Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout204-178MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Thursday, July 21, 2022
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Matt Herrera
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
ConocoPhillips Alaska, Inc.
CD2-54
COLVILLE RIV UNIT CD2-54
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 07/21/2022
CD2-54
50-103-20499-00-00
204-178-0
W
SPT
7015
2041780 1754
2106 2106 2106 2106
725 740 740 740
4YRTST P
Matt Herrera
6/27/2022
MIT-IA Performed to 2900 PSI Per Operations
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:COLVILLE RIV UNIT CD2-54
Inspection Date:
Tubing
OA
Packer Depth
650 2890 2800 2800IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitMFH220629145758
BBL Pumped:3.7 BBL Returned:3.7
Thursday, July 21, 2022 Page 1 of 1
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jing Regg DATE: Monday,June 11,2018
P.I.Supervisor l /13/
SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA,INC.
CD2-54
FROM: Brian Bixby COLVILLE RIV UNIT CD2-54
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry R
NON-CONFIDENTIAL Comm
Well Name COLVILLE RIV UNIT CD2-54 API Well Number 50-103-20499-00-00 Inspector Name: Brian Bixby
Permit Number: 204-178-0 Inspection Date: 6/6/2018 ,i
Insp Num: mitBDB180611052952
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well CD2-54 Type Inj W TVD 7015 Tubing 1680 H 1680 - 1680 1680 -
PTD 2041780 Type Test SPT Test psi! 1754 - IA 800 2400 2360 - 2360 -
BBL Pumped: 2.8 ' 1BBL Returned: 2.5 ' OA 705 - 720 - 720 720
Interval 4YRTST [P/F P
Notes:
SCANNED JUN 2 j L11l6
•
Monday,June 11,2018 Page 1 of 1
.. .
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may bescanned during a special rescan activity or are viewable
by direct inspection of the file.
:;) 0 Lf - L 1- g Well History File Identifier
Organizing (done)
~wo-sided 11111111111111" III
D Rescan Needed III II 111111 II 111111
RrCAN
Yf Color Items:
D Greyscale Items:
DIGITAL DATA
~skettesl No. á.
D Other, Norrype:
OVERSIZED (Scannable)
D Maps:
D Other Items Scannable by
a Large Scanner
D Poor Quality Originals:
D Other:
OVERSIZED (Non-Scannable)
D Logs of various kinds:
NOTES:
BY: ~
Date J I à.:J../ 0 ~
I
D Other::
Date I 'd-. ')... / Ðb
.?> x 30 = q () + 15 = TOTAL PAGES
Date: I,' I ~ 'J-.-/ D ~ (Count does not i~~;ude cover sheet)
1111111111111111111
151 mp
1111111111111111111
Project Proofing
BY: C Maria ~
151
t11P
Scanning Preparation
BY: ~
los
mp
Production Scanning
Stage 1
Page Count from Scanned File:
J Ô ({; (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: V YES
BY: tC Maria ) Date: U I a.. d-- / 0 0
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES
NO
151 . MP
NO
BY:
Maria
Date:
151
1/11111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
111111111111111111I
10/6/2005 Well History File Cover Page.doc
MEMORANDUM
To: Jim Regg ~~~~ -2~Z7~~~
P.1. Supervisor
FROM: Jeff Jones
Petroleum Inspector
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, July 26, 20 ] 0
SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CD2-54
COLVILLE RIV UNIT CD2-54
Src: Inspector
NON-CONFIDENTIAL
Reviewed By:
P.I. Suprv y~~~'_---
Comm
Well Name: COLVILLE RIV UNIT CD2-54
Insp Num: mitJJ100719114544
Rel Insp Num: API Well Number: 50-103-20499-00-00
Permit Number: 204-178-0 Inspector Name: Jeff Jones
Inspection Date: 6/11/2010
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well CD2-54 ' Type Inj. G ' TVD 7015 s IA 2575 i 3200 ~ 3160 3150 '
P.T.D 2041780 ' TypeTest ~ SPT ~Test psi ~ 1753 ' . OA 550 550 550 550
Interval 4YRTST p~ P Tubing . 3820 3820 3820 3820
Notes: 1.6 BBLS diesel pumped. 1 well inspected; no exceptions noted. -
u'-''FM fir. ',W ~rteav' :!"~. ~tl ~ -~ -, t-, i1 i ~~.:
Monday, July 26, 2010 Page 1 of 1
Page 1 of 2
• •
Maunder, Thomas E (DOA)
From: Galiunas, Elizabeth C [Elizabeth.C.Galiunas@conocophillips.com]
Sent: Tuesday, August 26, 2008 4:06 PM
To: Maunder, Thomas E (DOA); Alvord, Chip; Chambers, Mark A; Noel, Brian
Cc: Regg, James B (DOA); Davies, Stephen F (DOA)
Subject: RE: CD2-470 Operations: Surface Hole Issues
Tom, ~ ~~~5 °- ~a
I looked with our production folks at OA pressures on CD2-54 (477' from CD2-75's surface casing point) and
CD2-56 (378" away). These are the two closest surface casings to the surface casing of CD2-75. The OA data is
recorded daily by the field operator. These show no noticeable change from last Thursday through today on the
OAs that would indicate any interaction with CD2-75°s annular disposal operations. Let me know if you need any
more information.
~~`-~lo~
Thanks;
Liz Galiunas
Alpine Drilling Engineer
ConocoPhillips Alaska
Office: 907-265-6247
Cell: 907-441-4871
~~-NNE~ S r P ~ _y 2008
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Monday, August 25, 2008 3:49 PM
To: Galiunas, Elizabeth C; Alvord, Chip; Chambers, Mark A; Noel, Brian
Cc: Regg, James B (DOA); Davies, Stephen F (DOA)
Subject: RE: CD2-470 Operations: Surface Hole Issues
Liz,
Thanks for the information. Interesting that the shoe of CD2-75 is over 850' from CD2-470. At lunch you
mentioned that the wells might have been in the plain of minimum horizontal stress. Do I have that correct? Was
pressure seen on any of the other wells proximate to CD2-75? Are there any other surface bbls that lie in the
minimal horizontal stress plain? I look forward to your reply.
Tom Maunder, PE
AOGCC
From: Galiunas, Elizabeth C [mailto:Elizabeth.C.Galiunas@conocophillips.com]
Sent: Monday, August 25, 2008 3:37 PM
To: Maunder, Thomas E (DOA); Alvord, Chip; Chambers, Mark A; Noel, Brian
Subject: CD2-470 Operations: Surface Hole Issues
Hi, Tom,
On August 24th at 15:15 hrs, surface TD was reached on CD2-470 with a mud weight of 9.9 ppg. The rig began
a wiper trip checking connections for flow. The connections up to stand 17 (2047' MD) were static. At stand 17,
slight flow was observed. The well was monitored for 10 minutes, with slight flow continuing. The mud weight in
and out at this point was 9.7 ppg. The mud weight was increased to 10ppg with slight flow. There was no gas cut
mud or other hydrocarbons in the mud returns. The BHA was run back to bottom where the mud weight was
increased to a 10.2 ppg.
9/8/2008
Page 2 of 2
On Sunday, CD2-75 (308-213) was used for annular disposal for the first time with class 2 fluids from CD2-
470. CD2-470's TD is 867ft away from the surface shoe of CD2-75 (see attachment for details). I have also
attached a detailed summary of all the injections on CD2-75.
It was suspected that annular disposal on CD2-75 communicating with CD2-470. The decision was made to
bleed off the annulus on CD2-75 back to a tiger tank. Initially the pressure was 1100 psi on the annulus. A total
of 64 bbls of diesel and 9 bbls of water were bleed back on CD2-75's. Meanwhile, the gain rate on CD2-470
decreased and reached static.
This morning, CD2-470 was monitored from 0400 - 0530hrs with no gain while circulating at 6 bph. The pumps
were shutoff and the well was static for over 20 min. The rig began to pump out at this point
monitoring each connection for flow. At around 8 AM, the decision was made to bull head diesel freeze protect
on CD2-75 with 8 stands off bottom on CD2-470. While monitoring CD2-470, 54 bbls of diesel was pumped down
the annulus on CD2-75. CD2-470 remained static through the pumping operations. Currently the pumping is
complete down the annulus on CD2-75 and CD2-470 is still static.
Once the rig was confident there was no flow from CD2-75, the rig began to pump out of the hole. Currently we
are still coming out of the hole and is planning to rig up to run surface casing and cement operations once out of
the hole.
Since it appears CD2-75 is in communication with CD2-470, annular disposal operations on CD2-75 will be
suspended indefinitely and CD1-19a will be utilized for disposal.
Attached is the current rig surveys, CD2-75 injection summary, the Well View daily operations report up to
midnight on 8/24/08, and details on surface shoe distances.
Please call with any comments or questions. We will keep the AOGCC informed of any findings, like the Surface
LOT and Annular test on CD2-470.
Regards,
Liz Galiunas
Alpine Drilling Engineer
ConocoPhillips Alaska
Office: 907-265-6247
Cell: 907-441-4871
9/8/2008
• •
.,;9
MICROFILMED
03/01/2008
r _,~'.-
,'! .
r~
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:~LaserFichelCvrPgs_InsertslMicrofilm Marker.doc
~
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
April 11, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West th Avenue, Suite 100
Anchorage, AK 99501
~iCANNED APR 2 7 2007
~Ó4--/7 8
Dear Mr. Maunder:
Sorry for the inconvenience, however it was observed that a spreadsheet sent to you and dated
3/31/07 was incomplete.
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). It was
noticed that Alpine well CD2-404 was unintentionally left out of spreadsheet dated 3/31/07.
Please find enclosed updated spreadsheet, and replace. As per previous agreement with the
AOGCC, this letter and spreadsheet serves as notification that the treatments took place and
meets the requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
~.z:~----_/
ConocoPhillips Well Integrity Project Supervisor
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Corrosíon
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTO# cement pumped cement date inhibitor sealant date
ft bbls ft Clal
C02-1 205-118 4" na 4" na 2 2/18/2007
C02-2 205-109 6" na 6" na 2.5 2/18/2007
C02-404 206-054 6" na 6" na 1.8 3/22/2007
C02-7 203-187 16" na 16" na 7.5 2/17/2007
C02-9 202-129 22" na 22" na 10.5 2/17/2007
C02-12 203-073 16" na 16" na 7.5 2/17/2007
C02-14 201-177 4" na 4" na 2 2/17/2007
C02-15 201-159 12" na 12" na 5.7 2/17/2007
C02-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007
C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007
C02-18 203-151 36" na 36" na 17 2/17/2007
C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007
C02-21 204-245 6" na 6" na 2.5 2/18/2007
C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007
C02-24 201-095 6" na 6" na 1 3/8/2007
C02-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007
C02-28 202-217 29" na 29" na 11 3/8/2007
C02-30 203-135 8" na 8" na 3 3/8/2007
C02-31 204-082 15" na 15" na 6 3/8/2007
C02-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007
C02-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007
C02-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007
C02-37 202-211 29" na 29" na 13.8 2/18/2007
C02-38 202-171 18" na 18" na 8.5 2/18/2007
C02-39 201-160 34" na 34" na 16.2 2/18/2007
C02-44 202-165 13" na 13" na 6.2 2/18/2007
C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007
C02-47 201-205 25" na 25" na 11.9 2/18/2007
C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007
C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007
CO2-53 204-089 4" na 4" na 2 2/18/2007
CD2-54 204-178 8" na 8" na 3.7 2/18/2007
CO2-55 203-118 13" na 13" na 6 2/18/2007
CO2-57 204-072 8" na 8" na 1 3/8/2007
CO2-58 203-085 6" na 6" na 1 3/8/2007
CO2-59 204-248 6" na 6" na 1.5 3/8/2007
C02-60 205-068 6" na 6" na 1 3/8/2007
Alpine Field
March 31,2007
.
.
~
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
March 31, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West ih Avenue, Suite 100
Anchorage, AK. 99501 .. D APR 0 (~ 2007
5CANNE ·
:;).Ð\1' 1'1 q;
Dear Mr. Maunder:
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). Some of
these wells were found to have a void in the conductor by surface casing annulus. The voids that
were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The
remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered
to prevent water from entering the annular space. As per previous agreement with the AOGCC,
this letter and spreadsheet serves as notification that the treatments took place and meets the
requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
~~C
Jerry Dethlefs
ConocoPhillips Well Integrity Proj Supervisor
Attachment
.
.
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD# cement pumped cement date inhibitor sealant date
ft bbls ft gal
CD2-1 205-118 4" na 4" na 2 2/18/2007
CD2-2 205-109 6" na 6" na 2.5 2/18/2007
CD2-7 203-187 16" na 16" na 7.5 2/17/2007
CD2-9 202-129 22" na 22" na 10.5 2/17/2007
CD2-12 203-073 16" na 16" na 7.5 2/17/2007
CD2-14 201-177 4" na 4" na 2 2/17/2007
CD2-15 201-159 12" na 12" na 5.7 2/17/2007
CD2-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007
CD2-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007
CD2-18 203-151 36" na 36" na 17 2/17/2007
CD2-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007
CD2-21 204-245 6" na 6" na 2.5 2/18/2007
CD2-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007
CD2-24 201-095 6" na 6" na 1 3/8/2007
CD2-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007
CD2-28 202-217 29" na 29" na 11 3/8/2007
CD2-30 203-135 8" na 8" na 3 3/8/2007
CD2-31 204-082 15" na 15" na 6 3/8/2007
CD2-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007
CD2-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007
CD2-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007
CD2-37 202-211 29" na 29" na 13.8 2/18/2007
CD2-38 202-171 18" na 18" na 8.5 2/18/2007
CD2-39 201-160 34" na 34" na 16.2 2/18/2007
CD2-44 202-165 13" na 13" na 6.2 2/18/2007
CD2-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007
CD2-47 201-205 25" na 25" na 11.9 2/18/2007
CD2-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007
CD2-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007
CD2-53 204-089 4" na 4" na 2 2/18/2007
CD2-54 204-178 8" na 8" na 3.7 2/18/2007
CD2-55 203-118 13" na 13" na 6 2/18/2007
CD2-57 204-072 8" na 8" na 1 3/8/2007
CD2-58 203-085 6" na 6" na 1 3/8/2007
CD2-59 204-248 6" na 6" na 1.5 3/8/2007
CD2-60 205-068 6" na 6" na 1 3/8/2007
Alpine Field
March 31,2007
.
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservatíon Comm.
Attn.: Líbrarian
333 West 7th Avenue, Suíte 100
Anchorage, Alaska 99501
November 29, 2006
RE: MWD Formation Evaluatíon Logs: CD2-35A, CD2-37, CD2-40_PB1, CD2-53,
CD2-54 Ll.
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attentíon of:
Rob Kalísh, Sperry Drílling Services, 6900 Arctic Blvd., Anchorage, AK 99518
CD2-35A: vIe!.. dÖ'd -'d4Lf ~'-.(31)i)
Digital Log Images:
50-103-20256-01
1 CD Rom
S(;ANI~ED FES 0 1 2007
CD2-37: 9Ód--Q\1 Ii: tL/3Ö~
Digital Log Images:
50-103-20434-00
1 CD Rom
CD2-40_PB1: UIc....'dO'3-ì~(p +1L.13t1õ I
Digital Log Images:
50-103-20464-00,70
1 CD Rom
CD2-53: '~()L(-Ot'1 Í'l Lf3o,J
Digítal Log Images:
50-103-20494-00
1 CD Rom
oxc.
CD2-54_Ll: VIC- Qo4- i1-~ tt ¡43q~ ;)ó'-l -c90~ 11 !L!~3
Digital Log Images: ¡
50-103-20499-00, 60
1 CD Rom
1-
¿;t~ N, J ¡~\~
DATA SUBMITTAL COMPLIANCE REPORT
10/13/2006
MD
16617./
TVD
7350 ~. Completion Date 10/22/2004/ Completion Status WAGIN
Current Status WAGIN
$"'p ol f..{ ò J- ~fð
API No. 50-1 03-204~~00
é:lr. y -3
Permit to Drill 2041780
Well Name/No. COLVILLE RIV UNIT CD2-54
Operator CONOCOPHILLlPS ALASKA INC
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: GRlRes (data taken from Logs Portion of Master Well Data Maint
Well Log Information: .
Log/ Electr
!if Digital Dataset Log Log Run Interval OH/
Ty Med/Frmt Number Name Scale Media No Start Stop CH Received Comments
og Cement Evaluation 5 Col 1 12730 13874 Case 11/23/2004 CEMENT BOND
LOG/SLIM CEMENT MAP
~ TOOL
0 Asc Directional Survey 0 16617 Open 11/15/2004 IIFR
(to Directional Survey 0 16617 Open 11/15/2004 IIFR
Asc Directional Survey 0 16617 Open 11/15/2004 MWD
~D Directional Survey 0 16617 Open 11/15/2004 MWD
Lis 12942 Gamma Ray 3324 16559 Open 1/27/2005 MWD/GRlEWR4/ABI/ROP/
~ PWD
12942 LIS Verification 3324 16559 Open 1/27/2005 MWD/GR/EWR4/ABI/ROP/
J~ PWD
C Pdf 13794 Induction/Resistivity 114 16621 Open 3/9/2006 ROP DGR EWR Graphics
(.emf & .pdf)
Well Cores/Samples Information: .
Sample
Interval Set
Name Start Stop Sent Received Number Comments
ADDITIONAL INFORMATION
Well Cored? ~
Chips Received? ~,' t~
Daily History Received?
{DN
7J/N
Formation Tops
Analysis
Received?
~
Comments:
Permitto Drill 2041780
MD 16617
TVD 7350
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
10/13/2006
Well Name/No. COLVILLE RIV UNIT CD2-54
Operator CONOCOPHILLlPS ALASKA INC
Completion Date 10/22/2004
Completion Status WAGIN
Current Status WAGIN
~
Date:
API No. 50-103-20499-00-00
UIC Y
'8 AJtV' ~~
.
.
MEMORANDUM
.
State of Alaska .
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
J
¡\~
. I
/'1·-/ '..
-;¡ 2V UCp
"'. I
DATE: Wednesday, August 30,2006
SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CD2-54
COLVILLE RIV UNIT CO2-54
\.J( \ 1 I{¡
~
FROM:
Chuck Scheve
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Suprv :JB¡2--
Comm
Well Name: COLVILLE RlV UNIT CO2-54
Insp Num: mitCS060S2S152540
Rei Insp Num
NON-CONFIDENTIAL
API Well Number 50-103-20499-00-00
Permit Number: 204-17S-0
Inspector Name: Chuck Scheve
Inspection Date: S/2612006
Packer
Depth
7015
Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well I CO2-54 IType Inj. N
P.T. 2041780 TypeTest SPT
Interval 4YRTST P/F
TVD I
Test psi
/
2425
3070
3070
3070
1753.75
IA
OA
Tubing
380
400
400
400
P
3850
3850
3850
3850
Notes Well had a waiver form hanging on wellhead limiting it to water injection only. Well curently not injecting but had been most recently on gas
injection Conoco Phillips personell indicated the waiver had been canceled.
lL\:-t) 'v'6- C&,/t c£ied') e.C\¿L;:l -0zVV\. 0?J.d:. d~v-iecJ
/_1 ( I 3~ LJ€¡) Ii 1~1O\- gvh.L--'i+-t"i:q
C I:::> 0("" I '¡Lt~¡ C¿,,"L s,: 'UL c-- .J
'} x;:I=A CC'>;I-1)..'l¿i/lievJzM ~E.¿ t4s..~;J~
Wednesday, August 30, 2006
Page I of I
RE: Kuparuk Month Failed MIT and Delayed MIT Reports for April
4 "
~~/-' 1T1r
Jim,
CD2-54 (204-178), it was wagged to
So far the diagnostics and test MI
would like to continue to watch it
change the status back to normal.
mechanical to fix the well in the
communication to return as the MI
doped threads.
MI for a test cycle March 27, 2006.
cycle look acceptable, however I
for a couple more weeks before we
Since we didn't do anything
first place, it is possible for the
dries out wellhead seals and pipe
v
We should have a better answer for you when we analyze the data for the
May Failed MIT Report and/or if the communication comes back.
Let us know if you have any additional questions.
MJ Loveland
ConocoPhillips Alaska
Well Integrity Project Supervisor
Office (907) 659-7043
Cel (907) 448-3114
-----Original Message-----
From: James Regg [mailto:jim regg@admin.stð.te.ak.us]
Sent: Friday, May 12, 2006 9:22 AM
To: NSK Well Integrity proj
Cc: Thomas Maunder; NSK Problem Well Supv
Subject: Re: Kuparuk Month Failed MIT and Delayed MIT Reports for April
What is the status of your diagnostics and reveiw of CD2-54?
Jim Regg
NSK Well Integrity proj wrote:
Tom,
Attached are the monthly failed MIT and Delayed MIT reports for April.
Let us know if you have any questions.
MJ Loveland
ConocoPhillips Alaska
Well Integrity Project Supervisor
10f2
c9ó4 -I? 11
5/12/20062:15 PM
RE: Kuparuk Month Failed MIT and Delayed MIT Reports for April
.
20f2
.
Office (907) 659-7043
Cel (907) 448-3114
«CPAI Failed MITIA Monthly Data 04-06.xls»
Monthly Data 04-06.xls»
.
«CPAI Delayed MITIA
5/12/20062:15 PM
·
e
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Ceresa Tolley
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501-3539
March 02, 2004
RE: MWD Formation Evaluation Logs: CD2-54,
AK-MW-3317391
CD2-54 :
Digital Log Images:
50-103-20499-00
# i3LC¡cf
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED
COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
Date: 1(L~~~
Signed µ ðW
~ òll~ 17 ~ ~l \.-
~l 'Y!Æ' ír i.rr
i! Ll ¡ ¡ !?
, ! f f! ¡ í
,U \ L i....=J
.
nll!6 I~ ~ @: ~:y¡ /~\
lW J /Jlj ~ flU æJ J\~ ~¡j
.
/ FRANK H. MURKOWSKI, GOVERNOR
/
/
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
AI,ASKA. OIL AND GAS
CONSERVATION COMMISSION
Chip Alvord
Alpine Team Leader
Conoco Phillips Alaska, Inc.
P.O. Box 100360
Anchorage, AK 99510
Re: CRU Alpine C02-54
Sundry Number: 305-328
Dear Mr. Alvord:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
Please provide at least twenty-four (24) hours notice for a representative of
the Commission to witness any required test. Contact the Commission's
petroleum field inspector at (907) 659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
~
DATED tbiS~ay of October 2005
Encl.
· ~iO~tð-tJ)RECEIVE~.
STATE OF ALASKA ß?k5/("'"
ALASKA OIL AND GAS CONSERVATION COMMISSION /' --> 0 CT 2 4 ZOO .
APPLICATION FOR SUNDRY APPROVAL Alaska Oil & Gas Cons. com~~l~~
Anchorage
o Other 0
Time Extension 0
Re-enter Suspended Well 0
5. Permit to Drill N~ber:
204-178 ..../
6. API Number:
50-103-20499-00 ../
9. Well Name and Number:
CD2-54 ,,/
20 AAC 25.280
1. Type of Request:
o
o
o
Suspend 0
o
o
Perforate New Pool
Abandon
Perforate
o
o
Operational Shutdown 0
o
o
Alter casing
Change approved program
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, Alaska 99510
7. KB Elevation (ft):
RKB 36.7', 52.6' AMSL
Repair well
Stimulate
Plug Perforations
Pull Tubing
4. Current Well Class:
Development 0
Stratigraphic 0
Exploratory 0
Service 0
8. Property Designation:
ADL 380075, 387207
11.
Total depth MD (ft):
16617'
Waiver
10. Field/Pool(s):
Colville River Field 1 Alpine Oil Pool
PRESENT WELL CONDITION SUMMARY
Effective Depth TVD (ft): Plugs (measured): Junk (measured):
Casing
CONDUCTOR
SURFACE
PRODUCTION
OPEN HOLE
Total Depth TVD (ft): Effective Depth MD (ft):
7350'
Length
80'
3311'
14341'
2239'
Size MD TVD Burst Collapse
16" 114' 114'
9-518" 3348' 2377'
7" 14378' 7382'
5-1/2" 16617' 7350'
Perforation Depth MD (ft):
open hole from 14378'-16617'
Packers and SSSV Type:
Baker Premier pkr @
Cameo Landing DB nipple @
12. Attachments: Description Summary of Proposal 0
Detailed Operations Program 0 BOP Sketch 0
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
Perforation Depth TVD (ft):
7382'-7350'
Tubing Size:
4-1/2"
Packers and SSSV MD (ft)
12992'
2321'
13. Well Class after proposed work:
Exploratory 0 Development 0
15. Well Status after proposed work:
Oil 0 Gas 0
WAG 0 GINJ 0
October 26, 2005
Date:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name
Tubing Grade:
L-80
Tubing MD (ft):
13065'
Service 0
Plugged 0
WINJ 0
Abandoned 0
WDSPL 0
Signature
Chip Alvord /,.?
"Z---:: ð /)-z
Contact: Liz Galiunas @ 265-6247
Title: Alpine Team Leader
Phone Z'J~(.,C¡79 Date lI!Jj"LLff1..tJ"Os-"
Commission Use Only
Conditions of approval: Notify Commission so that a representative may witness
Plug Integrity 0 BOP Test -ø.. Mechanical Integrity Test .~
Other: '!> s-oO ~"'>"\ ~~ ""'-"-.J M. ~a? ~ \-
Location Clearance 0
I Sundry Number: ""2 "'" ,,)
.~.C)- ~
RBDMS 8Ft. aCT 2 6 2005
APPROVED BY
THE COMMISSION
Appro
o RIG I N Ä!SSIONER
Form 10-403 Revised 7/2005 J
Dow 10#6
Submit in Duplicate
.
.
Procedure
1. Pre-rig work will include removal of the injection valve @ 2554' MD. A plug will be set in an XN profile
below the packer, and it will be positively and negatively tested to ensure isolation. Tubing above the
packer will also be cut and a back pressure valve installed prior to moving the rig over the well.
2. Move on Doyon 19
3. ND tree.
4. NU and test BOP
5. MU landing jt Displace well by circulating to SA ppg seawater. Pull out of hole and lay down 4-1/2" tubing.
6. If the tubing stub indicates the need for milling/dressing run, PU milling assembly, RIH and dress tubing
stub.
7. Circulate the hole clean and pull out of hole, displacing the well to S.6 ppg brine.
S. Run 4-Y2, 12.6#, L-SO tubing with DB nipple, gas lift mandrel, packer and tubing overshot Swallow over
tubing stub and space out Land hanger.
9. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
10. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check.
11. Circulate tubing to diesel and install freeze protection in the annulus.
12. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi /30 mins.
13. Set BPV and secure well. Move rig off
.
Completion Schematic:
j"""'"
IIIIIIII1
,......'.
,';:,',=
"''''''l
..:.....
16" Conductor to 114'
,',',',:
:':'",'
'::':;:'
i~¡¡ii¡~
",=",=
:,,::,,:,
:::;~; ",
"::':'"
,,'::,:,:
,,;,:,:,:
I
¡¡!¡lllii
II
.......:¡
4-1/2" Cameo DB Nipple (3.812')
at 2000' TVD = 2554' MD
::~:::~:¡
¡:;:;:;;¡
¡j~W;¡1
,:,:,:,:,
.......:¡
>:':":;
. 9-5/8" 36 ppf J-55 BTC
Surface Casing
@ 3348' MD /2377' TVD
cemented to surface
4-1/2" 12.6 ppf L-80 IBT M
tubing run with Jet Lube Run'n'Seal
pipe dope
Cameo KBG-2 GLM (3.909" DRIFT 10)
wI dummy
Baker 53 Packer
3.81" X nipple, with RHC plug,
Perforated pup, and overshot
assembly
.
C02-54 WO
Updated 10/24/05
Upper Completion: TOP MD :Dill
Tubing Hanger 34' 34'
4-112", 12.6#/ft, IBT-Mod Tubing
Cameo DB nipple 2554' 2000'
4-112", 12.6#/ft, IBT-Mod Tubing
Cameo KBG2- GLM (3.909" 10) 12711 ' 6886'
4-1/2", 12.6#/ft, IBT-Mod Tubing (2)
Baker S3 Packer 12811' 6933'
4-1/2", 12.6#/ft, IBT-Mod Tubing (2)
HES "X" (3.81")-62° inc 12911 ' 6979'
4-1/2", 12.6#/ft, IBT-Mod tubing (2)
"poor boy" over shot with perforated pup 12983' 7011'
Lower Completion: TOP MD TVD
4-1/2", 12.6#/ft, IBT-Mod tubing stub 12986' 7012'
Baker S3 Packer wI mill out extension 12992' 7015'
4-1/2", 12.6#/ft, IBT-Mod Tubing (1)
HES "XN" (3.725") 13052' 7041'
4-1/2", 12.6#/ft, IBT-Mod 10' pup joint
WEG 13063' 7046'
Baker 53 Packer WI millout extension
Top Alpine at 14378' MD 17382' TVD
Well TD at
18250' MD I
7324' TVD
7" 26 ppf L-80 BTC Mod
Production Casing @ 14378 1 7382' TVD @+/- 88.3°
.
.
Cono~illips
Casing Detail
95/8" Surface Casinfl
Well:
Date:
~'-\-\~<6
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN
LENGTH
Doyon 19 RKB to Landing Ring
FMC Gen V Hanger
Jts 3 to 79 77 Jts 9-5/8" 36# J-55 BTC Csg
Davis Lynch Float Collar
Jts 1 to 2 2 Jts 9-5/8" 36# J-55 BTC Csg
Ray Oil Tools "Silver Bullet" Float Shoe
36.21
2.17
3218.73
1.49
86.85
2.28
TD 12 1/4" Surface Hole
RUN TOTAL 44 BOWSPRING CENTRALlZERS-
1 per jt on Jt #1 - #12 (stop ring on Jt #1 & 2 )
and over collars on jts# 14,16,18,20,22,24,26,28,30,
32,34,36,38,40,42,44,46,48,50,52,54,56,58,60,62
64,64,66,68,70,72,74,76.
84 joints in the pipe shed. Run 79 joints - 5 joints stay out
'\ '" '\ C, \" ~ 'C \I'AO.. \-\0 ..... '?....:. \)'V\\ ~~0 ',,,-
~tY~'\'O'.\-' \..\)d-~-~ (J~4-\Sl3)
'~ ~ \' Ð '\S\O,\4'\-\- ~ (;j?J\ A
ÆJJ:- IV\ tÛ/,cr-U S
Use Best-o-Life 2000 pipe dope
Remarks: Up Wt -180 k
DnWt-120 k
Block Wt - 75k
Supervisor: D. Lutrick / L Hill
CD2-54
10/5/2004
DEPTH
TOPS
36.21
38.38
3257.11
3258.60
3345.45
3347.73
3357.73
·
Legal Well Name: C02-54
Common Well Name: C02-54
Event Name: ROT - DRILLING
Hole Size: 12.250 (in)
TMD Set: 3,348 (ft)
Date Set: 10/6/2004
Csg Type: Surface Casing
Csg Size: 9.625 (in.)
Cmtd. Csg: OPEN HOLE
Cement Co: Dowell Schlumberger
Rot Time Start: :
Rec Time Start: :
Time End:
Time End:
Type: Cement Casing
Volume Excess %: 300.00
Meas. From: 142
Time Circ Prior
To Cementing: 1.50
Mud Circ Rate: 294 (gpm)
Mud Circ Press: 348 (psi)
Report #:
Start:
1
10/3/2004
Cement Job Typ
Squeeze Open Hole
Hole Size:
sa TMD: (ft)
sa Date:
sa Type:
Cmtd. Csg:
RPM:
SPM:
Hole Size:
TMD Set:
Date Set:
Csg Type:
sa TMD:
sa Date:
Cmtd. Csg:
Cementer: Steve Doughten
Init Torque:
Stroke Length:
Stage
Start Mix Cmt: 04:26
Start Slurry Displ: 05:30
Start Displ: 05:30
End Pumping: 06:10
End Pump Date: 10/6/2004
Top Plug: Y
Bottom Plu!J: Y
Type: Spud Mud Density: 9.6 (ppg) Vise: 54 (s/qt)
Bottom Hole Circulating Temperature: ("F)
Displacement Fluid Type:Mud
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Spud Date: 10/4/2004
Report Date: 10/6/2004
End: 10/22/2004
Hole Size:
Top Set: (ft)
BTM set: (ft)
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
PipeM
Pipe Movement: Reciprocating
(ft-Ibf)
(ft)
Avg Torque: (ft-Ibf)
Drag Up: (Ibs)
Max Torque: (ft-Ibf)
Drag Down: (Ibs)
Returns: 100
Total Mud Lost: (bbl)
Cmt Vol to Surf: 142.00 (bbl)
Ann Flow After: N
Mixing Method: Tub
Density Meas By: Densometer
PVIYP: 19 (cp)/17 (lb/100ft2) Gels 10 see: 4 (lb/100ft2) Gels 10 min: 18 (lb/100ft2)
Bottom Hole Static Temperature: ("F)
Density: 9.6 (ppg) Volume: 230.00 (bbl)
Stage No'
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
7.00 (bbl/min)
7.00 (bbl/min)
Y
730 (psi)
1,200 (psi)
(min)
Y
Mud Data
To: (ft)
Description: Biozan water wlnut plug
Cmt Vol: 40.0 (bbl) Density: 8.30 (ppg)
Slurry Vol: (sk) Water Vol: (bbl)
Class:
Yield: (ft3/sk)
Other Vol: 0
Temperature: ("F)
Temperature: ("F)
Temperature: ,CF)
Time
Compressive Strength 1:
Compressive Strength 2:
Purpose: Pre-flush
Mix Water: (gal)
Foam Job: N
Temp
(OF)
("F)
Pressure
(psi)
(psi)
Printed: 10/4/2005 10:08:44 AM
·
ConocoPhillips Alaska
Cementing Report
Legal Well Name: C02-54
Common Well Name: C02-54
Event Name: ROT - DRILLING
1
10/3/2004
Spud Date: 10/4/2004
Report Date: 10/6/2004
End: 10/22/2004
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: ("F)
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft) To: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: ("F)
Slurry Data
Fluid Type: LEAD
Slurry Interval: 2,848.00 (ft}J"o: (ft)
Water Source: lake
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Report #:
Start:
To: (ft)
Description: CW100
Cmt Vol: (bbl)
Slurry Vol: (sk)
Density: 8.34 (ppg)
Water Vol: (bbl)
Class:
Yield: (ff3/sk)
Other Vol: 0
Temperature: (OF)
Temperature: ("F)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Slurry No: 3 0
Description: MUDPUSH XL Class:
Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg) Yield: (ft3/sk)
Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0
Temperature: (OF)
Temperature: ("F)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
("F)
("F)
Stage No: 1
Description: ASLite
Cmt Vol: 385.0 (bbl)
Slurry Vol:487 (sk)
Class:
Density: 10.70 (ppg) Yield: 4.45 (ft3/sk)
Water Vol: 240.0 (bbl) Other Vol: 0
Temperature:; (0 F)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
("F)
Purpose:
Mix Water: (gal)
Foam Job: N
Pressure
(psi)
(psi)
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Pressure
(psi)
(psi)
Purpose: FILLER CEM
Mix Water: 20.70 (gal)
Foam Job: N
Pressure
(psi)
(psi)
Printed: 10/4/2005 10:08:44 AM
.
.
ConocoPhillip
Cementing
Legal Well Name: C02-54
Common Well Name: C02-54
Event Name: ROT - DRILLING
Report #:
Start:
1
10/3/2004
Slurry No: 5
Slurry Data
Fluid Type: TAIL
Slurry Interval: 3,348.00 (ftJfo:
Water Source: lake
Description:
2,848.00 (ft) Cmt Vol: 50.0 (bbl)
Slurry Vol:241 (sk)
Class: G
Density: 15.80 (ppg) Yield: 1.17 (ff'/sk)
Water Vol: 29.0 (bbl) Other Vol: 0
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: ("F)
Temperature: (OF)
Temperature: ("F)
Time
Compressive Strength 1:
Compressive Strength 2:
3 of 3
Spud Date: 10/4/2004
Report Date: 10/6/2004
End: 10/22/2004
Purpose: SHOE INTEG
Mix Water: 5.10 (gal)
Foam Job: N
Temp
("F)
(OF)
Pressure
(psi)
(psi)
Test
Shoe Test
Test Press: 2,550 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: Y
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Pressure: 18.00 (ppge)
Tool: N
Open Hole: 30 (ft)
Hrs Before Test:
Log/Survey Evaluation
CBL Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run: N
Bond Quality:
Temp Survey: N
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient: Y
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required: N
Number of Remedial Squeezes:
Tool: N
Tool: N
Pump 40 bbls biozan/nut plug spacer and 10 bbls CW100. Test lines to 2500 psi. Pump 30 bbls CW100, drop bottom plug, 50 bbls 10.5
mud push, 386 bbls 10.7 lead cement and 50 bbls 15.8 tail cement Drop top plug. Pump 20 bbls H20. Switch to rig pumps and displace
with 9.6 mud. Plug bumped. Floats OK
Printed: 10/4/2005 10:08:44 AM
I JOB NUMBER I EVENT CODE HRS PROG TMD I TVD
CD2-54 ODR 3,358.0 2,382.0 3.00
SUPERVISOR I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAILY TANG
Donnie LutricklLarry Hill Doyon Drilling Inc 19 Alpine 18,245.0 0
CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD
.
WELL NAME
RIH.
.
ConocoPhil
Daily D
o
I REPT NO. I DATE
4 10/6/2004
¡CUM. TANGO
CUM INTANG WI MUD
o
CUM COST WI MUD
776,772
24 HR FORECAST
Drill out FIT. Change to LSND. Drill 8 1/2" hole.
LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP
CLAYSTONE
LAST SURVEY: DATE TMD INC AZIM I LAST CASING
10/5/2004 3,301.46 62.135 241.060 9.625 (in) @
DATE OF LAST SAFETY MEETING DAILY TOTAL
10/4/2004 428,044
ILEAKOFF AFE
10042707
I NEXT CASING
3,348.0 (ft) 7.000 (in) @ 14,451.0 (ft)
LAST BOP PRES TEST
10/6/2004
o
LIME! ES
AUTH.
o
9.60
!WI..IHTHP I
6/20 9.81 21
TROUBLE SUB
00:00 00:45 0.75 CASE P RUNC
00:45 01:00 0.25 CASE P CIRC
01:00 01:45 0.75 CASE P RUNC
01:45 02:15 0.50 CASE P RURD
02:15 03:30 1.25 CEMENT P CIRC
03:30 03:45 0.25 CEMENT P SFTY
03:45 05:30 1.75 CEMENT P PUMP
05:30 06:15 0.75 CEMENT P DISP
06:15 07:00 0.75 CASE P DEQT
07:00 08:00 1.00 CASE P RURD
08:00 09:45 1.75 CASE P OTHR
09:45 10:30 0.75 WELCTL P NUND
10:30 13:00 2.50 WELCTL P NUND
13:00 13:30 0.50 WELCTL P BOPE
13:30 18:00 4.50 WELCTL P BOPE
18:00 18:30 0.50 WELCTL P BOPE
18:30 20:00 1.50 RIGMNT P RSRV
20:00 21:00 1.00 DRILL P PULD
21:00 23:30 2.50 DRILL P PULD
23:30 00:00 0.50 DRILL P RIRD
0.01/0
SURFAC RIH w/9 5/8" csg f/1875' to 2715'.
SURFAC Circ 50 bbls mud at 5 bpm at 380 psI.
SURFAC RIH w/9 5/8" csg to 3309'. MU hanger. Land csg at 3348'.
SURFAC RD Franks fill up tool. Blow down top drive. RU cement head and lines.
SURFAC Circ and condition mud. 7 bpm at 348 psI.
SURFAC PJSM on cementing surface csg.
SURFAC Pump 40 bbls biozan I nut plug spacer and 10 bbls CW100. Test lines to 2500
psI. Pump 30 bbls CW1 00, drop bottom plug, 50 bbls 10.5 mud push, 386 bbls
10.7 lead cement and 50 bbls 15.8 tail cement Drop top plug.
SURFAC Pump 20 bbls H20. Switch to rig pumps and displace with 9.6 mud. Plug
bumped. Floats OK. Approx 142 bbls cement to surface.
SURFAC Test csg to 2500 psi fl 30 mins.
SURFAC RD csg equipment
SURFAC PJSM. RD surface riser equipment
SURFAC NU well head. Test MTM seal to 1000 psI.
SURFAC Nipple up BOP.
SURFAC Spot Geo Span and set test plug.
SURFAC PJSM - RU & test BOPE - Hydril to 250 & 3500 psi - Pipe rams, blind rams,
choke & kill lines valves, choke manifold valves, TD IBOP, floor safety & dart
valves to 250 & 5000 psi - performed accumulator closure test - witnessing of
test waived by Lou Gramaldi AOGCC - Pull test plug.
SURFAC Blew down lines and set wear bushing.
SURFAC Slipped and cut drilling line. Adjusted brakes.
SURFAC RIH 4 stands 5" HWDP and 1 stand 5" DP. POOH and Lay down same.
SURFAC Picked up and RIH with 93 Jts. 4" DP.
SURFAC Rigged up to pull and stand back drill pipe.
24 HR SUMMARY: Ran 95/8" casing to 2247". Circulated and cemented casing. Tested casing. RD cementing and casing tools. Nippled down
riser and made up speed head. Nippled up and tested BOP. Picked up 4" DP from pipe shed.
SERVICE
ConocoPhillips Company
Fairweather E&P Service
Doyon Drilling Inc
ACI - Arctic Catering
PERSONNEL DATA
NO. HOURS COMPANY
1 M-I Drilling Fluids
1 Halliburton - Sperry-Sun
26 Halliburton - Sperry-Sun
5 Swaco
3
2
2
4
Printed: 10/4/2005 10:06:56 AM
WELL NAME
Dowell
Fuel
Water, Drilling
C02-53
CD2-54
.
ConocoPhillips
Daily Drilling
I JOB NUMBER I EVE~;~DE 124 HRS PROG
gals
bbls
USAGE
1,503
1,640
bbls
gals
Water, Potable
Fuel Camp
3.00
NO.
4 10/6/2004
120
720
2,080
Printed: 10/4/2005 10:06:56 AM
PRESSURE INTEGRITY TEST
CONOCOPHILLlPS Alaska, Inc.
Well Name: C02-54 I Ri9: Doyon 19 Date: I 10/6/2004
Drilling Supervisor: I Lutrick/Hil1 I used: 1 #2 Mud Pump I...
Type of Test: I OpenholeTest LOT/FIT 1...1 Pumping down I annulus and DP. I...
Hole Size: 18-1/2" 1"'1 Casing Shoe Depth I I Hole Depth
RKB-CHF:I 36.21Ft 3,348 IFt-MDI 2,3771 Ft-TVD 3,378IFt-MD I 1 Ft-TVD
Casina Size and Description: 19-5/8" 36#/Ft J-55 BTC 1...1
Casina Test Pressure IntearitvTest
Mud Weight: 9.6 ppg Mud Weight: 9.7 ppg
Mud 10 min Gel: 25.0 Lb/100 Ft2 Mud 10 min Gel: 10.0 Lb/100 Ft2
Test Pressure: psi Rotating Weight: 117,000 Lbs
Rotating Weight: Lbs BlockslTop Drive Weight: Lbs
BlockslTop Drive Weight: Lbs DesiredPIT EMW: 18.0 ppg
Estimates for Test: 2.4 bbls Estimates for Test: 1032 psi
I...l
EMW = Leak-off Pressure + Mud Weight = 1032 + 9.65
0.052 x TVD 0.052 x 2377
EMW at 3348 Ft-MD (2377 Ft-TVD) = 18.0 ppg
0.9 bbls
1...1
PIT 15 Second
Shut-in Pressure, psi
950
3000 -
/
~ /
U) 1500-
~ '000 ¿~
~:.þ ~/
2500 -
2000 -
o
2 3
Barrels
5 10 15 20 25 30
Shut-In time, Minutes
o PIT Point
4
-rll-CASING TEST
_LEAK-OFF TEST
Comments:
Tested 9 5/8"
held
on cement
after
0;', of test pressure
I Volume Input Volume/Stroke Pump Rate:
Strokes I~ O. 1 000 I Bbls/Strk I ~ 5.0 l Strkjmin ...
Casing Test Pressure Integrity Test
Pumping Shut-in Pumping Shut-in
Strks psi Min psi Strks psi Min psi
0 0 0 0 0 0 1035
2 100 1 1 5 0.25 950
4 250 2 2 17 0.5 910
6 500 3 3 50 1 890
8 740 4 4 100 1.5 I
10 880 5 5 160 2
12 -1100 6 6 250 2.5
14 1250 7 7 330 3 810
16 1400 8 8 420 3.5 800
18 1550 9 9 510 4 798
20 1750 10 10 580 4.5 790
22 1900 15 11 640 5 785
24 2100 20 12 690 5.5 770
26 2225 25 13 745 6 766
28 2500 30 14 805 6.5 765
29 2600 15 850 7 765
16 895 7.5 763
17 935 8 761
18 975 8.5 760
19 1035 9 755
9.5 I
10
Volume
Pumped
2.9 Bbls
Volume
Pumped
1.9 Bbls
Volume
Bled Back
IBbls
Volume
Bled Back
Bbls
.
.
Conoc6Phillips
Casing Detail
Jt Number Num of Jts
COMPLETE DESCRIPTION OF EQUIPMENT RUN
Jts 3 to 341
Doyon 19 RKB
FMC Gen V Hanger
339 Jts 7" 26# L-80 BTCM Csg
Davis Lynch Float Collar
2 Jts 7" 26# L-80 BTCM Csg
Ray Oil Tools "Silver Bullet" Float Shoe
Jts 1 to 2
TD 8 1/2" Hole
Total Centralizers: 55
Straight blade centralizer one per jt on jts # 1-15
Straight blade centralizer one per jt on jts. # 262, 263, 264
Straight blade centralizer one every other joint
Joints # 266 thru joint # 338
350 joints in shed - 341 total jts. to run
9 jts. Out
Use JET LUBE Run & Seal pipe dope
MU torque - 7900 ft/lbs
Remarks: Up Wt - k
On Wt - 150k
Block Wt - 75k
Supervisor: D. Lutrick / D. Mickey
Well: CD2-54
Date: 10/14/2004
LENGTH
34.07
2.38
14254.94
1.31
82.89
2.20
DEPTH
TOPS
34.07
36.45
14291.39
14292.70
14375.59
14377.79
14388.00
·
ConocoPhillips
Cementing
Legal Well Name: C02-54
Common Well Name: C02-54
Event Name: ROT - DRILLING
Report #:
Start:
Type: Prima
Squeeze Oþ.~n Hole
Hole Size: 8.500 (in) Hole Size:
TMD Set: 14,378 (ft) sa TMD: (ft)
Date Set: 10/14/2004 sa Date:
Csg Type: Intermediate Casing/Li sa Type:
Csg Size: 7.000 (in.)
Hole Size:
TMD Set:
Date Set:
Csg Type:
sa TMD:
sa Date:
Cmtd. Csg:
Cmtd. Csg: OPEN HOLE
Cmtd. Csg:
Cement Co: Dowell Schlumberger
Cementer: Jim Thompson
Pipe Mo nt
Rot Time Start:
Rec Time Start:
RPM:
SPM:
Init Torque: (ft-Ibf)
Stroke Length: (ft)
Time End:
Time End:
Stage No: 1 of 1
Type: Cement Casing
Volume Excess %: 40.00
Meas. From: 70
Time Circ Prior
To Cementing: 3.25
Mud Circ Rate: 45 (gpm)
Mud Circ Press: 620 (psi)
Start Mix Cmt: 08:03
Start Slurry Displ: 08:03
Start Displ: 08:17
End Pumping: 09:54
End Pump Date:
Top Plug: Y
Bottom Plug: Y
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
2
10/3/2004
1 of 3
Spud Date: 10/4/2004
Report Date: 10/14/2004
End: 10/22/2004
Hole Size:
Top Set: (ft)
BTM set: (ft)
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
Pipe Movement: No movement
3
Class:
Yield: (ft3/sk)
Other Vol: 0
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: ("F)
Temperature: rF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Avg Torque: (ft-Ibf)
Drag Up: (lbs)
6.00 (bbl/min)
6.00 (bbl/min)
Y
670 (psi)
1,200 (psi)
2 (min)
Y
Max Torque: (ft-Ibf)
Drag Down: (Ibs)
Returns: 1000
Total Mud Lost: (bbl)
Cmt Vol to Surf: (bbl)
Ann Flow After: N
Mixing Method: Tub
Density Meas By: Densometer
Type: LSND I Drilzone Density: 9.8 (ppg) Vise: 35 (s/qt) PVIYP: 9 (cp)/20 (lb/100ft2) Gels 10 see: 8 (lb/100ft2) Gels 10 min: 10 (lb/100ft2)
Bottom Hole Circulating Temperature: ("F) Bottom Hole Static Temperature: (OF)
Displacement Fluid Type:Mud Density: 9.8 (ppg) Volume: (bbl)
Purpose: Chemical was
Mix Water: (gal)
Foam Job: N
Temp
("F)
(OF)
Pressure
(psi)
(psi)
Stage No: 1
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft)
Water Source: lake
Description: CW100
Cmt Vol: 50.0 (bbl)
Slurry Vol: (sk)
To: (ft)
Density: 8.30 (ppg)
Water Vol: (bbl)
Printed: 10/4/2005 10:08:58 AM
·
Conoco
Legal Well Name: C02-54
Common Well Name: C02-54
Event Name: ROT - DRILLING
Report #:
Start:
2
10/3/2004
Spud Date: 10/4/2004
Report Date: 10/14/2004
End: 10/22/2004
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft) To: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: ("F)
Slurry Data
Fluid Type: TAIL
Slurry Interval: 14,391.00 (ff)o:
Water Source: lake water
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: ("F)
D-065
B-155
D-46
D-167
Stage No: 1 Slurry No:
Description: MUDPUSH XL Class:
Cmt Vol: 30.0 (bbl) Density: 10.50 (ppg) Yield: (ft3/sk)
Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Temperature:. (OF)
Temperature: (OF)
Temperature:. (0 F)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
("F)
Pressure
(psi)
(psi)
Stage No: 1
Description:
12,298.00 (ft~mt Vol: 70.2 (bbl)
Slurry Vol:340 (sk)
Class: G
Density: 15.80 (ppg) Yield: 1.16 (ft3/sk)
Water Vol: 412 (bbl) Other Vol: 0
Purpose: PRIMARY
Mix Water: 5.09 (gal)
Foam Job: N
Temperature: ("F)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
("F)
Pressure
(psi)
(psi)
Stage No: 1
Type
DiSPERSANT
retarder
DEFOAMER
FIJid loss
Concentration
0.30 %BWOC
0.10 %BWOC
020 %BWOC
OAO %BWOC
Printed: 10/4/2005 10:08:58 AM
.
.
of 3
Legal Well Name: C02-54
Common Well Name: C02-54
Event Name: ROT - DRILLING
Report #:
Start:
2
10/3/2004
Spud Date: 10/4/2004
Report Date: 10/14/2004
End: 10/22/2004
Test Press: 3,500 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: N
Pressu're: (ppge)
Tool: N
Open Hole: (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Tool: N
Tool: N
Log/Survey Evaluation
CBL Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run: N
Bond Quality:
Temp Survey: N
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOe Sufficient: N
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required: N
Number of Remedial Squeezes:
Remarks
Pump 5 bbls CW100. Test lines to 3700 psi. Pump 45 bbls CW100 and 30 bbls 10.5 mudpush. Drop bottom plug. pump 70 bbls 15.8
cement
Drop top plug. Pumped 20 bbls H20. Switch to rig pump a and displaced cement with 531 bbls 9.8 mud. Bumped plug. Floats OK. 100%
returns through out job.
Printed: 10/4/2005 10:08:58 AM
.
.
ConocoP
I REPT NO.
11
ICUM. TANGO
CUM INTANG WI MUD
o
CUM COST WI MUD
1,913,569
TMD I DFS
14,388.0 7,382.0 10.00
AUTH MD I DAILY TANG
18,245.0 0
DAILY INT WIO MUD
o
I JOB NUMBER I EVENT CODE 124 HRS PROG
CD2-54 . ODR
SUPERVISOR I RIG NAME & NO.' I FIELD NAME I OCS NO.
Lutrick 1 Mickey Doyon Drilling Inc 19 Alpine
CURRENT STATUS ACCIDENTS LAST 24 HRS.?
WELL NAME
Circulating for 7" cement job
DATE OF LAST SAFETY MEETING DAILY TOTAL
10/11/2004 101,072
ILEAKOFF AFE
17.94 10042707
I NEXT CASING
3,348.0 (ft) 7.000 (in) @ 14,378.0 (ft)
24 HR FORECAST
Cmt 7" - Set & test packoff - Test BOPE - MU BHA - RIH
LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP
VERY FINE SAND
LAST SURVEY: DATE TMD INC AZIM I LAST CASING
10/11/2004 14,359.09 87.482 327.760 9.625 (in) @
ECD 19.80
OILIWAT
AUTH.
LAST BOP PRES TEST
10/6/2004
o
LIME I ES
o
FCIT.SOL
11
0.1010
BHANO. I 2 I
BHA WT. BELOW JARS I
2
BHA / HOLE CONDITIONS
STRING WT. DN I STRING WT. ROT
NO JTS
1
1
1
1
1
1
1
1
STRING WT. UP
3,142.34
CONN TYPE
ft-Ibf
3.000
1.900
1.920
1.900
1.920
1.920
1.920
3.250
2.813
2.800
2.813
3.000
2.375
3.000
4.280
2.875
4.280
2.875
4.280
2.680
8.500
7.625
6.750
6.850
6.680
6.760
6.700
6.780
6.740
6.500
6.880
5.000
6.060
5.000
5.000
6.500
5.000
6.500
5.000
6.437
1.60
20.15
9.14
2.16
20.92
2.20
6.97
9.97
2.11
92.70
5.62
89.21
32.40
357.42
158. 82
6.95
951.02
6.97
1,364.63
1.38
FSF-2565
Geo Pilot
Geo Pilot Flex wI DM
GP Stabilizer
GR-RES
GP Stabilizer
MWD-HCIM
MWD-HOC
NM Float Sub
3-NM Flex DC's
IB NM Stabilizer
3 HWDP
Drilling Jar - DNT
12 HWDP
5" DP
Weatherford Ghost Reamer
5" DP
Weatherford Ghost Reamer
5" DP
Crossover
3
1
3
11
5
1
30
1
46
1
BITS
SIZE MANUF.iliTYPE. SERIAL NO. I
8.500 SECURITY-DB~FSF2565 10676838
JETS
16/16/16/16/161
1-2-CT -N-D-I-EC- TD
21
RPM
130/130
ROP
GPM
626
PRESS
3,950
15 I 25
21
OPERATIONSSIUlMMARY
PHASE
INTRM1 Change over mud bucket, elevators and iron roughneck to 5".
INTRM1 POH. Std back 5" DP and HWDP. LD jars and ghost reamers.
INTRM1 LD BHA #2. Download MWD.
INTRM1 Rig down Geo-span unit.
HOURS CODE
00:00 00:30 0.50 DRILL P
00:30 02:00 1.50 DRI LL P
02:00 04:15 2.25 DRILL P
04:15 04:45 0.50 DRILL P
OTHR
TRIP
PULD
RIRD
Printed: 10/4/2005 10:07:29 AM
.
WELL NAME
ConocoPhillips Alaska, I
Daily D
JOB NUMBER I EVE~Dc~DE 124 HRS PROG
.
TMD TVD
14,388.0 7,382.0
REPT NO.
11
OPERATI!ONS·!'S!I.J!M!M!AR'\'
PHASE
INTRM1 Pull wear bushing.
INTRM1 PJSM. Change top pipe rams to 7". Test rams tp 5000 psi. Instal thin wear
bushing.
Rig up csg equipment
PJSM on running 7" csg.
Run 7" 26# L-80 BTCM casing as follows: FS( Ray Oil Tools Siver bullet) 2 jts.
- FC ( Weatherford) 2 jts.< first 4 connections made up w/ BakerLoc - Filled
pipe & checked floats) 96 jts. ( 100 jts. total) to 4167' - PU wI. 155 SO wI. 120
Circ 1 csg volume at 5 bpm and 350 psi.
Continue running 7" casing fl 4160' to 8375' ( 200 jts. total)
Break circulation & stage pumps up to 4 bbls/min - Circulate bottoms up + ICP
610 psi FCP 460 psi
Continue running 7" casing fl 8375' to 12,645' ( 301 jts. total)
PU wI. 350 SO wt. 150
Break circulation @ 2 bbl/min - Stage pump up to 3 bbls/min ICP- 750 psi -
Circulate & condition mud & hole
CD2-54
TO
04:45 05: 15
05:15 07:15
HOURS
0.50
2.00
TROUBLE
SUB
OTHR
EQRP
DRILL P
WELCTL P
07:15 08:00 0.75 CASE P RURD INTRM1
08:00 08:15 0.25 CASE P SFTY INTRM1
08:15 12:30 4.25 CASE P RUNC INTRM1
12:30 13:00 0.50 CASE P CIRC INTRM1
13:00 17:30 4.50 CASE P RUNe INTRM1
17:30 18:30 1.00 CASE P CIRC INTRM1
18:30 23:00 4.50 CASE P RUNC INTRM1
23:00 00:00 1.00 CASE P CIRC INTRM1
DFS
10.00
24 HR SUMMARY: Finish POOH - LD BHA - RU to run 7" csg - Run 7" casing to 12,645' (310 jts of 341 to run) Circulate @ 4160,8375' &
12,645'
COMPANY
ConocoPhillips Company
Fairweather E&P Service
Doyon Drilling Inc
ACI - Arctic Catering
M-I Drilling Fluids
Halliburton - Sperry-Sun
PERSONNEL DATA
HOURS COMPANY
2 Halliburton - Sperry-Sun
1 Swaco
26 Dowell
5 FMC Corporation Wellhe
3 ASRC Energy Services (
1
Fuel
Water, Drilling
gals
bbls
2,665
300
2,345
3,140
Water, Potable
Fuel Camp
I CD2-54
, RESERVOIR AND INTERVAL DATA
ZONE I TOP BASE I
10 2 1060
CD2-53
2
4
2
1
2
bbls
gals
120
2,080
Printed: 10/4/2005 10:07:29 AM
.
.
I JOB NUMBER I EVENT CODE 124 HRS PROG TMD I TVD I DFS
CD2-54 ODR 14,388.0 7,382.0 11.00
SUPERVISOR I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAILY TANG
Lutrick I Mickey Doyon Drilling Inc 19 Alpine 18,245.0 0
CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD
RIHw/BHA#3 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL
C/O shoe tract - FIT - Drill 6 1/8" hole 10/11/2004 463,891
LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE
VERY FINE SAND 17.94 10042707
LAST SURVEY: DATE TMD INC AZIM I LAST CASING I NEXT CASING
10/11/2004 14,359.09 87.482 327.760 7.000 (in) @ 14,378.0 (ft) 4.500 (in) @ 13,112.0 (ft)
DENSITY(ppg) 9.80 I PP I ECD I I MUD DATA I DAILY COST I 0 I CUM COST I
FV I PVIYP GELS I WLlHTHP I FCIT.SOL OILIWAT I %Sand/MBT I Ph/pM Pf/Mf CI I 2COð I
41 9/20 8/10 3.8/7.6 11 I 0.1/15.0 9.01 0.05/0
BHA NO. I 3 I BHA / HOLE CONDITIONS I
BHA WT. BELOW JARS I STRING WT. UP STRING WT. DN I STRING WT. ROT TORQUE I UNITS
ITEM DESCRIPTION O.D. I.D.
6.125 2.250
4.974 2.794
4.625 2.250
4.720 2.187
4.750 2.250
4.720 1.250
4.700 1.250
4.670 2.250
4.700 2.250
4.770 2.625
3.500 2.060
4.750 2.000
3.500 2.063
ConocoPhil
Daily Dr
WELL NAME
Bit
Motor
Sub - Float
NM Sub Float Lock Down
MWD
MWD
MWD
MWD
NM Flex DC's
NO JTS LENGTH
1 0.75
1 32.57
1 1.87
1 0.97
1 8.55
1 24.39
1 10.78
1 10.22
3 93.11
1.18
3 91.99
32.24
2 61.31
Crossover
3 X HWDP
Jar DNT
2 X HWDP
BIT I RUN
31
SIZE I MANUF. I 'rvPE
6.125 HUGHES-CHR DP0796
BITS
I SERIAL N°·1 JETS OR TFA
7000733 13/13/13/13/12/12
I REPT NO. I DATE
12 10/14/2004
ICUM. TANGO
CUM INTANG WI MUD
o
CUM COST WI MUD
2,377,460
AUTH.
LAST BOP PRES TEST
10/14/2004
o
H2S I LIME I ES
BIT NO. I 3
BHA LENGTH
369.93
CONN SIZE CONN TYPE
I DEPTH IN DATE IN I I-O-D-L-B-G-O-R
14,388.0 10/14/200~ O-O------PR
BIT I RUN
GPM
BIT OPERATIONS
PRESS I P BIT I HRS I 24Hr DIST I 24Hr ROP I CUM HRS I CUM DEPTH I CUM ROP
WOB
RPM
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
00:00 01 :15 1.25 CASE P CIRC INTRM1 Circ and condition mud. Stage pumps from 3 to 4 bpm. FCP - 350 psi. Up wt -
310k. Dn wt - 150k.
01 :15 03:45 2.50 CASE P RUNe INTRM1 Continue running 7" casing f/12,645' to 14,354' (341 jts. total). MU hanger
and land csg wI shoe @ 14,378' FC @ 14,291'. Dn wt - 150k. No hole
problems.
03:45 04:15 0.50 CASE P RURD INTRM1 LD Franks fill up tool. Blow down top drive. RU cement head and lines.
04:15 07:30 3.25 CEMENT P CIRC INTRM1 Circ and condition mud. Stage pumps from 1 to 4.5 bpm. FCP - 620 psi.
Picked up to 450k with no pipe movement Reland csg.
07:30 07:45 0.25 CEMENT P SFTY INTRM1 PJSM on cementing csg.
07:45 08:30 0.75 CEMENT P PUMP INTRM1 Pump 5 bbls CW100. Test lines to 3700 psi. Pump 45 bbls CW100 and 30
bbls 10.5 mudpush. Drop bottom plug. Pump 70 bbls 15.8 cement
Printed: 10/4/2005 10:08:11 AM
.
.
WELL NAME
Daily
I JOB NUMBER 1 EVE;rDC~DE 124 HRS PROG
[TMD ITVD
14,388.0 7,382.0
I REPT NO.
11.00 12
OPERATIONS··SWIMlMlJ.\RV
PHASE
INTRM1 Drop top plug. Pumped 20 bbls H20. Switch to rig pump a and displaced
cement with 531 bbls 9.8 mud. Bumped plug. Floats OK. 100% returns
through out job.
Test csg to 3500 psi for 30 mins.
Rig down csg equipment. LD LJ.
Pull wear bushing. Install 95/8" x 7" packoff & Test to 5000 psi for 10 mins.
LD casing equipment fl rig floor
Change top pipe rams f/7" to 3 1/2" x 6" VBR
PJSM - RU & test BOPE - tested pipe rams, blind rams, choke & kill line
valves, choke manifold valves, Td IBOP's, floor safety & dart valves to 250 psi
& 5000 psi - Hydril to 250 & 3500 psi - Performed accumulator closure test -
Wittnessing of test waived by John Crisp AOGCC - RD
Install wear bushing
RU to lay down 5" DP - PU drilling bails & 5" DP elevators - Change out dies in
Iron roughneck
LD 5" DP fl derrick(prep for rig move) using mouse hole - change handling
equipment to 4"
MU BHA # 3 ( 6 1/8") Adjust motor to 1.15 bend - change stab sleeve - MU bit
- Up load MWD
24 HR SUMMARY: Finish running 7" casing wI shoe @ 14,378' - Circ & condition - Cmt 7" csg - Set & test pack off - RU & test BOPE - LD 5"
DP fl derrick - MU BHA #3 - up load MWD
C02-54
FROM TO
08:30 10:00
HOURS
1.50
CODE TROUBLE
CEMENT P DISP
10:00 10:45 0.75 CASE P DEQT INTRM1
10:45 11 :30 0.75 CASE P RURD INTRM1
11 :30 12:00 0.50 DRILL P OTHR INTRM1
12:00 12:30 0.50 DRILL P OTHR INTRM1
12:30 13:30 1.00 DRILL P OTHR INTRM1
13:30 17:30 4.00 WELCTL P BOPE INTRM1
17:30 18:00 0.50 DRILL P OTHR INTRM1
18:00 18:30 0.50 DRILL P OTHR INTRM1
18:30 22:00 3.50 DRILL P PULD INTRM1
22:00 00:00 2.00 DRILL P PULD INTRM1
COMPANY
ConocoPhillips Company
Fairweather E&P Service
Doyon Drilling Inc
ACI - Arctic Catering
M-I Drilling Fluids
Halliburton - Sperry-Sun
SERVICE
1
1
25
5
3
2
PERSONNEL DJ.\TJ.\
HOURS
HOURS
Halliburton - Sperry-Sun
Swaco
Dowell
ASRC Energy Services (
Epoch Well Services Inc
2
4
2
2
2
Fuel
Water, Drilling
USAGE
555
815
gals
bbls
1,790
2,325
Water, Potable
Fuel Camp
bbls
gals
120
-120
2,080
RESERVOIR NAME
CD2-53
I CD2-54
RESERVOIR AND INTERVAL
I TOP I BASE I
1441 3.9 1110
Printed: 10/4/2005 10:08:11 AM
PRESSURE INTEGRITY TEST
CONOCOPHILLlPS Alaska, Inc.
Doyon19 Date: I 10/14/2004
used I Cement Unit ...
...
.
Pump Rate:
.... Bbl/min
Pressure Integrity Test
,
Bbls/5trk
Volume Input
Barrels I....
Casing Test
Rig
Lutrick
CD2-54
Well Name:
Drilling Supervisor:
Shut-in
Min psi
o
0.25
0.5
1
1.~.
2.5 867:
3
3.5
4
4.5
5
5.5
6
6.5
7
7.5
8
8.5
9
9.5 ...>ß<.
10 .
Volume
Bled Back
Bbls
85
385
662
Pumping
Bbls psi
Volume
Pumped
18.3 Bbls
o
11.5
14.9
16
17.2
18.3
Shut-in
Min psi
Volume
Bled Back
IBbls
o
1
2
3
4
5
6
7
8
9
10
15
20
25
30
Casing Shoe Depth
IFt-MDI 2,3771 Ft-TVD
19-5/8" 36#/Ft J-55 BTC
AdeQuacv Test
in comments
casing string.
casing.
Pumping
Bbls psi
...
Hole Depth
5181Ft-MD I 6,298IFt-TVD
I'"
annulus.
Pumping down
...
Disposal Adequacy
for
Annulus Leak Off Test
Type of Test
Hole Size: I U5E PICK liST
RKB-CHF: 34.4Ft
CasinQ Size and Description
....
-0.4 bbls
1....1
PIT 15 Second
Shut-in Pressure, ps
741
11
Pressure InteQritvTest
Mud Weight: 9.8 ppg
nner casing aD: 7.0 In.
Desired PIT EMW:
Estimates for Test:
12.5 ppg
334 psi
ChanQes for Annular
outer casing shoe test results
Description references outer
,ize is that drilled below outer
;timated TOC for Hole Depth.
Enter inner casing OOat right
Volume
Pumped
0.0 Bbls
30
. .
5 10 15 20 25
Shut-In time, Minutes
o PIT Point
o
2377 + 9.8
17.0
20
~
18
887
0.052 x
¡
16
~
(2377 Ft-TVD)
j
8 10
Barrels
14
=
12
= Leak-off Pressure + Mud Weight
0.052 x TVD
EMW at 3348 Ft-MD
6
2
000
500 -
o .
o
EMW
w
0::
:J
tJ)
tJ)
w
0::
D..
_LEAK-OFF TEST
18. EMW
shoe LOT =:
.....CASING TEST
10-6-04 Performed 9 5/8'
Comments
.
.
ConocJÃ,illips
ConocoPhillips Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
October 24, 2005
Alaska Oil and Gas Conservation Commission
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501
RECEIVED
OCT 2 4 2005
Re: Sundry Permit for Workover Operations, CD2-54
Alaska Oil & Gas Cons. Gomm¡t~¡Gí1
Anchorage
Dear Sir or Madam:
ConocoPhillips Alaska, Inc. hereby applies for a Sundry permit for well workover operations. It is
intended that Doyon 19 move to CD2-54 +/- October 26, 2005.
Currently the road to CD4 is not passable with the rig due to the warm weather. Therefore,
other wellwork is filling the time gap until the road is ready. CD2-54 has a slow tubing by inner
annulus leak that is seen during diagnostics. Further diagnostic work is going to be done in the
next two days to assure a workover is necessary. It is expected that we will be isolated from the
reservoir during workover operations with the existing packer and a plug in the tailpipe below
the packer, so the well will not need to be killed.
It is requested that the packer placement requirement be relaxed to place the completion packer +/- 300
ft TVD above the Alpine formation. This will place the completion at a maximum inclination less than 650
and allow access to the completion with standard wireline tools for future intervention.
Please find attached the information required by 20 ACC 25.005 (a) and (c) for your
review. Pertinent information attached to this application includes the following:
1. Form 10-403 APPLICATION for Sundry Approval (20 ACC 25.280)
2. Proposed operational procedure.
3. Proposed completion diagram.
Information pertinent to the application that is presently on file at the AOGCC:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold layout as
required by 20 ACC 25.035 (a) and (b).
2. A description of the drilling fluids handling system.
If you have any questions or require further information, please contact Liz Galiunas at
265-6247, Vern Johnson at 265-6081 or Chip Alvord at 265-6120.
Liz Galiunas
Drilling Engineer
.
Attachments
cc:
C02-51 Well File I Sharon Allsup Drake
Chip Alvord
Vern Johnson
Liz Galiunas
Chris Alonzo
Steve Moothart
Lanston Chin
.
ATO 1530
ATO 1700
ATO 1702
ATO 1704
ATO 1770
ATO-1756
Kuukpik Corporation
11/19/04
Schlumberger
NO. 3264
Schlumberger-DCS
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
Attn: Beth
Company: Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Alpine
.
Well
Job#
Log Description
Date
BL
Color
Prints
CD
2ol{-JS"OCD2-56
?p1(-/78 CD2-54
10942786 SCMT
10942788 SCMT
10/25/04
1 0/27/04
1
1
.
Please sign and return on
DATE:
j;f-
SIGNE~
py of this transmittal to Beth at the above address or fax to (907) 561-8367. Thank you.
MEMORANDUM
.
State of Alaska
.
Alaska Oil and Gas Conservation Commission
TO:
Jim ReggV Z(z41ò5
P.I. Supervisor "'11
DATE: Monday, January 03, 2005
SUBJECT: Mechanical Integrity Tests
CONOCOPlllLLIPS ALASKA INC
CO2-54
COLVILLE RIV UNIT CO2-54
~vLt~tfò
FROM:
JeffJones
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. suprv5Ba-
Comm
Well Name: COLVILLE RIV UNIT CO2-54 API Well Number: 50-103-20499-00-00 Inspector Name: Jeff Jones
Insp Num: miUJ041223 190045 Permit Number: 204-178-0 Inspection Date: 12/22/2004
Rei Insp Num:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well I CO2-54 Type Inj. S TVD I 7015 I IA I 1150 2150 I 2125 I 2120 I I
! I
P.T. I 2041780 TypeTest SPT Test psi i 1753.75 ¡ OA 400 450 i 450 I 450 I
Interval INITAL P/F P Tubing 1490 I 1490 I 1490 ! 1490 ¡
!
Notes: 1 well house inspected, no exceptions noted.
ßCANNED JAN 0 ~ 2007
tJ
NON-CONFIDENTIAL
...···~f
Monday, January 03, 2005
Page 1 of 1
.
~.1-- ~.~!
Alpine Drilling Team Leader
Drilling & Wells
ConocóPhillips
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6120
December 3, 2004
Commissioner
State of Alaska
Alaska Oil & Gas ConseNation Commission
333 West yth Avenue Suite 100
Anchorage, Alaska 99501
RECEIVED
DEC 0 7 2004
Alaska Oil & Gas Cons Comm· .
. IssIon
Anchorage
Subject: Well Completion Report for CD2-54 I CD2-54L 1
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the
recent drilling operations on the Alpine well CD2-54 and CD2-54L 1.
If you have any questions regarding this matter, please contact me at 265-6120.
Sincerely,
,A"'£ <- az
G. C. Alvord
Alpine Drilling Team Leader
CPAI Drilling and Wells
GCAlskad
(\
Kt::Ct::IVt:UI
. STATE OF ALASKA . DEC 0 7 2004
ALASKA Oil AND GAS CONSERVATION COMMISSI~~ Qil&AGn~ns. Commission
WELL COMPLETION OR RECOMPLETION REPb~T ~aIeOG
Oil D Gas U Plugged D Abandoned D Suspended D WAG rvf~,~ 1b. Well Class:
20AAC 2S.1 OS 20AAC 2S. 11 0 'f'f, \ Development D Exploratory D
WDSPL D No. of Completions _ Other Service 0 Stratigraphic TesD
12. Permit to Drill Number:
1a. Well Status:
GINJ D
WINJ
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. 0, Box 100360, Anchorage, AK 99510-0360
4a. Location of Well (Governmental Section):
Surface: 2103' FNL, 1498' FEL, Sec. 2, T11N, R4E, UM
At Top Productive
Horizon: 1031' FNL, 1153' FEL, Sec. 9, T11 N, R4E, UM
Total Depth:
1289' FSL, 2460'FEL, Sec. 4, T11N, R4E,UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 371737.5 ' y-
TPI: x- 361457 y-
Total Depth: x- 360188 y-
18. Directional Survey: Yes 0 NU
5974254
5970228
5972572
Zone-4
Zone-4
Zone-4
21. Logs Run:
GRlRes
22.
S. Date Camp., Susp.,
or Aband.: October 22, 2004
6. Date Spudded:
October 4, 2004
7. Date TD Reached:
October 16, 2004
8. KB Elevation (ft):
36.7' RKB I 52.6' AMSL
9. Plug Back Depth (MD + TVD):
16617' MD I 7350' TVD
10. Total Depth (MD + TVD):
, 16617' MD 17350' TVD
11. Depth where SSSV set:
Landing Nipple @ 2321'
19. Water Depth, if Offshore:
N/A
feet MSL
CASING SIZE
GRADE
H-40
J-55
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD
TOP BOTTOM TOP BOTTOM
36.7' 114' 36.7' 114'
36.7' 3348' 36.7' 2377'
34.7' 14378' 34.7' 7382'
WT. PER FT.
62.5#
36#
26#
16"
9.625"
7"
23. Perforations open to Production (MD + TVD of Top and Bottom
Interval, Size and Number; if none, state "none"):
openhole completion from 14378' -16617' md
26.
Date First Injection
Novernber 24,2004
Date of Test Hours Tested
nla
Flow Tubing
24.
SIZE
4.5"
204-178 I
13. API Number:
50-103-20499-00
14. Well Name and Number:
C02-54
1S. Field/Pool(s):
Colville River Field
Alpine Oil Pool
16. Property Designation:
ADL 380075, 387207
17. Land Use Permit:
ALK ASRCNPRA 02
20. Thickness of
Permafrost:
1790' MD
HOLE
SIZE
AMOUNT
PULLED
CEMENTING RECORD
42"
18 cu yds Portland Type III
487 sx AS Lite, 241 sx Class G
340 sx Class G
12.25 "
8.5"
TUBING RECORD
DEPTH SET (MD)
13065'
I PACKER SET
12992'
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
nla
2S.
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Production for OIL-BBL
Test Period -->
Casing Pressure
Calculated
OIL-BBL
press. psi
27.
24-Hour Rate ->
Injector
WATER-BBL
GAS-MCF
GAS-MCF
WATER-BBL
CHOKE SIZE
IGAS-OIL RATIO
CORE DATA
OIL GRAVITY - API (corr)
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
NONE
Form 10-407 Revised 12/2003
RBDMS BFL DEt 1 0 2004
Of?
CONTINUED ON REVERSE
/q:2Z_~g.f
;fD~.~
, ./
~ \./
28.
.
29.
.
FORMATION TESTS
GEOLOGIC MARKERS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested, and
attach detailed supporting data as necessary. If no tests were
conducted, state "None".
C02-54
Seabee Form.
Nanushak
Gamma Ray Shale
Kalubik
Kuparuk Formation
Miluveach
Top Alpine D
Top Alpine C
Base Alpine C
TD
3386'
6380'
12755'
13238'
13341 '
13464'
13850'
13933'
13957'
16617'
2395'
3836'
6907'
7121'
7163'
7208'
7321'
7337'
7341'
7350'
NIA
30. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey, MIT
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Vern Johnson @ 265-6081
Printed Name A c. AIV. ord
Signature ß' -( 0eZ.
Title:
Phone
Alpine Drillinq Team Leader
2G>~ -& I ¿o
Date
{¿(c.{~
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water
supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item
23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to
be separately produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other (explain).
Item 27: If no cores taken, indicate "none".
Item 29: List all test information. If none, state "None".
() F'
.\
L
Form 10-407 Revised 12/2003
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-54
CD2-54
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start:
Rig Release:
Rig Number:
Spud Date: 10/4/2004
End: 10/22/2004
Group:
10/3/2004
10/22/2004
19
101312004 08:00 - 16:00 8.00 MOVE MOVE MOVE
16:00 - 18:30 2.50 WELCTL NUND MOVE
18:30 - 19:00 0.50 DRILL PULD SURFAC
19:00 - 23:30 4.50 RIGMNT RGRP SURFAC
23:30 - 00:00 0.50 DRILL PULD SURFAC
10/4/2004 00:00 - 01 :30 1.50 DRILL PULD RIGUP
01 :30 - 02:00 0.50 DRILL OTHR RIGUP
02:00 - 02:30 0.50 DRILL SFTY RIGUP
02:30 - 02:45 0.25 DRILL PULD RIGUP
02:45 - 12:00 9.25 DRILL DRLG SURFAC
Rigged down and moved from C02-56 to CD2-54. Rigged up.
Accepted rig @ 1600 Hrs. 10/3/04. Nipple up riser and connect lines.
Picked up and stood back 8" flex monels and jars.
Attempted to adjust new Goose neck on top drive. Goose neck was too
long causing hose to protrude into alley way. Repaired old goose neck
and replaced new piece with repaired original goose neck.
Picked up BHA.
MU BHA #1: Bit, motor, FS, stab, XO, DM, HCIM, TM, UBHO - set ako
to 1.5 - scribe tools.
Fill hole, check for leaks - test mud lines to 3500 psi
Held Pre-Spud meeting with crew and support personnel.
Orientate UBHO sub - MU 8" flex collars and jars.
Drill 12 1/4" hole from 114' to 970' MD - 950" TVD
ADT - 4.18 hrs. = ART - 0.95 hrs. AST - 3.23 hrs.
WOB 25/35k RPM 60 GPM 500/1420 psi
Stringwt.-PU120 S0115 Rot 117
Torque on/off btm. - 7500/5500 ftllbs.
. Ran Gyro surveys @ 80', 170',258',348',437', & 526'.
12.00 DRILL DRLG SURFAC Drill 12 1/4' hole from 970' to 2806' MD - 2123' TVD
ADT - 7.51 hrs. = ART - 5.62 hrs. AST - 1.89 hrs.
WOB 25/35k RPM 60/77 GPM 650 12500 psi
String wt. - PU 135 SO 110 Rot 120
Torque onloff btm. - 8500/7500 ftllbs.
12:00 - 00:00
10/5/2004 00:00 - 06:00 6.00 DRILL DRLG SURFAC Drill 121/4' hole from 2806' to 3358' MD - 2382' TVD
ADT - 4.33 hrs. = ART - 3.92 hrs. AST - 0.41 hrs.
WOB 25/45k RPM 80 GPM 655/2490 psi
String wt. - PU 135 SO 120 Rot 128
Torque onloff btm. - 8500/6500 ftI1bs.
06:00 - 07:00 1.00 DRILL CIRC SURFAC Circ 2X bottoms up at 655 gpm - 2290 psi - 80 rpms. Std back 1 std
every 30 min.
07:00 - 12:00 5.00 DRILL WIPR SURFAC POH wI pump from 3191' to 1826' at 650 gpm - 2190 psi - 80 rpms.
Reduce rate to 550 gpm and POH to 975'. Minor pkg off and large
amount of cuttings at shakers.
12:00 - 13:00 1.00 DRILL WIPR SURFAC RIH to 3254'.
13:00 - 14:30 1.50 DRILL CIRC SURFAC Washed from 3254' to 3358' and circulated hole clean.
14:30 - 17:00 2.50 DRILL TRIP SURFAC POOH to BHA. Hole condition good.
17:00 - 18:30 1.50 DRILL PULD SURFAC Flushed and laid down BHA.
18:30 - 20:00 1.50 CASE RURD SURFAC Cleared floor and rigged up to run 9 5/8" casing.
20:00 - 23:30 3.50 CASE RUNC SURFAC PJSM and ran 45 Jts. 95/8" 36# BTC casing. Tight from 800' to 1200'.
23:30 - 00:00 0.50 CASE CIRC SURFAC CBU.
10/6/2004 00:00 - 00:45 0.75 CASE RUNC SURFAC RIH w/9 5/8" csg f/1875' to 2715'.
00:45 - 01 :00 0.25 CASE CIRC SURFAC Circ 50 bbls mud at 5 bpm at 380 psi.
01 :00 - 01 :45 0.75 CASE RUNC SURFAC RIH w/9 5/8' csg to 3309'. MU hanger. Land csg at 3348'.
01 :45 - 02:15 0.50 CASE RURD SURFAC RD Franks fill up tool. Blow down top drive. RU cement head and lines.
02:15 - 03:30 1.25 CEMENTCIRC SURFAC Circ and condition mud. 7 bpm at 348 psi.
Printed: 11/9/2004 3:58:31 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-54
CD2-54
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start:
Rig Release:
Rig Number:
Spud Date: 10/4/2004
End: 10/22/2004
Group:
10/3/2004
10/22/2004
19
10/6/2004
03:30 - 03:45
03:45 - 05:30
05:30 - 06:15
06:15 - 07:00
07:00 - 08:00
08:00 - 09:45
09:45 - 10:30
10:30 - 13:00
13:00 - 13:30
13:30 - 18:00
0.25 CEMENTSFTY SURFAC
1.75 CEMENT PUMP SURFAC
0.75 CEMENTDISP
SURFAC
0.75 CASE DEQT
1.00 CASE RURD
1.75 CASE OTHR
0.75 WELCTL NUND
2.50 WELCTL NUND
0.50 WELCTL BOPE
4.50 WELCTL BOPE
SURFAC
SURFAC
SURFAC
SURFAC
SURFAC
SURFAC
SURFAC
18:00 - 18:30 0.50 WELCTL BOPE SURFAC
18:30 - 20:00 1.50 RIGMNT RSRV SURFAC
20:00 - 21 :00 1.00 DRILL PULD SURFAC
21 :00 - 23:30 2.50 DRILL PULD SURFAC
23:30 - 00:00 0.50 DRILL RIRD SURFAC
10/7/2004 00:00 - 01 :00 1.00 DRILL TRIP SURFAC
01 :00 - 02:30 1.50 DRILL PULD SURFAC
02:30 - 05:45 3.25 DRILL PULD SURFAC
05:45 - 07:15 1.50 DRILL TRIP SURFAC
07:15 - 07:45 0.50 DRILL REAM SURFAC
07:45 - 09:30 1.75 CEMENTDSHO SURFAC
09:30 - 09:45 0.25 DRILL DRLG SURFAC
09:45 - 10:15
10:15-11:00
11 :00 - 11 :45
11 :45 - 00:00
10/8/2004
00:00 - 12:00
12:00 - 00:00
0.50 CEMENTCIRC
0.75 CEMENT FIT
0.75 DRILL CIRC
12.25 DRILL DRLG
SURFAC
SURFAC
INTRM1
INTRM1
PJSM on cementing surface csg.
Pump 40 bbls biozan I nut plug spacer and 10 bbls CW100. Test lines
to 2500 psi. Pump 30 bbls CW1 00, drop bottom plug, 50 bbls 10.5 mud
push, 386 bbls 10.7 lead cement and 50 bbls 15.8 tail cement. Drop top
plug.
Pump 20 bbls H20. Switch to rig pumps and displace with 9.6 mud.
Plug bumped. Floats OK. Approx 142 bbls cement to surface.
Test csg to 2500 psi f/30 mins.
RD csg equipment.
PJSM. RD surface riser equipment.
NU well head. Test MTM seal to 1000 psi.
Nipple up BOP.
Spot Geo Span and set test plug.
PJSM - RU & test BOPE - Hydril to 250 & 3500 psi - Pipe rams, blind
rams, choke & kill lines valves, choke manifold valves, TD IBOP, floor
safety & dart valves to 250 & 5000 psi - performed accumulator closure
test - witnessing of test waived by Lou Gramaldi AOGCC - Pull test
plug.
Blew down lines and set wear bushing.
Slipped and cut drilling line. Adjusted brakes.
RIH 4 stands 5' HWDP and 1 stand 5" DP. POOH and Lay down
same.
Picked up and RIH with 93 Jts. 4" DP.
Rigged up to pull and stand back drill pipe.
POOH and stood back 4" DP.
Picked up and stood back 33 Jts. 4' DP from pipe shed.
Picked up BHA #2 and RIH.
RIH with 5" DP to 3142'.
Washed down to top of cement @ 3235'.
Drilled out shoe track and cleaned out rat hole to 3358'.
Drill 8 1/2" hole from 3358' to 3378' MD - 2391' TVD
ADT - .3 hrs. = ART - .3 hrs. AST - 0 hrs.
WOB 10k RPM 70 GPM 635/1540 psi
String wt. - PU 150 SO 100 Rot 125
Torque on/off btm. - 10000/9000 ftIIbs.
CBU.
Did FITto 18 PPG EMW.
Changed out mud system to LSND mud.
Drill 8 1/2" hole from 3378' to 4951' MD - 3130' TVD
ADT -7.8 hrs. = ART -7.8 hrs. WOB 10/15k RPM 160 GPM 650
12300 psi
String wt. - PU 150 SO 105 Rot 125
Torque on/off btm. - 12000/11000 ftllbs.
12.00 DRILL DRLG INTRM1 Drill 8 1/2' hole from 4951' to 6367' MD - 3832' TVD
ADT - 8.02 hrs. WOB 10/25k RPM 170 GPM 651/3040 psi
String wt. - PU 165 SO 120 Rot 140
Torque on/off btm. - 10000/10000 ftllbs.
ECD 10.9 - 11.6
12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 6367' to 7660' MD - 4430' TVD
ADT -7.38 hrs. WOB 20/25k RPM 170 GPM 651/2860 psi
Printed: 11/912004 3:58:31 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-54
CD2-54
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start: 10/3/2004
Rig Release: 10/22/2004
Rig Number: 19
Spud Date: 10/4/2004
End: 10/22/2004
Group:
10/8/2004 12:00 - 00:00 12.00 DRILL DRLG INTRM1 String wt. - PU 200 SO 120 Rot 150
Torque on/off btm. - 12000/11000 ftIlbs.
ECD 10.9 - 11.1
10/9/2004 00:00 - 12:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 7660' to 9066' MD - 5112' TVD
ADT - 8.22 hrs. WOB 20/25k RPM 170 GPM 651/3400 psi
String wt. - PU 210 SO 125 Rot 160
Torque on/off btm. - 14000/13500 ftIlbs.
ECD 10.5 - 10.8
12:00 - 00:00 12.00 DRILL DRLG INTRM1 Drill 81/2" hole from 9066' to 10425' MD - 5770' TVD
ADT - 8.78 hrs. WOB 17/25k RPM 170 GPM 651/3400 psi
String wt. - PU 220 SO 135 Rot 168
Torque on/off btm. - 15000/14500 ftIlbs.
ECD 10.5 - 10.8
1 0/1 0/2004 00:00 - 10:30 10.50 DRILL DRLG INTRM1 Drill 8 1/2" hole from 10425' to 11606' MD - 6344' TVD
ADT - 7.8 hrs. WOB 25k RPM 170 GPM 651/3440 psi
String wt. - PU 230 SO 140 Rot 180
Torque on/off btm. - 17500/17000 ftIIbs.
ECD 10.5 - 10.8
10:30 - 12:00 1.50 RIGMNT RGRP INTRM1 POOH 1 stand. Changed out swivel packing. RIH to 11606'.
12:00 - 00:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 11606' to 12810' MD - 6933' TVD
ADT - 8.4 hrs. WOB 17/25k RPM 170 GPM 626/3760 psi
String wt. - PU 235 SO 145 Rot 185
Torque on/off btm. - 16000/14000 ftIlbs.
ECD 10.5 - 10.8
10/11/2004 00:00 - 16:30 16.50 DRILL DRLG INTRM1 Drill 8 1/2" hole from 12810' to 14388' MD - 7382' TVD
ADT - 12.1 hrs. WOB 17/25k RPM 130 GPM 626/3950 psi
String wt. - PU 250 SO 135 Rot 187
Torque on/off btm. - 17000/14500 ftIIbs.
ECD 10.5 - 10.8
16:30 - 19:00 2.50 DRILL CIRC INTRM1 Pumped sweep and circulated hole clean. Flow checked well.
19:00 - 22:00 3.00 DRILL WIPR INTRM1 Backreamed out from 14388' to 12595'. 60 RPM 500 GPM.
22:00 - 23:00 1.00 DRILL WIPR INTRM1 RIH to 14300' and washed to 14388'.
23:00 - 00:00 1.00 DRILL CIRC INTRM1 Pumped sweep and circulated.
10/12/2004 00:00 - 00:45 0.75 DRILL CIRC INTRM1 Circ and condition mud at 600 gpm - 3970 psi - 140 rpm.
00:45 - 03:30 2.75 DRILL WIPR INTRM1 POH wI pump from 14,388' to 12,586' at 500 gpm - 50 rpm. Minor
packoff through HRZ.
03:30 - 04:30 1.00 DRILL WIPR INTRM1 RIH to 14,300'. String took 15k-25k wt in various spots from 13,215' to
13,874'.
04:30 - 06:30 2.00 DRILL CIRC INTRM1 Pump hi-vis sweep. Wash to 14,388'. Increase mud wt to 9.8 ppg. Spot
lube pill to bit.
06:30 - 11 :30 5.00 DRILL TRIP INTRM1 POH spotting lube pill in open hole from 14,388' to 12,491'. POH on trip
tank to 10,581'. Minor swabbing.
11 :30 - 12:00 0.50 DRILL CIRC INTRM1 Circ at 500 gpms and 140 rpms to clear BHA Blow down top drive.
12:00 - 16:00 4.00 DRILL TRIP INTRM1 Flow check (static) - POOH on TT f/10,581' to 9150' (pumped dry job)
Continue POOH on TT f/9150' to 7622' - Hole began swabbing @
7650'
16:00 - 17:00 1.00 DRILL CIRC INTRM1 Circulate bottoms up @ 7622' - 600 GPM @ 2750 psi wI 130 RPM
Printed: 11/9/2004 3:58:31 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-54
CD2-54
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start:
Rig Release:
Rig Number:
10/3/2004
10/22/2004
19
Spud Date: 10/4/2004
End: 10/22/2004
Group:
10/12/2004 17:00 - 17:30 0.50 DRILL TRIP INTRM1 Flow check (static) POOH on TT f/7622' to 7431' (hole swabbing)
17:30 . 19:30 2.00 DRILL TRIP INTRM1 POOH wI pump f/7431' to 6286' - 420 GPM @ 1350 psi
19:30 . 20:30 1.00 DRILL CIRC INTRM1 Flow check (static) Circulate bottoms up f/6286' 610 GPM @ 2530 psi
wI 120 RPM
20:30 - 00:00 3.50 DRILL TRIP INTRM1 Flow check (static) Continue to POOH on TT f/6286' to 3138' - hole
taking proper fill - worked through several tight spots f/6130' to 3950'-
pulled 15 to 40 over
10/13/2004 00:00 - 00:30 0.50 DRILL OTHR INTRM1 Change over mud bucket, elevators and iron roughneck to 5".
00:30 - 02:00 1.50 DRILL TRIP INTRM1 POH. Std back 5" DP and HWDP. LD jars and ghost reamers.
02:00 - 04:15 2.25 DRILL PULD INTRM1 LD BHA #2. Download MWD.
04:15 - 04:45 0.50 DRILL RIRD INTRM1 Rig down Geo-span unit.
04:45 - 05:15 0.50 DRILL OTHR INTRM1 Pull wear bushing.
05:15 - 07:15 2.00 WELCTL EQRP INTRM1 PJSM. Change top pipe rams to 7". Test rams tp 5000 psi. Instal thin
wear bushing.
07:15 - 08:00 0.75 CASE RURD INTRM1 Rig up csg equipment.
08:00 - 08:15 0.25 CASE SHY INTRM1 PJSM on running 7" csg.
08:15 - 12:30 4.25 CASE RUNC INTRM1 Run 7" 26# L-80 BTCM casing as follows: FS( Ray Oil Tools Siver
bullet) 2 jts. - Fe ( Weatherford) 2 jts.( first 4 connections made up wI
BakerLoc - Filled pipe & checked floats) 96 jts. ( 100 jts. total) to 4167' -
PU wt. 155 SO wt. 120
12:30 - 13:00 0.50 CASE CIRC INTRM1 Circ 1 csg volume at 5 bpm and 350 psi.
13:00 - 17:30 4.50 CASE RUNC INTRM1 Continue running 7' casing fl 4160' to 8375' ( 200 jts. total)
17:30 - 18:30 1.00 CASE CIRC INTRM1 Break circulation & stage pumps up to 4 bbls/min - Circulate bottoms
up + ICP 610 psi FCP 460 psi
18:30 - 23:00 4.50 CASE RUNC INTRM1 Continue running 7" casing f/8375' to 12,645' (301 jts. total)
PU wt. 350 SO wt. 150
23:00 - 00:00 1.00 CASE CIRC INTRM1 Break circulation @ 2 bbl/min - Stage pump up to 3 bbls/min ICP- 750
psi - Circulate & condition mud & hole
10/14/2004 00:00 - 01:15 1.25 CASE CIRC INTRM1 Circ and condition mud. Stage pumps from 3 to 4 bpm. FCP - 350 psi.
Up wt - 310k. Dn wt - 150k.
01 :15 - 03:45 2.50 CASE RUNC INTRM1 Continue running 7" casing f/12,645' to 14,354' (341 jts. total). MU
hanger and land csg wI shoe @ 14,378' FC @ 14,291'. Dn wt - 150k.
No hole problems.
03:45 - 04:15 0.50 CASE RURD INTRM1 LD Franks fill up tool. Blow down top drive. RU cement head and lines.
04:15 - 07:30 3.25 CEMENTCIRC INTRM1 Circ and condition mud. Stage pumps from 1 to 4.5 bpm. FCP - 620
psi. Picked up to 450k with no pipe movement. Reland csg.
07:30 - 07:45 0.25 CEMENT SHY INTRM1 PJSM on cementing csg.
07:45 - 08:30 0.75 CEMENT PUMP INTRM1 Pump 5 bbls CW100. Test lines to 3700 psi. Pump 45 bbls CW100 and
30 bbls 10.5 mudpush. Drop bottom plug. Pump 70 bbls 15.8 cement.
08:30 - 10:00 1.50 CEMENT DISP INTRM1 Drop top plug. Pumped 20 bbls H20. Switch to rig pump a and
displaced cement with 531 bbls 9.8 mud. Bumped plug. Floats OK.
100% returns through out job.
10:00 - 10:45 0.75 CASE DEQT INTRM1 Test csg to 3500 psi for 30 mins.
10:45 - 11 :30 0.75 CASE RURD INTRM1 Rig down csg equipment. LD LJ.
11 :30 - 12:00 0.50 DRILL OTHR INTRM1 Pull wear bushing. Install 95/8" x 7" packoff & Test to 5000 psi for 10
mins.
12:00·12:30 0.50 DRILL OTHR INTRM1 LD casing equipment fl rig floor
12:30 - 13:30 1.00 DRILL OTHR INTRM1 Change top pipe rams f/7" to 3 1/2" x 6" VBR
13:30 - 17:30 4.00 WELCTL BOPE INTRM1 PJSM - RU & test BOPE - tested pipe rams,blind rams, choke & kill line
valves, choke manifold valves, Td IBOP's, floor safety & dart valves to
250 psi & 5000 psi - Hydril to 250 & 3500 psi - Performed accumulator
closure test - Wittnessing of test waived by John Crisp AOGCC . RD
17:30 - 18:00 0.50 DRILL OTHR INTRM1 Install wear bushing
Printed: 11/912004 3:58:31 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-54
CD2-54
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start:
Rig Release:
Rig Number:
10/3/2004
10/22/2004
19
Spud Date: 10/4/2004
End: 10/22/2004
Group:
10/14/2004 18:00 - 18:30 0.50 DRILL OTHR INTRM1 RU to lay down 5" DP - PU drilling bails & 5" DP elevators - Change out
dies in Iron roughneck
18:30 - 22:00 3.50 DRILL PULD INTRM1 LD 5" DP fl derrick(prep for rig move) using mouse hole - change
handling equipment to 4"
22:00 - 00:00 2.00 DRILL PULD INTRM1 MU BHA # 3 ( 6 1/8") Adjust motor to 1.15 bend - change stab sleeve -
MU bit - Up load MWD
10/15/2004 00:00 - 00:30 0.50 DRILL PULD INTRM1 Program MWD. MU De's and HWDP. Shallow test MWD.
00:30 - 06:00 5.50 DRILL TRIP INTRM1 PU and RIH w/210 jts 4" DP to 7046'. Fill pipe every 2000'.
06:00 - 09:00 3.00 DRILL TRIP INTRM1 Continue RIH wI 4" DP from derrick to 14,108'.
09:00 - 10:30 1.50 RIGMNT RSRV INTRM1 Slip and cut drlg line. Service top drive.
10:30 - 14:00 3.50 CEMENT DSHO INTRM1 Wash to TOC at 14,282'. Drill! out cement, float equipment and 20' new
formation to 14,408'.
14:00 - 16:00 2.00 DRILL CIRC INTRM1 Change well over to 9.2 ppg FloPro drill in fluid - Monitor well - static -
blow down TD
16:00 - 17:00 1.00 DRILL FIT INTRM1 RU & perform FIT to 12.5 ppg EMW wI 1260 psi surface pressure wI
9.2 ppg mud @ 7282' TVD - RD
17:00 - 00:00 7.00 DRILL DRLH PFlOD Drill 6 1/8" horizontal section f/14,408' to 14,920' MD - 7382' TVD
ADT - 4A 1 hrs. = ART - 3.58 hrs. AST - .83 hrs.
WOB - 6/8 k RPM 90 GPM 220 @ 2250 psi
String wt. PU 230 So 135 Rot. 177
Torque onloff btm. - 13,500/13,500ftllbs.
ECD - 10.3 to 10A
10/16/2004 00:00 - 12:00 12.00 DRILL DRLH PFIOD Drill61/8" horizontal section f/14,920' to 15,731' MD 7372' TVD
ADT- 7.81 hrs. = ART - 7.02 hrs. AST - .79 hrs.
WOB 6/8 k RPM 90 GPM 220 @ 2400 psi I
String wt. PU 220 SO 140 Rot 175 /¿ f1 þ~
Torque on/off btm. - 12,500/12,000 ftlbs. I" I ' iZ/{'v4
ECD - 10.8 ppg /
12:00 - 00:00 12.00 DRILL DRLH PFIOD Drill61/8" horizontal section f/15,731' tO~MD 7350' TVD
ADT - 8.1 hrs. = ART - 7.85 hrs. AST - : 5 hrs.
WOB 6/9 k RPm 90 GPM 220 @ 2490 psi
String wt. PU 225 SO 135 Rot. 175
Torque on/off btm. - 13,000/12,000 ftIlbs.
ECD - 10.8 ppg
10/17/2004 00:00 - 00:30 0.50 DRILL DRLG PFIOD Bit would not drill past 16,617'.
00:30 - 02:00 1.50 DRILL TRIP PFIOD Pump out of hole f/16,617' to 16,022' at 4.2 bpm - 1450 psi - 50 rpm.
No hole problems. Will attempt lowside sidetrack.
02:00 - 02:30 0.50 DRILL DRLG PFlOD Trough from 16,022' to 16,054'. Did not build ledge.
02:30 - 10:30 8.00 DRILL DRLG PFIOD Attempt rotating sidetrack from 16,054' to 16,072' at 5.4 bpm - 2200 psi
- 80 rpm. No success.
10:30 - 13:00 2.50 DRILL CIRC PFlOD Circ and increase mud wt from 9.2 to 9A for trip out of hole - 5.2 BPM
@ 2150 psi wI 80 rpm
13:00 - 15:30 2.50 DRILL TRIP PROD Flow check (static) - POOH wI pump f/16,072' to 14,300 (7" casing) - 4
BPM @ 1360 psi wI 50 rpm
15:30 - 18:30 3.00 DRILL TRIP PROD Monitor well @ 7" casing shoe (15 mins. - slight drop in fluid level) -
Continue POOH wI pump f/14,300' to 12,295' - 4 BPM @ 1100 psi
18:30 - 00:00 5.50 DRILL TRIP PROD Monitor well (static) - POOH on TT f/12,295' to 3800' - hole taking
proper fill
10/18/2004 00:00 - 01 :30 1.50 DRILL TRIP PROD POH f/3800' to 370'. Flow check at 3500' & 370' - Hole static
01 :30 - 02:00 0.50 DRILL PULD PROD Std back De's. Download MWD. LD motor. Left short section of drive
shaft, bearing and bit in hole.
02:00 - 03:00 1.00 DRILL PULD PROD PU new motor and bit. Orient and program MWD.
03:00 - 10:00 7.00 DRILL TRIP PROD RIH wI BHA. Shallow test MWD. Cont' RIH wI 4" DP to 14,200'. Fill pipe
Printed: 11/9/2004 3:58:31 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-54
CD2-54
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start:
Rig Release:
Rig Number:
10/3/2004
10/22/2004
19
Spud Date: 10/4/2004
End: 10/22/2004
Group:
10/18/2004 03:00 - 10:00 7.00 DRILL TRIP PROD every 2000'.
10:00 - 11 :30 1.50 RIGMNT RSRV PROD Slip and cut driling line. Service top drive.
11 :30 - 12:30 1.00 DRILL TRIP PROD RIH wI 4" DP to 16,017'.
12:30 - 21 :30 9.00 DRILL DRLH PROD Wash down 1/16,017' to 16054' - OH sidetrack well - Time drill 11
16,054' to 16,075' - 223 GPM @ 2150 psi wI 80 RPM . See drilling
time below
21 :30 - 00:00 2.50 DRILL DRLH PROD Drill 6 1/8" horizontal section f/16,075' to 16,130' MD 7320' TVD
ADT - 9.9 hrs. = ART - 9.7 hrs. AST - .2 hrs
WOB 3/6 k RPM 80 GPM 220 @ 2250 psi
String WI. PU 220 SO 145 Rot 177
Torque on/off btm - 11,500/10,000 ftllbs.
ECD 10.5 to 10.6 ppg
10/19/2004 00:00 - 08:15 8.25 DRILL DRLH PROD Drill 6 1/8" horizontal section f/16, 130' to 16,617' MD
. End of trouble time associated wI motor failure
. See below for parameters
08:15 - 12:00 3.75 DRILL DRLH PROD Drill 6 1/8" horizontal section f/16,617' to 16,782' MD -7360' TVD
ADT - 7.42 hrs. = ART - 6.69 hrs. AST - .73 hrs.
WOB 6/16 k RPM 80 GPM 220 @ 2450 psi
String WI. PU 220 SO 140 Rot 180
Torque on/off btm. - 12,500/12,000 ft.llbs.
ECD - 10.8 to 11.0 ppg
12:00 - 00:00 12.00 DRILL DRLH PROD Drill 6 1/8" horizontal section 1/16,782' to 17,638' MD -7359' TVD
ADT - 9.71 hrs. = ART - 8.39 hrs. AST - 1.32 hrs.
WOB 8/12 k RPM 70 GPM 220 @ 2700 psi
String WI. PU 225 SO 130 Rot 174
Torque on/off btm. - 13,500/12,000 ft.llbs.
ECD - 10.9 to 11.0 ppg
10/20/2004 00:00 - 10:00 10.00 DRILL DRLH PROD Drill 6 1/8" horizontal section 1/17,638' to 18,250' MD -7322' TVD
ADT - 6.83 hrs. = ART - 6.68 hrs. AST - 0.15 hrs.
WOB 6/10 k RPM 80 GPM 220 @ 2750 psi
String WI. PU 225 SO 130 Rot 175
Torque on/off btm. - 14,500/13,000 ft.llbs.
ECD -10.9 to 11.0 ppg
10:00 - 13:00 3.00 DRILL CIRC PROD Pumped 40 bbls high vis sweep - Circ hole clean - 215 gpm 12420/80
rpm - Staged out 3 stands to 18,019' - while preparing for change over
to brine. PJSM
13:00 - 16:00 3.00 DRILL OTHR PROD Flow check well - static. Pumped 40 bbls high vis spacer and change
well over to 9.4 ppg brine. Observe well, losing> 60 bph
Mix and spot 40 bbls high vis pill across open hole. Set back 1 stand.
16:00 - 17:30 1.50 DRILL TRIP PROD Monitor well, static losses - 30 bph - POOH on trip tank from 17,924' to
16,495'
17:30 - 18:00 0.50 DRILL CIRC PROD Monitor well static losses 17 to 20 BPH - Spot LCM pill @ 5.2 BPM @
1720 psi wI 80 rpm
18:00 - 21 :00 3.00 DRILL TRIP PROD Continue to POOH on TT f/16,495' to 14,300' - string WI. PU 265 SO
140 - Monitor well 10 mins. @ 7" shoe - lose rate 3 BPH - Continue to
POOH on TT to 12,770'
21 :00 - 21 :30 0.50 DRILL OBSV PROD Monitor well - lose rate 3 BPH - Pumped dry job - Blow down TD
21 :30 - 00:00 2.50 DRILL TRIP PROD POOH laying down 4" DP f/12, 770' to 10,100'
10/21/2004 00:00 - 06:00 6.00 DRILL TRIP PROD POOH laying down 4" DP f/10,100' to 370'.
Static losses < 10 bph.
06:00 - 08:30 2.50 DRILL PULD PROD Lay down hwdp, nmdc's - download LWD - LD MWD tools, motor and
bit.
08:30 - 09:30 1.00 CMPL TN RURD CMPL TN Pull rear bushing and RU to run 4 1/2" tubing. Static losses to hole @ 6
Printed: 11/9/2004 3:58:31 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-54
CD2-54
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start:
Rig Release:
Rig Number:
10/3/2004
10/22/2004
19
Spud Date: 10/4/2004
End: 10/22/2004
Group:
10/21/2004 08:30 - 09:30
09:30 - 09:45
09:45 - 21 :00
1.00 CMPL TN RURD CMPL TN bph.
0.25 CMPL TN SFTY CMPL TN Held pre-Job safety and Opts meeting with crew.
11.25 CMPL TN RUNT CMPL TN Ran 41/2" completion as follows: WLEG - 41/2" 12.6# L-80 IBTM pup
jt - 41/2" XN nipple - 1 it 41/2" 12.6# L-80 IBTM tbg - 41/2" 12.6#
L-80 IBTM pup it. - Baker Premier packer - 41/2" 12.6# L-80 IBTM pup
jt. - 2 jt. 4 1/2" 12.6# L-80 IBTM tbg - 41/2" 12.6# L-80 IBTM pup it. -
Cameo GLM wI dummy valve - 41/2" 12.6# L-80 IBTM pup it. - 245 its.
41/2" 12.6# L-80 IBTM tbg - Cameo 41/2" DB nipple - 53 jts. 4 1/2"
12.6# L-80 IBTM tbg. (301 jts. total) MU FMC tbg hanger & landing it
A. - Land tbg in wellhead wI tail @ 13,064.80' - XN nipple @ 13,052.43'
- Packer @ 12,991.71' - GLM @ 12,877.84' & DB nipple @ 2321'
String wt - PU 180 SO 120
Run in locked downs - LD landing jt. A - set TWC - MU landing jt. B -
Test hanger seals to 5000 psi - LD landing jt. B
NO BOPE - Change out saver sub in TD
NU Tree
RU lubricator - test tree and lubricator to 5000 psi - pull TWC
RU circulating manifold and hard lines to wellhead.
PJSM. Test lines to 2500 psi - pumped 194 bbls of 9.6 ppg brine - 3
bpm 1300 psi initial - 230 psi FCP.
Line up to Dowell - test lines to 4300 psi - Pumped 248 bbls of diesel
down tubing (tubing volume + 2000' tvd ann volume).
RU lubricator, drop setting ball I rod - RD lubricator, test lines to 4500
psi.
Set packer, test tubing to 3570 psi, bled to 3496 in 30 minutes - test 7"
X 4 1/2" annulus to 3500 psi, bled to 3378 psi in 30 minutes.
Flush, blow down and RD circ lines and manifold. RU FMC lubricator
and install BPV, RD lubricator, dress and secure wellhead.
Held Pre-Job safety meeting for laying down drill pipe.
Lay down 186 joints of 4" drill pipe from derrick for Pad to Pad move.
Release rig to well CD1-11 @ 1500 hrs.
21 :00 - 22:00 1.00 CMPL TN OTHR CMPL TN
22:00 - 23:30 1.50 CMPLTN NUND CMPL TN
23:30 - 00:00 0.50 CMPL TN NUND CMPL TN
10/22/2004 00:00 - 00:30 0.50 CMPL TN NUND CMPL TN
00:30 - 01 :00 0.50 CMPL TN OTHR CMPL TN
01 :00 - 02:30 1.50 CMPL TN CIRC CMPL TN
02:30 - 04:30 2.00 CMPL TN FRZP CMPL TN
04:30 - 05:00 0.50 CMPL TN PCKR CMPL TN
05:00 - 06:30 1.50 CMPL TN DEQT CMPL TN
06:30 - 08:00 1.50 CMPL TN OTHR CMPL TN
08:00 - 08:15 0.25 CMPL TN SFTY CMPL TN
08:15 - 15:00 6.75 CMPLTN OTHR CMPL TN
Printed: 11/9/2004 3:58:31 PM
ST AIf rn: ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
E-Mail to;Tom_Maunder@admin.state.ak.usandBob_Fleckenstein@admin.state.ak.us
OPERATOR: ConocoPhillips
FIELD / UNIT / PAD:
Alpine I CD2
DATE:
10/22/2004
PTD: 204-178 N Diese/ 7,015 0 3,570 3,538 3,496 5:24 AM X
Well #: CD2..54 P Brine 12,995 7",26#, L-80 4.5" 0 0 0 0
COMMENTS: .
PTD: 204-178
Well #: CD2-54
COMMENTS:
N
14.5" I
3500
P
Diese/
Brine
7,015
12,992
1,450
800
1,800
3,500
7", 26#, L-80
PTD:
Well #:
COMMENTS:
o
PTD:
Well #:
COMMENTS:
o
PTD:
Well #:
COMMENTS:
o
TBG. INJ. FLUID CODES
F = FRESH WATER INJ.
G = GAS INJ.
S = SALTWATER INJ.
N = NOT INJECTING
TEST TYPE:
M = ANNULUS MONITORING
P = STD ANNULUS PRE$SURE TEST
R = INTERNAL RAD. TRACER SURVEY
A = TEMPERATURE ANOMALY TEST
D = DIFFERENTIAL TEMPERATURE TEST
ANNULAR FLUID: P.P.G.
DIESEL 6.8
GLYCOL
SALTWATER 9.6
DRILLING MUD
OTHER
Distribution:
orig - Well File
c - Operator
c - Database
c - Trip Rpt File
c - Inspector
OPERATOR REP SIGNATURE:
, AOGCC REP SIGNATURE:
CD2-54 MIT
1,800
3,422
16:00 AM 1 X 1
1,800
3,378
I I
I I
--
Grad.
0.35
0.00
0.50
0.00
0.00
WELL TEST:
Initial X
4 - Year
W orkover
Other
(Rev 9/23/99)
.
.
13-Nov-04
AOGCC
Robin Deason
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-54
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
16,617.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date / ç' 111 G \J)J\'& c/
Signed
7LJ {J/ú}
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
ConocoPhillips Alaska, Inc.
Alaska North Slope
North Slope, Alaska
CD2-54
.
Job No. AKZZ3317391, Surveyed: 16 October, 2004
Survey Report
11 November, 2004
Your Ref: API 501032049900
Surface Coordinates: 5974254.19 N, 371737.50 E (70020' 16.4215" N, 208057' 33.3157" E)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Kelly Bushing Elevation: 52.28ft above Mean Sea Level
.
Si-t-I ,raY-Sui""
CFt I L. L".IN cf. "5 Ii: RV I c: e 5
A Halliburton Company
Survey Ref: svy449
ConocoPhillips Alaska, Inc.
Survey Report for CD2-54
Your Ref: API 501032049900
Job No. AKZZ3317391, Surveyed: 16 October, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northin9s Eastin9s Northings Eastin9s Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
0.00 0.000 0.000 -52.28 0.00 0.00 N 0.00 E 5974254.19 N 371737.50 E 0.00 CB-SS-Gyro
80.00 0.700 186.000 27.72 80.00 OA9S 0.05W 5974253.70 N 371737A4 E 0.875 0.07
170.00 1.400 230.000 117.70 169.98 1.74 S 0.95W 5974252A7 N 371736.52 E 1.133 1.02
258.00 3.500 243.000 205.62 257.90 3.658 4.17W 5974250.61 N 371733.27 E 2A53 4.31
348.00 6.400 244.000 295.27 347.55 7.10 S 11.13 W 5974247.28 N 371726.25 E 3.224 11.40
437.00 9.700 251.000 383.39 435.67 11.71 S 22.68 W 5974242.87 N 371714.63 E 3.861 23.12 MWD+IIFR+MS+SAG .
526.00 13.900 251.000 470.49 522.77 17.64 S 39.88 W 5974237.24 N 371697.32 E 4.719 40.54
565.34 14.660 247A60 508.61 560.89 21.08 8 48.95 W 5974233.95 N 371688.20 E 2.942 49.74
654.45 16.680 241 A20 594.41 646.69 31.53 S 70.60 W 5974223.88 N 371666.37 E 2.911 71.78
744.92 18.260 245A80 680.71 732.99 43.62 S 94.90 W 5974212.20 N 371641.87 E 2.205 96.53
834.55 20.340 242.230 765.30 817.58 56.71 8 121 A6 W 5974199.57 N 371615.09 E 2.611 123.59
922.67 21.710 241.130 847.55 899.83 71.71 S 149.28 W 5974185.04 N 371587.01 E 1.618 151.98
1017.73 23.520 238.750 935.30 987.58 90.04 8 180.90 W 5974167.25 N 371555.09 E 2.133 184.29
1113.31 27.280 241.080 1021.63 1073.91 110.54 S 216.39 W 5974147.37 N 371519.25 E 4.070 220.56
1208.34 32.150 243.300 1104.14 1156A2 132A58 258.07 W 5974126.18 N 371477.21 E 5.253 263.07
1303.91 34.610 242.020 1183.94 1236.22 156.61 S 304.76 W 5974102.82 N 371430.11 E 2.677 310.67
1399.21 36.750 242.890 1261.34 1313.62 182.30 S 354.04 W 5974077.97 N 371380.39 E 2.308 360.93
1493.37 39.900 241.960 1335.21 1387.49 209.348 405.79 W 5974051.82 N 371328.19 E 3A01 413.69
1589.81 42.380 240.500 1407.83 1460.11 239.89 S 461.39 W 5974022.22 N 371272.08 E 2.758 470.45
1684.84 45.070 241.040 1476.50 1528.78 271.968 518.70 W 5973991.1 5 N 371214.22 E 2.858 528.98
1779.31 48.030 241.560 1541.46 1593.74 304.88 S 578.86 W 5973959.25 N 371153.51 E 3.159 590.38
1874A3 51.000 241.760 1603.21 1655.49 339.22 S 642.53 W 5973926.01 N 371089.26 E 3.126 655.35
1969.87 55A80 241.820 1660.31 1712.59 375.35 8 709.89 W 5973891.04 N 371021.29 E 4.694 724.08 .
2064.22 58.700 241.950 1711.57 1763.85 412.67 S 779.74 W 5973854.92 N 370950.81 E 3A15 795.34
2159.41 61.200 242.510 1759.23 1811.51 451.05 S 852.65 W 5973817.79 N 370877.26 E 2.675 869.70
2253.90 61 A40 242.000 1804.58 1856.86 489.65 8 926.01 W 5973780A5 N 370803.25 E 0.537 944.52
2349.45 61.560 242.150 1850.17 1902.45 528.97 S 1000.21 W 5973742AO N 370728.39 E 0.187 1020.20
2444.88 61 A20 241 .820 1895.72 1948.00 568.36 S 1074.24 W 5973704.29 N 370653.70 E 0.337 1095.72
2540.14 61 A80 241.520 1941.25 1993.53 608.07 S 1147.89 W 5973665.85 N 370579.38 E 0.284 1170.88
2635.26 60.840 241.980 1987.13 2039.41 647.51 S 1221.29W 5973627.67 N 370505.32 E 0.795 1245.77
2730A6 60.530 239.960 2033.75 2086.03 687.78 S 1293.86 W 5973588.64 N 370432.06 E 1.879 1319.87
2825.77 61.750 241.730 2079.75 2132.03 728A4 S 1366.76 W 5973549.24 N 370358A8 E 2.070 1394.30
2920.62 61.920 241.720 2124.52 2176.80 768.05 S 1440AO W 5973510.89 N 370284.17 E 0.179 1469.44
3015.85 61.280 241.760 2169.82 2222.10 807.71 8 1514.18 W 5973472.50 N 370209.72 E 0.673 1544.73
3109.39 62.040 241.680 2214.22 2266.50 846.72 S 1586.69 W 5973434.74 N 370136.56 E 0.816 1618.70
11 November, 2004 - 10:30
Page 2 of 7
DrillQuest 3.03.06.006
ConocoPhillips Alaska, Inc.
Survey Report for CO2-54
Your Ref: API 501032049900
Job No. AKZZ3317391, Surveyed: 16 October, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northin9s Eastings Northings Eastin9s Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
3206.20 62.740 241.900 2259.09 2311.37 887.27 S 1662.28 W 5973395.49 N 370060.28 E 0.751 1695.83
3301.49 62.130 241.060 2303.18 2355.46 927.608 1736.50 W 5973356.43 N 369985.38 E 1.010 1771.58
3397.63 61.630 240.740 2348.50 2400.78 968.83 8 1810.59 W 5973316.47 N 369910.60 E 0.597 1847.23
3492.49 61.600 241 .280 2393.59 2445.87 1009.28 S 1883.59 W 5973277.27 N 369836.92 E 0.502 1921.76
3587.86 61.820 241.710 2438.79 2491.07 1049.36 S 1957.39 W 5973238.46 N 369762.45 E 0.459 1997.08
3683.60 62.900 241 .560 2483.21 2535.49 1089.65 S 2032.02 W 5973199.45 N 369687.14 E 1.137 2073.23 .
3778.42 63.300 241.830 2526.11 2578.39 1129.75S 2106.47 W 5973160.64 N 369612.02 E 0.492 2149.20
3873.94 63.200 242.520 2569.10 2621.38 1169.56 S 2181.90 W 5973122.12 N 369535.91 E 0.653 2226.14
3970.05 63.460 242.610 2612.24 2664.52 1209.13 S 2258.13 W 5973083.86 N 369459.02 E 0.283 2303.86
4065.43 63.260 243.240 2655.01 2707.29 1247.94 S 2334.04 W 5973046.36 N 369382.46 E 0.627 2381.23
4160.56 63.020 243.740 2697.99 2750.27 1285.82 S 2409.98 W 5973009.78 N 369305.88 E 0.532 2458.61
4255.91 63.010 243.920 2741.25 2793.53 1323.29 S 2486.24 W 5972973.62 N 369228.99 E 0.169 2536.28
4351.47 62.270 243.720 2785.17 2837.45 1360.74 S 2562.40 W 5972937.48 N 369152.20 E 0.796 2613.85
4446.76 61.340 243.180 2830.19 2882.47 1398.27 S 2637.53 W 5972901.24 N 369076.44 E 1.096 2690.39
4542.22 61.010 242.470 2876.22 2928.50 1436.478 2711.93 W 5972864.32 N 369001.40 E 0.738 2766.24
4637.86 60.740 243.010 2922.77 2975.05 1474.73 S 2786.20 W 5972827.33 N 368926.48 E 0.568 2841.95
4733.30 60.680 243.030 2969.46 3021.74 1512.50 S 2860.38 W 5972790.84 N 368851.67 E 0.065 2917.55
4828.75 60.190 242.430 3016.55 3068.83 1550.54 S 2934.17 W 5972754.07 N 368777.24 E 0.750 2992.78
4924.00 59.780 242.490 3064.20 3116.48 1588.67 S 3007.30 W 5972717.19 N 368703.46 E 0.434 3067.36
5019.38 59.620 242.990 3112.32 3164.60 1626.39 S 3080.51 W 5972680.73 N 368629.62 E 0.483 3141.98
5114.62 59.720 242.950 3160.42 3212.70 1663.75 S 3153.73 W 5972644.63 N 368555.77 E 0.111 3216.62
5209.99 60.460 242.360 3207.97 3260.25 1701.72 S 3227.16 W 5972607.92 N 368481.70 E 0.943 3291.48
5305.33 60.600 242.390 3254.88 3307.16 1740.21 S 3300.70 W 5972570.69 N 368407.51 E 0.149 3366.48 .
5400.99 60.050 241 .590 3302.24 3354.52 1779.24 S 3374.08 W 5972532.92 N 368333.48 E 0.927 3441.33
5496.21 60.140 242.060 3349.71 3401.99 1818.21 S 3446.84 W 5972495.20 N 368260.06 E 0.438 3515.57
5591.50 59.740 241.980 3397.44 3449.72 1856.91 S 3519.67 W 5972457.76 N 368186.58 E 0.426 3589.86
5686.91 60.800 241 .420 3444.76 3497.04 1896.198 3592.62 W 5972419.73 N 368112.97 E 1.222 3664.30
5782.35 60.380 242.150 3491.62 3543.90 1935.49 S 3665.88 W 5972381.68 N 368039.05 E 0.799 3739.04
5877.78 60.810 241.910 3538.48 3590.76 1974.498 3739.31 W 5972343.95 N 367964.97 E 0.501 3813.94
5972.83 60.830 242.230 3584.82 3637.10 2013.36 S 3812.63 W 5972306.34 N 367890.99 E 0.295 3888.73
6068.71 60.670 242.780 3631.67 3683.95 2051.98 S 3886.83 W 5972269.00 N 367816.14 E 0.528 3964.40
6163.99 60.540 242.970 3678.43 3730.71 2089.83 8 3960.72 W 5972232.42 N 367741.62 E 0.221 4039.71
6259.48 60.240 243.370 3725.62 3777.90 2127.308 4034.80 W 5972196.22 N 367666.91 E 0.481 4115.20
6354.48 61.310 241.130 3772.00 3824.28 2165.90 S 4108.16 W 5972158.87 N 367592.90 E 2.346 4190.02
6449.95 62.410 241 .850 3817.03 3869.31 2206.08 S 4182.13 W 5972119.96 N 367518.24 E 1.330 4265.52
11 November, 2004 - 10:30
Page 3 of 7
OrillQuest 3.03.06.006
ConocoPhillips Alaska, Inc.
Survey Report for CD2-S4
Your Ref: API SO 1032049900
Job No. AKZZ3317391, Surveyed: 16 October, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northin9s Eastings Northings Eastin9s Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
6544.96 62.850 241.710 3860.71 3912.99 2245.98 5 4256A8 W 5972081.34 N 367443.23 E 0.481 4341.37
6640.50 62.930 241 .820 3904.24 3956.52 2286.21 S 4331 AO W 5972042AO N 367367.63 E 0.132 4417.82
6736.60 62.640 241 .390 3948.19 4000A7 2326.85 S 4406.58 W 5972003.05 N 367291.76 E OA99 4494.54
6831.96 61.860 241.000 3992.60 4044.88 2367.51 S 4480.53 W 5971963.66 N 367217.13 E 0.894 4570.03
6927 A2 62.080 241.210 4037A6 4089.74 2408.23 5 4554.30 W 5971924.21 N 367142.67 E 0.301 4645.34
7022.83 61.870 240.920 4082.28 4134.56 2448.98 5 4628.01 W 5971884.73 N 367068.27 E 0.347 4720.59 .
7117.78 63.610 242.840 4125.78 4178.06 2488.75 S 4702A5 W 5971846.24 N 366993.17 E 2.567 4796.54
7213.08 62.570 242.570 4168.91 4221.19 2527.71 S 4777.97 W 5971808.57 N 366916.99 E 1.120 4873.52
7308A4 62.720 242.700 4212.73 4265.01 2566.65 S 4853.19 W 5971770.93 N 366841.12 E 0.199 4950.21
7401.68 62.170 241.150 4255.86 4308.14 2605.55 S 4926.12 W 5971733.29 N 366767.53 E 1.587 5024.62
7499.21 61.990 239.610 4301.53 4353.81 2648.14 S 5001.04 W 5971691.98 N 366691.90 E 1A07 5101.15
7594.16 61.600 238.930 4346A 1 4398.69 2690.895 5072.96 W 5971650A6 N 366619.25 E 0.753 5174.70
7689.96 61.170 238AOO 4392.29 4444.57 2734.63 S 5144.80 W 5971607.96 N 366546.68 E 0.661 5248.19
7786.22 61 A40 238.750 4438.51 4490.79 2778.65 S 5216.85 W 5971565.18 N 366473.89 E OA25 5321.92
7881.86 61.890 241.190 4483.90 4536.18 2820.77 S 5289.72 W 5971524.31 N 366400.30 E 2.294 5396.39
7977.15 62.160 241.990 4528.60 4580.88 2860.81 S 5363.74 W 5971485.55 N 366325.61 E 0.794 5471.92
8072.60 62.860 242A20 4572.66 4624.94 2900.29 S 5438.65 W 5971447.35 N 366250.04 E 0.835 5548.32
8167.98 62.840 241.670 4616.19 4668A7 2940.08 S 5513.61 W 5971408.85 N 366174AO E 0.700 5624.79
8263.54 62.520 242.120 4660.05 4712.33 2980.07 S 5588.50 W 5971370.14 N 366098.84 E 0.536 5701.19
8359.12 61.860 242.130 4704.64 4756.92 3019.60 S 5663.23 W 5971331.90 N 366023A5 E 0.691 5777A2
8454.39 61.360 242.250 4749.94 4802.22 3058.70 S 5737.36 W 5971294.07 N 365948.66 E 0.536 5853.03
8549.96 61.260 242.700 4795.82 4848.10 3097 A4 S 5811.71 W 5971256.61 N 365873.66 E OA26 5928.84
8645A2 60.540 243.570 4842.24 4894.52 3135.145 5886.12 W 5971220.19 N 365798.62 E 1.097 6004.66 .
8740.92 60.190 243.530 4889A6 4941.74 3172.115 5960A4 W 5971184A9 N 365723.68 E 0.368 6080.38
8836.63 60.000 244.300 4937.18 4989A6 3208.59 S 6034.95 W 5971149.29 N 365648.55 E 0.725 6156.27
8931.85 60.670 244A30 4984.31 5036.59 3244.39 S 6109.55 W 5971114.78 N 365573.35 E 0.714 6232.21
9027 A9 60.810 245.510 5031.06 5083.34 3279.69 S 6185.15 W 5971080.78 N 365497.16 E 0.996 6309.14
9123.05 60.550 245A80 5077.85 5130.13 3314.255 6260.96 W 5971047.52 N 365420.77 E 0.273 6386.25
9218.59 60.920 245.380 5124.55 5176.83 3348.90 S 6336.76 W 5971014.17 N 365344.39 E 0.398 6463.35
9313.83 60.820 245.540 5170.92 5223.20 3383A5 S 6412A4 W 5970980.91 N 365268.13 E 0.180 6540.33
9409.35 60.720 246AOO 5217.56 5269.84 3417AO S 6488.57 W 5970948.28 N 365191A3 E 0.793 6617.73
9504.93 61.060 246.600 5264.06 5316.34 3450.705 6565.15 W 5970916.29 N 365114.29 E OAOO 6695.56
9600.23 61.230 247.940 5310.05 5362.33 3482.95 S 6642.13 W 5970885.37 N 365036.76 E 1.244 6773.75
9696.17 60.840 247.240 5356.51 5408.79 3514.95 S 6719.73 W 5970854.70 N 364958.63 E 0.757 6852.55
9791.34 60.820 246.390 5402.90 5455.18 3547.66 S 6796.12 W 5970823.29 N 364881.69 E 0.780 6930.16
11 November, 2004 - 10:30
Page 4 of 7
DrillQuest 3.03.06.006
ConocoPhillips Alaska, Inc.
Survey Report for CD2-54
Your Ref: API 501032049900
Job No. AKZZ3317391, Surveyed: 16 October, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
9886.58 61.320 246.250 5448.97 5501.25 3581.14 S 6872A6 W 5970791.13 N 364804.79 E 0.541 7007.75
9982.04 60.690 244.990 5495.25 5547.53 3615.60 S 6948.51 W 5970757.97 N 364728.17 E 1.330 7085.10
10077.37 59.950 244.190 5542A5 5594.73 3651.14S 7023.32 W 5970723.72 N 364652.76 E 1.065 7161.24
10172.67 60.240 243.730 5589.96 5642.24 3687 AO S 7097.54 W 5970688.73 N 364577.93 E 0.517 7236.84
10268.08 60.740 244.650 5636.96 5689.24 3723.55 S 7172.29 W 5970653.86 N 364502.57 E 0.989 7312.95
10363.60 60.620 245.710 5683.74 5736.02 3758.51 S 7247.88 W 5970620.20 N 364426.39 E 0.976 7389.85 .
10459.07 61 A70 246AOO 5729.96 5782.24 3792A 1 S 7324.23 W 5970587.61 N 364349A8 E 1.092 7467A7
10554.87 61.170 245.520 5775.93 5828.21 3826.65 S 7400.98 W 5970554.69 N 364272. 15 E 0.865 7545.51
10650A2 60.670 245A80 5822.37 5874.65 3861.28 S 7476.97 W 5970521.37 N 364195.58 E 0.525 7622.80
10745.82 60A10 245.120 5869.29 5921.57 3895.99 S 7552A3 W 5970487.95 N 364119.53E OA27 7699.57
10841.28 60A30 245.090 5916A1 5968.69 3930.94 S 7627.74 W 5970454.30 N 364043.64 E 0.034 7776.18
10936.89 61.020 245.670 5963.17 6015A5 3965.68 S 7703.55 W 5970420.86 N 363967.24 E 0.813 7853.31
11032.35 60.520 246A20 6009.78 6062.06 3999.50 S 7779.68 W 5970388.34 N 363890.55 E 0.863 7930.70
11127.97 60.500 246.790 6056.85 6109.13 4032.55 S 7856m W 5970356.60 N 363813.60 E 0.337 8008.33
11223.63 60.030 246.640 6104.30 6156.58 4065.39 S 7932.37 W 5970325.08 N 363736.75 E 0.510 8085.86
11319.24 60AOO 246.280 6151.79 6204.07 4098.53 S 8008A4 W 5970293.24 N 363660.13 E 0.507 8163.18
11414.74 60.780 246.870 6198.69 6250.97 4131.60 S 8084.78 W 5970261 A8 N 363583.24 E 0.669 8240.75
11510.57 61.110 247.330 6245.23 6297.51 4164.20 S 8161.95 W 5970230.21 N 363505.52 E 0.543 8319.14
11604.53 61.150 247.750 6290.60 6342.88 4195.63 S 8237.99 W 5970200.08 N 363428.95 E 0.394 8396.35
11700.13 62.060 246.250 6336.06 6388.34 4228A9 S 8315.39 W 5970168.55 N 363351.00 E 1.677 8474.99
11795.75 61.300 246.110 6381.42 6433.70 4262.49 S 8392.40 W 5970135.87 N 363273A2 E 0.805 8553.27
11891.11 61.140 245.760 6427.33 6479.61 4296.57 S 8468.71 W 5970103.10 N 363196.53 E 0.363 8630.87
11986.08 60.090 246.940 6473.93 6526.21 4329.77 S 8544.51 W 5970071.21 N 363120.18 E 1.547 8707.91 .
12081.70 60.200 247.650 6521.53 6573.81 4361.78 S 8621.01 W 5970040.51 N 363043.14 E 0.654 8785.61
12177.30 60.170 249.380 6569.07 6621.35 4392.16 S 8698.19 W 5970011 A6 N 362965A5 E 1.570 8863.92
12273.00 59.770 250.820 6616.96 6669.24 4420.36 S 8776.09 W 5969984.59 N 362887.08 E 1.368 8942.87
12368.48 59.820 253.980 6665.01 6717.29 4445.30 S 8854.73 W 5969960.99 N 362808.03 E 2.861 9022.43
12463.95 60.130 258.510 6712.80 6765.08 4464.95 S 8934.99 W 5969942.73 N 362727.45 E 4.121 9103.39
12559.45 60.200 262.650 6760.33 6812.61 4478.50 S 9016.69 W 5969930.57 N 362645.53 E 3.761 9185.56
12654.51 60.820 263.200 6807.12 6859.40 4488.69 S 9098.80 W 5969921.79 N 362563.25 E 0.824 9268.01
12750.08 62.160 262.510 6852.74 6905.02 4499.14 S 9182.13 W 5969912.77 N 362479.76 E 1.539 9351.68
12845.65 62.750 265.750 6896.94 6949.22 4507.80 S 9266.41 W 5969905.55 N 362395.35 E 3.069 9436.24
12941.26 63.530 271.320 6940.17 6992.45 4509.96 S 9351.62 W 5969904.85 N 362310.10 E 5.260 9521.48
13036.75 64.180 275.810 6982.26 7034.54 4504.62 S 9437.15 W 5969911.65 N 362224.68 E 4.275 9606.72
13132.16 64.450 279.440 7023.62 7075.90 4493.21 S 9522.35 W 5969924.51 N 362139.69 E 3A40 9691.41
11 November, 2004 . 10:30
Page 5 of 7
DrillQuest 3.03.06.006
ConocoPhillips Alaska, Inc.
Survey Report for CO2-54
Your Ref: API 501032049900
Job No. AKZZ3317391, Surveyed: 16 October, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
13226.62 64.940 282.120 7064.01 7116.29 4477.24 S 9606.23 W 5969941.92 N 362056.10 E 2.617 9774.60
13320.42 66.620 285.530 7102.49 7154.77 4456.79 S 9689.27 W 5969963.79 N 361973.42 E 3.768 9856.77
13417.84 68.960 289.070 7139.33 7191.61 4429.95 S 9775.35 W 5969992.09 N 361887.81 E 4.133 9941.73
13513.08 71.150 293.030 7171.82 7224.10 4397.78 S 9858.87 W 5970025.68 N 361804.85 E 4.534 10023.93
13608.28 70.830 293.840 7202.84 7255.12 4361.99 S 9941.45 W 5970062.89 N 361722.89 E 0.872 10105.04
13703.59 73.490 297.740 7232.04 7284.32 4322.51 S 10023.11 W 5970103.76 N 361641.92 E 4.791 10185.08 .
13797.48 76.250 302.500 7256.56 7308.84 4277.02 S 10101.46 W 5970150.58 N 361564.36 E 5.708 10261.59
13894.10 78.350 305.470 7277.80 7330.08 4224.34 S 1017959 W 597020459 N 361487.14 E 3.703 10337.59
13989.19 82.040 309.530 7294.00 7346.28 4167.30 S 10253.89 W 5970262.89 N 361413.83 E 5.723 10409.59
14084.43 82.900 314.960 7306.49 7358.77 4103.85 S 10323.76 W 5970327.53 N 361345.06 E 5.724 10476.91
14178.14 84.210 319.240 7317.01 7369.29 4035.65 S 10387.12 W 5970396.80 N 361282.87 E 4.749 10537.56
14272.80 86.500 323.840 7324.68 7376.96 3961.79 S 10445.78 W 5970471.65 N 361225.48 E 5.414 10593.27
14359.09 87.480 327.760 7329.22 7381.50 389053 S 10494.21 W 5970543.72 N 361178.28 E 4.676 10638.86
14449.56 88.820 332.600 7332.14 7384.42 3812.11 S 10539.16 W 5970622.91 N 361134.68 E 5.548 10680.69
14545.08 89.810 332.530 7333.28 7385.56 3727.34 S 10583.16 W 5970708.42 N 361092.13 E 1.039 10721.34
14640.56 89.670 332.350 7333.71 7385.99 3642.69 S 10627.34 W 5970793.81 N 361049.41 E 0.239 10762.16
14736.14 89.190 331.860 7334.66 7386.94 3558.22 S 10672.05 W 5970879.03 N 361006.15 E 0.718 10803.52
14831.63 91.520 333.660 7334.07 7386.35 3473.34 S 10715.76 W 5970964.65 N 360963.90 E 3.083 10843.86
14927.14 91.100 333.110 7331.89 7384.17 3387.97 S 10758.53 W 5971050.74 N 36092259 E 0.724 10883.25
15022.69 90.920 332.880 7330.21 7382.49 3302.85 S 10801.91 W 597113659 N 360880.68 E 0.306 10923.25
15118.22 90.780 332.920 7328.79 7381.07 3217.82 S 10845.42 W 5971222.35 N 360838.62 E 0.152 10963.39
15213.09 90.470 333.680 7327.75 7380.03 3133.Q7 S 10888.05 W 5971307.82 N 360797.45 E 0.865 11002.66
15309.10 90.530 333.910 7326.92 7379.20 3046.93 S 10930.44 W 5971394.67 N 360756.54 E 0.248 11041.64 .
15404.75 90.230 334.060 7326.28 7378.56 2960.97 S 10972.39 W 5971481.33 N 360716.06 E 0.351 11080.18
15500.08 89.990 332.780 7326.10 7378.38 2875.72 S 11015.05 W 5971567.30 N 360674.87 E 1.366 11119.46
15595.67 91.590 333.470 7324.78 7377.06 2790.47 S 11058.25 W 5971653.28 N 360633.13 E 1.823 11159.28
15691.14 92.090 333.050 7321.71 7373.99 2705.25 S 11101.19 W 5971739.22 N 360591.66 E 0.684 11198.84
15786.75 90.730 333.530 7319.36 7371.64 2619.87 S 11144.15 W 5971825.32 N 360550.17 E 1.508 11238.41
15882.14 90.530 333.520 7318.31 7370.59 2534.49 S 11186.67W 5971911.4 1 N 360509.11 E 0.210 11277.55
15977.70 90.490 332.820 7317.46 7369.74 2449.22 S 11229.80 W 5971997.41 N 360467.45 E 0.734 11317.30
16073.27 91.970 333.130 7315.41 7367.69 2364.11 S 11273.21 W 5972083.25 N 360425.50 E 1.582 11357.34
16168.97 92.330 333.600 7311.82 7364.10 2278.63 S 11316.09 W 5972169.46 N 360384.09 E 0.618 11396.82
16263.68 92.080 333.740 7308.18 7360.46 2193.80 S 11358.06 W 5972254.98 N 360343.57 E 0.302 11435.43
16359.28 91.970 332.710 7304.80 7357.08 2108.51 S 11401.10 W 5972341.00 N 360302.00 E 1.083 11475.09
16454.73 91.580 332.890 7301.84 7354.12 2023.65 S 11444.71 W 5972426.59 N 360259.85 E 0.450 11515.34
11 November, 2004 - 10:30
Page 6 of 7
OrillQuest 3.03.06.006
ConocoPhillips Alaska, Inc.
Survey Report for CD2-54
Your Ref: API 501032049900
Job No. AKZZ3317391, Surveyed: 16 October, 2004
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
16550.16 91.530 332.530 7299.25 7351.53 1938.88 S 11488.45 W 5972512.10 N 360217.57 E
- 16617.00 91.530 332.530 7297.47 7349.75 -. 1879.60 S 11519.27 W 5972571.90 N 360187.77 E
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to 52.28' above MSL. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 267.750° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 16617.00ft,
The Bottom Hole Displacement is 11671.61ft, in the Direction of 260.733° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
16617.00
1879.60 S
11519.27 W Projected Survey
7349.75
Survey tool program for CD?-54
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
526.00
0.00 526.00
522.77 16617.00
522.77 CB-SS-Gyro
7349.75 MWD+IIFR+MS+SAG
11 November, 2004·10:30
Page 7 of 7
North Slope, Alaska
Dogleg Vertical
Rate Section Comment
(0/100ft)
0.381 11555.71
0.000 11584.18 Projected Survey
.
.
DrillQuest 3.03.06.006
.
.
13-Nov-04
AOGCC
Robin Deason
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well CD2-54 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
16,617.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date ) C lÚ~v Å ð ~ Y Signed
'lLJ O}j~j
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
AUachment(s)
ConocoPhillips Alaska, Inc.
Alaska North Slope
North Slope, Alaska
CD2-54 (rowd)
.
Job No. AKMW3317391, Surveyed: 16 October, 2004
Survey Report
11 November, 2004
Your Ref: API 501032049900
Surface Coordinates: 5974254.19 N, 371737.50 E (70020'16.4215" N, 208057' 33.3157" E)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Kelly Bushing Elevation: 52. 28ft above Mean Sea Level
y
a
-C
-l
-.J
Oc
SPE!I"""'I"""'V-SUf'1
CFtI'L.LING SeRVI'CeS
A Halliburton Company
Survey Ref: svy453
ConocoPhillips Alaska, Inc.
Survey Report for CD2-54 (mwd)
Your Ref: API 501032049900
Job No. AKMW3317391, Surveyed: 16 October, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
0.00 0.000 0.000 -52.28 0.00 0.00 N 0.00 E 5974254.19 N 371737.50 E 0.00 CB-SS-Gyro
80.00 0.700 186.000 27.72 80.00 0.49 S 0.05W 5974253.70 N 371737.44 E 0.875 0.07
170.00 1.400 230.000 117.70 169.98 1.74 S 0.95W 5974252.47 N 371736.52 E 1.133 1.02
258.00 3.500 243.000 205.62 257.90 3.65 S 4.17W 5974250.61 N 371733.27 E 2.453 4.31
348.00 6.400 244.000 295.27 347.55 7.10 S 11.13W 5974247.28 N 371726.25 E 3.224 11.40 .
437.00 9.700 251.000 383.39 435.67 11.71 S 22.68 W 5974242.87 N 371714.63 E 3.861 23.12
526.00 13.900 251.000 470.49 522.77 17.64 S 39.88 W 5974237.24 N 371697.32 E 4.719 40.54 MWD Magnetic
565.34 14.870 247.450 508.59 560.87 21.11 S 49.01 W 5974233.92 N 371688.13 E 3.331 49.80
654.45 16.890 241.630 594.30 646.58 31.65 S 70.97 W 5974223.76 N 371666.00 E 2.884 72.15
744.92 18.490 245.810 680.50 732.78 43.77 S 95.62 W 5974212.06 N 371641.15 E 2.257 97.26
834.55 20.580 242.270 764.97 817.25 56.93 S 122.53 W 5974199.36 N 371614.01 E 2.679 124.67
922.67 21.940 241.950 847.09 899.37 71.88 S 150.77 W 5974184.90 N 371585.52 E 1.549 153.48
1017.73 23.760 239.330 934.69 986.97 90.00 S 182.92 W 5974167.33 N 371553.07 E 2.193 186.31
1113.31 27.530 241.800 1020.84 1073.12 110.27 S 218.96 W 5974147.68 N 371516.69 E 4.099 223.12
1208.34 32.410 244.180 1103.14 1155.42 131.75 S 261.27 W 5974126.93 N 371474.02 E 5.285 266.24
1303.91 34.860 242.780 1182.70 1234.98 155.40 S 308.62 W 5974104.09 N 371426.27 E 2.689 314.48
1399.21 37.010 243.750 1259.86 1312.14 180.55 S 358.57 W 5974079.80 N 371375.90 E 2.334 365.38
1493.37 40.160 242.670 1333.46 1385.74 207.03 S 410.97 W 5974054.22 N 371323.05 E 3.421 418.78
1589.81 42.650 241.140 1405.79 1458.07 237.08 S 467.22 W 5974025.13 N 371266.29 E 2.787 476.17
1684.84 45.350 241.780 1474.14 1526.42 268.61 S 525.21 W 5973994.60 N 371207.77 E 2.879 535.35
1779.31 48.310 242.360 1538.77 1591.05 300.87 S 586.08 W 5973963.39 N 371146.36 E 3.165 597.44
1874.43 51.280 242.4 10 1600.16 1652.44 334.54 S 650.45 W 5973930.82 N 371081.43 E 3.123 663.08 .
1969.87 55.760 242.640 1656.89 1709.17 369.93 S 718.52 W 5973896.60 N 371012.76 E 4.698 732.49
2064.22 58.990 242.740 1707.75 1760.03 406.39 S 789.11 W 5973861.36 N 370941.55 E 3.425 804.46
2159.41 61.480 243.210 1755.01 1807.29 443.93 S 862.72 W 5973825.09 N 370867.31 E 2.651 879.48
2253.90 61.730 242.700 1799.94 1852.22 481.72 S 936.75 W 5973788.56 N 370792.65 E 0.544 954.94
2349.45 61.850 243.040 1845.11 1897.39 520.12 S 1011.69 W 5973751.45 N 370717.06 E 0.338 1031.33
2444.88 61.710 242.380 1890.23 1942.51 558.67 S 1086.41 W 5973714.18 N 370641.69 E 0.627 1107.51
2540.14 61.770 242.4 10 1935.34 1987.62 597.55 S 1160.77 W 5973676.58 N 370566.68 E 0.069 1183.33
2635.26 61.130 241.980 1980.80 2033.08 636.52 S 1234.67 W 5973638.88 N 370492.12 E 0.781 1258.71
2730.46 60.800 240.830 2027.00 2079.28 676.36 S 1307.76 W 5973600.30 N 370418.37 E 1.112 1333.30
2825.77 62.040 242.890 2072.60 2124.88 715.82 S 1381.56 W 5973562.11 N 370343.90 E 2.301 1408.59
2920.62 62.190 243.020 2116.96 2169.24 753.94 S 1456.23 W 5973525.27 N 370268.59 E 0.199 1484.70
3015.85 61.560 242.480 2161.85 2214.13 792.39 S 1530.89 W 5973488.10 N 370193.28 E 0.829 1560.82
3109.39 62.330 242.320 2205.84 2258.12 830.64 S 1604.04 W 5973451.11 N 370119.48 E 0.837 1635.42
11 November, 2004 - 10:31
Page 20f7
DrillQuest 3.03.06.006
ConocoPhillips Alaska, Inc.
Survey Report for CD2-S4 (mwd)
Your Ref: APIS01032049900
Job No. AKMW3317391, Surveyed: 16 October, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3206.20 63.030 242.520 225028 2302.56 870.46 S 168028 W 5973412.60 N 370042.58 E 0.746 1713.16
3301.49 62.400 241.680 2293.96 2346.24 910.09 S 1755.13 W 597337426 N 369967.06 E 1.025 1789.50
3397.63 61.620 241.340 2339.08 2391.36 950.58 S 1829.74 W 5973335.05 N 369891.77 E 0.869 1865.65
3492.49 61 .590 241.870 2384.19 2436.47 99026 S 1903.15 W 5973296.63 N 369817.69 E 0.493 1940.56
3587.86 61.810 242.370 2429.40 2481.68 1029.53 S 1977.37 W 5973258.63 N 369742.81 E 0.516 2016.27 .
3683.60 62.890 242220 2473.83 2526.11 1068.96 S 2052.45 W 5973220.50 N 369667.06 E 1.137 2092.84
3778.42 63290 242.500 2516.75 2569.03 1108.18 S 2127.36 W 5973182.56 N 369591.50 E 0.497 2169.22
3873.94 63.190 243.690 2559.76 2612.04 1146.78S 2203.4 1 W 5973145.27 N 369514.80 E 1.117 2246.74
3970.05 63.450 243.400 2602.91 2655.19 1185.03 S 2280.30 W 5973108.33 N 369437.27 E 0.382 2325.06
4065.43 63.250 244.040 2645.69 2697.97 1222.78 S 2356.73 W 5973071.90 N 369360.20 E 0.6.35 2402.92
4160.56 63.020 244.500 2688.68 2740.96 1259.62 S 2433.18 W 5973036.37 N 369283.13 E 0.494 2480.76
4255.91 63.010 244.650 2731.95 278423 1296.10 S 2509.92 W 5973001.21 N 369205.78 E 0.141 2558.87
4351.47 62.270 244.500 2775.87 2828.15 1332.54 S 2586.57 W 5972966.09 N 369128.52 E 0.787 2636.89
4446.76 61.340 243.910 2820.89 2873.17 1369.08 S 2662.18 W 5972930.85 N 369052.29 E 1.118 2713.88
454222 61.000 243.250 2866.92 2919.20 1406.29 S 2737.08 W 5972894.93 N 368976.77 E 0.703 2790.18
4637.86 60.730 244.040 2913.48 2965.76 1443.37 S 2811.93 W 5972859.13 N 368901.29 E 0.775 2866.43
4733.30 60.670 244.380 2960.19 3012.47 1479.58 S 2886.87 W 597282420 N 368825.74 E 0.317 2942.73
4828.75 60.180 243.590 3007.30 3059.58 1515.99 S 2961.47 W 5972789.07 N 368750.53 E 0.884 3018.71
4924.00 59.770 243.400 3054.96 310724 1552.80 S 3035.27 W 5972753.54 N 368676.11 E 0.464 3093.90
5019.38 59.610 244.320 3103.10 3155.38 1589.07 S 3109.19 W 5972718.53 N 368601.58 E 0.849 3169.18
5114.62 59.710 243.880 3151.21 3203.49 1624.98 S 3183.13 W 5972683.90 N 368527.04 E 0.412 3244.48
5209.99 60.450 243.170 3198.78 3251.06 1661.83 S 3257.12 W 5972648.32 N 368452.43 E 1.009 3319.85 .
5305.33 60.590 243.140 3245.70 3297.98 1699.31 S 3331.17 W 5972612.11 N 368377.75 E 0.149 3395.32
5400.99 60.040 242.120 3293.07 3345.35 1737.51 S 3404.98 W 5972575.17 N 368303.30 E 1.090 3470.56
5496.21 60.130 242.320 3340.56 3392.84 1775.98 S 3478.00 W 5972537.96 N 368229.64 E 0.205 3545.04
5591.50 59.730 242240 3388.30 3440.58 1814.34S 3551.00 W 5972500.86 N 368155.99 E 0.426 3619.49
5686.91 60.790 242.130 3435.63 3487.91 1852.99 S 3624.27 W 5972463.46 N 368082.07 E 1.115 3694.22
5782.35 60.370 242.460 3482.51 3534.79 1891.64 S 3697.87 W 5972426.07 N 368007.82 E 0.533 3769.28
5877.78 60.800 241.700 3529.38 3581.66 1930.57 S 3771.32 W 5972388.4 1 N 367933.71 E 0.827 3844.20
5972.83 60.830 242.570 3575.73 3628.01 1969.35 S 3844.68 W 5972350.89 N 367859.70 E 0.800 3919.03
6068.71 60.670 242.980 3622.58 3674.86 2007.62 S 3919.07 W 5972313.90 N 367784.67 E 0.409 3994.86
6163.99 60.530 243.470 3669.36 3721.64 2045.02 S 3993.17 W 5972277.77 N 367709.93 E 0.472 4070.38
6259.48 60240 243.520 3716.54 3768.82 2082.07 S 4067.46 W 5972242.00 N 367635.02 E 0.307 4146.07
6354.48 61.300 241.690 3762.94 3815.22 2120.21 S 4141.06W 5972205.12 N 367560.78 E 2.018 4221.11
6449.95 62.400 241.630 3807.98 3860.26 2160.17 S 4215.15 W 5972166.43 N 367486.02 E 1.154 4296.71
11 November, 2004 - 10:31
Page 3 of7
DrillQuest 3.03.06.006
ConocoPhillips Alaska, Inc.
Survey Report for CD2-54 (mwd)
Your Ref: API 501032049900
Job No. AKMW3317391, Surveyed: 16 October, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6544.96 62.840 242.010 3851.67 3903.95 2200.01 S 4289.52 W 5972127.87 N 367410.98 E 0.584 4372.58
6640.50 62.920 242.170 3895.22 3947.50 2239.82 S 4364.66 W 5972089.36 N 367335.17 E 0.171 4449.23
6736.60 62.640 241.730 3939.18 3991.46 2280.00 S 4440.08 W 5972050.47 N 367259.07 E 0.501 4526.17
6831.96 61.850 241.780 3983.59 4035.87 2319.94 S 4514.42 W 5972011.81 N 367184.06 E 0.830 4602.02
6927.42 62.070 241.340 4028.46 4080.74 2360.06 S 4588.51 W 5971972.96 N 367109.30 E 0.468 4677.62 .
7022.83 61.860 241.210 4073.31 4125.59 2400.54 S 4662.36 W 5971933.75 N 367034.76 E 0.251 4753.01
7117.78 63.590 242.960 4116.82 4169.10 2440.04 S 4736.93 W 5971895.54 N 366959.53 E 2.450 4829.07
7213.08 62.560 242.960 4159.97 4212.25 2478.66 S 4812.61 W 5971858.21 N 366883.20 E 1.081 4906.21
7308.44 62.710 242.980 4203.81 4256.09 2517.15 S 4888.05 W 5971821.02 N 366807.11 E 0.158 4983.10
7401.68 62.160 241.770 4246.96 4299.24 2555.47 S 4961.28 W 5971783.95 N 366733.24 E 1.293 5057.78
7499.21 61.980 239.970 4292.64 4344.92 2597.42 S 5036.55 W 5971743.30 N 366657.26 E 1.641 5134.64
7594.16 61.590 239.330 4337.53 4389.81 2639.69 S 5108.75 W 5971702.27 N 366584.35 E 0.722 5208A4
7689.96 61.160 238.770 4383A3 4435.71 2682.94 S 5180.86 W 5971660.26 N 366511.50 E 0.682 5282.20
7786.22 61.430 239.170 4429.66 4481.94 2726A6 S 5253.21 W 5971617.98 N 366438A2 E 0.460 5356.20
7881.86 61.880 241.780 4475.07 4527.35 2767.93 S 5326A5 W 5971577.77 N 366364A9 E 2.447 5431.01
7977.15 62.150 242.380 4519.79 4572.07 2807.33 S 5400.80 W 5971539.65 N 366289A7 E 0.624 5506.85
8072.60 62.850 242.830 4563.86 4616.14 2846.29 S 5475.97 W 5971501.98 N 366213.65 E 0.844 5583A9
8167.98 62.830 241.720 4607 AO 4659.68 2885.77 S 5551.09 W 5971463.79 N 366137.86 E 1.036 5660.10
8263.54 62.510 242.300 4651.28 4703.56 2925.81 S 5626.05 W 5971425.24 N 366062.23 E 0.635 5736.57
8359.12 61.860 242.520 4695.87 4748.15 2964.76 S 5700.97 W 5971387.38 N 365986.65 E 0.710 5812.97
8454.39 61.360 242.530 4741.17 4793.45 3003A3 S 5775.33 W 5971349.99 N 365911.64 E 0.525 5888.79
8549.96 61.250 243.030 4787.06 4839.34 3041.78 S 5849.88 W 5971312.92 N 365836A5 E 0.473 5964.79 .
8645.42 60.540 243.770 4833A9 4885.77 3079.12 S 5924A6 W 5971276.85 N 365761.24 E 1.006 6040.78
8740.92 60.190 243.050 4880.72 4933.00 3116.28S 5998.69 W 5971240.98 N 365686.39 E 0.751 6116AO
8836.63 59.990 243A80 4928A4 4980.72 3153.60S 6072.78 W 5971204.93 N 365611.67 E 0.442 6191.91
8931.85 60.650 244.170 4975.59 5027.87 3190.09 S 6147.02 W 5971169.71 N 365536.81 E 0.936 6267.52
9027 A9 60.800 245.570 5022.36 5074.64 3225.51 S 6222.55 W 5971135.58 N 365460.69 E 1.286 6344.38
9123.05 60.550 245.410 5069.16 5121.44 3260.08 S 6298.35 W 5971102.32 N 365384.30 E 0.300 6421 A9
9218.59 60.910 245.800 5115.87 5168.15 3294.50 S 6374.26 W 5971069.20 N 365307.83 E 0.518 6498.68
9313.83 60.820 246.140 5162.24 5214.52 3328.38 S 6450.24 W 5971036.63 N 365231.28 E 0.326 6575.93
9409.35 60.710 246.920 5208.89 5261.17 3361.57 S 6526.69 W 5971004.75 N 365154.26 E 0.722 6653.63
9504.93 61.050 247.080 5255A 1 5307.69 3394.20 S 6603.55 W 5970973A4 N 365076.86 E 0.385 6731.72
9600.23 61.220 248.150 5301.41 5353.69 3425.98 S 6680.72 W 5970942.98 N 364999.15 E 0.999 6810.07
9696.17 60.830 247.840 5347.89 5400.17 3457.43 S 6758.54 W 5970912.87 N 364920.81 E 0.495 6889.07
9791.34 60.810 247.030 5394.29 5446.57 3489.31 S 6835.27 W 5970882.30 N 364843.55 E 0.743 6966.99
11 November, 2004 - 10:31
Page 4 of 7
DrillQuest 3.03.06.006
ConocoPhiJ/ips Alaska, Inc.
Survey Report for CD2-54 (mwd)
Your Ref: API 501032049900
Job No. AKMW3317391, Surveyed: 16 October, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9886.58 61.310 247.110 5440.38 5492.66 3521.78 S 6912.03 W 5970851.15 N 364766.24 E 0.530 7044.97
9982.04 60.680 245.830 5486.67 5538.95 3555.11 S 6988.57 W 5970819.14 N 364689.14 E 1.346 7122.76
10077.37 59.950 245.360 5533.88 5586.16 3589.33 S 7063.99 W 5970786.21 N 364613.15 E 0.877 7199A6
10172.67 60.230 244.060 5581 AO 5633.68 3624.62 S 7138.68 W 5970752.21 N 364537.87 E 1.218 7275A8
10268.08 60.730 244.800 5628A 1 5680.69 3660A5 S 7213.57 W 5970717.66 N 364462.37 E 0.854 7351.72 .
10363.60 60.610 246.290 5675.20 5727A8 3694.92 S 7289.37 W 5970684A9 N 364385.99 E 1 .366 7428.81
10459.07 61 A60 247.160 5721 A4 5773.72 3727.93 S 7366.10 W 5970652.80 N 364308.71 E 1.195 7506.78
10554.87 61.160 245.890 5767A3 5819.71 3761 AO S 7443.18 W 5970620.65 N 364231.07 E 1.204 7585.12
10650A2 60.660 245.710 5813.88 5866.16 3795.63 S 7519.34 W 5970587.73 N 364154.33 E 0.549 7662.56
10745.82 60A10 244.240 5860.81 5913.09 3830.76 S 7594.60 W 5970553.89 N 364078A8 E 1.367 7739.14
10841.28 60A20 245A70 5907.94 5960.22 3866.03 S 7669.75 W 5970519.91 N 364002.75 E 1.121 7815.62
10936.89 61.010 246.100 5954.71 6006.99 3900.24 S 7745.80 W 5970487.01 N 363926.12 E 0.843 7892.95
11032.35 60.520 246.010 6001.33 6053.61 3934.04 S 7821.93 W 5970454.51 N 363849A2 E 0.520 7970.35
11127.97 60A90 246.710 6048A 1 6100.69 3967 A2 S 7898.18 W 5970422A5 N 363772.62 E 0.638 8047.85
11223.63 60.020 246A20 6095.87 6148.15 4000A5 S 7974.38 W 5970390.73 N 363695.86 E 0.557 8125.29
11319.24 60.390 246.350 6143.38 6195.66 4033.69 S 8050AO W 5970358.79 N 363619.28 E 0.392 8202.56
11414.74 60.770 246.900 6190.29 6242.57 4066.69 S 8126.76 W 5970327.10 N 363542.37 E 0.640 8280.15
11510.57 61.100 247.780 6236.85 6289.13 4098.96 S 8204.06 W 5970296.16 N 363464.53 E 0.873 8358.66
11604.53 61.150 248.080 6282.22 6334.50 4129.87 S 8280.31 W 5970266.55 N 363387.77 E 0.285 8436.06
11700.13 62.050 247.040 6327.69 6379.97 4161.98 S 8358.03 W 5970235.79 N 363309.51 E 1.342 8514.98
11795.75 61.300 246A70 6373.06 6425.34 4195.19 S 8435.37 W 5970203.90 N 363231.61 E 0.944 8593.57
11891.1 1 61.130 246.000 6418.98 6471.26 4228.87 S 8511.86 W 5970171.53 N 363154.56 E OA67 8671.32 .
11986.08 60.090 247A10 6465.58 6517.86 4261.60 S 8587.85 W 5970140.11 N 363078.01 E 1.695 8748.54
12081.70 60.190 248A20 6513.19 6565A7 4292.78 S 8664.69 W 5970110.25 N 363000.65 E 0.922 8826.55
12177.30 60.160 250.170 6560.74 6613.02 4322.10 S 8742.27 W 5970082.26 N 362922.58 E 1.588 8905.21
12273.00 59.770 251.390 6608.64 6660.92 4349.37 S 8820.50 W 5970056.33 N 362843.90 E 1.176 8984A5
12368A8 59.810 254.730 6656.70 6708.98 4373A 1 S 8899A1 W 5970033.64 N 362764.58 E 3.023 9064.25
12463.95 60.120 259.160 6704.50 6756.78 4392.07 S 8979.90 W 5970016.36 N 362683.79 E 4.030 9145A1
12559A5 60.190 264.080 6752.05 6804.33 4404.13 S 9061.81 W 5970005.70 N 362601.68 E 4A69 9227.73
12654.51 60.810 263.960 6798.86 6851.14 4412.75S 9144.10 W 5969998.49 N 362519.26 E 0.661 9310.29
12750.08 62.150 263.870 6844A9 6896.77 4421.65 S 9227.59 W 5969991.02 N 362435.63 E 1A05 9394.07
12845.65 62.740 266.520 6888.70 6940.98 4428.74 S 9312.01 W 5969985.37 N 362351.10 E 2.535 9478.71
12941 .26 63.520 271.610 6931.94 6984.22 4430.12 S 9397.25 W 5969985A5 N 362265.85 E 4.818 9563.93
13036.75 64.170 275.750 6974.05 7026.33 4424.61 S 9482.76 W 5969992.42 N 362180.45 E 3.950 9649.16
13132.16 64.440 279.330 7015.43 7067.71 4413.33 S 9567.97 W 5970005.16 N 362095.44 E 3.393 9733.86
11 November, 2004 - 10:31
Page 50f7
DrillQuest 3.03.06.006
ConocoPhillips Alaska, Inc.
Survey Report for CD2-54 (mwd)
Your Ref: API 501032049900
Job No. AKMW3317391, Surveyed: 16 October, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
13226.62 64.930 282.470 7055.82 7108.10 4397.18 S 9651.80 W 5970022.74 N 362011.90 E 3.049 9817.00
13320.42 66.600 280.900 7094.33 7146.61 4379.87 S 9735.56 W 5970041 .48 N 361928.45 E 2.345 9900.01
13417.84 68.940 286.450 7131.21 7183.49 4358.53 S 9823.12 W 5970064.32 N 361841.26 E 5.794 9986.67
13513.08 71.140 290.900 7163.73 7216.01 4329.85 S 9907.89 W 5970094.44 N 361757.00 E 4.962 10070.24
13608.28 70.820 293.760 7194.76 7247.04 4295.66 S 9991.13 W 5970130.05 N 361674.35 E 2.860 10152.08 .
13703.59 73.470 300.340 7224.01 7276.29 4254.40 S 10071.85 W 5970172.69 N 361594.35 E 7.134 10231.11
13797.48 76.230 306.050 7248.57 7300.85 4204.79 S 10147.63 W 5970223.59 N 361519.43 E 6.564 10304.89
13894.10 78.330 309.150 7269.84 7322.12 4147.28S 10222.28 W 5970282.36 N 361445.77 E 3.810 10377.22
13989.19 82.020 313.750 7286.08 7338.36 4085.27 S 10292.46 W 5970345.56 N 361376.66 E 6.146 10444.92
14084.43 82.890 318.820 7298.59 7350.87 4017.05S 10357.69 W 5970414.89 N 361312.62 E 5.356 10507.4 1
14178.14 84.190 322.460 7309.13 7361.41 3945.07 S 10416.72 W 5970487.87 N 361254.82 E 4.101 10563.58
14272.80 86.480 325.230 7316.83 7369.11 3868.90 S 10472.37 W 5970564.98 N 361200.48 E 3.789 10616.19
14359.09 87.470 328.190 7321.39 7373.67 3796.88 S 10519.66 W 5970637.80 N 361154.43 E 3.612 10660.62
14449.56 88.580 333.350 7324.51 7376.79 3718.01 S 10563.80 W 5970717.42 N 361111.65 E 5.831 10701.62
14545.08 89.570 333.090 7326.05 7378.33 3632.74 S 10606.83 W 5970803.41 N 361070.08 E 1.072 10741.27
14640.56 89.440 332.460 7326.88 7379.16 3547.84 S 10650.51 W 5970889.04 N 361027.86 E 0.674 10781.59
14736.14 88.950 332.410 7328.22 7380.50 3463.12 S 10694.74 W 5970974.50 N 360985.09 E 0.515 10822.45
14831.63 91.300 334.220 7328.01 7380.29 3377.81 S 10737.61 W 5971060.54 N 360943.68 E 3.106 10861.95
14927.14 90.860 333.980 7326.21 7378.49 3291.91 S 10779.33 W 5971147.14 N 360903.44 E 0.525 10900.25
15022.69 90.680 334.020 7324.93 7377.21 3206.04 S 10821.21 W 5971233.71 N 360863.04 E 0.193 10938.73
15118.22 90.560 332.760 7323.89 7376.17 3120.64S 10863.99 W 5971319.84 N 360821.72 E 1.325 10978.13
15213.09 90.250 333.550 7323.22 7375.50 3035.99 S 10906.83 W 5971405.20 N 360780.33 E 0.895 11017.62 .
15309.10 90.310 334.020 7322.75 7375.03 2949.86 S 10949.24 W 5971492.05 N 360739.40 E 0.493 11056.61
15404.75 90.000 333.820 7322.49 7374.77 2863.95 S 10991.29 W 5971578.66 N 360698.83 E 0.386 11095.26
15500.08 89.750 333.680 7322.70 7374.98 2778.45 S 11033.46 W 5971664.87 N 360658.13 E 0.301 11134.03
15595.67 91.360 333.580 7321.78 7374.06 2692.81 S 11075.91 W 5971751.22 N 360617.15 E 1.688 11173.09
15691.14 91.850 333.770 7319.10 7371.38 2607.28 S 11118.23 W 5971837.47 N 360576.30 E 0.550 11212.02
15786.75 90.490 333.320 7317.15 7369.43 2521.70 S 11160.82 W 5971923.76 N 360535.18 E 1.498 11251.21
15882.14 90.310 334.050 7316.48 7368.76 2436.20 S 11203.10 W 5972009.97 N 360494.37 E 0.788 11290.11
15977.70 90.250 333.070 7316.02 7368.30 2350.64 S 11245.65 W 5972096.25 N 360453.29 E 1.027 11329.27
1607327 91.730 334.060 7314.37 7366.65 2265.07 S 11288.19 W 5972182.53 N 360412.22 E 1.863 11368.4 1
16168.97 92.100 333.900 7311.17 7363.45 2179.12 S 11330.15 W 5972269.18 N 360371.74 E 0.421 11406.96
16263.68 91.850 334.400 7307.90 7360.18 2093.94 S 11371.42W 5972355.06 N 360331.93 E 0.590 11444.86
16359.28 91.730 333.020 7304.92 7357.20 2008.27 S 11413.74W 5972441 .44 N 360291.08 E 1.448 11483.78
16454.73 91.360 332.870 7302.34 7354.62 1923.30 S 11457.14W 5972527.14 N 360249.14 E 0.418 11523.81
11 November, 2004 - 10:31
Page 6 of 7
DrillQuest 3.03.06.006
ConocoPhillips Alaska, Inc.
Survey Report for CD2-54 (mwd)
Your Ref: API 501032049900
Job No. AKMW3317391, Surveyed: 16 October, 2004
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
16550.16 91.300 333.010 7300.13 7352.4 1 1838.34 S 11500.54 W 5972612.83 N 360207.20 E
16617.00 91.300 333.010 7298.61 7350.89 1778.79 S 11530.87 W 5972672.89 N 360177.90 E
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to 5228' above MSL. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 267.7500 (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 16617.00ft,
The Bottom Hole Displacement is 11667.26ft, in the Direction of 261 .2300 (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
16617.00
1778.79 S
11530.87 W Projected Survey
7350.89
Survey tool program for CD2-54 (mwd)
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
526.00
0.00
522.77
522.77 CB-SS-Gyro
7350.89 MWD Magnetic
526.00
16617.00
11 November, 2004 - 10:31
Page 70f7
North Slope, Alaska
Dogleg Vertical
Rate Section Comment
(0/100ft)
0.160 11563.85
0.000 11591.81 Projected Survey
.
.
DrillQuest 3.03.06.006
.
.
2-04- l7'è
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Helen Wannan
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501-3539
November 17, 2004
RE: MWD Fonnation Evaluation Logs: CD2-54,
AK-MW-3317391
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy ofthis transmittal letter to the attention of:
Rob Kalish, Sperry-Sun, 6900 Arctic Blvd., Anchorage, AK 99518
CJ<t~J ldAA+C"
I LDWG formatted Disc with verification listing.
API#: 50-103-20499-00.
-;;. ) dv 1'1 ~
e
e
MECHANICAL INTEGRITY REPORT' ......
dOL\ - \'ìg'
:.IG REl.:U·.S;;: . ....~ \Q{d'ð-OL\
OPER Ex FIELD c.. ~ ~~. ~ \ ~\ Ñ.'
'W"'ELL NUHJ3ER c... \) d - ~ '-\
'-"'UD --,~,...
.::-. i.J:..:..:... :
~~LL DATA
C· ~\~
as ~TIg : . '"
TD: J1JJ. TVD j :?BTD: MD
<;. <:> I'\.
Shoe: \l..\-s'ì<& MD '\S~O TVD i DV: ~'"-" MD
TVD
·TVu
_:':1e~ : ~~ Shoe:
:'-1oi;:;g: 4.\/-;) Packe:!:'
::ole Size ~¡}Id
MD
\ :)" ~ -\ till
TVD¡ :CP: till
:~TD
TVD i Set ë. t \ sO (, '-\
ana
Pe:!:'£s to
~ C?ANI C;'.L INTEGRITY - P .6:..RT f 1
Annulus Press Test: ~p
; 15 min
; 30 min
COüi!:ùe~ts: (\?þ" I Sr...)'o~,~~<>\ ,,,.çcr~~,\~,, w'N V"'\ \N(..\\ ~~
(f) ~ \~ ~~ . W...-\: \'lê:.S ~~c¿, \--'\. \:\' 1f'...<t[¡J ~ ~ . /'
:-ŒCHÞ.l'!ICÞ~ INTEGRITY - PART /2 ~"'lO\:)~\
Cement: Volumes:' .Amt. Liner ~~ ; Csg SL\O~'{ DV ~ Þ\
CUlt -':01 to cover perfs O~<:¿~ ~\<L CDt-\\I \~\-\CJ('\.
Q. ~Olc·~ S <1s"::>,,:>~ o~ C<tt--\.<t~\ S~",,-,\(.~ ~ CD~~Ç"'Tt)~õ\ f\\~.\Ñ. -Ir-SOO'
Theoretical TOC c::. ~'DLc ~ S\~\t\;\c..~\\Oc... ~ \¿)OQO'
I( \ fCC.\~ "':c..
Cement Bond Log (Yes or No) '\<t ~ j In AOGCC File .
. ~~~\)~S. \- N.cÐ\ "c;-\:~~~(:J,-- .
CBL ~valuation, zone ë.DOVe perfs ~
. Q..~~\-ci..\"( ~'{,D ~\UC( V\\o\~v--. ~O~ \L(
\-O~ '1510 't),~\\tt~ \~~5i) ~ c:.r-Nl.~\\'t >~., "I~\.\(~ ~~ l\ \L(\'1 5>\"'" \0.\
\ " e:hc<!:.\,<-' '\ "'~~,~- r
Evaluation .
~._-~
Proå.uc.tion Log:
Type
CONCLUSIONS:
? ar t i 1 :
? ar -:: : z :
4-:C \~\.~gtC("~O
49-1'1' \/~-OL\
Re: CD2-54 (204-178) Request to Commence Injection
e
e
Subject: Re: CD2-54 (204-178) Request to Commence Injection
From: Thomas Maunder <tom_maunder@admin.state.ak.us>
Date: Tue, 09 Nov 2004 13: 11 : 13 -0900
To: "Hanson, Kelli L" <Kelli.L.Hanson@conocophillips.com>
CC: AOGCC North Slope Office <aogccyrudhoe_bay@admin.state.ak.us>
Kelli,
I concur with your assessment regarding the adequacy of the cement isolation for
CD2-54. You may have received an email from Bob Fleckenstein regarding the MIT
form you sent in the document package. The form that the rig used is out of date.
Also while I understand that the pressure information being presented is for
setting the packer and then testing the annulus (IA) and represents the complete
information for those completion operations, we would appreciate if only the IA
test were submitted to Bob.
By copy of this email, you have permission to initiate injection into CD2-54.
Please contact the inspectors with an opportunity to witness a MIT after the well
is put into service. Please call or message with any questions.
Tom Maunder, PE
AOGCC
Hanson, Kelli L wrote:
Mr. Maunder,
CPAI requests approval to commence injection into CD2-54.
The CD2-54 SCMT log is attached. The log indicates good to excellent quality
cement is present across the logged interval from 13,935' MD (7,285' TVD SS) up
to the tubing tail at 13,065' MD (6,995' TVD SS).
The packer is located at 12,992' MD (6,963' TVD SS) @ 64 deg.
The top of the Alpine C sand is located at 14,292' MD (7,326' TVD SS) @ 87 deg.
The 7" casing shoe is located at 14,378' MD (7,330' TVD SS) @ 88 deg.
PBTD is located at 18,250' MD (7,272' TVD SS) @ 97 deg.
Placement of the cement job went as planned with good returns:
Description of the 7" casing cement job pumped on 10/14/04:
Cemented 7" casing as follows: Pump 5 bbls CW100. Test lines to 3700 psi. Pump 45
bbls CW100 and 30 bbls 10.5 mudpush. Drop bottom plug. Pump 70 bbls 15.8 cement.
Drop top plug. Pumped 20 bbls H20. Switch to rig pump a and displaced cement with
531 bbls 9.8 mud. Bumped plug. Floats OK. 100% returns through out job.
The tubing and casing were successfully MIT'd on 10/22/04 as documented below:
Set packer, test tubing to 3570 psi, bled to 3496 in 30 minutes - test 7" X 4
1/2" annulus to 3500 psi, bled to 3378 psi in 30 minutes.
Based on this information I've concluded the Alpine interval is adequately
isolated in CD2-54.
We would like to place this well on injection as soon as the facility hookup is
complete (anticipated POI date is 11/12/04).
Your early attention to this request would be appreciated.
Thanks,
Kelli
Kelli L. Hanson
Production Engineer
Alpine Engineering
lof2
11/9/2004 1: 12 PM
CD2-54 Request to Commence Injection
It
e
Subject: CD2-54 Request to Commence Injection
From: "Hanson, Kelli L" <Kelli.L.Hanson@conocophillips.com>
Date: Mon, 08 Nov 2004 17:39:39 -0900 a Ol-\., \"'(, %
To: "Tom Maunder (E-mail)..<tom_maunder@admin.state.ak.us>
CC: "Bob Fleckenstein (E-mail)" <bob_fleckenstein@admin.state.ak.us>, "Jim Regg (E-mail)"
<jimJegg@admin.state.ak.us>, "Alonzo, Chris" <Chris.Alonzo@conocophillips.com>, "Pierson,
Chris R" <Chris.R.Pierson@conocophillips.com>
Mr. Maunder,
CPAI requests approval to commence injection into CD2-54.
The CD2-54 SCMT log is attached. The log indicates good to excellent quality
cement is present across the logged interval from 13,935' MD (7,285' TVD SS) up to
the tubing tail at 13,065' MD (6,995' TVD SS).
The packer is located at 12,992' MD (6,963' TVD SS) @ 64 deg.
The top of the Alpine C sand is located at 14,292' MD (7,326' TVD SS) @ 87 deg.
The 7" casing shoe is located at 14,378' MD (7,330' TVD SS) @ 88 deg.
PBTD is located at 18,250' MD (7,272' TVD SS) @ 97 deg.
Placement of the cement job went as planned with good returns:
Description of the 7" casing cement job pumped on 10/14/04:
Cemented 7" casing as follows: Pump 5 bbls CW100. Test lines to 3700 psi. Pump 45
bbls CW100 and 30 bbls 10.5 mudpush. Drop bottom plug. Pump 70 bbls 15.8 cement.
Drop top plug. Pumped 20 bbls H20. Switch to rig pump a and displaced cement with
531 bbls 9.8 mud. Bumped plug. Floats OK. 100% returns through out job.
The tubing and casing were successfully MIT'd on 10/22/04 as documented below:
Set packer, test tubing to 3570 psi, bled to 3496 in 30 minutes - test 7" X 4 1/2"
annulus to 3500 psi, bled to 3378 psi in 30 minutes.
Based on this information I've concluded the Alpine interval is adequately isolated
in CD2-54.
We would like to place this well on injection as soon as the facility hookup is
complete (anticipated POI date is 11/12/04).
Your early attention to this request would be appreciated.
Thanks,
Ke 11 i
Kelli L. Hanson
Production Engineer
Alpine Engineering
WNS Subsurface Development
907.265.6945
Content-Description: CD2-54_1320 Disposal.pdf
Content-Type: application/octet-stream
Content-Encoding: base64
10f2
11/9/20047:17 AM
CD2-54 Request to Commence Injection
tit
e
CD2-54
Content-Description: MIT CD2-54 lO-22-04.xls
Content-Type: application/vnd.ms-excel
Content-Encoding: base64
Tbg
Content-Description: CD2-54 Tbg detail.xls
Content-Type: application/vnd.ms-excel
Content-Encoding: base64
Content-Description: CD2-54 _ SCMT _ 270CT04.zip
Content-Type: application/x-zip-compressed
Content-Encoding: base64
Content-Description: CD2-5410g.ppt
Content-Type: application/vnd.ms-powerpoint
Content-Encoding: base64
20f2
11/9/2004 7: 17 AM
lips
!NS!TEGR_MWD_R_1
GAPI
-I
o
"
fA
',.
,.
"
'"
o
'"
¡;
-I
Õ
,=
INSITERPX_MVVD__R_l
:;-,--
DEPTH
FEET
12600 -
12700 -
~
==-
~
12800
-1500- ~
-4500-
-6000--
-7500-
+NI·S
0.000
+EI.W
0.000
Northing
5974254.190
Ground Level:
Easting
371737.500
0.000
latittude
70Ø2íY16.421N
Longitude
151'2'26.684W
Slot
-15000
I
-13500
-12000
Î
-10500
W est(~ )/East( + )
e STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
Submit to: Hm reQg~admín.state.ak.us
gOQcc prudhoe bay@adm¡n.sta!e.ak.us
bob f1eckenste;n@admín.state.ak.us
Contractor: Doyon Rig No.: 19 DATE: 10/14/2004
Rig Rep.: D. Lutrick Rig Phone: 670-4300 Rig Fax: 670-4301
Operator: Conoco Phillips Alaska IrOp. Phone: 670-4302 Op. Fax: 670-4303
Rep.: J. Welsh
Field/Unit & Well No.: Colville R. CD2-54 PTD # 204-178
Location: Section: 2 Township: T11N
Operation: Drlg: x Workover:
Test: Initial: Weekly: x
Test Pressure: Rams: 250/5000 psi Annular: 250/3500 p:
TEST DATA
MISC. INSPECTIONS:
Test Result
Location Gen.: P
Housekeeping: P
PTD On Location P
Standing Order Posted P
BOP STACK:
Quantity
1
1
1
1
1
2
1
o
1/28/04
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Well Sign
Dr!. Rig
Hazard Sec.
Size
13-5/8
3-112 x 6
3-1/2 x 6
blinds
3-1/8
3-1/8
3-1/8
MUD SYSTEM: Visual Test
Trip Tank P
Pit Level Indicators P
Flow Indicator P
Meth Gas Detector P
H2S Gas Detector P
Alarm Test
P
P
P
P
P
Test Result
P
P
P
Test Result
P
P
P
P
P
P
P
NA
e
Meridian:
Range:
Explor.:
Other:
Valves: 250/5000 psi
Umiat
R4E
FLOOR SAFETY VALVES:
Quantity Test Result
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 1 P
Inside BOP 1 P
CHOKE MANIFOLD:
Quantity Test Result
No. Valves 16 P
Manual Chokes 1 P
Hydraulic Chokes 1 P
ACCUMULATOR SYSTEM:
Time/Pressure Test Result
System Pressure 3000 P
Pressure After Closure 1525 P
200 psi Attained 23 P
Full Pressure Attained 2 min 15 sec. P
Blind Switch Covers: All stations P
Nitgn. Bottles (avg): 4 @ 1825 psi
Test Results
Number of Failures: ~ Test Time: 4.0 Hours Components tested 28
Repair or replacement of equipment will be made within n/a days. Notify the North Slope
Inspector 659-3607, follow with written confirmation to Superviser at: jim reQg~admín.state.ak.us
Remarks: Good Test
24 HOUR NOTICE GIVEN
YES x NO
Date
10/14/04
Time
Waived By
x
9:00AM
Witness
John Crisp
Test start 1 :30pm10/14 Finish 5:30pm10/14
BOP Test (for rigs)
BFL 1/28/04
BOP Doyon 19 10-14-04 CD2-54.xls
e STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
Submit to: Hm regg@admín.state.ak.us
aOQcc prudhoe bav(â{adm;n.state.ak.us
bob fieckenste;n@admín.state.ak.us
Contractor: Doyon Rig No.: 19 DATE: 101612004
Rig Rep.: D. Lutrick Rig Phone: 670-4300 Rig Fax: 670-4301
Operator: Conoco Phillips Alaska Ir Op. Phone: 670-4302 Op. Fax: 670-4303
Rep.: T. Krupa
Field/Unit & Well No.: Colville R. CD2-54 PTD # 204-178
Location: Section: 2 Township: T11N
Operation: Drlg: x Workover:
Test: Initial: x Weekly:
Test Pressure: Rams: 250/5000 psi Annular: 250/3500 p:
TEST DATA
MISC. INSPECTIONS:
Test Result
Location Gen.: P
Housekeeping: P
PTD On Location P
Standing Order Posted P
BOP STACK:
Quantity
1
1
1
1
1
2
1
o
1/28/04
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Well Sign
Dr!. Rig
Hazard Sec.
Size
13-5/8
3-1/2 x 6
3-1/2 x 6
blinds
3-1/8
3-1/8
3-1/8
MUD SYSTEM: Visual Test
Trip Tank P
Pit Level Indicators P
Flow Indicator P
Meth Gas Detector P
H2S Gas Detector P
Alarm Test
P
P
P
P
P
Test Result
P
P
P
Test Result
P
P
P
P
P
P
P
NA
e
Meridian:
Range:
Explor. :
Other:
Valves: 250/5000 psi
Umiat
R4E
FLOOR SAFETY VALVES:
Quantity Test Result
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 1 P
Inside BOP 1 P
CHOKE MANIFOLD:
Quantity Test Result
No. Valves 16 P
Manual Chokes 1 P
Hydraulic Chokes 1 P
ACCUMULATOR SYSTEM:
Time/Pressure Test Result
System Pressure 3000 P
Pressure After Closure 1525 P
200 psi Attained 33 sec. P
Full Pressure Attained~fnin 55 sec. P
Blind Switch Covers: All stations P
Nitgn. Bottles (avg): 4 @ 1750 psi
Test Results
Number of Failures: ~ Test Time: 4.5 Hours Components tested 28
Repair or replacement of equipment will be made within n/a days. Notify the North Slope
Inspector 659-3607, follow with written confirmation to Superviser at: íjm reQQt62admín.state.ak.us
Remarks: Good Test
24 HOUR NOTICE GIVEN
YES x NO
Waived By
Date 1 0/04/04 Time 8:20pm
Witness
Test start 1 :45pm10/6 Finish 6:15pm10/6
BOP Test (for rigs)
BFL 1/28/04
x
Lou Grimaldi
BOP Doyon 19 10-6-04 CD2-54.xls
.
~=:fÆ=:~ rnrF
.
~ fE\
~IYU
FRANK H. MURKOWSKI, GOVERNOR
AI,ASIiA. OILAlQ) GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
C. Alvord
Alpine Drilling Team Leader
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, Alaska 99510-0360
Re: Colville River CD2-54
ConocoPhillips Alaska, Inc.
Permit No: 204-178
Surface Location: 2104' FNL, 1498' FEL, SEC. 2, T11N, R4E, UM
Bottomhole Location: 2593' FNL, 2104' FWL, SEC. 4, T11N, R4E, UM
Dear Mr. Alvord:
Enclosed is the approved application for permit to drill the above referenced service well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's petroleum field inspector at (907) 659- 7 (pager).
BY ORDER Of THE COMMISSION
DATED this.Lkday of September, 2004
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
1 a. Type of Work: Drill L:J
Re-entry D
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
---
)f:~
4/¡7
~
STATE OF ALASKA
ALASKA OIL & GAS COMMISSION
PERMIT TO DRILL
Redrill U 1b. Current Well Class:
Stratigraphic Test D
ExploratoryU Development Oil U Multiple Zone D
Service [2] Development Gas D Single Zone [2]
5. Bond: ~ Blanket U Single Well 11. Well Name and Number:
Bond No. 59-52-180 CD2-54
6. Proposed Depth: ,/ 12. FieldIPool(s):
MD: 18391' ./ TVD: 7431' Colville River Field
7. Property Designation:
P.O. Box 100360 Anchorage, AK 99510-0360
4a. Location of Well (Govemmental Section):
Surface: 2104' FNL, 1498' FEL, Sec. 2, T11 N, R4E, UM II
Top of Productive Horizon:
ADL 380075, 387207
S. Land Use Permit:
Alpine River Pool
13. Approximate Spud Date:~
roi)5,~')çJ'J' /øf, If) r
14. Distance to
Nearest Property: 1058' FEL, Sec. 9
1120' FNL, 1058' FEL, Sec. 9, T11 N, R4E, UM
Total Depth:
2593' FNL, 2104' FWL, Sec. 4, T11N, R4E, UM I
4b. Location of Well (State Base Plane Coordinates):
20. Attachments: Filing Fee 0
Prope'rty Plat 0
Surface: x- 371737.5 0/
16. Deviated wells:
Kickoff depth: 200
1S. Casing Program
Size
Hole
42"
12.25"
8.5"
N/A
Casing
16"
9.625"
7"
4.5"
19
Total Depth MD (ft):
Casing
Structural
Conductor
Detailed Operations
Intermediate
Production
Liner
Perforation Depth MD (ft):
ASRCNPRA 02
9. Acres in Property:
2560
10. KB Elevation
15. Distance to Nearest
y-
5974254.2 Zone-
4 (Height above GL): 52 feet Well within Pool: CD2-31PB1, 1776'
17. Anticipated Pressure (see 20 Me 25.035)
./
Max. Downhole Pressure: 3363 psig / Max. Surface Pressure: 2619 psig
Setting Depth Quantity of Cement
Top Bottom c. 1. or sacks
MD TVD MD TVD (including stage data)
37' 37' 114' 114'
37' 37' 3210' 2390' 596 sx AS Lite & 230 sx LiteCrete
37' 37' 14597' 7400' 330 sx Class G
32' 32' 13317' 7169'
ft. Maximum Hole Angle: 900
Specifications
Weight Gracie Coupling Length
62.5# H-40 Weld 77'
36# J-SS BTC 3173'
26# L-80 BTC-M 14560'
12.6# L-80 IBT-mod 13285'
PRESENT WELL CONcmON SUMMARY
Total Depth TVD (ft): Plugs (measured)
(To be completed for Redrill and Re-Entry Operations)
Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured)
Length
Cement Volume MD
Size
TVD
Perforation Depth TVD (ft):
BOP SketchU
Diverter Sketch 0
Time v. Depth Plot U
Drilling Auid Program [2]
Date:
Shallow Hazard Analysis U
20 MC 25.050 requirements [2]
Drilling programl::J
Seabed Report 0
21. Verbal Approval: Co'mmission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Commission Use Only
AP~~"i;3-zo<lqq~tX> :::'9//I./oý
Samples required 0 Yes ~ No Mud log required' 0 Yes ~ No
Hydrogen sulfide measures D Yes ~ No Directional survey required .Dr Yes D No .
50oaQ~\ ~\'-\<t,>\-~~ ~\o..~~~ \š:)y>~c;.-\- \ rv\-~Q.\ f:. \ ~~Ù-l~' '\-\ \T~ C.(".M<'1\.-\ \C~
~~d 6>CA~~ðS",()SS-<J·,)(..)),
-\-~C-<-<:....(£~-\-o~\(¿ c)ÕÅ~c..d-SI4~A CE'VE~~
BY ORDER OF ~t: ,/ ,~
./ COMMISSIONER THE COMMISSION~: r~ tJ
SEP 1 07.004 I
0·\ o. Gas Cons. Comm\SS\on
A\as\<.a '01.
Anchorage
Printed Name
Signature
Permit to Drill
Number: 2-D v/ .-p 17 f{
Conditions of approval :
C. Alvord 6"1
/?~() Yl-e
Contact Vern Johnson @ 265-6081
Title Alpine Drilling Team Leader
Phone 2(, ~-'t::¡ 77 Date if lie joy
Preoared bv Vem Johnson
See cover letter
for other requirements
Form 10-401 Revised 3/2003, Submit in Duplicate
ORIGINAL
CD2-54 Drilling Hazards Summary
(to be posted in Rig Floor Doghouse Prior to Spud)
(See Well Plan Attachment: Detailed Risk Information for further discussion of these risks)
.12-1/4" Hole /9-5/8" Casina Interval
Event Risk Level
Conductor Broach Low
Well Collision Low
Gas Hydrates Low
Running Sands and Gravel Low
Abnormal Pressure in Low
Surface Formations J
>2000' TVD
Lost Circulation Low
.8-1/2" Hole /7" Casina Interval
Event Risk Level
Abnormal Pressure in Low
Surface Formations
>2000' TVD
Lost circulation Low
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
Low
Hydrogen Sulfide gas
Low
Mitigation Strategy
ry1onitor cellar continuously during interval.
-.J3.yro single shots as required
Monitor well at base of permafrost, increased mud
weight, decreased mud viscosity, increased
circulating times, controlled drilling rates, low mud
temperatures
Maintain planned mud parameters, Increase mud
weight, use weighted sweeps.
Increase mud weight
Reduce pump rates, mud rheology, lost circulation
material, use of low density cement slurries
./
Mitigation Strategy
BOPE drills, Keep mud weight above 9.6 ppg.
Check for flow during connections and if needed,
increase mud weight.
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECO) monitoring, mud
rheology, lost circulation material
Reduced trip speeds, mud properties, proper hole
filling, pumping out of hole, real time equivalent
circulating density (ECO) monitoring, weighted
sweeps.
Well control drills, increased mud weight. No
mapped faults occur within 700' of the planned
wellbore.
H2S drills, detection systems, alarms, standard well
control practices, mud scavengers
.6-1/8" Hole / Horizontal Production Hole
Event Risk Level
Lost circulation Low
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
Medium
Hydrogen Sulfide gas
Low
.../
Mitigation Strategy
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECO) monitoring, mud
rheology, lost circulation material
Reduced trip speeds, Pump out to 7" shoe, mud
properties, proper hole filling, pumping out of hole,
real time equivalent circulating density (ECO)
monitoring, weighted sweeps.
BOPE drills, Keep mud weight above 8.8 ppg.
Check for flow during connections and if needed,
increase mud weight. Well control drills, increased
mud weight.
H2S drills, detection systems, alarms, standard well
control practices, mud scavengers
o R ~!INAl
~ fr"'~~ t;J ~ :: -~<r_} ?
---
Alpine: CD2-54 Procedure
Procedure
1. Move on Doyon 19.
2. Rig up on riser
3. Drill 12- ~" hole to the surface casing point as per the directional plan.
4. Run and cement 9-5/8" surface casing.
5. Pressure test casing to 2500 psi.
6. Install and test BOPE to 5000 psi.
7. Pick up and run in hole with 8-1/2" drilling BHA.
8. Drill out 20' of new hole. Perform leak off test.
",/
9. Drill 8-%" hole to intermediate casing point in the Alpine Sands. (LWD Program: GR/RES/PWD)
10. Run and cement 7" casing as per program. Top of cement> 2058' MD above Alpine C sand. Carry out a
leak off test down the 9-5/811 x 7" casing annulus to confirm the fracture pressure referenced to the casing
shoe. Freeze protect casing annulus and casing. Note: Additional cement may be required if the
Albian or Nanuq sands are deemed commercially viable.
/
11. Pressure test casing to 3500' psi.
12. BOPE test to 5000 psi.
13. Run drilling assembly. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable
leak off for drilling ahead is 11.5 ppg EMW.
14. Drill 6-1/8" horizontal section to well TO (LWD Program: GR/RES/PWD).
15. Circulate the hole clean and pull out of hole, displacing the well to 9.2 ppg brine.
16. Run 4-%, 12.6#, L-80 tubing with DB nipple, gas lift mandrel(s), and packer. Land hanger.
17. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
18. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check.
19. Circulate tubing to diesel and install freeze protection in the annulus.
20. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi / 30 mins.
21. Set BPV and secure well. Move rig off.
OR G~NÀt
Well Proximity Risks:
r
/
~..j
Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in
following attachments. CD2-53 will be the closest well to C02-54. Well separation is 10.7' @ 250' MD.
Accounting for survey uncertainties, the ellipse-to-ellipse separation is 5.8' @ 250' MD.
DrillinQ Area Risks:
There are no high-risk events (e.g. over-pressures zones) anticipated. ~
Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost
circulation. Standard LCM material has proved effective in dealing with lost circulation in previous
development wells.
Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally
as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed
kicks.
Annular PumpinQ Operations:
Incidental fluids developed from drilling operations on well CD2-54 will be injected into a permitted annulus
on C02 'pad or the class 2 disposal well on C01 pad.
The CD2-54 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there
will be 500' of cement fill above the top of the Alpine as per regulations.
Upon completion of CD2-54 form 10-403, Application for Sundry Operations,will be filed. Annular pumping
of fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly
permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating
annular pumping. There will be no USOW's open below the shoe or potable/industrial water wells within
one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers
in this well.
Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick
shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl
without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0
ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of
1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi
= (12.0 ppg) * (0.052) * (2390') + 1,500 psi
= 2,990 psi
Pore Pressure = 1,081 psi
Therefore Differential = 2991 - 1081 = 1910 psi.
The internal casing pressure is conservative, since frictional losses while pumping have not been taken into
consideration. The surface and intermediate casing strings exposed to the annular pumping operations
have sufficient strength by using the 85% collapse and burst ratings listed in the following table:
Wt Connection 85% of 85% of
OD (ppf) Grade Range Type Collapse Collapse Burst Burst
9-5/8" 36 J-55 3 BTC 2,020 psi 1,717psi 3,520 psi 2,992 psi
7" 26 L-80 3 BTC-Mod 5,410 psi 4,599 psi 7,240 psi 6,154 psi
t¡1i)~~Nm
YJJi.~! . L .
Wc,"". '> '.. .. . ,.
--
CD2-54
DRilLING FLUID PROGRAM
Density
PV
YP
Funnel Viscosity
Initial Gels
10 minute gels
API Filtrate
HPHT Fluid Loss at 160
PH
KCL
Oil Iwater ratio
SPUD to
9-5/8"surface casing
point -12 %"
8.8 - 9.6 ppg
20 - 60
100 - 200
Intermediate hole to 7"
casing point - 8 Y2"
Production Hole
Section - 6 1 18"
9.6 - 9.8 ppg
1 0 - 25
15 - 25
9.0-9.6 ppg
10-15
25-30
v"
NC - 10 cc I 30 m in
4-8
<18
4 - 12 cc/30 min (drilling)
8.5 - 9.0
9.0 -10.0
10-15
12-20
NA
12-14 cc/30 min
9.0-9.5
6%
Surface Hole:
A standard high viscosity fresh water I gel spud mud is recommended for the surface interval. Keep
flowline viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing.
Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary.
Intermediate Hole Section:
Fresh water gel I polymer mud system. Ensure good hole cleaning by pumping regular sweeps and
maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is
penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good
filter caXe quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be
important in maintaining wellbore stability.
Production Hole Section:
The horizontal production interval will be drilled with aM-I Flo-Pro drill-in fluid. The base fluid will consist of
6% KCI, with ± 30PPB calcium carbonate bridging material to minimize formation damage. Flo-Vis Polymer
and Dual-Flo starch will be used for viscosity and fluid loss control respectively.
fO RIG INA L
Colville River Field
CD2-54 Injection Well Completion Plan
16" Conductor to 114'
Updated 8/31/04
Sperry Sun Directional
Plan WP 04
-
æ
4-1/2" Camco DS Nipple (3.812')
at 1900' TVD = 2285' MD
9-5/8" 36 ppf J-55 STC
Surface Casing
@ 3210' MD 1 2390' TVD
cemented to surface
Packer Fluid mix:
9.? PPQ KCI Srine
with 2000' TVD diesel cap
4-1/2" 12.6 ppf L-80 1ST M
tubing run with Jet Lube Run'n'Seal
pipe dope
Tubing suspended with diesel
Completion MD TVO
Tubing Hanger 32' 32'
4-1/2", 12.6#/ft, 1ST-Mod Tubing
Cameo DS6 nipple 2285' 1900'
4-1/2", 12.6#/ft, 1ST-Mod Tubing
Cameo KSG2- GLM (3.909" 10) 13145' 7113'
4-1/2", 12.6#/ft, 1ST-Mod Tubing (2)
Baker 83 Packer wI millout extension 13225' 7140'
4-1/2", 12.6#/ft, 1ST-Mod Tubing (1)
HES "XN" (3.725")-66.0° inc 13305' 7166'
4-1/2", 12.6#/ft, 1ST-Mod 10' pup joint
WEG 1331 7' 7169'
TOC @ +1- 12539' MD 16887' TVD
(>2058' MD above top Alpine)
Camco KBG-2 GLM (3.909" DRIFT 10)
wi dummy
Baker 83 Packer WI miílout extension at +1- 13225' MOl
7140' TVD < 200' TVD from top of Alpine
"""~~.:---~:=:.:.:.~,
.,~~<~.~~~< ~
Top Alpine at 14011' MO 1 7340' TVO '~-.;--:=~~~- ~-:.....
Well TO at
18391' MDI
74311 TVD
7" 26 ppf L-80 STC Mod
Production Casing @ 14597' 17400' TVD @+I- 88.3º
O~ r ~mf· " Jô)lt . N· ,'t,q., .
, ~, .. C..',. . '., '" . -
. - '; _ .. ~ .L .
Q.-.:·.Zl q ';.;:i <.; i ..""'" 9 - t -,~ t
CD2-54
PRESSURE INFORMATION AND CASING DESIGN
(per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2))
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well:
Casing Size Csg Setting Fracture Pore pressure ASP Drilling
(in) Depth Gradient (Ibs. I (psi) (psi)
MDfTVD(ft) gal)
16 114/114 10.9 52 53
9 5/8 3210 I 2390 14.5 1081 1563
7" 14597 I 7400 16.0 3349 2619
N/A 18391 17431 16.0 3363 N/A
. NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to minimum 3500 psi.
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas
gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as
follows:
1) ASP = [(FG x 0.052) - 0.1]D
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in Ib/gal
0.052 = Conversion from Ib./gal to psi/ft
0.1 = Gas gradient in psi/ft
o = true Vertical depth of casing seat in ft RKB
OR
2) ASP = FPP - (0.1 x D)
Where;.,FPP = Formation Pore Pressure at the next casing point
ASP CALCULATIONS
1. Drilling below conductor casing (16")
ASP = [(FG x 0.052) - 0.1] 0
= [(10.9 x 0.052) - 0.1] x 114 = 53 psi
OR
ASP = FPP - (0.1 x D)
= 1081 - (0.1 x 2390) = 842 psi
2. Drilling below surface casing (9 5/8")
ASP = [(FG x 0.052) - 0.1] D
= [(14.5 x 0.052) - 0.1] x 2390 = 1563 psi
OR
ASP = FPP - (0.1 x D)
= 3349 - (0.1 x 7400') = 2609 psi
3. Drilling below intermediate casing (7")
·ASP = FPP - (0.1 x D)
= 3362 - (0.1 x 7431') = 2619 psi
./
OHrGINAL
95/8" Surface Casing run to 3210' MD I 2390' TVD.
Cement from 3210' MD to 2710' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2710' to surface with
Arctic Set Lite 3. Assume 300 % excess annular volume in permafrost and 50 % excess below the permafrost
(1795' MD).
Lead slurry:
(2710' -1795') X 0.3132 ft3/ft X 1.5 (50% excess) = 401.2 fe below permafrost
1795' X 0.3132 fe/ft X 4 (300% excess) = 2248.8fe above permafrost
Total volume = 401.2 + 2248.8 = 2650.0 fe => 596 Sx @ 4.45 ft3/sk
System:
596 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.45 fe/sk, Class G + 30% D053 thixotropic additive,
0.6% D046 antifoamer, 1.5% D079 extender, 1.5% SOOI accelerator, 50% D124 extender and 9%
BWOWI D044 freeze suppressant
Tail slurry:
500' X 0.3132 ft3/ft X 1.5 (50% excess) = 234.9 fe annular volume
80' X 0.4341 ft3/ft = 34.7 ft3 shoe joint volume
Total volume = 234.9 + 34.7 = 269.6 fe => 230 Sx @ 1.17 fe/sk
System: .
230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1 % SOOI accelerator @ 15.8
PPG yielding 1.17 ft3/sk
7" Intermediate Casing run to 14597' MD 17400' TVD
Cement from 14597' MD to +1- 12539' MD (minimum 500' MD above top of Alpine C Formation) with Class G
+ adds @ 15.8 PPG. Assume 40% excess annular volume.
Tail:
(14597' - 12539') X 0.1268 ft3/ft X 1.4 (40% excess) = 365.3 fe annular vol.
80' X 0.2148 fe/ft = 17.2 fe shoe joint volume
Total volume = 365.3 + 17.2 = 382.5 fe => 330 Sx @ 1.16 fe/sk
System:
330 Sx Class G + 0.2% D046 antifoamer, 0.25% D065 dispersant, 0.25% D800 retarder and 0.18%
D167 fluid loss additive @ 15.8 PPG yielding 1.16 ft3/sk
1 By Weight Of mix Water, all other additives aœtæWJ(l
-~
--
I
. ···~Ph,~,,··~ <~II-
Conoco"i "" ips
Plan: CD2-54 (wp05)
.ConocoPhillips Alaska Inc.
'Colville River Unit
¡Alpine CD2
'Plan: CD2-54
Plan: CD2-54
Standard Planning Report
01 September, 2004
ORIGINAL
ConocJPt,illips
j
I / /
I /
I /
j I
I / /
: I / /
I 1 /
I 1 /
1 /
I 1 I
, { /
j 1 I
I 1 /
~- - - ~ -- - - - - - - - - - - - - -- -- -;~"~~~.~~I~~;1;'~H~I;:;~~;~.~ - - ~_-_- --- -::~-
-----\~-----------------------------------------------~-~I~
- . \"'9" {Heel} Con. Dk, 14717ft, 7402ft (S-{Sft FNL. 1493ft FEL. Sec!HI1....R4E i
~ I
// I
/// I
\ Begin Oir @ 4.00: 8633.34O«,5264.131ft
~\ ~-------l I I I I
1'--------- I I
I , End Dir, Start Sail @ 65.61: 8823.570f1, 5353.946ft
I , .
I , I:
11 I
I I I
, , I
I I I
I' I
I I I
I I I
I I I
~ : I
Begin Dir @ 3.50 : 12124.710f1,6717.222ft
I
I
I
I
I
I
I
I
I
4000
3000
2000
1000
0
c
2 -1000
o
o
o
C\J
:::: -2000
+
~
t
o
Z -
-;- -3000
~
-S
o
(j)
-4000
~Sì
b.\.~~
'0r¡,h
r:fG
. 00'2-': 6 1/8" Open Hole
~\,<>-0' "
f
1 CD2-54 Toe
1
1
1
{
1
1
1
- - - - - - - .... - - -
-------------
- ...
------ õ·-----
a,¡
::::J
E
------ ë:"
o
u
-5000
-6000
;:
Cõ
d
o 1
""" 1
,.... 1
§I
o f
01
r-.:
a¡
It)
~:
II
I,
I,
"
I,
I,
I,
I,
I,
I I J I
1
1
-7000
å,;
ë;
.c.
-8000
n~
<1>
t:
'51
a,¡
CD
I I I
I I I I
-13000
-1 0000
-12 2L)
0'
(/)
u
r-..
-11000
ConocoPhillips Alaska Inc.
Engineering
Calculation Method:
Error System:
Scan Method:
Error Surface:
Warning Method:
Project: Colville River Unit
Site: AJpine CO2
Well: Plan: CO2-54
Wellborn.:. --"Ian: CO2-54
Plan: CO2-54 (wp05)
Exploration
Minimum Curvature
ISCWSA
Elliptical Conic
Rules Based
Trav. Cylinder North
Approved Plan
SHL (2103'FNL & 1498TEL, Sec2-T11N-R4E}
,
,
\
,
Begin Dir @ 3.00 : 200.0100,200.0100
\
\
\
End Dir, Start Sail @ 58.00: 2133.340«, 1819.656ft
"
"
"
I I I J
,
I
I
I
I
I
I
I
I
I I J I
I I
I I I ,
I J
-i
I
I
I I I I I í
-3000
-1000
,
I
I
I I I I I
-6000
I I J II
-2000
J I I
I I I J
I I I I
-5000
-4000
-9000
-8000
-7000
West(-)/East(+) (2000 ft/in)
SECTION DETAILS
See MD Inc Azi TVD +w-S +EJ-W DLeg TFace vSec Target
1 36.100 0.00 0.00 36.100 0.000 0.000 0.00 0.00 0.000
2 200.000 0.00 0.00 200.000 0.000 0.000 0.00 0.00 0.000
3 2133.333 58.00 242.00 1819.653 -421.486 -792.700 3.00 242.00 808.629
4 8633.333 58.00 242.00 5264.128 -3009.360 -5659.783 0.00 0.00 5773.516
5 8823.564 65.61 241.87 5353.943 -3088.187 -5807;614 4.00 -0.90 5924.327
6 12124.699 65.61 241.87 6717.218 -4505.690 -8458.965 0.00 0.00 8629;261
7 14717.153 90.00 332.68 7402.000 -3744.517-10551.857 3.50 90.33 10690.671 CO2-54 Heel
8 18391.346 91.56 332.68 7352.000 -480.615-12238.065 0.04 0.03 12247.499 CD2-54 Toe
o RtGJI'NrAL
spel'r"V-5un
º_BJ.~L.. I NJ~ ...§..§~_~LÇ-=~~~
.\ IHLUllI'IHO\' ('O\II'V>Y
Conoc;Phillips
ConocoPhillips Alaska Inc.
Engineering
Exploration
Approved
Plan
Project: Colville River Unit
Site: Alpine CO2
Well: Plan: CO2-54
Well bore: Plan: CO2-54
Plan: CO2-54 (wp05)
Calculation Method: Minimum Curvature
Error System: ISCWSA
Scan Method: Trav. Cylinder North
1000
I SHL (21 (J3'FNL & 1498'FEL, Sec2-T11N-R4E)
Rß _------
o 0 -m-----~~--
:.- - - -- - -- - ~ - -- - - - ~~. - - - -- - - Begin D;fOO' 2'T0ft,200.0¡
End Dlr, Sta15a1l @ 58.00: 2133.34Oft, 1819.656ft
_-----------, I ,
9-518" Csg Pt n. Drill out 8-1/2" Hole: 3209.625ft, 2390.000ft
~-¿- - - -~ -1- - - - - -I 1 I I
: I I
I
I
(
8000
=t~~;¿~~,~~ ::
-'\ \"\' '~" ....
- "\' .\ \' .... ~ ,
\ \'\ ',"',
- \ \.\ .... "-
~ \ '- ...."
1\ I I \ ~ \ I I' ,1-
\ -30QO'
\ \ \
\ \ \ \
\ \ \
\ \ \
\ \ \
\ \
\
\
809
-----------~-------
---. 2000-
c: _ 2390
d, .- ~~---I-----r----r---
0",,_ -.
~,~OOO~
---=
ct':"
~ 4000
Zi
:J::::i 5000
~
ïJ
¡¡)
.j
II
I I I
I I I
I --;-
Target (Heel) Continue Dir, 14'7íl.15Oft, 7402.002ft, (S'15ft FNL, 1493ft FEL, Sec9- T11 N--R4E
I I I I II I I I II I I I II I I :1 ill I I I II I I I II I I: I II I I I II I
2000 3000 4000 5000 6000 7000 8000 9000 10000
Begin Dlr @ 4.00: 8633.34Oft,5264.131ft
I 1/ I I
I 1/ I I
ì / / /j ¡ ¡ ¡ i
/ / End Dlr, Start Sail @ 65.61: 8823.5700, 5353.946ft
/ / / - - - - - .~.~..~.~...J ...........J.................,J.. 1
Begin Dlr @ 3.50: 12124.71OO,6717.222ft ~
I I. 7': ~~IPt n. Begin LI8" hole: t597.000ft, J400.181ft - Lntinue Dlr
/ ' I
/ / I' 61/811 Open Hole
//// I
r/ L . .. ._J / !
~t;r~. t ('¡i:t:::~ i i
., ------
,I - --
,I C02-54 Toe
;: I I I I I I I I I I I I I I I I ··I··l"'·I···; I I
11000 12000 13000 14000 15000 16000
()
o
!\:)
¡j,
~
()
o
!\:)
¡j,
.þ.
II
ii
~~~~~L~-~~L~~ ~.~ ~..~ ~..,-~.
~~~r:--- ~ ~f-~~-~'- ~ --
~...;:, ····1······················· ..............
II
6000
7000
(
r
!I
ii
I I
o
1000
SECTION DETAILS
See MD Ine AzI TVD +NI-S +EI-W DLeg TFace VSec
1 36.100 0.00 0.00 36.100 0.000 0.000 0.00 0.00 0.000
2 200.000 0.00 0.00 200.000 0.000 0.000 0.00 0.00 0.000
3 2133.333 58.00 242.00 1819.653 -421.486 -792.700 3.00 242.00 808.629
4 8633.333 58.00 242.00 5264.128 -3009.360 -5659.783 0.00 0.00 5773.516
5 8823.564 65.61 241.87 5353.943 -3088.187 -5807.614 4.00 -0.90 5924.327
6 12124.699 65.61 241.87 6717.218 -4505.690 -8458.965 0.00 0.00 8629.261
spef""l""'ly-sun 7 14717.153 90.00 332.68 7402.000 -3744.517-10551.857 3.50 90.3310690.671
ë"ÄïLL'1 ¡;'IG" '!;is"tv ï I:: ~ 8 18391.346 91.56 332.68 7352.000 -480.615-12238.065 0.04 0.03 12247.499
A '.~j..:¡,t:U:,1I1J;:i:c" (,("'W:';~:I
Target
COO-54 Heel
COO-54 Toe
../
ConocoPhillips
SPERRY_SUN HES
Planning Report
Database:
Coinparjy:
ProjeCt:
Site:
Wèll:
Wellbore:
Design:
EDM 2003.11 Single User Db
ConocoPhillìps Alaska Inc.
Colville River Unit
Alpine CD2
Plan: CD2-54
Plan: CD2-54
CD2-54 (wp05)
Local Co-ordinateRéference:
TVDReference:
MDReference:
North Reference:
Survey CalculaüonMethod:
Well Plan: CD2-54
52' MSL @ 52.000ft (52' MSL)
52' MSL @ 52.000ft (52' MSL)
True
Minimum Curvature
Project
Colville River Unit, North Slope Alaska, United States
Map System:
Geo Datum:
Map Zone:
US :State Plane 1927 (Exact sOlution)
NACo 1927 (NADCON CONUS)
Alaska Zone 04
System Datum:
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
Site
Alpine CD2
0.000 ft
Northing:
Easting:
Slot Radius:
5,974,641.660 ft
371,696.240 ft
0"
Latitude:
Longitude:
Grid Convergence:
700 20' 20.225" N
151002' 28.083" W
-0.98 0
Site Position:
From:
Position Uncertainty:
Map
Plan: CD2-54, CD2-54 Slot
+N/-S
+E/-W
0.000 ft
0.000 ft
0.000 ft
Northing:
Easting:
Wellhead Elevation:
5,974,254.190 ft
371,737.500 ft v
ft
Latitude:
Longitude:
Ground Level:
70020' 16.421" N
151002' 26.684" W
0.000 ft
Plan: CD2-54
Field Strength
(nT)
57,504
CD2-54 (wp05)
7 Phase: PLAN Tie On Depth: 36.100
D.epth.FrOm(TVD) Direction
,(ft) C')
36.100 267.75
, Plan Sections
Measured Vertical Dogieg Build Turn
Depth Inclination Azimuth Depth +N[-S +E/-W Rate Rate Rate TFO
(ft) (0) (0) (ft) (ft) (ft) (0/100ft) ("/100ft) (·/100ft) (0)
36.100 0.00 0.00 36.100 0.000 0.000 0.00 0.00 0.00 0.00
200.000 0.00 0.00 200.000 0.000 0.000 0.00 0.00 0.00 0.00
2,133.333 58.00 242.00 1,819.653 -421.486 -792.700 3.00 3.00 0.00 242.00
8,633.333 58.00 242.00 5,264.128 -3,009.360 -5.659.783 0.00 0.00 0.00 0.00
8,823.564 65.61 24187 5,353.943 -3,088.187 -5,807.614 4.00 4.00 -0.07 -0.90
12,124.699 65.61 241.87 6,717.218 -4,505.690 -8,458.965 0.00 0.00 0.00 0.00
14,717.153 90.00 332.68 7,402.000 -3,744.517 -10,551.857 3.50 0.94 3.50 90.33 CD2-54 Heel
18,391.346 91 56 332.68 7,352.000 -480.615 -12,238.065 0.04 0.04 0.00 0.03 CD2-54 Toe
9/1/2004 9:32:07AM
Page 2 of 8
OR I,GINAl~··
COMPASS 2003.11 Build 38
.../- SPERRY_SUN HES ~~
ConocoPhillips Planning Report
Database: EÓM 2003.11 Single User Db Local Co-ordinate Reference: Well Plan: CD2-54
Company: ConocoPhillips Alaska Inc. TVD Reference: 52' MSL @ 52.000ft (52' MSL)
Project: Colville River Unit MD Reference: 52' MSL @ 52.000ft (52' MSL)
Site: Alpine CD2 North Reference: True
Well: Plan: CD2-54 Survey Calculation Method: Minimum Curvature
Wellbore: Plan: CD2-54
Design: CD2-54 (wp05)
Planned Survey
Measured Vertical Vertical Dogleg Buifd Tum
Depth Inclination Azimuth Depth +N/-S +EI-W Section Rate Rate Rate
(ft) (0) CO) (ft) (ft) eft) eft) e/100ft) e/100ft) (o/10Oft)
36.100 0.00 0.00 36.100 0.000 0.000 0.000 0.00 0.00 0.00
SHL (2103'FNL & 1498'FEL, Sec2-T11N-R4E) ./
100.000 0.00 0.00 100.000 0.000 0.000 0.000 0.00 0.00 0.00
200.000 0.00 0.00 200.000 0.000 0.000 0.000 0.00 0.00 0.00
Begin Dir @ 3.00: 200.010ft,200.010ft
300.000 3.00 242.00 299.954 -1.229 -2.311 2.357 3.00 3.00 0.00
400.000 6.00 242.00 399.635 -4.912 -9.238 9.423 3.00 3.00 0.00
500.000 9.00 242.00 498.768 -11.039 -20.761 21.178 3.00 3.00 0.00
600.000 12.00 242.00 597.082 -19.593 -36.850 37.590 3.00 3.00 0.00
700.000 15.00 242.00 694.308 -30.552 -57.459 58.614 3.00 3.00 0.00
800.000 18.00 242.00 790.179 -43.884 -82.534 84.192 3.00 3.00 0.00
900.000 21.00 242.00 884.432 -59.553 -112.004 114.254 3.00 3.00 0.00
1,000.000 24.00 242.00 976.810 -77.517 -145.789 148.718 3.00 3.00 0.00
1,100.000 27.00 242.00 1,067.058 -97.726 -183.796 187.490 3.00 3.00 0.00
1,200.000 30.00 242.00 1,154.930 -120.125 -225.922 230.462 3.00 3.00 0.00
1,300.000 33.00 242.00 1,240.184 -144.652 -272.051 277.518 3.00 3.00 0.00
1,400.000 36.00 242.00 1,322.587 -171.240 -322.056 328.527 3.00 3.00 0.00
1,500.000 39.00 242.00 1,401.913 -199.816 -375.800 383.352 3.00 3.00 0.00
1,600.000 42.00 242.00 1,477.945 -230.303 -433.136 441.840 3.00 3.00 0.00
1,700.000 45.00 242.00 1,550.474 -262.615 -493.908 503.833 3.00 3.00 0.00
1,800.000 48.00 242.00 1,619.302 -296.666 -557.947 569.159 3.00 3.00 0.00
1,900.000 51.00 242.00 1,684.239 -332.360 -625.079 637.640 3.00 3.00 0.00
2,000.000 54.00 242.00 1,745.109 -369.602 -695.120 709.088 3.00 3.00 0.00
2,100.000 57.00 242.00 1,801.743 -408.288 -767.878 783.308 3.00 3.00 0.00
2,133.333 58.00 242.00 1,819.653 -421.486 -792.700 808.629 3.00 3.00 0.00
End Dir, Start Sail @ 58.00: 2133.340ft, 1819.656ft
2,200.000 58.00 242.00 1,854.981 -448.028 -842.619 859.551 0.00 0.00 0.00
2,300.000 58.00 242.00 1,907.972 -487.842 -917.497 935.934 0.00 0.00 0.00
2,400.000 58.00 242.00 1,960.964 -527.655 -992.375 1,012.317 0.00 0.00 0.00
2,500.000 58.00 242.00 2,013.956 -567.469 -1,067.253 1,088.700 0.00 0.00 0.00
2,600.000 58.00 242.00 2,066.948 -607.282 -1,142.131 1,165.082 0.00 0.00 0.00
2,700.000 58.00 242.00 2,119.940 -647.096 -1,217.010 1,241.465 0.00 0.00 0.00
2,800.000 58.00 242.00 2,172.932 -686.909 -1,291.888 1,317.848 0.00 0.00 0.00
2,900.000 58.00 242.00 2,225.924 -726.722 -1,366.766 1,394.231 0.00 0.00 0.00
3,000.000 58.00 242.00 2,278.916 -766.536 -1,441.644 1,470.614 0.00 0.00 0.00
3,100.000 58.00 242.00 2,331.908 -806.349 -1,516.522 1,546.997 0.00 0.00 0.00
3,200.000 58.00 242.00 2,384.900 -846.163 -1,591.401 1,623.380 0.00 0.00 0.00
3,209.625 58.00 242.00 2,390.000 -849.995 -1,598.607 1,630.731 0.00 0.00 0.00
9-5/8" Csg Pt'... Drill out 8-1/2" Hole: 3209.625ft, 2390.000ft- 95/8"CsgPf@>3209':MD
3,217.173 58.00 242.00 2,394.000 -853.000 -1,604.259 1,636.497 0.00 0.00 0.00
C-30
3,300.000 58.00 242.00 2,437.892 -885.976 -1,666.279 1,699.763 0.00 0.00 0.00
3,400.000 58.00 242.00 2,490.884 -925.790 -1,741.157 1,776.145 0.00 0.00 0.00
3,500.000 58.00 242.00 2,543.876 -965.603 -1,816.035 1,852.528 0.00 0.00 0.00
3,600.000 58.00 242.00 2,596.867 -1,005.417 -1,890.913 1,928.911 0.00 0.00 0.00
3,700.000 58.00 242.00 2,649.859 -1,045.230 -1,965.792 2,005.294 0.00 0.00 0.00
3,800.000 58.00 242.00 2,702.851 -1,085.043 -2,040.670 2,081.677 0.00 0.00 0.00
3,900.000 58.00 242.00 2,755.843 -1,124.857 -2,115.548 2,158.060 0.00 0.00 0.00
3,949.360 58.00 242.00 2,782.000 -1,144.509 -2,152.508 2,195.762 0.00 0.00 0.00
C-20
4,000.000 58.00 242.00 2,808.835 -1,164.670 -2,190.426 2,234.443 0.00 0.00 0.00
4,100.000 58.00 242.00 2,861.827 -1,204.484 -2,265.304 2,310.826 0.00 0.00 0.00
9/1/2004 9:32:07AM Page 3 ot8 COMPASS 2003. 11 Build 38
ORIGINAL
y
ConocoPhillips
Database:
CQmpany:
Pr()ject:
Site:
Well:
Wellbore:
Design:
4,200.000
4,300.000
4,400.000
4,500.000
4,600.000
4,700.000
4,800.000
4,900.000
5,000.000
5,100.000
5,200.000
5,300.000
5,400.000
5,500.000
5,600.000
5,700.000
5,800.000
5,900.000
5,949.665
K-3 Marker
6,000.000
6,100.000
6,200.000
6,300.000
6,325.193
Basal K-3 Markur
6,379.919
K-2 Marker
6,400.000
6,500.000
6,545.982
Base K-2 Marker
6,600.000
6,700.000
6,800.000
6,900.000
7,000.000
7,100.000
7,200.000
7,300.000
7,400.000
7,500.000
7,600.000
7,700.000
7,800.000
7,900.000
8,000.000
8,100.000
8,200.000
8,300.000
8,400.000
8,500.000
8,600.000
EDM 2003.11 Single User Db
ConocoPhillìps Alaska Inc.
Colville River Unit
Alpine CD2
Plan: CD2-54
Plan: CD2-54
CD2-54 (wp05)
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
242.00
8,633.333 58.00 242.00
Begin Dir @ 4.00: 8633.340ft,5264.131ft
8,700.000 60.66 241.95
8,722.509 61.57 241.94
Albian 97
9/1/2004 9:32:07AM
SPERRY_SUN HES
Planning Report
LocalCo-ordinäteRèference;
TVDReference:
MDReferenee:
North Reference:
SurVey CålculationMethod:
2,914.819
2,967.811
3,020.803
3,073.795
3,126.787
3,179.779
3,232.771
3,285.763
3,338.754
3,391.746
3,444.738
3,497.730
3,550.722
3,603.714
3,656.706
3,709.698
3,762.690
3,815.682
3,842.000
3,868.674
3,921.666
3,974.658
4,027.649
4,041.000
4,070.000
4,080.641
4,133.633
4,158.000
4,186.625
4,239.617
4,292.609
4,345.601
4,398.593
4,451.585
4,504.577
4,557.569
4,610.561
4,663.553
4,716.545
4,769.536
4,822.528
4,875.520
4,928.512
4,981.504
5,034.496
5,087.488
5,140.480
5,193.472
5,246,464
-1,244.297
-1,284.111
-1,323.924
-1,363.738
-1,403.551
-1,443.364
-1,483.178
-1,522.991
-1,562.805
-1,602.618
-1,642,432
-1,682.245
-1,722.059
-1,761.872
-1,801.685
-1,841,499
-1,881.312
-1,921.126
-1,940.899
-1,960.939
-2,000.753
-2,040.566
-2,080.380
-2,090,4 1 °
-2,112.198
-2,120.193
-2,160.006
-2,178.313
-2,199.820
-2,239.633
-2,279.447
-2,319.260
-2,359.074
-2,398.887
-2,438.701
-2,478.514
-2,518.327
-2,558.141
-2,597.954
-2,637.768
-2,677.581
-2,717.395
-2,757.208
-2,797.022
-2,836.835
-2,876.649
-2,916,462
-2,956.275
-2,996.089
5,264.128 -3.009.360
5.298.128 -3,036.300
5.309.000 -3.045.570
-2,340.183
-2,415.061
-2,489.939
-2,564.817
-2,639.695
-2,714.574
-2,789.452
-2,864.330
-2,939.208
-3,014.087
-3,088.965
-3,163.843
-3,238.721
-3,313.599
-3,388.478
-3,463.356
-3,538.234
-3,613.112
-3,650.300
-3,687.990
-3,762.869
-3,837.747
-3,912.625
-3,931.489
-3,972.467
-3,987.503
-4,062.381
-4,096.812
-4,137.260
-4,212.138
-4,287.016
-4,361.894
-4,436.772
-4,511.651
-4,586.529
-4,661.407
-4,736.285
-4,811.163
-4,886.042
-4,960.920
-5,035.798
-5,110.676
-5,185.554
-5,260.433
-5,335.311
-5,410.189
-5,485.067
-5,559.945
-5,634.824
-5,659.783
-5,710.398
-5,727.791
Well Plan: CD2-54
52' MSL @ 52.000ft (52' MSL)
52' MSL @ 52.000ft (52' MSL)
True
Minimum Curvature
2,387.208
2,463.591
2,539.974
2,616.357
2,692.740
2,769.123
2,845.506
2,921.889
2,998.271
3,074.654
3,151.037
3,227.420
3,303.803
3,380.186
3,456.569
3,532.952
3,609.334
3,685.717
3,723.653
3,762.100
3,838,483
3,914.866
3,991.249
4,010,492
4,052.293
4,067.632
4,144.015
4,179.137
4,220.397
4,296.780
4,373.163
4,449.546
4,525.929
4,602.312
4,678.695
4,755.078
4,831,460
4,907.843
4,984.226
5,060.609
5,136.992
5,213.375
5,289.758
5,366.141
5,442.523
5,518.906
5,595.289
5,671.672
5,748.055
5,773.516
5,825.149
5,842.892
,.Q~T~l.N~ L
l' ".!/ ~ [I t ~ .~ ¿ . .;~
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
4.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
4.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.07
-0.07
COMPASS 2003.11 Build 38
ConocJPhillip; SPERRY_ SUN HES ~
Planning Report
Database: EDM 2003.11 Single User Db Plan: CD2-54
Company: ConocoPhillips Alaska Inc. MSL @ 52.000ft (52' MSL)
Project: Colville River Unit 52' MSL @ 52.000ft (52' MSL)
Site: Alpine CD2
Well: Plan: CD2-54
Wellbore: Plan: CD2-54
Design: CD2-54 (wp05)
8,800.000 64.66 241.88 5,344.036 -3,078.109 -5,788.758 5,905.090 4.00 4.00 -0.07
8,823.564 65.61 241.87 5,353.943 -3,088.187 -5,807.614 5,924.327 4.01 4.01 -0.06
End Dlr, Start Sail @ 65.61: 8823.570ft, 5353.946ft
8,900.000 65.61 241.87 5,385.509 -3,121.008 -5,869.005 5,986.958 0.00 0.00 0.00
9,000.000 65.61 241.87 5,426.806 -3,163.948 -5,949.321 6,068.897 0.00 0.00 0.00
9,100.000 65.61 241.87 5,468.103 -3,206.888 -6,029.637 6,150.837 0.00 0.00 0.00
9,200.000 65.61 241.87 5,509.400 -3,249.828 -6,109.954 6,232.776 0.00 0.00 0.00
9,300.000 65.61 241.87 5,550.698 -3,292.768 -6,190.270 6,314.716 0.00 0.00 0.00
9,400.000 65.61 241.87 5,591.995 -3,335.708 -6,270.586 6,396.655 0.00 0.00 0.00
9,500.000 65.61 241.87 5,633.292 -3,378.648 -6,350.903 6,478.595 0.00 0.00 0.00
9,600.000 65.61 241.87 5,674.589 -3,421.588 -6,431219 6,560.534 0.00 0.00 0.00
9,700.000 65.61 241.87 5,715.886 -3,464.527 -6,511.535 6,642.474 0.00 0.00 0.00
9,800.000 65.61 241.87 5,757.183 -3,507.467 -6,591.852 6,724.413 0.00 0.00 0.00
9,900.000 65.61 241.87 5,798.480 -3,550.407 -6,672.168 6,806.353 0.00 0.00 0.00
10,000.000 65.61 241.87 5,839.778 -3,593.347 -6,752.484 6,888.292 0.00 0.00 0.00
10,100.000 65.61 241.87 5,881.075 -3,636.287 -6,832.801 6,970.232 0.00 0.00 0.00
10,143.406 65.61 241.87 5,899.000 -3,654.925 -6,867.663 7,005.798 0.00 0.00 0.00
Albian 96
10,200.000 65.61 241.87 5,922.372 -3,679.227 -6,913.117 7,052.171 0.00 0.00 0.00
10,300.000 65.61 241 .87 5,963.669 -3,722.167 -6,993.434 7,134.111 0.00 0.00 0.00
10,400.000 65.61 241.87 6,004.966 -3,765.106 -7,073.750 7,216.050 0.00 0.00 0.00
10,500.000 65.61 241 .87 6,046.263 -3,808.046 -7,154.066 7,297.990 0.00 0.00 0.00
10,600.000 65.61 241.87 6,087.560 -3,850.986 -7,234.383 7,379.929 0.00 0.00 0.00
10,700.000 65.61 241:87 6,128.857 -3,893.926 -7,314.699 7,461.869 0.00 0.00 0.00
10,800.000 65.61 241.87 6,170.155 -3,936.866 -7,395.015 7,543.808 0.00 0.00 0.00
10,900.000 65.61 241 .87 6,211.452 -3,979.806 -7,475.332 7,625.748 0.00 0.00 0.00
11,000.000 65.61 241.87 6,252.749 -4,022.746 -7,555.648 7,707.687 0.00 0.00 0.00
11,100.000 65.61 241.87 6,294.046 -4,065.685 -7,635.964 7,789.627 0.00 0.00 0.00
11,200.000 65.61 241.87 6,335.343 -4,108.625 -7,716.281 7,871.567 0.00 0.00 0.00
11,300.000 65.61 241.87 6,376.640 -4,151.565 -7,796.597 7,953.506 0.00 0.00 0.00
11,400.000 65.61 241.87 6,417.937 -4,194.505 -7,876.913 8,035.446 0.00 0.00 0.00
11,500.000 65.61 241.87 6,459.235 -4,237.445 -7,957230 8,117.385 0.00 0.00 0.00
11,600.000 65.61 241.87 6,500.532 -4,280.385 -8,037.546 8,199.325 0.00 0.00 0.00
11,700.000 65.61 241.87 6,541.829 -4,323.325 -8,117.862 8,281.264 0.00 0.00 0.00
11,800.000 65.61 241.87 6,583.126 -4,366.265 -8,198.179 8,363.204 0.00 0.00 0.00
11,900.000 65.61 241.87 6,624.423 -4,409.204 -8,278.495 8,445.143 0.00 0.00 0.00
12,000.000 65.61 241.87 6,665.720 -4,452.144 -8,358.811 8,527.083 0.00 0.00 0.00
12,100.000 65.61 241.87 6,707.017 -4,495.084 -8,439.128 8,609.022 0.00 0.00 0.00
12,124.699 65.61 241.87 6,717.218 -4,505.690 -8,458.965 8,629.261 0.00 0.00 0.00
Begin Dir @ 3.50 : 12124.710ft,6717.222ft
12,200.000 65.62 244.76 6,748.313 -4,536.484 -8,520.235 8,691.692 3.50 0.02 3.84
12,300.000 65.72 248.60 6,789.523 -4,572.540 -8,603.893 8,776.700 3.50 0.10 3.84
12,400.000 65.92 252.43 6,830.496 -4,602.955 -8,689.875 8,863.810 3.50 0.20 3.83
12,500.000 66.21 256.25 6,871.079 -4,627.615 -8,777.863 8,952.697 3.50 029 3.82
12,584.612 66.53 259.46 6,905.000 -4,643.916 -8,853.634 9,029.049 3.50 0.38 3.80
HRZ
12,600.000 66.60 260.04 6,911.120 -4,646.428 -8,867.527 9,043.031 3.49 0.42 3.77
12,700.000 67.07 263.82 6,950.471 -4,659.323 -8,958.533 9,134.473 3.50 OA8 3.77
12,800.000 67.64 267.56 6,988.983 -4,666253 -9,050.542 9,226.683 3.50 0.56 3.74
12,900.000 68.29 271.27 7,026.515 -4,667.192 -9,143.211 9,319.317 3.50 0.65 3.71
13,000.000 69.02 274.94 7,062.924 -4,662.137 -9,236.193 9,412.029 3.50 0.73 3.67
13,014.212 69.13 275.46 7,068.000 -4,660.932 -9,249.412 9,425.191 3.51 0.78 3.67
Base HRZ
13,100.000 69.83 278.58 7,098.077 -4,651.105 -9,329.141 9,504.473 3.50 0.81 3.63
13,140.718 70.18 280.05 7,112.000 -4,644.910 -9,366.899 9,541.958 3.50 0.86 3.61
K-1 Marker
13,200.000 70.71 282.18 7,131 .841 -4,634.139 -9,421.710 9,596.305 3.50 0.90 3.59
9/1/2004 9:32:07AM Page 5 of 8 COMPASS 2003. 11 Build 38
OR¡~GINAt
~~
ConocoPhiltips
SPERRY_SUN HES
Planning Report
Database:
Company:
ProjEict:
Site:
Well:
Wellbore:
Design:
EDM 2003.11 Single User Db
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD2
Plan: CD2-54
Plan: CD2-54
CD2-54 (wp05)
Loc:at·CO-ordinateReference:
TVD Reference:
MD Referen~:
North ~eference:
Survey Calculation Method:
Well Plan: CD2-54
52' MSL @ 52.000f! (52' MSL)
52' MSL @ 52.000f! (52' MSL)
True
Minimum Curvature
13,265.051 71.33 284.50 7,153.000 -4,619.945 -9,481.559 9,655.551 3.50 0.94 3.57
Kuparuk Fm
13,300.000 71.67 285.74 7,164.091 -4,611.301 -9,513.554 9,687.182 3.49 0.97 3.54
13,400.000 72.69 289.25 7,194.707 -4,582.677 -9,604.330 9,776.764 3.50 1.02 3.52
13,424.688 72.95 290.12 7,202.000 -4,574.732 -9,626.537 9,798.643 3.51 1.06 3.50
LCU-Miluveach
13,500.000 73.77 292.73 7,223.573 -4,548.374 -9,693.700 9,864.719 3.50 1.09 3.47
13,600.000 74.90 296.17 7,250.583 -4,508.519 -9,781.329 9,950.717 3.50 1.14 3.44
13,700.000 76.09 299.57 7,275.636 -4,463.262 -9,866.892 10,034.438 3.50 1.19 3.40
13,800.000 77.32 302.94 7,298.638 -4,412.770 -9,950.069 10,115.569 3.50 1.23 3.37
13,838.839 77.81 304.24 7,307.000 -4,391.788 -9,981.664 10,146.317 3.50 1.26 3.35
Mlluveach A
13,900.000 78.60 306.27 7,319.503 -4,357.233 -10,030.550 10,193.809 3.50 1.28 3.32
13,928.251 78.96 307.21 7,325.000 -4,340.657 -10,052.756 10,215.348 3.51 1.30 3.32
Alpine D
14,000.000 79.91 309.57 7,338.154 -4,296.857 -10,108.034 10,268.864 3.50 1.32 3.30
14,010.608 80.05 309.92 7,340.000 -4,290.178 -10,116.066 10,276.628 3.52 1.34 3.30
Alpine C
14,100.000 81.25 312.85 7,354.521 -4,231.869 -10,182.233 10,340.456 3.50 1.35 327
14,200.000 82.63 316.10 7,368.544 -4,162.509 -10,252.870 10,408.316 3.50 1.37 3.25
14,300.000 84.02 319.33 7,380.168 -4,089.038 -10,319.680 10,472.192 3.50 1.40 3.23
14,400.000 85.44 322.54 7,389.353 -4,011.728 -10,382.416 10,531.846 3.50 1.42 3.21
14,500.000 86.87 325.75 7,396.062 -3,930.869 -10,440.843 10,587.055 3.50 1.43 320
14,597.000 88.26 328.85 7,400.181 -3,849.330 -10,493.194 10,636.165 3.50 1.44 3.20
7" Csg Pt... Begin 6-1/8" hole: 14597.000ft, 7400.181ft -- Continue Dir -7" Csg Pt @ 14597' MD
14,600.000 88.31 328.94 7,400.271 -3,846.762 -10,494.743 10,637.613 3.43 1.41 3.13
14,700.000 89.75 332.13 7,401.965 -3,759.721 -10,543.914 10,683.331 3.50 1.44 3.19
14,717.153 90.00 332.68 7,402.000 -3,744.517 -10,551.857 10,690.671 3.51 1.45 3.20
Target (Heel) Continue Dir, 14717.150ft, 7402.002ft, (575ft FNL, 1493ft FEL, Sec9-T11N-R4E - CD2-54 Heel
14,800.000 90.04 332.68 7,401.975 -3,670.913 -10,589.883 10,725.779 0.04 0.04 0.00
14,900.000 90.08 332.68 7,401.876 -3,582.069 -10,635.783 10,768.157 0.04 0.04 0.00
15,000.000 90.12 332.68 7,401.704 -3,493.226 -10,681.682 10,810.534 0.04 0.04 0.00
15,100.000 90.16 332.68 7,401.457 -3,404.382 -10,727.581 10,852.912 0.04 0.04 0.00
15,200.000 9020 332.68 7,401.136 -3,315.538 -10,773.480 10,895290 0.04 0.04 0.00
15,300.000 90.25 332.68 7,400.742 -3,226.695 -10,819.380 10,937.667 0.04 0.04 0.00
15,400.000 9029 332.68 7,400.273 -3,137.852 -10,865.278 10,980.044 0.04 0.04 0.00
15,500.000 90.33 332.68 7,399.730 -3,049.010 -10,911.177 11,022.421 0.04 0.04 0.00
15,600.000 90.37 332.68 7,399.113 -2,960.167 -10,957.075 11,064.798 0.04 0.04 0.00
15,700.000 90.42 332.68 7,398.422 -2,871.325 -11,002.974 11,107.174 0.04 0.04 0.00
15,800.000 90.46 332.68 7,397.657 -2,782.484 -11,048.871 11,149.550 0.04 0.04 0.00
15,900.000 90.50 332.68 7,396.818 -2,693.643 -11,094.769 11,191.926 0.04 0.04 0.00
16,000.000 90.54 332.68 7,395.904 -2,604.803 -11,140.666 11,234.302 0.04 0.04 0.00
16,100.000 90.59 332.68 7,394.917 -2,515.963 -11,186.563 11,276.677 0.04 0.04 0.00
16,200.000 90.63 332.68 7,393.856 -2,427.124 -11,232.460 11,319.052 0.04 0.04 0.00
16,300.000 90.67 332.68 7,392.720 -2,338285 -11.278.356 11,361.427 0.04 0.04 0.00
16,400.000 90.71 332.68 7,391.510 -2,249A48 -11,324.251 11,403.801 0.04 0.04 0.00
16,500.000 90.76 332.68 7,390.227 -2,160.611 -11,370.147 11 ,446.175 0.04 0.04 0.00
16.600.000 90.80 332.68 7,388.869 -2,071.775 -11,416.041 11,488.548 0.04 0.04 0.00
16,700.000 90.84 332.68 7,387A37 -1,982.940 -11,461.936 11,530.921 0.04 0.04 0.00
16,800.000 90.88 332.68 7,385.931 -1,894.106 -11,507.829 11,573.293 0.04 0.04 0.00
16,900.000 90.93 332.68 7,384.351 -1,805.273 -11,553.722 11,615.665 0.04 0.04 0.00
17,000.000 90.97 332.68 7,382.697 -1,716A41 -11,599.615 11,658.036 0.04 0.04 0.00
17,100.000 91.01 332.68 7,380.969 -1,627.610 -11,645.507 11,700A07 0.04 0.04 0.00
17,200.000 91.05 332.68 7,379.167 -1,538.780 -11,691.398 11,742.777 0.04 0.04 0.00
17,300.000 91.10 332.68 7,377.291 -1,449.951 -11,737.289 11,785.147 0.04 0.04 0.00
17,400.000 91.14 332.68 7,375.341 -1,361.124 -11,783.179 11,827.516 0.04 0.04 0.00
17,500.000 91.18 332.68 7,373.316 -1,272.298 -11,829.068 11,869.884 0.04 0.04 0.00
17,600.000 91.22 332.68 7,371.218 -1,183.473 -11,874.957 11,912.252 0.04 0.04 0.00
9/1/2004 9:32:07AM Page 6 of 8 COMPASS 2003.11 Build 38
(JR'm.TMfî
~ . : "- ~
~_ ~ ,t _ If
~.r ~.~ ~~ !-.: if _' ., -.~ t- '.- - ~
ConocJ.Phillipš
Database:
Company:
Project:
Site:
Well:
Wellbore:
Design:
SPERRY_SUN HES
Planning Report
EDM 2003.11 Single User Db
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD2
Plan: CD2-54
Plan: CD2-54
CD2-54 (wp05)
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
17,700.000
17,800.000
17,900.000
18,000.000
18,100.000
18,200.000 91.48 332.68 7,357.072 -650.555 -12,150.271
18,300.000 91.52 332.68 7,354.455 -561.741 -12,196.154
./ 18,391.040 91.56 332.68 7,352.008 -480.887 -12,237.925
6 118" Open Hole
18,391.346 91.56 332.68 7,352.000 -480.615 -12,238.065
Target (Toe) : 18391ft, 7352ft, (2593ft FNL, 3176ft FEL, Sec4-T11N-R4E - CD2-54 Toe ,/
Targets
Target N~me
... hitlmlsstarget
·.Shape· ..
CD2-54 Toe
- Point
91.27 332.68 7,369.045 -1,094.650 -11,920.845
91.31 332.68 7,366.799 -1,005.828 -11,966.732
91.35 332.68 7,364.478 -917.007 -12,012.618
91.39 332.68 7,362.083 -828.188 -12,058.503
91.44 332.68 7,359.615 -739.371 -12,104.388
--
+E1·W
ft
Northing
(ft)
Well Plan: CD2-54
52' MSL @ 52.000f! (52' MSL)
52' MSL @ 52.000f! (52' MSL)
True
Minimum Curvature
11,954.618 0.04 0.04 0.00
11,996.985 0.04 0.04 0.00
12,039.350 0.04 0.04 0.00
12,081.715 0.04 0.04 0.00
12,124.078 0.04 0.04 0.00
12,166.441 0.04 0.04 0.00
12,208.804 0.04 0.04 0.00
12,247.369 0.04 0.04 0.00
12,247.499 0.04 0.04 0.00
Easting
(ft)
Latitude
L.0ngitude
0.00
0.00 7,352.000
-480.615 -12,238.065 5,973,983.000
359,494.000
700 20' 11.597" N 1510 08' 24.096" W
CD2-54 Heel 0.00 0.00 7,402.000 -3,744.517 -10,551.857 5,970,691.000
- plan hits target
- Rectangle (sides W3,674.000 H200.000 DO.OOO)
361,124.000
700 19' 39.522" N 1510 07' 34.717" W
PJleasu~ed
. Depth
(ft)
3,209.625
14,597.000
18,391.040
Name
Casing
Diameter
('')
Hole.
Diameter
n
12-1/4
8-112
6-1/8
2,390.000 9 5/8" Csg Pt @ 3209' MD
7,400.181 7" Csg Pt @ 14597' MD
7,352.008 61/8" Open Hole
9-5/8
7
6-1/8
Measurød Dip
[)ep{h .... Name Lithorogy' Dip Direction
(ft) e) (O)
3,217.173 2,394.000 C-30 0.00
3,949.360 2,782.000 C-20 0.00
5,949.665 3,842.000 K-3 Marker 0.00
6,325.193 4,041.000 Basal K-3 Marker 0.00
6,379.919 4,070.000 K-2 Marker 0.00
6,545.882 4,158.000 Base K-2 Marker 0.00
8,722.!509 5,309.000 Albian 97 0.00
10,143.406 5,899.000 Albian 96 0.00
12,584.612 6,905.000 HRZ 0.00
13,014.212 7,068.000 Base HRZ 0.00
13,140.718 7,112.000 K-1 Marker 0.00
13,265.051 7,153.000 Kuparuk Fm 0.00
13,424.688 7,202.000 LCU-Miluveach 0.00
13,838.839 7,307.000 Mlluveach A 0.00
13,928.251 7,325.000 Alpine D 0.00
14,010.608 7,340.000 Alpine C 0.00
9/1/2004 9:32:07AM
Page 7 of 8
ORI·GINAL
COMPASS 2003.11 Build 38
.."..../
ConocoPhillìps
Database:
Company:
Próject:
Site:
Wèll:
Wellbore:
De~igri:
EDM 2003.11 Single User Db
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD2
Plan: CD2-54
Plan: CD2-54
CD2-54 (wp05)
9/1/2004 9:32:07AM
36.100
200.010
2,133.340
3,209.625
8,633.340
8,823.570
12,124.710
14,597.000
14,717.150
18,391.330
Vertical
Depth
(ft)
200.010
1,819.656
2,390.000
5,264.131
5,353.946
6,717.222
7,400.181
7,402.002
7,352.000
SPERRY_SUN HES
Planning Report
LocalCo-o rdinateRéfèrence:
TVDReference:
MDRefêÌ'eJ1c.e:
NÓrthRéference:
$ÚrVèyCalCUllitl6áMethoq :
Well Plan: CD2-54
52' MSL @ 52.000ft (52' MSL)
52' MSL @ 52.000ft (52' MSL)
True
Minimum Curvature
L6CålCooroinates
+NI-S +E1~W
(ft) (ft)
0.000
-421.489
-849.995
-3,009.363
-3,088.190
-4,505.695
-3,849.330
-3,744.522
-480.629
0.000
-792.705
-1,598.607
-5,659.788
-5,807.619
-8,458.974
-10,493.194
-10,551.859
-12,238.058
SHL (2103'FNL & 1498'FEL, Sec2-T11N-R4E)
Begin Dir @ 3.00 : 200.01 Oft,200.01 Oft
End Dir, Start Sail @ 58.00: 2133.340ft, 1819.656ft
9-5/8" Csg PI." Drill out 8-1/2" Hole: 3209.625ft, 2390.000ft
Begin Dir @ 4.00 : 8633.340ft,5264. 131 ft
End Dir, Start Sail @ 65.61: 8823.570ft, 5353.946ft
Begin Dir @ 3.50 : 12124.710ft,6717222ft
7" Csg Pt." Begin 6-1/8" hole: 14597.000ft, 7400. 181ft- Continue Dir
Target (Heel) Continue Dir, 14717. 150ft, 7402.002ft, (575ft FNL, 1493ft FEL, Se
Target (Toe) : 18391ft, 7352ft, (2593ft FNL, 3176ft FEL, Sec4- T11 N-R4E
a~;t~n~~L
COMPASS 2003.11 Build 38
CD2-54(wpOS)
Approved Plan
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [10ft/in]
From Colour To MD
36 - 300
300 - 400
400 500
500 - 750
750 - 1000
1000 - 1250
cI~'b (CD2-53) 1500
rsM 1750
1750 - 2000
2500
3000
3500
4000
4500
5000
5500
6500
7500
8500
9500
10000
10500
11000
12000
13000
14000
15000
16000
Ir
20000
o
(
Scanned from Surface to TD
Ri&:
Ref. Do""'< 52' MSL 52.000
V.ScclÏon Origin ~ ~:::~
Angle +Ni·S
267.751 '. 0.00 0.00 36.]0
ConoeoPhiIip' Alaska h",.
En~
C.k:ulotion Method: MlninIlß\ Curv.1Un:
~= ¥';v~S:inda North
W.=;=: ~~..in&
Pion: C02·54
WElU'ATH DETAILS
coM!' ANY D£t AIlS
Travelling Cy1inder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [ft]
Colour ToMD
300
400
500
750
1000
1250
1500
1750
2000
2500
3000
3500
4000
4500
5000
5500 -28.7
6500 -2 .0
7500
8500
9500
10000
10500 -15.0
11000
12000
13000
14000
15000
16000 -10.0
17000
18000
.~,~ 1ò888
~~ -5.0
1,
!:3
-0 270
-5.0
-10.0
-15.0
-28.0
-2 .7
SECTION DETAILS
See MD Ine Azi TVD +NI-S +'Ppy.¡ DLeg TFaee VSec Target
36..10 0.000 0.000 36:10 0.00 0.00 0,00 0.000 0,00
200.00 0.000 0..000 200.00 0.00 0.00 0.00 .0..000 0,00
2133.33 58.0Ö(} 242:000 181~.65 -421 A~ -792.70 3.00 242.ÖÖÖ 80S.63
8633.33 58.0Q0 242:000 5264.1.3 -3009.36 -5659:78 0.00 0:000 5773:53
8823,57 65.608 241.868 5353.94 -3(88)9 -5807.61 4.00 -0:907 5924.35
1212.4:.67 65.608 24.1.868 6717.20 -4505.74 -8.458:91 0.00 0.000 8629.24
14717.16 90.000 332.618 7402.00 '3744.59 -10551.83 3.50 90.334 10690.67 CO2-54 Hed
1839L34 91.560 332.678 7352:00 -480.69 -12238.06 0.02 180.000 12247.50 CO2-54 Toe
\
\
\
~
. .........~
K "--~
~
----
69
CB-GYRO-SS
MWD+IFR-AK-CAZ-SC
850.00 Planned: Plan: CD2-54 (wp05) V
18391.05 Planned: Plan: CD2-54 (wp05) V
Tool
Depth Fm Depth To SurveylPlan
SURVEY PROGRAM
Intervol: 25.00
To: 18391.05
Reference: Plan: Plan: CD2·54 (wp05)
Interpolation Method:MD
Depth Range From: 36.10
Maximum RBnge: 2035.50
...EJ.\": Nofthir~ E.ull.g ulku.1e 10llSitudc
~7.I.') .~9'J.~.\.190 J117:\7,jOO 'O~2(rH...\2IN 151"'02'26,li1UW N/A
ANTI-COLLISION SETnNGS
---91
-100
-69
-46
r~"23
»
·~o. 270
-
..........
-46
o
~
~
......;i¡¡¡23·
q
-69
-100
---91
36.10
850.00
Plal\CD2·S.l
N.III;
Halliburton Sperry-Sun
Anticollision Report
spel""'f""'-y-sun
ºRJJ".J,,11t.;L.~JiJª.aYJ.g;J;i
\ JUI JU"'ôt.ln.'- foo.Þ'_""
Company:
Field:
Reference Site:
Reference Well:
Reference Wellpath:
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine C02
Plan: C02-54
Plan: C02-54
Date: 8/30/2004
Time: 11 :05:49
Page:
Co-ordinate(NE) Reference:
Vertical (TVD) Reference:
Well: Plan: C02-54, True North
52' MSL 52.0
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MO Interval: 25.00 ft
Depth Range: 36.10 to 18391.05 ft
Maximum Radius: 2035.50 ft
Reference:
Error Model:
Scan Method:
Error Surface:
Db: Oracle
Plan: Plan: C02-54 (wp05) & NOT PLANf\ E) PR
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Casing Points
MD TVD Diameter Hole Size
ft ft in in
3209.62 2390.00 9.625 12.250
14597.00 7400.18 7.000 8.500
18391.34 7352.00 6.125 6.125
Plan: Plan: C02-54 (wp05)
Principal: Yes
Name
9 5/8" Csg Pt @ 3209' MO
7" Csg Pt @ 14597' MO
61/8" Open Hole
Date Composed:
Version:
Tied-to:
8/30/2004
22
From Well Ref. Point
Sununary
<_____n_n..__n____.. Offset'Vellpath _un_n_______.._..__> Reference Offset Ctr-Ctr No-Go Allowable
Site Well Wellpath MD :MD Distance Area Deviation Warning
ft ft ft ft ft
Alpine CO2 C02-27 C02-27 V8 525.05 550.00 263.44 10.22 253.21 Pass: Major Risk
Alpine CO2 C02-30 C02-30 V31 2550.03 2675.00 184.57 42.37 142.20 Pass: Major Risk
Alpine CO2 C02-31 C02-31 V7 271 .07 275.00 230.75 4.58 226.17 Pass: Major Risk
Alpine CO2 C02-31 C02-31 PB1 V4 271.07 275.00 230.75 4.58 226.17 Pass: Major Risk
Alpine CO2 C02-32 C02-32 PB1 VO 271.15 275.00 220.15 4.59 215.56 Pass: Major Risk
Alpine CO2 C02-32 C02-32 VO 271.15 275.00 220.15 4.48 215.67 Pass: Major Risk
Alpine CO2 C02-33 C02-33 V2 272.07 275.00 210.48 4.35 206.13 Pass: Major Risk
Alpine CO2 C02-33 C02-33A V1 7685.32 8325.00 260.80 152.14 108.66 Pass: Major Risk
Alpine CO2 C02-33 C02-33B V1 272.07 275.00 210.48 4.35 206.13 Pass: Major Risk
Alpine CO2 C02-34 C02-34 V3 200.09 200.00 200.34 3.93 196.41 Pass: Major Risk
Alpine CO2 C02-34 C02-34PB 1 V2 200.09 200.00 200.34 4.04 196.30 Pass: Major Risk
Alpine CO2 C02-35 C02-35 V1 285.26 275.00 189.57 4.78 184.79 Pass: Major Risk
Alpine CO2 C02-35 C02-35A V1 295.85 300.00 189.68 4.80 184.88 Pass: Major Risk
Alpine CO2 C02-36 CO 2-36 V2 463.21 475.00 180.44 7.42 173.02 Pass: Major Risk
Alpine CO2 C02-36 C02-36 PB1 V11 463.21 475.00 1 80.44 7.42 173.02 Pass: Major Risk
Alpine CO2 C02-37 C02-37 Lat 1 V2 Plan 871.29 900.00 167.89 15.32 152.57 Pass: Major Risk
Alpine CO2 C02-37 C02-37 Lat 2 V1 Plan 871.29 900.00 167.89 15.32 152.57 Pass: Major Risk
Alpine CO2 C02-37 C02-37 Lat 3 V1 Plan 871.29 900.00 167.89 15.32 152.57 Pass: Major Risk
Alpine CO2 C02-37 C02-37 V17 848.12 875.00 168.04 14.14 153.90 Pass: Major Risk
Alpine CO2 C02-38 C02-38 (Sag) VO 320.73 325.00 160.59 4.99 155.60 Pass: Major Risk
Alpine CO2 C02-38 C02-38 V5 320.73 325.00 160.59 5.24 155.35 Pass: Major Risk
Alpine CO2 C02-39 C02-39 V1 440.17 450.00 148.78 6.83 141.95 Pass: Major Risk
Alpine CO2 C02-39 C02-39PB 1 VO 439.32 450.00 148.76 6.81 141.95 Pass: Major Risk
Alpine CO2 C02-40 C02-40 V9 272.69 275.00 139.87 4.53 135.34 Pass: Major Risk
Alpine CO2 C02-40 C02-40PB 1 V10 272.69 275.00 139.87 4.53 135.34 Pass: Major Risk
Alpine CO2 C02-41 C02-41 V9 297.32 300.00 128.65 4.93 123.72 Pass: Major Risk
Alpine CO2 C02-42 C02-42 VO 297.69 300.00 120.65 4.61 116.04 Pass: Major Risk
Alpine CO2 C02-42 C02-42PB 1 VO 297.69 300.00 120.65 4.61 116.04 Pass: Major Risk
Alpine CO2 C02-43 C02-43 V15 2093.93 2175.00 94.54 35.74 58.80 Pass: Major Risk
Alpine CO2 C02-43 C02-43PB 1 V12 2093.93 2175.00 94.54 35.74 58.80 Pass: Major Risk
Alpine CO2 C02-44 C02-44 V15 248.57 250.00 100.10 4.61 95.49 Pass: Major Risk
Alpine CO2 C02-45 C02-45 V5 248.46 250.00 91.19 4.32 86.87 Pass: Major Risk
Alpine CO2 C02-46 C02-46 V2 273.28 275.00 80.05 4.37 75.67 Pass: Major Risk
Alpine CO2 C02-47 C02-47 V2 421.22 425.00 71.78 6.48 65.30 Pass: Major Risk
Alpine CO2 C02-48 C02-48 V1 273.87 275.00 60.47 4.97 55.50 Pass: Major Risk
Alpine CO2 C02-49 C02-49 V1 421.95 425.00 49.70 6.42 43.28 Pass: Major Risk
Alpine CO2 CO2-50 C02-50 V2 24920 250.00 40.53 4.77 35.75 Pass: Major Risk
Alpine CO2 CO2-50 C02-50PB1 V2 249.20 250.00 40.53 4.77 35.75 Pass: Major Risk
Alpine CO2 CO2-51 C02-51 V12 224.94 225.00 30.72 4.55 26.17 Pass: Major Risk
Alpine CO2 CO2-52 C02-52 V8 323.86 325.00 18.74 6.10 12.64 Pass: Major Risk
Alpine CO2 CO2-53 C02-53 V11 249.53 250.00 10.65 4.82 5.83 Pass: Major Risk
Alpine CO2 CO2-55 C02-55 V9 249.72 250.00 11.05 4.65 6.40 Pass: Major Risk
Alpine CO2 CO2-57 C02-57 V2 199.20 200.00 30.61 3.60 27.01 Pass: Major Risk
Alpine CO2 CO2-58 C02-58 V12 199.50 200.00 41.38 3.69 37.69 Pass: Major Risk
Alpine CO2 CO2-58 C02-58L 1 V7 199.50 200.00 41.38 3.58 37.80 Pass: Major Risk
Alpine CO2 Plan: C02-05 C02-05 (Rig Surveys) V 4409.24 4675.00 121.76 100.80 20.96 Pass: Major Risk
o RJ GJ.NA·:",
Company:
Field:
Reference Site:
Reference Well:
Reference Wellpath:
.~
Halliburton Sperry-S'un
Anticollision Report
ConocoPhillips Alaskalnc.
Colville River Unit
Alpine C02
Plan: C02-54
Plan: C02-54
Date: 8130/2004
Co-ordiIUlte(NE)·Reference:
Vertlcal(TVD)Rderenêe:
Swnmary
<______.._m__________ Offset Well path ______m_____________>
Site Well Wellpath
Alpine C02
Alpine C02
Alpine Satellites
Plan: C02-56
Plan: C02-56
Alpine West
C02-56 L 1 V1 Plan: Pia
Plan: C02-56 V2 Plan:
1 VO Plan: (Prelim) V1
Reference
MD
ft
275.29
275.29
Offset
MD
ft
275.00
275.00
Ctr.;Ctr No.;Gò
DisÚUlce Area
ft .11:
OH IGI NAL
TÌIl1e: .. .11:05:49
5pæ1""'r'~-5LS1
pRII..LING . se~'nlJ&_U
-'\ H"_It.-aun: HA....\."
Page:
2
Well:PIÇll1;>CD2-54, True North
52'MSL52.0
20.49
20.49
Db: Oracle
5.06
5.17
Allowable
Deviatiòn ·
ft
15.43 Pass: Major Risk
15.32 Pass: Major Risk
Out of range
W#l1Ïng
'~
1 (t'AD 271 Landing
GEOLOGIC SUMMARY:
Rasp' Jeff Y 9ðton - 4284
Formatlo
Alpine C
Targol
Z
(TVC.SS) Porosity Perm
et Shape: Rectangular as defined abo.....
Remark.:
2 (N<D2T) Toe
Formetlo
n
Alpine C
Obi Appkable
CD2-54
C1ncolt1Jlete
Preferred
Ter.
Net Pey Angle
Approx
Stepout:
Preferred
Z Tar.
(TVC.SS) Poroalty Perm Net pey Angle
et Shape: Rectangular as defined abo.....
Remark.:
3 (N:'D27\
Form.11o
n
el Shape:
Remarka:
Geologic Progno
Format 10 X
n
Wasl Sak
~:"frostl
C-30
C'20
K-3 Marker
Basal K-3 Sam
K-2 Marker
Base K-2 Cycle
Albian 97
Albian 96
I-f'IZ
Base I-RZ
K·1 Marker
KcparlJ< Fm
LCU-MillNeach
MilNeach A
Alpine 0 I
Alpine C
Alp C above shoe
Alpine A shoe
Alp C above toe
A!piõe A toe
Obt Applicable
Approx
Stepout:
Preferred
Z Tar.
(TVC.SS) Poroalty Perm Net Pey Angle
Responsible: Jeff Yeaton - 4284
Z MC Gross
(TVC.SS) Thlekne.
2,342'
2,730'
3,790'
3,989'
4,018'
4,106'
5,257'
5,847'
6,853'
7,016'
7,060'
7,101'
7,150'
7,255'
7,273'
7.288'
Approx
Stepout:
Clncomplete
Net pey Netto
Gross
Remarks:
Geologic Discussion: . ResponsiJle: Jeff Yeaton - 4284 n Incomplete
The Alpino C .ection is expec'ed 10 be approximately 15-20 It thick near Ihe landing point, I
"-i
ORIGINAL
DESCRIPTlON
PER K03074ACS
4 U,M.
PLAN
PAD
C.A
T 11 N R
SEC.LlNE Ò Is
FNL FEL
REV DATE BY CK
4 5/15/03 G.D. J.Z.
PROTRACTED SEC,2
REV DA 1£ BY I CK APP ';RIPTlON
o 5/29/01 G.D., J.Z C.A. PER A01004ACS
ALL CONDUCTORS ARE LOCATED
y'
E
N
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
GND
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.6
8.6
8.6
8.6
8.6
8.5
8.5
8.5
8.5
8.5
8.5
8.5
8.5
8.5
8.5
1558'
1556'
1555'
1554'
1552'
1551'
1550'
1549'
1548'
1546'
1545'
1544'
1543'
1542'
1541 '
1539'
1538'
1536'
1536'
1534'
1533'
1532'
1531 '
1530'
1528'
1527'
1526'
1525'
1523'
1522'
1521 '
1520'
1519'
1517'
1516'
1515'
1514'
1513'
1512'
1510'
1509'
1508'
1506'
1505'
1504'
1503'
1502'
1501'
1499'
1498'
1497'
1496'
1494'
1493'
1617'
1627'
1636'
1646'
1656'
1666'
1676'
1686'
1696'
1706'
1716'
1726'
1736'
1746'
1755'
1765'
1775'
1785'
1795'
1805'
1815'
1825'
1835'
1844'
1855'
1865'
1875'
1885'
1894'
1905'
1915'
1924'
1934'
1944'
1954'
1964'
1974'
1984'
1994'
2004'
2013'
2024'
2034'
2043'
2053'
2063'
2073'
2083'
2093'
2103'
2113'
2123'
2133'
2143'
LONG.(W)
02' 28.443"
02' 28.406"
02' 28.359"
02' 28.337"
02' 28.291"
02' 28.259"
02' 28.226"
02' 28.193"
02' 28.151"
02' 28.110"
02' 28.083"
02' 28.044"
02' 28.008"
02' 27.976"
02' 27.939"
02' 27.897"
02' 27.870"
02' 27.817"
02' 27.801"
02' 27.756"
02' 27.725"
02' 27.691"
02' 27.648"
02' 27.620"
02' 27.575"
02' 27.548"
02' 27.513"
02' 27.474"
02' 27.438"
02' 27.407"
02' 27.363"
02' 27.331"
02' 27.297"
02' 27.256"
02' 27.216"
02' 27.187"
02' 27.148"
02' 27.116"
02' 27.087"
02' 27.042"
02' 27.005"
02' 26.971"
02' 26.934"
02' 26.898"
02' 26.868"
02' 26.836"
02' 26.793"
02' 26.762"
02' 26.724"
02' 26.684"
02' 26.652"
02' 26.618"
02' 26.580"
02' 26.544"
151'
151'
151'
151'
151'
151'
151'
151'
151'
151·
151'
151'
151'
151'
151'
151'
151'
151'
151'
151·
151'
151'
151'
151'
151'
151'
151'
151'
151'
151'
151'
151'
151'
151'
151·
151'
151'
151'
151'
151·
151'
151'
151·
151'
151'
151'
151·
151·
151'
151'
151'
151·
151'
151·
(N)
21.202"
21.103"
21.008"
?O. 910"
20.812"
20.716"
?0.617"
?0.519"
20.424"
20.328"
20.225"
20.130"
20.033"
19.935"
19.842"
19.739"
19.642"
19.545"
19.445"
19.348"
19.250"
19.152"
19.053"
18.958"
18.860"
18.763"
18.665"
18.565"
18.475"
18.370"
18.274"
18.179"
18.079"
17.986"
17.885"
17.787"
17.689"
17.595"
17.494"
17.396"
17.304"
17.200"
17.102"
17.006"
16.908"
16.811"
16.713"
16.618"
16.518"
16.421 "
16.322"
16.226"
16.128"
16.029"
LAT.
70· 20'
70· 20'
70' 20'
70· ?O'
70· 20'
70· 20'
70' ?O'
70' ?O'
70· 20'
70· 20'
70· 20'
70' 20'
70· 20'
70' 20'
70' 20'
70· 20'
70· 20'
70' 20'
70· 20'
70· 20'
70· 20'
70· 20'
70· 20'
70· 20'
70' 20'
70· 20'
70· 20'
70· 20'
70· 20'
70· 20'
70· 20'
70· 20'
70· 20'
70· 20'
70· 20'
70' 20'
70· 20'
70· 20'
70· 20'
70· 20'
70' 20'
70· 20'
70' 20'
70' 20'
70· 20'
70' 20'
70· 20'
70· 20'
70' 20'
70· 20'
70' 20'
70' 20'
70' 20'
70' 20'
x
371,685.60
371,686.73
371.688.17
371.688.72
371,690.14
371.691.07
371.692.02
371.692.98
371,694.26
371,695.50
371,696.24
371,697.39
371,698.48
371.699.38
371,700.50
371,701.77
371.702.51
371,704.15
371,704.52
371,705.92
371,706.81
371,707.80
371,709.10
371,709.87
371,711.26
371.712.00
371,713.04
371,714.18
371,715.28
371.716.13
371.717.49
371,718.42
371,719.40
371,720.66
371,721.83
371.722.68
371.723.84
371,724.77
371.725.60
371,726.94
371,728.07
371,729.06
371,730.13
371,731.19
371.732.05
371,733.00
371,734.28
371,735.18
371,736.31
371,737.50
371,738.44
371,739.42
371,740.55
371,741.60
(3).
5.97L~, 741.17
5.97Lj·,731.13
5.974.721.46
5.974·.711.45
5.974,701.48
5.974.691.64
5.974.681.62
5.974.671.61
5.974.661.90
5.974.652.12
5.97,~.641.66
5,974,631.95
5,974,622.10
5.974.612.15
5.974.602.64
5,974.592.18
5,974·,582.28
5,974,572.39
5,974.562.21
5.974.552.30
5,97':,542.33
5,97£t,532.34
5,974,,522.31
5.974.512.60
5.97fr.502.63
5,974.492.75
5,97~~,482.74
5,974.472.57
5,974.463.34
5,974,452.65
5,974.442.90
5,97+,433.20
5,974,423.05
5,974,413.52
5.97J,403.28
5.974.393.27
5.974,383.33
5,97~}.373.69
5,97~}.363.45
5,974.,353.42
5,97<~,344.11
5,97'~,333.52
5.974,323.53
5,974,313.77
5,97L,·.303.80
5,97'_,,293.84
5,974,,283.88
5,97~·,274.18
5,974,264.07
5,97',,254.19
5,974,244.05
5,97L~.234.27
5,974,224.26
5,974,,214.18
WELL
CD2-1
CD2-2
CD2-3
CD2-4
CD2-5
CD2-6
CD2-7
CD2-8
CD2-9
CD2-10
CD 2 -11
CD2-12
CD2-13
CD2-14
CD2-15
CD2-16
C02-17
C02-18
CD2-19
CD2-20
CD2- 21
CD2-22
CD2-23
CD2-24
CD2-25
CD2-26
CD2-27
CD2-28
CD2-29
C02-30
C02-31
C02-32
C02-33
C02-34
C02-35
C02-36
C02-37
CD2-38
CD2-39
CD2-40
CD2-41
CD2-42
CD2-43
CD2-44
CD2-45
C02-46
CD2-47
CD2-48
CD2-49
C02-50
C02-51
C02-52
CD2-53
C02-54
CD2-55
C02-56
C02-57
C02-58
C02-59
CD2-60
*
*
*
NOTES
1. COOROINA TES SHOWN HEREON ARE ALASKA STATE PLANE. ZONE 4, NAO 27.
2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.)
3. * INOICAfES OA TA PER LOUNSBURY AS-BUILT.
ALPINE
CD
4
UNIT:
REV:
3
OF
MODULE: CD20
ALPINE PROJECT
CD-2 WELL CONDUCTORS
AS-BUILT LOCATIONS
21 I PART: 2
ps
Alaska, Inc..
I DRAUR:t G :~A-ED20-
. Y
ConocoPhilli
05-27-01
CADD FILE NO.
01-02-05-
&
"-I'
,
it
t
Area of
~
J ConocoPhillips Alask!c.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
. y
ConocoPhillips
September 10, 2004
Alaska Oil and Gas Conservation Commission
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501
Re: Application for Permit to Drill
CD2-54
Dear Sir or Madam:
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore injec{¡on well
from the Alpine CD2 drilling pad. The intended spud date for this well is October 1 S\
2004. It is intended that Doyon Rig 19 drill the well.
The intermediate section of CD2-54 will be drilled and landed in the Alpine sand
horizontally; 7" casing will then be run and cemented in place. CD2-54 will be
completed as an open hole injector. At the end of the work program the well will be shut
in awaiting surface connection. V-
Note that it is planned to drill the surface hole without a diverter. There have been 51
wells drilled on CD2 pad with no significant indication of gas or shallow gas hydrates.
It is also requested that the packer placement requirement be relaxed to place the
packer 300 ft TVD above the Alpine formation. This will place the completion at a
maximum incÌination less tlìàn 65 degrees, and allow access to the completion with
standard wireline tools for future intervention.
Further, ConocoPhilips, Alaska Inc. requests 14 days are allowed between BOPE
testing intervals. Any well control instance in' which the BOP equipment is utilized to
control flow will be reported to the AOGCC promptly.
Please ,find attached the information required by 20 ACC 25.005 (a) and (c) for
your review. Pertinent information attached to this application includes the
following:
1. Form 1 0-401 APPLICATION FOR Permit to Drill per 20 ACe 25.005 (a).
2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1).
3. A prpposed drilling program
4. A drilling fluids program summary.
5. Proposed completion diagram.
6. Pressure information as required by 20 ACC 25.035 (d)(2).
7. Directional drilling / collision avoidance information as required by 20 ACC 25.050
(b).
Information pertinent to this application that is presently on file at the AOGCC is:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold layout as
required by 20 ACC 25.035 (a) and (b).
2. A description of the drilling fluids handling system.
3. Diagram of riser setup which replaces diverter
ORIGINAL
RECEIVED
SEP 1 02004
Alaska Oil & Gas Cons. Commission
Aochorage
.
.
~
If you have any questions or require further information, please contact Vern Johnson or
Zane K\Jenzler at 265-6081 or 265-1308, respectively. Chip Alvord can also be reached
by calling 265-6120.
Sincerely,
~~/w
Zane Kuenzler
Drilling Engineer
Attachments
cc:
C02-54 Well File / Sharon Allsup Drake
Chip Alvord
Vern Johnson/Zane Kuenzler
Cliff Crabtree
Steve Moothart/Jeff Yeaton
Nancy Lambert
Lanston Chin
e-mail :
ATO 1530
ATO 1700
A TO 1702/1704
ATO 1768
A TO 1756/1752
Anadarko - Houston
Kuukpik Corporation
Tommy_Thompson @anadarko.com
JlA
!'"1
I .
I.)
.
.
Manhattan Bank USA, N.A. Valid Up To 5000 Dollars ~ L
~'pHASE :::.,",-~_."" d I/¡'d~,'
~, . ~YA-§/:..Jt '..
MEMO .8 ... ? . ~ 0 ? ~ 2 ? bill .0 b ~
1:0 ~. .00.......1.2.
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRlA TE LETTERIP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
�( CDz- s;Lj'
WELL NAME
PTD#
zoL(~ /7<6
])évelopment
V Service
CHECKWBAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API number
last two. (2) digits
are between 60-69)
Exploration
Stratigraphic
"CLUE"-
Tbe permit is for a new weHbore segment of
existing wen· .
Permit No, . API No.
Production. sbould continue 10 be reported as
a function' of tbe original API number. stated
above.
HOLE In accordance witb 20 AAC 25.005(1), an
records, data and logs acquired for tbe pilot
hole must be dearly differentiated In botb
name (name on permit plus PH)
and API Dum ber (50
70/80) from records, data and logs acquired
for well (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Tbe permit is approved subject ·to full
compliance witb 20 AAC 25.05S~ Approval to
perforate and produce is contingent upon
issuance of ~ conservation order approving a
spacing exception.
(Company Name) assumes tbe liability of any
protest 10 tbe spacing .exception tbat may
occur.
AU dry ditch sample sets submitted to tbe
Commission must be in no greater ·than 30'
sample intervals from below tbe permafrost
or from wbere samples are first caught and
10' sample h:iter:vals through target zones.
Field & Pool COLVILLE RIVER, ALPINE OIL -120100 Well Name: COLVILLE RIV UNIT CD2-54 Program SER Well bore seg D
PTD#: 2041780 Company CONOCOPHILLlPS ALASKA INC Initial ClasslType SER I PEND GeoArea 890 Unit 50360 On/Off Shore On Annular Disposal D
Administration 1 Pe(lTJit fee attached. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2Leasenumberappropri~te . . . . . . . . . . . . . . . . . . . . . . . . . . .. yes...... Surface loçaJion in ADL38Q075;well pas.ses th(oUgh.AOL. 3872"1.; P(od JnL& TO on ,ð.SRC : fe.e.ac(eç¡ge. .
3 9.nlque welln.ame.a!ld OUlTJb.er . _ . . . _ _ _ . _ . . . . . . . . . . . . . . . . _ . . . . . . . . . . . Yes. . . _ . . _ _ _ . . . _ . . . . . . . . . . . _ _ . _ . . . . . . _ . . . . . . . . . . . . . . . . . . . . _ . _ _ _ . . . . _ . . . . . . . . . .
4 WeIlJocç¡tedln.ad.efinedpool............. . yes..... . Colvil!e RiverUoit,AlplneOiIPool,goyer!led by.CQ44.3, .......... ..............
5 Well Jocated proper.dlstance.fromdriJling unilbound.a(y. . ........... ..... yes..... .WelJisJocatedwithil1theCRU.withinthe.exlsting.Alpine.PA.~odwithinJbeaffectedareaof.CQ443,... .
6 WelUocated proper .dlstance. from otber welJs. . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. ......... . . . . . . . . .
7 .S.ufficienl.acreageaYail~ble indJilIiog unil. . . . . . . .. ...... . . . . . . . . . . . Yes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8 Jf.deviated. is weJlbore plaUocJu.ded . . . . . . . . . . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9 .Ope(ator onl~ affected party. . . . . . . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10 .Ope(ator bas. appropriate. bond inJorce _ _ _ _ _ _ _ . _ . . . _ . . . _ . . . . . _ . . . . . . . . . . Yes. _ . . . _ _ _ _ _ . . . . . . . . . . . . . _ _ _ _ . . . _ _ . _ , , . . . . . . . . . . . . . . . . _ . . . . _ _ _ _ , . , . , , . . . . . . . _
11 Pe(lTJit Gc8!l Þe issued witbout co.nservation order. . . . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Appr Date 12 PeunitGc8!l Þe issued witbout admioist(ative.approvaJ . . . . . . . . . . . . . . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SFD 9/15/2004 13 Can permit be approved before 15-day wait Yes
14 WellJocated within area and,strç¡taauthorized by njectioo Orde( # (PutlO# in.comm.entsHFor. Yes. ,... ,ð.rea Injectio.n.Qrder NO..18A . . . . . . . . . . . . . . . .. .....,... . . . . . . . . . . . . .
15 .AJI we!)s.wit!1ln Jl4.lTJile.area.of (eyiew id.eotified (FO( seNic.e.well ool~L " ., _ , . _ , . . . . Yes. . . . . . . ~on.e. . . _ . . . . . . . . . . . . . . . . . , . _ _ . _ , . , . . , . _ . . . . . . . . . . . . . . . . . . . . . . . _ , , . . . .
16 PJe-produ.ced i!ljector; dur~tionof pre-productiooless thal13 months (For.servlce wel! onJy) . . No. .................... . . . . , . . . . . . . . . . . .
17 .ACMP Finding of Conslstency.h.as Þee.n .Issued. forJbis pr.oject. . . . . , . . . . . . . NA . . . . . . . WilLbe .drilled from .a!l existlng pad. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18 .C.o!lductor st(ingpJovided . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . .. ,. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19 .S.ucraœcasingpJotectsall.knowI1USOWs............. .,.....,....... NA...... .~oaquifers.pe(AIOJB,ð...c.onclusion.3,. ........................
20 .CMTvoladequ.ateJo circ.ulate.on.cood.uctor.& SUJf.csg . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21 .CMTvoladequateJotie-lnJong.stri!lgto.sucrçsg........ .....,........... No....... .,ð.on.ula(disposalmay be propo.sed.. ....... .................
22 .CMTwill coyer.aU koown-Pfo.ductiye boriZOl1s. . . No. .. ,... Openhole.completionpla!loed, .......................,... . . . . . . . .
23 .C.asing designs adeQua.te fo( C.T~ B&pel11Jafrost . . . . . . . . . . . . . . . . . . . . Yes. . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
24 Adequ~tetankage.oJ re.serve pit. . . . . . . . . . Yes. . . . . . . Rig isequippe.dwith steeLpits. No rese.rve.pitp!anoed, Wast to .approv.ed aOl1u!us O( disP.osal welt.
25 Jf.aJe-d(iII~ has a 10-403 for ~bandOl1lTJent been apPJoved. ...... ,.. . . . . . . . . NA . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . .
26 .Mequ~tewellbore s.eparatio.npropos.ed. . . . . . . . . . _ _ . _ _ _ _ _ _ , _ , , , . . . . . . . . Yes. . . . . . . I?roximlt~ anjilysiS perfp(lTJe.d, Jrayeling c~linder path calcuJate.d, ßy(OS pos.slble, . . . . . . _ _ _ _ _ . . . . . . . .
27 Jf.divecter Jeq.uired, does it meet reguJatioos . . . . . . . . . . . . . . . . . . NA . . . . . . . Diyerter waiveJ has. beeo givenJorC02.p.ad.. . . . . . . . . . . . . . . . . .
28 .DJiUingfJuid.RrogralTJschematic&equipJistadequate. ............ yes.... . MaxilTJulTJexpectedfounati0l1pressure.8'?EMW.. MWplal1ned9.0,,9.6ppginAJpine, ............
29 BOPEs.dothey meet reguJa.tioo . . . . . . . . . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
30 .BOPE-Pfess ra.ting approp(iate;Jestto.(put psig in.commeots). ................ . Yes. . . . . . MAS¡=> çalcuJate.d.at 2619psi, CPAI plans to tesUo 35.00 psi.. . . . . . . . . . . . . . . . . . . . . . . .
31 .C.hoke.lTJanifold cOlTJpJies w/Al?lRF'-53 (May 84) . . . . . . . . . . . . . . . . . . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
32 Work will occ.U( withoutoperationshutdown . . . . . . . . . . . . . . . . . . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
33 Js presence of H2S gas probaÞle . . . . . . . . . . . . . . . . . . . . . . No. . . . . . . . . . . . . . . . . . . . . . . . . . . .
34 Mecha.nical.coodJtio!l pf wells wlthin ,ð.OR verified (for service we!) onJy). . . . . . . Yes. . . . . ~o wells in. area. of review, . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
.
Engineering
Appr Date
TEM 9/15/2004
tø~~
a
Appr
SFD
Date
9/15/2004
35 Pe(lTJitGc8nÞeissuedw/o.hyd(ogel1s.u!fidemeas.u(es... yes............... ....................... .........
36D.atapJeseoted on. potential overpressure .zooes. . . . . . . . . . . . . . . . . . . . . Y.es . . . . . . . Expected reservoir preSSUJe is .8,7.ppg EMW; wilLbedrilled with 9.0 ~ 9.6. ppg mud.. . . . . . . . . . . . . . . . . . .
37 .Setsmicanalysis. of shaJlow gas.z.ones. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
38 .Seabedconditioo survey (if Off-sho(e) . . . . . . . . . . . . . . . . . . . . . . . NA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
39 . Conta.ct namelp!1onefor.weekly progress.reports [exploratoryonlYl . . . . . . . . NA . . . . . . . . . . . . . . . . . . . . . . . . .
Geology
Geologic ~/ ",,] Engineering
commissi~n~r: . Y n.· 1(, lJ1 Commissioner:
g~~~~~NE('~~r
Date
Public
~;""e'
Date
ßµýC
e
-
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding infonnation. information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
.
Sperry-Sun Drilling Services
LIS Scan Utility
.
ZDtf- 17g
$Revision: 3 $
LisLib $Revision: 4 $
Wed Nov 17 09:44:38 2004
Reel Header
Service name....... ......LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/11/17
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name.... ......... ...UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library.
~
J 9 u/~
Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/11/17
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.... .......... ..UNKNOWN
Continuation Number......01
Previous Tape Name. ..... . UNKNOWN
Comments................ .STS LIS Writing Library.
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Colville River Unit (Alpine)
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
CD2-54
501032049900
ConocoPhillips Alaska, Inc.
Sperry-Sun Drilling Services
17-NOV-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
MW0003317391
M. HANIK
D. LUTRICK
MWD RUN 3
MW0003317391
M. HANIK
D. LUTRICK
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
2
11N
4E
2103
1497
MSL 0)
52.28
15.90
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE
BIT SIZE (IN)
8.500
6.125
CASING
SIZE (IN)
9.625
7.000
DRILLERS
DEPTH (FT)
3345.0
14378.0
#
.
.
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUN 1 WAS DIRECTIONAL ONLY AND IS NOT PRESENTED.
4. MWD RUNS 2 & 3 COMPRISED DIRECTIONAL WITH DUAL GAMMA
RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS¡
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4)¡ AND PRESSURE WHILE
DRILLING (PWD). RUN
2 ALSO INCLUDED GEO-PILOT ROTARY STEERABLE BHA. RUN
3 INCLUDED AT-BIT
INCLINATION (ABI).
5. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE
LOGGING
REQUIREMENTS AT PHILLIPS/VENDOR MEETING HELD ON 26
SEPTEMBER 2001.
6. MWD RUNS 1 - 3 REPRESENT WELL CD2-54 WITH API#:
50-103-20499-00. THIS
WELL REACHED A TOTAL DEPTH (TD) OF
16617'MD/7350'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/11/17
Maximum Physical Record..65535
File Type.... .... ...... ..LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
1
and clipped curves¡ all bit runs merged.
.5000
START DEPTH
3316.0
3316.0
3316.0
3316.0
3316.0
3324.0
STOP DEPTH
16566.5
16566.5
16566.5
16566.5
16566.5
16559.5
.
ROP
$
3358.5
16617.0
.
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
$
BIT RUN NO
2
3
MERGE TOP
3316.0
14387.5
MERGE BASE
14387.5
16617.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type.... ....... .., ....0
Data Specification Block Type.....O
Logging Direction............ .... . Down
Optical log depth units. ... ...... .Feet
Data Reference Point.. ... ..... ....Undefined
Frame Spacing.......... ......... ..60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3316 16617 9966.5 26603 3316 16617
ROP MWD FT/H 1 826.47 165 26518 3358.5 16617
GR MWD API 36.49 421. 69 107.626 26472 3324 16559.5
RPX MWD OHMM 0.19 1199.48 8.0981 26502 3316 16566.5
RPS MWD OHMM 0.13 1728.56 9.13245 26502 3316 16566.5
RPM MWD OHMM 0.13 2000 11.1628 26502 3316 16566.5
RPD MWD OHMM 0.13 2000 16.2327 26502 3316 16566.5
FET MWD HOUR 0.15 97 .12 0.940795 26502 3316 16566.5
First Reading For Entire File........ ..3316
Last Reading For Entire File.......... .16617
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.... .......1.0.0
Date of Generation...... .04/11/17
Maximum Physical Record. .65535
File Type............... .LO
Next File Name...... .....STSLIB.002
.
Physical EOF
File Header
Service name.......... ...STSLIB.002
Service Sub Level Name...
Version Number.. ........ .1.0.0
Date of Generation.......04/11/17
Maximum Physical Record..65535
File Type.......... ......LO
Previous File Name.... ...STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPX
FET
RPD
RPS
RPM
GR
ROP
$
2
.
header data for each bit run in separate files.
2
.5000
START DEPTH
3316.0
3316.0
3316.0
3316.0
3316.0
3324.0
3358.5
STOP DEPTH
14345.5
14345.5
14345.5
14345.5
14345.5
14353.0
14387.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
11-0CT-04
Insite
66.37
Memory
14388.0
3358.0
14388.0
59.7
87.5
TOOL NUMBER
124725
151812
8.500
3345.0
LSND
9.60
42.0
9.0
300
6.0
1. 700
.840
2.100
2.200
76.0
159.8
76.0
76.0
.
.
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type........ ... .......0
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record. .......... ..Undefined
Absent value.... ... .............. .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3316 14387.5 8851.75 22144 3316 14387.5
ROP MWD020 FT/H 2.52 826.47 174.749 22059 3358.5 14387.5
GR MWD020 API 43.92 421.69 115.449 22059 3324 14353
RPX MWD020 OHMM 0.34 57.26 5.8843 22060 3316 14345.5
RPS MWD020 OHMM 0.13 1728.56 6.13903 22060 3316 14345.5
RPM MWD020 OHMM 0.13 1809.23 6.90747 22060 3316 14345.5
RPD MWD020 OHMM 0.13 2000 11.2823 22060 3316 14345.5
FET MWD020 HOUR 0.15 54.1 0.603738 22060 3316 14345.5
First Reading For Entire File... ...... .3316
Last Reading For Entire File......... ..14387.5
File Trailer
Service name........... ..STSLIB.002
Service Sub Level Name. . .
version Number.......... .1.0.0
Date of Generation...... .04/11/17
Maximum Physical Record..65535
File Type................ LO
Next File Name........ ...STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name. . .
Version Number. ......... .1.0.0
.
Date of Generation...... .04/11/17
Maximum Physical Record..65535
File Type............... .LO
Previous File Name.... ...STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
GR
ROP
$
3
.
header data for each bit run in separate files.
3
.5000
START DEPTH
14346.0
14346.0
14346.0
14346.0
14346.0
14353.5
14388.0
STOP DEPTH
16566.5
16566.5
16566.5
16566.5
16566.5
16559.5
16617.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
16-0CT-04
Insite
66.37
Memory
16617.0
14388.0
16617.0
88.8
92.3
TOOL NUMBER
156436
123943
6.125
14378.0
Flo Pro
9.20
43.0
8.7
30500
3.6
.120
.060
.160
.200
76.0
167.0
76.0
76.0
#
.
.
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type. ....0
Logging Direction..... ............Down
Optical log depth units.......... .Feet
Data Reference Point........... ...Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value.................... ..-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 14346 16617 15481. 5 4543 14346 16617
ROP MWD030 FT/H 1 729.06 116.769 4459 14388 16617
GR MWD030 API 36.49 124.18 68.5233 4413 14353.5 16559.5
RPX MWD030 OHMM 0.19 1199.48 19.0923 4442 14346 16566.5
RPS MWD030 OHMM 0.22 1201.26 23.9985 4442 14346 16566.5
RPM MWD030 OHMM 0.55 2000 32.2958 4442 14346 16566.5
RPD MWD030 OHMM 0.3 2000 40.8178 4442 14346 16566.5
FET MWD030 HOUR 0.29 97.12 2.61469 4442 14346 16566.5
First Reading For Entire File........ ..14346
Last Reading For Entire File... ..... ...16617
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number..... ......1.0.0
Date of Generation...... .04/11/17
Maximum Physical Record. .65535
File Type............... .LO
Next File Name..... ... ...STSLIB.004
Physical EOF
Tape Trailer
Service name....... ......LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/11/17
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments...... ... ..... ...STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name. . . . . . . . . . . . .LISTPE
, .
Date.. ...... ............ .~11/17 4IIÞ
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name... ............ . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File