750
4.000
I.D.
1.500
2.794
2.250
2.250
1.250
1.250
1.250
1.250
2.310
2.310
2.310
2.310
2.563
2.000
2.563
ITEM DESCRIPTION
NO JTS
1
1
1
1
1
1
1
1
1
1
1
1
3
1
2
Bit
Mud Motor
Stabilizer - Non Mag
Sub - Float
MWD
MWD
MWD
Sub - Hang Off
Flex Joint
Flex Joint
Flex Joint
Crossover
Drill Pipe - Heavy Wgt
Jars
Drill Pipe - Heavy Wgt
DEPTH IN DATE IN
9,540.0 8/17/2002 1-1-L T-M-D-I-BT-TD
BIT / RUN
3/
JETS OR TFA
12/12/12/12/13/13
SIZE MANUF. TYPE SERIAL NO.
6.125 HUGHES-CHR DP0796 7100919
3
BIT>OPERATIONS
RPM I GPM I PRESS I P BIT I HRS I 24Hr DIST I
OPERATIONS SUMMARY
TROUBLE SUB PHASE
RUNC INTRM1
24Hr ROP I CUM HRS I CUM DEPTH I CUM ROP
WOB
BIT / RUN
DESCRIPTION
Continue running 7" 26# L-80 BTCM casing fl 163
, to 2487' 61 jts. ran of 232
Break circulation & circulate 7" casing vol. @ 24
87' (95bbls) @ 4 BPM
Continue running 7" 26# L-80 BTCM casing fI 248
7' to 6143' total of 150 jts ran of 232
Break circulation & circulate 2X bottoms up @ 4
BPM 360 psi final pressure
Continue running 7" 26# L-80 BTCM casing fl 614
FROM TO HOURS CODE
00:00 02:00 2.00 CASE P
02:00 02:30 0.50 CASE P
02:30 06:00 3.50 CASE P
06:00 07:30 1.50 CASE P
07:30 10:30 3.00 CASE P
CIRC INTRM1
RUNC INTRM1
CIRC INTRM1
RUNC INTRM1
Printed: 9/12/2002 3:18:45 PM
m~~
I I
~
WELL NAME
CD2-16
('
(
Page 2 of3
Phillips Alaska, Inc.
Daily Drilling Report
I JOB NUMBER I EVENT CODE 124 HRS PROG I TMD
OOR 9,540.0
I TVD I DFS I REPT NO. IDA TE
7,138.0 11.00 12 8/17/2002
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE
07:30 10:30 3.00 CASE P RUNC INTRM1
10:30 11:00 0.50 CASE P RUNC INTRM1
11 :00 11 :30 0.50 CEMENT P
11 :30 13:00 1.50 CEMENT P
13:00 15:00 2.00 CEMENT P
15:00 15:30 0.50 CEMENT P
15:30 16:30 1.00 CEMENT P
16:30 17:30 1.00 WELCTL P
17:30 20:00 2.50 WELCTL P
RURD INTRM1
CIRC INTRM1
DESCRIPTION
3' to 9492' 232 jts. total ran
PU FMC mandrel hanger & landing jt. - land 7" ca
sing in wellhead on mandrel wI shoe @ 9528.65'
FC @ 9445.81' String wt. 345 K up & 165 K dow
n Rig down fill up tool & casing equip
RU Dowell cement head & cement lines
Break circulation - circulate & condition mud for
cement job lower YP to 15 Stage pumps up @ .5
BPM f/ 2.5 BPM to 5.5 BPM Inital pump pressur
e 7 2 0 psi - fin a I p u m p pre s sure 4 6 0 psi r e c i p. P i
pe (2) 15' strokes every 10 mins up wt. 300 - 325
dn wt. 175 - 160
PJSM - Cement 7" casing - Pumped 5 bbls Arco w
ash - Tested lines to 3500 psi - Pumped 15 bbls
Arco wash @ 8.3 ppg - 4.5 B/P @ 465 psi - Pump
ed 50 bbls Mud Push XL spacer @ 12.5 ppg - 4.5
B/M @ 575 psi - Dropped bottom plug - Mixed & p
umped 42 bbls (207 sks) Tail slurry - Class G wI
.20 % 0046, .30% 0065, .04% 0800, & .35% 016
7 @ 15.8 ppg - 4.5 B/M @ 790 psi - Dropped top
plug wI 20 bbls fresh water f/ Dowell - switch to
rig pumps & displaced wI 338 bbls 9.7 ppg LSND
mud - 7 B/M @ 170 to 720 psi for 322 bbls - slow
ed pump to 3.5 B/M @ 450 to 530 psi for 16 bbl -
Bumped plug wI 338 bbls mud wI 1100 psi - float
s held CIP @ 1445 hrs. Full returns through job
stopped pipe movement wI 68 bbls left to displ
ace - bumped plug wI total of 358 bbls - calc dis
placement 362 bbls
RD cement lines & head - LD landing joint - Pull
thin wall wear bushing -
Install pack off, run in lock down bolts & test pa
ck off to 500 psi 110 min.
Install 3 1/2" X 6" variable rams in upper cavity.
Test BOPE 250 I 5000 psi, Annular 250 13500 ps
i.
PUMP INTRM1
OTHR INTRM1
SEaT INTRM1
NUND INTRM1
BOPE INTRM1
INTRM1 M u b h a # 3 [6. 1 2 5 bit, wI 4. 7 5" d rill i n gas s e m b y &
rih. Shallow test motor & Lwd - Mwd equip.
24 HR SUMMARY: Finish running 7" casing - circulate - cement 7" casing-install pack off & test-install 3 1/2 X 6" var pipe rams-test bope-Rih wI
61/8" drlg assembly [incompletre @ rpt time]
20:00 00:00 4.00 DRILL P
COMPANY
Doyon
ARCA
DSR
Dowell
MI
SERVICE
TRIP
PERSONNEL DATA
NO. HOURS COMPANY
26 Sperry-Sun
5 PPCO
4 FMC
2 Epoch
3
SERVICE
4
3
1
2
Printed: 9/12/2002 3:18:45 PM
WELL NAME
ITEM
Fuel
Water, Drilling
TYPE
CD2-50
CD2-16
UNITS
gals
bbls
NO.
990 CD2-16
Phillips Alaska, Inc.
Daily Drilling Report
IJOBNUMBER IEVE~T;~DE 124HRSPROG 1~~540.0
USAGE
1,624
290
MATERIALS I CONSUMPTION
ON HAND ITEM
-40,946 Water, Potable
-11,753
REMARKS
SUPPORT CRAFT
TYPE
Page 3 of 3
I TVD I DFS I REPT NO. I DATE
7,138.0 11.00 12 8/17/2002
UNITS
bbls
USAGE
90
ON HAND
-2,162
NO.
REMARKS
Printed: 9/12/2002 3:18:45 PM
PRESSURE INTEGRITY TEST
PHilliPS Alaska, Inc.
Doyon 19 I Date: 8/18/2002 I Volume Input
Pump used: I Cement Unit I... Barrels ...
... Pumping down annulus. ...
Well Name:
Drilling Supervisor:
CD2-16
I Rig:
Don Mickey
Type of Test: Annulus Leak Off Test for Disposal Adequacy
Hole Size: 18-1/2" I... Casing Shoe Depth
RKB-CHF: 36.4 Ft 2,523 Ft-MD 2,352 Ft-TVD
CasinQ Size and Description: 19-5/8" 36#/Ft J-55 BTC
ChanQes for Annular AdeQuacv Jes
Enter outer casing shoe test results in comments
Casing Description references outel casing string
Hole Size is that drilled below outer casing.
Use estimated TOC for Hole Depth.
Enter inner casing 00 at right.
Hole Depth
8,303 Ft-MD 6,725 Ft-TVD
I...
Pressure InteQritvTes1
Mud Weight: 9.7 ppg
Inner casing 00 7.0 In.
Desired PIT EMW:
Estimates for Test:
14.5 ppg
587 psi
0.5 bbls
I...
I...
EMW = leak-off Pressure + Mud Weight = 777 9 7
0.052 x TVD 0.052 x 2352 + .
EMW at 2523 Ft-MD (2352 Ft-TVD) = 16.1
PIT 15 Second
Shut-in Pressure, psi
630
1000 .
w
0:::
;:)
~ 500-
W
0:::
a..
~I
0
0
2
4
6
Barrels
8
10
12
14 0
5 10 15 20 25
Shut-In time, Minutes
0 PIT Point
"""CASING TEST
~LEAK-OFF TEST
Comments:
FIT = 16.1 ppg EMW
Casing Test
Pumping Shut-in
Bbls psi Min psi
0
1
2
3
4
5
6
7
8
9
10
15
20
25
30
30
...
Pump Rate:
0.5 Bbl/min
...
Pressure Integrity Tes1
Pumping Shut-in
Bbls psi Min psi
0.5 15 0 631
1 22 0.25 630
1.5 25 0.5 630
2 39 1 619
2.5 48 1.5 61(~
3 67 2 59b
3.5 91 2.5 584
4 126 3 575
4.5 176 3.5 566
5 234 4 560
5.5 311 4.5 554
6 364 5 552
6.5 425 5.5 531
7 484 6 530
7.5 534 6.5 531
8 585 7 531
8.5 684 7.5 531
9 730 8 531
9.5 777 8.5 532
1 0 711 9 533
10.5 681 9.5 534-.~
11 663 10 53
11 .5 668
12 693
12.5 678
Volume Volume Volume Volume
Pumped Bled Back Pumped Bled Back
0.0 ~bls _~bls 12.~ Hbls _~bIS
ðoa-ILjLJ
lid 75
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7tl1 Avenue, Suite 100
Anchorage, Alaska 99501-3539
October 25, 2002
RE: MWD Formation Evaluation Logs - CD2-16, AK-MW-22132
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of:
Rob Kalish, Sperry-Sun Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
1 LDWG formatted CD Rom with verification listing.
API#: 50-103~20426-00.
RECEIVED
-~
NOV 06 2002
Alaska Oli & Gas Cons. Commiaion
Anchorage
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Mike Bill
Commissioner
~oy\(} SUBJECT: Mechanical Integrity Tests
THRU: Tom Maunder. I I , " Phillips
P.I. Supervisor \\( .;Q')" CD2
rS CRU
FROM: Chuck Scheve Alpine
Petroleum Inspector
NON. CONFIDENTIAL
f"jJe>
DATE: November 6, 2002
Packer Depth Pretest Initial 15 Min. 30 Min.
Well CD2-16 Type Inj. S TV.D. 6929 Tubing 255 255 255 255 Interval I
P.T.D. 202-144 Type test P Test psi 1732 Casing 1200 2125 2100 2100 P/F f
Notes:
Well CD2-29 Type Inj. S TV.D. 6974 Tubing 520 520 520 520 Interval I
P.TD. 202-148 Type test P Test psi 1744 Casing 1450 2200 2050 2050 P/F f
Notes:
Well CD2-38 Type Inj. S TV.D. Tubing 255 .255 255 255 Interval I
P.T.D. 202-171 Type test P Test psi Casing 1150 1775 1750 1750 P/F f
Notes:
Well CD2-44 Type Inj. S T.V.D. Tubing 120 120 120 120 Interval I
P.T.D. 202-165 Type test P Test psi Casing 125 1950 1925 1925 P/F f
Notes:
Well Type Inj. TV.D. Tubing Interval
P.T.D. Type test Test psi Casing P/F
Notes:
Type INJ. Fluid Codes Type Test Interval
F = FRESH WATER INJ. M= Annulus Monitoring 1= Initial Test
G = GAS INJ. P= Standard Pressure Test 4= Four Year Cycle
s = SALTWATER INJ. R= Internal Radioactive Tracer Survey v= Required by Variance
N = NOT INJECTING A= Temperature Anomaly Survey W= Testduring Workover
D= Differential Temperature Test 0= Other (describe in notes)
Test's Details
I traveled to Phillips CD210cation in the Alpine Field and witnessed the initial MIT on wells CD2-16, CD2-29, CD2-38
and CD2-44. The pr~!esttubing andcasingprêsSUteswereobserved and found to be stable. The standard annulus
pressure test was then performed with all 4 wells demonstrating good mechanical integrity.
M.I.T.'s performed: ~
Attachments:
Number of Failures: .Q
Total Time during tests: 4 hours
~
MIT report form
5/12/00 L.G.
M IT CRU CD2 11-6-02 CS.xls
11/15/2002
Sc~lulll.'gep
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TIN: Beth
Well
Job#
Log Description
CD2-16
~O~.. /l.Jt.J
22413
SCMT
sl~~Ál
Date
08/27/02
DATE:
09/18/02
NO. 2424
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Alpine
^-..
BL
Sepia
Color
Prints
CD
.-"",
Rt:.C':IVED
OCT 0 1 2002
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you.
AJIIka Oil & Gal ConI. ConIIlIKIDn
AnåMnI8
('
1PHí~ PHilLIPS Alaska, Inc.
,æ, A Subsidiary of PHilLIPS PETROLEUM COMPANY
Post Office Box 100360
Anchorage, Alaska 99510-0360
G. C. Alvord
Phone (907) 265-6120
Fax: (907) 265-6224
September 26, 2002
Commissioner Cammy Oechsli Taylor
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West ih Avenue Suite 100
Anchorage, Alaska 99501
Subject: Completion Report for CD2-16 (202-144)
Dear Commissioner:
Phillips Alaska, Inc. submits the attached Completion Report for the drilling operations on the
Alpine well CD2-16.
If you have any questions regarding this matter, please contact me at 265-6120 or Vem Johnson at
265-6081.
Sincerely,
A.t. (ìZ
G. C. Alvord
Alpine Drilling Team Leader
P AI Drilling
GCA/skad
R&(~EIVED
SEP 27: 2002
Alaska 01& Gas Oons. GomB1I8SItm
Anchof8Ø8
ORiGI
¡\L
'}
STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
(
1. Status of well
Classification of Service Well
Oil D Gas
2. Name of Operator
Phillips Alaska, Inc.
3. Address
P. O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
D
Suspended
D
Abandoned D
Service 0
WAG Injector
7. Permit Number
202-144
8. API Number
(ASP: 371697,5974632)
50-1 03-20426-00
9. Unit or Lease Name
1726' FNL, 1544' FEL, Sec. 2, T11 N, R4E, UM
At Top Producing Interval
912'FSL,2555'FEL,Sec.36,T12N,R4E,UM
At Total Depth
1573' FNL, 1453' FWL, Sec. 36, T12N, R4E, UM (ASP: 374782, 5980013)
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
RKB 36' feet ADL 380075 / 380096
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband.
August 7, 2002 August 22, 2002 August 24, 2002
17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey
12500' MD I 7120' TVD 12500' MD I 7120' TVD YES 0 No D
22. Type Electric or Other Logs Run
GR/Res
23.
Colville River Unit
10. Well Number
(ASP: 376008, 5977197)
CD2-16
11. Field and Pool
Colville River Field
Alpine Oil Pool
15. Water Depth, if offshore 16. No. of Completions
NI A feet MSL
20. Depth where SSSV set
N/A
feet MD
21. Thickness of Permafrost
1601' MD
16"
WT. PER FT.
62.5#
36#
26#
GRADE
H-40
J-55
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
TOP BOTTOM
Surface 114'
Surface 2523'
Surface 9529'
HOLE SIZE
9.625"
42"
12.25"
CEMENTING RECORD
10 cu yds Portland Type III
391 sx AS III Lite, 231 sx Class G
207 sx Class G
AMOUNT PULLED
CASING SIZE
7"
8.5"
4.5"
TUBING RECORD
DEPTH SET (MD)
8798'
PACKER SET (MD)
8732'
24. Perforations open to Production (MD + TVD of Top and Bottom and
interval, size and number)
25.
SIZE
open hole completion
26.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
N/A N/A
Date of Test
N/A
Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Injector
Production for OIL-BBL
Test Period>
Calculated
GAS-MCF
W A TER-BBL
CHOKE SIZE
GAS-OIL RATIO
27.
Date First Production
N/A
Flow Tubing
Casing Pressure
OIL-BBL
GAS-MCF
W A TER-BBL
OIL GRAVITY - API (corr)
press.
28.
psi
24-Hour Rate>
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips.
RECEIVED
N/A
OCT '4 2002
SEP 2 T 2002
Alaska 00& Gas Goos. CØInIIitssIon
Anchorage
RROMS BFl
(, I~
Form 10-407 Rev. 7-1-80
COTI~Ei ~~Rrv~1EiRID,=
,'~"'~ : ~ =:~ , ~ \a ,L\ t,.
\ \.c.¡ i ä il:U ,. '-
Submit in duplicate
29.
(
30.
(
GEOLOGIC MARKERS
FORMATION TESTS
MEAS. DEPTH
TRUE VERT. DEPTH
Include interval tested, pressure data, all fluids recovered and gravity.
GOR, and time of each phase.
NAME
CD2-16
Top Alpine D
Top Alpine C
9295'
9404'
7105'
7121'
RECEIVED
31. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey
32. I hereby certify that the following is true and correct to the best of my knowledge.
SEP 2 7' 2002
Alasfèa 01& Gas Cons. Commission
Ançhorage
Questions? Call Vern Johnson 265-6081
Signed ~ L Oe-t
Chip Alvord
Title
Alpine Drillinq Team Leader
Date )(U ((:$2-
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in
item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
(
(~þ
r¡t'jI
~~
(
Page 1 of 12
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name: CD2-16
Common Well Name: CD2-16
Event Name: ROT - DRILLING
Contractor Name: Doyon
Rig Name: Doyon 19
Date From;;' To Hours", 'Code Sub
Code
8/6/2002 10:30 - 12:00 1.50 MOVE DMOB MOVE
12:00 - 13:45 1.75 MOVE MOVE MOVE
13:45 - 15:30 1.75 MOVE POSN MOVE
15:30 - 16:00 0.50 MOVE RURD MOVE
16:00 - 20:30 4.50 WELCTL NUND RIGUP
20:30 - 22:30 2.00 DRILL PULD RIGUP
22:30 - 23:00 0.50 WELCTL BOPE RIGUP
23:00 - 00:00 1.00 DRILL OTHR RIGUP
8n 12002 00:00 - 07:00 7.00 DRILL OTHR RIGUP
07:00 - 09:00 2.00 DRILL OTHR RIGUP
09:00 - 00:00
15.00 DRILL DRLG SURFAC
8/8/2002 00:00 - 13:15 13.25 DRILL DRLG SURFAC
13:15 - 14:00 0.75 DRILL CIRC SURFAC
14:00 - 16:45 2.75 DRILL WIPR SURFAC
16:45 - 17:30
0.75 DRILL CIRC SURFAC
17:30 - 20:15
2.75 DRILL TRIP SURFAC
20:15 - 22:00
1.75 DRILL REAM SURFAC
22:00 - 00:00
2.00 DRILL TRIP SURFAC
Spud Date: 8/7/2002
End: 8/24/2002
Group:
Start: 8/7/2002
Rig Release: 8/24/2002
Rig Number: 19
DescriptibnbfQperatibns
Move out Pit/Motor Complex, skid rig to mov
e position on subbase.
Move rig to well slot 16, center Subbase ove
r well.
Skid rig over well, spot Pit/Motor Complex.
Connect Air, water and mud lines, Spot ball
mill, accepted rig @ 1600 hours.
NU riser and flowline, change out TD saver
sub to 4 1/21F, continue to rig up.
PU & MU bit, motor and MWD collar, scribe t
ools. MU one stand of 8" DC's.
Perform Diverter and Accumulator test, AOG
CC (John Crisp) waived witnessing test.
Continue to clean pits after MOBM system.
Finish cleaning pits after using MOBM.
Take on mud in pits, held pre-spud meeting
with drilling and support crews. Pressure te
st mud lines to 3500 psi - fill conductor and
check for leaks - clean out conductor from
75' to 114'.
Spud well @ 0900 hrs, drill 12 1/4" hole fro
m 114' to 984'. ART=2.96 AST=6.25 Ran
gyro surveys @ 175',265',354',445',535'
and 624' average time required 30 min per s
urvey.
Drill from 984' to 2532' (2358' tvd)'. ART=7.
64 AST=1.5 Added soap to mud @ 1800', in
creased wt. to 9.6 ppg @ 2100'.
Circ and cond mud @ 15.5 bpm - 2140 psi -
100 rpm until I clean (2 x BU).
Flow check well, static. Pulled to 1640' 5-15
k over, worked pipe up from 1640' to 1616'
20-45k over. RIH to 1680', circ @ 14 bpm -
2020 psi - 60 rpm backreamed slowly for 1.5
x BU, circulated out a large amount of cutt
ings, mostly clay. Pulled to 1395', 5-10k ov
er. RIH to 2532', no problems.
Circ and cond mud 15.4 bpm - 2100 psi - 10
0 rpm, heavy cuttings back through 1st BU,
very slight cuttings back @ 2nd BU.
Flow check well, static. POH to 1300' 5-15k
over, slight swab from 1300' to 998' 10-20k
over. Attempted to circ @ 1030', packed off.
RIH to 1110' establish circ. Staged pumps
up to 14 bpm, back reamed slowly from 1030'
, circ 1.5 BU heavy cuttings back, mostly sa
nd. RIH to 1490'.
Backream from 1490' to 1205' to clean up h
ole, 15.4 bpm - 2110 psi - 60 rpm. Circulate
d 1.5 x BU first 2 stands, 2.5 x BU on third
stand, heavy cuttings back untill last BU, m
ostly clay.
Flow check well, static. P 0 H s low I Y ,h 0 let a
Printed: 9/13/2002 4:00:43 PM
~~,
T¡I"jI
~
('
Page 2 of 12
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name: CD2-16
Common Well Name: CD2-16
Event Name: ROT - DRILLING
Contractor Name: Doyon
Rig Name: Doyon 19
Date From-To ~ Hours Code Sub Phase
Code
8/8/2002 22:00 - 00:00 2.00 DRILL TRIP SURFAC
8/9/2002 00:00 - 02:30 2.50 DRILL PULD SURFAC
02:30 - 04:00 1.50 CASE RURD SURFAC
04:00 - 04:15 0.25 CASE SFTY SURFAC
04:15 - 08:00 3.75 CASE RUNC SURFAC
08:00 - 08:30
08:30 - 09:45
0.50 CASE RURD SURFAC
1.25 CEMENTCIRC SURFAC
09:45 - 10:00
0.25 CEMENTCIRC SURFAC
10:00 - 11 :00
1.00 CEMENT PUMP SURFAC
11 :00 - 11 :30
0.50CEMENTDISP SURFAC
11 :30 - 13:30 2.00 CEMENT RURD SURFAC
13:30 - 16:30 3.00 WELCTL NUND SURFAC
16:30 - 21 :00 4.50 WELCTL NUND SURFAC
21 :00 - 00:00 3.00 WELCTL BOPE SURFAC
8/1 0/2002 00:00 - 01 :30 1.50 WELCTL BOPE SURFAC
01 :30 - 02:00 0.50 CASE RURD SURFAC
02:00 - 05:00 3.00 DRILL PULD SURFAC
05:00 - 07:00
2.00 DRILL TRIP SURFAC
07:00 - 08: 15
1.25 CEMENT COUT SURFAC
08:15 - 09:30
1.25 CASE DEQT SURFAC
09:30 - 10:15
0.75 RIGMNT RSRV SURFAC
Spud Date: 8/7/2002
End: 8/24/2002
Group:
Start: 8/7/2002
Rig Release: 8/24/2002
Rig Number: 19
Description of Operations
king proper fill, 5-10k over.
Stand back hwdp and 8" DC's - lay down stab
s, LWD and pony collars, bit and motor - cle
ar tools from floor.
RU slips, elevators, fill-up tool and power t
ongs to run 9 5/8" casing.
Held safety and opts meeting with crew.
Ran 59 joints of 9 5/8", 36#, J-55 BTC cas in
g MU hanger and LJ, land casing with shoe
@ 2523', FC @ 2436'.
Lay down fill-up tool and MU cement head.
Staged pumps up to 8 BPM - circ and conditi
on mud for cementing - final circ pressure 3
40 ps i.
Pumped 40 bbls of biozan preflush with nutp
lug for marker, line up to cementers.
Test lines to 2500 psi, pumped 50 bbls of 1
0.5 ppg Mudpush XL spacer, 391 sxs of 10.7
ppg lead and 230 sxs of 15.8 ppg tail ceme
nt.
D i s P I ace d c e men t wit h 2 0 b b I s of F W fro mc
em enters followed by 168 bbls of 9.6 ppg mu
d. Reciprocated pipe untill tail @ shoe, aver
age displacement rate 10 bpm, plugs bumpe
d - floats held. Full returns throughout job,
dumped 108 bbls of 10.7 ppg cement back.
Flush Surface stack and flowline, LD cement
head, landing joint, running tools and long
bai Is.
ND Diverter system, install FMC Unihead - t
ested M/M seal to 1000 psi - 10 min.
NU BOP stack - changed out Annular Preven
ter- NU bell nipple, flowline, turn buckles a
nd service lines.
Test BOPE, 250/5000 psi - Annular Prevente
r - 250/3500 psi. Repaired leaks on wellhea
d flanges.
Completed BOPE testing - John Spaulding w
aived witnessing test, Install long wear bus
hi n g.
Install drilling bails on Top Drive, change r
unning tools to 4".
MU BHA #2 - bit - motor @ 1.5 - NM pony -
AGS - LWD - MWD - fs - 3 flex collars - jars
- 5 jts hwdp - xo. Initialize tools and functi
on test AGS.
PU 30 jts of 4" drill pipe and RIH, tagged ce
ment stringer @ 2347'.
Clean out to 2408', circ and condition ceme
nt contaminated mud.
RU and test casing to 2500 psi for 30 min.
RD test lines.
C h a n g e d 0 uti e a kin g was h pipe a n dp a c kin g
Printed: 9/13/2002 4:00:43 PM
~~
TfI'lI
\~¡
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name: CD2-16
Common Well Name: CD2-16
Event Name: ROT - DRILLING
Contractor Name: Doyon
Rig Name: Doyon 19
Date From - To Hours Code Sub Phase
Code
8/10/2002 09:30 - 10:15 0.75 RIGMNT RSRV SURFAC
10:15 -11:00 0.75 CEMENT DSHO SURFAC
11 :00 - 11 :45 0.75 RIGMNT RGRP SURFAC
11 :45 - 12:30 0.75 CEMENT DSHO SURFAC
12:30 - 14:00 1.50 CEMENT FIT SURFAC
14:00 - 00:00 10.00 DRILL DRLG INTRM1
8/11/2002 00:00 - 04:15 4.25 DRILL DRLG INTRM1
04:15 - 05:00 0.75 DRILL CIRC INTRM1
05:00 - 08:15 3.25 DRILL WIPR INTRM1
08:15 - 09:00 0.75 DRILL CIRC INTRM1
09:00 - 00:00 15.00 DRILL DRLG INTRM1
8/12/2002 00:00 - 20:00 20.00 DRILL DRLG INTRM1
20:00 - 21 :00
1.00 DRILL DRLG INTRM1
21 :00 - 00:00 3.00 DRILL WIPR INTRM1
8/13/2002 00:00 - 00:30 0.50 DRILL REAM INTRM1
00:30 - 12:00 11.50 DRILL DRLG INTRM1
12:00 - 00:00
12.00 DRILL DRLG INTRM1
Page 3 of 12
Spud Date: 8n /2002
End: 8/24/2002
Group:
Start: 8n /2002
Rig Release: 8/24/2002
Rig Number: 19
Qèsçription of Operations
on Top Drive.
Drill out cement and FC from 2408' to 2467'
(FC @ 2436").
Welder repaired washout on gunline in pit #
5.
Drill out cement and FS, clean out rathole a
nd drill 20' of new hole to 2552'.
Circ and cond mud - RU and perform PIT to
EMW=16.0 ppg.
Drill from 2552' to 3518' ART=5.47 AST=0.1
7 Changed well over to 9.3 ppg LSND mud
while drilling ahead @ 2565'.
Drill from 3518' to 4091' (3715' tvd). ART=2
.08 AST=.1
Pumped 40 bbls 150 FV sweep, circ for wipe
r trip 650 gpm - 75 rpm (bha limit). Heavy c
uttings increase with sweep back.
Wiped hole to shoe, had to pull slowly from
3600' to avoid swabbing. Monitor well at sho
e, static. RIH to 3900', no problems.
Precautionary ream last 2 stands from 3900'
to 4091' had heavy cuttings returns through
out first BU.
Drill from 4091' to 5618'. ART=7.68 AST=1.
87 Backream each stand one time prior to c
onnection.
Drill from 5616' to 6287'. ART=1.93 AST=11
.43 Initial difficulty with weight transfer to
bit while sliding was eliminated with nutplug
and lubtex. Fell behind plan requiring 75' /
stand slides to recover. Toolface remained
very reactive to wt. on bit reducing ROP to
30-40 fph.
Pumed 40 bbls of 150 FV sweep, circ and co
nd mud 600 gpm - 75 rpm, saw slight increa
se in cuttings with sweep back. Flow check
well, static.
Wiped hole to 3900' average drag 10-15k, 2
5-30K over from 4830' to 4720' (sand interv
at). Flow check well, static. RIH to 6191'.
Establish circulation - Precautionary wash &
ream f/ 6191' to 6287', no detectable fill.
Drill 8 1/2" hole f/ 6287' to 7177' MD 6052'
TVD. Parameters: Pump P 2300 - 2850 psi
@ 540 gpm, wob 8 - 10 k Ibs, rpm rot / slid
e 255 1180, on I off bottom torque 8500 - 8
500 ft-Ibs. Rot rop 185 wI peaks to 280 fph
, slide rop 30 fph. ADT- 7.91 hrs ART- 4
.65 hrs AST- 3.26 hrs Difficult holding to
01 face @ 7084 & 7147 - 7180'.
Continue to dir drlg 7177 - 8128' md 6619'
tvd. Parameters: Pump P 2900 - 3300 psi
Printed: 9/13/2002 4:00:43 PM
/~~
TfI7I
~!:Ø
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
8/13/2002
8/14/2002
8/15/2002
(
Page 4 of 12
ConocoPhillips Alaska
Operations Summary Report
CD2-16
CD2-16
ROT - DRILLING
Doyon
Doyon 19
Sub
From- To Hours" Code Code Phase
12:00 - 00:00
00:00 - 01 :30
01 :30 - 02:30
02:30 - 08:00
12.00 DRILL DRLG INTRM1
1.50 DRILL DRLG INTRM1
1.00 DRILL CIRC INTRM1
5.50 DRILL WIPR INTRM1
08:00 - 09:00 1.00 DRILL CIRC INTRM1
09:00 - 09:30 0.50 DRILL TRIP INTRM1
09:30 - 10:00 0.50 DRILL REAM INTRM1
10:00 - 12:00 2.00 DRILL DRLG INTRM1
12:00 - 00:00
00:00 - 05:30
05:30 - 06:30
06:30 - 12:00
12.00 DRILL DRLG INTRM1
5.50 DRILL DRLG INTRM1
1.00 DRILL CIRC INTRM1
5.50 DRILL DRLG INTRM1
Spud Date: 8/7/2002
End: 8/24/2002
Group:
Start: 8/7/2002
Rig Release: 8/24/2002
Rig Number: 19
Description of Operations
@ 540 gpm, wob 18 - 20k Ibs, rpm rot I slid
e 255 1180, on bottom torque 10000 - 12000
ft-Ibs. Rot rop in the 165 range wI peaks t
0 230 fph, sliding 40 fph. Adt 6.68 Art 4.
82 Ast 1.86.
Drill 8 1/2" hole fl 8128' to 8293' MD - 6715
'TVD 75 RPM - 15/20 WOB - 546 GPM @ 33
20 psi - 138.5 ROP Down hole RPM - 180 A
DT- 1.41 hrs. ART- 1.0 hrs. AST- .41 hrs.
Pump hi-vis sweep - cirulate hole clean for
wiper trip - monitor well - static.
POOH fI 8293' to 7720' (6 stds.) - started p
ulling tight @ 7720' - 20 to 35K over & swab
bing - Pumped out fI 7720' to 7338' - attemp
t to pull wlo pump fI 7338' to 7242' 25K ove
r & swabbing - Continue pumping out fl 7242
, to 6478' - Pull fl 6478' to 6000' on trip tan
k - pulling 20 to 35 K over in spots.
Circulate bottoms up fI 6000' - Observed lar
ge amount of cuttings fl bottoms up
Monitor well - static - RIH fI 6000' to 8198'
Establish circulation - safety wash & ream f
18198' to 8293'
Drill 8 1/2" hole fl 8293' to 8388' MD, 6770
TVD 2800 - 3050 psi @ 546 GPM, WOB 1
0 - 20 k Ibs, dwn hole rpm 180 I 255, torque
0 n I 0 f f b t m 1 1 . 5 k 1 9. 5 k f t - I b s, .p u Iso 1 rot w
ts 200 1160 1180 k Ibs. Note: pumped hi v
is sweep immediately after start of drilling -
brought large amt of cuttings ADT- 1.21
hrs ART- .55 hrs. AST- .66 hrs.
Drlg 8388 - 8746'md [6932' tvd]. 2800 - 310
0 psi @ 546 GPM, WOB 10/20k Ibs, Down hol
e RPM 180 I 255, torque on off btm 11.5k Ib
s 1 9.5k Ibs, pulsolrot wts 210/160/180k Ibs.
ADT - 6.25 hrs ART- .45 hrs. AST- 5
.80 hrs. ROP rot = 100 - 160 fph ROP slide
= 30 -70 fph eratic.
Dril18 1/2" hole fl 8746' to 9056' MD - 7036
'TVD 75 RPM - 10/20 K WOB - 564 GPM @
3120 psi String wt. 215/155/185 U/D/R - To
rque 11,5001 9500 ADT- 3.59 hrs. ART-..5
9hrs. AST- 3.00 hrs. Avg. ROP sliding 80
FPH Avg. ROP rot. 80 FPH Trouble sliding
@ 9021'
Pump low/highivs sweep & circulate sweep b
ack to surface - observed slight amount of c
uttings at shakers
Dril18 1/2" hole fI 9056' to 9225' MD 7099'
TVD Same parameters as above ADT- 4.29
hrs. ART- ..64 hrs. AST- 3.65'
Printed: 9/13/2002 4:00:43 PM
~S'~
T¡rfI
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
8/15/2002
8/16/2002
(
Page 5 of 12
ConocoPhillips Alaska
Operations Summary Report
CD2-16
CD2-16
ROT - DRILLING
Doyon
Doyon 19
Sub
From ~ To ", Hours" Code Code Phase
12:00 - 21 :00
21 :00 - 22:00
22:00 - 00:00
00:00 - 03:00
03:00 - 06:00
06:00 - 08:30
08:30 - 11 :30
11 :30 - 15:30
15:30 - 18:00
18:00 - 19:00
19:00 - 19:30
19:30 - 21 :30
21 :30 - 22:00
22:00 - 00:00
9.00 DRILL DRLG INTRM1
1.00 DRILL CIRC INTRM1
2.00 DRILL DRLG INTRM1
3.00 DRILL DRLG INTRM1
3.00 DRILL CIRC INTRM1
2.50 DRILL WIPR INTRM1
3.00 DRILL CIRC INTRM1
4.00 DRILL TRIP INTRM1
2.50 DRILL CIRC INTRM1
1.00 DRILL PULD INTRM1
0.50 CASE OTHR INTRM1
2.00 WELCTL BOPE INTRM1
0.50 CASE SFTY INTRM1
2.00 CASE PUTB INTRM1
Spud Date: 8/7/2002
End: 8/24/2002
Group:
Start: 8/7/2002
Rig Release: 8/24/2002
Rig Number: 19
DescriptionofOpërations
Dril18 1/2" hole fl 9225' to 9450' MD - 7036
'TVD 75 RPM - 10/20 K WOB - 564 GPM @
3200 psi String wt. 220/155/182 U/D/R - To
rque 12,500/10500 Avg. ROP Rot I sliding
80 /15 FPH Avg. ROP rot. 60 FPH Troubl
e sliding @ 9247,9326,9425 & 9447'.
Stand back one stand. Rot @ 74 rpm I work
pipe Pumped 30 bbl low vis followed by 30
bbl high vis pills 564 gpm. Grade pill effect
¡veness @ 2, shakers 30% covered for 40 se
conds wI fine sandy material, decreased ec
d .06 ppg.
Drill 8 1/2" hole fl 9450' to 9485 MD - 7127'
TVD 75 RPM - 10/20 K WOB - 564 GPM @ 3
280 psi String wt. 225/155/182 U/D/R - Tor
que 130001 11000 ADT- 6.0 hrs. ART- 1.85
hrs, AST- 4.15 hrs. Avg. ROP sliding 80 F
PH Avg. ROP rot. 80 FPH Alpine formation
estimates 9402 'Md 7122' Tvd.
Drill 8 1/2" hole f/ 9485' to 9540' MD 7138"
TVD 75 RPM - 10K WOB - 546 GPM @ 3280
psi Torq. 13500/9000 - St. Wt. P/U 230K S
10 155k Rot 185K ADT- 2.10 hrs. ART- 2.1
hrs. AST- 0
Pump lowlhi vis sweep - circulate hole clean
for wiper trip Pumped 3X bottoms up - rot
aoe pipe @ 75 RPM & pump 600 GPM
Monitor well - static - Wipre trip f/ 9540' to
8000' - hole in good condition - no excessiv
e over pull & hole took proper fill - Monitor
well @ 8000' - static - RIH fl 8000' to 9540'
(establish circ & safety ream last 90' to bo
ttom)
Pump low/hi vis sweep & circulate hole clea
n 3X bottoms up Rotate pipe @ 75 RPM - pu
mp 600 GPM - Pulling & std back 1 std. DP
after each bottom up (stood back 3 stds. to
9343')
Monitor well @ 9343' - static - POOH f/ 934
3' to 4091' (55 stds) - hole in good conditio
n - no excessive drag - hole taking proper fi
II
Pump dry job @ 4091' - Continue to POOH fl
4091' to 300'.
LD BHA
Flush stack.
Pick up test jt, pull wear bushing, install te
st plug, x-out rams for 7" rams & test to 35
00 psi I 10 min.
PJ S M
Pick up & run 4 of 232jts 7" x 26 ppf x BT&
C Mod csg. Thread lock 1st 3 jts, ck Supers
eal floats good, & make crew change w/ PJS
Printed: 9/13/2002 4:00:43 PM
(~~
~
~
('
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
8/16/2002
8/17/2002
From ,-"To
22:00 - 00:00
00:00 - 02:00
02:00 - 02:30
02:30 - 06:00
06:00 - 07:30
07:30 - 10:30
10:30 - 11 :00
11 :00 - 11 :30
11 :30 - 13:00
13:00 - 15:00
(
Page 6 of 12
ConocoPhillips Alaska
Operations',Summary Report
CD2-16
CD2-16
ROT - DRILLING
Doyon
Doyon 19
Sub
~()lJ.rs.Ç()d~. -Code
Phase
2.00 CASE PUTB INTRM1
2.00 CASE RUNC INTRM1
0.50 CASE CIRC INTRM1
3.50 CASE RUNC INTRM1
1.50 CASE CIRC INTRM1
3.00 CASE RUNC INTRM1
0.50 CASE RUNC INTRM1
0.50 CEMENT RURD INTRM1
1.50 CEMENTCIRC INTRM1
2.00 CEMENT PUMP INTRM1
15:00 - 15:30 0.50 CEMENT OTHR INTRM1
15:30 - 16:30 1.00 CEMENT SEQT INTRM1
16:30 - 17:30 1.00 WELCTL NUND INTRM1
17:30 - 20:00 2.50 WELCTL BOPE INTRM1
20:00 - 00:00 4.00 DRILL TRIP INTRM1
Spud Date: 8n/2002
End: 8/24/2002
Group:
Start: 8n /2002
Rig Release: 8/24/2002
Rig Number: 19
Description of Operations
M.
Continue running 7" 26# L-80 BTCM casing f
1163' to 2487' 61 jts. ran of 232
Break circulation & circulate 7" casing vol.
@ 2487' (95bbls) @ 4 BPM
Continue running 7" 26# L-80 BTCM casing f
12487' to 6143' total of 150 jts ran of 232
Break circulation & circulate 2X bottoms up
@ 4 BPM 360 psi final pressure
Continue running 7" 26# L-80 BTCM casing f
16143' to 9492' 232 jts. total ran
PU FMC mandrel hanger & landing jt. - land
7" casing in wellhead on mandrel wI shoe @
9528.65' FC @ 9445.81' String wt. 345 K u
P & 165 K down Rig down fill up tool & casi
ng equip
RU Dowell cement head & cement lines
Break circulation - circulate & condition mu
d for cement job lower YP to 15 Stage pum
ps up @ .5 BPM fl 2.5 BPM to 5.5 BPM Init
al pump pressure 720 psi - final pump press
ure 460 psi recip. pipe (2) 15' strokes ever
y 10 mins up wt. 300 - 325 dn wt. 175 - 160
PJSM - Cement 7" casing - Pumped 5 bbls A
rco wash - Tested lines to 3500 psi - Pumpe
d 15 bbls Arco wash @ 8.3 ppg - 4.5 B/P @
465 psi - Pumped 50 bbls Mud Push XL spac
er @ 12.5 ppg - 4.5 B/M @ 575 psi - Droppe
d bottom plug - Mixed & pumped 42 bbls (20
7 sks) Tail slurry - Class G wI .20 % D046,
.30% 0065, .04% 0800, & .35% 0167 @ 15.8
ppg - 4.5 B/M @ 790 psi - Dropped top plug
wI 20 bbls fresh water fI Dowell - switch to
rig pumps & displaced wI 338 bbls 9.7 ppg
LSND mud - 7 B/M @ 170 to 720 psi for 322
bbls - slowed pump to 3.5 B/M @ 450 to 530
psi for 16 bbl - Bumped plug wI 338 bbls m
ud wI 1100 psi - floats held CIP @ 1445 hrs
. Full returns through job - stopped pipe m
ovement wI 68 bbls left to displace - bumpe
d plug wI total of 358 bbls - calc displacem
ent 362 bbls
RD cement lines & head - LD landing joint -
Pull thin wall wear bushing -
Install pack off, run in lock down bolts & te
st pack off to 500 psi I 10 min.
Install 3 1/2" X 6" variable rams in upper ca
vi t y.
Test BOPE 250 I 5000 psi, Annular 250 I 35
OOps i.
Mu bha #3 [6.125 bit, wI 4.75" drilling asse
mby & rih. Shallow test motor & Lwd - Mwd
Printed: 9/13/2002 4:00:43 PM
~,
r¡r¡I
\~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
8/17/2002
8/18/2002
8/19/2002
(
(
ConocoPhillips Alaska
Operations Summary Report
CD2-16
CD2-16
ROT - DRILLING
Doyon
Doyon 19
Page 7 of 12
Spud Date: 8/7/2002
End: 8/24/2002
Group:
Start: 8/7/2002
Rig Release: 8/24/2002
Rig Number: 19
D~sCripti()n ofOpetatibrlS
Sub
From ';. To HOlJrs Code Code Phase
20:00 - 00:00
00:00 - 00:30
00:30 - 06:00
06:00 - 06:30
06:30 - 07:30
07:30 - 08:30
08:30 - 12:00
4.00 DRILL TRIP INTRM1
0.50 RIGMNT RSRV INTRM1
5.50 DRILL TRIP INTRM1
0.50 DRILL REAM INTRM1
1.00 DRILL CIRC INTRM1
1.00 DRILL OTHR INTRM1
3.50 CEMENT DSHO INTRM1
12:00 - 12:30 0.50 DRILL CIRC INTRM1
12:30 - 13:30 1.00 DRILL FIT INTRM1
13:30 - 15:30 2.00 DRILL CIRC PROD
15:30 - 22:00 6.50 DRILL DRLH PROD
22:00 - 00:00
00:00 - 01 :00
2.00 DRILL CIRC PROD
1.00 DRILL DRLH PROD
01 :00 - 01 :30 0.50 DRILL CIRC PROD
01 :30 - 02:30 1.00 DRILL CIRC PROD
02:30 - 03:30 1.00 DRILL TRIP PROD
03:30 - 04:30 1.00 DRILL OBSV PROD
04:30 - 05:30 1.00 DRILL TRIP PROD
05:30 - 10:30
5.00 DRILL OBSV PROD
eq u i p.
Cut & slip drill line 60'
RIH - PU 132 jts. 4" DP fI shed - RIH wI DP
fl derrick to 9252' (fill every 20 stds)
Establish circ - wash down fl 9252' wI 2.5 B
IP @ 690 psi - tag up @ 9338'
Circulate bottoms up for casing test
RU & pressure test 7" casing to 3500 psi for
30 mins - RD
C/O cmt - wiper plugs - FC @ 9446' - cmt to
FS @ 9528' - Drill out shoe & C/O rat hole
to 9540' Drill 20' new hole to 9560' ADT-
.3 ART-.3
Circulate hole clean for FIT
RU - Perform F.I.T. to 12.5 ppg EMW wI 9.8
ppg mud wI 1010 psi - RD
Change well over fl 9.8 ppg LSND mud to 8.
8 ppg Flow Pro mud - monitor well - static
Dril16 1/8" hole fI 9560' to 9818' 7139' tvd
1680 psi @ 5bpm, bit wt 5-7k Ibs, rot @ 7
0 rpm, down hole 280. Torque on I off 10 19
k ft-Ibs. Rop 95 fph rot, 35 slide. ADT- 4.7
hrs. ART- 1.45 hrs AST- 3.25 hrs.
Lost partial rts [100 bbl/hr], reduced pump r
ate to 2.5 bpm, continued to lose +1- 60 b/h
r. Pu off bottom & spot 2 x 20 bbl 20 ppb
mixed size Icm pills increased rate to 5 bp
m when Icm on formation. losses reduced to
30-40 bph. Lcm concentrations limited to
20 ppb [ Iwd - mwd equip]. Total losses @
rpt 90 bbl.
Control Drlg ahd @ 50'/hr wI 30 -60 bbl/hr I
osses: 9817 - 9855', 7132' tvd. Reduced
pump rate of 3 bbl/min - 1070 psi. Mixing I
cm on the fly @ 20 - 30 Ib/bb!. Losses cont
inue @ 75 -100 bbl/hr.
Cir I cond, mix 40 bbl 35 Ib/bbl mixed size I
cm pill. Recipie = Coarse, med & fine. CaC
03,
Pump & disp 26 bbl Icm pill as above to dp
x annular space.
Pooh to 9250', 26 bbl Icm pill below bit. Hol
e took 9 excess bbl to fill while pulling out
Monitor well, circulate across top via trip ta
nk. Lost 23 bbl in 50 min [ rate 26 bbl/hr].
Rih to 9535' while mixing I increasing Icm pi
II to 40 bbl volume [35 Ib/bbl mixed size Ca
C03 & fine fiber material]. Spot 40 bbls LC
M pill
Monitor well on trip tank - losses slowed fI
26 bbls Ihr. to 14 bbls/hr (Mixed 40 bbl LC
Printed: 9/13/2002 4:00:43 PM
(~~,
~
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
8/19/2002
8/20/2002
(
(
ConocoPhillips Alaska
Operations Summary Report
CD2-16
CD2-16
ROT - DRILLING
Doyon
Doyon 19
Page 8 of 12
Spud Date: 8n /2002
End: 8/24/2002
Group:
Start: 8n /2002
Rig Release: 8/24/2002
Rig Number: 19
Description of Qperati()ns
Sub
From-To HÖlJrsCode Code Phase
05:30 - 10:30
10:30 - 12:00
12:00 - 23:30
23:30 - 00:00
00:00 - 00:30
00:30 - 01 :30
01 :30 - 03:30
5.00 DRILL OBSV PROD
1.50 DRILL DRLH PROD
11.50 DRILL DRLH PROD
0.50 DRILL CIRC PROD
0.50 DRILL DRLH PROD
1.00 DRILL CIRC PROD
2.00 DRILL DRLH PROD
03:30 - 04:30 1.00 DRILL CIRC PROD
04:30 - 07:30 3.00 DRILL OBSV PROD
07:30 - 08:00 0.50 DRILL CIRC PROD
08:00 - 09:00 1.00 DRILL DRLH PROD
09:00 - 10:00 1.00 DRILL CIRC PROD
10:00 - 10:30 0.50 DRILL TRIP PROD
10:30 - 12:30 2.00 DRILL OBSV PROD
12:30 - 14:00 1.50 DRILL CIRC PROD
M pill in pill pit, sized Safe-Carb & mixed f
iber LCM into 140 bbls mud in pit #5 - 35#/b
bl [ MI Seal fine, MI seal med. & nut plug m
e d] )
RIH to 9860' - Drill 6 1/8" hole 1/ 9860' to 9
906' MD 7130' TVD - Pumped 15 bbls 1/ pit
5 wI LCM & 15 bbls fl pit 6 wI no LCM until
60 bbls LCM pill pumped 1/ pit 5 - lossse slo
wed to 20 bbls/hrs while drilling - rotated 4
2' ADT- 1.9 hrs. ART- 1.9 hrs.
Drill 6 1/8" hole 1/ 9906' to 10488' Md 7121
TVD. 2000 psi I 5bpm, bit wt 5 - 6k Ibs 50 -
90 rpm Torque on loff bot 10k I 9k ft-Ibs.
PU ISO I Rot wts = 200 1155 I 185k Ibs.
Adt = 7.94 = art 3.71 + ast 4.23 hrs.
Lost partial rts, pu off bottom & pump 15 bb
I Icm 22.5 Ibl bbl pill,disp same @ rpt time
24hr mud losses = 644 bbl. Total los
ses to well - 780 bbls
Dril18 1/2" hole fl 10488' to 10495'[rot] wI
good returns. Started slide @ 10495'+ & 10
st all returns. XXX X 34 ppb Icm pill Recip
e = 100 bbl base mud, 30 sx each of MI Sea
I fine I medium I, a mix of 40 sx Mix II Co
arse - medium - fine, & 2 sx CaC03 mix. XX
XX
Pump 2 x 20 bbl Icm pills [as above] w/15
bbl mud spacer between same. Had 90% ret
urns before 2nd pill hit.
Drlg 10495 - 10617' , wI 30' of good slide.
Using reduced pump rate of 168 gpm 11450
psi. Returns from 50 - 90%. Bit wt 5 - 10 k
Ibs. Lost all returns
Work pipe & disp 50 bbl pre-mixed Icm pill [
as above], had 75 to 90% returns before pill
on formation.
Set back stand & observe well while keeping
hole full from annulus side. - no losses in
static condition
PU 1 std DP & Spot 55 bbls LCM pill wI 35#1
bbl hole took 40 bbls whole spotting LMC pi
II
Drill 6 1/8" hole 1/ 10617' to 10664' MD 712
3' TVD ADT- 2.13 hrs. ART- 1.75 hrs. AST
- .38 hrs. Losses went 1/ 24 bbls/hr to 264
bbsl hr @ 10654' - lose rate slowed to 120
bbls/hr to 10664'
Spot 34 bbls LCM pill wI 35 #/bbls - losses
while spot pill fl 360 bbls/hr
Pulled back to 10206'
Monitor well on trip tank while letting LMC p
ill soak Static losses 6.4 bbls/hrs
Circulate excess LCM pill out @ 10206' - 84
Printed: 9/13/2002 4:00:43 PM
/~,
TfTiI
~~
(
(
ConòcóPhillips Alaska
Operations Summary. Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
CD2-16
CD2-16
ROT - DRILLING
Doyon
Doyon 19
Sub
From ~T a_Hours' .' Code-Code
Phase
8/20/2002
8/21/2002
12:30 - 14:00 1.50 DRILL CIRC PROD
14:00 - 15:00 1.00 DRILL TRIP PROD
15:00 - 00:00 9.00 DRILL DRLG PROD
00:00 - 07:00
7.00 DRILL DRLH PROD
07:00 - 08:00
1.00 DRILL CIRC PROD
08:00 - 09:30
1.50 DRILL DRLH PROD
09:30 - 10:30
1.00 DRILL CIRC PROD
10:30 - 12:00
1.50 DRILL DRLH PROD
12:00 - 18:30 6.50 DRILL DRLH PROD
18:30 - 19:30 1.00 DRILL CIRC PROD
19:30 - 00:00 4.50 DRILL PROD
Page 9 of 12
Spud Date: 8/7/2002
End: 8/24/2002
Group:
Start: 8/7/2002
Rig Release: 8/24/2002
Rig Number: 19
Description of Operations
bbls while circulating bottoms up - 56 bbl/h
rs loss rate
RIH 1/ 10206' to 10664' (wash last 60' to bt
m)
Dril16 1/8" hole fl 10664' to 11109'md 712
5'tvd 1265 psi 140 spm, 60 rpm, [motor rp
m 157 rpm], torque on / off bot = 10k Ibs /
9k. LCM pumping schedule; 5 bbl Icm [re
cipie above] 15 bbl mud stageing to 5 bbl I
cm to 50 bbl mud. Losses in the 16 bph ran
ge wI instaneous "drinks" to 90 bph. adt
= 6.1 = art 5.05 + ast 1.04 hrs. Mud loss
es last 24 hrs = 864 Total loses to well - 1
644 bbls
Dril16 1/8" hole 1/ 11,109' to 11,508' MD 7
116 TVD 50 RPM - 5/6 K WOB - 151GPM @
1940 psi Hole taking fluid @ 31.7 bbls/hrs.
avg. XXX X 34 ppb Icm pill Recipe = 100 b
bl base mud, 30 sx each of MI Seal fine I m
edium I, a mix of 40 sx Mix II Coarse - me
dium - fine, & 2 sx CaC03 mix. XXX X
Hit drilling break @ 11,508 - lost all returns
- PU off bottom - pump LCM pill - work pip
e hole getting sticky - slowly regained retur
ns
Drill 6 1/8" hole 1/ 11,508' to 11585' MD 711
6' TVD 50 RPM - 5/6 k WOB - 151 GPM @ 1
940 psi
Hit drilling break - same as above - lost all
returns - PU off bottom - pump LCM pill - wo
rk pipe - hole sticky - regained returns slow
Iy
Dril16 1/8" hole 1/ 11585' to 11659' md 711
6' tvd. 2000 psi 1151 gpm, wob = 4 -7 k Ibs
, torque on I off bottom = 12k ft-Ibs I 11 k, P
u wt I so I rot = 205k Ibs /150 /175. Losin
g 15 - 25 bph wI instaneous losses to 75 bp
h. Pump schedule: 5 to 10 bbl Icm pill fall
owed by 50 bbl mud. Adt = 6.73 hrs = art 5.
43 + ast 1.30 Mud losses since midnight =
329 bbl
Drlg 11659 - 11927', 7119' tvd. Parameters
as above. @ end of time block losses inc
reased rapidly to 100+ bbl/hr.
Pu 60' off bottom, decrease pump rate to 3
bbl I min & spot 35 bbl pill, regained 90%+
returns.
Drlg 11927' - 12117' 7121'tvd. Losses went
to 100 bbl/hr @ 11932', reduce pump & drl
grate & pump 30 bbl pill while continuing to
drlg. Regained returns before pill hit. C
0 n tin u eta d rig, m a i n t a i n i n ,g + I - 5 0 f t I h r, r p
m si nth e 5 0 - 6 5 range & f low rat e s in the
Printed: 9/13/2002 4:00:43 PM
/~,
TjTjI
,~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Datê
8/21/2002
8/22/2002
ConocoPhillips Alaska
Operations Summary Report
CD2-16
CD2-16
ROT - DRILLING
Doyon
Doyon 19
Page 10 of 12
Spud Date: 8n /2002
End: 8/24/2002
Group:
Start: 8n /2002
Rig Release: 8/24/2002
Rig Number: 19
D~scriptiön öfOperati()m;
Sub
From-To HotlrsCode Code Phase
19:30 - 00:00
00:00 - 02:30
02:30 - 04:00
04:00 - 05:30
4.50 DRILL
PROD
2.50 DRILL DRLH PROD
1.50 DRILL CIRC PROD
1.50 DRILL DRLH PROD
05:30 - 07:30 2.00 DRILL CIRC PROD
07:30 - 08:00 0.50 DRILL DRLH PROD
08:00 - 09:00 1.00 DRILL CIRC PROD
09:00 - 10:00 1.00 DRILL DRLH PROD
10:00 - 11 :00
11 :00 - 13:00
1.00 DRILL OBSV PROD
2.00 DRILL DRLH PROD
126 - 150 gpm range. ECD in the 10.25 to
10.4ppg range. Parameters: 2050 psi 11
51 gpm, wob = 4 -5 k Ibs, torque on / off bot
tom = 12.5k ft-Ibs I 11k, pu wt I so I rot = 2
15k Ibs 1150 /180. Losing 15 - 30 bph wI
instaneous losses to 75 bph. Pump schedul
e for Lcm pills: 5 to 10 bbl Icm pill followe
d by 50 bbl mud. Adt = 7.28 hrs = art 6.47
+ ast 2.05 Mud losses last 24 hr = 755 bbl
Total losses to well = 2399 bbl Mud losse
s since midnight = 118 bbl --- estimate 200
ver shaker due to Icm blinding.
Drill 6 1/8" hole f/ 12117' to 12268' MD 71
22' TVD 2150 psi @ 151 gpm, WOB 4 -7 k
# - Torq. on I off bottom - 12k ft-Ibs / 11.
5k, PU/SO/ROT wt. -210/145/175 Losing 30
bbls avg./hr wI instaneous losses to 90 + B
IH. Pump schedule: 5 to 10 bbls LCM pill fo
Ilowed by 50 bbl mud. ECD climbed to 10
.5+ ppg wI corresponding pump press increa
se 2050 to 2200 psi.
Cir out LCM - run certrafuge & add 80 bbl n
ew 8.8 ppg mud to system. Resultant mud
= 8.9+ ppg, ECD 10.28 ppg @ 126 gpm. - los
t 22 bbls while circulating
Drill 6 1/8" hole f/ 12,268' to 12,371' MD 7
122' TVD Same parameters as above Mud I
ose rate beginning to increase fl 30 B/H to
90 B/H
Pump 20 bbls - LCM pill @ 35 #/B - lost 63
bbl while ciculating - 31.2 B/H
Drill 6 1/8" hole f/ 12371' to 12,404' MD - 7
121' TVD Same parameters as above Lose
rate increasing to 100+ B/H
Circ & pump LCM pill same as above - Loses
100+ B/H rate
Drill 6 1/8" hole fl 12,404' to 12,463' MD 7
121' TVD Same parameters as above Lose
rate 100+ B/H ADT- 5.43 hrs. ART- 5.09
hrs. AST- .34 hrs. (past 24 hrs.)
Shut down pumps to monitor for static loses
- well flowing wI pumps off - flow rate drop
ped fl 11% to 1% in 2 mins. - observe slight
flow - shut in well - shut in pressure 40 psi
- observed well for 7 mins. - pressure 40 p
si - bleed off through choke line - open well
- fluid level 8" below flow line - well breath
in g
Drill 6 1/8" hole f/ 12,463' to 12,500' MD - 7
120' TVD Same parameters as before Lose
rate fl 30 to 100+ B/H rate Discussed pia
n forward w/ Anchorage office Well TD call
ed @ 12,500' due to increasing loses
Printed: 9/13/2002 4:00:43 PM
~~
TfTfi
~~
(
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
8/22/2002
CD2-16
CD2-16
ROT - DRILLING
Doyon
Doyon 19
H 'C' 'd - Sub
From-To ~ ....ours'.. "'.'P ..e Code
Phase
13:00 - 15:30
2.50 DRILL CIRC PROD
15:30 - 20:30
5.00 DRILL TRIP PROD
20:30 - 21 :00
0.50 DRILL SFTY PROD
21 :00 - 00:00
3.00 DRILL CIRC PROD
8/23/2002 00:00 - 04:30 4.50 DRILL TRIP PROD
04:30 - 06:00 1.50 DRILL PULD PROD
06:00 - 11 :30 5.50 CMPLTN TRIP CMPL TN
11 :30 - 12:00 0.50 CMPL TN OBSV CMPL TN
12:00 - 15:00 3.00 CMPL TN TRIP CMPL TN
15:00 - 15:30 0.50 CMPL TN PULD CMPL TN
15:30 - 16:00 0.50 CMPLTN OTHR CMPL TN
16:00 - 17:00 1.00 CMPL TN RURD CMPL TN
17:00 - 23:00 6.00 CMPL TN RUNT CMPL TN
23:00 - 23:30
0.50 CMPL TN SOHO CMPL TN
23:30 - 00:00
0.50 CMPL TN OTHR CMPL TN
Page 11 of 12
Spud Date: 8n /2002
End: 8/24/2002
Group:
Start: 8n /2002
Rig Release: 8/24/2002
Rig Number: 19
De~criþti()n()fOp$rati()n~
Circulate & try to clean up LCM fl well - los
e rate +1- 80 B/H avg. Shut pumps down to
monitor well - well breathing - Flow rate dr
opped f/ 9% to 0 % in 2 mins. - well static i
n 6 mins.
Pump out of hole f/ 12,500' to 9507' md, 3 -
3.5 bpm I 1050 psi. Pulled tight @ 11800'
started to pack off. Run back ro 11831, bac
k ream to 11738'. No other anomilies. Loss
rate = +1- 14 bbl/hr.
Monitor well static. Make crew change, con
duct PJSM - Ops briefing, subject; continge
ncies, spacers & displacing hole to 8.8 ppg
brine water.
Pump 40 bbl hi vis polymer sweep. Continu
e to displace well wI 8.8 ppg KCI brine, obs
erved polymer pill [loaded wI Icm] followed
by clean brine returns after 320 bbls [calc
ulated 311 bbl] continuied for another 53 bb
I. Sd & observe well static for 15 minutes.
Displaceed @ 3.5 bpm, 1050 - 1150 psi, no
losses. 24 hr losses to well = 538 bbl = I
ost while drlg 412 bbl + losses while pumpin
g to the shoe of 126 bbl Total losses to w
ell = 2937 bbl
POOH f/ 9538' to 98' - std back HWDP, jars,
& flex DC's
Flush MWD wI fresh water - LD MWD, Motor,
& bit
MU 7" casing scraper & RIH to 8877'
Monitror well - hole took 10 bbls.
POOH wI 7" casing scraper
Std back HWDP & jars, - LD flex DC's, bs, s
craper & bit
Pull wear bushing - service TD & blocks
RU to run 4 1/2" completion - Held PJSM
MU - WLEG - Pup jt. (4 1/2" 12.6# L-80) - X
N nipple wI RHC plug installled - 1 jt. 4 1/2
" 12.6# L-80 IBT tbg - Baker S-3 Packer wI
mill out extension - (all connections bleow p
acker Baker-Loc) 2 jts. 4 1/2" 12.6# L-80 IB
T tbg - GLM - 149 jts 4 1/2" 12.6# L-80 IBT
tbg, Cameo DB nipple [3.812" profile], 48 jt
s 4 1/2" 12.6# L-80 IBT tbg & Tbg hanger wI
pup. H 0 let 0 0 k 3. 5b b I I h r w h i I e run n i n g t b g
200 jts. total jts. ran
Pu landing jt "A" & land out hanger in well h
ead, tbg landed wI tail @ 8798' - XN nipple
@ 8785' - Packer @ 8732' - GLM @ 8618'-
Cameo DB nipple @ 2131' MD RKB
Run in lock down bolts, Pull & LD landing jt
"A", install 2 way ck & PU landing jt. "B". T
i e fill up I i n e to 4 1 I 2" X 7 " an nul us for h 0 I e
Printed: 9/13/2002 4:00:43 PM
/~,
TfTfI
~~
(
(
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name: CD2-16
Common Well Name: CD2-16
Event Name: ROT - DRILLING
Contractor Name: Doyon
Rig Name: Doyon 19
Date From - To Hours Code Sub Phase
Code
8/23/2002 23:30 - 00:00 0.50 CMPL TN OTHR CMPL TN
8/24/2002 00:00 - 00:30 0.50 CMPL TN OTHR CMPL TN
00:30 - 03:30 3.00 WELCTL NUND CMPL TN
03:30 - 06:30 3.00 CMPLTN CIRC CMPL TN
06:30 - 07:30
1.00 CMPL TN PCKR CMPL TN
07:30 - 12:00
4.50 CMPL TN PULD CMPL TN
12:00 - 14:00
14:00 - 15:00
2.00 CMPL TN SUN CMPL TN
1.00 CMPL TN SUN CMPL TN
15:00 - 15:30
0.50 CMPL TN PCKR CMPL TN
15:30 - 16:30
1.00 CMPL TN PCKR CMPL TN
16:30 - 17:00 0.50 CMPL TN OTHR CMPL TN
17:00 - 17:30 0.50 CMPL TN OTHR CMPL TN
17:30 - 18:00 0.50 CMPL TN CMPL TN
18:00 - 19:00 1.00 CMPL TN TRIP CMPL TN
19:00 - 20:00 1.00 MOVE DMOB DEMOB
Page 12 of 12
Spud Date: 8n/2002
End: 8/24/2002
Group:
Start: 8n /2002
Rig Release: 8/24/2002
Rig Number: 19
Description of Operations
fill up while ND BOP
Test metal to metal seals on tgb hanger to 5
000 psi - OK - LD landing jt. "B"
ND BOP - NU & test tree to 5000 psi - Pull
TWC
RU hard lines to tbg & annulus & squeeze m
anifold - Test lines 2500 psi - Displace well
wI 126 bbls 9.2 brine - test lines to 3700 p
si - Pumped 134 bbls diesel for tbg displace
ment & freeze protect 2000' annulus
MU lubricator & drop ball/rod - RD lubricato
r - RU hard line to tbg - attempt to pressure
up on tbg to set packer - ball not on seat -
RD lines secure well
LD excess 4" drill pipe using mouse hole (w
aiting on slick line unit)
RU Halliburton slickline - Held PJSM
Test lines & Halliburton lubricator to 3500 p
si - RIH wI 3.1" OD centalizer, weight bars,
& spang jars - tag up @ 8618" WL -(GLM) w
ork string & rRIH to 8760" WL (appeared rod
& ball was hung up in GLM)
Pressure up on tbg to 3500 psi to set packe
r - test tbg to 3500 psi for 30 mins. - pull sl
ickline tools back up into lubricator
Bleed tbg down to 2500 psi - pressure up on
annulus to 3500 psi and test for 30 mins. -
(annulus took 13.5 bbls to fill)
Bleed down annulus & tbg - vac out íines -
RD lines & squeeze manifold
RD Halliburton slickline, lubricator, & BOP
Install Bpv. Set in mousehole.
Ld 24 jts dp from derrick & pull set back mo
use hole.
Nd annulus valves, sec well Decommision Es
d. Complete Preparing to move. ---- RIG RE
LEASED @ 2000 HRS 24 AUG 2002----
Printed: 9/13/2002 4:00:43 PM
( (
Phillips Alaska, Inc. CD2-16 (Rig Surveys)
MD Inc Azim. SSTVD TVD N/S EIW Y X DLS V.S. Comment
(ft) (Deg) (Deg) (ft) (ft) (ft) (ft) (ft) (ft) CO/100ft) (ft)
0.00 0.00 0.00 -52.00 0.00 0.00 N 0.00 E 5974631.95 N 371697.39 E 0.00 0.00 SHL
167.00 0.20 308.00 115.00 167.00 0.18 N 0.23W 5974632.13 N 371697.16 E 0.12 0.27
259.00 0.60 80.00 207.00 259.00 0.36 N 0.12 E 5974632.31 N 371697.51 E 0.81 0.26
350.00 1.83 81.00 297.98 349.98 0.67 N 2.02 E 5974632.59 N 371699.42 E 1.35 -0.40
440.00 4.00 81.00 387.85 439.85 1.39 N 6.54 E 5974633.23 N 371703.96 E 2.41 -1.99
528.00 6.30 76.00 475.49 527.49 3.04 N 14.26 E 5974634.74 N 371711.70 E 2.66 -4.32
624.19 8.58 71.53 570.87 622.87 6.59 N 26.19 E 5974638.09 N 371723.69 E 2.44 -7.05
655.05 9.49 71.94 601.35 653.35 8.11 N 30.79 E 5974639.53 N 371728.32 E 2.96 -7.97
747.96 9.90 74.75 692.93 744.93 12.58 N 45.78 E 5974643.75 N 371743.38 E 0.67 -11.39
837.74 11.62 74.75 781.13 833.13 16.99 N 61.95 E 5974647.88 N 371759.62 E 1.92 -15.45
925.54 13.63 80.60 866.80 918.80 21.01 N 80.69 E 5974651.57 N 371778.43 E 2.71 -21.10
1021.80 16.25 79.24 959.80 1011.80 25.37 N 105.11 E 5974655.52 N 371802.92 E 2.75 -29.22
1116.90 18.85 76.88 1050.47 1102.47 31.35 N 133.15 E 5974661.01 N 371831.06 E 2.83 -37.71
1210.78 20.44 76.12 1138.88 1190.88 38. 72 N 163.84 E 5974667.86 N 371861.87 E 1.72 -46.27
1305.68 20.95 76.21 1227.66 1279.66 46.74 N 196.40 E 5974675.32 N 371894.57 E 0.54 -55.19
1400.47 23.26 77.86 1315.47 1367.47 54.72 N 231.16 E 5974682.70 N 371929.46 E 2.52 -65.21
1496.64 26.36 79.23 1402.76 1454.76 62.70 N 270.71 E 5974690.01 N 371969.14 E 3.28 -77.57
1591.32 27.45 79.38 1487.19 1539.19 70.65 N 312.81 E 5974697.24 N 372011.37 E 1.15 -91.20
1686.45 28.62 76.88 1571.16 1623.16 79.86 N 356.56 E 5974705.70 N 372055.26 E 1.74 -104.54
1783.10 29.57 76.89 1655.61 1707.61 90.53 N 402.33 E 5974715.58 N 372101.21 E 0.98 -117.60
1878.14 29.90 77.51 1738.14 1790.14 100.97 N 448.29 E 5974725.24 N 372147.34 E 0.48 -130.95
1973.17 30.09 76.86 1820.44 1872.44 111.51 N 494.62 E 5974734.98 N 372193.84 E 0.40 -144.39
2068.18 29.86 76.33 1902.74 1954.74 122.51 N 540.79 E 5974745.19 N 372240.20 E 0.37 -157.35
2163.46 29.58 77.02 1985.49 2037.49 133.40 N 586.76 E 5974755.29 N 372286.34 E 0.46 -170.31
2258.00 29.45 77.21 2067.76 2119.76 143.79 N 632.16 E 5974764.90 N 372331.92 E 0.17 -183.43
2352.74 28.94 77.93 2150.46 2202.46 153.74 N 677.29 E 5974774.07 N 372377.21 E 0.65 -196.80
2445.74 30.10 78.23 2231.39 2283.39 163.20 N 722.12 E 5974782.77 N 372422.20 E 1.26 -210.45
2473.25 30.21 78.24 2255.18 2307.18 166.02 N 735.65 E 5974785.35 N 372435.77 E 0.40 -214.61
2523.00 30.15 78.36 2298.19 2350.19 171.09 N 760.14 E 5974790.01 N 372460.34 E 0.18 -222.15 9 5/8" Casing
2580.37 30.07 78.49 2347.82 2399.82 176.86 N 788.33 E 5974795.30 N 372488.63 E 0.18 -230.88
2672.36 29.95 78.21 2427.47 2479.47 186.15 N 833.39 E 5974803.82 N 372533.85 E 0.20 -244.79
2768.29 29.49 76.64 2510.79 2562.79 196.50 N 879.81 E 5974813.37 N 372580.43 E 0.94 -258.44
2867.32 29.20 75.02 2597.11 2649.11 208.38 N 926.86 E 5974824.44 N 372627.68 E 0.85 -271.07
2962.42 29.18 75.66 2680.13 2732.13 220.12 N 971.73 E 5974835.41 N 372672.74 E 0.33 -282.76
3058.35 29.12 74.94 2763.91 2815.91 231.97 N 1016.93 E 5974846.49 N 372718.14 E 0.37 -294.50
3150.70 29.19 75.09 2844.56 2896.56 243.61 N 1060.39 E 5974857.38 N 372761.79 E 0.11 -305.58
3248.79 29.03 74.86 2930.26 2982.26 255.98 N 1106.47 E 5974868.96 N 372808.08 E 0.20 -317.31
3343.29 28.67 74.23 3013.03 3065.03 268.13 N 1150.42 E 5974880.35 N 372852.23 E 0.50 -328.18
3438.79 28.35 78.92 3096.96 3148.96 278.71 N 1194.73 E 5974890.18 N 372896.71 E 2.37 -340.59
3534.26 28.16 79.30 3181.06 3233.06 287.25 N 1239.11 E 5974897.96 N 372941.23 E 0.27 -354.83
3629.06 30.02 78. 70 3263.90 3315.90 296.05 N 1284.35 E 5974905.98 N 372986.62 E 1.99 -369.26
3724.27 30.36 78.77 3346.19 3398.19 305.41 N 1331.30 E 5974914.53 N 373033.72 E 0.36 -384.04
3819.56 30.18 78.18 3428.49 3480.49 315.00 N 1378.37 E 5974923.32 N 373080.95 E 0.37 -398.66
3914.56 30.16 78.26 3510.62 3562.62 324.75 N 1425.11 E 5974932.27 N 373127.84 E 0.05 -413.00
4010.37 30.24 77.89 3593.43 3645.43 334.71 N 1472.26 E 5974941.42 N 373175.16 E 0.21 -427.35
4107.50 29.96 78.28 3677.46 3729.46 344.76 N 1519.92 E 5974950.66 N 373222.99 E 0.35 -441.86
4203.20 31.99 80.30 3759.51 3811.51 353.89 N 1568.31 E 5974958.95 N 373271.53 E 2.38 -457.54
4298.92 32.46 80.32 3840.49 3892.49 362.48 N 1618.63 E 5974966.68 N 373321.98 E 0.49 -474.63
4394.70 32.14 80.26 3921 .44 3973.44 371.11 N 1669.07 E 5974974.45 N 373372.57 E 0.34 -491.75
4489.66 32.07 78.75 4001.88 4053.88 380.31 N 1718.70 E 5974982.79 N 373422.34 E 0.85 -507.98
4585.44 31.59 79.45 4083.26 4135.26 389.86 N 1768.30 E 5974991.50 N 373472.10 E 0.63 -523.88
4680.69 31.04 78.35 4164.64 4216.64 399.39 N 1816.88 E 5975000.19 N 373520.83 E 0.83 -539.30
4776.54 31.61 77.76 4246.51 4298.51 409.70 N 1865.63 E 5975009.67 N 373569.75 E 0.68 -554.12
4871.12 32.36 74.26 4326.74 4378.74 421.82 N 1914.22 E 5975020.96 N 373618.54 E 2.11 -567.29
4966.38 32.28 72.68 4407.24 4459.24 436.31 N 1963.04 E 5975034.61 N 373667.61 E 0.89 -578.50
5061.81 31.95 71.48 4488.07 4540.07 451.92 N 2011.31 E 5975049.39 N 373716.14 E 0.75 -588.47
5157.12 30.69 73.39 4569.49 4621.49 466.88 N 2058.53 E 5975063.54 N 373763.61 E 1.68 -598.49
5252.43 30.16 73.34 4651.68 4703.68 480.70 N 2104.78 E 5975076.57 N 373810.08 E 0.56 -609.03
5347.95 29.56 72.49 4734.52 4786.52 494.67 N 2150.24 E 5975089.75 N 373855.78 E 0.77 -619.05
5441.41 29.04 71.96 4816.02 4868.02 508.63 N 2193.79 E 5975102.97 N 373899.56 E 0.62 -628.16
5539.11 29.78 72.19 4901.13 4953.13 523.40 N 2239.44 E 5975116.95 N 373945.46 E 0.77 -637.58
5634.40 31.59 71.71 4983.08 5035.08 538.47 N 2285.67 E 5975131.23 N 373991.94 E 1.92 -647.02
5729.22 34.46 72.27 5062.57 5114.57 554.43 N 2334.81 E 5975146.35 N 374041.35 E 3.04 -657.10
5824.35 37.15 70.89 5139.71 5191.71 572.04 N 2387.60 E 5975163.05 N 374094.43 E 2.95 -667.53
5919.37 39.86 68.35 5214.07 5266.07 592.67 N 2443.03 E 5975182.73 N 374150.20 E 3.30 -676.61
6016.45 43.73 63.32 5286.45 5338.45 619.23 N 2501.96 E 5975208.28 N 374209.58 E 5.27 -682.24
6112.46 48.58 58.89 5352.96 5404.96 652.76 N 2562.48 E 5975240.77 N 374270.67 E 6.05 -682.56
6208.14 53.92 54.06 5412.85 5464.85 694.03 N 2624.57 E 5975280.97 N 374333.45 E 6.83 -676.88
6302.14 55.86 52.69 5466.91 5518.91 739.91 N 2686.27 E 5975325.79 N 374395.93 E 2.38 -667.00
6398.20 55.60 51.75 5521.00 5573.00 788.54 N 2749.01 E 5975373.34 N 374459.49 E 0.85 -655.23
6494.59 53.87 53.47 5576.65 5628.65 836.34 N 2811.53 E 5975420.06 N 374522.82 E 2.31 -644.07
Page 1 of 2
( (
Phillips Alaska, Inc. CD2-16 (Rig Surveys)
MD Inc Azim. SSTVD TVD N/S E/W Y X DLS v.s. Comment
(ft) (Deg) (Deg) (ft) (ft) (ft) (ft) (ft) (ft) e/100ft) (ft)
6589.73 52.85 54.36 5633.43 5685.43 881.30 N 2873.22 E 5975463.96 N 374585.27 E 1.31 -634.98
6685.01 52.56 54.51 5691.16 5743.16 925.39 N 2934.88 E 5975506.99 N 374647.67 E 0.33 -626.65
6780.58 52.25 53.37 5749.47 5801.47 969.96 N 2996.09 E 5975550.50 N 374709.64 E 1.00 -617.67
6875.90 51.60 52.39 5808.25 5860.25 1015.24 N 3055.92 E 5975594.75 N 374770.24 E 1.06 -607.40
6972.04 51.11 52.74 5868.29 5920.29 1060.88 N 3115.55 E 5975639.37 N 374830.63 E 0.58 -596.71
7067.39 50.84 53.13 5928.33 5980.33 1105.53 N 3174.65 E 5975683.00 N 374890.50 E 0.43 -586.63
7162.82 52.17 53.54 5987.73 6039.73 1150.13 N 3234.57 E 5975726.56 N 374951.16 E 1.43 -577.00
7258.26 53.93 53.88 6045.10 6097.10 1195.27 N 3296.04 E 5975770.64 N 375013.40 E 1.87 -567.65
7354.46 54.21 52.29 6101.55 6153.55 1242.05 N 3358.32 E 5975816.36 N 375076.47 E 1.37 -557.26
7447.71 53.75 52.00 6156.39 6208.39 1288.34 N 3417.87 E 5975861.61 N 375136.80 E 0.55 -545.98
7546.36 53.23 51.63 6215.08 6267.08 1337.35 N 3480.19 E 5975909.56 N 375199.96 E 0.61 -533.66
7641.97 52.73 51.56 6272.64 6324.64 1384.77 N 3540.01 E 5975955.95 N 375260.58 E 0.53 -521.52
7737.62 52.39 50.84 6330.79 6382.79 1432.36 N 3599.20 E 5976002.51 N 375320.57 E 0.70 -508.92
7833.37 53.23 51.06 6388.67 6440.67 1480.41 N 3658.44 E 5976049.55 N 375380.62 E 0.90 -495.94
7928.43 52.88 50.61 6445.81 6497.81 1528.39 N 3717.34 E 5976096.51 N 375440.34 E 0.53 -482.85
8023.87 52.49 50.46 6503.66 6555.66 1576.64 N 3775.94 E 5976143.75 N 375499.76 E 0.43 -469.39
8118.76 52.80 49.96 6561.24 6613.24 1624.91 N 3833.90 E 5976191.02 N 375558.53 E 0.53 -455.60
8213.09 54.59 47.56 6617.09 6669.09 1675.03 N 3891.04 E 5976240.15 N 375616.52 E 2.79 -439.79
8308.64 54.34 47.51 6672.62 6724.62 1727.52 N 3948.40 E 5976291.66 N 375674.77 E 0.27 -422.01
8404.64 56.35 45.09 6727.22 6779.22 1782.09 N 4005.47 E 5976345.24 N 375732.76 E 2.95 -402.29
8500.13 60.05 40.98 6777.54 6829.54 1841.42 N 4060.78 E 5976403.61 N 375789.08 E 5.33 -377.55
8596.03 64.00 38.25 6822.52 6874.52 1906.66 N 4114.74 E 5976467.93 N 375844.15 E 4.83 -346.99
8691.44 67.59 31.32 6861.68 6913.68 1978.11 N 4164.27 E 5976538.51 N 375894.90 E 7.62 -308.86
8786.72 69.41 23.15 6896.65 6948.65 2056.86 N 4204.76 E 5976616.56 N 375936.73 E 8.20 -259.94
8881.79 72.67 16.41 6927.56 6979.56 2141.41 N 4235.12 E 5976700.58 N 375968.53 E 7.53 -200.99
8976.63 70.87 9.75 6957.26 7009.26 2229.09 N 4255.51 E 5976787.89 N 375990.42 E 6.93 -134.47
9072.55 69.27 5.73 6989.97 7041.97 2318.41 N 4267.67 E 5976877.00 N 376004.11 E 4.28 -62.47
9167.53 71.40 2.75 7021.94 7073.94 2407.59 N 4274.27 E 5976966.05 N 376012.23 E 3.71 12.12
9263.74 78.57 359.78 7046.85 7098.85 2500.42 N 4276.28 E 5977058.84 N 376015.82 E 8.03 92.13
9359.60 81.97 354.24 7063.06 7115.06 2594.72 N 4271.33 E 5977153.21 N 376012.49 E 6.71 176.82
9454.01 83.12 349.70 7075.32 7127.32 2687.39 N 4258.25 E 5977246.08 N 376001.00 E 4.92 264.07 Final Survey in 8-1/2" Hole Section
9540.00 83.89 350.34 7085.04 7137.04 2771.53 N 4243.44 E 5977330.47 N 375987.64 E 1.16 344.71 ne' Projection to TD of 8-1/2" Hole Section -
9561.06 84.08 350.50 7087.25 7139.25 2792.19 N 4239.96 E 5977351.18 N 375984.51 E 1.16 364.44
9657.01 91.11 348.94 7091.27 7143.27 2886.45 N 4222.86 E 5977445.72 N 375969.02 E 7.50 455.04
9752.27 92.52 349.15 7088.26 7140.26 2979.92 N 4204.77 E 5977539.49 N 375952.53 E 1.50 545.43
9847.94 92.71 349.14 7083.89 7135.89 3073.78 N 4186.77 E 5977633.64 N 375936.14 E 0.20 636.12
9943.29 93.26 347.27 7078.93 7130.93 3166.99 N 4167.31 E 5977727.17 N 375918.28 E 2.04 726.95
10038.81 90.06 340.86 7076.16 7128.16 3258.74 N 4141.10 E 5977819.35 N 375893.65 E 7.50 819.81
10135.01 89.26 333.26 7076.73 7128.73 3347.26 N 4103.64 E 5977908.51 N 375857.70 E 7.94 915.35
10230.23 91.11 328.79 7076.42 7128.42 3430.54 N 4057.52 E 5977992.56 N 375813.02 E 5.08 1010.54
10325.18 91.48 329.45 7074.27 7126.27 3512.01 N 4008.80 E 5978074.85 N 375765.70 E 0.80 11 05.43
10421.67 91.97 329.14 7071.37 7123.37 3594.93 N 3959.56 E 5978158.61 N 375717 .88 E 0.60 1201.84
10517.30 90.43 329.46 7069.37 7121.37 3677.14 N 3910.75 E 5978241.64 N 375670.48 E 1.65 1297.42
10613.94 88.40 329.23 7070.35 7122.35 3760.27 N 3861.48 E 5978325.59 N 375622.65 E 2.11 1394.02
10709.42 88.59 328.97 7072.86 7124.86 3842.17 N 3812.46 E 5978408.32 N 375575.04 E 0.34 1489.43
10802.03 88.89 328.48 7074.90 7126.90 3921.30 N 3764.40 E 5978488.26 N 375528.33 E 0.62 1581.96
10899.31 89.69 332.51 7076.10 7128.10 4005.94 N 3716.50 E 5978573.71 N 375481.89 E 4.22 1679.21
10993.98 90.37 331.09 7076.05 7128.05 4089.37 N 3671.77 E 5978657.89 N 375438.59 E 1.66 1773.86
11089.02 91.23 330.52 7074.73 7126.73 4172.33 N 3625.41 E 5978741.63 N 375393.66 E 1.09 1868.89
11186.11 91.05 333.50 7072.79 7124.79 4258.03 N 3579.86 E 5978828.11 N 375349.58 E 3.07 1965.92
11279.62 91.60 334.10 7070.63 7122.63 4341.91 N 3538.59 E 5978912.68 N 375309.75 E 0.87 2059.27
11375.81 92.22 333.94 7067.43 7119.43 4428.34 N 3496.47 E 5978999.81 N 375269.12 E 0.67 2155.25
11470.45 90.49 334.32 7065.19 7117.19 4513.46 N 3455.19 E 5979085.63 N 375229.31 E 1.87 2249.70
11568.04 90.18 333.64 7064.62 7116.62 4601.16 N 3412.38 E 5979174.05 N 375188.00 E 0.77 2347.13
11663.96 90.37 333.90 7064.16 7116.16 4687.20 N 3369.99 E 5979260.80 N 375147.09 E 0.34 2442.92
11760.08 90.00 333.11 7063.85 7115.85 4773.23 N 3327.11 E 5979347.55 N 375105.69 E 0.91 2538.92
11855.38 88.25 332.48 7065.30 7117.30 4857.97 N 3283.55 E 5979433.02 N 375063.58 E 1.95 2634.15
11950.74 88.83 332.55 7067.73 7119.73 4942.54 N 3239.55 E 5979518.33 N 375021.04 E 0.61 2729.43
12046.01 89.51 332.86 7069.11 7121.11 5027.19 N 3195.87 E 5979603.72 N 374978.81 E 0.78 2824.64
12139.03 89.63 333.13 7069.81 7121.81 5110.07 N 3153.63 E 5979687.31 N 374938.00 E 0.32 2917.58
12234.76 89.94 332.98 7070.17 7122.17 5195.40 N 3110.25 E 5979773.37 N 374896.09 E 0.36 3013.23
12330.86 90.25 333.55 7070.01 7122.01 5281.23 N 3067.02 E 5979859.93 N 374854.33 E 0.68 3109.24
12426.28 90.80 333.84 7069.14 7121.14 5366.76 N 3024.74 E 5979946.17 N 374813.52 E 0.65 3204.53 Final
N E N E
Page 2 of 2
03-0ct-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-16 GYRO
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
'MD (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
OCT 0 9 2002
Alaska Oñ & Gas Cons. Commis8ion
Anchof8ge
dCB--J t./¥
~
::J'
.--..
\
~
0
-l]
Sperry-Sun Drilling Services
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2..16 ,Gyro
Job No. AKF022132, Surveyed: 7 August, 2002
Survey Report
2 October, 2002
""-"
Your Ref: API 501032042600
Sutface Coordinates: 5974631.95 N, 371697.39 E (70020' 20.1297" N, 151002'28.0445" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Sutface Coordinates relative to Projéct H Reference: 974631.95 N, 128302.61 W (Grid)
Sutface Coordinates relative to Structure: 188.67 N, 23.33 W(True)
Kelly Bushing: 52. 50ft above Mean Sea Level
Elevation relative to Project V Reference: 52.50ft
Elevation relative to Structure: 52.50ft
s~l'y-su.,
DFnL.L.I,..G SERVices
A Halliburton Company
I
§
w
I
r~
OJ
I
5@
Survey Ref: svy9949
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-16 Gyro
Your Ref: API 501032042600
Job No. AKF022132, Surveyed: 7 August, 2002
I
£w
I
,
,
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inel. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
0.00 0.000 0.000 -52.50 0.00 O.OON O.OOE 5974631.95 N 371697.39 E 0.00 Tolerable Gyro
167.00 0.200 308.000 114.50 167.00 0.18 N 0.23W 5974632.13 N 371697.16 E 0.120 0.27
259.00 0.600 80.000 206.50 259.00 0.36N 0.12 E 5974632.31 N 371697.51 E 0.814 0.26
350.00 1.850 81.000 297.48 349.98 0.67N 2.04E 5974632.59 N 371699.44 E 1.374 -0.41
440.00 4.000 81 .000 387.35 439.85 1.39 N 6.57 E 5974633.23 N 371703.99 E 2.389 -2.00
.,- 528.00 6.300 76.000 474.99 527.49 3.04N 14.29 E 5974634.75 N 371711.73 E 2.660 -4.33
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.5' M.S.L.. Northings and Eastings are relative to 1726' FNL, 1544' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from 1726' FNL, 1544' FEL and calculated along an Azimuth of 330.750° (True).
Magnetic Declination at Surface is 24.874°(06-Aug-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 528.00ft.,
The Bottom Hole Displacement is 14.61ft., in the Direction of 77.986° (True).
Survey tool program for CD2-16 Gvro
......
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
.~.
0.00
527 .49 Tolerable Gyro
0.00
528.00
2 October, 2002 - 9:10
Page 20f2
DrillQuest 3.03.02.002
óSLB-Jtfi!
03-0ct-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-16
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
, M D (if applicable)
0.00 I MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RE.CE.\\lED
OCt 0 9 2002-
mm\1I\Øft
œ &. Gas eons. CO
Ai_a ~
Attachment(s)
~
~
J
~
OCT 0
v
qeOMs BFL
Sperry-Sun Drilling Services
'~
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-16
Job No. AKZZ22132, Surveyed: 7 August, 2002
Survey Report
2 October, 2002
Your Ref: API 501032042600
Surface Coordinates: 5974631.95 H, 371697.39 E (70020' 20.1297" H, 151002'28.0445" W)
Grid Coordinate System: HAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974631.95 H, 128302.61 W (Grid)
Surface Coordinates relative to Structure: 188.67 N, 23.33 W(True)
Kelly Bushing: 52. 50ft above Mean Sea Level
Elevation relative to Project V Reference: 52. 50ft
Elevation relative to Structure: 52.50ft
!S~I'\I-SU"
DRILLING SEAV"CES
A Halliburton Company
71
Survey Ref: svy9950
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2.,16
Your Ref: API 501032042600 '
Job No. AKZZ22132, Surveyed: 7 August, 2002
Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inct Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
528.00 6.300 76.000 474.99 527.49 3.04N 14.29 E 5974634.75 N 371711.73 E -4.33 AK-6 BPJFR-AK
624.19 8.580 71.530 570.37 622.87 6.59N 26.22 E 5974638.09 N 371723.72 E 2.444 -7.06
655.05 9.490 71.940 600.84 653.34 8.11 N 30.82 E 5974639.53 N 371728.35 E 2.956 -7.98
747.96 9.900 74.750 692.43 744.93 12.59 N 45.81 E 5974643.75 N 371743.41 E 0.674 -11.40
837.74 11.620 74.750 780.63 833.13 16.99 N 61.98 E 5974647.88 N 371759.65 E 1.916 -15.46
"- 925,54 13.630 80.600 866.30 918.80 21.01 N 80.72 E 5974651.58 N 371778.46 E 2.710 -21.11
1021,80 16.250 79.240 959.30 1011.80 25.38 N 105.15 E 5974655.52 N 371802.95 E 2.746 -29.23
1116.90 18.850 76.880 1049.97 1102.47 31.35 N 133.18E 5974661.02 N 371831.09 E 2.834 -37.72
1210.78 20.440 76.120 1138.38 1190.88 38.73 N 163.87 E 5974667.87 N 371861.90 E 1.715 -46.28
1305.68 20.950 76.210 1227.16 1279.66 46.74 N 196.43 E 5974675.33 N 371894.60 E 0.538 -55.20
1400.47 23.260 77.860 1314.97 1367.47 54.72 N 231.20 E 5974682.71 N 371929.49 E 2.523 -65.22
1496.64 26.360 79.230 1402.26 1454.76 62.71 N 270.74 E 5974690.01 N 371969.17 E 3.278 -77.58
1591.32 27.450 79.380 1486.69 1539.19 70.66 N 312.84 E 5974697.24 N 372011.40 E 1.153 -91.21
1686.45 28.620 76.880 1570.66 1623.16 79.87 N 356.59 E 5974705.71 N 372055.29 E 1.743 -104.55
1783.10 29.570 76.890 1655.11 1707.61 90.53 N 402.36 E 5974715.59 N 372101.24 E 0.983 -117.61
1878.14 29.900 77.510 1737.64 1790.14 100.98 N 448.32 E 5974725.24 N 372147.38 E 0.475 -130.96
1913.11 30.090 76.860 1819.94 1872.44 111.51 N 494.65 E 5974734.98 N 372193.87 E 0.396 -144.40
2068,18 29.860 76.330 1902.24 1954.74 122.52 N 540.82 E 5974745.20 N 372240.23 E 0.369 -157.36
2163.46 29.580 77.020 1984.99 2037.49 133.41 N 586.79 E 5974755.30 N 372286.37 E 0.464 -170.32
2258,00 29.450 77.210 2067.26 2119.76 143.79 N 632.19 E 5974764.90 N 372331.95 E 0.169 -183.44
2352.74 28.940 77.930 2149.96 2202.46 153.74 N 677.32 J: 5974774.08 N 372377.24 E 0.654 -196.81
2445.74 30.100 78.230 2230.89 2283.39 163.20 N 722.15 E 5974782.77 N 372422.23 E 1.257 -210.46
2473.25 30.210 78.240 2254.68 2307.18 166.02 N 735.68 E 5974785.36 N 372435.80 E 0.400 -214.62
2580.37 30.070 78.490 2347.31 2399.81 176.87 N 788.36 E 5974795.30 N 372488.66 E 0.176 -230.89
2672.36 29.950 78.210 2426.97 2479.47 186.16 N 833.42 E 5974803.82 N 372533.88 E 0.200 -244.81
2768.29 29.490 76.640 2510.28 2562.78 196.51 N 879.84 E 5974813.37 N 372580.46 E 0.942 -258.46
2867.32 29.200 75.020 2596.61 2649.11 208.38 N 926.89 E 5974824.44 N 372627.71 E 0.853 -271.08
2962.42 29.180 75.660 2679.63 2732.13 220.12 N 971.76 E 5974835.41 N 372672.77 E 0.329 -282.77
3058,35 29.120 74.940 2763.41 2815.91 231.98 N 1016.96 E 5974846.49 N 372718.17 E 0.371 -294.51
3150.70 29.190 75.090 2844.06 2896.56 243.61 N 1060.42 E 5974857.38 N 372761.82 E 0.110 -305.59
3248.79 29.030 74.860 2929.76 2982.26 255.98 N 1106.51 E 5974868.96 N 372808.11 E 0.199 -317.32
3343.29 28.670 74.230 3012.53 3065.03 268.13 N 1150.45 E 5974880.36 N 372852.26 E 0.499 -328.19
3438.79 28.350 78.920 3096.46 3148.96 278.72 N 1194.76 E 5974890.18 N 372896.74 E 2.367 -340,60
3534.26 28.160 79.300 3180.56 3233.06 287.26 N 1239.14 E 5974897.96 N 372941.26 E 0.274 -354.84
3629.06 30.020 78.700 3263.40 3315.90 296.06 N 1284.38 E 5974905.99 N 372986.65 E 1.986 -369.27
2 October, 2002 - 9:10 Page 20f6 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2..16
Your Ref: API 501032042600
Job No. AKZZ22132, Surveyed: 7 August, 2002
North Slope, .Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
3724.27 30.360 78.770 3345.69 3398.19 305.41 N 1331.33 E 5974914.53 N 373033.76 E 0.359 -384.05
3819.56 30.180 78.180 3427.99 3480.49 315.01 N 1378.40 E 5974923.32 N 373080.98 E 0.365 -398.67
3914.56 30.160 78.260 3510.12 3562.62 324.75 N 1425.14 E 5974932.27 N 373127.88 E 0.047 -413.01
4010.37 30.240 77.890 3592.93 3645.43 334.71 N 1472.29 E 5974941.42 N 373175.19 E 0.211 -427.36
4107.50 29.960 78.280 3676.96 3729.46 344.77 N 1519.95 E 5974950.66 N 373223.02 E 0.352 -441.87
'~- 4203.20 31 .990 80.300 3759.01 3811.51 353.90 N 1568.34 E 5974958.96 N 373271.56 E 2.383 -457.55
4298.92 32.460 80.320 3839.98 3892.48 362.49 N 1618.66 E 5974966.69 N 373322.01 E 0.491 -474.64
4394.70 32.140 80.260 3920.94 3973.44 371.12N 1669.11 E 5974974.45 N 373372.60 E 0.336 -491.76
4489.66 32.070 78.750 4001.38 4053.88 380.31 N 1718.73 E 5974982.80 N 373422.37 E 0.848 -507.99
4585.44 31.590 79.450 4082.76 4135.26 389.86 N 1768.33 E 5974991.50 N 373472.13 E 0.632 -523.89
4680.69 31.040 78.350 4164.13 4216.63 399.39 N 1816.91 E 5975000.19 N 373520.86 E 0.833 -539.31
4776.54 31.610 77.760 4246.01 4298.51 409.71 N 1865.66 E 5975009.67 N 373569.78 E 0.675 -554.13
4871.12 32.360 74.260 4326.24 4378.74 421.83 N 1914.25 E 5975020.96 N 373618.58 E 2.114 -567.30
4966.38 32.280 72.680 4406.74 4459.24 436.32 N 1963.07 E 5975034.61 N 373667.64 E 0.891 -578.51
5061.81 31.950 71 .480 4487.57 4540.07 451.92 N 2011.34 E 5975049.39 N 373716.17 E 0.753 -588.48
5157.12 30.690 73.390 4568.99 4621.49 466.89 N 2058.56 E 5975063.55 N 373763.64 E 1.683 -598.50
5252.43 30.160 73.340 4651.18 4703.68 480.71 N 2104.81 E 5975076.57 N 373810.12 E 0.557 -609.04
5347.95 29.560 72.490 4734.02 4786.52 494.67 N 2150.27 E 5975089.76 N 373855.81 E 0.769 -619.06
5441.41 29.040 71.960 4815.52 4868.02 508.64 N 2193.82 E 5975102.97 N 373899.59 E 0.622 -628.17
5539.11 29.780 72.190 4900.63 4953.13 523.40 N 2239.47 E 5975116.95 N 373945.49 E 0.766 -637.59
5634.40 31.590 71.710 4982.57 5035.07 538.47 N 2285.70 E 5975131.23 N 373991.97 E 1.917 -647.03
5729.22 34.460 72.270 5062.07 5114.57 554.44 N 2334.84E 5975146.36 N 374041.38 E 3.044 -657.11
5824.35 37.150 70.890 5139.21 5191.71 572.04 N 2387.63 E 5975163.05 N 374094.46 E 2.952 -667.54
-~>. 5919.37 39.860 68.350 5213.57 5266.07 592.67 N 2443.06 E 5975182.73 N 374150.23 E 3.302 -676.62
6016.45 43.730 63.320 5285.95 5338.45 619.24 N 2501.99 E 5975208.28 N 374209.61 E 5.272 -682.25
6112.46 48.580 58.890 5352.46 5404.96 652.76 N 2562.52 E 5975240.77 N 374270.70 E 6.047 -682.57
6208.14 53.920 54.060 5412.34 5464.84 694.04 N 2624.60 E 5975280.98 N 374333.48 E 6.827 -676.89
6302.14 55.860 52.690 5466.41 5518.91 739.92 N 2686.30 E 5975325.79 N 374395.96 E 2.383 -667.01
6397.49 55.600 51.750 5520.10 5572.60 788.19 N 2748.58 E 5975372.99 N 374459.05 E 0.859 -655.32
6494.59 53.870 53.470 5576.16 5628.66 836.34 N 2811.56 E 5975420.05 N 374522.85 E 2.295 -644.09
6589.73 52.850 54.360 5632.94 5685.44 881.30 N 2873.25 E 5975463.96 N 374585.30 E 1.309 -635.00
6685.01 52.560 54.510 5690.67 5743.17 925.39 N 2934.90 E 5975506.98 N 374647.70 E 0.329 -626.66
6780.58 52.250 53.370 5748.98 5801 .48 969.96 N 2996.12 E 5975550.50 N 374709.67 E 0.999 -617.68
6875.90 51 .600 52.390 5807.76 5860.26 1015.24 N 3055.95 E 5975594.75 N 374770.27 E 1.058 -607.41
6972.04 51.110 52.740 5867.80 5920.30 1060.88 N 3115.57 E 5975639.37 N 374830.66 E 0.584 -596.72
2 October, 2002 - 9:10 Page 3 0'6 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2,.16
Your Ref: API 501032042600
Job No. AKZZ22132, Surveyed: 7 August, 2002
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate
(ft) (ft) (ft) (ft) (ft) eft) (ft) (o/100ft)
7067,39 50.840 53.130 5927.84 5980.34 1105.53 N 3174.68 E 5975682.99 N 374890.52 E 0.426 -586.65
7162.82 52.170 53.540 5987.24 6039.74 1150.12 N 3234.59 E 5975726.56 N 374951.19 E 1.434 -577.01
7258.26 53.930 53.880 6044.60 6097.10 1195.26 N 3296.07 E 5975770.64 N 375013.43 E 1.866 -567.67
7354.46 54.210 52.290 6101.06 6153.56 1242.05 N 3358.35 E 5975816.35 N 375076.50 E 1.370 -557.28
7447.71 53.750 52.000 6155.89 6208.39 1288.33 N 3417.90 E 5975861.61 N 375136.83 E 0.554 -545.99
~' 7546.36 53.230 51 .630 6214.59 6267.09 1337.35 N 3480.22 E 5975909.55 N 375199.98 E 0.607 -533.68
7641.97 52.730 51 .560 6272.15 6324.65 1384.77 N 3540.04 E 5975955.94 N 375260.61 E 0.526 -521.53
7737.62 52.390 50.840 6330.30 6382.80 1432.36 N 3599.23 E 5976002.51 N 375320.60 E 0.695 -508.93
7833.37 53.230 51 .060 6388.18 6440.68 1480.41 N 3658.46 E 5976049.54 N 375380.65 E 0.896 -495.95
7928.43 52.880 50.610 6445.31 6497.81 1528.39 N 3717.37 E 5976096.51 N 375440.37 E 0.528 -482.87
8023.87 52.490 50.460 6503.17 6555.67 1576.64 N 3775.97 E 5976143.74 N 375499.78 E 0.427 -469.41
8118.76 52.800 49.960 6560.74 6613.24 1624.91 N 3833.93 E 5976191.02 N 375558.56 E 0.531 -455.61
8213.09 54.590 47.560 6616.60 6669.10 1675.03 N 3891.07 E 5976240.15 N 375616.55 E 2.794 -439.80
8308.64 54.340 47.510 6672.13 6724.63 1727.52 N 3948.43 E 5976291.66 N 375674.80 E 0.265 -422.03
8404.48 56.350 45.090 6726.63 6779.13 1781.99 N 4005.40 E 5976345.15 N 375732.69 E 2.952 -402.34
8500.13 60.050 40.980 6777.04 6829.54 1841.42 N 4060.80 E 5976403.62 N 375789.11 E 5.319 -377.56
8596.03 64.000 38.250 6822.03 6874.53 1906.67 N 4114.76 E 5976467.93 N 375844.17 E 4.825 -347.00
8691.44 67.590 31.320 6861 .18 6913.68 1978.11 N 4164.30 E 5976538.52 N 375894.93 E 7.617 -308.87
8786.72 69.410 23.150 6896.15 6948.65 2056.86 N 4204.79 E 5976616.56 N 375936.76 E 8.202 -259.94
8881.79 72.670 16.410 6927.06 6979.56 2141.42N 4235.14 E 5976700.59 N 375968.55 E 7.529 -201.00
8976.63 70.870 9.750 6956.76 7009.26 2229.09 N 4255.54 E 5976787.90 N 375990.45 E 6.934 -134.47
9072.55 69.270 5.730 6989.47 7041.97 2318.42 N 4267.70 E 5976877.00 N 376004.13 E 4.278 -62.48
9167.53 71.400 2.750 7021.44 7073.94 2407.60 N 4274.29 E 5976966.06 N 376012.25 E 3.709 12.11
9263.74 78.570 359.780 7046.35 7098.85 2500.43 N 4276.30 E 5977058.84 N 376015.85 E 8.026 92.12
9359.60 81.970 354.240 7062.56 7115.06 2594.73 N 4271.35 E 5977153.21 N 376012.52 E 6.709 176.82
9454.01 83.120 349.700 7074.82 7127.32 2687.39 N 4258.27 E 5977246.09 N 376001.02 E 4.921 264.06
9561.06 84.080 350.500 7086.75 7139.25 2792.19 N 4239.98 E 5977351.18 N 375984.53 E 1.164 364.43
9657.01 91.110 348.950 7090.77 7143.27 2886.46 N 4222.89 E 5977445.73 N 375969.05 E 7.502 455.03
9752.27 92.520 349.150 7087.76 7140.26 2979.93 N 4204.81 E 5977539.50 N 375952.57 E 1 .495 545.42
9847.94 92.710 349.140 7083.39 7135.89 3073.79 N 4186.81 E 5977633.65 N 375936.18 E 0.199 636.11
9943.29 93.260 347.270 7078.43 7130.93 3167.00 N 4167.35 E 5977727.18 N 375918.32 E 2.042 726.94
10038.81 90.060 340.860 7075.66 7128.16 3258.75 N 4141.15 E 5977819.36 N 375893.69 E 7.497 819.79
10135.01 89.260 333.260 7076.23 7128.73 3347.27 N 4103.68 E 5977908.51 N 375857.74 E 7.944 915.34
10230.23 91.110 328.790 7075.92 7128.42 3430.55 N 4057.57 E 5977992.57 N 375813.06 E 5.080 1010.53
10325.18 91.480 329.450 7073.78 7126.28 3512.02 N 4008.85 E 5978074.86 N 375765.74 E 0.797 1105.41
2 October, 2002 - 9:10 Page 4 of6 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2..16
Your Ref: API 501032042600
Job No. AKZZ22132, Surveyed: 7 August, 2002
Alaska North Slope ~rth Slope, Alaska
~l I
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical #!1~
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10421.67 91.970 329.140 7070.87 7123.37 3594.94 N 3959.60 E 5978158.61 N 375717.92 E 0.601 1201.83
10517.30 90.430 329.460 7068.87 7121.37 3677.15 N 3910.79 E 5978241.64 N 375670.53 E 1.645 1297.40
10613.94 88.400 329.230 7069.86 7122.36 3760.28 N 3861.52 E 5978325.60 N 375622.69 E 2.114 1394.01
10709.42 88.590 328.970 7072.36 7124.86 3842.18 N 3812.50 E 5978408.33 N 375575.08 E 0.337 1489.41
10802.03 88.890 328.480 7074.40 7126.90 3921.31 N 3764.44 E 5978488.27 N 375528.37 E 0.620 1581.94
10899.31 89.690 332.510 7075.61 7128.11 4005.95 N 3716.54 E 5978573.72 N 375481.93 E 4.223 1679.19
10993.98 90.370 331.090 7075.56 7128.06 4089.38 N 3671.81 E 5978657.90 N 375438.63 E 1.663 1773.84
11089.02 91.230 330.520 7074.23 7126.73 4172.34 N 3625.45 E 5978741.64 N 375393.71 E 1.086 1868.87
11186.11 91.050 333.500 7072.30 7124.80 4258.04 N 3579.90 E 5978828.11 N 375349.63 E 3.074 1965.91
11279.62 91.600 334.100 7070.13 7122.63 4341.92 N 3538.63 E 5978912.69 N 375309.79 E 0.870 2059.26
11375.81 92.220 333.940 7066.93 7119.43 4428.34 N 3496.51 E 5978999.82 N 375269.17 E 0.666 2155.24
11470.45 90.490 334.320 7064.69 7117.19 4513.47 N 3455.23 E 5979085.64 N 375229.35 E 1.872 2249.69
11568.04 90.180 333.650 7064.12 7116.62 4601.17 N 3412.43 E 5979174.06 N 375188.05 E 0.756 2347.12
11663.96 90.370 333,900 7063.66 7116.16 4687.22 N 3370.04 E 5979260.82 N 375147.14 E 0.327 2442.90
11760.08 90.000 333.110 7063.35 7115.85 4773.24 N 3327.16 E 5979347.56 N 375105.74 E 0.908 2538.91
11855.38 88.280 332.480 7064.78 7117.28 4857.99 N 3283.60 E 5979433.04 N 375063.64 E 1.922 2634.14
11950.74 88.830 332.550 7067.18 7119.68 4942.56 N 3239.61 E 5979518.35 N 375021.09 E 0.581 2729.42
12046.01 89.510 332.860 7068.56 7121.06 5027.21 N 3195.92 E 5979603.74 N 374978.87 E 0.784 2824.62
12139.03 89.630 333.130 7069.26 7121.76 5110.08 N 3153.69 E 5979687.32 N 374938.05 E 0.318 2917.57
12234.76 89.940 332.980 7069.62 7122.12 5195.42 N 3110.31 E 5979773.39 N 374896.14 E 0.360 3013.22
12330.86 90.250 333.550 7069.46 7121.96 5281.25 N 3067.08 E 5979859.94 N 374854.39 E 0.675 3109.23
12426.28 90.800 333.840 7068.59 7121.09 5366.78 N 3024.79 E 5979946.19 N 374813.57 E 0.652 3204.52
12500.00 90.240 333.840 7067.92 7120.42 5432.95 N 2992.29 E 5980012.90 N 374782.21 E 0.760 3278.13 Projected Azimuth
-
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.5' M.S.L.. Northings and Eastings are relative to 1726' FNL, 1544' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from 1726' FNL, 1544' FEL and calculated along an Azimuth of 330.750° (True).
Magnetic Declination at Surface is 24.876°(05-Aug-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 12500.0Oft.,
The Bottom Hole Displacement is 6202.48f1., in the Direction of 28.845° (True).
2 October, 2002.9:10
Page 50f6
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2~16
Your Ref: API 501032042600
Job No. AKZZ22132, Surveyed: 7 August, 2002
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
North Slope, Alaska
Alaska North Slope
Comments
Comment
12500.00
7120.42
5432.95 N
2992.29 E
Projected Azimuth
Survey tool program for CD2-16
From
Measured Vertical
Depth Depth
(ft) (ft)
, To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
528.00
0.00 528.00
527.49 12500.00
527.49 Tolerable Gyro(CD2-16 Gyro)
7120.42 AK-6 BP _IFR-AK(CD2-16)
'-
2 October, 2002 - 9:10
Page 60f6
DrillQuest 3.03.02.002
03-0ct-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well CD2-16 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
, M D (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECE'VED
OCT 0 9 ZOOl
Alaaka Oii & Gas Cons.Commillion
Ancbof8ge
Attachment( s)
ex Q}. Jill:!
~...,
.~
"-
\
~
(C)
Sperry-Sun Drilling Services
"-
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-16'MWD
Job No. AKMW22132, Surveyed: 7 August, 2002
Survey Report
2 October, 2002
Your Ref: API 501032042600
Surface Coordinates: 5974631.95 N, 371697.39 E (70020' 20.1297" H, 151002' 28.0445" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974631.95 N, 128302.61 W (Grid)
Surface Coordinate$ relative to Structure: 188.67 H, 23.33 W(True)
Kelly Bushing: 52. 50ft above Mean Sea Level
Elevation relative to ProJeçt V Reference: 52. 60ft
Elevation rel.tlve to Structure: 52. 50ft
.,,~."-"I'Y-!!iU"
I:) Alt;.. LIN" $ è AVice s
A Halliburton Company
Survey Ref: svy9984
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-16 MWD
Your Ref: API 501032042600
Job No. AKMW22132, Surveyed: 7 August, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
528.00 6.300 76.000 474.99 527.49 3.04N 14.29 E 5974634.75 N 371711.73 E -4.33 MWD Magnetic
624.19 8.580 71.540 570.37 622.87 6.59N 26.22 E 5974638.09 N 371723.72 E 2.443 -7.06
655.05 9.490 71.940 600.84 653.34 8.11 N 30.82 E 5974639.53 N 371728.35 E 2.956 -7.99
747.96 9.900 74.820 692.43 744.93 12.57 N 45.81 E 5974643.74 N 371743.41 E 0.683 -11.41
837.74 11.620 74.850 780.63 833.13 16.96 N 61.99 E 5974647.85 N 371759.66 E 1.916 -15.49
925.54 13.630 80.670 866.30 918.80 20.95 N 80.74 E 5974651.51 N 371778.47 E 2.707 -21.17
1021.80 16.250 79.320 959.30 1011.80 25.28 N 105.17 E 5974655.43 N 371802.97 E 2.746 -29.33
1116.90 18.850 76.920 1049.97 1102.47 31.23 N 133.21 E 5974660.89 N 371831.12 E 2.837 -37.85
1210.78 20.440 76.190 1138.38 1190.88 38.57 N 163.91 E 5974667.71 N 371861.93 E 1.714 -46.43
1305.68 20.950 76.250 1227.16 1279.66 46.56 N 196.48 E 5974675.14 N 371894.64 E 0.538 -55.38
1400.47 23.260 77.880 1314.97 1367.47 54.52 N 231.24 E 5974682.50 N 371929.53 E 2.521 -65.42
1496.64 26.360 79.290 1402.26 1454.76 62.48 N 270.80 E 5974689.78 N 371969.22 E 3.281 -77.81
1591.32 27.450 79.410 1486.69 1539.19 70.39 N 312.90 E 5974696.98 N 372011.45 E 1.153 -91.47
1686.45 28.620 76.980 1570.66 1623.16 79.56 N 356.65 E 5974705.39 N 372055.35 E 1.719 -104.86
1783.10 29.570 77.11 0 1655.11 1707.61 90.09 N 402.46 E 5974715.14 N 372101.33 E 0.985 -118.04
1878.14 29.900 77.570 1737.64 1790.14 100.42 N 448.45 E 5974724.68 N 372147.49 E 0.422 -131.50
19'13.17 30.090 76.780 1819.94 1872.44 110.97 N 494.77 E 5974734.43 N 372193.99 E 0.461 -144.94
2068.18 29.860 75.970 1902.24 1954.74 122.15 N 540.90 E 5974744.82 N 372240.30 E 0.490 -157.72
2163.46 29.'580 76.700 1984.99 2037.49 133.31 N 586.80 E 5974755.20 N 372286.39 E 0.480 -170.41
2258.00 29.450 76.870 2067.26 2119.76 143.96 N 632.14 E 5974765.07 N 372331.90 E 0.164 -183.28
2352.74 28.940 77.690 2149.96 2202.46 154.13 N 677.22 E 5974774.47 N 372377.15 E 0.684 -196.42
2445.74 30.100 77.890 2230.89 2283.39 163.82 N 722.00 E 5974783.40 N 372422.09 E 1.252 -209.85
2473.25 30.210 78.390 2254.68 2307.18 166.66 N 735.53 E 5974786.00 N 372435.66 E 0.997 -213.98
"'~ 2580.37 30.070 78.240 2347.31 2399.81 177.56 N 788.20 E 5974795.99 N 372488.51 E 0.148 -230.21
2672.36 29.950 78.000 2426.97 2479.47 187.03 N 833.22 E 5974804.69 N 372533.69 E 0.185 -243.95
2768.29 29.490 76.700 2510.28 2562.78 197.44 N 879.63 E 5974814.31 N 372580.27 E 0.825 -257.54
2867.32 29.200 75.090 2596.61 2649.11 209.26 N 926.69 E 5974825.32 N 372627.53 E 0.849 -270.22
2962.42 29.180 75.720 2679.63 2732.13 220.95 N 971.58 E 5974836.24 N 372672.60 E 0.324 -281.96
3058.35 29.120 75.010 2763.41 2815.91 232.75 N 1016.79 E 5974847.27 N 372718.01 E 0.366 -293.75
3150.70 29.190 '15.160 2844.06 2896.56 244.33 N 1060.26 E 5974858.11 N 372761.68 E 0.110 -304.88
3248.79 29.030 74.880 2929.76 2982.26 256.67 N 1106.36 E 5974869.65 N 372807.98 E 0.214 -316.65
3343.29 28.670 74.100 3012.53 3065.03 268.86 N 1150.30 E 5974881.09 N 372852.12 E 0.551 -327.48
3438.79 28.350 78.870 3096.46 3148.96 279.51 N 1194.58 E 5974890.98 N 372896.58 E 2.407 -339.82
3534.26 28.160 79.330 3180.56 3233.06 288.06 N 1238.96 E 5974898.77 N 372941.10 E 0.303 -354.05
3629.06 30.020 78.670 3263.40 3315.90 296.86 N 1284.20 E 5974906.80 N 372986.48 E 1.991 -368.48
2 October, 2002 - 9:14 Page 2 of 6 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-16 MWD
Your Ref: API 501032042600
Job No. AKMW22132, Surveyed: 7 August, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (oI100ft)
3724.27 30.360 79.000 3345.69 3398.19 306.13 N 1331.17 E 5974915.26 N 373033.61 E 0.397 -383.34
3819.56 30.180 78.450 3427.99 3480.49 315.52 N 1378.28 E 5974923.84 N 373080.87 E 0.347 -398.16
3914.56 30.160 78.650 3510.12 3562.62 325.00 N 1425.07 E 5974932.52 N 373127.81 E 0.108 -412.76
4010.37 30.240 78.500 3592.93 3645.43 334.55 N 1472.31 E 5974941.26 N 373175.21 E 0.115 -427.51
4107,50 29.960 78.280 3676.96 3729.46 344.35 N 1520.03 E 5974950.24 N 373223.09 E 0.310 -442.27
'~ 4203.20 31.990 80.140 3759.01 3811.51 353.55 N 1568.41 E 5974958.61 N 373271.62 E 2.345 -457.89
4298.92 32.460 79.420 3839.98 3892.48 362.61 N 1618.64 E 5974966.81 N 373321.99 E 0.634 -474.53
4394.70 32. 140 79.100 3920.94 3973.44 372.14 N 1668.92 E 5974975.48 N 373372.43 E 0.379 -490.78
4489.66 32.070 78.180 4001.38 4053.88 382.08 N 1718.40 E 5974984.57 N 373422.07 E 0.520 -506.28
4585.44 31.590 78.920 4082.76 4135.26 392.11 N 1767.91 E 5974993.75 N 373471.75 E 0.646 -521.72
4680.69 31.040 78.730 4164.13 4216.63 401.71 N 1816.47 E 5975002.52 N 373520.47 E 0.587 -537.08
4776.54 31.610 78.200 4246.01 4298.51 411.67 N 1865.30 E 5975011.64 N 373569.46 E 0.661 -552.24
4871.12 32.360 74.380 4326.24 4378.74 423.56 N 1913.94 E 5975022.70 N 373618.30 E 2.281 -565.64
4966.38 32.280 72.870 4406.74 4459.24 437.91 N 1962.80 E 5975036.21 N 373667.40 E 0.852 -576.99
5061.81 31.950 71.540 4487.57 4540.07 453.42 N 2011.11 E 5975050.89 N 373715.96 E 0.818 -587.07
5157.12 30.690 73.390 4568.99 4621.49 468.35 N 2058.34 E 5975065.02 N 373763.44 E 1.663 -597.11
5252.43 30.160 73.320 4651 .18 4703.68 482.18 N 2104.58 E 5975078.05 N 373809.91 E 0.557 -607.64
5347.95 29.560 72.320 4734.02 4786.52 496.22 N 2150.02 E 5975091.31 N 373855.58 E 0.816 -617.59
5441 .41 29.040 71.910 4815.52 4868.02 510.27 N 2193.54 E 5975104.61 N 373899.34 E 0.596 -626.61
5539.11 29.780 72.160 4900.63 4953.13 525.06 N 2239.18 E 5975118.62 N 373945.23 E 0.768 -636.00
5634.40 31.590 71.460 4982.57 5035.07 540.25 N 2285.37 E 5975133.02 N 373991.67 E 1.936 -645.32
5729.22 34.460 73.050 5062.07 5114.57 555.97 N 2334.59 E 5975147.89 N 374041.15 E 3.162 -655.65
5824.35 37.150 71 .140 5139.21 5191.71 573.11 N 2387.53 E 5975164.12 N 374094.38 E 3.062 -666.56
5919.37 39.860 68.000 5213.57 5266.07 593.79 N 2442.93 E 5975183.86 N 374150.12 E 3.516 -675.58
6016.45 43.730 62.940 5285.96 5338.46 620.73 N 2501.69 E 5975209.78 N 374209.34 E 5.285 -680.80
6112.46 48.580 58.820 5352.46 5404.96 654.49 N 2562.09 E 5975242.51 N 374270.31 E 5.922 -680.85
6208.14 53.920 53.850 5412.35 5464.85 695.92 N 2624.07 E 5975282.87 N 374332.99 E 6.894 -674.99
6302.14 55.860 52.530 5466.41 5518.91 742.00 N 2685.63 E 5975327.88 N 374395.32 E 2.362 -664.87
6397.49 55.600 51.760 5520.10 5572.60 790.35 N 2747.84 E 5975375.17 N 374458.35 E 0.721 -653.08
6494.59 53.870 54.090 5576.17 5628.67 838.15 N 2811.08 E 5975421.88 N 374522.40 E 2.648 -642.27
6589.73 52.850 54.800 5632.95 5685.45 882.54 N 2873.18 E 5975465.20 N 374585.25 E 1.228 -633.88
6685.01 52.560 54.250 5690.68 5743.18 926.53 N 2934.91 E 5975508.13 N 374647.72 E 0.551 -625.66
6780.58 52.250 53.450 5748.98 5801.48 971.20 N 2996.05 E 5975551.74 N 374709.62 E 0.738 -616.57
6875.90 51 .600 52.210 5807.77 5860.27 1016.53 N 3055.85 E 5975596.04 N 374770.18 E 1.230 -606.23
6972.04 51.110 52.210 5867.81 5920.31 1062.54 N 3115.19 E 5975641.03 N 374830.30 E 0.510 -595.08
2 October, 2002 - 9:14 Page 3 of6 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-16 MWD
Your Ref: API 501032042600
Job No. AKMW22132, Surveyed: 7 August, 2002
North Slope. Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
7067.39 50.840 52.560 5927.84 5980.34 1107.76 N 3173.86 E 5975685.24 N 374889.74 E 0.402 -584.30
7162.82 52.170 52.750 5987.24 6039.74 1153.06 N 3233.24 E 5975729.52 N 374949.89 E 1.402 -573.79
7258.26 53.930 53.470 6044.61 6097.11 1198.84 N 3294.24 E 5975774.25 N 375011.66 E 1.940 -563.65
7354.46 54.210 52.050 6101.06 6153.56 1245.98 N 3356.25 E 5975820.32 N 375074.47 E 1 .230 -552.82
7447.71 53.750 51 .560 6155.90 6208.40 1292.61 N 3415.53 E 5975865.93 N 375134.53 E 0.651 -541.10
7546.36 53.230 51. 650 6214.59 6267.09 1341.86N 3477.67 E 5975914.11 N 375197.51 E 0.532 -528.50
7641.97 52.730 51 .400 6272.16 6324.66 1389.35 N 3537.43 E 5975960.57 N 375258.08 E 0.563 -516.26
7737.62 52.390 50.590 6330.31 6382.81 1437.15 N 3596.45 E 5976007.35 N 375317.90 E 0.761 -503.39
7833.37 53.230 50.960 6388.19 6440.69 1485.38 N 3655.54 E 5976054.57 N 375377.81 E 0.930 -490.18
7928.43 52.880 50.370 6445.32 6497.82 1533.54 N 3714.30 E 5976101.71 N 375437.39 E 0.618 -476.88
8023.87 52.490 50.510 6503.18 6555.68 1581.88 N 3772.82 E 5976149.04 N 375496.72 E 0.425 -463.29
8118.76 52.800 50.110 6560.75 6613.25 1630.05 N 3830.86 E 5976196.21 N 375555.58 E 0.468 -449.63
8213.09 54.590 48.400 6616.60 6669.10 1679.67 N 3888.44 E 5976244.84 N 375614.00 E 2.395 -434.47
8308.64 54.340 46.050 6672.14 6724.64 1732.47 N 3945.51 E 5976296.66 N 375671.97 E 2.018 -416.29
8404.48 56.350 44.670 6726.64 6779.14 1787.87 N 4001.59 E 5976351.09 N 375728.99 E 2.409 -395.35
8500.13 60.050 40.980 6777.05 6829.55 1847.50 N 4056.79 E 5976409.76 N 375785.20 E 5.070 -370.30
8596.03 64.000 38.190 6822.03 6874.53 1912.77 N 4110.71 E 5976474.11 N 375840.23 E 4.854 -339.69
8691.44 67.590 32.320 6861 .17 6913.67 1983.82 N 4160.85 E 5976544.28 N 375891.58 E 6.755 -302.21
8786.72 69.410 24.070 6896.14 6948.64 2061.88 N 4202.65 E 5976621.62 N 375934.71 E 8.278 -254.52
8881.79 72.670 1 7.150 6927.06 6979.56 2145.98 N 4234.22 E 5976705.17 N 375967.71 E 7.689 -196.57
8976.63 70.870 1 0.500 6956.76 7009.26 2233.38 N 4255.76 E 5976792.19 N 375990.74 E 6.924 -130.84
9072.55 69.270 5.230 6989.47 7041.97 2322.67 N 4268.12 E 5976881.24 N 376004.62 E 5.427 -58.97
9167.53 71.400 2.490 7021.44 7073.94 2411.89 N 4274.12 E 5976970.35 N 376012.16 E 3.522 15.94
"-'~ 9263.74 78.570 0.120 7046.35 7098.85 2504.72 N 4276.20 E 5977063.14 N 376015.83 E 7.822 95.92
9359.60 81.970 354.900 7062.56 7115.06 2599.07 N 4272.08 E 5977157.54 N 376013.32 E 6.432 180.25
9454.01 83.120 350.070 7074.82 7127.32 2691.84 N 4259.83 E 5977250.51 N 376002.66 E 5.217 267.18
9561.06 84.080 350.600 7086.75 7139.25 2796.71 N 4241.98 E 5977355.67 N 375986.60 E 1.023 367.40
9657.01 91.110 349.040 7090.77 7143.27 2891.01 N 4225.04 E 5977450.24 N 375971.28 E 7.504 457.95
9752.27 92.520 350.580 7087.76 7140.26 2984.71 N 4208.20 E 5977544.22 N 375956.04 E 2.191 547.94
9847.94 92,710 348.440 7083.39 7135.89 3078.68 N 4190.80 E 5977638.47 N 375940.25 E 2.243 638.42
9943.29 93.260 346.110 7078.42 7130.92 3171.56N 4169.82 E 5977731.69 N 375920.87 E 2.508 729.71
10038.81 90.060 340.770 7075.66 7128.16 3263.03 N 4142.62 E 5977823.62 N 375895.24 E 6.515 822.81
10135.01 89.260 333.470 7076.23 7128.73 3351.60 N 4105.24 E 5977912.81 N 375859.38 E 7.634 918.35
10230.23 91.110 329.230 7075.92 7128.42 3435.14 N 4059.60 E 5977997.12 N 375815.18 E 4.858 1013.54
10325.18 91.480 329.680 7073.77 7126.27 3516.89 N 4011.36 E 5978079.69 N 375768.34 E 0.613 1108.44
2 October, 2002 - 9:14 Page4of6 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-16 MWD
Your Ref: API 501032042600
Job No. AKMW22132, Surveyed: 7 August, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
10421.67 91.970 329.680 7070.87 7123.37 3600.14 N 3962.67 E 5978163.76 N 375721.08 E 0.508 1204.87
10517.30 90.430 329.590 7068.87 7121.37 3682.63 N 3914.34 E 5978247.07 N 375674.17 E 1.613 1300.45
10613.94 88.400 328.360 7069.85 7122.35 3765.44 N 3864.54 E 5978330.71 N 375625.79 E 2.456 1397.03
10709.42 88.590 328.890 7072.36 7124.86 3846.93 N 3814.85 E 5978413.04 N 375577.50 E 0.590 1492.42
10802.03 88.890 328.770 7074.40 7126.90 3926.15 N 3766.93 E 5978493.07 N 375530.94 E 0.349 1584.95
10899.31 89.690 332.620 7075.60 7128.10 4010.96 N 3719.32 E 5978578.68 N 375484.80 E 4.042 1682.20
10993.98 90.370 331.940 7075.55 7128.05 4094.76 N 3675.29 E 5978663.23 N 375442.21 E 1.016 1776.84
11089.02 91.230 333.280 7074.23 7126.73 4179.14 N 3631.57 E 5978748.34 N 375399.94 E 1.675 1871.82
11186.11 91.050 333.850 7072.30 7124.80 4266.06 N 3588.36 E 5978835.98 N 375358.22 E 0.616 1968.77
11279.62 91.600 334.390 7070.13 7122.63 4350.17 N 3547.55 E 5978920.78 N 375318.86 E 0.824 2062.09
11375.81 92.220 334.420 7066.93 7119.43 4436.87 N 3506.02 E 5979008.18 N 375278.82 E 0.645 2158.03
11470.45 90.490 333.760 7064.69 7117.19 4521.97 N 3464.68 E 5979093.97 N 375238.94 E 1.956 2252.48
11568.04 90. 180 333.070 7064.12 7116.62 4609.24 N 3421.01 E 5979181.98 N 375196.77 E 0.775 2349.96
11663.96 90.370 333.900 7063.66 7116.16 4695.07 N 3378.19 E 5979268.53 N 375155.42 E 0.888 2445.77
11760.08 90.000 333.110 7063.35 7115.85 4781.09 N 3335.31 E 5979355.27 N 375114.02 E 0.908 2541.78
11855.38 88.280 332.540 7064.78 7117.28 4865.86 N 3291.79 E 5979440.77 N 375071.96 E 1.901 2637.00
11950.74 88.830 332.700 7067.18 7119.68 4950.51 N 3247.95 E 5979526.16 N 375029.57 E 0.601 2732.28
12046.01 89.510 333.330 7068.56 7121.06 5035.40 N 3204.72 E 5979611.77 N 374987.81 E 0.973 2827.4 7
12139.03 89.630 333.260 7069.26 7121.76 5118.49 N 3162.92 E 5979695.57 N 374947.43 E 0.149 2920.39
12234.76 89.940 333.140 7069.62 7122.12 5203.94 N 3119.76 E 5979781.74 N 374905.74 E 0.347 3016.03
12330.86 90.250 333.310 7069.46 7121.96 5289.73 N 3076.4 7 E 5979868.27 N 374863.92 E 0.368 3112.04
12426.28 90.800 333.800 7068.59 7121.09 5375.17 N 3033.98 E 5979954.41 N 374822.90 E 0.772 3207.35
12500.00 90.240 333.800 7067.92 7120.42 5441.31 N 3001.43 E 5980021.10 N 374791.49 E 0.760 3280.96 Projected Azimuth
.-
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.5' M.S.L.. Northings and Eastings are relative to 1726' FNL, 1544' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from 1726' FNL, 1544' FEL and calculated along an Azimuth of 330.750° (True).
Magnetic Declination at Surface is 24.876°(05-Aug-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 12500.00ft.,
The Bottom Hole Displacement is 6214.21ft., in the Direction of 28.881° (True).
2 October, 2002 - 9:14
Page 50f6
DrilIQuest3.0~02.002
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-16 MWD
Your Ref: API 501032042600
Job No. AKMW22132, Surveyed: 7 August, 2002
North Slope, Alaska
Alaska North Slope
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft)(ft)
Comment
12500.00
7120.42
5441.31 N
3001.43 E
Projected Azimuth
Survey tool prOf/ram for CD2-16 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
528.00
0.00 528.00
527.49 12500.00
527.49 Tolerable Gyro(CD2-16 Gyro)
7120.42 MWD Magnetic(CD2-16 MWD)
2 October, 2002 - 9:14
Page 60f6
DrillQuest 3.03.02.002
Well Name:
c.t)é)-'\ \0
dOQ- \'-\~
Sundry #:
Operator:
PTD:
Item
Y/N
1. Standard MIT test provided?
2. Notified of pressure communication or leakage?
~~
þ~
~~
\.:J~
'(
'\
e
3. Diagnostics planned/run? Method?
4. Form 10-403 submitted requesting waiver?
5. Alternate MIT passed? Method? AOGCC witnessed?
6. MIT Part II verified? How?
7. Area or Review examined?
VIC Check List
??(.a
~~
~
Date:
~'Vc::à ~~ ~~
~ .. ..
New Well
Conversion
\ <6 ~
Order(s):
Comments
Definition of Terms
T Tubing
IA Inner Annulus (tbg x csg)
OA Outer Annulus (csg x csg)
MIT Mechanical Integrity Test
CMIT Combined test of annular spaces
LLR T Leak Loss Rate Test
~\>~~~~, ,,~\> ~ ttè\'i(~
~\" \f\..~~\ \~~t..~.
Waiver Assessment (if necessary)
Integrity # Barriers Condition Enhanced Operational Restrictions
Cate!ory Affected Monitorin! Requirementsl
TxIA communication (tubing leak; Annual MITIA/LLRT
4 1 packer leak not quantifiable) 4 year CMIT T x IA Water only
TxIA communication (tubing leak; 2 year CMIT T x IA (tubing leak)
3 1 packer leak quantifiable) 2 year MIT T (packer leak) Water only
Annual CMIT IA x OA
2 1 Production casing leak MIT Tubing - 2 yrs Water only
IAxOA communication Annual MITT Water only, Alarm wi injection shutdown on OA. Set point minimum 1000 psi <
1 1 Annual CMIT IA x OA minimum burst strength of outside casing.
1 . .
e
In additIon to Monthly Report of Daily Operatmg Parameters; Annulus Pressure Momtormg
Matrix applies to the following well configuration:
1. Conventional completion per regulations; mono bore on case by case basis
~: ~~g~t~~~~::~ ::s~~:;~~o~fs:~t~~:~;ing pressure ~NED OCT 3 1 20D5
waiver _ chklst.doc:8/12/2002
Reviewing Engineer: t~~\.~ ~,)~~a\.~(J~
Recommended Action: ~~~e"."-:.'\~,,--~ '\~ð- 'JQ~\ ~ ~~,,\J-~
Integrity Category: \-...j ~ ~ '-- -.J '-- \ _ ~ \ ~ -~ ':>
Com patT'i
\i\ie II:
Fielci
E: 0 r·o u 1~1l-l:
...
w
i' ...
Q. ~
~ ~ ~
to ~
,; oil Ji
i ...
z II z
'" ... « Q
'"
o!! ~ ;¡; ~ ~
¡¡¡¡ ~ 0
0 Q 9
0 0 a.
~
I!.
~ 8
0
CD 2-16
Colville River Unit (A Ipine)
North Slope :~:tate. Alaska
Slim Cement Bond Log (SCMT-BB)
with Temperature & Pressure
27-August-2002
1726.14' FNL8c 1543.95' FEL
ASulڜ:
e
Phillips Alaska, Inc.
Pennanent OaIum: MSL
Log Measured From: OF
Dilling Measured From: OF
API SeriallÐ.
50·103·20426-00
27·ÅJ ·2002
1
12500 t
9302 t
9289 t
Ot
Desel and Brine
Sedion
2
8.500 in
e
Schlumberger
Oil Den .
\nåter Salin'
« Gas GI3 .
t: Bo
Q
!;;: Bw
a. liB
Bubble Point PreSiSlJre
Bubble Point -¡; ralUre
Solution GOR
MaJÔlT1Jm DeüalÎOn
CEMEtlTlNG OAT A
8ev.: K.B. 52.5 t
G.L. 15.9t
C.F. 52.5 t
Tail CementT e
8ev.: Ot \.blume
52.5 t abo1Æ! Perm. OaIum Den
\nåter Loss
ftddili1Æ!s
Township Range
IIN 4E,LM
19:15
Size
"""""""'"
9J'1:i1:a
2S23.D
e
e
CD2-16 7" casing cementing notes:
Break circulation - circulate & condition mud for cement job lower YP to 15 Stage
pumps up @ .5 BPM f/2.5 BPM to 5.5 BPM Inital pump pressure 720 psi - final
pump pressure 460 psi recip. pipe (2) 15' strokes every 10 mins up wt. 300 - 325
dn wt. 175 -160
Cement 7" casing - Pumped 5 bbls Arco wash - Tested lines to 3500 psi -
Pumped 15 bbls Arco wash @ 8.3 ppg - 4.5 B/P @ 465 psi - Pumped 50 bbls
Mud Push Xl spacer @ 12.5 ppg - 4.5 B/M @ 575 psi - Dropped bottom plug-
Mixed & pumped 42 bbls (207 sks) Tail slurry - Class G wI .20 % 0046, .30%
0065, .04% 0800, & .35% 0167 @ 15.8 ppg - 4,5 B/M @ 790 psi - Dropped top
plug wI 20 bbls fresh water fl Dowell - switch to rig pumps & displaced wI 338
bbls 9.7 ppg lSND mud - 7 B/M @ 170 to 720 psi for 322 bbls - slowed pump to
3.5 B/M @ 450 to 530 psi for 16 bbl - Bumped plug wI 338 bbls mud w/11 00 psi
- floats held CIP @ 1445 hrs. Full returns through job - stopped pipe movement
wI 68 bbls left to displace - bumped plug wI total of 358 bbls - calc displacement
362 bbls.
2-16 top of Alpine
e
e
Subject: 2-16 top of Alpine
Date: Thu, 29 Aug 2002 14:36:18 ~0800
From: "Clifford L Crabtree" <ccrabtr@ppco.com>
To: Tom Maunder <tom_maunder@admin.state.ak.us>
For CD2-16
Top of Alpine C sand 9402' MD, 7068' TVDss @ -82.5 degrees
Cliff Crabtree
Phillips Alaska Inc.- Alpine Subsurface Development
Office: (907) 265-6842; Cell: (907) 240-5357
Email: ccrabtr@ppco.com; Fax:: (907) 265-1515
1 of 1
8129/2002 2:43 PM
~~~j~I~~~¡~~~J.~J~'~I~
x
~
~
CD2-16 Schematic
e
e
Subject: CD2-16 Schematic
Date: Thu, 29 Aug 200216:19:53 -0800
From: "Clifford L Crabtree" <ccrabtr@ppco.com>
To: Tom Maunder <tom_maunder@admin.state.ak.us>
CC: "Chris R Pierson" <crpiers@ppco.com>, "Vernon T Johnson" <vjohnso1@ppco.com>
Tom
Correction from TVD to TVDss is 52'. There is a word based schematic below
with the depth information you requested
Based on a review of the directional maps available to me, I could not
identify any wellbore that penetrates the Alpine within 1/4 mile (1320
feet) of CD2-16. I have attached a geologic map of the well course and
surrounding area. I have attached a geologic map showing well path and the
estimated top of the Alpine reservoir.
(See attached file: CD2-16 Well proximity map.doc)
Cliff Crabtree
Phillips Alaska Inc.- Alpine Subsurface Development
Office: (907) 265-6842; Cell: (907) 240-5357
Email: ccrabtr@ppco.com; Fax:: (907) 265-1515
----- Forwarded by Clifford L Crabtree/PPCO on 08/29/2002 03:53 PM -----
Chris R Pierson
08/29/2002 03:45 PM
To: Clifford L Crabtree/PPCO@Phillips
cc:
Subject: CD2-16 Schematic
Here it is
(See attached file: CD2-16 Schematic. doc)
Chris R. Pierson
Phillips Alaska, Inc.
Alpine Subsurface
700 G. Street (ATO-846)
Anchorage, AK 99510
Phone: (907) 265-6112
PPCO Cell: (907) 240-5056
Personal Cell: (907) 360-9514
Fax: (907) 265-1515
Email: crpiers@ppco.com
^·~N."^,wmm~"m^~='~~'~~__m^"~'''_vc.·___W_''''''W~~_____~~-__'_______~_ '-um~=WN~_='m~v~~U_~=~~m~~m'_~=
--~~=~--~-~~~
c~r;;râme: CD2-16 Well proximity map. doc
DCD2-16 Well proximity map. doc Type: WINWORD File (application/msword)
Encoding: base64
Name: CD2-16 Schematic. doc
DCD2-16 Schematic. doc Type: WINWORD File (application/msword)
Encoding: base64
1 of 1
8/29/20024:37 PM
ÞA 5O-1œ..2J425.00
PacIœr F!jjd nix:
Ka aiÆ
WlhEC-1124A
and 2,00J M)desel œp
A-1
ì\ID
ss
~foSlriJ.œ
1-
l\tÐ
1" Qì!îœ ~e·1r. Qfœ· SK·5 lIìd1
. .~"-~'<.~ ~.~~~*-'" ..~.~~. ~."... .",~.~".. ~.",..
ss:
.~ ~ .'~""".~" ~.*~..~ ~~.......... .~."-. ...~... ..,,~.
M)J7,084' SS
'
@~!Æí!! rrr~ ~~ Æ\~~!Æ /
@ ~ U: ~ J u-'...=, If'j QV J /
A.1'~A.~1iA. OIL AND GAS /1
CONSERVATION COMMISSION í
i
(
TONY KNOWLES, GOVERNOR
Chip Alvord
Drilling Team Leader
Phillips Alaska, Inc.
PO Box 100360
Anchorage AK 99510
333 w. "JTH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re:
Colville River Unit CD2-16
Phillips Alaska, Inc.
Permit No: 202-144
Surface Location: 1726' FNL, 1544' FEL, Sec. 2, T11N, R4E, UM
Bottomhole Location: 419' FNL, 794' FWL, Sec. 36, T12N, R4E, UM
Dear Mr. Alvord:
Enclosed is the approved application for permit to drill the above referenced service well.
The permit to drill does not exempt you from obtaining additional permits or approvals required by law
from other governmental agencies, and does not authorize conducting drilling operations until all other
required permits and approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a
Commission order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the
mechanical integrity (M!) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 AAC
25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the
BOPE test performed before drilling below the surface casing shoe, must be given so that a representative
of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum
field inspector on the North Slope pager at 659-3607.
Sincerely,
(ß ~.~
C~ChSli Taylor
Chair
BY ORDER OF THE COMMISSION
DATED thisJ¿Nay of July, 2002
cc:
Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
1b Type of Well Exploratory
Service X Development Gas
5. Datum Elevation (OF or KB)
DF 52'
6. Property Designation
ADL 380075 & 380096
Unit or property Name
Stratigraphic Test Development Oil
Single Zone X Multiple Zone
10. Field and Pool
Colville River Field /
Alpine Oil Pool
(
1a.
Type of Work
Drill X
Re-Entry
Red rill
Deepen
2.
Name of Operator
Phillips Alaska, Inc.
Address
P. O. Box 100360, Anchorage, AK 99510-0360
Location of well at surface
7.
3.
4.
1726' FNL, 1544' FEL, Sec. 2, T11 N, R4E, UM
At target (=7" casing point)
Colville River Unit
8. Well num7r
CD2-16
9. Approximate spud date
7/25/2002 /
14. Number of acres in property
921' FSL, 2516' FEL, Sec. 36, T12N, R4E, UM
At total depth
419' FNL, 794' FWL, Sec. 36, T12N, R4E, UM
12. Distance to nearest 13. Distance to nearest well
Property line CD2-15 /
Crosses from feet 10.3' at 350' MD
380075 to 380096
16. To be completed for deviated wells
Feet
2560
(
feet
~JóA- 7/ lot 0 \..-
J~ -;j/ô
11. Type Bond (see 20 AAC 25.025)
Statewide
Number
#59-52-180
Amount
$200,000
15. Proposed depth (MD and TVD)
13894' MD
7110' TVD
feet
Kickoff depth
feet
Maximum hole angle
Maximum surface
2516
17. Anticipated pressure (see 20 AAC 25.035(e)(2))
psig
At total depth (TVD)
3194 at psig
7058'
TVD.SS
250'
91.56°
18. Casing program Setting Depth
size Specifications Top Bottom
Hole Casing Weight Grade Coupling Length MD TVD MD TVD
42" 16" 62.5# H-40 Weld 77' 37' 37' 114' 114'
12.25" 9.625" 36# J-55 BTC 2530' 37' 37' 2567' 2390'
8.5"
7"
26# L -80
12.6# L-80
BTC-M 9429'
I BT mod 8749'
37'
32'
9466'
8781'
37'
32'
N/A
4.5"
19.
To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
feet
feet
Plugs (measured)
Effective depth:
measured
true vertical
feet
feet
Junk (measured)
7139'
6962'
Quantity of cement
(include stage data)
Pre-installed
502 Sx Arcticset III L & /'
230 Sx Class G
182 Sx Class G ./
Tubing
Structural
Conductor
Surface
Intermediate
Production
Liner
R E ( E1e¥r£Ðh
JUL 10 2002
Casing
Length
Size
Cemented
True Vertical depth
Perforation depth:
measured
true vertical
maskaOil & Gas Gems. liommU.iSltm
_.- Anchorage
Title Drilling Team Leader Date
Commission Use Only
Permit Number L/U I API number ~ -"? ~ I Approval date tZ/' '/lþ'I1, . ~ I See cover ~etter for
:2.. t.> 2-" / 7 r 50- /03 - 2.. (;) '7'¿'" ~ OJ {I ~;"\ Other reqUirements
Conditions of approval Samples required Yes ~ Mud log Ulred ,Yes ~
Hydrogen sulfide measures Yes é§ Directional survey required § No
Required working pressure for BOPE
. L "" P - I -< 2M 3M 5M 10M ". 15M I
Other: Te'.:>.-- (~O L- 'f-O 5" Or!) 0 f~' (. M r: G ~t- Õ ,U't.i.t iÞ,' to~l ~ tAÁ,', ~ J .
p~ 2-vMc 2-S~O!>'5 (ÆJ(2}/ d¿\!~ rf-7Jc.vl~w'"-d KIM .JI.t2cÍ.
Ønganal Signed By by order of
Approved by ""-",' T.wlN' Commissioner the commission
Form 10-401 Rev. 7-24-89 Cammy vç\',n51 UI"""'
20. Attachments Filing fee X Property plat
Drilling fluid program X Time vs depth plot
BOP Sketch
Refraction analysis
Diverter Sketch
Seabed report
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed /(}.A--i- (þ(
O,'"jj U II
Drilling program X
20 AAC 25.050 requirements X
7(8 (DZ-
Date
7 ~~/q,acaæ
L
( (
CD2-16 Drilling Hazards Summary
(to be posted in Rig Floor Doghouse Prior to Spud)
(See Well Plan Attachment: Detailed Risk Information for further discussion of these risks)
12-1/411 Hole /9-5/8" Casina Interval
Event Risk Level
Conductor Broach Low
Well Collision medium
Gas Hydrates Low
Running Sands and Gravel
Low
Abnormal Pressure in
Surface Formations
>2000' TVO
Lost Circulation
Low
Low
,8-1/2" Hole /7" Casina Interval
Event Risk Level
Abnormal Pressure in low
Surface Formations
>2000' TVO
Lost circulation
Low
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
low
Hydrogen Sulfide gas
Low
Mitigation Strategy
Monitor cellar continuously during interval.
Gyro single shots, traveling cylinder diagrams
Monitor well at base of permafrost, increased mud
weight, decreased mud viscosity, increased
circulating times, controlled drilling rates, low mud
temperatures
Maintain planned mud parameters, Increase mud
weight, use weighted sweeps.
Increased mud weight
Reduced pump rates, mud rheology, lost circulation
material, use of low density cement slurries
Mitigation StrateQY
BOPE drills, Keep mud weight above 10.4 ppg.
Check for flow during connections and if needed,
increase mud weight.
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECO) monitoring, mud
rheology, lost circulation material
Reduced trip speeds, mud properties, proper hole
filling, pumping out of hole, real time equivalent
circulating density (ECO) monitoring, weighted
sweeps.
Well control drills, increased mud weight. No
mapped faults occur within 700' of the planned
wellbore.
H2S drills, detection systems, alarms, standard well
control practices, mud scavengers
,6-1/8" Hole / Horizontal Production Hole
Event Risk Level
Lost circulation moderate
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
Medium Ii
Hydrogen Sulfide gas
Low /
Mitigation Strategy
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECO) monitoring, mud
rheology, lost circulation material
Reduced trip speeds, Pump out to 7" shoe, mud
properties, proper hole filling, pumping out of hole,
real time equivalent circulating density (ECO)
monitoring, weighted sweeps.
BOPE drills, Keep mud weight above 9.0 ppg.
Check for flow during connections and if needed,
increase mud weight. Well control drills, increased
mud weight.
H2S drills, detection systems, alarms, standard well
control practices, mud scavengers
JR' ~
, I I
L
(
Alpine: CD2-16
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
j 12.
16.
17.
18.
19.
20.
21.
22.
Procedure
Move on Doyon 19.
/
Drill 12- }4" hole to the surface casing point as per the directional plan.
Run and cement 9-5/8" surface casing.
Install and test BOPE to 5000 psi. /
Pressure test casing to 2500 psi.
Drill out 20' of new hole. Perform leak off test.
Drill 8-Y2" hole to intermediate casing point in the Alpine Sands. 5>'WD Program: GR/RES/PWD)
Run and cement 7" casing as per program. Top of cement> 850 feet MD above Alpine reservoir. Carry out
a leak off test down the 9-5/8" x r casing annulus to confirm the fracture pressure referenced to the casing
shoe. Freeze protect casing annulus and casing.
BOPE test to 5000 psi. /
Run drilling assembly. Pressure test casing to 3500 psi. Drill out and perform formation integrity test to 12.5
ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg EMW. '
Drill 6-1/8" horizontal section to well TD (LWD Program: GR/RES/PWD).
Contingency - set open hole isolation equipment if required (due to unconsolidated formation or wellbore
having moved out of the Alpine reservoir sand).
Displace well to brine and pull out of hole.
Run 4- Y2, 12.6#, L-80 tubing with DB injection nipple, gas lift mandrel and packer. Land hanger.
Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check.
Circulate tubing to diesel and install freeze protection in the annulus.
/
Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi 130 mins.
Set BPV and secure well. Move rig off.
J.:)/GINA~
(
(
Well Proximity Risks:
Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in
following attachments. CD2-15 will be the closest well to CD2-16, 10.3' at 350' MD. /Áccounting for survey
tool inaccuracies, the ellipse separation between these wells will be 6.5' at 3501 MD.
DrillinQ Area Risks:
There are no high-risk events (e.g. over-pressures zones) anticipated.
Lost circulation: Faulting within the Alpine reservoir section is considered the most likely cause of lost
circulation. Standard LCM material has proved effective in dealing with lost circulation in previous
development wells.
Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally
as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed
kicks.
Annular PumpinQ Operations:
Incidental fluids developed from drilling operations on;vell CD2-16 will be injected into a permitted annulus
on CD2 pad or the class 2 disposal well on CQ1 pad.
The CD2-16 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 20001 TVD. The only significant hydrocarbon zone is the Alpine reservoir and there
will be 500' of cement fill above the top of the Alpine as per regulations.
We request that CD2-16 be permitted for annular pumping of fluids occurring as a result of drilling
operations, per regulation 20 AAC 25.080. As stated above, any zones containing significant hydrocarbons
will be isolated prior to initiating annular pumping. There will be no USDW1s open below the shoe or
potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional
drilling plan for other formation markers in this well.
Surface casing will be set near the ~Jbe15ase of the Schrader Bluff Formation (C-40). These 300-4001
thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other
areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl
without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0
ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of
1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi
= (12.0 ppg) * (0.052) * (2390') + 1,500 psi
= 2,991 psi"
/
= 1,081 psi
Pore Pressure
/'
Therefore Differential = 2991 - 1081 = 1910 psi.
The internal casing pressure is conservative, since frictional losses while pumping have not been taken into
consideration. The surface and intermediate casing strings exposed to the annular pumping operations
have sufficient strength by using the 85% collapse and burst ratings listed in the following table:
Wt Connection 850/0 of 850/0 of
OD (ppf) Grade Range Type Collapse Collapse Burst Bu rst /'"
9-5/8" 36 J-55 3 BTC 2,020 psi 1,717 psi 3,520 psi 2.992 psi
7" 26 L-80 3 BTC-Mod 5,410 psi 4.599 psi 7,240 psi 6,154 psi i
/
o=rGINAL
(
CD2-16
DRilLING FLUID PROGRAM
SPUD to Intermediate hole to 7" Production Hole
9-5/8"surface casing casing point - 8 Y2" Section - 6 1 18"
Density pOint - 12 1A" /' 9.6 - 9.8 ppg --/ 9.0-9.3 ppg /
8.8 - 9.6 ppg
PV 1 0 - 25 10-15
YP 20 - 60 15 - 25 25 - 30
Funnel Viscosity 100 - 200
Initial Gels 4-8 10-15
10 minute gels <18 12 - 20
API Filtrate NC -10 cc 130 min 4 - 12 cc/30 m in (drilling)
HPHT Fluid Loss at 160 12 - 14 cc/30 min
PH 8.5-9.0 9.0 -10.0 9.0 - 9.5
KCL 6%
Surface Hole:
A standard high viscosity fresh water I gel spud mud is recommended for the surface interval. Keep
flowline viscosity at :t 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing.
Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary.
Intermediate Hole Section:
Fresh water gel I polymer mud system. Ensure good hole cleaning by pumping regular sweeps and
maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is
penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good
filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be
important in maintaining well bore stability.
Production Hole Section:
The horizontal production interval will be drilled with aM-I Flo-Pro drill-in fluid. The base fluid will consist of
6% KCI, with :t 30PPB calcium carbonate bridging material to minimize formation damage. Flo-Vis Polymer
and Dual-Flo starch will be used for viscosity and fluid loss control respectively.
ORi INAL
Colville River Field
CD2-16 Injection Well Completion Plan
16" Conductor to 114'
Updated 07/05/02
Packer Fluid mix:
9.6 ppg KCI Brine
with 2000' TVD diesel cap
Tubing suspended with diesel
Completion MD TVD
Tubing Hanger 32' 32'
4-1/2", 12.6#/ft, 1ST-Mod Tubing
Camco DS6 nipple 2116' 2000'
4-1/2", 12.6#/ft, 1ST-Mod Tubing
Camco KSG2- GLM (3.909" ID) 8569' 6859'
4-1/2", 12.6#/ft, 1ST-Mod Tubing (2)
Baker 53 Packer wI millout extension 8669' 6910'
4-1/2", 12.6#/ft, 1ST-Mod Tubing (2)
HES "XN" (3.725")-63.4Q inc 8769' 6957'
4-1/2", 12.6#/ft, 1ST-Mod 10' pup joint
WEG 8781' 6962'
Baker 83 Packer WI millout extension at +1- 8669' MD <200'
TVD from top of Alpine
TOC @ +1- 8386' MD I
(>850' MD above top Alpine) "~,~
',~
Top Alpine at 9235' MD /711 0' ::,,--,,--,,-~-~
7" 26 ppf L-80 STC Mod
Production Casing @ 9466 I 7139' TVD @+I- 87Q
iI
¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡
4-1/2" Camco DS Nipple (3.812')
at 2000' TVD = 2001' MD
9-5/8" 36 ppf J-55 STC
Surface Casing
@ 2567' MD / 2390' TVD
cemented to surface
4-1/2" 12.6 ppf L-80 1ST M
tubing run with Jet Lube Run'n'Seal
pipe dope
Camco KBG-2 GLM (3.909" DRIFT ID)
wi dummy
Well TD at
138941 MD I
71101 TVD
ORIGINAL
(
-
Colville River Field
CD2-16 Injection Well Completion Plan
Formation Isolation Contingency Options
I
16" Conductor to 114'
Updated 07/05/02
.
4-1/2" Cameo DB Nipple (3.812" 10)
@ 2000' TVO = 2117' MO
9-5/8" 36 ppf J-55 BTC
Surface Casing
@ 2567' MO / 2390' TVO
cemented to surface
(A) Banzai ECP Assembly
- Baker ZXP Packer (4.75" 10)
- Baker HMC Liner Hanger
- XO to IBT-Mod
- blank 4-1/2" joints (TBO)
- Cementing Valve
- Baker Payzone ECP (mud inflated)
-Landing Collar
- 4-1/2" joint (1- 2) blank
- Guide Shoe
4-1/2" 12.6 ppf L-80 IBT Mod.
tubing run with Jet Lube Run'n'Seal
pipe dope
(.R) Open Hole Scab' iner
- Baker Payzone ECP (cement inflated)
- 4-1/2" joints (TBO) blank tbg
- Baker Payzone ECP (cement inflated)
- Baker Model XL-10 ECP (anchor)
- Muleshoe / Entry Guide
(C) Open Hole Bridge Plug Assembly
- Baker Payzone ECP (cement inflated)
-XO
-Float Collar
- 4-1/2" Float Shoe
TOC @ +/- 8386' MD /6758' TVD
(+850' MD above top Alpine C)
Cameo KBG-2 GLM (3.909"
ID) & 1" dummy installed, set
2 joints above Packer
Well TD at
138941 MD I
7110. TVD
7" 26 ppf L -80 BTC Mod
Production Casing @ 9466' MO /7139' TVO @ 8r
i;RI IN L
(
(
CD2-16
PRESSURE INFORMATION AND CASING DESIGN
(per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2))
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well:
Csg Setting Fracture Pore
Casing Size Depth Gradient pressure ASP Drilling
(in) MOrrVD(ft) (Ibs. I gal) (psi) (psi)
16 114/114 10.9 52 53
9 5/8 2567 I 2390 14.5 1081 1563
7" 9466 I 7139 16.0 3230 2516
N/A 13894 I 711 0 16.0 3217 N/A
. NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi. ~
PROCEDURE FOR CALCULATING ANTICPATEO SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas
gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as
follows:
1) ASP = [(FG x 0.052) - 0.1]0
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in Ib/gal
0.052 = Conversion from Ib./gal to psi/ft
0.1 = Gas gradient in psi/ft
0 = true Vertical depth of casing seat in ft RKB
OR
2) ASP = FPP - (0.1 x D)
Where; FPP = Formation Pore Pressure at the next casing point
1.
ASP CALCULATIONS
Drilling below conductor casing (16")
ASP = [(FG x 0.052) - 0.1] 0
= [(10.9 x 0.052) - 0.1] x 114 = 53 psi
OR
ASP = FPP - (0.1 x D)
= 1081 - (0.1 x 2390') = 842 psi
2.
Drilling below surface casing (9 5/8")
ASP = [(FG x 0.052) - 0.1] 0
= [(14.5 x 0.052) - 0.1] x 2390 = 1563 psi
OR
ASP = FPP - (0.1 x D) /
= 3230 - (0.1 x 7139') = 2516 p~i
3.
Drilling below intermediate casing (7")
ASP = FPP - (0.1 x D)
= 3217 - (0.1 x 7110') = 2506 psi
OR I
l
,"):roæ
(
(
Alpine, CD2-16 Well Cementina Requirements
95/8" Surface Casin2 run to 2567' MD 12390' TVD.
Cement from 2567' MD to 2067' (500' offill) with Class G + Adds @ 15.8 PPG, and from 2067' to surface with
Arctic Set Lite 3. Assume 300 % excess annular volume in permafrost and 50 % excess below the permafrost
(1602' MD).
Lead slurry:
System:
Tail slurry:
System:
(2067'-1602') X 0.3132 ft3/ft X 1.5 (50% excess) = 218.5 ft3 below permafrost
1602' X 0.3132 fe/ft X 4 (300% excess) = 2007.0 ft3 above permafrost
Total volume = 218.5 + 2007.0 = 2225.5 ft3 => 502 Sx @ 4.44 ft3/sk
v' /
502 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.44 ft3/sk, Class G + 30% D053 thixotropic additive,
0.6% D046 anti fo amer, 1.5% D079 extender, 1.5% SOOI accelerator, 50% D124 extender and 9%
BWOWI D044 freeze suppressant
500' X 0.3132 ft3/ft X 1.5 (50% excess) = 234.9 ft3 annular volume
80' X 0.4341 ft3/ft = 34.7 ft3 shoe joint volume
Total volume = 234.9 + 34.7 = 269.6 ft3 => 230 Sx @ 1.17 fe/sk
//
230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1 % SOOI accelerator @ 15.8
PPG yielding 1.17 ft3/sk /'
7" Intermediate Casin2 run to 10128' MD 1 7162' TVD
Cement from 9466' MD to +1- 8386' MD (minimum 850' MD above top of Alpine formation) with Class G +
adds @ 15.8 PPG. Assume 40% excess annular volume.
Slurry:
(9466' - 8386') X 0.1268 ft3/ft X 1.4 (40% excess) = 191.7 ft3 annular vol.
80' X 0.2148 ft3/ft = 17.2 ft3 shoe joint volume
Total volume = 191.7 + 17.2 = 208.9 ft3 => 182 Sx @ 1.15 fe/sk
Ii
System: 182 Sx Class G + 0.2% D046 antifoamer, ~,.2 % D065 dispersant, 0.25% D800 retarder and 0.18% D167
fluid loss additive @ 15.8 PPG yielding 1.15 ft3/sk
1 By Weight Of mix Water, all other additives are BWOCement
ORi
L
I
1800 -
2700 -
.........
.J
cA
:;Ë
b
C\Î
It)
II 3600-
/D
~
e;
..r::.
ã.
(])
0
~
i 4500-
>
5400 -
6300 -
ð
0
CI)
II
-5 7200-
~
Q;
~
(/)
DrillQuest 2.00.09.006
(
0 - - - ~ - - ~/ SHL (1726'FNL & 1544' FEL, SEC 2-T11N-R4E)
Begin Dir @ 2.oo/100ft (in 12-1/4" Hole) :
-- 250.00ft MD, 250.00ft TVD
-. '"
~l;PS')'
:,,; ..
~(Ð)
~-~,.
~~
.
Continue Dir @ 2.oo/100ft :
--- 750.00ft MD, 747.47ft TVD
900 - ~,,",~ -- -" - r' -, ".".., - ~ - ~ -
I
- -- --=+~., ......., -_.--- ---- ..
Phillips Alaska, Inc.
Coleville River Unit
CD2 Pad
-+--~ End Dir, Start Sail@30.00:
:) 1750.44ftMD,1682.81ftTVD
" t¡,"
I
, ~-- -~~~;~.:. c-;.~;~. D~iI;':;~~~1~2: Hole
. ~d'-I>1--'-'" ~'---'-- - '..-.-- - .
~ , '). I 9- 518" Casing
I,~~'~~.~~~..... .----- - --..
I
(,~9 I
I
.. ~<;)? I
I
K2 ,.#SJ ,...,J....,."
",!U"'.((}!rJ'\"1T ,.........,..,.-..."
I
.-~_..- ~"':t,~j6-:f!ftfV¡7 "-
CD2-16 (wp03)
Reference is True North
Current Well Properties
CD2.16
--.-..- .?:;:."q4-:rtjtf"~Tr - I
~- ~~.~..- "-'..-, '- .----.-- - "----...-
Well:
Horizontal Coordinates:
Ref. Global Coordinates: 5974631.95 N, 371697.39 E
Ref. Structure: 188.67 N, 23.33 W
Ref. Geographical Coordinates :700 20' 20.1297" N, 1510 02' 28.0445" W
1726' FNL & 1544' FEL, SEC 2 . T11 N . R4E
52.00ft above Mean Sea Level
52.00ft above Structure
T rue North
Feet (US)
RKB Elevation:
North Reference :
Units:
I
~J'.':Þr¡:, J.
, Be~n Dir @ 3.0"/100ft:
/ 55 I .44ft MD, 4930.41ftTVD
.. ",-¡t!()~~ I
Entl Dir, Start Sail @ 54.511" :
/ T98ft_M~~~49ft T~ -- ~
I Begin Dir @ 6.00/100ft :
8364.65ft MD, 6745.9211 TVD
Approved Plan (wp
)
tm)"'-v."".',.'d!s,."" 'ai', 'Y,',-~IIU"';'", ..,'n" , ',:
, L~.:rrllii\iiiif ' ,,' , '
.. ' ,~"
ñ'"r-~~"'''''-'''''r.r~-.'' -'.ím<~~1'1i''Q'¡¡.:;;:iJ'~'"~'.
1"\I",~t~J",,,J r!t~ ".~,~"....~ "".1:~!IL_4i.~:
A H\9;m~!tr't1~fí. ~.~m~n~'
-.- ---._,-.._-
7" Csg Pt; Begin Dir @ 3.0°/10011 (6-118" Hole):
9465.90ft MD, 71Sa.96ft TVD
I (921' FSL & 2515' FEL SEC 36- T12N-R4E)
KI~~é~~~~~~;;.~£~~~~::à',1i:;;D
~/ .. ~
-----,,- mCasing \ CD2-16 (wp03) /'
IVD"... 65.911 MD /'
139.0ftTVD \ /'
I CÐ2.J6 (RÚil) CD1-16 (Toe)
7.135.00 H1J,. 3059.70 /,.l. .$119.87 E l110J)() TVO, 6586'.92 I\'; 2332,24 ,lJ:
(l33J' PSI. & 2601' PEL, SEC 36 - T12N -fUEl (419' f?NL & 794' FIrL, SEe. 36 - Tl2N - R4B)
I I I I I
900 1800 2700 3600 4500
I
-900
0
Scala: 1 inch '" 900ft
0 ~/GI AL
!~.Ii~~
t~, .,' ,'\,
~
0
I
I
I
I
I
I
I
I
I
I Current Well Properties
Well : ~ CD2-16
Horizontal C rdlnates:
Ref. Globa Coordinates: 5974631.95 N, 371697.39 E
Ref. Struct~re : 188.67 N, 23.33 W
Ref. GeOgrrPhiCal Coordìnates 10° 20' 20.1297' N, 151" 02' 28.0445" W
1726' FNL & 1544' FEL, SEC 2 - T11 N - R4 ::
RKB Elevatio : 52.000 above Mean Sea Level
I 52.000 above Structure
North Refere1ce: True North
Units: Feet (US)
I Approved Plan (wp03) .
I End Oir, Start Sail @ 90.276° :
I ':~~~::~:,:TVD
I 9886.55ft MO, 7135.0Oft TVD
I
I
I
I
I
I
I
I
I
I
I
7000 -
6000 -
5000 -
4000 -
(f)
0>
c:
1:
1:::
0 3000 -
2:
2000".
1000 -
(
(
Phillips Alaska, Inc.
Cole vi lie River Unit
CD2 Pad
CD2-16 (wp03)
1000
I
2000
I
T atal Depth:
13894.28ft MD. 7110.000 TVD
4-1,.'2" Uner
13894.3ftMD
7110,011 TVD
.,,,,,.... ~"~L"
~Fì'LCmJ¡-:-:~Q
A Hd~Cj);~rílf
3000
I
4000
I
Reference is True North
5000
I
Scale: 1 inch = 1000ft - 7000
CD2-16 (Toe)
7IlO,O{) nD, 6586,92 ;\ 2332.24 E
(419' FNL & 794' FH'L, SEC. 36 . 1'1];'\- - R4E)
- 6000
- 5000
r-' ~~~
',..., ',-" '!;:4
(~r!~~
~~~..~~
.{;.. S ~;...
. 'i..:..J --'
~,J>''''''~
~.. 0:::;>
~, IJ',"
~-..r;;:
~~~¿
~'!-
":;"'(/>~
~~~
(')'çP.
f.,J"~
~'~
.,.;
....
'9,
~
t~
,,,"'"
End Oir, Start Sail @ 91.560" :
9654. 12ftMO, 7141.33ftTVO
7" Csg Pt; Begin Oir @ 3.0"/10Oft (6-1/8" Hole):
9465.900 MO, 7138.900 TVO
Begin Oir @ 6.0"/100ft:
83ß4.65ft MD, 6745.92ft TVO
9- 518" Casing
2567.011 MD
2$00.011 TVD
700o.Q,
End Oir, Start Sail @ 54.51 P :
6463.98ft MO, 5642A9ft TVO
Begin Oir@ 3.0"/100ft: 5500.44lt MO, 4930.4111 TVD
- 4000
I/)
0>
C
1:
1:::
- 3000 0
2:
7" Casing
9465.9ftMD
7139.0ftTVD
.,. 2000
..- 1000
0--------
- - - - - - 9-&'B'~cs9 Pt~ ~~lIout8.1/2~ ~ - - - - - -- - - - - 0
End Oir, Start Sail @ 30.0< : 1750.44ft MD, 1682.81ft TVO
Continue Oir @ 2.0"/100ft: 750.000 MD, 747.47ft TVD
Begin Dir @ 2.0"/10Oft (i1 12-1/4" Hole) : 250.00ft MO, 250.00ft TVO
SHL (1726'FNL & 1544' FEL, SEC 2- T11 N.R4E)
DríllQuest 2.00.09.006
Scale: 1 inch = 1000ft
0
I
1000
I
3000
Eastings
I
2000
I
4000
0",,'
jWiÎUìl
8
~
II
.s::.
I (.)
~
5000 Q)
~
c
:J:j
----.;.
r----
tiame.
'Ian: CDl-16
-65
--61)
-40
-20
-0
-20
-40
-(j()
-65
~N{.S
.9,6JO
WELLDIITAILS
A.~TI-COLLISION &'ETIINGS
+E1.W
N<xtling
Roofing
fAMud<:
Longiluk Sot
~~~~~~Wr~~:~50 ~~rva1: j~~£091
Maximum Range: 1584.914 Reference: Plan: CD2-16 (wplJ3)
J.316 59'1463t95
'5J1697.:!I:ì
1(f2(J1!¡.13fN 151'OZ2&0í4W NiA
Travelling Cylinder Azimuth (1Fü+AZI) [deg] vs Centre to Centre Separation [20ft/in]
COMPANYDEfAILS
i'h~~~J.o.
~
WFLI.PA1IiDEfiIUS
Pl=CD2,'6
Riç
Re£~tl.f1'!;
Dö~~ :9
CDJ.16 52.R,O.
Cihultfun~; MmmuTlC\JM.bM!:
~:= ~v~~~øJlh
W~:= ~~~mg
v~ ~~ ~'W
~':~~
19.50'
O.OúfJ
O.í,)O
O,OC;)
Fmffi Colour T,. ~ID
II --- ~llll
~1l1 - JiU!
LEGEND ,
CD21J (CI)2.14I, Major Ri<ik
- CU2.1 ~ ('C02.15" Maj\)f Rill:
- CD2-IS (CI.J2-15PDn. Þ,!blor~1t.
---.. CDZ-15tCD2.I5PB2), Måj,'r'{U;(
,- CD2.17 (CD2-I7ì, Major Risk'
- CD2.19ICD2-19). Maior Ri4.
- CD2-20 \CD2-20), Mil}:'!' Illik,
:~ CD2.22 (CD2-22), Major Ri:!k
,.-- CD2-24 (CI)2-24), Ms,jorRisk
'do"" CD2.24 (CD2-24PBI), M;ijo(lÜsk
....... CD2.25 (('D2-25), /.13;,'[ Risk '
.-..- C1)2-26 (CD2-26>, M8JOI" Risk,
, CD2 26 (CD2.26PBli, M"1or.\US1<
"''''''' C[)2.26ICD2.261'B2), MaOi";RiSk
'Co,,'. CD2-.~2f'CD2 .32 PB I I, M"joi:'R1sk
-= ggn~ rsg~:m ~t:~..
-- <: (rn3 kD2 ,~:~A,). ~tior RjAA
- CD2.3:HCD2,~,1B, MtJor R.iJ;k ",
- <.:D2.34 (CD2-34), M8jc>[ lllik~,
- CD2-M(ÇD234PBlJ. Maic>[
CD23~ (CD2-~5'. Majelf Risk
, CD2-39 (CDz.3I1). M:<Jor Iù*
-~ ÇJ)2.3Q(CD2-3<JPBn. MaJor Risk ,
.--- CD2-4J (CD2-41), Majl'\' 1ù9k
- CD2-42ICf)2.42), Major RJsI-; ,
= ~P.~:i!bi~?;þ~~gb~l~pm:
'- Plan: CD2.16 '
'- CO2 16~wp(3)
..1!,I'-r.11I1
'.III~:'--'JI.
~(~O - IllIlI)
lillJlt 1,111)
1.,1111 ~ ~IJlH)
: 111111 J."'b\"..,,,,....7,"''''~~' -'..., iI)
_'"dlll - ~',III}
t-,Iilj-J".III)
J'~IJlI- '0",111)
..-..'III-F,',liI)
t ",lit I ¡.'III)
7."ill ~~ ;"--111)
:~'., III . r.1 il)
IJ.IIII- "".')0
111"'11I1~"'" II~.I){)
11','jI'-I-"..)()
L:..II jJIi,)O
90
.........,
CD2-16 (wp03)
Approved Plan
SECTIONDI!TAILS
S", MD Ine A:z TVD +NI-S +Fj.W DLeg TF.Ot VSec TOIJ<I't
1 36950 0.00 0.00 36.950 (',000 o.om (1,00 0,00 (WOO
2 2SO,ooo (,00 ó.00 250,0;0 O.COO ûJ.ffl 0,00 O,(() UO(O
3 75O.flXJ 10.00 75.00 7t{J,465 11.3'", 42,010 2,00 75.00 24.650
4 1750.443 30.00 77.oX, 1682.817 90.819 373,013 2.00 2,'1.! 210.111
5 5500.443 3Q.00 77.00 4930,412 512.ó1l 2199.957 0.\») 0.00 1217.486
6 6o\6g,f1Z6 54,50 5287 5645,6Jt, 811.192 Z761.719 3,(10 -43.31 lIi864 53
íB74:356 54,50 5297 ólSJ.. 7lJ) 1748.CX56 399».999 0.00 O,(() 29825611
8 9457.717 87,('(J 351.71 7137,850 :1648.250 4306.:.1fiO 6.00 .74.83 3933.685
'-' 961'2.m 9t39 Wi99 7140.862 289.>,29/) 4266.511 3,00 -t7,iJ 4119.381
10 9878.6:fl 91.39 Wi99 7135,950 3Og},95S 4220,215 Of,() 0,0') 4293.061 CS2-16(Lmdin¡'j
11 1042t107 <JO.28 330.75 7127,865 351'>4.233 4025,337 3.00 ."171 4703.376
12 13S86.(1n 91128 33(),7S 7110.SSC> 6SíI1,458 2,\32.429 0.00 0.00 (1)8&.1"1 CS2.16(TD¡
C)
::J::]
~
PROPOSAL REPORT
4 July, 2002
.~
-.........-
Surface Coordinates: 5974631.95 N. 371697.39 E (70<> 20' 20.1297" N. 151<> 02' 28.0445" W)
Surface Coordinates relative to Project H Reference: 974631.95 N. 128302.61 W (Grid)
Surface Coordinates relative to Structure: 188.67 N. 23.33 W (True)
Kelly Bushing: 52.00ff above Mean Sea Level
---....
~
r---
I¡..J'-,'~ -AI '1\.1_1!!!!!!fI"",
''-''''1 ~-~... ::I -~. '" !
g:fjJJ:~t'i«-"-]l!f:èÜ2J~IIfÞ
¡. W~tp"H\~, ~~~ii
Propossl Ref: pro9911
Kuparuk River Unit
Measured
Depth Incl. Azim.
(ft)
0.00 0.000 0.000
100.00 0.000 0.000
200.00 0.000 0.000
250.00 0.000 0.000
300.00 1.000 75.000
400.00 3.000 75.000
500.00 5.000 75.000
600.00 7.000 75.000
700.00 9.000 75.000
750.00 10.000 75.000
800.00 10.999
900.00 12.997
1000.00 14.996
1100.00 16.995
1105.66 17.108
75.267
75.680
75.984
76.218
:':~-~,::
e- . -
1200.00 18.994,:~V:", 7~~05 .:d~
ji~:iC1;i!~1.:i~~ê;....
""<f:~¥¡;- "5~
C) 1601.5~~~ 27.023 76.884
1700.00 28.991 76.963
::J;:) 1750.44 30.000 77.000
~... 1800.00 30.000 77.000
1900.00 30.000 77.000
--""'~
2000.00 30.000 77.000
2100.00 30.000 77.000
2200.00 30.000 77.000
ir---- 2300.00 30.000 77.000
2343.02 30.000 77.000
4 July, 2002 - 10:55
Sub-Sea Vertical
Depth Depth
(ft) (ft)
-52.00 0.00
48.00 100.00
148.00 200.00
198.00 250.00
248.00 300.00
347.93
447.68
547.13
646.15
695.47
0.69 1182.69
1224.66 1276.66
1317.38 1369.38
1408.73 1460.73
1498.62 1550.62
1500.00 1552.00
1586.91 1638.91
1630.82 1682.82
1673.73 1725.73
1760.34 1812.34
1846.94 1898.94
1933.54 1985.54
2020.14 2072.14
2106.75 2158.75
2144.00 2196.00
Sperry-Sun Drilling Services
Proposal Report for CD2-16 (wp03)
Revised: 28 June, 2002
local Coordinates
Northings Eastings
(ft) (ft)
O.OON
O.ooN
O.ooN
O.ooN
13.60 N
18.81 N
24.72 N
31.34 N
31.73 N
38.65 N
46.64 N
55.30 N
64.63 N
74.61 N
74.77 N
85.22 N
90.82 N
96.39 N
107.64 N
118.89 N
130.14 N
141.38 N
152.63 N
157.47 N
0.00 E
.-
orth Slope, Alaska
Alpine CD-2
Global Coordinates
Northings Easti!
(ft)
':~~, 'iYerUtal
Ride ".:.'- ',~Section
';> (ol1ooft)
Comment
5974631.95 N
0.00 E 5971~1.95 N
0.00 E ~~Zi,tM~:~5 N
::~~~.OO ~?:)f~~~~~~~ f~ N
'~tE¡:!:::: :
5974634.59 N
5974637.12 N
5974640.49 N
5974642.49 N
50.85 E
70.97 E
94.42 E
121.17 E
122.78 E
151.18 E
184.42 E
220.86 E
260.43 E
303.10 E
303.79 E
348.82 E
373.01 E
397.16 E
445.88 E
494.59 E
543.31 E
592.03 E
640.75 E
661.71 E
Page 2 of 10
5974644.68 N
5974649.54 N
5974655.05 N
5974661.21 N
5974661.58N
5974668.00 N
5974675.42 N
5974683.46 N
5974692.11 N
5974701.36 N
5974701.51 N
5974711.19 N
5974716.37 N
5974721.53 N
5974731.95 N
5974742.36 N
5974752.77 N
5974763.18 N
5974773.59 N
5974778.07 N
371697.81 E
0.000
0.000
0.000
2.000
371701.20 E 2.000
371707.97 E .........2.000
371718.11 E '2.000
371731.61 E 2.000
371739.62 E 2.000
371748.46 E
371768.67 E
371792.22 E
371819.08 E
371820.69 E
371849.21 E
371882.59 E
371919.16 E
371958.89 E
372001.72 E
372002.41 E
372047.61 E
372071.90 E
372096.14 E
372145.04 E
372193.95 E
372242.85 E
372291.75 E
372340.66 E
372361.69 E
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
0.00 SHL (1726'FNL & 1544' FEL, SEC
T11 N-R4E)
0.00
0.00
0.00 Begin Dir @ 2.0°/1000 (in 12-'-
Hole) : 250.00ft MD, 250.00ftl
-0.11
-0.97
-2.68
-5.26
-8.68
-10.71 Continue Dir @ 2.00/1ooft: 750.00f
MD, 747.47ft TVD
-12.98
-18.27
-24.56
-31.86
-32.30 W. Sak
-40.15
-49.42
-59.66
-70.86
-83.01
--
2.000 -83.20 Permafrost
2.000 -96.08
2.000 -103.02 End Dir, Start Sail @ 30.0° :
1750.44ft MD, 1682.81ft TVD
0.000 -109.96
0.000 -123.95
0.000 -137.94
0.000 -151.93
0.000 -165.92
0.000 -179.91
0.000 -185.93 C-40
DrlllQuest 2.00.09.006
Kuparuk River Unit
Measured Sub-Sea
Depth Incl. Azim. Depth
(ft) (ft)
2400.00 30.000 77.000 2193.35
2500.00 30.000 77.000 2279.95
2567.03 30.000 77.000 2338.00
2576.26 30.000 77.000 2346.00
2600.00 30.000 77.000 2366.56
2700.00 30.000 77.000 2453.16
2800.00 30.000 77.000 2539.76
2900.00 30.000 77.000 2626.36
3000.00 30.000 77.000 2712.97
3011.59 30.000 77.000 2723.00
3100.00 30.000 77.000
3200.00 30.000 77.000
3300.00 30.000 77.000
3400.00 30.000 77.000
3500.00 30.000 77.000
Vertical
Depth
(ft)
2245.35
2331.95
2390.00
2398.00
2418.56
2505.16
2591.76
2678.36
2764.97
2775.00
Sperry-Sun Drilling Services
Proposal Report for CD2-16 (wp03)
Revised: 28 June, 2002
Local Coordinates
Northings Eastings
(ft) (ft)
163.88 N
175.13 N
182.66 N
689.47 E
738.19 E
770.84 E
Global Coordinates
Northings Eastil
(ft)
183.70 N 775.34 E,--__" 59t4a0~;~N
~~:;; ;~tìii~;i~~~;:~;
.12 N --, .- 933.0d'E 5974836.07 N
'N 981.78 E 5974846.48 N
N 987.42 E 5974847.69 N
7,,~~~'~~'~
~~~1~JZ:;
8 '
3600.00 30.000 77J)fJ!j~5;o
3700.00 30.000mOóÒ;::~~
~Eg:¡+,E:i"~:i~!ilj¡
4100. 77.000
4200. 77.000
4245.9 77.000
<:::> 4300.00 77.000
4400.00 77.000
::t:J 4494.22 30.000 77.000
"'---
4500.00 30.000 77.000
4600.00 30.000 77.000
-.-...... 4700.00 30.000 77.000
4800.00 30.000 77.000
~
r----
4 July, 2002 - 10:55
3665.59
3752.20
3792.00
3838.80
3925.40
4007.00
4012.00
4098.61
4185.21
4271.81
3284.58
3371.18
3457.79
3544.39
3630.99
3717.59
3804.20
3844.00
3890.80
3977.40
4059.00
4064.00
4150.61
4237.21
4323.81
298.85 N
310.10 N
321.34 N
332.59 N
343.84 N
355.09 N
366.33 N
371.50 N
377.58 N
388.83 N
399.43 N
400.08 N
411.32 N
422.57 N
433.82 N
1030.50 E
1079.22 E
1127.93 E
1176.65 E
1225.37 E
1274.09 E
1322.81 E
1371.53 E
1420.25 E
1468.96 E
1517.68 E
1566.40 E
1588.79 E
1615.12 E
1663.84 E
1709.74 E
1712.56 E
1761.27 E
1809.99 E
1858.71 E
Page 3 of 10
5974856.89 N
5974867.31 N
5974877.72 N
5974888.13 N
5974898.54 N
5974908.95 N
5974919.37 N
5974929.78 N
5974940.19N
5974950.60 N
5974961.02 N
5974971.43 N
5974976.21 N
5974981.84N
5974992.25 N
5975002.06 N
5975002.66 N
5975013.08 N
5975023.49 N
5975033.90 N
372536.27 E
372585.18 E
372634.08 E
372682.98 E
372688.65 E
372731.89 E
372780.79 E
372829.70 E
372878.60 E
372927.50 E
372976.41 E
373025.31 E
373074.21 E
373123.12 E
373172.02 E
373220.93 E
373269.83 E
373292.31 E
373318.73 E
373367.64 E
373413.72 E
373416.54 E
373465.45 E
373514.35 E
373563.25 E
orth Slope, Alaska
Alpine CD-2
Comment
-193.91
-207.90
-217.28 9-5/8" Csg Pt ... Drill out 8-1/2" Hole
9-5/8" Casing
-218.57 C-30
-221.89
0.000
0.000
0.000 -235.88
0.000 -249.87
0.000 -263.86
0.000 -277.85
0.000 -279.48 C-20
0.000 -291.85
0.000 -305.84
0.000 -319.83
0.000 -333.82
0.000 -347.81
0.000 -361.80
0.000 -375.79
0.000 -389.79
0.000 -403.78
0.000 -417.77
0.000
0.000
0.000
0.000
0.000
-431.76
-445.75
-452.18 K-3
-459.74
-473.73
0.000 -486.92 K-2
0.000 -487.73
0.000 -501.72
0.000 -515.71
0.000 -529.70
-,
Drl/lQuest 2.00.09.006
~
:J:)
----
r---
Kuparuk River Unit
Measured
Depth Incl. Azim.
(ft)
4900.00 30.000 77.000
5000.00 30.000 77.000
5100.00 30.000 77.000
5200.00 30.000 77.000
5300.00 30.000 77.000
5400.00 30.000 77.000
5500.00 30.000 77.000
5500.44 30.000 77.000
5600.00 32.252 73.202
5700.00 34.615 69.846
5800.00 37.060 66.873
5900.00 39.570 64.223
6000.00 42.135 61.843
6100.00 44.744 59.689
6200.00 47.391 57.726
6300.00 50.068 55~~h~
6400.00 52.770~~:251;:,¿;::,
~~:~"t:~~~?~!'i~"
6700.0 - 54.511 53.253
6800.00 54.511 53.253
6900.00 54.511 53.253
7000.00 54.511 53.253
7100.00 54.511
7200.00 54.511
7231.37 54.511
7300.00 54.511
7400.00 54.511
53.253
53.253
53.253
53.253
53.253
4 July, 2002 - 10:55
Sub-Sea Vertical
Depth Depth
(ft) (ft)
4358.41 4410.41
4445.02 4497.02
4531.62 4583.62
4618.22 4670.22
4704.82 4756.82
4791.43 4843.43
4878.03 4930.03
4878.41 4930.41
4963.64 5015.64
5047.09 5099.09
Sperry-Sun Drilling Services
Proposal Report for CD2-16 (wp03)
Rev/sed: 28 June, 2002
Local Coordinates
Northings Eastings
(ft) (ft)
yr-{¡'f'-þ,;...
Global Coordinates
Northings Eastil
(ft)
445.07 N 1907.43 E 5975044.31 N
456.31 N 1956.15 E 5975054.73N
467.56 N 2004.87 E 597~~.14 N
478.81 N 2053.59 E ~~¡;~"5W5 N
490.06 N 21.~2,30~?oc:;~;~'~9;~,N
;~~:~~ ~~:~t:?::}t';~~~\~~~g~.'¿=~~O::~ ~
512.60 N'';;.\..-~~:f99.~¥ ".èc';' 5975106.83 N
5128.16
5206.62
5282.26 .
}¥:f;}~ 54
é2.56
,63.00
5590.49
5611.40
5669.46
5727.51
5785.57
5843.62
5901.68
5959.73
6017.79
6036.00
6075.84
6133.90
5542.20
5604.56
5615.00
5642.49
5663.40
5721.46
5779.51
5837.57
5895.62
5953.68
6011.73
6069.79
6088.00
6127.84
6185.90
732.55 N
777.30 N
785.42 N
807.76 N
825.31 N
874.02 N
922.74 N
971.45 N
1020.17 N
1068.88 N
1117.59 N
1166.31 N
1181.59N
1215.02 N
1263.73 N
249.65 E
301.87 E
2356.26 E
2412.66 E
2470.93 E
2530.91 E
2592.42 E
2655.31 E
2719.39 E
2730.61 E
2760.93 E
2784.44 E
2849.68 E
2914.92 E
2980.17 E
3045.41 E
3110.65 E
3175.90 E
3241.14 E
3261.61 E
3306.38 E
3371.62 E
Page 4 ot10
5975119.26 N
5975135.87 N
5975156.56 N
5975181.28 N
5975209.97 N
5975242.54 N
5975278.90 N
5975318,96 N
5975362.60 N
5975370.53 N
5975392.35 N
5975409.50 N
5975457.09 N
5975504.68 N
5975552.27 N
5975599.86 N
5975647.45 N
5975695.04 N
5975742.63 N
5975757.56 N
5975790.22 N
5975837.81 N
373856.68 E
373905.58 E
373905.79 E
373955.71 E
374008.22 E
374062.97 E
374119.81 E
374178.58 E
374239.12 E
374301.26 E
374364.84 E
374429.68 E
374441.04 E
374471.74 E
374495.54 E
374561.61 E
374627.68 E
374693.74 E
374759.81 E
374825.88 E
374891.94 E
374958.01 E
374978.74 E
375024.08 E
375090.14 E
':'¥.ertfë'al
.:: ::Section
.000 -543.69
.000 -557.68
0.000 -571.67
0.000 -585.67
0.000 -599.66
:.t
orth Slope, Alaska
Alpine CD-2
.( ,"
Comment
'--
0.000 -613.65
0.000 -627.64
0.000 -627.70 Begin Dir @ 3.0o/100ft : 5500.44ft
MD,4930.41ftTVD
3.000 -640.40
3.000 -650.64
3.000 -658.35
3.000 -663.50
3.000 -666.07
3.000 -666.05
3.000 -663.46
3.000 -658.29
3.000 -650.56
3.000 -648.96 Albian-97
3.000 -644.28 End Dir, Start Sail @ 54.511 ° :
6463.98ft MD, 5642.49ft TVD
0.000 -640.46
0.000 -629.83
0.000 -619.21
0.000 -608.59
0.000 -597.96
0.000 -587.34
0.000 -576.72
0.000 -566.09
0.000 -562.76 Albian-96
0.000 -555.47
0.000 -544.85
Dril/Quest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for CD2-16 (wp03)
Revised: 28 June~ 2002
Kuparuk River Unit
Measured Sub-Sea Vertical
Depth Inel. Azim. Depth Depth
(ft) (ft) (ft)
7500.00 54.511 53.253 6191.95 6243.95
7600.00 54.511 53.253 6250.01 6302.01
7700.00 54.511 53.253 6308.06 6360.06
7800.00 54.511 53.253 6366.12 6418.12
7900.00 54.511 53.253 6424.17 6476.17
8000.00 54.511 53.253 6482.23 6534.23
8100.00 54.511 53.253 6540.28 6592.28
8200.00 54.511 53.253 6598.33 6650.33
8300.00 54.511 53.253 6656.39 6708.39
8364.65 54.511 53.253 6693.92 6745.92
local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates
Northings Eastil
(ft)
1312.45 N 3436.87 E 5975885.40 N
1361.16 N 3502.11 E 5975932.99 N
1409.87 N 3567.35 E 5975~Q.58 N
1458.59 N 3632.60 E ~~. ' ,tF N
1507.30 N 3~~~ .84~f~~i;~~~~:_: . ,cc;;J~,75!.~~ N
iE:E ~ifj'ii~'~1$4::!m~.E ~
1wÆ,.15 N '-. -~ '958.8fi't: 5976266.12 N
5 N .- 4000.99 E 5976296.88 N
375486.55 E
375552.61 E
375618.68 E
375684.75 E
375727.46 E
-D9gtØg 'iVerÏiti.I'
. Rete;" -. ~~<,Seetion
r/~C)Oft)
?l:"c¡é
.000 -534.22
.000 -523.60
0.000 -512.98
0.000 -502.35
0.000 -491.73
orth Slope, Alaska
Alpine CD-2
Comment
-"
0.000 -481.11
0.000 -470.48
0.000 -459.86
0.000 -449.24
0.000 -442.37 Begin Dir @ 6.00/100ft : 8364.65ft
M D, 6745.92ft TVD
8368.23 54.564 52.997 4003.32 E 5976298.59 N 375729.82 E 6.000
8400.00 55.059 50.745 4023.74 E 5976314.27 N 375750.51 E 6.000
8500.00 56.878 43.844 4084.54 E 5976369.41 N 375812.27 E ~.000
8600.00 59.060 37.249 4139.56 E 5976432.86 N 375868.38 E .000
8695.90 61.454 31.221 4186.32 E 5976500.86 N 375916.31 E 6.000
. .
8700.00 6924.96 1943.92 N 4188.19 E 5976503.92 N 375918.23 E 6.000
8800.00 6970.46 2022.53 N 4229.89 E 5976581.81 N 375961.27 E 6.000
8900.00 7011.41 2107.01 N 4264.22 E 5976665.68 N 375997.04 E 6.000
8909. 7015.00 2115.19N 4267.05 E 5976673.82 N 376000.00 E 6.000
9000. 7047.36 2196.41 N 4290.80 E 5976754.62 N 376025.14 E 6.000
9082. 9.533 7021.00 7073.00 2273.31 N 4306.69 E 5976831.23 N 376042.35 E 6.000
9100.0 8.639 7025.90 7077.90 2289.76 N 4309.33 E 5976847.64 N 376045.26 E 6.000
9170.4 5.067 7044.00 7096.00 2357.35 N 4317.44 E 5976915.08 N 376054.53 E 6.000
<::;) 9200.00 3.591 7050.72 7102.72 2386.04 N 4319.61 E 5976943.72 N 376057.19 E 6.000
9235.03 1.858 7058.00 7110.00 2420.26 N 4321.24E 5976977.91 N 376059.41 E 6.000
~.:J 9300.00 80.949 358.681 7069.53 7121.53 2484.19 N 4321.53 E 5977041.83 N 376060.79 E 6.000
~~~ 9400.00 84.583 353.868 7082.12 7134.12 2583.13 N 4315.07 E 5977140.87 N 376056.03 E 6.000
~) 9465.90 87.000 350.730 7086.96 7138.96 2648.25 N 4306.26 E 5977206.13 N 376048.33 E 6.000
~~
r--- 9500.00 87.826 350.125 7088.50 7140.50 2681.84 N 4300.60 E 5977239.81 N 376043.24 E 3.000
9600.00 90.248 348.355 7090.18 7142.18 2780.06 N 4281.93 E 5977338.33 N 376026.26 E 3.000
4 July, 2002 - 10:55 Page50f10
-441.98 HAZ
-437.97
-418.66
-389.35
-352.16 K-1
-350.38
-302.16
-245.23
-239.47 LCU
-180.22
-120.89 Miluveach A
-107.82
-52.81 Alpine D
-28.84
0.22 Alpine
55.85
145.34
206.46 7" Csg Pt; Begin Dir @ 3.001100ft (E
1/8" Hole): 9465.90ft MD, 7138.96f1
TVD
7" Casing
Target - CD2-16 (Casing Pt)
238.53
333.35
Dril/Quest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for CD2-16 (wp03)
Revised: 28 June~ 2002
Kuparuk River Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastii
(ft) (ft) (ft) (ft) (ft) (ft)
9654.12 91.560 347.398 7089.33 7141.33 2832.96 N 4270.57 E 5977391.42 N
9700.00 91.560 347.398 7088.08 7140.08 2877.72 N
9800.00 91.560 347.398 7085.36 7137.36 2975.27 N
9886.55 91.560 347.398 7083.00 7135.00 3059.70 N
9900.00 91.530 346.995
10000.00 91.304 344.003
10100.00 91.075 341.011
10200.00 90.843 338.019
10300.00 90.609 335.028
10400.00 90.373 332.037
10445.12 90.266 330.688
10500.00 90.266 330:9ßß,,",
10600.00 90.266 3~-6aa~~;>
~~~:i-. ::~.\~;/"i
10900.Øç;
11OO0.()~'
11100.0
11200.0 ,
11300.00
Ú~$tæ:æ
90.266 330.688
90.266 330.688
<:::>
11400.00 90.266 330.688
11500.00 90.266 330.688
11600.00 90.266 330.688
11700.00 90.266 330.688
11800.00 90.266 330.688
~~~£-¡'Ø'J!
~;::-L~'::"-"¿L;":'-"9
r--
4 July~ 2002 - 10:55
7082.64
7134.64
3'
7080.16
7078.09
7076.41
7075.15
7074.29 . "'."
7132.16 "õ'$'f~g$9 N
;¡5:;ij,~-i~0i¡!
'r, C-9:_¡~~~¡;;;1:' 3539.80 N
3579.40 N
7125.78
7125.32
7124.85
7124.39
3627.25 N
3714.45 N
3801.64 N
3888.84 N
7071.92
7071.46
7070.99
7070.53
7070.06
3976.03 N
4063.23 N
4150.42 N
4237.62 N
4324.82 N
7123.92
7123.46
7122.99
7122.53
7122.06
7069.60
7069.13
7068.67
7068.20
7067.74
7121.60
7121.13
7120.67
7120.20
7119.74
4412.01 N
4499.21 N
4586.40 N
4673.60 N
4760.79 N
'4191.86 E
4161.81 E
4126.83 E
4087.00 E
4042.44 E
4020.81 E
3993.94 E
3944.99 E
3896.03 E
3847.08 E
3798.12 E
3749.17 E
3700.21 E
3651.25 E
3602.30 E
3553.34 E
3504.39 E
3455.43 E
3406.47 E
3357.52 E
Page6of10
5977632.16N
5977729.35 N
5977825.19 N
5977919.43 N
5978011.80 N
5978102.06 N
5978142.02 N
5978190.33 N
5978278.35 N
5978366.37 N
5978454.39 N
5978542.41 N
5978630.43 N
5978718.45 N
5978806.47 N
5978894.49 N
5978982.51 N
5979070.54 N
5979158.56 N
5979246.58 N
5979334.60 N
375966.24 E
375942.87 E
375914.46 E
375881.08 E
375842.83 E
375799.80 E
375778.86 E
375752.82 E
375705.36 E
375657.90 E
375610.45 E
375562.99 E
375515.53 E
375468.08 E
375420.62 E
375373.16 E
375325.71 E
375278.25 E
375230.79 E
375183.34 E
375135.88 E
.' ,Oqg~. '.:¡~ertrèal
, ~ate"; .>Section
, ' r~lOOft)
, '
orth Slope, Alaska
Alpine CD-2
Comment
.000
385.06 End Dir, Start Sail @ 91.560<> :
9654.12ftMD,7141.33ftTVD
0.000
0.000
0.000
429.00
524.77
607.66
3.000
620.56
3.000 717.22
3.000 815.09
3.000 913.90
3.000 1013.37
3.000 1113.24
Begin Dir @ 3.0<>/1ooft: 9886.r-'.
MD, 7135.00ftTVD (1333'FSL
&2601' FEL, SEC 36-T12N-R4E)
Target- CD2-16 (Heel), Current
Target
3.000 1158.35 End Dir, Start Sail @ 90.276<> :
10445.12ft MD, 7126.04ftTVD
0.000 1213.23
0.000 1313.23
0.000 1413.23
0.000 1513.23
0.000 1613.23
0.000 1713.23
0.000 1813.23
0.000 1913.23
0.000 2013.23
0.000 2113.22
0.000 2213.22
0.000 2313.22
0.000 2413.22
0.000 2513.22
..-,.
DTl7/Quest 2.00.09.006
Kuparuk River Unit
Measured
Depth Incl. Azim.
(ft)
11900.00 90.266 330.688
12000.00 90.266 330.688
12100.00 90.266 330.688
12200.00 90.266 330.688
12300.00 90.266 330.688
12400.00 90.266 330.688
12500.00 90.266 330.688
12600.00 90.266 330.688
12700.00 90.266 330.688
12800.00 90.266 330.688
12900.00 90.266 330.688
13000.00 90.266 330.688
13100.00 90.266 330.688
13200.00 90.266 330.688
13300.00 90.266 330.688
13400.00 90.266 330.688,
~;~~:~~ ~~:~: ;~=t~,
13700.00 90.266;~~;':::;~3Ø~8 J:j;
0 - . '1~d.~;,";~'"
:::~;';;;1ifl~O.6àii
--- :~-;-'~"- ;..,.- .-:-:--;"0(,.
--:;: .~'..:- -,' .: '-~.
,~-
'J1
Sperry-Sun Drilling Services
Proposal Report for CD2-16 (wp03)
Revised: 28 June, 2002
Sub-Sea Vertical
Depth Depth
(ft) (ft)
7067.27 7119.27
7066.81 7118.81
7066.34 7118.34
7065.88 7117.88
7065.41 7117.41
7064.95 7116.95
7064.48 7116.48
7064.02 7116.02
7063.55 7115.55
7063.09 7115.09
orth Slope, Alaska
Alpine CD-2
,:,?rf~t~ .
,¿t,~:ì¡~,;t!~~
.000 2613.22
.000 2713.22
0.000 2813.22
0.000 2913.22
0.000 3013.21
local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates
Northings Easting
(ft)
Comment
4847.99 N 3308.56 E 5979422.62 N
4935.19 N 3259.61 E 5979510.64 N
5022.38 N 3210.65 E 5979 6 N
5109.58 N 3161.69 E N
5196.77 N 3112.7 4 E~,,,,,"&; N
EE:~ ~~fr,~:~'~~I~È:~:~
5 .56 N'(g~;":2916.9rE 5980126.78 N
N 2867.96 E 5980214.80 N
7062.62 7114.62 2819.00 E 5980302.82 N
7062.16 f~¡ i:~~:,;'i'~ 5961:;: ~ 2770.05 E 5980390.85 N
7061.69 2721.09 E 5980478.87 N
7061.23 2672.14 E 5980566.89 N
7 .1;~(j6 6068.73 N 2623.18 E 5980654.91 N
7112.30 6155.93 N 2574.22 E 5980742.93 N
7111.83 6243.12 N 2525.27 E 5980830.95 N
7111.37 6330.32 N 2476.31 E 5980918.97 N
7110.90 6417.51 N 2427.36 E 5981006.99 N
7110.44 6504.71 N 2378.40 E 5981095.01 N
7058.00 7110.00 6586.92 N 2332.24 E 5981178.00 N
è:.,'
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.0' M.S.L.. Northings and Eastings are relative to 1726' FNL, 1544' FEL.
Magnetic Declination at Surface is 25.012° (26-Jun-02)
"",
The Dogleg Severity is in Degrees per 1 00 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 330.750° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 13894.28ft,
The Bottom Hole Displacement is 6987.62ft., in the Direction of 19.498° (True).
4 July, 2002 - 10:55
Page 70110
-"
374851.14 E 0.000 3113.21
374803.68 E 0.000 3213.21
374756.22 E 0.000 3313.21
374708.77 E 0.000 3413.21
374661.31 E 0.000 3513.21
374613.85 E 0.000 3613.21
374566.40 E 0.000 3713.21
374518.94 E 0.000 3813.20
374471.48 E 0.000 3913.20
374424.03 E 0.000 4013.20
374376.57 E 0.000 4113.20
374329.11 E 0.000 4213.20
374281.66 E 0.000 4313.20
374234.20 E 0.000 4413.20
374186.74 E 0.000 4513.20
374142.00 E 0.000 4607.48 Total Depth: 13894.28ft MD,
7110.00ft TVD (419'FNL & 79~~"
SEC 36-T12N-R4E)
4-1/2" Liner
Target - CD2-16 (Toe), Current
Target
DrH/Quest 2.00.09.006
Sperry-SuD
Anticollision Report
. çompany: , Phißjps Araska InC.
,Field: ' ' CoJevilteRiver Unit
Reference Site: 'Alpine CO2
:keCerencë WeD: Plan: C02-16
,ReferenCe:WeBpat1~: PIan:~qD2~16,
GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference
Interpolation Method: MD Interval: 50.000 ft
Depth Range: 36.950 to 13886.091 ft
Maximum Radius: 1584.914 ft
~te: '6127/2002
'Time: '23:36~43
, Page:
1
Co-ordinate(NE) Referelice-:
Vertical (TV») Reference:
- ' ,
WeU: Plan: CD2-16, True North
C02.16 52.6
Reference:
Error Model:
Scan Method:
Error Surface:
Db: Oracle
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Survey Program for Definitive Well path
Date: 6/26/2002 Validated: No
Planned From To Survey
ft ft
36.950 1000.000
1000.000 13886.091
Version:
Toolcode
4
Tool Name
Planned: CD2-16 (wp03) V1
Planned: CD2-16 (wp03) V1
CB-GYRO-SS Camera based gyro single shot
MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC
Casing Points
MD 1VD Di~eter . Hole Size
ft ft, in in
9415.000 7134.995 7.000 6.500
13861.000 7111 .072 5.500 6.000
Name
7"
51/2"
Summary
. ' . Offset Ctr.Ctr No.C..o
0(.....-.................. Offset WeDpatb _........_.~..._~-> R,eference Allowable
Site WeD Weßpatb MD MD Distance Area Deviation Warning
ft ft ft ft ft
Alpine CD2 CD2-14 CD2-14 V1 549.745 550.000 20.462 8.738 11.737 Pass: Major Risk
Alpine CD2 CD2-15 CD2-15 V1 349.968 350.000 10.311 No Offset Errors
Alpine CD2 CD2-15 CD2-15PB1 V1 349.968 350.000 10.311 6.468 3.843 Pass: Major Risk
Alpine CD2 CD2-15 CD2.15PB2 V1 349.968 350.000 10.311 No Offset Errors
Alpine CD2 CD2.17 CD2-17 VO 399.898 400.000 9.708 6.544 3.166 Pass: Major Risk
Alpine CD2 CD2-19 CD2-19 V3 3982.141 4050.000 125.635 117.476 21.252 Pass: Major Risk
Alpine CD2 C D2-20 CD2.20 VO 36.950 32.850 40.295 No Offset Stations
Alpine CD2 CD2-22 CD2-22 V1 349.687 350.000 60.861 5.403 55.464 Pass: Major Risk
Alpine CD2 CD2-24 CD2-24 VO 448.753 450.000 81.742 7.263 74.503 Pass: Major Risk
Alpine CD2 CD2.24 CD2-24PB1 V1 446.753 450.000 81.742 7.263 74.503 Pass: Major Risk
Alpine CD2 CD2-25 CD2-25 V1 399.133 400.000 90.723 6.592 64.146 Pass: Major Risk
Alpine CD2 CD2.26 CD2-26 V3 647.667 650.000 89.254 No Offset Errors
Alpine CD2 CD2-26 CD2-26PB1 V2 299.669 300.000 101 .343 5.064 96.282 Pass: Major Risk
Alpine CD2 CD2-26 CD2-26PB2 V2 299.675 300.000 101.263 No Offset Errors
Alpine CD2 CD2-32 CD2-32 PB1 VO 446.089 450.000 161.547 7.294 154.270 Pass: Major Risk
Alpine CD2 CD2-32 CD2-32 VO 448.089 450.000 161.547 7.294 154.270 Pass: Major Risk
Alpine CD2 CD2-33 CD2.33 V2 398.629 400.000 171.264 6.104 165.234 Pass: Major Risk
Alpine CD2 CD2-33 CD2-33A V1 396.629 400.000 171.284 6.104 165.234 Pass: Major Risk
Alpine CD2 CD2.33 CD2-34B V1 398.629 400.000 171.284 6.104 165.234 Pass: Major Risk
Alpine CD2 CD2-34 CD2-34 V3 498.065 500.000 173.703 8.698 165.018 Pass: Major Risk
Alpine CD2 CD2-34 CD2.34PB1 V2 498.065 500.000 173.703 8.698 165.018 Pass: Major Risk
Alpine CD2 CD2-35 CD2-35 VO 349.017 350.000 191.714 5.657 186.070 Pass: Major Risk
Alpine CD2 CD2-39 CD2-39 V1 249.990 250.000 230.994 4.077 226.918 Pass: Major Risk
Alpine CD2 CD2-39 CD2-39PB1 VO 249.990 250.000 230.994 4.077 226.918 Pass: Major Risk
Alpine CD2 CD2-41 CD2-41 V2 Plan: CD2-41 447.468 450.000 248.884 7.853 241 .030 Pass: Major Risk
Alpine CD2 CD2.42 CD2.42 VO 447.089 450.000 262.063 7.090 255.003 Pass: Major Risk
Alpine CD2 CD2-42 CD2.42PB1 VO 447.089 450.000 262.063 7.090 255.003 Pass: Major Risk
Alpine CD2 Plan: CD2-28 Plan: CD2-28 PB1 V1 PI 1392.553 1400.000 52.594 28.347 26.165 Pass: Major Risk
Alpine CD2 Plan: CD2-28 Plan: CD2-28 VO Plan: 1392.553 1400.000 52.594 28.347 26.165 Pass: Major Risk
Alpine CD2 Plan: CD2-23 Plan: CD2-23PB1 V6 Pia 448.986 450.000 71.436 9.456 62.001 Pass: Major Risk
Alpine CD2 Plan: CD2-29 CD2-29 V2 Plan: CD2-29 1832.743 1850.000 62.560 42.605 22.561 Pass: Major Risk
ALPINE-01 A ALPINE-01A ALPINE-01A VO 5608.730 6400.000 386.577 No Offset Errors
Oi~1
,
I
L
(
Phillips Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
July 5, 2002
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Re: Application for Permit to Drill CD2-16
Dear Sir or Madam:
/
Phillips Alaska, Inc. hereby applies for a Permit to Drill an onshore WAG (water
alternating gas) injection well from the Alpine CO2 drilling pad. The intended spud d.9fe
for this well is July 25, 2002. It is intended that Doyon Rig 19 be used to drill the well.
CD2-16 will be drilled to penetrate the Alpine reservoir at horizontal. After setting 711
intermediate casin~ the horizontal section will be drilled and the well completed as an
open hole injector. At the end of the work program, the well will be closed in awaiting
completion of well work and facilities work that will allow the well to begin injection.
./
Note that it is planned to drill the surface hole without a diverter. There have been 38
wells drilled on CD1 pad and 21 surface holes drilled on CO2 pad with no significant
indication of gas or shallow gas hydrates. 20 of the 21 wells on CO2 have surface ./'
casing shoes within a 2000' radius of the planned surface casing shoe of CD2-16.
Please find attached the information required by 20 ACC 25.005 (a) and (c) for your
review. Pertinent information attached to this application includes the following:
.
Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a).
Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1).
A proposed drilling program, including a request for approval of annular pumping operations.
A drilling fluids program summary.
Proposed pilot hole schematic.
Proposed completion diagram.
Proposed completion diagram with open hole isolation options.
Pressure information as required by 20 ACe 25.035 (d)(2).
CD2-16 Cementing Requirements.
.
.
.
.
.
.
.
.
1. Directional drilling / collision avoidance information as required by 20 ACC 25.050
(b).
Information pertinent to this application that is presently on file at the AOGCC is: /
1. Diagrams of the BOP equipment, diverter equipment and choke manifold layout as
required by 20 ACC 25.035 (a) and (b).
2. A description of the drilling fluids handling system.
RECEIVED
JUL 1 0 2002
OR\G\
¡\L
Alaska Oil & Gas GOlls.l.íommiSSlon
Anchorage
If you have any questions or require further information, please contact Vern Johnson at
265-6081 or Chip Alvord at 265-6120.
ffrel~
". V v"" ~...
Vern Jo nson
Drilling Engineer
Attachments
cc:
CD2-16 Well File / Sharon Allsup Drake
Chip Alvord
Cliff Crabtree
Meg Kremer
ATO 1530
ATO 868
ATO 848
ATO 844
Nancy Lambert
Lanston Chin
Anadarko - Houston
Kuukpik Corporation
e-mail:
Tommy_Thompson @anadarko.com
RECEI\/ED
JUL 10 2002
maska Oil & Gas Gens. lIomUHSSIOl1
Anchorage
.;I~~"'!~'.::(;I 1f¡'~':1 ~ ~::( I. :l~' ~]::( :JII111' ~rl~ '~t!l!f~~.I'l'~.~:[I}!J.~J~}.,~«c:t'l'{~'.::(:1 1'1 '$1 ~ I'~III"J~; ., (~1'4::( .il~yaw~'.::(:1 1'1 '~':I~,
~.,~'.::.j~\\. ;\;~;#i':\\,;:\ ~
ARVE9T BANK
Phillips Alaska Inc.
Anchorage, AK ~961Ø
11100000001.,111 I: ~O j ~OOB 2 jl: 00 b ~ ~ b ~III
CHECK 1
ST ANDARD LETTER
DEVELOPMENT
DEVELOPMENT
REDRILL
( (
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME C./(q (£)2'-'/£
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MUL TI LATERAL
(If API number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
EXPLORATION
INJECTION WEL~
INJECTION WELL
REDRILL
Rev: 6/18/02
C\jody\templates
^-A~;N't1¥R, DISPOSAL
,INTO/ A~LUS OF
AN_q!HE,,R¡,/' WELL ON
SAMJ£--PA¡n
W
all
SPACING EktPTION
DRY DITCH SAMPLE
"CL UE"
The permit is for a new wellbore segment of existing well
----' Permit No, API No.
Production should continue to be reported as a function of
the original API number stated above.
In accordance with 20 AAC 25.005(t), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Please note that an disposal of fluids generated. . .
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Company Name) will assume the liability of any protest to
the spacing exception that may occur.
All dry ditch sample sets submitted to the Commission must
be in no greater than 30' sample intervals from below the
permafrost or from where samples are first caught and 10'
sample intervals through target zones.
WELL PERMIT CHECKLIST COMPANY /~ 'll/f-\ WELL NAME CI? bf CO2 - J h PROGRAM: Exp - Dev - Redrll - Se~ X Wetlbore sag - Ann. disposal para req X .
FIELD & POOL / Z C> /0 n INIT CLASS / - bt.)4q IN GEOL AREA 7/1'1 UNIT# S CJ .1 b () ON/OFF SHORE ON
ADMINISTRATION 1. Permittee attached. . . . . . . . . . . . . . . . '!. . . . . . ~)N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N
3. Unique well name and number. .. . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
8. If deviated, is well bore plat inctuded.. . . . . . . . . . . . . . Y N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . " . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
~ ~ ¿ 12. Permit ca~ be issued without administrative approval.. . . . . ~ N
ENGINEERING ~:: ~::;U:::;:::::f~r.e.1 ~a.y ~~I~.: : : '. : : : : : : ~y ~ 10"@/{II-'.
15. Surface casing protects all known USDWs. . . . . . . . . . . N. I
16. CMT vol adequate to circulate on conductor & surf csg. . . . . N Â1k;i~.._b ,~~ ~
17. CMT vol adequate to tie-in long stri, ng to surf csg. . . . " . ., Æy , ~ At? OVP, }'l Ü e-d (/.& y .
18. CMT will cover all known productive horizons. . . . . . . . . . N
19. Casing designs adequate for C, T, B & permafrost. . . . . . . N :\ I ~
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . , N 11 ft.1/] Ð1'>- (
21. If a re-drill, has a 10-403 for abandonment been approved. . . ;t:-N- NIÆf .,
22. Adequate well bore separation proposed.. . . . . . . . . .-.. CfJ N c~lf<J,f ClfLYOt:<.<¿-- 10.5 .
23. If diverter required, does it meet regulations. . . . . . . . .. Jþ ¥-N Iriru\lw6 vt.fç{=f ð .
24; Drilling fluid program schematic & equip list adequate. . . . . éi2 N
25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . ~ N P ,
AP~ DATE 26. BOPE press rating appropriate; testto !>"OOO psig. ~ N ~ 2.5 I ~ p~ t .
~ 7(10(0.2, 27. Choke manifold complies w/API RP-53 (May 84). . . . . . .. ' N
28. Work will occur without operation shutdown. . . . . . . . . . . N
29. Is presence ofH2S gas probable.. . . . . . . . . . . . . . . . ~
30. Permit can be issued w/o hydrogen sulfide measures. . . . . GJN IJ
31. Data presented on potential overpressure zones. . . . . . . Y N h // }
32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y /{/(J \
A~~F3 _Df:~ 33. Seabed condition survey (if off-shore). . . . . . . . . . . . .
¡r¡r, 1#tf' 02- 34. Contact name/phone for weekly progress reports [exploratory on/~
ANNULAR DISPOSAL 35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater; or cause drilling waste. ..
to surface;
(C) will not impair mechanical integrity of the well used for disposal Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING: UIC~3Iar: COMMISSIOJ
RP#= JDH ...¡¡::=- /íIl ~ COT
WGA \¡.1& RJ DTS () 7/)
J
GEOLOGY
APPR D1T1
/IP. 7J&J/o~
Commentsllnstructions:
G:\geology\permits\checklist.doc
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simpltfy finding information. information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of information.
(
S;e~=~'-S~n ~~i::i~g Se~v~ces
:":2 Scar: :::.:.:...:.~y
$?-e\-:..s:..c::: 3 $
:"~s~~t $Rev.:.s~o~: ~ S
=~~ J=: :8 :2::C:S: ::::
?-ee~ Eeaòe:::
Serv:..ce ::~~e....... ..... .LISTPE
Da::e . . . . . . . . . . . . . . . . . . . . .0:: /l 0 / 18
Origi::. . . . . . . . . . . . . . . . . . . STS
Reel Name.......... .,.. ..UNKNOWN
Continuat:..or. !Jumber...... 01
Previous ?-ee~ Name..... ..UNKNOWN
Comments................ .STS LIS Writing Library.
Tape Header
Service name........ .....LISTPE
Da t e . . . . . . . . . . . . . . . . . . . . . 02/10/18
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name... ...... .......UNKNOWN
Continuation Number... ...01
Previous Tape Name.......UNKNOWN
Comments......... ..:.....STS LIS
Physical EOF
Comment Record
TAPE HEADER
Colville River Unit (Alpine)
MWD /MAD LOGS
#
WELL NAME:
API' NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
AK-MW-22132
M. HANIK
D. BURLEY
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSH:::NG:
DERRICK FL'JOR:
GROUND LEV:=::L:
MSL 0)
#
WELL CASING RECO~D
Scientific Technical Services
Writing Library. Scientific Technical Services
CD2-16
501032042600
PHILLIPS Alaska, Inc.
Sperry Sun
18-OCT-02
MWD RUN 3
AK-MW-22132
R. KRELL
D. MICKEY
2
llN
4E
1726
1544
.00
52.50
15.90
1ST STRING
2ND STRING
3RD STRH":G
PRODUCTION ST~=NG
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
12.250 9.625 2522.0
8.500 ï.OOO 9530.0
#
REMARKS:
... .
ALL DEPTHS ARE MEASURED DEPT~S (MD) UNLESS OTHERWISE
.3TATED.
3.
2. MWD RUN 1 IS DIRECTIONAL ONLl AND IS NOT PRESENTED.
MWD RUNS 2 & 3 ARE DIRECTIONAL WITH DUAL GAMMA RAY
DGR) UTILIZING GEIGER
ó? 0<9\- J L/ Lj
l ld Î 5
M~~:~ER ~UBE JE:EC::?S,
;',,1\: S~:::C::RO!{,::"GNET!C W;'"Y":::
?.E:S::: ST :.\.: ':~.
PEAS=:: .;
\EK~';' .
- .
~~J0¿.- ?;.. .~.
:JGG£::: EEE:!~:::
:;.s =!'~G
~?o~~ : 4 E 2. I M: 1
"':' ~"' ;:: I
-.,......... T'T"-
-\--1 -....
25::1, :349' TV:.
5.
G~~~ ~~~ ~OGGEÐ BEE:KD CAS:NG FROM 9490' MD, 7132'
~~TTì "., ""
_v_/ .....'-'
953:', -13E' TV:::.
RES:S::V:TY DATA LOGGED BEHIN:
:::ASING FROM:
9482' MD, 7131' TVD TO 9530', 7136' TVD.
é.
MWD CONSIDERED PDe PER THE DISCUSSION OF
REQUIREMENTS FOR
ALPINE DATED 09/26/01.
ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL
DRILLER'S
DEPTH REFERENCES.
7. MWD RUNS 1 - 3 REPRESENT WELL CD2-16 WITH API #
50-103-20426-00. THIS
WELL REACHED A TOTAL DEPTH OF 12500' MD, 7120'
TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
EXTRA SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING)
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
MEDIUM SPACING)
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
DEEP SPACING)
SFXE = SMOOTHED FORMATION EXPOSURE TIME
$-
File Header
Service name............ ;STSLIB.001
Service Sub Level Name...
Version Number.. ....... ..1.0.0
Date of Generation.......02/10/18
Maximum Physical Record..65535
File Type................LO
Previous File Name.... ...STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
1
clipped curves; all bit runs mergèd.
.5000
FET
RPD
RPM
RPS
RPX
ROP
$
START DEPTH
2483.0
2512.0
2512.0
2512.0
2512.0
2512.0
2532.5
STOP DEPTH
12440.0
12447.0
12447.0
12447.0
12447.0
12447.0
12500.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSEIFTED DEPTH ---------
BASELINE DEF':'E
$
#
MERGED
PBU
MWD
MWD
DAT}:. SOURCE
TOOL CO;:)E
BIT RUN NO MERGE TOP
2 2483.0
3 9540.5
tv.ERGE BASE
9540.0
12500.0
RE!-L::.??-:S :
!":::?':;=::' !'-:..:..=~.~
=,.:..ss.
-
:. ê. -: è. ~ C ~¡na -:.
Spe:::.::.:.ca-:':"2::
Recc::è
Ja~a Recc~j ~~.pe..................O
Ja~a Spec~~ica~ion E:ock Type.....O
Loggi~g ~i::ec~ion.. .............. . Down
Optical log depth units......... ..Feet
Data Re:e::ence Point............. .Unde~ined
Frame Spacing...... .............. .60 .1IN
Max frames pe:: record.... ........ .Undefined
Absent value......... ............ .-999
Depth Uni: s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2483 12500 7491. 5 20035 2483 12500
ROP MWD FT/H 0.14 260.57 129.938 19936 2532.5 12500
GR MWD API 33.25 425.99 99.0286 19915 2483 12440
RPX MWD OHMM 0.06 1495.41 8.90906 19871 2512 12447
RPS MWD OHMM 0.27 2000 9.5163 19871 2512 12447
RPM MWD OHMM 0.25 2000 14.4666 19871 2512 12447
RPD MWD OHMM 0.19 2000 17.691 19871 2512 12447
FET MWD HR 0.27 62.33 1. 70357 19871 2512 12447
First Reading For Entire File..........2483
Last Reading For Entire File...........12500
File Trailer
Service name.............STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.... ...02/10/18
Maximum Physical Record..65535
File Type................ La
Next File Name.. """" .STSLIB.002
Physical EOF
File Header
Service name... .... ..... .STSLIB.002
Service Sub Level Name...
Version Numbe::.. ... ..... .1.0.0
Date of Gene::ation...... .02/10/18
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.OOl
Corrunent Record
FILE HEADER
FI LE NUMBER:
RAW MWD
Curves and leg
BIT RUN NUMBER:
DEPTH INCRE~1ENT:
#
FILE SUMMARY
2
header data for each bit run in separate files.
2
.5000
\. E!\ :X::?,
.-.,-,,-- ..-.........-,---
-'"-.....- -..........-
.....,.....-............. ---........,.........~
::-..~:'~- _:.:...~.;.::
c:.r--,..-"c:; "'"';-:;,-.t..;
.... - 'oJ.. .....--.......
GR
-~::-=.~
~~E~.:.
~P\.
94E2.C
.....__..:.........
'Ç"';:"""'
-....I.............
S'; E:..':
:\~ ....'
........:.. ~. '
RPS
RP~
ROP
$
"--...'...."-.. '-
9462.C
'::-:.....:::....'...
94E:.C;
253:.:
954C.C
#
LOG HEh-DEP. :':-.:':-.
DATE LOGGEr::
SOFTWARE
SURFACE SOFTWh-RE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER:?T) :
TOP LOG INTERVAL iFT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
EWR4
DGR
$
BOTTOM)
TOOL TYPE
ELECTROMAG. RES IS. 4
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type... ...............0
Data Specification Block Type.....O
Logging Direc~ion............ "" . Down
Optical log èepth units..... "" ..Feet
Data Reference Point........ "". .Undefineè
Frame Spacing...... "'."." "" ..60 .1IN
Max frames per record............ .Undefineè
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Ur:i ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specif~cation Block sub-type...O
16-AUG-02
Insite 4.05.5
66.37
Memory
9540.0
28.2
82.0
TOOL NUMBER
PB00293HWRG6
PB00293HWRG6
8.500
9530.0
LSND
9.70
39.0
9.2
400
4.4
.470
.241
1. 430
1. 300
73.0
149.0
73.0
73.0
Name Service Orèer Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD02C FT/H 4 1 68 4 2
GR MWD02C API 4 1 68 8 3
RPX l'>1WD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
F?!<
~:1\J;:::" .:
P-P:,
FET
!~~.;:,=.:. :
:~TI\~:; ~ : =
Name Servlce :~~~
DEPT --
ROP MWD02C F:/E
GR !'-1WDC2C ;.~:::
RPX MWDC2C OH:~~
RPS MWDC2C OHME
RPM MWD020 OH~~
RPD ~wD020 OH~
FET MWD020 HR
:. :l!"f!'.~ I ~ - E
:.::!.~~: éE
...., ~- "-'- 8
F.:.rs~ ~as"':
Mir~ Max Mean Nsam Reaàing Reading
2433 954C:, 6011.5 14115 2483 9540
0.68 26G.57 152.029 14016 2532.5 9540
~2.8::' ~25.99 1:.6.203 14014 2483 9489.5
0.06 28.61 5.06771 13941 2512 9482
0.2ï 2000 5.35928 13941 2512 9482
0.32 2000 6.65648 13941 2512 9482
0.27 2000 8.63322 13941 2512 9482
0.27 49.44 1.23902 13941 2512 9482
First Reading For Entire File. ...... ...2483
Last Reading For Entire File... ........9540
File Trailer
Service narne.............STSLIB.002
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation...... .02/10/18
Maximum Physical Record..65535
File Type.. ..... .........LO
Next File Narne...........STSLIB.003
Physical EOF
File Header
Service name.............STSLIB.OO3
Service Sub Level Name...
Version Number...........l.O.O
Date of Generation.......02/10/18
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.002
#
LOG HEADER DATÞ.
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (F: J :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINAT:::ON (DEG
MINIMUM Þ.NGLE:
MAXIMUM ANGLE:
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
GR
ROP
$
3
header data for each bit run in separate files.
3
.5000
START DEPTH
9482.5
9482.5
9482.5
9482.5
9482.5
9490.0
9540.5
STOP DEPTH
12447.0
12447.0
12447.0
12447.0
12447.0
12440.0
12500.0
22-AUG-02
Insite 4.05.5
66.37
Memory
12500.0
84.1
93.3
1:
:-C~J: s.:'?:!~.:;
- ~-
32::' J!~:
VE~~2~ :2:~ ~~~~
JG~
:o~=- :~~?E
J::;':" G;'~~:J:- ?~.:~
E~~:?~O~~.G. RES:S. ~
EX?4
f
BOREHOLE ANr :AS:NG DA7A
OPEK ~O:~ 31: SIZE ;:K):
DRI::ER'S ChSING DEF:~ (FT):
#
BOREHOLE crn==:TIONS
MUD TlPE:
MUD ~ENS::~ (:S!G:
MUD VISCOSITY IS):
MUD p~:
MUD C~LORIJES (PPM):
FLUE LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGFì
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
# ,
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.... ... ..... .Undefined
Absent value...................... -999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
TOO: NU~BE~
PBOC2E9~AG~~
PECC2E9EAS~~
6.125
Flo Pro
9.00
51.0
9.0
21500
3.8
.180
.087
.160
.260
74.0
160.0
70.0
72.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD03C HR 4 1 68 28 8
First Last
Name Service Un~~ Min Max Mean Nsam Reading Reading
DEPT FT 9482.5 12500 ::'0991.3 6036 9482.5 12500
ROP MWD03C FT/E 0.14 165.33 '77.6366 5920 9540.5 12500
GR MWD03C API 33.25 75.33 58.2414 5901 9490 12440
RPX MWD03C OHHt.: 0.26 1495.41 ::'7.9398 5930 9482.5 ::'2447
RPS MWD03C OHM!:>: 0.3 1495.83 ::'9.2892 5930 9482.5 12447
RPM MWD03C OHM:::': 0.25 2000 32.8276 5930 9482.5 12447
RPD MWD03C OHM:::.: 0.19 2000 38.9853 5930 9482.5 12447
FET MWD03C HR 0.42 62.33 :2.79571 5930 9482.5 12447
First Read~~g Fc~ Entire File......... .9482.5
Last Readi~g Fo~ Entire File... ....... .12500
File Traile~
Se::-\-:.ce
r:.ar.',e. . . . . . . . . . . . . S'I'S~:::B. QC3
S~b ~eve: Kame...
S e :-\'":" ,.:e
~\7e::sio:: l~u..Tnbe=. . . . . . . . . . . :. c. c
:.=.:e c:
~~a:.:im~;...~.
Ge~e=a~~=~...... .02"/:C:1:£
?~ys~:a: ~e=~~d..65535
1:':"_€ ~ype................~O
Ne~: F~le Na~e.......... .STSL:::B.OO4
Physica2. E8?
Tape Trailer
Service r:.ame............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/10/18
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name. ...... ........ . UNKNOWN
Continuation !'iumber..... .01
Next Tape Na~me........ ...UNKNOWN
Corrunents. . . . . . . . . . . . . . . . . STS LI,S
Writing Library. Scientific Technical Services
Reel Trailer
Service name.............LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/10/18
Origin. . . . . . . . . . '. . . . . . . . . STS
Reel Name................UNKNOWN
Continuation Number......01
Next Reel Name...........UNKNOWN
Corrunents. . . . . . . . . . . . . . . . . STS LIS
Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File