Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout203-177MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Wednesday, July 20, 2022
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Bob Noble
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
ConocoPhillips Alaska, Inc.
CD2-27
COLVILLE RIV UNIT CD2-27
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 07/20/2022
CD2-27
50-103-20471-00-00
203-177-0
G
SPT
6979
2031770 1745
4030 4030 4030 4030
650 760 760 760
4YRTST P
Bob Noble
6/7/2022
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:COLVILLE RIV UNIT CD2-27
Inspection Date:
Tubing
OA
Packer Depth
960 1990 1930 1920IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitRCN220612151613
BBL Pumped:1.3 BBL Returned:1.3
Wednesday, July 20, 2022 Page 1 of 1
III
MEMORANDUM S State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday,June 1 I,2018
TO: Jim Regg �
P.1.Supervisor /< i 1 s SUBJECT: Mechanical Integrity Tests
( �- / CONOCOPHILLIPS ALASKA,INC.
CD2-27
FROM: Brian Bixby COLVILLE RIV UNIT CD2-27
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry
NON-CONFIDENTIAL Comm
Well Name COLVILLE RIV UNIT CD2-27 API Well Number 50-103-20471-00-00 Inspector Name: Brian Bixby
Permit Number: 203-177-0 Inspection Date: 6/5/2018 ✓
Insp Num: mitBDB180610165659
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well CD2-27 ' Type Inj W 'TVD 6979 - Tubing 2350 - 2360• 2360 - 2360 -
PTD 2031770 ' Type Test SPT Test psi 1745 IA 1060 3200 ' 3150 - 3140
BBL Pumped: , 2.9 - BBL Returned: 2.9 - OA 520 - 760 • 760 - 760 -
Interval 4YRTST P/F P >%
Notes:
SII
1N6) JUN S1
Monday,June 11,2018 Page 1 of 1
) )
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
&10:3 - 17 7 Well History File Identifier
Organizing (done)
~O-Sided 1111111111111111111
D Rescan Needed 11111111111111111
R~CAN
~ Color Items:
o Greyscale Items:
DIGITAL DATA
¿.ø15iskettes, No. I
o Other, NolType:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
BY: '-M.ar.ia '\
o Other::
Date: J!J; ~/ t}~-
151
(t1j
Project Proofing
BY: G Maria)
1111111111111111111
Scanning Preparation
BY: ~..~
Date: 18': ~O J OS
if X 30 = ¡ dJJ +
Date: I {}- ~/ D ç-
.
151
/1111
I () = TOTAL PAGES 130
(Count does not include cover sheet) 9 /) /J
151 V II
Production Scanning
1111111111111111111
Stage 1
Page Count from Scanned File: I ~~ I (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: c/ YES
(Maria ") Date: ¡ ~ 'J,ÞI () 5'
If NO in stage 1, page(s) discrepancies were found: YES
151
NOVVl f)
Stage 1
BY:
NO
BY:
Maria
Date:
151
1111I1I1I11111111I1
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
1111111111111111111
10/6/2005 Well History File Cover Page.doc
MEMORANDUM
To: Jim Regg ~®~~ ~2~~,,~
P.I. Supervisor
EROM: Jeff Jones
Petroleum Inspector
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, June 28, 2010
SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CD2-27
COLVILLE RIV UNIT CD2-27
Src: Inspector
NON-CONFIDENTIAL
Reviewed By:
P.I. Suprv J~!`
Comm
Well Name: COLVILLE RIV UNIT CD2-27 API Well Number: 50-103-20471-00-00
Insp Num: mitJJ100615082551 Permit Number: 203-177-0
Rel Insp Num: Inspector Name: Jeff Jones
Inspection Date: 6/11/2010
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well CD2-27 ~ Type Inj-~G TVD 6979 ~ IA 162s 2300 ' 2270 I 2260 ~ ~
P.T.D 2031770' TypeTest SPT Test psi ~ 17aa ~ OA 6zs 700 700 700
InterVal4YRTST p~F, P ~ Tubing 3830 3830 3830 3830
Notes: 0.6 BBLS diesel pumped; no exceptions noted.
I~~d"4:~~~ v`lJL s ~i LUl~r'
Monday, June 28, 2010 Page I of 1
•
~,~
~ ~ -~~
}-"
~:
.:_~,~ ,:
~~
'• ~
03/0112008
DO N4T PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:1LaserFiche\CvrPgs_InsertslMicrofilm Marker.doc
.
.
~
ConocoPhillips
Alaska
\dÙ f~ ïo 7
P.O. BOX 100360
ANCHORAGE, AlASKA 99510-0360
(t\~~~!~ .~ .;¿ ~~ t "'JJ~, I~J~1iÎß,ij
;~'!æ'it~ g~. i5f GiI1f e'i!Jms, [;1 li ~~3m!3
!Rw~~'ea
March 24, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West ih Avenue, Suite 100
Anchorage, AK 99501
ar>3- ~11
Dear Mr. Maunder:
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). Some of
these wells were found to have a void in the conductor by surface casing annulus. The voids that
were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The
remaining volume of annular void respectively was coated with a corrosion inhibiter, RG240l
engineered to prevent water from entering the annular space. As per previous agreement with
the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and
meets the requirements of form 10-404, Report of Sundry Operations.
The cement top-fill operation was completed on March 21st, 2007. Schlumberger Well Services
mixed 15.7 ppg Arctic set I in a blender tub. The cement was pumped into the conductor bottom
and cemented up via a hose run to the existing tOf of cement. The corrosion inhibitor sealant
was pumped in a similar manner March 21 st - 22ß , 2007. The attached spreadsheet presents the
well name, top of cement depth prior to filling, and volumes used on each con~uctor.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
\]}#
~ Arend·
ConocoPhillips Well Integrity Field Supervisor
~
~GANNEO MAR 2 8 2007
Attaclunent
.
.
ConocoPhillips Alaska Inc.
Suñace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Alpine Field
March 24,2007
Initial top of
Well Name pro # cement
ft
Final top of Cement top off
cement date
ft
Corrosion
RG casing filler inhibitor! sealant
vol. date
al
.
.
ConocoPhillips Alaska Inc.
Suñace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Alpine Field
March 24,2007
Initial top of
Well Name pro # cement
ft
Final top of Cement top off
cement date
ft
Corrosion
RG casing filler inhibitor! sealant
vol. date
al
.
.
WELL LOG TRANS1\HTT AL
Z\;,~,<\_~,,;p,'J?:,:\}G!
Noverríbër'Ji6,2006
To: State of Alaska
Alaska Oil and Gas Conservation Cornrn.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs: CD2-1O_PBl, CD2-11, CD2-17A, CD2-27,
CD2-28_PBl, CD2-30.
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
CD2-1O_PBl: 803 -10S-
Digital Log Images:
50-103-20473-00,70
U :I: c...
C02-II: {)o~- ¡3d
Digital Log Images:
50-103-20515-00
i:f /4Lj /0
1 CD Rom
scAN'~ED FEB 0 1 2007
$± ¡l../L/I1-
1 CD Rom
CD2-17A: U Ie.. &oS--ot--:t- 1:1. ¡"-/Llfe>,
Digital Log Images:
50-103- 20406-01
1 CD Rom
CD2-27: VJ:.C.- .9Ô3 - If'+ \ t../q Ií)
Digital Log Images:
50-103-20471-00
1 CD Rom
CD2-28_PBl: dOG -81"':f- 't!- 1'-/'-/16-
Digital Log Images:
50-103-20435-00, 70
CD2-30: U .IC-Q03-1~ tÎ' ¡'{"-IILI
Digital Log Images:
50-103-20465-00
1 CD Rom
1 CD Rom
?-
MEMORANDUM
.
State of Alaska _
Alaska Oil and Gas Conservation CommisJP'
TO:
Jim Regg I<C/j,' Ç,1'2è/Oiy
P.I. Supervisor ' \ 1"1 v1--
" t
DATE: Wednesday, August 30, 2006
SUBJECT: Mechanical Integrity Tests
CONOCOPHILLJPS ALASKA INC
CD2-27
COLVILLE RIV UNIT CD2-27
"?> J {\ 1
d-.Ö
FROM:
Chuck Scheve
Petroleum Inspector
Src: Inspector
Reviewed By:
'1BP-
P.I. Suprv '- ,
Comm
NON-CONFIDENTIAL
Well Name: COLVILLE RIV UNIT CD2-27 API Well Number 50-103-20471-00-00 Inspector Name: Chuck Scheve
Insp Num: mitCS060828 142026 Permit Number: 203-177-0 Inspection Date: 8/27/2006
Rei Insp N urn
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well CD2-27 Type Inj. G TVD 6979 IA 1600 2670 2660 2660
P.T. 2031770 TypeTest SPT Test psi 1744,75 OA 850 950 950 950
Interval 4YRTST PIF P / Tubing 3100 3100 3100 3100
Notes Pretest pressure observed and found stable
SCANNED SEP 0 82DDô
Wednesday, August 30, 2006
Page I of I
e e
WELL LOG TRANSMITTAL J 355ð
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 9950]-3539
February] 7, 2004
RE: MWD Formation Evaluation Logs: CD2-27,
AK-MW-2722885
CD2-27:
Digital Log Images:
50-103-20471-00
~61-'lr)f)
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNlNG AND RETURNING THE ATTACHED
COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
~Date ;;¡/:i!)jNp
Signed Qd." â.õQVt'
l~ - \
\D ~
DATA SUBMITTAL COMPLIANCE REPORT
12/5/2005
MD 18250 ~ TVD 7205 .,., Completion Date 11/18/2003 ___ Completion Status WAGIN
Current Status WAGIN
;. tAt¿' ) ò Oct"~
AP~O. 50-103-20471-00-00
~c.y)-
Permit to Drill 2031770
Well Name/No. COLVILLE RIV UNIT CD2-27
Operator CONOCOPHILLlPS ALASKA INC
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: GRlRes
Well Log Information:
Logl
Data
Typ
Electr
Digital Dataset
MedlFrmt Number
D Asc
Name
Directional Survey
Cement Evaluation
Log Log Run
Scale Media No
5 CoI
5 CoI
1¡ 09
, og
Casing collar locator
Rpt
Rpt
~t
¡ ED
Directional Survey
Directional Survey
Directional Survey
I nd uction/Resistivity
Rate of Penetration
1_ f .~ . r... U ,r I 17_ - ",!¡"-l ~
ö IVIII ,",.,.7lv I r¡ .th"t ~ .,...
1-3
1-3
1-3
D ~ "IS 12400
D i!!e6 L' S 12400
: ~ A \If'
~
~8tB af P c.1..:..trati8R
~
~g
Temperature
Blu
5
(data taken from Logs Portion of Master Well Data Maint
~~-
Interval OH 1
Start Stop CH
o 18250 Open
Received Comments
---.. ------~,
2/3/2005 IIFR (Sag Corrected)
10450 12440 Case 12/12/2003 Ultrasonic Imager Tool -
USIT/GR/CCL
10450 12440 Case 12/12/2003 Ultrasonic Imager Tool -
USIT/GRlCCL
714 18250 Open 12/8/2003
714 18250 Open 12/8/2003 MWD
0 714 Open 12/8/2003 GYRO
3287 18183 Open 2/12/2004 GR, EWR4, ROP
3287 18183 Open 2/12/2004 GR, EWR4, ROP
3287 18183 Open 2/12/2004 GR, EWR4, ROP
326'7 1 6183 g"eR J/1J/JQQ1 r::D I=\M~ 1, ROP
~~
25 3850 Case 1/19/2005 TEMPERATURE
LOG/ANNULAR
INJECTION TEST
- - ------
Sample
Set
Number Comments
Well Cores/Samples Information:
Name
Interval
Start Stop
Received
Sent
DATA SUBMITTAL COMPLIANCE REPORT
12/5/2005
Permit to Drill 2031770
Well Name/No. COLVILLE RIV UNIT CD2-27
Operator CONOCOPHILLlPS ALASKA INC
API No. 50-103-20471-00-00
MD 18250
TVD 7205
Completion Date 11/18/2003
Completion Status WAGIN
Current Status WAGIN
UIC Y
ADDITIONAL INFORMATION
Well Cored? vG)
Daily History Received?
Q)N
fj)N
Chips Received? - f I 1'1
""'V
Formation Tops
Analysis
Received?
~
~
------ ----- ---
--~,
Comments:
Compliance Reviewed By:
tk
----1-~-~c-c _"..L
Date: __~
~~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF ANNULAR DISPOSAL
1. Operator: 4a. Well Class: Stratigraphic 0 Service 0 6. Permit to Drill Number: 203-177 -
ConocoPhillips Alaska, Inc. Development 0 Exploratory 0 7. Well Name: C02-27
2_ Address: 4b. Well Status: Oil 0 Gas 0 WAG 0 8. API Number:
P. O. Box 100360, Anchorage, Alaska GINJ 0 WINJ 0 WDSPL 0 50-103-20471-00
3. (Check one box only) 5a. Sundry number: 5b. Sundry approval date: 9. Field:
Initial Disposal Dor Continuation o or Final 0 304-226 6/23/2004 Colville River Field
10. (h)(1) drilling mud, drilling (h)(2) drill rig wash (h)(3) Other Commission Volume (bbls): Number of Disposal Disposal Source Wells:
cuttings, reserve pit fluids fluids and drill rig approved substances (include days Beginning Dates: Ending Dates: ,,~--
cement-contaminated domestic waste water descriptions in block 12) disposal
drilling mud, completion occurred
fluids, formation fluids and
any necessary water
added
Previous 0 0 381* 381 0
totals (bbls):
2004 / 3rd 31519 100 0 31619 41 7/9/2004 8/26/2004 C02-53, C02-31, C02-05, C02-
09
2004 / 4th 0 0 0 0 0
2005 /1 st 0 0 0 0 0
2005 / 2nd 0 0 0 0 0 ,-,
Total Ending Report is due on the 20th
Volume 31519 100 381 32000 41
(bbls): of the month following the final month of the quarter. Ex:
April 20 for the first quarter, July 20 for the second quarter,
11. Attach: Disposal Performance Data: Pressure VS. Time 0 Step Rate Test 0 October 20 for the third quarter, and January 20 for the
Other (Explain) 0 fourth quarter.
12. Remarks and Approved Substances
Description(s): * Freeze protect volumes
I hereby certify that the foregoing is true and correct to the best of my knowledge.
~- \ '7 (, 'Z (oJ~
Signature: \ v'-Ó- ~ Date:
Printed Name: Randy Thomas Title: Kuparuk Drilling Team Leader Phone Number: (907) 265-6830
Form 10-423 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF ANNULAR DISPOSAL
1. Operator: 4a. Well Class: Stratigraphic 0 Service 0 6. Permit to Drill Number: 203-177
ConocoPhillips Alaska, Inc. Development D Exploratory D 7. Well Name: C02-27
2. Address: 4b. Well Status: Oil 0 Gas 0 WAG 0 8. API Number:
P. O. Box 100360, Anchorage, Alaska GINJ D WINJ D WDSPL D 50-103-20471-00
3. (Check one box only) 5a. Sundry number: 5b. Sundry approval date: 9. Field:
Initial Disposal Dor Continuation o or Final 0 304-226 6/23/2004 Colville River Field
10. (h)(1) drilling mud, drilling (h)(2) drill rig wash (h)(3) Other Commission Volume (bbls): Number of Disposal Disposal Source Wells:
cuttings, reserve pit fluids fluids and drill rig approved substances (include days Beginning Dates: Ending Dates:
--~ cement-contaminated domestic waste water descriptions in block 12) disposal
drilling mud, completion occurred
fluids, formation fluids and
any necessary water
added
Previous 0 0 381* 381 0
totals (bbls):
2004 1 3rd 31519 100 0 31619 41 7/9/2004 8/26/2004 C02-53, C02-31 C02-05, C02-
09 -
2004 14th 0 0 0 0 0
20051 1st 0 0 0 0 0
')005 1 2nd
Total Ending Report is due on the 20th
Volume 31519 100 381 32000 41
(bbls): of the month following the final month of the quarter. Ex:
April 20 for the first quarter, July 20 for the second quarter,
11. Attach: Disposal Performance Data: Pressure VS. Time 0 Step Rate Test D October 20 for the third quarter, and January 20 for the
Other (Explain) 0 fourth quarter.
12. Remarks and Approved Substances
Description(s): * Freeze protect volumes
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~~\ ~ ~A'$ Date: '-( ( ( z.J (:. S-
Printed Name: Randy Thomas Title: Kuparuk Drilling Team Leader Phone Number: (907) 265-6830
Form 10-423 Rev. 212004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
(
((
01-Feb-05
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-27(Sag Corrected)
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window I Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
18,250.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF: '
Sperry-Sun Drilling Services
AUn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518 ,,/] /
Date ~fih ~ r Signed ~ ûiLA
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
:A~~·-1··7)
1/19/05
Schlumberger
NO. 3310
Schlumberger-DCS
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
Attn: Beth
Company: Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Alpine
~- Color
Well Job# Log Description Date BL Prints CD
2œ-215 CD1-229 10942798 INJECTION TEST 11/23104 1
2r;3--177 CD2-27 10922509 TEMPERATURE LOG 12/10/04 1
:2O'{-lgo CD1-11 10922523 SCMT 01/07/05 1
20 tf...2Ho CD1-20 10942823 SCMT 01/07/05 1
i/
, / / J I'
SIG0;;~Æ- .lú~ DATE: /frfis
Please sign and return U copy of this transm iltal to Beth at the above address or fax to (907) 561-8367. Thank you.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF ANNULAR DISPOSAL
0 0 381* 381 0
31519 100 0 31619 41 7/9/2004 8/26/2004 C02-53, C02-31, C02-05, C02-
09
0 0 0 0 0
1. Operator:
ConocoPhillips Alaska, Inc.
2. Address:
4a. Well Class: Stratigraphic 0 Service 0
Development 0 Exploratory 0
4b. Well Status: Oil 0 Gas 0 WAG0
GINJ 0 WINJ 0 WDSPL 0
5a. Sundry number: 5b. Sundry approval date:
P. O. Box 100360, Anchorage, Alaska
3. (Check one box only)
Initial Disposal 0 or Continuation
10. (h)(1) drilling mud, drilling
cuttings, reserve pit fluids
cement -contami nated
drilling mud, completion
fluids, formation fluids and
any necessary water
added
o or Final 0
(h)(2) drill rig wash
fluids and drill rig
domestic waste water
304-226
(h)(3) Other Commission
approved substances (include
descriptions in block 12)
6/23/2004
Volume (bbls): _ Number of
days
disposal
occurred
Previous
totals (bbls):
2004 / 3rd
2004 / 4th
2005/1st
2005 / 2nd
Total Ending
Volume
(bbls):
31519
100
381
32000
Disposal Performance Data:
Other (Explain) 0
12. Remarks and Approved Substances
Description(s):
Pressure vs. Time 0
Step Rate Test 0
11. Attach:
* Freeze protect volumes
I hereby certify that the foregoing is true and correct to the best of my knowledge.
. \ ~ \. \.............
Signature:
Date:
Printed Name:
Randy Thomas
Title:
Kuparuk Drilling Team Leader
Form 10-423 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
6. Permit to Drill Number:
7. Well Name:
8. API Number:
203-177
C02-27
50-103-20471-00
9. Field:
Colville River Field
Disposal Disposal Source Wells:
Beginning Dates: Ending Dates:
5CANNED JAN 2 3 2006
- /
-
~
41
Report is due on the 20th
of the month following the final month of the quarter. Ex:
April 20 for the first quarter, July 20 for the second quarter,
October 20 for the third quarter, and January 20 for the
fourth quarter.
\. ( ? (OS-
Phone Number:
(907) 265-6830
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF ANNULAR DISPOSAL
'---
1. Operator: 4a. Well Class: Stratigraphic D Service E] 6. Permit to Drill Number: 203-177
ConocoPhillips Alaska, Inc. Development D Exploratory D 7. Well Name: C02-27
2. Address: 4b. Well Status: Oil D Gas D WAGE] 8. API Number:
P. O. Box 100360, Anchorage, Alaska GINJ 0 WINJ 0 WDSPL D 50-103-20471-00
3. (Check one box only) 5a. Sundry number: 5b. Sundry approval date: 9. Field:
Initial Disposal E]or Continuation D or Final D 304-226 6/23/2004 Colville River Field
10. (h)(1) drilling mud, drilling (h)(2) drill rig wash (h)(3) Other Commission Volume (bbls): Number of Disposal Disposal Source Wells:
cuttings, reserve pit fluids fluids and drill rig approved substances (include days Beginning Dates: Ending Dates:
cement-contaminated domestic waste water descriptions in block 12) disposal
~ drilling mud, completion occurred
fluids, formation fluids and
any necessary water
added
Previous 0 0 381* 381 0
totals (bbls):
2004 1 3rd 31519 100 0 31619 41 7/9/2004 8/26/2004 C02-53, C02-31, C02-OS, C02-
09
2004 14th
20051 1st
2005 1 2nd
Total Ending Report is due on the 20th
Volume 31519 100 381 32000 41
(bbls): of the month following the final month of the quarter. Ex:
April 20 for the first quarter, July 20 for the second quarter,
11. Attach: Disposal Performance Data: Pressure vs. Time D Step Rate Test D October 20 for the third quarter, and January 20 for the
Other (Explain) D fourth quarter.
12. Remarks and Approved Substances
Description(s): * Freeze protect volumes
I hereby certify that the fOregOin~O the b,:st of my knowiedge. \0(([ (04-
Signature: ~~ Date:
,
Printed Name: Randy Thomas Title: Kuparuk Drilling Team Leader Phone Number: (907) 265-6830
Form 10-423 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
It
~
Note to File
CD2-27 (203-177...304-226)
Colville River Unit (Alpine) ConocoPhillips Alaska, Ine
Phillips has made application for annular disposal for the subject well. This document
examines the pertinent information for the well and recommends approval of
ConocoPhillips' request.
--No unusual events were reported while drilling the surface hole of the well.
--Surface casing was cemented to surface. Approximately 240 bbls of cement was
circulated to surface. The net cement remaining in the surface hole was 10% XS of
the calculated hole volume. The 5XS left in the hole is lower than previously seen,
however the engineer indicated that the job went well and the nut-plug "tattletale" was
circulated from the well.
-..On the initial leak off test, it was not possible to pump into the well at 18.0 EMW.
The pressure declined during the observation period to 15.9 EMW. The initial leak off
indicates that the surface casing shoe is well cemented.
--No problems are reported drilling the intermediate hole. The 7" casing was run and
became stuck prior to cementing. The 7" was cemented without pipe movement
approximately 200' off bottom. Some minor lost returns was experienced while
cementing.
--An injectivity test down 9...5/8" x 7" annulus was conducted. Pressure steadily
increases until the break at 15.0 EMW. Steady pump in occurred at 13.5 EMW.
During the observation period, the pressure declined to 12.4 EMW. The lower EMW
of the pump in test indicates that the planned disposal should be conducted at EMWs
below that of the shoe integrity.
--CPA provided a listing of all surface casing shoes within % mile of CD2-27. There
are a total of 10 wells within % mile of the surface shoe. The nearest well is C02-51
about 350' distant. CD2-51 was approved for AD in late October 2003. There are 4
other wells between 700' - 900' away with 2 of the wells having been approved for
AD. The remaining wells are in excess of 1000' distant. An examination of the files
did not reveal any problem that would preclude granting CPA's request for CD2-27.
Based on examination of the submitted information, I recommend approval of
ConocoPhillips' request for the subject well.
f::::1~
Sr. Petroleum Engineer
June 22, 2004
G:\common\tommaunder\ Well Information\By Subject\Annular Disposal\040622......CD2-
, 27.doc
(
(
ConocoPhillips Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
~
ConocoPhillips
June 9, 2004
R'· ïF- l'" Eo :< \ , 11""'" ~
.' ~~ I,~., ,,' . ~ 'i ~~'~ ~ )
~=.. \""f ~,' ~> ~,=". ~_"i
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501-3539
JUN 1 112004
AlaslŒ Oil g~i~i~: CC:L:, C~J;',:,;.n¡~~:S¡l~fi
Re: Aoolication for Sundry Aooroval for Annular Disoosal of Drilling: Waste on w~t~~~;~~~~7
Dear Sir or Madam:
ConocoPhillips Alaska, Inc. hereby requests that CD2-27 be pennitted for annular pumping of fluids
occurring as a result of drilling operations, per regulation 20 ACC 25.080. It is intended to begin annular
disposal operations on CD2-27 approximately June 23, 2004.
Please find attached fonn 10-403AD and other pertinent infonnation as follows:
1. Annular Disposal Transmittal Fonn
2. Pressure Calculations for Annular Disposal
3. Surface Casing Description
4. Surface Casing Cementing Report & Daily Drilling Report during cement job
5. Casing and Fonnation Test Integrity Report (LOT at surface casing shoe).
6. Intennediate Casing Description
7. Intennediate Casing Cementing Report & Daily Drilling Report during cement job
8. Fonnation LOT on 9-5/8" x 7" casing annulus
9. Plan View of Adjacent Wells
10. List of wells on CDl pad and the lateral distance from the surface casing shoe.
11. Additional information regarding wells within y.¡ mile radius, not already on file at AOGCC; CD2-57
Further details regarding wells on CD2 pad within lj.¡ mile radius should be on file at the AOGCC.
The initial annular LOT (15 ppg) and occurred at a lower equivalent mud weight than the casing shoe test
(18 ppg LOT). Therefore we conclude that waste will not migrate above the confining zone provided we
do not inject with sustained surface pressures that will cause pressures at the surface shoe to be in excess
of the shoe FIT/LOT.
If you have any questions or require further infonnation, please contact Vem Johnson at 265-6081, or
Chip Alvord at 265-6120.
~~.
Vem Johnson
Drilling Engineer
b/Íô/or
cc:
CD2-27 Well File
Chip Alvord
Nancy Lambert
Sharon Allsup-Drake
ATO-1700
Anadarko
ATO-1530
(J ~:ç ~ (;II~AL
:~
r-' ..ð )'r. "
ö~ -'" '-.~ Þ
, "~~",! R, &"~, .. (((
,~~ . )..)
,'" .......- '\I"EK
f'~~"'''''"' I,' . ~, ~ ~
I. \';.~""=\Jt-:~ . -~ )
" L....L'.:> 1i..:!r\l1].'.1f'
JUN 1 42004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
ANNULAR DISPOSAL APPLICATION
20 MC 25.080
(~[H':-¡C~;S s~'on
1. Operator
Name:
ConocoPhillips Alaska
3. Permit to Drill
Number: 203-177
4. API Number:
. .
~'-~ ¡
I':! :'., ,~~
50-103-20471-00
2. Address:
5. Well
P.O. Box 100360. Anchorage. Alaska
CD2-27
6. Field:
Colville River Field
7. Publicly recorded wells
a) All wells within one-quarter mile:
CD2-35, CD2-39, CD2-45, CD2-41, CD2-38, CD2-36, CD2-51,
C02-58, C02-52, C02-57
8. Stratigraphic description:
a) Interval exposed to open annulus:
Torok and Seabee formation, shale, siltstone and sandstone
b) water wells within one mile:
b) Waste receiving zone:
Sand layers in the Colville group C-30 in the Seabee formation
NONE
c) Confinement:
The Schrader Bluff formation provides an upper barrier and marine shales and claystones
of the Lower Cretaceous Torok Formation provide a lower barrier
1602' MO
10. Hydrocarbon zones above waste receiving zone:
None
9. Depth to base of permafrost:
11. Previous volume disposed in annulus and date:
None
12. Estimated slurry density:
densities range from diesel to 12#/gal
15. Fluids to be disposed:
13. Maximum anticipated pressure at shoe:
2219 psi
14. Estimated volume to be disposed with this request:
35,000 bbls.
June 23, 2004
Types of waste may be drilling mud, drilling cuttings, reserve pit fluids, cement-
contaminated drilling mud, completion fluids, diesel, formation fluids associated
with the act of drilling a well, drill rig wash fluids, cement rinsate, domestic
waste water, any added water needed to facilitate pumping of drilling mud or
drill in cuttin s, and an other fluids associated with drillin a well.
16. Estimated start date:
17. Attachments:
Well Schematic (Include MD and TVD) 0
Cement Bond Log (if required) D
FIT Records wlLOT Graph 0
Surf. Casing Cementing Data
o
Other
o _Details regarding wells within 1/4 mile radius: CD2-57
18. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature:
IJ:{_.~
./
Title: A 'r~ Ò,.,,(, L6-.)
Printed
Name:
Chip Alvord
Phone
Number:
Commission Use Onl
265-6120
Date:
Conditions of approval:
LOT review and approval:
(.) ~"b '-\
Approval number:
301- ~;;-~
Approved
COMMISSIONER
BY ORDER OF THE
COMMISSION
Date:
Form 10-403AD Rev. 9/2003
OR\G\NAL
INSTRUCTIONS ON REVERSE
Submit in Duplicate
{
Annular Disposal Transmittal Form
1. Designation of the well or wells to receive drilling CD2-27
wastes.
2. The depth to the base of freshwater aquifers and There are no USDW aquifers in the Colville River
permafrost, if present. Unit. Estimated base of Permafrost = 1602' TVD
(RKB)
3. A stratigraphic description of the interval exposed to The Schrader Bluff formation provides an upper barrier
the open annulus and other information sufficient to and marine shales and claystones of the Lower
support a commission finding that the waste will be Cretaceous Torok Formation provide a lower barrier.
confined and will not come to the surface or Calculated water salinities of the Cretaceous and older
contaminate freshwater. stratigraphic sections range from 15000 to 18000 mg/l.
(Ref. AOGCC Conservation Order No. 443, March 15,
1999)
4. A list of all publicly recorded wells within one- See attached map indicating wells within 1/4 mile.
quarter mile and all publicly recorded water wells There are no water wells within 1 mile.
within one mile of the well to receive drilling waste.
5. Identify the types and maximum volume of waste to Types of waste may be drilling mud, drilling cuttings,
be disposed of and the estimated density of the waste reserve pit fluids, cement-contaminated drilling mud,
slurry. completion fluids, diesel, formation fluids associated
with the act of drilling a well, drill rig wash fluids,
domestic waste water, any added water needed to
facilitate pumping of drilling mud or drilling cuttings,
and any other fluids associated with drilling a well.
Densities range from diesel to 12#/gal. Maximum
volume to be pumped is 35,000 bbls.
6. Description of any waste sought to be determined as Cement rinsate
drilling waste under h (3) of this section
7. An estimate of maximum anticipated pressure at the Maximum anticipated pressure at casing shoe during
outer casing shoe during annular disposal operation disposal operations is 2219 psi. See attached
and calculations showing how this value was calculation page.
determined.
8. Details that show the shoe of the outer casing is set See attached cementing reports, LOTIFIT reports, and
below the base of any freshwater aquifer and casing reports.
permafrost, if present, and cemented with sufficient
cement to provide zone isolation.
9. Details that show the inner and outer casing strings See attached casing summary sheet and calculation
have sufficient strength in collapse and burst to page.
withstand anticipated pressure of disposal
operations.
10. Any additional data required by the Commission to NA
confirm containment of drilling wastes.
Pressure Calculations for Annular Disposal
Well
Date
CD2·27
6/8/2004
'" '"
~ ~
\Jì \Jì
\Jì
I::
.~
U
.
<:::>
<:::>
<:::>
r.:
TOC Est. @ 11,461' MD
6,057' TVD
7,162 TVD
Assumptions
Maximum injection pressure of
Maximum density of the injection fluid is
Pore pressure at the 9 5/8" casing shoe is
Gas Gradient is
Header Pressure
1,500
12
0.4525
0.11
2,000
psi
ppg
psi/ft
psi/ft
psi
M ~~~
Pburst85% = PHydrostatic Applied' PFormation
2,992 = ( 2,371 * 0.052 * MW ma" ) + 1500 . (0.4525 * 2,371)
MWma"
20.8 ppg
Surface Casing String
Size
Weight
Grade
PburstJOO%
Pburst85%
Depth of Shoe
FlTILOT @ Shoe
FIT/LOT for Annulus
Max Surf. Pressure
9.625 in
36 ppf
J 55
3,520 psi
2,992 psi
2,371 ft
18 ppg
15 ppg
1,500 psi
or 2,219 psi
in
P coUapse85% Hydrostatic + P Applied' GasGradient' PHeader
4,599 =( 6,057* 0.052 "'MWmax )+ 1,500 .( 0.1100 * 6,057)- 2,000
MW max
18.3 ppg
2nd Casinl! String
Size 7 in
Weight 26 ppf
Grade L 80
P collapse 100% 5,410 psi
P collapse85% 4,599 psi
Top of Cement 6,057 ft
Gas Gradient 0.11 psi/ft
Max Surf. Pressu 1,500 psi
Header Press 2,000 psi
Maximum Allowable Pressure at Surface Casiull Shoe
P ma" allowable =
Pmaxallowable = Shoe TVD Depth * .052 * Shoe FIT/LOT
2,371 * .052 * 18
P max aUowable =
2,219
psi
e
e
.PHlllIPS Alaska, Inc.
Casing Detail
95/8" Surface Casinq
Well: CD2-27
Date: 11/1/2003
A Subsidiary of PHilLIPS PETROLEUM COMPANY DEPTH
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS
Doyon 19 RKB to Landing Ring 36.56
FMC Gen V Hanger 2.95 36.56
Jts 3 to 78 76 Jts 9-5/8" 36# J-55 BTC Csg 3186.91 39.51
Davis Lynch Float Collar 1.45 3226.42
Jts 1 to 2 2 Jts 9-5/8" 36# J-55 BTC Csg 80.93 3227.87
Ray Oil Tools "Silver Bullet" Float Shoe 2.30 /3308.80
i 3311.10
, '-.. ----
TO 12 1/4" Surface Hole 3321.00
RUN TOTAL 45 BOWSPRING CENTRALlZERS-
1 per jt on Jt #1 - #12 (On stop ring of Jt #2)
and over collars on jts# 14,16,18,20,22,24,26,28,30,
32,34,36,38,40,42,44,46,48,50,52,54,56,58,60,62
64,66,68,70,72,74,76,78
87 joints in the pipe shed. Run 78 joints-9 joints to stay in
the shed
Use Best-o-Life 2000 pipe dope
Remarks: Up Wt - 175k
On Wt - 135k
Block Wt - 75k
Supervisor: Whitlock / Bur/ey
)
e
e
ConocoPhillips Alaska Pa.ge 1 of 3
Cementing Report
Legal Well Name: CD2-27 Spud Date: 10/30/2003
Common Well Name: CD2-27 Report #: 1 Report Date: 11/1/2003
Event Name: ROT - DRILLING Start: 10/28/2003 End: 11/18/2003
Cement Job Type: Primary
.Pt1mï:it\! -- --.-- T- I ----.-
n ----,- ____ªque_f3~e_ gpenuHole Saueeze Ca~irlg_ -,- ._ __..n Plug
Hole Size: 12.250 (in) Hole Size: Hole Size: Hole Size:
TMD Set: 3,311 (ft) sa TMD: (ft) TMD Set: Top Set: (ft)
Date Set: 11/1/2003 sa Date: Date Set: BTM set: (ft)
Csg Type: Surface Casing sa Type: Csg Type: Plug Date:
Csg Size: 9.625 (in.) sa TMD: Plug Type:
sa Date: Drilled Out:
Cmtd. Csg: Surface Casing Cmtd. Csg: Cmtd. Csg: Cmtd. Csg:
Cement Co: Dowell Schlumberger Cementer: Steve Daughten .Movément: Recfprocating
Pipe Movement
Rot Time Start: Time End: RPM: Init Torque: (ft-Ibf) Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf)
Rec Time Start: 19:00 Time End: 22:22 SPM: 1 Stroke Length: 20.0 (ft) Drag Up: 163,000 (Ibs) Drag Down: 132,000 (lbs)
Stage No: 1 of 1
.. .....---. _._0.___.____
Type: Cement Casing Start Mix Cmt: 20:57 Disp Avg Rate: 7.00 (bbVmin) RtJUM;- 1œ
Volume Excess %: 100.00 Start Slurry Displ: Disp Max Rate: 7.00 (bbVmin) Total Mud Lost: (bbl)
Meas. From: 240 Start Displ: 22:17 Bump Plug: Y Cmt Vol to ~- -_.00(*)
Time Circ Prior End Pumping: 23:04 Press Prior: 440 (psi)
To Cementing: 1.50 End Pump Date: Press Bumped: 1,200 (psi) Ann Flow After: N
Mud Circ Rate: 337 (gpm) Top Plug: Y Press Held: 2 (min) Mixing Method:
Mud Circ Press: 410 (psi) Bottom Plug: Y Float Held: Y Density Meas By: Dowell
Mud Data
Type: Spud Mud Density: 9.6 (ppg) Visc: 245 (s/qt) PVIYP: 35 (cp)/65 (lb/100ft2) Gels 10 sec: 33 (lb/100ft2) Gels 10 min: 73 (lb/100ft2)
Bottom Hole Circulating Temperature: (OF) Bottom Hole Static Temperature: (OF)
Displacement Fluid Type: Mud Density: 9.6 (ppg) Volume: 229.40 (bbl)
Stage No: 1 Slurry No: 1 of 4
------ ...__ _u ---- ---..-- ......- n. ._ u..._u_ ~- "." .......¥...
Slurry Data
Fluid Type: FLUSH Description: Viscosified H20 wI nutplu Class: Purpose: SPACER
Slurry Interval: (ft) To: (ft) Cmt Vol: 40.0 (bbl) Density: 8.40 (ppg) Yield: (ft3/sk) Mix Water: (gal)
Water Source: Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (OF) Compressive Strength 1: ("F) (psi)
Free Water: (%) Temperature: (OF) Compressive Strength 2: (OF) (psi)
Fluid Loss: (cc) Temperature: (OF)
Fluid Loss Pressure: (OF)
Printed: 12/1112003 8:52:21 AM
e
e
ConocoPhillips Alaska Page 2 of 3
Cementing Report
Legal Well Name: CD2-27 Spud Date: 1 0/30/2003
Common Well Name: CD2-27 Report #: 1 Report Date: 11/1/2003
Event Name: ROT - DRILLING Start: 10/28/2003 End: 11/18/2003
Stage No: 1 Slurry No: 2 of 4
.-......--...-----.-.......-- . --.--- ___..___________ _____n_.__._______ .----
Slurry Data
Fluid Type: ·ø.USH Description: MUDPUSH XL Class: Purpose: SPACER
Slurry Interval: (ft) To: (ft) Cmt Vol: 50.0 (bbl) Density: 10.70 (ppg) Yield: (ft3/sk) Mix Water: (gal)
Water Source: Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (OF) Compressive Strength 1: (OF) (psi)
Free Water: (%) Temperature: (OF) Compressive Strength 2: (OF) (psi)
Fluid Loss: (cc) Temperature: (OF)
Fluid Loss Pressure: (OF)
stage No: 1 Slurry No: 3 of 4
--.-- .., ..--.-....-...-.... -.------.---.---.-----
Slurry Data
Fluid Type: .UiAD Description: ASLite Class: G Purpose: FILLER CEME
Slurry Interval: 2,811.00 (ft¡fo: 36.56 (ft) Cmt Vol: 390.0 (bbl) Density: 10.70 (ppg) Yield: 4.28 (ft3/sk) Mix Water: 19.40 (gal)
Water Source: Rig tank Slurry Vol:512 (sk) Water Vol: 236.0 (bbl) Other Vol: 0 Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (OF) Compressive Strength 1: (OF) (psi)
Free Water: (%) Temperature: (OF) Compressive Strength 2: (OF) (psi)
Fluid Loss: (cc) Temperature: (OF)
Fluid Loss Pressure: (OF)
...
StagêNo: 1 ShxrryNo:3øf4 -AdditiVêS i:
. ....
Trade Name Type Concentration Units liquid Conc. Units
0-53 GYPSUM 30.0C %SWOC
0-46 DEFOAMER 0.6C %SWOC
0-79 EXTENDER 1.5C %SWOC
S1 ACCELERATOR 1.5C %SWOC
0-124 FILLlTE 43.1C %SWOC
0-44 ACCELERATOR 9.0C %SWOW
0-65 DISPERSANT 0.5C %SWOC
,
StageNø: 1Sll.Il'ryN:0:40f4 ..:::>
.,.
Slurry Data
Fluid Type: 'tAil Description: Class: G Purpose: PRIMARY
Slurry Interval: 3,311.00 (ft¡fo: 2,811.00 (ft) Cmt Vol: 51.6 (bbl) Density: 15.80 (ppg) Yield: 1.16 (ft3/sk) Mix Water: 5.10 (gal)
Water Source: Slurry Vol:250 (sk) Water Vol: 30.0 (bbl) Other Vol: 0 Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (OF) Compressive Strength 1: (OF) (psi)
Free Water: (%) Temperature: (OF) Compressive Strength 2: (OF) (psi)
Fluid Loss: (cc) Temperature: (OF)
Fluid Loss Pressure: (OF)
Printed: 12/11/2003 8:52:21 AM
e
e
ConocoPhillips Alaska
Cementing Report
Page 3 of 3
Legal Well Name: CD2-27
Common Well Name: CD2-27
Event Name: ROT - DRILLING
Report #:
Start:
Spud Date: 10/30/2003
1 Report Date: 11/1/2003
10/28/2003 End: 11/18/2003
Stage No: 1 Slurry No: 4 of 4 - Additives
Tracie Name
__T~p'~ .
DEFOAMER
DISPERSANT
ACCELERATOR
Concentration Units
%BWOC
%BWOC
%BWOC
Li uid COI1º'---'. ____Jll1Î.!!L__
D-46
D-65
S1
Casing Test
Shoe Test
Test Press: (psi)
For: (min)
Cement Found between
Shoe and Collar:
Pressure: (ppge)
Tool:
Open Hole: (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool:
Tool:
Tool:
Log/SurveyEvaluatlon
Interpretation Summary
. ------.-. --..-.
. ___._n._.____ _. n_ _____...._.____.___.__.
-....----- ..----.-...--..---.-........
CBL Run:
Under Pressure: (psi)
Bond Quality:
Cet Run:
Bond Quality:
Temp Survey:
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient:
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required:
Number of Remedial Squeezes:
Printed: 12/1112003 8:52:21 AM
e
e
Page 1 of2
ConocoPhillips Alaska, Inc.
Daily Drilling Report
WELL NAME IJOBNUMBERIEVE~TDC~DE 124HRSPROG TMD IrvD DFS I REPT ;0. I DATE
CD2-27 3.321.0 2375.0 2.34 11/1/2003
SUPERVISOR , I RIG NAME & NO. FIELD NAME 10CS NO. AUTH MD DAILY TANG ICUM. TANGO
Dave Burlevl G.R. Whitlo Dovon Drillina In Doyon 19 AIDine 17.802.0 0
CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD CUM INTANG WI MUD
Testina BOPE 0 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL CUM COST WI MUD
Finish testing BOPE. M/U BHA. drillout, LOT and drill ahead 10/31/2003 384.624 679.252
LITHOLOGY JAR HRS OF SERVICE I BHA HRS SINCE INSP LEAKOFF AFE AUTH.
SHALE 10030723
LAST SURVEY: DATE TMD INC AZIM I LAST CASING NEXT CASING LAST BOP PRES TEST
10/31/2003 3,271.17 58.860 137.480 9.625 (in) @ 3,311.0 (ft) 7.000 (in) @ 12,524.0 (ft)
DENSITY(þþg) 9.60 Ipp I IECDI i MUD DATAl DAILY COST I 0 I CUM COST I 0
FV PVNP GELS WUHTHP FCIT.SOL I OIUWAT I %Sand/MBT : Ph/pM I Pf/Mf CI I Ca I H2S UMEI ES
245 35/65 33/73 8.41 31 I I I 0.5/25.0 I 8.91 I 0.0310 I I 20 I I I
BHA NO. I 1 BHA 1 HOLE CONDITIONS I BITNO. t 1
BHA WT. BELOW JARS I STRING WT. UP I STRING WT. DN I STRING WT. ROT TORQUE I UNITS I BHA LENGTH
I I I 978.18
ITEMilîSSCRlPTION NOJTS t;e\\jIfI1 Ö.I!ì. jil!ì,-
Bit 1 1.30 12.250 3.750
Mud Motor 1 30.78 8.000 5.250
Sub - Float 1 2.23 8.000 2.813
Stabilizer - NonMag 1 5.96 8.150 2.500
Crossover 1 2.52 8.000 3.000
MWD 1 9.20 7.920 1.900
MWD 1 8.89 7.950 1.900
MWD 1 9.97 8.170 1.900
Sub - Bottom Hole Orienting 1 2.95 8.050 2.813
Drill Collar - Non Mag 1 31.28 8.100 2.810
Drill Collar - Non Mag 1 31.28 8.100 2.810
Drill Collar - Non Mag 1 31.22 8.100 2.810
Crossover 1 2.49 8.000 2.880
Drill Pipe - Heavy Wgt 3 89.75 5.000 3.000
Jars 1 32.86 6.375 2.750
Drill Pipe - Heavy Wgt 23 685.50 5.000 3.000
BITS
BIT/RUN I SIZE I MANUF. I TYPE I SERIAL NO. I JETS OR TFA DEPTH IN DATE IN I-O-D·L-B·G-o-R
11 1 12.250 I HUGHES-CHR I MX-C1 16009334 I 12/16/16/181/ 0.0 10/30/200~ 1-1-WT-A-E-1-EC-TD
BIT OPERATIONS
BIT/RUN WOB I RPM I GPM IPRE$~~~-TP-~RS _ J__24H~[)IS_T ŒHr ROP-rcuM aiRs I ~~M DEPTHTcÜM-R:OP
____'.,------,--_ n --".- OPj:RATIONS S_UMMARY
FROM TO HOURS ¡CODE TROUBLE SUB PHASE DESCRIPTION
....----. 1___. ..---- ---- -- .-. ----- -- -.-....-. ..-. ..
00:00 00:15 0.25 DRILL P CIRC SURFAC Finish circ hole clean - 650 gpm I 2020 psi I 90 rpm
00:15 08:00 7.75 DRILL P TRIP SURFAC Monitor well, static. POOH on trip tank from 3321', worked thru several tight
spots 15-30K, pulled 40 Kover @ 3062'. Backream from 3159' to 1164' wI
600 gpm 180 rpm. POOH on trip tank from 1164' to 168'.
08:00 10:30 2.50 DRILL P PULD SURFAC Stand back 8" flex collars - LD BHA , UBHO. MWD, stab, float sub, motor & bit.
10:30 12:00 1.50 CASE P RURD SURFAC RU to run 9 5/8" casing.
12:00 12:15 0.25 CASE P SFTY SURFAC Prejob safety and opts meeting.
12:15 14:30 2.25 CASE P RUNC SURFAC Run !Hi/a", _. Jo55 Cuing; FS, 2 jts, FC, 2 jts -BakerLoc 1st four jts
Printed: 619/2004 4:25:47 PM
e
e
Page 2 of2
ConocoPhillips Alaska, Inc.
Daily Drilling Report
WELL NAME I JOB NUMBER I EVENT CODE 24 HRS PROG ITMD [TVD DFS I REPT ;0. DATE
CD2-27 ODR 3,321.0 2 375.0 2.34 11/1/2003
OPERATIONS SUMMARY
FROM I TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
12:15 14:30 2.25 CASE P RUNC SURFAC establish circ and check floats. Run casing - washed thru tight spot from 418'
to 420'. Run casing, started taking wt @ 960', pipe stopped @ 975'.
14:30 15:45 1.25 CASE P RUNC SURFAC Washed down from 956' to 1066' Ots 23,24,25) 4 bpm /190 psi.
15:45 17:00 1.25 CASE P RUNC SURFAC Run casing from 1066' to 2323', no problems.
17:00 17:15 0.25 CASE P RUNC SURFAC Wash down 2323' to 2367' (jt # 57) to break gels and lower cuttings load in
annulus.
17:15 18:30 1.25 CASE P RUNC SURFAC Run casing from 2367' to 3271', MU FMC fluted hanger and LJ, land casing
with shoe @ 3311', FC @ 3226'.
18:30 19:00 0.50 CEMENT I PULD SURFAC Lay down fill-up tool, blow down Top Drive - MU cement head.
19:00 20:30 1.50 CEMENT I CIRC SURFAC Circulate and condition mud @ 8 bpm 410 psi.
20:30 22:15 1.75 CEMENT I PUMP SURFAC Pump 40 bbl viscosified water w/ nutplug w/ rig pump. Cementer pumped 5 bbl
water and tested lines to 2500 psi. Dropped bottom plug and pumped 50 bbl
Mudpush spacer @ 10.5 ppg. Mixed and pumped 390 bbl Lead slurry @ 10.7
ppg and 51.6 bbl Tail slurry @ 15.8 ppg.
22:15 23:00 0.75 CEMENT I DISP SURFAC Dropped top plug and ptmp8d 2Ø bb4 water wi cementer and displaced cement
w/229.4 bbl mud w/ rig pump. ___--~...~;04 hrs 11/1/03.
CheoUcl JIi::IId8.OK. CIrculated 240 bbl cement to surface, full returns
thr'" ,^"",d
23:00 00:00 1.00 CASE P DEQT SURFAC Tested casing to 2500 psi for 30 minutes w/ no leakoff. Flushed riser wI
treated water and blew down lines
24 HR SUMMARY: POOH and RIU casing equipment. Run 78jts 9-5/8" 36# J-55 BTC casing. Washed from 418'-420' and 956'-1066'. Land
casing shoe @ 3311'. Circ and condition mud. Cement w/390 bbl Lead/51.6 bbl Tail. CIP @ 23:04 hrs. Test casing to
2500 psi for 30 min.
____~-'h - PERSONNEL DATA --- r-----'--- ,
CØMPANY SERVICE NO. HOURS COMPANY SERVICE I NO. ' HOURS
..,- .....-.-.. .n . .........-------- -.-...--.-- ._n.. ..n___.._ ........-..---..-.... -- -------
ConocoPhillips Company 1 Dowell 2
Fairweather E&P Service 1 Swaco 4
Doyon Drilling Inc 27 Other 3
ACI - Arctic Catering 5 Other 2
M-I Drilling Fluids 3
MATERIALS 1 CONSUMPTION
ITEM I UNITS USAGE ON HAND ITEM UNITS USAGE ØN HAND
Fuel I gals 1,600 -4,362 Water, Potable bbls 110 -300
Water, Drilling I bbls 1,750 -4,740
........,--.... ......-- RESERVOIR AND INTERV~L 'p'AT~__ ____no_..__. .._.____.__ø._
RESERVØIRNAME -icD2~27 ZONE '1- ;~;3.*~~~:.5 11300 COMMENTS
...____u.__. __ _m .._ _ _ ..___. ...._ _ ___.____. . . --.. ,---.-.--.---------.----
CD2-29
Printed: 61912004 4:25:47 PM
.It
--
......
^^^47
-
0
e
e
Casing Detail
7" Intermediate Casing
Well: CD2-27
Date: 11/08/03
ConocoPhillips Alaska
DEPTH
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS
Doyon 19 RKB to LDS 34.75
FMC 11" X 7" emergency slips 34.75
Jts 3 to 294 292 Jts 7" 26# L-80 BTCM Csg 12341.38 34.75
7" Weatherford Float Collar 1.32 12376.13
Jts 1 to 2 2 Jts 7" 26# L-80 BTCM Csg 81.55 12377.45
7" Ray Oil Tools Float Shoe(Silver bullet) 2.05 12459.00
12461.05
7" Shoe @ 12,461.05' MD 7139' TVD
TD of 8-1/2" hole @ 12,659' MD 7160' TVD
Top of Alpine C - 12,530' 7152' TVD
Total Centralizers: 63
Straight blade centralizer one per jt on jts # 1-20
Straight blade centralizer one per jt on jts. # 22.24,26,220,221 ,222
224,226,228,230,232,234,236,238,240,242,244,246 ,248 ,250 ,252
254,256,258,260,262,264,266,268,270,272 ,274,276,278,280,282
284,286,288,290,292,294
308 joints in pipe shed - 294 total jts. to run / last 14 joints stay ou
. Note - Stuck casing @ 12,461.05 - Set Emergency slips
Use Best-o-Life 2000 pipe dope
Drifted to 6.151"
MU Torque 8,000 ftJlb
Remarks: Up Wt = 220K On Wt = 100K Block Wt= 26K
Supervisor: Mickey/Whitlock
e
e
ConocoPhillips Alaska Page 1 of 3
Cementing Report
Legal Well Name: CD2-27 Spud Date: 10/30/2003
Common Well Name: CD2-27 Report #: 2 Report Date: 11/8/2003
Event Name: ROT - DRILLING Start: 10/28/2003 End: 11/18/2003
Cement Job Type: Primary
Primal'V ... ~ ----¡--.. ----.-------.------.---------.---
§g~eze Open Hole", I.. ____n'_~!2:!'I_Ǫ~in.gn'n ....- ._u._" . . .----.P!~g,.. ........ --------.-----_._--
Hole Size: 8.500 (in) Hole Size: Hole Size: Hole Size:
TMD Set: 12,380 (ft) sa TMD: (ft) TMD Set: Top Set: (ft)
Date Set: 11/8/2003 sa Date: Date Set: BTM set: (ft)
Csg Type: Intermediate Casing/U sa Type: Csg Type: Plug Date:
Csg Size: 7.000 (in.) sa TMD: Plug Type:
sa Date: Drilled Out:
Cmtd. Csg: Intermediate Casing/Un Cmtd. Csg: Cmtd. Csg: Cmtd. Csg:
Cement Co: Dowell Schlumberger Cementer: Steve Daughten Pipe Movement: ....r¡¡rjìjlìd
Pipe Movement
Rot Time Start: Time End: RPM: Init Torque: (ft-Ibf) Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf)
Rec Time Start: Time End: SPM: Stroke Length: (ft) Drag Up: (Ibs) Drag Down: (Ibs)
Stage No: 1 of 1
.---. ...-- ...... ----.-------... .. "." n__.n
Type: Cement Casing Start Mix Cmt: 16:52 Disp Avg Rate: 5.00 (bbVmin) Returns:
Volume Excess %: Start Slurry Displ: 16:52 Disp Max Rate: 5.10 (bbl/min) T.__u.t 1Ø..OG (bbl>
Meas. From: Start Displ: 17:02 Bump Plug: Y Cmt Vol to Surf: (bbl)
Time Circ Prior End Pumping: 18:36 Press Prior: 960 (psi)
To Cementing: 4.00 End Pump Date: 11/8/2003 Press Bumped: 1,500 (psi) Ann Flow After: N
Mud Circ Rate: 168 (gpm) Top Plug: Y Press Held: 2 (min) Mixing Method:
Mud Circ Press: 530 (psi) Bottom Plug: Y Float Held: Y Density Meas By:
Mud Data
Type: LSND/Glydrill Density: 9.6 (ppg) Visc: 44 (s/qt) PVIYP: 8 (cp)/19 (lb/100ft2) Gels 10 sec: 8 (lb/10Oft2) Gels 10 min: 11 (lb/10Oft2)
Bottom Hole Circulating Temperature: (OF) Bottom Hole Static Temperature: (OF)
Displacement Fluid Type: Density: (ppg) Volume: (bbl)
Stage No: 1 Slurry No: 1 of 3
...n ...---- ----------- ..-.-- --
Slurry Data
Fluid Type: FLUSH Description: ARCO Wash Class: Purpose: SPACER
Slurry Interval: (ft) To: (ft) Cmt Vol: 20.0 (bbl) Density: 8.40 (ppg) Yield: (ft3/sk) Mix Water: (gal)
Water Source: Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (OF) Compressive Strength 1: (OF) (psi)
Free Water: (%) Temperature: (OF) Compressive Strength 2: (OF) (psi)
Fluid Loss: (cc) Temperature: (OF)
Fluid Loss Pressure: (OF)
Printed: 6/912004 4:27:07 PM
e
Legal Well Name: CD2-27
Common Well Name: CD2-27
Event Name: ROT - DRILLING
e
ConocoPhillips Alaska
Cementing Report
Page 2 of 3
Report #:
Start:
Spud Date: 10/30/2003
2 Report Date: 11/8/2003
10/28/2003 End: 11/18/2003
--------.-......-
Stage No: 1 Slurry No: 2 of 3
-
-.--.-.-.-.----
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft) To: (ft)
Water Source:
Description: MUDPUSH XL
Cmt Vol: (bbl) Density: (ppg)
Slurry Vol: (sk) Water Vol: (bbl)
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Class:
Yield: (ft'/sk)
Other Vol: 0
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
. ..-----.----.--...
Stage No: 1 Slurry No: 3 of 3
--.-------..... -.-.--
Slurry Data
Fluid Type: PRIMARY
Slurry Interval: 11,461.00 (11)0:
Water Source:
....-..
.-- ,------_...
- ...... .. ..___.__ n._.__.u
Description: LOW FLUID LOSS Class: G
12,461.00 (ftJ::mt Vol: 37.3 (bbl) Density: 15.80 (ppg) Yield: 1.16 (ft'/sk)
Slurry Vol:184 (sk) Water Vol: 22.3 (bbl) Other Vol: 0
Purpose: PRIMARY
Mix Water: 5.09 (gal)
Foam Job: N
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Trade Name
Stage No: 1 Slurry No: 3 of 3 - Additives
Liquid Cone.
D-46
D-65
D-167
XE920
Type
DEFOAMER
DISPERSANT
Concentration Units
0.2C %BWOC
0.2E %BWOC
OAC %BWOC
O.O~ %BWOC
Units
Printed: 61912004 4:27:07 PM
e
e
ConocoPhillips Alaska
Cementing Report
Page 3 of 3
Legal Well Name: CD2-27
Common Well Name: CD2-27
Event Name: ROT - DRILLING
Report #:
Start:
Spud Date: 10/30/2003
2 Report Date: 11/8/2003
10/28/2003 End: 11/18/2003
Casing Test
Shoe Test
Liner Top Test
..--
---
. -----------
."__n.__..__._._".__.________
Test Press: 3,500 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: Y
Pressure: 11.00 (ppge)
Tool: N
Open Hole: 218 (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Tool: N
Tool: N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run: N
Bond Quality:
Temp Survey: N
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient: N
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required: N
Number of Remedial Squeezes:
--."'..
.--.-."...
Remarks
----.--------
..-----
.......--..
...----
Cement 7" casing as follows - Pumped 5 bbls CW 100 - test lines to 3500 psi - pump 15 bbls CW100 @ 3.2 BPM @ 425 psi - Mix & pump
50 bbls Mud Push XL @ 12.5 ppg @ 4.7 BPM @ 480 psi
Dropped bottom plug - Mixed & pumped 37 bbls Class G w/.20% 046, .25% 065, .40% 0167, & .02% B155 @ 15.8 ppg - 5.1 BPM @
500 psi Dropped top plug wI 20 bbls water fl Dowell - switch over to rig pumps & displace wI 452 bbls 9.6 ppg LSND mud @ 5 BPM @
260 to 760 psi- slow&d pumps to 2.5BPM & bumped plug wI 1500 psi - CIP @ 1830 hrs.
U.... to tecIþrocate pipe
Lost returns on last 14 bbls of displacement
Printød: 61912004 4:27:07 PM
e
e
Page 1 of 2
ConocoPhillips Alaska, Inc.
Daily Drilling Report /.- - -
WELL NAME I JOB NUMBER I EVE~TDc~DE 124 HRS PROG ~D JTVD IDFS 1 REPT NO. 1 DATE
CD2-27 (12,659.0 7161.0 9.34 10 11/8/2003
SUPERVISOR .1 RIG NAME & NO. I FIELD NAME 10CS NO. / ~o I DAILY TANG I CUM. TANGO
MickevlWhitlocklKuenzler Dovon Drilling In Dovon 19 Alpine 1 , 02.0 0
CURRENT STATUS ACCIDENTS lAST 1RS.? DAILY INT WIO MUD CUM INTANG WI MUD
Cifc 101ollGl'k8tUCk 1" 0 0
24 HR FORECAST DATE OF LAS;t;.~CTY MEETING DAILY TOTAL CUM COST WI MUD
Work casino - Cement & Test BOPE 11l 12003 418,986 2,024,038
UTHOLOGY JAR HRS OF SERVICE I BHA HRS SINCE INSP ItKOFF AFE AUTH.
17.48 10030723
LAST SURVEY: DATE TMD INC AZlM I LAST CASING / NEXT CASING LAST BOP PRES TEST
11/6/2003 12,588.75 85.550 145.650 7.000 (in) @ 12,461.0 (ft) 7.000 (in) @ 12,649.0 (ft) 11/3/2003
Ð'$f./$ITY(PP$) 9.60 [pp [ ECD19.60 [MUD DAtAl DAILY COST ' 0 I CUM COST I 0
FV pVjf'(p I GELS I WUHTHP FCIT.SOL OIUWAT , %Sa!ld/MBT I Ph/pM I Pf/Mf I CI I Ca I H2S I LIME I ES
44 8/19 8/11 4.218.8 11 I OJl/15.0 I 9.01 I 0.10/1 I I 40 I I I
OPERA liONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE· DESCRIPTION.
00:00 00:30 0.50 CASE T DH RUNC INTRMf CQntInueworWng 7" """ 124Ø4' (unable to move pipe)'
00:30 02:00 1.50 CASE T DH RUNC INTR~ ~ Regain circulation - ~.....tJyj «'Þ ~.8 8PM @ 670 psi - condition
mud - 1'10 losses
02:00 04:00 2.00 CASE T DH RUNC INTR 1 Continue working 7" casing wlo pump
04:00 08:30 4.50 CASE T DH RUNC INTR 1 Mix & pump lubrication pill 40 bbls ( Lubetex, Flow lube, nut plug, & glass
beads) Spot 24 bbls outside casing - Continue working pipe - pump 4 bbls pill
every 30 mins
08:30 12:00 3.50 CASE T DH RUNC INTR~1 Circulate & work pipe - mix surface vol to 1 0% lubrication,.'.~ and work
\ pipe - still no pipe movement
/ ~:Jade by Drilling team leader to cement 7" casing in place wi shoe
12,461'
12:00 14:00 2.00 CASE P OTHR INTRM1 RD1::a'Sing slips - cut 7" casing 5' up fJ~tibJe - RD casing elevators - LD
Frank's fill up tool - blow down TO
14:00 15:30 1.50 CASE P OTHR INTRM1 Prep & w.eIQ coupling onto cut off 7" casing stub
15;30 16;30 1.00 CEMENTF CIRC INTRM1 RU cement head & lines - Establish circulation - circulate @ 4 BPM @ 530 psi
- condition mud - PJSM on cement job
16:30 18:30 2.00 CEMENT F PUMP INTRM1 Cement 7" casing as follows - Pumped 5 bbls CW 100 - test lines to 3500 psi -
pump 15 bbls CW100 @ 3.2 BPM @ 425 psi - Mix & pump 50 bbls Mud Push
XL @ 12.5 ppg @ 4.7 BPM @ 480 psi
Dropped bottom plug - Mixed & pumped 37 bbls Class G wi .20% 046, .25%
065, .40% 0167, & .02% B155 @ 15.8 ppg - 5.1 BPM @ 500 psi Dropped top
plug wi 20 bbls water fl Dowell - switch over to rig pumps & displace wi 452
bbls 9.6 ppg LSND mud @ 5 BPM @ 260 to 760 psi - slowed pumps to
2.5BPM & bumped plug wi 1500 psi - CIP @ 1830 hrs.
Lost returns on last 10 bbls of displacement
18:30 19:30 1.00 CEMENT F OTHR INTRM1 Check floats - OK - RD cement lines & head - LD mouse hole
19:30 22:30 3.00 CASE T DH NUND INTRM1 PJSM - RD flow line - hole fill line - NO BOPE fl wellhead - PU BOP - Set
emergency slips on 7" casing wi 200 k tension - rough cut 7" casing & LD cut
off - Make final cut @ 26 3/16" below top of wellhead
22:30 00:00 1.50 CASE T DH NUND INTRM1 NU BOPE
24 HR SUMMARY: Work stuck pipe @ 12,461' - Regain circulation - Circulate & workpipe - Spot Lub-tex/nut plug pill- Work pipe -Increase lub
to 10 % - circulate & work pipe - RU cement head - Circulate - Cement 7" csg - Set emergency slips on 7" casing
Printed: 6/9/2004 4:28:50 PM
e
e
Page 2 of 2
ConocoPhillips Alaska, Inc.
Daily Drilling Report
WELL NAME I JOB NUMBER I EVENT CODE 24 HRS PROG ITMD ITVD DFS T REPT NO. DATE
CD2-27 ODR 12,659.0 7,161.0 9.34 10 11/8/2003
PERSONNEL DATA
COMPANY SERVICE NO. HOURS Ii COMPANY SERVICE NO. HOURS
PRA - Petroleum Resour 2 Dowell 2
Fairweather E&P Service 2 Swaco 4
Doyon Drilling Inc 27 Halliburton - Sperry-Sun - 2
ACI - Arctic Catering 5 Halliburton - Sperry-Sun - 2
M-I Drilling Fluids 3 FMC Corporation Wellhe 1
------ ..- --
-. --.._----......_- .--....-. MATERIALS 1 CONSUMPTION --
ITEM UNITS USAGE "1 ON HAND ITEM UNITS USAGE ON HAND
i _____ _...__ _ ._______m_ .--.... --
Fuel gals 1,670 I -14,931 Water, Potable bbls 120 -1 ,090
Water, Drilling bbls 200 I -11,020
RESERVOIR AND INTERVAL DATA
RESERVOIR NAME I ZONE I TOP I BASE I COMMENTS
CD2-29 I CD2-27 I 2791 3.5 11490
Printed: 61912004 4:28:50 PM
PRESSURE INTEGRITY TEST
CONOCOPHILUPS Alaska, Inc.
Well Name:
...
- Leak..off Pressure'" Mud Weight :::: 670... 9 6
0.052 x TVD 0.052 x 2371 .
EMWat 3311 Ft~MD (2371 Ft~TVD)::: 15.0
PIT 15 Second
Shut-in Pressure, psi
419
1000
w
a::
::::I
w 500
tIJ
W
a::
!.'.I.
2 4
6
Barrels
6
10
12
14 0
5 10 15 20 25
Shut-In time, Minutes
o PIT Point
"""'IIII-CASING TEST
_LEAK-OFF TEST
e
e
SURFACE CASING SHOE SEPARATION FROM CD2-27
CD2-27 x y
Surface Casing Shoe ASP 4 Coordinates: 373046.07 5973071.83
uu.umce
Details from Surface csg. Surface csg.
@ Ann. Object Shoe X Shoe Y
Wells AOGCC Permit # Permit Date Source well Vol. -* Start Date End Date well* Coord. Coord.
CD2-35** --- ---- -- -- ---- 1197: 372312.31 5974017.68
CD2-24, CD2-33, CD2-33A,
CD2-42 y 301-140 6/1/2001 CD2-15 33992 6/1/2001 10/10/2001 2154 371098.46 5973992.48
CD2-33 (+A&B), CD2-39,
CD2-24 y 301-186 7/13/2001 CD2-14, CD2-15 33999 7/16/2001 10/9/2001 2926 370630.11 5974721.81
CD2-33 B*** --- -- -- --- --- 3003 370155.64 5973886.23
CD2-3i .. y 00.....1 10/9/2001 CD2-15, CD2-47, CD2-44 29945 10/10/2001 9/16/2002 ., ,- 372350.61 5973633.17
CD2-14 y 301-288 10/9/2001 CD2-45, CD2-47, CD2-32 31073 11/13/2001 3/512002 2069 372202.47 5974960.87
CD2-15 y 301-308 11/6/2001 CD2-50, CD2-25, CD2-44 31652 3/6/2002 9/21/2002 2926 370832.00 5974984.02
CD2-47 v 301-322 12/3/2001 CD2-34, CD2-26 27349 12/17/2001 1/20/2002 1828 371231.72 5973294.19
CD2-45 y 301-345 12/13/2001 CD2-49, CD2-17 22991 1/20/2002 2/1912002 831 i 372765.13 5973853.74
CD2-34 y 302-069 3/4/2002 CD2-13, CD2-37 22842 10/17/2002 11/28/2002 1848 371803.06 5974439.79
CD2-26 y 302-068 3/4/2002 CD2-44, CD2-29, CD2-13 29626 9m2002 10117/2002 1938 371798.52 5974554.55
CD2-49 y 302-070 3/4/2002 CD2-50, CD2-46, CD2-22 27960 4/22/2002 5/28/2002 2051 371252.38 5974065.93
CD2-17 y 302-122 4/10/2002 CD-48, CD2-08 18181 5/29/2002 2/7/2003 2023 371774.00 5974645.00
CD2-32 y 302-119 4/30/2002 CD2-19, CD2-41, CD2-23 31113 6/14/2002 7/2312002 2140 371295.61 5974302.38
CD2-41, CD2-19, CD2-16,
CD2-50 y 302-121 4/30/2002 CD2-38 32000 7/24/2002 9/7/2002 1801 371665.21 5974227.65
CD2-25 y NA 2022 371594.00 5974479.00
CD2-46 y 302-273 9/20/2002 CD2-51, CD2-12 31864 4/15/2003 5/19/2003 1833 371694.80 5974310.85
CD2-22 y 302-274 9/20/2002 CD2-08, CD2-36, CD2-51 31253 217/2003 3/16/2003 2023 371678.61 5974562.30
CD2-28, CD2-35a, CD2
CD2-48 y 302-275 9/20/2002 45, CD2-08 32000 12/10/2002 2/4/2003 1563 371631.74 5973736.14
CD2-19 y 303-083 4/28/2003 CD2-58, CD2-52 31337 5/19/2003 6/27/2003 1780 372284.88 5974681.33
CD2-41 y 303-081 4/28/2003 CD2-20, CD2-55,CD2-43 32000 6/27/2003 7/28/2003 1284 371990.58 5973802.52
CD2-23 y 303-080 4/28/2003 CD2-18, CD2-55, CD2-06 32000 9/4/2003 1/1/2004 2851 371013.17 5975070.46
CD2-16 y --- -- -- --- --- 1815 372460.34 5974790.01
CD2-38 y 303-082 4/28/2003 CD2-40, CD2-30 30011 7/28/2003 9/4/2003 n10 372033.86 5973527.13
CD2-44 y -- --- -- -- -- 1613 372034.57 5974328.53
CD2-29 y 303-249 8/25/2003 CD2-06, CD2-30, CD2-27 27144 10/8/2003 11/18/2003 1866 372652.44 5974896.02
CD2-13 y -- -- -- -- --- 2741 372658.78 5975785.31
CD2-37 y -- --- -- -- ---- 1489 371569.79 5972874.47
CD2-28 y --- -- -- -- -- 1889 372139.80 5974728.95
CD2-08 y --- -- -- -- --- 2562 372655.88 5975603.76
CD2-36 y 303-365 12/12/2003 CD2-43 14131 12/31/2003 1/20/2004 12114 371848.22 5973535.38
CO2'" y .....,2 10/28/2003 CD2-07, CD2-10 31769 11/19/2003 12/24/2003 347 373114.02 5973411.81
CD2-12 y 303-365 12/12/2003 NA 379 5/15/2004 6/9/2004 3088 371071.29 5975445.60
CD2-58 y NA 0 1031 372102.03 5972657.80
CD2-52 y NA 0 117 372637.61 5973661.63
CD2-20 NA 0 2959 371366.14 5975507.11
CD2-55 y --- -- -- -- -- 1932 371118.23 5973194.84
CD2-40 y NA 0 2465 370691.67 5973801.44
CD2-30 NA 0 2628 370473.52 5973610.96
CD2-18 -- -- -- -- -- 3616 369825.76 5974716.05
CD2-06 y NA 0 3278 371610.81 5976018.45
CD2-27 y NA 0 0 373046.07 5973071.83
CD2-10 NA 0 3188 371800.58 5976006.36
CD2-07 y NA 0 3321 372218.06 5976287.95
CD2-43 -- -- -- -- --- 2739 370344.04 5973520.68
CD2-57 904 372537.05 5972324.37
CD2-31 3505 369824.37 5974451.30
* Lateral distance in feet, between surface casing shoes, in the X- Y plane
.. CD2-35 was drilled from an ice pad in early 1998. The 9-5/8" x 7" annulus has not been permitted for annular disposal.
***CD2-33 B was a delineation well with a window milled out of 9-5/8" casing at 3840' MD (3062' TVD), shoe depth shown indicates window depth. It has
not been permitted for annular disposal.
*..* As of 10/27/03
Note that this sheet is not the definitive record
1320
-1240
1033
-827
20
413
~07
o
207
-413
-620
27
1033
1240
1320
+EI~W NoItJ¡j,ng
14.90 $974522310
ANTI-COLLlSJON SETTINGS
&'""
371709.100
Latitudt: ~ Sþt
7W20'19JJ53N 15t"Ø2';?7.648W NJA
C<}tlQÇOP~A!w';bInt;_
""='"
Caku}¡¡OOltMí:;lbod: MmnumC~
=~~ ~~Phne
W=:= ~~Ca$ing
CD2-27
501032047100
!uterv1ll, 1.00
236WQ To: 2381,00
1900.00 Reference: Definitive Survey
52.77ft
Rîg;
Ref.Dattum:
V.sec60n
""'"
!).1.
CD2-27;
=~
s_
From TVD
0.00
'6.87
From Colour ToMD
37 300
300 400
400 500
500 75{j
750 1000
1000 1250
1250 1500
1500 1750
1750 2000
2000 2500
2500 3000
3000 3500
3500 4000
4000 4500
4500 5000
5000 5500
5500 6500
6500 7500
7500 8500
8500 9500
9500 1??oo
1??oo 10500
10500 11000
11000 12000
12000 13000
13000 14000
14000 15000
15000
16000
17000
18000 19000
19000 2??oo
27
180
Reference Azimuth Angle [degJ vs Centre to Centre Separation [ftJ
MEMORANDIn
State ofltlaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg ?r-'þf. )(~JC4
P.I. Supervisor'~~-rl
DATE: January 25,2004
SUBJECT: Mechanical Integrity Test
Conoco Phillips
CD2
CRU
FROM: Chuck Scheve
Petroleum Inspector
NON- CONFIDENTIAL
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G = GAS INJ.
S = SALTWATER INJ.
N = NOT INJECTING
I
P
I
P
I
P
I
P
I
P
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Interval
1= Initial Test
4= Four Year Cycle
V= Required by Variance
W= Test during Workover
0= Other (describe in notes)
Test's Details
I traveled to Conoco Phillips CD2 Pad in the Alpine field and witnessed the initial MIT's on the above listed 5 wells.
The pretest pressures were observed and found to be stable. The standard annulus pressure tests were then performed
with all wells demonstrating good mechanical integrity.
M.I.T.'s performed: ~
Attachments:
Number of Failures: Q
Total Time during tests: 6 hours
cc:
MIT report form
5/12/00 L.G.
MIT CRU CD2 1-25-04 CS-1.xls
1/30/2004
.
.
02 03 -- \ ft
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard OkIand
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501-3539
January 27, 2004
RE: MWD Formation Evaluation Logs: CD2-27,
AK-MW-2722885
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of:
Rob Kalish, Speny-Sun Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
"~ð\~:~ N'~'S~ ~r-/Y'_
1 LDWG formatted Disc with verification listing.
API#: 50-103-20471-00. ..;#)d J...f ClJ
RECEIVED
F·¡-T~ 1 ~. ~nO'4
'->.- ,~.J ..... '-¥ I.i .
NaskaOí! & Gas Cons. Commision
!\..,!"h~
!"';1 1'<11 """iIO/:t'"
~~~N\~
.
Conoc~hillips
.
G. C. Alvord
Alpine Drilling Team Leader
Drilling & Wells
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6120
February 6, 2004
RECE.\\/~
4\ I! ?nn/\
rEB \J U
~\8S\t.a m\ &. Gas C!., >,
Mchm i.lü'"'
'f~i
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West ¡th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Well Completion Report for CD2-27 (APD 203;,177)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the
recent drilling operations on the Alpine well CD2-27.
If you have any questions regarding this matter, please contact me at 265-6120.
Sincerely,
,4~'-Í- ~
G. C. Alvord
Alpine Drilling Team Leader
CPAI Drilling and Wells
GCAlskad
ORIGINAL
1a. Well Status: Oil D Gas U Plugged D Abandoned D Suspended D WAG 0 1b. Well Class:
20AAC 25.105 20AAC 25.110 Development D Exploratory D
GINJ D WINJ D WDSPL D No. of Completions _ Other - Service 0 Stratigraphic Test D
2. Operator Name: 5. Date Comp., Susp., 12. Permit to Drill Number:
ConocoPhillips Alaska, Inc. ~ 203-1771
or Aband.: November 18, 2003
3. Address: 6. Date Spudded: 13. API Number:
P. O. Box 100360, Anchorage, AK 99510-0360 October 30, 2003 .- 50-103-20471-00
4a. Location of Well (Govemmental Section): 7. Date TD Reached: 14. Well Name and Number:
Surface: 1835' FNL, 1531' FEL, Sec. 2, T11 N, R4E, UM November 14, 2003 , CD2-27
At Top Productive 8. KB Elevation (It): 15. Reld/Pool(s):
Horizon: 1303' FSL, 417' FEL, Sec. 12, T11N, R4E, UM 36.9' RKB 1 52.8' AMSL Colville River Field
Total Depth: 9. Plug Back Depth (MD + TVD): Alpine Oil Pool
3700' FNL, 2609' FEL, Sec. 18, T11 N, R5E, UM ' 18250' MD 17205' TVD .
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD + TVD): 16. Property Designation:
Surface: x- 371709/ y- 5974522./ Zone- 4 - 18250' MD 17205' TVD - ADL N/A
TPI: x- 377981 y- 5966995 Zone-4 11. Depth where SSSV set: 17. Land Use Permit:
x- 380651" V- ./ ¡J-Þ¡'" ~80075, 372097, 25559 Þ
Total Depth: 5961949 Zone-4 Landing Nipple @ 2643'
18. Directional Survey: Yes 0 NoD 19. Water Depth, if Offshore: 20. Thickness of
N/A feet MSL Permafrost: 1602' MD
21. Logs Run:
GR/Res
22. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
16" 62.5# H-40 Surface 114" 42" Pre-installed
9.625" 36# J-55 Surface 3311' 12.25" 512 sx AS III Lite, 250 sx Class G
7" 26# L-80 Surface 12461' 8.5" 184 sx Class G
23. Perforations open to Production (MD + TVD of Top and Bottom 24. TUBING RECORD
Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
4.5" 12672' 11904'
I
open hole completion from 12672' to 18250' MD 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
N/A ¡,.,.. i\c j ~ . r"'~
Q\-l ,,1:.\ V I~
. .. " hnJl
\=£B \J U l.-
26. PRODUCTION TEST
Date First Injection Method of Operation (Flowing, gas lilt, etc.) \t Œ\ &. Ü~S \.J\lH'· ..,.
January 8, 2004 Sea Water Injecto~\as a Anl'nQt8\!6
Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-SriL CHOKE SIZE GAS-OIL RATIO
Test Period -->
Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - API (corr)
press. psi 24-Hour Rate -> not available
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". CDrk'tt ¡ ¡UN
JL2ltB
NONE \¡~O
. STATE OF ALASKA ...
ALA OIL AND GAS CONSERVATION COM"ION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Form 10-407 Revised 2/2003
CONTINUED ON REVERSE SIDE
(pf/
Submit in duplicate
nR'G\~,'AI dI;M~
28.
29.
.
FORMATION TESTS
GEOLOGIC MARKER:;..~ ~.
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested, and
attach detailed supporting data as necessary. If no tests were
conducted, state 'None".
CD2-27
Seabee Form.
Nanushak
Gamma Ray Shale
Kalubik
Kuparuk Formation
Miluveach
Top Alpine D
Top Alpine C
TD
3371'
6071'
11394'
11819'
11895'
11990'
12397'
12529'
18250'
2402'
3833'
6673'
6904'
6942'
6987'
7126'
7150'
7206'
N/A
30. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact:
Zane Kuenzler @ 265-1308
Printed Nam~ C. Alvord
Signature _L. l1a
.' '-
Title:
Phone
Alcine Drillina Team Leader
2-~'Ç-~, L~
Date
2- ( oS I ¡) "t--
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water
supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item
23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to
be separately produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other (explain).
Item 27: If no cores taken, indicate 'none'.
Item 29: List all test information. If none, state 'None".
Form 10-407 Revised 2/2003
nQ\h\"\~J"
Page 1 of 8
ConocoPhillips Alaska
Operations Summary Report
Move ball mill and pitslmotor complex. Move sub base from CD2-30 to
CD2-27. Move well guard. Spot sub base, pitslmotor complex, ball mill
and pipeshed.
Make interconnects between complexes, Hookup hi-line power and
prepare pits to take on mud, water and fuel
Rig on highline and start taking on mud. Accept rig @ 10:00 hours
10/30/200. N/U surface riser and install mousehole
Bring BHA to rig floor and pickup one additional stand of 5" d.p.
M/U 1 stand 8' flex collars and rack in derrick. CIO jars and P/U motor
and M/U bit. M/U MWD
Orient motor and upload MWD
Held prespud meeting. Fill hole and check for leaks. Test mud lines to
3500 psi. Tag ice plug @ 77' and clean out.
Drill from 114' to 730' utilizing gyro surveys. ART=.3, AST=2.7,
ADT =3.0 TVD=723'. PU=110k, SO=105k. WOB=10-30, Pump =1060
psi @ 140 spm (500 gpm)
Drill from 730' to 2320'. TVD=1833', ART=3.61, AST=3.61, ADT=7.22,
PU=127k, SO=118k, Rot=125k, Torque= 8000 onl 6000 off.
Rotary=70-80, WOB= 5/25, PUmp=1460 psi @ 170 spm (600 gpm)
Drill from 2320' to 3321'. TVD=2375', ART =5.54, AST =1.45, ADT =6.9,
PU=140k, SO=120k, Rot=130k, Torque=8000 onl 7000 off.
Rotary=70-80, WOB=5-40k, Pump=2280 psi @ 183 spm (650 gpm)
Rotate and reciprocate pipe while cbu 2x @ 650 gpm 80 rpm
Finish circ hole clean - 650 gpm I 2020 psi I 90 rpm
Monitor well, static. POOH on trip tank from 3321', worked thru several
tight spots 15-30K, pulled 40 Kover @ 3062'. Backream from 3159' to
1164' wi 600 gpm I 80 rpm. POOH on trip tank from 1164' to 168'.
Stand back 8" flex collars - LD BHA , UBHO, MWD, stab, float sub,
motor & bit.
RU to run 9 5/8' casing.
Prejob safety and opts meeting.
Run 9 5/8',36#, J-55 Casing: FS, 2 jts, FC, 2 jts -BakerLoc 1st four jts
establish circ and check floats. Run casing - washed thru tight spot
from 418' to 420'. Run casing, started taking wt @ 960', pipe stopped @
975'.
Washed down from 956' to 1066' Ots 23, 24, 25) 4 bpm 1190 psi.
Run casing from 1066' to 2323', no problems.
Wash down 2323' to 2367' ( jt # 57) to break gels and lower cuttings
load in annulus.
Run casing from 2367' to 3271', MU FMC fluted hanger and LJ, land
casing with shoe @ 3311', FC @ 3226'.
Laydown fill-up tool, blow down Top Drive - MU cement head.
Circulate and condition mud @ 8 bpm 410 psi.
Pump 40 bbl viscosified water wi nutplug wi rig pump. Cementer
pumped 5 bbl water and tested lines to 2500 psi. Dropped bottom plug
and pumped 50 bbl Mudpush spacer @ 10.5 ppg. Mixed and pumped
390 bbl Lead slurry @ 10.7 ppg and 51.6 bbl Tail slurry @ 15.8 ppg.
0.75 CEMEN DISP SURFAC Dropped top plug and pumped 20 bbl water wi cementer and displaced
cement wi 229.4 bbl mud wi rig pump. Bumped plug wi 1200 psi @
23:04 hrs 11/1/03. Checked floats-OK. Circulated 240 bbl cement to
surface, full returns throughout.
1.00 CASE MIT SURFAC Tested casing to 2500 psi for 30 minutes wi no leakoff. Flushed riser
wi treated water and blew down lines
Legal Well Name: CD2-27
Common Well Name: CD2-27
Event Name: ROT - DRILLING
Contractor Name: doyon1 @ppco.com
Rig Name: Doyon 19
··?,;Date From - To 'lfuIours,Code Sub Phase
. ..,.. Code
10/30/2003 04:00 - 09:00 5.00 MOVE MOVE MOVE
09:00 - 10:00 1.00 MOVE RURD MOVE
10:00 - 11 :30 1.50 MOVE RURD MOVE
11 :30 - 12:30 1.00 DRILL PULD SURFAC
12:30 - 13:30 1.00 DRILL PULD SURFAC
13:30 - 15:00 1.50 DRILL PULD SURFAC
15:00 - 15:45 0.75 DRILL SFTY SURFAC
15:45 - 00:00 8.25 DRILL DRLG SURFAC
10/31/2003 00:00 - 12:00 12.00 DRILL DRLG SURFAC
12:00 - 23:00 11.00 DRILL DRLG SURFAC
23:00 - 00:00 1.00 DRILL CIRC SURFAC
11/1/2003 00:00 - 00:15 0.25 DRILL CIRC SURFAC
00:15 - 08:00 7.75 DRILL TRIP SURFAC
08:00 - 10:30 2.50 DRILL PULD SURFAC
10:30 - 12:00 1.50 CASE RURD SURFAC
12:00 - 12:15 0.25 CASE SFTY SURFAC
12:15 - 14:30 2.25 CASE RUNC SURFAC
14:30 - 15:45 1.25 CASE RUNC SURFAC
15:45 - 17:00 1.25 CASE RUNC SURFAC
17:00 - 17:15 0.25 CASE RUNC SURFAC
17:15 - 18:30 1.25 CASE RUNC SURFAC
18:30 - 19:00 0.50 CEMEN PULD SURFAC
19:00 - 20:30 1.50 CEMEN CIRC SURFAC
20:30 - 22:15 1.75 CEMEN PUMP SURFAC
22:15 - 23:00
23:00 - 00:00
Start:
Rig Release:
Rig Number:
10/28/2003
11/18/2003
Spud Date: 10/30/2003
End: 11/18/2003
Group:
. .
Description of Operations
Printed: 12/912003 3:09:20 PM
Page 2 of 8
ConocoPhillips Alaska
Operations Summary Report
SURFAC RID cement head and UD landing jt. Remove casing equipment from
floor
SURFAC RID surface riser and flowline. Disconnect turnbuckles and service
lines. Pull mousehole
SURFAC N/U unihead and test metal to metal seal to 1000 psi for 10 min.
SURFAC Install BOPE. Hookup flowline, turnbuckles and service lines. Install
mousehole
SURFAC Set lower test plug and test BOPE. Test annular 250/3500 psi. Test
PR's, BR's, manifold valves, manual and HCR kill/choke valves, manual
and auto IBOP's, and DarVTlW valves to 250/5000 psi. Perform
accumulator test and install wear ring.
P/U short bails and elevators. RlU Geospan unit on rig floor
M/U BHA #2: Bit, geopilot, MWD, DM and TM. Install Pulser, float and
load mwd.
Surface test MWD @ 500 gpm and 910 psi-OK
RIH w/ flex collars and P/U 42 jts 4" d.p. POOH and rack back d.p.
M/U rest of BHA and RIH to 270' Change out jars and RIH w/ BHA to
632'
RIH and P/U 4" d.p. and ghost reamers to 3131'
Cut and slip 60' of drilling line
Wash and ream from 3131' to 3225'-no cement.
Drill top and bottom plugs @ 3225'. Drill float collar @ 3227'. Drill
cement from 3227' to shoe @ 3311'. Drill shoe @ 3311' and cement to
3321'
Drill 20' of new hole from 3321' to 3341'
Pump 40 bbl viscous pill and displace hole to 9.6 ppg LSND mud
Perform FIT to 970 psi w/ 9.6 ppg mud in hole @ 2371' TVD shoe
depth. FIT =17.46 ppg EMW. RID test equipment and blow down kill
line
Drill from 3341' to 4908'. ART =6.35.
Hole packed off @ 4908'. Work pipe and regain circulation. Pump 40
bbl hi-vis sweep and circulate hole clean @ 650 gpm @ 2650 psi.
Drill from 4908' to 5895'. TVD=3755'. ART =6.89. P/U = 170k,
S/0=115k, Rot=135k. Torque=10500 on/9500 off. Rotary=75-160.
WOB=10-20. Pump=3460 @ 183 spm 650 gpm
Drill 8 1/2" hole w/ Geopilot f/ 5896' to 6946'
. see below for parameters
Circulate while changing out swab on #1 mud pump
Drill 8 1/2" hole f/6946' to 7184' MD 4332' TVD - ADT 7.68 hrs
RPM - 150/170 WOB - 10/15 k GPM 577 @ 2800 psi
String wt. PU 210 So 120 Rot 145
Torque on/ off btm - 13,500/12,500 ft.#
Drill 8 1/2" hole w/ Geopilot f/7184' to 8855'. ADT=6.64, TVD=5316'.
PU=240k, SO=120k, Rot=160k, Torque=14000 on/13000 off" rotary=
150-170, WOB=10-18, Pump =184 spm @ 3610 psi (650 gpm)
Drill 8 1/2" hole w/ Geopilot f/ 8855' to 10,242'
Circuate w/ pump #2 while working on pump #1 - changed 2 seats & 2
valves
Drill 8 1/2" hole f/10,242' to 10,516' MD 6209' TVD
RPM -170 WOB - 15/25 k GPM 650/580 @ 3640/2960 psi
String wt. - PU 270 SO 125 Rot 170
Torque on/off btm. - 16,500/15,500 ft. #
ADT past 12 hrs. - 6.61 hrs.
Legal Well Name: CD2-27
Common Well Name: CD2-27
Event Name: ROT - DRILLING
Contractor Name: doyon1 @ppco.com
Rig Name: Doyon 19
i : Sub
Date From - To ; Hours Code: Code Phase
.._n___._ _______ .. ......... . _ _... . _____.________
11/212003
00:00 - 01 :15 1.25 CEMEN RURD
01:15 - 02:15 1.00 WELCT
02:15 - 03:15 1.00 WELCT
03:15 - 04:30 1.25 WELCT
04:30 - 09:30 5.00 WELCT
09:30 - 10:00 0.50 DRILL OTHR SURFAC
10:00 - 12:00 2.00 DRILL PULD SURFAC
12:00 - 12:30 0.50 DRILL OTHR SURFAC
12:30 - 14:30 2.00 DRILL TRIP SURFAC
14:30 - 15:45 1.25 DRILL TRIP SURFAC
15:45 - 18:30 2.75 DRILL TRIP SURFAC
18:30 - 19:30 1.00 RIGMNT RSRV SURFAC
19:30 - 20:00 0.50 CEMEN COUT SURFAC
20:00 - 23:30 3.50 CEMEN DSHO SURFAC
23:30 - 23:45 0.25 DRILL DRLG SURFAC
23:45 - 00:00 0.25 DRILL CIRC SURFAC
11/3/2003 00:00 - 01 :00 1.00 CEMEN FIT SURFAC
01 :00 - 12:15 11.25 DRILL DRLG INTRM1
12:15 - 13:00 0.75 DRILL CIRC INTRM1
13:00 - 00:00 11.00 DRILL DRLG INTRM1
11/4/2003 00:00 - 08:45 8.75 DRILL DRLG INTRM1
08:45 - 09:30 0.75 RIGMNT RGRP INTRM1
09:30 - 12:00 2.50 DRILL DRLG INTRM1
12:00 - 00:00 12.00 DRILL DRLG INTRM1
11/5/2003 00:00 - 08:30 8.50 DRILL DRLG INTRM1
08:30 - 09:45 1.25 RIGMNT RGRP INTRM1
09:45 - 12:00 2.25 DRILL DRLG INTRM1
Start:
Rig Release:
Rig Number:
10/28/2003
11/18/2003
Spud Date: 10/30/2003
End: 11/18/2003
Group:
Description of Operations
----.-.---- ..
. ----.-- .
Printed: 12/9/2003 3:09:20 PM
~
.,.,
ConocoPhillips Alaska Page 3 of 8
Operations Summary Report
Legal Well Name: CD2-27
Common Well Name: CD2·27 Spud Date: 10/30/2003
Event Name: ROT - DRILLING Start: 10/28/2003 End: 11/18/2003
Contractor Name: doyon1@ppco.com Rig Release: 11/18/2003 Group:
Rig Name: Doyon 19 Rig Number:
Date from - To Hours Code Sub Phase J;;¡ ,Description of Operation~, ..,
Code
11/512003 09:45 - 12:00 2.25 DRILL DRLG INTRM1
12:00 - 00:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole wI Geopilot f/10, 516' to 11970'. TVD=6979'
PU=275k, SO=130k, Rot=180k Torque=16500 on/15500 off.
Rotary=170, WOB=10/25, Pump =2850 psi @ 175 spm, (550 gpm)
. Note - Began adding Glydril to mud system @ 10,800' in preparation
to drill HRZ
11/6/2003 00:00 - 03:15 3.25 DRILL DRLG INTRM1 Drll 8 1/2" hole wI Geopilot f/11.970' to 12,293' MD
7100' TVD - ADT - 2.85 hrs.
RPM 150 WOB 10/25 k GPM 550 @ 2800 psi
03:15 - 05:15 2.00 DRILL CIRC INTRM1 Circ 2X btms. up & std back 1 std. every 30 mins. to 11,911'
130 RPM 550 GPM @ 2770 psi
05:15 - 05:45 0.50 DRILL TRIP INTRM1 Observe well (static) - RIH to 12,198' (change swab in #1 MP
05:45 - 06:00 0.25 DRILL REAM INTRM1 Break circ - wash & ream f/12,198' to 12,293'
06:00 -10:15 4.25 DRILL DRLG INTRM1 Drill 8 1/2" hole wI Goepilot f/12,293' to 12,659' MD
7159' TVD ADT - 2.93 hrs.
RPM 150 WOB 10/25 k GPM 550 @ 2870 psi
String wt. PU 260 SO 135 Rot. 185
Torque on/off btm - 17,000/16,000 ft. #
. Note Top Alpine C -7152' TVD 12,545' MD
10:15 -10:30 0.25 DRILL CIRC INTRM1 Spot 40 bbls G-seal pill @ 20 #/bbl.
10:30 - 12:30 2.00 DRILL TRIP INTRM1 Observe well (static - POOH wI pump f/12,659' to 11338' - 550 GPM wI
no rotation
12:30 - 14:30 2.00 DRILL CIRC INTRM1 Pump sweep & circulate hole clean 2X btms up. Rack back 2 stands
while circulating. Monitor well.
14:30 - 15:30 1.00 DRILL TRIP INTRM1 POOH on trip tank from 11148' to 9209'. Work through tite spots. RIH
to 11148'.
15:30 - 17:30 2.00 DRILL TRIP INTRM1 POOH from 11148' to 9209'. Flow check and pump slug and blow
down top drive.
17:30 - 21 :00 3.50 DRILL TRIP INTRM1 POOH from 9209' to 632'
21 :00 - 22:00 1.00 DRILL TRIP INTRM1 POOH wI BHA to 83' and flush MWD and Geo-pilot wI water.
22:00 - 22:45 0.75 DRILL PULD INTRM1 Download MWD
22:45 - 00:00 1.25 DRILL PULD INTRM1 UD MWD tools and Break bit. UD Geopilot and flush Geo-Span. Blow
down and rig down Geo-span
11/7/2003 00:00 - 00: 15 0.25 DRILL OTHR INTRM1 Clear floor of BHA tools - LD Geo Pilot skid unit
00:15 - 02:15 2.00 WELCTL EQRP INTRM1 Pull wear bushing & install test plug - PJSM - change top pipe rams to
7" & test to 5000 psi - Pull test plug 7 install thin wall wear bushing
02:15 - 03:30 1.25 CASE OTHR INTRM1 RU to run 7" casing - PJSM
03:30 - 07:00 3.50 CASE RUNC INTRM1 Ran 7" 26# L80 BTCM casing as follows: FS (Ray Oil tools Sliver bullet)
2 jts. - FC - 2 jts. ( Baker Loc first 4 connections - fill pipe & check
floats) -
75 jts.(79 jts. total) to 3310' (repair hydralic hose on tongs)
07:00 - 07:30 0.50 CASE CIRC INTRM1 Circulate casing volume - 5 BPM @ 330 psi - PU wt. 135 SO wt. 115
07:30 - 10:30 3.00 CASE RUNC INTRM1 Continue running 7" casing f/3310' to 7173' (170 jts. total)
10:30 - 11 :30 1.00 CASE CIRC INTRM1 Circulate & condition mud @ 4.5 BPM @ 450 psi - PU wt. 225 SO wt.
130
11 :30 - 14:30 3.00 CASE RUNC INTRM1 Continue running 7" casing fl 7173' to 11,211' (265 jts. total)
14:30 - 16:00 1.50 CASE CIRC INTRM1 Cicculate & condition mud - 5 BPM @ 600 psi - PU wt. 350 SO wt. 140
16:00 - 18:30 2.50 CASE RUNC INTRM1 Continue running 7" casing f/11 ,211' to 12,444' (294jts. total) worked
pipe through tight spots f/12,274' to 12,444'
18:30 - 00:00 5.50 CASE RUNC INTRM1 Wash & work 7" casing f/12,444' to 12,464' -lost returns @ 12,460' -
Printed: 12/9/2003 3:09:20 PM
, -
~
ConocoPhillips Alaska Page 4 of 8
Operations Summary Report
Legal Well Name: CD2-27
Common Well Name: CD2-27 Spud Date: 10/30/2003
Event Name: ROT - DRILLING Start: 10/28/2003 End: 11/18/2003
Contractor Name: doyon1 @ppco.com Rig Release: 11/18/2003 Group:
Rig Name: Doyon 19 Rig Number:
Date ¡From - To Hours I Code ¡ Sub Phase Description of Operations
: --..---.... 1 . Code - --.. , , .. - .---..---.--...--,--.- -. . .. . -- ---.-.. -- -
11/7/2003 18:30 - 00:00 5.50 CASE RUNC INTRM1 run pump to keep pipe full - work pipe
11/8/2003 00:00 - 00:30 0.50 CASE RUNC INTRM1 Continue working 7" casing @ 12464' (unable to move pipe)'
00:30 - 02:00 1.50 CASE RUNC INTRM1 Regain circulation - Circulate bottoms up @ 3.8 BPM @ 670 psi -
condition mud - no losses
02:00 - 04:00 2.00 CASE RUNC INTRM1 Continue working 7" casing wlo pump
04:00 - 08:30 4.50 CASE RUNC INTRM1 Mix & pump lubrication pill 40 bbls ( Lubetex, Flow lube, nut plug, &
glass beads) Spot 24 bbls outside casing - Continue working pipe-
pump 4 bbls pill every 30 mins
08:30 - 12:00 3.50 CASE RUNC INTRM1 Circulate & work pipe - mix surface vol to 10% lubrication - circulate and
work pipe - still no pipe movement
. Decision made by Drilling team leader to cement 7" casing in place wi
shoe @ 12,461'
12:00 - 14:00 2.00 CASE OTHR INTRM1 RD casing slips - cut 7' casing 5' up fl rotary table - RD casing
elevators - LD Frank's fill up tool - blow down TD
14:00 - 15:30 1.50 CASE OTHR INTRM1 Prep & weld coupling onto cut off 7' casing stub
15:30 - 16:30 1.00 CEMEN CIRC INTRM1 RU cement head & lines - Establish circulation - circulate @ 4 BPM @
530 psi - condition mud - PJSM on cement job
16:30 - 18:30 2.00 CEMEN PUMP INTRM1 Cement 7" casing as follows - Pumped 5 bbls CW 100 - test lines to
3500 psi - pump 15 bbls CW100 @ 3.2 BPM @ 425 psi - Mix & pump
50 bbls Mud Push XL @ 12.5 ppg @ 4.7 BPM @ 480 psi
Dropped bottom plug - Mixed & pumped 37 bbls Class G wi .20% D46,
.25% D65, .40% D167, & .02% B155 @ 15.8 ppg - 5.1 BPM @ 500 psi
Dropped top plug wi 20 bbls water fl Dowell - switch over to rig pumps
& displace wi 452 bbls 9.6 ppg LSND mud @ 5 BPM @ 260 to 760 psi -
slowed pumps to 2.5BPM & bumped plug wi 1500 psi - CIP @ 1830
hrs.
Lost returns on last 10 bbls of displacement
18:30 - 19:30 1.00 CEMEN OTHR INTRM1 Check floats - OK - RD cement lines & head - LD mouse hole
19:30 - 22:30 3.00 CASE NUND INTRM1 PJSM - RD flow line - hole fill line - ND BOPE fl wellhead - PU BOP -
Set emergency slips on 7" casing wi 200 k tension - rough cut 7" casing
& LD cut off - Make final cut @ 26 3/16" below top of wellhead
22:30 - 00:00 1.50 CASE NUND INTRM1 NU BOPE
11/9/2003 00:00 - 00:45 0.75 DRILL OTHR INTRM1 Install 7" X11' pack-off & test to 4300 psi for 10 mins.
00:45 - 01 :45 1.00 WELCTL EQRP INTRM1 PJSM - Change top pipe rams fl 7' to 3 1/2' x6" VBR
01:45 - 06:15 4.50 WELCTL BOPE INTRM1 Test BOPE - Pipe rams, blind rams, choke & kill line valves, choke
maniflod valves, TD IBOP's, Floor TIW & Darts valve to 250 psi & 5000
psi - Hydril to 350 & 3500 psi - Perform Accumlater closure test - Pull
test plug - set wear bushing
Test witnessed & approved by John Chrisp AOGCC
06:15 - 06:30 0.25 DRILL PULD INTRM1 PU drilling bails & DP elevators
06:30 - 09:30 3.00 DRILL PULD INTRM1 MU 6 1/8" BHA - bit,motor, stab, FS, MWD - Upload MWD - PU 3 NM
flex DC's & 1 std HWDP, jars to 371' - Test MWD
09:30 - 15:30 6.00 DRILL TRIP INTRM1 RIH wi 61/8' BHA - run 11 std 4" DP fl derrick - PU 147 jts. 4" DP & 33
jts. HWDP fl pipe shed to 7112'
15:30 - 18:00 2.50 DRILL TRIP INTRM1 RIH wi DP fl derrick fl 7112' to 12174'
18:00 - 18:30 0.50 DRILL CIRC INTRM1 Circulate
18:30 - 20:00 1.50 RIGMNT RSRV INTRM1 Slip and cut 60' drilling line. Service rig and top drive.
20:00 - 20:30 0.50 CEMEN COUT INTRM1 Wash and ream from 12174' to 12324'. Top of cement @ 12,300'
20:30 - 21 :30 1.00 CEMEN CIRC INTRM1 CBU @ 61 spm, 1940 psi
21 :30 - 22:30 1.00 CASE MIT INTRM1 Test casing to 3500 psi for 30 min.-OK.
Printed: 12/9/2003 3:09:20 PM
Page 5 of 8
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name: CD2-27
Common Well Name: CD2-27
Event Name: ROT - DRILLING
Contractor Name: doyon1 @ppco.com
Rig Name: Doyon 19
. Date From - To Hours Code.. Sub Pha$em
Code
11/9/2003 22:30 - 00:00 1.50 CEMEN DSHO INTRM1
11/10/2003 00:00 - 04:00 4.00 CEMEN DSHO INTRM1
04:00 - 05:00 1.00 CEMEN OTHR INTRM1
05:00 - 07:00 2.00 DRILL CIRC INTRM1
07:00 - 08:00 1.00 DRILL REAM INTRM1
08:00 - 08:30 0.50 DRILL REAM INTRM1
08:30 - 08:45 0.25 DRILL DRLH INTRM1
08:45 - 09:15 0.50 DRILL TRIP INTRM1
09:15 - 10:00 0.75 DRILL CIRC INTRM1
10:00 -11:15 1.25 DRILL FIT INTRM1
11:15 -11:30 0.25 DRILL TRIP PROD
11 :30 - 11 :45 0.25 DRILL REAM PROD
11 :45 - 12:00 0.25 DRILL DRLH PROD
12:00 - 00:00
12.00 DRILL DRLH PROD
11/11/2003 00:00 - 10:30
10:30 - 11 :00
11 :00 - 12:00
10.50 DRILL DRLH PROD
0.50 RIGMNT RGRP PROD
1.00 DRILL DRLH PROD
12:00 - 20:00
8.00 DRILL DRLH PROD
20:00 - 22:00 2.00 DRILL CIRC PROD
22:00 - 00:00 2.00 DRILL TRIP PROD
11/12/2003 00:00 - 01 :15 1.25 DRILL WIPR PROD
01:15 - 02:30 1.25 DRILL WIPR PROD
02:30 - 03:30 1.00 DRILL REAM PROD
03:30 - 12:00
8.50 DRILL DRLH PROD
Start: 10/28/2003
Rig Release: 11/18/2003
Rig Number:
Spud Date: 10/30/2003
End: 11/18/2003
Group:
Description'Qf Operations
Drill cement and float equipment from 12324' to 12373'
Drlg FC @ 12,376' - cement to FS @ 12,459' - drlg FS to 12,461' - c/o
rat hole to 12,626'
Pipe became stuck @ 12,626 - worked pipe free - POOH f/ 12,626' to
12,455'
Change well over f/ 9.6 ppg LSND to 8.8 ppg FloPro - Pumped 40 bbls
Safe Clean followed by 50 bbls Viscosified FloPro - pumped @ 220
GPM @ 1940 psi w/ 60 RPM's
Wash & ream f/ 12,455' to 12,626' - 214 GPM @ 1940 psi w/60 RPM's
Continue to wash & ream rat hole f/ 12,626' to 12,659'
Drill 20' new hole f/ 12,659' to 12,679' ADT - .25 hrs.
POOH f/ 12,679' to 12,455' w/ pump
Circulate hole clean for FIT 218 GPM @ 1940 psi w/60 RPM's
RU & perform FIT to 11.0 ppg EMW w/ 820 psi w/ 8.8 ppg @ 7139'
TVD - RD
RIH f/ 12,455' to 12,641'
Break circulation - wash & ream f/ 12,641' to 12,679'
Drill 6 1/8· horizontal section f/ 12,679' to 12,700' 7159' TVD
ADT - .25 hrs
WOB 8 RPM 100 GPM 215 @ 2300 psi
String wt. PU 280 SO 135 Rot 180
Torque on/oft btm. - 18,500/ 18,000 ft.#
Drill 61/8" hole from 12700' to 13357'. TVD=7168'. ART=6.3 AST=1.5,
ADT=7.8 WOB=8-10, Rotary=100 rpm, Pump=2510 psi Pump=68 spm
(238 gpm), P/U=300k, S/0=125k, Rot= 180k, Torque= 20,000 on!
19,000 oft.
Drill 6 1/8" horizontal section f/ 13,357' to 14078'
Circulate while changing sprague air pump on TD
Drill 6 1/8" horizontal section f/ 14,078' to 14,124' 7172' TVD
ADT - 8.23 hrs ART - 7.48 hrs. AST - .75 hrs.
RPM - 100 WOB 5/10 GPM 229 @ 2550 psi
String wt. PU 295 SO 120 Rot 180
Torque on!oft btm - 19500/19000 ft #
Drill61/8" horizontal section f/ 14,124' to 14,653' 7173' TVD
ADT - 5.8 hrs ART - 4.85 hrs. AST - .95 hrs.
RPM - 100 WOB 8/10 GPM 229 @ 2570 psi
String wt. PU 275 SO 125 Rot 180
Torque on/oft btm - 19,500/ 17,000 ft - Ib
AVG ECD = 10.5 ppg
Circulate bottoms up 2 times at 229 GPM, 2,150 psi, 100 RPM.
Backream out from 14,653' - 13,416' at 60 RPM and 60 SPM. TQ =
17,500 ft-Ib, 1,900 psi, UWT=215K - 215K. No mud losses while
backreaming out.
Pump & back ream out f/ 13,416' to 12,455' - 60 RPM 211 GPM @
1870 psi
Flow check - RIH f/ 12,455' to 14,556'
Break circulation - wash & ream to 14,653' - while circulating
bottoms up 229 GPM @ 2150 psi 100 RPM
Hole in good codition - no losses on trip
DriIl61/8" horizontal section f/ 14,653' to 15,130' -7181' TVD
ADT - 5.7 hrs. = ART - 4.37 hrs. AST - 1.33 hrs.
RPM 80/100 WOB 7/10 GPM 229 @ 2490 psi
Printed: 12/9/2003 3:09:20 PM
-
....
ConocoPhillips Alaska Page 6 of 8
Operations Summary Report
Legal Well Name: CD2-27
Common Well Name: CD2-27 Spud Date: 10/30/2003
Event Name: ROT - DRILLING Start: 10/28/2003 End: 11/18/2003
Contractor Name: doyon1 @ppco.com Rig Release: 11/18/2003 Group:
Rig Name: Doyon 19 Rig Number:
. ... ..
Sub ......... ...
. . ...
..... ..
Date From·)To: Hours Code Phase [)/;"!$cription of Operatioqs
.".".. . Code
11/12/2003 03:30 - 12:00 8.50 DRILL DRLH PROD String wt. PU 250 SO 130 Rot 183
Torque on/off btm. 17,000/16,000 fV#
Note - rotary torque dropped off f/ 19 to 20 to 15 to 16 after wiper trip &
200 bbl mud dilution
12:00 - 00:00 12.00 DRILL DRLH PROD DriIl61/8" horizontal section f/ 15,130' to 15,808' -7,164' TVD
ADT - 7.3 hrs. = ART - 5.27 hrs. AST - 2.03 hrs.
RPM 0/100 WOB 8/10 GPM 229 @ 2390 psi
String wt. PU 245 SO 130 Rot 180
Torque on/off btm. 17,000/16,000 ft-Ib
11/13/2003 00:00 - 12:00 12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/ 15,808' to 16,352' -7171 TVD
ADT - 8.4 hrs. = ART - 6.79 hrs. AST - 1.61 hrs.
RPM 100 WOB 5/8 GPM 229 @ 2450 psi
String wt. PU 240 SO 130 Rot 180
Torque on/off btm. 16,000/15,000 ft. #
12:00 - 00:00 12.00 DRILL DRLH PROD Drill 6 1/8' horizontal section f/ 16,352' to 16,848' - 7,206 TVD
ADT - 7.2 hrs. = ART - 3.07 hrs. AST - 4.13 hrs.
RPM 100 WOB 10/12 GPM 229 @ 2,590 psi
String wt. PU 240 SO 135 Rot 180
Torque on/off btm. 15,000/14,000 ft-Ib
11/14/2003 00:00 - 12:00 12.00 DRILL DRLH PROD Drill 6 1/8' horizontal section f/ 16,848' to 17,421' -7209' TVD
ADT - 6.95 hrs. = ART - 4.22 hrs. AST - 2.73 hrs.
RPM 100 WOB 8/10 GPM 220 @ 2740 psi
String wt. PU 240 So 130 Rot 180
Torque on/off btm - 15,000/14,000 ft #
12:00 - 17:30 5.50 DRILL DRLH PROD Drill 6 1/8" horizontal section f/ 17,421' to 17,802' -7209' TVD
ADT - 4.08 hrs. = ART - 3.66 hrs. AST - 0.42 hrs.
RPM 100 WOB 10/12 GPM 229 @ 2,900 psi
String wt. PU 230 So 130 Rot 175
Torque on/off btm - 15,000/14,500 ft-Ib
17:30 - 00:00 6.50 DRILL DRLH PROD Drill 6 1/8" horizontal section f/ 17,802' to 18,250' -7,205' TVD ~
ADT - 4.33 hrs. = ART - 4.33 hrs. AST - 0.0 hrs.
RPM 90 WOB 10/12 GPM 229 @ 2,850 psi
String wt. PU 230 So 130 Rot 175
Torque on/off btm - 15,000 /14,500 ft-Ib
11/15/2003 00:00 - 03:00 3.00 DRILL CIRC PROD Pump sweep & circulae 2X bottoms up - 225 GPM @ 2380 psi w/ 80
rpm - std back 1 std to 18,089' - PJSM on displacement
03:00 - 06:00 3.00 DRILL CIRC PROD RIH to 18,250' - displace hole to 8.8 ppg KCL brine @ 225 gpm @ 2300
psi - FCP 1070 psi @ 158 GPM
06:00 - 07:30 1.50 DRILL OBSV PROD Shut down - monitor well for losses - 6 BPH while cleaning surface
equipment - Spot viscosified brine pill - 197 gpm @ 1820 psi - flow
check - fluid level dropping slowly in annulus
07:30 - 11 :30 4.00 DRILL TRIP PROD POOH on trip tank f/ 18,250' to 12,455' - LD 14 jts DP w/ hard band
wear - hole in good condition pulling out - hole taking 17 BHP on trip to
shoe
11 :30 - 12:30 1.00 DRILL OBSV PROD Monitor well on IT - while servicing top drive - hole taking 20 BPH
12:30 - 14:30 2.00 DRILL CIRC PROD Spot viscosified brine pill for losses - displaced @ 210 GPM @ 1500 psi
- monitor well - fluid level droppping slowly in annulus at 20 bbl/hr
14:30 - 18:00 3.50 DRILL TRIP PROD POOH on IT f/ 12,455' to 7,122'. Layed down 2 bad joints.
18:00 - 19:30 1.50 DRILL TRIP PROD POOH from 7,112' - 6,101', laying down 33 jts of HWDP.
19:30 - 22:00 2.50 DRILL TRIP PROD POOH from 6,101' to 95'.
22:00 - 00:00 2.00 DRILL PULD PROD Flush BHA w/ fresh water, download MWD, break out bit and LD MWD
and motor. Static fluid losses at 8-10 bbl/hr.
Printed: 12/9/2003 3:09:20 PM
Page 7 of 8
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name: CD2-27
Common Well Name: CD2-27
Event Name: ROT -' DRILLING
Contractor Name: doyon1 @ppco.com
Rig Name: Doyon 19
; Hours I Code Sub
Date ¡From - To Phase
, Code.
__.i.__..... .
11/16/2003 00:00 - 01 :30 1.50 LOG PULD PROD
01 :30 - 03:00 1.50 LOG ELOG PROD
03:00 - 05:00 2.00 LOG ELOG PROD
05:00 - 07:00 2.00 LOG ELOG PROD
07:00 - 08:00 1.00 LOG ELOG PROD
08:00 - 09:30 1.50 LOG ELOG PROD
09:30 - 11 :30 2.00 LOG DEQT PROD
11 :30 - 14:30 3.00 LOG ELOG PROD
14:30 - 16:00 1.50 LOG ELOG PROD
16:00 - 17:00 1.00 LOG PULD PROD
17:00 - 18:00 1.00 RIGMNT OTHR CMPL TN
18:00 - 18:30 0.50 WELCT BOPE CMPL TN
18:30 - 23:00 4.50 WELCT BOPE CMPL TN
23:00 - 23:30 0.50 WELCT BOPE CMPL TN
23:30 - 00:00 0.50 DRILL PULD CMPL TN
11/17/2003 00:00 - 03:30 3.50 CMPLTN OTHR CMPL TN
03:30 - 05:30 2.00 CMPL TN OTHR CMPL TN
05:30 - 06:30 1.00 RIGMNT RSRV CMPL TN
06:30 - 11 :30 5.00 CMPL TN OTHR CMPL TN
11 :30 - 12:00 0.50 CMPL T OTHR CMPL TN
12:00 - 12:30 0.50 CMPL T RURD CMPL TN
12:30 - 21 :00 8.50 CMPL T RUNT CMPL TN
21 :00 - 21 :30 0.50 CMPL TN RUNT CMPL TN
21 :30 - 22:30 1.00 CMPL TN RUNT CMPL TN
22:30 - 00:00 1.50 CMPL TN NUND CMPL TN
11/18/2003 00:00 - 01 :00 1.00 CMPL TN NUND CMPL TN
01 :00 - 01 :30 0.50 CMPL TN NUND CMPL TN
01 :30 - 02:00 0.50 CMPL TN NUND CMPL TN
02:00 - 03:00 1.00 CMPL TN CIRC CMPL TN
03:00 - 04:00 1.00 CMPL TN CIRC CMPL TN
04:00 - 05:30 1.50 CMPL TN CIRC CMPL TN
05:30 - 06:00 0.50 CMPL T PCKR CMPL TN
Start:
Rig Release:
Rig Number:
10/28/2003
11/18/2003
Spud Date: 10/30/2003
End: 11/18/2003
Group:
Description of Operations
.. .... --.-.----------....-
.. ...-.------.--
Rig up Schlumberger wireline
RIH wI US IT & tractor to 9000' - tool failure
POOH wI tools - trouble shoot - found problem wI tractor
RIH wI US IT & tractor to 12,458' (didn't have to use tractor to get down)
Tool failure - trouble shoot tools - problem seems to be in trackor tool
POOH wI USIT & tractor tools
Trouble shoot tools - LD tractor tool
RIH wI US IT tools to 12,450' - run log f/12,450' to 11,000'
POOH wI US IT tool
RD Schlumberger - LD tools
Thaw frozen control manifold of TD, with steam hoses.
Pull wear bushing and set test plug.
Test BOPE - pipe rams, blind rams, kill & choke line valves, choke
manifold valves, top drive manual & atuo IBOP's - floor TIW & dart
valves to 250 psi & 5000 psi - Hydril to 250 & 3500 psi - performed
accumulator closure test - Jeff Jones AOGCC waived witnessing of test
Blow down Choke and Kill lines, pull Test Plug, set WB.
MU mule shoe and xo, RIH to 100' with DP (to lay down).
MU mule shoe & RIH wI 4" DP to 9,000'
POOH laying down excess 4" DP (75 its)
Slip & cut 60' drill line - adiust brakes - replace deadline anchor brass
Continue POOH laying down excess 4' DP - (210 its) - Change
elevators
Pull wear bushing
Rig up to run 4 1/2" completion - PJSM
Run 41/2" completion as follows: WLEG - 16 its. 4 1/2' 12.6# L-80
IBTM tbg( ran 4 bow spring centralizers 10' - 44' - 64' & 87' fl WLEG) -
XN nipple wI RHC plug - 1 it. 4 1/2" 12.6# L-80 IBTM tbg - Baker S-3
packer wI Mill out extension ( Baker Loc all connections below packer)
2 its. 4-1/2',12.6#, L-80, IBTM tbg - Camco GLM wI dummy valve
installed - 210 its. 41/2' 12.6# L-80 IBTM tbg. - Camco DB nipple- 60
its. 4 1/2" 12.6# L-80 IBTM tbg - (289 jts total) Average MU torque =
3,000 ft-Ib.
UWT = 185K, DWT = 125K.
MU tbg hanger, Landing Jt A, land tbg wI tbg tail @ 12,671.74' - XN
nipple @ 11,968.79' - Packer @ 11,904.13' - GLM @ 11,791.40' - DB
nipple @ 2643.28' - RILDS.
LD Landing Jt A, install TWC, PU Landing Jt B. Test hanger seals and
TWC to 5,000 psi - okay. LD Landing Jt B.
ND BOPE.
NU tree and test seals to 5,000 psi. Remove TD grabbers and junk sub
for maintenance while NU.
Test tree to 5,000 psi - ok.
RU lubricator on tree and pull TWC.
RU circulating manifold, PJSM. Test surface lines to 2,500 psi.
Displace well with 187 bbl of 9.2 ppg brine at 3 bbllmin and 240 psi.
(Had returns of 2.3 bbls for every 3 bbl pumped).
Continue displacement with 240 bbl of diesel freeze protect, using
Dowell pump, with calculated volume to fill the tubing and 2,000' (tvd) of
annulus volume.
Vac diesel from lines, break tree cap, RU lubricator. Drop Ball and Rod
wI rollers.
Printed: 12/9/2003 3:09:20 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date From - To
. ----...--.. ..
11/18/2003 06:00 - 06:45
Page 8 of 8
ConocoPhillips Alaska
Operations Summary Report
CD2-27
CD2-27
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
; Sub I
Hours Code: Code!
Phase
Start: 10/28/2003
Rig Release: 11/18/2003
Rig Number:
Spud Date: 10/30/2003
End: 11/18/2003
Group:
Description of Operations
0.75 CMPL TN PCKR CMPL TN RD lubricator. RU and test lines. Pressure up on tubing and set packer.
Continue pressuring up to 3,500 psi and test and record for 30 min -
ok.
Bleed tbg pressure and pressure up annulus + packer to 3,500 psi, and
test and record for 30 min - ok.
Bleed annulus pressure to 0 psi, tubing pressure to 500 psi. Vaccum
out surface lines. RD circulating manifold.
Install BPV with lubricator. Secure well. Clear rig floor.
Frz protect Ball Mill, vac injection line, move Ball Mill
06:45 - 07:30 0.75 CMPL TN DEQT CMPL TN
07:30 - 08:00 0.50 CMPL T DEQT CMPL TN
08:00 - 09:00 1.00 CMPL TN NUND CMPL TN
09:00 - 10:00 1.00 MOVE RURD CMPL TN
RIG RELEASE: 10:00hrs, November 18, 2003.
Printed: 12/9/2003 3:09:20 PM
.
. $03 - \ 1-1--
26-Nov-03
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-~tGYRO
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEI\lED
DEC 08 2003
Alaska 0;, ~ Cp¡íjm~fì
AnÇhoarge
K~'b\\ \.~
Halliburton Sperry-Sun
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-27 Gyro
Job No. AKF00002722885, Surveyed: 15 November, 2003
Survey Report
25 November, 2003
Your Ref: API 501032047100
Surface Coordinates: 5974522.31 N, 371709.10 E (70020'19.0535" N, 151002' 27.6477" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974522.31 N, 128290.90 W (Grid)
Surface Coordinates relative to Structure: 79.24 N, 9.75 W (True)
Kelly Bushing Elevation: 52.77ft above Mean Sea Level
Kelly Bushing Elevation: 52.77ft above Project V Reference
Kelly Bushing Elevation: 52.77ft above Structure
SpE!í'í'Y-SUI'1
DRILLING SER.VIC:SS
A Halliburton Company
~,*~'ûN\ ~
~Q3-ITT
DEFINITIVE
..
./"....
.
.
RECEIVED
DEC 082003
Alaska Oil & Gas Cons. Çommi85i0n
Anchorage
Survey Ref: svy310
Alaska North Slope
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
0.00 0.000 0.000 -52.77 0.00
81.00 0.500 149.000 28.23 81.00
169.00 1.150 128.000 116.22 168.99
259.00 2.650 123.000 206.17 258.94
352.00 4.000 126.000 299.01 351.78
440.00 6.500 129.000 386.63 439.40
527.00 9.250 118.000 472.81 525.58
630.00 12.800 116.000 573.89 626.66
714.00 17.800 113.000 654.89 707.66
. .. '.... .
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-27 Gyro
Your Ref: API 501032047100
Job No. AKF00002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates
Northings Eastings
(ft) (ft)
Dogleg Vertical
Rate Section
(0/100ft)
Comment
0.00 N 0.00 E 5974522.31 N 371709.10 E 0.00 Tolerable Gyro
0.30 S 0.18 E 5974522.00 N 371709.28 E 0.617 0.35
1.18 S 1.08 E 5974521.12 N 371710.16 E 0.803 1.59
2.87 S 3.53 E 5974519.38 N 371712.58 E 1.675 4.41
5.94 S 7.96 E 5974516.23 N 371716.96 E 1 .463 9.52 .
10.88 S 14.31 E 5974511.18N 371723.23 E 2.857 17.27
17.27 S 24.32 E 5974504.63 N 371733.12 E 3.591 28.36
26.16 S 41.89 E 5974495.44 N 371750.53 E 3.466 45.97
35.26 S 62.08 E 5974485.99 N 371770.57 E 6.025 65.31
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB= 52.77" MSL. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 143.420° (True).
Magnetic Declination at Surface is 24.269° (21-0ct-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 714.00f1.,
The Bottom Hole Displacement is 71.4Of1., in the Direction of 119.593° (True).
Survey tool proaram for CD2-27 Gvro
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
.
0.00
714.00
707.66 Tolerable Gyro
0.00
25 November, 2003·15:40
Page 20f2
DrillQuest 3.03.05.005
.
.
d03-171
26-Nov-03
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-27
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' M D (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
DEC 08 2003
AJaska 0Ií & Gas Cons. commiteion
AnchdnJge
-~~~f~'-~"::>
Halliburton Sperry-Sun
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-27
.
Job No. AKZZ0002722885, Surveyed: 15 November, 2003
Survey Report
25 November, 2003
~ Your Ref: API 501032047100
Surface Coordinates: 5974522.31 N, '371709.10 E (70° 20'19.0535" N, 151°02'27.6477" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Surface Coordinates relative to Project H Reference: 974522.31 N, 128290.90 W (Grid)
Surface Coordinates relative to Structure: 79.24 N, 9.75 W (True)
Kelly Bushing Elevation: 52. 77ft above Mean Sea Level
Kelly Bushing Elevation: 52. 77ft above Project V Reference
Kelly Bushing Elevation: 52. 77ft above Structure
5ipE!r"'rtY-5iUI!
DFULLING seRVices
A Halliburton Company
Survey Ref: svy319
Halliburton Sperry-Sun
Survey Report for Alpine CD-2· CD2-27
Your Ref: API 501032047100
Job No. AKZZ0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inet. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1000)
714.00 17.800 113.000 654.89 707.66 35.26 8 62.08 E 5974485.99 N 371770.57 E 65.31 AK-6 BP _IFR-AK
790.32 19.010 116.580 727.31 780.08 45.38 8 83.94 E 5974475.50 N 371792.25 E 2.169 86.46
835.56 20.720 118.620 769.85 822.62 52.51 8 97.55 E 5974468.14 N 371805.74 E 4.078 100.30
925.70 23.310 125.190 853.43 906.20 70.43 S 126.14 E 5974449.73 N 371834.01 E 3.961 131.73
1021.03 28.210 132.240 939.28 992.05 96.47 S 158.26 E 5974423.15 N 371865.69 E 6.054 171.78 .
1116.67 32.750 135.070 1021.68 1074.45 130.00 8 193.28 E 5974389.02 N 371900.13 E 4.977 219.58
1211.31 35.660 134.820 1099.95 1152.72 167.588 230.94 E 5974350.81 N 371937.14 E 3.078 272.19
1306.96 37.650 134.130 1176.68 1229.45 207.57 S 271.69 E 5974310.12 N 371977.20 E 2.125 328.60
1402.13 40.500 136.870 1250.56 1303.33 250.38 8 313.69 E 5974266.60 N 372018.46 E 3.501 388.00
1497.02 45.200 139.060 1320.11 1372.88 298.33 8 356.84 E 5974217.92 N 372060.79 E 5.195 452.22
1592.48 50.190 138.850 1384.34 1437.11 351.558 403.19 E 5974163.91 N 372106.22 E 5.230 522.58
1687.53 55.290 139.960 1441.87 1494.64 408.99 8 452.38 E 5974105.64 N 372154.42 E 5.445 598.02
1782.77 58.920 140.090 1493.59 1546.36 470.268 503.75 E 5974043.50 N 372204.73 E 3.813 677.84
1877.93 60.000 137.490 1541.95 1594.72 531.91 8 557.74 E 5973980.94 N 372257.66 E 2.612 759.52
1973.07 60.420 135.440 1589.22 1641.99 591.76 8 614.61 E 5973920.12 N 372313.50 E 1.921 841.47
2068.04 56.220 135.440 1639.08 1691.85 649.338 671.31 E 5973861.59 N 372369.20 E 4.422 921.49
2163.16 55.700 136.940 1692.33 1745.10 706.20 8 725.87 E 5973803.79 N 372422.78 E 1.416 999.68
2211.03 55.690 136.640 1719.31 1772.08 735.02 8 752.95 E 5973774.51 N 372449.36 E 0.518 1038.96
2256.02 55.690 137.920 1744.67 1797.44 762.33 8 778.16 E 5973746.78 N 372474.10 E 2.350 1075.91
2353.28 56.350 136.320 1799.03 1851.80 821.428 833.04 E 5973686.76 N 372527.96 E 1.524 1156.06
2448.37 56.580 136.890 1851.56 1904.33 879.01 8 887.49 E 5973628.24 N 372581.42 E 0.555 1234.77
2542.93 56.860 139.260 1903.46 1956.23 937.828 940.30 E 5973568.54 N 372633.22 E 2.116 1313.47 .
2638.39 56.770 139.750 1955.71 2008.48 998.58 8 992.18 E 5973506.90 N 372684.05 E 0.440 1393.17
2733.81 56.810 139.330 2007.97 2060.74 1059.328 1043.99 E 5973445.28 N 372734.81 E 0.371 1472.82
2826.93 57.030 139.530 2058.79 2111.56 1118.598 1094.73 E 5973385.15 N 372784.54 E 0.297 1550.66
2924.11 56.620 139.190 2111.97 2164.74 1180.318 1147.71 E 5973322.53 N 372836.45 E 0.514 1631.79
3019.00 57.180 139.900 2163.79 2216.56 1240.808 1199.29 E 5973261.17 N 372886.98 E 0.861 1711.10
3114.14 57.210 140.430 2215.34 2268.11 1302.20 8 1250.51 E 5973198.90 N 372937.15 E 0.469 1790.94
3209.46 58.770 138.090 2265.87 2318.64 1363.43 8 1303.27 E 5973136.78 N 372988.85 E 2.648 1871.54
3271.17 58.860 137.480 2297.82 2350.59 1402.538 1338.74 E 5973097.08 N 373023.65 E 0.858 1924.08
3344.12 58.810 137.420 2335.57 2388.34 1448.51 8 1380.95 E 5973050.38 N 373065.06 E 0.098 1986.16
3440.07 58.140 136.980 2385.74 2438.51 1508.528 1436.52 E 5972989.43 N 373119.60 E 0.800 2067.47
3535.94 57.570 137.200 2436.75 2489.52 1567.988 1491.79 E 5972929.04 N 373173.84 E 0.625 2148.15
3631.20 57.410 136.870 2487.95 2540.72 1626.768 1546.54 E 5972869.33 N 373227.58 E 0.337 2227.98
3726.92 57.080 137.580 2539.74 2592.51 1685.858 1601.21 E 5972809.31 N 373281.23 E 0.713 2308.01
25 November, 2003 - 15:47 Page 2 of8 DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Alpine CO.2 - CD2-27
Your Ref: API 501032047100
Job No. AKZZ0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3822.31 56.530 137.230 2591.96 2644.73 1744.61 8 1655.23 E 5972749.63 N 373334.24 E 0.653 2387.39
3917.47 56.630 137.400 2644.37 2697.14 1803.00 8 1709.08 E 5972690.34 N 373387.08 E 0.182 2466.37
4013.61 56.250 137.720 2697.52 2750.29 1862.128 1763.14 E 5972630.30 N 373440.12 E 0.483 2546.06
4108.80 55.940 138.260 2750.62 2803.39 1920.828 1816.01 E 5972570.70 N 373491.99 E 0.572 2624.71
4204.44 55.940 138.320 2804.18 2856.95 1979.978 1868.73 E 5972510.66 N 373543.68 E 0.052 2703.63 .
4299.97 55.370 138.640 2858.08 2910.85 2039.038 1921.02E 5972450.72 N 373594.95 E 0.658 2782.21
4395.35 55.260 138.740 2912.36 2965.13 2097.94 S 1972.79 E 5972390.93 N 373645.71 E 0.144 2860.37
4490.93 55.230 140.000 2966.84 3019.61 2157.53 S 2023.93 E 5972330.46 N 373695.82 E 1.084 2938.70
4586.46 57.230 141.590 3019.95 3072.72 2219.07 S 2074.11 E 5972268.08 N 373744.94 E 2.509 3018.02
4681.64 56.930 141.850 3071.67 3124.44 2281.79 S 2123.60 E 5972204.52 N 373793.35 E 0.390 3097.89
4777.03 55.390 142.950 3124.79 3177.56 2344.55 S 2171.95E 5972140.94 N 373840.62 E 1.877 3177.10
4872.31 56.310 145.490 3178.28 3231.05 2408.52 S 2218.04 E 5972076.19 N 373885.60 E 2.408 3255.93
4965.94 56.620 149.180 3230.02 3282.79 2474.21 S 2260.14 E 5972009.80 N 373926.58 E 3.302 3333.77
5062.70 55.260 152.730 3284.22 3336.99 2544.26 S 2299.07 E 5971939.09 N 373964.30 E 3.348 3413.22
5158.14 55.710 153.030 3338.30 3391.07 2614.25 S 2334.92 E 5971868.49 N 373998.95 E 0.538 3490.79
5253.66 54.850 151.650 3392.71 3445.48 2683.79 S 2371.36 E 5971798.34 N 374034.19 E 1.490 3568.35
5349.09 56.660 151.150 3446.41 3499.18 2753.04 S 2409.12 E 5971728.45 N 374070.77 E 1.945 3646.47
5444.49 58.800 150.010 3497.34 3550.11 2823.30 S 2448.75 E 5971657.53 N 374109.19 E 2.460 3726.50
5540.02 62.690 149.970 3544.02 3596.79 2895.45 S 2490.43 E 5971584.67 N 374149.62 E 4.072 3809.28
5635.50 63.670 148.390 3587.10 3639.87 2968.62 S 2534.09 E 5971510.76 N 374192.02 E 1.798 3894.05
5731 .11 63.740 146.400 3629.46 3682.23 3040.83 8 2580.27 E 5971437.78 N 374236.97 E 1.867 3979.56 .
5826.69 65.240 146.220 3670.62 3723.39 3112.60 S 2628.12 E 5971365.20 N 374283.58 E 1.579 4065.71
5922.90 63.730 143.560 3712.07 3764.84 3183.62 S 2678.04 E 5971293.33 N 374332.28 E 2.948 4152.49
6018.44 61.870 142.150 3755.74 3808.51 3251.36 S 2729.34 E 5971224.73 N 374382.41 E 2.348 4237.46
6114.33 61 .440 141.930 3801.26 3854.03 3317.90 S 2781.25 E 5971157.31 N 374433.18 E 0.492 4321.83
6210.00 60.590 141.460 3847.62 3900.39 3383.57 S 2833.12 E 5971090.77 N 374483.92 E 0.987 4405.47
6304.92 59.870 140.140 3894.75 3947.52 3447.42 S 2885.19 E 5971026.03 N 374534.89 E 1.426 4487.78
6400.56 59.230 138.690 3943.23 3996.00 3510.03 S 2938.83 E 5970962.51 N 374587.44 E 1.468 4570.02
6496.02 58.240 136.980 3992.77 4045.54 3570.51 S 2993.59 E 5970901.10 N 374641.16 E 1.849 4651.23
6591.37 58.170 136.120 4043.01 4095.78 3629.35 S 3049.32 E 5970841.32 N 374695.88 E 0.770 4731.69
6687.07 56.990 136.160 4094.32 4147.09 3687.59 S 3105.30 E 5970782.13 N 374750.85 E 1.234 4811.82
6782.54 56.700 136.530 4146.53 4199.30 3745.42 S 3160.47 E 5970723.36 N 374805.03 E 0.444 4891.13
6878.00 56.110 137.260 4199.35 4252.12 3803.47 S 3214.81 E 5970664.39 N 374858.36 E 0.888 4970.13
6973.68 55.990 138.010 4252.78 4305.55 3862.12 S 3268.29 E 5970604.84 N 374910.84 E 0.662 5049.10
7069.24 56.160 138.420 4306.12 4358.89 3921.24 S 3321.13 E 5970544.82 N 374962.65 E 0.398 5128.06
25 November, 2003 - 15:47 Page 3 of8 DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Alpine CD·2 - CD2-27
Your Ref: API 501032047100
Job No. AKZZ0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
7163.69 56.750 139.330 4358.31 4411.08 3980.54 S 3372.90 E 5970484.65 N 375013.40 E 1.017 5206.53
7259.01 57.940 139.050 4409.74 4462.51 4041.28 S 3425.35 E 5970423.02 N 375064.80 E 1.273 5286.57
7354.52 58.240 137.920 4460.23 4513.00 4101.98 S 3479.09 E 5970361.40 N 375117.49 E 1.052 5367.34
7449.93 58.640 138.340 4510.16 4562.93 4162.52 S 3533.35 E 5970299.94 N 375170.71 E 0.563 5448.29
7545.62 58.750 136.410 4559.89 4612.66 4222.68 S 3588.71 E 5970238.85 N 375225.04 E 1.727 5529.59
7640.92 58.050 134.980 4609.83 4662.60 4280.76 S 3645.40 E 5970179.80 N 375280.73 E 1.474 5610.02 .
7737.12 57.860 135.100 4660.87 4713.64 4338.46 S 3703.02 E 5970121.13 N 375337.35 E 0.224 5690.69
7831.72 57.580 135.360 4711.39 4764.16 4395.24 S 3759.35 E 5970063.39 N 375392.70 E 0.376 5769.85
7927.16 57.300 135.290 4762.75 4815.52 4452.44 S 3815.90 E 5970005.23 N 375448.26 E 0.300 5849.49
8022.55 57.130 135.020 4814.41 4867.18 4509.30 S 3872.45 E 5969947.41 N 375503.84 E 0.297 5928.85
8118.14 56.820 135.390 4866.50 4919.27 4566.18 S 3928.92 E 5969889.58 N 375559.32 E 0.459 6008.18
8214.00 56.620 135.380 4919.10 4971.87 4623.22 S 3985.21 E 5969831.58 N 375614.62 E 0.209 6087.53
8309.47 56.400 136.130 4971.78 5024.55 4680.26 S 4040.76 E 5969773.60 N 375669.19 E 0.695 6166.44
8404.99 56.480 137.100 5024.59 5077.36 4738.11 S 4095.43 E 5969714.83 N 375722.87 E 0.850 6245.47
8500.58 57.280 138.320 5076.82 5129.59 4797.33 S 4149.30 E 5969654.69 N 375775.71 E 1.358 6325.13
8596.03 57.880 138.690 5127.99 5180.76 4857.68 S 4202.68 E 5969593.44 N 375828.06 E 0.709 6405.41
8691.94 58.290 139.640 5178.70 5231.47 4919.28 S 4255.91 E 5969530.94 N 375880.23 E 0.943 6486.59
8787.63 58.670 138.880 5228.72 5281.49 4981.08 S 4309.15 E 5969468.23 N 375932.40 E 0.785 6567.95
8883.17 59.330 137.640 5277.93 5330.70 5042.18 S 4363.67 E 5969406.21 N 375985.87 E 1.310 6649.51
8978.93 58.930 136.380 5327.07 5379.84 5102.31 S 4419.71 E 5969345.13 N 376040.87 E 1.204 6731.19
9074.61 58.070 135.760 5377.06 5429.83 5161.06 S 4476.31 E 5969285.42 N 376096.45 E 1.055 6812.10
9170.00 58.000 135.720 5427.56 5480.33 5219.02 S 4532.79 E 5969226.50 N 376151.93 E 0.082 6892.30
9265.13 57.860 135.880 5478.07 5530.84 5276.81 S 4588.99 E 5969167.76 N 376207.14 E 0.205 6972.20 .
9360.64 57.790 135.690 5528.93 5581. 70 5334.75 S 4645.37 E 5969108.86 N 376262.51 E 0.184 7052.32
9456.30 57.280 135.510 5580.28 5633.05 5392.42 S 4701.84 E 5969050.24 N 376317.99 E 0.556 7132.28
9552.00 57.340 135.590 5631.96 5684.73 5449.91 S 4758.24 E 5968991.79 N 376373.40 E 0.094 7212.06
9647.65 58.510 136.420 5682.76 5735.53 5508.22 S 4814.53 E 5968932.52 N 376428.68 E 1.427 7292.43
9742.85 56.470 136.180 5733.92 5786.69 5566.26 S 4869.99 E 5968873.54 N 376483.14 E 2.153 7372.09
9839.07 56.520 136.370 5787.03 5839.80 5624.24 S 4925.45 E 5968814.62 N 376537.60 E 0.173 7451.70
9934.44 56.170 137.120 5839.89 5892.66 5682.06 S 4979.85 E 5968755.89 N 376591.00 E 0.750 7530.55
10029.98 55.940 137.190 5893.24 5946.01 5740.17 S 5033.74 E 5968696.86 N 376643.90 E 0.248 7609.33
10125.62 56.370 137.470 5946.50 5999.27 5798.57 S 5087.58 E 5968637.54 N 376696.73 E 0.511 7688.32
10217.26 57.360 137.220 5996.59 6049.36 5855.01 S 5139.58 E 5968580.23 N 376747.75 E 1.104 7764.62
10315.96 57.940 137.220 6049.41 6102.18 5916.21 S 5196.21 E 5968518.07 N 376803.32 E 0.588 7847.52
10411.71 57.860 137.380 6100.29 6153.06 5975.82 S 5251.21 E 5968457.52 N 376857.30 E 0.164 7928.17
25 November, 2003 -15:47 Page 4 of 8 DrlllQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Alpine CO.2 - CD2-27
Your Ref: API 501032047100
Job No. AKZZ0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10506.97 57.650 137.520 6151.11 6203.88 6035.17 S 5305.70 E 5968397.25 N 376910.76 E 0.253 8008.30
10602.27 57.340 137.470 6202.33 6255.10 6094.42 S 5360.00 E 5968337.08 N 376964.04 E 0.328 8088.24
10697.71 57.660 137.880 6253.61 6306.38 6153.93 S 5414.20 E 5968276.65 N 377017.22 E 0.494 8168.33
10793.18 58.310 138.510 6304.22 6356.99 6214.27 S 5468.16 E 5968215.39 N 377070.14 E 0.881 8248.94
10888.53 58.580 138.590 6354.12 6406.89 6275.17 S 5521.94 E 5968153.58 N 377122.87 E 0.292 8329.90 .
10984.13 58.880 137.270 6403.74 6456.51 6335.83 S 5576.69 E 5968092.00 N 377176.57 E 1.221 8411.23
11079.54 58.650 136.710 6453.22 6505.99 6395.48 S 5632.34 E 5968031.40 N 377231.19 E 0.557 8492.30
11174.97 57.880 136.320 6503.41 6556.18 6454.37 S 5688.19 E 5967971.56 N 377286.03 E 0.879 8572.87
11270.98 57.800 136.320 6554.52 6607.29 6513.15 S 5744.32 E 5967911.83 N 377341.15 E 0.083 8653.53
11365.45 57.640 136.200 6604.97 6657.74 6570.86 S 5799.54 E 5967853.19 N 377395.37 E 0.201 8732.77
11461.00 56.630 137.030 6656.82 6709.59 6629.18 S 5854.67 E 5967793.93 N 377449.50 E 1.284 8812.46
11556.49 56.190 138.780 6709.65 6762.42 6688.20 S 5908.00 E 5967734.01 N 377501.80 E 1.595 8891.63
11651.78 56.850 142.150 6762.23 6815.00 6749.49 S 5958.57 E 5967671.86 N 377551.32 E 3.030 8970.99
11747.39 58.020 144.100 6813.69 6866.46 6813.95 S 6006.91 E 5967606.59 N 377598.55 E 2.110 9051.56
11843.22 59.390 146.310 6863.48 6916.25 6881.19 S 6053.63 E 5967538.56 N 377644.11 E 2.434 9133.40
11938.97 61.520 147.350 6910.69 6963.46 6950.91 S 6099.19 E 5967468.06 N 377688.47 E 2.417 9216.54
12034.03 64.410 147.980 6953.89 7006.66 7022.45 S 6144.47 E 5967395.76 N 377732.52 E 3.097 9300.97
12129.82 67.110 148.200 6993.22 7045.99 7096.59 S 6190.63 E 5967320.84 N 377777.41 E 2.826 9388.02
12224.84 71.090 147.680 7027.11 7079.88 7171.80 S 6237.75 E 5967244.83 N 377823.23 E 4.220 9476.49
12320.82 75.150 147.280 7054.97 7107.74 7249.23 S 6287.11 E 5967166.57 N 377871.26 E 4.249 9568.09
12416.52 77.630 146.340 7077.49 7130.26 7327.06 S 6338.03 E 5967087.89 N 377920.84 E 2.762 9660.93 .
12511.74 81.570 145.520 7094.67 7147.44 7404.62 S 6390.49 E 5967009.44 N 377971.97 E 4.224 9754.48
12588.75 85.550 145.650 7103.31 7156.08 7467.74 S 6433.73 E 5966945.59 N 378014.12 E 5.171 9830.93
12696.19 87.220 146.540 7110.09 7162.86 7556.73 S 6493.54 E 5966855.59 N 378072.40 E 1.761 9938.03
12791.11 88.520 145.480 7113.61 7166.38 7635.37 S 6546.56 E 5966776.05 N 378124.07 E 1.767 10032.79
12886.28 89.010 146.450 7115.66 7168.43 7714.22 S 6599.82 E 5966696.30 N 378175.97 E 1.142 10127.84
12982.04 90.860 147.920 7115.77 7168.54 7794.69 S 6651.71 E 5966614.95 N 378226.48 E 2.468 10223.39
13078.33 90.060 149.310 7115.00 7167.77 7876.89 S 6701.85 E 5966531.91 N 378275.20 E 1.666 10319.28
13173.08 89.510 150.940 7115.36 7168.13 7959.04 S 6749.05 E 5966448.96 N 378320.99 E 1.816 10413.37
13269.29 90.000 152.280 7115.77 7168.54 8043.68 S 6794.79 E 5966363.55 N 378365.27 E 1.483 10508.60
13365.20 88.150 153.010 7117.32 7170.09 8128.85 S 6838.85 E 5966277.64 N 378407.87 E 2.074 10603.25
13461.07 88.460 153.490 7120.15 7172.92 8214.42 S 6881.98 E 5966191.35 N 378449.54 E 0.596 10697.67
13556.66 88.950 153.090 7122.31 7175.08 8299.79 S 6924.94 E 5966105.26 N 378491.02 E 0.662 10791.82
13652.15 89.940 153.590 7123.24 7176.01 8385.12 S 6967.78 E 5966019.20 N 378532.40 E 1.161 10885.88
13747.67 90.800 153.440 7122.62 7175.39 8470.61 S 7010.38 E 5965932.99 N 378573.53 E 0.914 10979.92
25 November, 2003 - 15:47 Page 5 of 8 Drí//Quest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-27
Your Ref: API 501032047100
Job No. AKZZ0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
13843.18 91.600 153.270 7120.62 7173.39 8555.96 8 7053.20 E 5965846.93 N 378614.88 E 0.856 11073.97
13938.79 90.060 151.850 7119.23 7172.00 8640.80 8 7097.25 E 5965761.34 N 378657.48 E 2.191 11168.35
14033.30 89.880 150.900 7119.28 7172.05 8723.768 7142.53 E 5965677.62 N 378701.33 E 1.023 11261.95
14128.88 89.880 149.130 7119.48 7172.25 8806.54 S 7190.30 E 5965594.04 N 378747.67 E 1.852 11356.90
14224.67 89.690 148.490 7119.84 7172.61 8888.49 8 7239.90 E 5965511.26 N 378795.87 E 0.697 11452.26 .
14319.57 89.570 146.890 7120.46 7173.23 8968.69 8 7290.63 E 5965430.20 N 378845.21 E 1.691 11546.89
14415.91 89.810 148.270 7120.98 7173.75 9050.01 8 7342.27 E 5965348.00 N 378895.46 E 1.454 11642.98
14512.10 90.370 147.750 7120.83 7173.60 9131.598 7393.23 E 5965265.56 N 378945.02 E 0.794 11738.86
14605.48 90.190 150.350 7120.37 7173.14 9211.678 7441.25 E 5965184.68 N 378991.66 E 2.791 11831.78
14702.41 90.370 150.550 7119.90 7172.67 9295.99 8 7489.05 E 5965099.55 N 379038.01 E 0.278 11927.98
14798.00 90.740 150.570 7118.97 7171.74 9379.23 8 7536.04 E 5965015.52 N 379083.56 E 0.388 12022.82
14893.47 89.260 151.200 7118.97 7171.74 9462.64 8 7582.49 E 5964931.33 N 379128.58 E 1.685 12117.48
14988.82 87.960 149.230 7121.28 7174.05 9545.36 8 7629.83 E 5964847.81 N 379174.50 E 2.475 12212.13
15084.67 88.890 148.350 7123.92 7176.69 9627.308 7679.48 E 5964765.03 N 379222.74 E 1.336 12307.52
15179.30 89.750 149.930 7125.04 7177.81 9708.53 8 7728.02 E 5964682.98 N 379269.88 E 1.901 12401.67
15275.53 91.420 150.880 7124.06 7176.83 9792.20 8 7775.54 E 5964598.52 N 379315.96 E 1.997 12497.17
15371 .29 92.280 151.470 7120.97 7173.74 9876.05 8 7821.68 E 5964513.89 N 379360.66 E 1.089 12592.01
15466.07 92.220 152.780 7117.25 7170.02 9959.768 7865.96 E 5964429.43 N 379403.50 E 1.383 12685.62
15562.42 91.670 152.690 7113.98 7166.75 10045.368 7910.07 E 5964343.09 N 379446.15 E 0.578 12780.64
15658.09 91.670 152.530 7111.19 7163.96 10130.278 7954.07 E 5964257.44 N 379488.68 E 0.167 12875.05
15753.48 89.380 153.490 7110.31 7163.08 10215.26 8 7997.35 E 5964171.72 N 379530.51 E 2.603 12969.09
15849.12 89.940 153.450 7110.88 7163.65 10300.828 8040.07 E 5964085.43 N 379571.75 E 0.587 13063.26 .
15941.55 89.810 152.670 7111.08 7163.85 10383.228 8081.95 E 5964002.33 N 379612.21 E 0.856 13154.39
16039.59 89.070 152.560 7112.04 7164.81 10470.278 8127.04 E 5963914.52 N 379655.81 E 0.763 13251.16
16135.18 89.510 152.800 7113.23 7166.00 10555.198 8170.91 E 5963828.87 N 379698.22 E 0.524 13345.50
16230.78 88.580 153.830 7114.82 7167.59 10640.60 8 8213.83 E 5963742.74 N 379739.68 E 1.451 13439.66
16326.12 87.780 156.240 7117.85 7170.62 10726.98 8 8254.05 E 5963655.68 N 379778.41 E 2.662 13532.99
16420.86 87.470 157.890 7121.77 7174.54 10814.158 8290.94 E 5963567.89 N 379813.80 E 1.771 13624.98
16516.59 87.590 160.540 7125.90 7178.67 10903.56 8 8324.87 E 5963477.92 N 379846.20 E 2.768 13717.00
16613.32 85.120 158.540 7132.05 7184.82 10993.998 8358.61 E 5963386.92 N 379878.39 E 3.283 13809.72
16708.03 84.810 155.290 7140.36 7193.13 11080.778 8395.60 E 5963299.52 N 379913.88 E . 3.434 13901.45
16803.53 86.540 153.790 7147.57 7200.34 11166.748 8436.53 E 5963212.86 N 379953.34 E 2.395 13994.88
16899.19 86.420 152.830 7153.44 7206.21 11252.05 8 8479.42 E 5963126.83 N 379994.76 E 1.009 14088.94
16994.89 88.830 153.260 7157.41 7210.18 11337.278 8522.75 E 5963040.88 N 380036.64 E 2.558 14183.21
17089.60 89.380 153.590 7158.88 7211.65 11421.978 8565.12 E 5962955.47 N 380077.55 E 0.677 14276.47
25 November, 2003 -15:47 Page 6 of 8 DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-27
Your Ref: API 501032047100
Job No. AKZZ0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
17185.47 89.510 152.340 7159.81 7212.58 11507.35 S 8608.69 E 5962869.35 N 380119.65 E 1.311 14371.00
17281.00 90.620 150.250 7159.70 7212.47 11591.14 S 8654.57 E 5962784.80 N 380164.09 E 2.477 14465.63
17373.74 91.970 149.650 7157.61 7210.38 11671 .39 S 8701.00 E 5962703.76 N 380209.14 E 1.593 14557.74
17471.67 92.280 149.270 7153.98 7206.75 11755.68 S 8750.73 E 5962618.64 N 380257.42 E 0.501 14655.06
17567.04 90.060 149.190 7152.03 7204.80 11837.60 S 8799.50 E 5962535.89 N 380304.79 E 2.329 14749.91 .
17662.84 89.690 148.910 7152.24 7205.01 11919.76 S 8848.77 E 5962452.90 N 380352.64 E 0.484 14845.25
17758.52 89.510 147.800 7152.91 7205.68 12001.21 S 8898.97 E 5962370.60 N 380401.44 E 1.175 14940.57
17852.70 89.440 149.030 7153.77 7206.54 12081.43 S 8948.30 E 5962289.55 N 380449.38 E 1.308 15034.39
17946.48 89.940 149.250 7154.28 7207.05 12161.93 S 8996.40 E 5962208.24 N 380496.10 E 0.582 15127.70
18043.57 90.930 148.280 7153.54 7206.31 12244.95 S 9046.74 E 5962124.37 N 380545.02 E 1 .428 15224.36
18201.05 89.510 147.460 7152.94 7205.71 12378.30 S 9130.49 E 5961989.61 N 380626.47 E 1.041 15381.36
"18250.00 89.510 147.460 7153.35 7206.12 ~. 12419.56 S 9156.82 E - 5961947.90 N ~ 380652.09 E 0.000 15430.19 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB= 52.77' MSL. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 143.420° (True).
Magnetic Declination at Surface is 24.267° (21-0ct-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 18250.00ft.,
The Bottom Hole Displacement is 15430.26ft., in the Direction of 143.599° (True).
.
25 November, 2003 -15:47
Page 70f8
DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Alpine CD-2· CD2-27
Your Ref: API 501032047100
Job No. AKZZ0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
18250.00
7206.12
12419.56 S
9156.82 E Projected Survey
.
Survey tool program for CD2-27
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
714.00
0.00 714.00
707.66 18250.00
707.66 Tolerable Gyro (CD2-27 Gyro)
7206.12 AK-6 BP _IFR-AK (CD2-27)
.
25 November, 2003 - 15:47
Page 8 of 8
DrillQuest 3.03.05.005
e
e¿?)03- \1-1-
26-Nov-03
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well CD2-27 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window 1 Kickoff Survey:
Projected Survey:
0.00 I MD
0.00 I M D (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
DEC 082003
Alaska 0Ii & Gas Cons. Commiteion
Andtomge
~~~f\\:~
Halliburton Sperry-Sun
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-27 MWD
Job No. AKMW0002722885, Surveyed: 15 November, 2003
Survey Report
25 November, 2003
Your Ref: API 501032047100
Surface Coordinates: 5974522.31 N, 371709.10 E (70020'19.0535" N, 151002' 27.6477" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974522.31 N, 128290.90 W (Grid)
Surface Coordinates relative to Structure: 79.24 N, 9.75 W (True)
Kelly Bushing Elevation: 52. 77ft above Mean Sea Level
Kelly Bushing Elevation: 52.77ft above Project V Reference
Kelly Bushing Elevation: 52.77ft above Structure
SPE!r"r"V-SUf1
DRILLING SeRVIt::eS
A Halliburton Company
~~\\\~
d-03-\T1-
~
.
.
RECEIVED
DEC 08 2003
Alaska 0i1 & Gas Cons. Comrnieeìon
Anchorage
Survey Ref: svy320
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-27 MWD
Your Ref: API 501032047100
Job No. AKMW0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 DDft)
714.00 17.800 113.000 654.89 707.66 35.26 S 62.08 E 5974485.99 N 371770.57 E 65.31 MWD Magnetic
790.32 19.010 117.070 727.31 780.08 45.47 S 83.89 E 5974475.41 N 371792.20 E 2.312 86.51
835.56 20.720 119.180 769.86 822.63 52.73 S 97.44 E 5974467.92 N 371805.62 E 4.098 100.41
925.70 23.310 126.240 853.43 906.20 71.05 8 125.76 E 5974449.12 N 371833.62 E 4.103 132.00
1021.03 28.210 132.210 939.28 992.05 97.36 S 157.68 E 5974422.26 N 371865.09 E 5.810 172.15
1116.67 32.750 135.690 1021.68 1074.45 131.088 192.52 E 5974387.96 N 371899.35 E 5.091 219.99 .
1211.31 35.660 135.730 1099.95 1152.72 169.168 229.66 E 5974349.25 N 371935.84 E 3.075 272.71
1306.96 37.650 133.640 1176.68 1229.45 209.29 S 270.27 E 5974308.43 N 371975.75 E 2.455 329.13
1402.13 40.500 137.410 1250.56 1303.33 252.128 312.24 E 5974264.89 N 372016.98 E 3.898 388.53
1497.02 45.200 138.300 1320.11 1372.88 299.97 S 355.51 E 5974216.31 N 372059.43 E 4.994 452.74
1592.48 50.190 139.120 1384.35 1437.12 353.01 S 402.07 E 5974162.47 N 372105.07 E 5.266 523.08
1687.53 55.290 140.850 1441.88 1494.65 410.95 S 450.66 E 5974103.71 N 372152.66 E 5.557 598.57
1782.77 58.920 140.080 1493.59 1546.36 472.61 S 501.56 E 5974041.19 N 372202.50 E 3.871 678.42
1877.93 60.000 138.310 1541.95 1594.72 534.63 8 555.12 E 5973978.26 N 372255.00 E 1.963 760.15
1973.07 60.420 134.630 1589.23 1642.00 594.48 S 611.98 E 5973917.45 N 372310.82 E 3.386 842.09
2068.04 56.220 134.100 1639.09 1691.86 650.98 S 669.74 E 5973859.97 N 372367.60 E 4.448 921.88
2163.16 55.700 136.440 1692.34 1745.11 706.97 S 725.21 E 5973803.04 N 372422.11 E 2.110 999.90
2211.03 55.690 136.540 1719.32 1772.09 735.65 S 752.43 E 5973773.90 N 372448.83 E 0.174 1039.15
2256.02 55.690 138.940 1744.69 1797.46 763.158 777.42 E 5973745.97 N 372473.35 E 4.406 1076.13
2353.28 56.350 136.780 1799.05 1851.82 822.94 8 831.53 E 5973685.26 N 372526.43 E 1.963 1156.39
2448.37 56.580 138.390 1851.58 1904.35 881.468 884.99 E 5973625.84 N 372578.88 E 1 .432 1235.24
2542.93 56.860 140.760 1903.48 1956.25 941.638 936.24 E 5973564.80 N 372629.09 E 2.116 1314.10 .
2638.39 56.770 140.810 1955.73 2008.50 1003.53 8 986.75 E 5973502.05 N 372678.54 E 0.104 1393.91
2733.81 56.810 140.500 2007.99 2060.76 1065.27 8 1037.37 E 5973439.45 N 372728.09 E 0.275 1473.65
2826.93 57.030 140.570 2058.81 2111.58 1125.508 1086.96 E 5973378.37 N 372776.64 E 0.245 1551.58
2924.11 56.620 138.170 2112.00 2164.77 1187.238 1139.92 E 5973315.75 N 372828.54 E 2.110 1632.70
3019.00 57.180 139.280 2163.82 2216.59 1246.978 1192.35 E 5973255.12 N 372879.94 E 1.144 1711.93
3114.14 57.210 141.600 2215,37 2268.14 1308.628 1243.28 E 5973192.61 N 372929.81 E 2.050 1791.78
3209.46 58.770 137.420 2265.91 2318.68 1370.05 8 1295.76 E 5973130.29 N 372981.23 E 4.062 1872.38
3271.17 58.860 135.210 2297.86 2350.63 1408.22 8 1332.22 E 5973091.50 N 373017.03 E 3.067 1924.77
3344.12 58.810 139.510 2335.63 2388.40 1454.128 1374.49 E 5973044.88 N 373058.51 E 5.044 1986.82
3440.07 58.140 137.750 2385.80 2438.57 1515.508 1428.54 E 5972982.59 N 373111.50 E 1.712 2068.32
3535.94 57.570 135.690 2436.81 2489.58 1574.598 1484.18 E 5972922.55 N 373166.12 E 1.914 2148.93
3631.20 57.410 135.640 2488.01 2540.78 1632.05 8 1540.32 E 5972864.14 N 373221.27 E 0.174 2228.53
3726.92 57.080 139.310 2539.81 2592.58 1691.368 1594.72 E 5972803.91 N 373274.65 E 3.243 2308.57
25 November, 2003 - 15:41
Page 2 of 8
DrillQuest 3.03.05.005
~
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-27 MWD
Your Ref: API 501032047100
Job No. AKMW0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3822.31 56.530 136.500 2592.04 2644.81 1750.59 S 1648.22 E 5972743.78 N 373327.12 E 2.532 2388.01
3917.47 56.630 137.540 2644.46 2697.23 1808.698 1702.36 E 5972684.75 N 373380.27 E 0.918 2466.94
4013.61 56.250 136.540 2697.60 2750.37 1867.328 1756.96 E 5972625.20 N 373433.85 E 0.953 2546.56
4108.80 55.940 137.760 2750.70 2803.47 1925.24 8 1810.68 E 5972566.37 N 373486.58 E 1.112 2625.09
4204.44 55.940 138.410 2804.27 2857.04 1984.208 1863.61 E 5972506.51 N 373538.49 E 0.563 2703.98
4299.97 55.370 140.420 2858.17 2910.94 2044.09 8 1914.93E 5972445.75 N 373588.77 E 1.837 2782.65 .
4395.35 55.260 140.410 2912.45 2965.22 2104.548 1964.90 E 5972384.46 N 373637.71 E 0.116 2860.97
4490.93 55.230 138.630 2966.94 3019.71 2164.27 8 2015.88 E 5972323.87 N 373687.66 E 1.530 2939.31
4586.46 57.230 141.800 3020.04 3072.81 2225.29 8 2066.66 E 5972261.99 N 373737.39 E 3.463 3018.58
4681.64 56.930 142.900 3071.77 3124.54 2288.55 8 2115.47 E 5972197.90 N 373785.10 E 1.020 3098.46
4777.03 55.390 141.290 3124.89 3177.66 2351.06 8 2164.13 E 5972134.56 N 373832.69 E 2.138 3177.67
4872.31 56.310 144.640 3178.39 3231.16 2414.008 2211.60 E 5972070.82 N 373879.08 E 3.066 3256.50
4965.94 56.620 148.690 3230.13 3282.90 2479.198 2254.47 E 5972004.92 N 373920.83 E 3.620 3334.39
5062.70 55.260 151.460 3284.33 3337.10 2548.648 2294.47 E 5971934.79 N 373959.63 E 2.757 3414.00
5158.14 55.710 151.880 3338.41 3391 .18 2617.868 2331.79 E 5971864.94 N 373995.75 E 0.595 3491.82
5253.66 54.850 152.740 3392.81 3445.58 2687.388 2368.27 E 5971794.81 N 374031.05 E 1.165 3569.39
5349.09 56.660 152.400 3446.51 3499.28 2757.398 2404.61 E 5971724.18 N 374066.18 E 1.919 3647.27
5444.49 58.800 147.910 3497.46 3550.23 2827.31 8 2444.77 E 5971653.59 N 374105.14 E 4.568 3727.35
5540.02 62.690 149.690 3544.14 3596.91 2898.59 8 2487.91 E 5971581.58 N 374147.06 E 4.384 3810.30
5635.50 63.670 149.500 3587.22 3639.99 2972.08 8 2531.04 E 5971507.36 N 374188.92 E 1.042 3895.01
5731.11 63.740 147.590 3629.58 3682.35 3045.20 8 2575.76 E 5971433.49 N 374232.39 E 1.792 3980.38
5826.69 65.240 144.740 3670.75 3723.52 3116.838 2623.80 E 5971361.05 N 374279.19 E 3.115 4066.53
5922.90 63.730 145.200 3712.19 3764.96 3187.928 2673.64 E 5971289.11 N 374327.80 E 1.628 4153.32 .
6018.44 61.870 144.070 3755.86 3808.63 3257.22 8 2722.81 E 5971218.98 N 374375.78 E 2.213 4238.27
6114.33 61.440 140.420 3801.40 3854.17 3323.93 8 2774.47 E 5971151.40 N 374426.29 E 3.380 4322.63
6210.00 60.590 142.810 3847.76 3900.53 3389.52 8 2826.43 E 5971084.93 N 374477.12 E 2.359 4406.26
6304.92 59.870 138.940 3894.90 3947.67 3453.42 8 2878.40 E 5971020.15 N 374527.99 E 3.619 4488.55
6400.56 59.230 138.530 3943.37 3996.14 3515.408 2932.78 E 5970957.25 N 374581.30 E 0.764 4570.73
6496.02 58.240 138.740 3992.92 4045.69 3576.64 8 2986.70 E 5970895.10 N 374634.17 E 1.054 4652.04
6591.37 58.170 138.890 4043.15 4095.92 3637.638 3040.06 E 5970833.20 N 374686.48 E 0.153 4732.82
6687.07 56.990 138.060 4094.46 4147.23 3698.11 8 3093.62 E 5970771.81 N 374738.99 E 1.434 4813.30
6782.54 56.700 135.720 4146.68 4199.45 3756.458 3148.23 E 5970712.54 N 374792.60 E 2.074 4892.70
6878.00 56.110 136.470 4199.50 4252.27 3813.748 3203.37 E 5970654.32 N 374846.75 E 0.900 4971.56
6973.68 55.990 136.440 4252.93 4305.70 3871.27 8 3258.05 E 5970595.86 N 374900.44 E 0.128 5050.35
7069.24 56.160 137.630 4306.27 4359.04 3929.298 3312.09E 5970536.93 N 374953.48 E 1.048 5129.14
25 November, 2003 - 15:41
Page 3 of 8
DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-27 MWD
Your Ref: API 501032047100
Job No. AKMW0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
7163.69 56.750 139.370 4358.46 4411 .23 3988.25 S 3364.24 E 5970477.09 N 375004.62 E 1.658 5207.57
7259.01 57.940 137.780 4409.90 4462.67 4048.42 S 3417.35 E 5970416.02 N 375056.68 E 1.879 5287.53
7354.52 58.240 136.460 4460.38 4513.15 4107.828 3472.51 E 5970355.68 N 375110.82 E 1.215 5368.11
7449.93 58.640 137.750 4510.32 4563.09 4167.388 3527.85 E 5970295.18 N 375165.13 E 1.226 5448.92
7545.62 58.750 137.150 4560.04 4612.81 4227.61 8 3583.13 E 5970234.01 N 375219.38 E 0,548 5530.23
7640.92 58.050 134.260 4609.98 4662.75 4285.71 8 3639.80 E 5970174.96 N 375275.05 E 2.685 5610.65 .
7737.12 57.860 136.290 4661.03 4713.80 4343.63 S 3697.18 E 5970116.06 N 375331.43 E 1.800 5691.37
7831.72 57.580 137.080 4711.55 4764.32 4401.83 8 3752.05 E 5970056.93 N 375385.29 E 0.766 5770.79
7927.16 57.300 135.700 4762.92 4815.69 4460.07 S 3807.53 E 5969997.75 N 375439.76 E 1.253 5850.62
8022.55 57.130 136.430 4814.57 4867.34 4517.828 3863.17 E 5969939.06 N 375494.41 E 0.668 5930.16
8118.14 56.820 133.990 4866.67 4919.44 4574.69 S 3919.63 E 5969881.23 N 375549.88 E 2.165 6009.47
8214.00 56.620 134.680 4919.28 4972.05 4630.70 S 3976.95 E 5969824.25 N 375606.24 E 0.637 6088.61
8309.47 56.400 136.460 4971.96 5024.73 4687.55 S 4032.68 E 5969766.45 N 375660.99 E 1.572 6167.47
8404.99 56.480 138.340 5024.77 5077.54 4746.148 4086.55 E 5969706.95 N 375713.85 E 1.642 6246.63
8500.58 57.280 139.230 5077.00 5129.77 4806.36 8 4139.30E 5969645.83 N 375765.56 E 1.144 6326.42
8596.03 57.880 139.820 5128.17 5180.94 4867.658 4191.60 E 5969583.66 N 375816.81 E 0.817 6406.81
8691.94 58.290 138.720 5178.87 5231.64 4929.34 8 4244.72 E 5969521.07 N 375868.86 E 1.063 6488.01
8787.63 58.670 137.290 5228.90 5281.67 4989.96 S 4299.30 E 5969459.52 N 375922.39 E 1.334 6569.21
8883.17 59.330 139.040 5278.11 5330.88 5050.98 8 4353.91 E 5969397.58 N 375975.96 E 1.715 6650.75
8978.93 58.930 136.200 5327.25 5380.02 5111.698 4409.30 E 5969335.93 N 376030.30 E 2.580 6732.52
9074.61 58.070 134.230 5377.25 5430.02 5169.59 8 4466.76 E 5969277.06 N 376086.76 E 1.972 6813.25
9170.00 58.000 136.760 5427.75 5480.52 5227.308 4523.48 E 5969218.39 N 376142.49 E 2.251 6893.40 .
9265.13 57.860 135.990 5478.26 5531.03 5285.65 8 4579.10E 5969159.09 N 376197.10 E 0.702 6973.40
9360.64 57.790 134.570 5529.13 5581 :90 5343.09 8 4635.98 E 5969100.68 N 376252.99 E 1.261 7053.43
9456.30 57.280 134.310 5580.47 5633.24 5399.60 8 4693.61 E 5969043.20 N 376309.64 E 0.580 7133.15
9552.00 57.340 137.160 5632.17 5684.94 5457.278 4749.81 E 5968984.57 N 376364.85 E 2.507 7212.95
9647.65 58.510 137.090 5682.96 5735.73 5516.66 8 4804.96 E 5968924.24 N 376418.97 E 1.225 7293.51
9742.85 56.470 137.720 5734.12 5786.89 5575.768 4859.29 E 5968864.23 N 376472.29 E 2.214 7373.35
9839.07 56.520 138.010 5787.24 5840.01 5635.25 8 4913.12 E 5968803.82 N 376525.09 E 0.257 7453.20
9934.44 56.170 136.540 5840.09 5892.86 5693.57 8 4966.98 E 5968744.59 N 376577.94 E 1.334 7532.13
10029.98 55.940 136.080 5893.44 5946.21 5750.88 8 5021.72 E 5968686.35 N 376631.70 E 0.466 7610.77
10125.62 56.370 136.020 5946.71 5999.48 5808.07 8 5076.85 E 5968628.23 N 376685.84 E 0.453 7689.55
10217.26 57.360 138.010 5996.80 6049.57 5864.208 5129.16 E 5968571.21 N 376737.18 E 2.115 7765.80
10315.96 57.940 137.280 6049.62 6102.39 5925.82 8 5185.34 E 5968508.64 N 376792.30 E 0.858 7848.76
10411.71 57.860 136.360 6100.50 6153.27 5984.97 8 5240.84 E 5968448.55 N 376846.78 E 0.818 7929.33
25 November, 2003 - 15:41 Page 4 of 8 DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-27 MWD
Your Ref: API 501032047100
Job No. AKMW0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10506.97 57.650 136.390 6151.32 6204.09 6043.29 S 5296.43 E 5968389.29 N 376901.36 E 0.222 8009.29
10602.27 57.340 136.850 6202.54 6255.31 6101.70S 5351.63 E 5968329.94 N 376955.55 E 0.521 8089.10
10697.71 57.660 138.200 6253.82 6306.59 6161.07 S 5405.98 E 5968269.65 N 377008.88 E 1.239 8169.16
10793.18 58.310 138.480 6304.43 6357.20 6221.55 S 5459.79 E 5968208.26 N 377061.65 E 0.725 8249.79
10888.53 58.580 137.300 6354.33 6407.10 6281.82 S 5514.27 E 5968147.06 N 377115.09 E 1.092 8330.67
10984.13 58.880 138.810 6403.95 6456.72 6342.60 S 5568.89 E 5968085.36 N 377168.66 E 1.386 8412.02 .
11079.54 58.650 136.580 6453.43 6506.20 6402.93 S 5623.79 E 5968024.10 N 377222.52 E 2.013 8493.18
11174.97 57.880 137.930 6503.63 6556.40 6462.53 S 5678.88 E 5967963.57 N 377276.58 E 1.449 8573.87
11270.98 57.800 136.560 6554.74 6607.51 6522.20 S 5734.05 E 5967902.96 N 377330.72 E 1.211 8654.67
11365.45 57.640 136.370 6605.19 6657.96 6580.11 S 5789.07 E 5967844.12 N 377384.74 E 0.240 8733.96
11461.00 56.630 137.320 6657.04 6709.81 6638.65 S 5843.96 E 5967784.65 N 377438.63 E 1.347 8813.68
11556.49 56.190 138.280 6709.87 6762.64 6697.57 S 5897.39 E 5967724.82 N 377491.04 E 0.956 8892.84
11651.78 56.850 141.880 6762.45 6815.22 6758.52 S 5948.38 E 5967663.01 N 377540.97 E 3.226 8972.17
11747.39 58.020 144.800 6813.92 6866.69 6823.15 S 5996.47 E 5967597.56 N 377587.95 E 2.850 9052.73
11843.22 59.390 146.680 6863.70 6916.47 6890.83 S 6042.55 E 5967529.10 N 377632.87 E 2.203 9134.54
11938.97 61.520 148.230 6910.91 6963.68 6961.05 S 6087.35 E 5967458.13 N 377676.46 E 2.633 9217.63
12034.03 64.410 147.840 6954.12 7006.89 7032.88 S 6132.17 E 5967385.55 N 377720.05 E 3.062 9302.02
12129.82 67.110 146.470 6993.44 7046,.21 7106.24 S 6179.55 E 5967311.38 N 377766.16 E 3.106 9389.16
12224.84 71.090 148.570 7027.34 7080.11 7181.12 S 6227.19 E 5967235.70 N 377812.51 E 4.670 9477.68
12320.82 75.150 149.820 7055.20 7107.97 7259.99 S 6274.20 E 5967156.04 N 377858,17 E 4.410 9569.04
12416.52 77.630 147.920 7077.72 7130.49 7339.59 S 6322.29 E 5967075.62 N 377904.89 E 3.231 9661.62
12511.74 81.570 146.430 7094.91 7147.68 7418.27 S 6373.05 E 5966996.08 N 377954.30 E 4.415 9755.05
12588.75 85.550 144.990 7103.54 7156.31 7481 .48 S 6416.16 E 5966932.15 N 377996.32 E 5.492 9831.50 .
12696.19 87.220 145.110 7110.32 7163.09 7569.37 S 6477.58 E 5966843.23 N 378056.23 E 1.558 9938.68
12791 .11 88.520 144.710 7113.85 7166.62 7646.98 S 6532.11 E 5966764.69 N 378109.42 E 1 .433 10033.50
12886.28 89.010 145.640 7115.90 7168.67 7725.09 S 6586.45 E 5966685.67 N 378162.41 E 1.104 10128.60
12982.04 90.860 147.890 7116.01 7168.78 7805.17 S 6638.92 E 5966604.69 N 378213.51 E 3.042 10224.18
13078.33 90.060 150.290 7115.23 7168.00 7887.78 S 6688.38 E 5966521.25 N 378261.55 E 2.627 10319.99
13173.08 89.510 151.120 7115.59 7168.36 7970.41 S 6734.74 E 5966437.84 N 378306.49 E 1.051 10413.98
13269.29 90.000 155.220 7116.00 7168.77 8056.24 S 6778.16 E 5966351.28 N 378348.43 E 4.292 10508.77
13365.20 88.150 156.320 7117.55 7170.32 8143.69 S 6817.51 E 5966263.17 N 378386.28 E 2.244 10602.45
13461.07 88.460 153.240 7120.38 7173.15 8230.37 S 6858.34 E 5966175.80 N 378425.62 E 3.228 10696.39
13556.66 88.950 154.590 7122.54 7175.31 8316.20 S 6900.36 E 5966089.27 N 378466.16 E 1 .502 10790.35
13652.15 89.940 156.500 7123.47 7176.24 8403.11 S 6939.88 E 5966001.69 N 378504.20 E 2.253 10883.70
13747.67 90.800 153.400 7122.85 7175.62 8489.64 S 6980.32 E 5965914.49 N 378543.15 E 3.368 1 0977 .28
25 November, 2003 - 15:41
Page 5 of 8
Dril/Quest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-27 MWD
Your Ref: API 501032047100
Job No. AKMW0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
13843.18 91.600 157.660 7120.85 7173.62 8576.53 S 7019.87 E 5965826.93 N 378581.20 E 4.537 11070.62
13938.79 90.060 152.450 7119.47 7172.24 8663.18 S 7060.17E 5965739.61 N 378620.02 E 5.682 11164.22
14033.30 89.880 153.670 7119.52 7172.29 8747.43 S 7102.99 E 5965654.64 N 378661.39 E 1.305 11257.39
14128.88 89.880 150.140 7119.72 7172.49 8831.73 S 7147.99 E 5965569.57 N 378704.94 E 3.693 11351.91
14224.67 89.690 146.790 7120.08 7172.85 8913.36 S 7198.08 E 5965487.10 N 378753.63 E 3.503 11447.32
14319.57 89.570 146.640 7120.69 7173.46 8992.69 S 7250.17 E 5965406.89 N 378804.35 E 0.202 11542.06 .
14415.91 89.810 147.050 7121.21 7173.98 9073.35 S 7302.85 E 5965325.34 N 378855.65 E 0.493 11638.23
14512.10 90.370 147.140 7121.06 7173.83 9154.11 S 7355.11 E 5965243.70 N 378906.51 E 0.590 11734.22
14605.48 90.190 150.010 7120.60 7173.37 9233.78 S 7403.79 E 5965163.21 N 378953.82 E 3.079 11827.21
14702.41 90.370 150.850 7120.13 7172.90 9318.08 S 7451.62E 5965078.10 N 379000.21 E 0.886 11923.41
14798.00 90.740 151.070 7119.20 7171.97 9401.65 S 7498.02 E 5964993.75 N 379045.17 E 0.450 12018.17
14893.47 89.260 154.430 7119.20 7171.97 9486.51 S 7541.73 E 5964908,15 N 379087.42 E 3.846 12112.36
14988.82 87.960 150.190 7121.52 7174:29 9570.90 S 7586.01 E 5964823.02 N 379130.25 E 4.650 12206.51
15084.67 88.890 150.050 7124.15 7176.92 9653.97 S 7633.74 E 5964739.14 N 379176.55 E 0.981 12301.67
15179.30 89.750 150.590 7125.27 7178.04 9736.18 S 7680.59 E 5964656.15 N 379221.99 E 1.073 12395.61
15275.53 91.420 151.310 7124.29 7177.06 9820.30 S 7727.32 E 5964571.24 N 379267.27 E 1.890 12491.00
15371.29 92.280 150.820 7121.20 7173.97 9904.06 S 7773.62 E 5964486.70 N 379312.13 E 1.033 12585.86
15466.07 92.220 151.830 7117.48 7170.25 9987.15 S 7819.D7E 5964402.85 N 379356.15 E 1.067 12679.67
15562.42 91.670 153.060 7114,21 7166.98 10072.52 S 7863.61 E 5964316.73 N 379399.23 E 1.398 12774.77
15658.09 91.670 154.940 7111.42 7164.19 10158.47 S 7905.53 E 5964230.07 N 379439.67 E 1.964 12868.76
15753.48 89.380 154.700 7110.55 7163.32 10244.78 S 7946.11 E 5964143.08 N 379478.77 E 2.414 12962.26
15849.12 89.940 153.690 7111.11 7163.88 10330.88 S 7987.74 E 5964056.28 N 379518.92 E 1.207 13056.21 .
15941.55 89.810 161.440 7111.32 7164.09 10416.25 S 8022.99 E 5963970.32 N 379552.70 E 8.386 13145.77
16039.59 89.070 153.790 7112.28 7165.05 10506.83 S 8060.30 E 5963879.11 N 379588.45 E 7.839 13240.74
16135.18 89.510 156.240 7113.46 7166.23 10593.46 S 8100.66 E 5963791.80 N 379627.33 E 2.604 13334.37
16230.78 88.580 154.920 7115.05 7167.82 10680.49 S 8140.18 E 5963704.11 N 379665.35 E 1.689 13427.81
16326.12 87.780 156.350 7118.08 7170.85 10767.30 S 8179.49 E 5963616.65 N 379703.18 E 1.718 13520.94
16420.86 87.470 157.410 7122.01 7174.78 10854.35 S 8216.66 E 5963528.97 N 379738.85 E 1.165 13612.99
16516.59 87.590 159.690 7126.13 7178.90 10943.36 S 8251.63 E 5963439.37 N 379772.29 E 2.383 13705.31
16613.32 85.120 157.870 7132.28 7185.05 11033.34 S 8286.57 E 5963348.81 N 379805.68 E 3.169 13798.39
16708.03 84.810 155.230 7140.60 7193.37 11119.88 S 8324.11 E 5963261.63 N 379841.74 E 2.796 13890.26
16803.53 86.540 152.570 7147.80 7200.57 11205.39 S 8366.00 E 5963175.42 N 379882.16 E 3.316 13983.89
16899.19 86.420 153.810 7153.67 7206.44 11290.60 S 8409.06 E 5963089.49 N 379923.76 E 1.300 14077.98
16994.89 88.830 152.750 7157.64 7210.41 11376.00 S 8452.05 E 5963003.36 N 379965.28 E 2.751 14172.18
17089.60 89.380 153.880 7159.12 7211.89 11460.61 S 8494.58 E 5962918.04 N 380006.35 E 1.327 14265.46
25 November, 2003 - 15:41
Page 6 of 8
DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-27 MWD
Your Ref: API 501032047100
Job No. AKMW0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
17185.47 89.510 152.610 7160.05 7212.82 11546.215 8537.73 E 5962831.71 N 380048.04 E 1.332 14359.92
17281.00 90.620 149.800 7159.94 7212.71 11629.92 5 8583.74 E 5962747.23 N 380092.61 E 3.163 14454.56
17373.74 91.970 151.090 7157.84 7210.61 11710.575 8629.48 E 5962665.81 N 380136.95 E 2.013 14546.58
17471.67 92.280 149.170 7154.21 7206.98 11795.43 5 8678.21 E 5962580.13 N 380184.23 E 1.985 14643.76
17567.04 90.060 148.630 7152.26 7205.03 11877.075 8727.46 E 5962497.66 N 380232.08 E 2.396 14738.67
17662.84 89.690 147.890 7152.47 7205.24 11958.54 5 8777.86 E 5962415.34 N 380281.07 E 0.864 14834.13 .
17758.52 89.510 147.220 7153.14 7205.91 12039.28 5 8829.19 E 5962333.73 N 380331.01 E 0.725 14929.56
17852.70 89.440 148.210 7154.00 7206.77 12118.905 8879.49 E 5962253.26 N 380379.94 E 1.054 15023.47
17946.48 89.940 148.780 7154.51 7207.28 12198.855 8928.49 E 5962172.48 N 380427.57 E 0.809 15116.88
18043.57 90.930 151.070 7153.77 7206.54 12282.865 8977.14 E 5962087.65 N 380474.78 E 2.570 15213.33
18201.05 89.510 150.310 7153.17 7205.94 12420.185 9054.23 E 5961949.04 N 380549.51 E 1.023 15369.54
18250.00 89.510 150.310 7153.59 7206.36 12462.70 5 9078.48 E 5961906.11 N 380573.02 E 0.000 15418.14 Projected Survey
All data is in Feet (U5 Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB= 52.71' MSL. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical 5ection is from Well and calculated along an Azimuth of 143.420° (True).
Magnetic Declination at 5urface is 24.267° (21-0ct-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 18250.00ft.,
The Bottom Hole Displacement is 15418.74ft., in the Direction of 143.928° (True).
.
25 November, 2003 - 15:41
Page 70f8
DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-27 MWD
Your Ref: API 501032047100
Job No. AKMW0002722885, Surveyed: 15 November, 2003
North Slope, Alaska
Alaska North Slope
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
18250.00
7206.36
12462.70 S
9078.48 E Projected Survey
.
Survey tool program for CD2-27 MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
714.00
0.00 714.00
707.66 18250.00
707.66 Tolerable Gyro (CD2-27 Gyro)
7206.36 MWD Magnetic (CD2-27 MWD)
.
25 November, 2003 - 15:41
Page 80f8
DrillQuest 3.03.05.005
~ conocoPf(!II!¡I8~tc,
.ALPINE
CD2-27
v'/F /V 'v .v// 'DSû 'DSû22 V'v
TUBING 11III API: 501032047100 Well Tvne: SVC AnDie ({jJ TS: dea (cV
(Q..12671 , SSSV Type: NIPPLE Orig Angle @ TD: 90 deg @ 18250
0D:4.500, ComDletion:
1D:3.958) Annular Fluid: Last W/O: Rev Reason: Set DMY, Pull RHC
'RODUCTION ball/rod
(34-12461, Reference Loa: 36' RKB Ref Loa Date: Last Undate: 12/2612003
00:7.000, Last Too: TD: 18250 ftKB
Wt:26.00) Last Tag Date: Max Hole Angle: 92 deg @ 17472
Casino Strina . ALL STRINGS
DescriDtion Size TaD Bottom TVD Wt Grade Thread
CONDUCTOR 16.000 0 114 114 62.50 H-40 WELDED
PRODUCTION 7.000 34 12461 7138 26.00 L-80 BTCM
'. SURFACE 9.625 36 3311 2371 36.00 J-SS BTC
OPEN HOLE 6.125 12461 18250 18250 0.00
Tubina Strina . TUBING
Size 1 TaD 1 Bottom I TVD I Wt I Grade I Thread
; 4.500 I 0 I 12671 I 7161 I 12.60 I L-80 ì IBTM
Gas Lift Mandrels/Valves
St MD I TVD I r:,~ Man Type I VMfr I V Type I V OD I Latch I Port I TRO I Date I Vlv
Run Cmnt
PACKER 1 1117911 68891 CAMCO I KBG-2 I I OV I 1.0 1 BK I 0.250 I o 112/3120031
(11904-11905. Other (; luas auiD. etc.\· JEWELRY
OD:5.970) DeDth TVD TVDe DescriDtion ID
33 33 HANGER FMC 4.5" TBG HANGER 4.500
2643 2011 NIP CAMCO LANDING 'DB' NIPPLE 3.812
11904 6946 PACKER BAKER S-3 PACKER W/MILLOUT EXTENSION 3.875
11969 6977 NIP HES 'XN' NO GO NIPPLE 3.725
12670 7161 WLEG BAKER WIRELlNE GUIDE 3.875
: General Notes
NIP
(11969-11970. Date I Note
00-5000) 11/8/20031 !REE: FMC 4 1/16 I 5K
TREE CAP CONNECTION: 7" OTIS
1/18/20œJ DUE TO POOR PRODUCTION CASING SHOE TBG RUN DOWN INTO OPEN HOLE
OPEN HOLE
(12461,18250.
OD 6125)
WLEG I
(1267Q..12671.
OD:5OOO)
,
I .
I .
,
~ t lilt...
stATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
E-Mail to;Tom_Maunder@admin.state.ak.usandBob_Fleckenstein@admin.state.ak.us
OPERATOR: COhocoPhlllips Alaska Inc.
FIELD 1 UNrr 1 PAO:
Alpine
OATE:
11/18/2003
WELL
NUMBER
PTO: 203-177
Well #: C02·27
COMMENTS:
N
P Diesel
KCL brine
4.5 3500
TBG
CSG
PRI;$S<
1,500
3,451
6:56
am X
PTO:
Well #:
COMMENTS:
PTO:
Well #:
COMMENTS:
PTO:
Well #:
COMMENTS:
PTO:
Well #:
COMMENTS:
TBG. INJ. FLUID COOES
F = FRESH WATER INJ.
G = GAS INJ.
S = SALTWATER INJ.
N = NOT INJECTING
TEST TYPE:
M = ANNULUS MONITORING
P = STD ANNULUS PRESSURE TEST
R = INTERNAL RAD. TRACER SURVEY
A == TEMPERATURE ANOMALY TEST
D = DIFFERENTIAL TEMPERATURE TEST
ANNULAR FLUIO: P.P.G.
DIESEL 6.8
GLYCOL
SALTWATER 9.2
DRILLING MUD
OTHER
Grad.
0.35
0.00
0.48
0.00
0.00
WELL TEST:
Initial X
4 - Year
W orkover
Other
Distribution:
orig - Well File
c - Operator
c - Database
c - Trip Rpt File
c - Inspector
OPERATOR REP SIGNATURE:
Don Mickey , AOGCC REP SIGNATURE:
CD2-27 MIT .xls
(Rev 9/23/99)
Schfumbepgep
NO. 3064
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TTN: Beth
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Alpine
Well
Color
Prints
CD
Job#
Log Description
Date
BL
CD2-06 ~~-IPíq 10709650 SCMT 11/03/03 1
CD2-2 10696810 USIT 11/16/03 1
-
Kt:Gt:IV =U
'----. . '"
SIGNED: ""\-Zr\_\. ~ ./~~ ,( ~~'b"v"
DATE:
OFC 1? 2003
Alaska Qjl & Gas Cons. Commiseion
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank Y041.nchomge
~~':ül\\.. ~
12/08/03
.
.
.
.
.
Ç()~-\,\\
WPHILLIPS Alaska, Inc.
Casing Detail
9518" Surface Casing
Well: CD2-27
Date: 11/1/2003
A Subsidiary ()f PHILLIPS PETROLEUM COMPANY DEPTH
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS
Doyon 19 RKB to Landing Ring 36.56
FMC Gen V Hanger 2.95 36.56
Jts 3 to 78 76 Jts 9-5/8" 36# J-55 BTC Csg 3186.91 39.51
Davis Lynch Float Collar 1.45 3226.42
Jts 1 t02 2 Jts 9-5/8" 36# J-55 BTC Csg 80.93 3227.87
Ray Oil Tools "Silver Bullet" Float Shoe 2.30 3308.80
3311.10
TO 12 1/4" Surface Hole 3321.00
RUN TOTAL 45 BOWSPRING CENTRALlZERS-
1 per jt on Jt #1 - #12 (On stop ring of Jt #2)
and over collars on jts# 14, 16, 18, 20, 22, 24, 26, 28, 30,
32,34,36,38,40,42,44,46,48,50,52,54,56,58,60,62
64,66,68,70,72,74,76,78
87 joints in the pipe shed. Run 78 joints-9 joints to stay in
the shed
Use Best-o-Lite 2000 pipe dope
Remarks: Up Wt - 175k
On Wt - 135k
Block Wt - 75k
Supervisor: Whitlock / Burley
ConocoPhillips Alaska
Cem.ritingp,¡epørt
Report #:
Start:
1
10/28/2003
Cement Job Type: Primary
..0 __.._" _... ,_, ,',... _ ,. _., ,. __ _ ,_.,.,. . .. . '.
L___~Queeze _Ǫ~i!!9.~ .___
Hole Size:
TMD Set:
Date Set:
Csg Type:
sa TMD:
sa Date:
Cmtd. Csg:
.__ Prima!Y'___.___. __ SQue~~e Opel'!. Hole
Hole Size: 12.250 (in) Hole Size:
TMD Set: 3,311 (ft) sa TMD: (ft)
Date Set: 11/1/2003 sa Date:
Csg Type: Surface Casing sa Type:
Csg Size: 9.625 (in.)
Cmtd. Csg: Surface Casing
Cement Co: Dowell Schlumberger
Cmtd. Csg:
-----_._-_._~-_.__.. ----
Hole Size:
Top Set: (ft)
BTM set: (ft)
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
Cementer: Steve Daughten
--- --"-.-------.-.---. .----- ...'----..._-".._--..._--._.----_.. --....------.. -----_.---
Pipe Movement
Rot TIme Start: :
Rae Time Start:19:00
RPM:
SPM: 1
_._~.__.__. --- . ._-- ---..------. .--- ..---.---..----" .----". ---.-.-. . -.-..- .---- -_._-.- ..~._--
Time End: :
Time End: 22:22
Init Torque: (ft-Ibf)
Stroke Length: 20.0 (ft)
Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf)
Drag Up: 163,000 (Ibs) Drag Down: 132,000 (Ibs)
.-.-- . -.--.-.....--....--......---.--. .... ~~_.-
____ ..___. .___._._,.__. .".____ .._____. ._.._.__...._.___ ._..___ "..____a_.______. .____.____... ...__.
Stage No: 1 of 1
_ ___.__ _ __.. __." ...__._...._.____.__ _ ... ~.______._.__......____...... __ ....._.. ___.. ...... ._.. .__._____ .... .._. .. ... .' .__.... . ~._. ___.._ .... ____.... . __....... ·M·~·___
Type: Cement Casing
Volume Excess %: 100.00
Meas. From: 240
Time Circ Prior
To Cementing: 1.50
Mud Circ Rate: 337 (gpm)
Mud Circ Press: 410 (psi)
Start Mix Cmt: 20:57
Start Slurry Displ: :
Start Displ: 22:17
End Pumping: 23:04
End Pump Date:
Top Plug: Y
Bottom Plug: Y
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
7.00 (bbl/min)
7.00 (bbl/min)
Y
440 (psi)
1,200 (psi)
2 (min)
Y
-.-....--
.-...-.....--..
..---..,-
.....---.-. .--'.--'--'.'
Mu~ Data
, " .
",', """ . '
-. --.. .. '--'~'._.--"..'--' ., -.-.. ,---- '-..--.. - ---..- . ~-_...._.._. "''''..---....
Retums: 100
Total Mud Lost: )Þbl)/
Cmt Vol to Surf: ~bbl)
Ann Flow After: N
Mixing Method:
Density Meas By: Dowell
. .. .._. .__..____.._... "0'. __._
,I'"
"
....-.--.".. .-.-.'--. ..--....-.---.. --.-.-.-.
.""
.-.... ---. .....------....
--- - - --..-.. - ..--- -.. .
PVIYP: 35 (cp)/65 (lb/10Qft2) Gels 10 see: 33 (lb/100ft2) Gels 10 min: 73 (lb/10Qft2)
Bottom Hole Static Temperature: (OF)
Density: 9.6 (ppg) Volume: 229.40 (bbl)
-'~-'.'_.._-_." ...._-~, .-......--..-... .....-...-..." ......--_.... ..-- -.-.. ---.,..
'. --.. .....-.--. . ...-. ....--. ...
.~.'.__. .. .. ..--_. ...--.--...... -~...- ...-.. .-.... .---.--.. . '--.------.
StagÎ!No:1, Slurry No: 1 of 4
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft)
Water Source:
To: (ft)
Description: Viscosified H20 w/ nutplu
Cmt Vol: 40.0 (bbl) Density: 8.40 (ppg)
Slurry Vol: (sk) Water Vol: (bbl)
Class:
Yield: (ft3/sk)
Other Vol: 0
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
---.... . ..----.. . .-. -'" . --......... .....
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Printed: 111712003 10:22:08 AM
-.--.,,------,-.. .,.
.-. - ..-. - ...----------... -....-.
legal Well Name:
Common Well Name:
Event Name:
. "
...............................................w..._.-:....:.:.-~_
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft) To: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
.
. . .......-----.-. - .... .
ConocoPhillips Alaska
Cementing Report
. ---..----..--- -...
.
. -... ----
Page 2 of 3
. ..-.....-.--.
Report #:
Start:
Spud Date: 10/30/2003
1 Report Date: 11/1/2003
10/28/2003 End: 11/18/2003
Description: MUDPUSH XL Class:
Cmt Vol: 50.0 (bbl) Density: 10.70 (ppg) Yield: (ft3/sk)
Slurry Vol: (sk) Water Vol: (bbl) Other Vol: ()
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Stage No: 1 Slurry No: 3 of 4
Slurry Data
Fluid Type: LEAD
Slurry Interval: 2,811.00 (ft)To: 36.56 (ft)
Water Source: Rig tank
CD2-27
CD2-27
ROT - DRilLING
.".. '- J') '/:' .. ';. :):i;ifF,:;:m mmmm::;_______"y;
.____.....:...m..L:¡;.;::.~;·Ú~Lm_._~~~~~.~~: 1· '$1.:'
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
-.------..-.....
Trade Name
D-53
0-46
D-79
S1
D-124
D-44
D-65
Slurry Data
Fluid Type: TAIL
Slurry Interval: 3,311.00 (ft)To:
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Description: ASLite
Cmt Vol: 390.0 (bbl)
Slurry Vol:512 (sk)
Temperature: ("F)
Temperature: ("F)
Temperature: ("F)
Temp
(OF)
("F)
Class: G
Density: 10.70 (ppg) Yield: 4.28 (ft3/sk)
Water Vol: 236.0 (bbl) Other Vol: ()
Time
Compressive Strength 1:
Compressive Strength 2:
Stage No: 1 Slurry No: 3 of 4 - Additives
Type
GYPSUM
DEFOAMER
EXTENDER
ACCELERATOR
FILLlTE
ACCELERATOR
DISPERSANT
Concentration Units
% BWOC
%BWOC
%BWOC
%BWOC
% BWOC
% BWOW
% BWOC
Stage No: 1 Slurry No: 4 of 4
Description:
2,811.00 (ft) Cmt Vol: 51.6 (bbl)
Slurry Vol250 (sk)
Temperature: ("F)
Temperature: (OF)
Temperature: (OF)
Temp
(OF)
(OF)
Liquid Cone..
Class: G
Density: 15.80 (ppg) Yield: 1.16 (ft3/sk)
Water Vol: 30.0 (bbl) Other Vol: ()
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
("F)
("F)
............................_m.._........_..._._
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Pressure
(psi)
(psi)
Purpose: FILLER CEME
Mix Water: 19.40 (gal)
Foam Job: N
Pressure
(psi)
(psi)
Units
Purpose: PRIMARY
Mix Water: 5.10 (gal)
Foam Job: N
Pressure
(psi)
(psi)
Printed: 1211112003 8:52:21 AM
I
-
.,
Con()coPhillips Alaska
Qementing..·.Repørt
Page 30f 3
Legal Well Name: CD2-27
Common Well Name: CD2-27
Event Name: ROT - DRILLING
Report #:
Start:
Spud Date: 10/30/2003
1 Report Date: 11/1/2003
10/28/2003 End:
Concentration ....
.StageiNo: 1 Slurry No: 4 of 4 . Additives
D-46
D·65
S1
DEFOAMER
DISPERSANT
ACCELERATOR
Casing Test
Shoe Test
Liner Top Test
-----.--
__ --.....___._0___··-----
Test Press: (psi)
For: (min)
Cement Found between
Shoe and Collar:
Pressure: (ppge)
Tool:
Open Hole: (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool:
Tool:
Tool:
Log/Survey Evaluation
Interpretation Summary
------.. .--,.--.---...-----
-------------.-.-.- . - ...... ....- .-.-.. -...-....--.---
.----........-----.---
CBL Run:
Under Pressure: (psi)
Bond Quality:
Cet Run:
Bond Quality:
Temp Survey:
Hrs Prior to Log:
CementTop: (ft)
How Determined:
TOC Sufficient:
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required:
Number of Remedial Squeezes:
Printed: 111712003 10:22:08 AM
~
-
~
....
WELL NAME
ConocoPhllllps Alaska
. DaUyDrllllng Report
Page1of2
CD2·27
SUPERVISOR I RIG NAME & NO.
Dave Burlev/ G.R. Whitlo I doyon1 @PPCo.co
CURRENT STATUS
JOB NUMBER I EVENT CODE 24 HRS PROG
I ODR
FIELD NAME I OCS NO.
Alpine
ACCIDENTS LAST 24 HRS.?
Doyon 19
.. < .'<
TMD TVD I DFS IREPT NO. I DATE
3321.0 I 2375.0 I 2.34 3 111/1/2003
AUTH MD DAILY TANG I CUM. TANGO
17802.0 0 I
DAILY INT WIO MUD CUM INT ANG WI MUD
o 0
DATE OF LAST SAFETY MEETING DAILY TOTAL CUM COST WI MUD
10/31/2003 384,624 679.252
LEAKOFF AFE AUTH.
TestinQ BOPE
24 HR FORECAST
Finish testina BOPE.
LITHOLOGY
BHA NO. I 1 ~ BHA I HOLE CO~º-lTIº.NS
~.!,T: BELO~~~RS ~IN~ WT~ UP __ ._ STRING WT._~~___ STRING WT. ROT__
~~... ',:i~a;ij(1mH<
Bit 1 1.30 12.250 3.750
Mud Motor 1 30.78 8.000 5.250
Sub - Float 1 2.23 8.000 2.813
Stabilizer- NonMag 1 5.96 8.150 2.500
Crossover 1 2.52 8.000 3.000
MWD 1 9.20 7.920 1.900
MWD 1 8.89 7.950 1.900
MWD 1 9.97 8.170 1.900
Sub - Bottom Hole Orienting 1 2.95 8.050 2.813
DrillCollar-NonMag 1 31.28 8.100 2.810
DrillCollar-NonMag 1 31.28 8.100 2.810
DrillCollar-NonMag 1 31.22 8.100 2.810
Crossover 1 2.49 8.000 2.880
Drill Pipe - Heavy Wgt 3 89.75 5.000 3.000
Jars 1 32.86 6.375 2.750
Drill Pipe - Heavy Wgt 23 685.50 5.000 3.000
"_.____,.."".,. ...'. ...... .... ..... ..'.'__"" no _... n ._._......'''''''.,._.
" .,¡. ' ........ i .'. . .... ..... .... BITS:. . . ............ . ',.. ..... '
·~t~~~i.:.Ru.~~~1~F~·~~~:~~:·1·::·:j2~~HRl,Mttt :'. ': ~6:~:i~~;·~r· ...::. .'.::. '~~~~f~~T'::~':~~'l~~~~'¡;~~~ 1:c~~:;':oJ·~·;·~·~1~:~~-:~~~~~~~:~~
M/U BHA drillout, LOT and drill ahead
JAR HRS OF SERVICE I BHA HRS SINCE INSP
SHALE I
LAST SURVEY: DATE TMD INC AZIM I LAST CASING NEXT CASING
10/31/2003 3,271.17 58.860 137.480 19.625(jn)@ 3,311.0(ft) 7.000(in)@ 12,524.0(ft)
~N.!Ir~ '--~~_~j~~/-~~T _m_."...... ~C~l__. IMUD DAr~I='ï~~!-~~~-'-T"----~-"'r-'--- I CUMCOSTyl 0 dES
-2: -l':*:: ~~-r!'~;'P FC:~SOL +-'''''~~T~~-~~~::!_-- r"-~::ïM_u. I ë}~:6 -1' . ~I. --+--i~----T .. H2S LI~~r
_ I BIT NO.! ___~. .___.
TORQUE I UNITS I _~~~u':~~G1M
..1..... ... .....9J~.1.~., .....
::~ql;i~:SIZËi" 'ǺN"'~:.'
10030723
LAST BOP PRES TEST
-- ...__u__.__.___-:-.. . --.. - :",;:'BIT-OPERATIONSm-~~- -.. .-. -- ..n._____ .-.._u
'~"-'~-U'''' .,-.....------'. ..nn... m__.___._ ...--.-..... ,... ·..,·t: ....,.-¡;~.__._..m - r -"- :... .......n..___. _____u. - . ,.____..u____,. ..... .:' ..--~..----.,-~..-.. c... .. ..;,.
~a.IT I ~~_~_... n.1. .~_~~...n .. :... ..RPM. .! 'GP~ . ~L~~RE~~_. L.m.~ .~IT L ..__~~~ .. .L . 2.~H.r DIST .: 24Hr. ROpJ _~~.!'1_~!!S I CU"!J~~~1H. i ~1J_~..Ft~~.
---...,.
. _. - . - ..._ __._m_._____... .._._.
",
'.' OPERATIONS SUMMARY
-;:""- - ,. ·_.n_......___ u. .. , ........n..... - . - -.... T.... .,,_ .,.n ,. _.....__.__..,. _. ... _ __......__..... .... _ _ __... ...._.._ .. ... .n_.... .__ _nu...........__.. ....~,..
!R.OML.T.(). HO~.~~.J _ .CODE :TROUBL~~.~_E.'.:..__L~~.A~.E I ... __-._.".. ..._.. _... .. DESCRIP!,.~.~___...u...._ __.. .. ___..._.-um
00:00 00:15 0.25 DRILL P CIRC SURFAC Finish circ hole clean.. 650 gpm 12020 psi /90 rpm
00:15 08:00 7.75 DRILL P TRIP SURFAC Monitor well, static. POOH on trip tank from 3321', worked thru several tight
spots 15-30K, pulled 40 Kover @ 3062'. Backream from 3159' to 1164' wI
600 gpm / 80 rpm. POOH on trip tank from 1164' to 168'.
PULD SURFAC Stand back 8" flex collars· LD BHA . UBHO, MWD, stab, float sub, motor &
bit.
RURD SURFAC RU to run 9 5/8" casing.
SFTY SURFAC Prejob safety and opts meeting.
_'_.__.'_'~'._". . .... .__,__'..__n....
.. .... ...__..._.._ ._,__.. - ._.__..__...... _.. ____.........___ ... ._.__n ~_ ____..
08:00 10:30
2.50
DRILL P
10:30 12:00
12:00 12:15
1.50
0.25
CASE P
CASE P
Printed; 111712003 10:27: 14 AM
-
..a
~
'CÖI'IOCOPhUUpSHAlåska
Daily Drilling Report
Page 2 of 2
CD2-27
I JOB NUMBER I EVENT CODE 24 HRS PROG
I I ODR
DATE
11/1/2003
......<. ".<' .··ORERA'T'IONSSUMMAAY
~T_· TO [!.tõ~_~~_1 nc~~~_irRÕUBL_El._.~~~n_. __P~ASE_ __om. n. '''''' .~·-·~=~~~·:~~_~~Rn~!'~~_..o.__.n___. .._ ______ . nm.
12:15 14:30 2.25 CASE P RUNC SURFAC Run 9 5/8',36#, J-55 Casing: FS, 2 its, FC, 2 its -BakerLoc 1st four its
establish circ and check floats. Run casing - washed thru tight spot from 418'
to 420'. Run casing, started taking wt @ 960', pipe stopped @ 975'.
SURFAC Washed down from 956' to 1066' Ots 23, 24, 25) 4 bpm 1190 psi.
SURFAC Run casing from 1066' to 2323', no problems.
SURFAC Wash down 2323' to 2367' ( it # 57) to break gels and lower cuttings load in
annulus.
RUNC SURFAC Run casing from 2367' to 3271', MU FMC fluted hanger and LJ, land casing
with shoe @ 3311', FC @ 3226'.
SURFAC Lay down fill-up tool, blow down Top Drive - MU cement head.
SURFAC Circulate and condition mud @ 8 bpm 410 psi.
SURFAC Pump 40 bbl viscosified water wI nutplug wI rig pump. Cementer pumped 5 bb
water and tested lines to 2500 psi. Dropped bottom plug and pumped 50 bbl
Mudpush spacer @ 10.5 ppg. Mixed and pumped 390 bbl Lead slurry @ 10.7
ppg and 51.6 bbl Tail slurry @ 15.8 ppg.
SURFAC Dropped top plug and pumped 20 bbl water wI cementer and displaced
cement wI 229.4 bbl mud wI rig pump. Bumped plug wI 1200 psi @ 23:04 hrs
11/1/03. Checked floats-OK. Circulated 240 bbl cement to surface, full retums
throughout.
SURFAC Tested casing to 2500 psi for 30 minutes wI no leakoff. Flushed riser wI
treated water and blew down lines
WELL NAME
14:30 15:45
15:45 17:00
17:00 17:15
1.25
1.25
0.25
CASE P
CASE P
CASE P
RUNC
RUNC
RUNC
17:15 18:30
1.25
CASE P
18:30 19:00
19:00 20:30
20:30 22:15
CEMENT I
CEMENT I
CEMENT I
PULD
CIRC
PUMP
0.50
1.50
1.75
22:15 23:00
CEMENT I
DISP
0.75
23:00 00:00
1.00
CASE P
MIT
TMD I TVD DFS I REPT N30.
3321.0 I 2 375.0 2.34 I
24 HR SUMMARY: POOH and RIU casing equipment. Run 78 its 9-5/8' 36# J-55 BTC casing. Washed from 418'-420' and 956'-1066'. Land
casing shoe @ 3311'. Circ and condition mud. Cement wI 390 bbl Lead/51.6 bbl Tail. CIP @ 23:04 hrs. Test casing to
2500 psi for 30 min.
7t'~- -- COMPANŸ ---.-.. -.. .--
.c_._ ..:_--'-'-O'._ n__+_.....n
ConocoPhillips Company
Fairweather E&P Service
Doyon Drilling Inc
ACI - Arctic Catering
M-I Drilling Fluids
. ..__.__. _O'_ un ._ . .. _ __ _m. _._.._. _. __ mom _.._ u_
P.ERSONNEL DATA. .'.
_}L~_-~;:~-=C~~~~~.':..~:_··~..--~CO~-~AN.Y ·~--J.~~.-~~=:~-.:~~:~VIC~=~:_._. j_~::~~. . i·:~OU~.___
1 Dowell 2
1 Swaco 4
27 Other 3
5 Other 2
3
-- ..".
.--
SERVICE
" ....., ....... :,... '.'--. _mn..n_n_. .._.n. . .':-':::j\,tA'fIžRiALSYéoNSUMPTíON' '.:: .... n...._..._..__.....uu_..___"........ nm .:. __ ...,.nno
,:".--;-.. .:. .---,-..... -. n_._-:,~u. .. ..n._..._.____._________.._.. u _ .:......:. ..........1...0_.'.....__.. ---................ .........n..._ ...n..-,-._..___.__...,.-__........._._ _... .. .. .._.......... n ......:. ....._.. ....,-___._____. .n____._. ..._". "'._-.-
,:.:: ITEM "1 UNITS ¡ USAGE; ..... '··.ONHANC:iJ .. ITEMi UNITS .1 USAGE ¡ .ONHANQ:.
Fuel . "-'-'-i" ..g;~·_-·-....-1··..-u1·:Ë3ÖÖ··... r---:¡:362'-- Wät;;,·p~t~¡;i~--·----··r . 'bbls" ..., .. . 110..--nj........ . --<"300 .,-
Water, Drilling I bbls I 1,750 I -4,740 I I I
_·,_"'··.._____u_._....._._._____... .. _._.____. ...___._..___.________n__' __._...__." _......__.. ._......... _._______._______.
. . RESERVOIR' AND INTERVAL DATA
--..--.......--.--O'-...... ......--.-.._.......... ......... --O' .....-----.............. ..---T----..-..'... ." ..... ....... ... _.n uou_.._.......___._..u....___.._..____.m.. ...... ...-...--...-..-
CD2~2i~~~VOIR.~-A~E .... fC~:2~2i'" ZONE n_..~.+-. T~;3.51· .B~!i:5· f'13ÕÖ"--" . ._~~~~~~T.S .--... ..--- .----
Printed: 111712003 10:27:14 AM
PRESSURE INTEGRITY TEST
CONOCOPHILLlPS Alaska, Inc.
Well Name: I CD2-27 I Rig: Doyon 19 Date: 1 11/2/2003 _I Volume Input VolumelStroke Pump Rate:
Drilling Supervisor: Burley/Whitlock Pump used: I #2 Mud Pump .... ~ Strokes ... 0.0840 Bbls/Strk ... 6.0 Str1</min I'"
Type of Test: I Casing Shoe Test LOT/FIT ~ Pumping down annulus and DP. I ~
Casin Test Pressure Inteoritv Test
Hole Size: 12-1/4" . Casing Shoe Depth I I Hole Depth Pumping Shut-in Pumpina Shut-in
RKB-CHF:I 36.7 Ft 3,311 IFt-MD 2,3711 Ft- TVDI I 3,3411 Ft-MD I 2,387IFt-TVD Strks psi Min psi Strks psi Min psi
Casino Size and Description: 19-5/8" 36#/Ft J-SS BTC . 0 0 0 2500 0 0 0 1030
Casina Test Pressure IntenritvTest 2 0 1 2500 5 15 0.25 1000
Mud Weight: 9.6 ppg Mud Weight: 9.6 ppg 4 40 2 2500 10 50 0.5 960
Mud 10 min Gel: 18.0 Lb/100 Ft2 Mud 10 min Gel: 12.0 Lb/1 00 Ft2 6 50 3 2500 15 80 1 910
Test Pressure: 2,500 psi Rotating Weight: 120,000 Lbs 8 100 4 2500 20 cnð 140 1.5 -
Rotating Weight: o Lbs BlocksfTop Drive Weight: 75,000 Lbs 10 200 5 2500 25 ~ "270 2
BlocksfT op Drive Weight: o Lbs Desired PIT EMW: 18.0 ppg 12 300 6 2500 30 \'7j} "400 2.5
Estimates for Test: 2.4 bbls Estimates for Test: 1036 psi 0.9 bbls 14 450 7 2500 35 ,~"\ ~530 3 840
¡·l . 16 600 8 2500 40 \'-\ts70 3.5 830
-
EMW = Leak-off Pressure + Mud Weight = 1030 96 PIT 15 Second 18 800 9 2500 45 \J,ù -800 4 820
0.052 x TVD 0.052 x 2371 + . /' Shut-in Pressure, psi 20 900 10 2500 50 \...Ö970 4.5 810
EMW at 3311 Ft-MD (2371 Ft- TVD) = 18.0 DDa 1000 22 1050 15 2500 54 "á 030 5 800
3000 ~ Lost 0 psi during test, held 100% = 24 1175 20 2500 5.5 800
i- of test pressure. _ 26 1300 25 2500 6 790
28 1400 30 2500 6.5 790
.
2500 30 1525 7 780
~
32 1650 7.5 780
~ . 34 1800 8 780
2000 , 36 1925 8.5 780
w
a: ~
::) 38 2050 9 770
(J) 1500 40 2200 9.5 770
(J) ~ 42 2375 10 .
W /
a: ~ 44 2500
D..
1000 ~
-- ~ --
..- ~ -
500 ~~
I ;:>---
.... ~-~
...-!! " ~I
-' I
0 - - -
0 1 2 3 4 5 0 5 10 15 20 25 30
Barrels Shut-In time, Minutes Volume Volume Volume Volume
.....CASING TEST _LEAK-ûFF TEST 0 PIT Point Pumped Bled Back PumDed Bled Back
3.7 BÞIS 3.7IBÞIS 4.5 BÞIS IBbls
Comments: Tested casing after bumping plugs and checking floats on cement job.
Changed over to new LSND mud prior to PIT.
.
.
Casing Detail
7" Intermediate CasinQ
Well: CD2-27
Date: 11/08/03
ConocoPhillips Alaska
DEPTH
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS
Doyon 19 RKS to LDS 34.75
FMC 11" X 7" emergency slips 34.75
Jts 3 to 294 292 Jts 7" 26# L-80 STCM Csg 12341.38 34.75
7" Weatherford Float Collar 1.32 12376.13
Jts1t02 2 Jts 7" 26# L-80 STCM Csg 81.55 12377.45
7" Ray Oil Tools Float Shoe(Silver bullet) 2.05 12459.00
12461.05
7" Shoe @ 12,461.05' MO 7139' TVO
TO of 8-112" hole @ 12,659' MO 7160' TVO
Top of Alpine C -12,530' 7152' TVO
Total Centralizers: 63
Straight blade centralizer one per jt on jts # 1-20
Straight blade centralizer one per jt on jts. # 22.24,26,220,221,222
224,226,228,230,232,234,236,238,240,242,244,246,248,250,252
254,256,258,260,262,264,266,268,270,272,27 4,276,278,280,282
284,286,288,290,292,294
308 joints in pipe shed - 294 total jts. to run / last 14 joints stay out
· Note - Stuck casing @ 12,461.05 - Set Emergency slips
Use Best-o-Lite 2000 pipe dope
Drifted to 6.151"
MU Torque 8,000 ft/lb
Remarks: Up Wt = 220K On Wt = 100K Block Wt= 26K
Supervisor: Mickey/Whitlock
./
~ ~
ConocoPhillips Alaska
Cementing· RepQñ
Legal Well Name: CD2-27
Common Well Name: CD2-27
Event Name: ROT - DRILLING
Report #:
Start:
Spud Date: 10/30/2003
2 Report Date: 11/8/2003
10/28/2003 End: 11/18/2003
Cement Job Type: Primary
Prima
Hole Size: 8.500 (in)
TMD Set: 12,380 (ft) (ft)
Date Set: 11/8/2003
Csg Type: Intermediate Casing/Li
Csg Size: 7.000 (in.)
Hole Size:
TMD Set:
Date Set:
Csg Type:
SO TMD:
SO Date:
Cmtd. Csg:
Cementer: Steve Daughten
Cmtd. Csg: Intermediate Casing/Li Cmtd. Csg:
Cement Co: Dowell Schlumberger
Rot Time Start: :
Ree Time Start: :
Time End:
Time End:
Type: Cement Casing
Volume Excess "10:
Meas. From:
Time Circ Prior
To Cementing: 4.00
Mud Circ Rate: 168 (gpm)
Mud Circ Press: 530 (psi)
Pipe Movement
Pipe Movement:
RPM:
SPM:
Init Torque: (ft-Ibf)
Stroke Length: (ft)
Avg Torque: (ft-Ibf)
Drag Up: (Ibs)
Stage No: 1 of 1
Start Mix Cmt: 16:52
Start Slurry Displ: 16:52
Start Displ: 17:02
End Pumping: 18:36
End Pump Date: 11/8/2003
Top Plug: Y
Bottom Plug: Y
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
5.00 (bbVmin)
5.10 (bbl/min)
Y
960 (psi)
1,500 (psi)
2 (min)
Y
Hole Size:
Top Set: (ft)
BTM set: (ft)
Plug Date:
Plug Type:
Drilled Out:
Cmtd sg:
Max Torque: (ft-Ibf)
Drag Down: (Ibs)
R~ums: ~
Total Mud Lost: 10.00 (bbl)
Cmt Vol to Surf:
Ann Flow After: N
Mixing Method:
Density Meas By:
Type: LSND/Glydrill Density: 9.6 (ppg) Vise: 44 (s/qt)
Bottom Hole Circulating Temperature: (OF)
Displacement Fluid Type:
PVNP: 8 (cp)/19 (lb/1ooft2) Gels 10 see: 8 (1b/100ft2) Gels 10 min: 11 (lb/100ft2)
Bottom Hole Static Temperature: (OF)
Density: (ppg) Volume: (bbl)
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Mud Data
To: (ft)
Description: ARCO Wash
Cmt Vol: 20.0 (bbl) Density: 8.40 (ppg)
Slurry Vol: (sk) Water Vol: (bbl)
Class:
Yield: (ft3/sk)
Other Vol: 0
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Printed: 121912003 3:17:44 PM
~ /'
ConocoPhillips Alaska
Cementing Report
Page 2 of 3
Legal Well Name: CD2-27
Common Well Name: CD2-27
Event Name: ROT - DRILLING
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft) To: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Slurry Data
Fluid Type: PRIMARY
Slurry Interval: 11,461.00 (11)0:
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Trade Name
0-46
0-65
0-167
XE920
Report #:
Start:
Spud Date: 10/30/2003
2 Report Date: 11/8/2003
10/28/2003 End: 11/18/2003
Stage No: 1 Slurry No: 2 of>3
Description: MUDPUSH XL
Cmt Vol: (bbl) Density: (ppg)
Slurry Vol: (sk) Water Vol: (bbl)
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Class:
Yield: (ft3/sk)
Other Vol: ()
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Stage No: 1 Slurry No: 3 of 3
Description: LOW FLUID LOSS Class: G
12,461.00 (ftJ::mt Vol: 37.3 (bbl) Density: 15.80 (ppg) Yield: 1.16 (ft3/sk)
Slurry Vol:184 (sk) Water Vol: 22.3 (bbl) Other Vol: 0
Purpose: PRIMARY
Mix Water: 5.09 (gal)
Foam Job: N
Temperature: (OF)
Temperature: (OF)
Temperature: rF)
Time
Compressive Strength 1:
Compressive Strength 2:
Pressure
(psi)
(psi)
Temp
(OF)
(OF)
Stage No: 1 Slurry No:3 of~ - Additives
T e
DEFOAMER
DISPERSANT
Concentration Units
%BWOC
%BWOC
%BWOC
%BWOC
Printed: 121912003 3: 17:44 PM
·
ConocoPhillips Alaska
Cementing Report
Page 301 3
...
Legal Well Name: CD2-27
Common Well Name: CD2-27
Event Name: ROT - DRILLING
Report #:
Start:
Spud Date: 10/30/2003
2 Report Date: 11/8/2003
10/28/2003 End: 11/18/2003
Casing Test
Shoe Test
Liner Top Test
Test Press: 3,500 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: Y
Pressure: 11.00 (ppge)
Tool: N
Open Hole: 218 (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Tool: N
Tool: N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run: N
Bond Quality:
Temp Survey: N
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient: N
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required: N
Number of Remedial Squeezes:
Remarks
Cement 7" casing as follows - Pumped 5 bbls CW 100 - test lines to 3500 psi - pump 15 bbls CW100 @ 3.2 BPM @ 425 psi - Mix &
pump 50 bbls Mud Push XL @ 12.5 ppg @ 4.7 BPM @ 480 psi
Dropped bottom plug· Mixed & pumped 37 bbls Class G w/.20% D46, .25% D65, .40% D167, & .02% B155 @ 15.8 ppg - 5.1 BPM @
500 psi Dropped top plug wI 20 bbls water fl Dowell - switch over to rig pumps & displace wI 452 bbls 9.6 ppg LSND mud @ 5 BPM @
260 to 760 psi· slowed pumps to 2.5BPM & bumped plug wI 1500 psi - CIP @ 1830 hrs.
Un~ble to reciprocate pipe
Lost retums on last 14 bbls of displacement
,
Printed; 121912003 3;17:44 PM
,
,
l "~··..!~"i.
ConocoPhlUlpSAlaska ····~··'·.~II,f.,..i·...;"I.·,·
PallyÐrUling AepC>1"t ........ <'/ }J;." ......... ." .....
WELL NAME IJOBNUMBERIEVENTCODE 24 HRS PROG TMD ITVD DFS REPT NO. DATE
CD2-27 ODR 12659.0 7161.0 8.34 9 11/7/2003
SUPERVISOR RIG NAME" NO. FIELD NAME I OCS NO. AUTH MD IDAlLYTAN~ CUM. TANG
Mickev/Whitlock/Kuenzle dovon1 @ppco.co Doyon 19 Alpine 17,802.0 0
CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD CUM INTANG WI MUD
Workino stuck 7" casino 0 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL CUM COST WI MUD
Work casing & cement 11/312003 95,504 1,605,052
LITHOLOGY JAR HRS OF SERVICE BHA HRS SINCE INSP I LEAKOFF AFE AUTH.
17.48 10030723
LAST SURVEY: DATE TMD INC AZIM I LAST CASING NEXT CASING LAST BOP PRES TEST
11/612003 12,588.75 85.550 145.650 9.625 (in) @ 3,311.0 (ft) 7.000 (in) @ 12 649.0 (ft) 11/312003
Q~SITY(ppg) 9.60 I PP I ECD19.60 IMUDDATAI DAlLYCOST I 0 ICUM9Q~ 0
FV PVIYP GELS WLJHTHP FCIT.SOL OIUWAT %SandlMBT I PhIpM I PfIMf I CI I Cå}l 'fct~II,;JNEf '¡;S
42 I 8/25 12/14 4.8/9.0 11 I I 0.2/15.0 I 9.01 I 0.0611 I I 40 I I I
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE QESCRIPTlON .'
00:00 00:15 0.25 DRILL P OTHR INTRM1 Clear floor of BHA tools - LD Geo Pilot skid unit
00:15 02:15 2.00 WELCTL F EQRP INTRM1 Pull wear bushing & install test plug - PJSM - change top pipe rams to 7" &
test to 5000 psi - Pull test plug 7 install thin wall wear bushing
02:15 03:30 1.25 CASE P OTHR INTRM1 RU to run 7" casing - PJSM
03:30 07:00 3.50 CASE P RUNC INTRM1 Ran 7" 26# L80 BTCM casing as follows: FS (Ray Oil tools Sliver bullet) 2 jts.
FC - 2 jts. ( Baker Loc first 4 connections - fill pipe & check floats) -
75 jts.(79 jts. total) to 3310' (repair hydralic hose on tongs)
07:00 07:30 0.50 CASE P CIRC INTRM1 Circulate casing volume - 5 BPM @ 330 psi - PU wt. 135 SO wt. 115
07:30 10:30 3.00 CASE P RUNC INTRM1 Continue running 7" casing f/3310' to 7173' (170 jts. total)
10:30 11:30 1.00 CASE P CIRC INTRM1 Circulate & condition mud @ 4.5 BPM @ 450 psi - PU wt. 225 SO wt. 130
11:30 14:30 3.00 CASE P RUNC INTRM1 Continue running 7" casing f/7173' to 11,211' (265 jts. total)
14:30 16:00 1.50 CASE P CIRC INTRM1 Cicculate & condition mud - 5 BPM @ 600 psi· PU wt. 350 SO wt. 140
16:00 18:30 2.50 CASE P RUNC INTRM1 Continue running 7" casing f/11,211' to 12,444' (294jts. total) worked pipe
through tight spots f/12,274' to 12,444'
18:30 00:00 5.50 CASE Np DH RUNC INTRM1 Wash & work 7" casing f/12,444' to 12,464' -lost retums @ 12,460' - run
pump to keep pipe full - work pipe
24 HR SUMMARY: Clear floor - RU to run 7" casing - Run 7" casing to 12464' - Work stuck pipe
·c '.' ....... ...... PERSONNEL DATA
;> SERVICE NO. HOURS COMPANY SERVICE NO~ HOURS
Tech Limits 1 Swaco 4
Fairweather E&P Service 2 Halliburton - Sperry-Sun 2
Doyon Drilling Inc 26 Halliburton - Sperry-Sun 2
ACI - Arctic Catering 5 Halliburton - Sperry-Sun 1
M-I Drilling Fluids 3 ConocoPhillips Company 1
Dowell 2 FMC Corporation Wellhe 1
........ C... C.'..'·.'" MATERIALS I CONSUMPTION
ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND
Fuel gals 1 ,499 -13,261 Water, Potable bbls 120 -970
Water, Drilling bbls 300 -10,820
·.i RESERVOIR AND INTERVAL DATA
i.··· .. RESERVOIR NAME I ZONE I TOP BASE I COMMENTS
CD2-29 1 CD2-27 1 10 1.5 11500
Printed: 121912003 3: 15:25 PM
.
.
"'c "."f.t)
ConOcoPhllllps·.Alâ$ka ""~"'.'. -.''r
Dai.ly.Drilling..Report . .'
WELL NAME I JOB NUMBER I EVE~D~DE 124 HRS PROG TMD 1 TVD 1 DFS 1 REPT NO. ¡DATE
CD2-27 12.659.0 7,161.0 9.34 10 11/8/2003
SUPERVISOR , I RIG NAME & NO. t FIELD NAME I OCS NO. AUTH MD IDAlLYTAN~ CUM. TANGO
Mickev/Whitlock/Kuenzle dovon 1 @DecO.CO Dovon 19 AIDine 17802.0
CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD CUM INTANG WI MUD
Circ & work stuck 7" 0 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL CUM COST WI MUD
Work casino - Cement & Test BOPE 11/3/2003 418,986 2 024 038
UTHOLOGY JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE AUTH.
17.48 10030723
LAST SURVEY: DATE TMD INC AZIM I LAST CASING NEXT CASING LAST BOP PRES TEST
11/6/2003 12,588.75 85.550 145.650 7.000 (in\ @ 12,461.0 (ft) 7.000 (in) @ 12,649.0 (ft) 11/3/2003
DEN$ITY(ppg) 9.60 I PP I I ECD 19.60 IMUD OAT A I DAILY COST 1 0 1 CUMCOST 1 0
FV PVIYP GELS WUHTHP FCIT.SOL OIUWAT 1 %SandlMBT I Ph/pM I PfIMf I CI 1 ca 1 H2SIIJMJ; ES
44 8/19 8/11 4.2/8.8 11 I I 1 0.3/15.0 1 9.01 1 0.10/1 1 I 40 1 I 1
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION /.
00:00 00:30 0.50 CASE T DH RUNC INTRM1 Continue working 7" casing @ 12464' (unable to move pipe)' ~
00:30 02:00 1.50 CASE T DH RUNC INTRM1 Regain circulation - Circulate bottoms up @ 3.8 BPM @ 670 psi - condition
mud - no losses
02:00 04:00 2.00 CASE T DH RUNC INTRM1 Continue working 7" casing wlo pump
04:00 08:30 4.50 CASE T DH RUNC INTRM1 Mix & pump lubrication pill 40 bbls ( Lubetex, Flow lube, nut plug, & glass
beads) Spot 24 bbls outside casing - Continue working pipe - pump 4 bbls pill
every 30 mins
08:30 12:00 3.50 CASE T DH RUNC INTRM1 Circulate & work pipe - mix surface vol to 10% lubrication - circulate and work
pipe - still no pipe movement
. Decision made by Drilling team leader to cement 7" casing in place wI shoe
@ 12,461'
12:00 14:00 2.00 CASE P OTHR INTRM1 RD casing slips· cut 7" casing 5' up fl rotary table - RD casing elevators - LD
Frank's fill up tool· blow down TD
14:00 15:30 1.50 CASE P OTHR INTRM1 Prep & weld coupling onto cut off r casing stub
15:30 16:30 1.00 CEMENT I CIRC INTRM1 RU cement head & lines - Establish circulation - circulate @ 4 BPM @ 530 psi
- condition mud - PJSM on cement job
16:30 18:30 2.00 CEMENT PUMP INTRM1 Cement 7" casing as follows - Pumped 5 bbls CW 100 - test lines to 3500 psi-
pump 15 bbls CW100 @ 3.2 BPM @ 425 psi - Mix & pump 50 bbls Mud Push
XL @ 12.5 ppg @ 4.7 BPM @ 480 psi
Dropped bottom plug - Mixed & pumped 37 bbls Class G wI .20% D46, .25%
D65, .40% D167, & .02% B155 @ 15.8 ppg. 5.1 BPM @ 500 psi Dropped top
plug wI 20 bbls water fl Dowell - switch over to rig pumps & displace wI 452
bbls 9.6 ppg LSND mud @ 5 BPM @ 260 to 760 psi - slowed pumps to
2.5BPM & bumped plug wI 1500 psi - CIP @ 1830 hrs.
Lost retums on last 10 bbls of displacement
18:30 19:30 1.00 CEMENT F OTHR INTRM1 Check floats - OK - RD cement lines & head - LD mouse hole
19:30 22:30 3.00 CASE T DH NUND INTRM1 PJSM - RD flow line - hole fill line - ND BOPE fl wellhead - PU BOP - Set
emergency slips on 7" casing wI 200 k tension - rough cut 7" casing & LD cut
off - Make final cut @ 26 3/16" below top of wellhead
22:30 00:00 1.50 CASE T DH NUND INTRM1 NU BOPE
24 HR SUMMARY: Work stuck pipe @ 12,461' - Regain circulation - Circulate & workpipe - Spot Lub-tex/nut plug pill- Work pipe -Increase lub
to 10 % - circulate & work pipe - RU cement head - Circulate - Cement 7" csg - Set emergency slips on 7" casing
Printed: 121912003 3:16:18 PM
"
'- /
P~gØ2Qf2
ConocoPhillips Alaska
Daily Drilling Report .....
WELL NAME I JOB NUMBER I EVENT CODE 24 HRS PROG ITMD ITVD DFS I REPT NO. DATE
CD2-27 ODR 12659.0 7,161.0 9.34 10 11/812003
PERSONNEL DATA
COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOUR$
PRA - Petroleum Resour 2 Dowell 2
Fairweather E&P Service 2 Swaco 4
Doyon Drilling Inc 27 Halliburton - Sperry-Sun 2
ACI - Arctic Catering 5 Halliburton - Sperry-Sun 2
M-I Drilling Fluids 3 FMC Corporation Wellhe 1
MATERIALS ¡CONSUMPTION - - ..
ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ~..w.º
Fuel gals 1,670 -14,931 Water, Potable bbls 120 -1,090
Water, Drilling bbls 200 -11,020
RESERVOIR AND INTERVAL DATA .. .
RESERVOIR NAME 1 ZONE I TOP BASE I COMMENTS
CD2-29 I CD2-27 1 279 3.511490
Printed: 121912003 3:16:18 PM
,
PRESSURE INTEGRITY TEST
CONOCOPHILLIPS Alaska, Inc.
Well Name: I CD2-27 I Rig: Doyon 19 Date: I 11 /9/2003 _I Volume Input Pump Rate:
Drilling Supervisor: Don Mickey I Pump used: I Cement Unit ... E ~ 0.0840 ~ 0.8 ~
Barrels Bbls/Strk Strk/min
Type of Test: I Annulus Leak Off Test for Disposal Adequacy ... Pumping down annulus. I... Casin Test Pressure Intearitv Test
Hole Size: 8-1/2 " ... Casina Shoe Depth I I Hole Depth Pumping Shut-in PumDina Shut-in
RKB-CHF: I 36.7 Ft 3,311 IFt-MD 2,3711 Ft- TVDI I 11,461 Ft-MD I 6,709IFt-TVD Bbls psi Min psi Bbls psi Min Dsi
Casino Size and Description: 19-5/8" 36#/Ft ]-55 BTC ... 0 0 0 480
Chanaes for Annular Adeauacv Test Pressure InteoritvTest 0.5 60 0.25 419
:>uter casing shoe test results in comments Mud Weight: 9.6 ppg 1 83 0.5 412
Description references oute casing string. Inner casing 00: 7.0 In. 1.5 105 1 406
ize is that drilled below oute casing. 2 135 1.5 »
timated TOC for Hole Depth. 2.5 165 2
Enter inner casing 00 at right Desired PIT EMW: 15.0 ppg 3 200 2.5
Estimates for Test: 666 psi 0.7 bbls 3.5 240 3 397
I... L ... 4 280 3.5 395
-
EMW = Leak-off Pressure + Mud Weight = 670 2371 + 9.6 PIT 15 Second 4.5 320 4 394
0.052 x TVD 0.052 x Shut-in Pressure, psi 5 360 4.5 393
EMW at 3311 Ft-MD (2371 Ft- TVD) = 15.0 419 5.5 400 5 392
1000 - - 6 440 5.5 390
6.5 480 6 390
7 520 6.5 389
7.5 560 7 388
n. .. ,,-.... 8 590 7.5 387
8.5 620 8 386
.JíIt \( Ù\~.l..> 9 650 8.5 385
w __ 'on
a: / I~ 9.5 670 9 384
;:)
U) 500 10 625 9.5 382
U) J ~ -- .. 10.5 515 10 .
w
a: 11 495
a.. /
11.5 487
./ 12 485
12.5 480
... ,¡r
0 r
0 2 4 6 8 10 12 14 0 5 10 15 20 25 30
Barrels Shut-In time, Minutes Volume Volume Volume Volume
-"-CASING TEST ~LEAK~FFTEST 0 PIT Point Pumped Bled Back Pumped Bled Back
0.0 Bbls 3.71Bb1S 12.5 Bbls IBbls
Comments: 9-5/8" casing shoe tested to 18.0 ppg EMW
Re: Approval to commence injection in CD2-27
e
cI~-\tJ
Subject: Re: Approval to commence injection in CD2-27
From: Thomas Maunder <to111_maunder@)admin.state.ak.us>
J)atc: Fri, 12 Dee 2003 15:31 :24 -0900
To: "Crabtree, C L" <C.L.Crabtree@~conocophillips.com>
CC: "Hanson, Kelli L" <KellLL.Hanson@eonocophillips.com>, "Alonzo, Chris"
<Chris.A lonzo@eonoeophillips.com>
Cliff, Chris and Kelli1
I have examined the USIT log that you submitted. I concur that
isolation is demonstrated by the log. You have approval to
commence injection into the well. Please coordinate with the
Inspectors to have a witnessed MIT when one of them is next out at
Alpine.
Tom Maunder I PE
AOGCC
Crabtree I C L wrote:
Tom
CPAI requests approval to commence injection into CD2-27.
This well was out of necessity completed slightly different from
the normal Alpine injector because the 7" casing was stuck above
the normal location the casing shoe is set..... After concluding
the pipe was stuck. The casing was cemented with the shoe at
12,461' MD in the Alpine D interval. Normally the 7" shoe would
be just below the top of the Alpine C at 12,530' MD. The cement
job went well although circulation was lost on the last 10
barrels of the displacement. Job notes follow:
RU cement head & lines - Establish circulation - circulate @ 4
BPM @ 530 psi - condition mud - PJSM on cement job
Cement 7" casing as follows - Pumped 5 bbls CW 100 - test lines
to 3500 psi - pump 15 bbls CW100 @ 3.2 BPM @ 425 psi - Mix & pump
50 bbls Mud Push XL @ 12.5 ppg @ 4.7 BPM @ 480 psi Dropped bottom
plug - Mixed & pumped 37 bbls Class G wi .20% D46, .25% D65, .40%
D1671 & .02% B155 @ 15.8 ppg - 5.1 BPM @ 500 psi Dropped top plug
wi 20 bbls water fl Dowell - switch over to rig pumps & displace
wi 452 bbls 9.6 ppg LSND mud @ 5 BPM @ 260 to 760 psi - slowed
pumps to 2.5BPM & bumped plug wi 1500 psi - CIP @ 1830 hrs. Lost
returns on last 10 bbls of displacement Check floats - OK - RD
cement lines & head - LD mouse hole
Since some of the D interval shale was open to the production
hole after cementing casing , we elected to run the tubing tail
through the 7" casing shoe in case the D interval would present
hole stability problems in the future. Because this was the
plan1 we elected to run a USIT bond log before running the
tubing. The log indicates good isolation was achieved with the
primary cement job. The tubing and casing were MIT'd - OK after
10f2
12/12/20033:34 PM
Re: Approval to commence injection in CD2-27
e
running the tubing.
e
~OS-\l)
Cliff Crabtree
Alpine Subsurface Development - ConocoPhillips Alaska, Inc.
Office Telephone: (907) 265-6842
Mobile Telephone: (907) 240-5357
«CD2-27 USI_Cement_023. zip» . «CD2-27 1320 Plot .pdf»
«CD2-27_Casing.ppt»
Tubing Detail
4 1/2" Tbg Detail
Well:
Date:
CD2-27
11/16/2003
DEPTH
COMPLETE DESCRIPTION OF EQUIPMENT RUN
LENGTH
TOPS
Doyon 19 RKB to LDS
FMC 4 1/2" Tbg hanger.
4 1/2" 12.6# L-80 IBTM Tbg
Camco 4 1/2" DB nipple
ID 1.15 2643.28
4 1/2" 12.6# L-80 IBTM Tbg 9137.53 2644.43
Pup - 4 1/2" 12.6# L-80 IBTM Tbg 9.44 11781.96
Camco 4 1/2" KBG-2 GLM w/dummy 5.984" OD x 3.938" ID
11791.40
Pup - 4 1/2" 12.6# L-80 IBTM Tbg 9.69 11798.68
4 1/2" 12.6# L-80 IBTM Tbg 85.94 11808.37
Pup - 4 1/2" 12.6# L-80 IBTM Tbg 9.82 11894.31
4.5" X 7" BAKER S-3 PACKER w/ Millout ext. 5.97" OD X
ID 10.98 11904.13
Pup - 4 1/2" 12.6# L-80 IBTM Tbg
4 1/2" 12.6# L-80 IBTM Tbg 43.85
4.5" "XN" NIPPLE
"ID 1.23 11968.79
4 1/2" 12.6# L-80 IBTM Tbg
4 1/2" WLEG 5" OD
31875"ID 1.34
4 1/2" tgb tail @
32.84
3.80 32.84
2606.64
36.64
5.62" OD x 3.812"
·7.28
3.875"
9.83 11915.11
11924.94
5" OD x 3.725
700.38
11970.02
5" OD x
12670.40
12671.74
20f2
12/12/20033:34 PM
~I
Z
o
~
~
æ
o
u.
0.:
-'
«I
CI)
11.
o
!-
Depth
FEET
100
100
-8000
í?
:§
<::>
<::>
<::>
~
~
¿ -9000
'€
0
~
~
.z::
::;
0
ø
-I 0000
-5000
WELL DETAILS
Name +N(,S iE/·W NQrthing Easting
Lari4lde LPngìtude Slot
C02·21 ,119.12 14,90 5974522.3[0 371709.100 70~20'19,{}53N 151~02'27.648W NfA
-6000
-7000-
-11000
-BOO
4000
!
5000
10000
6000
7000
West( - )/East( +) (1 OOOft/in]
8000
9000
Re: CD2-27 completion
e
e
~O -S - \ t ì
Subject: Re: CD2-27 completion
Date: Thu, 13 Nov 2003 07:48:02 -0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Johnson, Vern" <Vern.Johnson@conocophillips.com>
CC: "Alvord, Chip" <Chip.Alvord@conocophillips.com>,
"Kuenzler, Zane A" <ZaneAKuenzler@conocophillips.com>,
"Noel, Brian" <Brian.Noel@conocophillips.com>, "Crabtree, C L" <C.L.Crabtree@conocophillips.com>
Vern, et al:
This is as we discussed. The key isolation required is around the penetration into the Alpine. As I understand, the D
is not reservoir rock which gives some sealing ability and then the shale overlies the D. Based on your log
interpretation, the shoe is set into the D. Running the evaluation log will help you determine the way forward and
there is a possibility of sufficient isolation already being
achieved.
The only comment I have with regard to the proposed Bonsai is filling the ECP with brine. Has that been done
previously?? My concern would be the potential to burst the elements as thermal equilibrium is achieved. I don't
know if this is a risk, but it should be considered.
Good luck with the evaluation and forward plans. Please keep us advised of your progress.
Tom Maunder, PE
AOGCC
"Johnson, Vern" wrote:
> Tom,
>
> As discussed, we are planning to run a bond log on the 7" casing prior to running the completion. If the bond log
looks good, and it is clear that we have 7" casing isolated in the Alpine D, we would prefer to run our typical Alpine
injector completion, but with extra tailpipe running into the Alpine C sand. The extra tailpipe would facilitate running
coil tubing in the future.
>
> If the bond log does not show sufficient isolation, we plan to run a Bonsai type isolation completion. See the
attached proposed completion schematic. We are still working on a few details, but this is pretty much what it will
look like. We may drop the upper ECP. Current plan is to fill the lower ECP with brine, pump cement around, then fill
the second ECP with cement and set the liner top packer.
>
> Let me know if you have any questions or comments.
>
> Regards
>
> Vern Johnson
> ConocoPhillips
> 907-265-6081
>
> «Visio-Revised completion schematic CD2-272.pdf»
>
> ------------------------------------------------------------------------
>
>
>
>
Name: Visio-Revised completion schematic CD2-272.pdf
Visio-Revised completion schematic CD2-272.pdf Type: Acrobat (application/pdt)
Encoding: base64
Description: Visio-Revised completion schematic CD2-272.pdf
I . ____ - .. ..._____ - .,__,__ . ._."'_..'._n.'.. .'. _._____.._ .. _..__. .,.'. .0. .__.,. ___. ....,_ __._ ,..._._..
Tom Maunder <tom maundcr(ã)admin.state.F.lk.w;>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
1of2
11/13/20037:49 AM
e
e
ifa ~- \11
16" Conductor to 114'
Updated 11/12/03
4-1/2" Cameo DB Nipple (3.812')
at 2000' TVD = 2623' MD
Packer Fluid mix:
9 2 PP<J KCI Brine
with 2000' TVD diesel cap
Tubing suspended with diesel
9-5/8" 36 ppt J-55 BTC
Surface Casing
@ 3311' MD /2371' TVD
cemented to surface
Ucper Completion .MQ. IYQ
Tubing Hanger 32' 32'
4-1/2", 12.6#/ft, IBT-Mod Tubing
Cameo DB nipple 2629' 2000'
4-1/2", 12.6#/ft, IBT-Mod Tubing
Cameo KBG2- GLM (3.909" ID) 11850' 6920'
4-112", 12.6#/ft, IBT-Mod Tubing (2)
Baker 53 Packer w/ millout extension 11950' 6969'
4-1/2", 12.6#/ft, IBT-Mod Tubing (1)
HES "X" (3.81")-63.5° inc 12010' 6996'
4-1/2", 12.6#/ft, 1ST-Mod Tubing (1)
WEG 12058' 7017'
4-1/2" 12.6 ppt L-80 1ST M
tubing run with Jet Lube Run'n'Seal
pipe dope
Lower Completion
4 1/2" 12.6# L-80 IBTM Tb
Length Depth (top)
11.33 12048.81
7.77 12060.14
6.71 12067.91
1.44 12074.62
4.10 12076.06
12080.16
440.00 12080.16
12520.16
1.34 12520.16
8.96 12521.50
23_06 12530.46
2.63 12553.52
12556.15
12556.15
88.00 12556.15
12644.15
9.51 12644.15
1.34 12653.66
8.07 12655.00
4.56 12663.07
8.98 12667.63
1.34 12676.61
8.96 12677.95
23.06 12686.91
2.63 12709.97
9.80 12712.60
1.25 12722.40
31.00 12723.65
1.35 12754.65
12756_00
4 1/2" 12.6# L-80 IBTM Tbg
Top Alpine 'D' at 12385' MD /71?:)' TVD
Cameo KBG-2 GLM
(3.909" DRIFT 10)
wI dummy
Baker Premier Packer
+/- 11950' MO/6969'1VO
<200' 1VO from top of
Alpine
PUP - 4 1/2" 12.6# L-80 IBTM Tbg (BAKER)
Locating profile 3_85" ID (BAKER)
PUP - 41/2" 12.6# L-80 IBTM Tbg (BAKER)
HM cementin valve BAKER)
PUP - 4112" 12.6# L-80 IBTM T BAKER
Locating profile 3.85" ID (BAKER)
PUP·4 112" 12.6# L-80 IBTM Tbg (BAKER)
20' CTC external casing packer BAKER
PUP - 4 1/2" 12.6# L·80 IBTM T BAKER
4 1/2" 12.6# L-80 IBTM Tb9
4.5" "XN" NIPPLE 5" OD x 3.725 "ID
Pup - 4 112" 12.6# L-80 IBTM Tbg
4 1/2" WLEG 5" OD 5" OD x 3.875" ID
---' - ~'- -'- --'- w__ - -- -'---'- ----'- ---------- ï
Well TD@ ¡
17802' MD I:
-----________________~_~~_~~~~J
Top Alpine 'C' at 12545' MD /7151' TVD
7" 26 ppt L-80 BTC Mod
Production Casing @
12461' /7139' TVD @ 79.50
- - - - - - - - -8='12" OH TD@
12659'/7161'TVD
@86°
RE: Planned operations, Doyon 19 CD2-27
e
e
Subject: RE: Planned operations, Doyon 19 CD2-27 '0 ~ \ r"\
Date: Mon, 10 Nov 2003 08:58:56 -0900 \t ~ - \ ,.....,
From: "Johnson, Vern" <Vern.Johnson@conocophillips.com> \
To: Tom Maunder <tom_maunder@admin.state.ak.us>
CC: "Alvord, Chip" <Chip.Alvord@conocophillips.com>
Tom,
You are right, there is a typo on the ETOC, it should rea~D. ./
FYI all indications point to a good cement job; good circ~
lift etc.
Vern
-----Original Message-----
From: Tom Maunder fmailto:tom maunder@admin.state.ak.usl
Sent: Monday, November 10, 2003 7:56 AM
To: Johnson, Vern
Cc: Alvord, Chip
Subject: Re: Planned operations, Doyon 19 C02-27
Vern and Chip,
This is pretty much as I remember discussing with Chip. Only question I
have is with re oint 2. Is there a typo on the ETOC??
Shouldn't it b 11360??
Tom Maunder,
AOGCC
"Johnson, Vern" wrote:
> Tom,
>
> We have encountered problems running 7" casing on CD2-27. We are
stuck at 12461' MO in the Alpine 0 interval. Planned casing point was
12650' MO, TO for the 8-1/2" hole section was 12659' MO and the top of
the Alpine is at +/- 12535' MD. Our current plan forward is as follows:
>
> 1- set emergency slips on the ~~i~(shoe at 12461' MD)
> 2- pump cement (ETOC= +/- ~ with 40% xs)
> 3- change rams, test BOP
> 4- PU 6-1/8" drilling BHA, drill out, drill 20' new hole (12679' MD)
> 5- perform PIT to 12.5 ppg EMW
> 6- drill horizontal to planned TD (17802' MD)
> 7- POOH, LD BHA
> 8- run a Bonzai type isolation completion to straddle the 6-1/8" &
8-1/2"open hole and 7" casing, including a 4-1/2" ECP set with cement in
6-18" hole (+1- 12680' MO), a cementing valve above the ECP, a
7"x4-1/2" liner hangerJliner top packer set at +/- 11950' MD, and 4-1/2"
tubing in the straddle
> 9- set the liner hanger
> 10-inflate the ECP with cement the a cup tool on a 2-7/8" inner
string
> 11- release from the liner hanger
> 12- PU and open the cementing valve
> 13- pump cement to above the liner top
> 14- set the liner top packer
> 15- PU with inner string to above the liner top packer
> 16- circulate the hole clean and POOH
> 17 - run a seal assembly and 4-1/2" tubing completion
> 18- Rig down and move off with Doyon 19
10f2
11/10/200310:25 AM
RE: Planned operations, Doyon 19 CD2-27
e
> 19- perform cement evaluation with e-line and tractor
> 20- perform remedial cement job with coil tubing if needed
>
> We will develop a more detailed completion plan on Monday, but this is
the basics of what we have planned. It will provide cement isolation
above the Alpine C which we can evaluate after the rig moves off. Let
me know if there is any other paperwork required.
>
> Regards
>
> Vern Johnson
> CPAI Alpine Drilling
> 907-265-0681 (w)
> 907-784-3906 (c)
> 907-265-1515 (fx)
> «Johnson, Verno vet»
2of2
e
11/10/200310:25 AM
~v á\C[Œ lffi ~"á\~á\~[K\á\
.
AI,ASJiA. OIL AND GAS
CONSERVATION COMMISSION
Chip Alvord
Alpine Drilling Team Leader
ConocoPhillips, Alaska, Inc.
PO Box 100360
Anchorage AK 99510
FRANK H. MURKOWSKI, GOVERNOR
333 W. "P" AVENUE, SUITE 100
ANCHORAGE. ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Colville River Field CD2-27
ConocoPhillips, Alaska, Inc.
Permit No: 203-177
Surface Location: 1835' FNL, 1531' FEL, Sec. 2, TIIN, R4E, UM
Bottomhole Location: 1952' FSL, 2119' FWL, Sec. 18, TIIN, R5E, UM
Dear Mr. Alvord:
Enclosed is the approved application for permit to drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
tf4-A ~.L~
Randy Ruedrich
Commissioner
BY ORDER OF THE COMMISSION
DATED this-&tay of October, 2003
cc: Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
Exploration, Production and Refineries Section
1 a. Type of Work:
DrillW
Re-entry 0
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
)
~
It<o
Redrill U
) STATE OF ALASKA
ALASKA OIL & GAS COMMISSION
PERMIT TO DRILL
ExploratoryU Development Oil U Multiple Zone D
Service 0 Development Gas 0 Single Zone 0
5. Bond: W Blanket U Single Well 11. Well Name and Number:
Bond No. 59-52-180 CD2-27
6. Proposed Depth: 12. Field/Pool(s):
MD: 17802' .. TVD: 7212' Colville River Field
1 b. Current Well Class:
Stratigraphic Test 0
P.O. Box 100360 Anchorage, AK 99510-0360
4a. Location of Well (Governmental Section):
Surface: 1835' FNL, 1531' FEL, Sec. 2, T11 N, R4E, UM
Top of Productive Horizon:
1329' FSL, 365' FEL, Sec. 12, T11 N, R4E, UM
Total Depth:
1952' FSL, 2119' FWL, Sec. 18, T11 N, R5E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 371709'
16. Deviated wells:
Kickoff depth: 200 ft.
18. Casing Program
Size
Hole
42"
12.25"
8.5"
Casing
16"
9.625"
7"
N/A
4.5"
19
Total Depth MD (ft):
Casing
Structural
Conductor
Detailed Operations
Intermediate
Production
Liner
Perforation Depth MD (ft):
20. Attachments: Filing Fee 0
Property Plat 0
7. Property Designation:
ALK 380075, 25559, 372097 ·
8. Land Use Permit:
Alpine River Pool
13. Approximate Spud Date:
11/4/2003
ADL NI A
9. Acres in Property:
2560
14. Distance to
Nearest Property: 365' FNL, Sec. 12
10. KB Elevation
15. Distance to Nearest
y- 5974522 Zone- 4 (Height above GL): 52 feet Well within Pool: CD2-58, 1480
17. Anticipated Pressure (see 20 MC 25.035)
Maximum Hole Angle: 90° Max. Downhole Pressure: 3263 psig 1 Max. Surface Pressure: 2542 psig
Setting Depth Quantity of Cement
Specifications Top Bottom c. f. or sacks
Weight Grade Coupling Length MD TVD MD TVD (including stage data)
62.5# H-40 Weld 77' 37' 37' 114' 114'
36# J-55 BTC 3322' 37' 37' 3359' 2390' 607 sx AS Lite & 230 sx LiteCrete
26# L-80 BTC-M 12487' 37' 37' 12524' 7151' 146 sx Class G
12.6# L-80 IBT-mod 12030' 32' 32' 12062' 7026'
PRESENT WELL CONDITION SUMMARY
Total Depth TVD (ft): Plugs (measured)
(To be completed for Redrill and Re-Entry Operations)
Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured)
Length
Cement Volume
MD
TVD
Size
Perforation Depth TVD (ft):
BOP SketchU
Diverter Sketch 0
I Drilling ProgramW
Seabed Report 0
Time v. Depth Plot U
Drilling Fluid Program 0
Date:
Shallow Hazard Analysis U
20 MC 25.050 requirements 11]
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name
Signature
C. Alvord
..,,4~ {, {l~
Contact Zane Kuenzler @ 265-1308
Title Alpine Drilling Team Leader
Phone 1_l"t4).... (., , Z.P Date I 0 I (4- I {) 3
Preoared bv Zane Kuenzler
Commission Use Only
API Number: Permit Approval
50- I () 3 - ;2.û </7/ - C>(::, Date:
Conditions of approval: Samples required 0 Yes .~r No Mud log required 0 Yes §' No
Hydrogen sulfide measures DYes Œa' No Directional survey required I8f Yes 0 No
~500\,c;l ,~\~'-\~~ ~ ~\'~\. k \ T~ (£ ~i'..\ ~\J(}\.~~t \o~.
Other: tn~~, \Io.)~\~~ ðO ~'-dS,D )S<..'-'\(..)) \>OC-~~<t~-\"Q.1ji\)~);~~~~q·.~S()<M '\
[~V 1."': ~ \1 t: l~
Approved~ k -) ~kV(~ COMMISSIONER ~:;:~:~:'ON ~~ 03
Form 10-401 Revised 3/2003, Submit in Duplicate Alaska Oil 8{ Gas Cons. Commissinn
Anchorage
Permit to Drill
Number: 20 3 - ¡ '77
See cover letter
for other requirements
Oc,
~, l ~
··~'ì ~-'01
~ i' f
J
2
~I,;, ¡ .~ :i
CD2-27 Drilling Hazards Summary
(to be posted in Rig Floor Doghouse Prior to Spud)
(See Well Plan Attachment: Detailed Risk Information for further discussion of these risks)
J
,12-1/4" Hole /9-5/8" Casing Interval
Event Risk Level
Conductor Broach Low
Well Collision medium
Gas Hydrates Low
Running Sands and Gravel Low
j Abnormal Pressure in Low
Surface Formations
>2000' TVO
Lost Circulation Low
./
8-1/2" Hole /7" Casing Interval
Event Risk Level
Abnormal Pressure in low
Surface Formations
>2000' TVD
Lost circulation Low
Hole swabbing on trips
Moderate
.j
Abnormal Reservoir
Pressure
low
Hydrogen Sulfide gas
Low
Mitigation Strategy
Monitor cellar continuously during interval.
Gyro single shots, traveling cylinder diagrams
Monitor well at base of permafrost, increased mud
weight, decreased mud viscosity, increased
circulating times, controlled drilling rates, low mud
temperatures
Maintain planned mud parameters, Increase mud
weight, use weighted sweeps.
Increased mud weight
Reduced pump rates, mud rheology, lost circulation
material, use of low density cement slurries
Mitigation Strateqy
BOPE drills, Keep mud weight above 9.6 ppg.
Check for flow during connections and if needed,
increase mud weight.
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECO) monitoring, mud
rheology, lost circulation material
Reduced trip speeds, mud properties, proper hole
filling, pumping out of hole, real time equivalent
circulating density (ECO) monitoring, weighted
sweeps.
Well control drills, increased mud weight. No
mapped faults occur within 700' of the planned
wellbore.
H2S drills, detection systems, alarms, standard well
control practices, mud scavengers
6-1/8" Hole / Horizontal Production Hole
Event Risk Level
Lost circulation moderate
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
Medium
J Hydrogen Sulfide gas
Low
Mitigation Strategy
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECO) monitoring, mud
rheology, lost circulation material
Reduced trip speeds, Pump out to 7" shoe, mud
properties, proper hole filling, pumping out of hole,
real time equivalent circulating density (ECO)
monitoring, weighted sweeps.
BOPE drills, Keep mud weight above 8.8 ppg.
Check for flow during connections and if needed,
increase mud weight. Well control drills, increased
mud weight.
H2S drills, detection systems, alarms, standard well
control practices, mud scavengers
i~
tJ·
Alpine: CD2-27
-)
)
Procedure
1. Move on Doyon 19.
2. Drill 12-1,4" hole to the surface casing point as per the directional plan.
3. Run and cement 9-5/8" surface casing.
4. Install and test BOPE to 5000 psi.
5. Pressure test casing to 2500 psi.
6. Drill out 20' of new hole. Perform leak off test.
7. Pick up and run in hole with 8-1/2" drilling BHA.
8. Drill 8-%" hole to intermediate casing point in the Alpine Sands. (LWD Program: GR/RES/PWD) ,/'
9. Run and cement 7" casing as per program. Top of cement> 825 feet MD above Alpine reservoir. Carry
out a leak off test down the 9-5/8" x r casing annulus to confirm the fracture pressure referenced to the
casing shoe. Freeze protect casing annulus and casing.
10. BOPE test to 5000 psi.
11. Run drilling assembly. Pressure test casing to 3500 psi. Drill out and perform formation integrity test to 12.5
ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg EMW.
12. Drill 6-1/8" horizontal section to well TD (LWD Program: G R/RES/PW D). ./
16. Circulate the hole clean and pull out of hole.
17. Run 4-%, 12.6#, L-80 tubing with DB nipple, gas lift mandrel(s), and packer. Land hanger.
18. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
19. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check.
20. Circulate tubing to diesel and install freeze protection in the annulus.
21. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi 130 mins.
22. Set BPV and secure well. Move rig òff.
[,1
....'" .. '" ,.., ,
'.',' ,j /..;
\~¡I¡ j 'I '.. .~r!il
Well Proximity Risks
Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in
following attachments. CD2-28 will be the closest well to CD2-27. Well separation is 8.8 ft at 350 ft MD.
Accounting for survey uncertainty, the ellipse-to-ellipse separation is 2.9 ft at 350 ft MD.
Drillinq Area Risks:
There are no high-risk events (e.g. over-pressures zones) anticipated.
Lost circulation: Faulting within the Alpine reservoir section is considered the most likely cause of lost
circulation. Standard LCM material has proved effective in dealing with lost circulation in previous
development wells.
Additional care and attention will be ,given to the higher potential of inducing a kick when drilling horizontally
as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed
kicks.
Annular Pumping Operations:
Incidental fluids developed from drilling operations on well CD2-27 will be injected into a permitted annulus
on C02 pad or the class 2 disposal well on CD1 pad.
The CD2-27 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there
will be 500' of cement fill above the top of the Alpine as per regulations.
Upon completion of cD2-27 form 10-403, Application for Sundry Operations, will be filed. Annular pumping
of fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly
permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating
annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within
one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers
in this well.
Surface casing will be set near the below the base of the Schrader Bluff Formation (C-40). These 300-400'
thick shales are part of the Colville' Group and are known to provide vertical barriers to fluid flow in other
areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl
without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0
ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of
1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi
= (12.0 ppg) * (0.052) * (2390') + 1,500 psi
= 2,990 psi
Pore Pressure = 1,081 psi
Therefore Differential = 2991 - 1081 = 1910 psi.
The internal casing pressure is conservative, since frictional losses while pumping have not been taken into
consideration. The surface and intermediate casing strings exposed to the annular pumping operations
have sufficient strength by using the 85% collapse and burst ratings listed in the following table:
Wt Connection 85% of 85% of
OD (ppf) Grade Range Type Collapse Collapse Burst Burst
9-5/8" 36 J-55 3 BTC 2,020 psi 1,717 psi 3,520 psi 2,992 psi
7" 26 L-80 3 BTC-Mod 5,410 psi 4,599 psi 7,240 psi 6,154 psi
I;
CD2-27
DRILLING FLUID PROGRAM
)
)
SPUD to Intermediate hole to 7" Production Hole
9-5/8"su¡1ace casing casing point - 8 Y2" Section - 6 1 18"
point - 1.2 14"
Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 8.8-9.3 ppg
PV 10 - 25 10 -15
YP 20 - 60 15 - 25 25 - 30
Funnel Viscosity 100 - 200
Initial Gels 4-8 10-15
10 minute gels <18 12 - 20
API Filtrate· NC - 10 cc I 30 min 4 - 12 cc/30 min (drilling)
HPHT Fluid Loss at 160 12 - 14 cc/30 min
PH 8.5-9.0 9.0 -10.0 9.0-9.5
KcL 6%
Surface Hole:
A standard high viscosity fresh water I gel spud mud is recommended for the surface interval. Keep
flowline viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing.
Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary.
Intermediate Hole Section:
Fresh water gel I polymer mud system. Ensure good hole cleaning by pumping regular sweeps and
maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is
penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material.
Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be
important in maintaining wellbore stability.
Production Hole Section :
The horizontal production interval will be drilled with aM-I Flo-Pro drill-in fluid. The base fluid will consist of
6% KCI, with ± 30PPB calcium carbonate bridging material to minimize formation damage. Flo-Vis Polymer
and Dual-Flo starch will be used for viscosity and fluid loss control respectively.
(), ,'.""',:," ."''''''',.' .~ "~.,I' ,
.: ~"" , , .',:' \, ,.' ,I "
~ , $ , \.",. '\~
CD2-27
PRESSURE INFORMATION AND CASING DESIGN
(per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2))
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well :
Csg Setting Fracture Pore
Casing Size Depth Gradient pressure ASP Drilling
(in) MDfTVD(ft) (Ibs. 1 gal) (psi) (psi)
16 114/114 10.9 52 53
95/8 3359 1 2390 14.5 1081 1563
7" 12524/7151 16.0 3236 2542
N/A 17802/7212 16.0 3263 N/A
. NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi.
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas
gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as
follows:
1) ASP = [(FG x 0.052) - 0.1]D
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in Ib/gal
0.052 = Conversion from Ib./gal to psi/ft
0.1 = Gas gradient in psi/ft
D = true Vertical depth of casing seat in ft RKB
OR
2) ASP = FPP - (0.1 x D)
Where; FPP = Formation Pore Pressure at the next casing point
ASP CALCULATIONS
1. Drilling below conductor casing (16")
ASP = [(FG x 0.052) - 0.1] D
= [(10.9 x 0.052) - 0.1] x 114 = 53 psi
OR
ASP = FPP - (0.1 x D)
= 1081 - (0.1 x 2390') = 842 psi
2. Drilling below surface casing (9 5/8")
ASP = [(FG x 0.052) - 0.1] D
= [(14.5 x 0.052) - 0.1] x 2390 = 1563 psi
OR
ASP = FPP - (0.1 x D)
= 3236 - (0.1 x 7151') = 2521 psi
3. Drilling below intermediate casing (7")
ASP = FPP - (0.1 x D)
= 3263 - (0.1 x 7212') = 2542 psi
) Colville River Field )
CD2-27 Injection Well Completion Plan
16" Conductor to 114'
Updated 10/13/03
.
4-1/2" Cameo DS Nipple (3.812')
at 2000' TVD = 2629' MD
9-5/8" 36 ppf J-55 STC
Surface Casing
@ 3359' MD /2390' TVD
cemented to surface
Packer Fluid mix:
9.? PPQ KCI Srine
with 2000' TVD diesel cap
4-1/2" 12.6 ppf L-80 IBT M
tubing run with Jet Lube Run'n'Seal
pipe dope
Tubing suspended with diesel
Completion .MQ TVD
Tubing Hanger 32' 32'
4-1/2", 12.6#/ft, 1ST-Mod Tubing
Camco DS6 nipple 2629' 2000'
4-1/2", 12.6#/ft, 1ST-Mod Tubing
Cameo KSG2- GLM (3.909" ID) 11850' 6926'
4-1/2", 12.6#/ft, 1ST-Mod Tubing (2)
Baker 53 Packer wI mlllout extension 11950' 69761
4-1/2", 12.6#/ft, 1ST-Mod Tubing (1)
HES "XN" (3.725")- 12050' 7021'
4-1/2", 12.6#/ft, 1ST-Mod 10' pup joint
WEG 12062' 7026'
TOC @ +1- 11675' MD 16832' TVD
(>825' MD above top Alpine)
Camco KBG-2 GLM (3.909" DRIFT ID)
wi dummy
Baker 83 Packer WI millout extension at +1- 11950' MOl
6976' TVD <200' TVD from top of Alpine
Well TD at
17802' MD I
72121 TVD
./
Top Alpine at 12500' MD /7147' TVD
7" 26 ppf L -80 BTC Mod
Production Casing @ 12524' /7151' TVD @+/- 83.0Q
. 0 .""," - . 1 £\ L
~~, , i ,d
"i /14 \...~ ~ ~:' ~.'r:, .
Alpine, CD2-:!7 Well Cementinç¡ Requ.fements
95/8" Surface Casin~ run to 3359' MD /2390' TVD
Cement from 3359' MD to 2859' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2859' to surface with
Arctic Set Lite 3. Assume 300 % excess annular volume in permafrost and 50 % excess below the permafrost
(1602' MD).
Lead slurry:
System:
Tail slurry:
System:
(2859'-1602') X 0.3132 fe/ft X 1.5 (50% excess) = 590.5 ft3 below permafrost
1602' X 0.3132 ft3/ft X 4 (300% excess) = 2007.0 ft3 above permafrost
Total volume = 590.5 + 2007.0 = 2597.5 fe => 607 Sx @ 4.28 fe/sk
607 Sx ArcticSet Lite .3 @ 10.7 PPG yielding 4.44 ft3/sk, Class G + 30% D053 thixotropic additive,
0.6% D046 antifoamer, 1.5% D079 extender, 1.5% S001 accelerator, 50% D124 extender and 9%
BWOW1 D044 freeze suppressant
500' X 0.3132 ft3/ft X 1.5 (50% excess) = 234.9 ft3 annular volume
80' X 0.4341 fe/ft = 34.7 ft3 shoe joint volume
Total volume = 234.9 + 34.7 = 269.6 fe => 230 Sx @ 1.17 fe/sk
230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1 % SOOl accelerator @ 15.8
PPG yielding 1.17 ft3/sk
7" Intermediate Casin~ run to 12524' MD /7151' TVD
Cement from 12524' MD to +/-11675' MD (minimum 500' MD above top of Alpine formation) with Class G +
adds @ 15.8 PPG. Assume 40 % excess annular volume.
Slurry:
System:
(12524' - 11675') X 0.1268 ft3/ft X 1.4 (40% excess) = 150.7 fe annular vol.
80' X 0.2148 fe/ft = 17.2 fe shoe joint volume
Total volume = 150.7 + 17.2 = 167.9 fe => 146 Sx @ 1.15 fe/sk
146 Sx Class G + 0.29(¡ D046 antifoamer, 0.25% D065 dispersant, 0.25% D800 retarder and 0.18%
D167 fluid loss additive @ 15.8 PPO yielding 1.15 ft3/
1 By Weight Of mix Water, all other additives are BWOCement
-I ,",\
a
~-.
"-..~.. -1
~--
~
r--
Sperry-Sun Drilling Services
Alaska North S
North S~
PIa
roposal Report
25 September, 2003
.---
Surface Coordinates: 5974522.31 N, 371709.10 E (70020'19.0535" N, 151002'27.6477" W)
Grid Coordinate System: NAD27 Alaska State Pla'nes, Zone 4
Kelly Bushing: 52.000 above Mean Sea Level
spe.........y-sul!
[;fArLL.'iNG~5-EAvlcEfS
A Hatllburton Company
.~
Proposal Ref: pro294
/'
ConocóPhilIi ps
ConocoPhillips Alaska, Inc.
Colville River Unit
Alpine (CD2 Pad)
CD2-27 (wp01)
Scale: 1 inch = 2000ft
-2000 0 2000 4000 6000 8000 10000
I ¡ ¡Surface Loçat¡O~: O.OOftMO,O.OOftT~D; (1835' FNL, 153111 FEL, SeC2~T"11N-~4E) I
.' 1/'............- Begin Dir @ 3.000o/100ft : 200.00ft MD, 200.00ft TVD .
U --- -. -- - ----^'--- C~ntinue Dìr @ 4.ÕÕÕoI100ft: 533. 33ftM D,531.64ftTVD -- -- - -- - - - - -- .-.--- - - 0
.-- End Dir, Start Sail @ 57.70r : 1788.33ftMD,1550.90ftTVD
1800.00
-8000 -
Dir @ 4.00001100ft : 11846.36ft MD, 6924.39ft TVD -
7" Csg PI ...ContinueDir @ 4.00o/100ft:
Begin 6-1/8" Hole: 12524ft MD, 7151 ft TVD
Tatget Heel, Start Dir (GeoSteer) : 12709 ftMD,7162ftTVD
(41111' FNL, 275' FEL See 12-T11N-R4E)
¡
9-5/8" Csg PI ... Drill out 8-1/2" Hole:
3356 ft MD, 2390 ft TVD
~
..L.
'T'
Reference is True North
- -2000
-2000 -
WolI
Current Well Properties
Plan: CD2·27
!-brilOntal Coordinates:
ReI. Global Coordinates:
ReI. Stroctura :
Ref. Geographical Coordinates:
RKB Elevation'
5974522.31 N, 371709.10 E
79.24 N, 9.75 W
70' 20' 19.0535" N, 151" 02' 27.6477" W
1835' FNL & 1531' FEL, SEC 2· T11N· R4E
52.001t abeve Mean Sea Level
52.00ft above Structuro
True North
Feet (US SUlVey)
- -4000
-4000 -
North ReI erenco :
Un«s:
-6000 -
¡
I
I
I
Begin
I
6000.00
- -6000
,~ 7158.10
(1)2-27 (Ueeli
'.,. Paf)'goll: 201.79 x 5098.97 x 198.37 x 5092.63ß
7162.00 Tl7), 7552.90 S~ 654Uì2 E - -8000
7162.00
-10000 -
Tar!;Jet Mid pt 1, Continue GeoSteering: 14778t MD, 7162ft TVD; .."
65~ FNL 4234' FEL (Sec18~ T11 N-R5E) .--....-
I
¡
I
i
¡
i
I
7162.16
.' CD2-27 OI'¡Üll't 1)
._...-.~ -······l'oillt Tl!1:f4et
~. 7Ui2JJO TV!), 937lUJ9 S, 75.15.75 E
. <6 7174.23
~ Cm-27 (Mid 1'12)
Target Mid Pt 2, (GeoSteer): 16152.11ftMD,7177.00ftTVD; .........~ "'" PointTarget
1871' FNL 3592' FEL (See 18- T11 N-RSE) .., ~ 7177.0(J 'lVI), 1Ii59/L<j/) S, 8162.98 I~
~
- -10000
-12000 -
TD Target Toe: Open Hole; 17802 ftMD,7212 ftTVD: ...................
3328' FNL, 2823' FEL (See 18- T11 N-R5E)
C1>2·27 (Toe)
Poillt TW'''et
'7212.00 :FVf), /2045.998, l039.70 E
- -12000
I
-2000 ()
Scale: 1 inch = 2000ft
SpSr"r-aY-SUI!
DRIL LING SERV.c:eS
A Hamburton Oampan)'
I I
4000 6000
- -14000
-14000 -
I
2000
I
8000
I
10000
rPrepared by:
I GAndrews
¡Date/Time: fhecked:
25 September, 2003 - 9:01
Îpproved:
DrillOuost 3.03.02.002
~I
2000 4000 6000 8000 10000 12000 14000 16000
~ I I I I I I I I
g __....·Surface Location: O.OOftMD,O.OOftTVD; (1835' FNL, 1531' FEL, Sec2-T11N-R4E) if
~ 0 - - - - -===ãegin Dï"r@ 3.00Õo1100ft :-200.00ft-MD, 200-:-00ftTVD - - - - - - - - - - - - -- - - - - ~ - -- - - - - - 0
~ '~~~(;:, Continue Dir@4.0000/10OO:533.33ftMD,531.64ftTVDfJ9Q
.~ ,," ¡:: ~ ;:: ~ ~
I ~ ;:: ¡.." c:r!? 0
~ ~ I ~ End Dir, Start Sail,@ 57.7070: 1788.33ftMD,1550.9OOTVD 5 ¡ : ~ i-
''-J (f) 'V (;:,(;:,. . GI Ä: ~ f',., ;;:
:J~ 2000 - : ,'¿:9-.518" cs~,!:I,:" Drill out &-112" Hole: 3356 It MD',2390 It TVDi :g.!¡- ff i ~;¡¡ - 200C
f(',. ,-1 I ~...~.. ~~(;:,(;:,~~'~~HE§'fFf!El ~~
;:-~i i '~~ c~ tlil! 11 ~l If
~~OOO - ,~~~G !;~µ: l! Ii ;;
t $ ll;~~ -~~ ~æ ~l:i
<l> @ i Po Iii ~ ~ ;if ~.r!:! LO ~
:) .... :s C\,( ~ ~ _ .... .- .,.
is Q, ró :!$ ...¡ ~ ~ õ; ...f
~ ~ _5~ ~
1:: ..... i!'- . - .- .....
gaooo - ..~.~ g,j:: ~ ~.
~ (;:,~~ Î(;:,(;:,
p,a:~:f::;Zft lj ~~!l;~!:'HN'''~'J9'
CD2-27 (Mid Pi 1.J 7125.00 nv, 5.963793.61 N, 379689,69 E
Point Target
7110.f¡{) 1'YD. 5965(117.f¡{) N, 379063.30 E
'~Ph' ." _II-
Canoco ' ,I" IpS
ConocoPhillips Alaska, Inc.
Colville River Unit
Alpine (CD2 Pad)
CD2-27 (wp01)
Scale: 1 inch = 2000ft
o
8000 -
!IJ-=. -rty-SUI ~
O'iA·IL.^LI^N'Ø--']!SiERVI£:^IæiS
A Hdibuf!'ion C'Omp8fí)'
o
Scale: 1 inch = 2000ft
I
2000
I
4000
I
6000
I
8000
I
10000
rrepared by:
GAndrews
DrillQuest 3.03.02.002
.t'..
.?t.;
Reference is True North
WaI:
Current Well Properties
Plan: C02-27
H>rizonlal Coordnales:
ReI. Global Coonfll'lales :
Ref. Slruc:llKe :
Ref. Geograpljcal Coordinates :
RK8 Elevation :
5974522.31 N. 371709.10 E
79.24 N. 9.75 W
70020' 19.0535' N, 151002' 27.64n· W
1835' FN.. & 1531' FEL, SEC 2 - T11N - R4E
52.0011 above Mean Sea Level
52.0011 above Stru:;hre
True North
Feel (US Survey)
North Reference:
IkiIs :
I
12000
I
14000
I
16000
DatelTime: fhecked:
I 25 September, 2003 - 12:31
¡Approved:
~
-1
en
~
<l>
>
o
..c
«
- 400C þ!
.L:
õ..
<l>
o
(ij
(,)
t
<l>
- 6(1' ">
~
- 800C
~
o
o
o
C\/
II
~
o
.S
Q)
~
o
(f)
DrillQuest 3.03.02.002
Page 2 of 12
25 September, 2003 - 8:59
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2·27 (wp01)
Revised: 9 September, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rån~ Section Comment
(ft) (ft) (ft) (ft) (ft) (ft)
0,00 0.000 0,000 -52.00 0,00 0,00 N 0,00 E 5974522,31 N 3'Rl'Z09,1'Œ,E 0.00 Surface Location: O,OOftMD,O,OOftTV(
(1835' FNL, 1531' FEL, Sec2-T11 N-
R4E)
:/200,00 0,000 0.000 148.00 200.00 0.00 N 0.00 E OE 0,000 0.00 Begin Dir @ 3,OOoo/100ft : 20r -'1
MD, 200.00ft TVD
300,00 3,000 100,000 247.95 299.95 0.45 S ,.;ftt~ 8 371711.67 E 3.000 1,90
400,00 6,000 100.000 347.63 399.63 1,82 S 10:30 371719,37 E 3,000 7.60
500,00 9,000 100.000 446.77 498,77 4.08 S 23,16 E 371732,18 E 3.000 17,08
533,33 10,000 100.000 47~.64 531,64 5,04 S 28.57E 5974~16.78 N 371737,58 E 3,000 21.07 Continue Dir @ 4,OOoo/100ft :
533.33ftMD,531,64ftTVD
C) 600.00 12,063 1 08,880 545.08 40,87 E 5974513.31 N 371749.82 E 4.000 31.02
700,00 1 5,502 117.528 642.20 62.61 E 5974503,38 N 371771.40 E 4.000 51.66
800,00 19.156 123.023 737.65 88,23 E 5974487,82 N 371796.75 E 4.000 79.07
900.00 22,922 126.791 830.97 117.60 E 5974466,71 N 371825.76 E 4.000 113.12
1000.00 26,753 79,60 S 150.56 E 5974440,15 N 371858.28 E 4,000 153,65
1100,00 30,625 110,86 S 186,97 E 5974408.27 N 371894,15 E 4,000 200.45
1200,00 34.523 147,23 S 226,65 E 5974371.22 N 371933,19 E 4,000 253,30
1300.00 38.440 188,54 S 269.39 E 5974329.19 N 371975,23 E 4.000 311,94
1400.00 42.370 234,57 S 315.00 E 5974282,38 N 372020.04 E 4,000 376,09
.~._~
1500.00 46,31 ° 136.805 1373,70 285,11 S 363.25 E 5974231 .02 N 372067.42 E 4,000 445.43
1600,00 50.258 137,61Z0 1440.23 339,92 S 413,91 E 5974175,36 N 372117.14 E 4.000 519.63
1700.00 54,211 138 .44~;W 1501.46 398,71 S 466,73 E 5974115.67 N 372168,94 E 4.000 598.32
1788,33 57.707 139,062 1550.90 453,74 S 514,98 E 5974059.82 N 372216,24 E 4.000 671 ,26 End Dir, Start Sail @ 57,70r
1788.33ftMD,1550.90ftTVD
139,062 1505,14 1557.14 461,19 S 521.44 E 5974052,26 N 372222.57 E 0,000 681 ,1 °
1900,00 57.707 139,062 1558.56 1610,56 525.05 S 576.83 E 5973987.4 7 N 372276.86 E 0,000 765,39
2000,00 57,707 139,062 1611 .99 1663.99 588.91 S 632.22 E 5973922.67 N 372331,15 E 0,000 849,67
2100,00 57,707 139,062 1665.41 1717.41 652.76 S 687.61 E 5973857,88 N 372385.44 E 0,000 933,96
2200.00 57,707 139,062 1718.84 1770,84 716,62 S 743,00 E 5973793,08 N 372439,73 E 0,000 1018.25
2300,00 57,707 139,062 1772.26 1824.26 780.48 S 798,39 E 5973728,29 N 372494,02 E 0,000 1102.54
2400,00 57,707 139.062 1825,69 1877.69 844,34 S 853.78 E 5973663.49 N 372548.31 E 0,000 1186.83
2500,00 57,707 139,062 1879,11 1 931 .11 908,19 S 909,1 7 E 5973598,70 N 372602.60 E 0.000 1271,12
2600.00 57,707 139.062 1 932.54 1984.54 972,05 S 964.56 E 5973533,90 N 372656.88 E 0.000 1355.40
2700,00 57,707 139,062 1985,96 2037.96 1035.91 S 1019,95 E 5973469.10 N 372711,17 E 0,000 1439,69
2800,00 57,707 139,062 2039,39 2091.39 1099.76 S 1075.34 E 5973404,31 N 372765.46 E 0.000 1523,98
DrillQuest 3.03.02.002
Page 3 of 12
25 September, 2003 - 8:59
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-27 (wp01)
Revised: 9 September, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings" Rãfev~[~i!~Jš'ection Comment
(ft) (ft) (ft) (ft) (ft) (ft) .
_~~~il <~t~. 0" ,11\{1~f:'- _~tj~_ ·:~JiIt[~~:-W;~7
2900.00 57.707 139.062 2092.81 2144.81 1163.62 S 1130.73 E 5973339.51 N i~~t¡. 3t,gfil.:f~,7~M! "(I~>.ooo 1608.27
3000.00 57.707 139.062 2146.24 2198.24 1227.48 S 1186.12 E 5973274.72 N r¡ftilir~,372Iì'\>4"~' 't5.000 1692.56
3003.30 57.707 139.062 2148.00 2200.00 1229.59 S 1187.94 E 5973442~58 N'-tlt.?72875:83 E 0.000 1695.34 C-40
3100.00 57.707 139.062 2199.66 2251.66 1291.34 S 1241.51 E 5973~~92 Nq"~928.33 E 0.000 1776.85
3200.00 57.707 139.062 2253.09 2305.09 1355.19 S 1296.90 E .' 5973145~13N 372982.62 E 0.000 1861.13
. --, .
~J~~'~ .',~t· >:":', '~:::f;"1 ;"
3300.00 57.707 139.062 2306.51 2358.51 1419.05 SJ.35229 E "; 5973080.33 N 373036.91 E 0.000 1945.42
3358.94 57.707 139.062 2338.00 2390.00 1456.69 S ·"i3a.4.93.E . 5973042.14 N 373068.91 E 0.000 1995.10 9-5/8" Csg Pt... Drill out 8-1/2"f:iõÍe:
l 'tf¡f@}i" 3356 ft MD 2390 ft TVD
f& 9 5/8"Csg Pt @ 3359' MD
~ 3379.53 57.707 139.062 2349.00 2401.00 14691$4 SttÆ~¡~,1396.34 E 5973028.80 N 373080.09 E 0.000 2012.46 C-30
~:'~ 3400.00 57.707 139.062 2359.94 2411.94 f4â2~t st." 407.68 E 5973015.54 N 373091.20 E 0.000 2029.71
,~''{ .~ 3500.00 57.707 139.062 2413.36 2465.36 1q46.16 S 1463.07 E 5972950.74 N 373145.49 E 0.000 2114.00
---. J
3600.00 57.707 139.062 2466.78 25 Ht78 .1610:62 S 1518.45 E 5972885.94 N 373199.78 E 0.000 2198.29
3700.00 57.707 139.062 2520.21. ·.257~1 1674.48 S 1573.84 E 5972821.15 N 373254.07 E 0.000 2282.57
3800.00 57.707 139.062 2573.63,' 2625;63 1738.34 S 1629.23 E 5972756.35 N 373308.35 E 0.000 2366.86
3900.00 57.707 139.062 26271>6; '. 2679~Ò6 1802.19 S 1684.62 E 5972691.56 N 373362.64 E 0.000 2451.15
.___.,;,.;. 4000.00 57.707 139.0.6..~..'~8~~'t~._ ::'~:2732.48 1866.05 S 1740.01 E 5972626.76 N 373416.93 E 0.000 2535.44
_-.:$;._;=,__;:", _!:,~_;._::..,¿:_ _~",,:,>.J.~~:::..._._.__.:._
f'--"" 4058.99 57.707 139,ø62';/'>, 'ftlls12.oã""'* 2764.00 1903.72 S 1772.69 E 5972588.54 N 373448.96 E 0.000 2585.16 C-20
4100.00 57.707 .139;þ62~::::: 2æ3.91 2785.91 1929.91 S 1795.40 E 5972561.97 N 373471.22 E 0.000 2619.73
4200.00 57.707. -';'t~9:b'62 ~:~:'. 2787.33 2839.33 1993.77 S 1850.79 E 5972497.17 N 373525.51 E 0.000 2704.02
4300.00 57.707 '139.062'" 2840.76 2892.76 2057.62 S 1906.18 E 5972432.38 N 373579.80 E 0.000 2788.30
4400.00 57.707 . ;".:,13'9.062: 2894.18 2946.18 2121.48 S 1961.57 E 5972367.58 N 373634.09 E 0.000 2872.59
4500.00 Oy>57:707 rJf139.062 2947.61 2999.61 2185.34 S 2016.96 E 5972302.78 N 373688.38 E 0.000 2956.88
4600.00:~>~ 57.707 . 139.062 3001.03 3053.03 2249.19 S 2072.35 E 5972237.99 N 373742.67 E 0.000 3041 .17
4700.00:'.' 57.707 139.062 3054.46 3106.46 2313.05 S 2127.74 E 5972173.19 N 373796.96 E 0.000 3125.46 --
4800.00 57.707 139.062 3107.88 3159.88 2376.91 S 2183.13 E 5972108.40 N 373851.25 E 0.000 3209.75
4900.00 57.707 139.062 3161.31 3213.31 2440.77 S 2238.52 E 5972043.60 N 373905.54 E 0.000 3294.03
5000.00 57.707 139.062 3214.73 3266.73 2504.62 S 2293.91 E 5971978.81 N 373959.83 E 0.000 3378.32
5100.00 57.707 139.062 3268.16 3320.16 2568.48 S 2349.30 E 5971914.01 N 374014.11 E 0.000 3462.61
5200.00 57.707 139.062 3321.58 3373.58 2632.34 S 2404.69 E 5971849.22 N 374068.40 E 0.000 3546.90
5300.00 57.707 139.062 3375.01 3427.01 2696.19 S 2460.08 E 5971784.42 N 374122.69 E 0.000 3631.19
5400.00 57.707 139.062 3428.43 3480.43 2760.05 S 2515.47 E 5971719.62 N 374176.98 E 0.000 3715.48
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-27 (wp01)
Revised: 9 September, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastlng$ Rate ..... "'Section Comment
(ft) (ft) (ft) (ft) (ft) (ft)
5500,00 57.707 139.062 3481.86 3533.86 2823,91 S 2570.86 E 37.~g~~¡\2:q·:~ 0.000 3799,76
5600,00 57.707 139.062 3535.28 3587.28 2887.77 S 2626.25 E ,'{ 37 42~8áp6E 0.000 3884.05
5700.00 57,707 139.062 3588.71 3640.71 2951.62 S 2681.64 E ;);jF 4339:85 E 0.000 3968.34
5800,00 57.707 139.062 3642.13 3694.13 3015.48 S 2737.03 E ;@~d;394.14 E 0,000 4052.63
5900,00 57,707 139.062 3695.56 3747.56 3079,34 S 2792.42 E 374448.43 E 0.000 4136.92
6000,00 57,707 139.062 3748.98 3800.98 3143.20 S N 374502,72 E 0,000 4221.21
6052.44 57.707 139.062 3777 .00 3829.00 3176.68 S N 374531.19 E 0,000 4265.41 K-3
6100,00 57.707 139.062 3802.41 3854.41 3207.05 S 266.06 N 374557,01 E 0,000 4305.49
6200,00 57,707 139.062 3855.83 3907.83 327Q.91 S 5971201.26 N 374611,30 E 0,000 4389.78
6300,00 57,707 139.062 3909.26 3961.26 3334,77 S 5971136.46 N 374665,58 E 0,000 4474.07
(,"~~
""-'<-'=oJ 6400.00 57.707 139,062 4014,68 3398,62 S 3069,37 E 5971071,67 N 374719.87 E 0.000 4558.36
6409,95 57,707 139.062 4020.00 3404.98 S 3074.88 E 5971065.22 N 374725.28 E 0.000 4566,75 Basal K-3 Sand
6458.62 57.707 139.062 4046.00 3436,06 S 3101.84 E 5971033.69 N 374751,70 E 0.000 4607,77 K-2
6500.00 57.707 139.062 3462.48 S 3124.76 E 5971006.87 N 374774.16 E 0.000 4642,65
6600.00 57,707 139.062 3526.34 S 3180.15 E 5970942.08 N 374828.45 E 0.000 4726.94
6649.54 57.707 139,062 3557.98 S 3207,59 E 5970909,98 N 374855.35 E 0,000 4768.69 Base K-2 Cycle
6700.00 57,707 1 39,062 3590.20 S 3235.54 E 5970877 .28 N 374882.74 E 0.000 4811.22
,~--"~ 6800,00 57,707 1 39.062 3654.05 S 3290.93 E 5970812.49 N 374937.03 E 0.000 4895,51
6900,00 57.707 139.062 3717.91 S 3346.32 E 5970747.69 N 374991.32 E 0,000 4979.80
7000.00 57,707 139.062 4283,23 3781.77 S 3401.71 E 5970682.90 N 375045.61 E 0.000 5064.09
7100,00 57.707 139,062 4336.66 4388,66 3845,62 S 3457.10 E 5970618,10 N 375099.90 E 0.000 5148.38
7200,00 57.707 139.062 4390.08 4442.08 3909.48 S 3512.49 E 5970553.30 N 375154,19 E 0.000 5232.67
7300,00 57.707 39,062 4443,51 4495.51 3973.34 S 3567.88 E 5970488.51 N 375208.48 E 0.000 5316.95
7400.00). 57.707 139.062 4496.93 4548.93 4037.20 S 3623.27 E 5970423,71 N 375262.77 E 0.000 5401,24
7500,00' 57,707 139.062 4550.36 4602.36 4101,05 S 3678.66 E 5970358.92 N 375317.06 E 0.000 5485.53
7600.00 57.707 1 39.062 4603.78 4655.78 4164.91 S 3734,05 E 5970294,12 N 375371.34 E 0.000 5569.82
7700.00 57.707 139,062 4657,21 4709.21 4228,77 S 3789.44 E 5970229.33 N 375425.63 E 0.000 5654.11
7800,00 57,707 139,062 4710.63 4762.63 4292.63 S 3844.83 E 5970164,53 N 375479.92 E 0.000 5738.39
7900.00 57.707 139,062 4764.06 4816.06 4356.48 S 3900.22 E 5970099.74 N 375534.21 E 0,000 5822,68
8000.00 57.707 139,062 4817.48 4869.48 4420.34 S 3955.61 E 5970034.94 N 375588.50 E 0.000 5906.97
8100,00 57.707 139,062 4870.91 4922.91 4484.20 S 4011.00 E 5969970,14 N 375642.79 E 0.000 5991 ,26
8200.00 57.707 139,062 4924.33 4976.33 4548.05 S 4066.39 E 5969905.35 N 375697.08 E 0,000 6075.55
8300,00 57.707 139,062 4977.76 5029.76 4611,91 S 4121,78E 5969840.55 N 375751.37 E 0,000 6159,84
8400,00 57.707 139.062 5031.18 5083.18 4675,77 S 4177.17 E 5969775.76 N 375805,66 E 0,000 6244.12
8500.00 57,707 139.062 5084.60 5136,60 4739.63 S 4232.56 E 5969710.96 N 375859,95 E 0.000 6328.41
25 September, 2003 - 8:59 Page 4 of 12 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-27 (wp01)
Revised: 9 September, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Easting,~, Rãfe ~<;¡¡!¡tfwtSection Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
8600.00 57.707 139.062 5138.03 5190.03 4803.48 S 4287.95 E 5969646.17 N 375914.24,:é· 101;[t).000 6412.70
8700.00 57.707 139.062 5191.45 5243.45 4867.34 S 4343.34 E 5969581 .37 N . 3759Säi53Ê W¡Õ~OOO 6496.99
8800.00 57.707 139.062 5244.88 5296.88 4931.20 S 4398.73 E 5969§,19:.58 N ",,"4~76022:81 E 0.000 6581 .28
8900.00 57.707 139.062 5298.30 5350.30 4995.05 S 4454.12 E 5969451,78 N '%t'ì§p77.10 E 0.000 6665.57
9000.00 57.707 139.062 5351.73 5403.73 5058.91 S 4509.51 E . 5969386.98.N 376'tf;S1.39 E 0.000 6749.85
1.'!1:·, ,1 ~ -. ' ¡ . . ~,¡
_"'., ,~.:_¡ ,:' "Ie' ",',
9100.00 57.707 139.062 5405.15 5457.15 5122.77 S .,!4564;90 E"' 5969322.19 N 376185.68 E 0.000 6834.14 --
9200.00 57.707 139.062 5458.58 5510.58 5186.63 S ~i.':' ':46?Ò';~29, E" . . 5969257.39 N 376239.97 E 0.000 6918.43
9300.00 57.707 139.062 5512.00 5564.00 5250.48 S 4á75.68"':E -' 5969192.60 N 376294.26 E 0.000 7002.72
9400.00 57.707 139.062 5565043 5617.43 ~.~~~ ~ ~t~~:~~ ~ 5969127.80 N 376348.55 E 0.000 7087.01
9500.00 57.707 139.062 5618.85 5670.85 5969063.01 N 376402.84 E 0.000 7171 .30
t':J
- ~ - -- ~:" ''''~:l-
.~;;::"=--~~"-. 9580.76 57.707 139.062 5662.00 5714.00 '5429.7,78 4831.19 E 5969010.68 N 376446.68 E 0.000 7239.37 Albian 97
9600.00 57.707 139.062 5672.28 5724.28. ,5442.00· S 4841.85 E 5968998.21 N 376457.13 E 0.000 7255.58
9700.00 57.707 139.062 5725.70 5777~70~' 5505:91 S 4897.24 E 5968933.42 N 376511.42 E 0.000 7339.87
9800.00 57.707 139.062 5779.13 +4Î;5831':13" -5569.77 S 4952.63 E 5968868.62 N 376565.71 E 0.000 7424.16
9900.00 57.707 139.062 5:3~"ì~'i¡~ì~" 5633.63 S 5008.02 E 5968803.82 N 376620.00 E 0.000 7508.45
10000.00 57.707 139.062 ""Úh~8'~13.1593i98 5697.48 S 5063.41 E 5968739.03 N 376674.29 E 0.000 7592.74
.~_-.l~ 10100.00 . 57.707 139.0.6.2,>. 'i\i"939.1~¥Þ 5991.40 5761.34 S 5118.80 E 5968674.23 N 376728.57 E 0.000 7677.03
~'- 10200.00 57.707 139.ö62·;)~·~:' ·15992.83"~-· 6044.83 5825.20 S 5174.19 E 5968609.44 N 376782.86 E 0.000 7761.31
10300.00 57.707 ..,..1391162;:':;: 00\6.25 6098.25 5889.06 S 5229.58 E 5968544.64 N 376837.15 E 0.000 7845.60
10400.00 57.?Ot·ÿni~~~9~Ç6,2. ....t..': 6099.68 6151.68 5952.91 S 5284.97 E 5968479.85 N 376891.44 E 0.000 7929.89
'~~~~~:" ";ì~ ~;ti.,'~..
1 0417.4ª,~t~;;';j9:Z.:7Ò7·~'.~1$9.062:· 6109.00 6161.00 5964.06 S 5294.63 E 5968468.54 N 376900.91 E 0.000 7944.60 Albian 96
1 0500.0~~:\. ~~~r~~Q1~à:í 39.062' 6153.10 6205.10 6016.77 S 5340.35 E 5968415.05 N 376945.73 E 0.000 8014.18
1 0600.od>:iii¡ß57~7Õ7 '~¡jlf~139.062 6206.53 6258.53 6080.63 S 5395.74 E 5968350.26 N 377000.02 E 0.000 8098.47
10700.0o'?Ì#[ 57.707 v/139.062 6259.95 6311.95 6144.48 S 5451.13 E 5968285.46 N 377054.31 E 0.000 8182.76 J
10800.00t:F 57.707 139.062 6313.38 6365.38 6208.34 S 5506.52 E 5968220.66 N 377108.60 E 0.000 8267.04
10900.00 57.707 139.062 6366.80 6418.80 6272.20 S 5561.91 E 5968155.87 N 377162.89 E 0.000 8351.33
11000.00 57.707 139.062 6420.23 6472.23 6336.06 S 5617.30 E 5968091.07 N 377217.18 E 0.000 8435.62
11100.00 57.707 139.062 6473.65 6525.65 6399.91 S 5672.69 E 5968026.28 N 377271 .47 E 0.000 8519.91
11200.00 57.707 139.062 6527.08 6579.08 6463.77 S 5728.08 E 5967961.48 N 377325.76 E 0.000 8604.20
11300.00 57.707 139.062 6580.50 6632.50 6527.63 S 5783.47 E 5967896.69 N 377380.04 E 0.000 8688.48
11387.03 57.707 139.062 6627.00 6679.00 6583.21 S 5831.68 E 5967840.29 N 377427.30 E 0.000 8761.84 Top H RZ
11400.00 57.707 139.062 6633.93 6685.93 6591 .49 S 5838.86 E 5967831.89 N 377434.33 E 0.000 8772.77
11500.00 57.707 139.062 6687.35 6739.35 6655.34 S 5894.25 E 5967767.10 N 377488.62 E 0.000 8857.06
11600.00 57.707 139.062 6740.78 6792.78 6719.20 S 5949.64 E 5967702.30 N 377542.91 E 0.000 8941 .35
11700.00 57.707 139.062 6794.20 6846.20 6783.06 S 6005.03 E 5967637.50 N 377597.20 E 0.000 9025.64
25 September, 2003 - 8:59 Page 5 of 12 DrillQuest 3.03.02.002
Dri/lQuest 3.03.02.002
Page 6 of 12
25 September, 2003 - 8:59
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-27 (wp01)
Revised: 9 September, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate '¡Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) {fi)1
11733.31 57.707 139,062 6812.00 6864.00 6804,33 S 6023.49 E 5967615.92 N 377615.29 E 9053.72 Base H RZ
11800,00 57.707 139.062 6847.63 6899,63 6846.91 S 6060.42 E 5967572,71 N 377651.49 E 9109.93
11804.44 57.707 139.062 6850.00 6902.00 6849,75 S 6062.88 E 5967569,83 N 377653.90 E 0,000 9113.67 K-1 Marker
11846,36 57,707 139.062 6872.39 6924.39 6876.52 S 6086,10E 5967542~67 N 3%,7676.66 E 0.000 9149.00 Begin Dir @ 4.0000/100ft : 11" 16f
MD, 6924.39ft TVD
11879,89 58,942 139,676 6890.00 6942.00 6898.17 S 61Qik68 Ei;) "0'$967520.70N 377694.87 E 4.000 9177.46 Kuparuk D
11900,00 59,684 140.038 6900,26 6952.26 6911.39 5967507.29 N 377705.79 E 4.000 9194.73
11967,38 62,177 141,209 6933,00 6985.00 6956,92 S 5967461.14 N 3777 42.36 E 4,000 9253,54 Kuparuk C
11978,16 62.577 141 .392 6938:00· 6990.00 6994,37 S 5967453,58 N 377748.20 E 4.000 9263,09 LCU
.~ 12000,00 63.387 141 .757 6947.92 6999,92 69"79;6 1 S 5967438.13 N 377760.03 E 4,000 9282,53
~J 12100,00 67.11 0 143.369 6989.78 7041.78 :.B(¡}si;ZZ S 5967365.10 N 377813,96 E 4,000 9373,32
::y~~
12200.00 70.849 144.894 7025.65 7077.65 7J;4X..$51$ 6281,09 E 5967288.53 N 377867,33 E 4,000 9466.63
12273.21 73.593 145,966 7048.00 7100.00 7184.75 S 6320,64 E 5967230.47 N 377905.89 E 4.000 9536,29 Miluveach A
12300.00 74,599 146,351 7055.34 WZJ 07.34 7206.1 5 S 6334,99 E 5967208,82 N 377919.87 E 4.000 9562,03
12355.04 76.667 147,130 7069,00 11;?1i¡Øo 7250.74 S 6364.23 E 5967163.74 N 377948.34 E 4.000 9615,26 Alpine D
12400.00 78.358 147,757 7078.72 71'30.72 7287.73 S 6387,85 E 5967126,35 N 377971 .33 E 4.000 9659,04
~~""-.~- 12462.05 80,695 Z090,Q.Q. 7142.00 7339.58 S 6420,01 E 5967073.96 N 378002.60 E 4.000 9719.85 Alpine C
12500,00 82,124 fl~,95.61··· 7147.67 7371.70 S 6439.41 E 5967041 .52 N 378021 .45 E 4.000 9757,20
12524,00 83.029 lÔ98.77 7150.77 7392.16S 6451.57 E 5967020.85 N 378033.25 E 4.000 9780.87 7" Csg Pt ...Continue Dir @ 4,00°/100'
Begin 6-1/8" Hole: 12524ft MD, 7151 f
TVD
7" Csg Pt @ 12524' MD
12600,00 85.895 1 50.468 7106,10 7158.10 7457.63 S 6489,43 E 5966954.74 N 378069.99 E 4.000 9856.02
12700,00 89,667 51 .798 7109.97 7161.97 7545.13 S 6537.66 E 5966866.43 N 378116.71 E 4.000 9955.02
12708,82 ...... 90.000 151.915 7110.00 7162.00 7552.90 S 6541,82 E 5966858,59 N 378120.74 E 4.000 9963,74 Target Heel, Start Dir (GeoSteer) :
12709 ftMD,7162ftTVD (4111' FNL,
275' FEL See 12-T11 N-R4E)
Target - CD2-27 (Heel), Current Targe
12800.00 90,000 151,915 7110.00 7162.00 7633.35 S 6584.75 E 5966777,42 N 378162,28 E 0.000 10053,92
12900.00 90,000 151.915 7110.00 7162.00 7721.57 S 6631.83 E 5966688.40 N 378207.84 E 0.000 10152.82
13000,00 90.000 151.915 7110.00 7162,00 7809.80 S 6678.90 E 5966599.38 N 378253.41 E 0.000 10251.73
13100,00 90.000 151.915 7110.00 7162.00 7898.02 S 6725.98 E 5966510.37 N 378298.97 E 0.000 10350.63
Dril/Quest 3.03.02.002
~
Target Mid Pt 1, Continue GeoSteerinç
14778t MD, 7162ft TVD; 658' FNL
4234' FEL (Sec18- T11 N-R5E)
Target - CD2-27 (Mid Pt 1), Current
Target
-'<.,~
Comment
North Slope, Alaska
12724.27
12823.17
12922.07
13020.96
13119.86
12229.77
12328.67
12427.57
12526.47
12625.37
12025.37
12031.97
12130.87
11933.07
12009.82
11438.56
11537.46
11636.36
11735.27
11834.17
10944.04
11042.95
11141 .85
11240.75
11339.66
1 0449.53
10548.43
10647.34
10746.24
10845.14
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
4.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
379392.51 E
379438.08 E
379483.65 E
379529.23 E
379574.80 E
379164.65 E
379210.22 E
379255.79 E
379301.37 E
379346.94 E
379070.46 E
379073.51 E
379119.08 E
379027.94 E
379063.30 E
378800.14 E
378845.70 E
378891.26 E
378936.82 E
378982.38 E
378572.33 E
378617.89 E
378663.46 E
378709.02E -
378754.58 E
5964374.02 N
5964285.02 N
5964196.01 N
5964107.01 N
5964018.00 N
5964819.05 N
5964730.05 N
5964641 .04 N
5964552.04 N
5964463.03 N
5965003.00 N
5964997.06 N
5964908.06 N
5965086.08 N
5965017.00 N
5965531.17 N
5965442.15 N
5965353.13 N
5965264.12 N
5965175.10 N
5966421.35 N
5966332.33 N
5966?'1!~31 N
5966154.30 N
596606S:28N
. , 5~5976.26 N
5965887.24 N
5965798.22 N
5965709.21 N
5965620.19 N
Global Coordinates
Northings Eastin
(ft)
Page 7 of 12
7855.91 E
7903.00 E
7950.09 E
7997.18 E
8044.27 E
7620.47 E
7667.56 E
7714.65 E
7761.74 E
7808.83 E
7523.15 E
7526.30 E
7573.39 E
7479.22 E
7515.75 E
7243.83 E
7290.91 E
7337.99 E
7385.06 E
7432.14 E
. ' ., ~
7008~44 E"
. \ 705S·;52.E
,7102.60. E
1149.68 E
.7196.75 E
6773.06 E
6820.14 E
6867.21 E
6914.29 E
6961.37 E
10015.34 S
10103.56 S
10191.77 S
10279.98 S
10368.19 S
9574.28 S
9662.49 S
9750.70 S
9838.92 S
9927.13 S
9391.97 S
9397.85 S
9486.07 S
7169.84
7170.94
7172.04
7173.14
7174.23
7164.35
7165.45
7166.55
7167.65
7168.75
7162.09
7162.16
7163.26
7117.84
7118.94
7120.04
7121.14
7122.23
7112.35
7113.45
7114.55
7115.65
7116.75
7110.09
7110.16
7111 .26
7110.00 7162.00
7110.00 7162.00_
7110.00 71623)(1 -
7110.00 ..::'7162.ÒO·".c
7110.09._-;.,,·.'7162·~ÓO .',
(:':./ ";~'~'".~ ~~, ,p
.,1.11 O~O,O ;;'f,7162.00
':>;711á:òo:~"("7162.00
. ....-;;.~:¥..::?;;::::;;.,-
9309.63 S
9378.09 S
7986.25 S
8074.47 S
8162.70 S
8250.92 S
8339.15 S
Local Coordinates
Northings Eastings
(ft) (ft)
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-27 (wp01)
Revised: 9 September, 2003
7162.00
7162.00
7162.00
·7162.00
7162.00
7162.00
7162.00
7162.00
7162.00
7162.00
Vertical
Depth
(ft)
7110.00
7110.00
7110.00
7110.00
7110.00
7110.00
7110.00
7110.00
7110.00
7110.00
Sub-Sea
Depth
(ft)
25 September, 2003 - 8:59
151.907
151.907
151.907
151.907
151.907
89.371
89.371
89.371
89.371
89.371
15500.00
15600.00
15700.00
15800.00
15900.00
.; ~ ~\
11~ttf¡;'~:--;
14793.3ßt:"·~i?iª~·371_ ~:.
14800.0Ö:;h~ªJi!ª71 :
14900.0Ó?t1Ú;~â'9'-:371
\~)t.
15000.001:;;;" 89.371
15100.00 89.371
15200.00 89.371
15300.00 89.371
15400.00 89.371
151.907
151.907
151.907
151.907
151.907
-' ¡ ;.:~. .:
:,""':. ;o.':'L,
,J'51.90'': ..
"'1'51.907
51.907
. .
151.915
151.9,1,p>_ .
t:?}t A/
151.915
151.915
151.915
1 51 .915
151.915
151.915
151.915
151.915
151.915
151.915
151.915
151.915
151.915
151.915
151.915
Azlm.
90.000
90.000
90.000
90.000
90.000
90.000
90.000
90.000
90.000
90.000
90.000
90.000
90.000
90.000
90.000
90.000
90.000
Incl.
J"'--
1
14700.00
14777.60
.-
14200.00
14300.00
14400.00
14500.00
14600.00
--;-- ~.
-c...~ J
a
13700.00
13800.00
13900.00
14000.00
14100.00
13200.00
13300.00
13400.00
13500.00
13600.00
Measured
Depth
(ft)
Alaska North Slope
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-27 (wp01)
Revised: 9 September, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings - Râte Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
16000.00 89,371 151.907 7123.33 7175.33 10456.41 S 8091.36 E 5963929.00 N 379620.37 E 0.000 13218.76
16100,00 89,371 151.907 7124.43 7176.43 10544.62 S 8138.44 E 5963839.99 N 379665.94 E --0,000 13317.66
16152,11 89.371 151,907 7125.00 7177,00 10590,59 S 8162.98 E 5963793.61 N 379689,69 E 0,000 13369,20 Target Mid Pt 2, (GeoSteer):
16152,11ftMD,7177,OOftTVD "1'
FNL 3592' FEL (Sec 18-T11 t\ , t:)
Target - CD2-27 (Mid Pt 2), Current
59'63780,50 N Target
16166,84 88.782 151.912 7125.24 7177.24 10603.58 379696.40 E 4.000 13383.76
16200.00 88.782 151,912 7125,94 7177.94 10632.83 S 5963750,99 N 379711,51 E 0,000 1 3416.55
~ 16300.00 88.782 151.912 7128,07 7180.07 1 S E 5963661,99 N 379757,06 E 0,000 13515.43
'-J 16400.00 88.782 151,912 7130.19 7182,19 10809.23 S E 5963573.00 N 379802,62 E 0.000 13614.32
16500.00 88.782 151.912 7132.32 7184.32 10897.44 S 8326,74 E 5963484.00 N 379848.17 E 0,000 13713.20
16600.00 88.782 151.912 7134.45 7186,45 10985.64 S 8373,81 E 5963395,01 N 379893.73 E 0.000 13812.08
16700.00 88.782 151.912 7136,57 S 8420.88 E 5963306,01 N 379939.29 E 0.000 13910.96
16800,00 88,782 11162.05 S 8467.95 E 5963217,02 N 379984.84 E 0.000 14009,84
16900.00 88.782 11250.25 S 8515.03 E 5963128,02 N 380030.40 E 0.000 14108.72
17000.00 88.782 11338.45 S 8562.10 E 5963039,03 N 380075,95 E 0,000 14207.60
17100.00 88,782 11426.65 S 8609.17 E 5962950,03 N 380121.51 E 0.000 14306.48
~~-="=- 17200,00 88,782 11514.86 S 8656,24 E 5962861,04 N 380167.06 E 0.000 14405.37
17300,00 7149.33 7201.33 11603.06 S 8703.31 E 5962772,04 N 380212.62 E 0,000 14504.25
17400.00 7151.45 7203.45 11691 .26 S 8750,39 E 5962683.05 N 380258.18 E 0.000 14603.13
17500,00 7153.58 7205,58 11779.47 S 8797.46 E 5962594.05 N 380303.73 E 0,000 14702.01
17600,00 7155,70 7207.70 11867.67 S 8844,53 E 5962505,06 N 380349,29 E 0,000 14800.89
17700.00 7157,83 7209.83 11955,87 S 8891,60 E 596241 6.06 N 380394.84 E 0.000 14899,77
17800.00 88,782 151.912 7159,95 7211.95 12044,07 S 8938.67 E 5962327.07 N 380440.40 E 0.000 14998.65
17802.00 88.782 151,912 7160.00 7212,00 12045.84 S 8939,61 E 5962325.29 N 380441.31 E 0,000 15000,63 TD Target Toe: Open Hole; 17802
ftMD,7212 ftTVD; 3328' FNL, 2823'
FEL (Sec 18- T11 N-R5E)
6 1/8" Open Hole
v 17802,18 88,782 151.912 7160.00 7212.00 v 12045.99 S 8939.70 E 5962325,13 N 380441 ,39 E 0.000 15000.80 Target - CD2-27 (Toe), Current Target
DrillQuest 3.03.02.002
Page 8 of 12
25 September, 2003 - 8:59
~
.......J
:-r,
::-. -
~-~,-,-~.
~
Alaska North Slope
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-27 (wp01)
Revised: 9 September, 2003
Based upon Minimum Curvature type calculations, at a Measured Depth of 17802.18ft., .,,,-,M1Ü,,,,
The Bottom Hole Displacement is 15000.80ft., in the Direction of 143.420° (True).
.-,-. ':
~'
North Slope, Alaska
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB= 52' MSL. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 143.420° (True).
Magnetic Declination at Surface is 24.485°(09-Sep-03)
The Along Hole Displacement is 151 08.32ft, the Planned T ortuos,ity is 1.073°/100ft and tt{ê DtréCtionaj Difficulty Index is 6.3.
Comments
.-
Measured
Depth
(ft)
11åò
125g~::ÔÒ
127Q8;82
14777.60
16152.11
17802.00
25 September, 2003 - 8:59
Station Coord
TVD Northingš'iljî;1*~
(ft) , I:(~) '.':~. _,
:"0/
0,00 /·'*iki" .>/ 0.6ò~~J
200.00 .00 N
531.64 5.04 S
1550.90 453.74 S
'2390.00 1456.69 S
'TI]1!tji', 6~g~.39
.",y 7t50.77
7162.00
7162.00
7177.00
6876.52 S
7392.16 S
7552.90 S
9378.09 S
10590.59 S
7212.00
12045.84 S
0.00 E
0.00 E
28.57 E
514.97 E
1384.93 E
6086.10 E
6451.57 E
6541.82 E
7515.75 E
8162.98 E
8939.61 E
Comment
Surface Location: O.OOftMD,O.OOftTVD; (1835' FNL, 1531' FEL, Sec2-T11 N-R4E)
Begin Dir @ 3.0000/100ft : 200.00ft MD, 200.00ft TVD
Continue Dir @ 4.0000/100ft : 533.33ftMD,531.64ftTVD
End Dir, Start Sail @ 57.707°: 1788.33ftMD,1550.90ftTVD
9-5/8" Csg Pt... Drill out 8-1/2" Hole: 3356 ft MD, 2390 ft TVD
Begin Dir @ 4.0000/100ft : 11846.36ft MD, 6924.39ft TVD
7" Csg Pt ...Continue Dir @ 4.000/100ft: Begin 6-1/8" Hole: 12524ft MD, 7151 ft TVD
Target Heel, Start Dir (GeoSteer) : 12709 ftMD,7162ftTVD (4111' FNL, 275' FEL Sec 12-T11 N-R4E)
Target Mid Pt 1, Continue GeoSteering: 14778t MD, 7162ft TVD; 658' FNL 4234' FEL (Sec18-T11 N-R5E)
Target Mid Pt 2, (GeoSteer): 16152.11ftMD,7177.00ftTVD; 1871' FNL 3592' FEL (Sec 18-T11 N-R5E)
-
TD Target Toe: Open Hole; 17802 ftMD,7212 ftTVD; 3328' FNL, 2823' FEL (Sec 18-T11N-R5E)
Page 9 of 12
DrillQuest 3.03.02.002
Formati on Plane Profile Penetration Poi n t
(Below Well Origin) Measured Vertical Sub-Sea
Sub-Sea Dip Up-Dip Depth Depth Depth Northings
(ft) Angle Dirn. (ft) (ft) (ft) (ft)
2148.00 0.000 359,020 3003,30 2200.00 2148,00
2349,00 0,000 359.020 3379,53 2401,00 2349,00
2712.00 0.000 359.020 4058.99 2764,00 2712,00
3777,00 0.000 359.020 6052.44 3829,00 3777.00
3968,00 0,000 359:020 6409,85 4020.00 3968.00'·
3994.00 0.000 359.020 6458,62 4046.00 3994.00 343Ef,06 S 3101,84 E K-2
4096,00 0.000 359.020 6649,54 4148.00 4096.00 3557.98 S 3207.59 E Base K-2 Cycle
5662.00 0.000 359.020 9580,76 5714.00 5662,00 5429.77 S 4831 .1 9 E Albian 97
6109,00 0.000 359.020 10417.45 §·161~ 6109,00 5964.06 S 5294,63 E Albian 96
6627,00 0.000 359.020 11387.03 'õS7L9.Q<l 6627.00 6583.21 S 5831.68 E Top HRZ
6812.00 0,000 359.020 11733.31 6864,00/ 6812.00 6804.33 S 6023.49 E Base HRZ
6850.00 0.000 359,020 11804.44 6902.00 6850.00 6849,75 S 6062,88 E K-1 Marker
6890.00 0.000 359,O.f:Q <,11§Z9.89 . 6942.00 6890.00 6898.17 S 6104.68 E Kuparuk D
6933.00 0.000 359£020 );;1196'7.38 6985.00 6933.00 6956.92 S 6153.18 E Kuparuk C
6938,00 0,000 359.020 11918.16 6990.00 6938,00 6964.37 S 6159.16 E LCU
12273.21 7100.00 7048.00 7184.75 S 6320.64 E Miluveach A
12355.04 7121.00 7069.00 7250,74 S 6364.23 E Alpine D
12462.05 7142.00 7090,00 7339.58 S 6420.01 E Alpine C
Dri/lQuest 3.03.02.002
Norlh Slope, Alaska
Page 10 of 12
25 September, 2003 - 8:59
Gï-"7=~
-"'~~
L--=-':"~
-
~
~~
Formation Tal's
Alaska Norlh Slope
Sperry-Sun Drilling Services
Proposal Reporl for Plan: CD2-27 (wp01)
Revised: 9 September, 2003
CasinQ details
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-27 (wp01)
Revised: 9 September, 2003
Alaska North Slope
North Slope, Alaska
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Casing Detail
<Surface>
<Surface>
<Surface>
<Surface>
<Surface>
<Surface>
3358.94
12524.00
17802.00
2390.00
7150.77
7212.00
95/8" Csg Pt @ 3359' MD
7" Csg Pt @ 12524'
61/8" Open Hole
"-'
t,:~-~
TarQets associated with this welløath
CD2-27 (Toe)
Target Entry Coordinates
TVD Northings Eastings Target Target
(ft) (ft) (ft) Shape Type
7212.00 12045.99 S 8939.70 E Point Current Target
Mean Sea LeveVGlobal Coordinates: 7160.00 5962325.13 N 380441.39 E
Geographical Coordinates: 700 18' 20.5198" N 1500 58' 06.9355" W
7177.00 10590.59 S 8162.98 E Point Current Target
Mean Sea LeveVGlobal Coordinates: 7125.00 5963793.61 N 379689.69 E
Geographical Coordinates: 700 18' 34.8436" N 150058' 29.5410" W
7162.00 9378.09 S 7515.75 E Point Current Target
Mean Sea LeveVGlobal Coordinates: 7110.00 5965017.00 N 379063.30 E
Geographical Coordinates: 70018'46.7760" N 150058'48.3846" W -~
7162.00 7552.90 S 6541.82 E Polygon Current Target
Mean Sea LeveVGlobal Coordinates: 7110.00 5966858.59 N 378120.74 E
Geographical Coordinates: 700 19' 04.7371" N 150059'16.7514" W
Target Boundary Point #1 7162.00 7507.81 S 6631.96 E
#2 7162.00 7599.65 S 6452.28 E
#3 7162.00 12097.58 S 8853.97 E
#4 7162.00 12001.75 S 9027.66 E
Target Name
-;"._':'¿;,:-....-$:i
¡ ~
CD2-27 (Mid Þt 1)
CD2-27 (Heel)
25 September, 2003 - 8:59
Page 11 of 12
DrillQuest 3.03.02.002
DrillQuest 3.03.02.002
70019'05:1798" N 150059'14,1199" W
70° 19' 04.2781" N 150059' 19,3655" W
70018' 20.0134" N 150058' 09.4374" W
700 18' 20.9540" N 150058' 04.3686" W
378211.64 E
378030.41 E
380354,79 E
380530.10 E
5966902.13 N
5966813.38 N
5962275.02 N
5962367,86 N
North Slope, Alaska
Page 12 of 12
25 September, 2003 - 8:59
~?-- -- --:- --=-~-
"'-O-_=_--=-_L....
r:"'~~:..~__
::Jt:J
!~
"'-
7110.00
7110.00
7110.00
71
Mean Sea Level/Global Coordinates #1
#2
#3
#4
Targets associated with this wellpath (Continued)
Alaska North Slope
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-27 (wp01)
Revised: 9 September, 2003
WELLPATHDET AILS
CDl-II (Prein)
~
Ref. Datum:
V.Sectio"
AnP:
143.420"
COMPANY DETAILS
COIlO«JP/ñ5ps A10sb 1..:.
Fngio=ing
A\>Ðe
Cakulo60n~ MmirmmCmw"""
Error Syslom ISCWSA
Scan Mdhod: Tnv Cyinder North
W'=:= a.~.?'ing
ANTI-COLLISION SETI1NGS
50.00
17803.28
Plan: CD2-27 (wpOl
Interval:
To:
Reference:
Interpolation Method:TVD
Depth Range From: 36.10
MaximunRange: 1976.72
Sb.
NlA
Longitud.
151°02'II.648W
WElL DIIT AILS
NorllDng Easling LaIXod.
5914522.31 371709.10 70"20' 19.OS3N
+F1.W
14.90
+NI·S
·119.11
Name
P..im: coo-v
52' MSL 5HOft
Origin Origin SW1ing
+Nl..s +Ef-W FromTVD
0.00 0.00 36.10
-10.0
-2
CJ I
~_'::~--_.r EB13:é fElltN/it'!
':--~-! . -c --5.0
-. 90
~. /~ CD~ID gn>-BI)
-0 27fi,
-2
~ ;I',:,,",,"-~~ --5.0
-50 hl20
/J -10.0
-75
CD2-29
-15.0
-100
-105
See MD DC Azi TVD +N/-S +FJ-W DLeg TFace vSec Target -20.0
1 36.10 0,000 0.000 36.10 0.00 0.00 0.00 0.000 0.00 -'20.7
2 200.00 0.000 0.000 200.00 0.00 0.00 0.00 0.000 0.00
3 533.33 10.000 100.000 531.64 -5.04 28.57 3.00 100.000 21.07
4 1788.39 57.7œ 139.062 1550.93 -453. 78 515.01 4.00 43.895 671.31
5 11847.11 57.7œ 139.062 6924.43 -6877.16 6J86.68 0.00 0.000 9149.86
6 127œ,5O 90.000 151.915 7162,00 -7553.50 6542.37 4.00 23.129 9964.55 CD2-27 (Heel)
7 l27œ.56 90.002 151.915 7162.00 -7553.55 6542.40 4.00 0.803 9964.61
8 14762.77 90.002 151.915 7161.91 -9365.00 7509.00 0.00 0.000 11995.28
9 14778.46 89.375 151.907 7162.00 -9378.84 7516.38 4.00 -179.197 12010.80 CD2-27 (Mid PI 1
10 14778.54 89.378 151.907 7162.00 -9378,91 7516.42 4.00 -0.527 12010.88
II 16138.25 89.378 151.907 7176.76 -10578.35 8156.69 0.00 0.000 13355.62
12 16153,08 88.785 151.912 7177.00 -10591.43 8163.67 4.00 179.473 13370.29 CD2-27 (Mid PI 2
13 17803.28 88.785 151.912 7212.00 -12046.95 8940.45 0.00 0.000 15002.00 CD-27 (Toe)
Tldvdli11g Cylinde, ALiIluJlh (TPO+AZI) [deg] v~ Ceuue to CeJllre Se¡)d.t.dlioJl [50fLliJl]
From Colour To MD
36 - 300
300 - '~r¡
400
500 - .J
750 "ïOOJ
1000 1250
1250 1500
1500 - 1750
1750 - 2000
000 2500
3000
3500
3 4000
4 4500
45 5000
5000 5500
5500 6500
6500 7500
~~gg \... g~gg
9500 t\= 1??oo
1??oo 10500
10500 ·-~:r 11000
11000: ±:::: 12000
J 12~l 13~
/!
120
~
.7
.0
CD2-25
CD2-26 (CD2-26)
-'20.7
-20.0
-15.0
ToMD
300
400
500
750
1000
1250
1500
1750
2000
2500
3000
3500
4000
4500
5000
5500
6500
7500
8500
9500
1 ??oo
10500
11 000
12000
13000
Colour
-
From
36
300
400
500
750
1000
1250
1500
1750
2000
2500
3000
3500
4000
4500
5000
5500
6500
7500
8500
9500
1
SURVEYPROORAM
Depth Fm Depth To SurveylPlan Tool
36.10 1000.00 Planned: CD2-27 (wpOl) V5 CB-GYRO-SS
1000.00 17803.28 Planned: CD2-27 (wpOl) V5 MWD+IFR-AK-CAZ·SC
-105
-100
-75
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [10ft/in]
CD2-27 (wpOl)
---Draft Plan ---
Company:
Ficlð:
Reference Site:
Refèl'tince Well:
Referenc.e Wellpath:
SPERRY SUN
Anticollision Report
ConoboPhillips Alaska Inc.
Colville Hi'ler·Unit
AlpineCD2
Prelih1:C02~27
C02-27 (Prelim)
Date: 9/9/2003
Time: 08:02:57
Page:
Co-ordinate(NE)·Reference:
V ertical(TVD) Rêferen.ce:
Well: Prelim:C02c27, TrueNorth
52'<MSL 52.0 .
Db: Oracle
Plan: C02-27 (wp01) & NOT PLANNED P~)GR.
ISCW SA Ellipse
Trav Cylinder North
Ellipse + Casing
GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference
Interpolation Method: TVO Interval: 50.00 ft
Depth Range: 36.10 to 17803.28 ft
Maximum Radius: 1976.72 ft
Casing Points
MD TVD Diameter Hole Size
ft ft in in
3359.05 2390.00 9.625 12.250
12543.00 7152.88 7.000 8.500
16177.68 7177 .52 6.125 6.125
Name
Reference:
Error Model:
Scan Method:
Error Surface:
95/8" Csg Pt @ 3282'MO
7" Csg Pt @ 12543' MO
Open Hole
I)rincipal: Yes
Plan: C02-27 (wp01)
Smmnary
<____~_~~___"_____m_~· .·Offse.t .W ellpàth ..--~--~~------~~---"..-~>
Site Well Wellpath
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine CD2
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine CD2
Alpine C02
Alpine C02
Alpine CD2
Alpine C02
Alpine C02
Alpine CD2
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
C02-08
C02-12
C02-13
C02-13
C02-13
C02-14
C02-15
C02-15
C02-15
C02-16
CD2-16
C02-17
C02-18
C02-18
C02-19
C02-20
C02-22
C02-23
C02-23
C02-24
C02-24
C02-25
C02-26
CD2-26
C02-26
C02-28
CD2-28
C02-29
C02-30
C02-30
C02-32
C02-32
C02-33
C02-33
C02-33
C02-34
C02-34
C02-35
C02-35
C02-36
C02-36
C02-37
C02-38
C02-39
C02-39
C02-40
CD2-08 V8
C02-12 V7
C02-13 V1
C02-13PB1 V10
C02-13PB2 V 4
C02-14 V1
CD2-15 V3
CD2-15PB1 V1
C02-15PB2 V2
C02-16 (Rig Surveys) V
C02-16 V7
C02-17 VO
C02-18 V1 Plan: C02-18
Rig: C02-18 V1
CD2-19 V8
CD2-20 V4
C02-22 V1
C02-23 V2
C02-23PB1 V12
C02-24 VO
C02-24PB1 V1
C02-25 V1
C02-26 V4
CD2-26PB1 '12
C02-26PB2 V3
C02-28 V3
C02-28PB1 V13
C02-29 V1
Plan: C02-30 V4 Plan:
Rig: C02-30 V1
C02-32 PB 1 VO
CD2-32 VO
C02-33 V2
C02-33A V1
C02-34B V1
C02-34 V3
C02-34PB1 V2
C02-35 V1
C02-35A V1
C02-36 PB1 V5
C02-36 V5
C02-37 V16
C02-38 V5
C02-39 V1
C02-39PB1 VO
Plan: C02-40 V5 Plan:
Date Composed:
Version:
Tied-to:
9/9/2003
5
From Well Ref. Point
Rèference Offset çt['~Ctr No~Go MIQw:ible
MJ) MD Distance Area Deviation Warning
ft ft ft ft ft
199.60 200.00 190.45 4.06 186.39 Pass: Major Risk
248.61 250.01 150.27 4.58 145.69 Pass: Major Risk
248.48 250.02 141 .26 4.90 136.36 Pass: Major Risk
248.48 250.02 141 .26 4.90 136.36 Pass: Major Risk
248.48 250.02 141 .26 4.90 136.36 Pass: Major Risk
297.12 300.00 130.99 4.92 126.07 Pass: Major Risk
297.65 300.00 121.08 5.52 115.56 Pass: Major Risk
297.65 300.00 121.08 5.52 115.56 Pass: Major Risk
297.65 300.00 121.08 5.52 115.56 Pass: Major Risk
298.28 300.01 111 .37 5.07 106.30 Pass: Major Risk
297.79 300.01 111 .36 4.95 106.40 Pass: Major Risk
248.82 250.00 100.99 4.41 96.58 Pass: Major Risk
298.54 300.00 91.17 6.05 85.11 Pass: Major Risk
249.28 250.01 90.69 4.26 86.43 Pass: Major Risk
446.22 450.16 82.48 7.04 75.44 Pass: Major Risk
249.03 250.01 71.31 4.77 66.53 Pass: Major Risk
298.78 300.00 50.72 4.76 45.96 Pass: Major Risk
248.92 250.01 41.01 4.24 36.77 Pass: Major Risk
248.92 250.01 41.01 4.35 36.66 Pass: Major Risk
298.59 300.00 30.82 4.91 25.91 Pass: Major Risk
298.59 300.00 30.82 4.91 25.91 Pass: Major Risk
248.99 250.00 20.51 4.56 15.95 Pass: Major Risk
249.98 250.01 10.60 4.37 6.23 Pass: Major Risk
249.95 250.02 10.41 4.29 6.12 Pass: Major Risk
249.95 250.02 10.30 4.36 5.93 Pass: Major Risk
349.28 350.00 8.83 5.88 2.96 Pass: Major Risk
349.28 350.00 8.83 5.99 2.85 Pass: Major Risk
399.43 400.01 17.85 6.42 11.43 Pass: Major Risk
350.32 350.01 28.92 6.98 21.94 Pass: Major Risk
300.07 300.13 29.27 5.13 24.14 Pass: Major Risk
449.49 450.00 48.25 7.28 40.98 Pass: Major Risk
449.49 450.00 48.25 7.17 41.08 Pass: Major Risk
450.74 450.01 58.49 6.90 51.59 Pass: Major Risk
450.74 450.01 58.49 6.85 51.64 Pass: Major Risk
450.74 450.01 58.49 6.90 51.59 Pass: Major Risk
808.66 803.41 35.69 13.76 21.93 Pass: Major Risk
808.66 803.41 35.69 13.87 21.82 Pass: Major Risk
514.35 500.02 80.08 8.26 71.82 Pass: Major Risk
500.52 500.02 79.74 7.89 71.85 Pass: Major Risk
809.63 801.24 94.67 13.16 81.51 Pass: Major Risk
809.63 801.24 94.67 13.16 81.51 Pass: Major Risk
400.63 400.38 100.33 7.32 93.01 Pass: Major Risk
502.48 500.07 110.18 8.08 102.10 Pass: Major Risk
1204.35 1169.89 95.24 21.64 73.60 Pass: Major Risk
1203.44 1169.84 95.20 21.62 73.59 Pass: Major Risk
553.59 550.04 126.21 8.51 117.70 Pass: Major Risk
~,
t~ll~
)
SPERRY SUN
Anticollision Report
)
. '" '" ,'. ,,,,...
. . .. ..... ....", . . .. . ... ..
..Oat¢: · ·.·9/9i20()3<·· ... ...». TiÎi1~:Qå:02;5t :. .
. Ç9nw.pany: . Ç(mocoPhillips Alaska Inc.
FI¢IØ~ .... ......... ... ... Co hAlle River Unit . ..
~~"er(m~eSit~: ... >.. .Àlpine ¢Q2 . < .. .
··R¢fer(\nçe Well: .... · ·Prelirn;C02~27 .
Refer¢n¢eW¢llpåtlt: · Pb2~27(prelim)
Summary
~-~-;:-~+-~--~~---~~-~~. . OffsetW~Üpath.··~·~_L~"L~.~~~~++~>.·· .
Sit~ ....... . Well.· .. ... . . . ···>:VY~llp~th
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine C02
Alpine C02
Alpine CD2
Alpine C02
Alpine C02
Alpine CD2
Alpine C02
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine C02
Alpine CD2
Alpine CD2
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine C02
Alpine CD2
Alpine Outlands
CD2-40
CD2-40
CD2-41
CD2-42
CD2-42
CD2-44
CD2-45
C02-46
C02-47
C02-48
C02-49
CD2-50
C02-50
CD2-51
CD2-52
C02-58
CD2-58
Plan: CD2-06
Plan: C02-07
Plan: C02-10
Plan: CD2-31
Plan: CD2-31
Plan: C02-43
Plan: CD2-43
Plan: CD2-43
Plan: CD2-43
Plan: CD2-43
Plan: CD2-54
Plan: CD2-55
Plan: CD2-55
Prelim: CD2-53
Prelim: C02-57
Alpine 1
···Page:
. " .. .. .. ... .
. ... . . .... .. '" . ...., .. ..
. . . . . .. .... . "' .. . .... . . .. . "'
. . .. .. .... .
. .. . .... .... ".. . ....... . .
. . . . " . .. .... . ...,
.. ... . ..... ..... . . ... ... .
'.. .., . ."', ......... ,... .. .... .. .... .. .
Ço-ordiriätê(NE)l{¢fere~c(Ù ..... Wèll:Pr~nm:CD2~27;<TrUeNorth..·. .
. · Vediêål(TVI):Refe~~.n<;ê:< > ... .. ·$2'MSC52~Ö .... .. ...... . .
Db:þracle
Rig: CD2-40 PB1 V6
Rig: CD2-40 V10
CD2-41 V9
CD2-42 VO
CD2-42PB1 VO
CD2-44 V15
CD2-45 V5
CD2-46 V2
CD2-47 V2
CD2-48 V1
CD2-49 V1
CD2-50 V2
CD2-50PB1 V2
CD2-51 V8
CD2-52 V6
CD2-58 V10
CD2-58L 1 V 4
Plan: CD2-06 V2 Plan:
CD2-07 (wp01) VO Plan:
Plan: C02-10 VO Plan:
PLAN: CD2-31 (GR Horz)
Plan: CD2-31 (ST Core)
CD2-43 Lat1 00 not us
CD2-43 (Lat 1 A Sand)
CD2-43 (Lat 2 C Sand)
CD2-43 Don't Use BHL05
CD2-43 Pilot.(wp01) V4
C02-54 VO Plan: A 15 (
Plan: CD2-55 V2 Plan:
Rig: CD2-55 V3
CD2-53 VO Plan: CD2-53
CD2-57 VO Plan: CD2-57
Alpine 01 B V1
Site: Alpine CO2
Well: CD2-08
Wellpath: C02-08 V8
Reference Offset
l\:ID TVD J.\.'ID TVD
ft ft ft ft
36.10 36.10 36.50 36.50
49.60 49.60 50.00 50.00
99.60 99.60 100.00 100.00
149.60 149.60 150.00 150.00
199.60 199.60 200.00 200.00
248.20 248.20 250.02 . 250.00
296.80 296.75 300.08 300.00
345.38 345.24 350.20 350.00
393.90 393.57 400.37 400.00
442.37 441.72 450.61 450.00
490.74 489.62 500.93 500.00
538.48 536.71 551.27 550.00
582.30 579.75 601 .65 600.00
625.75 622.22 652.09 650.00
668.76 664.02 702.55 700.00
711 .28 705.05 753.02 750.00
753.24 745.25 803.53 800.00
800.00 789.65 854.10 850.00
835.58 823.12 904.90 900.00
Rêìerence
..Mn
··ft·· .
553.59
553.59
1014.17
811.39
811.39
1119.73
1429.22
918.76
454.72
1030.72
822.79
775.98
775.98
1746.21
1723.79
199.51
199.51
248.42
200.00
297.37
450.06
450.06
36.10
503.34
503.34
36.10
503.34
775.40
407.98
252.18
1594.07
408.90
8780.63
. ....."
AlIØ)V~i).ié ... . . :
·Úeviådon. War¡Ûng..
.. ft..·. ..... .
.?r:;,t·· .·Ctr~çthNo~G(f..
. ...fi.. . ..?is~cei\r~f ·
550.04 126.21 8.68
550.04 126.21 8.68
1003.57 95.93 17.40
800.08 143.58 13.25
800.08 143.58 13.25
1105.11 111.53 18.55
1385.31 98.98 25.28
900.05 172.32 14.43
450.25 200.12 7.29
1000.77 172.47 17.27
801.49 227.78 13.60
750.77 225.53 13.19
750.77 225.53 13.19
1665.36 72.08 35.02
1632.19 120.07 33.56
200.01 311.01 3.69
200.01 311.01 3.58
250.01 210.87 5.11
200.00 200.26 3.81
300.00 171.07 6.04
450.00 38.39 8.91
450.00 38.39 8.91
36.10 159.73
500.37 157.80 9.13
500.37 157.80 9.02
36.10 159.73
500.37 157.80
753.17 271.32
400.00 279.01
250.02 280.66
1472.23 285.38
400.00 299.19
6419.69 665.94
9.13
14.63
7.46
4.37
34.06
7.46
218.14
Rule Assigned:
Inter-Site Error:
Semi-Major Axis Ctr-Ctr No-Go
Ref Offset TFO+AZI TFO-HS . CasingIHIDistance Area
ft ft deg deg in. ft ft
0.00 0.00 352.87 352.87 9.625 190.25 0.91
0.02 0.02 352.87 352.87 9.625 190.25 1.13
0.07 0.09 352.87 352.87 9.625 190.25 1.96
0.19 ,0.19 352.89 352.89 9.625 190.28 3.00
0.30 0.29 352.96 352.96 9.625 190.45 4.06
0.35 0.39 353.10 253.10 9.625 191.46 4.96
0.41 0.51 353.13 253.13 9.625 193.52 5.87
0.45 0.62 353.03 253.03 9.625 196.62 6.75
0.49 0.66 352.73 252.73 9.625 200.46 7.45
0.57 0.67 352.31 252.31 9.625 205.07 8.17
0.66 0.68 351.77 251 .77 9.625 210.39 8.91
0.76 0.70 351.03 250.22 9.625 216.12 9.68
0.84 0.73 350.27 243.44 9.625 222.87 10.38
0.92 0.76 349.53 237.99 9.625 231.06 11.08
1.01 0.79 348.76 233.49 9.625 240.55 11.77
1.10 0.82 347.96 229.69 9.625 251.25 12.48
1.22 0.85 347.16 226.43 9.625 263.25 13.22
1.35 0.89 346.45 223.43 9.625 276.67 14.06
1.47 0.94 345.95 221.44 9.625 291.49 14.77
or ,'\ ,
~...I ";~I'.f ..;. L~:.I[I'?
117.53
117.53
78.53
130.33
130.33
92.98
73.70
157.88
192.83
155.20
214.18
212.34
212.34
37.07
86.51
307.32
307.43
205.75
196.45
165.03
29.49
29.49
148.67
148.78
148.67
256.69
271.56
276.29
251.31
291.73
447.80
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
No Offset Stations
Pass: Major Risk
Pass: Major Risk
No Offset Stations
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Major Risk
0.00 ft
Allowable
Deviation WarlÙng
ft
189.34 Pass
189.12 Pass
188.30 Pass
187.28 Pass
186.39 Pass
186.50 Pass
187.65 Pass
189.86 Pass
193.01 Pass
196.90 Pass
201 .48 Pass
206.44 Pass
212.49 Pass
219.98 Pass
228.78 Pass
238.77 Pass
250.03 Pass
262.61 Pass
276.72 Pass
ConocoPhillips Alaska, Inc. ')
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
tonocciP'hilups
October 13, 2003
Alaska Oil and Gas Conservation Commission
333 West ¡th Avenue, Suite 100
Anchorage, Alaska 99501
Re: Application for Permit to Drill CD2-27
Dear Sir or Madam:
¡/
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore injection well from the Alpine
C02 drilling pad. The intended spud date for this well is November 4, 2003. It is intended that Doyon
Rig 19 be used to drill the well.
CD2-27 will be drilled to penetrate the Alpine reservoir horizontally. After setting 7" i~ermediate casing,
the horizontal section will be drilled and the well completed as an open hole injector. At the end of the
work program, the well will be closed in awaiting completion of well work and facilities work that will allow
the well to begin injection../
Note that it is planned to drill the surface hole without a diverter. There have been 38 wells drilled on
CD1 pad and 40 surface holes drilled on CD2 pad with no significant indication of gas or shallow gas ~...'
hydrates. All of the wells onCD2 have surface casing shoes within a 2000' radius of the planned
surface casing shoe of CD2-27.
It is also requested that the packer placement requirement be relaxed to place the completion packer
200ft TVD above the Alpine formation. This will place the completion at a maximum inclination less than
650 and allow access-to-the--completion-w1th-st-andard-wireli-ne-tools-fof-futur-e-i ntervention.
Please find attached the information required by 20 ACC 25.005 (a) and (c) for your
review. Pertinent information attached to this application includes the following:
1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a).
2. Fee of $100 payable to the State of Alaska per 20 ACe 25.005 (c) (1).
3. A proposed drilling program, including a request for approval of annular pumping
operations.
4. A drilling fluids program summary.
5. Proposed completion diagram.
6. Proposed completion diagram with open hole isolation options.
7. Pressure information as required by 20 Aee 25.035 (d)(2).
8. Directional drilling / collision avoidance information as required by 20 ACC 25.050
(b).
Information pertinent to the application that is presently on file at the AOGCC is:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold layout as
required by 20 ACe 25.035 (a) and (b).
2. A description of the drilling flÙids handling system. RECE!VED
3. Diagram of riser setup which replaces diverter. I
OCT 1 5 2003
A1aska Oil & Gas Cons. Commissior.
Anchorage
If you have any qUE ms or require further information, piE ~ contact Zane Kuenzler
at 265-1308 or Chip Alvord at 265-6120.
Sincerely,
~~~II~/o;.
Drilling Engineer
Attachments
cc:
CD2-20 Well File / Sharon Allsup Drake
Chip Alvord
Vern Johnson
Cliff Crabtree
Steve Moothart
Nancy Lambert
Lanston Chin
e-mail:
ATO 1530
A TO 868
A TO 802
ATO 848
ATO 844
Anadarko - Houston
Kuukpik Corporation
Tommy_Thompson @anadarko.com
SHARON K. ALLSUP-DRAKE 1004
CONOCOPHILLlPS .
3760 PERENOSA /) I 1 F I
ANCHORAGEAK 99515 DATE U:::{Vþe./I, ~/311
~~~~ó~ES:TItTEO~ !JL¡l/-C;{j! / /4-0GÇ{_ 1$ ¡ao. DC)
--- ()µ¿ !U~ ctl&r<; 0.-1 fi.4>joc-õOLLARS 'tÐ æ.:=
..~ CHASE Chase Manhattan Bank USA, N.A. Valid Up T.O 5000 Dollars
~, 200WhKeCIay Center Dr.. Newark. DE 19711 r.) /.... .) / '^
;:Y/Uy~
MEMO --------
': 0 :ì . .00 . ~ ~ I: 2 . 8 ~ 7 . ~ 0 7 I:i 2 7 b II- . 0 0 ~
~/
)
)
TRANSMIT AL LETTER CHECK'LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME (!R¿,{ aD 2. - z----;
PTD# 2-03~- ('7'7
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API number
last two (2) digits
are between 60-69)
"CLUE"
The permit is for a new wellbore 'segment of
existing well
Permit No, API No.
Production should continue to be reported as
a function 'of the original API number. stated
above.
HOLE In accordance with 20 AAC 25.005(1), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name OD permit plus PH)
and API Dumber (50
70/80) from records, data and logs acquired
for well (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
Ojody\templates
The permit is approved subject ,to fuD
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing ,exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below tbe permafrost
or from where samples are first caught and
10' sample intervals through target zones.
iig!¡~J41'~I2ßM~1M¡t;U;g!Sg~~1 Field & Pool COLVILLE RIVER, ALPINE OIL -120100 Well Name: .c-º-L\LLL_bE.BN U~JJ~Q2.:.27 Program .SJ=B Well bore seg D
PTD#: 2031770 Company .c_~O_C_QPHIJ.,lJPS~lASKA INC Initial Class/Type _~ER / PEJ:JD_ GeoArea ßJiO Unit _5_Q3_6_0 On/Off Shore .on Annular Disposal D
Administration 1 p~(rnit fe~ ~ttaçhe.d. _ . . _ . . . . . _ . _ . . . . . _ . . _ . . . _ . _ . . . _ _ _ _ . . . _ y ~s _ __ _ . . . _ . _ . . . . . _ _ . _ . _ . _ . _ _ _ _ . _ _ _ . _ _ _ _ . . _ _ _ . _ . _ . _ . . _ _ . _ . . . . . _ _ . _ _ _ _ . . _ _ . _ _ _ _
2 .Le~s~ .numb~r _appropriat.e. _ _ _ _ _ . . . . . _ . _ . __ . . . _ _ _ _ . _ . . _ _ _ . . . _ _ _ _ _ Y~s . . ._ . . . . . . . _ . . . . _ _ _ . . _ . _ _ _ . _ . . . . . . . _ . _ _ _ _ _ _ _ _ _ _ _ _ . . . _ . . . . _ . _ . . _ _ . . _ . _ _ . _ _ . .
3 Unique well_ n_am~ .and oumb.er . . . _ . _ _ . . _ _ . . . _ . _ __ . _ _ _ _ _. _ . . _ _ _ . _ . . . . Y~s _ _ . _ _ _ . . . _ . . . _ . _ __ . . . _ _ _ . _ _ . _ _ . . . _ _ _ . _ _ _ _ _ . _ _ . _ _ . _ _ _ . . _ _ . . _ _ _ . . . . . . . _ _
4 WeJIJQCÇlt~d in.a_d_efined.pool. . . . . _ . _ . . . . . . _ . . . . . _ _ . _ _ _ _ _ _ _ _ . _ _ y~s _ _ . _ _ . . _ . . . . . . . . _ _ _ _ . . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . . . _ . _ _ . . . . . . _ . _ . . _ _ _ _ . . . _ . _ _ _ . . . . . _
5 _We.IIJQCÇlt~d prop~r distance. from dri.lling unitb.oundary. _ . . . _ _ _ _ _ _ _ _ . _ _ _ . . Y~s . _ _ _ . . _ . . . . _ . . . . . . . . . . _ _ _ _ . _ _ _ _ . . . _ _ . _ _ . . _ . _ _ . _ __ . _ . _ _ _ . _ . _ _ _ _ _ _ . _ _ . _ . . . _ . . .
6 We.IIJQcat~d prop~r .distance.fro.m_ QtheJ wells. . _ . _ _ _ _ _ . . _ _ _ _ _ . . . Y~s . . . _ . . _ _ _ . . _ _ . . . . _ _ _ . . . _ _ . . . _ . . _ _ _ _ _ . . . _ _ . . . _ _ . _ . _ . _ . _ . . . _ _ . . _ _ . . _ . . . _ _
7 _SJ,lffiçient acre~9.e_ay~ilable in.driIJio9. unjt. _ _ _ _ . . . _ . . . . . _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ Y~s _ _ _ . . . . . _ . . _ . . . . . . . . . . _ . _ . _ . _ . _ . . _ _ _ _ _ . . _ . . . . _ _ _ _ _ _ _ . _ . _ _ . _ _ _ _ _ _ . _ . . . . _ . . . _
8 Jf_d~viated, js_ weJI bQre platincJuded . . _ _ . _ _ . . _ . . . . . . . _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ y~s . . . . . . . . . . . . . . . . . . . . . . . _ . . . _ _ _ _ . _ . _ . . . _ _ . . . _ _ . . _ . _ _ _ _ _ . _ _ . _ _ _ . _ . _ . _ _ . _ . . _
9 _Qper_ator only- ~ff.eçted party _ _ _ . _ _ . _ _ . . _ . _ . _ . . . . _ . . . . _ _ _ _ . _ _ _ _ _ _ . _ . . Y ~s _ . . . . . . . . _ . . . . . . . . . . . . _ _ . . _ . . . . . . . . _ _ _ . _ . . _ . . . _ _ _ _ . . _ . _ _ . _ _ . _ . _ _ . . . . . . . _ _ _ .
10 .Qper:.ator bas.appropriate.b.ond inJorce. . . . . . _ _ . _ . . _ . . _ _ . . _ _ _ . _ _ . _ . _ . . _ _ _ Y~s . _ . . . . . . . . . . . . . . . . . . . . _ . . . _ . . _ _ _ _ _ _ . . . . . . . . . . . . _ _ . . _ . . _ _ . . . . . . . . . . . . _ _ _ . . _ .
11 P~rmit GaO be issued wjthQut cons~rya_tion order _ _ . . . . . . . . _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ _ . _ . _ . . _ _ _ _ _ _ _ . . . . . . . . . . . . _ _ . . . _ _ _ _ _ _ _ . . . . . . . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . _ _ _
Appr Date 12 P~rmit GaO be issued wjthout admini~tr:.ati\le.approvaJ . . . . . . _ _ _ . . _ . . _ _ . _ . _ _ . _ . _ Y~s - . _ . . . . . . _ _ _ . _ _ _ _ . . . _ . . . _ . . . . . . . _ _ . . _ _ _ . . _ . . _ . . . . . _ . _ _ . _ _ _ _ _ _ _ _ _ . . . . . . _
S FD 10/16/2003 13 .C.ao permjt Þe app.rQv~d before .15-day. wajt. . . . . . - . . - . - . . - . . - - . . . - . - - . . . - . Y ~s . . . - . - - . . - . . . . . . . . . . . . . . . - - . . . - - - . - . . . . . . . - - - - . - . . - - . - . . - . . - . . . . - - - - . ._ . . - -
14 .We.llJocat~d within area and.strata authorized by_lojectiolJ Ord~r: # (putlO# in.cOOlm~ots).(For. Y~s . _ . . . . . Area lnjecijo.n.Qrde.r NO..1.8A. . . . . . . . . . . . _ _ _ _ _ . _ _ _ _ . _ . _ . _ . _ _ _ _ _ _ _ _ _ _ _ . . . . . _ _ _ . . . ('
15 _AJlwelJs.witni.n_1¿4.rtlile.area.ofr:eyiewid~otified(For:&ervjc~.welJonlY-). _... _ _ _.... _.. Y~s_. _. _. ..Cß,UCD2-35ABI:iLi~.-9QO~awayJrOOl.T.opProdHorizonjnC02_-27...... _................ _....
16 Pr~-produceclinjector; duraijo.n.ofpr~-:prodUGtiool~ss_ttH~n.3months.(For.ser:vicewell QnJy) .. No...... _ _............... _... _..... _ _....... _... _ _.......... _.............. _..
17 ACMP. F.inding.of ÇQn.si~teocy_has bee.n j&sued.for.tbis prolect. . . . _ . _ . . _ . _ . _ _ . . . . . NA. . . _ . . _ . _ . _ . . . _ . . _ . . . . . . . . . . . . . . . _ _ . . . . . _ . _ . . . . . . . . . _ _ . . . _ _ _ _ _ . _ _ . . . . . . _ _ . . .
Engineering 18 .C.ooductor str:ing.prQvided . . . . . . . . . . . . _ . . . . . . . . . . . . . . _ . . . . _ . . . . . . . . Y~$ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . _ _ _ _ . . . . . _ . . _ . . _ . . . . . . . . . . . . . _ _ _ . . . . _ _ .
19 _SJ,ldac~.casing.PJotec.t&all.known.USQWs _ . . . . . _ . . . . . . _ _ _ . _ _ _ . . _ . _ _ _ . . . _ NA . _ . _ . _ . ~o aqui.ferS,.p~r:AI0.18Acon.clusiol] 3.. . . _ . . __ . _ . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . _
20 .CMT.votadequ.ate.to çirc.utate.on.cond.uctor.& $u.rf.CSg . . . . . _ . . _ _ . _ . _ _ _ _ _ . . . _ . . Y~s . . . . _ . . . . . . . . . . . . _ . . . _ . . . . . . . . _, . . _ . _ _ . . . . . . . . . . . . . . . . . . _ . . . ._ . . . . _ . . . . . . _ . .
21 .CMT.vol.adequ.ate.totie-iJ1JQng.stringto.slJr:fcSg................ _ _. _........ No....... .AnnJ,llar:disP.osalultimatelyplaoned...... _. _............ _.................. __.......
22 .CMT.will coyer.a!l_koown.pro.ductiye bQri?on.s. . . . . . . . . . . . . . _ _ _ . . . . . _ . . . . . . . No. . . . . . . . Open.hol~.completion.. . . . . _ . . . . _ . . . . . . . . . . . . . . . . . . . . . _ . _ . . . . . . . . . . . . _ . . . . . . .
23 .C.asiog de.signs adequate for: ç,.T., B.&.p.ermafrost. . . . . . . . . . . . _ _ . _ . . . _ _ _ . _ . . . Y~s. . _ . _ . . . . . . . . . . . . . . . . . _ _ _ _ . . . . _ . . . _ . . _ _ _ . . . . . . . . . . _ _ . _ . . . . . . _ . . . . . . . . _ . _ _ _
24 .Adequate.tan.kage.oJ re.serye pit. . . . . . . . . . . . . . . . . . . _ . . _ _ _ . _ . _ _ _ _ _ _ . _ _ Y~s _ _ . _ _ _ _ ß,ig js_e.quippe_dwitb st~e'-pit~.. No rese.r\le.pjtpl_anoe.d. Wa.ste.to approved annuh,.lS or.djspo&al well, . . . . . _ _ .
25 Jf.a.re-dr:ill... bas.a. 1.0:403 for abandonment b.e~o apprQved . . . . . ._ . . _ . _ . __ . _ . . . . . . NA. . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . _ __ . . _ . . _ . . . . . . . _ . . . . _ . . . . . . . _ _ _ . . . . . . . . _ . . . . . .
26 ,AdequateweUbore. &eparatjo.n_Pfoposed. _ . . . . . . . . . . . . _ . . . . . _ _ _ _ . . . _ . . . _ . Y~s _ _ _ . . . . I?ro~imi.ty- analysis PElrfor:me.d, Jrayeling cy-lioder Pë!th çaIGul_ate.d, Gyr:.os pos~iÞl.e, . . _ . . . _ . _ . . . . . . . . . .
27 Jf.djverter reqJ,lirEld, dQes jtmeet reguJatiol1s. . . . . . . . . . . . . . . . . . . . . _ . . . . . _ . . . NA . _ _ . . . . Diyerter Wë!iyer hë!s.b.eelJ given.for.CQ2.pad.. 20. MC 2Q.Q30(h)(2), . _ . . . . . . . . . _ . _ . . . ._ . . . . _ . _ . .
Appr Date 28 .DJilli09 flujd.program sc.hematic.&eqJ,lipJist.adequate. . . _ . _ _ . . . . . . . . _ . . . . . . . . . .Y~s . . . . . . . Maxirtlum expected for:mation. pre&sUfe.8,7.EMW.. MW plan.ned up to.9,3.ppg.. . . . __ __ . . . . _ . . _ . . . . . _ . .
TEM ~;r003 ~~ ;~;~S~;~;:'~:~:j)':p~::;Qt~si to :(~uì ~i~ i~ :.,;,~~~~~): : : : : : : : : - : : _ : : : : : : : :~: : : : : : : : MAS~ ~I~i';~:ai 2~2 ~~i: 35QOp~i~p~:.o~r¡'lte:, PPC~ ~~U~JìY:t~sì ¡o:~OOÒ ~sj~ : : : : : : : : : : : : : _ _ _ _ _
31 .C.hoKe.rtlë!nifold çQmpJies. w/A!?I. R~-53 (May 84). . . _ . _ . _ . . . . . _ . _ _ _ ._ . . . . . . . . .Y~s . . ._ . . . . . . . . . . . . . ._ . . _ . . . . . . . _ _ . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . _ . . . . . . . . .
32 .WQrk will oCC.U( without.operation .sbutdow.n. . . . . . . . _ _ . . . . . _ . . . _ _ _ __ . . . . . . . . .Y ~$ . . . . . . . . . . . . . . . . . . . . . _ _ . . _ _ .. ............................... _ _ _ . . . . . . . .
33 .Is. pre&ence. of H2S gas_ prob.able. . . _ . . . _ _ . _ . _ _ . . . . _ . . _ . . . .. __. _ _ . . . . . No. . . . . . __ . I?acker .placement exceptioo requested. Packer:. wilJ be. within_200'.wd_ oHop .of Alpine. _ _ . . . . _ _ . . _ . . . . __ _
34 Mecba.nical.coodJtioflotWEllIswiJh.inAOß,yerified.(for.s.ervicew~l]onJy-).... _......... .Y~$...... .There.areOQpe.netraJions.oJth~.AJpjn_ewitbinV4.mil~.ofCD2-27..................... _ _ _..
.(
Appr
SFD
35
36
Date 37
10/16/2003 38
39
.P~r:mitGao be iS$ued w!o. hydr:.ogen.s.ulfide meë!sur:es. . . . . . . . _ . . . . . _ _ . . . _ _ _ _ _ _ Y~$ _ . _ . . . . . . . . . . . . . . . . . . . . . . . . . _ . _ _, . . . _ _ . . . . . . . . . . . . . . . . . _ . _ . . _ _ _ . . . . . _ _ . _ . _ _ _
.D.ata.PJeseoted on. potentië! ovemres.sure .zones. . . . . . . . . . . . . . _ _ . . . . _ _ . . . . . . Y~s . . _ . . . . I;)çpected. r~$e.ryojr _pre~$uJe. i~ .8..7.ppg EMW; will.b~ .dr:illed with 8.8:- 9.3 ppg mud.. _ . . . . . . . . . _ . . . . .
.S~i~01ic.analysjs. Qf shallow gas.zooes_ _ . . _ _ . _ .. . . . . . _ _ . . . . _ _ . . . . _ NA . . . . . . . . . . . . . . . . . _ . . _ . . _ . . . . . _ . _ . _ _ . . _ . . . _ _ _ . . . . . . . . . . . . _ . . . . _ . _ . . . . . . _ . _ _ .
_S.eaQed .COlldjtipo survey ~(if Qff-~h9(e) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,. _ _ _ _ _ ~ ~ ~ .. _ _ ~ _ _ _ _ _ .N.A. ~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .. _ _ _ _ _ _ _ _ _ _ ,. _ _ _ _ ~ _ _ _ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. CQnta.ct. nam.e¿pnQne. for.weekly- progress.reports [exploratory .only]. _ _ . . _ . . _ _ _ . . . . . . NA . . . . . . _ _ . . . _ . _ . . . . . . . . . . . . . . . . . _ . . . . . _ . . . . . . .. . _ . . . . . . . . _ _ . . . . . . . . . . . . . . . .
Geology
P1S
Date:
J of ulJ
Engineering
Commissioner:
Date
Public I
~ioneío Iii ¡:J;
Geologic
Commissioner:
)
)
Well History File
APPENDIX
Information of detailed nature that is not
particulariy germane to the Well Pennitting Process
but is part of the history file. ,
To irnprove the readability of the Well History file and to
sinì,plify finding infomlation, information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of information.
$Revision: 3 $
LisLib $Revision: 4 $
Thu Jan 15 10:14:00 2004
{J03 -/7~1-
)
. IOÙ
, ~ '--'\
~
Sperry-Sun Dr. }ng Services
LIS Scan Utility
Reel Header
Service name............ .LISTPE
Date.................... .04/01/15
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... .UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/01/15
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Colville River Unit (Alpine)
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
CD2-27
501032047100
ConocoPhillips Alaska, Inc.
Sperry-Sun Drilling Services
15-JAN-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
RUN 1
MW0002722885
R. KRELL
D. BURLEY
MWD RUN 2
MW0002722885
R. KRELL
D. BURLEY
MWD RUN 3
MW0002722885
M. HANIK
D. MICKEY
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
2
IlN
4 E
1835
1531
MSL 0)
.00
52.77
15.90
RECEIVED
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE
BIT SIZE (IN)
12.250
8.500
6.125
CASING
SIZE (IN)
16.000
9.625
7.000
DRILLERS
DEPTH (FT)
114.0
3311.0
12461.0
r::.~~ 1 ~: ?n04
'._i.../ ..._....U
Ala$ka on & Gas Cons. Caromisian
An~1!WSge
#
~~~~~
REMARKS:
) )
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE J.~vTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUN 1 WAS DIRECTIONAL ONLY AND IS NOT PRESENTED.
4. MWD RUNS 2 AND 3 COMPRISED DIRECTIONAL WITH DUAL
GAMMA RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS;
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4); AND PRESSURE WHILE
DRILLING (PWD). RUN 2
ALSO INCLUDED GEO-PILOT ROTARY STEERABLE. RUN 3 ALSO
INCLUDED
AT-BIT INCLINATION (ABI).
5. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE
LOGGING
REQUIREMENTS AT PHILLIPS/VENDOR MEETING HELD ON 26
SEPTEMBER 2001.
6. MWD RUNS 2 AND 3 REPRESENT WELL CD2-27 WITH API#:
50-103-20471-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 18250' MD /
7206' TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/01/15
Maximum Physical Record. .65535
File Type.. . . . . . . . . . . . . . .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
3287.5
3300.0
3300.0
3300.0
3300.0
3300.0
STOP DEPTH
18183.5
18190.5
18190.5
18190.5
18190.5
18190.5
ROP
$
3321., )
18250.0
)
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
$
BIT RUN NO
2
3
MERGE TOP
3287.5
12659.0
MERGE BASE
12659.0
18250.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3287.5 18250 10768.8 29926 3287.5 18250
ROP MWD FT/H 0.63 614.85 173.625 29859 3321 18250
GR MWD API 43.89 432.24 94.5933 29793 3287.5 18183.5
RPX MWD OHMM 0.32 1796.63 7.63193 29782 3300 18190.5
RPS MWD OHMM 0.15 2000 8.47325 29782 3300 18190.5
RPM MWD OHMM 0.13 2000 9.10165 29782 3300 18190.5
RPD MWD OHMM 0.1 2000 9.86578 29782 3300 18190.5
FET MWD HOUR 0.13 98.07 1.03585 29782 3300 18190.5
First Reading For Entire File......... .3287.5
Last Reading For Entire File.......... .18250
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/01/15
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.002
')
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/01/15
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPX
FET
RPD
RPS
RPM
ROP
$
2
)
header data for each bit run in separate files.
2
.5000
START DEPTH
3287.5
3300.0
3300.0
3300.0
3300.0
3300.0
3321.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
12624.0
12616.0
12616.0
12616.0
12616.0
12616.0
12659.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
06-NOV-03
Insite
66.37
Memory
12659.0
3321.0
12659.0
55.2
85.6
TOOL NUMBER
124725
163840
8.500
3311.0
LSND
9.60
43.0
8.8
400
6.9
3.000
1.550
3.400
2.800
70.0
141.8
70.0
70.0
NEUTRON TOOL )
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Service Unit
FT
MWD020 FT/H
MWD020 API
MWD020 OHMM
MWD020 OHMM
MWD020 OHMM
MWD020 OHMM
MWD020 HOUR
I
Min
3287.5
10.4
50
0.32
0.15
0.13
0.1
0.13
Max
12659
614.85
432.24
1796.63
2000
2000
2000
50.12
Mean
7973.25
221.183
113.66
5.76846
6.07429
6.62943
7.42175
0.498812
First Reading For Entire File......... .3287.5
Last Reading For Entire File.......... .12659
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/01/15
Maximum Physical Record. .65535
F i 1 e Typ e . . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Nsam
18744
18677
18674
18633
18633
18633
18633
18633
First
Reading
3287.5
3321
3287.5
3300
3300
3300
3300
3300
Last
Reading
12659
12659
12624
12616
12616
12616
12616
12616
Date of Generation...... Y01/15
Maximum Physical Record. .65535
F i 1 e Type. . . . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
GR
ROP
$
3
')
header data for each bit run in separate files.
3
.5000
START DEPTH
12616.5
12616.5
12616.5
12616.5
12616.5
12624.5
12659.5
STOP DEPTH
18190.5
18190.5
18190.5
18190.5
18190.5
18183.5
18250.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
14-NOV-03
Insite
66.37
Memory
18250.0
12659.0
18250.0
84.8
92.3
TOOL NUMBER
129046
159439
6.125
12461.0
Flo Pro
8.80
40.0
8.9
17000
4.8
.300
.120
.250
.420
60.0
167.0
60.0
60.0
#
)
)
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value.. . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 12616.5 18250 15433.3 11268 12616.5 18250
ROP MWD030 FT/H 0.63 434.46 94.1907 11182 12659.5 18250
GR MWD030 API 43.89 117.05 62.5707 11119 12624.5 18183.5
RPX MWD030 OHMM 4.18 16.91 10.7463 11149 12616.5 18190.5
RPS MWD030 OHMM 5.65 20.77 12.4826 11149 12616.5 18190.5
RPM MWD030 OHMM 5.95 22.15 13.2334 11149 12616.5 18190.5
RPD MWD030 OHMM 6.53 21.82 13.9504 11149 12616.5 18190.5
FET MWD030 HOUR 0.42 98.07 1.93339 11149 12616.5 18190.5
First Reading For Entire File......... .12616.5
Last Reading For Entire File.......... .18250
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .04/01/15
Maximum Physical Record. .65535
File Type...... . . . . . . . . . . LO
Next File Name.......... .STSLIB.004
Physical EOF
Tape Trailer
Service name............ .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 04/01/15
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Da~e:................... )/01/15 ')
Or1.g1.n. . . . . . . . . . . . . . . . . . . S1'S
Reel Name....... ........ . UNKNOWN
Continuation Number.... ..01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS writing Library. Scientific Technical Services
Physical EOF
Physical EOF